Loading...
HomeMy WebLinkAboutB_5315_SCITY OF COSTA MESA PJ1c1F1c JOHN WAYNE AIRPORT >,_,. <§c-�f'<, _:,"> -%-;-$ cJ' "' PROJECT LOCATION ____/ VICINITY MAP NOT TO SCALE PROJECT LOCATION PUBLIC WORKS DEPARTMENT FIRE STATION NO. 8 HVAC REHABILITATION 6502 RIDGE PARK RD, NEWPORT BEACH, CA 92657 CONTRACT NO. 9373-1 PROJECT NO. 24F02 AVID A. WEBB, PUBLIC WORKS DIRECTOR AN, P.E., DEPUTY PWD / CITY ENGINEER LOCATION MAP NOT TO SCALE DATE: DATE: GENERAL NOTES 1.ALL WORK DETAILED ON THESE PLANS TO BE PERFORMED UNDER CONTRACT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE "STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION", 2015 EDITION AND SUPPLEMENTS TO DATE, EXCEPT AS OTHERWISE STATED IN THE CITY'S STANDARD SPECIAL PROVISIONS, OR IN THIS CONTRACT'S SPECIAL PROVISIONS. 2.EXISTING UNDERGROUND UTILITIES ARE SHOWN AS PER AVAILABLE RECORDS. THE CONTRACTORSHALL BE RESPONSIBLE FOR VERIFYING THE ACTUAL LOCATION AND ELEVATION IN THE FIELDPRIOR TO BEGINNING CONSTRUCTION. 3.ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR, DIMENSION, ANO FINISHTO ADJOINING IMPROVIEMENTS, UNLESS NOTED OTHERWISE. 4.P.C.C. SHALL BE CLASS 560-C-3250 UNLESS NOTED OTHERWISE. 5.CONTRACTOR SHALL ADJUST CITY UTILITIES (e.g. WATER VAULTS, WATER VALVES, sea, SURVEY MONUMENTS, SEWER AND STORM DRAIN MANHOLES) FRAMES AND COVERS TO FINISHED GRADEPER CITY STANDARDS. ALL OTHER UTILITIES SHALL BE ADJUSTED TO GRADE BY OTHERS. 6.PROPOSED PAVEMENT AND CURB ANO GUTTER SHALL JOIN AND MATCH LINE AND GRADE OFEXISTING IMPROVEMENTS UNLESS NOTED OTHERWISE. 7.ANY DISCREPANCY IN THE DRAWINGS OR SPECIFICATIONS SHALL BE CALLED TO THE ATTENTIONOF THE ENGINEER. FAILURE TO DO SO WILL PLACE RESPONSIBILITY OF THE CONTRACTOR FORCORRECTION. 8.ANY WORK NOT INDICATED ON THE DRAWINGS BUT CALLED FOR IN THE SPECIFICATIONS, ORVICE-VERSA, SHALL BE FURNISHED AND PERFORMED AS THOUGH SPECIFICALLY INDICATED ANDCALLED FOR IN BOTH. ANY WORK NOT INSTALLED ACCORDING TO DRAWINGS ANO SPECIFICATIONS OR ORDINANCES ANO LAWS SHALL BE REPLACED AT CONTRACTOR'S EXPENSE. SHEET INDEX 1 TITLE SHEET 2 NOTES, LEGEND ANO ABBREVIATIONS 3 SCHEDULES 4 MECHANICAL FLOOR PLAN DEMOLITION 5 MECHANICAL FLOOR PLAN NEW 6 DETAILS 7 TITLE 24 DOCUMENTATION C Q) "'C Q) -"' L 0() C E Cl. U) "' N ..,_ � U) 0 -----­ro 0 -Q)Q) .c(/) Q) :;:; f-u <( > 3-w (/) <( I n_z '-' (/) w 0 / N 0 LI.. ..,_N I t'l r--­t'l "' I u u <( > I <Xl 0 -(/) � LI.. (I) (I) 0 0 /n_ ::;; ::;; LI.. / (/) w F::J0 <( LI.. I 0 0 2 z w fr'. fr'. => u u, N I ..,_ N >­LI.. / "' -C-9373-1 �t----------------------,---------------------------------------------------------------------------------�-----------1----------�-------------------------:......:-��0 u / APPROVAL RECOMMENDED: APPROVAL RECOMMENDED: CALL TOLL FREE 1-800-227-2600 BEFORE YOU DIG �-/1;;� FIRE CHIEF DATE: TOM SANDEFUR, P .E. ASSISTANT CITY ENGINEER TITLE SHEET FIRE STATION NO. 8 HVAC REHABILITATION " Q) L 0 .c (/) /:,; 0) 1---------------------��------�7 B-5315-SI-------� :J: CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT SHEET 01 OF 07 7...._ _________________ ..i... ___________________________________________________________________ ....... _______ ....... _______ ..J...... ________________ ......J. __ ..::....;_....::..;:......J L L rs 'C'-11,: ~'°' :5' O,p CI TY OF IRVINE 1,11\JERSIT'l # I I 1 NOTES, LEGEND AND ABBREVIATIONSM-001 2 3 4 NO SCALE SCHEDULESM-002 NO SCALE 5 6RETURN GRILLE EXHAUST GRILLE SIDEWALL SUPPLY REGISTER RETURN AIR DUCT SUPPLY AIR DUCT EXHAUST AIR DUCT ROOM THERMOSTAT MANUAL VOLUME DAMPER FLEXIBLE CONNECTION SIDEWALL RETURN GRILL SIDEWALL EXHAUST REGISTER QUADRANT BALANCING DAMPER MOTORIZED BACKDRAFT DAMPER COMBINATION SMOKE-FIRE DAMPER S.A. O.S.A. TYP. E.A. T.A. MBD SFD R.A. M SF SUPPLY AIR TRANSFER AIR OUTSIDE AIR EXHAUST AIR TYPICAL RETURN AIR SWS MVD DL QBD SWR FC T'STAT UC SWG DL UC T UNDERCUT DOOR DOOR LOUVER EAD OSA SAD RAD ABB. RG EG CD (L) CA SYMBOL CEILING DIFFUSER LINED DUCTWORK COMBUSTION AIR DESCRIPTION OUTSIDE AIR LOCKED ROTOR AMPS PHASE PRESSURE MINIMUM REVOLUTIONS PER MINUTE MAX. OVER CURRENT PROTEC. AMPS RATED LOAD AMPS MINIMUM CIRCUIT AMPS RPM R.L.A. L.R.A. PH MIN. M.O.C.P. PRESS. M.C.A. ACCESS PANEL DESCRIPTION CONDENSATE DRY BULB DOWN CONCRETE ABOVE FINISHED FLOOR EXHAUST FAN INCHES KILOWATTS HORSEPOWER FEET ENTERING AIR CONDITIONING UNIT STAINLESS STEEL GENERAL CONTRACTOR EXTERNAL STATIC PRESSURE (INCHES OF WATER) FULL LOAD AMPS CUBIC FEET PER MINUTE BACK DRAFT DAMPER KW GC HP FT. FLA. IN. DN. E.S.P. A.F.F ENT. EF SYMBOL COND. D.B. B.D.D. CONC. CFM AC AP S/S ABB. HEATING, VENTILATION, AND AIR CONDITIONINGHVAC BOTTOM OF SHEET METAL DUCTB.O.D. ABOVE FINISHED FLOORA.F.F. CARBON DIOXIDE SENSORCO2 LEGEND & ABBREVIATIONS VARIABLE FREQUENCY DRIVEVFD C OPPOSED BALANCING DAMPEROBD VARIABLE AIR VOLUME FLOWVAV CONSTANT AIR VOLUME FLOWCAV BRAKE HORSEPOWERBHP FUSED DISCONNECTFD NON-FUSED DISCONNECTNFD CIRCUIT BREAKERCB DEMAND CONTROL VENTILATIONDCV TYPICALTYP. UP THRU ROOFUTR DOWN THRU ROOFDTR ELECTRONICALLY COMMUTATED MOTORECM TRANSFER GRILLETG MECHANICAL SHEET INDEX S.No.SHEET TITLESHEETNUMBER SCALE DUCT LINERS AND INSULATION GENERAL NOTES 1. ALL WORK SHALL COMPLY WITH CALIFORNIA CODE OF REGULATIONS TITLE 24 PART 6 (2022) CALIFORNIA ENERGY CODE, THE LATEST CALIFORNIA MECHANICAL AND BUILDING CODES, 2022 CAL GREEN CODE, ALL OTHER APPLICABLE CODES AND REGULATIONS, AND LOCAL CODES. ALL EQUIPMENT AND SYSTEMS SHALL BE U.L.LISTED. 2. HVAC EQUIPMENT SHALL BE CERTIFIED BY THE CALIFORNIA ENERGY COMMISSION TO COMPLY WITH EFFICIENCY STANDARDS PER TITLE-24, PART 6. 3. CONTRACTOR SHALL CAREFULLY REVIEW THESE PLANS AND SPECIFICATIONS PRIOR TO BID. CONTRACTOR SHALL ADDITIONALLY REVIEW PLANS AND SPECIFICATIONS OF OTHER RELATED TRADES INCLUDING ARCHITECTURAL, STRUCTURAL, ELECTRICAL, FIRE PROTECTION AND PLUMBING PRIOR TO SUBMITTING BID. 4. CONTRACTOR SHALL COORDINATE THEIR INSTALLATION WITH ALL OTHER TRADES PRIOR TO INSTALLATION OF EQUIPMENT OR MATERIALS, INCLUDING BUT NOT LIMITED TO, STRUCTURAL, ARCHITECT, ELECTRICAL, AND PLUMBING. 5. A PRE-BID SITE VISIT IS MANDATORY. THE CONTRACTOR SHALL VISIT THE SITE, VERIFY THE EXACT CONDITIONS RELATING TO THE WORK AND SHALL OBTAIN SUCH INFORMATION AS MAY BE NECESSARY TO PRESENT A CONCLUSIVE BID. NO ALLOWANCE SHALL BE MADE FOR ANY EXTRA EXPENSE, DUE TO FAILURE OF THE CONTRACTOR TO MAKE SUCH A FIELD VERIFICATION. BY SUBMITTING A PROPOSAL FOR THE WORK INCLUDED IN THE CONTRACT, THE CONTRACTOR SHALL BEDEEMED TO HAVE MADE THE FIELD VERIFICATION AND ACCEPTS ALL JOB SITE CONDITIONS. 