HomeMy WebLinkAboutT_5902_S/
(
)
\
/
6 !§ j t,; Q:
CD
z
0
I-1-
(.) if)
Z!:!i -~ f-~ ~ zo
::::i ~
:r:m
Li...
0
ADAMS AVE.
CITY OF
COSTA
MESA
.
"1CTORIA
~ m
"' 0 rn ~ ;,:
ci "'
ORANGE
COAST
COLLEGE
BAKER
1------1 ORANGE CO.
FAIRGROUND
~ > q ~ ,;;,~ <f'
ST.
CITY
OF
IRVINE
UNIVERSITY
19TH ST.
PROJECT LOCATION
VICINITY MAP
SCALE: 1" ; 4400'
SYMBOL I EGEND
8 POWER POLE
@SSMH SANITARY SEWER MANHOLE
'(:1 FIRE HYDRANT
~ u ·· ··· · WATER METER BOX & SERVICE
□GM GAS METER
--<Sf-VALVE
POWER POLE ANCHOR
MONUMENT
-X-X-X-FENCE
.LLL LLL .LLL ..llL...
BLOCKWALL
TREE
SHRUBBERY
ASPHALT PAVEMENT
BRICKWALK
CONCRETE
BUILDING
EXISTING CONSTRUCTION
PROPERTY LINE
----NEW CONSTRUCTION
---~---CENTERLINE
----S----SEWER LINE
-----W-----WATER LINE
---G---GAS LINE
--E--POWER LINE
-TEL~ TELEPHONE LINE
-· -CATV-CABLE LINE
_5p __ SPRINKLER SYSTEM
:a: STREET LIGHT
-u-SIGN
F .:::j GARAGE OPENING
t:::------j WINDOW
• SPRINKLER
~ POTHOLE LOCATION
CALL TOLL FREE
. 1-800-422-4133
BEFORE YOU DIG
ABBREVIATIONS
AC
DIP
VCP
RWY
FE
MJ
NTS
RT
STL
ASPHALT CONCRETE
DUCTILE IRON PIPE
VITRIFIED CLAY PIPE
RESILIENT WEDGE VALVE
FLANGED END
MECHANICAL JOINT
NOT TO SCALE
RING TIGHT
STEEL
ABAND ABANDONED
IP&T IRON PIPE AND TAG
MON MONUMENT
CATV CABLE TV
DWY DRIVEWAY
CO CLEANOUT (SEWER)
ARV AIR RELIEF VALVE
8/APPR BACK OF ALLEY APPROACH
EV ELECTRICAL VALVE
SW SIDEWALK
WWF WELDED WIRE FABRIC
SO STORM DRAIN
LEGEND
QS---SANITARY SEWER MANHOLE
+o+ ---FIRE HYDRANT
w --~---WATER VALVE
---S---SEWER LINE
---W----WATER LINE
--SCE---ELECTRICAL LINE
--TEL---TELEPHONE LINE
--COiv,,-1 ---CABLE LINE
--SD -STORM DRAIN
---~----CENTERLINE
-------PROPERTY LINE
---POTHOLE LOCATION
EMERGENCY TELEPHONE NUMBERS
SOUiHERN CALIFORNIA GAS COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
PACIFIC TELIPHONE COMPANY
CITY OF NEWPORT BEACH UTILITIES DEPT.
COUNTY SANITATION DISTRICT
COMCAST CABLE VISION
UNDERGROUND SERVICE ALERT
800-624-8153
800-611-1911
611
949-644-3011
714-962-2411
714-542-6222
800-422-4133
NIGHT
800-624-8153
800-611-1911
611
800-422-4133
THE CONTRACTOR SHALL NOTIFY THE FOLLOINING
UTILITIES PRIOR TO COMMENCING WORK
ELDON DAVIDSON
LARRY KOBO
BECKY CALVITTI-BRANDON
MARK PALEN
BOB WARTH
MATT WAZNEWSKI
TIM. SCANLIN
BRAD JACKSON
CITY SEWER AND WATER
CITY STORM DRAIN
PACIFIC BELL
THE GAS COMPANY (DISTRIBUTION)
THE GAS COMPANY (TRANSMISSION)
EDISON
CABLE
IRVINE RANCH WATER DISTRICT
949-718-3400
949-644-3055
714-666-5711
714-634-3262
714-634-3119
714-895-0109
714-338-2000
949-453-5611
CONSTRUCTION NOTES:
SAWCUT AND REMOVE INTERFERING
PORTIONS OF EXIST. IMPROVEMENTS.
CONSTRUCT 6" A.C. PAVEMENT OVER
8" AGGREGATE BASE.
CONSTRUCT 6" A.C. BERM.
CONSTRUCT TYPE A CURB AND GUTTER (18")
PER CITY STD-182-L
CONSTRUCT LOW POINT AND LEAVE 1'
OPENING IN A.C. BERM AT LOW POINT.
CONSTRUCTI01\J NOTES (SIGNING ONLY)
CD PLACE SIGN AND POST (CAL TRANS DESIGNATION).
@ REMOVE EXISTING SIGN AND POST (CALTRANS DESIGNATION).
