Loading...
HomeMy WebLinkAboutT_5869_S(!) z ~ II 0 0 z ~ is : 0 ffi ·~ ftuo m ~~ ~ ~ 0 a :c ~---~~ ft I t .I) 0 () ' - ( ([ w rn 2 :::J I . I I I I I • I GRAPHIC SCALE -------1g 17 -----------------........_ ----........_ ........_ BACKBA Y DR/~ i i;-+11-----11 ____ ..., ____ ..., _____ ~+----'2 .. •"*·"-------------"""'l-----'J---.--------------®-3 _ 4 ___ ,_4 _________ ~----.... --. l " .;Ii .. - STRIPING GENERAL NOTES: 1. ALL STRIPING DETAILS, MARKINGS, ETC., SHALL BE PER STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD PLANS, 1999 EDlllON. 2. ALL EXISTING lHERMOPLASTIC STRIPING MUST BE REMOVED ~RIOR TO SLURRY/NEW PAVEMENT. 3. ALL EXISTING PAVEMENT MARKERS MUST BE REMOVED PRIOR TO SLURRY/NEW PAVEMENT AND REPLACED WllH NEW MARKERS, UNLESS OlHERWISE SHOWN. •· ALL STOP BARS TO BE 12" WHITE O 1/2 A UNLESS OlHERWISE NOTED. 5. ALL FINAL STRIPING SHALL BE "SPRAY ABLE REFLECTORIZED lHERMOPLASTIC" APPLIED AT A MINIMUM lHICKNESS OF O • .i5 MM, EXCEPT' CROSSWALKS AND LIMIT LINES SHALL BE 0.90 MM MINIMUM lHICKNESS. lHE FINAL STRIPING SHALL NOT BE APPLIED UNTIL lHE PAVING HAS BEEN IN PLACE FOR AT LEAST 15 DAYS. 6. TEMPORARY PAINTED TRAFFIC STRIPING AND MARKINGS SHALL BE APPLIED IN ONE COAT ANO AS SOON AS POSSIBLE WllHIN 2• HOURS AFTER lHE FINISHED COURSE OF PAVEMENT HAS BEEN APPLIED. 7. NECESSARY STRIPING SHALL BE LOCATED PRIOR TO POSITIONING DETECTORS. I, I Engineering Civil • Surveying • Planning 18 Technology Drive, Suite 100 Irvine, CA 9261B (949) 753-9393 FAX (949) 753-9322 \ \ I - @ ® @) ® @ ® ® ® -- STRIPING NOTES: INSTALL 4• WIDE YELLOW SOI.JD DOUBLE LINES WITH 3" CENTER BLACK STRIP£ PER CALTRANS TRAFFIC MANUAL DETAIL 21 INSTALL 6" WIDE WHIT£ SOI.JD STRIP£ BIKE LAN£ PER CAL TRANS TRAFFTC MANUAL DETAIL 39 INSTALL BIKE LAN£ PAVEMENT MARKING INSTALL 100' BIKE LAN£ INTERSECT/ON LINE PER CAL TRANS TRAmc MANUAL DETAIL 39A INSTALL 4• WIDE WHIT£ LANE UN£ PER CALTRANS TRAmc MANUAL DETAIL 8 INSTALL 4• WIDE WHIT£ SOI.JD LIN£ (50' T'rPICAL) INSTALL 1' WIDE WHIT£ SOI.JD STRIPES INSTALL PAVEMENT MARKING AS NOTED ON TH£ PLANS ---... GRAPHIC SCALE / ( IN FEET )., / 1 inch = 20 It. \ BACK BAY DRIVE STREET IMPROVEMENTS STRIPING 04-23-01 04-12-01 03-23-01 11-17-00 11-03-00 10-16-00 10-04-00 SHEET 46 - EE m ~ :J z CJ z ~ a: 0 ( a: w [lJ ~ 7 I I I I I 0. . L ;t .. • \.aJ 'Z. -....1 1.0 :i:. --- • "' --------'-,.;.