HomeMy WebLinkAboutS_5134_SI 611 AC P I I ·/;1 I I t/ , I I I I , , I , I , ' CITY OF NEWPORT BEACH UTILITIES DEPARTMENT (WORK TO BE DONE BY CITY FORCES) CONSTRUCTION NOTES (j)-SNAP IN s"x 4'' WYE BRANCH FITTING. @-INSTALL 4'' SDR-35 P.V.C SEWER PIPE. @ ___ EXIST. @-INSTALL 4'' SEWER CLEAN-OUT PER C.N.B. STD. 400-L @-PLUG END OF LATERAL FDR FUTURE CONNECTION. 2 FLAGPOLE ~-611 WATER MAIN. GO UNDER WITH I 2" MINIMUM CLEARANCE. 6" A.C.E' EXIST WATER EXIST. SEWER CITY OF NEWPORT BEACH GENERAL NOTES -THE CONSTRUCTION OF ALL PUBLIC IMPROVEMENTS SHALL CONFORM TO THE REQUIREMENTS OF THE NEWPORT BEACH CONSTRUCTION STANDARDS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, 1988 EDITION 8 SUPPLEMENTS. 2 -EXISTING UNDERGROUND UTILITIES ARE SHOWN AS PER AVAILABLE RECORDS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE ACTUAL LOCATION AND ELEVATION IN THE FIELD PRIOR TO BEGINNING CONSTRUCTION OF THE NEW FACILITIES. 3 -THE WALLS AND FACE OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE EFFECTIVELY GUARDED BY A SHORING SYSTEM: SLOPING OF THE GROUND OR OTHER EQUIVALENT MEANS. TRENCHES OR EXCAVATIONS LESS THAN FIVE (5) FEET IN DEPTH SHALL ALSO BE GUARDED WHEN EXAMINATION INDICATES THAT HAZARDOUS GROUND MOVEMENT MAY BE EXPECTED. 4 -THE CONTRACTOR(S) SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK /JS DESCRIBED IN NO. 3 ABOVE FROM CAL-OSHA. 5 -ALL STORM DRAIN, SEWER AND WATER PIPE SHALL BE BEDDED PER CITY OF NEWPORT BEACH STD-106-L 6 -iffie SEWER PIPE MAY BE USED IN LIEU OF PVC PIPE AY SPECIAL PERMISSION PIPE $HAI I BE MANUFACTURED PER ASTM D-3034 SDR-35 OR ASTM-F789. ALL FITTINGS SHALL BE PREFABRICATED FULL BODY FITTINGS. P.V.C SEWER PIPE BEDDING SHALL BE 3/4'' CRUSHED ROCK FROM 611 BELOW THE PIPE TO 12" ABOVE THE TOP OF THE PIPE AND SHALL BE CONSOLIDATED BY JETTING PRIOR TO COMPLETION OF TRENCH BACKFILL. 7 -ALL SEWER LINES TO BE OWNED, OPERATED AND MAINTAINED BY THE CITY OF NEWPORT BEACH SHALL BE VIDEO INSPECTED AFTER CLEANING, AIR TESTING AND MANDRILLING. ALL VIDEO INSPECTION SHALL BE PERFORMED BY THE CITY UTILITIES DEPARTMENT. THE DEVELOPER SHALL PAY THE CURRENT RATE ESTABLISHED BY THE CITY FOR VIDEO INSPECTION. ANY SEWER LINE FOUND TO BE INSTALLED INCORRECTLY DEFECTIVE, DAMAGED OR OTHERWISE COMPROMISED SHALL BE REPAIRED/REPLACED AND REINSPECTED, INCLUDING AIR TEST, MANDRIL AND VIDEO, PRIOR TO ACCEPTANCE. UTILITIES DEPT. THIS PLAN IS SIGNED BYTHECITYOFNEWPORT BEACH FOR CONCEPT 1----+---+---------------t-----t AND ADHERENCE TO CITY STANDARDS AND REQUIREMENTS ONLY. TY UTIL.DIRECTO CORONA DEL MAR BEACH PARKING LOT PARKING BOOTH SEWER THE CITY IS NOT RESPONSIBLE FOR DESIGN ASSUMPTIONS AND l----+---+---------------t-----tRcE.,38799 DATE= 1lz.oj~, ACCURACY. DATE BY DESCRIPTION APPROVED ________________ _ CITY ENGINEER DATE REVISIONS REV, A APP'D, DESIGNED ~ -G.A~\/E.IZ- CHECKED DRAWN C. RINDT DATE 3/20/91 CITY OF NEWPORT BEACH S-5134-S PUBLIC WORKS DEPARTMENT SHEET I OF I c: c, " [~ i2 '.';! "f' '=·' " ,, " "' " '·' ' - I '