Loading...
HomeMy WebLinkAboutR_6060_SCITY OF COSTA MESA JJ c=:, PROJECT LOC/\TIC\J LEGEND: EXISTING CURB PROPOSED STRIPING EXISTING AC BERM EDGE OF PAVEMENT EXISTING STRIPING SHARED LANE BIKE LANE PEDESTRIAN LANE VICINITY MAP I,JOT TO SC;ILE EDGE MARKER LOCATIONS Know what's below. Call before you dig. SIGN "A" RS-1 IWRONGI I WAY I R5-1a 1[ BIKES II ~XEMPTI! SIGN "B" ---.. ·- SIGN "C" RECORD DRAWINGS 11 ALL USERS • SPEED LIMIT 15 SIGN "D" rr··--",n'·······D I ALL USERS I ' SPEED ' LIMIT 1 5 I" , i'l1 !i1: 11', ·1\!!i! 11,1 •':: SIGN "E" r:iese F:ecord Jr:Jw ngs r-Jve been prepared based 0.1 infor:-ncticr: submitted, in oart, by other':o. Whiie tr·,.s into~rnation ·s ~e!ievee: to be relioo!e, City of Newpurt. Beach is not responsible fer ii.s accurucy, no; for errors o; omissions which may have been incorpcroted : ·nto tlcsc plans as a rest,_;IL . . .. . ... . ., . GENERAL NOTES 1. ALL WORK, MATERIALS, AND EQUIPMENT SHALL CONFORM TO CALTRANS STANDARD PLANS AND STANDARD SPECIFICATIONS DATED 2010, CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DFViCES (CA MUTCD). 2014 EDITION, AS SHOWN HEREON AND IN 'HE SPECIAL PROVISIONS. 2. THE CONTRACTOR SHALL COORDINATE WITH THE Cl,Y OF NEWPORT BEACH FOR ALL WORK. 3. ALL S,RIPING SHALL. BE SPRAYABLE, REFLECTORIZED THERMOPLAST!C UNLESS OTHERWISE NOTED. 4. REMOVE ALL EXISTING/CONFL'CTING PAVEMENT STRIPING AND PAVEMENT LEGENDS BY GRINDING AND/OR ETCHING. 5. APPLY TYPE 1 SLURRY SEAL TO BACK BAY DRIVE '"ROM EASTBLUFF TO SHELLMAKER. I 6. THE TYPICA.L CROSS SECTIONS ARE SHOWN ON THIS SHEET. ALL LANE MEASUREMENTS SHALL START FROM EDGE OF PAVEMENT (EP) DN THE EASTERLY SIDE OF BACK BAY DRIVE (SIDE FURTHEST AWAY FROM THE BAY). FINAL STRIPl~G LAYOUT SHALL BE DETERMINED IN THE FIELD BY THE CITY TRAFFIC ENGINEER OR DESIGNEE. 7. ALI. STRIPING SHA.LL BE CAT-TRACKED AND APPROVED BY THE CITY PRIOR TO THE IN STAI.LA TION OF FINAL STRIPING. 8. ALL SIGNS SHALL BE INSTALLED USING STAINLESS STEEL HARDWARE AND BE ON NEW PRESSURE TREATED 4"X4" 1/1000 POSTS UNLESS OTHERWISE SHOWN. PUBLIC WORKS DEPARTMENT 9. ALL OBJECT MARKERS, EDGE M~.RKERS AND STORM DRAIN MARKERS SHALL BE INSTALLED ON A UNI-STRUT POST AT .A HEIGHT OF 30 INCHES IO lHE TOP OF SIGN. R3-2 BACK BAY DRIVE ROADWAY MAINTENANCE PROJECT C-6005 DAVID A. WEBB, P.E., PUBLIC WORKS DIRECTOR MARK VUKOJEVIC, P.E , DEPUTY PWD / CITY ENGINEER [I ALL USERS I] R10-31P(MOD) I CROSS TRAFFIC DOES NOT STOP W4-4P OM2-2V 1 1 OM2-2V (MOD) SIGN "F" SIGN "G" R26A( CA)(MOD) CATE: ______ _ 10. ALL SiGMS LOCATIONS SH.~'cL BE APPROVED BY THE CITY PRIOR TO INSTALLATION. 11. ALL SIGN DESIGNS SHALL BE SUBMITTED TO THE CITY FOR APPROVAL. 12. ALL SIGNS SHALL BE INSTALLED A MINIMUM OF TWO FEET OUTSIDE OF THE TRAVELED PATH UNLESS OTHERWISE NOTED. 13. ALL PAVEMENT LEGENDS SHALL BE SPACED APPROXIMATELY 250 FEET OR AS DIRECTED BY THE CITY. 14. NUMBERED STORM DRAIN MARKERS (OM2-2V(MOD)) SHALL BE POSTED '0 MARK STORM DRAIN INLETS ON THE EAST SHOULDER. MARKERS SHAU, BE LOCATED OUTSiDE DF THE PAVEMENT, FACE SOUTH, AND GE IMMCDIATELY ADJACENT TO STORM DRAIN .. 15. EDGE MARKERS (OM2-2V) SHALL BE PLACED WrlERE SHOWN ON THE PLANS WITH MARKERS AT THE BEG!NNING AND END OF ZONES AND SPACED AT 100 FEET WITHIN. MARKERS SHALL BE LOCATED OUTSIDE OF THE PAVEMENT, M!NiMUM 1 FOOT FROM THE ROADWAY SURFACE ON fHE EAST SHOULDER, AND MINIMUM 4 FEET FROM ROADWAY SURFACE ON THE WEST SHOULDER. 16. OBJECT MARKERS SHALL BE LOCATED IMMEDIATELY IN FRONT OF OBJECT. 17. ALL CHANGES TO PROPOSED SIGN LOCAT!ONS SHA.LI. BE APPROVED BY THE CITY. 18. THE CONTRACTOR SHALL FURNISH THE PEDESTRIAN. BICYCLE, AND SHARROW STENCILS TO THE CITY OF NEWPORT BEACH AT THE COMPLETION OF CONSTRUCTION. ALL STENC'LS SHALL BE CONSISTENT WiTH THE 2014 CA MUTCD. 19. REMOVE AND SALVAGE t,LL EXISTING EDGE MARKERS, STORM DRAIN MARKERS, INTERSECTION MARK[RS, ANO POST MILE SIGNS. 20. MILE MARKER SIGNS {SIGN "F") SHALL BE PLACED AT THE BEGINNING AND THE END OF EACH SEGMENT, AND AT 0.25 MILE INTERVALS. NB MILE MARKERS TO BEGIN AT SHELLMAKER AND SAN JOAQUIN HILLS. SB MILE MARKERS TO BEGIN AT EASTBLUFF 1\ND SAN JOAQUIN HILLS. 0- 0- 0- 0- 0- 0-- 0- 0- IT}- @)- 0-- @}-- @]- & @]- ~ @]- CONSTRUCTION NOTES INSTALL 4" WHITE EDGE UNE, DETAIL 278. INSTALL 4" SOLID YELLOW CENTER LINE. INSTALL 4" SOLID YELLOW HATCH LINE AT 15' SPACING. INSTALL PAVEMENT LEGEND A.S SHOWN. FURNISH AND INSTALL NEW SIGN AND WOOD POST AS S~OWN. INSTALL 4" SKIP YELLOW CENTER UNE (3' UNE, g' GAP). INSTALL 12" LIMIT, CROSSWALK OR ROADWAY MARKING LINE ft.S SHOWN. RAISE EXiSTING R1-1 (STOP) SIGN ABOVE EXISTING R3-2 (NO LEFT TLRN) SIGN. FURNISH AND INSTALL NEW SIGN "g" BELOW R3-2 (NO LEFT TURN) SIGN. INSTALL SIGN ON EXISTING POST AS SHCWN. INSTALL EXISTING SIGN ON A NEW WOOD POST. INSTALL DOUBLE YELLOW CENTER LINE. INSTALL 8" WHITE CHANNELIZING LINE, DETAIL 38A. INSTALL 4" SKIP WHITE LINE (3' LINE, 9' GAP). FURNISH AND INSTALL EDGE MARKER A.S SHOWN. REALIGN EXISTING K-RAiL FOR PATH OF TRAVEL. INSTALL 6" WHITE BIKE LANE LINE. DETAIL 39. FURNISH AND INSTALL SIGN ON DELINE A TOR POST ON !OP OF K-RAIL AS SHOWN. u 0 r u [ Q J) N ,.() ...... CJ '7 ...... N CD s u en >, 0 '.D cc 0 0 '.D (/) en 0, C s Q CJ / w C 0 ---------------------1"- SHEET INDEX ry C Q f------------------------------------------l;-; TILC: SHEET 2 rlETAII SrlEE- 3-8 SIGNltJG ,\ND STRIPING P!_ANS C-6005 VJ "' u 0 '.D N 0 ...----------------------------.-------------,-----------,,---------------------..--------------------------------10 :lEVIEWED: APPROVAL ':ECOM11ENDEC: APPR'.lVAL RECOMMENDEC: REVl'WEO (714) 992-,2990 FAX 992-2883 ANTCNY BR'NE, ~CE 1,5521 C TY TR~.FFIC ENGINEER L • TITLE SHEET i - BR,\D SOMMERS. ~CE 65241 SENIOR CIVIL E'IGINEER BACK BAY DRIVE t 0 (l) SHELLMAKER ROAD TO EASTBLUFF ROAD n ~ L 1-----------------------.,..----------10 CL " Q) z / © ® @ CONSTRUCTION NOTES= [TI-INSTALL 4" WHITE EDGE IJNE, DETAIL 278. 0--INSTALL 4" SOLID YELLOW ClNTER LINE. 0-INSTALL 4" SOLID YELLOW HATCH L!NE AT 15' SPACING, 0-INSTALL PAVEMENT LEGEND AS SHOWN. 0-FURNISH AND INSTALL NEW SIGN AND WOOD POST AS SHOWN. 0-INSTALL 4" SKIP YELLOW CENTER LINE {3' LINE, 9' GAP). 0---INST~.LL 12" LIMIT, CROSSWALK OR ROADWAY MARKING LINE AS SHOWN. GENERAL NOTES 1. ALL WORK, MATERIALS, AND EQUIPMENT SHALL CONFORM TO CAL TRANS STANDARD PLANS AND STANDARD SPECIFICATIONS DATED 2010, CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CA MUTCD), 2014 EDlllDN, AS SHOWN HEREON AND IN THE SPECIAL PROVISIONS. 2. THE CONTRA,CTOR SHALL COORDINATE 1'11TH THE CITY OF NEwPORT BEACH FOR ALL WORK. 3. ALL STRIPING SHALL BE SPRAYABLE, REFLECTOR!ZED THERMOPLASTIC UNLESS OTHERV~SE NOTED. 