°'-4 s._.,~A A..J.. ~ •• ' ~ ,,,__. _ _i------V) - ---- -.._,., -,_,,.....,..._.,,._,,..___,./ - -- -...., !"$ ---------..----------- ... .;ti ... ... '-r ,, ' '---«-.(',<:~), /f --f--2J 2. ALL EXJSllNG lHERMOPLASTIC SlRlPING MUST BE REMOVED PRIOR TO SLURRY/NEW PA~T. 3. ALL EXJSllNG PAVEMENT MARKERS MUST BE REMOVED PRIOR TO SLURRY /NEW PAVEMENT AND REPLACED WllH NEW MARKERS, UNLESS OlHERWISE SHOYIII. 4. ALL STOP BARS TO BE 12" WHITE O 1/2 A UNLESS OlHERWISE NOTED. 5. ALL FINAL STRIPING SHALL BE "SPRAY ABLE REFLECTORIZED lHERMOPLASTlc" APPLIED AT A MINIMUM lHICKNESS OF 0.45 MM, EXCEPT CROSSWALKS AND LIMIT LINES SHALL BE 0.90 MM MINIMUM lHICKNESS. lHE FINAL STRIPING SHAU. NOT BE APPLIED UNTIL lHE PA'vlNG HAS BEEN IN PLACE FOR AT LEAST 15 DAYS. 6. TEMPORARY PAINTED lRAFFIC SlRIPING AND MARKINGS SHALL BE APPLIED IN ONE COAT AND AS SOON AS POSSIBLE WllHIN 24 HOURS AFTER lHE FINISHED COURSE OF PAVEMENT HAS BEEN APPLIED. 7. NECESSARY STRIPING SHALL BE LOCATED PRIOR TO POSITIONING DETECTORS. T - \ 24 ------------JO • D1f Engineering Civil • Surveying • Planning 18 Technology Drive, Suite 100 Irvine, CA 92618 (949) 753-9393 FAX (949) 753-9322 -- - .25 - m .. _- DATE BY DESCRIPTION IID,1SIONS - --- @ ® @) ® @) @) @ @) STRIPING NOTES: INSTALL 4• IIID£ >a.LOW SOLID DCIJBL£ UN£S 1111H J" CCNTfR BLACK STRIPE PER CAL TRANS TRAFRC .W,,.llfML DUAi!. 21 INSTALL 6" IIID£ rHTE SOUD STRIPE BIKE LANE PER CAI.TRANS TRAFFIC MANUAL DUAi/. JI INSTALL BIKE LANE PAVEMENT IIARKING INSTALL 100' BIKE LANE INTERSCCTKJN UN£ PER CAI.TRANS TRAFFIC MANUAL DETAIL .1'M INSTALL 4• IIID£ ltHITE LANE LINE PER CAI.TRANS TRAFFIC 1'ANiJAL DETAIL 8 INSTALL 4• IIID£ ltHITE SOI.ID UN£ (50' Tl1'#CAL) INSTALL 1' IIWE WTE SOUD STRIPES INSTALL PAVEMENT MARKING AS NOTED ON THE: Pl.ANS BACKBAY DRIVE STREET IMPROV(;:MENTS STRIPING 04-23-01 04-12-;01 0J-2J-01 11-17-00 11-03-00 10-16-00 10-04-00 SHEET 47 APP'□. DESIGNED DRAIIIN HDK EA CITY OF NEWPORT BEACH R-6782•8 Pt ■ IC IOMI DliiPARTIENT II I 7 OP 14 CHECKED DATE DJM OCT 04 2000 ~ z < (!) ~ 0 z z is > ~ ~ UC C 0 w 0. 0 " " 0 u u a: u C g D 0 r z '.l 0. ~~ ~ t' ~ z " 0: -~ 0 ~ 0 "' ~'l.. u ci z ~ 2 ~ ~ ::J 0 z~ . C w z ~ (!) • 0 z z ... ~ " ~ C .