CONSTRUCTION NOTES (STRIPING ONLY)
OJ INSTALL 8" SOLID WHITE LINE (CALTRANS DETAIL 38).
IT] INSTALL 50' 4" SOLID WHITE LINE.
[l] INSTALL WHITE PAVEMENT ARROW AS SHOWN (TYPE IV).
INSTALL 12" WHITE CHEVRONS @ 10' SPACING AND 45' ANGLES.
INSTALL 4" SKIP WHITE LINE (CALTRANS DETAIL 12).
INSTALL 12" WHITE LIMIT LINE.
CITY OF NEWPORT BEACH INSTALL 4" DOUBLE YELLOW LINE (CALTRANS DETAIL 27).
INSTALL 4" DOUBLE YELLOW LINE (CALTRANS DETAIL 21).
INSTALL TYPE "D" TWO-WAY YELLOW REFLECTIVE PAVEMENT
MARKERS @ 3' SPACING ON TOP OF AC BERM.
TRAFFIC SIGNAL AND ROADWAY IMPROVEMENTS
ON NEWPORT COAST DRIVE
APPROVED:
APPROVED:
SAGE HILL SCHOOL
AT SAGE HILL SCHOOL
CONTRACT NUMBER C-3587
p ' /
w;i;..,~~ CITY ENctNEERi:24967
NFWPORT COAST DRIVE
PROJECT LOCATION
~
ED MILLER Jr.
No. 47615
Exp.12-31-0
----iiiiiiiiiiir'lll
SCALE: 1" -80'
CITY OF NEWPORT BEACH
THIS PLAN IS SIGNED BY THE CITY OF NEWPORT BEACH
FOR CONCEPT AND ADHERENCE TO THE CliY AND STATE
STANDARDS AND REQUIREMENTS ONLY. THE CliY IS NOT RESPONSIBLE FOR DESIGN ASSUMPTIONS AND
ACCURACY. n
APPROVED K,yR~JiMU'NI.IN'<lk-_ 1a/l7/o'L
PUBLIC l'iORKS DEPT. DATE
APPROVED __________ ~~-
DATE UTILITIES DEPT.
12./r,(ot...
GAS RECOVERY PLANT
ACCESS ROAD
PREPARED BY:
KFM ENGINEERING, INC.
26672 Towne Centre Dr. #300
Foothill Ranch, CA 92610
Phone (~;~).~f838 ~~~ 12./16/oz.
R.C.E. NO. 47615 DATE
[ill REMOVE "CONFLICTING" PAVEMENT MARKINGS AND STRIPING.
SIGNAL CONSTRUCTION NOTES
m
m
INSTALL CITY FURNISHED 8-PHASE MULTISONICS 820A CONTROLLER ASSEMBLY IN A TYPE "P" CABINET WITH
DETECTION AS SHOWN, VEHICLE COUNTING SYSTEM, OPTICOM PHASE SELECTORS, ANO MISCELLANEOUS AUXILIARY
EQUIPMENT. BICYCLE LOGIC SHALL ALSO BE USED. BIKE LOGIC ON SAGE HILL <l>7 ONLY.
INSTALL 3" CONDUIT WITH PULL ROPES TO EDISON SERVICE POINT (CONDUCTORS BY EDISON). COORDINATE WITH
SOUTHERN CALIFORNIA EDISON SERVICE PLANNER MATT WAZNEWSKI AT (714) 895-0109 FOR ENTRY INTO VAULT
AND SERVICE CONNECTION. INSTALL TYPE II SERVICE PER CITY OF NEWPORT BEACH STD. 910-l.
INSTALL CITY FURNISHED POLES ON EXISTING FOUNDATIONS. CONTRACTOR SHALL ARRANGE FOR UNLOADING OF POLES.
INSTALL 6 PR#19 INTERCONNECT IN EXISTING CONDUIT TO ACCESS ROAD. CONTRACTOR TO VERIFY, CLEAN AND REPAIR
SIC, AS NECESSARY.
INSTALL E.V.P. DETECTOR ON SIGNAL MAST ARM, USING PELCO ASTRO MINI-BRACKET WlTH REDUCER BUSHING 1.5" TO 0.75".
INSTALL TELEPHONE DEMARCATION CABINET AT GAS RECOVERY PLANT ACCESS ROAD, PAINTED AND ATTACHED TO TYPE "p"
CABINET. THE CABINET SHALL CONTAIN 3/4" EXTERIOR GRADE PLYWOOD BACKBOARD ANO A 12 TERMINAL STRIP WITH A
STAND OFF DEVICE. SWEEP CONDUIT INTO CABINET AND USE CABLE SLACK TO ACCESS TERMINAL BLOCK. INSTALL CONDUIT
& PHASE CONDUCTORS TO TELEPHONE SERVICE POINT. COORDINATE WITH TELEPHONE SERVICE PROVIDER.
7. CONSTRUCT CONCRETE PAVEMENT AT MISSING LOCATIONS AT FOUNDATIONS.
DESIGNED
DJ
CHECKED
EM
DRAWN DJ
DATE BY
DATE
12/10/02
GENER,4L NOTES
1. ALL WORK SHALL CONFORM TO THE CITY OF NEWPORT BEACH STANDARQ
PLANS AND SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION 1997 EDITION
(GREEN BOOK) 1999 CALIFORNIA STANDARD SPECIFICATIONS, AND CALTRANS
STANDARD PLANS.
