Loading...
HomeMy WebLinkAboutT_5934_SI'll CONDUCTOR SCHEDULE AWG CIRCUIT /1\ 12\ 13\ /4\ 1)N ¢1 -3 3 -3 ¢2 - - -3 3 ¢4 - - -3 3 ¢5 3 3 3 3 3 ¢6 -3 3 3 3 ¢8 3 3 3 -- ¢2P - - -2 2 ¢6P 2 2 2 - - ¢BP 2 2 2 2 2 ¢2PPB - - -1 1 ¢6PPB 1 1 1 -- #14 ¢8PPB 1 1 1 1 1 ¢28PB - - --1 ¢48PB -1 1 - - ¢6BPB 1 1 1 -- ¢88PB - - -1 1 PPB & BPS COMMON 1 1 1 1 1 SPARES 3 3 3 3 3 TOTAL 17 24 24 23 27 ILLUM. ST. NAME SIGN 2 2 2 2 2 #12 TOTAL 2 2 2 2 2 SIGNAL & SIGN COMMON 1 1 1 1 1 #10 LU MIN AIRE 2 2 2 2 2 TOTAL ~ 3 3 3 6 6 3 2 2 4 1 1 2 1 1 1 1 2 6 48 4 4 2 4 CONSTRUCTION NOTES: &O PROVIDE AND INSTALL A NEW 8-PHASE IDC 820A CONTROLLER IN A NEW TYPE "R" CABINET AND AN ADDITIONAL SHELF ON NEW FOUNDATION. CABINET TO INCLUDE ALL NEW PLUGABLES AND ALL MISCELLANEOUS AUXILIARY EQUIPMENT PER THE SPECIAL PROVISIONS. ~ INSTALL NEW TYPE II MODIFIED SERVICE ON THE NEW CONTROLLER CABINET PER CITY OF NEWPORT BEACH SID-910-L AND PER THE SPECIAL PROVISIONS. 5J INSTALL NEW BATTERY BACKUP SYSTEM AS DETAILED IN THE SPECIFICATIONS. BATTERIES SHALL BE INSTALLED INSIDE NEW TYPE "R" CABINET ON AN ADDITIONAL SHELF. Ii) REPLACE OPTICOM DETECTORS WITH NEW 3M #722 DETECTORS USING PELCO ASTRO MINI-BRACKET OR EQUAL (DETAIL "A"), NEW 752 PHASE SELECTORS, AND 3M 138 CABLE. EXISTING DETECTORS AND PHASE SELECTORS SHALL BE SALVAGED TO THE CITY. E) REMOVE 6 FT. PORTION OF THE CONCRETE MEDIAN CURB AND RECONSTRUCT CONCRETE MEDIAN NOSE AS SHOWN. INSTALL FULL DEPTH OF A.C. PAVEMENT IN REMOVED MEDIAN SEGMENT. ~ INSTALL R4-7 SIGN. [zJ REPLACE OR INSTALL WITH NEW No. 6 PULL BOX. INSTALL NEW No. 5 PULL BOX. INSTALL TRAFFIC SIGNAL LOOP DETECTORS. NEW 3" CONDUIT SHALL BE INSTALLED IN RUNS #3, #5, AND #6. INSTALL 12-PAIR #19 ICC CABLE (APPROXIMATELY 315') IN EXISTING CONDUIT. INTERCEPT EXISTING CONDUIT RUN TO NEW FOUNDATION. l,2I REMOVE AND INSTALL NEW CURB ACCESS RAMP PER CITY STD 181-L-A/B/C/D (11/2005 REVISION), INCLUDING DETECTABLE WARNING SURFACE. &Q ABANDON EXISTING CONDUIT RUN AS SHOWN. &d.gl> NEW 3" CONDUIT (SERVICE CONDUCTORS BY SCE). / BALBOA ETECTOR (OPTICOM MODEL 722) ASTARM MOUNTING CLAMP (PELCO NO. AB-121) EMERGENCY VEHICLE PRE-EMPTION DETECTOR MASTARM MOUNTING DETAIL 11:i SENSOR SCHEDULE SENSOR SENSOR UNIT CHANNEL LOOP DETECTORS 1 1 1-¢1 2 1-06 