CITY OF NEWPORT BEACH
UTILITIES DEPARTMENT
(WORK TO BE DONE BY CITY FORCES)
CONSTRUCTION NOTES
(j)-SNAP IN s"x 4'' WYE BRANCH FITTING.
@-INSTALL 4'' SDR-35 P.V.C SEWER PIPE.
@ ___ EXIST.
@-INSTALL 4'' SEWER CLEAN-OUT PER C.N.B. STD. 400-L
@-PLUG END OF LATERAL FDR FUTURE CONNECTION.
2
FLAGPOLE
~-611 WATER MAIN.
GO UNDER WITH I 2"
MINIMUM CLEARANCE.
6" A.C.E' EXIST WATER
EXIST. SEWER
CITY OF NEWPORT BEACH
GENERAL NOTES
-THE CONSTRUCTION OF ALL PUBLIC IMPROVEMENTS SHALL CONFORM TO THE REQUIREMENTS OF
THE NEWPORT BEACH CONSTRUCTION STANDARDS AND THE STANDARD SPECIFICATIONS FOR PUBLIC
WORKS CONSTRUCTION, 1988 EDITION 8 SUPPLEMENTS.
2 -EXISTING UNDERGROUND UTILITIES ARE SHOWN AS PER AVAILABLE RECORDS. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR VERIFYING THE ACTUAL LOCATION AND ELEVATION IN THE
FIELD PRIOR TO BEGINNING CONSTRUCTION OF THE NEW FACILITIES.
3 -THE WALLS AND FACE OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL
BE EFFECTIVELY GUARDED BY A SHORING SYSTEM: SLOPING OF THE GROUND OR OTHER
EQUIVALENT MEANS. TRENCHES OR EXCAVATIONS LESS THAN FIVE (5) FEET IN DEPTH SHALL
ALSO BE GUARDED WHEN EXAMINATION INDICATES THAT HAZARDOUS GROUND MOVEMENT MAY BE
EXPECTED.
4 -THE CONTRACTOR(S) SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK /JS
DESCRIBED IN NO. 3 ABOVE FROM CAL-OSHA.
5 -ALL STORM DRAIN, SEWER AND WATER PIPE SHALL BE BEDDED PER CITY OF NEWPORT BEACH
STD-106-L
6 -iffie SEWER PIPE MAY BE USED IN LIEU OF PVC PIPE AY SPECIAL PERMISSION PIPE $HAI I BE
MANUFACTURED PER ASTM D-3034 SDR-35 OR ASTM-F789. ALL FITTINGS SHALL BE PREFABRICATED
FULL BODY FITTINGS. P.V.C SEWER PIPE BEDDING SHALL BE 3/4'' CRUSHED ROCK FROM 611 BELOW
THE PIPE TO 12" ABOVE THE TOP OF THE PIPE AND SHALL BE CONSOLIDATED BY JETTING PRIOR
TO COMPLETION OF TRENCH BACKFILL.
7 -ALL SEWER LINES TO BE OWNED, OPERATED AND MAINTAINED BY THE CITY OF NEWPORT BEACH
SHALL BE VIDEO INSPECTED AFTER CLEANING, AIR TESTING AND MANDRILLING. ALL VIDEO
INSPECTION SHALL BE PERFORMED BY THE CITY UTILITIES DEPARTMENT. THE DEVELOPER SHALL
PAY THE CURRENT RATE ESTABLISHED BY THE CITY FOR VIDEO INSPECTION. ANY SEWER LINE
FOUND TO BE INSTALLED INCORRECTLY DEFECTIVE, DAMAGED OR OTHERWISE COMPROMISED SHALL
BE REPAIRED/REPLACED AND REINSPECTED, INCLUDING AIR TEST, MANDRIL AND VIDEO, PRIOR TO
ACCEPTANCE.
UTILITIES DEPT.
THIS PLAN IS SIGNED BYTHECITYOFNEWPORT BEACH FOR CONCEPT 1----+---+---------------t-----t
AND ADHERENCE TO CITY STANDARDS AND REQUIREMENTS ONLY. TY UTIL.DIRECTO
CORONA DEL MAR
BEACH PARKING LOT
PARKING BOOTH SEWER THE CITY IS NOT RESPONSIBLE FOR DESIGN ASSUMPTIONS AND l----+---+---------------t-----tRcE.,38799 DATE= 1lz.oj~,
ACCURACY.
DATE BY DESCRIPTION
APPROVED ________________ _
CITY ENGINEER DATE REVISIONS
REV, A
APP'D, DESIGNED
~ -G.A~\/E.IZ-
CHECKED
DRAWN
C. RINDT
DATE
3/20/91
CITY OF NEWPORT BEACH S-5134-S
PUBLIC WORKS DEPARTMENT SHEET I OF I
c: c,
" [~ i2
'.';!
"f' '=·'
" ,,
"
"' "
'·' '
- I
'