Loading...
HomeMy WebLinkAboutT_6085_ST-6085-S INSTALL DETAIL "A" I I SCALE: 1''=20' ,_ U) ,_ U) ~ C\J ro LJ PREFORMED THERMOPLASTIC STATE ROUTE 55 SHIELD DETAIL "A" ....______ INSTALL DETAIL "A" ,_ U) ~ 0 C\J I dOJS STOP ,_ U) ~ 0 C\J ------ ------- I SIGNING AND STRIPING GENERAL NOTES 1. ALL WORK SHALL BE IN ACCORDANCE WITH THE PROJECT SPECIAL PROVISIONS, THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GREENBOOK), 2009 EDITION AND ALL SUPPLEMENTS, THE CALTRANS STANDARD PLANS, DATED 2010, THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CA MUTCD), DATED MARCH 2018, THESE PLANS, AND THE CITY OF NEWPORT BEACH STANDARDS AND POLICIES. 2. THE LAYOUT FOR ALL PROPOSED PAVEMENT MARKINGS AND/OR TRAFFIC STRIPING SHALL BE "PRE-MARKED" AND/OR "CAT-TRACKED" FOR INSPECTION BY THE ENGINEER OR HIS REPRESENTATIVE PRIOR TO FINAL APPLICATION OF PAVEMENT MARKINGS OR STRIPING. 3. CALIFORNIA STATE ROUTE SHIELD PAVEMENT MARKINGS SHALL BE ENNIS-FUNT® PREMARK® PREFORMED THERMOPLASTIC OR APPROVED ALTER NATIVE. 4. NEW SIGNS SHALL BE INSTALLED TO MAINTAIN 7 FEIT TO THE BOTTOM OF THE LOWEST SIGN. INSTALL DETAIL "A" 16+oo-..., 16- " C " 1' e' E C. "' N ~ -C " ~ C D. "' "' " -::, 0 0:: ""§: CD C 0 .c C m / "' " ~ ..: VJ "' -~ -" ~ C :,; -C " E ~ C D. "' "' " -::, 0 0:: ""§: CD C 0 .c 1'i :3-~ N N N co 0 ~ "' ::, 0 ·;; 1' D. ~ ,----,------,------------------T"---r---------,-,-::,=:-:::::-=:------.------------------------------t::l APPROVED B~ u NO. DATE DESCRIPTION OF REVISIONS APPROVED BRAD SOMMERS RCE 65241 CITY TRAFFIC ENGINEER SIGNING AND STRIPING IMPROVEMENT PLAN WEST BALBOA BOULEVARD WEST OF 19TH, 20TH, AND 21ST STREET -~ VJ m D. z "' DESIGNED: DRAWN: RG RG CITY OF NEWPORT BEACH f?l CHECKED: EL DATE: 3 15 23 PUBLIC WORKS DEPARTMENT I--SH-E-ET_1_D_F_1--I~ L--------------------------------------------------------I.-...L...--...l...---------------1--...1...--------'----=._____,;;,'-'=;;;;.i...--------------........ -----