6. THESE DRAWINGS ARE DIAGRAMMATIC ONLY AND NOT INTENDED TO INDICATE ALL REQUIRED OFFSETS, BENDS, ELBOWS, TRANSITIONS, FITTINGS AS REQUIRED TOCONFORM TO THE BUILDING STRUCTURE, CLEARANCE INSIDE CEILINGS, AVOIDANCE OF OBSTRUCTIONS, AND MAINTAINING HEAD CLEARANCE. THE CONTRACTOR SHALL FOLLOW THE PLANS AS CLOSELY AS POSSIBLE. 7. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL, INSURANCE, EQUIPMENT, INSTALLATION, CONSTRUCTION TOOLS, TRANSPORTATION, ETC. FOR A COMPLETE AND PROPERLY OPERATING MECHANICAL SYSTEM. 8. USE ONLY COMPETENT SKILLED PERSONNEL. PERFORM ALL WORK CONSISTENT WITH THE BEST POSSIBLE TRADE PRACTICES. 9. MATERIALS SHALL BE NEW AND OF THE SAME MANUFACTURER FOR EACH CLASS OR GROUP OF EQUIPMENT. EQUIPMENT SHALL BE LISTED AND APPROVED BYUNDERWRITER'S LABORATORIES, AND SHALL BEAR THE INSPECTION LABEL WHERE SUBJECT TO SUCH APPROVAL. MATERIALS SHALL MEET WITH THE APPROVAL OF THE GOVERNING BODIES HAVING JURISDICTION. MATERIALS SHALL BE MANUFACTURED AND INSTALLED IN ACCORDANCE WITH APPLICABLE STANDARDSESTABLISHED BY THE LATEST EDITION OF CMC, CBC U.L., SMACNA AND ASHRAE GUIDELINES. INSTALL PER MANUFACTURERS' RECOMMENDATIONS, AND INSTALLATIONINSTRUCTIONS. 10. CONTRACTOR SHALL SECURE AND PAY FOR ALL NECESSARY BUILDING PERMITS AND VARIANCES. COORDINATE TEMPORARY CONSTRUCTION REQUIREMENTS WITHALL TRADES PRIOR TO CONSTRUCTION. INCLUDE ALL COSTS IN THE BID. 11. THE JOB SHALL BE GUARANTEED FOR A PERIOD OF ONE (1) YEAR AFTER DATE OF ACCEPTANCE BY OWNER. ANY WORK, MATERIAL OR EQUIPMENT FOUND TO BE FAULTY DURING THAT PERIOD SHALL BE CORRECTED AT ONCE, UPON WRITTEN NOTIFICATION AT THE EXPENSE OF THE MECHANICAL CONTRACTOR. 12. THE EQUIPMENT AS INSTALLED, INCLUDING ALL EQUIPMENT AND MATERIALS SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE DATE THE INSTALLATIONIS ACCEPTED. COMPRESSORS SHALL HAVE A FIVE YEAR GUARANTEE. 13. IF ALTERNATE EQUIPMENT OR MATERIALS ARE PROPOSED BY THE CONTRACTOR, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN ALL BUILDINGDEPARTMENT APPROVALS, PAY ALL RELATED FEES AND OBTAIN APPROVAL FROM OWNER & ENGINEER OF RECORD. 14. IF ALTERNATE EQUIPMENT OR SYSTEMS ARE PROPOSED BY THE CONTRACTOR, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TITLE-24 COMPLIANCECERTIFICATION AND ALL ASSOCIATED FEES REQUIRED. CONTRACTOR MUST ALSO COORDINATE SUBMITTED EQUIPMENT WITH OTHER TRADES. 15. EQUIPMENT SUBMITTED FOR APPROVAL WITH A DIFFERENT PHYSICAL SIZE OR ARRANGEMENT FROM THAT SHOWN ON THE PLANS SHALL INCLUDE SHOP DRAWINGS.MECHANICAL CONTRACTOR SHALL PROVIDE AND SHOW COORDINATED PLANS WITH ALL OTHER TRADES. 16. PROVIDE SIX COPIES OF ALL MANUFACTURER'S PRODUCT DATA CLEARLY INDICATING MODEL NUMBERS, CAPACITIES, CONSTRUCTION, ELECTRICAL INFORMATION,AND OPTIONAL ACCESSORIES, WITHIN 45 DAYS OF AWARD OF CONTRACT AND PRIOR TO THE START OF WORK. THESE NEED TO BE APPROVED BY ARCHITECT PRIOR TO PURCHASING. 17. ALL BROCHURES, OPERATING MANUALS, CATALOGS, SHOP DRAWINGS, "AS-BUILTS", ETC. SHALL BE TURNED OVER TO THE OWNER AT THE COMPLETION OF THE JOB. PROVIDE THE OWNER WITH ONE (1) SET OF COMPLETE MECHANICAL "AS-BUILTS" INDICATING FINAL EQUIPMENT LOCATIONS, DUCTWORK AND PIPE ROUTING, ETC.MECHANICAL CONTRACTOR SHALL SUBMIT AS-BUILTS IN CAD FORMAT. 18. ADDENDA AND CHANGE ORDERS SHALL BE APPROVED BY OWNER. 19. EQUIPMENT, ACCESSORIES, AND MATERIAL SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS AND RECOMMENDATIONS. 20. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ALL MAJOR PIECES OF MECHANICAL EQUIPMENT, INCLUDING, BUT NOT LIMITED TO FAN COILS, CONDENSING UNITS, EXHAUST FANS, DUCTWORK, AND PIPING. SUBMITTALS SHALL BE MADE TO THE ARCHITECT AS SOON AS PRACTICABLE AFTER AWARD OF CONTRACT. 21. CONTRACTOR SHALL ARRANGE AND PAY FOR ALL NECESSARY PERMITS, INSPECTOR'S EXAMINATIONS, AND FEES REQUIRED BY THE AHJ. 22. ANY MATERIAL EXPOSED WITHIN A PLENUM OR DUCT MUST HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25, AND A SMOKE DEVELOPED RATING OF NOT MORETHAN 50, AND A MOLD/HUMIDITY RESISTANCE PER U.L. 181. 23. EQUIPMENT SHALL BE LOCATED SUCH THAT CODE REQUIRED ACCESS IS MAINTAINED, INCLUDING N.E.C. REQUIREMENTS. ACCESS PANELS WHERE REQUIRED, SHALLBE COORDINATED WITH ARCHITECT, AND PROVIDED BY FACTORY OR BE FIELD-PROVIDED. FOR ATTIC EQUIPMENT, G.C. TO PROVIDE A CATWALK & LIGHT PER CMC FOR ATTIC EQUIPMENT. ALSO COORDINATE REQUIRED ACCESS WITH THE BUILDING ENGINEER. 24. PROVIDE VIBRATION ISOLATION TO ALL ROTATING EQUIPMENT TO PREVENT TRANSMISSION OF VIBRATION TO BUILDING STRUCTURE. PROVIDE FLEXIBLE DUCT OR PIPE CONNECTIONS TO ALL ROTATING EQUIPMENT. 25. AIR MOVING SYSTEMS SUPPLYING AIR IN EXCESS OF 2,000 CUBIC FEET PER MINUTE TO ENCLOSED SPACES IN THIS PROJECT SHALL BE EQUIPPED WITH CODE-REQUIRED DUCT MOUNTED AUTOMATIC SHUTOFF SMOKE DETECTORS. AUTO SHUTOFF SHALL BE ACCOMPLISHED BY INTERRUPTING THE POWER SOURCE OFTHE AIR-MOVING EQUIPMENT UPON DETECTION OF SMOKE IN THE MAIN SUPPLY DUCT (OR AREA DETECTORS AT THE AHJ'S APPROVAL). THESE DETECTORS SHALL BESUPERVISED BY THE BUILDING FIRE ALARM SYSTEM AND THE DETECTORS SHALL ACTIVATE THIS SYSTEM. REFER TO CMC SECTION 609. 26. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS AS THESE ARE PART OF THE CONTRACT DOCUMENTS. 27. WHERE A CONFLICT OCCURS BETWEEN THIS SPECIFICATION AND OTHER SPECIFICATIONS ISSUED AS A PART OF THE CONTRACT DOCUMENTS, THE MORE STRINGENT REQUIREMENT SHALL PREVAIL. 28. AIR FILTERS SHALL BE STATE FIRE MARSHAL APPROVED AND LISTED. PREFORMED FILTERS HAVING COMBUSTIBLE FRAMING SHALL BE TESTED AS A COMPLETEASSEMBLY. AIR FILTERS IN ALL OCCUPANCIES SHALL BE PER TITLE-24 PART 6 AND APPLICABLE ASHRAE REQUIREMENTS. LOW-RISE RESIDENTIAL (3-STORIES ANDBELOW) SHALL COMPLY WITH OUTSIDE AIR INTAKE FILTRATION REQUIREMENTS AS REQUIRED. FILTERS SHALL BE ACCESSIBLE FOR CLEANING OR REPLACEMENT. 29. ALL APPLIANCES DESIGNED TO BE FIXED IN POSITION SHALL BE SECURELY FASTENED IN PLACE PER BUILDING CODE REQUIREMENTS OR APPLICABLEMANUFACTURER INSTALLATION REQUIREMENTS. 30. IT SHALL BE THE TEST AND BALANCE AGENCY’S RESPONSIBILITY TO PERFORM THE REQUIRED TESTING PROCEDURES, COMPLY, FILL-OUT, AND SIGN ALL THECERTIFICATE OF COMPLIANCE FORMS MECH-1C THROUGH MECH-4C REQUIRED BY THE BUILDING INSPECTOR. HE SHALL COORDINATE AND WORK WITH THE EQUIPMENT AND CONTROLS INSTALLERS TO COMPLY WITH THESE REQUIREMENTS IN A TIMELY MANNER WITHIN THE PROJECT SCHEDULE. 31. IT SHALL BE THE TEST AND BALANCE CONTRACTOR’S RESPONSIBILITY TO PERFORM THE TESTING PROCEDURES, REQUIRED BY THE MECH-2A THROUGH MECH-11A CERTIFICATE OF ACCEPTANCE FORMS, AS APPLICABLE FOR ALL NEWLY INSTALLED HEATING AND COOLING SYSTEMS, AS CHECKED-OFF IN FORM MECH-1C ON THEPLANS. THE TEST AND BALANCE CONTRACTOR IS RESPONSIBLE FOR OBTAINING THE CERTIFICATE OF ACCEPTANCE FORMS REQUIRED BY THE BUILDING INSPECTOR. THE TEST AND BALANCE AGENCY SHALL BE WELL VERSED WITH ALL THE REQUIREMENTS OF THESE CERTIFICATE OF ACCEPTANCE FORMS, AND SHALL COORDINATE AND WORK WITH THE EQUIPMENT AND CONTROLS INSTALLERS TO COMPLY WITH THESE REQUIREMENTS IN A TIMELY MANNER WITHIN THE PROJECT SCHEDULE. 