4. REMOVE ALL EXISTING/COl✓FUCTING PAVEMENT STRIPING ANO PAVEMENT LEGENDS BY GRINDING AND/OR ETCHiNG. 5. APPLY TYPE 1 SLURRY SEAL TO BACK BAY DRIVE FROM EASTBLUFF TO SHcLLMAKER. 6. THE TYP!CAL CROSS SECTIONS ARE SHOWN ON THIS SHEET. ALL LANE MEASUREMENTS SHALL START FROM EDGE OF PAVEMENT (EP) ON THE EASTERLY SIDE OF BACK BAY DRIVE (SIDE FURTHEST .~WAY FROM THE BAY)-FINAL STRIPING LAYOUT SHALL BE REVIEWED/APPROVED BY THE CITY TRAFFIC ENGINEER OR OESIGNEE. [II--RAiSE EXISTING R1-1 {STOP) SIGN ABOVE EXISTING R3-2 {NO LEFT TURN) SIGN. FURNISH AND INSTALL NEW SIGN •s" BELOW R3-2 (NO LEFT TURN) SIGN. 7. ALL STRIPING SHALL BE CAT-TRACKED AND APPROVED BY THE CITY PRIOR TO THE INSTALLATION OF FINAL STRIPING_ 8. ALL SIGNS SHALL BE INSTALLED USING STAINLESS STEEL HARDWARE AND BE ON NEW PRESSURE TREATED 4"X4" WOOD POSTS UNLESS OTHER'll1SE SHOWN. Section A-A ® Section B-B CONTOUR UN[~ s,oPrn Ac '__~s· 5, I 5, I Section C-C Section D-D AC BERM -~ , EP ls·ls·I 9'6" C Section E-E ® Section F-F AC BERM" 1 VAR I 10· ,, AC BERM r CURB - " /CURB i6''7'' 9•70• r Section G-G ® Section H-H Typical Cross Sections Back Bay Drive (She!!maker Road to Eastbluff Drive) SIGN LEGEND= S!GN "A" SIGN SIZES: /-~ //DO NOT'\ l~--~~i \ENTER) ~__/ R5-1 WRONG WAY R5-1a BIKES I EXEMP'lj SIGN "B' SIGN •c• =='"'='ll==:, Ii ALL USERS I SPEED LIMIT 15 SIGN "D" IALL,~~ SPEED LIMIT 15 SIGN "E" 0-INSTALL SIGN ON EXISTING POST AS SHOWN. lill--- Ei]- [ill-- @]- ~ ~ @]- INSTALL EXISTING SIGN ON A NEW WOOD POST. INSTALL DOUBLE YELLOW CENTER LINE. INSTALL 8" WHITE CHANNELIZING LINE, DETAIL 38A. INSTALL 4" SKIP WHITE LINE (3' LINE, 9' GAP). FURNISH AND INSTALL EDGE MARKER AS SHOWN. REALIGN EXISTING K--RAIL FOR PATH OF TRAVEL. INSTALL 6" WHITE BIKE LANE LINE, DETAIL 39. E?J-FURNISH AND INSTALL SIGN ON DEUNEATOR POST ON TOP OF K-RAIL AS SHOWN. ,y STOP Ri-1 61. R3-2 [I ALL USERS I] R10-31P(MOD) CROSS TRAFFIC DOES NOT STOP W4-4P SIGN "F" OM2-2V SIGN "G" 1 1 OM2-2V (MOD) NO PARKJNO AN/Tf,IE BEYOND R26A(CA)(MOD) NB SIGNS SB SIGNS OTHER SIGNS --------~~~~~~----·-------·----------------==--=-='--"-'"'--------------1--------------",..__.__.___,...,.....__.___...,,_.-=.___,._,.,.,,__ _____ ~ R1-1 STOP SIGN (30">:30") • R5-1 DO NOT ENTER (30"x30•) N-2(CA) OBJECT MARKER (18"x18·) . R3-2 NO LEFT TURN (24"X24") R5--',a WRONG WPY (30"X24") C2(CA) ROAD CLOSED W1·-1 CURVE WARNING (18"X18") '/14--4P CROSS TRAFFIC DCES NOT STOP (24"X12") TYPE P(CA) OBJECT MARKER (12"X36") W1-8 CHEVRON ALIGNMENT (18"X24") W2-3 INTERSECTION WARNING (18"X18") • WB-18 ROAD M,\Y FLOOD (18"X'c8") W1-5 CURVE WARNING (18"X18") • W8-2 DiP (18"X78") SIGN B BIKES EXEMPT (30"X24") WB-1 BU~IPS (18"X18") SIGN C MULTI-USE TRAiL (36''x48"), TRAIL COURTESY (18"X18") W13-1P ADVISORY SPEED (18"X18") SIGN D ALL USERS (12"X9"), R2-1 {12"X18"), W7-5 (18"X18") W11-2 PEDESTRIAN WARNING (18"X18") R10-31P(MOD) ALL USERS PLAQUE (18"X9") R26A(CA){MOD) NO PAR~ING BEYOND THIS POiNT (18"X24") OM2-2V YELLOW OBJECT Mft.RKER (6"X12") OM2-2V(MOD) YE.LLOW OBJECT MARKER W:TH NUMBERS (6"X12") SiGN A MULTI-USE TRAIL (24"X36"), TRAIL COURTESY {18"X18") SiGN E AU_ USERS (18"X9"), R2-1 (18"X24") SiGN F SPECIAL MILE MARKER (10" DIAMETER) R36{CA) COMMERCIAL VEHICLES OVER 3 TONS PROHIBITED /'.GA ,lch No ,\G/1 F:le Name: Print Date Last Rev:sion 169 -007 BackBal,ST 12/30;15 12/30/15 9. AU OBJECT MARKERS, EDGE MARKERS AND STORM DRAIN MA.RKERS SHALL BE INSTAL:_EO ON A BROWN UNI-ST~UT POST AT A HEIGHT OF 30 INCHES TO THE TOP OF SIGN. 10. ALL SIGNS cOCATiDNS SHALL BE APPROVED BY THE CITY PRiOR TO INSTALLATION. 11. ALL SIGN DESIGNS SHALL BE SUBl11TTED TO THE CITY FOR APPROVAL. 12. ALL SIGNS SHALL BE INSTALLED A MINIMUM OF TWO FEET OUTSIDE OF THE TRAVELED PATH UNLESS OTHER\\1SE NOTED. 13. AUL PAVEMENT LEGENDS SHALL BE SPA.CED APPROXIMATELY 250 FEET OR AS DIRECTED BY THE CITY. 14. NUMBERED EDGE MARKERS (OM2-2V(MOD)) SHALL BE POSTED TO MARK STORM DRAiN iNLETS ON THE EAST SHOULDER. MARKERS SHALL BE LOCATED OUTSIDE OF THE PAVEMENT, FACE SOUTH, AND BE IMMEDIATELY ADJACENT TO STORM DRAIN. 15. EDGE MARKERS (OM2-2V) SHALL BE PLACED WHERE SHOWN ON THE PLANS WITH MARKERS AT THE BEGINNING AND END OF ZONES AND SPACED AT 100 fEET WITHIN. MARKERS SHALL BE LOCATED OUTSIDE OF THE PAVEMENT, MINIMUM 1 FOOT FROM THE ROAOWAY SURFACE ON TrlE EAST SHOULDER, AND MINIMUM 4 FffT FROM ROADWAY SURFACE ON THE WEST SHOULDER. 16. OBJECT MARKERS SHALL BE LOCATED IMMEDIATELY IN FRONT OF OBJECT. 17. AUL CHANGES TO PROPOSED SIGN LOCATIONS SHALL BE APPROVED BY THE CiTY. 18. THE CCNTRACTOR SHA.LL FURNISH THE PEDESTRIAN, BICYCLE, A.ND SHARROW STENCILS TO THE CITY OF NEWPORT BEACH AT THE COMPLETION OF CONSTRUCTION. ALL STENCILS SHALL BE CONSISTENT WITH THE 2014 CA MUTCD. 19. REMOVE AND SALVAGE ALL EXISTING EDGE MARKERS, STORM DRAiN MARKERS, INTERSECTION MARKERS, AND POST MILE SIGNS. 20. MILE MARKrn SIGNS (SIGN "F") SHALL BE PL.'.CED AT THE BEGINNING AND THE END OF EIICH SEGMENT, AND AT 0.25 MILE INTERVALS. NB MILE MARKERS TO BEGIN AT SHELLMAKER AND SAN JOAQUIN HILLS. SB MILE MARKERS TO BEGIN AT EASIDLUFF AND SA.N JOAQUIN HILLS_ RECORD DRAWINGS LEGEND: EXISTING CURB PROPOSED S"TRIPING EXISTING AC BERM EDGE OF PA '/EM ENT EXISTING STRIPING SH~.RED L/'.NE BIKE LANE PEDESTRIAN LANE EDGE M.ARKER LOCATIONS These Record Drawings hove been prepared baserl 01; information subrrit~ed, in port, Jy others. While this :nforrr-::::ition is believed to be reliable, City of Newport Beach :s no: responsib!e for its accuro-:::y, nor for e1Tc-rs or omissicr-s which may have been ·ncorporated into these plans cs u 1-esu!L ALBERT G ROVER& wsOCIATES (714) 992-2990 DESIGNED FAX 992-2883 CA\/ CHECKED MHM - DETAIi. SHEET BACK BAY DRIVE FROM C-6005 TRANSPORTATION CONSULTING ENGINEERS 1-------1·----·---·-----1-----------------1--------l SI-IELLMAKER ROAD TO EASTBLUFF DRIVE f\ 211 E. l~periaL (wy., Suite 208 Fullerton, CA 92835 \ -~-::" ' (\\ ' r,:--= ' \ ;,_¥'-\ f\J.-.,J.J----f--G -2D((., RC.E. NO~ 40956 DATE DRAWN CAV DATE 10/2014 f--01>_.rE.....__sY_,__ ___ o_E_sc_R_1P_T1o_N _____ ..