Loading...
HomeMy WebLinkAboutT_5064_SCITY OF COS A °MES VICTORIA VICINITY ST. MAP 1A O 1/4 1/2 ~/4 I GRAPHIC SCALE IN MILES " :'i "" Q 0: BAl<ER AVE. SYMBOL LEGEND -c::J-POWER POLE 0 I -o-1 □ ---t><r- E- -x-x- ~'-(<'1 .u,. .ti, .dt. d ,/,. 1-:'.·· ,.· ... ·;:) i.:.:.:.:.::.. .::: .::: ;.J ., ,t ~L/..U.ll.u1 --- -s- -w- -G- -TV-- MANHOLE Fl RE HYDRANT METER BOX VALVE POWER POLE ANCHOR SPRINKLER SYSTEM BLOCK WALL TREE SHRUBBERY ASPHALT PAVEMENT CONCRETE BUILDING CENTER LINE SEWER LINE WATER LINE GAS LINE EXISTING CONSTRUCTION NEW CONSTRUCTION BRICK WALi< COMMUNITY T.V. --T--TELEPHONE CABLE EMERGENCY TELEPHONE NUMBERS AGENCY NUMBER SOUTHERN COUNT! ES GAS COMPANY 538-0211 SOUTHERN CALIF. EDISON CO~ANY 835-38'3'3 PACIFIC TELEPHONE COMPANY 67'3-0046 CITY OF NEWPORT BEACH(SEWER&WATER) 673-2110, EXT.267-69 COUNTY SANITATION DISTRICTS COMMUNITY CABLEV ISi ON 962-2411,EXT. 38 545-3556 Eureka CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT FEDERAL AID TOPICS PROJECT NO. T-3041 (214) San Francisco • r • Sacramento • Santa Barbara NEWPORT BEACH Son Diego t• _____ __, CALIFORNIA VICINITY. MAP TRAFFIC ENGINEERING Herman coNsuLTANTs kimmel and Associates 4242 CAMPUS DRIVE,SUITE E-6 (714) 546·9814 NEWPORT BEACH,CALIFPRNIA 92660 TRAFFIC SIGNAL AT CONSTRUCTION NEWPORT CENTER DRIVE EAST SANTA ROSA DRIVE SHEET INDEX I. Title Sheet 2. Traffic. Signal Plan CITY OF NEWPORT BEACH APPROVED _ _c_?;.,,,_~---·--_a:l_.~/t,-L __ _ ASSISTANT PUBLIC WORKS DIRECTOR R.C.E. NO. 12806 DATE Sheet I of 2 I CONDUCTOR SCHEDULE AWG Function & &, ffi & ffi & 0AI ( Future) -3 -3 -- 0A2 - - - --3 0A3 ( Future ) -3 -3 -- 0A4 3 3 -3 -- 0B2 --3 3 -- 0B4 3 3 -3 3 3 0A2 Ped. 2 2 -2 -2 ill s 3 6 3 6 3 6 -3 -3 3 6 2 4 Pole Type Length (D I-A 10' * + 2 XlZI[ 28'6h 3 Exist. 5 J + (6 (j) Exist. :xrx: I-A 17' 30' 10' POLE SCHEDULE Signal Lum Signol Mounting P.P. B P. P. B. M.A. M.A. Veh. M.A. Ped. Type Phase 20' 30' 30' -A-I -W-0 B A2+A4 6' B-2 M-2 W-0 Exist. B-1 6' B-1 M-2 W-0 B-1 W-0 B-1 M-2 W-0 A-I -W-0 B B B B B B A2+A4 B2+84 B2+84 A2+A4 A2+A4 B2+84 For detector operotion see Special Provisions <;:_ \ \ \ \ I . _) ( ---------- ' '5 Al A3 A2 \ I -I I I FUTURE PHASE DIAGRAM -------_)_ r _ _; -----...,... -------) • ' I I I I I . I ' + A4 Al + A3 Al+ A2 A3 + A4 A2 + A4 B2 B4 I 3 4 5 ~2 ~ ••ther of ------'-------'----~--' PREFERRED PHASE SEQUENCE WITH CALLS ON ALL PHASES ,._ _________ _ 0A4 Ped. ---2 #14 0B2 Ped. - - -- 0B4 Ped. 2 2 2 2 ---2 8 Exist• Exist. B B2+84 2 2 2 4 + 9 '"""" 17' 30' B-1 M-2 W-0 B B2+84 2 \ I I I \ )~ ,. ' CONTROLLER MODULE SCHEDULE 0A2 P.P.B. I I -I 0A4 P. P. B. --I I 0B2 P. P. B. - --- 0B4 P.P.B I I -I P.P.B. Common I I I I Spares 3 3 3 3 TOTAL 16 22 10 28 -t1:12 Internally ilium. sign 2 2 -2 Signal Common I I I I *10 l..J.Jminaires 2 2 -2 . TOTAL 3 3 I 3 Det. A2 (1,2,3) -3 -3 - - I I -- -I -- I I 3 3 10 16 -2 I I -- I I - - - I - I - I 3 