Loading...
HomeMy WebLinkAboutC-9718-1 - Traffic Signal Rehabilitation Project FY24-25CITY OF NEWPORT BEACH NOTICE INVITING BIDS Sealed bids shall be submitted electronically via PlanetBids to office of the City Clerk, 100 Civic Center Drive, Newport Beach, CA 92660 Before 10:00 AM on the 5th day of June, 2025, at which time such bids shall be opened and read for FY2024-25 TRAFFIC SIGNAL REHABILITATION Contract No. 9718-1 $1,110,000 Engineer's Estimate Approved by �;� James M. Houlihan eputy PWD/City Engineer Prospective bidders may obtain Bid Documents, Project Specifications and Plans via PlanetBids: http://www.planetbids.com/portal/porta1.cfm?CompanyID=22078 Hard copy plans are available via Santa Ana Blue Print at (949)756-1001 Located at 2372 Morse Avenue, Irvine, CA 92614 Contractor License Classification(s) required for this project: "C-10" For further information, call Eric Loke, Project Manager at (949) 644-3336 BID INFORMATION IS AVAILABLE ON THE CITY WEBSITE: littps•//www newportbeachca gov/government/data-hub/online-services/bids-rfps-vendor- reqistration City of Newport Beach FY2024-25 TRAFFIC SIGNAL REHABILITATION Contract No. 9718-1 TABLE OF CONTENTS NOTICE INVITING BIDS..........................................................................................Cover INSTRUCTIONS TO BIDDERS...................................................................................... 3 BIDDER'S BOND............................................................................................................6 DESIGNATION OF SUBCONTRACTOR(S)................................................................... 9 TECHNICAL ABILITY AND EXPERIENCE REFERENCES.-.. ..... ....... _ ...... _ .............. 10 NON -COLLUSION AFFIDAVIT..................................................................... 14 DESIGNATION OF SURETIES.................................................................... 15 CONTRACTOR'S INDUSTRIAL SAFETY RECORD .................................................... 16 ACKNOWLEDGEMENT OF ADDENDA....................................................................... 18 INFORMATION REQUIRED OF BIDDER....................................................................19 NOTICE TO SUCCESSFUL BIDDER........................................................................... 21 CONTRACT.................................................................................................................. 22 LABOR AND MATERIALS PAYMENT BOND .......................................... Exhibit A FAITHFUL PERFORMANCE BOND........................................................... Exhibit B INSURANCE REQUIREMENTS................................................................. Exhibit C PROPOSAL............................................................................................................. PR-1 SPECIAL PROVISIONS.................................................... ........... SP-1 2 Citv of Newport Beach FY2024-25 TRAFFIC SIGNAL REHABILITATION Contract No. 9718-1 INSTRUCTIONS TO BIDDERS 1. The following documents shall be completed, executed, uploaded and received by the City Clerk via PlanetBids in accordance with NOTICE INVITING BIDS: INSTRUCTIONS TO BIDDERS BIDDER'S BOND (Original copies must be submitted to the City Clerk's Office in Sealed Envelope before the bid opening) DESIGNATION OF SUBCONTRACTORS ACKNOWLEDGEMENT (Subcontractor information to be submitted via PlanetBids) CONTRACTOR'S INDUSTRIAL SAFETY RECORD INFORMATION REQUIRED OF BIDDER ALL ADDENDA TO PLANS AND SPECIFICATIONS AS ISSUED BY AGENCY PRIOR TO BID OPENING DATE (if any; Contractor shall confirm via PlanetBids) TECHNICAL ABILITY AND EXPERIENCE REFERENCES NON -COLLUSION AFFIDAVIT DESIGNATION OF SURETIES PROPOSAL ACKNOWLEDGEMENT (Line Items to be completed via PlanetBids) The City Clerk's Office will open and read the bid results from PlanetBids immediately following the Bid Opening. The Bid Results are immediately available to the public via PlanetBids following the Bid Opening Date (Bid Due Date), Members of the public who would like to attend this reading may go to Bay E, 2"d Floor of the Civic Center (Located at 100 Civic Center Dr.) 2. Cash, certified check or cashier's check (sum not less than 10 percent of the total bid price) may be received in lieu of the BIDDER'S BOND. The title of the project and the words "Sealed Bid" shall be clearly marked on the outside of the envelope containing the documents. Original copies must be submitted to the City Clerk's Office. 3. The City of Newport Beach will not permit a substitute format for the Contract Documents listed above. Bidders are advised to review their content with bonding and legal agents prior to submission of bid. 4. BIDDER'S BOND shall be issued by an insurance organization or surety (1) currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, and (2) listed as an acceptable surety in the latest revision of the Federal Register Circular 570. The successful bidder's security shall be held until the Contract is executed. Original, sealed copies must be submitted to the City Clerk's Office before the Bid Opening. The title of the project, Contract Number and the words "Sealed Bid" shall be clearly marked on the outside of the envelope containing the documents. 5. The estimated quantities indicated in the PROPOSAL are approximate, and are given solely to allow the comparison of total bid prices. 6. Bids are to be computed upon the estimated quantities indicated in the PROPOSAL multiplied by unit price submitted by the bidder. In the event of discrepancy between wording and figures, 3 bid wording shall prevail over bid figures. In the event of error in the multiplication of estimated quantity by unit price, the correct multiplication will be computed and the bids will be compared with correctly multiplied totals. The City shall not be held responsible for bidder errors and omissions in the PROPOSAL. 7. The City of Newport Beach reserves the right to reject any or all bids and to waive any minor irregularity or informality in such bids. Pursuant to Public Contract Code Section 22300, at the request and expense of the Contractor, securities shall be permitted in substitution of money withheld by the City to ensure performance under the contract. The securities shall be deposited in a state or federal chartered bank in California, as the escrow agent. 8. In accordance wAh the California Igor Code (Sections 1770 et seq.), the Director of Indust al ReTations has ascertained the general prevraifing rate of per died wages in the tocalitty in which the work is to be perforrned for each crafk classification, or type of workman or mechanic needed to, execute the contract. A copy of said &termination is av ruble, by calling the prevairing wage hotline number ('415) 703-4 74, and requesting one from the Department of Industrial Relations.. All parfies to the contract shall be governed by all provisions of the Callifornia Labor Code — inc uding, but not Yin ted to, the requirement to pay prevailing wage rates (Sections 1770-7981 inclusive). A copy of the prevaiilingl wage rates shall be posted by the Contractlor at the lob site. 9. The Contractor, shall be responsible for insuring compliance with provisions of Section 11777.5 of the Labor Cadla Apprenticeship requirements and Section 4100 of sW. of the PU1 bilic Contracts Codd„'SUbl tting andl Subcontracting Fair Practices Act". 10. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. 11. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. 12. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. 13. All documents shall bear signatures and titles of persons authorized to sign on behalf of the bidder. For corporations, the signatures shall be of a corporate officer or an individual authorized by the corporation. For partnerships, the signatures shall be of a general partner. For sole ownership, the signature shall be of the owner. 14. Pursuant to Public Contract Code section 9204, for any demand by contractor, whether on behalf of itself or a subcontractor that lacks privity of contract with the City but has requested that contractor proceed on its behalf, sent by registered mail or certified mail return receipt requested for a time extension, payment by the City for money or damages arising from work done by, or on behalf of, the contractor and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled, or for payment of an amount that is disputed by the City, the following is a summary of the claims resolution process to be applied: A. The City shall review the claim and, within 45 days, shall provide a written statement identifying the portions of the claim that are disputed and undisputed. This time period may be extended by mutual agreement. The claimant shall furnish all reasonable documentation to support the claim. If the City needs approval from its City Council to 4 provide the written statement and the City Council does not meet within the prescribed time period, the City shall have up to 3 days following the next regular meeting of the City Council to provide the written statement. Payment of the undisputed portion of the claim shall be made within 60 days after the City issues its written statement. B. If the claimant disputes the City's written statement or if the City does not issue a written statement in the prescribed time period, the claimant may demand in writing an informal meet and confer conference, which shall be scheduled within 30 days of receipt of claimant's demand. C. Within 10 business days of the meet and confer conference, if a dispute remains, the City shall provide a written statement identifying the portion of the claim that remains in dispute and the undisputed portion. The City shall pay any remaining amount of the undisputed portion within 60 days. Any disputed portion of the claim shall be submitted to nonbinding mediation or similar nonbinding process, with the City and claimant sharing the costs equally and agreeing to a mediator within 10 business days. If the parties cannot timely agree on a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate the remaining disputed portion. If mediation is unsuccessful, any remaining disputed portion shall be addressed using procedures outside of Public Contract Code section 9204. D. Failure by the City to meet the time requirements herein shall result in the claim being rejected in its entirety and shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant. The signature below represents that the above has been reviewed. 738518 A,B,C-10 John Wong, Executive Vice President Contractor's License No. & Classification Aut on d nature/Title �j 1000004804 6/02 DIR Registration Number & Expiration Date Date Elecnor Belco Electric, Inc. Bidder 5 City of Newport Beach FY2024-25 TRAFFIC SIGNAL REHABILITATION Contract No. 9718-1 BIDDER'S BOND We, the undersigned Principal and Surety, our successors and assigns, executors, heirs and administrators, agree to be jointly and severally held and firmly bound to the City of Newport Beach, a charter city, in the principal sum of Ten Percent of the amount bid Dollars ($ 'Ilia. of the amount bid ), to be paid and forfeited to the City of Newport Beach if the bid proposal of the undersigned Principal for the construction of FY2024-25 TRAFFIC SIGNAL REHABILITATION, Contract No. 9718-1 in the City of Newport Beach, is accepted by the City Council of the City of Newport Beach and the proposed contract is awarded to the Principal, and the Principal fails to execute the Contract Documents in the form(s) prescribed, including the required bonds, and original insurance certificates and endorsements for the construction of the project within thirty (30) calendar days after the date of the mailing of "Notification of Award", otherwise this obligation shall become null and void. If the undersigned Principal executing this Bond is executing this Bond as an individual, it is agreed that the death of any such Principal shall not exonerate the Surety from its obligations under this Bond. Witness our hands this 5th day of June , 2025. Elecnor 13elco Electric, Inc. . John Won / Executive Vice President Name of Contractor (Principal) Liberty Mn Name of S 175 Berkele Ann_ toMA Address o (617)357-9 Telephone uthorized Sign urefTitle tual Insurance Company urety Authori zed Agent Signature y Street Doritza Moiica. Atto rney -in -Fact 02116 f Surety 500 (Notary acknowledgment of Principal & Surety must be attached) Liberty Mn Name of S 175 Berkele Ann_ toMA Address o (617)357-9 Telephone utsv j Po�-. Toy�m m 1912 �'ssq� u,Efida Print Name and Title 7 k *� A A ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of 04iW Connecticut County of Hartford _) ss. On June 5 2025 before me, Stephanie Harvey Notary Public, personally appeared Doritza Moiica who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WI NESS my hand anTffi' eal. STEPHANIE HARVEY NOTARY PUBLIC - CT 185862 My Commission Expires Mar. 31, 2027 Signature _ iephanie Harvey (seal) OPTIONAL INFORMATION Date of Document Thumbprint of Signer Type or Title of Document !Number of Pages in Document Document in a Foreign Language Type of Satisfactory Evidence: Personally Known with Paper Identification Paper Identification Credible Witness(es) 07 Capacity(ies) claimed by Signer(s): Trustee Power of Attorney CEO/CFO/COO President / Vice -President / Secretary / Treasurer Other: Other Information: 7 Check here if no thumbprint or fingerprint is available. ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of SS. On Sun 5, 2ca9 20 z5 before me, ZO-10 Notary Public, personally appeared cSat�ykr-r-4 who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. Dour MCW HOVER WITNESS my hand and official seal. HotaryPublic .Caiirornla San 6ernardino County IF Commission N 2426775 ray COMM. Exatres Nov I5. 2026 ig . u e (seal) ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of SS. On 20 _ before me, Notary Public, personally appeared who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature C:7 (seal) Cno This Power of Attorney limits the acts of those named herein, and (hey have no authority to bind the Company except in the manner and to the extent herein stated. Liberty Liberty Mutual Insurance Company Mutual. The Ohio Casualty Insurance Company Certificate No $210646 - 985949 10 West American Insurance Company SURETY POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duty organized under the laws of the State of New Hampshire, (hat LbertyMutual Insurance Company is a corporation duly organized under the taws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the "Companies7, pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Connor Wulperl, Uortua Mullca, Comm Steuart, Jennifer Godvie Jonathan Wcasun Joyhtut Sanford, Kathryn Pryur, Kyle Williams, Michelle Anne 44:4Mahoo. Nicholas Miller Riclurnt Ilackner. Robyr Salley. Sarah Munho all of the city of , Hartford state of CT each individually ITthere be more than one named, its We and lawful attorney-in4act to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as Y they have been duty signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF, this Power of Aftomey has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 22nd day of August 2023 Liberty Mutual Insurance Company %HSU,g4 tv rNSV 1NSLR� The Ohio Casualty Insurance Company J 4°RVORTf L� yJ `°1 noR4><�y ``Q 4°11 Olt r� yC� West American Insurance Company 1912 0 0 1919 „ 1991 0 dY d9 s�clwyl da �� f41xo5`x yD� rs io,Au� da Ely: / FF David M. Carey, Assistant Secretary M State of PENNSYLVANIA County of MONTGOMERY ss U j On this 22nd day of August 2023 before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual insurance io Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing Instrument for the purposes (herein contained by signing on behalf of the corporations by himself as a duty authorized officer aJ — = IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seat at Plymouth Meeting, Pennsylvania, on the day and year first above written. O CemmmnrslhofPammW.scut-N"ySaar O '� r Teresa Pasielb, Noury Puuic 6 " Msnyomery CancY O � "' MY canntisuron expires AAarrh 28, 2625 By: C N v CwmfAxrn nuahrr 112W44 y�vr syyj'n:i,c, h4xwcr.P...w/.avA.soo-r1nsarrwna, Notary Public a: fw .. This Parer of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual Insurance o Company, and West American Insurance Company which resolutions are now in full force and effect reading as fcdows. �R ARTICLEIV— OFFICERS: Section 12. Power of Attorney. 12 Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such ]Imitation as the Chairman or the President may prescribe, shall appoint such altorneys4n-fad, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all � N undertakings, bonds, recognizances and other surety obligations. Such aftomeys-h-fact, subject to the limitations set forth in their respective powers of attorney, shall have full o power to birrd the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall Z U be as binding as If signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney -in -fact under the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer of officers granting such power or authority. ARTICLE YJII — Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such allomeys-in-faLl, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact subject to the limitations set forth in their respective powers of attomey, shall have full power to bind the Company by their signature and execution of any such instruments and to allach thereto the seal of the Company When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation — The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attomeys-in- fad as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Authorization — By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed. 1, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of altoiney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 5th day of June , 2025 INS UR j,( INS0. 1Nst/q AJp'�oRooe�rq�Yc1 OJPa°anon4r'P9� `VP`°aooa�r�?r VQ:T o t� 21 1912 p 1919 1991 F G 4 By �',j>'eja4ChUy4�,da� yid NAMP6� da s rNOIAIIT ,rib -eRenee C. Llewellyn, Assistant Secretary LMS-12e73 LMIG (YLAC WAIL Win Ca 02121 City of Newport Beach FY2024-25 TRAFFIC SIGNAL REHABILITATION Contract No. 9718-1 DESIGNATION OF SUBCONTRACTOR(S) - AFFIDAVIT State law requires the listing of all subcontractors who will perform work in an amount in excess of one- half of one percent of the Contractor's total bid. If a subcontractor is not listed, the Contractor represents that he/she is fully qualified to and will be responsible for performing that portion of the work. Substitution of subcontractors shall be made only in accordance with State law and/or the Standard Specifications for Public Works Construction, as applicable. Pursuant to Public Contract Code Section 22300 appropriate securities may be substituted for any monies to be withheld to ensure performance under the Contract. The Bidder, by signing this designation, certifies that bids from the subcontractors as listed in the Bidder's electronic bid have been used in formulating the bid for the project and that these subcontractors will be used subject to the approval of the Engineer and in accordance with State law. No changes may be made in these subcontractors except with prior approval of the City of Newport Beach. Bidders must also include DIR registration numbers for each subcontractor. Elecnor Belco Electric, Inc. John Wong Executive Vice President Bidder A th Mizednatureffitle E City of Newport Beach FY2024-25 TRAFFIC SIGNAL REHABILITATION Contract No. 9718-1 TECHNICAL ABILITY AND EXPERIENCE REFERENCES Contractor must use this form!!! Please print or type. Bidder's Name Elecnor Belco Electric, Inc. FAILURE OF THE BIDDER TO PROVIDE ALL REQUIRED INFORMATION IN A COMPLETE AND ACCURATE MANNER MAY BE CONSIDERED NON -RESPONSIVE. For all public agency projects you have worked on (or are currently working on) in the past 2 years in excess of $150,000, provide the following information: No. 1 Project Name/Number Traffic Signal Modification on Honolulu Ave Project Description Traffic Signal Approximate Construction Dates: From 4/22 To: 2123 City of Glendale Agency Name Contact Person Sarkis Oganeyan Telephone (818) 548-3945 Original Contract Amount $3,893,848.00Final Contract Amount $4.325,239.85 If final amount is different from original, please explain (change orders, extra work, etc.) City requested change orders Did you file any claims against the Agency? Did the Agency file any claims against you/Contractor? If yes, briefly explain and indicate outcome of claims. NA 10 No. 2 El Paseo Pedestrian Improvements Project Name/Number Project Description Traffic Signal Modifications Approximate Construction Dates: From v2020 To: 3no2o Agency Name City of Palm Desert Contact Person Randy Bowman Telephone ( 760) 346-0611 Original Contract Amount $858,011.00 Final Contract Amount $ 931,355.98 If final amount is different from original, please explain (change orders, extra work, etc.) City requested change orders Did you file any claims against the Agency? Did the Agency file any claims against you/Contractor? If yes, briefly explain and indicate outcome of claims. NA No. 3 Project Name/Number Monroe Street Ave. 41 Project Description Traffic Signal Installation Approximate Construction Dates: From Agency Name City of Indio 08/2022 To: 9/2023 Contact Person Erick Weck Telephone (760) 625-1838 Original Contract Amount $4s4,e44.00 Final Contract Amount $ 465,441.83 If final amount is different from original, please explain (change orders, extra work, etc.) City requested change orders Did you file any claims against the Agency? Did the Agency file any claims against you/Contractor? If yes, briefly explain and indicate outcome of claims. NA 11 No. 4 Project Name/Number Traffic Signal Installation & Modifications at Various Locations Project Description Traffic Signal Installation & Modifications Approximate Construction Dates: From 3/2022 To: 8/2022 Agency Name City of Garden Grove Contact Person Ken Vu Telephone (714 ) 741-5184 Original Contract Amount $1,276,196.00 Final Contract Amount $1,357,108.92 If final amount is different from original, please explain (change orders, extra work, etc.) City requested Change Orders Did you file any claims against the Agency? Did the Agency file any claims against you/Contractor? If yes, briefly explain and indicate outcome of claims. N/A No. 5 Project Name/Number Traffic Interconnect System Upgrades Project Project Description Furnish & Install Controller Cabinet & BIBS Approximate Construction Dates: From 3/2021 Agency Name City of Commerce Contact Person Okan Demirci To: 5/2021 Telephone (714 ) 319-6137 Original Contract Amount $1_257.818.00 Final Contract Amount $1,266,678.42 If final amount is different from original, please explain (change orders, extra work, etc.) City requested Change Orders Did you file any claims against the Agency? Did the Agency file any claims against you/Contractor? If yes, briefly explain and indicate outcome of claims. na 12 No. 6 Project Name/Number Broadway Improvements Traffic Signal Modifications Project Description New Traffic Signals & Signal Modifications at Various Locations Consisting of New Conduit Runs & Existing Poles Approximate Construction Dates: From Agency Name City of Carson Contact Person Reata Kulcsar 1212020 To: 1/2021 Telephone (310 ) 952-1700 Original Contract Amount $1.166,835 00 Final Contract Amount $ 1.386.065.63 If final amount is different from original, please explain (change orders, extra work, etc.) City requested Change Orders Did you file any claims against the Agency? Did the Agency file any claims against you/Contractor? If yes, briefly explain and indicate outcome of claims. na Attach additional sheets if necessary. Attach to this Bid the experience resume of the person who will be designated as General Construction Superintendent or on -site Construction Manager for the Contractor. Upon request, the Contractor shall attach a financial statement and other information sufficiently comprehensive to permit an appraisal of the Contractor's current financial conditions. Elecnor Belco Electric, Inc. Bidder 13 John Wong Executive Vice President A o e Signature/Title R 299 OWNER � uW Q�.w�,5'c� ci aa{{ oo rua rru RO'S�'¢?aooa rrzruuz} zmuu oo�w�� i rcsru i<`aua7<�� >ec ��oi u ,i>mz �°���yygao°xzz2���naa :-- r-'-' y� « ON G � m g88,8�888 _CY1� 8 iRfieP�an�M��n�1:d`y�GYS��_. 8�pg8ri8 8 ,8 S8S 88 g88�8 S�;g s&88 mo�`�_ €18- 88 5 CS8$g.�,�, -H L~l y 09 13 1� H n$ -�• I A i v n 1�r - y ii __„� a - _ - m F (W. G NN5 rNo�N jti oG JHNHriNN �pnp �$[�j}1„VVof gryoN�yN $[7 c�7y�pyy7}}} �i�R vpnp� oyga� 1'isNY`i ��{{ ass�ayy n„OrysNrygO ,�ayy 11ovvaeeel1 � r NgnH �y ttvv raj fiFl QQ f�`1r•lY1 tltlpp [}aj�,�` n1i' ❑❑-,<,J, a�^-. -. -,-, O�-.wy <❑4.<a Y. �❑`� (�'} UU 000 9 U(iU>u1 W W ❑ W ❑❑x ❑y�L M m UNNNmm W ❑.1. w` ti mmY} Y. is OMM 5. Q} W ❑❑ USYU W O <•.y4❑-. ❑❑Q'. ^�N❑-, ii W.J.. 3 q❑ Z �F pppp °au33c��3e333333533��c9t�33�i3�33°33gu3333i�i3333�u33333333�333�m3333�333�t933UI', gqppgppppp pp pp ppC ppp pp ppp ppgqPPppppppppp pppp ppgqPPpp ppppp pp uo z 6 F [i! J a x ° x 5 < .-1 j 0 h a F �oi ; 0. -w5°"yy�i�i z E V O X W ° O O F j xouu21iu Uvd� x {-i ❑ li F u' F• v0.{S W a _ W S Gu F• �x���o�",y� <u6{-•qq z C a V <�9Fsp(eGago' X O 1 x O F• ������w�y u� F V F- l7 t6✓�� F a a a U Fo ww m 3c- x S mr O z;s N w >> zzzxN O� >>a;e°P❑�z 8 u a�55�F; J 6 zyo 0 pi�upav ua a,, 6 $w a6� ><0GuM p•uu y0.< rz❑u¢ Q Q U w % e-^ y �/6'� o>-5 � <po d (J �r�.ozz❑<LZY�ua � .7 d <� U c�oxM1�p q"< r-xiiF� 4['Z Lx> C J O "z0 xSx ¢wzz�z a `C 0 t�c� W] daty<#a ` V az ❑z ? u �QOe2^$o�W 'PJ �o° C J QdQ� �i<c�uoNNpoa dI aF¢Q d ~ o w O 0wax-ocFa�ua�wuu r O x w m ❑4' W a r ZWu /. U •j WFa"ao 961 p� 0 j• a<�� d❑a� } F Y� ,�2 Q�> P. J V J�2^Uy} J/•J U,,,1 US � LC UU 7 �it YYY l7 U U J y � F mpjp YY}}zzr z}}}}zzz>Izz>zz>zzzzz ziZz}'r>zz'J,T-1Z>.z}x}Z}z1zzzz>>zxz>zz}zzxzY zzzzz> U U V u U U U U V -Ja����0337�.i�0�]75�ma03n5maR U U U U u U u u U U U u U V U U U U U U U U U U U U U H U U U V U `J�a�aN U U F U U u U U V NMM es U U «an U U U U U n U U �a y b 4 6 d d 0. b 4 d 6 0.p 4m 6 0. 4 ap d 0. 0. 0. d d ym 6 0. d 4 6Wq i d mm4 7 { p0.y� i SM is 7 �� m 7Rms `y^`y4 W �NNNp'2NaNOCNa m p 7J7 m 7 p 7 7 �fa a 'i m 7 m a ^' m4 �J77 m m m 777 m 0'Z M`0. oZ NNhNd a��0. 0. NNNMN6d' M1 NNN d NNNN yN W NR 0.' 0.460. M MM W NN y �CNNN�WVi Mill.NNNKNNN NN A O � z 6 _gg v�3^e$3-'��va•]vvd3�^+i2v�= v$x^•^^v?�i••^�--e-�+�o-��' ��33�i�a—:i�3�v�'-:•' a ti 3}YY3 ' } } 333333333Y33YYY`� } } Y } } ! < >3NNOCN �44 �J.V N5 N541NJN NNHNJ N ag KaG1 SNJaJ N4%MaNsw NNN W NNN W� OLN W a0.' 4' W 4' V31 W W W W a=❑ >446 w❑ aU¢WGLL���U ❑ O ❑ � a K W = a s K ."[�'�yN�N C w d K W <�«„ B❑ o p �6 g qa�� W z W C �¢ W a ❑><} G p❑ Y<}❑>• K w a b C❑¢ my-.n O O Kd d4,?"i d�❑❑� C7 ❑�'.'❑4 4 d❑m �� d�} <�7<O wQ W <7� �Wwwp z2a<�diwa¢ogz�<3s��o�z py Wp i�� p ❑w`jc�° ❑<<< tqw < tq pz dSCi� O�¢<[ ,.t p< pp�w K< O ❑�a❑ ppp� i min vni- wn'S.-'.E " nvni +n.n vni �. n nn.�ep : nnN„e�+nnN„rn.�p nN eo rnn nnynnN3R-1i nth - -w...; x xx xx x m zzy6M m, z 'CM°aaOu �& D°pr3 wO y 0apu uppxzOO z¢¢ 0zu 0< 6 uO OC°°d c zhh GUp <z 3 0 Pzz °��unl •~z JM°dpaN JF<' .5.} a>ttYY yyi�Ja�a �pZz< z a 4j $xci�0 WZz aU� S w apazpF«xWM5, 00Ur�JFSVxNiti.. ❑ .`• m h CMuN3 SO7w-' y Sapj, �Wdo<° 0.Fdv- Q ogi1a,n,.7 <°a❑Jw>� ao�0`n � W 6 a��WL0 °dw44FWpPoaM❑am UWgo 8a WFa�r��n-' oWri${d+ x���OzpawQ>j -WOa•-�Iz]' 7pz 7ti;aNzoq yy z pT�,❑re¢) "tyQKv°3�❑,7i O°d?xuYM�'�z�! S >wJ�>am -f<d' o uNxeLWqaQ GXx a 0o z �n-�< a XJsSOX Fz<.Nzd> "" S m0 m 0 a Fz��;zw-3j y6 0 F >aL2y m�>WsM-' O >�M'U-� vPuq yxe❑�. i°W�adi_UV� pZ<z-� p�orMoWpJ�� �F,jFW�O0xmm4; t°>>d M�ddFJa^�� Y�4Fa^' w�pjmz4�Z um oQ6mztN3z+ 0uz-Sy❑J p� W4UFNd3 7UxxQ$'a• 0 w<6' `mw_ FCK rc'J3xx 6uO- ^_-� NmpQ� aH4yiW�d° ¢ z OL �sw z vcc U aJ aU wu O � 0 ° Qu <°L auP HUFWo 6 UOu}Nyq-w0.Q Wp-QrF- oU� °zamf $a F GFi`a� V�zWp>Od_]' ¢<CWZS xt><� QZH2Q2Q x HU> -^�PF a 3 ,upQWo o u x ° F qq< � ' g o 0o<y Qw N p m .nr �oogSdF°$$33$$g$gg$$�q$3$�id3$3d$$�$$$$i�$$$3$d$3e$�°o gggo_rv__n 'n .ognar-.a eNaonS'n�nnno" aill ggga�g O d c ROZ ON 7mmaaaapS{ x��°�<�`<o� �'J.a < z 7 u W99-W l7:u ra�x�..a Uia 8,-MMr:S'JwS�LLim u >•. <r • of LL�LLWV ,.1 J d' .eOsSi� o q� p` wZwa EO 0C 0("w :y<j{wO a00 ann�f.(a iGr Qa ;L z C 5 ` y �d'0 QA � J •wW/! y ®c 6 K eC C¢'��O �K OI Q, f �,<�,�hLLCLL, O m m 03 m ( > an d rJ Wm T 'Cjj z �i d Z Wm 5 z Y 7 S s C L G< +m( << z V�i1 �< 7 U tt 4 �j > l 2? / 5 J> ym V d w d W s< .{ 0.' v> �<p<Q 00 O ([<OQt�6drjd.�DOaw��<gOG72 mV< G g ,4.7 y O �pu D 00 aZ ¢1 ° ¢<�%�6 ,7.tQG%J'�id.d < < ��Qic .� '� (O (Dd QdX ."!.-> Y ti+ dY 76 �i O u v A dur U m 0 m ow G � aT UO dF p °;33333 m pp 3 3o3U 3 y A z z, ozz 0x C a IX� 7 2r. w0 aa. . UFUF.. SF.0 1_ 4IX J J .mow JT x } yy N W a `yU•w w Y j C b UU z U > F $'L r<wG a F Z _ _ E y 5 G m� Tdd %Y .7' 7x7.zz z NF ma U mm - _' U f9 MUM- flg§-- u:l 'UUUU 0. -9 0. ....... 'm b JS wu 9 m m�m(Lmmm m aui a a°�.a ti ryyU1ay»-. frail Q w Z Z __off v vi 3 g $Y t-a-'--•r y. } Y A. Y r %Z 'l.z� � 3 u°•Sw iza 'a Ff < 4 h0 a Y Y' 6<< oC,6 .Q <�2Waa%' Q <tmoK s� � bt V man nhv r+�'ir �O 3 uu, >z z! im�5 o' g 5ag�°i�F<Qom <a5 o - waas o-<7 < Woi z vo a z z vm f• a < ��v•>.� o 7F w - M"LKW nzz a a0 a :3 C u�zi4�t= 6 ❑ y S mYWZ; nti <^� _ U > a F pp dg�g�i pp rA m� < W � a �oi� QQ�p3C3C3C��3�C3�33p3pz3p�p333333��++ pp pp pq U m _ Z Z GU Z- 00 zn 0 Fib 6 OUIXONOU500M oum[�z� zo°o U.l. o8a�mw V W W TIL O!k W C m,�,ZszrzzZxz7Z>zz>zZYYYZY F m �T'1 G{UODU 7 mU UU 7 UUUm UUU pU1 7 mU mU 7 7 mU J mU UG 7 U 6 y � N�.'�+4N NyNyNN�NN NNNa 0.0(4.N 0. ti m W � �z z 3^�3v3S.r 3ay3��3�3a„�3Y�Y3�35o��3 a PC W N W N y W N W N W N � z � ¢ a 4 9�Q�gzo❑xgo A9A � o w 6 X X V V v1 TV O 3 �i��°�z�<�+c�y��& +� V z Wa S� ffiffi < PzGN m oGp�=G�� o3° 60 ae V v3 }< z iW., W z�WOo 3 Z WW D 7. K 4�aaw@z f0o 0S w?MIaG$'�i1�wF..iu�[ <��z ;F y of laF-�=Y� S0 l+9al4y>0°xjn z t'ji �FF(ZO~�j uO�UY�� az�3Maa.�5<p; y5 za �z>4��osag<�O�m <da p�yft3 $aW�2CT<O� Nw 0UU V wY z6 Mz �v < oza O �o�pa�pa U06 w O U- W C 0 ¢V w zN �C7 OOY 0. U �u U s00 033333 �wwwww mmmmm 8000go_egg�ag8==Sog 8S o 8_Spp 8OO go a 000 000 So g�8008og8SSSgSo�aSoS8SSSg .- y rh y h h N h N M h H Z, N h N N �� FFH� FFH�F{WWW11-F HH:� F H N!^ F HH FF FFF-H _]��.-. F HFFFH�H H F FF �F{�t1t+�7 ({a-}{FyH HFF FFF FF{y.�.F F1-F =r Ei�k�k"��nS2ix��Sif�gFa.i 4 4 7igEE��E��i�i ff iiEsi� �• 888880000 ai�i� V OQ O V D000000000000000000 V V U U V Ctii U U U U V :J U V U U U V V U 00000 U V V V U V 00 V U OOD00000 U U U U U U U U U U 00�0000000000000000 U U U U U U U U U U U U U fill U U U U rG ❑ppgg3�uFes 3333 qq3 333 qqp P30 303 [� pp3 R qq ppqqpp 333❑�3q " pp q 33 333 aq Ppa�1 3dv Q [p� 3qq 33g3m o3u q3�#333333�33u�3'❑-'33�3 pp pq Gprpp e _ o,mh 8- �n �� Nm�H�mNN m� m:aSae�g - r$ $-'ry m O- �'o G& O Y YO z z 6<=W z U Y 7--. < W Z _O OO a�p U U z U- U K O taw p U h O o F 6 ❑ H z U upog<�aa V -Oz a U �FO U JO[�f W yy� a S Y zo ❑�a< O D O= U z wOtrj4 << z S �¢¢.1 6 puFQQ"-aaJ F aM{-'0o.4w�y K .a.7 T S} .Q.7 5 4 W H W SUM.Z z �l y a .z„mUZU 44Ngb Q zJ Q F. sO4'g - UOOx 4' 70 F q4 aU F F�a.,r7 V V h4�y<y'� z oy <z JJ >a <KE" } FazU-Or� a4a o z aE' oCM>SH N H o ar" Q E.aaz W,,..JJo �7r��'//'+ O m V oyQ O~jU sQ.'y FhFy> a ugu'Mis Z z<h u o Lz zq < jOm a 0 1-13i1luugo❑ p O a h oz 0 �UU<Q a Z h 4 c=i V l <J 4 <z 'd yyy <6OPG Z V V yy pdUUUQ� M'<6E 6 V .vv,4yy�f,� Zm Z4 <op$ �wu_pv�j.� x ZZ Fa1hz' 'H"�S W °UO H c4 F F `UUpK�]C] U z-!y O V °h°°yyyW -a •^. apiUwzxp4N OFpO YHz} W 41aUG xUF<mrrrWWW���>'rW�UU°U°}w�'•° , R-o0 °F>°.i 4 m U f}i.Uiiuii oaa U a 4 .-7 OCc30 V LJ}��."�Q�y��U,F-a F=U a PWC U' �U a U..J ¢ a �v J Y� V J U N �0. 6 °�pO4<a J y IO < ❑ mZ z z z z z Y z Y z z z z z z z} z z Z z Z Y z >T z z z Y z}} z} z z z Y Z z Z Y z Y Z Y} z z Y Y Y z Z Z Z Y z >• 9_ Z z} z z <Gaa.J3a > F+U »m U �-, UOUu mm UUUUV aaa.J<4333a mmmpo»m U pw.. UUUU m �3a�3733 U�U m 3c.i mm UUUUU�W.,O a] m 33<3 m > V a33<3 V V mm 4000U m 3-�=�<3a3'"aaa333<.=�3�t.=� U mat>m pW.,000U V ti �UU V UUUFW„U �> a MOWN aa��a=9�J=aaaa� _=�47J=�q�==�� p„ 4 y 4 4 0. 0. 4 0. 0. 0. m m m m W m m m mm m m ma m m m m m m m m m w W m m W m m pJJ W WSq m CS W{ w m m{ iSg1 w$a m m m m m W gx x x x x x x x x a -' S S 44? •--• e�� P J- O C O R �y V� �• v -' ��� �• T- T O-< ' v Y v ' "' v v V v v ti- v ..- ^<q<❑<❑ mm m �� yZ° w E -' �i<❑pdw�¢q 9 �4zi m wxz=og�j�.z�4] aim �fA �m���al ❑W h ceCaG<❑ m�myZz W 4W❑1v, °}39x❑`°Wz WERE eC ❑2❑� g �2o ��mm-.m ¢❑ ¢o x�sSC 44� ❑Vf w-i?- h❑ ❑^�,q mCm W�a a a}C ��� m u°r30� h u, 59. 0000� 55. oo Qisoo �OOFF oFxo551,0 °FQNOOOF i555>;. OOOOOM 5aoA�OyS�oS F}-F-03 f-00.J f:,o o E..� 51SAD5Qo ototl. j Ft- o;g:% E:,o o03�.. 4>�Oas }S7O 3� gyyp 3�0�.�].:].�J >S s�¢�Oj �-. a O O O O 0 0 0 000 00 0000 6 HIH, HI 11 111 Hil Hill 11 111 111 o a x x Ix x x x 1+1 x x ° n q@(y{W z�q hQ�i ❑} w a <"_<da Waq a� o ty w Xa dELI"W W � z �O< w wq 2> W u1 G� W {e�q ym° z W F' J a x <5 �oa } a0 < v O °000.>WHobor<oaH�i> wmmr,! [JO wzaa��Qg]z F p> Cd o w eoJ 40H 4> »�<HaaJ � °.3 a1 dZ Q ZN173F�az<Cwz7y3$ooar3°�❑ba>z�a� h ❑RJ' b �aogH°°z O m_ Z O N xp U w aid hl�!�yo y Z aawzdw,&'sre< 8 o O �dOy a s J ��zd°p<opzdH ° u� H 0 724 0 p Ornz Q O _ 6 O a d Q Oa O W i z 7j ` X p GG4 s R§ § O z 4 a F l y 5 W F 3 7 O w a F 7-� g4'a F of > F vwi zwy p, W W{� 4z O C z�"d 5`n°F 4 Na W = q W (FUJO� W oC.7 ac HH {� Ka a W� O } a q3 z Oz Hhx O P4 W < pFa y� f C7 q F o H z E<„Q w i" Al< 0 a�'AM l N�°u S d wo5'Sa> ^'� m°Uz� > a❑ W zc?w d<m ❑-.4goz z z �ra`� I- `z°� ZRF' >°3 aq dE w °o p>�o<u Flux wu yo4, 9"d�3' �o > Q9 ¢6gj°_ a Ea7Aq�f ZZ 0> zYoyr=< m�H a < �4K 3 ao�m`�zHX wwg�„�u<`d pp h O y �Jodw z< 6 b,d�� ❑ d ❑ 3 f. SE„ �+ H06a00^q �4 C7 6 UUF �ry ❑f<-W d- 4 5a. O F"ty 3H{.gQ �a Ya462� i' .J E-Za` 3 vmipq� hµµ SS ❑ da h � �'J � a4. O v'S3o0owQ�aWNy oo�.-. yy n:gOmz F Jzz O- � u WWq -0.q chi %� W �a QQ�❑ >�?• ��m � v>rz a z° W ❑�(�d❑>w va4.O�µ�73 O ����,�aH� <Hio°� =�do az "J�Y ° W w>i�jQ woS �m O 3"6c��H,<,oui�ui� Z�.,H v F<zi> {.�z <F aN`�'d pQvi '�f4/y� a V yH0 C� �3 y � > z0 a FY Q0 `'z�drrir d U< q �z Q� c�-^w NCJJU °�-moo <F °z(uHJ uF, W � z W 60.❑ C7 W < z, P'{ QO<0 V j a <° O Oo� p �.. W Vi -1 Qya� <z W ❑^JQmSea xj-Fa- 7w•a�j vFi W dd` > W � °y� °04 ry hN Ioo �❑� °z {rp�dy .yy7 > ¢W �N H < �> Vl W 1pC. �a• Q U H <O Ia ohUag F H4�^z, ai`j C dW }c7oZci�WWw}ci 3 z�Wzf HR� npa >ov $Fyy W C h o 7u wWa uGlW?y m�J�z wain d Wwo77 °4i e ..t zC$1 ��w oq N o a �i 6m� z W0�wr iu dmd .gaoo a W a z _ w a wV 1.22 "'S�goyy000m rno -.^v� v �onmaOn v �Nn mmr�n gS 'm m'"�m.�O•rn,mrP d,$aa $$-. g od gag ooe ... 0q 0o 0q �Or �v �°, �:a cN�prn qv 4g d v d eag4v - oo -_ 1110 v04 d0 co -d v0o - 88o3 om$$$0o0$�.mSn$$$$?$$$e O 0 O oS.o o8�88g8o e�$SnSS?S$o <g� OO O h P a O N S,d S o p m O0 o S S S S S o O c ,mn S P n „ -.Ong, -.. S erp v1 V1 Nw w�y� W po y W N - H�win W w vNi }' Ny LO o W PV W vi z�N6Nn M FF F ri-!-FF F+H FF F{+F FF F W W F HFFFhk W W W W ty F W :U yJ � F F W {y F rr W w W r W W W F�F w W F w F+' W w Fi^Fr w u� r w � H ty r J F-1-:-• � �l Fr y (--F W W W r Ly w W W F F w [� W W r r w J J W W FF J.-] 2 p i S F i 5_ E .]J S J.]JJJJJ-1J 5.. 5 E f pS_' a}_'9000000>. J J-iJ�J.-1 0. 0. d d S 5 4 6 F 6&& x d d i 1 r+� E x i T O ff6LL g d i d 4 d i R d a f R f O 0,00000 V V O V V u U V 0000000 U U V V U V V U 0 00000 u V U V V U 0 000 U U U U 0 0 U V 0 00 U U 0 U U U U U U U U 0 U U 0 0 U U 0 0 U U 0 0 U U 0 0 U U 0 0° U U U Ci O O u u 8000800000 V V u u U V V u O O V U O O U U o O o U U U ❑❑❑❑❑ 3N3333333p pp❑ pp❑ pp 3 C ;N ❑ C❑❑ 0O 333d p q❑ 3i� 3n 3PGG 3COP 3^NN 3❑❑P 3❑O 3 Ca C3up N3 pp�p S S S N S V m$ a a m 6N pOpP - s z mtv� <QO,J} m F Z F �Zaa u F 0 O PE a 44 6^ Q a rj ¢¢ F S qU 0. W J U J a J x 0. d z F 0¢ V N u F a� H W J W a `-7 O q 0 F W�Zz F a U zz q 02, F W¢ u q a z _O F' a H 6 m p o v U D V H ¢ l mWynO x jC W V J (% [Ti! a W y ��-. F+ Fl yaa+ y J J< a< zy> j W.Om ¢ J a J } 7 J a q V¢ U Os. 0 Q�Q 6 -i z z O F�❑ a 6 0 P a ua T- K a o�<>o�¢oo<oaaOu X ¢ ✓"i mZavi>F < U az�aaa�waxuw r z y�+^� �a m a u❑ �aoa3�a,<=<¢ NO- a N Z? �><aaa zyUU y aaaaoau UY•�nOw t�,aoysw� F- o U rn 7_ V O 'yJ V J y x a Z m<° UOU U z!:F ¢< Uc70U�F.--IUgy z z a w �"' u<< Z Z m r Z. O Z U 4< �uu Z y O J 0. U �L Uuu X r as 6 0 wmz Z p O o l U a m u �.,; 0�. nr ❑M Z gQQ a 6 V J$ H Z 7 �+1 a 3< UZzaUu.w O J ui7 ..�oo UW aazaaz] a0u7z V ZOz u U�.. V_7,a U!_Kd'U zd v1mo U J C¢O Ua W V �w V W uq W V J J a p W 37, r W V i wy W S.. 7. OUTS rp a O❑ 3Uq-7 U mO �OyU 5 wd0 TSJ aS E>�"' a p uw0-r a00 �w aO� W -a.' /. ,�,� 2 Ou T O W G ❑� } Y J 3a �-• UQxxJ �1 ¢}HF u endF-� Y ¢ �-"vN1Y U t4y� H 6 W y,yy_•> r WW lNy <w F ¢xalT-•V q^ YUa�m H ..]U 4FG aJ 4U< J O qaJ U 7y UQUU U^ > FUF- V U} OU >w �¢ 660 6�a y�a'� V % a0� oxu ayy�..�x< a a z z T z T z z z X z z z Y z T z Z z z z z T z :4 z T T z z T z Z z z T z T z z z z z z T T T T T} z z z z z z >. z h T T 7-7 z r Z T Y Y Y T z tw- 6�6�QQ6 UFU�f FUFw,F JQ¢JJJ V UUC�[y'UUU V �W.,4UHHV, Q�=1¢4JJ�6a VUFpw.,U V UEW.. VUU V VULy�U �w., Q.-1Q_1 C.i U �w., UUUU'�U -1 V V JaJ u V �l JJ..I�Q UU�H 6 12N ¢Ja��J u VU_V U J J > m> m 7 >> a 74 m>> a M m 'yam y m m a 7 y:�=t�.a a �a m 4 a m> a a 0. m mm>> �1 6 m >> mmm } m m m m m> m > d m w d �'.JaJ.