__---1 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT REVISIOflS R-6060-·S SHEET _2 __ OF _JL_ MATCH LINE "A" C'if' I "c" MATCH LINE "B" -~ -, SIGN ANC POST (R5-1a, BIKES EXCEPIED SIGN)~-~-~- :;:'¼1!!.": " .,_,. // 1,;~::~-~ ,r .::~· \ ; ; ; I I ' I I I I 5 '112-3 ,--3{' f' ,,(i;F•~ 8IKES EXCFPTF.) SIGN) BACK BAY DRIVE IJJ--\J 12 1 ~ SCALE:1"=40' LEGEND= EXISTING CURB PROPOSED STRIPING EXISTING AC BERM EDGE OF PAVEMENT EXISTING STRIPING SHARED LANE BIKE LANE PEDESllRIAN LANE EDGE M,\RKER l.OC,\ TIONS SIGN "F" 5 (7.25) ' 1' MATCH LINE "A" ., / ./~·/ . , ...... ,., MATCH LINE "B" RECORD DRAWINGS :hese Rec::>rd Drawings ha\ie :Jeen prepared baseC Dn infvrm,::.ilio,1 submitted, in port, by others. \Nr-ile thls infor'11ctic-n is be::,3ved ~o be reliable, Ci:y cf Ne-.vport Becc'! i;::; not 1! respon~ib•e for its occurocy, 1or fo" e'Ton or omissions wh;ch may hove bcc:1 incorporated into :hese plans as a resu! t. l: AGA Job No. AGA File Name: Pr:nt Dote : Last Revision : ; ' ! 169-002 BockBayST 12/30/15 12/.lC/15 / . "' >- '""-ikt ",e,-•e"•,}'• ~ ✓, ', j( No. 4 ~ ~ CJV\ ~<OF ~- , /: IRSISIGN AND PCST (R5-1a) .:. 5 R5-1a SIGN "B" CONSTRUCTION NOTES: ALBERT G ROVER& wsOCIATES SIGN "'F" (().50 • ' ,.,. N-2( C,\),C2( CA) (01-l''GA 1'~) /, SIGN AND PO.ST IRS t, R'-1 5 (714) 992-2990 DESiGNEO FAX 992-2883 CAV CHECKED ~lHM TRANSPORTATION CONSULTING ENGINEERS \ /211 E. r~~rial r~Y-, Suite 208 Fullerton, CA 92835 DRAWN CAV & 0- 0-- G- IT]- 0- 0- 0- 0- 0-- & [ill- @:I- & @}- [:I]- 0-, \~-=t J~>---~-f --G -?. t! k DATE BY R.C.E. NO. 40956 DATE DATE 10/2014 INSTALL 4" WHITE EDGE LINE, DETAIL 278. INSTALL 4" SOLID YELLOW CEtHER LINE. !NSTALL 4" SOUD YELLOW HATCH LINE AT 15' SPACING. INSTALL P.~VEMENT LEGEND AS SHOWN. FURNISH A.ND INSTALL NEW SIGN AND 'I/DOD POST AS SHOWN. INSTALL 4" SKIP YELLOW CENTER LINE (3' LINE, g' GAP). INSTALL 12" LIMIT, CROSSWALK OR ROADWAY MARKING LINE AS SHOWN. RAISE EXISTING R1 -1 (STOP) SIGN ABOVE EXISTING R3-2 (NO LEFT TURN) SIGN. FURNISH AND INSTALL NEW SIGN "B" BELOW R3· 2 (NO LEFT TURN) SIGN. !NSTALL SIGN ON EXiSTING POST AS SHOWN. INSTALL EXISTING SIGN ON A NEW WOOD POST. INSTALL DOUBLE YELLOW CENTER LINE. 'NSTALL 8" WHITE CHA.NNELIZING LINE, DETAIL 38A. iNSTALL 4" SKIP WHITE UNE (3' LINE, 9' GAP). FURNISH A.ND INSTALL EDGE MARKER A.S SHOWN. REALIGN EXISTING K-RAiL FOR PA TH OF TRAVEL. ;NSTALL 6" WHiTE BIKE LANE l!NE, DETAIL 39. FURNISH AND INSTALL SIGli ON DELINEATOR POST ON TOP OF K-RAIL AS SHOWN. -±100' v••" • ~ . .r ~ \ ~N-2(CA;,C2(CA) (0: GAE)\ SIGN A.ND ~OST(R2 1115), W~RN!NG SIGN,R.l6(CAJ) WARl<ING 5 GN SIGN ",~",R.3c(CA) C-6005 SIGNING AND STRIPING Pl.AN BACK BAY DRIVE FROM SHELLMAKER ROAD TO EASTBLUFF DRIVE ----------~--------·--·¾----+----------------,--------; DESCRIPTION REvIsI0,Is CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT R-6060-S SHEET _--2.__ OF_8_ MATCH LINE "D" MATCH LINE "E" SIGN "F" 5 (2.00) . . i i i f ' l ; ' i / ' i ; ' ' I ! ' . ; f I \ I I ' I i I \ I ! ' J. ; SIGN AN1 °0ST (R1-1(15),R5-1o, RIKE EXCEPTED) .. / I ' ! c TCTAL Wl-8 ~·". /"" \ '.JN K-RAIL RS. \ 11· --3(3 T:TAL) 17 \,. •·. '· ~ SIGN AND POST('111-J,W13-1P) /',, [i] W1 -1 (RT) RECORD DRAWINGS ·1 hese Record Drawings have been prepared Cased on information submitted, in part, by ol~1ers. 'Nh.le lhis inforrna~ion is believed to be re::ob!e, City of-Nev,;port 8eocil is rot responsible for i:s accuracy, nor for errors or om:s~ions v1hich rr;Jy hove been incorporated i"1to these Jlons os c res11lt. ... " AGA Job No. : AGA File Nomr,: Print Date : Lost Revis:on : 169-002 8ock8nyST 12/30/15 12/J0/i'.:, ALBERT G ROVER& wsOCIATES \ \ (714) 992-2990 DESIGNED FAX 992-2883 CAV -.. CHECKED MHM LEGEND: EXISTING CURB PROPOSED STRIPING E:~ISTING AC BERM EDGE OF PAVEMENT EXISTING STRIPING SHARED LANE BIKE LANE PEDESTRIAN LANE EDGE MARKER LOCATIONS CONSTRUCTION NOTES: [D-INSTA.LL 4" WHITE EDGE LINE, DETAIL 273. [D-INSTALL 4" SOLID YELLOW CENTER LINE. 0--INSTALL 4" SOLID YELLOW HATCH LINE AT 75' SPACING. [D-INSTALL PAVEMENT LEGEND AS SHOWN. 0--FURNISH AND INSTALL NEW SIGN AND WOOD POST AS SHOWN. [I}-INSTALL 4" SKIP YELLOW CENTER LINE (3' LINE, 9' GAP). 0-INSTALL 12" LIM!T, CROSSWALK OR ROADWAY MARKING L!NE AS SHOWN. 0-RAISE EXISTING R1-1 (STOP) SIGN ABOV~ EXISTING R3--2 (ND LEFT TURN) SIGN. FURNISH AND INSTALL NEW SIGN "B" BELOW R3-2 (NO LEFT TURN) SIGN. [II-INSTALL SIGN ON EXISTING POST AS SHOWN. E9]-INSTA.LL EXISTING SIGN ON A NEW WOOD pos,. @J--INSTALL DOUBLE YELLOW CENTER LINE. IJil--INSTALL 8" WHITE CHANNELIZING LINE, DETAIL 38A. @}-INSTALL 4" SKIP WHITE LINE (3' LINE, 9' GAP). & FURNISH ANO INSTALL EDGE MARKER AS SHOWN . ~ REALIGN EXISTING K-RAIL FOR PA TH OF TRAVEL. §-INSTALL 6" '1/HllE BIKE LA.NE LINE, DETAIL 39. 0--FURNISH AND INSTALL SIGN ON DELINEATOR POST ON TOP OF K-RAIL AS SHOWN. 6 \\ \ ·-·, ·. r71: __ ,_\ .... _ L: .. r--------__,_, ''F" (0 75) SIGN AND POST (R5-1o, R5-ia SIGN "B" \ .("\ \_ \ I MATCH LINE "E" BIKE EXCEPT~) SCALE,1"=40' C-6005 SIGNING AND STRIPING PLAN BACK BAY DRIVE FROM , TRANSPQRTA.TION CCNSULTING ENGINEERS \\.~.11 E.1 lmp~,jol Hljl)'., Suite 208 Fu!lerton, CA 92835 l--------t----t-----11-------------................ ,_ __ , SHELLMAKER ROAD TO EASTBLUFF DRIVE {~ .. , c·· I\ \ I • • 1 \)\ f. f 20( l 'I '-"··. J\j-...\J"------. ' -"' -... .., R.C.E. NO. 40956 DATE DRAWN CAV DATE 10/2014 DATt BY DESCRIPTION REVISIONS CllY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT R-6060-S SHEET 4 OF ..JL CONSTRUCTION NOTES: -------------------------- CD-INSTALL a" WHITE EDGt LINE, DETAIL 273. m-INST,,LL t(' SOLID YELLOW CENTER LINE. -------------·-·\ \ l OM2-2V (2 EA.) (AT STORM DRAIN OUTLET) EXISTING PARKING LOT ./ 1:S1 S1GN AND POST (RS-la, BIKE EXC[PTCD) .' 5 R5-1o ; S G\J "B" :_/) ~ , -/'---<..3:\1-/4 ' f _,,,,. '\ \ I V 0-INSTALL t;' SOLID YELLOW HATCH UNE XI 15' SPACING. 0-INSTALL PAVEMENT LEGEND AS SHOWN. \ .\ I , I ----~~- [I}-FURNISH AND INSTALL NEW SIGN P.ND WOOD POST AS SHOWN. 0-INSTALL 4" SKIP YELLOW CENTER LINE (3' LINE, 9' GAP). 0-INSTALL 12" LIMIT, CROSSWALK OR ROADWAY MARKING UNE AS SHOWN. ~ SIGN AND POST (R5-1a) \ • 0-RAISE EXISTING R1-1 (STOP) SIGN ABOVE EXISTING R3-2 (NO !FFT TURN) SIGN. FURNISH fa.ND INSTALL NEW SIGN "8" BELOW R3-2 (NO LEFT TURN) SIGN. 5 s1dN ;f, (r.oo} fRs] SiG·N· AND POST (IV818(MOD)) m \1/8-18,SIGN "[" 0- E9]- ED- @}- @]- @]-- @]- EB- @]- INSTALL SIGN ON EXISTING POST AS SHOWli. INSTALL EX!STING SIGN ON A NEW WOOD POST. INSTALL DOUBLE YELLOW CENTER LINE. INSTALL 8" WHITE CHANNELIZING LINE, DETAIL 38,\ INSTALL 4" SKIP WHITE LINE (3' LINE, 9' GAP). FURNISH AND INSTALL EDGE MARKER AS SHCWN. REALIGN EXISTING K-RAIL FOR PATH OF TRfaVEL INSTALL 6" WHITE BIKE LANE LINE, DET /,IL 3!l. FURNISH AND INSTALL SIGN ON DELINEATOR POST ON TOP OF K-RAIL AS SHOWN. II rYPE P(CA)IRsl \ fR'sls1GN···· .AND POST (R3-1,R6-7(1 T)) (8R3 1,R6-2(LT), SIGN "B" SIGN AND POST ('/5-la,BIKES EXCEPlLD) RS R5-1c 5 SIGN "g" \ [}]SIGN "F'' (1.25) RECORD DRAWINGS These Rec:ord D:cv1inqs have oeen prepared based on inforrrnt!on submitted, in port, by others. While this information is t:e::eved -:o be reliable, City of Newport Beach is not respors:ble for its ,Jccurocy, 1or for errors or omissions wh!ch r:1ay have been incorporated into these plcns as -J resull. \ . \ , I - SIGN .A~D PGST (ws-fwf3-1P) W8-'2 w·;3-IP(IO) AG.A Job No. /J..GA !