HomeMy WebLinkAboutB_5315_SCITY OF COSTA MESA
PJ1c1F1c
JOHN WAYNE AIRPORT >,_,. <§c-�f'<, _:,"> -%-;-$ cJ' "'
PROJECT LOCATION ____/
VICINITY MAP
NOT TO SCALE
PROJECT LOCATION
PUBLIC WORKS DEPARTMENT
FIRE STATION NO. 8 HVAC REHABILITATION
6502 RIDGE PARK RD, NEWPORT BEACH, CA 92657
CONTRACT NO. 9373-1 PROJECT NO. 24F02
AVID A. WEBB, PUBLIC WORKS DIRECTOR
AN, P.E., DEPUTY PWD / CITY ENGINEER
LOCATION MAP
NOT TO SCALE
DATE:
DATE:
GENERAL NOTES
1.ALL WORK DETAILED ON THESE PLANS TO BE PERFORMED UNDER CONTRACT SHALL BE
CONSTRUCTED IN ACCORDANCE WITH THE "STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION", 2015 EDITION AND SUPPLEMENTS TO DATE, EXCEPT AS OTHERWISE STATED IN
THE CITY'S STANDARD SPECIAL PROVISIONS, OR IN THIS CONTRACT'S SPECIAL PROVISIONS.
2.EXISTING UNDERGROUND UTILITIES ARE SHOWN AS PER AVAILABLE RECORDS. THE CONTRACTORSHALL BE RESPONSIBLE FOR VERIFYING THE ACTUAL LOCATION AND ELEVATION IN THE FIELDPRIOR TO BEGINNING CONSTRUCTION.
3.ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR, DIMENSION, ANO FINISHTO ADJOINING IMPROVIEMENTS, UNLESS NOTED OTHERWISE.
4.P.C.C. SHALL BE CLASS 560-C-3250 UNLESS NOTED OTHERWISE.
5.CONTRACTOR SHALL ADJUST CITY UTILITIES (e.g. WATER VAULTS, WATER VALVES, sea, SURVEY
MONUMENTS, SEWER AND STORM DRAIN MANHOLES) FRAMES AND COVERS TO FINISHED GRADEPER CITY STANDARDS. ALL OTHER UTILITIES SHALL BE ADJUSTED TO GRADE BY OTHERS.
6.PROPOSED PAVEMENT AND CURB ANO GUTTER SHALL JOIN AND MATCH LINE AND GRADE OFEXISTING IMPROVEMENTS UNLESS NOTED OTHERWISE.
7.ANY DISCREPANCY IN THE DRAWINGS OR SPECIFICATIONS SHALL BE CALLED TO THE ATTENTIONOF THE ENGINEER. FAILURE TO DO SO WILL PLACE RESPONSIBILITY OF THE CONTRACTOR FORCORRECTION.
8.ANY WORK NOT INDICATED ON THE DRAWINGS BUT CALLED FOR IN THE SPECIFICATIONS, ORVICE-VERSA, SHALL BE FURNISHED AND PERFORMED AS THOUGH SPECIFICALLY INDICATED ANDCALLED FOR IN BOTH. ANY WORK NOT INSTALLED ACCORDING TO DRAWINGS ANO SPECIFICATIONS
OR ORDINANCES ANO LAWS SHALL BE REPLACED AT CONTRACTOR'S EXPENSE.
SHEET INDEX
1 TITLE SHEET
2 NOTES, LEGEND ANO ABBREVIATIONS
3 SCHEDULES
4 MECHANICAL FLOOR PLAN DEMOLITION
5 MECHANICAL FLOOR PLAN NEW
6 DETAILS
7 TITLE 24 DOCUMENTATION
C Q) "'C
Q) -"' L 0() C
E Cl. U) "'
N
..,_
� U) 0 -----ro 0
-Q)Q) .c(/)
Q) :;:; f-u <( > 3-w (/)
<( I n_z '-'
(/) w 0 / N 0 LI.. ..,_N I t'l r--t'l "' I u u
<( > I
<Xl
0 -(/)
�
LI..
(I)
(I) 0 0 /n_ ::;; ::;; LI.. / (/) w F::J0 <( LI.. I 0 0 2 z w fr'. fr'. => u
u, N
I ..,_ N >LI.. / "' -C-9373-1 �t----------------------,---------------------------------------------------------------------------------�-----------1----------�-------------------------:......:-��0 u /
APPROVAL RECOMMENDED: APPROVAL RECOMMENDED:
CALL TOLL FREE 1-800-227-2600
BEFORE YOU DIG
�-/1;;� FIRE CHIEF
DATE:
TOM SANDEFUR, P .E.
ASSISTANT CITY ENGINEER
TITLE SHEET
FIRE STATION NO. 8
HVAC REHABILITATION
"
Q) L 0 .c (/) /:,; 0) 1---------------------��------�7 B-5315-SI-------� :J: CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT SHEET 01 OF 07 7...._ _________________ ..i... ___________________________________________________________________ ....... _______ ....... _______ ..J...... ________________ ......J. __ ..::....;_....::..;:......J
L L
rs
'C'-11,: ~'°' :5' O,p
CI TY OF
IRVINE
1,11\JERSIT'l
#
I
I
1 NOTES, LEGEND AND ABBREVIATIONSM-001
2
3
4
NO SCALE
SCHEDULESM-002 NO SCALE
5
6RETURN GRILLE
EXHAUST GRILLE
SIDEWALL SUPPLY REGISTER
RETURN AIR DUCT
SUPPLY AIR DUCT
EXHAUST AIR DUCT
ROOM THERMOSTAT
MANUAL VOLUME DAMPER
FLEXIBLE CONNECTION
SIDEWALL RETURN GRILL
SIDEWALL EXHAUST REGISTER
QUADRANT BALANCING DAMPER
MOTORIZED BACKDRAFT DAMPER
COMBINATION SMOKE-FIRE DAMPER
S.A.
O.S.A.
TYP.
E.A.
T.A.
MBD
SFD
R.A.
M
SF
SUPPLY AIR
TRANSFER AIR
OUTSIDE AIR
EXHAUST AIR
TYPICAL
RETURN AIR
SWS
MVD
DL
QBD
SWR
FC
T'STAT
UC
SWG
DL
UC
T
UNDERCUT DOOR
DOOR LOUVER
EAD
OSA
SAD
RAD
ABB.
RG
EG
CD
(L)
CA
SYMBOL
CEILING DIFFUSER
LINED DUCTWORK
COMBUSTION AIR
DESCRIPTION
OUTSIDE AIR
LOCKED ROTOR AMPS
PHASE
PRESSURE
MINIMUM
REVOLUTIONS PER MINUTE
MAX. OVER CURRENT PROTEC. AMPS
RATED LOAD AMPS
MINIMUM CIRCUIT AMPS
RPM
R.L.A.
L.R.A.
PH
MIN.
M.O.C.P.
PRESS.
M.C.A.
ACCESS PANEL
DESCRIPTION
CONDENSATE
DRY BULB
DOWN
CONCRETE
ABOVE FINISHED FLOOR
EXHAUST FAN
INCHES
KILOWATTS
HORSEPOWER
FEET
ENTERING
AIR CONDITIONING UNIT
STAINLESS STEEL
GENERAL CONTRACTOR
EXTERNAL STATIC PRESSURE (INCHES OF WATER)
FULL LOAD AMPS
CUBIC FEET PER MINUTE
BACK DRAFT DAMPER
KW
GC
HP
FT.
FLA.
IN.
DN.
E.S.P.
A.F.F
ENT.
EF
SYMBOL
COND.
D.B.
B.D.D.
CONC.
CFM
AC
AP
S/S
ABB.
HEATING, VENTILATION, AND AIR CONDITIONINGHVAC
BOTTOM OF SHEET METAL DUCTB.O.D.
ABOVE FINISHED FLOORA.F.F.
CARBON DIOXIDE SENSORCO2
LEGEND & ABBREVIATIONS
VARIABLE FREQUENCY DRIVEVFD
C
OPPOSED BALANCING DAMPEROBD
VARIABLE AIR VOLUME FLOWVAV
CONSTANT AIR VOLUME FLOWCAV
BRAKE HORSEPOWERBHP
FUSED DISCONNECTFD
NON-FUSED DISCONNECTNFD
CIRCUIT BREAKERCB
DEMAND CONTROL VENTILATIONDCV
TYPICALTYP.
UP THRU ROOFUTR
DOWN THRU ROOFDTR
ELECTRONICALLY COMMUTATED MOTORECM
TRANSFER GRILLETG
MECHANICAL SHEET INDEX
S.No.SHEET TITLESHEETNUMBER SCALE
DUCT LINERS AND INSULATION
GENERAL NOTES
1. ALL WORK SHALL COMPLY WITH CALIFORNIA CODE OF REGULATIONS TITLE 24 PART 6 (2022) CALIFORNIA ENERGY CODE, THE LATEST CALIFORNIA MECHANICAL AND
BUILDING CODES, 2022 CAL GREEN CODE, ALL OTHER APPLICABLE CODES AND REGULATIONS, AND LOCAL CODES. ALL EQUIPMENT AND SYSTEMS SHALL BE U.L.LISTED.
2. HVAC EQUIPMENT SHALL BE CERTIFIED BY THE CALIFORNIA ENERGY COMMISSION TO COMPLY WITH EFFICIENCY STANDARDS PER TITLE-24, PART 6.
3. CONTRACTOR SHALL CAREFULLY REVIEW THESE PLANS AND SPECIFICATIONS PRIOR TO BID. CONTRACTOR SHALL ADDITIONALLY REVIEW PLANS AND
SPECIFICATIONS OF OTHER RELATED TRADES INCLUDING ARCHITECTURAL, STRUCTURAL, ELECTRICAL, FIRE PROTECTION AND PLUMBING PRIOR TO SUBMITTING BID.
4. CONTRACTOR SHALL COORDINATE THEIR INSTALLATION WITH ALL OTHER TRADES PRIOR TO INSTALLATION OF EQUIPMENT OR MATERIALS, INCLUDING BUT NOT
LIMITED TO, STRUCTURAL, ARCHITECT, ELECTRICAL, AND PLUMBING.