-1 m m> d 6 m y 7 d �. m> :) 0. 0. m a- d 0. m m a m m>>> a a a a pp 7 mm m 7 a m 7 m 7 ttyy g � � W � � m m aN m m 7aaN m m m a W m N � m m m W mmm W m W m � m m m m W � � jai y m NaN m m m m as W m 7 $q W w � W W CY-� � '1 E1 -4JNaJya m m m m w m f W 4` $ :J W E m m Ga W m a m 5 W W S W W F F m G m rn - m y m y �A a y vl v1 a y Vi m y VJ1 y Vl � y VI y y o4 a K a y y y VI m v. X ai �/f y 6 N x x x x x xx x xx - - - � � 'c _ z a " ^ v v " � ^ " e � � - v � � ^ e v ^ c - � - - - � ^ ..• � �• ^ J � v '< � - ^ v a ^ v �v a gg b v e ^ � � o � x z a a z Q �0a a�p } K.7a a z } O�mO w n¢ zY z zo ❑OOP 7.zzz OO aTy vi .ny >,7N Y Zai� Tggq .w 009 m a °a 0K 0000Kd d< 0 a ��>— >- >a>oo�o�o>oQ�oo oo'�000'�0000z Soot>o o?�o�000No�� J 000z ��-�H ooG -� oo❑ <r�FF�F-�J�F o 0 000 <-F ❑ F o rr-r F-F 0 rH J op a~ J o 0o J..]JF Ooo F ^�F 0 F-�F<F o a o FJ<F3FFF�Fa op o ❑oo J ti E,F.J 0 x x x xx x x x x x x O ¢3Zy zmmzm�..} ZO❑� QTF - Qqw Z Wau<0 L4, 00 T ° u (]] - .>.mV T¢ q U bro Z oz �° O z > S pFaa wm or Q x ii r<yaIn�i,`a< 0 �x5 zz2 ox 4u q>0x, a aW x zp¢ O iX,zaaS4OM mJ 0S OU5 Uo uo-bgd<u O C3x P � �O- rn a� w yot�< z oF S y> J 3y J J z an W Vq a FF H $W 6 `Q pa�� zr 00 O C>�a W y t3y �Htn L1 xur �13 z<° oUy W Fey 7 r X W '.zilF U J > m C7�a �5❑gNa W ^ONLOiFN O z O Fa tuy��^� R c7 Eo4gm yqW Ja3 f.J^ < �3vowwg V w> rK'rS W O`,S Mn u a.y'70 �IOUF=�ni z > UF'h.'x lW n760-6— sso5�x_ L w x��_ a-� f., �o y❑ O�O N U W Z W> a3T3a a 0iuraJ f u73y� F•o 7uU•¢dYZa O4��vJa-i•d4.F�y Ouo`zJ Uaarw�zp�g"' m4 ���,a i.., Zwz116ily C�aOwQ❑"L' Z,My,6 Wa>m0�a.O. v~F0.oE,iiwo>g a[7 {W5QQ$E' x�,�tw_❑yom�?.ga lµFdHW-� p� q�Q z `iz�>ZF �❑z6�H- Ou>Q »Q3axCca'z uh.WiI' UcW> U°u�FzouW}Q<a�37ll zdFa�ar¢w<¢yW 0�re���❑w ZZz �t�Hx�aa z o OO ",�FK�j U »W.� aIZ �'�a' UP F ez azdvS6!{,' > u'`Cr-a�s Fg �a-, Oa�dmzl �ZTF.,, O❑a� �zya. O>r2?FH�<q o yu>6H�s.. >oO > r�au.J6J.7 a �q .r�Fyu3<°•� mNK1^o`m" oH>mm�hj_a<94Kld... yq� FFx�y< wa6 rF<6cuF7.- >Vz cW65W q> d:] FH`u o>Fo �ZOo OQ31� na❑ -M:+ a zdyW'�q'Fwr=4Oawm�` u y> o'�,3yauywa4^�❑ of >V�wa} ui�0z Au > pza wSavoff z o z oo o >WmQ3 r o N W�o � M; 0 > Fo HwN z u g <O oJ¢NZa<a oV V a;z u 8 3 oq o> F ti mWaa m U oW mo 0 r r m F. R V o � m P o� 0- o o R ,n ^ h 4 0 m P 0 0 0 - o S N `d &$ o m m S$$ m -• a� n? S o$$$ NN m o S 0 - -+ N m o_ •n � r o P N o o o b ^ o 0 m m p 0 0 R g K d 4 444 d 4 4 d 4444 d v w i d e 4 4 4 v v 4 R d R R a a d g d e R a l q a R R R R e d Sg$So8^S SSSSSa�� S 8S a�o� SSS8SSoS8oS 800= o88SSv ��S $r2,�8,'S8oSSSmoa 9 mry �S�]i 6 11 1-- $i$o a, SNry � $ �9.o N NNN KNw V1 N t�9NwN�wilNNw�NwHN 6� N�AHHrywHNN N N VjHw ��/1Nu �Nw�.�MNwwfTlN wwNo v�lNw rf VAN wN W w�yi n �iwwplwwWwWwww FFFr-HF F k-FF HF w:�wwWwwwwwwwWwwwWwWwwww F F FH I-F=EHFtF�F FtFy {Fy {E� WF WF WE UE� WwwwWwwww u.�tsF� WHE WE Fy+�H UH�cF��Hy wwwWwww::w ,y tH�Ei-{E�taH�Ei-•F wWWwwwwwww F EF HEEHHE F % s$ uc0.�3u0uuloicoi0888ou �-1 s ..1 4 4 s s .] .-1 g 4 s 2 J J q 4 7. i J J 4 �. s E J J 44fg�. i 0 ,.1 $_ 5> 8o��od000��00o�ooOOuo�o� •-7 -� i> W JJJ 5 .-1 J 7. S J .] F. S_ � .-t 5 5 J a 5 w � ..] F S cc 2 2$ ufflg J 72$ � J F O°uuu°o x d J f 0 ODUO°u X 7� J i� u o0Oo0o980000��-o J E$�� J 0. �� Y 6 6 m i$��$�1190, .-1 0. 6 J J 4 ,-] .] A .-1 � J � a°a❑ 3s3r3Sam°38at �uNo•F�� qS,9 3;3O g❑❑ao❑a❑a❑QQQ99Qqq❑ o�dxN4 oUuE� u�Oe o� 3rzO 38 p �Rp 3°N upp❑❑3�pp3�❑3aaW: Q3� ❑uw tt3uaaQ3u ❑3o PP3zr ❑3J4 a3u o3J�Z 8uOPG a.aJ �.q'4J��s 8W} �Za �sa�¢x4 ma❑� ��0. 8W 838°SSzzwS1aA �4 BmSe°S :,°3�o3N„gw° M�° aapS: Qaw° �F❑ Uy�au a O8zo~dt O 4<m°S' qM V ax4r o`0m� p¢¢ z(�=, oOfw u V3SJ 0FQQ 8 o O O 7 l U U ` U z c`s<i � mN p �OQ uu 6Oz- Huq�o$�1,,gaaJzuiu U o�xa zoo7� z Z :Oo O p< 0z a<a�wZZ�Z zS zN� a- Z zozz aoWa } u. m -�< x ai ob<soalo��<'"u�ou¢a EUz��77 t�.] N Z o; ��uu k Z �Iyy O V z z Om-¢ <.ww- ❑ o•y�} wzz OQ N�a V V T� a a < O w O W Juu mom. Jy r[ ¢ c J ,� <N W.a y p� 4 J w z O-tA, V a n•d I`•Oa V U �..waa p00 V UwNO❑u..z,GCV 01- Oz w mHp4 Ow Z {yy Z V F.} ya V }as Oz 303t=¢Wu-�u06a O ¢ s -Y J V a. xx V V V }muu a T Oyy F �• pF.O FW U T W } } Hu.9}ce�`GNu aOaF ZoW sdQN UO SUE ¢T X}FS W W ❑ > E-<OOU W� }} F U F wt�Qa ✓�2, O,z,z.. V 30 } 3a E �0.'ty VyOy O <wa O �' }OO r}�=^z d.CHu' V 7 m <HF Hq G Fca.T 0JJpU VVVVVV l- V } 1U� J=Ji �:, ^VU ❑UUJ �O HH Y '� ...1 Oq 63u, _ 0. UO } <F_ V U nxa� GJ O .� W W JNNUOw.]..l u 4 V u U a� w U qU`y < �a ti < as J > 3 T z z T T} z z z z z z z}> z z z lw.000Iw.. ¢ a[p V a J UU a FIw.,F 6 a VrU a a V 7 UUU - V a UUHU 7 a 3< F�UV a UUUUU 3 a, V UUUUU 3 W Ci lw, FUFFNU.U.. FW,U�U UUU V fw.,F4UU%aF FUUHUUUUU < 3 3 a .. . J 3 Pip o. i a L d 0. L d 4 0. M 0. M 0. Q d 4 d d 0. 0. a 4 0. L 4 4 mfq W m po m w aN m wmw a aNNNNNNa lGmmmmw m W LL. W wW mmmwmm ,9 mm W WQ1W S_ 7 m W 5wi. a�NN�NNaGxN mm O:] mmwwmm a7 5 9 J 73a tp mm mmmmmwxim 7 N NNaaN 44 Ng0. awNwa 40.0. q4 a NN NaiYyaao!NaNN4�NNNaaN� �.4 4 0. t'Jn 4 NaN X X X X - -• _ V a v- -' n_ - e� O C Y^ V V- d^. -�I -- v e� e v O T T "' - py ^ O T z R 7. W }z �} PNzzz<yzaazyw4r>- W }}' IC W>IT ZZ}az2 {z TL+]} }w �asdaa��°-7- W zz Zz>•ZZ W Z N}Z} z zzz}Dz< z.NyaazazzozazozOz ��000aaoo�o�ooa�o�a�ooaoJ�00000aaa�ooggor�O00000 �S0 O EO�FFF.1FHFFHOHF > 0x O ~ w Q 0 0 0 a O x O F Y CLi � FFOFOFOFF��F n O> S O ExS O U^ H> x5zx O F W �X _'O k E 0 y x 0 .� Fy'jF 0 0> F�F �O q O Jo f0 0" x 0 1.., 0 . xF 50 r F .�$ 0 OF 0 5 Fpp F� x H o F-�- 00 x 50 H 05. O O O x y 0 Y a5 > o o < k E. a 0 OOFF m X >4x xX xx x xX X xxX XX X xX xx X z gg55 Opg W b < r ° szz>�i]aaoE�Q4gk�M4 N�y ww U y O UU r � }03z0 z w V m -W3 d� >y b p q a> QJK I° dos o a: W ......77a¢H¢ j a c° y} O,W1 > W 7 z �ou@ OO°o 00 7 3 N 3 uq Zw W Fw+ a ll a N Z .� 4q b w> zzbzzf O < �yy V 0 0 O O zWJ > a b k F� a i� M » o Z q a w OYOz41 t qN C 4 0 5]zz^4> aK _ 60 Om Oa Ili U 4 F 6 y�.-. 4.0 pp O•-li �O 4 �U50w pppp,,z F> vl aE 00Q S F �; U .�] UOq Oz O �°' Ydt0t��I»FxS�ZY W] zz d��> aL a Z. OO a �, 4N(d•� ZOFz'-x[aya� m F UO a.-. 6IO-ON N3z�oo 2 �� `o .a w�aLJ 0..1 g $z1.7 �y H y ...Ia Z N'� O xU❑ Q 3d N Jau > w> J3xlai E C7 taaa7 Om j z, �y •d[> Z O JOO 4 Ud-?RI /. za Z 3 3 F 5 g" aZ o SWy�q4q O3a Wo Up _R0 F3 p�i .❑.1: Zm Ed> . yz^Wu, x`G�m ��1" m K�H 7 Nub..CiiE O z O Qn -'m W t-"z }Fm7 0' O¢ 6F;, U4Z z c<G i��sjj O 4a' a z w OWm ZtWy p°L �ZoO < oo: Fw yNq,ap v V.��a �c 62z 4 a❑ 3O zb°Jys❑6N� o3 t a1f- z>9 W O x ¢F> zoNWFzkwA�K 3 x< Wu yO N x� auyy _u3 4"UOJ� F{{Km X ¢w�ZHZOrvn� a > [+� 3 z>d 00 u. F H o } VUuI¢q> �i� J ❑ J 4❑ Zo.�a G N z < .� a <❑� W J ❑ <aG o N � 7 r. ozzNMA J ¢ q o c7 ff ud�❑ <xH I'�" ^ } SNu ac ❑O�H}�u�Y}>�yyy+ mp,❑ ap'J4 o- � O°t l�z ao m p a: QC � �-' �j � d ❑'� l7 �OOOF m W N ax ❑ z ry4aF <w O µu,o Q Id• wa} V q6a o3z SG OawLLy.77� apC E° > yO 4'Ja C W S FHZ �F a m 46N j ^�U }F Q 3 Ww'N < cz UOa�y vy^vy m _ as OIK 3 W 7. Hb"' x W z vEiO ❑ F+�:,>j a W < b❑4a�. "'lz a z U ¢ zy-`�❑�zW U^'t a u.N H Q G w>'m < F>3z��ai�^u aN u!<❑w' <�t 67� L S O `+E s e[qq 0. W O. F J <d �; L[Ly�Wp. N J Uao>a6 J> SF• ap❑ SA'z O 7ysdl7dH0 d x p U W m Iw„ Gaa x W > W< V T'74 v U 6 E z x cab J> I,�O 2f., z< .-1xmQ aoLm m <<^ F W >xo �< J m F. a }q 3 q= E z G W 4 zpN O w > 4} F: 4' u¢1 p <C❑H..Oat. A uIc`�bii� m - O O f N , u p O Q W e M d 4 N E uiA m a w 0 0❑> a 'dr" UZ O r N }a❑F�x�oSN ,e W F Zau w< ww T O U zo O -..1 HzEway p n 0. a 3 >E '�..'lUw 0. ¢� > O,J ❑�-a N V.. > p N OL z O W ^^z zz ` a�06JIK F0.m °ua > 03 z 4< Fc�y ttyy a4 ¢ ww ❑Wd3� y 6 Z Eye" S N ¢ z ��yy os��q�ahu w o q..i f W Oat z❑ C7> �Oou Y{t.�� F 0.' -u < �j }NN } }x Quvl °a µF> NI 6aL m u. uQ, qU 7�.0 [yKn qw W <QO > 6 u03i V O ui0 FS zEU dd Yu� E °Ga y0a>U F+� J �p}�jN .71 CS ¢¢ m J.5 N4Q,a V $'O d HO W a< W 3 Hey Z 4 yVC ESV o9 a; E LLu.�N�ky- Q 3 J0.Euu$j]] w L> o�pp' �. nHi I� otlU 4 aCa- za�F �y�y E, iEa �w }a F F• �-+ s H y O $ F W a o-Am1N.1n �D ^�a V b b -ry 79 n � n m ._.o--- aqg; 2rwn�n�n � jai mrno P^o V N8n d d d o d d d d• v n d 2 c 4 v d 2 d4444 o . d 4444444 d d d a a i e v 4 4 4 1 4 4 4 4-� d e 888808888 ^Q 88� c N 8 ry 88 8 0 0 8 �8;�$08,8{88a�8S�����u8g8 88 $8 �oS�� d 0 0 ma`r`imno an_ o �8m8miy8 0 n _a g N Nq a ., w din y�w w NWN w—wu9 f-'A ��h Ky �y y � w v�i �iH K� yyy Nviy N" N W W W ;+.t W W W w W W W w w W W W W W W W w` w w W w W wtad W W W W w W W W W W W W W W W W W W W WIy W �d W W W W W J.] �d Wtad �7J5i$5i5ii5 SU0090o0o�oaoqU�aO�cpp�,oppopuop00000Oo0O���d0000'000088000UpoopoUoppop000°o00000uog00poo 4 0. 6 4 0. 0. g 4 Xei�S_5f 4 S_zf 5_f F55O7lii�Sz55555�"55555i 33 gg 0.aa,, 4 4 4 4 aa,, S.F 4 4 i q a� i� yf. 2S��� 0. UUU 4 55 4 4 F55$52 0. 0. 4 6 L gggg gg '�25� g 0. 333°�3 333c93a 0-F 3333333c9Ou33�°c�oo�P5p°300333u33 333333332 c°i33333°333a 3 av2gg,rvnoNn--su --sue 3''.rnro a °�_°rnwg3$�000�S:=3$n ��e°o_°o_m"o n�a$000P$ UUU u'7 U Z U .F. J �-- d z z O ;z O �-'}o Uu rr UUu� w U a a UU4i u� F= xgz pxu �Oa tnm o a < x > 6 a oa O 6 gx z gi°� ¢>. S' > Ow <UQ U FS ua' U F U F JO F z J oy5�y —e F > < a. w m u: >N .. 7 Ou.FZ 44 UFF-- ? W l7 H z O�� z'�r~iiUm q a p �3 W Fa@@ 7 KF q� 4'Uz�`6�zWM e y otti �4 aU -+- a46 gF0 o z O>'�a0 U �i U O O y u a° a�< .L Q 'J. < 400.4a4 v✓�� aH u r/�V� a4J<%a z a,�� Naa. p am `a3`>iz�arraypgay¢ aZ < 4 f tui•~w w ❑a<zUWo_o '> > z 0 U a - 3_ w w z ozg,00 U„H,p Ot''O Z L uutnu W F z �<u>o7,u U O W wuc_7 Z O > W W y g` 6 J r U z �.. Q Q Ua U u �c� 7 < O x U F za U U Q �vaKuw r zd u} m mpw�p �., Oz U a �uu"' a N 0< u O F } Y> zu� w z>i _ W U V tl u0- > V N�(.7^1 WW a O w W p ¢ iy�%Z..1V y pt` V OK " U W O r V�dE±H..]aZ H w Uv U w W L];yf!!d� ¢ z m zFU < O Lu. O W <aOOa V NV X H W „dO_xzwd g} �Q w�LLO�Na E .] O >U-O OJOFy a O �a O f D r u }da yo4 u > i�3 uu ��O" YZaaa� CJ° U .5a W Y W J ua_oZ �-. �°� tdya_a�G a� -77w-l!�; a u3uVUda}a a z U c� z o-< Q U a a < ¢� �¢ �a a F.{i�H>� y a� a u a y 5 z z z z Y}} zt� - zddz lZ z z} >. z z z} Z z z Y} z z z Z z} z Z Y} z >. >_ z z} Z:7_ Z T z Z Y Z Y z z z Z >. >_ z> z z z z Y Y z z z V F,.. ....ddad-1 Fr UFw.,1_j a-� { IW M.U.n d<J QJJ U �U V J F.W.. pw., 6Q<¢6 H HOF Fw-4W+U ¢ uUUUHF U�`�. Iw- V UUFw., U Q.-1 V JJ�<.-16 U U�U� V FW- fW.,U� Qa�6.�1- V K<a73 �UU yU V Fw_.0 F.W.. 3<JJ.-1 UUUwF ..]q3 UU�w.H WWz J66 5 > > a > > m R.1 p] > , > 1QQ4-16 > ',_1�'_']] amJ. m ' > > w0. 7 7 0. > 4 6 > 7 n 6 7 0. 0. j 6 > 0. > > 6�. a > �' 4 m > 6 7 > 6 0. 4 > ? 4 > 0- � > 2 m 2 > ' m > > m m y m m •n y W g a46 '�' �U7:=t P�.NyyylyL m m w m 5 �--11S. m m to m m` m d�y m m yy m m m E� m` y4y gl m v� m ydy W m i» m m yy •' N 0. y m y yNp�N W m g 7 r �ti m m 5 Jaayg7 m m rn W m£ iLy W m 0777 r/1 m m Vl VI W m 5 N0�4 w 5¢ : il m m m t/i m g VI6 w m m m m X X X X X v V y> V 4" •~-• < '- u pV Z 2 ZTwl-"IM_ o p a o Z}.},t }� YK O p 0 0 0> a W w W T a Z} Z} z 0 w ZY�i..adaz�azaazz°°-PazdNy=V]lzazzazaaz¢z�ao<a<azadzaza>K O 0 0 0 v O 0 0 0 >Q O V 0 0 O O � F s a s a 0 0 a ur O ??�z>°0000��o�y�ySot�WSo�z>dooZ°Or°oZ�>o»>�r>°_»zp>=CFl�VW>oH��oa��oo O F F F r F H H w F O~ -' H r H H H H H F H H H H O O O O O 0 0 O O S O O O O O 0 0 0 0 O 000. O y' x+ 0 •l O n X X X X X x X X X X X X X X X X W U z m a Q m O W > W ail Z,> to JCHi W O IW- a -,U O V Z p k W r � V }< 6.� p r Z } J _> }} F Z(jU a ,; W O ZZ o°Se Q< Uy CW� m �E' K Ltd O W 'Z O �a UZ Wµd z a0 S a W O O w4 °_� 7 y U G1 Z a J°�.la w O N W .rL./yj� W dp0 W IT- I! J F+ Oin > �Ci °zF J Z O Z a>, 4 O ryZ�.y. H U p 4'>i' .-:_O�.OJZ zUz a¢ x' F a mm 4' �U z Q F ZUZ4 S OOywzH>�06 Zay0� a V n �Ox zz,, 6 >[�AS as UO �O a x Z 3 6 Z(-� z7 W wz H c.Ux 's V V w> 5> 0. _y' 4'a 6 6 H° _ ° S W z4 ° z yWz U y >> 00 Q OOW Og mw0o�vai uo VO°" OFF 3�� ¢=F V<,Om m� iw-a ..lo" 3Frati o aS yg t' d nt, JIa O vt0 W > `< ! O > d = �' O - gw 7 7 w 4 V> l7 yea z �y J Q-,<4 g > }a Oy D0 p>M O �Wro U.g 1=�> wym�z°Yd>y..d T d _°J F'g � S�n4 R� r5 z 'd�r>�g aaa p y, 6 a 6 0'N aJ a f oimza z4�y duud o R EsN�yd � V w °Oww !2g-r udUKyw--z JY! <..a 7 �EuFp r-+up� - JO W > _6 `K Lt7p, U H tl 7F' K <uF 4x U a V l5 ,y� a^a O� a W oG W r Wd r Fx> 1 xmv'4 V Ga O• O° 5 ¢ Y O iu1 d>�w>d�j p W g O rS 9 Ot�w VOeCuZ i z O8I• **��++°5<r�p a w>' 0:+7 SAS. �C y O �r wJ7u�0�` m >O m< J > e°tn 0.'s 7 u Hn,g4 W F7 z O u ° j m j 'da 3 o�1 J W �,,`< '''vpi"vij-•'^a.CzOzEQ 'd7> w=y < � S7 ma� V Qt <<tn'y a[ O<34�...7y } y a,�i,{ �L°CatNtl w ° r ti.Zw r'9,nuu5 Sx v_ussu7a <y !.UY {cy O> 1 ba uw{''drQda°y�, '^ • '+Q 777 V u <� �L�S�tna�0b3ti` ww 7 '�O y" pmyld 7 pps++yy l-z }�{y t rtr-tn> 3rd' a y"i <u OSac�< O w ,�,d �ig70�7as�q .0 L pp du.d ya , '27. 6� i" b!yCq �yx W Y. OUO«pw� yy Nb�st`r>W g� W'^a�U7`�x[ �> �r yy lalQ }60��- F.. 33 s� r mF' 'zu V� to 0- •H uai C W W KKK nq w mzF��U t-ny x �o _E�y �z S tun am�W� o <� > Upj � , tnU,;z w Gw c� NOa U uJ > Hm<O `4 °7Yi tt. < r, LLs '�<<r �W �.j�0 r 4... a < u N s�43> O��-'+u a� p ad <At 3 u<f 5 F » a 5s amz ur�� QC8 Ei -ul 6d4OO F5y wO O Cf d t0 a o- N d rvrvo v N ogg000 O O N^ q= O N O Oq ^ O O a N o c?g N oq N o O N O O O ry c c�v oqo N N NQ o� ry ry NQ N o f� o N 0 N N oq o v d d a< d -+ v c d d� d d v o 44444 d 44 a v v d 4 d i 444444414444444 d 4 .T d d .: z h; - O^$ $_`�Poc$$�S j v S $M8Soo$ h Q o o l m SSv n Y$oSSSoS$pncoSB y, n d 0 O Me ~$ SSo$$Va> Q f r =<^on_n�aFa q �' m 7� n^ ^ m P"�gpao3'e$ p •-• l` N c nN a� N �� C^ �NNwNNvIKnNP� C�p NmNN� � N�1 p! Nzrvl„�NNNKy^Nt'ni,w N ,mn N P e -_- rrvI sV1 � V��N NNN viNNN -�N �N:miiN VNi NH VI�NN$ N W W w W w w W W W w W W W W W ( W WwW W W W W W w W W W w W w w F WHHwW W W W W W w W WI �55557tS hJ4 �.i5�2" 0.e�gg �S%555,'.Ef��400000000 u u U U u V D u V U V OOUa000 U U uuVV 000 V uV 00 V U U u o006 V Vp V V 0000 U U U U V 0008 VuuU U 0 00000 U U U U CJ 800088000000$00¢ U u U U U u U u U u U U V O '.+ u Onogo°oq} 3333o�3oa3�u��c��333333333 O000c o o q pppq °OWq p °qqO°33�i°PO3 33333 3 3 p qM 333u9uo aOsB°unucoi8�c�c°�Qcoi�is8c�c°i°uc�c°i°ucgip o o0 o u 3 - a -ama^'eaM8rn roe ;y..a�m�$v,-„o•,�M,nn�n��nn�nn�i=n�.nnni�nr �'i"�n���am S U a F -,�6< 6... U U _ Z''- pO C- H U NFu U u LTt OF zJ.3 Y- H O �"w� aa - 4� Z u b O F F7 -1 -10 �,�j `'F O F -'��" Q i-F2 -�00000900 ¢¢¢ Utz Z a<t UU Z.Zx z:CZzZzz as U OOD Y. -pp «a¢6a6a UUU Z % 00000OUOOCO c7U % z, z:zl. t7 o0Uc: X «a6< z z" UtJ. %'-% U O UJ b6 w z m0 zy zz�' 00 u¢¢ C � z�i$a 644 �,-^yp O W z � W z O'�� �• ��'' a >� a oz -moo � 4x yF' l,,f,•umz ¢ k't-z u w d_ ul�7F^3. nx. N 44 « a- < %r.S55i ¢«1 d SS�iXi1T5 a<a< ¢<tc N F N K Z,Za O a2YZ¢¢b�Hi.�gOa ifwm W D a 4 NZ <d K l..,Q OZz7.p`^ NN <f✓K [[yyx 70.-� ¢,nw F a JE,� 40=� C s,:.� OJJON7�- a F V66¢. vv��tvl��a z^4'z05FZ� D� > ¢� F 6 ;V >. � W ¢q ti U uUU {�, OU5' +UUU V Jaa?' �iu Uu UU[iU :7 :77:]Sd UUUUUUUuuUUU UUU 'I; U �' UUU V>a w 7a 3aauz2�oDu w aa¢w U J u aQ. auo<< wyVUUu F•pxLH ���4 70. ¢ Rio c%�Siac�5 �'" o W,7 z`OO'� OCww�•��'u an4` �a4 c�45xxxxxxxsSxxxxxxxx a Oo Oo VU O V O000000 VUU Uuuu 00 U li V:J oOoo xxxx uuu. �u z w �jOOFw„.H.. LLa w a f/3 N waw p q O^wlY„�� } may- z N a W 4 wp4Z Or04' LLO�y } 4' Y o r-YH 000C� x U wy v_ oOxZ. ? w y. ¢ W W y.UU 7. z �KKnL4'0.'aK�CKK z6 az L< Z@za az Qz x"!t.' <x z¢az z'!(. 4'�KKs z¢z z 7-z zzx Hy w V (� < } .Z li 3 Fri V V O U O�� Y 6 F cia ~<6 OU �• Cl -� H Q D 7. U V " O �j j - v <0O <F 0 LL LL w yo•oYo000 W w W W noo0006 LL W W W W W LL W pooyyod y w W¢ as O a V C !! UQ F FF FlY -FFF 4� FFFFa Fr-- MUG c7UUVu u au f uu VuCiu }}Yz}}%7zZYZZY`/_7.%%z}}r%i}YY}}}%}2Zz}}rYTz>2}'LZ}YrzZZ U V JJJ m U v mmm U UUFW.. J m > H UU > mm>mmID> F J<JJ�< U u-�U �6� m F U m> U �UF < UUU a.i�J3.a IDmm UU fw.,000U[�UUF mmm m V mm U U UUFW.. m NU > U m UU [L[OF1 U U�u m� U_U mID V U U U4UU 'Smmmma V UUU:iU mmmm�> V Uu_ Utw.,U C.1 G6 S 6. d a0.dd6G666L 40.Ld L C=.L d a 1 S d 1 2R db 4>CJ.4 44a4 m 4~' NNH mm,�smmmm W W Zvi N NN'w�m �Ng��?m�5S�FS w 6 N .w mG�.66Nb666 ��yy .tl w w ww ikiIDmmm7i53.�gimim pa.6SN W �=/1 ,Jn v14d Wwwww Y42�aN W W Y.mm�Ei�SES. N2��6 W W 0�.4666G W WwWwwwwW .6�.')iSi�S 0. 0.0.4a46Ca.0.4 W wW W W WwW ��Fi W W i wWw g�gmm p�.40.1NN� W .moo»+ e� w"Wy �oO hzpaza�-"<zd=a%xd�a`dza<¢� YW Yw z w zYr7 .L ww- rzzz i z �asz¢zaOS¢`aO,�N�sx YzrzW z w 333 W wy3w�w Jmac�aI <= a 0o.Ui .}-i�ov�oo.0.ta 4^,o oaoa0o0 OOa0aza���ao�a0�oo�400 zgzzPoo00pcjf%%x'7n.zzao�o a�j [ a a a a a[«« a« a a N w �557:50 000>HFoo l'f'�O`�F° wp5 -' Z�<»o�yw ggg •OCF'a�H g¢5 » < o�ast->o><oNSi<n�°O>Zo?>Z��qq�S>S>s>Z %< 3 ~JOO�OF gs <SSxS S3SS�ggS gg<_agg >]]>>>a>aZ>Z- aagag<¢<g »-»>2o> dOOOf'-0 a Ox OOFO~iOH0 00� 000�0~0000 0000000000000000 M Xx X x x XX x xxxxxxxx xxxxxxxxxxxxxxxxx W v� d < Z Z-LZZZz <6gqt6<< UUC?U zZ Q66<t U zzzzz%zM7.%' e6<6«<¢¢t UUU 777 H -.> JUV >00OU z W ¢ bb fdUO y w Wg N Hr��Wz+51�j azlUKw,2�. a OUa' WH �„ _ OJF"OW y6jgz�z ° zw aU W W� ¢ 6a W m4U < ?' W�%�UU �j ~h� uaf< J 1< flu OOOo0000000000 Q¢C6Q<asaaae<SFda V Uu 11-000- V V UuU �J u G$a¢< cJ V uu 000 ¢Q U �ODq u �_ H a FO N 6 Q Jx,n �O Fpza •] E•z �L O V a LKF 6p Z->> V x7H l"'a J3 5_H0.7 O d+x a�WZ O F J [ � _a_p x V a < �">' y� NS O a> as 77 V u OJ UUUUUuUu JD On D a05] V U V u:]7»50,',,,]7��77:D Uu V uuuuUUUUU< u<> 4 ¢ w hip N V o �w a wz0¢p� N p� opuSJoa- �.] 4' o u w� <. .3U-000000000000000x0000000z0S000 �p<, a U� 7 H NJ '�1 x J yUx,-l4 U1 > J UU 7a z4 V U zQ2 V UU Z(`Z Lxiu CxJUUUUUUUU 747 a7 ,'Q{`L<x(,<y Qz <z V�JUUUu z.<[ Q tY aCtL4'4'4^0.'0.' 4� KO(OG OL 4� Qz 4'0.'�CG Kd�OG o uzl w>p > ada W N W J � Z QyF tWt ~S 4 w OF; z O V u Ii G¢ da o 2 p q ".� ,�-, F., E S H 7a. y Z pvy. j z }�-Q V pp� 7NOa O > O^ >d'w dw F W x Z m iS 'n u" O LL W S Uw w�u r �_ F U p� Z{SJz 3 ¢. Rf m2ZW} F 0>0� 44 WZ1�5 WOu�O>pa Hg44 �wO v'zx UyU73Cx v,b~Fm���4pS> y �K' y u7 KZ 6 O u%w� OF3 04 C U U4l fr at^ eSZa �H�"Iffi 06< aZp��U> +lzia;y XQ i� y�Nh W Uj>> U 0 V �. ¢OW ¢o> ._. a I60omOmV `1:2 O Q¢U �Zu�IC z.W° 51<-, �H., SZFS�m H C w uuh x W W <y >pF Wyyy O HF4OZ'/. 6ra U4{., m� WUU¢d^�C >-aaOww-ll..��Zz J>O U6 U> d yWy ° ¢ W W `-ZUUZgN�}yJ1� �`.j4N O a W 3mJ 4m CCa^z WW HF., U ¢ ZW QQ6s'J] x} W i i-= 3" �ndY O w�z0U NN �m U> p= 0 z m wN F K fi JU d W 1-,.7 46 °{ a< rai>�iSH�! F �j' `���Cjj,, �¢ xwF �cd� �l Ti. [Qy Ha4 F W b ❑ F W ¢ F�; J N J -00> U O U_ W �{{{---... m JF• 6 ,�,�,,""<}KU O^ FM ZW �N W... �-- Fa v�,yz��Hp Z 0.'U O 4. m q�IDU <ry M-1c. < Z�; ¢x °N°'H 4'4' u JV Lr Ww LLI w v�Z6 �. bm r'71 Z � mS> V <QZ 6 Ox <u [ $' Od > a L W > z F z< ...7 a W W_ W F.,3'�A I�i ,�j m V oC�> < W < a �`-' V `Z F <m ' 1,.,� 0.'�}4dy0� u a a e L <F �< f ¢LL G^q'fywlja F z _ ^7yF-..., N> r W'7y 50mW?w 0GW ZW m{tl��Srjm} � 0. cz.l aN F�w�Fx.,�2�� m �y<<U!] 66 PLHYF¢ Q> w < J fail W °tlID c6 aSw W u q Z$-!�3 <A- w.:i g OC>,06 ,n �17¢ "� ILz W4aYpx q.-1 ..1 FCK Q 3IDuuw p,' l��oaz 7 W , a �l }LL191A 3-ww W �hOP s-xnp �y N w < l..mLLu o 3 p "• z F u., z g< dza'f<i> O ¢ O o afa'h�N�<O e J z z ��i�aawui Hd0. zz ,cc > of H f" u �a-J._. u O faµ x SFadu u wow fi �IDaN.7 W,nZgm u: of 0w x Wa °a�2aa�w < o- HOr`n Ow" V d' a p �' µl' ..]> a <FS_ ti a a U 4'_. <`_ U N O J t- z 4 m fr LL LL w -A e U ' as U N� }Fo za°a > o �¢" �7u wu N q aQ u x55¢�LL 000 a ��< 4° 3 �ooa FUFu� 2y u taa a4?�m my�u u��O J� o �� dA ID < r wS o°N Tx oO b q H a u fr u �Vw au�i maa� ufk U a N O m ry e s i4ggijj egpe;y P P S cc?? o S e yyO 1111 ry m e N D q q q q,qc} n m P_ O a r V qqN N m e V n^ 4 M1^ e 4 m P 9- •N„ n O, n b !+ K o pp W N a a N e '*d g d i ov d vQi vvo h v d iv v v -! i 3 a v d d .t c e 4 4 P d e< a v a R? 9 o q^ 4 o d oS�gg8S,S S800.81 .1 $a .11 SooSQSB��S 88�SoSyB�$Qoo,o$8S;oo_8$8;5�=gog g�gSB o w W HH W ii4��..i W F W WHWFiai W Wty F{[-�.FF-F W W�� W W�i cFcyy F J W W W W w F`•F-F Fy+F E t-• FF-h F� .e F F573Fi��� J ..7 J J J J J J J J J J J 4 £� .-t J 0. �� J 0. J 4 � ��. i5_�F J 0. J 0. F����� J J 6 0. J J 6 0. J 0. JJJ J 6 0. ISM J J 0. 0. 6 6 ! 4 6 fgn}'.$ 1z J J 0. SiiSi �'FrSS_ zcoo OO�a0�000 uu uu uUuuuuuuuuuuuuuUuuuuuUu OOOOOOOOOOOOOOOQO o0000 uuuuv Ob vu o00 vuu Os u uuuu 000 00000 vuuUuu 0000. Uuu UUV 000 U u�uuuuu U u ❑I�N1 3 gW �ppOVp�u°❑ppQ u �RR p �a❑0❑pO �RnoRpp PRuO R3pB❑pW °M❑❑uu °Q N - cNO� rY8d v�i t� v��r o NN$H m bah 1.1: 0�. m rn ppQs �pR Or"f. Pi�nm�P���r pp�❑ hT M1a b�innm.�..P g9q3p P~ v�i F h J z F. U ZZ Z0 m <O ONO yq z O U 7 YY K <u 4�zU LmO x 0 t4 {{--. °tea av0l!--xT u �� Z H!^ J a Q¢ _: u rL rw Uea�..,F � Ut Uae U E. ,Z JO d a"'ilU % uxu � 2`!" H 4 E' mU %�""' O (� Y S z V `�OinOZ <FQv: N I-• uuJJz U 7F 4 d yiV W N Z r Oz zS OG 4 V1NH.] !_y�•°]ta-OQZpy$ < o:�V 6 F z m CyW G>}O}.. V 617 F b'�d <v� W. pp F-aFw x7F d a zz pp; v �L C7 O"-z0 �{.. uwi ,{rn 7 w �.Zo00a Q �I } �..,q 4 ! O< yUi LuZFOx UF. w�.yOu~ %7-�< y ''jz W -�- n• •36am h r = X' Q U U_!"Oab'T a ZmW V b'Op T_a. UX V-� w a� W W a.6u p'V :... �y K c�ZUoi�rJ'-L, 66 LO V c[ay,UGOUZ�•O V O K� W V xwUO<U z u6 7 V rC w_m b wO"• �y uJ, U u aZ-U O xiO4yy� °�j < wOza <<<❑O UUZ U�,my J lOupu: a .tea• Q �'•<F 7�� K uJ e�i�VJO<w.t 5i�= O W G }i.-.• �-p J }FF.O J �uz�y+ 05 Y }}FwS C-Own z ]C>.uwi�-�Oia� W O h FS %• O m J W J w F. u}a_�.., 2O W w99 >�i. 5 d } V4<LL�F .[� dJOZ74..�� W T. OU } O U Fee W3>i-• r U 0 r w ' O W❑ �OO��yyCOu W O T w 0 W a7 ZZ Z Ow ¢<O J�i y Uu rO U 3 y. K W Q W J `� Q J �._,U }UJ}UJ a U ..0.�.' } } rJ W F„ JJO7U JJ at^Y N U W'y y J O U U04 ..--11 U V ZW O y a< O N U U U 6 ¢��' X s 4 Q j V 6< u 6 u `t Q �J N SLa .. YZ z z z z Z. T, z }z. z z %% •L Y z}>- zzzz } }Z%TzY2ZY%zz zzY zY z}r%T T Z}zr-l.Tr U UU.� QJ..IJJJ.-1 V U UU WWmmZ Si �w.. a UtW..Uu .�6J���..:a m>m U Wm�aZ V Ci 4F000 6Q » .J fsmmmmm>mmZmmp�m� p U S J..1 US :U ��iEJ {w..0 V �-� <JJJJJJa.-1 V Y L)Ruu mpJsm>�mm>mm j'`., Q UUVU w-. ' 6�� LJS <�� >mm�»gym U - ��W-.0 66 V 3 m�mm��>mm>mm�m UU �N'., -� a <�3Q.:: M V �w.,U V a�7 U V V m �'>mm S 77 :] 75:]' 4� 37 7 a:J � 7 7 70 0. 6 6 6� 7 `J 67 mmmSm�m 707� g �Sl.��mmp�mmmmmm s��ommmsmm��mmmmmm`>'`mm� O 77 N h 077 � mmmmm��m a 7 K m�mmm �4 7 7 76 C ow N N y y P. y N P 4 y� V J 6 N� y y 6 N P 6 6 v-- T 7 4 v O a �' j- V- O O 9 l - z O- O c h e 0 0 j 4 T- V Y- Y •� r zrs• } %Yz z r}z'l.rrr Y} }�, '/.YT Z } } T rYr zzYY'LYr 'L r Y%TTrr rrzzY}zyzY%YZ �Y0.'�._, Z a Oh ��i7'�eTe e}e �r3n Q �K�Q F Q K?FK v�iCK 6 a N z E< OF... <¢¢¢< vY'f v3i tail ran v3i Jb�aF m';r n iAA Z<¢ A0.'OCN�PCN3n3.fNKr3nwhv3i�yb'Kmv3i Q 6 < 6 a a 6!< 4 d Q Z<<< Q< 4- n!'J a< ay3i Q 4 eG r3n � w � U a _1 C.Fpj F H Za JO a5S G-5 5 O iaaEOOF,aKK�0 zz zzz 2 / J� t �.9 �°7^ z y< > CO O o Qa. oJ X Q%<OO ee n m m % -IX X X X X X X X X X X 1-1 Ix X 11-1 Y, X X X X ta r F F u S > U �¢ aJx W J4 < zyi Oh .•iz�Q ¢ C7 OF 5tyyn W �.. %a d Q w ~ C' W ❑ �yYJJ VvWWI1 J Jm0.aa 6 0Xt I<uy 6 zK iti 9<"'� z O Q S_ a O a> W <O ;� ZN W (� 7� �0.w aY T.F❑y <W y. .11a Y Jy' W Yr W F H< tnW- rL% a iit,iy M., u�oya�>6Ve[xx aJ°'iu$ WR�?'O x �0 W 7 p �67wPLF�� 0.'� VOF,aZz Z JW > W OzhlF7�a�10 0a <>z - upufz 3yR --{{h>yWZ!° i m orn�0 Opp x cx, 7❑< Zz``,_.Ixw�ii u1 Oz` > w m<f O > �?CCJ C'y`�aV aU pp.�<u�jyp K/Sn.OaG�t7� y dOJ i..0,� '�Ja jy y+JO.Jv¢i u6U wOgOzo h W �i�`'OR a "1.rb..7T�m u-7m 6rn<OQ s. W o ay' o Y U a < a k' t/i3N i... 6 °. ;}�j �" b� x (� F [7 O N h 6 t Y / z w?z W �- _W- to u �y` ly-- N4 �yni C u QQ Ur °> z •F �h < N FO i..J" W ^ Ago < t^60 h C W piz m Z % QO O Z�> U ooi,..yt->s�ffi h0O with U Z 4 .E' a a bona y 4at-�F-y,� N J:46 va� p LC F z <f<•, �ON[J- h<O X'i: �h'p/Q FO adF " 5 o.. O.�� '•'yy�� � i��i C �Na�O mx. >x U�y(�p.N- y V L W CLL�� EEE000 w N h T. L f am�� C 30.% �O o/`tl'1 3• LU6W br .OL i9"' I.i 0.."1 < a� .� R W % p[ 1� /. W W i,,, 2: w41 > LY ^ t i a JS F N h _ > Zoo % O} +a�zw G7^-yU� 7 -1.1 ♦ <% U F z 5� <,Gh.I awl_ C d• z• L v,,7y> j~ss C 4l[yl0 z0.'b-6 p� e N _ t d U UW `�>O b .�y nnn µi C-• <OaR^ oy�ja'L d {lpyyiCy�• z Ein y� « N� !-� 1�-•y 3<❑y ..i U�".' LS, ii�� L._ s, z- i bR h '... K� ii�tii '' x.isC o ¢ °�Ty'' F- V �T,7 j'C7C apZt < %.r �r VVVJJJ < K<J y3_ vi J U zpC a��' <pt°• N° TOb et % <�6-❑5N• t,. J'• 2L <x Nt- 1-C 5 F-7 N< h3x of -o�JO yrn OL^ �a<uWii- On K ❑ %{2Y< _. iL- %x� d < �j �j iil Y h ir�'iK %m R un Uw J <% 6 .f❑ 7 N .r< U O s hozz"6�4�0 L600 � W 0z O Jp a O Fhb iyii < ttyyEJ O�G •mh :.0 > yi.., W QQ> >tw> <0o aiOhO� pi"'p S<m 4R W > �J / hUh->p rnp �< L o�C �i ti <OJ pp g U % 4 h o wp•._ 0y�OCg<m-wZ�R- W / aY Q h w W 4�>a.p.(.� RE ee Uh{g�N < ��t.b<j/j0. i:l--L �-• F�j O<Ou7�•- W< >' uN ui a_U a �u T�W..i hq >< ��F S y�}}�yypa=�a• wh w-� PIMA, h_ 3 7aa w B $a W<n b,bw <hr+05mo��j �p<pP_R O O�Z F'"j i�t .<�< �V w}Ct oyf� > <OKO F O St K x Wm %60 z ^,� O o� n ee0>F < w q ° WU� MOM ° .�c °• NVF `U �5 r z < �x E❑ �zo<�< ier��yi ??GiG�^o° �I � vc�dvva.eed1�e�ede p°m"'�q oo7c"�'oc ao�o�ooc vno moVo,rorrhmm V'�� mnoo ��e aog-'nnntg-D2-ts..m�r.qe' nna'mv roo z>mv<me°4vOb�m4m�a4�o4. m�ae oo amQcdaoav o�3 �$$3dddS-.itc$<^�$d S S-FoS.i -11-11 ccr �c w-e 88ppgp e � •nS g4888g�8g88g88^��8�8888 om-� =P 00 i��p� �gSo88$$ 8=-0 8Td gQBg�OeCp8,88ge8ggl8V�88�S88g� O0a8888� �^G 5y� Y jf whNiN��m O �� CSOn m--..hm pvmi O �OpOM1m N rha� dWq' �vPib m N $ �c� �hryN� M„ 'O V n h A4� q ` CAM �. .Q O��w n TC_< p rYi~'^NO N H�iH �w �,' N�nw NN N�bf NpvmiN N �^NN ^yd»NNN f%wwNn NigNN N N�ui r 74 W W F FFF u1 W W W 41 Y1 W H � W w FHHF W W W W W w FF-F- w W w w I- W w �- yy{� W HFH w W W w w W HF ,iI ��� fy��j J y .�4 •, w i W w t� (4-! J W yy yJ W ' w W S S.F i5$ 4 0. SSE33=533 4 6 b 4 4 6 4 i 3YF f5 3 6 4 7i21 43 35F 6 4 0. F.SF 4 S SS SSSSES_33 3'i�5n'ii.fi 0 u V 000000u00000poou U U V U V u U U U V U V u U oocoouuouoca9 U u u U U V u U U 0 ouoo U U U 00 V U u ou00000 MR U U U V u U 0 u u U 0 U ofi V U U od00000 U u U U U U U U 00000 U u V u u U 4 °pq❑ 33u3u�33CC3�pp3Nu�33_3Qu3uup�iC3COuO333pu333u33��333u3�u3a3ap3p�333'-'333333333a333333 ppA ❑❑A gpgqo°❑c❑ p ❑pppApp❑❑❑❑A ppgq00❑ ❑❑}p q A[]O❑oAppppAA°pp}pAp ❑° ppppq❑ 3333 _^��� gvOi ^n :pOP R�n��b V N$m V 0^ rnA P P P PRRe$O8P _•n�o°'n❑ O�n Orn ryry�Ov n O �RO� OO zF ° O 3 f Od�^b < F't7u �< �a O�� I❑¢u w.F: ar,4 U ¢ << T 4 Q �i oyy uu'7Nw F,0❑000 `�^ [ uH -� /F ¢T i U c.�u0-_ z o a r... V zu 1.. U < dui a cw. ¢KXU'n p r.., u u ,F4m H z o�FC xr=z uu .. U 00 Cr y C� �U �yd F< ub 7 �u ppZ o z"tt w w t�i, u.T ¢ F �Z V u3�'+iL < u •r. O u�. z00 m3 3 L E- u�^xi r FS�`.�u1N faWO yak >azzNz6�d� H0_ N 45 z Z.. 2a�SJ �• ¢ V -) �d a4a 2H <-Z6¢J Q �. a�HUO �OCN4 QO N(Y� F {y-.�-•y� KO K uz Lxd<� ¢b, 2 < U60z<�U❑ ' uiH ua0 tJ �zv < w6i ,J w ,~i, oz�CO u! "- wum36A�z5 ° � a xz 6 a,.0 wSpp a"t () J s m° zo a uoeuo7 u wa<aFui< ¢¢ m 7 Z O ¢V u=...u-+`�`�w p°> ww.` Z �j G z Q Qiu a O F• �. 7 O- O u Z6 ou� u z A O° T4 a U a muz w¢-Ow�Oy x L q auH ul-i zz04o J 7.. Fu p, f_ u ee �Wx ¢ W "C7Jd! U u� m z J 000 O <wNW7X¢HS�u ! J¢. r- L4F,KAOp a J a 7 -�, Z z OUO u-xu }ON} HU H�F`.L >' °w3�°�xw-.A1a0004E 7 �-Ta S�'"h }>• HaroF� �`` u i Z J Hwo O }O °yyjj�TwuTyf-�'n4 F-C�•�' H .�>� m ° F p Ow O r >,-07- OZ OOU^❑ w O� ,Z} CpvW� qx0 °AL� z0 < V U W < ¢ V MUUM V 0uh yjN2 FF- U .. V FLU 4 oZ V'" �° FOCF .4t u6 5 �! 4' ¢Jv~iFu �' G W U�`•a U p� K} K�SO• w (r f{� U 1a' 7p� 7U }a4C-' F44N07i� IK pj 4 G LK UUw xOu < a d m a y0 AJ s w J S >x x u �Jl- wJ_ c-jw u u xa >•zz}zrzT zzz}zrzz}zzzrzzYYrzzzzzzz-r.zT}z}zrzziz-z}zz>-IxzrzrW.zrz}Yz7Tzzz}zz}}} U u m w F V > U U mmm U u .-1 •� < > u :% -a.-.¢J`.�J- ms> ;n �- .V U U V U m� I.i U 3 m> w f, u <�d w w F F.. ¢.:a >>m V U� G w F U 6J� »mm» V� r V «aa W w F > U G J J mmm U <� >m>m> W f.. l• a W f.. a <_10a V U U a m» w F V a.aa w F > U U m V [.) x» w �.. a a Gi (_i :J ..] U V min w V �.. U mmxmmmm U U U U U u a�a�J�J2 0.y d4 4 d '0.a,E 46 6 6oaa0n0�aaaadda 40. 666 aa7 a�a�ad� iaa a�= �aaa'a�� �aa�a�._•Jaa' 44 b 4 dd4 �-4 �' 60. 6 66 4 0. 4 4 66440.. S 6 mmyW Spp773 W mmm3m] w W w m3 pa m m mm J J W W 3S_m W :� mmmmm� 50:]00 N W w CSSC.. Sao W m W mmmmmm3mm W W W W mgm m�3mm�}ammmmm=g w w U _]0:7 N t/f a N N N Cd N N N W t 6 4 o � � O O - d � O v T f - - - v - f •� V V � t v O V .f "' '� ? P v V i � " 4 d - V Y y Y - •1 R O V O K � •_• •~.• V � � -1 � O ^ � -• n - •• � O � O � Y '-• Y} Z },ZZrZ < 6 < ¢ Z}YZ} d Q Z <d ¢ }}}}T < < ¢ zZ }Y 4 z << }Z}}1111 a < r < zzwwLZY}}Y ¢ qH6 zz>.,>-lT ¢ Z < zZ ¢ ¢ Z'l:}Z}T"l.Zr} ¢ ¢ < < >-io}e���zw�.3i�a�mQ ¢ Q a ,l }zz Z Y};!'LYZZ�+Y}'r' Q¢ar [ r< z0 a,3„3,3nwoo 3o�cHN.3n�aacw a�3co}c?�3.,7'Or��r.��a�3na Y X ¢ O X nOOd<JO<800NOOf�60$p°oJ$FO�17-gOO« i 0 a0 0 6 S OO K J 6 ❑ '� ¢ zMzoo ❑ gO � 5:5a a¢ A J `� Q ¢ ZZ i 0 0 z a¢Oa¢CC � za aaOa ^$ Q z¢ Ou� ^ a Q zz vK� 3 0 0<¢� ter~--p::njc=p p z p r5�• q ^ ¢,w„�aq<'o z m:5 < 4 c z?:r¢ z0 3n O" 5_ ¢ O0 p 0o� O$ p g¢�o6pO;d��a::=i lz X X X X X X X X X X X X X X X u��z5y_ zO w�3C O Jaox�WZ wtn -i J 0 N Z O J d0,9K 0w w.,OGOwwW �z >O o� U Otx0J h OuVfd 6 Jum.T¢J, xu o3H_ u° wO aa a�xA .- U �> LZ zN ��� � w 20 j� u q GHz¢ u Jsu 3u a om44V °u au> vJpW[ °u oA¢x5 5ZZ]¢ OJ z $< z u F 6 NX�YUZ Zi u� W u`f-.. F J W mNC/ 5 W r, t�L mLL� (?Z> �7 W �26, W zF ewe �"' o'' p. a 6 mC z ¢ j• VTE < J tom, J° e•- ~ 7 w t°'� "�' ZCN Ci Nooz }Y yy,, 1- u°�(K06 >~ �• < p N> 'Z 2.� ❑N V Z �2 U N 8 ��' 1 �< y �i Z O < A t>3 w Q F z (� a: Z O5 u H w 7>U4> 00 u m< < 4O V y¢ '" wqO.r z w w .,� ��..yy >.lZc 0.'OO u < XN= YO FZ 'N W y.OF �0. >x a> HOp�OJz {{....Z xkl OAwN 3z QQZ Ji. O HFr{mxp ¢>y 'a ¢�� UAL-• W �F% U W f4. i5z O "<L w> U _ µµ,,. u. H z O i:ZrF <5 4' �`-'W(y<u z L2LU- �E<S U dqq' t'r a CNOH6u mH- aN V� s>. $° W L OOd Z•-� yiK wm "H9 6 U`.a' m Gq .0 gqJ;a!j -mi ty 0.'�n '2'�y Q N AY.r 1�< Jm _.�C W 4 �q OUV W 4. aQ 4• a t-K U~' < A «7 W >Q <b' ZL° W d �Qd �yj A>ywQ'q Fq z03 m in �dQ4 ZN�3' <>�'❑d'p�w� � 7CN7 � oNP}sFU�4 Sd<a y mF�n� <4zu u Hi,,,"}i !'c{r"JO w z Mom rdo 73 am vw�< }30 >az<r„- 0� a4<�AN�Gp } �c:w�<JaoCo�owoag�« 8' S a4N i�i Wi+.z poi>ci d,S 4u TO a Q d .`O ewtu g>z r>S, ax'a¢-<~ 3 J >Otz t-��W < >"� < 4- W>t'O ttt--- H❑x ; uva p3u u �O EMS;ro eat.e�2Go H7� 3� N p3 xA m>i <� 3t <"- Q p<-'i� b+4 c-•^ _uzY`>in a p�Sz ��', �b O°' tg�A u ". a>X<mZ<S0Z > �,1 r�2�ooatTaz< >u0y "'O n�i �= �m F N� �> 60 }z7ii w A use O U - d< L OKm .-�" .?ter axr3NcEU � g 3� V< U o m A U t'� Fmx04' < wA�- z�y w� -� > 3 w u O J U zCi� O Hgg < <00 A H O u FNaG,a., '- u Z ,fits-3 d< U �., .: a «' W FA_ p� -C < z gu_ o 7C ❑ �HCjO y Z� Ho u�u 65H ��c Wti�jZ9w Y i uzuo wdJ z4x�'A�d>x wut F r<o� uH m vU oamNW Tru tW3°�¢ o�^3 �U >� �r4 Z�m <dw >>? c7a v� °k4 x> �j <o0ez1- t o ❑u < �L<� i aO� W d S [ u 55y �fz �z J a�o9ASC d' $ Y V O o28333 V •} O V r+eP T Y a ^fir•, z35ao8$SggS�o�LdqaB$S�So3$oa�SSS$o$gSS$o V N,G I�YP O^.Y d, 4n y3 O-•ry mv�i �vmj O v�i h d44 �D V v N�1�mU TO-mm.�.n .a �� 8388888880 gSS=800��oa00008go88888sS88 8� 8$8.3 888888g %9888��go '� 8oga88$$8a �a ,-Fo; -���daRg I �="�� ���g$�P^�- r �;§ ^�aa; ''=mIg�a - d ryeiP y1 y tlFl N N VI �� Vi N y N N� N 7n N y f/1 y Yi � �M W W W W [:J W W W W W W W W W W W W W W W W Y: W yW W W W W W ly-� JJ W W F W J y W �1y- . W w fW-�1-W�j !'1 W yF�FF _1 t2 W W �� W W W.1� W � W W W W W w •.:: W :+: W W W W WlJ W �..IJ y� W F .W] Y.iS�SSS 000000��0�0000000000000q�� S.F7E�Eg5�7?Y.i�i55.S<w.SSS:e 000aad0000 o000000o i'F 6a, EgS7S 6 4 E SSF o 00 31 .SSSRISSSSS%SSFf 0. 000 0. 4 4 4 0 C L 00 4 6 6 00 6 4 4 b F.iS 0 6 4 0 6 �0 4 4 PI 0 U U U U U U U U U U U U V U V U U U U U U U U V V U U V u U V u u U U U U V U U U V U U U U U U U V U U U ' u U U U U V u U U U poopp❑ sNo3N❑u33Qepp pppp q❑❑pp❑ 3u333�e�033333cp❑pi333�333O3O33e3333p3ppC3C33303p3❑�333cQi333+3+1133Up3p3u3�333up�p3° q❑ ❑°❑ o❑pp oppppqq❑pp ppppppqq ppoppqpp�orapp ❑ PP ❑pppppp❑ pppp a pp N'^N� mvY CAN v1�oo-T Ywl .pny vOi vmiy�5000&n'�'�mbp.T O-s O rn aOSN�'.7 N OO.�N�ryS yIV aOS y aOC of .-. ,OaS$ry'i' O U F p W U a6, ZL a O'a F W J tiux FT-J0> t-Oumi 0. 0> %U�O�} qF J L Ny 0 UU J JJO.F..I7 Q<SC x p S °p3�/jU w ❑t-. T z+ J saU< .F]zQ S V Ui-6 i- Z aU Ox y K F J F �< Zu W ❑ OJ S T V O �F.1 z �b ✓1 �yy,, x y W> I- ce wp+%, z�-l. .F.t O T W�j yU Z °u6 << T (a7 p 2, J << t# Q% a ¢¢J } F,?>NbUU b O< U <0.' ooZ U z < =0j 70 W L><Q 0.0.Qd N Q<� U UAME. r%1=JJ FF�}rK W ad 0.'rya�¢ OC 4 >> 0.i v. �il Q .�1 L< d °vj N'� <mQ Z 4t'a N 6O > 4r H L U9 J < f 8Q. Gw ac K a 2 %1.� J6<S 4' Z4 QF- t-U !- y <y=aS UC] U_ ❑ zN oz F z 2' PC ¢x<z�•���wogF< aF W u r- W ❑ z wx�. a w z^ut<i zx ° '�ooao w wW 6y > G J undo 0Uu N~ ❑° c,J t,G_ J7 �a vOz 0WN ..1< m" gFazax 3 7 7U zd % c�Om4Z Zo z dxr u%Sa�a� Z'�..'ir-i F'a4/_Kp0 � _7Fc uu. u x IU+! w ec �•:. i°5oo z <zo u u0} 4Na�oaa< azzaJ O7<W Wo d%� a, oW }eZu°�1 %5 aF=� Wa°- o SFyya WW}�F}7FO�..,�T.bw <l7 .� ¢ a2WNw-a}>WaW ° T }Q z¢ J� J3Fx } ae �QQm �`^ac�u W �SFciar<ym W Y� a i� 4y <�d3 <_.t^F�r.O x<�°ow< OJ °�u Y e%a<�y4m $J m< Wt- U U U u ¢> 0.f"Jo- U< 4 U cc❑ 5 ��F x Q UO•.• U V JUJ.. -] ¢ JS� 6 (�J -] < ,.a ,,aa J...7 Q uzlJ3F-U > JET u< U J 6 u U=a C7 J pU SN J z _ U w U U a U } % zz%zY Z>zY2%>.z>- % It x'l%7.>z'L ZY }}YYZY"L-J-zZ}'Z} j'J. %z ZZ7zz %YT zz7.>'-L%Y Z- %%} z ZT. %%7_> }T U -77777 m Ai uU� m > > V UU m FU m W �.. m > U 3 m - U.., daaaa m > W t-: > > W F > > UU 4<:3 Y > W V r, :1 m > 'v V ,c m m uUU V_U 7 S V 3��JJ- m m uU� m <<a.:-�a¢777<�a7<7<.`-�Q.:,< > W W F, F. > > U V m m W f.UUU�-. m w V > m w .-. U > Up., m W V m UU 77<.- m m w > m m m W > > {1I > m > m m a�gg� a66 aaaaaaa b 6 aaJJ6 0, 4 ¢¢ 0. 4 0. a 0. 0. (C 1 y 4 (A }}aaaaaaaa 6 6 > 6 0. 0. 0. > 4 �°aaJg 6 4 0. �' > fq g�a'�aaaaa� 6 > 0. L > > 4 0. 6 6 a a > 0.� > �-� 6 4 4 4 Pm. S 6 6 d 4 4 iK m mmm faI1NN mg OZ N'J0. m�Sm'TlSm N NC V10Z fJ/1 mmmmmmSmmmSgCCT.. rJA ����lafla NNraif O:60ZK yESS�fmcmmmSmmfammmmm�.ammm 70. W NOG H� �y 0.: NNN N y H vJf N NV]i 0.' mmmmSmxjm 4J1N Vaf OfIJ/1 J. CG vJiN pomJmmQq tJ/f �C N r� �N--�/=1 mmm5 �4 x xx x x x ssx gx Y #?3o3>Q3 } }T F z> 0 4 }}TY No3}3r3333�3 F• z>.z L C K YT Yy>- YYT} [L 3N33N3C., } T YY}>-T N V.>Z}}}}ZY r3�333o>Q33rr�3}y F 0. T'I. 1' 1. u,> K Zz C d� }! 3>33333 B C TT} Y} yYZY 33>333 b }} }}<yN 0.' % d' z% G' C }}} 9 N N y N V 1 r/ � N y y y N V 0.' N 4 N N N N N N N N y N N N N t� V 1 v! ti I N dq W W w d d W ¢ z< x ,aa wx < Nx 7< x z x z¢<z y za C a x a a 8 Zpyqa�j WN� NZa %g<q�aee«CC q 6°6y7 zp K�> _? , ww<<>�1 t O�¢+Cdd �J a Ns n'0.'�v S > z CS N7z� q%7ec. 0Jw.-i7❑<y WzG .< 'f ❑O O5Z,� �W^ `..wtt `1"1YGGdNN7K< 0C'0Q0 08 pffiz d � X% x X x xxxx X X 1-1-11 d x X x Y. x x w f7 ¢ W,F h�o r' iy ❑ N 1 7d�> Y .a Q 7 d'^x¢�<C:FW Y F p > J Ju:OF } (QCQ�awy U^ a >aC7UUoZ ^LLY]J << 0o z N ❑ 6 z o E o 000....11z �uUFF¢UyFw00>O J U z W r W y� J. aa <t`i o '<i Y LLLL]] > q w zz a- >p _ � < o m z W 7 pSZ w V `� < Y W w > iLy 4 F o xo u W u`�• x 00- '�z. ❑� W V 07uC7177 < y� u4�Jl <N-' N Z-' w i-.¢U< a 0 o a w J pQ❑x U 7i�❑ J z Wj OFv4i�4' �Z, 0 VIE. a> ❑ i- r :..: '� I[.3pZ> < �,� C T F Y % uV 7 Q Wj �JU U 00747 4 N %..t q .sj aC > 0. x N U C r �j5�<� fop9 ��V ° S y� z` >O U < F Noted°axt z x�F�S O F zt-w O$ xp b�00< W z S x%2? Fqp 1-. F S W W° NSU G x moos z ¢ c+: o 6 <4 > °Jf O> P• zJo< V Wca0'.a 2 ° �c5xx0mVu pXp u �p S u' .J _ J °'z a:.t u<! m L p � 6 4N p<•HU V U z pSU Q 4 V <u °q4E }}-- W W 62 5� F�a u� W�nN `�z SL � uFilF �� - in, 7 �> H c S o s u a u:b ❑f-yr��-O wb((o> {zZWu ❑ > 3 4' S � � 7-+ Y ra u`i o"� �72��-<Mw 6 6 <--> U(� Wtp� U_zui6< mo�=,S7' F�6Q -� �� 3�Yu o Nec F4 G2 hi O t'9 > <wi= F W6<4`� o JOC m > �} Fqd� O CL 4~ � all 7�w ay �,.,w4 O..< � 7 p 4 aF w 60� u w .� N ua ;z7 d 4i7 mV '� 9G`U 4eoQC ul 641 �G>�y� mJ _.L G�% t+ � O� W }. 4L W OC :! 0.0 K.�a Ny I "[ .�•yS� Sy It1 FO_a l:l �C OF Savo FpN 0" u Elul J µ� W 4p2 EG 0.�GGyC> SEEM WO���4-m,Ti}❑U�[�- OuK���Ke.7 w O X J °<&S>�S % O'<0.J°❑ ❑ J7 iiyy OC 0❑ aG 2 .V/ LL OYI WttO� > 4 $.. tj y4j ooy OrN Eadl �6jgU m❑qiS>y�>0 l$� N < J W U X U p, X ❑ % 81. OF .NQ C7 �6FL>Oz <6 SZyI �<}F <`` a<yJ y.%'i �j e> mt�i �JQ %7. Y� <- � F80 U >❑- <4 > a o W° yMf fWY72]S6VN 4 ��y> m V ❑�J�q �t y�y O a.7 f YAW C a x �hF< qN m VIS<N�2% -� oJ4-y >�> %ma q W�� and >< < - a 34 W �> < �2x 3� Jqo <aae W �� >_Q ❑ � S''m p p(i'U55 C]< �h iS0. fL F m W pd �wi.dz o sty'< F y�Hx�P�- a z <pN oz zw Obx u o u W�u qgq <3 } `L ,W�5W >mJ��a J%' i o� 4 as W(yj aoej�d Y1. C7Fy �U'z3 (a0 yu� S4"p <��yy 4 Ki } V 5 ,7y7� m� F U p� 4 �� T PO; U6WQiqj v y,U.,ua� `� OO > J w� a� ❑ 8 �.. O><f C S J m3 61 G F7 fn V F U P SPPPP F S� P P 4 P P 44d- P0000 14 �000000 4 4 od o �N�� 4N- ev O-rI mo- mo- � P P- io- n v�3�v"0i 'O0-P3N4 0vOi 'fi0n v0�i fi'0n vroi Pon�oob�o�gbq V � 44 c44 <oovogog�q.oprq�od,P-Na- e <N - --- 44 4mo -mo - -e -od - -4`c�-Y� -vo -Vo-v0 8Svoggg8g °'°do•gom v�5p8� 80,0 pp S.,pp oQ-80-..' "1QgSgg�gaggog ad maeo .d"n vQ a� e - Qoo8g$$gg=S Q �ggggg8 g ggQggg8gggS8gS=gg88Mo g m.nf wMA srN11v Nb VY�yy VNV NK!", 5.N `� m ^N9ANq Q�.4.$7`_r1 AN�N(�SLiNryB�dH�N� ��-^FnN hNOANu�S wW }. {{.. 4YlILa; JJ W �F-((--.. JJ W W W {yy{++((1-• JJJJ ��J1..1� WW F1-^FF .YW W wW �.J F W'y� F FF �:-L` W Wyyyy FF W u,y � J_t wW rrFF •W y� 6.]n W w `w 6�.7 W�u gr .-7 7 �j WµI ww �JJ W .i 7�:'� W F�F w w JJ W F{q.�{{�.FFF w41W J�-]�.]J wwW W W wwwW �IJJ F- ww .t�rii� W W Fr .1 W W w4: JJ11J.J W WUJWww r FrrFF of :.i t1 W w .-1 .-1 W W F nula J_] W F WwW r �J W T- � iS 6 6 SiS�i.i 6 4 4 d 6 6 S SSiTe�1.k 4 d FF 6 �S�Ffi 6 0. a 0. 6 4 b a SSx� a a a a� 5X0.i'i533�fiF�S.�i r� 0. 4 a a 4 66�i d a O d [� O 6 d 555Boo'd'cS� 0. 0 4 00000 0. xRSiS 0. O 880000 G888 O 0 Uu � 00000p �� r,OsB OCp UUU 00 ��� 00 OOGO000 ��UQUUpu O �G�G O 000 ��� G ���B��G�B O 8 �B�GuuU U8 O pOOCppppOppppgqQwppppppgqpp❑pppC(�qUqq 3333Q3Q33O;3330333333u33uu3Q3°OUC3ppp3G ppUpppp33❑ (�]U 3Ce3333�Q3oQQ� OClppp 3 333 gppVQOp 3 33 u3 33p3v3v11u3's_333303303 0130 GppVQp❑pVppA rvPa.ry __. �1# m.0-r4 Y m r.°iary rvoiS ae .D��n V.H V m b'ny MtityM v.� p3p W-8�.en o faOn�MP� FZ JO ¢ O T F6� 1 ¢¢' z O r F .� d �-' ]L �l..Z U _ C O o U z a ffi `' -�U N g w u�OJr' mm < F a Se Qg a Z F p FNFF 1 < 1 O< a F J < ¢ O z ffi O a 3 d 3 c !-M �yi y 4' 0 V r J< } UuU0.0nn,, V Uu uUa�O}l7 pOp ��yy (w7 m os.a`� wpp,,w 6 y04' d.