HomeMy WebLinkAboutT_6085_ST-6085-S
INSTALL DETAIL "A"
I I
SCALE: 1''=20'
,_
U) ,_
U)
~
C\J
ro
LJ
PREFORMED THERMOPLASTIC
STATE ROUTE 55 SHIELD
DETAIL "A"
....______
INSTALL DETAIL "A"
,_
U)
~
0
C\J
I
dOJS
STOP ,_
U)
~
0
C\J
------
-------
I
SIGNING AND STRIPING GENERAL NOTES
1. ALL WORK SHALL BE IN ACCORDANCE WITH THE PROJECT SPECIAL
PROVISIONS, THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION (GREENBOOK), 2009 EDITION AND ALL SUPPLEMENTS,
THE CALTRANS STANDARD PLANS, DATED 2010, THE CALIFORNIA MANUAL
ON UNIFORM TRAFFIC CONTROL DEVICES (CA MUTCD), DATED MARCH
2018, THESE PLANS, AND THE CITY OF NEWPORT BEACH STANDARDS AND
POLICIES.
2. THE LAYOUT FOR ALL PROPOSED PAVEMENT MARKINGS AND/OR TRAFFIC
STRIPING SHALL BE "PRE-MARKED" AND/OR "CAT-TRACKED" FOR
INSPECTION BY THE ENGINEER OR HIS REPRESENTATIVE PRIOR TO FINAL
APPLICATION OF PAVEMENT MARKINGS OR STRIPING.
3. CALIFORNIA STATE ROUTE SHIELD PAVEMENT MARKINGS SHALL BE
ENNIS-FUNT® PREMARK® PREFORMED THERMOPLASTIC OR APPROVED
ALTER NATIVE.
4. NEW SIGNS SHALL BE INSTALLED TO MAINTAIN 7 FEIT TO THE BOTTOM
OF THE LOWEST SIGN.
INSTALL DETAIL "A"
16+oo-...,
16-
" C " 1'
e'
E
C. "' N
~
-C
" ~ C D.
"' "' " -::,
0 0::
""§:
CD
C 0 .c
C m / "' " ~ ..: VJ
"' -~ -" ~
C :,; -C " E ~ C D.
"' "' " -::,
0 0::
""§:
CD
C 0 .c
1'i :3-~ N N N co 0
~
"' ::,
0 ·;;
1' D. ~
,----,------,------------------T"---r---------,-,-::,=:-:::::-=:------.------------------------------t::l APPROVED B~ u
NO. DATE DESCRIPTION OF REVISIONS APPROVED
BRAD SOMMERS RCE 65241
CITY TRAFFIC ENGINEER
SIGNING AND STRIPING IMPROVEMENT PLAN
WEST BALBOA BOULEVARD
WEST OF 19TH, 20TH, AND 21ST STREET
-~
VJ
m D. z
"' DESIGNED: DRAWN: RG RG CITY OF NEWPORT BEACH f?l
CHECKED: EL DATE: 3 15 23 PUBLIC WORKS DEPARTMENT I--SH-E-ET_1_D_F_1--I~
L--------------------------------------------------------I.-...L...--...l...---------------1--...1...--------'----=._____,;;,'-'=;;;;.i...--------------........ -----