5. A PRE-BID SITE VISIT IS MANDATORY. THE CONTRACTOR SHALL VISIT THE SITE, VERIFY THE EXACT CONDITIONS RELATING TO THE WORK AND SHALL OBTAIN SUCH
INFORMATION AS MAY BE NECESSARY TO PRESENT A CONCLUSIVE BID. NO ALLOWANCE SHALL BE MADE FOR ANY EXTRA EXPENSE, DUE TO FAILURE OF THE
CONTRACTOR TO MAKE SUCH A FIELD VERIFICATION. BY SUBMITTING A PROPOSAL FOR THE WORK INCLUDED IN THE CONTRACT, THE CONTRACTOR SHALL BEDEEMED TO HAVE MADE THE FIELD VERIFICATION AND ACCEPTS ALL JOB SITE CONDITIONS.
6. THESE DRAWINGS ARE DIAGRAMMATIC ONLY AND NOT INTENDED TO INDICATE ALL REQUIRED OFFSETS, BENDS, ELBOWS, TRANSITIONS, FITTINGS AS REQUIRED TOCONFORM TO THE BUILDING STRUCTURE, CLEARANCE INSIDE CEILINGS, AVOIDANCE OF OBSTRUCTIONS, AND MAINTAINING HEAD CLEARANCE. THE CONTRACTOR
SHALL FOLLOW THE PLANS AS CLOSELY AS POSSIBLE.
7. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL, INSURANCE, EQUIPMENT, INSTALLATION, CONSTRUCTION TOOLS, TRANSPORTATION, ETC. FOR A COMPLETE
AND PROPERLY OPERATING MECHANICAL SYSTEM.
8. USE ONLY COMPETENT SKILLED PERSONNEL. PERFORM ALL WORK CONSISTENT WITH THE BEST POSSIBLE TRADE PRACTICES.
9. MATERIALS SHALL BE NEW AND OF THE SAME MANUFACTURER FOR EACH CLASS OR GROUP OF EQUIPMENT. EQUIPMENT SHALL BE LISTED AND APPROVED BYUNDERWRITER'S LABORATORIES, AND SHALL BEAR THE INSPECTION LABEL WHERE SUBJECT TO SUCH APPROVAL. MATERIALS SHALL MEET WITH THE APPROVAL OF
THE GOVERNING BODIES HAVING JURISDICTION. MATERIALS SHALL BE MANUFACTURED AND INSTALLED IN ACCORDANCE WITH APPLICABLE STANDARDSESTABLISHED BY THE LATEST EDITION OF CMC, CBC U.L., SMACNA AND ASHRAE GUIDELINES. INSTALL PER MANUFACTURERS' RECOMMENDATIONS, AND INSTALLATIONINSTRUCTIONS.
10. CONTRACTOR SHALL SECURE AND PAY FOR ALL NECESSARY BUILDING PERMITS AND VARIANCES. COORDINATE TEMPORARY CONSTRUCTION REQUIREMENTS WITHALL TRADES PRIOR TO CONSTRUCTION. INCLUDE ALL COSTS IN THE BID.
11. THE JOB SHALL BE GUARANTEED FOR A PERIOD OF ONE (1) YEAR AFTER DATE OF ACCEPTANCE BY OWNER. ANY WORK, MATERIAL OR EQUIPMENT FOUND TO BE
FAULTY DURING THAT PERIOD SHALL BE CORRECTED AT ONCE, UPON WRITTEN NOTIFICATION AT THE EXPENSE OF THE MECHANICAL CONTRACTOR.
12. THE EQUIPMENT AS INSTALLED, INCLUDING ALL EQUIPMENT AND MATERIALS SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE DATE THE INSTALLATIONIS ACCEPTED. COMPRESSORS SHALL HAVE A FIVE YEAR GUARANTEE.
13. IF ALTERNATE EQUIPMENT OR MATERIALS ARE PROPOSED BY THE CONTRACTOR, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN ALL BUILDINGDEPARTMENT APPROVALS, PAY ALL RELATED FEES AND OBTAIN APPROVAL FROM OWNER & ENGINEER OF RECORD.
14. IF ALTERNATE EQUIPMENT OR SYSTEMS ARE PROPOSED BY THE CONTRACTOR, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TITLE-24 COMPLIANCECERTIFICATION AND ALL ASSOCIATED FEES REQUIRED. CONTRACTOR MUST ALSO COORDINATE SUBMITTED EQUIPMENT WITH OTHER TRADES.
15. EQUIPMENT SUBMITTED FOR APPROVAL WITH A DIFFERENT PHYSICAL SIZE OR ARRANGEMENT FROM THAT SHOWN ON THE PLANS SHALL INCLUDE SHOP DRAWINGS.MECHANICAL CONTRACTOR SHALL PROVIDE AND SHOW COORDINATED PLANS WITH ALL OTHER TRADES.
16. PROVIDE SIX COPIES OF ALL MANUFACTURER'S PRODUCT DATA CLEARLY INDICATING MODEL NUMBERS, CAPACITIES, CONSTRUCTION, ELECTRICAL INFORMATION,AND OPTIONAL ACCESSORIES, WITHIN 45 DAYS OF AWARD OF CONTRACT AND PRIOR TO THE START OF WORK. THESE NEED TO BE APPROVED BY ARCHITECT PRIOR
TO PURCHASING.
17. ALL BROCHURES, OPERATING MANUALS, CATALOGS, SHOP DRAWINGS, "AS-BUILTS", ETC. SHALL BE TURNED OVER TO THE OWNER AT THE COMPLETION OF THE JOB.
PROVIDE THE OWNER WITH ONE (1) SET OF COMPLETE MECHANICAL "AS-BUILTS" INDICATING FINAL EQUIPMENT LOCATIONS, DUCTWORK AND PIPE ROUTING, ETC.MECHANICAL CONTRACTOR SHALL SUBMIT AS-BUILTS IN CAD FORMAT.
18. ADDENDA AND CHANGE ORDERS SHALL BE APPROVED BY OWNER.
19. EQUIPMENT, ACCESSORIES, AND MATERIAL SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS AND
RECOMMENDATIONS.
20. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ALL MAJOR PIECES OF MECHANICAL EQUIPMENT, INCLUDING, BUT NOT LIMITED TO FAN COILS, CONDENSING
UNITS, EXHAUST FANS, DUCTWORK, AND PIPING. SUBMITTALS SHALL BE MADE TO THE ARCHITECT AS SOON AS PRACTICABLE AFTER AWARD OF CONTRACT.
21. CONTRACTOR SHALL ARRANGE AND PAY FOR ALL NECESSARY PERMITS, INSPECTOR'S EXAMINATIONS, AND FEES REQUIRED BY THE AHJ.
22. ANY MATERIAL EXPOSED WITHIN A PLENUM OR DUCT MUST HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25, AND A SMOKE DEVELOPED RATING OF NOT MORETHAN 50, AND A MOLD/HUMIDITY RESISTANCE PER U.L. 181.
23. EQUIPMENT SHALL BE LOCATED SUCH THAT CODE REQUIRED ACCESS IS MAINTAINED, INCLUDING N.E.C. REQUIREMENTS. ACCESS PANELS WHERE REQUIRED, SHALLBE COORDINATED WITH ARCHITECT, AND PROVIDED BY FACTORY OR BE FIELD-PROVIDED. FOR ATTIC EQUIPMENT, G.C. TO PROVIDE A CATWALK & LIGHT PER CMC
FOR ATTIC EQUIPMENT. ALSO COORDINATE REQUIRED ACCESS WITH THE BUILDING ENGINEER.
24. PROVIDE VIBRATION ISOLATION TO ALL ROTATING EQUIPMENT TO PREVENT TRANSMISSION OF VIBRATION TO BUILDING STRUCTURE. PROVIDE FLEXIBLE DUCT OR
PIPE CONNECTIONS TO ALL ROTATING EQUIPMENT.
25. AIR MOVING SYSTEMS SUPPLYING AIR IN EXCESS OF 2,000 CUBIC FEET PER MINUTE TO ENCLOSED SPACES IN THIS PROJECT SHALL BE EQUIPPED WITH
CODE-REQUIRED DUCT MOUNTED AUTOMATIC SHUTOFF SMOKE DETECTORS. AUTO SHUTOFF SHALL BE ACCOMPLISHED BY INTERRUPTING THE POWER SOURCE OFTHE AIR-MOVING EQUIPMENT UPON DETECTION OF SMOKE IN THE MAIN SUPPLY DUCT (OR AREA DETECTORS AT THE AHJ'S APPROVAL). THESE DETECTORS SHALL BESUPERVISED BY THE BUILDING FIRE ALARM SYSTEM AND THE DETECTORS SHALL ACTIVATE THIS SYSTEM. REFER TO CMC SECTION 609.
26. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS AS THESE ARE PART OF THE CONTRACT DOCUMENTS.
27. WHERE A CONFLICT OCCURS BETWEEN THIS SPECIFICATION AND OTHER SPECIFICATIONS ISSUED AS A PART OF THE CONTRACT DOCUMENTS, THE MORE STRINGENT
REQUIREMENT SHALL PREVAIL.
28. AIR FILTERS SHALL BE STATE FIRE MARSHAL APPROVED AND LISTED. PREFORMED FILTERS HAVING COMBUSTIBLE FRAMING SHALL BE TESTED AS A COMPLETEASSEMBLY. AIR FILTERS IN ALL OCCUPANCIES SHALL BE PER TITLE-24 PART 6 AND APPLICABLE ASHRAE REQUIREMENTS. LOW-RISE RESIDENTIAL (3-STORIES ANDBELOW) SHALL COMPLY WITH OUTSIDE AIR INTAKE FILTRATION REQUIREMENTS AS REQUIRED. FILTERS SHALL BE ACCESSIBLE FOR CLEANING OR REPLACEMENT.
29. ALL APPLIANCES DESIGNED TO BE FIXED IN POSITION SHALL BE SECURELY FASTENED IN PLACE PER BUILDING CODE REQUIREMENTS OR APPLICABLEMANUFACTURER INSTALLATION REQUIREMENTS.