2 1 2-¢6 2 3-¢6 3 1 1-05 2 1-¢2 4 1 2-¢2 2 1-¢4 5 1 * 2-04 2 1-08 6 1 SPARE 2 SPARE Iii = SENSOR UNITS WILL BE RACK MOUNTED WITH INTEGRAL TIMING CAPABILITY PER CHANNEL (CALL EXTENSION: 0-5 SECONDS MINIMUM, CALL DELAY: 0-30 SECONDS MINIMUM). SPECIAL DETECTOR OPERA llON SHALL BE AS NOTED: e = CALL EXTENSION • = CALL DELAY PVT DWY 1 o' 20' \ X6 TYP. rn PHASE-FUNCTION -SEQUENCE DIAGRAM VEHICLE & PEDESTRIAN _) ( -----i t t MOVEMENTS PER FUNCTION ---t NEMA PHASE DESIGNATION 5 1 2 6 4 8 I 1+6 I • I 2+6 I • I 2+5 I I 4+8 I SEQUENCE WITH CALLS ON ALL PHASES RIVER AVE R/W / / 3 3 3 3 3 6 [,] --c)\.._ __________ _;;f-_____ _;;i, _________ P_R_O_TE_C_T_I_N_P_L_A_C_E_"' !i<,!(----cf ¢1 1 1 1 Det. ¢2 - - -Loop ¢4 -2 2 Cable ¢5 - - - #18 ¢6 3 3 3 ¢8 - - - TOTAL 4 6 3 E.V.P. Cable - - - CONDUIT SIZE 2" 2½" 3" * I'll REMOVE EXISTING CONDUCTORS AND INSTALL NEW THROUGHOUT • NEW CONDUIT BPB = BICYCLE PUSH BUTTON GENERAL NOTES: -- -2 -- -1 - - 1 1 1 3 1 1 22½' 2-3" * 1 2 2 1 3 1 10 1 2-3" * s / 1. ALL WORK, MATERIAL AND EQUIPMENT SHALL BE FURNISHED BY THE CONTRACTOR AND CONFORM TO (1) THE SPECIAL PROVISIONS FOR THIS PROJECT, (2) THE TRAFFIC SIGNAL MODIFICATION PLANS FOR THIS PROJECT, (3) THE STATE OF OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, STANDARD PLANS AND STANDARD SPECIFICATIONS DATED JULY 2002, (4) THE "GREENBOOK" STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, 2003 ED., AND (5) THE CITY OF NEWPORT BEACH DESIGN CRITERIA, STANDARD SPECIAL PROVISIONS & STANDARD DRAWINGS, 2004 ED. 2. THE CONTRACTOR IS REQUIRED TO ASCERTAIN THE EXACT LOCATION OF UNDERGROUND FACILITIES PRIOR TO DOING WORK. THE CONTRACTOR SHALL POTHOLE FOR NEW POLE LOCATIONS AND CONDUIT RUN, AND OBTAIN APPROVAL FOR THE PROPOSED LOCATION FROM THE CITY. 3. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND NOTIFY ALL UTILITY COMPANIES A MINIMUM OF 48 HOURS PRIOR TO THE START OF CONSTRUCTION. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE ALL PHASES OF THE CONSTRUCTION WITH THE VARIOUS UTILITY COMPANIES INVOLVED. 4. THE CITY SHALL APPROVE THE EXACT LOCATION OF ALL POLES, PULL BOXES, CONDUITS, DETECTOR LOOPS, AND CABINETS IN THE FIELD. 5. ALL PULL BOXES SHALL BE No. 6 UNLESS OTHERWISE NOTED ON PLANS. 