~ 0 Ll & ~ 0 0 -'" u C II \. 0 ., D;,; 0 :i; V\ z '.l 0. fl I ~ ,g t:) 1'\ ' -I " z \. C 0 ~ a: a ,i w u []] ui z ~ 2 5 "' " ~ ' ::J □ z . C fl Ll ro z , (!) ('/J C, 0 z z ~ ~ ~ ffi 0 ~ 0. u " C 0 0 Ll [[ u C ..,) 0 D _, 0 n'I I z '.l 0. \ \ s z C S' 0: 0 "' LU u Cl) uJ I ~ 2 " 7 ' 0 • ~ °a > • } '~ i I I i I l 11 I I I I 11 I I I I I I I I I ~! '··• -;:z -~Ii ;I •• ,~ i~ i~ I ! I I I I I I Ii I I I ii , I ' ii l! ;i ,. i~ :'.D ~it ,-,n ~ i; ?~ 11 I I I I I I "-. I I a; 4~ I I -~ I I w ;,.;') ~ :0 I I 0 --~ = "' I I "' "' ~, -- I I -· .. "' < :.t fu < 0 -a ' CD ,-0 ,.,,.. ;r, m c,."1 . , a; cc X ~ ,r, ~ a, ~ U"l i'5 -, ,;/ u ~ STRIPING GENERAL NOTES: 1. AU. STRIPING DETAILS, MARKINGS, ETC., SHALL BE PER STA TE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD PLANS, 1999 EDlllON. 2. ALL EXISTING THERMOPLASTIC STRIPING MUST BE REMO\IED PRIOR TO SLURRY/NEW PAVEMENT. 3. ALL EXISTING PAVEMENT MARKERS MUST BE REMO'v£D PRIOR TO SLURRY/NEW PA'v£MENT AND REPLACED WllH NEW MARKERS, UNLESS OlHERWISE SHOWN. 4. ALL STOP BARS TO BE 12" \\tillE e 1/2 t:,, UNLESS OTHERWISE NOlED. 5. ALL FINAL STRIPING SHALL BE "SPRAY ABLE REFLECTORIZED THERMOPLASTIC" APPLIED AT A MINIMUM THICKNESS OF 0.45 MM, EXCEPT CROSSWALKS ANO LIMIT LINES SHALL BE 0.90 MM MINIMUM THICKNESS. THE FINAL STRIPING SHALL NOT BE APPLIED UNTIL THE PAVING HAS BEEN IN PLACE FOR AT LEAST 15 DAYS. 6. lEMPORARY PAINlED TRAFFIC STRIPING AND MARKINGS SHALL BE APPLIED IN ONE COAT AND AS SOON AS POSSIBLE WllHIN 24 HOURS AFlER 1HE FINISHED COURSE OF PA'v£MENT HAS BEEN APPLIED . 7. NECESSARY STRIPING SHALL BE LOCATED PRIOR TO POSITIONING DETECTORS. DJ\f Engineering Civil • Surveying • Planning 18 Technology Drive, Suite 100 Irvine, CA 92618 (949) 753-9393 FAX (949) 753-9322 STRIPING NOTES: INSTALL 4• ltlDE lfl.LOW SOLJI) DOUB/.£ LINES WITH J" CENTER BLACK STRIP£ PER CAL TRANS 71lAFFIC IIANUAL DETAIL 21 INSTALL 6• ltlDE fir£ SOI.ID STRIPE BIKE LAN£ PER CALTRANS TRAFFIC lrlANUAL DETAIL Jg INSTALL BIKE LAN£ PA 'v£MENT /rlARKING INSTALL 100' BIKE LAN£ INTERSECTION UN£ PER CAL TRANS TRAFFIC /JANI.JAL DETAIL J9A INSTALL 4• ltlDE WTE LAN£ UN£ PER CALTRANS TRAFFIC lrlANUAL DETAIL 8 INSTALL 4• ltlDE WT£ SOI.ID UN£ (50' TYPICAL) 04-23-01 04-12-01 03-23-01 11-17-00 11-03-00 10-16-00 10-04-00 SHEET 48