�l. a i7 j Nod a a U N a�y od N✓ U �x� a �6uayF N C a } Z idZuyy� zi Y 7. uuz�y" ww a m qww �Nz Nw uzoC`y`�44�u3zaa 00 ..1 Zu Oz O s°dz qqw F¢' uzadrzuzWa��z. 0<�10 q ..i < wF.��zzFpmlz �y F-Z6 4 Z_ O a Uws O . ,w >4a }> r• z%;yWp �e� O;CO �WUOxUUUZ .e wSW '2V0 C9 =a 5�� wOU t7U a w=� �aXwl.�t7� ENO Nu0 ualw a gF}p �¢ 0�...000< }O7 x > F>}W�1�- a�a Twty 6¢Z-VwU T} at C� Ku.oz w �.'O?'y4 .E 7 �uJ `a� uiz C�wup`�b ��=SO:t£ U U e�aWu wW OcZ Taw p �.w�"i ��}FffismW6 Oq W.0 t } u gTOtdiS Jy u � ¢� JO}N pffi o] ma a2 mOq mmq-F vuu uuu^�� F-U< .li �roJ000��uo;o i ¢ www¢ TF. < ma owJ� ='< <4 a 2 ui:u1 .F. <mweC �z'>2x >G $ « m }��° a Z a a a a Guy ue e� N u <�'' u > }%% "l.%Z'f_ 4 % 4 z z T C.ZZ Z}Y%}T+1+1 z 7..%z Z Z % }ZzYYzz'L 4wizk z}zxz z. Z}z'Z Zz}zzT}T }Y.}'LZ %x7WW_% Z 4 q >> a < >�>y d._ m mmmm mmm> J 1�uu UU > V m c. U m (q>> UUUVU ��..i�.].]..] mmmm UUU m J V mm V V m U m _UUU mmmm� V V UUUUU � 7 a m U m�3m UuU W [. U mmm}m' 6-'000 .�� V �aaa.I m�mm U V UUUUUF m '4-1 RI > �» V 6 6 g 4 C. P. 0. 4• 6 a 0. 4- 1 L 6 d 6 L L 6 0. 0. 6 4' 6 L d 1 4 6 4 4 L 6 6 S 4 C 6 RO. 6 4 4 4 6=. 6 6 F 1- a d 0. 6 4 »�» N N N 7 N �n 7 J N N i f N N R N N J_I N N W -^. 0. v J'...}y N N W Y a N W W 5� 1 a m m U N m m J ` N N m m N N m N m mm� N W a m� N W W ss$ a W m a N m N m m� yN..7770 m m N N N N W a N W N a N N K K N N N a N N N N N N x IT H --- <�---e- �-=�==�c-v-i•,-eae :^_��<�=�e$''i ..=r- ��--n<�> <�avvK=�y�c---�.�$- -- Z z'!.}TT 4 < 6 a < NNz q -. ZXz}>'L ¢ ¢ < d d < a ¢ < a < < < < 6 < < < < < < ¢ ¢ < ¢ < a z d ¢ T}! ¢ }ZN'L 2 ¢ ¢ -- 'l_} < < <r zTz" ¢ < d _ 4 %z%.}z>`ZZ¢ < 4 ¢ 6 < < 6 a aNNaz'a'au3iaJNa&3iN�aYNYNaa"'�h3Na' . 7s� L Q < z ,djL, `ez 6 ` S t L a „%) d W •'< <xx Y <w< w< < a `�r5w ,� w< < Z q d Z iz v as � S Z - Ka Z Nr- .OJ o.-jp 6Q>�<o ��-a !. 'L %i ��a> z zz a-� z <»6a {z w �6+zg G 2. c �L Q 7a�a '!. < '�' zz �g OaGZ C oiz z•J.a%z SK 9qOWn�aRNLa Z�y Z z% 6 a� Z %. 0j{IL z'!.z ac a�a� Q �oaa g$ QQa 7S aSso g Saoo<oo S 8 ��S <<o�< °oo d�'<�'<< ¢a w 1< ° nI =1A 91-9 - V.h.. - �p� tl mM199 - M V xx xx x xx xxx x x u OQ Qa O W Oci > O Op� W7 - Z o 5% Ulu < yN <gqa zeu F z } yyO� WW3� WbL 0 a osOc z ;?z Z�u66O 3 UU ;1 O 'FVOU4 � S 2U O OORFUOJo zA < 0' < u2 G � 7 J gON m< d6d6" zz Nww N� O % O u P7, < < Tr'�< a p- � N % 1� F"Fw�O , N%% NF d Zty O F .� N O N/aw � zGGSS O �' �i �' i p r- 7 O U < F W N ul� r N 6 > F w 1aN O F pff Z. O NO,< F.m �yy <6< 14 rq O% <O. U1�> < S NZZO z47 <Fy m4 oa aO N �- V a LLawN O SM W S q F<-<µ�y1 x U� U -N W177 NO� t Oz a O % O r ''a R6 y�7 y TT t- <4 4 < O a Z 4 e..< o•<x O_ MI MN O Ua< <b x 36N ax S<� �" yx a0 Nx N o�N ffiooCC O �J7xm o a{ �.. N%F-y V6" Oa.} a a o UO Cw 0 N, r� 6 Y}rr!tt >i < 1 ffipp7�>>m j�-'W1NO (7 > u c a%}q� 2 `'sot 'nNiO°C} V aGm paqq S '�O¢ O F y<,Oda<OUO iCq Qpt CGI :3 < %ia Q7. ari t.,<<q 0 O•`I-C7a-� U�'/.z >u$<O��a<tm zz1"F �,< �100�z FF < aU O<<<R U�� m 61`lS�43uw•• %Fu�h.- O Y+ V u�je�QQ �^S 66 a o'ii jQ�FzN� eeZiZiOF_ <$ o W¢Z U 3 O 0 !3y Ozz % O o W a ❑4g J. m-. W U s < F- 4! y> ¢L 2 w S U 4 a m F < z r"�tc ! ual O r•, G (� L P3' W o< < > �i µ � I,- f W �0.z ti�< �>� q {y -.y 4' }y GaW. a'r. x> < i NU Ow>EidS-%$`n r-C w S x NwC OaES x �0 � ;� m F 00 O ((�.gq..(1�y0 >x U F} < O U > w xy � N F m < ppc�. �Z, ^' - r ~' F S �i-u� 8 = %11 d z9?� O � 7 O u 5 N a nrt1C v��n �414 O o"�i�000aoo7'744a�4�R4494a4�<QQ3Y4e�4pi�yp !m v+.pnm n m $ L!-2 n4 h_F!P_ y P �-�1 �./. NNh 4 P O•� y SO$t3g $Jy ,S�PgN 4.4 44�i Qvde vavedee veie eeri e aer+ $ ,erg r $oH rl as $8mao�g8800$ga "1 P� m g �30�=pp 88 80= �eeg S. $maQ8o g $$$o0 8 $ $Q 73_� 8N$$ $8 ^ac.$`°°�.mo og S_g - Orvj o�m ma• y] n br- N m vH -@ m N M __w� w N ��0o0�0h N V {q�rh m^• W OO N I�R w0 N w ry ...Pp} 1+' a hw n a.mo�^1�1 o b n •[ m N y 03 Np n•°PL a. o'a? H_ d N �$ N« v " w N �q o Ci N y V $ '� �!Em b' N M 1 N N N^ M„ N N N N _ W F J w W F-• F ..1 .JJ w Y w w F- W t- J w FF.. c W w i{�. W W w W w w w yy.�. W W F- W W i[-�� {W- W W W w � W w {y-,. w W F- W W = F w W ^ ,ry W w F- J W W FW- yF.1 W yH W W W F W W W W F 1- JJ W W F- .�i-�. W W LL is yI tU F W µ1 W h• y..1 w t{[Y�. �] W W W W {y W NJ �-- ('• J gg7o g �gS.iSgg"e X£gg g 0000 .7.gg:5.5 6 1 d g- 6 s 4 1 ..gFS 1 OOOooesoosoessooco U U U V U °ap U V U U Uq U U V u U U /L'7 U 0 U o U V O U U O V U U �O 000000000000000088o U 000000 U U U U V U up U U 0000� UUU U U U e0000a3 U U C� U UU U Oo�00 U U V V Oz U 00� U U U A 3333Q3Qp3p333�#p33�333o3j;3333�0Y�03333��333ng3333�3�3�03�333�333�33333333��3g333gq333p3p q p p pp p pp pp p pp p lam+ S• P p P v1 $ 0 0 g b o n 0 - i N N N N b N N O r$ P w b N w 8 0 `�JUFH o 0.ia.uz'Zd"F¢<yV o OoJar aeC WZ p } z o `� z t-u' xf 1-O7xaGw > O w' o< FJT e � �' t•4 FtilV% n o U aQ 3C eJ 6 W K .J< V Sd i`L J UOC F tK <.0 i (i n n77 ata¢��iFi4�U- Q. W rag, <<Z "'zO 0U UgS" _� FF �Z�d1' �¢^/4 U ° aEpL j <4 > UUA-�a. O �`J>O< F W �+..0 O¢ < ZIW-• a> x> ZZx p K 2 Oa FN wxZ�l. 4 p V aao8�o'ex O V x �. zU 7..m oF' U e:OO v�WaO M FOO z OU �{ V(i� J �<z °U� 6Z a U� ° 'Zpy w0a w 4 Wu. V �pJ uUU OZS 5WEn� O-¢ a -L y. 2,{{ w ca{. O �x pe¢ -. F•>QUCiU Fy z Ox Ci < yi�+j U�ry ;j .0 W ULax6_•F TRE- w< (W� Q i,r. % KK r-aiw �O. 6d 0.'gLL1 u.]a O W aw ft1 �..i oCxl �.. 2N-- a> <d _ F Y ww F., 55� UQ a:-. .g :]Q w'7d NU X K T ti F aZZO mid a OyF W g^yl7 " JUJ. W O zz O >•} !-. g�+.i aid< 00 J 4J Jg- S4 Ofn m0 ! /[ uY J c'ii,� %�+1 zi u °�:, 1'K ww}OUVSL.yL mm py,. C a M:-'cGO OQO4• O-L Rj )•i+. Cot OWWY OMM oov� S 0.< W 04ri1 Z, ° W '/.Sn,Qopx} ¢t Q <J xLlzz i.. TU d• o W F-x�'•� _3 T az0 CO N t�. y. �J N J a UW pi .x7 y ou zo- > � � T < U _F UU JU '; J J J V U 6 Z �,J.� Y U 3 yo � V< X.4�gUUF b �' ¢.,.F ...0 V V Q�x 4 � < ¢ a <� d ¢ N U a U 0. � y U O :D 13 77 F } 7 zYxzz%% Z z TZ Z Z;LZ YTZLT z}Y}ZZZ Z YZ z7l zzTzLxxz Zz }Z.zx} }YZZZ zZ}%x};� }x-!.%;G iC 7.}ryT Z:GYY V U 3737 m UUU UUU J737a m m �W.. UU m»mmmm r F U V UUU 3 773¢37377 mm>mm U w'u V UU mmmfom�mmfnewm�n V V 3J7 uU u 77 U U (� V J37 Q UUUI. �«amm J'.�a7 C. U(iU �3m .7 UUtw.. 3a m> U V 7.�7 mmm��mm�� U UUU J�_1J37<=»3� V U}W.,U UU mmmm V UUUUU 3 mmmmm 777 �40.�4 W a d 4 �7 ���� �] 67:J7�>:J :J 477- .•'.i7� �-' �.� :7� :] 5q' �J� :]a .7 2 �6 a�� =4 �_3 6 ¢0.. 6 d 0. 6 0. 6 6 0. 6 1 a 4 6 0. 4 6 0. 6 d 0. 0. 0. 19 4 4 0. 0. gmm mmmmppppmmgmmmmmmm mm�m g me mgm ammmmm mpmmmag m'ri5� gmmgggg mmmmg g mg•gm�emg a 6 aZ. 0. 4 y x x x x x <_ y•--o'c=.h�crc�3.,.3.,•3.,v�z�aoYt r6 cia6a¢¢¢¢«•�<d<¢a6Q`"zQ¢<6iQQ<a6d LZz} ni�zzyo}ew3�aa��H�3n�aYecs zz,, zz,,LL} NzY'rzZxz ttaaa«<¢aa<ae2 T} z xz v�v� zz Gz ¢a¢ z�a353�33�N3�3 Y,�YyYYz a Q-t444G YT yY y'LNY .�i3n YYY �'3i, t.,3a}ez.3.�a-i�-�usaHaoYca a °uw� e �••� �•,:':JJWJ�<Wr. Hz iG 7�7a <QQ6¢QQyyx as Y <1(<y aZ y�u�Fwu�; z. T'x _7l ¢ <` y NN W 3u z �q �wzeea ?, z xx qQ �a Qw -1y6 .aa '� ° z a f� " 5a�N<.:a <w> a'i Q wu�• Y�wkwAa<,��iw< 2ua�u Tac¢ gg < am< > H 66 z O z �z z g� zz :37ga z ui 9ogo zz;$ z¢ 7 g'a� o ° $a °w$O< o < �$<�W _ � M _ x x x x x xx is xi< x x xxxxx x x xx wa y� F K o r.� Wx y> oWF 007 6zHw��poZ a U W a o z ¢ aW J ao�a� <a` -� <x KY <ow O S <g I-a� w�y a 000 as zd�°o > 7aoe z ]-< Y rd- sa azmz U 6 <x >' w 3 < �eeC zd G0 a F% c w aC °ozoi�ag4�dtmiz u3y <mu'1 �wz� c�Www a r xwF tua e<t N�W$ O>L a❑ ra r.ry zd0 m°� ¢g F ` HW¢6�>F-'VL a o fao� >x• /.w�a°�gZrygaa•aza•aNQUF .Cdux>zWzx,,7 U e:<>w;i; W'Xzz OF. F- $ tzi > of �c F Z<Zzz <j° t x F'u,W,13U< Oo >P-Le tspQt Lzi F4 °i7 �LiI as d' 55 a NJ¢ 3 o5dao��`oyza J aod4 g<dOu za 5 po-w_Jmmu oxuzJzyN <-OFo d aw °p a5 ° &m zz J a o z �d j yy Z O W > 6 X Z O? N C F' �S6Z �Ow z z yy�� O < (0.jN_ °'Y} zww �iK J Nl```5F. Y <� `fi J ••' Z Y�!y V LL Wu�.jm }pp~ µ > CVY >Opsa �f a OAS c F'•3 >'-� Jt_Ou+¢w `<4Z>osz<0 �F NH w° ac�S' z S- m� tu-i. b`• ,5-°s < x wi F o <�o 3m3 u pN•• >r¢ <zu v n 4 zeoe<m gag << u <t$iSCH �U7F a�i b3 r xr r� 3°VOW�z md7 < > W %FZ},nC a z g<-o - a V 4iuY O x N O�s�° F:!t>;!�F k O 3 z • �4Fs w, W�>s F z 4<i�u b w 2 U. me _ u�y, p atly.."i nw "C F• �oZ< iO a <Y 1 �, 1 F <°; �^ � i r•p 0., t, Y Li-6 p t�i G {� 4Y aba= F• < �x p > m< vOg Fun i-n v �( w 4l cxyy �1 i UUN 1-• �" � z_1 e:%mGa4 �+• V W u U PC 0.• W V �L aw 4C• �,,, ^NtL� Ky 1• � V_p•�O at ct Z hhh---O Yf1 �{F Opu' E_F 6' � N F ...N U N �N W <6 GUCCU�Nn Yl<,O T g <p( 4•!-tO-N 7 �n JCp�y1 z Q N' F- >�.;><<<>�mGy }O NMs 4 a 30Wn�- W 40 N NUs N 3oe•�E--45� N n Uyy N-06 j<�nOQ;Q <�Npl O J< 7 >yyCC4aFz4x«";!t OUa x •Zx< Ci p J om o-� i<a�o u _ W Z 0.. O NET %t °� F.Y.i y$U d < F>...0 OO4 N�'j •mW ><`iaZ�<Yf �Oa6 � O-�p•t.�. tx�t ��41 "f.UPT. paC NtF�<U WpZ V}A6> a./4��N0 <h. /< a j6yL�<`.�7<pui. d a1+LFWLWyy" �xP4�H 20.7a m�J.4 ity.�<NJt- JiY� �gJmN>< `�_ � eG'e� aS S Sm ° F�->m w awz u°fltx q�[- o zNz w a 5� ❑ >uax }t; ]Z"� <� r• GOGg�mJa tt7 .. _ a<� N zz ���= Wes, 03 F.� t7•.mG�it•QJ ec d�^< ryzNytt PWOW F•, dry° Fv�i� m- $ at u. o� AZ}w}���w -1m�� O N �uxio� 0< <FA< UO-��y$ m N Z W t- O_]yy ° -• ziR N �I+i 3 J gnu°RQ y 4l S ¢ V...�!-5U -p 7.0 <} -7. aW >2S� y��3 y Opp 5 U 9 U2igec N x >^w a J tVVVJ F N }'o-cgoq�$oo$�'o�'Oo .o h oo $$ 23o mvn� oqo`a,?'cqo$g$ggSB�'$$g8gg444QR?4M.�aoe��o��q��0000�oo ma o-•n v n •n r mn .o �+ .a m -.rvm�h.or o- v� a v vvde.: .:ede-}ei evvdvv vdve,r d-.; v'a •i d-idvays�vvv vv � � O n o o g O C O P �O � 2 d "� ry n��� 4�& a 4� Q�� y� y N g 0 o o_ 0 0 0 S o - o� O�O 8 g O tlt! C C� r� r�` -. y c � v �y 0 r K� w� R� w n �O �� N^ N� d� g m N y N �rj V ti y a - o r � o r d g �� O V 3� r p �C � v r� n r 1 NN vW1 1NA 1A W vWi NN V W W W W W W W W W W W W W W W W W W d W W W W WWWW WFFWWy�� wic- 5�55 3i 5 �ioZ 4 0. 0.0. E�SpsF Y 446 f5i�iSSE 4^ V O up UUU OOOUO poSVSUV SUV�uuO ODUO�0000uCdOOpOU sOuO �-■Gaammaa 99999§eKaq 2 & k§20»aee »»»»% uou�e u /§ FROM � !§omzB■o4 /\§82�■Bz )22/\§T¢� §)§�23§§]§ !�li=34Qi� »22222t2!) } k pJ& (!�( )� ®§`2kum z 2 A 2 2� §§zaem u!#o,�%.mg ]68N�;-4 _o m;§7\e«gb) CAME80 &2 k/2))�z [ \§k§$);,i4i44 belco elecnor Ralph Antuna General Superintendent Summary Over 20 years in the construction industry performing various work as an Electrician. Work History Elecnor Eelco Electric, Inc. General Superintendent Oversee all field operations Flatiron Electric, Inc. General Foreman 2016 m Present 2012 — 2016 Oversee and coordinate multiple projects within Southern California Division Moore Electrical Contracting, Inc., Foreman 2002 — 2012 Oversee and coordinate multiple projects within San Bernardino / Riverside Counties HCI Corp. Foreman 1999 -- 2002 Oversee and coordinate multiple projects within San Bernardino / Riverside Counties Paul Gardner Corp. Wireman / Operator Shacklett Construction Laborer '.- Nh� think <aboiit a b(,tt r world bel,Co www.elecnorbelco.com 1992 -1999 1984-1992 14320 Albers Way Chino, CA 91710 (909) 993-5470 Office (909) 993-5476 Fax CA License 738518 belco' elemor Projects 0 The San Fernando Valley Metro Rapidway Project • Metro Orange Line Transportation Project • 405 / 55 Connector Project • Bob Hope / Ramona Avenue Bridge • Riverside Avenue Bridge • 10 / 60 Connector Lighting Project • Big Bear Dam • Ortega Highway / Antonio Parkway Lighting & Signal • Mission Boulevard Grade Separation • Highway 178 Extension Project ® Ranchero Avenue Bridge • Clyde V. Kane Rest Stop Education / Training / Certifications • Control Data Institute Technical School • IBEW Trained State Certified Electrician • OSHA 30 • CPR 14320 Albers Way Chino, CA 91710 -� We think about a better world (909) 993-5470 Office bell ,S2 www.elecnorbelco.com (909) 993-5476 Fax CA License 738518 City of Newport Beach FY2024-25 TRAFFIC SIGNAL REHABILITATION Contract No. 9718-1 NON -COLLUSION AFFIDAVIT State of California ) ) ss. County of San Bernardino ) John Wong , being first duly sworn, deposes and says that he or she is Executive Vice President of Elecnor Belco Electric, Inc. , the party making the foregoing bid; that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that party making the foregoing bid; that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. I declare under penalty of perjury of the laws of the Stat of California that the foregoing is true and correct. Elecnor Belco Electric, Inc. John Wong Executive Vice President Bidder Auth ri Sig ture/Title Subscribed and sworn to (or affirmed) before me on s +day of �vNE 2025 by "�.� S4" , proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me. I certify under PENALTY OF PERJURY under the laws of the State f liforni at the foregoing paragraph is true and correct. r-- o P I [SEAL] ODOUG MCWIOIIT£R Notary Public . Callfornia San Barnardlno County Commission 0 24267,75 y Comm. Expires Nov IS, 1016 14 My Commission Expires: l5l ZCo City of Newport Beach FY2024-25 TRAFFIC SIGNAL REHABILITATION Contract No. 9718-1 DESIGNATION OF SURETIES Bidder's name Elecnor Belco Electric, Inc. Provide the names, addresses, and phone numbers for all brokers and sureties from whom Bidder intends to procure insurance and bonds (list by insurance/bond type): Liberty Mutual Insurance Company 175 Berkeley St. Boston, MA 02116 Michael Stein Liberty Mutual 790 The City Drive South, Suite 200 Orange, CA 92868 (714) 634-3311 15 City of Newport Beach FY2024-25 TRAFFIC SIGNAL REHABILITATION Contract No. 9718-1 CONTRACTOR'S INDUSTRIAL SAFETY RECORD TO ACCOMPANY PROPOSAL Bidder's Name Elecnor Belco Electric, Inc. Record Last Five (5) Full Years Current Year of Record Current Record Record Record Record Record Year of for for for for for Record 2024 2023 2022 2021 2020 Total 2025 No. of contracts NA 115 116 121 135 128 615 Total dollar Amount of $119,406 $87M $65M $57M $56M $384M Contracts (in NA Thousands of $)_ No. of fatalities NA 0 0 0 0 0 0 No. of lost NA 1 0 0 3 0 4 Workday Cases No. of lost workday cases involving permanent NA 3 0 0 0 0 3 transfer to another job or termination of employment The information required for these items is the same as required for columns 3 to 6, Code 10, Occupational Injuries, Summary --Occupational Injuries and Illnesses, OSHA No. 102. 16 Legal Business Name of Bidder Elecnor Belco Electric, Inc. Business Address: 14320 Albers Way Chino, CA 91710 Business Tel. No.: (909)-993-5470 )-9 _._......- State Contractor's License No. and Classification: 738518 &B,C-10 Entity Type: CORPORATION _ The above information was compiled from the records that are available to me at this time and I declare under penalty of perjury that the information is true and accurate within the limitations of those records. Signature of bidder Date Title Signature of bidder Date Title Signature of bidder Date Title Signature of bidder Date Title 6/ /2 ��ng, Jo Executive Vice President 6/4/2025 Roger Devito, Assistant Secretary Signature Requirements: If bidder is an individual, name and signature of individual must be provided, if doing business under a fictitious name, the fictitious name must be set fort along with the County. If bidder is a partnership or joint venture, legal name of partnership/joint venture must be provided, followed by signatures of all of the partners/joint ventures or if fewer than all of the partners/joint ventures submit with evidence of authority to act on behalf of the partnership/joint venture. If bidder is a corporation, legal name of corporation must be provided, followed by signatures of the corporation President or Vice President or President and Secretary or Assistant Secretary, and the corporate seal, or submit with evidence of authority to act on behalf of the corporation. All must be acknowledged before a Notary Public, who must certify that such individuals, partners/joint ventures, or officers were proven on the basis of satisfactory evidence to be the persons whose name are subscribed to and acknowledged that they executed the same in their authorized capacities. (NOTARY ACKNOWLEDGMENT and CORPORATE SEAL MUST BE ATTACHED] 17 ACKNOWLEDGMENT notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of On -; ac- S, 202S before me,`k( - c. (insert name and title of the officer) personally appeared who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature (Seal) e DOUG MCWHORPER Notary Public - Californta san Bernardino County Commission it 2426775 MY Comm. Expires Nav is, 2026 City of Newport Beach FY2024-25 TRAFFIC SIGNAL REHABILITATION Contract No. 9718-1 ACKNOWLEDGEMENT OF ADDENDA Bidder's name Elecnor Belco Electric, Inc. The bidder shall signify receipt of all Addenda here, if any, and attach executed copy of addenda to bid documents: Addendum No. Date Received _ Signature 18 City of Newport Beach FY2024-25 TRAFFIC SIGNAL REHABILITATION Contract No. 9718-1 INFORMATION REQUIRED OF BIDDER Bidder certifies under penalty of perjury under the laws of the State of California that the following information is true and correct: Name of individual Contractor, Company or Corporation: Eleenor Belco Electric, Inc. Business Address: 14320 Albers Way Chino, CA 91710 Telephone and Fax Number: (909) 993-5470 Fax: (909) - 993-5476 California State Contractor's License No. and Class: 738518 A,B, C-10 (REQUIRED AT TIME OF AWARD) Original Date Issued. 7/28/97 Expiration Date: 7/31 /25 List the name and title/position of the person(s) who inspected for your firm the site of the work proposed in these contract documents: Ralph Antuna / Superntendent The following are the names, titles, addresses, and phone numbers of all individuals, firm members, partners, joint ventures, and company or corporate officers having a principal interest in this proposal: Name Title Address Telephone Leonardo Sancho Frances CEO/President 14320 Albers Way Chino, CA 91710 (909)993-5470 John Wong, Executive Vice President Pablo Sanchez Repila, Vice President Jeroni Gervilla, CFO Roger Devito, Assistant Secretary Corporation organized under the laws of the State of Delaware 19 The dates of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal are as follows: na All company, corporate, or fictitious business names used by any principal having interest in this proposal are as follows: na For all arbitrations, lawsuits, settlements or the like (in or out of court) you have been involved in with public agencies in the past five years (Attach additional Sheets if necessary) provide: Provide the names, addresses and telephone numbers of the parties; na Briefly summarize the parties' claims and defenses; na Have you ever had a contract terminated by the owner/agency? If so, explain. na Have you ever failed to complete a project? If so, explain. na For any projects you have been involved with in the last 5 years, did you have any claims or actions by any outside agency or individual for labor com fiance (i.e. failure to pay prevailing wage, falsifying certified payrolls, etc.)? Yes / o 20 Are any claims or actions unresolved or outstanding? Yes / No If yes to any of the above, explain. (Attach additional sheets, if necessary) na Failure of the bidder to provide ALL requested information in a complete and accurate manner may be considered non -responsive. Elecnor Belco Electric, Inc. Bidder Alberto Garcia De Los Angeles (Print name of Owner or President of Corporation/Company) John Wong Executive Vice President nutze Signature/Title tive ice President Title 6/02/2025 Date On ZL-&.LS,7Az5 before me, _000G r4WA1'Wt-t�L— Notary Public, personally appeared Sot+,• Way -'cam , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WIT SS my nd and ffici seal. (SEAL) of P blib in $nd,br sad State My Commission Expires: 21 •IQLG'146VI.Q47 RR41 Inc CQ"'t IQ l�es1416 UNANIMOUS WRITTEN CONSENT IN LIEU OF 2024 ANNUAL MEETING OF THE BOARD OF DIRECTORS OF ELECNOR BELCO ELECTRIC, INC. March 1, 2024 The undersigned, being all of the members of the Board of Directors (the `Board") of Elecaor Belco Electric, Inc., a California corporation (tire "Company"), in lieu of holding a meeting of the Board, hereby take the following actions and adopt the following resolutions by unanimous written consent: WHEREAS, the Board has determined that it is in the Company's best interests to appoint a revised slate of Officers of the Company. NOW, THEREFORE, BE IT RESOLVED, that the following persons be, and hereby are, elected to the offices set forth opposite their respective names, to hold such offices until their respective successors are elected and qualified at or before the next annual meeting of the Board, or until their earlier respective deaths, resignations or removals: NAMES Alberto Garcia De Los Angeles Jeroni Gervilla Roger Devito Pedro Enrile Leonardo Sancho Prances John Wong Pablo Sanchez OFFICE President and Chief Executive Officer Chief Financial Officer Chief Legal Officer, Senior Vice President, and Assistant Secretary Secretary Vice President Administrative Vice President - Licensing Administrative Vice President - Licensing FURTHER RESOLVED, that Alberto Garcia De Los Angeles, Jeroni Gervilla, Leonardo Sancho Frances and Roger DeVito in their respective capacities (listed above) subject to such supervisory powers of the Board of Directors, hereby are authorized and directed to perform all the duties commonly incident to that office; shall have authority to execute in the name of the Company contracts, leases and other written instruments to be executed by the Company; and, shall perform such other duties as the Board of Directors may from time to time determine. FURTHER RESOLVED, that the President and Chief Executive Officer may delegate authority to any ChiefFinancial Officer or Chief Operating Officer or Senior Vice President or Vice President as and within their authority levels as set forth in the Company's Bylaws, as the same may be amended from time to time; AND IT IS FURTHER RESOLVED, that all actions heretofore taken by the officers of the Company on behalf of and in the name of the Company, relating to the conduct of the business of the Company, the expenditure of money, the making of contracts and all other acts taken or omitted in the performance of their duties to the Company be, and the same hereby are, in all respects, approved, ratified and affirmed, as of the date taken, done or omitted, respectively. UNANIMOUS WRITTEN CONSENT IN LIEU OF 2024 ANNUAL MEETING OF THE SOLE SHAREHOLDER OF ELECNOR BELCO ELECTRIC, INC. March 1, 2024 The undersigned, being the sole shareholder of Elecnor Belco Electric, Inc., a California corporation (the "Company"), hereby takes the following actions and adopts the following resolutions by unanimous written consent in lieu of holding a meeting of the Shareholders of the Company: WHEREAS, the sole Shareholder has determined that it is in the Company's best interests to appoint a revised slate of Directors of the Company. NOW, THEREFORE, BE IT RESOLVED, that the following persons be, and hereby are, elected to serve as Directors of the Company until their respective successors are elected and qualified at or before the next annual meeting of the Shareholder(s), or until their earlier respective deaths, resignations or removals: Jesus Alberto Diez Fernandez Alberto Garcia De Los Angeles David Rodriguez Pablo Sanchez AND IT IS FURTHER RESOLVED, that all actions heretofore taken by the Directors of the Company on behalf of and in the name of the Company, relating to the conduct of the business of the Company, the expenditure of money, the making of contracts and all other acts taken or omitted in the performance of their duties to the Company he, and the same hereby are, in all respects, approved, ratified and affirmed, as of the date taken, done or omitted, respectively. IN WITNESS WHEREOF, the undersigned, being the sole shareholder of Elecnor Belco Electric, Inc., has executed these actions by written consent as of the date first written above. EI,ECNOR, INC. Alberto Garcia De Los Angeles, President & CEO The actions taken by the Board Consent shall have the same force and effect as if taken by the undersigned at a meeting of the Board of Directors, duly called and constituted pursuant to the Bylaws of the Company and the laws of the State of California. This Board Consent may be executed in counterparts, each of which shall be deemed an original, but all of which together shall constitute one and the same document. IN WITNESS WHEREOF, the undersigned, being all of the members of the Board of Directors of Elecnor Belco Electric, Inc., have executed these actions by written consent as of the date first written above. r-11, Jesus A David Rodriguez, Director .._.......__..__...-- Director Alberto Garcia De Los Angeles, Director PabI4,Ktichez, Director City of Newport Beach FY2024-25 TRAFFIC SIGNAL REHABILITATION Contract No. 9718-1 NOTICE TO SUCCESSFUL BIDDER The following Contract Documents shall be executed and delivered to the Engineer within ten (10) days (not including Saturday, Sunday and Federal holidays) after the date shown on the "Notification of Award" to the successful bidder: • CONTRACT WITH REQUIRED INSURANCE CERTIFICATES AND ENDORSEMENTS = LABOR AND MATERIALS PAYMENT BOND • FAITHFUL PERFORMANCE BOND The City of Newport Beach will not permit a substitute format for these Contract Documents. Bidders are advised to review their content with bonding, insuring and legal agents prior to submission of bid. Original Certificate(s) of Insurance, General Liability Insurance Endorsement, and Automobile Liability Insurance Endorsement shall be provided as required by the Contract documents and delivered to the Public Works Department within ten (10) working days after the date shown on the Notification of Award to the successful bidder. The Labor and Materials Payment Bond and Faithful Performance Bond shall be issued by an insurance organization or surety (1) currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, and (2) listed as an acceptable surety in the latest revision of the Federal Register Circular 570. Pursuant to Public Contract Code Section 22300, appropriate securities may be substituted for any monies to be withheld to ensure performance under the Contract. Insurance companies affording coverage shall be (1) currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, and (2) assigned Policyholders' Rating A (or higher) and Financial Size Category Class VI (or larger) in accordance with the latest edition of Best's Key Rating Guide: Property -Casualty. Coverages shall be provided as specified in the Standard Specifications for Public Works Construction, except as modified by the Special Provisions. Certificates of Insurance and additional insured endorsements shall be on the insurance company's forms, fully executed and delivered with the Contract. The Notice to Proceed will not be issued until all contract documents have been received and approved by the City. 22 FY2024-25 TRAFFIC SIGNAL REHABILITATION CONTRACT NO. 9718-1 THIS CONTRACT FOR PUBLIC WORKS ("Contract") is entered into this 24th day of June, 2025 ("Effective Date"), by and between the CITY OF NEWPORT BEACH, a California municipal corporation and charter city ("City"), and ELECNOR BELCO ELECTRIC, INC., a California corporation ("Contractor"), whose address is 14320 Albers Way, Chino, CA 91710, and is made with reference to the following: RECITALS A. City is a municipal corporation duly organized and validly existing under the laws of the State of California with the power to carry on its business as it is now being conducted under the statutes of the State of California and the Charter of City. B. City has advertised for bids for the following described public work: The work necessary for the completion of this contract consists of, but is not limited to: traffic signal rehabilitation and modification at four intersections, installation of CCTV equipment, installation of LED intersection luminaires, installation of LED internally illuminated street name signs with custom sign panels, and other items shown on, but not limited to plan no. T-6083-S (the "Project" or "Work"). C. Contractor has been determined by City to be the lowest responsible bidder and Contractor's bid, and the compensation set forth in this Contract, is based upon Contractor's careful examination of all Contract documents, plans and specifications. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. CONTRACT DOCUMENTS The complete Contract for the Project includes all of the following documents: Notice Inviting Bids, Instructions to Bidders, Proposal, Bidder's Bond, Non -Collusion Affidavit, Notice to Successful Bidder, Labor and Materials Payment Bond (Exhibit A), Faithful Performance Bond (Exhibit B), Permits, Standard Special Provisions and Standard Drawings, Plans and Special Provisions for Contract No. 9718-1, Standard Specifications for Public Works Construction (current adopted edition and all supplements), and this Contract, and all modifications and amendments thereto (collectively the "Contract Documents"), all of which are incorporated herein by reference. The Contract Documents comprise the sole agreement between the parties as to the subject matter therein. Any representations or agreements not specifically contained in the Contract Documents are null and void. Any amendments must be made in writing, and signed by both parties in the manner specified in the Contract Documents. 2. SCOPE OF WORK Contractor shall perform everything required to be performed, and shall provide and furnish all the labor, materials, necessary tools, expendable equipment and all utility and transportation services required for the Project. All of the Work to be performed and materials to be furnished shall be in strict accordance with the provisions of the Contract Documents. Contractor is required to perform all activities, at no extra cost to City, which are reasonably inferable from the Contract Documents as being necessary to produce the intended results. 3. COMPENSATION 3.1 As full compensation for the performance and completion of the Project as required by the Contract Documents, City shall pay to Contractor and Contractor accepts as full payment the sum of One Million One Hundred Ninety Two Thousand One Hundred Dollars ($1,192,100.00). 3.2 This compensation includes: 3.2.1 Any loss or damage arising from the nature of the Work; 3.2.2 Any loss or damage arising from any unforeseen difficulties or obstructions in the performance of the Work; and 3.2.3 Any expense incurred as a result of any suspension or discontinuance of the Work, but excludes any loss resulting from earthquakes of a magnitude in excess of 3.5 on the Richter Scale and tidal waves, including tsunamis, and which loss or expense occurs prior to acceptance of the Work by City. 4. PROJECT MANAGER Contractor shall designate a Project Manager, who shall coordinate all phases of the Project. This Project Manager shall be available to City at all reasonable times during the term of the Contract. Contractor has designated Ralph Antuna to be its Project Manager. Contractor shall not remove or reassign the Project Manager without the prior written consent of City. City's approval shall not be unreasonably withheld. 5. ADMINISTRATION This Contract shall be administered by the Public Works Department. City's Public Works Director, or designee, shall be the Project Administrator and shall have the authority to act for City under this Contract. The Project Administrator or designee shall represent City in all matters pertaining to the Work to be rendered pursuant to this Contract. 6. NOTICE OF CLAIMS 6.1 Unless a shorter time is specified elsewhere in this Contract, before making its final request for payment under the Contract Documents, Contractor shall submit to Elecnor Belco Electric, Inc. Page 2 City, in writing, all claims for compensation under or arising out of this Contract. Contractor's acceptance of the final payment shall constitute a waiver of all claims for compensation under or arising out of this Contract except those previously made in writing and identified by Contractor in writing as unsettled at the time of its final request for payment. The Contractor and City expressly agree that in addition to all claims filing requirements set forth in the Contract and Contract Documents, Contractor shall be required to file any claim Contractor may have against City in strict conformance with the Government Claims Act (Government Code 900 et seq.). 6.2 To the extent that Contractor's claim is a "Claim" as defined in Public Contract Code section 9204 or any successor statute thereto, the Parties agree to follow the dispute resolution process set forth therein. Any part of such "Claim" remaining in dispute after completion of the dispute resolution process provided for in Public Contract Code section 9204 or any successor statute thereto shall be subject to the Government Claims Act requirements requiring Contractor to file a claim in strict conformance with the Government Claims Act. To the extent that Contractor's claim is not a "Claim" as defined in Public Contract Code section 9204 or any successor statute thereto, Contractor shall be required to file such claim with the City in strict conformance with the Government Claims Act (Government Code sections 900 et seq.). 7. WRITTEN NOTICE 7.1 All notices, demands, requests or approvals, including any change in mailing address, to be given under the terms of this Contract shall be given in writing, and conclusively shall be deemed served when delivered personally, or on the third business day after the deposit thereof in the United States mail, postage prepaid, first-class mail, addressed as hereinafter provided. 7.2 All notices, demands, requests or approvals from Contractor to City shall be addressed to City at: Attention: Public Works Director City of Newport Beach Public Works Department 100 Civic Center Drive P.O. Box 1768 Newport Beach, CA 92658 7.3 All notices, demands, requests or approvals from City to Contractor shall be addressed to Contractor at: Attention: John Wong Elecnor Belco Electric, Inc. 14320 Albers Way Chino, CA 91710 Elecnor Belco Electric, Inc. Page 3 8. INDEPENDENT CONTRACTOR City has retained Contractor as an independent contractor and neither Contractor nor its employees are to be considered employees of City. The manner and means of conducting the Work are under the control of Contractor, except to the extent they are limited by statute, rule or regulation and the express terms of this Contract. No civil service status or other right of employment shall accrue to Contractor or its employees. Contractor shall have the responsibility for and control over the means of performing the Work, provided that Contractor is in compliance with the terms of this Contract. Anything in this Contract that may appear to give City the right to direct Contractor as to the details of the performance or to exercise a measure of control over Contractor shall mean only that Contractor shall follow the desires of City with respect to the results of the Work. 9. BONDING 9.1 Contractor shall obtain, provide and maintain at its own expense during the term of this Contract both of the following: (1) a Faithful Performance Bond in the amount of one hundred percent (100%) of the total amount to be paid Contractor as set forth in this Contract in the form attached as Exhibit B and incorporated herein by reference; and (2) a Labor and Materials Payment Bond in the amount of one hundred percent (100%) of the total amount to be paid Contractor as set forth in this Contract and in the form attached as Exhibit A and incorporated herein by reference. 9.2 The Faithful Performance Bond and Labor and Materials Payment Bond shall be issued by an insurance organization or surety (1) currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, (2) listed as an acceptable surety in the latest revision of the Federal Register Circular 570, and (3) assigned a Policyholders' Rating A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide: Property - Casualty. 9.3 Contractor shall deliver, concurrently with execution of this Contract, the Faithful Performance Bond and Labor and Materials Payment Bond, and a certified copy of the "Certificate of Authority" of the Insurer or Surety issued by the Insurance Commissioner, which authorizes the Insurer or Surety to transact surety insurance in the State of California. 10. COOPERATION Contractor agrees to work closely and cooperate fully with City's designated Project Administrator and any other agencies that may have jurisdiction or interest in the Work to be performed. City agrees to cooperate with the Contractor on the Project. 11. PROGRESS Contractor is responsible for keeping the Project Administrator informed on a regular basis regarding the status and progress of the Project, activities performed and planned, and any meetings that have been scheduled or are desired. Elecnor Belco Electric, Inc. Page 4 12. INSURANCE Without limiting Contractor's indemnification of City, and prior to commencement of Work, Contractor shall obtain, provide and maintain at its own expense during the term of this Contract or for other periods as specified in the Contract Documents, policies of insurance of the type, amounts, terms and conditions described in the Insurance Requirements attached hereto as Exhibit C, and incorporated herein by reference. 