6. ALL LOOPS SHALL BE TYPE "E", SPACED 10' APART, AND SHALL EXTEND 1' INTO CROSSWALK OR LIMIT LINE UNLESS NOTED OTHERWISE (i.e. EXISTING). 7. ALL SALVAGED MATERIAL AND EQUIPMENT SHALL BECOME THE PROPERTY OF THE CONTRACTOR, EXCEPT AS REQUESTED, SHALL BE SALVAGED TO THE CITY OF NEWPORT BEACH. 8. ALL TRAFFIC LOOPS, SIGNING, PAVEMENT MARKERS, AND STRIPING SHALL BE COMPLETED PRIOR TO SIGNAL TURN ON. 9. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AT LEAST 48 HOURS IN ADVANCE OF THE ELECTRICAL WORK AND PRIOR TO THE REQUIRED INSPECTIONS. 10. REPLACE ALL SIGNAL HEADS, TERMINAL BOXES, AND HARDWARE NEW. INDICATIONS SHALL BE 12-INCH L.E.D. (LIGHT EMITTING DIODE). ALL SIGNAL HEADS TO BE COMPOSITE TYPE PER THE SPECIAL PROVISIONS. 11. REPLACE ALL PEDESTRIAN INDICATIONS, HOUSINGS, AND HARDWARE NEW. PEDESTRIAN INDICATIONS SHALL BE L.E.D. COUNTDOWN MODULES PER THE SPECIAL PROVISIONS. 12. ALL PEDESTRIAN AND BIKE BUTTONS SHALL BE REPLACED NEW WITH APPROVED A.D.A. BUTTON ASSEMBLIES, PER THE SPECIAL PROVISIONS. ALL BUTTONS SHALL BE 40 INCHES ABOVE FINISHED GRADE. 13. INSTALL ALL NEW CONDUCTORS IN EXISTING CONDUITS. PRIOR TO INSTALLING NEW CONDUCTORS, EXISTING UNDERGROUND CONDUIT SHALL BE CLEANED WITH A MANDREL OR CYLINDRICAL WIRE BRUSH AND BLOWN OUT WITH COMPRESSED AIR. 14. ALL NEW CONDUITS SHALL BE PVC SCHEDULE 80 AT A MINIMUM DEPTH OF 36 INCHES UNLESS OTHERWISE APPROVED. 15. ROTATE ALL FRAMEWORK AWAY FROM THE CURB FACE TO MAXIMIZE VEHICLE CLEARANCE FROM ROADWAY. 16. SIGNAL SHALL REMAIN IN OPERATION AT ALL TIMES, EXCEPT AS NOTED IN THE SPECIAL PROVISIONS. 17. THE CONTRACTOR SHALL PROVIDE WATER REMOVAL EQUIPMENT IF UNDERGROUND WATER IS ENCOUNTERED, PER SECTION 19-3.04 OF THE STATE STANDARD SPECIFICATIONS AND SECTION 7-8.6 OF THE PROJECT SPECIAL PROVISIONS. I L,, -\ st- SD SD I 's-IJ' so~ I \ 6 / \\\ '-' ~-'" SIGNS ,, --SD --SD --SD --SD --SD 1---i-' - s-- SCALE 1 "=20' -+---- l_,, -\ I\ / I - y -\ \ I -l'JHL - 0 (315') EXISTING 1"C C'\J ~ C'\J ~ ~ s-- C'\J 1-¢2 2-¢2 es I I -\ 20' I \ I -'---,' DI IL DIil □H1 OH EXIST. EDISON CO. SERVICE POINT #2021177E 1 3 I \ 1 \ I r -.1.