=":le Name: Prin-... Date Last Revision 169-002 BackBavST 12130/15 12;'30/15 \·· \ I I \ I I \ . / .,/ / ··-- / [§Us1G1, AND POS I _j.2.JWB 18 SIGN AND POST (1/18-18(,100)) '118-2 '1113-'.P(IO; LEGEND: EXISTING CURB PROPOSED STRIPING EXISTING AC BERM EDGE OF PP,VEMENT EXISTING STRIPING SHARED LANE BIKE LANE PEDESTRIAN LP.NE EDGE MARKER LOCATIONS ·- ~BERT (714) 992-2990 DESIGNED FAX 992-2883 C/>,V G ROVER& wsOCIATES . TRANSPORTAT!ON CONSULTING ENGINEERS J i1 f:g.-·imp<ario! ~wy., Suite 208 Fullerton, CP. 92B35 , N" >;;-{ ~ 1\ ! --:r-\ < ', ' \J ~ . V .lz l,;°"'~ f -C:, -2~"' R,C,E. NO. 40956 DATE CHECKED MHM DRAWN CAV DATE 10/2014 BY -f--• -· --· -· -------L DESCRIPTION REVISIONS • Cl • -"'-• .._ Ul C-6005 SIGNING AND STRIPING PLAN BACK BAY DRIVE FROM SHELLMAKER ROAD TO EASTBLUFF DRIVE CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT R-6060-S SHEET 5 OF_8_ w z ::J I ~ :l • 4 / / S CN ANC POST (R2-1(15))~ SIGN "E"I}] • -----------·--------------------------------- CONSTRUCTION NOTES: [D--INSTALL 4" WHl1E EDGE LINE, DETAIL 278. I}]-INSTALL 4" SOLID YELLOW CENTER LINE. ·-----·---------------------------\ i!t-~f!JA C,K~~; ;~,~~ -~-~ :;:--•:--: _--:_ ~-:~ 0-INSTALL 4" SOLID YELLOW HATCH LINE AT 15' SPACING. 0-INSTALL PAVEMENT LEGEND ~.S SHOWN. 0---FURNISH AND INSTALL NEW SIGN ANO WOOD POST AS SHOWN. 0-INSTALL 4" SKIP YELLOW CENTER UNE (3' LINE, 9' GAP). m-INSTALL 12" LIMIT, CROSSWALK OR ROADWAY MARKING LINE AS SHOWN. (I}-RAISE EXISTING R1-1 (STOP) SIGN ABOVE EXISTING R3-2 (NO LEFT TURN) SIGN. FURNISH AND INSTALL NEW SIGN "B" BELOW R3-2 (NO LEFT TU,N) SIGN. 0-INSTALL SIGN ON EXISTING POST AS SHOWN. ~ INSTALL EXISTING SIGN ON A NEW WOOD POST. 0-INSTALL DOUBLE YELLOW CENTER UNE. IE)-INSTALL 8" WHITF CHANNELIZING LINE, DETft.il 38A. E:i]-INSTALL 4" SKIP WfHE LINE (3' LINE, 9' GAP). & FURNISH AND INSTALL EDGE MARKER AS SHOWN. ~ REALIGN EXISTING K-RAIL FOR PATH OF TRAVEL. §--INSTALL 6" WHITE BIKE LANE LINE, DETAIL 39. 0-FURNISH AND INSTALL SIGN ON DEUNEATOR POST ON TOP OF K·RAIL AS SHOWN. ., Of/2-2'1(2 EA) (AT STORM DRAIN OU TLE") s c, '"' eos-(.e-,il~sl W8-1 5 4 • [8 SIGN "F"·~:~:;----: ' ·:-• :· ·=--~-........ __ • _______ _ RECORD DRAWINGS 'T"hf:se Recnrrl Drawings nave been prepared based on informatio:1 subrnilted, :n port, by ot1ers. 'Jv'h:le this in"'"ormff~ion is believed to Ce: re·:nb!o, City of Newport Beech is rot responsible fo,-Its accuracy, nor for errors or orr:'ssions which may hove been incorporated into these plans as a result. A.GA Job No. AGA He Name: Prine Date Lost Revh;;ior1 : 169-002 Boc_kBayST 12/30/15 12/30/15 ALBERT G ROVER& wsOCIATES (714) 992-2990 DESIGNED FAX 992-2883 CAV CHECKED MHM TRANSPORTAT!ON CONSULTING ENGINEERS DRAWN CAV \ ~lJ ... E. lrrfperiol .~wy., Suite 208 Fullerton. CA 92835 LEGEND: EXISTING CURB PROPOSED STRIPING EXiSTING AC BERM EDGE OF PAVEMENT EXiSTING STRIPING SHARED LANE BIKE LANE PEDESTRIAN LANE EDGE MA.RKER LOCATIONS SIGN ANO POST (l,o-1c,BIKlS c:<CEPTEC) RS R5·-1J 5 SIGN "8'.' SIG,! ANO rosT (W1-1.W13-1P) Rs . W1-1(RT) 5 C-6005 SIGNING AND STRIPING PLAN BACK BAY DRIVE FROM SHELLMAKER ROAD TO EASTBLUFF DRIVE \ 1 \c-. \ :::f\, \\I ) ~ \Jv-9...YY.,~-i -Co 2.D(k R.C.E. NO. 40956 DATE ,-..D-AT_E __ __,1-o_A_TE_,__0_Y_._ ____ o_Es_c_R_1PT_1o_N_' ------'---I CITY OF NEWPORT BEACH R-6060--S 10/2014 REVISIONS PUBLIC WORKS DEPARTMENT SHEET _EL OF --B LEGEND: EXISTING CURB PROPOSED STRIPING EXISTING AC BERM EDGE OF PAVEMENT EXISTING STRIPING SHARED LANE BIKE LANE PEDESTRIAN LANE EDGE MARKER cOCATIONS MATCH LINE "K" CONSTRUCTION NOTES: @-- [II-- 0-- & [8- 0- 0- 0- & [ill- 0- @J~ @}- & @}- @]- @]- INSTALL 4" Wl-ilTE EDGE UNF, DFTAIL 278. INSTALL. f' SOLID YELLOW CENTER LINE. INSTALL 4" SOLID YELLOW HATCH LINE AT 15' SPP.CiNG. INSTALL PAVEMENT LEGEND AS SHOWN. FURNISH AND INSTALL NEW SIGN AND WOOD POST AS SHOWN. INSTALL 4" SKIP YELLOW CENTER LINE I)' LINE, 9' GAP). INSTALL 12" Ll111T. CROSSWALK OR RCP.DWAY MARKING l.lNF AS SHOWN. I ' ! ; i i i f I ! I i ; RAISE EXISTING R1-I (STOP) SIGN ABOVE EXISTING R3-2 (NO lJ:FT TIJRN) SIGN. FURNiSH AND INSTALL NEW SIGN "8" BELOW R3-2 (NO LEFT TURN) SIGN. I INSTAI_L SIGN ON EXISTING POST AS SHOWN. INSTALL EXISTING SIGN ON A NEW WOOD POST. INSTALL DOUBLE YELLOW CENTER LINE. INSTALL 8" WHITE CHANNELIZING LINE, DETAIL 38A. INSTALL 4" SKIP WHITE LINE (3' LINE, 9' G/1.P). FURNISH AND INSTALL EDGE MARKER AS ShOWN. REAUGN EXISTING K-RAIL FOR PATH OF TRAVEL. INSTALL 6" WHITE BIKE LANE Ul,E, DETAIL .39. FURNISH AND INSTALL SIGN ON DELINEATOR POST ON TCP OF K-RAIL AS SHOWN. SIGN / / / ! I / I / ! I j I i I [D-----/-i --1..J J ! SIGN AND POST (RS-'o,Rli<FS 0 XCEPTED) RS R5-1o 5 S!GN "B" .... ! S 1 1GN "F"~\ (0.15) \ l .) / ; I ' i ' \ ' l I \ ' \ MATCH LINE 'K" RECORD DRAWINGS i ' ,' Tf., c:sc k'ccord Drowings hcvc been prcpcrcd based on information submitted, in part, uy ethers. Vhile -his 1rformot1o'l is believed tc '.)e rn!ioble, City of Newport Beach :s no-:- responsl:ile ..:or its accuracy, ncr fr>r errors or emissions which may have been incorporated into these pla11s cs a result. AGA Job No. : AGA File Nome: Print Cate Lost Revision ; 169-002 BackBo;sT 12/.30;"5 12/30/,5 SCALE=1"=40' A (714) 992-2990 DESIGNED LBERT FAX 992-2883 C/W G ROVER& wsOCIATES CHECKED MHM TRANSPO TATION CCNSULTING ENGINEERS \21(1. E. lrnp . icl Hw~.,, Suite 208 Fu!lerton, CA 92835 DRAWN ( ~\ '\t~:::::f--\ . \ \ , ,. ~ , I , CAV '4 \,IS:,! \ J\i'f, y /'--....,~ ... I -6' Cu '-" DATE R .• E. NO. 40956 DATE 10/201 /4- • ...J • ~--· I.LI z :J R5-1c 1-;l SIGN "g"~~ . ~ ... ------~ =-' . • •• -----~--• ' / --dJ 6 I ~ ~ ~ RS S G'I ANC FOST (W1-B) -·· ' .-<"""· ~- SIGN Al,IJ POST (R2-1(15))~_........---;,· SIG~l "["W DATE BY DESCRIPTION REVISIONS eN) POST (R? '(15)) ' _qJ ·, .. _ I ··--. ~ -,_ ', ~--~ -~--.. C-6005 SIGNING AND STRIPING FLAN BACK BAY DRIVE FROM SHELLMAKER ROAD TO EASTBLUFF DRIVE CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT R-6060-S SHEET 7 OF_8_ LEGEND= EXISTING CURB PROPOSED STR!P:NG EXISTING AC BERM EDGE OF PAVEMENT EXISTING STRiPING SHfo.RED LANE BIKE LANE PEDESTRIAN LANE EDGE MARKER LOCATIONS llifil S:G;N. ANC l;J Wl-4 I F'OST (Wl-4) RECORD DRAWINGS These Record Drcwincs hu'i€ :.