32. ALL WORK COVERED BY THIS DESIGN SHOULD CONFIRM TO LATEST CODE REQUIREMENT, 2022 CBC, CMC, ALONG WITH 2022 T-24 ENERGY STANDARDS. 33. IN MIXED OCCUPANCY BUILDINGS, EACH PORTION OF A BUILDING SHALL COMPLY WITH SPECIFIC GREEN BUILDING MEASURES APPLICABLE TO EACH SPECIFIC OCCUPANCY. 34. COVERING OF NEW DUCT OPENING AND PROTECTION OF MECHANICAL EQUIPMENT DURING CONSTRUCTION. AT THE TIME OF ROUGH INSTALLATION, DURINGSTORAGE ON THE CONSTRUCTION SITE AND UNTIL FINAL STARTUP OF THE HEATING, COOLING AND VENTILATION EQUIPMENT, ALL DUCT AND OTHER RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH TAPE, PLASTIC, SHEET METAL OR OTHER METHODS ACCEPTABLE BY THE AHJ TO REDUCE THEAMOUNT OF WATER, DUST AND DEBRIS, WHICH MAY ENTER THE SYSTEM. 35. ALL HVAC UNITS OR SYSTEMS SERVING A COMMON AIR SPACE MUST BE INTERCONNECTED TO SHUT DOWN IMMEDIATELY UPON ALARM CONDITION FROM DUCTDETECTORS ( OR FIRM ALARM SYSTEM WHEN USING AREA SMOKE DETECTORS IN LIEU OF DUCT DETECTORS) WITHOUT INTERFERENCE FROM EMS OR CALIFORNIA STATE FIRE MARSHAL LISTED FOR RELEASING SERVICE. COMPLY WITH 2022 CALIFORNIA ENERGY CODE (CEC) STANDARDS SUB CHAPTER 3, SECTION 120.4: REQUIREMENTS FOR AIR DISTRIBUTIONSYSTEM DUCTS AND PLENUMS CONVEYING HEATED AND/OR COOLED AIR SHALL BE INSTALLED PER REQUIREMENTS OF 2022 CMC CHAPTER 6. 1. PORTIONS OF SUPPLY-AIR AND RETURN-AIR CONVEYING HEATED OR COOLED AIR LOCATED OUTDOORS, SPACES BETWEEN ROOF AND INSULATED CEILINGS, SPACES UNDER A ROOF WITH FIXED VENTS OR OPENINGS TO THE OUTSIDE OR UNCONDITIONED SPACES,UNCONDITIONED CRAWL SPACE, AND OTHER UNCONDITIONED CRAWL SPACE SHALL BE INSULATED TO A MINIMUM INSTALLED LEVEL OF R-8. 2. PORTIONS OF THE SAME DUCTS THAT ARE NOT IN ONE OF THE SPACES ENUMERATED ABOVE, DUCTS IN INDIRECTLY CONDITIONED SPACESSUCH AS DUCT SPACE ABOVE THE CEILING, SHALL BE INSULATED TO A MINIMUM INSTALLED LEVEL OF R-4.2 (OR ANY HIGHER LEVEL REQUIRED BY CMC SECTION 605.0. 3. COMBINATION DUCT LINER AND DUCT WRAP INSULATION MAY BE USED TO ACHIEVE THE INSTALLED MINIMUM R-VALUES DESCRIBED ABOVE. 4. DUCT WRAP INSULATION SHALL BE JOHNS MANNVILE MICROLITE EQ TYPE 75 WITH FSK ALUMINUM FOIL, MIN. R-8 INSULATION. 5. DUCT LINER SHALL BE JOHNS MANNVILE LINACOUSTIC RC FOR RECTANGULAR DUCTS, AND SPIRACOUSTIC PLUS FOR ROUND SPIRAL DUCTS. UNLESS OTHERWISE EXPLICITLY INDICATED ON PLANS, OUTDOOR LINED DUCTS SHALL BE INSTALLED WITH 2" THICK DUCT LINER R-8, ANDINDOOR LINED DUCTS SHALL BE INSTALLED WITH 1" THICK DUCT LINER R-4.2. 6. DUCTS CARRYING UNTEMPERED MAKE UP AIR SHALL BE INSULATED WITH DUCT WRAP INSULATION WITH VAPOR BARRIER TO PREVENTCONDENSATION. CODES AND STANDARDS 2022 CALIFORNIA BUILDING STANDARDS ADMINISTRATIVE CODE, (TITLE 24 PART 1)2022 CALIFORNIA BUILDING CODE (CBC), (TITLE 24 PART 2) 2022 CALIFORNIA ELECTRICAL CODE (CEC), (TITLE 24 PART 3)2022 CALIFORNIA MECHANICAL CODE (CMC), (TITLE 24 PART4)2022 CALIFORNIA PLUMBING CODE (CPC), (TITLE 24 PART 5) 2022 CALIFORNIA ENERGY CODE, (TITLE 24 PART 6)2022 CALIFORNIA FIRE CODE (TITLE 24 PART 9) 2022 CALIFORNIA GREEN BUILDING CODE (CGBC), (TITLE 24 11) ANY OTHER LOCAL AND STATE LAWS AND REGULATIONS SCOPE OF WORK LIKE FOR LIKE REPLACEMENT OF HVAC EQUIPMENT AS SHOWN ON SCHEDULE SHEET M-002 MECHANICAL FLOOR PLAN DEMOLITIONM-201 1/4" = 1'-0" DETAILSM-501 NO SCALE TITLE 24 DOCUMANTATIONM-601 NO SCALE THE CALIFORNIA ENERGY CODE SECTION 10-103 REQUIRES ACCEPTANCE TESTING ON ALL NEWLY INSTALLED LIGHTINGCONTROLS, MECHANICAL SYSTEMS, ENVELOPES, AND PROCESS EQUIPMENT AFTER INSTALLATION AND BEFORE PROJECTCOMPLETION. AN ACCEPTANCE TEST IS A FUNCTIONAL PERFORMANCE TEST TO HELP ENSURE THAT NEWLY INSTALLED EQUIPMENT IS OPERATING AND IN COMPLIANCE WITH THE ENERGY CODE. LIGHTING CONTROLS ACCEPTANCE TESTS MUST BE PERFORMED BY A CERTIFIED LIGHTING CONTROLS ACCEPTANCE TEST TECHNICIAN (ATT). MECHANICAL SYSTEM ACCEPTANCE TESTS MUST BE PERFORMED BY A CERTIFIED MECHANICAL ATT FOR PROJECTS SUBMITTED ON OR AFTER OCTOBER 1, 2021. A LISTING OF CERTIFIED ATT CAN BE FOUND AT HTTPS://WWW.ENERGY.CA.GOV/PROGRAMS-AND-TOPICS/PROGRAMS /ACCEPTANCE-TEST-TECHNICIAN-CERTIFICATION-PROVIDER-PROGRAM/ACCEPTANCE . THE ACCEPTANCE TESTING PROCEDURES MUST BE REPEATED, AND DEFICIENCIES MUST BE CORRECTED BY THE BUILDER OR INSTALLING CONTRACTOR UNTIL THE CONSTRUCTION / INSTALLATION OF THE SPECIFIEDSYSTEMS CONFORM AND PASS THE REQUIRED ACCEPTANCE CRITERIA. PROJECT INSPECTORS WILL BE COLLECTING THE FORMS TO CONFIRM THAT THE REQUIRED ACCEPTANCE TESTS HAVE BEENCOMPLETED. PIPING INSULATION SHALL BE AS PER CALIFORNIA ENERGY CODE TABLE 120.3-A <1 1 TO <1.5 TO <4 1.51 TO SPACE COOLING SYSTEMS (HVAC CONDENSATE, REFRIGERANT) 40 - 60 0.21 - 0.27 75 0.5 0.75 1.0 BELOW 40 0.20 - 0.26 50 1.0 1.5 1.5 FLUIDTEMPERATURERANGE (°F) CONDUCTIVITY RANGE (INBTU-INCH PER HOUR PERSQUARE FOOT PER °F) INSULATION MEAN RATING TEMPERATURE (°F) NOMINAL PIPE DIAMETER (IN INCHES) INSULATION THICKNESS REQUIRED (IN INCHES) PIPING INSULATION NOTES TABLE 120.3-A PIPE INSULATION THICKNESS CALIFORNIA ENERGY CODE - ACCEPTANCE TESTING REQUIREMENT MEP COMPONENT ANCHORAGE NOTE: MECHANICAL, PLUMBING, AND ELECTRICAL COMPONENTS SHALL BE ANCHORED AND INSTALLED PER THEDETAILS ON THE APPROVED CONSTRUCTION DOCUMENTS. WHERE NO DETAIL IS INDICATED, THE FOLLOWING COMPONENTS SHALL BE ANCHORED AND/OR BRACED TO MEET THE FORCE AND DISPLACEMENT REQUIREMENTSPRESCRIBED IN THE 2022 CBC, 1617A.1.24 THROUGH 1617A.1.26 AND ASCE 7-16 CHAPTER 13, 26 AND 30. 1. PERMANENT EQUIPMENT AND COMPONENTS. 2. TEMPORARY OR MOVABLE EQUIPMENT THAT IS PERMANENTLY ATTACHED (e.g. HARDWIRED) TO THE BUILDING UTILITY SERVICES SUCH AS ELECTRICITY, GAS, OR WATER. 