-_ - - RIVER AVE ATTENTION Utilities shown on the plan are based on available records. It shall be the contractors sole responsibility to verify all existing utilities by contacting the utility agencies, and to exercise extreme care to avoid damaging existing utilities during excavation. RECORD DRAWINGS THESE DRAWINGS HAVE BEEN PREPARED BASED ON INFORMATION SUBMITTED, IN PART, BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, CITY OF NEWPORT BEACH IS NOT RESPONSIBLE FOR ITS ACCURACY, NOR FOR ERRORS OR OMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO THESE PLANS AS A RESULT. ~FESSIQ ~'! E .fl ,, 4' ~ ~t No. 45521 . 12-31- CJV\l., OF' CAl.,'$ 1 ¢ --SD = -= ::::::::i c_:=, 8::::, L...c....J =-=:::: XIST. 2"C, & 1-DLC EnPOLE -_,. CP. \__R/W SCHEDULE 5 ----------- \~ £ \ I --io1\-\ 51 --SD POLE DATA H.P.SOD. VAP. SIGNAL MOUNTING PED PUSH BUTTON POLE LOCATION TYPE "A" SIGN SIGNAL No TYPE HEIGHT M.A. M.A. WATTS VEH I 1) 29-4-7Q, IE 30' 45'(E) 15(E) 250 • ·a-t@ 12) PPB (E' 4' 7" - @ 17-2-129 30' 20' 12' 250 SV-2 j 14) PPB (E' 4' 7" 5 25-4-70 11'.' 30' 35'(E) 15/El 250 sv 2i 6 PPB /E' 4' 7" -- 17 17 2 129 30' 20' 12' 250 SV-2 ·1 (8 PPB /El 4' 7" - Iii ALL EQUIPMENT NEW EXCEPT AS OTHERWISE SHOWN: (E) EXISTING NOTE: NEW MOUNTING HARDWARE SHALL BE USED THROUGHOUT. MA MAS MAS - MAS - MAS MAS - MAS PED PED PHASE BIKE PHASE A (DOUBLE FACE) B I.S.N.S SP 1 T 6 o· 2.5' -River-----A -6 4 e 1 o· 2.5' SP-2-T 6 8 -lJ;:;4.5' 2.5' Balboa Blvd A ·---6 ® 1 2.5' SP 2 T 8 12' 4' ----River A -2 8 Ii) 12· 2.5' SP 1 T 2 18 I~ 6,5 2 e (~ j:J' IX 2.5' - O PPB WITH SPECIAL BICYQE SIGN & TIMING @ ALL TERMINAL BOXES SHALL BE LINGO INDUSTRIAL ELECTRIC MODEL, LESV1T, OR AGENCY APPROVED EQUAL. CIRCUITRY (SEE SPECIAL PROVISIONS & STD-914-L) A ALL ISNS SHALL BE NEW INDUCTION LAMP (SEE SPECIAL PROVISIONS) AND HAVE SHORTING CAP. TRAFFIC SIGNAL QTYlRAFflC N MODIFICATION PLAN R.E. NO: 45521 BALBOA BLVD AT RIVER AVE BL AS--BUILT DAlE S -I~ -e, 8 5/0II 1--ND_. ~DA_1E~-BY~ ____ DE_sc_:R1P_TION _____ ~AFl"_o+. DES1~:m=---DRA=~~--1CI TY OF NEWPORT BEACHl--_-_5..,.9_3_4_-..,,_.-11 O£a<£il DATE 1 1 es 05 15 2008 PUBLIC WORKS DEPARTMENT SHEET OF REVISIONS ~ r u!. .r, 00 0 ~ 0 ~ "' I "' -I ... (.fl! "' 0 @J 0 < 0 ~ ...- ~ 7ft " > f w "' I!! .c I • ~ 1 ...... I 0 .. 0 .0 r 0 ;9-V) I ... "' "' "' ~ ill 0 "' I "' 0 0 ;::!-V) z <t J a. ;j_ z '-" v; / '-' 8: <t I'""-g: / V) ~ "' QC ~ ~ '-' ::; co ::, ~ 0 0 <t ~ 0 w QC <C :JC ~ co ~ u, QC w V) ?