2.
PUBLIC AND PRIVATE UTILITIES AND THE ACCOMPANYING SUBSTRUCTURES
SHOWN ON THESE PLANS ARE FROM AVAILABLE PUBLIC DATA. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL
UTILITIES AND SUBSTRUCTURES WITHIN THE CONSTRUCTION LIMITS, DAMAGE TO
SUCH RESULTING FROM CONSTRUCTION OPERATIONS SHALL BE THE
3. CONTRACTORS RESPONSIBILITY.
ALL UNDERGROUND UTILITY AND OTHER SUBSURFACE WORK SHALL BE
4. COMPLETED PRIOR TO COMPLETING THE FINAL SURFACING.
THE CONffiACTOR SHALL NOTIFY THE CITY OF NEWPORT BEACH, PUBLIC
WORKS DEPARTMENT, PH. (949) 644-3311, forty -eight (48) hours, PRIOR
5• TO ANY ROAD CLOSURE AND /OR DETOUR.
CONSTRUCTION SURVEY WORK FOR THE LINES AND GRADES FOR
CONSTRUCTION OF THIS PROJECT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR,
BENCH MARK:
SHEET INDEX
DESCRIPTION
TITLE SHEET
ROADWAY PLAN
SIGNING AND STRIPING
SIGNALIZED INTERSECTION
SHEET NO.
2
3
4-5
TITLE SHEET
NEWPORT COAST DRIVE
AT SAGE HILL SCHOOL
DESCRIPTION T-5902-S
REVISIONS SHEET 1 OF_5_
(
')
')
I
f-. " " ~
\I)
• ,._
Q
CONSTRUCTION NOTES:
0
®
Q)
0
®
SAWCUT AND REMOVE INTERFERING
PORTIONS OF EXIST. IMPROVEMENTS.
CONSTRUCT 6" A.C. PAVEMENT OVER
8" AGGREGATE BASE.
CONSTRUCT 6" A.C. DIKE TYPE A.
CONSTRUCT TYPE A CURB AND GUTTER
PER CITY STD-182-L.
CONSTRUCT LOW POINT AND LEAVE 1'
OPENING IN A.C. BERM AT LOW POINT.
LEGEND
--A.C. PAVEMENT
(18")
18.50'
6" AC DIKE 6" AC DIKE
18"
17
I \
I L-
L
6" AC
w ' (/) co<( 8" BASE
co
INTERSECTION PAVEMENT SECTI01~
NOT TO SCALE
+0.21' FROM ROADWAY
SAWCUT LINE
w ' (/) co<(
[l)
1.50%
A-A
6"
TC
I
ROADWAY l~~PROVEMENT SECTION B-B
NOT TO SCALE
SAGE Hill
SCHOOL DRIVEWAY
' ' I i ; '. i/ ,,
'
~-177+1133 q{-~NEWPORT·COA-Sf-QRIVE / ,;{J
·-·10't'G000 ',\Iv;--SAGEJ:lll.L.S_CH_OQL DB_l','EWAf/ 1,
--------·· ··---~=~;,.~ ·Zf~;~Jlffj-,;;£11/
:;:_::;::-.:..._-:::::_ "'" ' ---·--~
/
i !
/
I J-.-1 vi;,.,.·
C
----c------·t+v-
'"---·-•
I /
' J J
I
-~..,.,.---~· ./;>
·.----f,---•• -_. . L _f-:;,, -' -·," \ -r-~~-
\
I
... --:.,,s1;cc1•, •""-1::::-;;.~,1.. ------
FOR REDUCED PLANS 0 2 3
ORIGINAL SCALE IS IN INCHES
i
i I
;< :£1
,--.;
10
SCALE: 1 "
ED MlLLER
No. 47615
Exp.12-31-0
SAWCUT LINE
PAVEMENT
RT
40'
PLACE
EXIST.
MEDIAN IMPROVEMENTS DETAIL
SACALE: 1" = 20'
GAS RECOVERY PLANT
ACCESS ROAD
cO ,•--.::' u-::
C-3587
CITY OF NEWPORT BEACH
THIS PLAN IS SIGNED BY THE CITY OF NEWPORT BEACH
FOR CONCEPT AND ADHERENCE TO THE CITY AND STATE
STANDARDS AND REQUIREMENTS ONLY. THE CfTY IS
PREPARED BY: DESIGNED DJ l----+---+---------t-------------7 STREET I tv1 PRO VE M ENT PLAN
NOT RESPONSIBLE FOR DESIGN ASSUMPTIONS AND
KFM ENGINEERING, INC.
26672 Towne Centre Dr. #300 CHECKED EM
ACCURACY. Q ( .I Foothill Ranch, CA 92610
APPROVED 'f...._~°"'JJ"{\ · ~~~ t2fr111J?. Phone (949) 580-3838
PUBLIC WORKS DEPT. DATEr 9-~ l.,IJA,._Q)~
R.C.E. NO. 47615 APPROVED -----------------UTILITIES DEPT. DATE
DATE
DJ
( 'L/11 /Q'l, >--------< DATE BY DESCRIPTION
{' DATE t----'----'---------------~~---1
12/ 10/02 REVISIONS
DRAWN
NEWPORT
AT SAGE
COAST DRIVE
HILL SCHOOL
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
T-5902-S
SHEET 2 OF_5_
I
.n -
1J
v\ Q._
-,.,;y
(1
cr---V,
-
SAGE HILL
SCHOOL DRIVEWAY
J
I I /
! .