30. IT SHALL BE THE TEST AND BALANCE AGENCY’S RESPONSIBILITY TO PERFORM THE REQUIRED TESTING PROCEDURES, COMPLY, FILL-OUT, AND SIGN ALL THECERTIFICATE OF COMPLIANCE FORMS MECH-1C THROUGH MECH-4C REQUIRED BY THE BUILDING INSPECTOR. HE SHALL COORDINATE AND WORK WITH THE
EQUIPMENT AND CONTROLS INSTALLERS TO COMPLY WITH THESE REQUIREMENTS IN A TIMELY MANNER WITHIN THE PROJECT SCHEDULE.
31. IT SHALL BE THE TEST AND BALANCE CONTRACTOR’S RESPONSIBILITY TO PERFORM THE TESTING PROCEDURES, REQUIRED BY THE MECH-2A THROUGH MECH-11A
CERTIFICATE OF ACCEPTANCE FORMS, AS APPLICABLE FOR ALL NEWLY INSTALLED HEATING AND COOLING SYSTEMS, AS CHECKED-OFF IN FORM MECH-1C ON THEPLANS. THE TEST AND BALANCE CONTRACTOR IS RESPONSIBLE FOR OBTAINING THE CERTIFICATE OF ACCEPTANCE FORMS REQUIRED BY THE BUILDING INSPECTOR.
THE TEST AND BALANCE AGENCY SHALL BE WELL VERSED WITH ALL THE REQUIREMENTS OF THESE CERTIFICATE OF ACCEPTANCE FORMS, AND SHALL COORDINATE
AND WORK WITH THE EQUIPMENT AND CONTROLS INSTALLERS TO COMPLY WITH THESE REQUIREMENTS IN A TIMELY MANNER WITHIN THE PROJECT SCHEDULE.
32. ALL WORK COVERED BY THIS DESIGN SHOULD CONFIRM TO LATEST CODE REQUIREMENT, 2022 CBC, CMC, ALONG WITH 2022 T-24 ENERGY STANDARDS.
33. IN MIXED OCCUPANCY BUILDINGS, EACH PORTION OF A BUILDING SHALL COMPLY WITH SPECIFIC GREEN BUILDING MEASURES APPLICABLE TO EACH SPECIFIC
OCCUPANCY.
34. COVERING OF NEW DUCT OPENING AND PROTECTION OF MECHANICAL EQUIPMENT DURING CONSTRUCTION. AT THE TIME OF ROUGH INSTALLATION, DURINGSTORAGE ON THE CONSTRUCTION SITE AND UNTIL FINAL STARTUP OF THE HEATING, COOLING AND VENTILATION EQUIPMENT, ALL DUCT AND OTHER RELATED AIR
DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH TAPE, PLASTIC, SHEET METAL OR OTHER METHODS ACCEPTABLE BY THE AHJ TO REDUCE THEAMOUNT OF WATER, DUST AND DEBRIS, WHICH MAY ENTER THE SYSTEM.
35. ALL HVAC UNITS OR SYSTEMS SERVING A COMMON AIR SPACE MUST BE INTERCONNECTED TO SHUT DOWN IMMEDIATELY UPON ALARM CONDITION FROM DUCTDETECTORS ( OR FIRM ALARM SYSTEM WHEN USING AREA SMOKE DETECTORS IN LIEU OF DUCT DETECTORS) WITHOUT INTERFERENCE FROM EMS OR CALIFORNIA
STATE FIRE MARSHAL LISTED FOR RELEASING SERVICE.
COMPLY WITH 2022 CALIFORNIA ENERGY CODE (CEC) STANDARDS SUB CHAPTER 3, SECTION 120.4: REQUIREMENTS FOR AIR DISTRIBUTIONSYSTEM DUCTS AND PLENUMS CONVEYING HEATED AND/OR COOLED AIR SHALL BE INSTALLED PER REQUIREMENTS OF 2022 CMC CHAPTER 6.
1. PORTIONS OF SUPPLY-AIR AND RETURN-AIR CONVEYING HEATED OR COOLED AIR LOCATED OUTDOORS, SPACES BETWEEN ROOF AND
INSULATED CEILINGS, SPACES UNDER A ROOF WITH FIXED VENTS OR OPENINGS TO THE OUTSIDE OR UNCONDITIONED SPACES,UNCONDITIONED CRAWL SPACE, AND OTHER UNCONDITIONED CRAWL SPACE SHALL BE INSULATED TO A MINIMUM INSTALLED LEVEL OF R-8.
2. PORTIONS OF THE SAME DUCTS THAT ARE NOT IN ONE OF THE SPACES ENUMERATED ABOVE, DUCTS IN INDIRECTLY CONDITIONED SPACESSUCH AS DUCT SPACE ABOVE THE CEILING, SHALL BE INSULATED TO A MINIMUM INSTALLED LEVEL OF R-4.2 (OR ANY HIGHER LEVEL
REQUIRED BY CMC SECTION 605.0.
3. COMBINATION DUCT LINER AND DUCT WRAP INSULATION MAY BE USED TO ACHIEVE THE INSTALLED MINIMUM R-VALUES DESCRIBED ABOVE.
4. DUCT WRAP INSULATION SHALL BE JOHNS MANNVILE MICROLITE EQ TYPE 75 WITH FSK ALUMINUM FOIL, MIN. R-8 INSULATION.
5. DUCT LINER SHALL BE JOHNS MANNVILE LINACOUSTIC RC FOR RECTANGULAR DUCTS, AND SPIRACOUSTIC PLUS FOR ROUND SPIRAL DUCTS.
UNLESS OTHERWISE EXPLICITLY INDICATED ON PLANS, OUTDOOR LINED DUCTS SHALL BE INSTALLED WITH 2" THICK DUCT LINER R-8, ANDINDOOR LINED DUCTS SHALL BE INSTALLED WITH 1" THICK DUCT LINER R-4.2.
6. DUCTS CARRYING UNTEMPERED MAKE UP AIR SHALL BE INSULATED WITH DUCT WRAP INSULATION WITH VAPOR BARRIER TO PREVENTCONDENSATION.
CODES AND STANDARDS
2022 CALIFORNIA BUILDING STANDARDS ADMINISTRATIVE CODE, (TITLE 24 PART 1)2022 CALIFORNIA BUILDING CODE (CBC), (TITLE 24 PART 2)
2022 CALIFORNIA ELECTRICAL CODE (CEC), (TITLE 24 PART 3)2022 CALIFORNIA MECHANICAL CODE (CMC), (TITLE 24 PART4)2022 CALIFORNIA PLUMBING CODE (CPC), (TITLE 24 PART 5)
2022 CALIFORNIA ENERGY CODE, (TITLE 24 PART 6)2022 CALIFORNIA FIRE CODE (TITLE 24 PART 9)
2022 CALIFORNIA GREEN BUILDING CODE (CGBC), (TITLE 24 11)
ANY OTHER LOCAL AND STATE LAWS AND REGULATIONS
SCOPE OF WORK
LIKE FOR LIKE REPLACEMENT OF HVAC EQUIPMENT AS SHOWN ON SCHEDULE SHEET M-002
MECHANICAL FLOOR PLAN DEMOLITIONM-201 1/4" = 1'-0"
DETAILSM-501 NO SCALE
TITLE 24 DOCUMANTATIONM-601 NO SCALE
THE CALIFORNIA ENERGY CODE SECTION 10-103 REQUIRES ACCEPTANCE TESTING ON ALL NEWLY INSTALLED LIGHTINGCONTROLS, MECHANICAL SYSTEMS, ENVELOPES, AND PROCESS EQUIPMENT AFTER INSTALLATION AND BEFORE PROJECTCOMPLETION. AN ACCEPTANCE TEST IS A FUNCTIONAL PERFORMANCE TEST TO HELP ENSURE THAT NEWLY INSTALLED
EQUIPMENT IS OPERATING AND IN COMPLIANCE WITH THE ENERGY CODE.
LIGHTING CONTROLS ACCEPTANCE TESTS MUST BE PERFORMED BY A CERTIFIED LIGHTING CONTROLS ACCEPTANCE TEST
TECHNICIAN (ATT).
MECHANICAL SYSTEM ACCEPTANCE TESTS MUST BE PERFORMED BY A CERTIFIED MECHANICAL ATT FOR PROJECTS
SUBMITTED ON OR AFTER OCTOBER 1, 2021.
A LISTING OF CERTIFIED ATT CAN BE FOUND AT HTTPS://WWW.ENERGY.CA.GOV/PROGRAMS-AND-TOPICS/PROGRAMS
/ACCEPTANCE-TEST-TECHNICIAN-CERTIFICATION-PROVIDER-PROGRAM/ACCEPTANCE .
THE ACCEPTANCE TESTING PROCEDURES MUST BE REPEATED, AND DEFICIENCIES MUST BE CORRECTED
BY THE BUILDER OR INSTALLING CONTRACTOR UNTIL THE CONSTRUCTION / INSTALLATION OF THE SPECIFIEDSYSTEMS CONFORM AND PASS THE REQUIRED ACCEPTANCE CRITERIA.
PROJECT INSPECTORS WILL BE COLLECTING THE FORMS TO CONFIRM THAT THE REQUIRED ACCEPTANCE TESTS HAVE BEENCOMPLETED.