- c.: 11 CONDUCTOR SCHEDULE AWG CIRCUIT I,\ /2\ /4\ /4\ 15' 12)1 -3 3 -3 ¢2 ---3 3 ¢4 ---3 3 12)5 3 3 3 3 6 ¢6 -3 3 3 6 ¢8 3 3 3 -3 ¢2P ---2 2 ¢6P 2 2 2 -2 ¢8P 2 2 2 2 4 CONSTRUCTION NOTES: [!J PROVIDE AND INSTALL A NEW 8-PHASE IDC 820A CONTROLLER IN A NEW TYPE "R" CABINET WITH EXTERIOR FLANGE AND AN ADDITIONAL SHELF ON EXISTING FOUNDATION. CABINET TO INCLUDE ALL NEW PLUGABLES AND ALL MISCELLANEOUS AUXILIARY EQUIPMENT PER THE SPECIAL PROVISIONS. (;iJ INSTALL NEW TYPE II MODIFIED SERVICE ON THE NEW CONTROLLER CABINET PER CITY OF NEWPORT BEACH STD-910-L AND PER THE SPECIAL PROVISIONS. 5] INSTALL NEW BATTERY BACKUP SYSTEM AS DETAILED IN THE SPECIFICATIONS. BATTERIES SHALL BE INSTALLED INSIDE NEW TYPE "R" CABINET ON AN ADDITIONAL SHELF. l±:J REPLACE OPTICOM DETECTORS WITH NEW 3M #722 DETECTORS USING PELCO ASIBO MINI-BRACKET OR EQUAL (DETAIL "A"), NEW 752 PHASE SELECTORS, AND 3M 138 CABLE. EXISTING DETIECTORS AND PHASE SELECTORS SHALL BE SALVAGED TO THE CITY. DETAIL "A" ETECTOR ( OPTIC OM MODEL 722) ASTARM MOUNTING CLAMP {PELCO NO. AB-121) EMERGENCY VEHICLE PRE-EMPTION DE1ECTOR MASTARM MOUNTING DETAIL II SENSOR SCHEDULE SENSOR SENSOR UNIT CHANNEL LOOP DETECTORS 1 1 1-¢1 2 1-¢6 2 1 2-06 2 3-~6 .3 1 1-¢5 2 1-¢2 4 1 2-~2 2 1-04 5 1 • 2-¢4 2 1-¢8 6 1 SPARE 2 SPARE IO = SENSOR UNITS WILL BE RACK MOUNTED WITH INTEGRAL TIMING CAPABILITY PER CHANNEL (CALL EXTENSION: 0-5 SECONDS MINIMUM. CALL PHASE-FUNCTION VEHICLE & PEDESTRIAN MOVEMENTS PER FUNCTION NEMA PHASE DESIGNATION 5 SEQUENCE DIAGRAM ------ --------- 1 2 6 4 8 1+6 f---•-2+6 f--~•-2+5 f---• 1 4+8 SEQUENCE WITH CALLS ON ALL PHASES +· ¢2PPB --- ¢6PPB 1 1 1 --· - 1 1 1 ·---Eo--RE!11lOVEo-FT. POR I ION -oF··~cONC~lilEDfAllfTUREf-AND RECONSTRUCT-~ONCRE IE MEDIAN NOSE AS SHOWN. INSTALL FULL DEPTH OF A.C. PAVEMENT IN REMOVED MEDIAN -~~E)~e~L,\Yc-0· 30 3eC(ll;[)s-1.ftt~IMUM). 