13. PROHIBITION AGAINST ASSIGNMENTS AND TRANSFERS Except as specifically authorized under this Contract, the services to be provided under this Contract shall not be assigned, transferred contracted or subcontracted out without the prior written approval of City. Any of the following shall be construed as an assignment: The sale, assignment, transfer or other disposition of any of the issued and outstanding capital stock of Contractor, or of the interest of any general partner or joint venturer or syndicate member or cotenant if Contractor is a partnership or joint -venture or syndicate or co -tenancy, which shall result in changing the control of Contractor. Control means fifty percent (50%) or more of the voting power or twenty-five percent (25%) or more of the assets of the corporation, partnership or joint -venture. 14. PREVAILING WAGES In accordance with the California Labor Code (Sections 1770 et seq.), the Director of Industrial Relations has ascertained the general prevailing rate of per diem wages in the locality in which the work is to be performed for each craft, classification, or type of workman or mechanic needed to execute the contract. A copy of said determination is available by calling the prevailing wage hotline number (415) 703-4774, and requesting one from the Department of Industrial Relations. All parties to the contract shall be governed by all provisions of the California Labor Code — including, but not limited to, the requirement to pay prevailing wage rates (Sections 1770-7981 inclusive). A copy of the prevailing wage rates shall be posted by the Contractor at the job site. 15. SUBCONTRACTING The subcontractors authorized by City, if any, to perform the Work on this Project are identified in the Contractor's Proposal and are attached as part of the Contract Documents. Contractor shall be fully responsible to City for all acts and omissions of any subcontractors. Nothing in this Contract shall create any contractual relationship between City and subcontractor, nor shall it create any obligation on the part of City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise required by law. City is an intended beneficiary of any Work performed by the subcontractor for purposes of establishing a duty of care between the subcontractor and City. Except as specifically authorized herein, the Work to be performed under this Contract shall not be otherwise assigned, transferred, contracted or subcontracted out without the prior written approval of City. Elecnor Belco Electric, Inc. Page 5 16. RESPONSIBILITY FOR DAMAGES OR INJURY 16.1 City and its elected or appointed officers, agents, officials, employees and volunteers shall not be responsible in any manner for any loss or damage to any of the materials or other things used or employed in performing the Project or for injury to or death of any person as a result of Contractor's performance of the Work required hereunder, or for damage to property from any cause arising from the performance of the Project by Contractor, or its subcontractors, or its workers, or anyone employed by either of them. 16.2 Contractor shall be responsible for any liability imposed by law and for injuries to or death of any person or damage to property resulting from defects, obstructions or from any cause arising from Contractor's Work on the Project, or the Work of any subcontractor or supplier selected by Contractor. 16.3 To the fullest extent permitted by law, Contractor shall indemnify, defend and hold harmless City, its elected or appointed officers, agents, officials, employees and volunteers (collectively, the "Indemnified Parties") from and against any and all claims (including, without limitation, claims for bodily injury, death or damage to property), demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including, without limitation, attorneys' fees, disbursements and court costs) of every kind and nature whatsoever (individually, a Claim; collectively, "Claims"), which may arise from or in any manner relate (directly or indirectly) to any breach of the terms and conditions of this Contract, any Work performed or Services provided under this Contract including, without limitation, defects in workmanship or materials or Contractor's presence or activities conducted on the Project (including the negligent, reckless, and/or willful acts, errors and/or omissions of Contractor, its principals, officers, agents, employees, vendors, suppliers, subconsultants, subcontractors, anyone employed directly or indirectly by any of them or for whose acts they may be liable for any or all of them). 16.4 Notwithstanding the foregoing, nothing herein shall be construed to require Contractor to indemnify the Indemnified Parties from any Claim arising from the sole negligence or willful misconduct of the Indemnified Parties. Nothing in this indemnity shall be construed as authorizing any award of attorneys' fees in any action on or to enforce the terms of this Contract. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by Contractor. 16.5 Contractor shall perform all Work in a manner to minimize public inconvenience and possible hazard, to restore other work areas to their original condition and former usefulness as soon as possible, and to protect public and private property. Contractor shall be liable for any private or public property damaged during the performance of the Project Work. 16.6 To the extent authorized by law, as much of the money due Contractor under and by virtue of the Contract as shall be considered necessary by City may be Elecnor Belco Electric, Inc. Page 6 retained by it until disposition has been made of such suits or claims for damages as aforesaid. 16.7 Nothing in this Section or any other portion of the Contract Documents shall be construed as authorizing any award of attorneys' fees in any action to enforce the terms of this Contract, except to the extent provided for above. 16.8 The rights and obligations set forth in this Section shall survive the termination of this Contract. 17. CHANGE ORDERS 17.1 This Contract may be amended or modified only by mutual written agreement of the parties. 17.2 The Contractor shall only commence work covered by a change order after the change order is executed and notification to proceed has been provided by the City. 17.3 There shall be no change in the Contractor's members of the project team, as listed in the approved proposal, which is a part of this contract without prior written approval by the City. 18. CONFLICTS OF INTEREST 18.1 Contractor or its employees may be subject to the provisions of the California Political Reform Act of 1974 (the "Act") and/or Government Code §§ 1090 et seq., which (1) require such persons to disclose any financial interest that may foreseeably be materially affected by the Work performed under this Contract, and (2) prohibit such persons from making, or participating in making, decisions that will foreseeably financially affect such interest. 18.2 If subject to the Act and/or Government Code §§ 1090 et seq., Contractor shall conform to all requirements therein. Failure to do so constitutes a material breach and is grounds for immediate termination of this Contract by City. Contractor shall indemnify and hold harmless City for any and all claims for damages resulting from Contractor's violation of this Section. 19. TERMINATION 19.1 In the event that either party fails or refuses to perform any of the provisions of this Contract at the time and in the manner required, that party shall be deemed in default in the performance of this Contract. If such default is not cured within a period of two (2) calendar days, or if more than two (2) calendar days are reasonably required to cure the default and the defaulting party fails to give adequate assurance of due performance within two (2) calendar days after receipt of written notice of default, specifying the nature of such default and the steps necessary to cure such default, the non -defaulting party may terminate the Contract forthwith by giving to the defaulting party written notice thereof. Elecnor Belco Electric, Inc. Page 7 19.2 Notwithstanding the above provisions, City shall have the right, at its sole discretion and without cause, of terminating this Contract at any time by giving seven (7) calendar days' prior written notice to Contractor. In the event of termination under this Section, City shall pay Contractor for Services satisfactorily performed and costs incurred up to the effective date of termination for which Contractor has not been previously paid. On the effective date of termination, Contractor shall deliver to City all materials purchased in performance of this Contract. 20. STANDARD PROVISIONS 20.1 Recitals. City and Contractor acknowledge that the above Recitals are true and correct and are hereby incorporated by reference into this Contract. 20.2 Compliance with all Laws. Contractor shall at its own cost and expense comply with all statutes, ordinances, regulations and requirements of all governmental entities, including federal, state, county or municipal, whether now in force or hereinafter enacted. In addition, all Work prepared by Contractor shall conform to applicable City, county, state and federal laws, rules, regulations and permit requirements and be subject to approval of the Project Administrator. 20.3 Integrated Contract. This Contract represents the full and complete understanding of every kind or nature whatsoever between the parties hereto, and all preliminary negotiations and agreements of whatsoever kind or nature are merged herein. No verbal agreement or implied covenant shall be held to vary the provisions herein. 20.4 Conflicts or Inconsistencies. In the event there are any conflicts or inconsistencies between this Contract and any other attachments attached hereto, the terms of this Contract shall govern. 20.5 Interpretation. The terms of this Contract shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of the Contract or any other rule of construction which might otherwise apply. 20.6 Amendments. This Contract may be modified or amended only by a written document executed by both Contractor and City and approved as to form by the City Attorney. 20.7 Severability. If any term or portion of this Contract is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Contract shall continue in full force and effect. 20.8 Controlling Law and Venue. The laws of the State of California shall govern this Contract and all matters relating to it and any action brought relating to this Contract shall be adjudicated in a court of competent jurisdiction in the County of Orange, State of California. Elecnor Belco Electric, Inc. Page 8 20.9 Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status, sex, sexual orientation, age or any other impermissible basis under law. 20.10 No Attorney's Fees. In the event of any dispute or legal action arising under this contract, the prevailing party shall not be entitled to attorneys' fees. 20.11 Counterparts. This Contract may be executed in two (2) or more counterparts, each of which shall be deemed an original and all of which together shall constitute one (1) and the same instrument. 21. EFFECT OF CONTRACTOR'S EXECUTION Execution of this Contract and all other Contract Documents by Contractor is a representation that Contractor has visited the Project site, has become familiar with the local conditions under which the Work is to be performed, and has correlated all relevant observations with the requirements of the Contract Documents. 22. WAIVER A waiver by City or any term, covenant, or condition in the Contract Documents shall not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant or condition. 23. RECITALS City and Contractor acknowledge that the above Recitals are true and correct and are hereby incorporated by reference into this Contract. [SIGNATURES ON NEXT PAGE] Elecnor Belco Electric, Inc. Page 9 IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed on the day and year first written above. APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date: h f (qTZ 5 By: pjd"��- 44 Aa on C. Harp aS City Attorney 0W - CITY OF NEWPORT BEACH, a California municipal corporation Date: 2q Z S By: 4 V Joe S plet Mayor ATTEST: CONTRACTOR: ELECNOR BELCO Date: �� ELECTRIC, INC., a California corporation .ate Date: Signed in Counterpart > By: � By: of y Perry)'t, Leonardo Sancho Frances Interim City Clerk 4' ~'�� Vice President Date: Signed in Counterpart By: Roger Devito Chief Legal Officer, Senior Vice President, Assistant Secretary [END OF SIGNATURES] Attachments: Exhibit A -- Labor and Materials Payment Bond Exhibit B -- Faithful Performance Bond Exhibit C — Insurance Requirements Elecnor Belco Electric, Inc. Page 10 IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed on the day and year first written above. APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date:—,6 I . I - 5 By: - �- A on C. Harp S City Attorney C� ATTEST: Date: CITY OF NEWPORT BEACH, a California municipal corporation Date: By: Joe Stapleton Mayor CONTRACTOR: ELECNOR BELCO ELECTRI2, INC., a California corporation Date: P By: By: 1" - Molly Perry Leona ancho Frances Interim City Clerk Vice Pr6§Went Date: ByrerDevito Officer, President, cretary [END OF SIGNATURES] Attachments: Exhibit A -- Labor and Materials Payment Bond Exhibit B -- Faithful Performance Bond Exhibit C - Insurance Requirements Elecnor Belco Electric, Inc. Page 10 CALIFORNIA ALL- PURPOSE CERTIFICATE OF ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of San Bernardino On 07/01 /25 before me, Rebecca Wilks, Notary Public ere insert name and UI e or me o icer personally appeared Leonardo Sancho Frances & Roger Devito who proved to me on the basis of satisfactory evidence to be the person 3whose name is re subscribed to the within instrument and acknowledged to me that he/sheAt executed the same in his/heo4E r uthorized capacity((ED and that by his/her ejDsignatureQ on the instrument the persons` , or the entity upon behalf of which the person sgacted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. REBECCA WILKS WITNESS my hand and official seal. Commission # 2462475 X Notary Public - California San Bernardino County ,.� My Comm. Expires Sep. 9, 2027 Lzul�I Notary Public Signature (Notary Public seal) ADDITIONAL OPTIONAL INFORMATION DESCRIPTION OF THE ATTACHED DOCUMENT (Title or description of attached document) (Title or description of attached document continued) Number of Pages Document Date CAPACITY CLAIMED BY THE SIGNER ❑ Individual (s) 0 Corporate Officer (Title) ❑ Partner(s) ❑ Attorney -in -Fact ❑ Trustee(s) ❑ Other �.vnrJ.NotaryClassr�s.ront �;(it:i-r�l'3-i3`zci5 INSTRUCTIONS FOR COMPLETING THIS FORM This form complies with current California statides regarding nolor) wording and, if needed, should be completed and attached to the document. Acknowledgments fi"om other slates main be completed for documents being sent to that state so long as the wording does not require the California notmn, to violate California nolan, law. • State and County information must be the State and County where the document signer(s) personally appeared before the notary public for acknowledgment. • Date of notarization must be the date that the signer(s) personally appeared which most also be the same date the acknowledgment is completed. • The notary public must print his or her name as it appears within his or her commission followed by a comma and then your title (notary public). • Print the name(s) of document signer(s) who personally appear at the time of notarization. • Indicate the correct singular or plural forms by crossing off incorrect forms (i.e. he/she/they- is /afe ) or circling the correct forms. Failure to correctly indicate this information may lead to rejection of document recording. • The notary seal impression must be clear and photographically reproducible. Impression must not cover text or lines. If seal impression smudges, re -seal if a sufficient area permits, otherwise complete a different acknowledgment form. • Signature of the notary public must match the signature on file with the office of the county clerk. Additional information is not required but could help to ensure this acknowledgment is not misused or attached to a different document. Indicate title or type of attached document, number of pages and date. Indicate the capacity claimed by the signer. If the claimed capacity is a corporate officer, indicate the title (i.e. CEO, CFO, Secretary). • Securely attach this document to the signed document with a staple. Premium: $3,870.00 EXHIBIT A CITY OF NEWPORT BEACH BOND NO.015228324 LABOR AND MATERIALS PAYMENT BOND WHEREAS, the City of Newport Beach, State of California, has awarded to Elecnor Belco Electric, Inc. hereinafter designated as the "Principal," a contract for: The work necessary for the completion of this contract consists of, but is not limited to: traffic signal rehabilitation and modification at four intersections, installation of CCTV equipment, installation of LED intersection luminaires, installation of LED internally illuminated street name signs with custom sign panels, and other items shown on, but not limited to plan no. T-6083-S, in the City of Newport Beach, in strict conformity with the Contract on file with the office of the City Clerk of the City of Newport Beach, which is incorporated herein by this reference. WHEREAS, Principal has executed or is about to execute the Contract and the terms thereof require the furnishing of a bond, providing that if Principal or any of Principal's subcontractors, shall fail to pay for any materials, provisions, or other supplies used in, upon, for, or about the performance of the Work agreed to be done, or for any work or labor done thereon of any kind, the Surety on this bond will pay the same to the extent hereinafter set forth. NOW, THEREFORE, We the undersigned Principal, and, Liberty Mutual Insurance Company duly authorized to transact business under the laws of the State of California, as Surety, (referred to herein as "Surety") are held and firmly bound unto the City of Newport Beach, in the sum of One Million One Hundred Ninety Two Thousand One Hundred Dollars ($1,192,100.00) lawful money of the United States of America, said sum being equal to 100% of the estimated amount payable by the City of Newport Beach under the terms of the Contract; for which payment well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly and severally, firmly by these present. THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal or the Principal's subcontractors, fail to pay for any materials, provisions, or other supplies, implements or machinery used in, upon, for, or about the performance of the Work contracted to be done, or for any other work or labor thereon of any kind, or for amounts due under the Unemployment Insurance Code with respect to such work or labor, or for any amounts required to be deducted, withheld and paid over to the Employment Development Department from the wages of employees of the Principal and subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to such work and labor, then the Surety will pay for the same, in an amount not exceeding the sum specified in this Bond, and also, in case suit is brought to enforce the obligations of this Bond, a reasonable attorneys' fee, to be fixed by the Court as required by the provisions of Section 9554 of the Civil Code of the State of California. The Bond shall inure to the benefit of any and all persons, companies, and corporations entitled to file claims under Section 9100 of the California Civil Code so as Elecnor Belco Electric, Inc. Page A-1 to give a right of action to them or their assigns in any suit brought upon this Bond, as required by and in accordance with the provisions of Sections 9500 et seq. of the Civil Code of the State of California. And Surety, for value received, hereby stipulates and agrees that no change, extension of time, alterations or additions to the terms of the Contract or to the Work to be performed thereunder shall in any wise affect its obligations on this Bond, and it does hereby waive notice of any such change, extension of time, alterations or additions to the terms of the Contract or to the Work or to the specifications. In the event that any principal above named executed this Bond as an individual, it is agreed that the death of any such principal shall not exonerate the Surety from its obligations under this Bond. IN WITNESS WHEREOF, this instrument has been duly executed by the above named Principal and Surety, on the 30th day of June , 20 25 . Elecnor Belco Electric, Inc. Name of Contractor (Principal) Liberty Mutual Insurance Company Name of Surety 175 Berkeley Street, Boston, MA 02116 Address of Surety (617) 357- 9500 Telephone APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date: -7h `l �Zf By. Aar n C. Harp City Attorney na re/Titl 5aY.p7Awat'. Authorized Agent Signature Michelle Anne McMahon, Attorney -In -Fact Print Name and Title (Corporate Seal) NOTARYACKNOWLEDGMENTS OF CONTRACTOR AND SURETY MUST BE ATTACHED VK S U °gyp or o 19'12 � fsgcry��� A Elecnor Belco Electric, Inc. Page A-2 CALIFORNIA ALL- PURPOSE CERTIFICATE OF ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of San Bernardino On 07/03/25 before me, Rebecca Wilks, Notary Public ere insert name and title or tile officer) personally appeared Roger DeVito who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s-) Is re subscribed to the within instrument and acknowledged to me that ieMe/they executed the same in 4aer/their authorized capacity(ies), and that by Is er/their signature(&) on the instrument the person(s), or the entity upon behalf of which the person(6-) acted, executed the instrument. certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. ., REBECCA WILKS WITNESS my hand and official seal. y Commission # 2462475 Notary Public - California °— San Bernardino County My Comm. Expires Sep. 9, 2027 Notary Public Signature (Notary Public Seal) �~ ADDITIONAL OPTIONAL INFORMATION DESCRIPTION OF THE ATTACHED DOCUMENT Newport Bond (Title or description of attached document) (Title or description of attached document continued) Number of Pages Document Date CAPACITY CLAIMED BY THE SIGNER ❑ Individual (s) ❑ Corporate Officer (Title) ❑ Partner(s) ❑ Attorney -in -Fact ❑ Trustee(s) ❑ Other vw,A,v.NotaryClasses.conl800-87 e1865 INSTRUCTIONS FOR COMPLETING THIS FORM This form complies with current California statutes regarding notary hording and, f needed, should be completed and attached to the document. Acknowledgments from other states mar be completed /or documents being sent to that state so long as the hording does not require the California notan• to violate California notary la,v. • State and County information must be the State and County where the document signer(s) personally appeared before the notary public for acknowledgment. • Date of notarization must be the date that the signer(s) personally appeared which must also be the same date the acknowledgment is completed. • The notary public must print his or her name as it appears within his or her commission followed by a comma and then your title (notary public). • Print the name(s) of document signer(s) who personally appear at the time of notarization. • Indicate the correct singular or plural forms by crossing off incorrect forms (i.e. he/sheAey; is /are ) or circling the correct forms. Failure to correctly indicate this information may lead to rejection of document recording. • The notary seal impression must be clear and photographically reproducible. Impression must not cover text or lines. If seal impression smudges, re -seal if a sufficient area permits, otherwise complete a different acknowledgment form. • Signature of the notary public must match the signature on file with the office of the county clerk. Additional information is not required but could help to ensure this acknowledgment is not misused or attached to a different document. Indicate title or type of attached document, number of pages and date. Indicate the capacity claimed by the signer. If the claimed capacity is a corporate officer, indicate the title (i.e. CEO, CFO, Secretary). • Securely attach this document to the signed document with a staple. ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of } ss. On , 20 before me, , Notary Public, personally appeared who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. (seal) State of Ctffix Connecticut County of Hartford } ss. On June 30 , 2025 before me, Ashley Alexis Notary Public, personally appeared Michelle Anne McMahon proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. 1 certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS and n e I seal. ASHLEY ALEXIS NOTARY PUBLIC- #192450 Si nature STATE OF CONNECTICUT (seal) Aso,y A �- 9lexis, Notary Public MY COMMISSION EXPIRES AUG. 31, 2029 Elecnor Belco Electric, Inc. Page A-3 Liberty POWER OF ATTORNEY Mutual® Liberty Mutual Insurance Company Certificate No: 8214122- 985949 SURETY The Ohio Casualty Insurance Company West American Insurance Company KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Danielle M. Bechard; Jonathan Gleason; Jennifer Godere; Richard Hackner; Chad Warren Johnson; Michelle Anne McMahon; Nicholas Miller; Doritza Mojica; Sarah Murtha; Kathryn Pryor; Robyn Salley; Joshua Sanford; Gentry Stewart; Kyle Williams; Connor Wolpert all of the city of Hartford state of CT each individually if there be more than one named, its true and lawful attorney -in -fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 30th day of May 2025 Liberty Mutual Insurance Company P� \NSU,01 P��v INS& \NSURq The Ohio Casualty Insurance Company =PO�rQynm 2�°aPO�rb C, �G ��oaPORq>��'n West American Insurance Company u o m 19 0oy19190 O s 1991 �m dj19sS9CHU`'��.da y��NA MPsa .da `!s �4'0101" da c 0/7 + �� ''yl + t �'M * A� By: N Nathan J. Zangede, Assistant Secretary La Lm State of PENNSYLVANIA ss : County of MONTGOMERY Cn 0 S On this 30th day of May 2025 before me personally appeared Nathan J. Zangerle, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance co Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes G) > therein contained by signing on behalf of the corporations by himself as a duly authorized officer. a� Co Cc O L aj O 0.2 C N N N O1N L O._ C Eai om -a > ca c > a> w, L O L Z IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year first above written 9P PAsl PQ, �0, C OF Commonwealth of Pennsylvania - Notary Seal Montgomery County Teresa Pastella, Notary Public�Q%�C�-Q/ My commission expires March 28, 2029 ®A By: v Commission number 1126044 eresa Pastella, Notary Public 2syNS'IIVP�\\C, 4qy PV0 Member, Pennsylvania Association of Notaries This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: ARTICLE IV —OFFICERS: Section 12. Power of Attorney. Any officer or other official of the Corporation authorized for that purpose in writng by the Chairman or the President, and subject to such limitation as the Chairman or the President may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attomeys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attomey-in-fact under the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. ARTICLE XIII —Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attomeys-in-fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation — The President of the Company, acting pursuant to the Bylaws of the Company, authorizes Nathan J. Zangede, Assistant Secretary to appoint such attomeys-in-fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Authorization — By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed. I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full fro ce and effect and has not been revoked. �,� 11 UR4 IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 30th day of June 2025 po�a \Nsu.1 01 INSU,p \NSUo P J 3`p0.voRyr�oym apo�rFgyCf G 2GoaaorfyT�'G 7 g 191E 0 f 1912 n o: 1919 o Q 1991 0��sgcruy`��pa rdd ss1CHUS��da ZOhAMPsaa ( N°IANP a3 By: 7 + ej� * , Renee C. Llewellyn, Assistant Secretary LMS-12873 LMIC OCIC WAIC Multi Co O2/24 Premium: $3,870.00 CITY OF NEWPORT BEACH BOND NO.015228324 FAITHFUL PERFORMANCE BOND KNOW ALL PERSONS BY THESE PRESENTS: THAT WHEREAS, the City of Newport Beach, (hereinafter referred to as "City") has awarded to Elecnor Belco Electric, Inc., (hereinafter referred to as the "Contractor") an agreement for: The work necessary for the completion of this contract consists of, but is not limited to: traffic signal rehabilitation and modification at four intersections, installation of CCTV equipment, installation of LED intersection luminaires, installation of LED internally illuminated street name signs with custom sign panels, and other items shown on, but not limited to plan no. T-6083-S (hereinafter referred to as the "Project"). WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated June 24, 2025 , (hereinafter referred to as "Contract Documents"), the terms and conditions of which are expressly incorporated herein by reference; and WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents. NOW, THEREFORE, we, the undersigned Contractor and Liberty Mutual Insurance Company as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the City in the sum of One Million One Hundred Ninety Two Thousand One Hundred Dollars ($1,192,100.00), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, their or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one (1) year guarantee of all materials and workmanship; and shall indemnify and save harmless the City, their respective officials, officers, employees, and authorized volunteers, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect. As a part of the obligation secured hereby and in addition to the face amount specified therefore, there shall be included costs and reasonable expenses and fees including reasonable attorney's fees, incurred by City in enforcing such obligation. Elecnor Belco Electric, Inc. Page B-1 As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by City, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City's rights or the Contractor or Surety's obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure Section 337.15. Whenever Contractor shall be, and is declared by the City to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the City's option: Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term "balance of the contract price" as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents. iii. Permit the City to complete the Project in any manner consistent with California law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term "balance of the contract price" as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the 'Contract Documents. Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor. Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the City, when declaring the Contractor in default, notifies Surety of the City's objection to Contractor's further participation in the completion of the Project. Elecnor Belco Electric, Inc. Page B-2 The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project. IN WITNESS WHEREOF, this instrument has been duly executed by the Principal and Surety above named, on the 30th day of _ Aune 2025 . Elecnor Belco Electric, Inc. Name of Contractor (Principal) Liberty Mutual Insurance Company Name of Surety 175 Berkeley Street, Boston, MA 02116 Address of Surety (617) 357- 9500 Telephone (Attach Attorney -in -Fact Certificate) horZ�jjgnature/Title` 1� �1 rP.�A�sstae�. Attorney -in- moo+ 1912 Michelle Anne McMahon, Attorney -In -Fact �� gCHO- Aa Print Name and Title (Corporate Seal) The rate of premium on this bond is $3.38/Slide per thousand. The total amount of premium charges is $ 3,870.00 (The above must be filled in by corporate attorney.) Any claims under this bond may be addressed to: (Name and Address of Surety or Liberty Mutual Surety Agent for Service in California) 790 The City Drive South, Suite 200 Orange, CA 92868 APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Dal NOTARY ACKNOWLEDGMENTS OF CONTRACTOR AND SURETY MUST BE ATTACHED Elecnor Belco Electric, Inc. Page B-3 CALIFORNIA ALL- PURPOSE CERTIFICATE OF ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of San Bernardino On 07/03/25 before me, Rebecca Wilks, Notary Public ere insert name ana ttfie or t e officer) personally appeared Roger DeVito who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) Is re subscribed to the within instrument and acknowledged to me that `ieZshe/they executed the same in 41Ts er/their authorized capacity(ie-s), and that by Is er/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. REBECCA WILKS WITNESS my hand and official seal. LOY Commission#2462475 Notary Public - California San Bernardino County My Comm. Expires Sep. 9, 2027 NotaryVIGNE Signature (Notary Public Seal) ADDITIONAL OPTIONAL INFORMATION DESCRIPTION OF THE ATTACHED DOCUMENT Newport Bond (Title or description of attached document) (Title or description of attached document continued) Number of Pages Document Date CAPACITY CLAIMED BY THE SIGNER ❑ Individual (s) ❑ Corporate Officer (Title) ❑ Partner(s) ❑ Attorney -in -Fact ❑ Trustee(s) ❑ Other e,,%,v. v.NotarvClasses.con1 800-873-98f15 INSTRUCTIONS FOR COMPLETING THIS FORM This form complies with current California stances regarding notary wording and, f needed. should be completed and attached to the docutnent. Acknowledgments from other states may be completed for documents being sent to that state so long as the hording does not rewire the California notar v to violate California notary la,v. • State and County information must be the State and County where the document signer(s) personally appeared before the notary public for acknowledgment. • Date of notarization must be the date that the signer(s) personally appeared which must also be the same date the acknowledgment is completed. • The notary public must print his or her name as it appears within his or her commission followed by a comma and then your title (notary public). • Print the name(s) of document signer(s) who personally appear at the time of notarization. • Indicate the correct singular or plural forms by crossing off incorrect fonns (i.e. lie/she/tliey; is /are ) or circling the correct forms. Failure to correctly indicate this information may lead to rejection of document recording. • The notary seal impression must be clear and photographically reproducible. Impression must not cover text or lines. If seal impression smudges, re -seal if a sufficient area permits, otherwise complete a different acknowledgment form. • Signature of the notary public must match the signature on file with the office of the county clerk. Additional information is not required but could help to ensure this acknowledgment is not misused or attached to a different document. Indicate title or type of attached document, number of pages and date. Indicate the capacity claimed by the signer. If the claimed capacity is a corporate officer, indicate the title (i.e. CEO, CFO, Secretary). • Securely attach this document to the signed document with a staple. ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of SS. On 20 before me, Notary Public, personally appeared who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. (seal) State of (39V&M Connecticut County of Hartford } ss. On June 30 , 2025 before me, Ashley Alexis Notary Public, personally appeared Michelle Anne McMahon proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and offici ASHLEY ALEXIS NOTARYPUBLIC- #192450 Sgn re STATE OF CONNECTICUT (seal) Ashley-/-\ exis, Notary Public MY COMMISSION EXPIRES AUG, 31, 2029 Elecnor Belco Electric, Inc. Page B-4 Liberty POWER OF ATTORNEY Mutual. Liberty Mutual Insurance Company SURETY The Ohio Casualty Insurance Company West American Insurance Company Certificate No: 8214122- 985949 KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Danielle M. Bechard; Jonathan Gleason; Jennifer Godere; Richard Hackner; Chad Warren Johnson; Michelle Anne McMahon; Nicholas Miller; Doritza Mojica; Sarah Murtha; Kathryn Pryor; Robyn Salley; Joshua Sanford; Gentry Stewart; Kyle Williams; Connor Wolpert all of the city of Hartford state of CT each individually if there be more than one named, its true and lawful attorney -in -fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 30th day of May , 2025 . 