PIPING INSULATION SHALL BE AS PER CALIFORNIA ENERGY CODE TABLE 120.3-A
<1
1
TO
<1.5
TO
<4
1.51
TO
SPACE COOLING SYSTEMS (HVAC CONDENSATE, REFRIGERANT)
40 - 60 0.21 - 0.27 75 0.5 0.75 1.0
BELOW 40 0.20 - 0.26 50 1.0 1.5 1.5
FLUIDTEMPERATURERANGE (°F)
CONDUCTIVITY RANGE (INBTU-INCH PER HOUR PERSQUARE FOOT PER °F)
INSULATION MEAN
RATING
TEMPERATURE (°F)
NOMINAL PIPE DIAMETER (IN INCHES)
INSULATION THICKNESS REQUIRED (IN INCHES)
PIPING INSULATION NOTES
TABLE 120.3-A PIPE INSULATION THICKNESS
CALIFORNIA ENERGY CODE - ACCEPTANCE TESTING REQUIREMENT
MEP COMPONENT ANCHORAGE NOTE:
MECHANICAL, PLUMBING, AND ELECTRICAL COMPONENTS SHALL BE ANCHORED AND INSTALLED PER THEDETAILS ON THE APPROVED CONSTRUCTION DOCUMENTS. WHERE NO DETAIL IS INDICATED, THE FOLLOWING
COMPONENTS SHALL BE ANCHORED AND/OR BRACED TO MEET THE FORCE AND DISPLACEMENT REQUIREMENTSPRESCRIBED IN THE 2022 CBC, 1617A.1.24 THROUGH 1617A.1.26 AND ASCE 7-16 CHAPTER 13, 26 AND 30.
1. PERMANENT EQUIPMENT AND COMPONENTS.
2. TEMPORARY OR MOVABLE EQUIPMENT THAT IS PERMANENTLY ATTACHED (e.g. HARDWIRED) TO THE
BUILDING UTILITY SERVICES SUCH AS ELECTRICITY, GAS, OR WATER.
3. MOVABLE EQUIPMENT WHICH IS STATIONED IN ONE PLACE FOR MORE THAN 8 HOURS AND HEAVIER THAN 400
POUNDS ARE REQUIRED TO BE ANCHORED WITH TEMPORARY ATTACHMENTS.
THE FOLLOWING MECHANICAL AND ELECTRICAL COMPONENTS SHALL BE POSITIVELY ATTACHED TO THE
STRUCTURE, BUT THE ATTACHMENT NEED NOT BE DETAILED ON THE PLANS. THESE COMPONENTS SHALL HAVE
FLEXIBLE CONNECTIONS PROVIDED BETWEEN THE COMPONENT AND ASSOCIATED DUCTWORK, PIPING, AND
CONDUIT.
A. COMPONENTS WEIGHING LESS THAN 400 POUNDS AND HAVE A CENTER OF MASS LOCATED 4 FEET OR LESS
ABOVE THE ADJACENT FLOOR OR ROOF LEVEL THAT DIRECTLY SUPPORT THE COMPONENT.
B. COMPONENTS WEIGHING LESS THAN 20 POUNDS, AND IN THE CASE OF DISTRIBUTED SYSTEMS, LESS THAN 5
POUNDS PER FOOT, WHICH ARE SUSPENDED FROM A ROOF OR FLOOR OR HUNG FROM A WALL.
FOR THOSE ELEMENTS THAT DO NOT REQUIRE DETAILS ON THE APPROVED DRAWINGS, THE INSTALLATION SHALLBE SUBJECT TO THE APPROVAL OF THE STRUCTURAL ENGINEER OF RECORD. THE PROJECT INSPECTOR WILL
VERIFY THAT ALL COMPONENTS AND EQUIPMENT HAVE BEEN ANCHORED IN ACCORDANCE WITH ABOVEREQUIREMENTS.
PIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEM BRACING NOTE:
PIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEMS SHALL BE BRACED TO COMPLY WITH THE FORCESAND DISPLACEMENTS PRESCRIBED IN ASCE 7-16 SECTION 13.3 AS DEFINED IN ASCE 7-16 SECTIONS 13.6.5, 13.6.6,
13.6.7, 13.6.8 , AND 2022 CBC, SECTIONS 1617A.1.24, 1617A.1.25 AND 1617A.1.26.
THE BRACING AND ATTACHMENTS TO THE STRUCTURE SHALL BE DETAILED ON THE APPROVED DRAWINGS.
COPIES OF THE BRACING SYSTEM INSTALLATION GUIDE OR MANUAL SHALL BE AVAILABLE ON THE JOBSITE PRIORTO THE START OF HANGING AND BRACING OF THE PIPE, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEMS.
THE STRUCTURAL ENGINEER OF RECORD SHALL VERIFY THE ADEQUACY OF THE STRUCTURE TO SUPPORT THE
HANGER AND BRACE LOADS.
EQUIPMENT ANCHORAGE & SEISMIC NOTES
MECHANICAL FLOOR PLAN NEWM-202 1/4" = 1'-0"
07
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
C-8704-1
1 PETERS CANYON ROAD, SUITE 130
IRVINE, CA. 92606
TEL: 949-387-8500, FAX: 949-387-0800
IDS
IDS GROUP
IDS PROJECT # 22X037.02
No. 30841
R
EMS
ATTE
ET
ER
SIG
ER
PD
L
OA
C
N
F
H
O
C A
A L
I FC ANRI
OEFOISS
N
ER
EN
I
G
E
LAN
I
DAR R E N B. SM
I
T
H
Exp. 12/31/24
100 % CD03-22-2024
REPLACEMENT OF HVAC EQUIPMENT AT FIRE
STATION NO.8
NEWPORT BEACH FIRE DEPARTMENT
6502 Ridge Park Rd, Newport Beach, CA 92657
M-001
NOTES, LEGEND & ABBREVIATIONS
02
B-5315-S
~
[""[lill]
[IlJll"J
[Sill] ~
le :::ii
[><:J
ISi
l3l
IZl
oE-
□~
□~ ~
+------h
I o I ~ ~
8
°'--°'--
..
/
-AA o~ ~\._-
NO. DATE DESCRIPTION OF REVISIONS APPROVED
REVIEWED:
SEE COVER SHEET FOR
is~ l/2 APPROVALS
"" * DESIGNED: DRAWN:
RJ ss
CHECKED: DATE:
DS 03/22/24 SHEET OF
-0
0 N ..c 0 ..c .,
0 ..c ::, .,
E
0 I')
0
0 -
-0 0
I
:::.I
"' 0
.... I')
~
"' _'.;:!,
..c 0 .,
:::;;
sj-
~ Cl < (.)
IO
~ 00
C:
.Q -0 -(/)
~ ii:
(D z
"' 0
~ 0 X
"' _'.;:!,
-0 ., ~ 0 t
"' 0
_'.;:!,
~ (.) w ...,
0
cc:
~ -0
~
0 ..c
~
~
I (/)
Cl
-;;;
TAG MAKE MODEL TYPE LOCATION SERVICE
ELECTRICAL PHYSICAL
ANCHORAGEDETAIL REMARKSNOM
TONS MCA MOCP V PH
OUTDOOR CONDENSING UNIT SCHEDULE
TAG MAKE MODEL TYPE LOCATION SERVICENOM
TONS OPERATINGWEIGHT (LBS)V PH
FORCED AIR FURNACE / DX UNIT
ESP
"WG
7611.05 SEER R22
TOTALOPERATING
WEIGHT (LBS)
SOUNDPOWER W
INCH.
D
INCH.
H
INCH.
1
dbA
HZ
HZ
LENNOX3 N/A 120 113000.5 60 275
1.1 23.6 40 1208/230 60
COOLING
OUTDOOR TEMP
DB ºF
COOLING
WB ºF
95 70.035,400 250HS25-411-1P
AIR COOLED
CONDENSING
UNIT
FAF-1GRADELENNOX
STATUS
EXISTING
DEMO
CU
1 1 2 31
M-501
CU
2 1 2 3
(E) CU-1
FAN
FLA
COMP.
RLA
18 35 33 31 N/A
(E) FAF-1
STATUS
EXISTING
DEMO PULSE 21
FAN
FLA
15 16" x 25" x 1"
FILTER
(NO.) SIZE MERV
-
(E) CU-2
3
TOTAL
COOLING
BTU/h
EFFICIENCY TYPE
30,800
SENSIBLE
COOLING
BTU/h
7611.05 SEER R22 1.1 23.6 40 1208/230 6095 70.035,400 250HS25-411-1P
AIR COOLED
CONDENSING
UNIT
FAF-2GRADELENNOXEXISTING
DEMO 18 N/A330,800 35 33 31
(E) FAF-2
C22-41-FC-TXV-2
MODEL
VERTICAL
DUCTED
HVAC ROOM
23
LENNOX3 120 10.5 60 275PULSE 21 15 16" x 25" x 1" -C22-41-FC-TXV-2VERTICAL
DUCTED
FURNISH WITH CONTROLS AND ACCESSORIES FOR LOW AMBIENT COOLING OPERATION, START ASSIST - CAPACITOR AND RELAY.
SIZE AND INSTALL REFRIGERANT PIPING STRICTLY PER MANUFACTURER'S INSTALLATION INSTRUCTIONS AND RECOMMENDATIONS. FIELD DETERMINE THESHORTEST POSSIBLE ROUTING OF REFRIGERANT PIPING BETWEEN INDOOR AND OUTDOOR UNITS.
PROVIDE BLYGOLD ® COATING FOR COIL AND CABINET.
2
3
EXISTING
DEMO
FAF
1
FAF
2
NEW
NEW
LENNOX SL297UH040NV36B CX35-36B-6F-203VERTICAL
DUCTED
DAY RM. 18, PHYSICAL
TRAINING 15, KITCHEN 16,
HALL 19
OPEN DORM 21
DAY RM. 18, PHYSICAL
TRAINING 15, KITCHEN 16,
HALL 19
OPEN DORM 21
1370
1300
0.8 120 1 60
MOCP
7.7 151/2 175
FUEL
NATURAL
GAS
INPUT
BTUH
40,000
OUTPUT
BTUH
39,000
AFUE
97.5%
HEATING ELECTRICAL
16" x 25" x 1" 13
LENNOX SL297UH040NV36B CX35-36B-6F-20VERTICAL
DUCTED 1370 0.8 120 1 607.7 151/2NATURAL
GAS 40,000 39,000 97.5%16" x 25" x 1" 13 175
ML18XC2-036-230LENNOXNEW
AIR COOLED
CONDENSING
UNIT
GRADE FAF-1
FAF-2
3 12 EER2
16 SEER2 36,400 28,000 95 70.0 R410A 1 6035 29 29 34 1871 15.4
LENNOXNEW
REMARKS
1 PROVIDE TITLE 24 COMPLIANT PROGRAMMABLE THERMOSTAT.
PROVIDE BLYGOLD ® COATING FOR COIL AND CABINET.