3. MOVABLE EQUIPMENT WHICH IS STATIONED IN ONE PLACE FOR MORE THAN 8 HOURS AND HEAVIER THAN 400 POUNDS ARE REQUIRED TO BE ANCHORED WITH TEMPORARY ATTACHMENTS. THE FOLLOWING MECHANICAL AND ELECTRICAL COMPONENTS SHALL BE POSITIVELY ATTACHED TO THE STRUCTURE, BUT THE ATTACHMENT NEED NOT BE DETAILED ON THE PLANS. THESE COMPONENTS SHALL HAVE FLEXIBLE CONNECTIONS PROVIDED BETWEEN THE COMPONENT AND ASSOCIATED DUCTWORK, PIPING, AND CONDUIT. A. COMPONENTS WEIGHING LESS THAN 400 POUNDS AND HAVE A CENTER OF MASS LOCATED 4 FEET OR LESS ABOVE THE ADJACENT FLOOR OR ROOF LEVEL THAT DIRECTLY SUPPORT THE COMPONENT. B. COMPONENTS WEIGHING LESS THAN 20 POUNDS, AND IN THE CASE OF DISTRIBUTED SYSTEMS, LESS THAN 5 POUNDS PER FOOT, WHICH ARE SUSPENDED FROM A ROOF OR FLOOR OR HUNG FROM A WALL. FOR THOSE ELEMENTS THAT DO NOT REQUIRE DETAILS ON THE APPROVED DRAWINGS, THE INSTALLATION SHALLBE SUBJECT TO THE APPROVAL OF THE STRUCTURAL ENGINEER OF RECORD. THE PROJECT INSPECTOR WILL VERIFY THAT ALL COMPONENTS AND EQUIPMENT HAVE BEEN ANCHORED IN ACCORDANCE WITH ABOVEREQUIREMENTS. PIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEM BRACING NOTE: PIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEMS SHALL BE BRACED TO COMPLY WITH THE FORCESAND DISPLACEMENTS PRESCRIBED IN ASCE 7-16 SECTION 13.3 AS DEFINED IN ASCE 7-16 SECTIONS 13.6.5, 13.6.6, 13.6.7, 13.6.8 , AND 2022 CBC, SECTIONS 1617A.1.24, 1617A.1.25 AND 1617A.1.26. THE BRACING AND ATTACHMENTS TO THE STRUCTURE SHALL BE DETAILED ON THE APPROVED DRAWINGS. COPIES OF THE BRACING SYSTEM INSTALLATION GUIDE OR MANUAL SHALL BE AVAILABLE ON THE JOBSITE PRIORTO THE START OF HANGING AND BRACING OF THE PIPE, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEMS. THE STRUCTURAL ENGINEER OF RECORD SHALL VERIFY THE ADEQUACY OF THE STRUCTURE TO SUPPORT THE HANGER AND BRACE LOADS. EQUIPMENT ANCHORAGE & SEISMIC NOTES MECHANICAL FLOOR PLAN NEWM-202 1/4" = 1'-0" 07 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C-8704-1 1 PETERS CANYON ROAD, SUITE 130 IRVINE, CA. 92606 TEL: 949-387-8500, FAX: 949-387-0800 IDS IDS GROUP IDS PROJECT # 22X037.02 No. 30841 R EMS ATTE ET ER SIG ER PD L OA C N F H O C A A L I FC ANRI OEFOISS N ER EN I G E LAN I DAR R E N B. SM I T H Exp. 12/31/24 100 % CD03-22-2024 REPLACEMENT OF HVAC EQUIPMENT AT FIRE STATION NO.8 NEWPORT BEACH FIRE DEPARTMENT 6502 Ridge Park Rd, Newport Beach, CA 92657 M-001 NOTES, LEGEND & ABBREVIATIONS 02 B-5315-S ~ [""[lill] [IlJll"J [Sill] ~ le :::ii [><:J ISi l3l IZl oE- □~ □~ ~ +------h I o I ~ ~ 8 °'--°'-- .. / -AA o~ ~\._- NO. DATE DESCRIPTION OF REVISIONS APPROVED REVIEWED: SEE COVER SHEET FOR is~ l/2 APPROVALS "" * DESIGNED: DRAWN: RJ ss CHECKED: DATE: DS 03/22/24 SHEET OF -0 0 N ..c 0 ..c ., 0 ..c ::, ., E 0 I') 0 0 - -0 0 I :::.I "' 0 .... I') ~ "' _'.;:!, ..c 0 ., :::;; sj- ~ Cl < (.) IO ~ 00 C: .Q -0 -(/) ~ ii: (D z "' 0 ~ 0 X "' _'.;:!, -0 ., ~ 0 t "' 0 _'.;:!, ~ (.) w ..., 0 cc: ~ -0 ~ 0 ..c ~ ~ I (/) Cl -;;; TAG MAKE MODEL TYPE LOCATION SERVICE ELECTRICAL PHYSICAL ANCHORAGEDETAIL REMARKSNOM TONS MCA MOCP V PH OUTDOOR CONDENSING UNIT SCHEDULE TAG MAKE MODEL TYPE LOCATION SERVICENOM TONS OPERATINGWEIGHT (LBS)V PH FORCED AIR FURNACE / DX UNIT ESP "WG 7611.05 SEER R22 TOTALOPERATING WEIGHT (LBS) SOUNDPOWER W INCH. D INCH. H INCH. 1 dbA HZ HZ LENNOX3 N/A 120 113000.5 60 275 1.1 23.6 40 1208/230 60 COOLING OUTDOOR TEMP DB ºF COOLING WB ºF 95 70.035,400 250HS25-411-1P AIR COOLED CONDENSING UNIT FAF-1GRADELENNOX STATUS EXISTING DEMO CU 1 1 2 31 M-501 CU 2 1 2 3 (E) CU-1 FAN FLA COMP. RLA 18 35 33 31 N/A (E) FAF-1 STATUS EXISTING DEMO PULSE 21 FAN FLA 15 16" x 25" x 1" FILTER (NO.) SIZE MERV - (E) CU-2 3 TOTAL COOLING BTU/h EFFICIENCY TYPE 30,800 SENSIBLE COOLING BTU/h 7611.05 SEER R22 1.1 23.6 40 1208/230 6095 70.035,400 250HS25-411-1P AIR COOLED CONDENSING UNIT FAF-2GRADELENNOXEXISTING DEMO 18 N/A330,800 35 33 31 (E) FAF-2 C22-41-FC-TXV-2 MODEL VERTICAL DUCTED HVAC ROOM 23 LENNOX3 120 10.5 60 275PULSE 21 15 16" x 25" x 1" -C22-41-FC-TXV-2VERTICAL DUCTED FURNISH WITH CONTROLS AND ACCESSORIES FOR LOW AMBIENT COOLING OPERATION, START ASSIST - CAPACITOR AND RELAY. SIZE AND INSTALL REFRIGERANT PIPING STRICTLY PER MANUFACTURER'S INSTALLATION INSTRUCTIONS AND RECOMMENDATIONS. FIELD DETERMINE THESHORTEST POSSIBLE ROUTING OF REFRIGERANT PIPING BETWEEN INDOOR AND OUTDOOR UNITS. PROVIDE BLYGOLD ® COATING FOR COIL AND CABINET. 2 3 EXISTING DEMO FAF 1 FAF 2 NEW NEW LENNOX SL297UH040NV36B CX35-36B-6F-203VERTICAL DUCTED DAY RM. 18, PHYSICAL TRAINING 15, KITCHEN 16, HALL 19 OPEN DORM 21 DAY RM. 18, PHYSICAL TRAINING 15, KITCHEN 16, HALL 19 OPEN DORM 21 1370 1300 0.8 120 1 60 MOCP 7.7 151/2 175 FUEL NATURAL GAS INPUT BTUH 40,000 OUTPUT BTUH 39,000 AFUE 97.5% HEATING ELECTRICAL 16" x 25" x 1" 13 LENNOX SL297UH040NV36B CX35-36B-6F-20VERTICAL DUCTED 1370 0.8 120 1 607.7 151/2NATURAL GAS 40,000 39,000 97.5%16" x 25" x 1" 13 175 ML18XC2-036-230LENNOXNEW AIR COOLED CONDENSING UNIT GRADE FAF-1 FAF-2 3 12 EER2 16 SEER2 36,400 28,000 95 70.0 R410A 1 6035 29 29 34 1871 15.4 LENNOXNEW REMARKS 1 PROVIDE TITLE 24 COMPLIANT PROGRAMMABLE THERMOSTAT. PROVIDE BLYGOLD ® COATING FOR COIL AND CABINET. PROVIDE DISCONNECT SWITCH. REBALANCE UNIT TO AIR QUANTITY SHOWN 2 3 REMARKS 1 2 3 REMARKS 1 2 3 ANCHORAGEDETAIL N/A N/A WEIGHT LBS REFRIGERANT 8 8 8 1 M-501 2 M-501 2 M-5013 HVAC ROOM 23 HVAC ROOM 23 HVAC ROOM 23 NATURAL GAS NATURAL GAS 470 470 470 470 MIN.OSA CFM SUPPLY CFM COOLING COIL CAPACITY BTU/h 35,400 35,972 35,972 35,400 LAT DB ºF 54.6 58.6 58.6 54.6 LAT WB ºF 53.0 57.5 57.5 53.0 4 4 4 40,000 39,000 40,000 39,000 1/3 1/3 FAN HP N/A N/AN/A 5 NEW FAF UNIT CONTROLLER SHALL INTEGRATE WITH EXISTING MODULATING ECONOMIZER DAMPER SECTION (LENNOX MODEL # EDM14M-65). FIELD VERIFY EXISTING CONDITION. 5 5 208/230 76 ML18XC2-036-230 AIR COOLED CONDENSING UNIT GRADE 3 12 EER2 16 SEER2 36,400 28,000 95 70.0 R410A 1 6020.2 35 29 29 34 1871 15.48 208/230 76 20.2 07 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C-8704-1 1 PETERS CANYON ROAD, SUITE 130 IRVINE, CA. 92606 TEL: 949-387-8500, FAX: 949-387-0800 IDS IDS GROUP IDS PROJECT # 22X037.02 No. 30841 R EMSATTE ET E R SIG ER PD L O A C N F H O CA AL I F C ANR I OEFOISS N ER EN I G EL AN I DAR R E N B. SM I T H Exp. 12/31/24 100 % CD03-22-2024 REPLACEMENT OF HVAC EQUIPMENT AT FIRE STATION NO.8 NEWPORT BEACH FIRE DEPARTMENT 6502 Ridge Park Rd, Newport Beach, CA 92657 M-002 SCHEDULES 03 CK40CT-36B-01 CK40CT-36B-01 B-5315-S e e 0 0 0 e e 0 0 0 0 0 .. / is~ l/2 _..AA~~ "" ,.\._-* NO. DATE DESCRIPTION OF REVISIONS APPROVED 8 020 8 020 REVIEWED: SEE COVER SHEET FOR APPROVALS DESIGNED: DRAWN: RJ ss CHECKED: DATE: DS 03/22/24 8 00200 8 00200 SHEET OF .,, 0 N .c 0 .c ., 0 .c ::, ., E 0 ,,., 0 0 ~ O> 3 .,, .,, ., .c 0 "'1 N 0 0 I ::.I N 0 .... ,,., ~ N _'.;:!, .c 0 ., :::;; st ~ 0 < (.) IO ~ 00 C: .Q -0 -(/) (Il z N 0 ~ 0 X N _'.;:!, .,, ., ~ 0 t N 0 _'.;:!, ~ (.) w -, a 0:: ~ .,, ~ 0 .c ~ ~ I (/) 0 -;::, 8 (E) FAF-1 1 (E) FAF-2 10 (E) CU-1(E) CU-2 4 (E) CU-3 3 5 5 5 5 6 POD 7 (E) FS POD (E) REFRIGERANTLINES IN SOFFIT 1 8 T 9 T 9 2102 (E) MS . MAINSWITCHBOARD DEMOLITION KEYNOTES GENERAL NOTES 1. CONTRACTOR TO REPAIR / REPLACE DAMAGED CEILING AFFECTED DURING HVAC REPLACEMENT. 