I
i
1.rj, ;! L I
<t_SAGE HILL SCHOOL DRIVEWAY i
177+11.33 <i;. NEWPORT COAST DRIVE =
10+00.00 SAGE HILL SCHOOL DRIVEWAY
EX. CURB & GUTTER
7
"~'
2
GAS RECOVERY PLANT
ACCESS ROAD
I
I
I
<t_ACCESS ROAD
169+94.43 IC. NEWPORT COAST DRIVE =
10+00.00 CL GAS RECOVERY PLANT ACCESS ROAD
-----❖---❖-------•--
Lt'
12' iNEWPORT COASTDRIVE
1 270' 168 ~,
FOR REDUCED PLANS
VAR.
GENERAL NOTES:
1. PAVEMENT STRIPING AND MARKINGS SHALL BE SPRAYABLE
THERMOPLASTIC UNLESS OTHERWISE INDICATED.
2. PAVEMENT STRIPING, MARKINGS AND SIGNS SHALL CONFORM
TO THE CAL TRANS STANDARD PLANS, LATEST EDITION.
12'
VAR.
·------------• ---
----------~-----
90' TRANSITION
-----·---~
11'
12·
··---·--•·----.. -_ -1_7_:t:::==---====-·-...:...._:·_--:::::==·1''tt=-: ---= •• 11' -,.!
----·-11' ------·------·------·---❖-------------------· --•• • ' ' •• -~
------
·••s-•-
EXIST. RAISED MEDIAN
• • -¾TYP~ N-&-IV5;(LT)---NEWPORT COAST DRIVE
SCALE: 1 " = 40'
CONSTRUCTION NOTES (SIGNING ONLY) CONSTRUCTION NOTES (STRIPING ONLY)
CD PLACE SIGN AND POST (CAL TRANS DESIGNATION). IT] INSTALL 8" SOLID WHITE LINE (CALTRANS DETAIL 38).
® REMOVE EXISTING SIGN AND POST (CAL TRANS DESIGNATION). (I] INSTALL 50' 4" SOLID WHITE LINE.
IT] INSTALL WHITE PAVEMENT ARROW AS SHOWN (TYPE IV).
3. EXACT SIGN LOCATION SHALL BE DETERMINED BY THE ENGINEER. [I] INSTALL 12" WHITE CHEVRONS @ 10' SPACING AND 45· ANGLES.
@J INSTALL 4" SKIP WHITE LINE (CALTRANS DETAIL 12). 4. CONFLICTING STRIPING SHALL BE SANDBLASTED.
5. ALL REFLECTIVE PAVEMENT MARKERS SHALL HAVE GLASS
COVERED REFLECTIVE FACES OR BE 3M SERIES 290 MARKERS.
THIS PLAN ACCURATE FOR SIGNING & STRIPING ONLY
ED MILLER J
No. 47616
Exp,1_2_-3_1_-0_
I 6 I INSTALL 12" WHITE LIMIT LINE.
I]] INSTALL 4" DOUBLE YELLOW LINE ( CAL TRANS DETAIL 27).
[]]
[]]
INSTALL 4" DOUBLE YELLOW LINE (CAL TRANS DETAIL 21 ).
INSTALL TYPE "D" TWO-WAY YELLOW REFLECTIVE PAVEMENT
MARKERS @ 3' SPACING ON TOP OF AC BERM.
[ill REMOVE "CONFLICTING" PAVEMENT MARKINGS AND STRIPING.
Cl1Y OF NEWPORT BEACH
THIS PLAN IS SIGNED BY THE CITY OF NEWPORT BEACH
FOR CONCEPT AND ADHERENCE TO THE CITY AND STATE
STANDARDS AND REQUIREMENTS ONLY. THE CITY IS
NOT RESPONSIBLE FOR DESIGN ASSUMPTIONS AND
ACCURACY. n
APPROVED (;J,,,pJ,W\A tL,.,~ (1../11/02.
PUBLIC WORKS DEPT. 'DM'E
PREPARED BY: DESIGNED DJ
KFM ENGINEERING, INC.
26672 Towne Centre Dr. #300 CHECKED
EM
Foothill Ranch, CA 92610
Phone (949) 580-3838 DRAWN
DJ
170
6
169
' •-s•---❖ .. --•-· ---
VAR.
C-3587
SIGNING & STRIPING PLAN
NEWPORT COAST DRIVE
AT SAGE HILL SCHOOL
0 2 3
¾,/'<" CIV\1-
0F C~ APPROVED ________ ~=--~~ I • .Q~!h~llzr 1 ~,,t. o .,_ DATE BY
DATE R.C.E. NO. 47~ DATE
1---~-~---D_Es_c_R1_Pr_1o_N ____ ~---1 CITY OF NEWPORT BEACH T-5902-S
ORIGINAL SCALE IS IN INCHES UTILITIES DEPT. DATE 12/10/02 REVISIONS PUBLIC WORKS DEPARTMENT SHEET 3 OF_5_
1
' )
)
(
J ~
')
_ ...