22 2 I - I - 2 I I I I 6 54 2 I 2 3 3 . -- IO 1-A 10' --A-I -W-0 B A2+A4 + 'ljpe :xJlll, XIllll, t :XCC standards shall be capable of supparting additionol intemat(y illuminated sign with 7 sq. ft. of sign surface_ if 'lypeZillI I XIX stondards shall be capoble of supporting future 4 -section 12" most-orm signal head. r.,,._ 45' Break ri-42 ' Bree k ------ ---- NEWPORT Loop Del. A2-D (4) -I -I - - - I Del. A4 ( 1,2,3) -- - ----3 Detector Det.A4-D (4) -------I i"c, 2 Magnetometer Cables -- --Del. B2 ( I, 2) 2 2 2 2 Cable (3) Del. B2-D I I I I ---------- Del. B4 l I, 2 ) - -2 2 -- -2 't----_J__j TOTAL -4 2 6 3 3 3 13 Del. A2 (5,6,) -2 -2 - - -2 Magneto-Del. A2-R ( 7, 8 ) -2 -2 -- -2 -------meter Del. A4 (5,6, 7) 3 Del. A4-R (8 ,9, 10) - - -----3 Detector Det. B2-R (4,5) --- -2 2 2 2 --- - -Cable Det. B4-R (3 ,4) 2 2 2 TOTAL -4 2 6 2 2 2 14 GENERAL NOTES : I. 2. 4. 5. 6. The electrical work and equipment shall conform to this pion, the California Standard plans, and Standard Specifications in effect at time of Contract and the Special Provisions. • Install a 7ype 90 controller, eight phase frame with two modules for IPA and rJB operation in a "Type ''R" cabinet. Control/er and cabinet shall be wired for future six module operation, (see Special Provision). Install detector sensing units as shown on pion. Failsafe lo be tested in field prior to Signal turn on. Install 120/240 Signal a Lighting Service (40 amp circuit breakers) and meter box on the side of the controller cabinet. (See Special Provisions) Where four or more conduit are run into pullbox use "Type -1¥5 pullbox, all others shall be "Type llt< 5. Conduit shall be 2" unless otherwise noted. All conductors shall be installed for future six module operation. Conductors not used for two phase operation shall be pulled to the pullbox adjacent to its ultimate phase terminus, as shown on the pion. 30' of each unused conductor shall be coiled in the pullbox. All conductors shall be banded at each end to clearly designate present and future phase application in addition to normal color coding. <( U) ~ ILL 1-B2 2-B2 --411-TV---+-l- I 11 Run 3 $;o (line, load, a ground/ to pole mounted photo-electric control. ( Note IOI ,-.. 1-""«=-l--+ Note 14 " Phase A2 + A4 B2+ B4 7. 8. 9. 1a At poles @ a @ relocate the existing City lighting standards to new position and insto/1 pedestrian push buttons as shoW'II on pole schedule. 66' t---1½ C, 2 Magnetometer Cables II. 12. /3. 14. /5. /6. 17. /8. 