31'cCtA!:· DETECTOR OPERATION SHALL BE AS NOTED: • = CALL EXTENSION #14 ¢8PPB 1 1 1 ¢2BPB --- ¢4BPB -1 ' ' ¢6BPB 1 1 1 ¢8BPB --·- PPB & BPB COMMON 1 1 1 SPARES 3 3 3 TOTAL 17 24 24 ILLUM. ST. NAME SIGN 2 2 2 #12 TOTAL 2 2 2 SIGNAL & SIGN COMMON 1 1 1 #10 LUMINAIRE 2 2 2 TOTAL 3 3 3 (1)1 1 1 1 - 1 2 ' -1 -1 -1 1 1 1 2 3 6 23 48 2 4 2 4 1 2 2 4 3 6 -1 SEGMENT. Ii) INSTALL R4-7 SIGN. W REPLACE WITH NEW No. 6 PULL BOX. Ii] INSTALL NEW No. 5 PULL BOX. [i] INSTALL TRAFFIC SIGNAL LOOP DETIECTORS. [ig] NEW 3" CONDUIT SHALL BE INSTALLED IN RUN #3. Iii] INSTALL 12-PAIR #19 ICC CABLE (APPROXIMATELY 315') IN EXISTING CONDUIT. ~ REMOVE AND INSTALL NEW CURB ACCESS RAMP PER CITY STD 181-·L-A/B/C/D (11/2005 REVISION), INCLUDING DETECTABLE WARNING SURFACE. / / t:.) BALBOA 7 ,\ ..._ ____________ _;;c+,J:_ ______ .:... ____________________ .J;;j~ Det. (1)2 1 ---- Loop ¢4 -2 2 -2 Cable ¢5 ----1 ~ '··· 1 , -£::,,', ~~; v PROTECT-IN-PLACE : ; --_-::~--; -:~\~, ,'' 7_/_.-_-·-··-·_···_···· ---t~)_··_ -:er:---_--,_, ------_·-··· __ ~--,.....---: • ~-C SIG~~~u \/ /.: L_-_;!f-p--= .. ~1--...,-, ---... -_,___,-=---, -_-_-;-.,-"'-·7::....-:•:... ___ +--------------½-r-_-. ,------------◊....:_ __ >---·---··----~· l.....-il-1111111► ¢6 #18 ¢6 3 3 3 -3 ¢8 ---1 1 ' 0~ //'/ CJ -,1/ ,/ ~ \ ,_ / ~/ ,-·z·_ I \ ___ / (\J ~ ~/ --.,...... ~ TOTAL 4 6 I .3 E.V.P. Cable --- CONDUIT SIZE 211 2½" 3" * 11 REMOVE EXISTING CONDUCTORS AND INSTALL NEW THROUGHOUT * NEW CONDUIT BPB = BICYCLE PUSH BUTTON GENERAL NOTES: 1 9 1 1 2211' 2-3 -7 >;Y / . . '. . ---. -•. ') ----· ,_.- .,, •• ....___....______-"/c._·/ ___ _ 1. ALL WORK, MATERIAL AND EQUIPMENT SHALL BE FURNISHED BY THE CONTRACTOR AND CONFORM TO (1) Tl-IE SPECIAL PROVISIONS FOR THIS PROJECT, (2) THE TRAFFIC SIGNAL MODIFICATION PLANS FOR THIS PROJECT, (3) THE STATE OF OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, STANDARD PLANS AND STANDARD SPECIFICATIONS DATED JULY 2002, (4) THE "GREENBOOK" STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, 2003 ED., AND (5) THE CITY OF NEWPORT BEACH DESIGN CRITERIA, STANDARD SPECIAL PROVISIONS & STANDARD DRAWINGS, 2004 ED. 2. THE CONTRACTOR IS REQUIRED TO ASCERTAIN THE EXACT LOCATION OF UNDERGROUND FACILITIES PRIOR TO DOING WORK. THE CONTRACTOR SHALL POTHOLE FOR NEW POLE LOCATIONS AND CONDUIT RUN, AND OBTAIN APPROVAL FOR THE PROPOSED LOCATION FROM THE CITY. 3. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND NOTIFY ALL UTILITY COMPANIES A MINIMUM OF 48 HOURS PRIOR TO THE START OF CONSTRUCTION. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE ALL PHASES OF THE CONSTRUCTION WITH THE VARIOUS UTILITY COMPANIES INVOLVED. 4. THE CITY SHALL APPROVE THE EXACT LOCATION OF ALL POLES, PULL BOXES, CONDUITS, DETECTOR LOOPS, AND CABINETS IN THE FIELD. 5. ALL PULL BOXES SHALL BE No. 6 UNLESS OTHERWISE NOTED ON PLANS. 6. ALL LOOPS SHALL BE TYPE "E". SPACED 10' APART, AND SHALL EXTEND 1' INTO CROSSWALK OR LIMIT LINE UNLESS NOTED OTHERWISE (i.e. EXISTING). 7. ALL SALVAGED MATERIAL AND EQUIPMENT SHALL BECOME THE PROPERTY OF THE CONTRACTOR, EXCEPT AS REQUESTED, SHALL BE SALVAGED TO THE CITY OF NEWPORT BEACH. 8. ALL TRAFFIC LOOPS, SIGNING, PAVEMENT MARKERS, AND STRIPING SHALL BE COMPLETED PRIOR TO SIGNAL TURN ON. 9. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AT LEAST 48 HOURS IN ADVANCE OF THE ELECTRICAL WORK AND PRIOR TO THE REQUIRED INSPECTIONS. 10. REPLACE ALL SIGNAL HEADS, TERMINAL BOXES, AND HARDWARE NEW. INDICATIONS SHALL BE 12-INCH L.E.D. (LIGHT EMITTING DIODE). ALL SIGNAL HEADS TO BE COMPOSITIE TYPE PER THE SPECIAL PROVISIONS. 11. REPLACE ALL PEDESTRIAN INDICATIONS, HOUSINGS, AND HARDWARE NEW. PEDESIBIAN INDICATIONS SHALL BE L.E.D. COUNTDOWN MODULES PER THE SPECIAL PROVISIONS. 12. ALL PEDESTRIAN AND BIKE BUTTONS SHALL BE REPLACED NEW WITH APPROVED A.D.A. BUTTON ASSEMBLIES, PER THE SPECIAL PROVISIONS. ALL BUTTONS SHALL BE 40 INCHES ABOVE FINISHED GRADE. 13. INSTALL All NEW CONDUCTORS IN EXISTING CONDUITS. PRIOR TO INSTALLING NEW CONDUCTORS, EXISTING UNDERGROUND CONDUIT SHALL BE CLEANED WITH A MANDREL OR CYLINDRICAL WIRE BRUSH AND BLOWN OUT WITH COMPRESSED AIR. 14. ALL NEW CONDUITS SHALL BE PVC SCHEDULE 80 AT A MINIMUM DEPTH OF 36 INCHES UNLESS OTHERWlSE APPROVED. ~R/W b N 1-02 I \ 1 Q' / \ \ / \ ,;.-_ ---.J- , __ -i-;...-..,-•--'-'.,.~~-_,-=_;_~,-,_ rj_ ~ -@_-··tl-:JC ]~I '~ EXIST. EDISON co. SERVICE T POINT #2021177E RELOCATE R-49 (CA) SIGN TO NEW POLE 1 2 3 4 ' ,, .. ,,q. PY ., = CALL DELAY RIVER AVE PVT DWY 1 Q' 1 o' 20' ' -st-0. I X6 TYP. v [2] e. I N ~ ¢5"1111n-:fih PV - •. \ ·, / \. XIST. 2"C, & 1-DLC / / / ; / ·c J ..