~
CONDUCTOR
AWG PHASE
¢2
¢4
¢5
#14 (/; 6
¢8
TOTAL
E.V.P. CABLE
#10 LUMINARE
6PR #11 S.I.C.
¢2 DLC
¢4 DLC
(/; 5 DLC
LOOP ¢6 DLC DET
CABLE ¢8 DLC
2-#12 TOTAL TYPE B
CONDUIT SIZE
ALL CONDUCTORS SHALL BE NEW.
PROPOSED
1 2
NOT
USED
5 6
FOR REDUCED PLANS
ORIGINAL SCALE IS IN INCHES
&
3
3
1
1
2 " ( E)
PHASE
0
3
NOT
USED
7
NOT
USED
SCHEDULE
RUNS
£ & & &
3 3
3 3
3 6 3
3
3 6
6 21 9
2
2 2
1 1
1 1
1 1
1 1
1 1
1 1
1 1 5 3
2"(E) 2" 2-3" 3"(E)
DIAGRAM
4
2
&
3
3
6
2
1
1
2"
3
IA
3
~ J
6
2
2"
DETECTOR SCHEDULE
SENSOR DETECTORS UNIT· CHANN
1 1 -¢4 * 1
2 1 -¢8
1 1 -¢2
2 2 1 -¢5
1 1 -¢6
3 2
1
Ll. .
2
1
5
2
STANDARD
No. TYPE HEIGHT
( 1) 29A-5-80 35'
0 17-2-80 30'
0 29A-5-80 35'
0 1-A 1 o·
® 1-A 1 o·
H.P.S. = HIGH PRESSURE SODIUM
ALL EQUIPMENT SHALL BE NEW.
ALL VEHICLE INDICATIONS SHALL BE LED.
SIG.M.A.
20'
20'
50'
POLE
LUM.M.A.
15'
12'
15'
S.I.S.N.S. = SELF ILLUMINATING STREET NAME SIGN (SEE SPECS)
LUMINAIRE
H.P.S.
310W
250W
310W
ALL DETECTORS SHALL BE NEW. * TEMPORARY 20' MA -FLANGE FOR 50' M.A. (FUTURE) ON 29A-5-80 POLE.
DETECTOR LOOP LOCATIONS SHALL BE
APPROVED BY THE ENGINEER IN THE FIELD
PRIOR TO INSTALLATION. ALL DETECTOR
UNITS SHALL BE RACK MOUNTED, DUAL
CHANNEL, DUAL OUTPUT PER CHANNEL
WITH INTEGRAL CALL HOLD (D-7 SECS)
AND CALL DELAY (D-31 SECS) CAPABILITY
EACH WITH COLORGATED EXTENSION.
DETECTORS SHALL NOT EXTEND ON RED.
DETECTORS SHALL DELAY ON RED IF
SELECTED. ALL DETECTORS SHALL HAVE A
SECONDARY PRESENCE OUTPUT WITHOUT
TIMING FOR SYSTEM SAMPLING PURPOSES.
NE'vVPORT
SCALE: 1" =
COAST DRIVE
20'
THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY.
GENERAL NOTES:
SCHEDULE
S.I.S.N.S. SIGNAL MOUNTING PPB 1BPB POLE LOCATION
1. ALL WORK, MATERIAL, AND EQUIPMENT SHALL CONFORM TO THE REQUIREMENTS
OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, STANDARD
PLANS AND STANDARD SPECIFICATIONS DATED JULY 1999 AND THE SPECIAL
PROVISIONS FOR THIS PROJECT. LEGEND VEHICLE PED PHASE QUAD LOCATION A
2-MAS SV-2-T 3'-6"
Newport MAS SV-1-T Coast
3-MAS SV-1-T
TV-1-T 8'
TV-1-T 8'
B C D REMARKS
2'-6' FOUNDATION EXISTS IN FIELD
3' FOUNDATION EXISTS IN FIELD
3' FOUNDATION EXISTS IN FIELD
2'-8' FOUNDATION EXISTS IN FIELD
3'-4' FOUNDATION EXISTS IN FIELD
2. SEE STREET IMPROVEMENT PLANS FOR UTILITIES. THE CONTRACTOR IS REQUIRED
TO ASCERTAIN THE EXACT LOCATION OF UNDERGROUND FACILITIES PRIOR TO DOING
WORK THAT MAY DAMAGE SUCH FACILITIES OR INTERFERE WITH THEIR SERVICE.
3. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND NOTIFY ALL UTILITY
COMPANIES A MINIMUM OF 48 HOURS PRIOR TO START OF CONTRUCTION. IT SHALL
BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE ALL PHASES OF
CONSTRUCTION WITH THE VARIOUS UTILITY COMPANIES INVOLVED.
4. THE ENGINEER SHALL APPROVE THE EXACT LOCATION OF ALL PULL BOXES, CONDUITS,
DETECTOR LOOPS.