>een pr e;:>ured based on intorm::ition submitted, in port, by others. Whi e this in.,,formoticn is be;:eved to be reliable, Cilv of Newpurl Beach is ,iol re:sJons'ble for its occuracy, rJor for ,:;:-rors or omissions whfch may have been ir,corporotcd into these plars as a result. SCALE=1"=40' AGA Job No. : AGfa. File Name: Print Dote : Lost Revision : '169-002 BackBayST 12/30/15 12/30/15 -, " ';,/'·.' "-'~'f:t'· ;,;,:-. EJ I rp ALBERT (714) 992-2990 DESIGNED FAX 992-2883 GAV G ROVER& wsOCJATES TRANSPORTATION CONSULTING ENGINEERS \2J;1 1 E .. lmpem1aI Hwy., /,uite 208 Fullerton, CA. 92835 (\ c.c.-.:f.)0\\ l\) c;:;S\ '' ",\,....~-, : -6 -1,tl t, ) I -._ -'t -._ ,',_ • R:'C.E. ND. 40956 DATE CHECKED MHM DRAWN GAV DATE 10/2014 CONSTRUCTION NOTES: EJ--INSTALL 4" 'I/HITE EDGE LINE, DETAIL 273. 121--INSTALL 4" SOLID YELLOW CENTER LINE. [I]-INSTALL 4" SOLID YELLOW HATCH LINE AT 15' SPACING. OJ-INSTALL PAVEMENT LEGtND AS SHOWN. I}]-FURNISH AND INSTALL NEW SIGN AND WOOD POST A.S SHOWN. 0· INSTP.LL 4" SKIP YELLOW CENTER LINE (3' LINE, 9' GAP). 0--INSTALL 12" LIMIT, CROSS'I/Al.K OR ROADWAY MARKING LINE AS SHOWN. [~}--RAISE EXISTING R1-1 (STOP) SIGN ABOVE EX!STING R3·2 (NO LffT TURN) SIGN. FURNISH AND INSTALL NEW SIGN "B" BELOW R3-2 (NO LEFT nJRN) SIGN. 0-INSTALL SIGN ON EXISTING POST AS SHOWN. ~ INSTALL EXISTING SIGN ON A NEW WOOD POST. ED-INSTALL DOUBLE YELLOW CENTER LINE. @}-INSTALL 8" WHITE CHANNELIZING LINE, DETAIL 38A. l~}l·· INSTALL 4" SKIP WHITE LINE (3' UNE, 9' GAP). 8--FURNISH AND INSTALL EDGE MARKER AS SHOWN. EB-REALIGN EXISTING K-RAIL FOR PATH OF TRAVEL. 0-INSTALL 6" WHITE BIKE LANE LINE, DETAIL 39. [ID-FURNISH AND INSTALL SIGN ON DEUNEATOR POST ON TCP OF K-RA.IL AS SHOWN. I I -r - DATE BY DESCRIPT1ON REVISIONS C-6005 SIGNING AND s:m1e1NG et.AN BACK BAY DRIVE FROM SHELLMAKER ROAD TO EASTBLUFF DRIVE CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT R-6060-S SHEET 8 OF __a_ 15TH ST C IY Of COSTA M[SA LEGEND: EXISTING CURB PROPOSED STRIPING EXISTING AC GERM EDGE OF PAVEMENT EXISTING STRIPING SHARW LANE BIKE LANE PEDESTRIAN LANE VICINITY MAP NOT TO SC1\L[ EDGE MARKER LOCATIONS SIGN LEGEND: SIGN "A" Know what's below. Cali before you dig. CIT'c OF IR'JINE F~ ~~ R5-1 WRONG WAY R5-1a I BIKES I· EXEMPT! - _ _J SIGN "B" SIGN "C" I ALL USERS I SPEED LIMIT 15 ' SIGN "D" I ALL'U~RS ij SPEED LIMIT 15 SIGN "E" PUBLIC WORKS DEPARTMENT BACK BAY DRIVE ROADWAY MAINTENANCE PROJECT C-6005 f\ i \ f'"\ ) j !? ' />PPRC\/ED /";~ 1 /'11) / J {J //1 <, j I/~,__~--"'_' ________ _ DAVID A. WEBB. P.E, PUBLIC WORKS DIRECTOR ,44,.~r. 1! ,l(,~1 ,. • , ,APP,,C\/ED: ,ff/~ fv, ~ __ M_A_R_K_V_,_KOJEVIC~E., DEPUTY PWD / CITY ENGINEER ,~~ '. ,/I R1-1 R3-2 ~ ALL LJSERS ~ R10-31P(MOD) CROSS TRAFFIC DOES NOT STOP W4-4P ' ,,,I ,-'D SIGN 'F" OM2-2V 1 1 OM2-2V (MOD) NO PAli<ING ! ANY TIME i BEYOND i POll<l7 R26A(CA)(MOD) DATE: GENERAL NOTES L ALL WORK, MATERIALS, AND EQUIPMENT SHALL CONFORM TO CAL TRANS ST,INDARD Pil\NS i\NO ST/,f!DARD SPECIFICATIONS DATCD 2010, CALIFORNIA MANUAL ON UNTORM TRAFFIC CONfROL DEVICES (CA MUTCD), 2014 EDITION, AS SHOWN HEREON AND IN THE SPECIAL PROVISIONS. 2. THE CONfRACfOR SHALL COORD!NATE WITH THE CITY OF NEWPORT BEACH FOR ALL WORK. 3. ALL SIRIPING SHALL BE SPRAYABLE. REFLECTORIZED THERMOPLASTIC UNLESS OTHER'MSE rmTrn. 4. REMOVE ALL EXISTING/CONFLICTING PAVEMENT STRIPING AND PAVEMENT LEGENDS BY GRINDING AND/OR ETCHING. 5. APPLY TYPE 1 SLURRY SEAL TO BACK BAY DRIVE FROM EASTBLUFF TO SHELLMAKER. 6. 11 IE TYPICAL CROSS SECTIONS ARE SHOWN ON THIS SHEET. ALL LANE MEASUREMENTS SHALL START FROM EDGE OF PAVEMENT (EP) ON THE EASTERLY SIDE OF BACK BAY DRIVE (SiDE FURiHESi AWAY FROM THE 8~.Y). FINAL STRiPING LAYOUT SHA.LL BE DETERMINED IN THE FIELD BY THE CITY TRAFFIC ENGINEER OR CESIGNEE. 7. ALL STRIPING SH1\l.L BE CAT-TRACKED AND APPROVED BY THE CITY PRIOR TO THE INSTALLAnON OF FINAL STRIPING. 8. ALL SIGNS SHALL BE INSTALLED USING STAINLESS STEEL HARDWARE AND BE ON NEW PRESSURE TREATED 4"X4" WOOD POSTS UNLESS OTHER\\1SE SHOWN, 9. ALL OBJECT MARKERS, EDGE MARKERS AND STORM DRAIN MARKERS SHALL BE INSTl'.LLED ON A UNI-STRUT POST /1T A HEIGHT OF 30 INCHES TO THE TOP OF SIGN. 10. ALL SIGNS LOCATIONS SHALL BE APPROVED BY THE CITY PRIOR TO INSTALLATION. 11. .ALL SIGN DESIGNS SHALL BE SUBMITTED TO THE CITY FOR APPROVAL. 12. ALL SIGNS SHALL BE INSTALLED A MINIMUM OF TWO FffT OUTSIDE OF THE IRAVELED PATIi UNLESS OTHERWISE NO TED. 13. ALL PAVEMENT LEGENDS SHALL BE SPACED APPROXIMATELY 25D FEET OR AS DIRECTED BY THE CITY. 14. NUMBERED STORM DRAIN MARKERS (OM2-2V(MOD)) SHALL BE POSTED TO MARI< STORM DR.~IN INLETS ON IHE EAST SHOULDER. MARKERS SHAll BE LOCATED OUTSIDE OF THE PAVEMENT, rACE SOUTH, AND DE IMMEDIA.TELY ADJACENT TO STORM DRAIN .. 15. EDGE MARKERS (OM2·2V) SrlALL Bf. PLACE[) WHERE SHOWN ON THE PLANS WITH MARKERS AT THE BEGINNING AND END OF ZONES AND SPACED ~.T 100 FEET WITHIN. MARKERS SHALL BE LOCATED OUTSIDE OF THE PAVEMENT, MINIMUM 1 FOOT FROM THE ROADWAY SURFACE ON THE EAST SHOULDER, AND MINIMUM 4 FEET FROM ROADWAY SURF~.CE ON THE WEST SHOULDER, 16, OBJECT MARKERS SHALL BE LOCATED iMMEDIATEL Y IN FRONT OF OBJECT. 17. ALL CHANGES TO PROf'OSED SIGN LOCATIONS SHALL BE APPROVED BY THE CITY. 18. THE CONTRACTOR SHALL. FURNISH THE PEDESTRIAN, BICYCLE, AND SIL~RROW STENCILS TO THE CITY OF NEWPORT BEACH AT THE COMPLETION OF CONSTRUCTION. ALL STENC!LS SHALL BE CONSISTENT WITH THE 2014 CA MUTCD. 19. REMOVE AND SALVAGE ALL EXISTING EDGE MARKERS, STORM DRAIN MARKERS, INTERSECTION "1ARKERS, /,ND POST MILE SIGNS. 20. MILE MARKER SIGNS {SIGN 'F") SHALL BE PLACED AT THE BEG!l,NING AND THE END OF EACH SEGMENT, AND AT 0.25 MILE INTERVALS NB MILE MARKERS TO BEGIN AT SHEU.MAKER AND SAN JOAQUIN HILLS. SB MILE MARKERS TO BEGIN AT EASTBLUFF AND SAN JOAQUIN HILLS. 0- 0- 0 0- [II- II}- CONSTRUCTION NOTES INSTALL 4" WHITE EDGE LINE, DETAIL 27B. INSTALL 4" SOLID YELLOW CENTER LINE. INSTALL f' SOLID YELLOW HA.TCH LINE AT ,5' SPACING. INSTALL PAVEMHH LEGEND AS SHOWN, FURNISH AND INSTALL NEW SIGN AND WOOD POST A.S SHOWN. INSTALL 4" SKIP YELLOW CENTER LINE (3' LINE, 9' GAP). INSTALL 12" LIMIT, CROSSWALK OR ROADWAY MARKING UNE AS SHOWN. 