PROVIDE DISCONNECT SWITCH.
REBALANCE UNIT TO AIR QUANTITY SHOWN
2
3
REMARKS
1 2 3
REMARKS
1 2 3
ANCHORAGEDETAIL
N/A
N/A
WEIGHT
LBS
REFRIGERANT
8
8
8
1
M-501
2
M-501
2
M-5013
HVAC ROOM
23
HVAC ROOM
23
HVAC ROOM
23
NATURAL
GAS
NATURAL
GAS
470
470
470
470
MIN.OSA
CFM
SUPPLY
CFM
COOLING COIL
CAPACITY
BTU/h
35,400
35,972
35,972
35,400
LAT
DB ºF
54.6
58.6
58.6
54.6
LAT
WB ºF
53.0
57.5
57.5
53.0
4
4
4
40,000 39,000
40,000 39,000
1/3
1/3
FAN
HP
N/A
N/AN/A
5 NEW FAF UNIT CONTROLLER SHALL INTEGRATE WITH EXISTING MODULATING
ECONOMIZER DAMPER SECTION (LENNOX MODEL # EDM14M-65). FIELD VERIFY EXISTING
CONDITION.
5
5
208/230 76
ML18XC2-036-230
AIR COOLED
CONDENSING
UNIT
GRADE 3 12 EER2
16 SEER2 36,400 28,000 95 70.0 R410A 1 6020.2 35 29 29 34 1871 15.48 208/230 76
20.2
07
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
C-8704-1
1 PETERS CANYON ROAD, SUITE 130
IRVINE, CA. 92606
TEL: 949-387-8500, FAX: 949-387-0800
IDS
IDS GROUP
IDS PROJECT # 22X037.02
No. 30841
R
EMSATTE
ET
E
R
SIG
ER PD
L
O
A
C
N
F
H
O
CA
AL
I
F
C ANR
I
OEFOISS
N
ER
EN
I
G
EL
AN
I
DAR R E N B. SM
I
T
H
Exp. 12/31/24
100 % CD03-22-2024
REPLACEMENT OF HVAC EQUIPMENT AT FIRE
STATION NO.8
NEWPORT BEACH FIRE DEPARTMENT
6502 Ridge Park Rd, Newport Beach, CA 92657
M-002
SCHEDULES
03
CK40CT-36B-01
CK40CT-36B-01
B-5315-S
e e
0
0
0
e e
0 0
0
0
0
..
/ is~ l/2 _..AA~~ "" ,.\._-*
NO. DATE DESCRIPTION OF REVISIONS APPROVED
8 020
8 020
REVIEWED:
SEE COVER SHEET FOR
APPROVALS
DESIGNED: DRAWN:
RJ ss
CHECKED: DATE:
DS 03/22/24
8 00200
8 00200
SHEET OF
.,,
0 N .c 0 .c .,
0 .c ::, .,
E 0 ,,.,
0
0 ~
O> 3 .,, .,, .,
.c 0
"'1
N
0 0
I
::.I
N 0
.... ,,.,
~ N
_'.;:!, .c 0 .,
:::;;
st
~ 0 < (.)
IO
~ 00
C:
.Q -0 -(/)
(Il z
N 0
~ 0 X N
_'.;:!, .,, ., ~ 0 t N 0
_'.;:!,
~ (.) w -, a
0::
~ .,,
~
0 .c
~
~
I (/)
0
-;::,
8 (E) FAF-1
1 (E) FAF-2
10 (E) CU-1(E) CU-2
4 (E) CU-3
3
5
5
5
5
6
POD
7
(E) FS
POD
(E) REFRIGERANTLINES IN SOFFIT
1
8
T
9
T
9
2102
(E) MS . MAINSWITCHBOARD
DEMOLITION KEYNOTES
GENERAL NOTES
1. CONTRACTOR TO REPAIR / REPLACE DAMAGED CEILING AFFECTED
DURING HVAC REPLACEMENT.
2. CONTRACTOR TO REPAIR AND / OR PATCH DAMAGED WALLS
AFFECTED DURING HVAC REPLACEMENT.
DEMOLISH AND REMOVE EXISTING FURNACE UNIT, COOLING COIL ANDREFRIGERANT PIPING INCLUDING ALL APPURTENANCES. RETURN
PLENUM BELOW UNIT AND OUTSIDE AIR DUCT TO REMAIN ANDRE-USED. DISCONNECT AND CAP GAS CONNECTION.
DEMOLISH AND REMOVE EXISTING OUTDOOR CONDENSING UNIT,REFRIGERANT PIPING INCLUDING ALL APPURTENANCES.
DEMOLISH AND REMOVE EXISTING REFRIGERANT PIPING.
EXISTING EQUIPMENT TO REMAIN AND RE-USED.
EXISTING DUCTWORK TO REMAIN AND REUSED.
EXISTING OSA INTAKE LOUVER AND MODULATING ECONOMIZER
DAMPER SECTION TO REMAIN AND REUSED.
EXISTING CONDENSATE DRAIN PIPING TO REMAIN AND REUSED.
EXISTING UNIT DISCONNECT SWITCH AND FEEDER TO REMAIN.
DEMOLISH AND REMOVE EXISTING THERMOSTAT FOR FAF-1 ANDFAF-2 .
DISCONNECT AND REMOVE EXISTING CU-1 AND CU-2 DISCONNECTSWITCH, FEEDER CONDUCTORS AND CONDUIT COMPLETELY TOSOURCE.
1
2
3
4
5
6
7
8
9
10
11/8"-1'-0"MECHANICAL FLOOR PLAN - DEMOLITION
TRUENORTH N
W
S
E
07
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
C-8704-1
1 PETERS CANYON ROAD, SUITE 130
IRVINE, CA. 92606
TEL: 949-387-8500, FAX: 949-387-0800
IDS
IDS GROUP
IDS PROJECT # 22X037.02
No. 30841
R
EMS
ATTE
ET
ER
SIG
ER
PD
L
OA
C
N
F
H
O
C A
A L
I FC ANRI
OEFOISS
N
ER
EN
I
G
E
LAN
I
DAR R E N B.SM
I
T
H
Exp. 12/31/24
100 % CD03-22-2024
REPLACEMENT OF HVAC EQUIPMENT AT FIRE
STATION NO.8
NEWPORT BEACH FIRE DEPARTMENT
6502 Ridge Park Rd, Newport Beach, CA 92657
M-201
MECHANICAL FLOOR PLAN
DEMOLITION
04
B-5315-S
OFFICE
OFFICE·
2754'
12.xlO E.A.+-__.,,,
DISCHARGE
LOUVER
. WORK
•. STORAGE
6 "_¢DRYER 0.ISCH.ARGE --t-'---
I 0 00 ,f 00
l8"x_12" EXH. AIR-~
DISCHARGE LOUVER
I
-----i----+----+-----+----fM ,_/
NO. DATE
(TYP.
75q:
OF 2)
r
DESCRIPTION OF REVISIONS
--RANGE HOOD
· EXHAUST DUCT
CONNECTION
APPROVED
OF 4)
B 185,:f (TYP. OF 4)
REVIEWED:
SEE COVER SHEET FOR
APPROVALS
DESIGNED: DRAWN:
RJ SS
CHECKED: DA TE:
DS 03 22 24
0
0
0
0
0
0
0
0
0
0
SHEET
"'CJ 0 N .c 0 .c (J)
0 .c ::,
(J)
E 0 I") a
0 -
""' "' ' "' -' ""' a
"' 31: 'O
a
E .,
'O a. -I -a
"' I
:::. I
"' a
.... I") a X
"' ~ .c 0 .,
:::.
""' a /
0 <( u
IO a /
CX)
C E -0 -(/) ., .. ii:
(D z
"' a
r..: I") a X
"' "' /
"'CJ ., ..
0 .c (/)
/
"' "' a
"' / (/) I-u w --:, a
0:: a. / 'O ., ..
0 .c
;;)--(/) IL
I (/)
0
OF / /
(E) CU-3
1 FAF
2
3
5
1 FAF
1
6
5
5
9 CU
2
9 CU
1
4
5
POC
7
(E) FS
POC
63
2
2
T
T
8
FAF-2
8
FAF-1
(E) MS . MAINSWITCHBOARD
10
KEYNOTES
GENERAL NOTES
1. CONTRACTOR TO REPAIR / REPLACE DAMAGED CEILING AFFECTEDDURING HVAC REPLACEMENT.
2. CONTRACTOR TO REPAIR AND / OR PATCH DAMAGED WALLSAFFECTED DURING HVAC REPLACEMENT.
PROVIDE NEW FURNACE UNIT. INSTALL ABOVE (E) RETURN PLENUM.CONNECT SUPPLY DUCT TO EXISTING DUCTWORK. RE-CONNECT TO
(E) GAS CONNECTION. SEE SCHEDULE ON SHEET M-002.
PROVIDE NEW OUTDOOR CONDENSING UNIT AND REFRIGERANT
PIPING. SEE SCHEDULE ON SHEET M-002 .
PROVIDE NEW REFRIGERANT PIPING. REUSE EXISTING PIPE ROUTING
AND PIPE SUPPORTS
EXISTING EQUIPMENT TO REMAIN AND REUSED.
EXISTING DUCTWORK TO REMAIN AND REUSED.
EXISTING OSA INTAKE LOUVER AND MODULATING ECONOMIZER
DAMPER SECTION TO REMAIN AND REUSED.
CONNECT NEW CONDENSATE DRAIN LINE TO EXISTING CONDENSATE
DRAIN PIPING.
PROVIDE TITLE 24 COMPLIANT, PROGRAMMABLE THERMOSTAT.
REPLACE EXISTING CU-1 AND CU-2 DISCONNECT SWITCH WITH NEW
SURFACE MOUNT DISCONNECT SWITCH, 60AS, 35AF (FRN-R),2P, NEMA
3R AND PROVIDE NEW FEEDER FOR EACH UNIT, 3/4"C-2#8 & 1#10G CUFOR MAIN SWITCHBOARD FEEDER 'MS'-4 (CU-1) AND 'MS'-5 (CU-2).