1NSU,pq POSH INS& d %NSU�pq 4oaeoryq Qy�ca �J 40——4l'Qyy� uP oaroR,4r y� 3 m 3 F 1912 n o 1919 1991 0 2 O Q d��SSCHU`'.da y���HAMPsa\,da �s �NDIANP .rib B c`u I State of PENNSYLVANIA cgJ County of MONTGOMERY Liberty Mutual Insurance Company The Ohio Casualty Insurance Company West American Insurance Company °iF1 L- Nathan J. Zangede, Assistant Secretary On this 30th day of May , 2025 before me personally appeared Nathan J. Zangede, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting SN PASl Q41 MpN WF F< Commonwealth of Pennsylvania - Notary Seal 7 Teresa Paslella, Notary Public OF Montgomery County Pennsylvania, on the day and year first above written. My commission expires March 26, 2029 By: �v Commission number 1126044 ..... am er, ennsyvaniaAssociabono Notanes Pastella, Notary Public hgRy PVei� N 2 This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual Insurance O •S Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: N ARTICLE IV — OFFICERS: Section 12. Power of Attorney. o Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the President U may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all co > m undertakings, bonds, recognizances and other surety obligations. Such attomeys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full o power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall Z be as binding as if signed by the President and attested to by the Secretary. Any power or autholity granted to any representative or attomey-in-fact under the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. ARTICLE XIII — Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attomeys-in-fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation — The President of the Company, acting pursuant to the Bylaws of the Company, authorizes Nathan J. Zangede, Assistant Secretary to appoint such attomeys-in-fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Authorization — By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attomey issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed. I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has not been revoked. 4 %*J q 1, J 2Gnp,P 0RarFo��i� 1912 ����'QACNUy�ad! IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 30th day of P� 1NSURq P��Y INS& 114SUy j4oaaoRyroy�ca ooaPo`�r�yc+ \GP2Dµcok 1912 0 1919 Lu 1991 s v p Q o d.� sSgCHUs��.da yO R�hAMPsa`,dD !s By. �NDIANP ,aa3 June , 2025 LMS-12873 LMIC OCIC WAIC Multi Co 02/24 EXHIBIT C INSURANCE REQUIREMENTS — PUBLIC WORKS AND CONSTRUCTION 1. Provision of Insurance. Without limiting Contractor's indemnification of City, and prior to commencement of Work, Contractor shall obtain, provide and maintain at its own expense during the term of this Contract, policies of insurance of the type and amounts described below and in a form satisfactory to City. Contractor agrees to provide insurance in accordance with requirements set forth here. If Contractor uses existing coverage to comply and that coverage does not meet these requirements, Contractor agrees to amend, supplement or endorse the existing coverage. 2. Acceptable Insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, with an assigned policyholders' Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide, unless otherwise approved by the City's Risk Manager. 3. Coverage Requirements. A. Workers' Compensation Insurance. Contractor shall maintain Workers' Compensation Insurance providing statutory benefits and Employer's Liability Insurance with limits of at least one million dollars ($1,000,000) each employee for bodily injury by accident and each employee for bodily injury by disease in accordance with the laws of the State of California. In addition, Contractor shall require each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with California law for all of the subcontractor's employees. Contractor shall submit to City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of City, its City Council, boards and commissions, officers, agents, volunteers, employees, and any person or entity owning or otherwise in legal control of the property upon which Contractor performs the Project and/or Services contemplated by this Agreement. B. General Liability Insurance. Contractor shall maintain commercial general liability insurance, and if necessary excess/umbrella liability insurance, with coverage at least as broad as provided by Insurance Services Office form CG 00 01, in an amount not less than two million dollars ($2,000,000) per occurrence, four million dollars ($4,000,000) general aggregate and four million dollars ($4,000,000) completed operations aggregate. The policy shall cover liability arising from bodily injury, property damage, products - completed operations, personal and advertising injury, and liability Elecnor Belco Electric, Inc. Page C-1 assumed under an insured contract (including the tort liability of another assumed in a business contract). C. Automobile Liability Insurance. Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of Contractor arising out of or in connection with Work to be performed under this Contract, including coverage for any owned, hired, non -owned or rented vehicles, in an amount not less than one million dollars ($1,000,000) combined single limit for each accident. D. Excess/Umbrella Liability_Insurance. If any Excess or Umbrella Liability policies are used to meet the limits of liability required by this contract, then said policies shall be "following form" of the underlying policy coverage, terms, conditions, and provisions and shall meet all of the insurance requirements stated in this contract, including, but not limited to, the additional insured and primary & non-contributory insurance requirements stated herein. No insurance policies maintained by the City, whether primary or excess, and which also apply to a loss covered hereunder, shall be called upon to contribute to a loss until the Contractor's primary and excess/umbrella liability policies are exhausted. 4. Other Insurance Requirements. The policies are to contain, or be endorsed to contain, the following provisions: A. Waiver of Subrogation. All insurance coverage maintained or procured pursuant to this Contract shall be endorsed to waive subrogation against City, its City Council, boards and commissions, officers, agents, volunteers, employees, and any person or entity owning or otherwise in legal control of the property upon which Contractor performs the Project and/or Services contemplated by this Agreement or shall specifically allow Contractor or others providing insurance evidence in compliance with these requirements to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its subcontractors. B. Additional Insured Status. All liability policies including general liability, products and completed operations, excess/umbrella liability, and automobile liability, if required, shall provide or be endorsed to provide that City, its City Council, boards and commissions, officers, agents, volunteers, employees, and any person or entity owning or otherwise in legal control of the property upon which Contractor performs the Project and/or Services contemplated by this Agreement shall be included as additional insureds under such policies. C. Primary and Non -Contributory. Contractor's insurance coverage shall be Elecnor Belco Electric, Inc. Page C-2 primary insurance and/or the primary source of recovery with respect to City, its City Council, boards and commissions, officers, agents, volunteers and employees. Any insurance or self-insurance maintained by City shall be excess of Contractor's insurance and shall not contribute with it. D. Notice of Cancellation. All policies shall provide City with thirty (30) calendar days' notice of cancellation or nonrenewal of coverage (except for nonpayment for which ten (10) calendar days' notice is required) for each required coverage. 5. Additional Agreements Between the Parties. The parties hereby agree to the following: A. Evidence of Insurance. Contractor shall provide certificates of insurance to City as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers' compensation and other endorsements as specified herein for each coverage. All of the executed documents referenced in this Contract must be returned to City within ten (10) regular City business days after the date on the "Notification of Award". Insurance certificates and endorsements must be approved by City's Risk Manager prior to commencement of performance. Current certification of insurance shall be kept on file with City at all times during the term of this Contract. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf. At least fifteen (15) days prior to the expiration of any such policy, evidence of insurance showing that such insurance coverage has been renewed or extended shall be filed with the City. If such coverage is cancelled or reduced, Contractor shall, within ten (10) days after receipt of written notice of such cancellation or reduction of coverage, file with the City evidence of insurance showing that the required insurance has been reinstated or has been provided through another insurance company or companies. City reserves the right to require complete, certified copies of all required insurance policies, at any time. B. City's Right to Revise Requirements. The City reserves the right at any time during the term of the Contract to change the amounts and types of insurance required by giving Contractor sixty (60) calendar days' advance written notice of such change. If such change results in substantial additional cost to Contractor, City and Contractor may renegotiate Contractor's compensation. C. Right to Review Subcontracts. Contractor agrees that upon request, all agreements with subcontractors or others with whom Contractor enters into contracts with on behalf of City will be submitted to City for review. Failure of City to request copies of such agreements will not impose any liability on City, or its employees. Contractor shall require and verify that all Elecnor Belco Electric, Inc. Page C-3 subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors shall provide coverage with a format at least as broad as CG 20 38 04 13. D. Enforcement of Contract Provisions. Contractor acknowledges and agrees that any actual or alleged failure on the part of City to inform Contractor of non-compliance with any requirement imposes no additional obligations on City nor does it waive any rights hereunder. E. Requirements not Limiting. Requirements of specific coverage features or limits contained in this Exhibit A are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for higher limits maintained by the Contractor. Any available proceeds in excess of specified minimum limits of insurance and coverage shall be available to the City. F. Self -Insured Retentions. Contractor agrees not to self -insure or to use any self -insured retentions on any portion of the insurance required herein and further agrees that it will not allow any indemnifying party to self -insure its obligations to City. If Contractor's existing coverage includes a self -insured retention, the self -insured retention must be declared to City. City may review options with Contractor, which may include reduction or elimination of the self -insured retention, substitution of other coverage, or other solutions. Contractor agrees to be responsible for payment of any deductibles on their policies. G. City Remedies for Non -Compliance. If Contractor or any subcontractor fails to provide and maintain insurance as required herein, then City shall have the right but not the obligation, to purchase such insurance, to terminate this Contract, or to suspend Contractor's right to proceed until proper evidence of insurance is provided. Any amounts paid by City shall, at City's sole option, be deducted from amounts payable to Contractor or reimbursed by Contractor upon demand. H. Timely Notice of Claims. Contractor shall give City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor's performance under this Contract, and that involve or may involve coverage under any of the required liability policies. City assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve City. Elecnor Belco Electric, Inc. Page C-4 I. Contractor's Insurance. Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgement may be necessary for its proper protection and prosecution of the Work. J. Coverage Renewal. Contractor will renew the coverage required here annually as long as Contractor continues to provide any Work under this or any other Contract or agreement with City. Contractor shall provide proof that policies of insurance required herein expiring during the term of this Contract have been renewed or replaced with other policies providing at least the same coverage. Proof that such coverage has been ordered shall be submitted prior to expiration. A coverage binder or letter from Contractor's insurance agent to this effect is acceptable. A certificate of insurance and/or additional insured endorsement as required in these specifications applicable to the renewing or new coverage must be provided to City with five (5) calendar days of the expiration of the coverages. K. Maintenance of General Liability Coverage. Contractor agrees to maintain commercial general liability coverage for a period of ten (10) years after completion of the Project or to obtain coverage for completed operations liability for an equivalent period. Elecnor Belco Electric, Inc. Page C-5 City of Newport Beach FY2024-25 TRAFFIC SIGNAL REHABILITATION Contract No. 9718-1 PROPOSAL (Contractor shall submit proposals via the PROPOSAL (Bid Line Items) contained in PlanetBids. Contractor shall sign the below acknowledgement) To the Honorable City Council City of Newport Beach 100 Civic Center Drive Newport Beach, California 92660 Councilmembers: The undersigned declares that the Contractor has carefully examined the location of the work, has read the Instructions to the Bidders, has examined the Plans and Special Provisions, and hereby proposes to furnish all materials except that material supplied by the City and shall perform all work required to complete Contract No. 9718-1 in accordance with the Plans and Special Provisions, and will take in full payment therefore the following unit prices for the work, complete in place, to wit: 6/02/2025 Date (909) 993- 5470 Fax: (909) 993 - 5476 Bidder's Telephone and Fax Numbers^ 738518 A,B,C-10 Bidder's License No(s). and Classification(s) 1000004804 DIR Registration Number Elecnor Belco Electric, Inc. Bid er John Wong Executive Vice President Bi de s A horized Signature and Title 14320 Way Chino, CA 91710 Bidder's Address Bidder's email address: Jwong@elecnor.com PR-1 re � �2�fIS;, "_/ CITY OF NEWPORT BEACH ` PUBLIC WORKS DEPARTMENT No- 60 32 INDEX * * i FOR �Jf SPECIAL PROVISIONS \OF Chi TRAFFIC SIGNAL REHABILITATION PROGRAM 25T01 FY 2024-2025 CONTRACT NO. 9718-1 PART 1 - GENERAL PROVISIONS 1 SECTION 1-TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1 1-2 TERMS AND DEFINITIONS 1 SECTION 2 - SCOPE AND CONTROL OF THE WORK 2-1 AWARD AND EXECUTION OF THE CONTRACT 2-1.1 Contractor's Qualifications 2-5 PLANS AND SPECIFICATIONS 2-5.2 Precedence of Contract Documents 2-6 WORK TO BE DONE 2-9 SURVEYING 2-9.1 Permanent Survey Markers 2-9.2 Survey Service SECTION 3 — CHANGES IN WORK 3-3 EXTRA WORK 3-3.2 Payment 3-3.2.2 Basis for Establishing Cost 3-3.2.3 Markup SECTION 4 - CONTROL OF MATERIALS 4-1 MATERIALS AND WORKMANSHIP 4-1.3 Inspection Requirements 4-1.3.1 General SECTION 5 - UTILITIES 5-1 LOCATION 5-1.1 General 5-2 PROTECTION 5-4 RELOCATION 2 2 2 2 2 3 3 3 3 4 4 4 4 4 4 4 4 4 5 5 5 5 6 SECTION 6 - PROSECUTION, PROGRESS AND ACCEPTANCE OF THE WORK 6 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK 6 6-1.1 Construction Schedule 6 6-7 TIME OF COMPLETION 7 6-7.1 General 7 6-7.2 Scheduling of Traffic Signal Work 8 6-8 COMPLETION, ACCEPTANCE, AND WARRANTY 9 6-9 LIQUIDATED DAMAGES 9 SECTION 7 - RESPONSIBILITIES OF THE CONTRACTOR 10 7-1 THE CONTRACTOR'S EQUIPMENT AND FACILITIES 10 7-1.2 Temporary Utility Services 10 7-2 LABOR 10 7-2.2 Prevailing Wages 10 7-7 COOPERATION AND COLLATERAL WORK 10 7-8 WORK SITE MAINTENANCE 11 7-8.4 Storage of Equipment and Materials 11 7-8.4.2 Storage in Public Streets 11 7-8.6 Water Pollution Control 11 7-8.6.2 Best Management Practices (BMPs) 11 7-10 SAFETY 11 7-10.3 Haul Routes 11 7-10.4 Safety 12 7-10.4.1 Work Site Safety 12 7-10.5 Security and Protective Devices 12 7-10.5.3 Steel Plate Covers 12 SECTION 9 - MEASUREMENT AND PAYMENT 12 9-2 LUMP SUM WORK 12 9-3 PAYMENT 12 9-3.1 General 12 9-3.2 Partial and Final Payment. 15 PART 2 - CONSTRUCTION MATERIALS 16 SECTION 200 — ROCK MATERIALS 16 200-2 UNTREATED BASE MATERIALS 16 200-2.1 General 16 SECTION 201 - CONCRETE, MORTAR, AND RELATED MATERIALS 16 201-1 PORTLAND CEMENT CONCRETE 16 201-1.1 Requirements 16 201-1.1.2 Concrete Specified by Class and Alternate Class 16 201-2 REINFORCEMENT FOR CONCRETE 16 201-2.2 Steel Reinforcement 16 201-2.2.1 Reinforcing Steel 16 SECTION 214—TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS AND PAVEMENT MARKERS 16 214-4 PAINT FOR STRIPING AND MARKINGS 16 214-4.1 General 16 214-6 PAVEMENT MARKERS 16 214-6.3 Non -Reflective Pavement Markers 17 214-6.3.1 General 17 214-6.4 Retroreflective Pavement Markers 17 214-6.4.1 General 17 PART 3 - CONSTRUCTION METHODS 17 SECTION 300 - EARTHWORK 17 300-1 CLEARING AND GRUBBING 17 300-1.3 Removal and Disposal of Materials 17 300-1.3.1 General 17 300-1.3.2 Requirements 18 SECTION 303 - CONCRETE AND MASONRY CONSTRUCTION 18 303-1 CONCRETE STRUCTURES 18 303-1.2 Subgrade for Concrete Structures 18 303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY INTERSECTIONS, ACCESS RAMPS AND DRIVEWAYS 18 303-5.1 Requirements 18 303-5.1.1 General 18 303-5.5 Finishing 18 303-5.5.2 Curb 18 303-5.5.4 Gutter 18 SECTION 310 — PAINTING 19 310-1 GENERAL. 19 SECTION 314—TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT MARKERS 20 314-4 APPLICATION OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS 20 314-4.1 General 20 314-4.2 Control of Alignment and Layout 20 314-4.2.1 General 20 314-4.4 Thermoplastic Traffic Striping and Pavement Markings 20 314-4.4.1 General 20 314-4.4.2 Surface Preparation 21 314-5 PAVEMENT MARKERS 21 314-5.1 General 21 SECTION 315 - TRAFFIC SIGN INSTALLATION 21 PART 6 - TEMPORARY TRAFFIC CONTROL 21 SECTION 600 - ACCESS 21 600-1 GENERAL 21 600-2 VEHICULAR ACCESS 21 600-3 PEDESTRIAN ACCESS 22 SECTION 601— WORK AREA TRAFFIC CONTROL 23 601-1 GENERAL 23 601-2 TRAFFIC CONTROL PLAN (TCP) 23 PART 7 - STREET LIGHTING AND TRAFFIC SIGNAL SYSTEMS 24 SECTION 700 — MATERIALS 24 700-3 COMMON COMPONENTS 24 700-3.1 General. 24 700-3.3 Standards. 24 700-3.5 Conduit 25 700-3.7 Pull Boxes 26 700-4 STREET LIGHTING SYSTEM MATERIALS. 27 700-4.9 LED Luminaires 27 700-5 TRAFFIC SIGNAL MATERIALS 28 700-5.3 Conductors and Cable. 28 700-5.3.3 Interconnect Cable. 28 700-5.3.4 Fiber Optic Cable. 30 700-5.4 Controllers. 37 700-5.4.3 Cabinets. 37 700-5.5 Traffic Signal Faces and Fittings. 43 700-5.6 Pedestrian Signal Sections. 44 700-5.9 Pedestrian Push Button Assemblies. 44 700-5.8 Detectors. 700-6 FIBER OPTIC EQUIPMENT 700-6.1 Fiber Patch Panel/Wall Interconnect Unit. 700-6.2 Fiber Distribution Unit (FDU). 700-6.3 Splice Closure. 700-6.4 Ethernet System. 700-7 CCTV SYSTEM 700-8 OPTICOM PRIORITY CONTROL SYSTEM 700-9 BATTERY BACKUP SYSTEM 700-10 LED INTERNALLY ILLUMINATED STREET NAME SIGNS. SECTION 701— CONSTRUCTION 701-1 GENERAL 701-8 FOUNDATIONS, FOUNDATION CAPS AND SLABS 701-8.2 Foundations. 701-11 PULL BOXES 701-12 CONDUIT 701-14 SERVICES 701-17 TRAFFIC SIGNAL CONSTRUCTION 701-17.4 Wiring, Conductors and Cable. 701-17.4.4 Interconnect. 701-17.4.5 Fiber Optic Cable. 701-17.6 Detectors. 701-17.6.3 Inductive Loop Detectors 44 45 45 45 46 48 49 50 51 52 52 52 55 55 56 57 59 59 59 59 60 70 70 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT SPECIAL PROVISIONS TRAFFIC SIGNAL REHABILITATION PROGRAM 25T01 FY 2024-2025 CONTRACT NO. 9718-1 INTRODUCTION All work necessary for the completion of this contract shall be done in accordance with (1) these Special Provisions; (2) the Plans (Drawing No. T-6083-S; (3) the City's Design Criteria Standard Special Provisions and Standard Drawings for Public Works Construction, (2021 Edition), including Supplements; (4) Standard Specifications for Public Works Construction (2018 Edition) including supplements; (5) Standard Specifications and the Standard Plans of the State of California, Department of Transportation (2018 Edition); and (6) Standard Specifications and the Standard Plans of the State of California, Department of Transportation (2010 Edition (Pre -errata) — For traffic signal standards/poles, foundations, anchor bolts, and ancillary items only), unless otherwise noted on the Plans. The City's Design Criteria, Standard Special Provisions and Standard Drawings for Public Works Construction are available at the following website: http://www.newportbeachca.gov/government/departments/public-works/resources Copies of the Standard Specifications for Public Works Construction may be purchased from Building News, Inc., 1612 South Clementine Street, Anaheim, CA 92802, 714-517- 0970. The following Special Provisions supplement or modify the Standard Specifications for Public Works Construction as referenced and stated hereinafter: PART 1 - GENERAL PROVISIONS SECTION 1 — TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-2 TERMS AND DEFINITIONS Add the following definition: City — City of Newport Beach Pagel of 70 SECTION 2 - SCOPE AND CONTROL OF THE WORK 2-1 AWARD AND EXECUTION OF THE CONTRACT At the time of the award and until completion of work, the Contractor shall possess a "C- 10" license. At the start of work and until completion of work, the Contractor and all Subcontractors shall possess a valid Business License issued by the City. 2-1.1 Contractor's Qualifications General This section describes mandatory experience requirements for Contractors and/or Subcontractor(s) bidding on this project. Contractors and/or Subcontractor(s) not meeting the requirements of this section will have their bid deemed non -responsive. Requirements In addition to having sufficient experience in the electrical work regarding traffic signal modifications, the Contractors and/or Subcontractor(s) shall have sufficient experience in the installation and integration of fiber optic cable, closed circuit television (CCTV) cameras, and electronic communication equipment. At the discretion of the Engineer, the minimum requirements for sufficient experience are as follows: 1. The Contractor (or its Subcontractor(s)) shall have three (3) years' experience in the installation of fiber optic cables, including fusion splicing, terminating, and testing of single -mode fiber optic cable. 2. The Contractor (or its Subcontractor(s)) shall have completed at least two (2) systems where fiber optic cables were installed in outdoor conduits and the systems have been in continuous satisfactory operation for at least one year. 3. The Contractor (or its Subcontractor(s)) shall have completed at least two (2) systems where communications equipment was installed in and the systems have been in continuous satisfactory operation for at least one year. 4. The Contractor (or its Subcontractor(s)) shall have completed at least two (2) systems where CCTV cameras and associated equipment were installed in and the systems have been in continuous satisfactory operation for at least one year. Each qualifying project must have included at least two (2) miles of underground conduit with fiber optic cabling. In addition, each qualifying project must have been constructed within a public street or within a public easement. 2-5 PLANS AND SPECIFICATIONS 2-5.2 Precedence of Contract Documents If there is a conflict or discrepancy between different Contract Documents, the more stringent requirement as determined by the Engineer shall control. Page 2 of 70 2-6 WORK TO BE DONE The work necessary for the completion of this contract consists of, but is not limited to: traffic signal rehabilitation and modification at four intersections, installation of CCTV equipment, installation of LED intersection luminaires, installation of LED internally illuminated street name signs with custom sign panels, and other items shown on, but not limited to plan no. T-6083-S. 2-9 SURVEYING 2-9.1 Permanent Survey Markers Delete the second paragraph and replace with the following: The Contractor shall submit to the Engineer, a minimum of 7 days prior to the start of work, a list of controlling survey monuments, which may be disturbed. The Contractor will: a) set survey points outside the affected work area that reference and locate each controlling survey monument that may be disturbed, b) file a Corner Record or Record of Survey with the County Surveyor after setting the survey points to be used for re-establishment of the disturbed controlling survey monuments, and c) file a Corner Record or Record of Survey with the County Surveyor after reestablishment of the disturbed (permanent) controlling survey monuments. The Contractor shall protect all survey monuments during construction operations. In the event that existing survey monuments are removed or otherwise disturbed during the course of work, the Contractor shall restore the affected survey monuments at his sole expense. The Contractor's Licensed Surveyor shall file the required Corner Record or Record of Survey with the County Surveyor upon monument restoration. Existing street centerline ties and property corner monuments are to be preserved. The Contractor shall be responsible for the cost of restoring all survey ties and/or monuments damaged by the Work. 2-9.2 Survey Service Delete this section and replace with the following: The Contractor's California Licensed Land Surveyor shall utilize/follow the existing City survey records used for the project design to provide all construction survey services that are required to construct the improvements. Page 3 of 70 SECTION 3 — CHANGES IN WORK 3-3 EXTRA WORK 3-3.2 Payment 3-3.2.2 Basis for Establishing Cost 3-3.2.2.3 Tool and Equipment Rental Tool and equipment rental rates shall be based on the current Caltrans rental rates. 3-3.2.3 Markup 3-3.2.3.1 Work by the Contractor Delete this section and replace with the following: The following percentages shall be added to the Contractor's costs (prior to any markups) and shall constitute the markup for all overhead and profit: 1) Labor ............................................ 15 2) Materials ....................................... 15 3) Equipment Rental ........................... 15 4) Other Items and Expenditures ........... 15 3-3.2.3.2 Work by a Subcontractor Delete this section and replace with the following: When all or any part of the extra work is performed by a Subcontractor, the markup established in Section 3-3.2.3.1 shall be applied by the Subcontractor to the actual costs (prior to any markups) and shall constitute the markup for all overhead and profit. An additional markup of five (5) percent of the subcontracted actual cost (prior to any markups) may be added by the Contractor. To the sum of the costs and markups provided for in this subsection, one (1) percent may be added for compensation for bonding. SECTION 4 - CONTROL OF MATERIALS 4-1 MATERIALS AND WORKMANSHIP 4-1.3 Inspection Requirements 4-1.3.1 General All material and articles furnished by the Contractor shall be subject to rigid inspection, and no material or article shall be used until it has been inspected and accepted by the Engineer. The Contractor shall furnish the Engineer with full information as to the progress of the work in its various parts and shall give the Engineer timely (48-hours Page 4 of 70 minimum) notice of the Contractor's readiness for inspection. Submittals are required for all construction material. The Engineer shall select an independent testing laboratory and pay for all testing as specified in the various sections of the Standard Special Provisions and these Special Provisions. When, in the opinion of the Engineer, additional tests and retesting due to failed tests or inspections are required because of unsatisfactory results in the manner in which the Contractor executed the work, such tests and inspections shall be paid for by the Contractor. SECTION 5 - UTILITIES 5-1 LOCATION 5-1.1 General The Contractor is responsible for, and shall at his or her expense, pothole all existing utilities which may be affected by the work to verify points of connection and potential conflicts. Existing underground utilities shown are taken from record information to aid the Contractor. The Contractor shall be responsible for verifying the actual location (both vertical and horizontal) in the field of all existing underground lines (shown or not) and notify the Engineer of any discrepancies or conflicts prior to the beginning of construction. No segment of work shall begin until the contractor has potholed and verified points of connection and related connection material requirements and coordinated the final/existing layout of the laterals/pipeline with the Engineer, including adjustments due to field conflicts with other utilities or structures above or below ground. In addition, the first order of work shall consist of potholing of all 15TS signal pole foundation locations. These shall constitute the Contractor's first order of work prior to placing the pole order, with a pothole size equal to the corresponding foundation diameter and eight (8) foot depth for each pole location. Immediately after potholing, the Contractor shall restore the sidewalk pedestrian areas with half -thickness of full depth concrete and maintain these areas for the duration of the project until final reconstruction is complete. Sidewalk shall be installed per City of Newport Beach Standard Drawing No. 180. For asphalt restoration for exploratory potholing and conduit installation, the Contractor shall pave flush to existing pavement with A.C. Base Course per CNB Std. 106-B. Within seven (7) calendar days after completion of the work or phase of work, the Contractor shall remove all USA utility markings. Removal by sand blasting is not allowed. Any surface damaged by the removal effort shall be repaired to its pre - construction condition or better at the contractor's expense. 5-2 PROTECTION In the event that an existing pull box, meter box or any other utility box is damaged by the Work and is not re -useable, the Contractor shall provide and install a new replacement pull box, meter box or any other utility box of identical type and size at no additional cost to the City. Page 5 of 70 5-4 RELOCATION All City owned pull boxes, water meter boxes, water valve boxes, sewer cleanout boxes and survey monument boxes (collectively known as "utility boxes") which are affected by the Work shall be replaced to finish grade with new utility boxes. During asphalt paving operation, manholes within paving area shall be temporarily lowered and covered. Upon completion of paving operation, manholes shall be permanently adjusted to finish grade. The Contractor will be required to contact Southern California Edison, The Gas Company, cable television companies, telecommunication companies and any other utility companies to have their existing utilities adjusted to finish grade. The Contractor shall coordinate with each utility company for the adjustment of their facilities in advance of work to avoid potential delays to the project schedule. The Contractor shall provide the necessary survey control for all utility companies to adjust boxes and vaults to the final grade. The Contractor will be required to coordinate with these companies for inspection of the work. SECTION 6 - PROSECUTION, PROGRESS AND ACCEPTANCE OF THE WORK 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK 6-1.1 Construction Schedule No work shall begin until a Notice to Proceed has been issued, a pre -construction meeting has been conducted, and a schedule of work has been approved by the Engineer. The Contractor shall submit a baseline schedule to the Engineer for approval a minimum of five working days prior to the pre -construction meeting. The Engineer will review the baseline schedule and may require the Contractor to modify the schedule to conform to the requirements of the Contract Documents. If work falls behind the approved baseline schedule, the Contractor shall be prohibited from starting additional work until Contractor has exerted extra effort to meet the baseline schedule and has demonstrated the ability to maintain the schedule in the future. Such stoppages of work shall in no way relieve the Contractor from the overall time of completion requirement, nor shall it be construed as the basis for payment of extra work because additional personnel and equipment were required on the job. Contractor shall update the schedule periodically or as directed by the Engineer to reflect any delay or extension of time. In additional, Contractor shall prepare 2-week look -ahead schedules on a bi-weekly (every two weeks) basis with detailed daily activities. The schedule shall detail all planned traffic signal outages ("dark" or "red -flash") taking place at night (Night Work). The scheduling of these items shall be maintained and updated as necessary. The Engineer shall be notified immediately when these items are rescheduled. Page 6 of 70 NOTE: To expedite the necessary potholing of all 15TS signal pole foundation locations and installation of all conduit run crossings, the City desires to issue Notice to Proceed to Contractor immediately after contract award. City and Contractor shall coordinate to expedite required paperwork and submittal approval. In addition, immediately after potholing, the Contractor shall restore the sidewalk pedestrian areas with half -thickness of full depth concrete and maintain these areas for the duration of the project until final reconstruction is complete. In addition, for asphalt restoration for exploratory potholing and conduit installation, the Contractor shall pave flush to existing pavement with A.C. Base Course per CNB Std. 106-B. 6-7 TIME OF COMPLETION 6-7.1 General The Contractor shall complete all work under the Contract within 100 consecutive working days after the date on the Notice to Proceed. The Contractor shall ensure the availability and delivery of all material prior to the start of work. Unavailability of material will not be sufficient reason to grant the Contractor an extension of time. Due to the long lead times required for necessary traffic signal equipment, including, but not limited to traffic standards/poles, the Contractor shall submit justification for approval by the Engineer in order to suspend the progression of contract working days. At the end of the suspension period, the Contractor shall diligently prosecute the Work to completion. The following days are designated City holidays and are non -working days: 1. January 1st (New Year's Day) 2. Third Monday in January (Martin Luther King Day) 3. Third Monday in February (President's Day) 4. Last Monday in May (Memorial Day) 5. July 4th (Independence Day) 6. First Monday in September (Labor Day) 7. November 11 th (Veterans Day) 8. Fourth Thursday and Friday in November (Thanksgiving and Friday after) 9. December 24tt', (Christmas Eve) 10. December 25th (Christmas) 11. December 26th thru 30th (City Office Closure) 12. December 31 st (New Year's Eve) If the holiday falls on a Sunday, the following Monday will be considered the holiday. If the holiday falls on a Saturday, the Friday before will be considered the holiday. Normal working hours are limited to 7:30 a.m. to 4:30 p.m., Monday through Friday. The Contractor, subcontractors, suppliers, etc., shall not generate any noise at the work site, storage sites, staging areas, etc., before or after the normal working hours prescribed above. Page 7 of 70 Should the Contractor elect to work on a Saturday, which is outside normal working hours, Contractor must first obtain special permission from the Engineer. The request may be for 8:00 a.m. to 6:00 p.m. on Saturdays only. A request for working outside the normal working hours must be made at least 72 hours in advance of the desired time period. A separate request must be made for each work shift. The Engineer reserves the right to deny any or all such requests. Additionally, the Contractor shall pay for supplemental inspection costs of $146 per hour when such time periods are approved. 