0-- 0-RAISE EXISTING Rl-1 (STOP) SIGN ABOVE EXISTING R3-2 (NO LffT TURN) SIGN. FURNISH AND INSTALL NEW SIGN "B" BELOW R3-2 (NO LEFT TURN) SIGN. 0- E9], 0- @}- @]- Er @l EB- @}- INSTALL SIGN ON EXiSilNG POST AS SHOWN. INSTALL EXISTING SIGN ON A NEW WOOD POSl. INSTALL DOUBLE YELLOW CENTER UNE. INSTALL 8" WHITE CHANNELIZING LINE, DETAIL 38~ .. INSTALL f' SKIP WHITE UNE (3' LINE, 9' GAP). FURNISH .AND INSTALL EDGE MARKER AS SHOWN. REALIGN EXISTING K-RAIL FOR PA TH OF TRAVEL INSTALL 6" WHITE BIK[ LANE UNE, DETAIL 39. FURNISH AND !NST/..Ll. SIGN ON DEUNEATOR POST ON TOP OF K-i~A!L AS SHOVvN, SHEET INDEX 1 TITIF ShFET 2 DC:TAlc SHEE' J-8 SlGNiNG ANO STRIPING :;'L ANS C-6005 TI 0 u 0 N 0 0 ' 0 >· 0 CJ .¥ 0 0 rn "' ,-----------------------------.------------,,----------,-----------+------------,-------------------------------18 R[Vl[WCD: Ac"RC\J/\L RECOl,IMENDED: APPROVAL Rf .. CCMMl:.NUt.D: REVIEWED: 1 1\G1\ ..lob r,.,r; ACA File !,l1_w1e. Pri:1l Ocl2 Lost Re-/sion 169-802 BuckE.uy.ST 0' /09/ 5 l".f(J(• i., .JI I J/ l:J CA\/ CJ\'v' ANTONY DR/NJ?,Ci;u;ri' 45521 CITY TR.i\FFX H,Gi~ffR TITLE SHEET ~ BACK BAY DRIVE SHELLMAKER ROAD TO EASTBLUFF ROAD .L u u "' [JJ 7Z l:l :,;; I ~ r 0 z r rn ,C, 2 I C ·l,f"I ~ III m :rl © ® ® EP" EP ,~ , I s· I •· If~: Section A-A ® Section B-B EP-, ' CONTOUR UNE ,"-FP , •· Ir,/,: 2·] 4 I s· I SLOPED AC ~-s·I ,· I 5' I .i -- Section C-C @ Section D-D AC BERM ...._....._ _.-/ EP I ,· I s· I e·6· Section E-E ® AC BERM " j VAR I 10' ,,..-AC BERM r~ CURB ) 6' I r I s·10· Section G-G ® Section H-H Typical Cross Sections Back Bay Drive /Shel/maker Road to Eastbluff Drive) SIGN LEGEND: ;/ :1• I ii 1 ii I ]I lil WRONG WAY R5-1a. BIKES EXEMPT SIGN "A" SIGN "B" SIGN SIZES: NB SIGNS R1-1 STOP SIGN (30"X30") R3-2 NO LEFT TURN (24"X24") W1 1 CURVE WARNING (18"X18") Wl-8 CHEVRON ALIGNMENT (18'"X24") WB-18 ROAD MAY FLOOD (18"Xi8") WB-2 DIP (18"X18") WB-1 BUMPS (18"X18") W13-1P ADVISORY SPEED (18"X18") W11 ·2 PEDESTRIAN WARNING (18"X18") R10-31P(MOD) ALL USERS PLAQUE (18"X9") R26A(CA)(MOD) NO PARKING BEYOND THIS POINT (18"X24") OM2· 2V YELLOW OBJECT MARKER (6"X12'') OM2-2V(MOD) YELLOW OBJECT MARKER W!TII NUMBERS (6"X12") SIGN A MULTI USE TRAIL (24"X36"), TRAIL COURTESY (18"X18") SIGN E ALL USERS (18"X9"), R2-1 (18"X24") SIGN F SPECIAL MILE MARKER (10" DIAMETER) R36(C,A) COMMERCIAL VEHICLES OVER 3 TONS PROHIBITED .. ! I R5-1 R5·1a W4--4P W2-3 Wl-5 SIGN B SIGN C SIGN D l[ALLUSERS] SPEED LIMIT 15 SIGN "D" i[Au'.;ERS j: SPEED LIMIT 15 SB SIGNS CONSTRUCTION NOTES= "" -. --· -------- IJ]-INSTALL 4" WHITE EDGE LINE, DETAiL 278. [D-INSTALL 4" SOLID YELLOW CENTER UNE. 0--INSTALL 4" SOLID YELLOW HATCH UNE AT 15' SPACING. m--INSTALL PAVEMENT LEGEND AS SHOWN. 0·· FURNISh AND INSTALL NEW SIGN AND WOOD POST AS SHOWN. 0-· iNSTALL 4" SKIP YELLOW CENTER UNE (3' LINE, 9' GAP). 0-INSTALL 12" LIMIT, CROSSWALK OR ROADWAY MARKING LINE AS SHOWN. 0-R.~ISE EXISTING Rl-1 (STOP) SIGN .~BOVE EX!STING R3-2 (NO LEFT lURN) SIGN. tURNISH AND INSTALL NEW SIGN "B" BELOW R3-2 (NO LEFT TURN) SIGN. 0-INSTALL SIGN ON EXISTING POST AS SHOWN. ~ INSTALL EXISTING SIGN ON A NEW WOOD POST. ED-INSTALL DOUBLE YELLOW CENIER LINE. §-INSTALL 8" WHITE CHANNELIZING LINE, DETAIL 38A. ~ INSTALL 4" SKIP WHITE UNE (3' LINE, 9' GAP). [El-FURNISH AND INSTALL EDGE MARKER AS SHOWN. QB-REALIGN EXISTING K-RAII. FOR PATH OF TRAVEi .. ~ INSTALL 6" WHITE BIKE LANE LINE, DETAIL 39. 0--FURNISH ANO INST,\LL SIGN ON DELINEATOR POST ON TOP OF K-RAIL AS SHOWN. ~ R1-1 lS! R3-2 [I ALLUSERS l] R10-31P(MOD) CRCl~S ~~;,-,I~,-,-,-,,,] DOES NOT STOP - --- - W4-4P SIGN "F" 1 1 OM2-2V OM2-2V (MOD) NO PARKING 1 ANYmEI! ,::~~I R26A(CA)(MOD) OTHER SIGNS .. .•.• ---·~····-· ·-,_ .. -~---.--.. ----- DO NOi ENTER (30"X30") WRONG WAY ( 30"X24") CROSS TRAFFIC DOES NOT STOP (24''x12") IMTERSECTION WARNING (18"X18") CURVE WARNING (18"Xl8") BIKES EXEMPT (30"X24") MULTI-USE TRAIL (36"X48"), TRAIL COURTESY (18"X18") ALL USERS (12"X9"), R2-1 (12"X18"), W7-5 (18"X!8") N-2(CA) OBJECT MARKER (18"X18") C2(CA) ROAD CLOSED TYPE P(CA) OBJECT MARKER (12"X36") AG1\ Jcb ~k>. AGA File Name: Print net,; \_;Jd RP.'s'isiO'l R.C.E. MO. 40956 GENERAL NOTES= 1. .ALL WORK, MATERIALS, AND EQUIPMENT SHALL CONFORM TO CAL TRANS STAND.ARD PLANS ANO STANDARD SPFCIFlCATIONS DA.TED 2010, CALIFORNIA MANUAL ON UHIFORM TRAfflC CONTROL DEi/iCES (CA MUTCD), 2014 EDITION, AS SHOWN HEREON AND IN THE SPECIAL PROVISIONS. 2. THE CONTRACTOR SHALL COORDINATE IMTH THE CITY OF NEWPORT BEACH FOR ALL WORK. 3. ALL SrHIPING SHALL BE SPRAYABLE, REFlECTORIZED THERMOPLASTIC UNLESS OTHERWISE NOTED. 4. REMOVE ALL EX:SllNG/CONfLICTING PAVEMENT STRIPING AND PAVEMENT LFGFNDS BY GRINDING AND/OR ETCHING. 5. A.PPL Y TYPE 1 SLURRY SE.sL TO BACK BAY DRIVE FROM EASTBLUFF TO SHELLMAKER. 6. fHE TYPICAL CROSS SECTIONS ARE SHOWN ON THIS SHEET. ALL LA.NE MEASUREMENTS SHALL START rROM EDGE OF PAVEMENT (EP) ON THE EASTERLY SIDE OF BACK BAY DR!VE (SIDE FUfllHEST .~WAY FROM THE B,IY). FINAL STR!P:NG LAYOUT SHALL BE REVIEWED/APPROVED BY THE CITY TRAFFIC ENGINEER OR DESIGNf.E. 7. ALL STRIPING SHALL BE CAT-TRACKED AND APPROVED BY THE CITY PRIOR TO THE INSTALLATION OF FINAL STRIPING. 8. ALL SIGNS SHALL BE INSTALLED USING STAINLESS STEEL HARDWARE ANO BE ON NEW PRESSURE TRE.ATED 4"X4" WOOD POSTS UNLESS OTHERWISE SHOWN. 9. ALL OBJECT MARKERS, EDGE MARKERS AND STORM DRAlfl MARKERS SHALL BE INSTALLED ON A BROWN UNI-STRUT POST AT A HEIGHT OF 30 INCIIES TO Tli[ TOP OF SIGN. 10. 1\LL SiGNS LOCATIONS SHALL BC APPROVED BY THE CITY PRIOR TO INSTALLATION. 11. ALL SIGN DESIGNS SHAU. BE SUBMITTED TO THE CITY FOR APPROVAL. 12. ALL SIGNS SHALL BE INSTALLED A MINIMUM OF TWO FEET OUTSIDE OF THE TRAVELED PATH UNLESS OTHERWISE NOlED. 13. ALL PAVEMENT LEGENDS SHALL BE SPACED APPROXIMATELY 250 FEET OR AS DIRECTED BY THE CITY. 14. NUMBERED EDGE MARKERS (OM2-2V(MOD)) SHALL BE POSTED lO MARK STORM DRAIN INLETS ON THE EAST SHOULDER. MARKERS SHALL BE LOCATED OUTSIDE OF THE PAVEMENT. FACE SOUTH, AND Be IMMEDIATELY ADJACENT TO STORM DRAIN. 15. EDGE MARKERS (OM2-2V) SHALL BE PLACED WHERE SHOWN ON THE PLANS W!TH MARKERS AT THE BEGINNING AND END OF ZONES AND SPACED AT 100 FEET W!THlt,. MARKERS SHALL BE LOCATED OUTSIDE OF THE PAVEMENT, MINIMUM 1 FOOT FROM THE ROADWAY SURFACE ON THE EAST SHOULDER, AND MINIMUM 4 FEET FROM ROADWAY SURF ACE ON THE WEST SHOULDER. 16. OBJECT MARKERS SH.ALL 8[ LOCATCD IMMCDIATCLY IN FRONT OF OBJECT. 17. AIL CHANGES TO PROPOSED SIGN LOCATIONS SHALL GE APPROVED BY TiiE CITY. 18. TII[ CONmACTOR SHALL FURNISH THE PEDESTRIAN, BICYCLE, AND SHARROW STENCILS TO THE CITY OF NEWPORT BEACH AT THE COMPLETION OF CONSTRUCTION. ALL STENCILS SHALL BE CONSISTENT 111TH THE 2014 CA MUTCD. 19. REMOVE AND SALVAGE ALL EXISTING EDGE MARKERS, STORM DRAIN MARKERS, INTERSECTION MARKERS, AND POST MILE SIGNS. 