ELECTRICAL CONTRACTOR TO FIELD VERIFY BEFORE ROUGH-IN.
ADJUST EXISTING MAIN SWITCHBOARD 'MS' FEEDER CIRCUIT
BREAKER TRIP SETTING FOR CU-1 AND CU-2 FROM 100AF, 30AT, 2P TO
100AF, 35AT, 2P. ELECTRICAL CONTRACTOR TO FIELD VERIFY BEFOREROUGH-IN.
1
2
3
4
5
6
7
8
9
10
11/8"-1'-0"MECHANICAL FLOOR PLAN - NEW
TRUENORTH N
W
S
E
07
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
C-8704-1
1 PETERS CANYON ROAD, SUITE 130
IRVINE, CA. 92606
TEL: 949-387-8500, FAX: 949-387-0800
IDS
IDS GROUP
IDS PROJECT # 22X037.02
No. 30841
R
EMS
ATTE
ET
ER
SIG
ER
PD
L
OA
C
N
F
H
O
C A
A L
I FC ANRI
OEFOISS
N
ER
EN
I
G
E
LAN
I
DAR R E N B. SM
I
T
H
Exp. 12/31/24
100 % CD03-22-2024
REPLACEMENT OF HVAC EQUIPMENT AT FIRE
STATION NO.8
NEWPORT BEACH FIRE DEPARTMENT
6502 Ridge Park Rd, Newport Beach, CA 92657
M-202
MECHANICAL FLOOR PLAN
NEW
05
B-5315-S
250{
OFFICE
OFFICE .
2]5<f
..
>
8x8
, cc R .
12x10 E. A.-+-_..,,,-
DISCHARGE •
LOUVER
0
t '.
10x8
..
. ·1 .. -.
• I
1 oocf .
(TYP. OF 2)
l8"x12" EXH. AIR-~
DISCHARGE LOUVER
10x10 (300<f) --~
THERMALLY ACTIVATED
VAV DIFFUSER
I
NO, DATE
(TYP.
75cf
OF 2)
I
\
DESCRIPTION OF REVISIONS
--RANGE HOOD
· EXHAUST DUCT
CONNECTION
150cj:
! I I 175<f (TYP. OF 4)
APPROVED
REVIEWED:
SEE COVER SHEET FOR
APPROVALS
DESIGNED: DRAWN:
RJ SS
CHECKED: DA TE:
DS 03 22 24
0
0
0
0
0
0
0
0
0
0
SHEET
'O C N ..c: C ..c: " C ..c: :,
"
E
C I')
0 a ~
...
~ N ~
-...... ... 0
"' ~ 'O ;.
" C:
,B-I N 0 N
I ::. I N 0
,.._
I')
0 X N
~ ..c: " " ::.
...
:3-Cl <( u
IO 0 / IX)
C:
.c::> -C -C/1
" ... ii:
ID z
N 0
r...: I')
0 X N N / 'O " ...
C
..c:
C/1 / N N 0 N /
C/1 f-u w -,
0 ~ ll. / 'O
" ...
C
..c:
:;;, ~
C/1 u.
I
C/1 Cl
OF / /
5/8" THICK NEOPRENE VIBRATION
PAD LARGE ENOUGH TO COVERTHE ENTIRE LENGTH AND WIDTH
OF UNIT LEG. TYPICAL BOTH SIDES.
(E) CONCRETE
GRADE
1/2" HILTI KB TZ2 SS 304 WITH 2"EFFECTIVE EMBEDMENT
(ICC-ESR 4266).
1NO SCALEOUTDOOR UNIT MOUNTING ON GRADE
2NO SCALEINDOOR UNIT
3NO SCALEDETAIL
4NO SCALEDETAIL
5NO SCALEDETAIL
6NO SCALEDETAIL
7NO SCALEDETAIL
8NO SCALEDETAIL
9NO SCALEDETAIL
10NO SCALEDETAIL
11NO SCALEDETAIL
12NO SCALEDETAIL
CU
1
CU
2
(E) RA PLENUM
(N) DUCTCONNECTION
F.F.L
(E) SA DUCT
FAF
1
FAF
2
(E) ANCHOR TO (E) CONCRETE FLOOR
ATTACH UNIT TO (E) RA PLENUM
#12 SMS EACH LEG, TYP. 4 CORNERS.
1-1/2"x1-1/2", 16 GA ANGLE EA. CORNER
WITH (1) # 12 SMS EA. LEG TYP.
NOTE:EXISTING BOLTS MUST BE REMOVED, LOOSE CONCRETE MUST BE CHIPPED OUT TO SOUND
CONCRETE, AND REPAIRED WITH SIKATOP 123 OR APPROVED EQUAL
07
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
C-8704-1
1 PETERS CANYON ROAD, SUITE 130
IRVINE, CA. 92606
TEL: 949-387-8500, FAX: 949-387-0800
IDS
IDS GROUP
IDS PROJECT # 22X037.02
No. 30841
R
EMS
ATTE
ET
ER
SIG
ER
PD
L
OA
C
N
F
H
O
C A
A L
I FC ANRI
OEFOISS
N
ER
EN
I
G
E
LAN
I
DAR R E N B. SM
I
T
H
Exp. 12/31/24
100 % CD03-22-2024
REPLACEMENT OF HVAC EQUIPMENT AT FIRE
STATION NO.8
NEWPORT BEACH FIRE DEPARTMENT
6502 Ridge Park Rd, Newport Beach, CA 92657
M-501
DETAILS
06
B-5315-S
'
00
-' " ' ' ·, f' " . ' L
r: ' " " _.,,,J
" ,, ' "
.. REVIEWED:
SEE COVER SHEET FOR
/ is~ l/2 APPROVALS
_..AA~~ "" ~\_-* DESIGNED: DRAWN:
RJ ss
NO. DATE DESCRIPTION OF REVISIONS APPROVED CHECKED: DATE:
DS 03/22/24
V
0
0
Oo
"" I 'Ji'
. ,, .
' " .
' " a,
-----K; \J' ~
/\/\
V \__/\__/
V
/
0
r
"' ' . . ,, ' ' ' ., " " . ,, ' ' ' ' ' ,, ,, ''
,, ., ,.6"
SHEET OF
" 0 N .s::;
0
.s::; .,
0 .s::; ::, .,
E
0 ,,.,
0
0 -
-0 IO
I
::.I
N 0
" ,,.,
~ N
_'.;:!,
.s::;
0 .,
:::;;
st
~ 0 < (.)
IO
~ 00
C:
.Q -0 -(/)
(Il z
N 0
~ 0 X N
_'.;:!,
" ., ~ 0 t
N 0
_'.;:!,
~ (.) w -,
0
0::
~ " ~ a
.s::;
~
~
I (/)
0
-;::.
07
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
C-8704-1
1 PETERS CANYON ROAD, SUITE 130
IRVINE, CA. 92606
TEL: 949-387-8500, FAX: 949-387-0800
IDS
IDS GROUP
IDS PROJECT # 22X037.02
No. 30841
R
EMS
ATTE
ET
ER
SIG
ER
PD
L
OA
C
N
F
H
O
C A
A L
I FC ANRI
OEFOISS
N
ER
EN
I
G
E
LAN
I
DAR R E N B. SM
I
T
H
Exp. 12/31/24
100 % CD03-22-2024
REPLACEMENT OF HVAC EQUIPMENT AT FIRE
STATION NO.8
NEWPORT BEACH FIRE DEPARTMENT
6502 Ridge Park Rd, Newport Beach, CA 92657
M-601
TITLE 24 DOCUMENTATION
07
B-5315-S
STAH OF CALIFORNIA STAH OF CALIFORNIA
Mechanical Systems CALIFORNIA ENERGY COMMISSION Mechanical Systems CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-MCH-E CERTIFICATE Of COMPLIANCE NRCC•MCH-E
This dowment is used to demonstrate wmp/ionr:;e for mer:;honiml system'> that ore within the gape of the permit oppliwtion ond are demonstrating r:;omplionr:;e using the presuiptiw Project Name: REPLACEMENT OF HVAC EQUIPMENT AT FIRE STATION N0.8 Report Page: (Page z of9)
path outlined in 140.4, or 141.0(b)2 for alteratiom. D.-.te Prep.-.red: 2024-02-12T20:08: 38-05 :00
Project Name: REPLACEMENT OF HVr'IC EQUIPMENT AT FIRE STr'ITION NO.R Report Page: (Page 1 of 9)
Project Address: Date Prepared: 2024-02-12T20:08:38-05: 00
C. COMPLIANCE RESULTS
A. GENERAL INFORMATION
01 Project Location (city) I NEWPORT BEACH 04 Total Conditioned Floor Area 22.47
Table C will indicate if the project data input into the compliance document is compliant with mechaniwi requiremeI1ts. This table is not editable by thf' ust?r. ff this table says "DOES
NOT COMPLY" or "COMPLIES with Exceptional Conditions" refer to Table D., or the table indicated as not compliant for guidance.