5. ALL PULL BOXES SHALL BE NO. 5 UNLESS OTHERWISE NOTED ON THE PLAN.
6. ALL LOOPS SHALL BE TYPE "E" OR 6' x 6' SPACED 10' APART. EXTEND 1' INTO
CROSSWALK OR LIMIT LINE UNLESS NOTED OTHER\\ISE .
7. ALL TRAFFIC LOOPS, SIGNING, PAVEMENT MARKERS AND STRIPING SHALL BE
COMPLETED PRIOR TO SIGNAL TURN ON.
8. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AT LEAST 48 HOURS IN ADVANCE
OF ELECTRICAL WORK AND PRIOR TO REQUIRED INSPECTIONS.
9. WORK SHALL BE PERFORMED ACCORDING TO CITY OF NEWPORT BEACH DESIGN
CRITERIA, STANDARD SPECIAL PROVISIONS, AND STANDARD DRAWINGS, 1994 EDITION.
GAS RECOVERY PLANT
ACCESS ROAD
10. ALL SIGNAL HEADS TO BE METAL TYPE.
11. PEDESTRIAN INDICATIONS SHALL BE TYPE "c".
SIGNAL CONSTRUCTIOf\l NOTES
I
i \ / I -,
IT] INSTALL CITY FURNISHED 8-PHASE MULTISONICS 82DA CONTROLLER ASSEMBLY IN A TYPE "p" CABINET WITH
DETECTION AS SHOWN, VEHICLE COUNTING SYSTEM, OPTICOM PHASE SELECTORS, AND MISCELLANEOUS AUXILIARY
EQUIPMENT. BICYCLE LOGIC SHALL ALSO BE USED. BIKE LOGIC ON SAGE HILL <1>7 ONLY. BATERY BACKUP BY CITY.
IT] INSTALL 3" CONDUIT WITH PULL ROPES TO EDISON SERVICE POINT (CONDUCTORS BY EDISON). COORDINATE WITH
SOUTHERN CALIFORNIA EDISON SERVICE PLANNER MATT WAZNEWSKI AT (714) 895-D109 FOR ENTRY INTO VAULT
AND SERVICE CONNECTION. INSTALL TYPE II SER~CE PER CITY OF NEWPORT BEACH STD. 910-L.
QJ INSTALL CITY FURNISHED POLES ON EXISTING FOUNDATIONS. CONTRACTOR SHALL ARRANGE FOR UNLOADING OF POLES.
[Ij INSTALL 6 PR#19 INTERCONNECT IN EXISTING CONDUIT TO SAGE HILL SCHOOL DRIVEWAY. CONTRACTOR TO VERIFY,
CLEAN AND REPAIR SIC, AS NECESSARY.
[I] INSTALL E.V.P. DETECTOR ON SIGNAL MAST ARM, USING PELCO ASTRO MINI-BRACKET WITH REDUCER BUSHING 1.5" TO 0.75".
~ INSTALL TELEPHONE DEMARCATION CABINET AT GAS RECOVERY PLANT ACCESS ROAD, PAINTED AND ATTACHED TO TYPE "p"
CABINET. THE CABINET SHALL CONTAIN 3/4" EXTERIOR GRADE PLYWOOD BACKBOARD AND A 12 TERMINAL STRIP WITH A
STAND OFF DEVICE. SWEEP CONDUIT INTO CABINET AND USE CABLE SLACK TO ACCESS TERMINAL BLOCK. INSTALL CONDUIT
& PHASE CONDUCTORS TO TELEPHONE SERVICE POINT. COORDINATE WITH TELEPHONE SERVICE PRO~DER.
7. CONSTRUCT CONCRETE PAVEMENT AT MISSING LOCATIONS AT FOUNDATIONS.
EXIST. 2" CONDUIT
169+94.43 <C. NEWPORT COAST DRIVE =
¢5
11'
12·
169
.~-·
560'FROM
LIMIT LINE
168
EXl~.!,.,z,3" CONDUIT
1 2'
12' ¢4
Cl1Y OF NEWPORT BEACH PREPARED BY:
THIS PLAN IS SIGNED BY THE CITY OF NEWPORT BEACH
FOR CONCEPT AND ADHERENCE TO THE CITY AND STATE KFM ENGINEERING, INC.