6-7.2 Scheduling of Traffic Signal Work For all four traffic signal intersection locations, night work shall be included in the bid as part of the Work in order to minimize disruption to the community and shall adhere to the following requirements: A. For each intersection, the Contractor shall plan for four (4) nights of work including, but not limited to, temporary relocation and subsequent replacement of signal cabinet and related electrical conductor work, and signal standard/pole installations. B. Night work hours shall be considered to be from 9:00 p.m. to 6:00 a.m., Sunday night through Friday morning. No work is allowed Friday or Saturday nights. C. The Contractor may request additional nights. All requests must be approved by the Engineer prior to work. D. The Contractor shall notify the Engineer two weeks prior to the start of any requested night work. For further clarification, the Contractor shall use the following parameters to schedule traffic signal work: Daytime Work Normal Working Hours 7:30 am to 4:30 pm Monday thru Friday Lane Closures 9:00 am to 3:00 pm Monday thru Friday Traffic Signal Outages* 9:00 am to 3:00 pm Monday thru Thursday * Planned daytime outages (dark or red -flash) shall be approved by the Engineer prior to work. Nighttime Work Working Hours 9:00 pm to 6:00 am Monday thru Thursday Please note that turn -on of traffic signals shall not begin the functional test on a Friday, weekend, or any day preceding a holiday as outlined above. All turn-ons shall have prior authorization by the Engineer. The Contractor may perform sub -surface work consisting of the installation of conduit, foundations, and detectors, prior to receipt of all electrical materials and equipment. Page 8 of 70 Above -ground signal work shall not commence until such time that the Contractor notifies the Engineer, in writing, of the date that all electrical materials and equipment are received and said work shall start within 15 days after said date. Above -ground signal work shall be scheduled such that the signal turn -on shall occur within 10 days of the pole installation. All vehicle and pedestrian indications that are to be installed prior to signal turn -on shall be covered until the signal is turned on. Traffic signal modification work shall be phased so that no more than one traffic signal shall be shut -down ("dark" or "red -flash") at the same time. Existing street lighting shall remain in operation until new lighting is operational. All striping, pavement markings, and signing shall be in place prior to signal turn -on and/or opening of street to public travel. Prior to installation of signal detector loops, the location of proposed striping and crosswalks shall be marked in the field and approved by the Engineer. 6-8 COMPLETION, ACCEPTANCE, AND WARRANTY Prior to acceptance of work, the Contractor shall submit a full-size set of as -built plans to the Engineer. Retention payment and bonds will not be released until the as -built plans are reviewed and approved by the Engineer. A set of approved plans and specifications shall be on the job site at all times. The Contractor shall maintain as -built drawings of all work as the job progresses. A separate set of drawings shall be maintained for this purpose. These drawings shall be up-to-date and reviewed by the Engineer at the time each progress payment is submitted. Any changes to the approved plans that have been made with approval from the Engineer shall be documented on the as -built plans. The Contractor shall maintain books, records, and documents in accord with generally accepted accounting principles and practices. These books, records, and documents shall be retained for at least three years after the date of completion of the project. During this time, the material shall be made available to the Engineer. Suitable facilities are to be provided for access, inspection, and copying of this material. 6-9 LIQUIDATED DAMAGES For each consecutive calendar day after the time specified in Section 6-7.1 for completion of the work, the Contractor shall pay to the City or have withheld from moneys due it, the daily sum of $500.00. Execution of the Contract shall constitute agreement by the City and Contractor that the above liquidated damages per calendar day is the minimum value of the costs and actual damage caused by the failure of the Contractor to complete the Work within the allotted time. The intent of this section is to emphasize to the Contractor the importance of prosecuting the work in an orderly preplanned continuous sequence so as to minimize inconvenience Page 9 of 70 to residences, businesses, vehicular and pedestrian traffic, and the public as a result of construction operations. SECTION 7 - RESPONSIBILITIES OF THE CONTRACTOR 7-1 THE CONTRACTOR'S EQUIPMENT AND FACILITIES 7-1.2 Temporary Utility Services If the Contractor elects to use City water, Contractor shall arrange for a meter and tender a $973.00 meter deposit with the City. Upon return of the meter to the City, the deposit will be returned to the Contractor, less a $90 monthly charge for meter use, a charge for water usage and any repair charges for damage to the meter. Water used during construction shall be paid for by the Contractor. This includes water for flushing and pressure testing water lines, compaction, dust control, irrigation during maintenance period for landscaping, etc. City shall designate to the Contractor the location of the fire hydrant or other connection acceptable for drawing of construction and temporary water. City reserves the right to limit the location, times and rates of drawing such water. 7-2 LABOR 7-2.2 Prevailing Wages In accordance with California Labor Code Section 1720.9, hauling and delivery of ready - mixed concrete for public works contracts are subject to prevailing wages. 7-7 COOPERATION AND COLLATERAL WORK City forces will perform all shutdowns of water, sewer, and storm drain facilities as required. The Contractor shall provide the City advanced notice a minimum of seven calendar days prior to the time contractor desires the shutdown these City facilities. A four-hour shut down of water facilities during the daytime hours of 10:00 a.m. to 2:00 p.m. or a six -hour shut down between the nighttime hours of 11:00 p.m. to 5:00 a.m. will be allowed. The Contractor will be responsible for completing all water connections within the time period allowed. The times and dates of any utility to be shut down must be coordinated with the Engineer. It is the Contractor's responsibility to notify the affected businesses and residents of the upcoming water shutdown with a form provided by the Engineer at least 48 hours in advance of the water shut down. Page 10 of 70 7-8 WORK SITE MAINTENANCE 7-8.4 Storage of Equipment and Materials 7-8.4.2 Storage in Public Streets Construction materials and equipment may only be stored in streets, roads, or sidewalk areas if approved by the Engineer in advance. It is the Contractor's responsibility to obtain an area for the storage of equipment and materials. The Contractor shall obtain the Engineer's approval of a site for storage of equipment and materials prior to arranging for or delivering equipment and materials to the site. Prior to move -in, the Contractor shall take photos of the laydown area. The Contractor shall restore the laydown area to its pre -construction condition. The Engineer may require new base and pavement if the pavement condition has been compromised during construction. 7-8.6 Water Pollution Control 7-8.6.2 Best Management Practices (BMPs) The Contractor shall submit a Best Management Practice (BMP) plan for containing any wastewater or storm water runoff from the project site including, but not limited to the following: a. No placement of construction materials where they could enter storm drain system, which includes gutters that lead to catch basins. b. Checking construction vehicles for leaking fluids. c. Providing a controlled area for cleaning or rinse -down activities. d. Monitoring construction activities. e. Minimizing usage of water when saw -cutting and vacuum the residue. f. Providing measures to capture or vacuum -up water contaminated with construction debris. g. Removing any construction related debris on a daily basis. h. Protecting work areas from erosion. The BMP will be approved by the Engineer prior to any work. The City will monitor the adjacent storm drains and streets for compliance. Failure of the Contractor to follow BMP will result in immediate cleanup by City and back -charging the Contractor for all costs plus 15 percent. The Contractor may also receive a separate administrative citation per Section 14.36.030 of the City's Municipal Code. 7-10 SAFETY 7-10.3 Haul Routes Haul routes shall be submitted to the Engineer for review and approval. Page 11 of 70 7-10.4 Safety 7-10.4.1 Work Site Safety The Contractor shall be solely and completely responsible for conditions of the job site, including safety of all persons and property during performance of the work. The Contractor shall fully comply with all state, federal and other laws, rules, regulations, and orders relating to the safety of the public and workers. The right of the Engineer or the City's representative to conduct construction review or observation of the Contractor's performance shall not include review or observation of the adequacy of the Contractor's safety measures in, on, or near the construction site. 7-10.5 Security and Protective Devices 7-10.5.3 Steel Plate Covers Steel plates utilized for trenching shall be the slip resistant type per Caltrans standards. In addition, steel plates on asphalt pavement shall be pinned and recessed flush with existing pavement surface. SECTION 9 - MEASUREMENT AND PAYMENT 9-2 LUMP SUM WORK Contractor shall submit a detailed schedule of value for all lump sum bid items to the Engineer within 15 days after award of contract. 9-3 PAYMENT 9-3.1 General Revise paragraph two to read: The unit and lump sum bid prices for each item of work shown on the proposal shall include full compensation for furnishing the labor, materials, tools, and equipment and doing all the work, including restoring all existing improvements, to complete the item of work in place and no other compensation will be allowed thereafter. Payment for incidental items of work not separately listed shall be included in the prices shown for the other related items of work. The following items of work pertain to the bid items included within the Proposal: Item No. 1 Mobilization: Work under this item shall include, but not be limited to, the cost of all labor, tools, equipment and material costs for providing bonds, insurance and financing, obtaining an equipment and material storage site, construction surveying, preparing and implementing the BMP Plan, preparing and updating construction schedules, providing submittals, attending construction meetings, and all other related work as required by the Contract Documents. This bid item shall also include work to demobilize from the project site including but not limited to site cleanup, removal of USA markings and providing any required documentation as noted in these Special Provisions. Page 12 of 70 Item No. 2 Traffic Control: Work under this item shall include, but not be limited to, all labor, tools, equipment and material costs for delivering all required notifications and temporary parking permits, posting signs, covering conflicting existing signs, and all costs incurred notifying businesses and residents, preparing traffic control plans, providing the traffic control required by the project including, but not limited to, signs, cones, barricades, flashing arrow boards, K-rails, temporary striping, and flag persons. This item includes providing four (4) Changeable Message Boards (CMBs) and updating messages on the CMBs as requested by the Engineer for the duration of the project. This item also includes furnishing all labor, tools, equipment and materials necessary to comply with the W.A.T.C.H. Manual, latest edition, and City requirements. Item No. 3 Provide As -Built Plans: Work under this item shall include, but not be limited to, all labor, tools, equipment and material costs for all actions necessary to provide as -built drawings. These drawings must be kept up to date and submitted to the Engineer for review prior to request for payment. An amount of $1,500.00 is determined for this bid item. The intent of this pre-set amount is to emphasize to the Contractor the importance of as -build drawings. Item No. 4 Von Karman Avenue at Birch Street Traffic Signal Modification: Work under this item shall include all labor, equipment, and material costs, including potholing & exploratory work, required to complete the work in place, and modify the traffic signal at the Von Karman Avenue at Birch Street intersection per the Plans and these Special Provisions. Item No. 5 Von Karman Avenue at Birch Street Temporary Traffic Signal Operation: Work under this item may include, but not be limited to, temporary relocation of the traffic signal cabinet, temporary traffic signal poles, and temporary traffic signal wiring to maintain traffic signal operation at the Von Karman Avenue at Birch Street intersection, including pedestrian and bike push buttons per the Plans and these Special Provisions. Vehicle detection may be excluded from the temporary operation of the traffic signal. NOTE: The contractor shall review the location. Temporary overhead wiring is intended to limit required signal outages. The bid shall include items needed to complete the overhead wiring. Other methods may be considered during construction and must be approved by the City. Should other methods be approved that convenience the contractor, payment for some, or all, of this bid item may be reduced by the City dependent on work performed. Item No. 6 Bristol Street North at Campus Drive Traffic Signal Modification: Work under this item shall include all labor, equipment, and material costs, including potholing & exploratory work, required to complete the work in place, and modify the traffic signal at the Bristol Street North at Campus Drive intersection and coordination with the County of Orange for an encroachment permit per the Plans and these Special Provisions. Page 13 of 70 Item No. 7 Bristol Street North at Campus Drive Temporary Traffic Signal Operation: Work under this item may include, but not be limited to, temporary relocation of the traffic signal cabinet, temporary traffic signal poles, and temporary traffic signal wiring to maintain traffic signal operation at the Bristol Street North at Campus Drive intersection, including pedestrian and bike push buttons per the Plans and these Special Provisions. Vehicle detection may be excluded from the temporary operation of the traffic signal. NOTE: The contractor shall review the location. Temporary overhead wiring is intended to limit required signal outages. The bid shall include items needed to complete the overhead wiring. Other methods may be considered during construction and must be approved by the City. Should other methods be approved that convenience the contractor, payment for some, or all, of this bid item may be reduced by the City dependent on work performed. Item No. 8 Bristol Street North at Birch Street Traffic Signal Modification: Work under this item shall include all labor, equipment, and material costs, including potholing & exploratory work, required to complete the work in place, and modify the traffic signal at the Bristol Street North at Birch Street intersection per the Plans and these Special Provisions. Item No. 9 Bristol Street North at Birch Street Temporary Traffic Signal Operation: Work under this item may include, but not be limited to, temporary relocation of the traffic signal cabinet, temporary traffic signal poles, and temporary traffic signal wiring to maintain traffic signal operation at the Bristol Street North at Birch Street intersection, including pedestrian and bike push buttons per the Plans and these Special Provisions. Vehicle detection may be excluded from the temporary operation of the traffic signal. NOTE: The contractor shall review the location. Temporary overhead wiring is intended to limit required signal outages. The bid shall include items needed to complete the overhead wiring. Other methods may be considered during construction and must be approved by the City. Should other methods be approved that convenience the contractor, payment for some, or all, of this bid item may be reduced by the City dependent on work performed. Item No. 10 San Joaquin Hills Road at Santa Rosa Drive Traffic Signal Modification: Work under this item shall include all labor, equipment, and material costs, including potholing & exploratory work, required to complete the work in place, and modify the traffic signal at the San Joaquin Hills Road at Santa Rosa Drive intersection per the Plans and these Special Provisions. Specific traffic signal equipment will be painted as described in Section 310-1. Item No. 11 San Joaquin Hills Road at Santa Rosa Drive Temporary Traffic Signal Operation: Work under this item may include, but not be limited to, temporary relocation of the traffic signal cabinet, temporary traffic signal poles, and temporary traffic signal wiring to maintain traffic signal operation at the San Joaquin Hills Road at Santa Rosa Drive intersection, including pedestrian and bike push buttons per the Plans and Page 14 of 70 these Special Provisions. Vehicle detection may be excluded from the temporary operation of the traffic signal. NOTE: The contractor shall review the location. Temporary overhead wiring is intended to limit required signal outages. The bid shall include items needed to complete the overhead wiring. Other methods may be considered during construction and must be approved by the City. Should other methods be approved that convenience the contractor, payment for some, or all, of this bid item may be reduced by the City dependent on work performed. Bid Alternative No. 1 Von Karman Avenue at Birch Street, Bristol Street North at Campus Drive, and Bristol Street North at Birch Street: Work under this item shall include, but not be limited to, all labor, tools, coordination, equipment and material costs for the installation of 2" Schedule 80 conduit to pull new detector -lead -cable. 9-3.2 Partial and Final Payment. From each progress payment, five (5) percent will be retained by the City, and the remainder less the amount of all previous payments will be paid. Partial payments for mobilization and traffic control shall be made in accordance with Section 10264 of the California Public Contract Code. Page 15 of 70 PART 2 - CONSTRUCTION MATERIALS SECTION 200 — ROCK MATERIALS 200-2 UNTREATED BASE MATERIALS 200-2.1 General Crushed Miscellaneous Base (CMB) shall be used as the untreated base material. SECTION 201 - CONCRETE, MORTAR, AND RELATED MATERIALS 201-1 PORTLAND CEMENT CONCRETE 201-1.1 Requirements 201-1.1.2 Concrete Specified by Class and Alternate Class Portland cement concrete shall be Class 560-C-3250 unless shown otherwise on the Plans. 201-2 REINFORCEMENT FOR CONCRETE 201-2.2 Steel Reinforcement 201-2.2.1 Reinforcing Steel Reinforcing steel shall be Grade 60 steel conforming to ASTM A 615 with 2-inch minimum cover unless shown otherwise on the Plans. SECTION 214 — TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS AND PAVEMENT MARKERS 214-4 PAINT FOR STRIPING AND MARKINGS 214-4.1 General Temporary striping shall be Rapid Dry paint. Final striping shall be reflectorized thermoplastic. 214-6 PAVEMENT MARKERS All pavement markers shall comply with Section 81-3 Pavement Markers of the Caltrans Standard Specifications. Page 16 of 70 214-6.3 Non -Reflective Pavement Markers 214-6.3.1 General All new non -reflective pavement markers Types A and AY shall be ceramic. 214-6.4 Retroreflective Pavement Markers 214-6.4.1 General All retroreflective pavement markers shall be 3M Series 290 with glass -covered faces or approved equal. PART 3 - CONSTRUCTION METHODS SECTION 300 - EARTHWORK 300-1 CLEARING AND GRUBBING 300-1.3 Removal and Disposal of Materials Removal and disposal of material shall be done by City approved licensed and Franchised Commercial Solid Waste Haulers. A current list of approved haulers can be found on the City's website at: http://newportbeachca.gov/index.aspx?page=157 and then selecting the link for Franchised Haulers List. 300-1.3.1 General The Contractor shall maintain the job site in a clean and safe condition. The Contractor shall remove any broken concrete, debris or other deleterious material from the job site at the end of each workday or as directed by the Engineer. All areas of roadway removal and replacement shall have a minimum trench width of 3-feet to facilitate maximum compaction. Contractor shall meet with the Engineer to mark out the areas of roadway removal and replacement. Non -reinforced concrete and asphalt wastes generated from the job site shall be disposed of at a facility that crushes such materials for reuse. Excess soil and other recyclable solid wastes shall not be disposed of at a sanitary landfill. The Contractor shall maintain monthly tonnage records of total solid wastes generated and solid wastes disposed of at a sanitary landfill. The Contractor shall report said tonnage monthly to the Engineer and provide appropriate confirmation documentation from the recycling facility. All material disposal manifests shall be provided to the Engineer prior to release of final retention. The Contractor shall dispose of all excess or waste material and shall include all fees for such disposal in the appropriate bid items. Page 17 of 70 300-1.3.2 Requirements (c) Concrete Curb, Walk, Gutters, Cross Gutters, Driveway, and Alley Intersections. Concrete shall be removed to neatly sawed edges with saw cuts made to a minimum depth of two (2) inches. Joins to existing pavement lines shall be full depth sawcuts. Final removal between the sawcut lines may be accomplished by the use of jackhammers or sledgehammers. Pavement breakers or stompers will not be permitted on the job. The Engineer must approve final removal accomplished by other means. SECTION 303 - CONCRETE AND MASONRY CONSTRUCTION 303-1 CONCRETE STRUCTURES 303-1.2 Subgrade for Concrete Structures Add to this section: "General existing field conditions consist of a water table level of three (3) to four (4) feet below finish grade. The Contractor shall monitor and account for the tide cycle in order to utilize necessary dewatering procedures required for the installation of reinforced concrete foundations for traffic signal standards and poles." 303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY INTERSECTIONS, ACCESS RAMPS AND DRIVEWAYS 303-5.1 Requirements 303-5.1.1 General Sidewalks and curb access ramps shall be opened to pedestrian access on the day following concrete placement. In addition, all forms shall be removed, irrigation systems shall be repaired, and backfill or asphalt concrete patchback shall be placed within 72 hours following concrete placement. 303-5.5 Finishing 303-5.5.2 Curb The Contractor shall install or replace curb markings that indicate sewer laterals on the face of the curb. The Contractor shall mark the curb with a chiseled "S" for sewer. A two (2) day notice to the Engineer is required for requests to the City to determine the location of sewer laterals. 303-5.5.4 Gutter The Contractor shall hold the flow line tolerances to within 0.01 feet of those elevations shown on the plan. Page 18 of 70 SECTION 310 — PAINTING 310-1 GENERAL. All new traffic signal standards, poles, and mast arms shall be coated as detailed below: 1. Galvanize: The product shall be galvanized in accordance with ASTM 123; Only when new traffic signal standards/pole shafts, mast arms, and luminaire arms are specified on the Plans to be painted, the following steps (nos. 2-4) shall be applicable: 2. Surface Preparation: Brush blast exterior surface to SSP7 specifications; 3. Application Instructions: The product shall be painted prior to delivery to the job site. Apply in conformance to the manufacturer's instructions. The total application shall be 10 to 16 mils D.F.T. consisting of 5-8 mils of epoxy primer and 5-8 mils of gloss urethane color top coat. 4. Touch Up: The manufacturer shall provide extra coating for field touch up due to transportation and handling. For the San Joaquin Hills Road at Santa Rosa Drive traffic signal intersection only, the existing traffic signal standard/pole shafts, mast arms and luminaire arms shall be painted with two coats of white paint per the Plans (Sheet 5 of Drawing No. T-6083- S) and in accordance with the following requirements: 1. Surface Preparation: The contractor shall follow all procedures and guidelines outlined herein to ensure the effective and durable repairing of existing powder - coated traffic signal poles and mast arms. The contractor shall thoroughly clean the surfaces to remove all dirt, grease, and contaminants using an appropriate solvent. Following the cleaning, the contractor shall smooth and prepare the surface by utilizing a suitable abrasive method to ensure proper adhesion of the new paint. Any corroded or damaged areas should be addressed and repaired prior to painting. 2. Application Instructions: The contractor shall apply a high -quality primer compatible with the existing powder -coated surface to provide a strong base for the topcoat. Once the primer has adequately dried, the contractor shall apply a minimum of two coats of durable weather -resistant paint Valmont Frost White, No. 652 (or equal) and ensure each coat is evenly distributed and allowed to fully dry prior to the application of the second coat. The contractor shall adhere to all manufacturers' requirements of products used during the repainting process. Upon completion, the newly painted poles and mast arms should be inspected for uniformity, coverage, and quality of finish. Any deficiencies in the paint application shall be corrected at the contractor's expense. Other items to be coated shall be properly pretreated with environmentally safe, ultraviolet resistant, polyester powder coating, which shall be applied electro statically at 90 kV. and baked for 20 minutes at 375 degrees F, per ASTM D-3359, ASTM D-3363 and ASTM D-522. Page 19 of 70 SECTION 314 — TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT MARKERS 314-4 APPLICATION OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS 314-4.1 General The layout for all proposed traffic striping and pavement markings shall be pre -marked and/or cat -tracked and approved by the engineer or his representative prior to application. Temporary painted traffic striping and markings shall be applied in one coat, as soon as possible and within 24 hours after the finish course has been placed. Reflectorized glass beads or other retroreflective material shall be added to the installation of temporary paint striping. In addition to temporary pavement tabs, crosswalks shall be restriped as soon as possible, within 24 hours. Crosswalks shall not be left unpainted overnight. 314-4.2 Control of Alignment and Layout 314-4.2.1 General The Contractor shall perform all layout, alignment, and spotting. The Contractor shall be responsible for the completeness and accuracy of all layout alignment and spotting. Traffic striping shall not vary more than 1/2 inch in 40 feet from the alignment shown on the Plans. The Contractor shall mark or otherwise delineate the new traffic lanes and pavement markings within 24 hours after the removal or covering of existing striping or markings. No street shall be without proper striping over a weekend or holiday. Stop bars shall not remain unpainted overnight. 314-4.4 Thermoplastic Traffic Striping and Pavement Markings 314-4.4.1 General The final reflectorized thermoplastic striping shall not be applied until the finish course pavement or slurry seal has been in place for at least 15 days. The thermoplastic shall be applied at 0.45 mm minimum thickness for all striping except crosswalks and limit lines which shall be 0.90 mm minimum thickness. If the Contractor fails to perform striping as specified herein, the Contractor shall cease all contract work until the striping has been properly performed. Such termination of work shall require the Contractor to re -install "NO PARKING, TOW -AWAY" signs and re -notify the affected residents, at the Contractor's sole expense. In addition, if the Contractor removes/covers/damages existing striping and/or raised pavement markers outside of the work area, he shall re-stripe/replace such work items at no cost to the City. Page 20 of 70 314-4.4.2 Surface Preparation Primer shall be applied to concrete surfaces prior in application of thermoplastic striping. The primer shall be formulated for the intended application. 314-5 PAVEMENT MARKERS 314-5.1 General Raised pavement markers shall not be placed until the finish course pavement or slurry seal has been in place for at least 15 days. SECTION 315 - TRAFFIC SIGN INSTALLATION Location of traffic signs shown on Plans is approximate and shall be approved by the City prior to installation. Regulatory signs on signal standards, poles and mast arms shall be the sized to ensure visibility, e.g., a R3-4 sign shall be 36-inch by 36-inch. Signs shall be furnished and installed per CNB STD No. 924. PART 6 - TEMPORARY TRAFFIC CONTROL SECTION 600 - ACCESS 600-1 GENERAL Ten (10) working days prior to starting work, the Contractor shall distribute construction notices to residents and businesses immediately adjacent to the project work, describing the project and indicating the limits of construction. The City will provide the notices. At the discretion of the Engineer, forty-eight (48) hours prior to the start of construction, the Contractor shall distribute to the residents and businesses a second written notice prepared by the City clearly indicating specific dates in the space provided on the notices when construction operations will start for each block or street. An interruption of work at any location in excess of 14 calendar days shall require re -notification. The Contractor shall insert the applicable dates and times at the time the notices are distributed. The written notices will be prepared by the City but shall be completed and distributed by the Contractor. Errors in distribution, false starts, acts of God, strikes or other alterations of the schedule will require Contractor re -notification using an explanatory letter furnished by the City. 600-2 VEHICULAR ACCESS The Contractor shall install and maintain in place "NO PARKING -TOW AWAY" signs (even if streets have posted "NO PARKING" signs) which shall be posted at least forty- eight hours in advance of the need for enforcement. The signs will be provided by the City at no cost to the Contractor. However, the City reserves the right to charge $2.00 Page 21 of 70 per sign following any excessive abuse or wastage of the signs by the Contractor. In addition, it shall be the Contractor's responsibility to notify the City's Police Department at (949) 644-3717 for verification of posting at least forty-eight hours in advance of the need for enforcement. City "Temporary Tow -Away, No Parking" signs are available at the Public Works Department public counter. The Contractor shall print the hours and dates of parking restriction on the "NO PARKING -TOW AWAY" sign in 2-inch high non -erase letters and numbers. A sample of the completed sign shall be reviewed and approved by the Engineer prior to posting. 600-3 PEDESTRIAN ACCESS Pedestrian access to all storefronts, offices, residences, etc., within the limits of work must be maintained at all times. The Contractor shall cooperate with the Engineer to provide advance notice to any and all establishments whose access will be impacted by construction operations, particularly sidewalk construction. Page 22 of 70 SECTION 601 — WORK AREA TRAFFIC CONTROL 601-1 GENERAL The Contractor shall furnish and install signage, barricades, delineators, yellow safety ribbons, four (4) changeable message boards (CMBs), and any other measures deemed necessary by the Engineer to safely direct the public around areas of construction, and into and out of the affected establishments. Messages for the CMBs shall be updated by the Contractor as directed by the Engineer. 601-2 TRAFFIC CONTROL PLAN (TCP) The Contractor shall provide traffic control and access in accordance with Section 7-10 of the Standard Specifications and the WORK AREA TRAFFIC CONTROL HANDBOOK (W.A.T.C.H), Latest Edition. Traffic control and detours shall incorporate the following items: 1. Emergency vehicle access shall be maintained at all times 2. The locations and wordings of all barricades, signs, delineators, lights, warning devices, parking restrictions, and any other required details shall ensure that all pedestrian and vehicular traffic will be handled in a safe manner with a minimum of inconvenience to the public. 3. All advanced warning sign installations shall be reflectorized and/or lighted. 4. The Contractor shall accommodate the City's trash collection. If the Contractor elects to work on a street or alley during its trash collection day, it shall be the Contractor's responsibility to make alternative trash collection arrangements by contacting the City's Refuse Superintendent, at (949) 718-3466 and all affected property owners. 5. At a minimum, the Contractor shall maintain one lane of traffic in each direction at all times when completing the work. For Newport Coast Drive, the Contractor shall maintain two lanes of traffic in each direction at all times when completing the work. Lane closures shall be approved by the City prior to work. 6. Sidewalk closures in non-residential areas, or as determined by the City, shall be set with barricades and SIDEWALK CLOSED signs on barricades at the closure and SIDEWALK CLOSED USE OTHER SIDE signs on barricades at the closest crosswalk or controlled intersection. 7. Sidewalk closures in residential areas, or as determined by the City, shall be set with barricades and SIDEWALK CLOSED signs on barricades at the closure. Page 23 of 70 8. Bike lane closures shall have BIKE LANE CLOSED AHEAD, BIKE LANE CLOSED, and SHARE THE ROAD/BICYCLE WARNING (combination) signs mounted on barricades in order on the approach and at the closure. 9. Lane closures on Arterial Highways are limited to the hours of 9:00 am to 3:00 pm. Hours may be extended at the request of the Contractor and if approved by the City. 10.Traffic signal outages shall adhere to the parameters in Section 6-7.2 Scheduling of Traffic Signal Work. 11. During a traffic signal outage ("dark" or prolonged "red -flash"), "STOP" signs shall be furnished by the contractor. A minimum of two "STOP" signs shall be placed per approach. Barricades shall be furnished with flashing red lights when deployed at night. Signs shall be retro-reflective and in good condition. Signs will not be necessary during momentary "red -flash" while turning the traffic signal on. 12. Four (4) Changeable Message Boards (CMBs) shall be placed two weeks prior to first planned traffic signal shut -down ("red -flash" or "dark") for each of the traffic signal modification locations. Final locations and messages to be approved by the Engineer. CMBs can be removed after turn -on. 13.The Contractor shall take special care to place construction signs and CMBs to reduce the impact to pedestrians, cyclists and motorists. Where able, shoulder signs may be placed on wide sidewalks where 48 inches of clear pathway may be maintained. PART 7 - STREET LIGHTING AND TRAFFIC SIGNAL SYSTEMS SECTION 700 — MATERIALS 700-3 COMMON COMPONENTS 700-3.1 General. Contractor shall furnish all hardware to meet the Caltrans specifications for all new and relocated traffic signal equipment as shown on the Plans and detailed within these Special Provisions. The hardware shall be hot -dip galvanized or stainless steel as detailed. 700-3.3 Standards. Traffic signal standards and poles shall be steel and conform to the 2010 Caltrans Standard Plans and Standard Specifications (Pre -errata), including foundations, anchor bolts, and ancillary items. Page 24 of 70 For the traffic signal intersection at San Joaquin Hills Road at Santa Rosa Drive only, the existing traffic signal standard/pole shafts, mast arms and luminaire arms shall be finished per Section 310 - PAINTING of these Special Provisions. 