02 Climate Zone I 6 05 Total Unconditioned Floor Area 0 01 02 03 04 05 06 07 08 09
03 Occupancy Types Within Project· 06 # of Stories (Habitable Above Grade) 1 System Fans/ System Summary Terminal Box Distribution • Office Pumps Er:onomizers Controls 110.1, AND AND AND ANO Ventilation ANO Controls ANO 120.3, ANO Cooling Towers 14D.4{k), 14D.4(c), 110.2, 120.2, 110.2, 120.1, 160.2 140.4[d), 140.4(1), 110.Z(e)Z Compliance Results 170.2(c)41 140.4(e), 140.4(f), 140.4, 170.2.(c) 170.2(c) 170.2{c)4B 160.2, 160.3
B. PROJECT SCOPE 17D.2(c)
This table Includes mechanical systems or components tlial ore wilhin the scope of the permit oppficatioo and are demonstrating compliance using the prescriptive pat/J outlined in {See Table F) (See Table G) (See Table H) (See Table I) (See Table J) (See Table K) (See Table L) (See Table M)
140.4,. 170.2(b) or 141.0(b)2 and 180.2(b)2 for alterations. COMPLIES with
01 02 03 Yes AND AND AND Yes AND Yes AND AND AND E~ceptiona l
Air System(s) Wet System Components Dry System Components Conditions
□ Heating Air System □ Water Economizer □ Air Economizer Mandatory Measures Compliance (See Table Q for Details) COMPLIES
0 Cooling Air System □ Pumps □ Electric Resbtance Heat
Mech,mic,il Controls □ System Pipini;: □ Fem Systems D. EXCEPTIONAL CONDITIONS
□ Mechanical Controls (eKisting to remain, altered □ Cooling Towers □ Ductwork (€Kisling to remain. altered or new) This table is auto-filled with uneditable comments because of selections made or data entered in tables throughout the form. or new)
□ Chillers 0 Ventilation Transfer air is being used in at least one zone to meet minimum ventilation requirements. See Table J for details. Transfer air must be designed per §.1ZQJJg)_ for air classification and
□ Boilers □ Zonal Systems/Terminal Boxes recirculation limitations and be documented within construction documents
E. ADDITIONAL REMARKS
This table includes remarks made by the permit applicant to the Authority Hoving Jurisdiction.
F. HVAC SYSTEM SUMMARY (DRY & WET SYSTEMS)
Space Conditioning System Information
01 02 03 04 OS 06
System Name Quantity System Serving System Status Space Type Utilizing Recovered Heat
FAF-1, CU-1,FAF-2,CU-2 2 Single zone Alteration □
Gf'nf'rntf'd O;atr>/Timf'· Documf'nt;ation Softw_ar<': En<'rgy Co!le> Ar:P Gf'nf'rntP<i D_ate(limf'· Dornme>ntntion Softwnrp· Enf'rgy Co<if' Arf'
CA Buildin1, Ener~ Efficiency Stundards -2022 Nonresidcntic1I Complic1ncc Report Version: 2022.0.000 (ompliJncc 10: 176806·0224-0002 CA Buildini:; Energy Efficiency Strindards -2022 Nonresidential Compliance Report Version: 2022.0.000 Compliance ID: 1768D6-0224·0002
Schema Version: rev 20220101 Report Generated: 2024-02-12 17:08:43 Schema Version: re11 20220101 Report Generated 2024-02-12 17:08:43
STATE OF CALIFORNIA STATE OF CALIFORNIA
Mechanical Systems CALIFORNIA ENERGY COMMISSION Mechanical Systems CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-MCH-E CERTIFICATE OF COMPLIANCE NRCC•MCH-E
Project Name: REPLACEMENT OF HVr'IC EQUIPMENT AT FIRE STATION N0.8 Report Pa.ge: (Page 4 of 9) Project Name: REPLI\CEMENT OF HVI\C EQUIPMENT /\T FIRE ST/ITION N0.8 Report Page: (Pages of9)
Date Prepared: 2024-02-12120:08:3$-05: 00 D;ite Prepared: 202 4-02 -12120:08: 38-05 :00
J, VENTILATION AND INDOOR AIR QUALITY
G. PUMPS Exh. Vent per 120.l(c)4 &
This sc:ction does not apply to this project. Mer:hankal Ventilation Required per 120.l(c)J" & 160.2(c)3 160.2(c)4 DCV or Sensor Controls per 120.l {d)3. Space Name 120.l(d)S, and 120.l(e}3~ 16D.2(r:;)5D or Item Tag Conditioned tt of Shower • of Required Required Provided per Design OccupJncy Type4 Floor Area heads/ Min OA 160.2(c)5E 160.2(c)5D
H. FAN SYSTEMS & AIR ECONOMIZERS (ft2) toilets people" CFM
M in (FM CFM
This section does not apply to this project. NA: Not required per DCV
DAY RM. 18, Bedroom/living room 915 137.25
§120.1(di3
KITCHEN 16 (hate I/mote I/do rm) NA: Not req1.1ired I. SYSTEM CONTROLS 0cc Sensor space type
This section does not apply to this project. NA: Not required per DCV PHYSICAL Bedroom/living room 170 25.5
§120.1(d)3
J. VENTILATION AND INDOOR AIR QUALITY TRAINING 15 (hate I/mote I/do rm) NA: Not req1.1ired 0cc Sensor This table is used to demonstrate comp/ianr:;e with mandatory ventilation requirements in 120.1120.2{e)38 140, 4{p) and 140.4{q) far o/1 nonresidential and hotel/motel and space type
d:t24refnolink/}160.2, 160.3{a}3D, 170.2(o)4N, 170.2(0)40 for high-ri9~ residential ocwpanciR.S. Far a!tnation,, only vf'ntilotion sy.,tem., bf'1ng altf'red within thf> .,cope af thf' permit 17 Total System Required Min OA CFM 162.75 18 Ventilation for this System Complies? Yes
application need to be documented in this table. In lieu of this table, the required outdoor ventilation rates and airflows may be shown an the plans or the calculations can be presented 04 05 06 07 in a sprr?adsher::t.
01 □ Check the box if the project is showing ventilation calculations on the plans, or attaching the calculations instead of completing this table. System Design DA CFM System Design
Air Filtration per 120,l(c) 141.0(b)2 and
0 Check th is box if the project included Nonresidential, Hotf'I/Motel Spaces or Multifamily Common Use Spaces System Name FAF-2 Airflow1 470 TransferAirCFM 1370 160.2(c)212
02 Provided □
□ 08 09 10 11 12 13 14 15 16 03 Check the box if the project is using natural ventilation in any nonresidential or hotel/motel spaces to meet required ventilation rates per 120.1(c)2
Nonresidential and Hotel/ Motel Multifamily Common Use Ventilation svstems Mech~nkill Ventil,1tion Required per 120.l(c)33 & 160.2(c)3 E~h. Vent per 120.l (c)4 &
160.2(c)4 □CV or Sensor Controls per 120.1{d)3,
04 05 06 07 Space Name,
Conditioned # of Shower Required 1 2.0.l(d)5, cind 120. l.(e)3G 160.2{c)SD
Air FiltrJtion per 120.l(c) 141.0(b)2 ~nd or Item Tag
Occupancy Type4 Floor Arf'a heads/ • of Required Provided per Design 160.2(c)SE 160.2(c)5D Min OA
System Name FAF-1 System Design DA CFM 470 System Design 1370 160.2(c)212 (ft2) toilets peopler, CFM M in CFM CFM
Airflow'-Transfer Air (FM
Provided NA: Not required per
HALL 19, DCV 08 09 10 I 11 12 13 I 14 15 16 §120.l(d)3 OPEN DORM Barracks sleeping area 1080 162
21 Dec Sensor NA: Not required
space type
Generated Date/Time: Documentation Software: Energy Code Ace Generated Date/lime: Documentation Software: Energy Code Ace
CA Buildin13 Ener[W Efficiency Standards -2022 Nonresidential Compliance Report Version; 2022.0.000 Compliance ID: 176806·0224-0002 CA Buildin13 Energy Efficiency Standards -2022 Nonresidential Compliance Report Version: 2022.0.000 Compliance ID: 176806-0224-0002
Schema Version: rev 20220101 Report Gener;ited: 2024-02-12 17:08:43 Schem;i Version: re11 20220101 Report Gener;ited: 2024-02-12 17:08:43
STATE 01 CALlroRNIA STATE or C/\LlfORNIA
Mechanical Systems CALIFORNIA ENERGY COMMISSION Mechanical Systems CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-MCH-E CERTIFICATE OF COMPLIANCE NRCC-MCH-E
Project Name: REPLACEMENT OF HVAC EQUIPMENT AT FIRE STATION N0.8 Report Pa.ge: (Page 7 of 9) Project Name: REPLACEMENT OF HVAC EQUIPMENT AT FIRE STATION N0.8 Report Page: (Page 8 of9)
Date Prepared: 2024-02-12T20:08:38-05: 00 Date Prepared: 202 4-02 • 12T20:08: 38-05:00
Q. MANDATORY MEASURES DOCUMENTATION LOCATION
N, DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION This table is used to indicate whr.:re mandatory measures are documented in the p!on set or construction documentation.
Selections have been made based on information provided In previous tables of this document. If any selection needs to be changed, please explain why in Table E Additional Remarks. 01 02 These documents must be provided to the building inspector during construction and can be found online at
Compliance with Mandatory Measures documented through MCH
I
Plan sheet or rnnstruction document location https.//www.em:rgy.rn.gov/programs-and-topio/programs/building-t·nergy-r;:fficiency-~tandards/2022-huilding-energy-t:ffidency-4 Mandatory Measures Note Block No
Form/Title 03 04
N RCI-MCH-01-E -Must be submitted for al I buildings Mandatory Measure Plan sheet or construction document location
Heating Equipment Efficiency per 110.1 M-002
Cooling Equipment Efficiency per 110.1 M-002 0. DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE Furnace Standby Loss Control per 110.2(d) N/A
Selections have been made based on inJOrmotion provided in previous tables of this document If any selection needs to be changed, please explain why in Table E Additional Remarks Heat Pump with Supplemental electric Resistance Heater Cont rols per 110.2(b) M601 These documents must be provided to the building inspector during wnstruction and wn be found online at
https.j/www.energy.ca.gov/title24/20195tandards/2019_compliance_documents/Nonres!dential_Documents/NRCA/ Kitchen range hoods shall be rated for sound in accordance w ith Section 7.2 of ASH RAE 62.2 N/A
Form/Title Syotems/Sp.;ces To BP Field
Verified
NRCA-MCH-02-A-Outdoor Air must be submitted for all newly installed HVAC units Note: MCH-02-A can be performed in conjunction with MCH-07-A FAF-1; FAF-2
Supply Fan VFD Acceptance (if applicable) since testing activities overlap.
P. DECLARATION OF REQUIRED CERTIFICATES OF VERIFICATION
There arc no NP.CV forms required for this project.