2. CONTRACTOR TO REPAIR AND / OR PATCH DAMAGED WALLS AFFECTED DURING HVAC REPLACEMENT. DEMOLISH AND REMOVE EXISTING FURNACE UNIT, COOLING COIL ANDREFRIGERANT PIPING INCLUDING ALL APPURTENANCES. RETURN PLENUM BELOW UNIT AND OUTSIDE AIR DUCT TO REMAIN ANDRE-USED. DISCONNECT AND CAP GAS CONNECTION. DEMOLISH AND REMOVE EXISTING OUTDOOR CONDENSING UNIT,REFRIGERANT PIPING INCLUDING ALL APPURTENANCES. DEMOLISH AND REMOVE EXISTING REFRIGERANT PIPING. EXISTING EQUIPMENT TO REMAIN AND RE-USED. EXISTING DUCTWORK TO REMAIN AND REUSED. EXISTING OSA INTAKE LOUVER AND MODULATING ECONOMIZER DAMPER SECTION TO REMAIN AND REUSED. EXISTING CONDENSATE DRAIN PIPING TO REMAIN AND REUSED. EXISTING UNIT DISCONNECT SWITCH AND FEEDER TO REMAIN. DEMOLISH AND REMOVE EXISTING THERMOSTAT FOR FAF-1 ANDFAF-2 . DISCONNECT AND REMOVE EXISTING CU-1 AND CU-2 DISCONNECTSWITCH, FEEDER CONDUCTORS AND CONDUIT COMPLETELY TOSOURCE. 1 2 3 4 5 6 7 8 9 10 11/8"-1'-0"MECHANICAL FLOOR PLAN - DEMOLITION TRUENORTH N W S E 07 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C-8704-1 1 PETERS CANYON ROAD, SUITE 130 IRVINE, CA. 92606 TEL: 949-387-8500, FAX: 949-387-0800 IDS IDS GROUP IDS PROJECT # 22X037.02 No. 30841 R EMS ATTE ET ER SIG ER PD L OA C N F H O C A A L I FC ANRI OEFOISS N ER EN I G E LAN I DAR R E N B.SM I T H Exp. 12/31/24 100 % CD03-22-2024 REPLACEMENT OF HVAC EQUIPMENT AT FIRE STATION NO.8 NEWPORT BEACH FIRE DEPARTMENT 6502 Ridge Park Rd, Newport Beach, CA 92657 M-201 MECHANICAL FLOOR PLAN DEMOLITION 04 B-5315-S OFFICE OFFICE· 2754' 12.xlO E.A.+-__.,,, DISCHARGE LOUVER . WORK •. STORAGE 6 "_¢DRYER 0.ISCH.ARGE --t-'--- I 0 00 ,f 00 l8"x_12" EXH. AIR-~ DISCHARGE LOUVER I -----i----+----+-----+----fM ,_/ NO. DATE (TYP. 75q: OF 2) r DESCRIPTION OF REVISIONS --RANGE HOOD · EXHAUST DUCT CONNECTION APPROVED OF 4) B 185,:f (TYP. OF 4) REVIEWED: SEE COVER SHEET FOR APPROVALS DESIGNED: DRAWN: RJ SS CHECKED: DA TE: DS 03 22 24 0 0 0 0 0 0 0 0 0 0 SHEET "'CJ 0 N .c 0 .c (J) 0 .c ::, (J) E 0 I") a 0 - ""' "' ' "' -' ""' a "' 31: 'O a E ., 'O a. -I -a "' I :::. I "' a .... I") a X "' ~ .c 0 ., :::. ""' a / 0 <( u IO a / CX) C E -0 -(/) ., .. ii: (D z "' a r..: I") a X "' "' / "'CJ ., .. 0 .c (/) / "' "' a "' / (/) I-u w --:, a 0:: a. / 'O ., .. 0 .c ;;)--(/) IL I (/) 0 OF / / (E) CU-3 1 FAF 2 3 5 1 FAF 1 6 5 5 9 CU 2 9 CU 1 4 5 POC 7 (E) FS POC 63 2 2 T T 8 FAF-2 8 FAF-1 (E) MS . MAINSWITCHBOARD 10 KEYNOTES GENERAL NOTES 1. CONTRACTOR TO REPAIR / REPLACE DAMAGED CEILING AFFECTEDDURING HVAC REPLACEMENT. 2. CONTRACTOR TO REPAIR AND / OR PATCH DAMAGED WALLSAFFECTED DURING HVAC REPLACEMENT. PROVIDE NEW FURNACE UNIT. INSTALL ABOVE (E) RETURN PLENUM.CONNECT SUPPLY DUCT TO EXISTING DUCTWORK. RE-CONNECT TO (E) GAS CONNECTION. SEE SCHEDULE ON SHEET M-002. PROVIDE NEW OUTDOOR CONDENSING UNIT AND REFRIGERANT PIPING. SEE SCHEDULE ON SHEET M-002 . PROVIDE NEW REFRIGERANT PIPING. REUSE EXISTING PIPE ROUTING AND PIPE SUPPORTS EXISTING EQUIPMENT TO REMAIN AND REUSED. EXISTING DUCTWORK TO REMAIN AND REUSED. EXISTING OSA INTAKE LOUVER AND MODULATING ECONOMIZER DAMPER SECTION TO REMAIN AND REUSED. CONNECT NEW CONDENSATE DRAIN LINE TO EXISTING CONDENSATE DRAIN PIPING. PROVIDE TITLE 24 COMPLIANT, PROGRAMMABLE THERMOSTAT. REPLACE EXISTING CU-1 AND CU-2 DISCONNECT SWITCH WITH NEW SURFACE MOUNT DISCONNECT SWITCH, 60AS, 35AF (FRN-R),2P, NEMA 3R AND PROVIDE NEW FEEDER FOR EACH UNIT, 3/4"C-2#8 & 1#10G CUFOR MAIN SWITCHBOARD FEEDER 'MS'-4 (CU-1) AND 'MS'-5 (CU-2). ELECTRICAL CONTRACTOR TO FIELD VERIFY BEFORE ROUGH-IN. ADJUST EXISTING MAIN SWITCHBOARD 'MS' FEEDER CIRCUIT BREAKER TRIP SETTING FOR CU-1 AND CU-2 FROM 100AF, 30AT, 2P TO 100AF, 35AT, 2P. ELECTRICAL CONTRACTOR TO FIELD VERIFY BEFOREROUGH-IN. 1 2 3 4 5 6 7 8 9 10 11/8"-1'-0"MECHANICAL FLOOR PLAN - NEW TRUENORTH N W S E 07 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C-8704-1 1 PETERS CANYON ROAD, SUITE 130 IRVINE, CA. 92606 TEL: 949-387-8500, FAX: 949-387-0800 IDS IDS GROUP IDS PROJECT # 22X037.02 No. 30841 R EMS ATTE ET ER SIG ER PD L OA C N F H O C A A L I FC ANRI OEFOISS N ER EN I G E LAN I DAR R E N B. SM I T H Exp. 12/31/24 100 % CD03-22-2024 REPLACEMENT OF HVAC EQUIPMENT AT FIRE STATION NO.8 NEWPORT BEACH FIRE DEPARTMENT 6502 Ridge Park Rd, Newport Beach, CA 92657 M-202 MECHANICAL FLOOR PLAN NEW 05 B-5315-S 250{ OFFICE OFFICE . 2]5<f .. > 8x8 , cc R . 12x10 E. A.-+-_..,,,- DISCHARGE • LOUVER 0 t '. 10x8 .. . ·1 .. -. • I 1 oocf . (TYP. OF 2) l8"x12" EXH. AIR-~ DISCHARGE LOUVER 10x10 (300<f) --~ THERMALLY ACTIVATED VAV DIFFUSER I NO, DATE (TYP. 75cf OF 2) I \ DESCRIPTION OF REVISIONS --RANGE HOOD · EXHAUST DUCT CONNECTION 150cj: ! I I 175<f (TYP. OF 4) APPROVED REVIEWED: SEE COVER SHEET FOR APPROVALS DESIGNED: DRAWN: RJ SS CHECKED: DA TE: DS 03 22 24 0 0 0 0 0 0 0 0 0 0 SHEET 'O C N ..c: C ..c: " C ..c: :, " E C I') 0 a ~ ... ~ N ~ -...... ... 0 "' ~ 'O ;. " C: ,B-I N 0 N I ::. I N 0 ,.._ I') 0 X N ~ ..c: " " ::. ... :3-Cl <( u IO 0 / IX) C: .c::> -C -C/1 " ... ii: ID z N 0 r...: I') 0 X N N / 'O " ... C ..c: C/1 / N N 0 N / C/1 f-u w -, 0 ~ ll. / 'O " ... C ..c: :;;, ~ C/1 u. I C/1 Cl OF / / 5/8" THICK NEOPRENE VIBRATION PAD LARGE ENOUGH TO COVERTHE ENTIRE LENGTH AND WIDTH OF UNIT LEG. TYPICAL BOTH SIDES. (E) CONCRETE GRADE 1/2" HILTI KB TZ2 SS 304 WITH 2"EFFECTIVE EMBEDMENT (ICC-ESR 4266). 1NO SCALEOUTDOOR UNIT MOUNTING ON GRADE 2NO SCALEINDOOR UNIT 3NO SCALEDETAIL 4NO SCALEDETAIL 5NO SCALEDETAIL 6NO SCALEDETAIL 7NO SCALEDETAIL 8NO SCALEDETAIL 9NO SCALEDETAIL 10NO SCALEDETAIL 11NO SCALEDETAIL 12NO SCALEDETAIL CU 1 CU 2 (E) RA PLENUM (N) DUCTCONNECTION F.F.L (E) SA DUCT FAF 1 FAF 2 (E) ANCHOR TO (E) CONCRETE FLOOR ATTACH UNIT TO (E) RA PLENUM #12 SMS EACH LEG, TYP. 4 CORNERS. 1-1/2"x1-1/2", 16 GA ANGLE EA. CORNER WITH (1) # 12 SMS EA. LEG TYP. NOTE:EXISTING BOLTS MUST BE REMOVED, LOOSE CONCRETE MUST BE CHIPPED OUT TO SOUND CONCRETE, AND REPAIRED WITH SIKATOP 123 OR APPROVED EQUAL 07 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C-8704-1 1 PETERS CANYON ROAD, SUITE 130 IRVINE, CA. 92606 TEL: 949-387-8500, FAX: 949-387-0800 IDS IDS GROUP IDS PROJECT # 22X037.02 No. 30841 R EMS ATTE ET ER SIG ER PD L OA C N F H O C A A L I FC ANRI OEFOISS N ER EN I G E LAN I DAR R E N B. SM I T H Exp. 12/31/24 100 % CD03-22-2024 REPLACEMENT OF HVAC EQUIPMENT AT FIRE STATION NO.8 NEWPORT BEACH FIRE DEPARTMENT 6502 Ridge Park Rd, Newport Beach, CA 92657 M-501 DETAILS 06 B-5315-S ' 00 -' " ' ' ·, f' " . ' L r: ' " " _.,,,J " ,, ' " .. REVIEWED: SEE COVER SHEET FOR / is~ l/2 APPROVALS _..AA~~ "" ~\_-* DESIGNED: DRAWN: RJ ss NO. DATE DESCRIPTION OF REVISIONS APPROVED CHECKED: DATE: DS 03/22/24 V 0 0 Oo "" I 'Ji' . ,, . ' " . ' " a, -----K; \J' ~ /\/\ V \__/\__/ V / 0 r "' ' . . ,, ' ' ' ., " " . ,, ' ' ' ' ' ,, ,, '' ,, ., ,.6" SHEET OF " 0 N .s::; 0 .s::; ., 0 .s::; ::, ., E 0 ,,., 0 0 - -0 IO I ::.I N 0 " ,,., ~ N _'.;:!, .s::; 0 ., :::;; st ~ 0 < (.) IO ~ 00 C: .Q -0 -(/) (Il z N 0 ~ 0 X N _'.;:!, " ., ~ 0 t N 0 _'.;:!, ~ (.) w -, 0 0:: ~ " ~ a .s::; ~ ~ I (/) 0 -;::. 