20. MILE MARKER SIGNS (SIGN "F") SHALL BE PLACED .AT THE BEGINNING AND THE END OF EACH SEGMENT, AND Al 0.25 MILE INTERVALS. NB MILE MARKERS TO BEGIN AT SHELLMAKER AND SAN ,JOAQUIN H!Ll.S. SB MII.E MARKERS TO BEGIN AT EASTBLUrF AND SAN JOAQUIN I l!llS. (714) 992--2990 DESIGNED FAX 992-2883 CAV DATE CHECKED MHM DRAWN CAV DATE 10/2014 LEGEND: EXISTING CURB PROPOSED STRIPING EXISTING AC BERM EDGE OF PAVEMENT EXISTING STRIPING SHARED LANE BIKE LANE PEDESTRl1\N LANE EDGE MARKER LOCATIONS DETAIL SHEET BACK BAY DRIVE FROM C-6005 SHELLMAKER ROAD TO EASTBLUFF DRIVE ..... ---~---1---------------...... -------s R 6060 S !-o,_1r_E.,___B_Y__. ____ o_r_s(_:R_1P_·11_0N _____ _,___-! CHY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT RQ/ISIONS SHEET 2 OF __B__ (i) ;z r: s: w m ::0 • () • MATCH LINE "A" SCALE=1"=40' LEGEND: EXISTING CURB PROPOSED STRIPING EXISTING AC BERM WGE OF PAVEMENT EXISTING STRIPING SHARED LANE BIKE LANE FtDESTR!AN L.AJ~E EDGE MARKrn LOCA.TIONS BACK BAY DRIVE / / I , I I t I ! !~ ' 9' ..... J 1' -+-+-<-..., 1 -·~SIGN AND POST(W2-3) I IT]w2-3 MATCH LINE MATCH LINE "B" (R5-1u, BIKES EXCEPffD SIGN) ;!'.: i"..,,, ~ •• .J - ,,h • . . 1J .d' "" ,s~\i:t,lK ~ --H~' . ,f• " MATCH LINE 'B" AGA Jc,b ~ o. : ,6-GA 1-i!,e Name: Print Onte . I ast Revisio:. : I ! 169--082 C:ackGc/ST C1/C8;15 Cl/C3/IS ' . / i y / I ✓:·( IRSISIGN AND POST (R5-1o) T---/1:f'--'-5 R5-1a "' SIGN "8" \ . 4 CONSTRUCTION NOTES: [}]-INSTALL 4" w.,1TE EDGE LINE, DETAIL 27B. 0-i~lSTALL 4" SOL!D YElcOW CENTER LINE. 0-INSTALL 4" SOLID YELLOW HATCH UNE AT 15' SPACING. & ,NSTALL PAVEMENT LEGEND AS SHOWN. 0-FURNISH AND INSTALL NEW SIGN AND WOOD POST AS SHOWN. 0--INSTALL 4" SKIP YELLOW CENTER UNF (3' LINE, 9' GAP). 12]-INSTAil 1?" LIMIT, CROSSWALK OR ROADWAY MARKING LINE AS SHOWN. • o. 0--RAISE EXISTING Rl-1 (STOP) SIGN ABOVE EXISTING R3-2 (NC LEFT TURN) SIGN. FURNISH AND INSTALL NEW SIGN "8" BELOW R3-2 (NO LEFT i'URN) SIGN. 0--INSTALL SiGN ON EXISTING POST AS SHOWN. §--INSTALL EXISTING SIGN ON A NEW WOOD POSl. 0-INSTALL DOUBLE YELLOW CENTER LINE. §-INSTALL 8" WrllTE CHANNELIZING LINE, DETAIL 38A. EB-INSTALL 4" SKIP WHITE UNf (.i' LINE, 9' GAP). [E}-FURNISH AND INSTALL EDGE MARKER AS SHOWN. Efil-REALIGN EXISTING K-RAIL FOR PATH OF TRAVEL. ~-INSTALL 6" WHITE BIKE LANE LINE, DETAIL 39. Q:z]-FURNISH AND INSTALL SIGN ON DELINEATOR POST ON TOP OF K-RAIL AS SfiOWN. RS SIGN ~.ND POST (TRAIL SIGN) ·5 SIGN "E" SIGN AND POST RS . Rl-1 5 " \ " " ,, ,, \\ \\ " " , .. " " " ,, \ SAN JOAQUIN HILLS C-6005 (714) 992-2990 DESIGNE'O FAX 992-2883 CAV SIGNING AND SfR!PING PLAN BACK BAY DRIVE FROM CHECKEO MHM DRAWN CAV f------1 DAlE BY DESCRiPTION SHELLMAKER ROAD TO EASTBLUFF DRIVE R-6060-S D.4TE 10/2014 CllY OF NEWPORT BEACH l---'---l...-----,E-_v-1s-1o_N_s _____ __,__--I PUBLIC WORKS DEPARTMENT SHEET __ 3_ OF _ii_ r' i & Ii ' V, 2 C: s:: 00 m ::JJ tl ::lJ ~ -z Gl z c:: ~ III m ll MATCH LINE "E" \ , ··/\ OM2-2V(2 EA.) r-;71// \ (AT STORM DRAIN OUTLET) L:J -, , / I MATCH LINE 'D" ! / / ! I ! / ! I j \ I I • ' ' \ I I , I . f ! ... -\ .,,·· /, 5 TOTAL W1-8fil],.,,-\ ON K-RAIL RS , \ W1-8(3 TOTAL 17 • \ \ ' ,,,..,..,,,..··-•• , .. ,. TYPE P(CA) ,,. •. · .. AG/!-. '"l)b ~ki. : AG/\ lile Nome: Pi-i:1: Date : Los-;: F::e1isic,:1 : 169 • OC2 BackBc/vS I 01/CB 15 01/CB/15 ', ·-..,, , ·-........ 4 ALBER"J' G ROVER& WSOCIATES \ (714) 992-2990 DESIGNED FAX 992-2883 CAV CHEGKlcO MHM LEGEND: EXISTING CURB PROPOSED STRIPING EXISTING AC BERM EDGE OF PAVEMENT EXISTING STRIPING SHARED LANE BIKE LANE PEOESTRl/1N LANE EDGE MARKER LOCA 110NS CONSTRUCTION NOTES: OJ--INSTALL 4• WHITE EDGE LINE, DETAIL 27B. 0--iNSTALL 4• SOLID YELLOW CENTER LINE. 0-INSTALL 4" SCUD YELLOW HATCH UNE AT 15' SPACING. @-INSTALL PAVEMENT LEGEND AS SHOWN. @-FURNISH AND IMSTALL NEW SIGN AND WOOD POST AS SHOWN. 0--iNSTALL 4" SKIP YELLOW CENTER LINE (3' UNE, 9' GAP). CD-!NSIALL 12· LIMIT, CROSSWALK OR ROADWAY MARKING LINE AS SHOWN. [I]-RAISE EXISTING R1-1 (STOP) SIGN ABOVE EXISTING R3-2 (NO LEFT TURN) SIGN. FURNISH AND INSTALL NEW S!GN "B" BELOW R3-2 (NO LEFT TURN) SIGM. m--INSTALL. SIGN ON EXIS11NG POST AS SHOWN. ~ INSTALL EXISTING SIGN ON A NEW WOOD POST. ED-INSTALL DOUBif YELLOW CENTER UN[, ~ INSTALL 8" WHITE CHANNELIZING LINE, DETAIL 38A. @I-INSTALL 4" SKIP WHITE LINE (3' LINE, 9' GAP). 0-fURNISH AND INSTALL EDGE MARKER AS SHOWN. [El-REALIGN EXISTING K-·RA!L FOR PA11-I OF TRAVEL. 0---INSTALL 6" WHITE BIKE LANE LINE, DETAIL 39. §~-FURNISH AND INSTALL SIGN ON DELINE A TOR POST ON TOP OF K-RAIL AS SHOWN. SIGN AND POST (R5-la, BIKE. EXCEPTED) R5·-1a · SIGN "B" \ MATCH LINE "E" REVISIONS SCALE:1"=40' C-6005 SIGNING AND STRIPING PLAN BACK BAY DRIVE FROM SHELLMAKER ROAD TO EASTBLUFF DRIVE CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTh!ENT R-6060 -S Sc,EET __ 4 ____ or_B_ m ~ i tl Ix.~ \, 3i::j Z JJc ~ltln i " "" ;,, mW ~ ~ . i> g~Z ~z~ •"' ~ S X £ rn o ~ 111 ;:i:i .: rn. «{.'.\":? I "-NZ 2 ~ cc C ]> ' • - . ,:= r C, r 0 I V' -ID .1:: C ~ Fil l1 □ ll j;, § z rn 2 C s:: l!l m ll C jJ § 2 Gl z i:::: ~ 'ill m :tJ CONSTRUCTION NOTES: @-INSTALL 4" WHITE EDGE LINE, DETAIL 27B, 0-INSTALL 4" SOLID YELLOW CENTER UNE, 0-INSTALi. 4" SOLID YELLOW HATCH L!NE AT 15' SPACING. E}-INSTALL PAVEMENT LEGEND AS SHOWN. m--FURlllSH AND INSTALL NEW SIGN AND WOOO POST AS SHOWN, 0--INSTALL 4" SKIP YELLOW CENTER LINE (3' LINE, 9' G,•P). 0-INSTALL 12" LIMIT, CROSSWALK OR ROADWAY MARKING LINE AS SHOWN. 0-RAISE EXISTING R1-I (STOP) SIGN ABOVE EXISTING R.\-2 (NO LEFT 11.IRN) SIGN, FURNISH AND INSTALL NEW SIGN "B" BELOW R3-2 (NO LEFT TURN) SIGN. 0- [2Il-- @]- [ill- @J- e- @1- INSTAl.L SIGN ON EXISTING POST AS SHOWN. INSTALL EXISTING SIGN ON A NEW WOOD POST, INSTALL DOUHLI: YELLOW CENTER LINE. INSTALL 8" WHI fE CHANNELIZING LINE, DETAIL 38A, INSTALL 4" SKIP WHITE LINE (3' LINE, 9' GAP). FURNISH ANO INSTALL EDGE MARKER AS SHOWN. REALIGN EXISTING K-RAil fOR PATH OF TRAVEL EB-INSTALL 6" WHITE BIKE LANE UNE, DETAIL 39. IT:]-FURNISH AND INSTALL SIGN ON DELINEATOR POST ON TOP OF K-RAII AS SHOWN, -- "\ SIGN AND POST (R5 .. 1o,BIKES EXCEPfED) 1R:1 R5-1a 5 SIGN "B" -· --... ~,.... ~ .. ==== .. -.. ,-~-----:==_. ~. , ....... AG/,,_ Job ~~o AG,6. r ·,c ~~:::ww: ::Jrint Dote ,_est Revision : [R7ils1GN AND POST (W8-2,W13-1P) [I]wa-rn ,,,.,/,,,,,,,,' ;;.'/_,./ \ \\ - \ SIGN AND POST (IV8-18(MOD)) WB-2 W13-1P(10) LEGEND: EXISTING CURB PROPOSED STRIPING EXISTiNG AC BERM EDGE OF PAVEMENT EXISTING STRIPING SHARED LANE BIKE LANE PEDESTRIAN LANE EDGE MARKER LOCATIONS -~--~--~~ ---- ,_., ___ _ ·,;:::· ......................... . - -_-<f,. - - . ----'~~- (714) 992··2990 DESIGNED FAX 992-2883 C,6-V ............. +---+----------- -CHECKED MHM DRAWN C/.