700-3.5 Conduit Traffic Signal and Interconnect It is envisioned that all conduit will be installed by directional drill method and be high density polyethylene (HDPE) Schedule 80 UL continuous conduit. HDPE conduit shall be designed and engineered for direct burial, directionally drilled installation, or encased underground applications, and shall be installed at locations as shown on the plans. The PVC Schedule 80 UL conduit shall be designed and engineered for direct burial or encased underground applications and shall be installed at the pull box modification locations where conduit elbows are upgraded to sweeps, or as shown on the Plans. The PVC conduit shall be straight, and the ends shall be cut square to the inside diameter. The PVC conduit system shall be designed so that straight sections and fittings will assemble without the need for lubricants or cement. All conduits shall be free from defects including non -circularity, foreign inclusions, etc. It shall be nominally uniform (as commercially practical) in color, density, and physical properties. If new conduit is being installed into an existing pull box location, the Contractor shall protect existing pull box and conduit from damage. Should the existing pull box and/or conduit become damaged, the Contractor shall repair and/or replace damaged pull box and conduit at the cost of the Contractor and not the City. Prior to repair/replacement, the Contractor shall notify the City of exact location and contents of damaged pull box and conduit. All pavement markings shall be returned to existing conditions. If disturbed, the Contractor shall replace or repair any and all pavement markings. All work shall be approved by the Engineer. The Contractor shall obtain written approval from the Engineer before installing any conduit. Quality Control All conduits furnished, as part of the Contract shall be new, UL-listed, and meet NEMA and NEC requirements pertaining to electrical conduits and components. HDPE Schedule 80 Continuous Conduit The size of the HDPE conduit shall be as shown on the Plans and shall meet the following requirements: The HDPE Schedule 80 continuous conduit shall conform to NEMA TC-2 and UL651 B. Page 25 of 70 The conduit leading to splice vaults or pull boxes shall be terminated with a manufacture - produced terminator connector to seal the wall of the spice vault/pull box. The conduit shall be color coded black. The conduit shall also be marked with data traceable to plant location, date, shift, and machine of manufacture. Conduit shall be Carlon or Endot made or approved equal. PVC Schedule 80 Conduit The size of the PVC Schedule 80 conduit shall be as shown on the Plans and shall meet the following requirements: The PVC Schedule 80 conduit shall conform to NEMA TC-2 and UL 651 specifications. The conduit shall have an extended 6" integral "bell" end. The conduit shall have a circumferential ring on the spigot end, which shall be used to ensure proper insertion depth when connecting conduit ends. The conduit shall also be marked with data traceable to plant location, date, shift, and machine of manufacture. A complete line of fittings, adapters, and bends (sweeps) shall be provided by the conduit manufacturer and shall be manufactured from the same materials and manufacturing process as the conduit. The complete system will allow for all these fittings: Coupling Kits, Manhole Terminator Kits, Lubrication Fittings, and Repair Kits. Conduit shall be Carlon or Endot made or approved equal. Street Lighting Conduit Unless otherwise noted on the Plans, street lighting conduit shall be 1-1/4" Schedule 40 PVC. 700-3.7 Pull Boxes Traffic Signal and Interconnect Pull Boxes Pull boxes shall conform to the provisions in the Caltrans Standard Specifications and Standard Plan ES-8 and these Special Provisions. All new pull boxes, each complete with cover, shall be pull box number 6 (PB#6), or pull box B40, as noted on the Plans. P13#6 shall have nominal dimensions of 30.5-inch L x 17.5 inch W x 12 inch D, as stated in these Special Provisions and per the Plans. B40 shall have Page 26 of 70 nominal dimensions of 40.5-inch L x 28.25 inch W x 14 inch D, as stated in these Special Provisions and per the Plans. The cover marking for each pull box containing fiber optic cable shall read "TRAFFIC SIGNAL" on one line and "FIBER OPTIC' on second line. The cover marking for each pull box not containing fiber optic cable shall only read "TRAFFIC SIGNAL" on one line. Pull boxes shall be provided with locking mechanisms as specified in the Caltrans Standard Plans. All splice boxes shall have vertical proof -load strength of 25,000 lbs. This load shall be placed anywhere on the box and cover for a period of one minute without causing any cracks or permanent deformations. Splice boxes shall have nominal dimensions of 36-inch L x 24 inch W x 12 inch D, as stated in these Special Provisions and per the Plans. Where pull boxes are installed in sidewalk, sidewalk shall be removed and replaced from score line to score line as directed by Engineer. Pull boxes and covers in the sidewalk or behind the curb shall be per below, Christy "Fiberlite" models, or Engineer approved equal, unless otherwise noted on the Plans. Size #5 Box #5 Lid #6 Box #6 Lid Splice Box & Lid B40 Box B40 Lid Street Lighting Pull Boxes Approved Models Christy N30 Electrical Box Christy FL30T Christy N36 Electrical Box Christy FL36T Armorcast A600197APCX12 Christy N40 Box Christy B40M All new pull boxes shall be per CNB STD No. 204 and per the Plans. 700-4 STREET LIGHTING SYSTEM MATERIALS. 700-4.9 LED Luminaires Traffic signal luminaires shall conform to the provision in Section 86-1.02K LED Luminaires of the Caltrans Standard Specifications, the approved Caltrans LED Lighting Purchase Specification, and these Special Provisions. Each luminaire shall consist of an assembly that utilizes LEDs as the light source. In addition, a complete luminaire shall consist of a housing, LED array, and electronic driver (power supply). Page 27 of 70 Each luminaire shall be rated for a minimum operational life of 63,000 hours. Each luminaire will operate at an average operating time of 11.5 hours per night. Each luminaire is expected to have a minimum operational life of 180 months (15 years). The luminaires to be installed shall be 120 volts with integral constant wattage ballast and detachable power unit assemblies. The power unit assemblies shall contain the ballast, starter board, capacitors, and a heavy-duty terminal block. The luminaire on -board circuitry shall include surge protection devices (SPD) to withstand high repetition noise transients as a result of utility line switching, nearby lightning strikes, and other interference. Each luminaire shall be installed with photoelectric controls that are operationally compatible with currently used lighting control systems. The luminaire shall provide true ninety -degree (90 degree) cutoff with no light emitted above the horizontal. The lower edge of the luminaire housing shall extend below the light source and all glassware. Glare shields external to the luminaire will not be accepted. The luminaire optical assembly shall be sealed, watertight, and filtered to prevent contamination from infiltration of gaseous and particulate matter. The lamp socket shall be factory preset to produce a medium cutoff IES Type III light distribution. When the components are mounted on a down opening door, the door shall be hinged and secured to the luminaire housing separately from the refractor or lens frame. The door shall be secured to the housing in a manner to prevent its accidental opening. A safety cable shall mechanically connect the door to the housing. The manufacturer shall provide a warranty against loss of performance and defects in materials and workmanship for the luminaires for a period of 84 months after acceptance of the luminaires. Replacement luminaires shall be provided promptly after receipt of luminaires that have failed at no cost to the City. All warranty documentation shall be given to the City. LED luminaires shall be Leotek GreenCobra Series GC1-60E-MV-NW-3-WH-700 (see Plans for exact wattage per location) or approved equal. For all intersections, Contractor shall have manufacturer technician on -site for final acceptance testing and approval of LED luminaires. 700-5 TRAFFIC SIGNAL MATERIALS 700-5.3 Conductors and Cable. 700-5.3.3 Interconnect Cable. All materials furnished, assembled, fabricated, or installed under this item shall be new, corrosion resistant and in strict accordance with the details shown on the Plans and in Page 28 of 70 these Special Provisions. All pairs in the cable shall be usable and free of defects, in order to meet or exceed all of the requirements contained in these Special Provisions. The Contractor shall furnish, install, terminate and test all the required twisted pair cable. All equipment for installation, terminating and testing shall be provided by the Contractor. The twisted pair cable shall conform to the latest reversions of the REA (Rural Electrical Administration) and the NEC (National Electrical Code) specification for Filled Telephone Cables RUS-PE-39. Cable Marking • The twisted pair cable outer jacket shall be marked with manufacturer's name, the month and year of manufacture, pair count and conductor size, and sequential feet marks. • The markings shall be repeated every two (2) feet. • The actual length of the cable shall be within ±1 % of the length marking. • The marking shall be in a contrasting color to the cable jacket. • The marking shall be approximately one-half (1/2) of the diameter of the cable and must be permanent and weatherproof. Quality Control The manufacturer(s) of supplied optical cable, optical cable assemblies, and hardware shall be TL 9000 and/or ISO 9001 registered. General Considerations The twisted pair cable shall meet the following: • Conductors: Solid # 19 AWG copper conductors • Insulation: solid virgin high density polyethylene with telephone industry color - coding • Twisted Pairing: Individual conductors twisted into pairs of varying twist to minimize crosstalk with specific color combinations to provide pair identification (telephone industry color coding) • Filling Compound: the cable shall be gel -filled to prevent water intrusion • Shielding: the cable shall employ a thick (0.005") corrugated copper shield to provide a 100% electrical shielding coverage • Outer Jacket: a black, low density, high molecular weight virgin polyethylene, compounded to withstand sunlight, temperature variations, and other environmental conditions, including abuse during installation. • Footage Marking Printed sequentially every two feet along the outer jacket to provide readily accurate records of cable usage and reel contents When terminating the cable, the following shall be complied with: Page 29 of 70 • Each pair of matched wire shall have a minimum of ten twists after leaving the cable sheaf • All copper pairs are to be properly cleaned to remove residue • Cable shall be installed free of kinks, cuts or damages • All pairs shall be installed (landed) in a termination box in the cabinet • One end of the copper shielding cable shall be grounded. 700-5.3.4 Fiber Optic Cable. Fiber optic cables shall be supplied in the configurations shown on the Plans and specified in these Special Provisions. There shall be three (3) principal cable types as well as incidental cabling procured under this specification. They are identified using a naming convention as follows: 1. Mainline cable which shall contain forty-eight (48), strand single -mode optical fibers for City of Newport Beach. 2. Mainline cable which shall contain forty-eight (48), strand single -mode optical fibers for Caltrans 3. Drop cable which shall contain six (6) single -mode optical fibers. Each fiber optic cable shall be suitable for underground duct placement. The length of fiber optic cable to be installed within City Buildings does not require the fiber optic cable to be plenum and fire rated. Additionally, there will be ancillary connecting (patching) optical fiber cables furnished and installed by Contractor under this Contract and this Supplemental, which are more precisely described elsewhere in this document. All materials furnished, assembled, fabricated, or installed under this item shall be new, corrosion resistant and in strict accordance with the details shown on the Plans and in these Special Provisions. All fibers in the cables shall be usable fibers and free of surface imperfections and occlusions, in order to meet or exceed all of the optical, mechanical, and environmental requirements contained in this Supplemental. All cables shall be free of material or manufacturing defects and dimensional non - uniformity that would: • Interfere with the cable installation employing accepted cable installation practices. • Degrade the transmission performance and environmental resistance after installation. • Inhibit proper connection to interfacing elements. • Otherwise yield an inferior product. • Each fiber optic outside plant cable for this project shall be all -dielectric, dry water - blocking material, duct type, with loose buffer tubes, and shall conform to these Special Provisions. Page 30 of 70 The Contractor shall furnish, install, splice and test all the required fiber optic cable. All splicing kits, fiber optic cable caps, moisture/water sealants, terminators, splice trays, patch cords, connectors, pig tails and accessories to complete the fiber optic network shall be provided as incidentals. All equipment for installation, splicing and testing shall be provided by the Contractor per manufacturer's specifications and as detailed in these specifications. All fiber optic glass/cable on this project shall be from the same manufacturer and who is regularly engaged in the production of optical fiber material. The cable shall be qualified as compliant with Chapter XVII, of Title 7, Part 1755.900 of the Code of Federal Regulations, and "REA Specification for Filled Fiber Optic Cables." Packaging 1. The completed cable shall be packaged for shipment on non -returnable wooden reels. Required cable lengths shall be stated in the purchase order. 2. Top and bottom ends of the cable on spools shall be available for testing. 3. Both ends of the cable shall be sealed to prevent the ingress of moisture. 4. Each reel shall have a weather resistant reel tag attached identifying the reel and cable. Cable Marking 1. The optical fiber cable outer jacket shall be marked with manufacturer's name, the month and year of manufacture, the words "Optical Cable," telecommunications handset symbol as required by Section 350G of the National Electrical Safety Code° (NESC°), fiber count, fiber type, and sequential feet marks. 2. The markings shall be repeated every two (2) feet. 3. The actual length of the cable shall be within ±1 % of the length marking. 4. The marking shall be in a contrasting color to the cable jacket. 5. The marking shall be approximately 2mm in height regardless of the cable diameter. 6. The cable shall be tagged in each pull box with size and direction. Payment Upon acceptance and approval of the fiber optic cable, the City will pay the remaining amount as calculated by the actual measured quantity of installed fiber optic cable at the unit bid price minus the previously paid amount (80% of bid price). Refer to Section 9-3.2 for additional details. Acceptance and approval are achieved as determined by the City and includes: • Approved fiber optic test results • Completed cable/splice repairs or replacement as determined by the test results • Measured and approved quantities of installed cable Page 31 of 70 • Uninterrupted operation of fiber optic communication network, including fiber optic cable and communication devices for one week. This item may include items installed by others. Quality Control The manufacture(s) of supplied optical cable, optical cable assemblies, and hardware shall be TL 9000 and/or ISO 9001 registered. All cabled optical fibers shall be 100% attenuation tested. The attenuation of each fiber shall be provided with each cable reel. General Considerations Fiber optic cable installed shall be single mode fiber of the size as specified on the Plans and shall be Corning ALTOS all -dielectric gel -free fiber optic cable or approved equal. Fiber Characteristics One hundred percent (100%) of the optical fibers shall meet or exceed the requirements contained in this specification. The cable shall be tested in accordance with TIA/EIA-455-3A (FOTP-3), "Procedure to Measure Temperature Cycling Effects on Optical Fiber, Optical Cable, and Other Passive Fiber Optic Components." The average change in attenuation at extreme operational temperatures (40 °C to +70 °C) will not exceed 0.05 dB/km at 1550 nm. The magnitude of the maximum attenuation change of each individual fiber will not be greater than 0.15 dB/km at 1550 nm. This figure includes an allowance of up to 0.05 dB/km for measurement repeatability. The cable shall meet the requirements of ITU-T G.652.D and shall be a low water peak fiber. All fibers within the finished cable shall be composed primarily of silica and shall have a matched clad index of refraction profile as well as the physical and performance characteristics that shall meet the requirements in the following table: Parameters Value Mode Single Type Corning Altos or approved equivalent Core diameter 8.3 pm nominal Cladding diameter 125 pm ± 1.0 pm Core to Cladding Offset <_ 0.7 pm Coating Diameter 240 pm ±0.5 pm Cladding Non -circularity defined as: [1- (min. cladding dia _ max. cladding dia.)]x100 < 1.0% Proof/Tensile Test 100 k si, min. Page 32 of 70 Parameters Value Attenuation: @ 1310 nm _< 0.35 dB/km @ 1385 nm < 0.31 dB/km @ 1550 nm < 0.25 dB/km Attenuation Uniformity No point discontinuity greater than 0.1 dB at either 1300 nm or 1550 nm Attenuation at the Water Peak <_ 2.1 dB/km @ 1383 ±3nm Attenuation At Extreme < +0.05 dB @ 1310 nm or 1550 nm Operational Temperatures Chromatic Dispersion: Zero Dispersion Wavelength (Ao) 1302 < Ao <_ 1322 nm Zero Dispersion Slope < 0.092 ps/(nm2.km) Maximum Dispersion: _< 3.5 ps/(nm.km) for 1285 - 1330 nm <_ 18 s/ nm.km for 1550 nm Cut -Off Wavelength <1260 nm Mode Field Diameter (Petermann 9.2 ± 0.4 pm at 1310 nm II) 10.5 ± 0.5 pm at 1550 nm Cable Outer Diameter 0.30" 7.6 mm Buffer Tube Size 0.08" 2.0 mm Color Coding Optical fibers shall be distinguishable from others in the same buffer tube by means of color -coding according to the following: 1. Blue BL 7. Red RD 2. Orange OR 8. Black BK 3. Green GR 9. Yellow YL 4. Brown BR 10. Violet VL 5. Slate SL 11. Rose(IRS) 6. White WT 12. Aqua AQ The colors shall be targeted in accordance with the Munsell color shades and shall meet TIA/EIA-598B "Color Coding of Fiber Optic Cables" and RUS 7 CFR 1755.900. The color formulation shall be compatible with the fiber coating and the buffer tube filling compound, and be heat stable. It shall not fade or smear or be susceptible to migration, it shall not affect the transmission characteristics of the optical fibers and shall not cause fibers to stick together. General Cable Performance The fiber optic cable shall withstand water penetration when tested with a one -meter static head or equivalent continuous pressure applied at one end of a one -meter length of filled cable for one hour, no water shall leak through the open cable end. Testing shall be done Page 33 of 70 in accordance with TIA/EIA-455-82 (FOTP-82), "Fluid Penetration Test For Fluid -Blocked Fiber Optic Cable." The cable shall exhibit no flow (drip or leak) for 24 hours at 800 C. The weight of any compound that drips from the sample shall be less than 0.05 grams (0.002 ounce). A representative sample of cable shall be tested in accordance with TIA/EIA-455-81 B (FOTP-81), "Compound Flow [Drip] Test for Filled Fiber Optic Cable". The test sample shall be prepared in accordance with method A. Crush resistance of the finished fiber optic cables shall be 220 N/cm applied uniformly over the length of the cable without showing evidence of cracking or splitting when tested in accordance with TIA/EIA-455-41 (FOTP-41), "Compressive Loading Resistance of Fiber Optic Cables." The 220 N/cm (125 Ibf/in) load shall be applied at a rate of 2.5 mm (0.1 in) per minute. The load shall be maintained for a period of 1 minute. The load shall then be decreased to 110 N/cm (63 Ibf/in). Alternatively, it is acceptable to remove the 220 N/cm (125 Ibf/in) load entirely and apply the 110 N/cm (63 Ibf/in) load within five minutes at a rate of 2.5 mm (0.1 in) per minute. The 110 N/cm (63 Ibf/in) load shall be maintained for a period of 10 minutes. Attenuation measurements shall be performed before release of the 110 N/cm (63 Ibf/in) load. The change in attenuation shall not exceed 0.4 dB during loading at 1550 nm for single -mode fibers and 1.0 dB during loading at 1300 nm for multimode fiber. The repeatability of the measurement system is typically 0.05 dB or less. No fibers shall exhibit a measurable change in attenuation after load removal. The cable shall withstand 25 cycles of mechanical flexing at a rate of 30±1 cycles/minute with a sheave diameter not greater than 20 times the cable diameter. The cable shall be tested in accordance with Test Conditions I and III of TIA/EIA-455-104A (FOTP-104), "Fiber Optic Cable Cyclic Flexing Test." The magnitude of the attenuation change will be within the repeatability of the measurement system for 90% of the test fibers. The remaining 10% of the fibers will not experience an attenuation change greater than 0.1 dB at 1550 nm. The repeatability of the measurement system is typically ± 0.05 dB or less. The cable jacket will exhibit no cracking or splitting when observed under 5X magnification. Impact testing shall be conducted in accordance with TIA/EIA-455-25B (FOTP-25) "Repeated Impact Testing of Fiber Optic Cables and Cable Assemblies." The cable shall withstand 20 impact cycles. The magnitude of the attenuation change will be within the repeatability of the measurement system for 90% of the test fibers. The remaining 10% of the fibers will not experience an attenuation change greater than 0.1 dB at 1550 nm. The repeatability of the measurement system is typically ± 0.05 dB or less. The cable jacket will not exhibit evidence of cracking or splitting at the completion of the test. Using a maximum mandrel and sheave diameter of 560 mm, the finished cable shall withstand a longitudinal tensile load of 1330 N (300 lbs.) applied for one hour (using "Test Condition II" of the test plan). The test shall be conducted in accordance with TIA/EIA- 455-33 (FOTP-33), "Fiber Optic Cable Tensile Loading and Bending Test." The measured fiber tensile strain shall be < 60% of the fiber proof strain. The cable will not experience a measurable increase in attenuation when subjected to the rated residual Page 34 of 70 tensile load, 400 N (90 Ibf). The repeatability of the measurement system is typically ± 0.05 dB or less. The cable shall be capable of withstanding a bending radius of fifteen (15) times the cable diameter under tensile loading and ten (10) times the cable diameter under a no-load condition. Drop Cable As may be required, the Contractor shall provide a single -mode optical fiber cable between each mid -span splice location and each traffic control equipment cabinet, which shall contain six (6) optical fibers. The drop cable shall have two (2) or four (4) fiber strand(s) spliced into the appropriate fiber strand in the mainline cable as prescribed elsewhere in the Plans and/or these Special Provisions. The drop cable shall have the six optic fibers terminated at its other end with connector as described elsewhere in this specification. Optical fiber cable used for a drop cable shall comply with all other aspects of the specifications as set forth in these Special Provisions for optical fiber cable. The drop cable shall have sufficient length to extend from the fiber splice location to the optical interface of the associated communications equipment, allowing for routing and securing with nylon ties plus fifty (50) feet of slack at all splice points and fifteen (15) of slack inside the cabinet, unless otherwise specified in the Plans or these Special Provisions or directed by the Engineer. The drop cable shall be sufficiently de -sheathed within the traffic control cabinet to allow adequate slack fiber to afford ease of routing of the active fiber to the communications equipment. The Contractor shall provide a thermal shrink sleeve dam or other appropriate wrapping at the beginning of the de -sheathed cable area so as to prevent loss of any aqueous gel filling from the remainder of the service drop cable. Fiber Patch Cords The fiber optic cable patch cords, assemblies and components shall be compatible components, designed for the purpose intended, and manufactured by a company regularly engaged in the production of material for the fiber optic industry. All components or assemblies shall be best quality, non -corroding, with a design life of at least twenty (20) years. All patch cords, components or assemblies of the same type shall be from the same manufacturer. The Contractor shall furnish and install Patch cords, which are fiber optic cables with connectors on both ends. Patch cords are used to connect fiber optic transmission equipment to connector panel modules. The patch panel shall interface to patch cords with approved connectors. Patch cords shall have 900JAm single fiber single mode cable with approved connectors. The patch cords shall be at least six (6) feet in length and shall be pre -sized in the factory to the required lengths. The attenuation of the cable shall be between 1.0 and .75 dB. Page 35 of 70 All patch cords shall be installed without exceeding the manufacturer specified bending radius. Acceptable equipment shall be from Corning Cable System or approved equal. Fiber Optic Fan -Out Kits If required, fan -out kit connects the fiber optic jumper cable to the fiber optic transmission equipment located in the cabinet. The fan -out shall be equipped to terminate 250pm fiber (loose tube cable) and shall provide protection for the bare fibers. The fan -out kit shall have two (2) 6- or one (1) 12-fiber fan -out insert and 2-meter lengths of fan -out tubing with twelve (12) single mode fibers that are ready for field installable connectors. The fan -out cable kit shall also meet the following specifications. Housing Length 132 mm (5.2 in) Diameter 31 mm 1.22 in Fan Out Tubing Length 2 m 78.8 in Diameter 2.9 mm 0.11 in Environmental -408C to 708C The fan -out kit, when installed in the existing traffic cabinets or proposed fiber optic terminal cabinet attached to the existing traffic cabinet, shall be securely anchored to the side wall of the cabinet by suitable ties. Acceptable Fan -Out Kit shall be from Corning Cable System or approved equal. Fiber Optic Connectors The Contractor shall furnish and install fiber optic pre -manufactured connectors that are single mode LC type connectors that meet the requirements for outdoor installation with Gigabit Ethernet communications. LC type connectors will be used for all outdoor and indoor installations. The LC connectors shall meet the following specifications. The Connectors shall be compliant Interconnection Compatibility with EIAMA and JIS specifications for LC compatible connectors. Insertion Loss 0.4 dB (typical) Reflectance <_ -40 dB between a temperature range of -408 C to 758 C Durability <_0.3 dB change, 200 rematin s. Page 36 of 70 Tensile Strength <_ 0.2 dB change, 10 lb. Temperature Cycling <_0.3 dB change, -408 C to 758 C Nominal Fiber OD 125 Lm Materials Ferrule: Ceramic I Housing: Composite Accepted equipment shall be SC and LC Compatible Single Mode, as required, from Corning Cable System or approved equal. 700-5.4 Controllers. 700-5.4.3 Cabinets. Controller Assembly Testing Solid-state traffic actuated controller units, cabinets and auxiliary equipment shall conform to the provisions in these Special Provisions, NEMA TS2-2 standards, and the latest Caltrans Transportation Electrical Equipment Specifications (TEES). Cabinet Construction The following items are included in the cabinet assembly: • For 16 position main panel Type "O", "P", and "R" aluminum cabinet powder -coated white inside and out. • Fully wired eight phase NEMA Type 2 main panel — Horizontal hardwired swing down load bay. • Type 16 Malfunction Management Units (programmed for intersection) Econolite MMU • 16-channel detector rack w/ BIU slot (minimum) • 8- 2-channel Detectors (minimum) or (16 channel max.) • Bus Interface Units — detector rack only • 12/16- Load switches All auxiliary equipment to completely operate an eight -phase traffic intersection control cabinet. General National Electrical Manufacturers Association, Traffic Control Systems, NEMA Standards Publication: TS2-Latest release. Page 37 of 70 Documentation The City reserves the right to reject traffic signal control equipment and auxiliary equipment items in which the manufacturer of such items does not have at least nine million dollars of product liability insurance. Warranty The supplier of equipment shall warranty their product to be free from defect in design and operation and that it meets all the requirements of this specification and those incorporated in this document. The term of the warranty on a wired cabinet shall be a minimum of one (1) year from date of acceptance including the Bus Interface Units and Cabinet Power Supply. Equipment such as the Controller and Malfunction Management Unit shall have a minimum of a two- year warranty. Cabinet Standards Cabinet Construction A complete NEMA TS2 Type 2 Plug N Go in a Type "O", "P" or "R" aluminum cabinet as indicated on the Plans shall be supplied. Cabinets shall meet, as a minimum, all applicable sections of the NEMA Standard Publication. Where differences occur, this specification shall govern. The cabinets shall meet the following criteria: • Material shall be 5052-1-132 0.125-inch thick aluminum. • The cabinet shall be supplied powder coated aluminum with white powder coat inside and out Federal color #17875 to match the service enclosure and battery backup cabinet. • The door hinge shall be of the continuous type with a stainless steel hinge pin. • The door handle shall be cast aluminum. With the provisions for padlock installation. • All seams shall be sealed with RTV sealant or equivalent material on the interior of the cabinet. All outside seams shall be continuous welded. • Cabinet lock shall be of the Corbin #1548-1 (#2 Key). • A roll out computer table shall be mounted under the Controller location on the First shelf. • Each cabinet shall have 3 sets of cabinet wiring diagrams. • Each cabinet shall have 2 sets of equipment manuals (Controller, MMU, etc.). Shelves Type "P" cabinets shall have two (2) substantial metal shelves extending across the back of the cabinet the cabinet shall be provided to support the controller unit, auxiliary equipment and detector rack. The lower shelf shall be easily removable without tools. Four "C" mounting Channels shall be installed on both side walls and two rear wall allowing versatile positioning of shelves and side panels. Page 38 of 70 Type "O" and "R" cabinets shall have three (3) shelves. Cabinet Wiring Equipment Accessibility All mounted panels and equipment shall have a minimum tool access clearance of 6". Ventilating Fan The cabinet shall be provided with a thermostatically controlled adjustable between 80- 150(degrees Fahrenheit) ventilation fan and shall be installed in the top of the cabinet plenum and protected by a 0.5-amp fuse. Air Filter Assembly The cabinet Air Filter shall be a one-piece removable, medium efficiency, synthetic air filter and shall be firmly secured to the air entrance of the cabinet. To provide for a positive air flow through the cabinet. (12' x 16") minimum. Cabinet Light Assembly The cabinet shall be equipped with a florescent lighting fixture that shall be mounted on the inside top of the cabinet near the front edge. The florescent light shall be activated by an on/off switch that is turned on when the cabinet door is opened and turned off when the door is closed. Lightening Suppression The cabinet shall be equipped with an EDCO model SHP-300-10 surge arrester. Power Panel The Power Panel shall house the following equipment: • A 40-amp main breaker shall be supplied. This breaker shall supply power to the main panel, controller, MMU and cabinet power supply. • A 20-amp auxiliary breaker shall supply power to the fan, light and GFCI outlet. • An EDCO model SHP-300-10 or equivalent surge arrester. • A 50 amp, 125 VAC radio interference line filter. • A normally -open, 60-amp, mercury contractor • A spare 15 amp, auxiliary breaker shall be provided. Convenience Outlet Three Duplex outlets shall be supplied. 1. Is for short term equipment use and shall be a 120 volt AC, 15-Amp NEMA 5-15 GFCI 2- gang duplex outlet shall be mounted in the lower right corner of the cabinet facing the inside of the cabinet door and within 6" of the front edge of the opening of the door. 2. Is for long term equipment use and shall be a 120 volt AC, 15-Amp NEMA 2- gang duplex outlet shall be mounted in the upper right corner and upper left corner of the cabinet facing the inside of the cabinet. Power shall be supplied from filtered power. Page 39 of 70 Inside Aux Control Panel Switches The inside door panel shall contain three (3) switches: AUTO/FLASH, STOP TIME and CONTROLLER POWER ON/OFF. Auxiliary door panel switches shall be hard wired only. (No printed circuit boards shall be used for the door panel switches.) Controller panel shall also contain plunger style vehicle and pedestrian test switches for all phases in use (typically phase 1 to 8 & peds). 2-Position Auto/Flash Switch In the Auto position the intersection shall operate normally. When in the Flash position, power shall be maintained to the controller and the intersection shall be placed in flash. The controller shall not be stop timed when in flash. A guard (sk3036) shall be installed to prevent the switch from being shut off accidentally. 3-Position Auto/OFF/ON Stop Time — Switch When in the Auto position the controller shall be stop timed when the police door AUTO/FLASH switch is in the flash position or MMU flash. If in the off position the switch will release all stop time from controller. In the On position the switch shall maintain a continuous stop time to the controller. 2-Position Controller Power On/OFF — Switch This switch shall control the controller's AC power. A guard (sk3036) shall be installed to prevent the switch from being shut off accidentally. Police Panel Switches The Police Panel shall contain one (1) switch: The AUTO/FLASH. All police panel switches shall be hard wired. A switch guard shall be provided for each switch. 2-Position Signals ON/OFF Switch In the On position the field displays shall show either normal operation or flash. In the Off position, power shall be removed from signal heads in the intersection. The controller shall continue to operate. In the OFF position, the MMU shall not conflict or require reset. 