ro
B. ' .. L .. ' ..
STANDARDS AND REQUIREMENTS ONLY. THE CITY IS # NOT RESPONSIBLE FOR DESIGN ASSUMPTIONS ANO 26672 Towne Centre Dr. 300
ACCURACY. Q • Foothill Ronch, CA 92610
APPROVED <f-¥l',,.AM{ YY\. ~\-_, 1'2.~?/02, Phone (949) 580-3838
PUBLIC WORKS DEPT. D~ El ~~~~-!1..{!!{0'Z,
APPROVED __________ ~ R.C.E. ND. 476156 DATE
UTILITIES DEPT. DATE
¢2 VAR
11 '
¢2
T
DESIGNED
DJ
CHECKED
EM
DRAWN
DJ
CONDUIT, SIC
r~, r·-! / ('\ t, -
~-\,_) \ __ _j ,,"'_
C-3587
TRAFFIC SIGNAL PLAN
NEWPORT COAST DRIVE
AND
ACCESS ROAD
DATE BY
DATE 1---~~~---□-Es_c_Ri_PT_io_N ____ ~--CITY OF NEWPORT BEACH T-5902-S
12/10/02 REVISIONS PUBLIC WORKS DEPARTMENT SHEET 4 OF_5_
1
)
)
'
f
I
s;:
~
CL
,:r----
(;/1
CONDUCTOR SCHEDULE
RUNS
AWG PHASE & ~ & &
r/> 2 3 3 3
r/>6 3
#14 r/> 7 3 3 3
TOTAL 9 6 6
EVP CABLE 2
#10 LUMINARE 2 2 2
3PR #1 S S.I.C. 1 1 1
LOOP r/!2 DLC 1 1
DET r/) 6 DLC 1
CABLE
2-#12 r/) 7 DLC 1 1
TYPE B TOTAL 1 3 1
CONDUIT SIZE 2" 2-3" 2'' 2"
ALL CONDUITS ANO CONDUCTORS SHALL BE NEW EXCEPT SIC.
PROPOSED PHASE DIAGRAM
1 2 3 4
NOT NOT NOT
USED USED USED
5 6 7 8
-
NOT ~~ NOT
USED USED
\ \
POLE
STANDARD LUMINAIRE S.I.S.N.S.
No. TYPE HEIGHT
(1) 26A-4-80 35'
0 1A 1 o·
0 24A-4-80 35'
H.P.S. = HIGH PRESSURE SODIUM
ALL EQUIPMENT SHALL BE NEW.
SIG.M.A. LUM.M.A. H.P.S. LEGEND
45' 15' 310W Sage Hill
35' 15' 310W Sage Hill
ALL VEHICLE INDICATIONS SHALL BE LED.
S.I.S.N.S. = SELF ILLUMINATING STREET NAME SIGN (SEE SPECS)
DETECTOR
SENSOR
UNIT CHANN
1
1
2
1
2
2 .
1
3 2
1
4
2
1
5 2
SCHEDULE
DETECTORS
1-r/>7
1-¢2
1-¢6
ALL DETECTORS SHALL BE NEW.
DETECTOR LOOP LOCATIONS SHA.LL BE
APPROVED BY THE ENGINEER IN THE FIELD
PRIOR TO INSTALLATION. ALL DETECTOR
UNITS SHALL BE RACK MOUNTED, DUAL
CHANNEL, DUAL OUTPUT PER CHANNEL
WITH INTEGRAL CALL HOLD (0-7 SECS)
AND CALL DELAY (0-31 SECS) CAPABILITY
EACH WITH COLORGATED EXTENSION.
DETECTORS SHALL NOT EXTEND ON RED.
DETECTORS SHALL DELAY ON RED IF
SELECTED. ALL DETECTORS SHALL HAVE A
SECONDARY PRESENCE OUTPUT WITHOUT
TIMING FOR SYSTEM SAMPLING PURPOSES.
PROPOSED SERVICE POINT
SIGNAL MOUNTING
VEHICLE PED
2-MAS SV-1-T
TV-1-T
2-MAS SV-2-T
SCHEDULE
PPB 'BPB POLE LOCATION
PHASE QUAD LOCATION A B C
2'-6'
3'
SAGE HILL
SCHOOL DRIVEWAY
\
\
D REMARKS
FOUNDATION EXISTS IN FIELD
FOUNDATION EXISTS IN FIELD
FOUNDATION EXISTS IN FIELD
. -----------~ -------·---~~---~------~-----------~--------
FOR REDUCED PLANS 0
ORIGINAL SCALE IS IN INCHES
-t, >
560' FROM
LIMIT LINE
2 3
12'
\
12'
i I
'
__ ,,,,. ------
__ __, ... /" -~--.,-,---
_......, _______ ..._ ~~~------·
SCALE: 1" 20'
THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY.
¢6
34-2
SI
ED MILLER Jr.
No. 47615
Exp.12-31-03
12'
-•-·---·· ---~~---------
~ R34-2 12'
7 4
-----~--------· ~-~-~--,... • • -~:; •
----
CITY OF NEWPORT BEACH PREPARED BY:
THIS PLAN IS SIGNED BY THE CITY OF NEWPORT BEACH
FOR CONCEPT AND ADHERENCE TO THE CrfY AND STATE KFM ENGINEERING, INC.
STANDARDS AND REQUIREMENTS ONLY. THE CITY IS 26672 T C t D #300 NOT RESPONSIBLE FOR DESIGN ASSUMPTIONS AND owne en re r.
ACCURACY. () Foothill Ranch, CA 92610
.'PPROVED ii:=iJ.,.....,.l_ 1M ~~k-12,.,11/0 Phone (949) 580-3838
¾;: CiV\'-~~'<-PUBLIC WORKS DEPT. DAT ~~~x~ (Z.(1//o,Z,,,.
APPROVED __________ ===-R.C.E. NO. 47615 0 DATE
UTILITIES DEPT. DATE
GENERAL NOTES:
f ,..-, \.) _;
1. ALL WORK, MATERIAL, AND EQUIPMENT SHALL CONFORM TO THE REQUIREMENTS
OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, STANDARD
PLANS AND STANDARD SPECIFICATIONS DATED JULY 1999 AND THE SPECIAL
PROVISIONS FOR THIS PROJECT.