07 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C-8704-1 1 PETERS CANYON ROAD, SUITE 130 IRVINE, CA. 92606 TEL: 949-387-8500, FAX: 949-387-0800 IDS IDS GROUP IDS PROJECT # 22X037.02 No. 30841 R EMS ATTE ET ER SIG ER PD L OA C N F H O C A A L I FC ANRI OEFOISS N ER EN I G E LAN I DAR R E N B. SM I T H Exp. 12/31/24 100 % CD03-22-2024 REPLACEMENT OF HVAC EQUIPMENT AT FIRE STATION NO.8 NEWPORT BEACH FIRE DEPARTMENT 6502 Ridge Park Rd, Newport Beach, CA 92657 M-601 TITLE 24 DOCUMENTATION 07 B-5315-S STAH OF CALIFORNIA STAH OF CALIFORNIA Mechanical Systems CALIFORNIA ENERGY COMMISSION Mechanical Systems CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-MCH-E CERTIFICATE Of COMPLIANCE NRCC•MCH-E This dowment is used to demonstrate wmp/ionr:;e for mer:;honiml system'> that ore within the gape of the permit oppliwtion ond are demonstrating r:;omplionr:;e using the presuiptiw Project Name: REPLACEMENT OF HVAC EQUIPMENT AT FIRE STATION N0.8 Report Page: (Page z of9) path outlined in 140.4, or 141.0(b)2 for alteratiom. D.-.te Prep.-.red: 2024-02-12T20:08: 38-05 :00 Project Name: REPLACEMENT OF HVr'IC EQUIPMENT AT FIRE STr'ITION NO.R Report Page: (Page 1 of 9) Project Address: Date Prepared: 2024-02-12T20:08:38-05: 00 C. COMPLIANCE RESULTS A. GENERAL INFORMATION 01 Project Location (city) I NEWPORT BEACH 04 Total Conditioned Floor Area 22.47 Table C will indicate if the project data input into the compliance document is compliant with mechaniwi requiremeI1ts. This table is not editable by thf' ust?r. ff this table says "DOES NOT COMPLY" or "COMPLIES with Exceptional Conditions" refer to Table D., or the table indicated as not compliant for guidance. 02 Climate Zone I 6 05 Total Unconditioned Floor Area 0 01 02 03 04 05 06 07 08 09 03 Occupancy Types Within Project· 06 # of Stories (Habitable Above Grade) 1 System Fans/ System Summary Terminal Box Distribution • Office Pumps Er:onomizers Controls 110.1, AND AND AND ANO Ventilation ANO Controls ANO 120.3, ANO Cooling Towers 14D.4{k), 14D.4(c), 110.2, 120.2, 110.2, 120.1, 160.2 140.4[d), 140.4(1), 110.Z(e)Z Compliance Results 170.2(c)41 140.4(e), 140.4(f), 140.4, 170.2.(c) 170.2(c) 170.2{c)4B 160.2, 160.3 B. PROJECT SCOPE 17D.2(c) This table Includes mechanical systems or components tlial ore wilhin the scope of the permit oppficatioo and are demonstrating compliance using the prescriptive pat/J outlined in {See Table F) (See Table G) (See Table H) (See Table I) (See Table J) (See Table K) (See Table L) (See Table M) 140.4,. 170.2(b) or 141.0(b)2 and 180.2(b)2 for alterations. COMPLIES with 01 02 03 Yes AND AND AND Yes AND Yes AND AND AND E~ceptiona l Air System(s) Wet System Components Dry System Components Conditions □ Heating Air System □ Water Economizer □ Air Economizer Mandatory Measures Compliance (See Table Q for Details) COMPLIES 0 Cooling Air System □ Pumps □ Electric Resbtance Heat Mech,mic,il Controls □ System Pipini;: □ Fem Systems D. EXCEPTIONAL CONDITIONS □ Mechanical Controls (eKisting to remain, altered □ Cooling Towers □ Ductwork (€Kisling to remain. altered or new) This table is auto-filled with uneditable comments because of selections made or data entered in tables throughout the form. or new) □ Chillers 0 Ventilation Transfer air is being used in at least one zone to meet minimum ventilation requirements. See Table J for details. Transfer air must be designed per §.1ZQJJg)_ for air classification and □ Boilers □ Zonal Systems/Terminal Boxes recirculation limitations and be documented within construction documents E. ADDITIONAL REMARKS This table includes remarks made by the permit applicant to the Authority Hoving Jurisdiction. F. HVAC SYSTEM SUMMARY (DRY & WET SYSTEMS) Space Conditioning System Information 01 02 03 04 OS 06 System Name Quantity System Serving System Status Space Type Utilizing Recovered Heat FAF-1, CU-1,FAF-2,CU-2 2 Single zone Alteration □ Gf'nf'rntf'd O;atr>/Timf'· Documf'nt;ation Softw_ar<': En<'rgy Co!le> Ar:P Gf'nf'rntP<i D_ate(limf'· Dornme>ntntion Softwnrp· Enf'rgy Co<if' Arf' CA Buildin1, Ener~ Efficiency Stundards -2022 Nonresidcntic1I Complic1ncc Report Version: 2022.0.000 (ompliJncc 10: 176806·0224-0002 CA Buildini:; Energy Efficiency Strindards -2022 Nonresidential Compliance Report Version: 2022.0.000 Compliance ID: 1768D6-0224·0002 Schema Version: rev 20220101 Report Generated: 2024-02-12 17:08:43 Schema Version: re11 20220101 Report Generated 2024-02-12 17:08:43 STATE OF CALIFORNIA STATE OF CALIFORNIA Mechanical Systems CALIFORNIA ENERGY COMMISSION Mechanical Systems CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-MCH-E CERTIFICATE OF COMPLIANCE NRCC•MCH-E Project Name: REPLACEMENT OF HVr'IC EQUIPMENT AT FIRE STATION N0.8 Report Pa.ge: (Page 4 of 9) Project Name: REPLI\CEMENT OF HVI\C EQUIPMENT /\T FIRE ST/ITION N0.8 Report Page: (Pages of9) Date Prepared: 2024-02-12120:08:3$-05: 00 D;ite Prepared: 202 4-02 -12120:08: 38-05 :00 J, VENTILATION AND INDOOR AIR QUALITY G. PUMPS Exh. Vent per 120.l(c)4 & This sc:ction does not apply to this project. Mer:hankal Ventilation Required per 120.l(c)J" & 160.2(c)3 160.2(c)4 DCV or Sensor Controls per 120.l {d)3. Space Name 120.l(d)S, and 120.l(e}3~ 16D.2(r:;)5D or Item Tag Conditioned tt of Shower • of Required Required Provided per Design OccupJncy Type4 Floor Area heads/ Min OA 160.2(c)5E 160.2(c)5D H. FAN SYSTEMS & AIR ECONOMIZERS (ft2) toilets people" CFM M in (FM CFM This section does not apply to this project. NA: Not required per DCV DAY RM. 18, Bedroom/living room 915 137.25 §120.1(di3 KITCHEN 16 (hate I/mote I/do rm) NA: Not req1.1ired I. SYSTEM CONTROLS 0cc Sensor space type This section does not apply to this project. NA: Not required per DCV PHYSICAL Bedroom/living room 170 25.5 §120.1(d)3 J. VENTILATION AND INDOOR AIR QUALITY TRAINING 15 (hate I/mote I/do rm) NA: Not req1.1ired 0cc Sensor This table is used to demonstrate comp/ianr:;e with mandatory ventilation requirements in 120.1120.2{e)38 140, 4{p) and 140.4{q) far o/1 nonresidential and hotel/motel and space type d:t24refnolink/}160.2, 160.3{a}3D, 170.2(o)4N, 170.2(0)40 for high-ri9~ residential ocwpanciR.S. Far a!tnation,, only vf'ntilotion sy.,tem., bf'1ng altf'red within thf> .,cope af thf' permit 17 Total System Required Min OA CFM 162.75 