-0 -· 11 POLE SCHEDULE POLE DATA H.P.SOD. VAP. SIGNAL MOUNTING No TYPE HEIGHT (j) 29 4}~ 30• 12) PPB IE' 4' 7" 3 17-2-129 30' 4 PPB IE' 4' 7" ® 25-4-7~ 30' 6 PPB IE' 4' 7" 7 17-2-129 30' 8 PPB IE' 4' 7" SIGNAL M.A. M.A. WATTS 45'(E) 15iE~ 250 20' 12' 250 35'(E) 15(E] 250 20' 12' 250 VEH MA ..,. -~-u ~AS • AS - SV-2-"I MAS SV-2-1. MAS tlll MAS SV-2-T.6_ W MAS 111 ALL EQUIPMENT NEW EXCEPT AS OTHERWISE SHOWN: (E) EXISTING NOTE: NEW MOUN.ONG HARDWARE SHALL BE USED THROUGHOUT. PED SP 1 T SP-2-T SP 2 T SP 1 T PED PUSH BUTTON PED PHASE BIKE PHASE 6 6 4 6 8 --6 8 2 B 2 2 • All TERMINAL BOXES SHALL BE LINGO INDUSTRIAL ELECTRIC MODEL, LESV1T, OR AGENCY APPROVED EQUAL \ "' 0 ~ I "' ~ ~ 0 ~ ii" I 0 0 .o 0 ~ ' ... ,,, "' "' POLE LOCATION TYPE "A" SIGN (DOUBLE FACE) I.S.N.S ;!:, '3 A 6' 23.5' B ---River------4 2.5' Balboa Blvd ... ----River --6 5.5' 0 N I cry 0 0 ;::'-,n z « ~ u. ~ « z "' ~ E « !;§. ,n OL "' ~ @ PPB WITH SPECIAL BICYCLE SIGN & TIMING u CIRCUllRY (SEE SPECIAL PR0i1S10NS & STD-914-L) a5 A ALL ISNS SHALL BE NEW INDUCTION LAMP (SEE ~ SPECIAL PR0'.1SIONS) AND HAVE SHORTING CAP. g <( ~ ,--...----.----------------~-------------------------------13 ~ 15. ROTATE ALL FRAMEWORK AWAY FROM THE CURB FACE TO MAXIMIZE VEHICLE CLEARANCE FROM ROADWAY. 16. SIGNAL SHALL REMAIN IN OPERATION AT ALL TIMES, EXCEPT AS NOTED IN THE SPECIAL PROVISIONS. ATTENTION Utilities shown on the plan are based on available records. It shall be the contractors so!e responsibility to verify all existing utilities by contacting the utility agencies, and to exercise extreme core to i----+-~------1-----18J,,w1f1(~ TRAFFIC SIGNAL ~ TRANS. & DEV. SERVICES MANAGER MODIFICATION PLAN ;;;- '<-~ • " ct" '-<f>' ~ 17. Tl-IE CONTRACTOR SHALL PROVIDE WATER REMOVAL EQUIPMENT IF UNDERGROUND WATER IS ENCOUNTIERED, PER SECTION 19-3.04 OF THE STATE STANDARD SPECIFICATIONS AND SECTION 7-8.6 OF THE PROJECT SPECIAL PROVISIONS. SCALE 1 "=20' avoid damaging existing utilities during excavation. No. 22045 Exp. 09/30/0 CIV\\.. OF CAU R.E. NO 22045 BALBOA BL VD AT RIVER AVE bl ~-+----l--------------1--~DA:.'.T:.:E=A~=·='==l':;.2..:c'C()(,~===11-----------------~-.....Jf DATE BY DESCRIPTION APP'D. DESIGNED DRASWCN CITY OF NEWPORT BEACH T-5934-S !--....L..---'--------------L----+,.,.,,,;R:o,G;,,,._ __ b~'-----1 1--------1 CHECKED DATE PUBLIC WORKS DEPARTMENT SHEET 1 OF 1 BS 04 11 /2006 REVISIONS cO i ,. ., , OJ 0 .... r ~ '! n -!I ~ 0 II ~ i r • :t 0 -0 ' -11 Ill -s l .. 0 z I