2. SEE STREET IMPROVEMENT PLANS FOR UTILITIES. THE CONTRACTOR IS REQUIRED
TO ASCERTAIN THE EXACT LOCATION OF UNDERGROUND FACILITIES PRIOR TO DOING
WORK THAT MAY DAMAGE SUCH FACILITIES OR INTERFERE WITH THEIR SERVICE.
3. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND NOllFY ALL UTILITY
COMPANIES A MINIMUM OF 48 HOURS PRIOR TO START OF CONTRUCTION. IT SHALL
BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE ALL PHASES OF
CONSTRUCTION WITH THE VARIOUS UllLITY COMPANIES INVOLVED.
4. THE ENGINEER SHALL APPROVE THE EXACT LOCATION OF ALL PULL BOXES, CONDUITS,
DETECTOR LOOPS.
5. ALL PULL BOXES SHALL BE NO. 5 UNLESS OTHERWISE NOTED ON THE PLAN.
6. ALL LOOPS SHALL BE TYPE "E" OR 6' x 6' SPACED 10' APART. EXTEND 1' INTO
CROSSWALK OR LIMIT LINE UNLESS NOTED OTHERWISE.
7. ALL TRAFFIC LOOPS, SIGNING, PAVEMENT MARKERS AND STRIPING SHALL BE
COMPLETED PRIOR TO SIGNAL TURN ON.
8. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AT LEAST 48 HOURS IN ADVANCE
OF ELECTRICAL WORK AND PRIOR TO REQUIRED INSPECTIONS.
9. WORK SHALL BE PERFORMED A.CCORDING TO CITY OF NEWPORT BEACH DESIGN
CRITERIA, STANDARD SPECIAL PROVISIONS, AND STANDARD DRAWINGS, 1994 EDITION.
10. ALL SIGNAL HEADS TO BE METAL TYPE.
11. PEDESTRIAN INDICATIONS SHALL BE TYPE "c".
SIGNAL CONSTRUCTION NOTES
OJ INSTALL CITY FURNISHED 8-PHASE MULTISONICS 820A CONTROLLER ASSEMBLY IN A TYPE "p" CABINET WITH
DETECTION AS SHOWN, VEHICLE COUNTING SYSTEM, OPTICOM PHASE SELECTORS, AND MISCELLANEOUS AUXILIARY
EQUIPMENT. BICYCLE LOGIC SHALL ALSO BE USED. BIKE LOGIC ON SAGE HILL ¢17 ONLY. BATTERY BACKUP BY CITY.
INSTALL 3" CONDUIT WITH PULL ROPES TO EDISON SERVICE POINT (CONDUCTORS BY EDISON). COORDINATE WITH
SOUTHERN CALIFORNIA EDISON SERVICE PLANNER MATT WAZNEWSKI AT (714) 895-0109 FOR ENTRY INTO VAULT
AND SERVICE CONNECTION. INSTALL TYPE II SERVICE PER CITY OF NEWPORT BEACH STD. 910-L.
INSTALL CITY FURNISHED POLES ON EXISTING FOUNDATIONS. CONTRACTOR SHALL ARRANGE FOR UNLOADING OF POLES.
INSTALL 6 PRi,119 INTERCONNECT IN EXISTING CONDUIT TO GAS RECOVERY PLANT ACCESS ROAD. CONTRACTOR TO VERIFY,
CLEAN AND REPAIR SIC, AS NECESSARY.
INSTALL E.V.P. DETECTOR ON SIGNAL MAST ARM, USING PELCO ASTRO MINI-BRACKET V~TH REDUCER BUSHING 1.5" TO 0.75".
INSTALL TELEPHONE DEMARCATION CABINET AT GAS RECOVERY PLANT ACCESS ROAD, PAINTED AND ATTACHED TO TYPE "p"
CABINET. THE CABINET SHALL CONTAIN 3/4" EXTERIOR GRADE PLYWOOD BACKBOARD AND A 12 TERMINAL STRIP WITH A
STAND OFF DEVICE. SWEEP CONDUIT INTO CABINET AND USE CABLE SLACK TO ACCESS TERMINAL BLOCK. INSTALL CONDUIT
& PHASE CONDUCTORS TO TELEPHONE SERVICE POINT. COORDINATE WITH TELEPHONE SERVICE PROVIDER.
7. CONSTRUCT CONCRETE PAVEMENT AT MISSING LOCATIONS AT FOUNDATIONS.
,#-11'
,, _____ ,. -\ ________ _
s1c@J
·~ 560' FR
LIMIT LINE
1-956
C-3587
01-----
DESIGNED TRAFFIC SIGNAL PLAN
NEWPORT COAST DRIVE
AND SAGE HILL SCHOOL
DRIVEWAY
DJ
CHECKED
EM
DRAWN
DJ
DATE BY DESCRIPTION
DATE 1----'---'------------'----1 CITY OF NEWPORT BEACH T-5902-S
12/10/02 REVISIONS PUBLIC WORKS DEPARTMENT SHEET 5 OF-2_