18 Ventilation for this System Complies? Yes application need to be documented in this table. In lieu of this table, the required outdoor ventilation rates and airflows may be shown an the plans or the calculations can be presented 04 05 06 07 in a sprr?adsher::t. 01 □ Check the box if the project is showing ventilation calculations on the plans, or attaching the calculations instead of completing this table. System Design DA CFM System Design Air Filtration per 120,l(c) 141.0(b)2 and 0 Check th is box if the project included Nonresidential, Hotf'I/Motel Spaces or Multifamily Common Use Spaces System Name FAF-2 Airflow1 470 TransferAirCFM 1370 160.2(c)212 02 Provided □ □ 08 09 10 11 12 13 14 15 16 03 Check the box if the project is using natural ventilation in any nonresidential or hotel/motel spaces to meet required ventilation rates per 120.1(c)2 Nonresidential and Hotel/ Motel Multifamily Common Use Ventilation svstems Mech~nkill Ventil,1tion Required per 120.l(c)33 & 160.2(c)3 E~h. Vent per 120.l (c)4 & 160.2(c)4 □CV or Sensor Controls per 120.1{d)3, 04 05 06 07 Space Name, Conditioned # of Shower Required 1 2.0.l(d)5, cind 120. l.(e)3G 160.2{c)SD Air FiltrJtion per 120.l(c) 141.0(b)2 ~nd or Item Tag Occupancy Type4 Floor Arf'a heads/ • of Required Provided per Design 160.2(c)SE 160.2(c)5D Min OA System Name FAF-1 System Design DA CFM 470 System Design 1370 160.2(c)212 (ft2) toilets peopler, CFM M in CFM CFM Airflow'-Transfer Air (FM Provided NA: Not required per HALL 19, DCV 08 09 10 I 11 12 13 I 14 15 16 §120.l(d)3 OPEN DORM Barracks sleeping area 1080 162 21 Dec Sensor NA: Not required space type Generated Date/Time: Documentation Software: Energy Code Ace Generated Date/lime: Documentation Software: Energy Code Ace CA Buildin13 Ener[W Efficiency Standards -2022 Nonresidential Compliance Report Version; 2022.0.000 Compliance ID: 176806·0224-0002 CA Buildin13 Energy Efficiency Standards -2022 Nonresidential Compliance Report Version: 2022.0.000 Compliance ID: 176806-0224-0002 Schema Version: rev 20220101 Report Gener;ited: 2024-02-12 17:08:43 Schem;i Version: re11 20220101 Report Gener;ited: 2024-02-12 17:08:43 STATE 01 CALlroRNIA STATE or C/\LlfORNIA Mechanical Systems CALIFORNIA ENERGY COMMISSION Mechanical Systems CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-MCH-E CERTIFICATE OF COMPLIANCE NRCC-MCH-E Project Name: REPLACEMENT OF HVAC EQUIPMENT AT FIRE STATION N0.8 Report Pa.ge: (Page 7 of 9) Project Name: REPLACEMENT OF HVAC EQUIPMENT AT FIRE STATION N0.8 Report Page: (Page 8 of9) Date Prepared: 2024-02-12T20:08:38-05: 00 Date Prepared: 202 4-02 • 12T20:08: 38-05:00 Q. MANDATORY MEASURES DOCUMENTATION LOCATION N, DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION This table is used to indicate whr.:re mandatory measures are documented in the p!on set or construction documentation. Selections have been made based on information provided In previous tables of this document. If any selection needs to be changed, please explain why in Table E Additional Remarks. 01 02 These documents must be provided to the building inspector during construction and can be found online at Compliance with Mandatory Measures documented through MCH I Plan sheet or rnnstruction document location https.//www.em:rgy.rn.gov/programs-and-topio/programs/building-t·nergy-r;:fficiency-~tandards/2022-huilding-energy-t:ffidency-4 Mandatory Measures Note Block No Form/Title 03 04 N RCI-MCH-01-E -Must be submitted for al I buildings Mandatory Measure Plan sheet or construction document location Heating Equipment Efficiency per 110.1 M-002 Cooling Equipment Efficiency per 110.1 M-002 0. DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE Furnace Standby Loss Control per 110.2(d) N/A Selections have been made based on inJOrmotion provided in previous tables of this document If any selection needs to be changed, please explain why in Table E Additional Remarks Heat Pump with Supplemental electric Resistance Heater Cont rols per 110.2(b) M601 These documents must be provided to the building inspector during wnstruction and wn be found online at https.j/www.energy.ca.gov/title24/20195tandards/2019_compliance_documents/Nonres!dential_Documents/NRCA/ Kitchen range hoods shall be rated for sound in accordance w ith Section 7.2 of ASH RAE 62.2 N/A Form/Title Syotems/Sp.;ces To BP Field Verified NRCA-MCH-02-A-Outdoor Air must be submitted for all newly installed HVAC units Note: MCH-02-A can be performed in conjunction with MCH-07-A FAF-1; FAF-2 Supply Fan VFD Acceptance (if applicable) since testing activities overlap. P. DECLARATION OF REQUIRED CERTIFICATES OF VERIFICATION There arc no NP.CV forms required for this project. Generated □Jte/Time: Documentation Software: Energy Code Ace GenerJted Date/lime: Documentation Software: Energy Code Ace CA Building Energy Efficiency Stcindards -2022 Nonresidential CompliJncc Report Version: 2022.0.000 [ompliJncl' ID: 176805·0224-0002 CA Building Energy Efficiency Strind~rds -2022 Nonresidential Compliance Report Version: 2022.0.000 Complic1nce ID: 1758D6-022.4·0002 Schema Version ; rev 20220101 Report Generated; 2024-02-12 17:08:43 Schema Version; re11 20220101 Report Generated: 2024-02-12 17;08:43 • NO. STAT[OF CALIFDANIA Mechanical Systems CALIFORNIA ENERGY COMMISSION CERTIFICATE Of COMPLIANCE NRCC-MCH-E Project Name: REPLACEMENT OF HVAC EQUIPMENT AT FIRE STATION N0.8 !Report Page: (Page 3 of9) ID.-.te Prep.-.red: 2024-02-12120:08 :38-05: 00 F. HVAC SYSTEM SUMMARY (DRV & WET SYSTEMS) Ory System Equipment Sizing (includes air conditioners, condensers, heat pumps, VRF, furnaces and unit heaters and OOAS systems] 01 02 03 04 05 06 07 08 09 10 11 Equipment Sizing per Mechanical Schedule (kBtu/h) 140.4{a&bl, 170.2{c)l & 170.2(c)2 Smallest Size Heating Output2,> Coo Ii ng Output2,> Load Calculations>,~ Name or Item Equipment Category per Equipment Type per Tables 110.2 and Av~ilable 1 Tables 110.2, 140.4(a)2 and Total Tag Title 20 140.4(a) and Supp. Total 170.Z(c)3aii Sensible Sensible 170.l(c)l Per Design Rated Heating Rated Heating (kBtu/h) (kBtu/h) Output Per Design (kBtu/h) Load Cooling (kBtu/h) Load lkBtu/h) lkBtu/h) (kBtu/h) FAF-1, AC, air cooled, split+ weatherized gas NA: Altered per CU-1,FAF-2,CU-Furnace+ AC central furnace with single phase 141.0(b)2E and 36,000 40,000 0 35,972 37,600 39000 35,972 2 supply 180.2(b)2 1FOOTNOTES: Equipment shall be the smallest size, within the available options of the desired equipment line, necessary to meet the design heating and cooling loads of the building per 140.4(a) and 170.2(c)l. Healthcare facilities are excepted 'It is common practice to show rated output capacity on the equipment schedule. Sensible cooling output comes from specification sheet tables. 