19. Luminaire arm shall be a davit type arm. (See Special Provisions) Luminoires shall be installed without glare shields. Lamps shall be 400-Watt mercury vapor. Install Photo-electric Cell receptacle on pole ®. Photo-electric switch to be provided and installed by Edison Co. ( For pole top receptacle installation see Standard. Plan) Pedestrian heads shall be 7ype C. All inductive loops shall be e'x 6' with 10 'lateral spacing except where shown otherwise. Maunetometer units shall hove two inputs and two qutputs. . . Detectors 4-A2-0, 4-A4-0 and 3-B2-0 shall have adjustable time-delay circuitry provided in the cabinet. See Special Provisions. Remove City Lighting Standard and ballast. Remove foundation. Close series circuit. Notify city to pick up salvaged items. • All signal heads shall be 12~1 Mount A4 head on Pole ® at 17 'height. Construct 11/2 11 A.C. S/Jrfoce Course over 6 11A.C. Base Course. Al Pole (5) reuse existing pul/box and conduit to exist Lighting Standard. Install new signal conduit to existing pul/bax. Install new pul/box. Join 3 existing series street lighting conduits and extend into new pullbox. Install "Traffic Signal" cover a, existing pull box and new ballast. 1n1 o:ETERICH•PDST 21018 .003 20. iii I I I-I I I I ,, .__,_.. 4-82-R I 't. '-.,-' IU 5-B2-R' I I I For detector operation see Speciol Provisions :, Conduit and foundations for poles @@(6) and ® and pullboxes to be installed on the N/£ and S/£ corners shall not be installe"d ,n'tlie "exposed aggregate" area. No removal or sawcuts in the /;exposed aggregate'' slob will be allowed. If for any reason the exposed aggregate / is damaged. the entire slab involved shall be removed and replaced. P.C.C. radials separating ''exposed aggregate'' slabs may be removed to facilitate installation of conduit onr/ signal equipment. See SpeciolProvisions. DATE Type SP SP BY PRESENT PHASE DIAGRAM Break --------♦ ♦ I I L---::=-r"c, 3 Magneto- meter Cables I I I I ---· Scale : I " = 20' POLE LOCATION SCHEDULE Pole No. Distance Dist. from curb face I 8' from B.C. 2' 2 12' from B.C. 2' 3 8' ·from nose centered 4 f 3' from B.C. 3' 5 Exist. Exist. 6 t°3' from B.C. 2' 7 :lt, 12· from B.C. 2' 8 8 1 from nose centered 9 8' from B.C. . 2' 0 12' from a.c. 2' =K: See Note 20 DESCRIPTION APP'D. REVISIONS -------t t A2 + A4 B2 + B4 Sensor Unit Channel Detector --------- i¼I A 6-A2 ""' B 7-A2 il\2 A 8-A2-R %2 B 9-A2-R 11.3 A 5-A4 *3 B 6-A4 *4 A 7-A4 ~5 A 8-A4-R i/;!5 B 9-A4-R *6 A IO-A4-R %7 A 4-B2-R If,. 7 B 5-B2-R 11.8 A 3-B4-R ;I;, 8 B 4-B4-R INDUCTIVE LOOP DETECTOR SCHEDULE Sensor Unit Detector ,i;,; I I-A2 *2 2-A2 ;i;.3 3-A2 *4 4-A2-D '1¼5 I-A4 *6 2-A4 'lt,7 3-A4 *a 4-A4-D *s 1-B2 'II, 10 2-B2 *11 3-B2-D 'lt:12 1-B4 i'f-13 2-B4 TRAFFIC ENGINEERING PREPARED UNDER THE SUPERVISION OF 1./d.5w 1-/,d?,., 8.;,;w,,, DATE IZ/$/7: fierman coNsULTANrs Kimmel and Associates •a~ c ..... ov.i MW,SOTT [·4 (?IOI tn•~"· HILBERT WILLIAM DICKSON R.C.E. NO. 19417 N•"""11T au .... ,""U'O"" ... UUQ APPROVED f'l:,r,; PUBLIC WORKS DIRECTOR R.E. NO. I ZQ.::,.5 DAT.___:;I • -? DESIGNED f?.P. G. CHECKED- :,/3 DRAWN ,:;;;-;a:,..,/C DATE 1.?/5/1z. TRAFFIC SIGNAL PLAN NEWPORT CENTER at SANTA. ROSA DRIVE DRIVE EAST CITY OF NEWPORT BEACH T-5O64-S PUBLIC WORKS DEPARTMENT SHEET 2 OF 2 i ,.,