Generated □Jte/Time: Documentation Software: Energy Code Ace GenerJted Date/lime: Documentation Software: Energy Code Ace
CA Building Energy Efficiency Stcindards -2022 Nonresidential CompliJncc Report Version: 2022.0.000 [ompliJncl' ID: 176805·0224-0002 CA Building Energy Efficiency Strind~rds -2022 Nonresidential Compliance Report Version: 2022.0.000 Complic1nce ID: 1758D6-022.4·0002
Schema Version ; rev 20220101 Report Generated; 2024-02-12 17:08:43 Schema Version; re11 20220101 Report Generated: 2024-02-12 17;08:43
•
NO.
STAT[OF CALIFDANIA
Mechanical Systems CALIFORNIA ENERGY COMMISSION
CERTIFICATE Of COMPLIANCE NRCC-MCH-E
Project Name: REPLACEMENT OF HVAC EQUIPMENT AT FIRE STATION N0.8 !Report Page: (Page 3 of9)
ID.-.te Prep.-.red: 2024-02-12120:08 :38-05: 00
F. HVAC SYSTEM SUMMARY (DRV & WET SYSTEMS)
Ory System Equipment Sizing (includes air conditioners, condensers, heat pumps, VRF, furnaces and unit heaters and OOAS systems]
01 02 03 04 05 06 07 08 09 10 11
Equipment Sizing per Mechanical Schedule (kBtu/h)
140.4{a&bl, 170.2{c)l & 170.2(c)2
Smallest Size Heating Output2,> Coo Ii ng Output2,> Load Calculations>,~
Name or Item Equipment Category per Equipment Type per Tables 110.2 and Av~ilable 1
Tables 110.2, 140.4(a)2 and Total
Tag Title 20 140.4(a) and Supp. Total
170.Z(c)3aii Sensible Sensible 170.l(c)l Per Design Rated Heating Rated Heating
(kBtu/h) (kBtu/h) Output Per Design (kBtu/h) Load Cooling
(kBtu/h) Load lkBtu/h) lkBtu/h) (kBtu/h)
FAF-1, AC, air cooled, split+ weatherized gas NA: Altered per
CU-1,FAF-2,CU-Furnace+ AC central furnace with single phase 141.0(b)2E and 36,000 40,000 0 35,972 37,600 39000 35,972
2 supply 180.2(b)2
1FOOTNOTES: Equipment shall be the smallest size, within the available options of the desired equipment line, necessary to meet the design heating and cooling loads of the building per
140.4(a) and 170.2(c)l. Healthcare facilities are excepted
'It is common practice to show rated output capacity on the equipment schedule. Sensible cooling output comes from specification sheet tables.
3 If equipment is heating only. leave cooling output and load blank. If equipment is cooling only, leave heating output and load blank.
4 Authority Having Jurisdiction may ask for load calculations used for compliance per 140.4(b) and 170.2(c).
Ory System Equipment Efficiency (ether than Package Terminal Air Conditioners (PTAC) and Package Terminal Heat Pumps (PTHP), DX-DOAS and Dual Fuel Heat Pumps)
01 02 03 I 04 05 06 07 08 09
Heating Mode Cooling Mode
Minimum Minimum
Name or Item Sile Category Rating Efficiency Efficiency
Tag (Btu/h) Condition Efficiency Unit Required per Design Efficiency Efficiency Unit Required per Design Efficiency
I 'Fl Tables 110.2 / Tables 110.2 /
Title 20 Title 20
FAF-1, <45kBtuh cooling/ <225kBtuh heating AFUE 0.81 0.97 EER2 9.8 12
CU-1,FAF-2,CU-2 SEERZ 14.3 16.5
Gr>nPr;ite!l Diltf'/Timf' Dnrumc>ntntirrn Softw;arr>: Enr>rgy Co!le Ace
CA Building Enl'rgy Efficiency StJndards -2022 Nonresidential Compliance Rl'portVersion: 2022.0.000 CompliJncl' ID: 176806-0224·0002
Schema Version: rev 20220101 Report Generated: 2024-02-1217:08:43
5TATEOF CALIFOANIA
Mechanical Systems CALIFORNIA ENERGY COMMISSION
CERTIFICATE Of COMPLIANCE NRCC-MCH-E
Project Name: REPLflCEMENT OF HV/\C EQUIPMENT /IT FIRE STATION N0.8 !Report Page: (Page 6 of9)
!Date Prepared: 2024-02-12120:08 :38-05: 00
J. VENTILATION AND INDOOR AIR QUALITY
NA: Not required per DCV §120.1(d)3 Or:;cupiJble storage rooms for dry Storage 26 materials 85 12.75
Dec Sensor NA: Not required
space type
17 Total System Required Min DA CFM 174.75 18 Ventilation for this System Complies? Yes
1 FOOTNOTES: System CFM should in dude both mechaniwl and natural ventilation for the zone/system
2 Air filtration reql!irements apply to the following three system types per 120.1 (c)l A: space wnditioning systems utilizing d1ir:t5 to supply air to ocr:;upiable space; supply-only ventilation
systems providing outside air to occupiable space; supply side of balanced ventilation systems including heat recove,y and energy recove,y ventilation systems providing outside air to
occupiablc space.
3 Uniform Mechanical Code may have more stringent ventilation requirements; the most stringent code requirement takes precedence.
1 See Standards Tables 120.1-A and 120.1-B.
·° Far lecture halls with fixed seating, the expected number of occupants shall be determined in accordance with the California Building Cade.
"120.2(e)3 requires systems serving rooms that are required by 130.l(c) to have lighting occupancy sensing controls ta also have occupancy sensing zone controls for ventilation.
Examples of spaces which require lighting ocwprincy sensors include office.s 250ft2 or .smaller; m1Jltipurpose moms less than 1,000ft21 classrooms, conference moms, restrooms, aisles
and open areas in warehouses, library book stack aisles, corridors, stairwe!ls, parking garages, and loading and unloading zones, unless excepted by 130.l(c).
K. TERMINAL BOX CONTROLS
This section does not apply to this project.
L. DISTRIBUTION (DUCTWORK and PIPING)
This section does not apply to this proJect.
M. COOLING TOWERS
This section does not apply to this proJect.
Generated Oate/Time Dornmentation Software: Energy Code Ace
CA Building Ener13y Efficiency Standards -2022 Nonresidential Compliance Report Version; 2022.0,000 Compliance ID: 176806-0224-0002
Schema Version: rev 20220101 Report Generated: 2024-02-1217:08:43
STATE or CALlrDRNIA
Mechanical Systems CALIFORNIA ENERGY COMMISSION
CERTIFICATE Of COMPLIANCE NRCC-MCH-E
Project Name: REPLACEMENT OF HVAC EQUIPMENT AT FIRE STATION N0.8 !Report Page: (Page 9 of9)
Project Address: 6502 Ridge Park Rd, Newport Beach. CA 92657 !Date Prepared: 2024-02-12T20:08: 38-05: 00
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
I certify that this Certificate of Compliance documentation is accurate and complete. .-.
Oocum<"ntation Author N.,m~ Oocumenl:ltion Author ~ign~ture: "/2 ' Ii ;,+--' Alexander Yau c .di;,,{f. I
Campany Signature Dmc / 02/1312024 IDS Group
Address 1 Peters Canvon Road. Suite 130 CEA/ HERS Ccrtiiication Identification (if a pplicublc)
n;y/State/Zip Irvine. California 92606 Phone: 949 387 8500
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the followinE under pen~ltv of perjur,·, under the laws of the State of California:
1 The informotion provided on this Certificate of Compliance ii true Jnd correct.
' I am eligible under Division 3 of the Busin~ss and Pmfossions Code to ac~cpt n.,sponsibility for the buildin~ d~sign or system design idcntifad on this Ccr1ificatc of Compliance (responsible designcCI
' The energy fentures and performan<:e specifications. m"~rinls, component.,, an~ manufactured de~ic.es for the building de.sign or system design identified on thi; Certifknte of Cnmpliance conform to the re~ui rement.;
of TillP 24, Part 1 and rart 6 d thP California Cr,de nf RPgul;atians.
' The buildine desien teature, or system desien temure, identified on this Certificate ot Compliance are co~sistent with the intorrnation provided on ot11er applicable com11lianC€ doc~ments, workst1eets, ralculations,
pl~ns and specificatioos submitted to the enforcemest ap,ency for opprovol with this buildinp, permit applicJtion
s I v.ill en,~re that a rnmple:ed signed copv of this Certificate af Compliance shall be m3de available with the building permit(,) issued for the building, and made avcilable ta t~e enforcement cgent·y for all a~plirnble
inspections. I undersrnnd that .i completed si~ned copy of this CertificJte ofCompliJnce is required to be included with the documemation the builder provides 10 the bl!iJ.din,c owner ;itpq:up;incy.
Responsible IJesigner Name Darren Smith llesponsib e IJesigner Signature I J ,vl/\..,l-">"'-,e,~
Cumµany IDS Group Dal~ Sig11~d: 02/13/2024
,\ddress 1 Peters Canvon Road, Suite 130 License· M 30841
Ci:y/State/Zip: Irvine. California. 92606 Phone: 949 387 8500
Generated Date/Time Documentation Software: Energy Code Ace
CA Building Enl'rgy Efficiency StJndards -2022 Nonresidential Compli;mcc Report Version: 2022.0.000 Compli,1ncl' ID: 175806-0224·0002
Schema Version; rev 20220101 Report Generated: 2024-02-1217:08:43
REVIEWED:
SEE COVER SHEET FOR
/ is~ l/2 APPROVALS
-"" o~ ',,;
~~-* DESIGNED: DRAWN:
RJ ss
DATE DESCRIPTION OF REVISIONS APPROVED CHECKED: DATE:
DS 03/22/24 SHEET OF
,,
0 N
_s;;
0 _s;; .,
·o
_s;; ::, .,
E
~ a a
-a
<O
I
:::.I
"' a
" I')
~
"' ~ _s;;
0 .,
:::;;
v
~ Cl < u
IO
~ 00
C:
.Q -0 -(/)