•.V DATE 10/2014 DATE BY DESCRPTION REVISIONS SIGN AND P0S 1 (Ro-1a,BIKES EXCEPTC:D) ~' S OM2-2V 5 R5-1o .·.," SIGN "8'' ~ ~~' • "'' .... ·-.. ·-···----·-··- "i -' • C, • w z ..J I ~ <l'. :'.2 C-6005 SIGNING AND STRIPING PLAN BACK BAY DRIVE FROM SHELLMAKER ROAD TO EASTBLUFF DRIVE CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT ;~-6060-S SHEET 5 OF 8 ~ " Cl □ ~ il ~~ .o § ~f~ ~(: ' 2 t • e ' Ci) ~~ 2..:-2 '.=: < s-i:: Q Ei "I, s:; 'I to '.t 5'.: nz m z :::0 ~ > cP " 7;5 tl ~ s ~ -• E z crl ' 2 ' ,~ i:::: s: !I! m II ' ' • I • CONSTRUCTION NOTES: (TI-INSTALL 4" WHITE EOG[ LINE, DETAIL 278. ill-INSTALL 4" SOLID YELLOW CENTER LINE, Q}-INSJALL 4" SOLID YELLOW HATCH LINE AT 15' SPACING. 0 INSTALL PAVEMENT LEGEND AS SHOWN. m-FURNISH AND INSTALL NEW SIGN AND WOOD POST AS SHOWN. 0-INSTALL 4" SKIP YELLOW CENTER LINE (3' LINE, 9' GAP). 0-INSTALi 12" LIMIT, CROSSWAIK OR ROADWAY MARKING UNf AS SHOWN. SIGN AND POST (R2-1(15))~,, SIGN "E"0 ----✓,,,...-- /'' ,,/ m-RAISE EXISTING R1-1 (STOP) SIGN ABOVE EXISflNG R3-2 (NO LEFT TURN) SIGN. FURNISH AND INSTALL NEW SIGN "B" BELOW R3-2 (NO LEFT lllRN) SIGN. 0-INSTALL SIGN ON EXiSTING POST AS SHOWN. ~ INSTALL EXISTING SIGN ON A NEW WOOD POST. 0-INSTALL DOUBLE YELLOW CENTER LINE. [ill--INSTALL 8" WHITE CHANNELIZING UNE, DETAIL 38A. IE}-INSTALL 4" SKIP WHITE LINE (3' LINE, 9' CAP). 0-FURNISH AND INSTALL EDGE MARKER AS SHOWN. ~ REALIGN 1:X!STING K-RAIL FOR PATH OF TRAVEL. (§-INSTALL 6" WHITE BIKE LANE LINE, DETAIL 39. ED-FURNISH AND INSTALL SIGN ON DELINEATOR POST ON lOP OF K-RAIL AS SHOWN. 5 TOTAL W1-~il<SI ON K-RAI ~SIGN "i:",R5 1a,SIGN "B" \, \ __ - -···--•••. -·------. -·-- TYPE P(CA,)IRSl W1--8(3 TOTAL) 17 TYPE P(CA) 5 , I ~:,_,,_:·:"'_-_-_-_·•_''::===::::::-i .... ;::: ::::: : r,:;i OM2-2Y(2 EA.) L'.;'.J (Al STORM DRAIN OUTLET) ' -_• __ s1GN AN_'□ POST (ws-1)1~s1 ---W8-1 5 ' " ¥ ---I . , I I [Il--7-:--: :-·-- --\ ) --/ ---------= ,\Gt1 ,Jc,'.) Ne ,\CJ, File N:Jr··1e: Print Del:.: Lo~l Revision ··--·-~ ·----·-·-··-··• ....... . s- -- fi4I OM2-,V(2 EA.) 7"' (AT STORM DRAIN OUTLET) /~ -------------- (714) 992--2990 DESIGNED FAX 992-2883 CA\/ CHECKED MHM LEGEND: EXISTING CURB PROPOSED STRIPING EXISTiNG AC BERM EDGE OF PAVEMENT EXISTING STRIPING SHARED LANE BIKE l ANE PEDESTRIAN LANE EDGE MARKER LOCATIONS --- REViS!ONS - SiGN AND POST (W1-1,W13-1P) RS_ W1-1(RT) 5 • -• w z :J I ~ <( :?i \-------+----[ LI.J J. --_q z ..J I ~ ::iii C-6005 SIGNING AND s:IBIP!NG PLAN BACK BAY DRIVE FROM SHELLMAKER ROAD TO EASTBLUFF DRIVE CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT R 6060-S SHEET 5 OF _J3_ ~ 5 Cl " ::l:l m" QB )r;, r'JC ~ !fit) iii@ -< 2 ~ . " IJl ~2 2 f"D z c'.:? ~-C ~s. s: m 017? m g~ rn 2 :n m ~ J> LEGEND: EXISTING CURB PROPOSED STRIPING EXISTING A.C BERM EDGE OF PAVEMENT EXISTING STRIPING SHARED LANE BIKE LANE PEDESTRIAN LANE EDGE MARKER LOCATIONS CONSTRUCTION NOTES: IJ}- 0--0-0- II]- [f}- 0- [D- 0- ~l·· 0- @}- @J····· 8- @}-~ @} INSTALL 4" WHITE EDGE LINE, DETAIL 27B. INSTALL 4" SOUD YELLOW CENTER UNE. INSTALL 4" SOLID YELLOW HATCH LINE Al 15' SPA.CING. INSTALL PAVEMENT LEGEND AS SHOWN. FURNISH AND INSTALi.. NEW SIGN AND WOOD POST AS SHOWN. INSTALL 4" SKIP YELLOW CENTER LINE (3' LINE, 9' GAP). INSTALL 12" UMIT, CROSSWALK OR ROADWAY MARKING UNE AS SHOWN. RAISE EXISTING R1-1 (STOP) SIGN .<\BOVE EXISTING R3-2 (NO LEFT TURN) SIGN. FURNISH AND INSTALL NEW SIGN "B" BELOW R3-2 (NO LEFT TURN) SIGN. INSTALL SIGN ON EXISTING POST AS SHOWN. INSTALL EX!STING SIGN ON A NEW WOOD POST. INSTALL DOUBLE YELLOW CENTER LINE. iNSTALL s• WHITE CHANNELIZING LINE, OETAil 38A. !NSTALL 4" SKIP WH!TE LINE (3' LINE, 9' GAP). EURNISII AND INSTALL EDGE fAARKER AS SHOWN. I,EALiGN EXISTING K-RAIL FOR PATH OF TRAVEL. INSTALL 6" WHITE BIKE LANE LINE. DETAIL 39. FURNISH AND INSTALL SIGN Oil DELINEATOR POST ON TOP OF K-RAll AS SIIOIIN. M.ATCH LINE "K" I \ ! I i ' i I I ! I ~-- j-,,~ ' I I SIGN AND POST (R5-1 a,BIKES EXCEPTED) RS R5-1o 5 SIGN "8" ! ; / / j ; . f \ I \ \ MATCH LINE "K" AGP. ,J:>b No. 1-\Gfa. File Name: F'ri:1: Da:.e Las;_ Revision : • ..l • 169 002 BockBcf✓ I 01/08; '15 01 /C3/15 ", . , \ EJ ..... .... •··'~·- ·····~···· .... i \ 4, ·,·:'. . ........ - 1; . , .• ---- ~ ~ SCALE=1"=40' 992---2990 DESIGNED 992-2BB3 CAV CHECKED f~HM DRAWN C,\1/ 1---------J DATE DA.TE 10/2014 BY R5-1a ('5] SIGN "B"~ ~ IJFSCR!PT!ON . / ·•, ,:,,__..- ·-.. ; • .J • _ ... -t w -z '"-.J I ~ ~ ~SIGN AND POST (R2-1(15)) I.I] SIGN "E" ,,,, ·" ti C 6005 SIGNING AND STRIPING PLAN BACK BAY DRIVE FROM SHELLMAKER ROAD TO EASTBLUFF DRIVE C!TY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT R -6060S SHEET 7 CF _Ii___ -is r., G'l ..,.~7 •2~ ~ i ~-= C: g Rr!i," •a i: <::mf-1 ~ ul ID : k1~ ' z F1'I ' z ll ~ _, " ?' I:) JJ \ l:> t;: ~ -z r I,') • z v i:: ~ ~ ' D • z " SIGN AND POST (R5-la,81KES EXCEPTED) R5-1a SiGN "B" --'-~t;;;,:.~t LEGEND: EXISTING CURB PROPOSED STRIPING EXISTING ~-C BERM EDGE OF PAVEMENT EXISTING STRIPING SHARED LANE BIKE LANE PEDESTRIAN LANE EDGE MARKER LOC.A llONS ➔ §j SIGN AND POST (Wl-4) WJW1-4 I /0 SCALE:1"=40' /IG/i ,Job N(_, ,6,CA F :(.' ~~O!flC" Prir.l Ode Last Revision 169-1J02 BuckB<JJST 01 /Oii;lo 01/08/1:i (714) 992-2990 DESIGNED FAX 992-2883 CAV CHECKED MHM DRAW~J CAV DATE 10/2014 CONSTRUCTION NOTES: IT}-INSTALL_ 4" WHITF FDGF LINE, DET•.il 278. [II-INSTALL. 4" SOLID YELLOW CENTER LINE. 0--INSTALL 4" SOLID YELLOW H.ATCH LINE AT 15' SPAC:NG. @-INSTALL PAVEMENT LEGEND AS SHOWN_ [I] FURNISH AND INSTA!.L NEW SIGN AND WOOD POST AS SHOWN. 0-INSTALL 4" SKIP YELLOW CENTER LINE (3' LINE, 9' GAP). 0-INSTALL 12" Ll~IT. CROSSWALK OR ROADWAY MARKING LINE AS SHOWN. 0-RAISE EXISTING R1-1 (STOP) SIGN ABOVE EXISTING R3--2 (NO LEFT TURN) SIGN. FURNISH AND INSTALL NEW SIGN "B" BELOW R.3-2 (NO !EFT TIURN) SIGN. 0-INSTALL SIGN ON EXISTING POST AS SHOWN. [§)--INSTALL EXISTING SIGN ON A NEW WOOD POST. {E]-INSTALL DOUBLE YELLOW CENTER LINE. @]--INSTALL 8" WHITE CHANNELIZING LINE, DETAIL 38A. EB--INSTALL 4" SKIP WHITE LINE (3' LINE, 9' GAP). 8-FURNISH AND INSTALL EDGE M~.RKER AS SHOWN. EB-REALIGN EXISTING K--RAIL FOR PATH OF TRAVEL. [ill-INSTALL 6" WHllc 8iKE LANE_ LINE, LJUAIL 39. §-FURNISH AND INSIALL SIGN ON DELINEATOR POST ON TOP OF K-RAIL AS SHOWN. DATE BY DESCRIPTION REVISIONS I\ -' ':>'.··· .. ··-.,. _,·,·;;A. • z • w g ... -··-·· z :J I ~ ~ C-6005 SIGNING AMP STRIPING PLAN BACK BAY DRIVE FROM SHELLMAKER ROAD TO EASTBLUFF DRIVE CllY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT tS) (jJ z C i 00 m Il