3 If equipment is heating only. leave cooling output and load blank. If equipment is cooling only, leave heating output and load blank. 4 Authority Having Jurisdiction may ask for load calculations used for compliance per 140.4(b) and 170.2(c). Ory System Equipment Efficiency (ether than Package Terminal Air Conditioners (PTAC) and Package Terminal Heat Pumps (PTHP), DX-DOAS and Dual Fuel Heat Pumps) 01 02 03 I 04 05 06 07 08 09 Heating Mode Cooling Mode Minimum Minimum Name or Item Sile Category Rating Efficiency Efficiency Tag (Btu/h) Condition Efficiency Unit Required per Design Efficiency Efficiency Unit Required per Design Efficiency I 'Fl Tables 110.2 / Tables 110.2 / Title 20 Title 20 FAF-1, <45kBtuh cooling/ <225kBtuh heating AFUE 0.81 0.97 EER2 9.8 12 CU-1,FAF-2,CU-2 SEERZ 14.3 16.5 Gr>nPr;ite!l Diltf'/Timf' Dnrumc>ntntirrn Softw;arr>: Enr>rgy Co!le Ace CA Building Enl'rgy Efficiency StJndards -2022 Nonresidential Compliance Rl'portVersion: 2022.0.000 CompliJncl' ID: 176806-0224·0002 Schema Version: rev 20220101 Report Generated: 2024-02-1217:08:43 5TATEOF CALIFOANIA Mechanical Systems CALIFORNIA ENERGY COMMISSION CERTIFICATE Of COMPLIANCE NRCC-MCH-E Project Name: REPLflCEMENT OF HV/\C EQUIPMENT /IT FIRE STATION N0.8 !Report Page: (Page 6 of9) !Date Prepared: 2024-02-12120:08 :38-05: 00 J. VENTILATION AND INDOOR AIR QUALITY NA: Not required per DCV §120.1(d)3 Or:;cupiJble storage rooms for dry Storage 26 materials 85 12.75 Dec Sensor NA: Not required space type 17 Total System Required Min DA CFM 174.75 18 Ventilation for this System Complies? Yes 1 FOOTNOTES: System CFM should in dude both mechaniwl and natural ventilation for the zone/system 2 Air filtration reql!irements apply to the following three system types per 120.1 (c)l A: space wnditioning systems utilizing d1ir:t5 to supply air to ocr:;upiable space; supply-only ventilation systems providing outside air to occupiable space; supply side of balanced ventilation systems including heat recove,y and energy recove,y ventilation systems providing outside air to occupiablc space. 3 Uniform Mechanical Code may have more stringent ventilation requirements; the most stringent code requirement takes precedence. 1 See Standards Tables 120.1-A and 120.1-B. ·° Far lecture halls with fixed seating, the expected number of occupants shall be determined in accordance with the California Building Cade. "120.2(e)3 requires systems serving rooms that are required by 130.l(c) to have lighting occupancy sensing controls ta also have occupancy sensing zone controls for ventilation. Examples of spaces which require lighting ocwprincy sensors include office.s 250ft2 or .smaller; m1Jltipurpose moms less than 1,000ft21 classrooms, conference moms, restrooms, aisles and open areas in warehouses, library book stack aisles, corridors, stairwe!ls, parking garages, and loading and unloading zones, unless excepted by 130.l(c). K. TERMINAL BOX CONTROLS This section does not apply to this project. L. DISTRIBUTION (DUCTWORK and PIPING) This section does not apply to this proJect. M. COOLING TOWERS This section does not apply to this proJect. Generated Oate/Time Dornmentation Software: Energy Code Ace CA Building Ener13y Efficiency Standards -2022 Nonresidential Compliance Report Version; 2022.0,000 Compliance ID: 176806-0224-0002 Schema Version: rev 20220101 Report Generated: 2024-02-1217:08:43 STATE or CALlrDRNIA Mechanical Systems CALIFORNIA ENERGY COMMISSION CERTIFICATE Of COMPLIANCE NRCC-MCH-E Project Name: REPLACEMENT OF HVAC EQUIPMENT AT FIRE STATION N0.8 !Report Page: (Page 9 of9) Project Address: 6502 Ridge Park Rd, Newport Beach. CA 92657 !Date Prepared: 2024-02-12T20:08: 38-05: 00 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT I certify that this Certificate of Compliance documentation is accurate and complete. .-. Oocum<"ntation Author N.,m~ Oocumenl:ltion Author ~ign~ture: "/2 ' Ii ;,+--' Alexander Yau c .di;,,{f. I Campany Signature Dmc / 02/1312024 IDS Group Address 1 Peters Canvon Road. Suite 130 CEA/ HERS Ccrtiiication Identification (if a pplicublc) n;y/State/Zip Irvine. California 92606 Phone: 949 387 8500 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the followinE under pen~ltv of perjur,·, under the laws of the State of California: 1 The informotion provided on this Certificate of Compliance ii true Jnd correct. ' I am eligible under Division 3 of the Busin~ss and Pmfossions Code to ac~cpt n.,sponsibility for the buildin~ d~sign or system design idcntifad on this Ccr1ificatc of Compliance (responsible designcCI ' The energy fentures and performan<:e specifications. m"~rinls, component.,, an~ manufactured de~ic.es for the building de.sign or system design identified on thi; Certifknte of Cnmpliance conform to the re~ui rement.; of TillP 24, Part 1 and rart 6 d thP California Cr,de nf RPgul;atians. ' The buildine desien teature, or system desien temure, identified on this Certificate ot Compliance are co~sistent with the intorrnation provided on ot11er applicable com11lianC€ doc~ments, workst1eets, ralculations, pl~ns and specificatioos submitted to the enforcemest ap,ency for opprovol with this buildinp, permit applicJtion s I v.ill en,~re that a rnmple:ed signed copv of this Certificate af Compliance shall be m3de available with the building permit(,) issued for the building, and made avcilable ta t~e enforcement cgent·y for all a~plirnble inspections. I undersrnnd that .i completed si~ned copy of this CertificJte ofCompliJnce is required to be included with the documemation the builder provides 10 the bl!iJ.din,c owner ;itpq:up;incy. Responsible IJesigner Name Darren Smith llesponsib e IJesigner Signature I J ,vl/\..,l-">"'-,e,~ Cumµany IDS Group Dal~ Sig11~d: 02/13/2024 ,\ddress 1 Peters Canvon Road, Suite 130 License· M 30841 Ci:y/State/Zip: Irvine. California. 92606 Phone: 949 387 8500 Generated Date/Time Documentation Software: Energy Code Ace CA Building Enl'rgy Efficiency StJndards -2022 Nonresidential Compli;mcc Report Version: 2022.0.000 Compli,1ncl' ID: 175806-0224·0002 Schema Version; rev 20220101 Report Generated: 2024-02-1217:08:43 REVIEWED: SEE COVER SHEET FOR / is~ l/2 APPROVALS -"" o~ ',,; ~~-* DESIGNED: DRAWN: RJ ss DATE DESCRIPTION OF REVISIONS APPROVED CHECKED: DATE: DS 03/22/24 SHEET OF ,, 0 N _s;; 0 _s;; ., ·o _s;; ::, ., E ~ a a -a <O I :::.I "' a " I') ~ "' ~ _s;; 0 ., :::;; v ~ Cl < u IO ~ 00 C: .Q -0 -(/)