2-Position Auto/Flash Switch In the Auto position the intersection shall operate normally based on all other switches. In the Flash position, power shall not be removed from the controller and stop time shall be applied based on the STOP TIME switch. Cables All Controller and MMU cables shall be of sufficient length to access any shelf position. All cables shall be encased in a protective sleeve along their entire free length. All cables shall be fixed to the bottom front of each shelf. Cables shall be neatly dressed and not hang down in front of other equipment. Page 40 of 70 Color Coding All cabinet wiring shall be color coded as follows: • Purple = Flash color programming • Brown = Green Signal Wiring • Yellow = Yellow signal wiring • Red = Red signal wiring • Blue = Controller wiring • Gray = DC ground (return),(logic ground) • Black = AC+ • White = AC- • Green = Chassis Main -Panel and Wire Terminations All wires terminated behind the main -panel and other panels shall be soldered. No pressure or solder less connectors shall be used. Printed circuit boards shall Not be used on main panels. Flashing Operation Cabinet shall be wired for NEMA flash. All cabinets shall be wired to flash red for all phases. Flashing display shall alternate between phases 1,4,5,8 and phases 2,3,6,7. Detector Rack and Interface A minimum of one vehicle loop detector rack and one detector interface panel shall be provided in each cabinet. Each rack shall support up to (16) sixteen channels of loop detection, two 2- channel of EVP devices, and one (1) BIU. Preemption Wiring The cabinet shall be completely wired for Rail Road or EVP preemption as needed if specified on the Plans. Main -Panel Configuration The main panel shall be fully wired in the following configuration: • The Main -Panel shall be a hardwired horizontal swing down sixteen position load socket load bay or as called for on the plan sheet, for a "P" cabinet. • Four or Six flash transfer relay sockets as required. • One flasher socket. • Wiring for one Type -16 MMU. • All connector cables shall be dressed neatly along the front edge of the cabinet shelf the equipment (controller & MMU) will be installed on. NO cables shall hang freely in the cabinet. Field Terminal Locations Field terminals shall be located at the bottom of the main panel and angled forward for easy viewing and wiring. Their order shall be left to right beginning with phase one and following the order of the load switches. Field terminals shall be of the barrier type. Page 41 of 70 Cabinet equipment Controller Unit Shall be a Cobalt Controller provided with NTCIP level 2 protocol, ECPIP & AB3418 basic with Ethernet communications module and data key. Detectors Cabinets shall be equipped with eight (8) TS2 detectors in single detector rack cabinet and sixteen (16) in a two (2) detector rack configuration. Econolite G-68 and G-70 detectors shall be provided or approved equal. MMU (Malfunction Management Unit) Cabinets shall be equipped with NEMA TS2 Type 16 Malfunction Management Unit with latest current released software. MMU jumper cards shall be programmed to each intersections requirements or standard 8 phase configuration for spare units. BIU (Bus Interface Unit) BTU's shall meet all TS2-1992 section 8 requirements. In addition, all BIU's shall provide 3 separate front panel indicators. Power, Valid Data and Transmit. Cabinet Power Supply The cabinet power supply shall meet the NEMA TS2 specification. All power supplies shall also provide a separate front panel indicator LED for each of the four power outputs. Front panel banana jack test points for 24 VDC and logic ground shall also be provided. Telemetry Interface Panel All cabinets shall be wired with a telemetry interface panel and telemetry connecting cable so as to work with the CENTRACS central control system. The interface panel shall also contain wiring for door open and flash alarms. Power Bus Assembly The power bus assembly shall provide filtered power for the controller, MMU, cabinet power supply and all auxiliary equipment. It shall include the SDLC Bus connecting cables wired into a surface mounted compression terminal block. It shall also include up to 6 filtered power connectors and 2 terminal strips to hardwire the power connections. Interconnect Termination All cabinets shall be supply with interconnect termination blocks, Siemons model # S66M1-50 and sub -base. Load Switch All load switches shall meet NEMA TS-2, Section 6 requirements and shall be PDC SSS- 86-1/0 or City Approved Equal. All load sockets shall be equipped with a load switch. Flasher Unit All flasher units shall meet NEMA TS-2, Section 6 requirements and shall be EDI model 810 or equivalent. Page 42 of 70 Intersection Diagram An intersection diagram, shall be made on 8 1/2" X 11" sheet of paper enclosed in plastic cover, it shall be located on the inner side of the door above the auxiliary panel. The diagram shall depict the general intersection layout, controller location, traffic signal conduit crossings, phases, overlaps, detector assignments, and north arrow. The top of the diagram will be North and the diagram shall be approved by the City representative. Cabinet Wirinq Prints The cabinet wiring prints shall be arranged in a simplistic way in terms of reading prints on three pages. Testing Facility The testing facility shall have up to seven (7) days to test the controller assembly. Cabinet loaded shall be tested under full load for seven (7) days straight without any problems. The testing facility shall be selected by the Engineer. Equipment Turn On Requirements An Econolite representative and a signal technician from the city shall be present at the time of the controller assembly turn on. The representative shall be fully qualified to work on the controller assembly equipment. The City shall be notified at least 7 working days prior to intersection turn -on. 700-5.5 Traffic Signal Faces and Fittings. Installed vehicle indications/heads shall be furnished new, including mounting framework and hardware. Indications/heads shall be made of aluminum and colored black. New vehicle indications shall be nominal 12-inch diameter (300 mm), furnished with Light Emitting Diode (LED) indications, visors, and back plates. All new TV-1-T indications shall be furnished with bronze terminal compartments. Vehicle heads shall be furnished new by the Contractor with the LED units installed. Where vehicle indications are to be powder coated, new vehicle heads, visors, and back plates shall be metal. Otherwise, new vehicle heads, visors, and back plates shall be aluminum. Top openings of vehicle indications shall be sealed with neoprene gaskets. If shown on the Plans, the Contractor shall furnish and install Lingo Industrial Electric Model LESV1 T (or Agency -approved equal) terminal compartments. All Vehicle indications shall be 12 inch LED and shall be Gelcore or Dialight brand (or Agency approved equal). A yellow retroreflective strip with a width of 2 inches shall be placed along the perimeter of the face of a signal backplate to project a rectangular appearance at night. Page 43 of 70 For the traffic signal intersection at San Joaquin Hills Road at Santa Rosa Drive only, Vehicle and Pedestrian faces and equipment shall have a finished color coating per Section 310 — PAINTING of the Special Provisions. 700-5.6 Pedestrian Signal Sections. Installed pedestrian indications/assemblies shall be furnished new, including mounting framework and hardware. Indications/heads shall be made of structural plastic and colored black. Where pedestrian signal faces are to be powder coated, new pedestrian housings shall be metal. Otherwise, new pedestrian assemblies shall have aluminum Type A indications with Stainless steel hardware and shall be furnished with bronze terminal compartments. All Pedestrian indications shall be Countdown LED and shall be Gelcore or Dialight brand (or Agency approved equal). For the traffic signal intersection at San Joaquin Hills Road at Santa Rosa Drive only, Vehicle and Pedestrian faces and equipment shall have a finished color coating per Section 310 — PAINTING of these Special Provisions. 700-5.9 Pedestrian Push Button Assemblies. Installed pedestrian and bicycle push buttons/assemblies shall be furnished new, including mounting hardware. Pedestrian push button signs, for push button assemblies to be installed on pedestrian push button posts shall be 5" x 7-1 /2". All other pedestrian push button signs shall be 9" x 12" and shall not extend beyond the mounting framework. Bicycle Push Button Assemblies Installation of push button assemblies for bicycle use shall be in accordance with CNB STD No. 913. Paint and Powder Coating For the traffic signal intersection at San Joaquin Hills Road at Santa Rosa Drive only, Pedestrian and Bicycle push button assemblies shall have a finished color coating per Section 310 — PAINTING of these Special Provisions. 700-5.8 Detectors. Loop wire shall be Type 2. Loop detector lead-in cable (DLC) shall be Type B. Loop sealant shall be Hot -Melt Rubberized Asphalt Sealant. Page 44 of 70 700-6 FIBER OPTIC EQUIPMENT 700-6.1 Fiber Patch Panel/Wall Interconnect Unit. General Fiber Patch Panel (also called Wall Interconnect Center (WIC)) shall be furnished and installed at the locations shown on the Plans. The section includes material and installation for fiber patch panel. Description The fiber patch panel shall act as the demarcation point between the fiber optic cable via the fiber pigtail from the splice closure and the terminal equipment via the fiber optic patch cords. The Contractor shall furnish and install matching connectors. The approved type optical connectors on the end of each pigtail shall screw into a sleeve securely mounted to a patch panel within the fiber patch panel enclosure. The maximum optical loss across the connection shall not exceed 0.4 dB. The fiber patch panel housings installed in 332 cabinets shall be rack -mounted in the outdoor traffic signal controller cabinets, as shown on the Plans. Contractor to verify rack space for fiber patch panel prior to procurement. If space limitations exist, Contractor shall notify Engineer. The fiber patch panel housings installed in NEMA cabinets shall be wall or shelf mounted in the outdoor traffic signal controller cabinets, as shown on the Plans. Preference is for fiber patch panel to be wall mounted on side of cabinet. Contractor shall verify space in cabinet and provide recommendation to Engineer for mounting. The fiber patch panel shall have 48 strand capacity. The cabinet shall have fiber optic cable entrances with cable sheath strain relief, leading to the fiber patch panel. All fiber terminations on the patch panel, located in the traffic signal controller cabinet, shall be SC type connectors. The Fiber Patch Panel shall be Corning Cable System or approved equal. Rack mounted fiber patch panel shall be Corning CCS-01U, shelf/wall mounted fiber patch panel shall be Corning SPH-01 P, or approved equals. 700-6.2 Fiber Distribution Unit (FDU). General The Contractor shall furnish and install fiber distribution unit (FDU) sized to be rack - mounted in the new or existing equipment rack in the City Building equipment room as shown on the Plans. The FDU shall have the capacity to terminate and connect all fiber optic cable strands installed by Contractor as part of this Project, as shown on the Plans. Contractor shall coordinate installation of rack and FDU with Engineer. The section includes material and installation for fiber distribution unit. Page 45 of 70 The FDUs at the City Buildings shown in the Plans shall serve as the demarcation point for work to be completed by Contractor and work to be performed by others. The Contractor shall be fully responsible for furnishing, installing and testing of the FDU at each City Building and all Field Work elements. From, but excluding the FDU, others will be responsible for elements inside the City Buildings. Description of FDU FDU shall consist of two parts: a splice shelf and a fiber patch panel. The splice shelf shall house and protect fusion splices of fibers to optical fiber pigtails with six (6) feet of pigtail slack on each fiber. The FDU shall house and protect the required quantity of connectors and splices on each pigtail and slack for fiber optic patch cords. The fiber pigtail slack shall be neatly coiled and secured in a manner that does not allow the minimum operational bending radius of the pigtail to be exceeded. The approved type optical connectors on the end of each pigtail shall screw into a sleeve securely mounted to a patch panel within the FDU enclosure. The maximum optical loss across the connection shall not exceed 0.4 dB. The patch panel shall be capable of single mode terminations grouped by six (6) to eight (8) connector sub -panels. The housing shall have fiber optic cable entrances with cable sheath strain relief. All fiber terminations on the FDU, located at communication hubs, shall be LC type connectors. The Contractor shall provide pre -wired connectors panels, fiber pigtails, interconnection sleeves, and connector panels as required to make the indicated connections. The FDU shall have the spare capacity to hold the required number of connector panel modules and fiber capacity splice trays. The Contractor shall provide trays to house the entire number of fibers within the cable for future use. Prior to ordering the FDU and associated equipment, the Contractor shall provide submittals of the exact equipment proposed to the Engineer. The Engineer must approve the equipment submittals prior to ordering. The FDU shall be Corning Cable System or approved equal. 700-6.3 Splice Closure. General Any below ground fiber optic splices or fiber optic splices exposed to the elements shall be contained in a waterproof, rodent proof, re -enterable fiber optic splice closure designed for use on optical fiber cables in a cable vault environment where total and continuous submersion in water may be expected. Page 46 of 70 Splice closures shall be complete with outer and inner closures, splice organizer trays, brackets, plugs, clips, cable ties, seals, and sealant, and a dry encapsulate and shall conform to the following special provisions. 1. The fiber optic splice closure shall conform to the requirements of Bellcore GR 771 and shall be designed for a temperature range of -40' C. to +700 C. 2. The splice closure shall be suitable for either a direct burial or pull box/vault application. 3. The size of the closure shall allow all the fibers of the largest fiber optic cable to be spliced to a second cable of the same size. The closure shall be not more than 18 inches in length and not more than 4 inches in diameter. The closures shall be designed for both horizontal and butt splicing. 4. All materials in the closures shall be non -reactive and shall not support galvanic cell action. The outer -closure shall be compatible with the other closure components, the inner closure, splice trays, and cables. 5. The outer -closure shall protect the splices from mechanical damage; shall provide strain relief for the cable, and shall be resistant to salt corrosion. The outer -closure shall be waterproof, and re -enterable. The outer -closure shall be flash -tested at 100 kPa. 6. The inner -closure shall be of metallic construction. The inner -closure shall be compatible with the outer closure and the splice trays and shall allow access to and removal of individual splice trays. 7. The splice trays shall be compatible with the inner -closure and shall be constructed of rigid plastic or metal. Installation 1. Adequate splice trays shall be provided to splice all fibers of the communication cable with the greatest fiber count entering the closure. 2. Upon completion of the splices, the splice trays shall be secured to the inner closure. The Contractor shall verify the quality of each splice prior to sealing the splice closure. 3. The closure shall be sealed using a procedure recommended by the manufacturer that will provide a waterproof environment for the splices. Encapsulant shall be injected between the inner and outer closures. 4. Care shall be taken at the cable entry points to ensure a tight salt resistant and waterproof seal is made which will not leak upon aging. It is acceptable to have multiple service drop cables enter the fiber optic splice closure through one hole as long as all spaces between the cables are adequately sealed. 5. The splice closure shall be mounted horizontally in a manner that allows the cables to enter at the end of the closure without exceeding any minimum bending radius specification. 6. All fiber optic cable splicing performed on this project shall be of the fusion type. All fiber optic cable splices shall be of the fusion type and shall not exceed 0.1 dB loss per splice. 7. The field splices shall connect the fibers of the two (2) fiber optic cable lengths together. The termination splices shall connect the fiber optic cable span ends Page 47 of 70 with pig tails. The field splices shall be placed in a splice tray, and then the splice tray with splice shall be placed in a splice closure. 8. The termination splices shall be placed in a splice tray and the splice tray with splice shall then be placed in a fiber distribution unit or field cabinet as required. All splices shall be protected with a thermal shrink sleeve. 9. The fiber optic field splices shall be enclosed in splice closures, which shall be waterproof, rodent proof, and re -enterable, and shall accommodate all the fibers in a single cable. 10. The microduct coupling shall house the fiber optic cable up to the cable opening in the splice closure. The Contractor shall furnish and install fiber optic splice closures capable of accommodating a minimum of six (6) splice trays and a maximum of 72 splices. The splice closure shall also include the required encapsulant. The splice closure shall be able to accommodate up to four (4) cable entries. If all four cable entry holes are not required, the remaining unused entry holes will be closed such that moisture does not enter the splice closure and affect the operation of the fiber optic cable. The splice closure shall have sleeves to size the cable entry to the appropriate cable diameter. Each splice closure shall come equipped with the required number of single mode splice trays. Included within the splice closure, the Contractor shall also supply and install splice trays. Each spice tray shall be appropriately sized to fit inside the splice closure. The splice trays shall be of injection molded plastic type with a clear plastic cover so allow visibility of fibers without opening the tray. Each splice tray shall handle up to twelve (12) single mode fusion splices. A minimum of three unopened kits required for the resealing of the splice closure shall be supplied with this contract and considered as part of the necessary equipment. Splice closures, encapsulant, trays, and reseal kits shall be from Corning Cable Systems, or approved equal. 700-6.4 Ethernet System. The following items are included in the Ethernet System: 1. Ethernet System 2. Testing 3. Warranty General The locations for the installation of Ethernet switches are shown on the corresponding design plans. The Ethernet Switches with power supplies shall be furnished by Iteris and installed by the Contractor. Page 48 of 70 Ethernet Switch shall be Cisco IE-3300-8T2S-E, or approved equal. The Ethernet Switch power supply shall be Cisco PWR-IE65W-PC-AC=. Contractor shall furnish and install CAT6 cable and fiber optic jumpers to complete connections to fiber patch panel and installed hardware. CAT6-A Cable Contractor shall furnish and install CAT6-A cable and complete connections from Ethernet Switch and installed equipment in controller cabinet including traffic signal controller and video encoder, at locations as shown on the Plans. Contractor shall furnish and install CAT6-A cable and complete connections from Aggregation Switch and installed equipment in rack, at locations as shown on the Plans. Installation Contractor shall furnish and install switches as shown on the Plans and as directed by Engineer. Testing Contractor shall complete on -site acceptance testing of installed items and certify in writing to City that installed items operate within manufacturer's requirements. Warranty The supplier of equipment shall warranty on work performed to be free from defect in design and operation and that it meets all the requirements of this specification and those incorporated in this document. The term of the warranty on work performed shall be a minimum of one (1) year from date of acceptance. 700-7 CCTV SYSTEM General The Closed Circuit Television (CCTV) Camera System shall comply with all rules and regulations of the Federal Communications Commission (FCC) and these Special Provisions. The CCTV camera system including the dome camera, CCTV cable (video/data/power), and CCTV camera mounting hardware and shall be Contractor - furnished. The Contractor shall install the CCTV camera system at locations as shown on the Plans. Page 49 of 70 CCTV IP Dome Camera The Camera shall be IP, Color CCD and capable of producing no less than 720P resolution and communicate using non-proprietary control protocol. It shall have Pan, Tilt, Zoom (PTZ) capabilities, NTCIP control language, and a minimum optical zoom of 30X and be manual/auto focus capable. The camera shall be able to operate with a continuous 3600 rotation (no stops). The camera shall be able to operate a light rating of 3.0 lux at 60 frames per second color and at 0.3 lux at 60 frames per second black and white. The camera shall operate at NEMA TS2 voltage levels of 89 VAC to 135 VAC and environmental temperatures of -340 to 74°C. The camera shall have a minimum of 6 programmable privacy zones, zones at which the video is blanked, and 32 presets. The camera shall be in a pressurized sealed enclosure and have a built in character generator for site ID name and/or number, and alarm codes. The camera shall weigh no more than 20 lbs. and shall have dimensions no greater than 18 inches tall and 15 inches long. All equivalencies must be approved by the Engineer prior to procurement. The camera shall have the following features: • Network Interface — Ethernet (100BaseT-Tx) • Protocol — TCP, IGMP, RTSP, NTP, HTTP, ONVIF Profile S, NTCIP • CODECs — H.264 and MPEG (720p) • Pan Range - 360' • Tilt Range - 50 to -900 • Power — POE++ Camera shall use pole -mounting hardware provided by the dome CCTV camera vendor, capable of mounting to a vertical traffic signal pole. The pole mount shall be affixed to the pole to extend the camera towards the center of the signalized intersection. The dome CCTV camera and mounting hardware shall withstand a wind load of 80 mph when affixed to traffic signal pole without permanent damage to mechanical and electrical equipment. The CCTV Dome Camera shall be Axis Q6318-LE PTZ Camera or approved equal. The POE++ Injector shall be Axis T8134 60W Midspan or approved equal. CCTV Integrated Camera Cable The integrated CCTV camera cable shall be procured from the CCTV camera vendor. No exceptions shall be allowed. The CCTV cable shall be outdoor -rated CAT 6 shielded or approved equal. 700-8 OPTICOM PRIORITY CONTROL SYSTEM Emergency Vehicle Pre-empt (EVP) systems are to be furnished new and installed by the Contractor per the plans. The Contractor shall arrange for a representative of the manufacturer to test the operation of the systems after installation. Page 50 of 70 On new cabinet installations, the Model 764 phase selector units shall be installed in the vehicle detection rack by the cabinet manufacturer. For modifications of existing cabinets, the phase selector units shall be installed in a new Model 760 rack or if vehicle detector rack is not available/full. The EVP system shall consist of the following components: • Model 764 phase selector units, • Model 760 rack (if required), • Model 722 Optical Detector Units • Model 138 Optical Detector Cable The Contractor shall coordinate with the Manufacturer to have a technician onsite the date of the signal turn -on. 700-9 BATTERY BACKUP SYSTEM The Contractor shall furnish and install a Battery Backup System (BBS) for use with a NEMA system (shelf -mount) as detailed on Plans. The Contractor shall furnish new and install all necessary cables, wiring harness, and all other equipment and incidentals, including batteries, to connect the UPS to the traffic signal controller cabinet wiring harness to provide the intended operation. The BBS shall be installed per the manufacturer's guidelines. The Contractor shall at his own expense, arrange to have a technician, qualified to work on the BBS assembly and employed by the BBS assembly manufacturer, or his representative, present at the time the equipment is turned on. The Engineer shall be notified at least two working days prior to the beginning of the functional test period. The BBS shall be Marathon Power Ruggedized Traffic UPS/BBS 2000VA / 150OW TRTC- 2004-N1, Marathon Power Manual Power Transfer Switch Closed Version, and MK Battery Model 8A24 HEU, or approved equal. Battery Backup Cabinet Where BBS system is to be installed on a Type "O" or "P", a separate battery cabinet for NEMA controller cabinets shall be furnished and installed to house the batteries and inverter. The battery cabinet shall be supplied powder coated aluminum with white powder coat inside and out Federal color #17875 to match traffic signal cabinet and service enclosure. The battery cabinet shall be mounted to the side of the signal cabinet at a minimum height of 30" above the foundation. Page 51 of 70 The BBS Cabinet shall be McCain Model 36x20x16 BBS Cabinet, Side Mount M42513- SC Power Coated, or approved equal. 700-10 LED INTERNALLY ILLUMINATED STREET NAME SIGNS. All street name signs shall be furnished and replaced new, including mounting brackets and hardware. Internally illuminated street name signs shall conform to Section 87-4.02C Internally Illuminated Street Name Signs of the Caltrans Standard Specifications. Type A signs with Type IV photoelectric controls shall be installed where shown on the Plans. The contractor shall provide shop drawings of all of the required sign legends for review by the Engineer. IISNS shall be National Signal, Inc. EdgeLit (NAIM-72-LED-D or MAIM-96-LED-D) with mounting brackets or approved equal. Each EdgeLit LED IISNS shall be equipped with factory installed photoelectric controls. Custom Sign Panels shall be white on blue background with Newport Beach logo per CNB STD No. 916-A. For the traffic signal intersection at San Joaquin Hills Road at Santa Rosa Drive only, Internally Illuminated Street Name Sign Housings shall have a finished color coating per Section 310 — PAINTING of these Special Provisions. SECTION 701 — CONSTRUCTION 701-1 GENERAL All materials, equipment and components furnished shall be new, be of the latest design and manufacture, and be in an operable condition. All parts shall be of high quality workmanship, and no part or attachment shall be substituted or applied contrary to the manufacturer's recommendations and standard practices. Like components shall be of the same manufacturer. Equipment shall be furnished in matching, or closely coordinating, colors and materials The equipment shall be readily accessible for service or replacement. Equipment shall be neatly located within cabinets such that there are no obstructions to air flow. There shall be proper cooling of all equipment. No equipment shall be considered which requires direct/dedicated ventilation systems. All equipment shall have conveniently located, protected on -off switches. It shall be the responsibility of the Contractor to supply and install all necessary power distribution devices including power switches, circuit breakers, grounding straps, etc., for equipment within each cabinet. Page 52 of 70 All equipment shall be tagged clearly indicating the type of equipment. Where specified in the Plans or these specifications, the Contractor shall provide all material and equipment per the manufacturer's name and model or catalog number. Products of other manufacturers will not be considered. Electrical and Environmental Requirements The equipment shall meet all the specified performance requirements under the following ranges of electrical and environmental conditions (unless otherwise noted). • Primary Power - 120 volts single phase, voltage variation ± 10%; frequency range, 60 Hz ± 1. • High Frequency Interference - Spikes of 50 volts. • Low Voltage Transients - +20% of the nominal line voltage for maximum duration of one power cycle. • Temperature Range - +50 to +85 degrees F. • Temperature Gradient - 10 degrees F per hour. • Humidity - 50 to 60 percent, non -condensing. All electronic equipment shall be of solid-state design (unless otherwise noted) and modular construction. Individual electrical components in any module shall be removable and replaceable without resulting damages to the module or equipment. The design shall be such as to prevent reversed assembly or installation of connectors, fasteners, etc., where possible malfunction or personnel hazards might occur. Each item of equipment shall be designed to protect personnel from exposure to high voltage and temperature during equipment operation, adjustments, and maintenance. All video display system and computer equipment shall be suitably protected against Electro-Magnetic Interference (EMI) and shall be sufficiently shielded so as not to produce any EMI, which would interfere with any other equipment in the City TMC. Any equipment failing to meet this requirement shall not be used. All video power circuits shall be on the same phase and dedicated for video use only. The equipment shall be protected from surges and transients in the electrical service and dedicated interconnect cable system. The equipment shall be provided with manually re-settable or replaceable circuit protection devices to protect the equipment and power sources. All such devices shall be readily accessible. Conductor and Cabling Requirements All cable plugs and connectors shall be labeled and keyed to preclude improper connection. The use of ribbon type cables to connect between equipment is not acceptable unless the cables are shielded and have an extra layer of heavy-duty Page 53 of 70 protection from the environment, as well as connectors on each end with some form of locking mechanism. When designated as "new" per the Plans and these Special Provisions, all conductors and cables shall be new including within standards/poles and mast arms. Responsibilities of the Contractor It shall be the Contractor's responsibility to perform site inspection of the work area prior to beginning Field Work and to identify any factors that will affect the unit cost and the total cost to implement the System per the Plans and these Special Provisions. The Contractor shall be responsible for all work necessary for delivery, installation, testing, configuration, calibration and maintenance of all Field Work equipment installed as part of this contract, such that they operate as an integrated functional system until final acceptance. The Contractor shall also be responsible for all incidental accessories necessary to make the installed system, including the fiber optic communication system and CCTV system, complete and ready for operation, even if not particularly specified. Such incidentals shall be furnished, delivered and installed by the Contractor without additional expense to the Engineer or the City. Minor details not usually shown or specified but necessary for the proper installation and operation, shall be included in the work and in the Contractor's cost proposal, the same as if herein specified. The Contractor shall note that approval by the Engineer is required before ordering or installing any material and equipment that is to be used for the Contract. All communication equipment should be operationally tested before they are shipped to the project site. The Contractor shall fully inform himself/herself regarding any and all peculiarities and limitations of spaces available for installation of all Field Work and materials furnished and installed under this Contract. The Contractor shall exercise due and particular caution to determine that all parts of the Field Work are made quickly and easily accessible after installation. Although the location of equipment may be shown on the Plans in certain positions, the Contractor shall be guided by details and conditions at job; the Plans are essentially diagrammatic, intended to indicate the scope of work to be done, and are not to be used for fabrication. It shall be the responsibility of the Contractor to make sure that the equipment he/she proposes to use will fit into the available space with proper clearances. The Contractor shall verify all controlling field dimensions before ordering or fabricating any material. No equipment or materials to be installed as part of this contract shall be ordered prior to receiving written approval from the Engineer. The Contractor shall maintain the project site in a neat condition. No debris shall be left under any circumstances. The Contractor shall keep material and equipment at his facility and shall deliver only material needed at a given time to the project site. The material shall be delivered in a coordinated manner, and as approved by the Engineer. Page 54 of 70 Included as part of the work, but not limited to, the installation of pole foundations, traffic signal cabinets, electrical service cabinets, utility pull boxes, splice boxes, manholes, vaults and conduits, the Contractor shall be responsible for all concrete restorations to the nearest existing joint as directed and approved by the Engineer. When the installation of all equipment is completed, the Contractor shall dispose all unused materials. Prior to disposal, the Contractor shall identify all unused materials with the Engineer and obtain the approval from the Engineer. The Contractor is required to observe all regulations and ordinances of the City as they apply to work in City buildings, streets, and other rights -of -way or City property. The Contractor shall procure encroachment permits for all work done outside City right - or -way, including work completed on Caltrans right -or -way, at the Contractor's expense. The Contractor shall coordinate the Field Work with all required agencies and utility companies. If other equipment not mentioned in these Special Provisions is deemed necessary by the Contractor for a complete and successful installation of the Field Work described in Section 1.2, the Contractor shall do so in concert with the equipment list submittal. This section of the submittal shall be entitled "OTHER PERTINENT EQUIPMENT" and the Contractor shall include a brief justification statement relative to the inclusion of this equipment. The purchase of additional equipment is subject to approval by the Engineer. It is the Contractor's responsibility to ensure that a complete and working system installation is achieved. The Contractor shall assign project management staff to coordinate all project activities with the City, the Engineer, and other vendors. 701-8 FOUNDATIONS, FOUNDATION CAPS AND SLABS 701-8.2 Foundations. Portland cement used shall be Type V. Placement of concrete shall conform to the provisions in Section 51-1.03D Placing Concrete of the Caltrans Standard Specifications. All abandoned foundations shall be removed completely. Foundation concrete shall be vibrated to eliminate air pockets. The Contractor shall define exact location of all utilities in the vicinity of the new foundations, by hand digging if necessary. After all utilities are established, the Contractor shall contact the Engineer for authorization of specific foundation location. Foundations shall be hand - dug until clear of obstructions. Page 55 of 70 701-11 PULL BOXES All pull boxes shall be located at the locations shown on the Plans, or as directed by the Engineer. However, these locations may be changed to suit field conditions as directed or approved by the Engineer. No pull box shall be located on the driveway apron, or above catch basin, or within one (1) foot of any existing, proposed or future (as shown on the Plans) wheelchair ramp, or within one foot from the curb in case of streets without gutter, or within thirty (30) inches from any pole foundation, or other locations which may interfere with the movement of people or vehicles, unless approved by the Engineer. Pull boxes within unimproved areas shall have a Class 1 flexible Post Delineator, per Caltrans Standard Plan A73C installed adjacent to the pull box. Within the pull box, the conduit shall be placed in a manner that the lowest portion of the opening shall be a minimum of two (2) inches above the bottom of the pull box. The top portion of the conduit shall be not less than eight (8) inches from the top of the pull box. The maximum thickness of the rock shall be one (1) inch. The conduit shall also be placed in a manner to allow the cable/wire to be pulled in a straight line and clear the side of the pull box by at least two (2) inches. The distance between pull boxes shall not exceed 800 feet, unless otherwise shown on the Plans, unless otherwise specified in the Plans or these Special Provisions, or as directed by the Engineer. A minimum of fifteen (15) feet of slack fiber optic cable, or length as shown on the Plans, shall be coiled in each pull box at all locations, unless otherwise specified in the Plans or these Special Provisions, or as directed by the Engineer. If new pull boxes are replacing existing pull boxes, the Contractor shall protect existing conduit and cable from damage. Should the existing conduit or cable become damaged, the Contractor shall repair and/or replace damaged conduit or cable. Prior to repair/replacement, the Contractor shall notify the Engineer and the City of exact location, and provide a detailed description of damage. Any existing features or improvements damaged by the Contractor shall be replaced in kind, at the cost of the Contractor and not the Engineer or the City. Pull boxes shall be installed with lid and completely secured prior to any conductor or cable installation. Where the sump of an existing pull box is damaged by the Contractor's operations, the sump shall be reconstructed and if the sump was grouted, the old grout shall be removed and new grout placed at the cost of the Contractor and not the City. Page 56 of 70 Excavating and backfilling shall conform to the provision in section 87-1.03E , Excavating and Backfilling for Electrical Systems of Caltrans Standard Specifications except that the backfill material shall not contain rocks graded larger than one (1) inch. 701-12 CONDUIT All conduits shall be installed at locations as shown on the Plans, or as directed by the Engineer. Locations of proposed conduit are approximate and may be changed to suit field conditions as directed or approved by the Engineer. Conduit shall be laid to a depth as shown on the Plans. A minimum of thirty- (30) inches of cover to the top of the conduit is required at all locations. Conduit shall be placed in a manner to allow the cable/wire to be pulled in a straight line and clear the side of the pull box by at least two inches. Where conduits are shown on the Plans to be installed parallel and adjacent to each other, they shall be installed together in a common trench or directional drill bore. Make right angle bends in conduit runs with long -radius elbows or conduits bent to radii not less than three (3) feet. All bend radii shall be three (3) feet unless otherwise set forth elsewhere in these Special Provisions or as directed by the Engineer. The sum of the angles for conduit bends between two consecutive pull boxes shall not exceed 270 degrees. All conduit bends shall be factory bends done by the manufacturer. Hot box or other field bends will not be accepted. The bell and spigot ends of each PVC conduit shall be chamfered by the manufacturer. Transition of the conduit without bends shall not exceed more than one foot for every ten feet. Make bends and offsets so that the inside diameter of conduit is not effectively reduced. Unless otherwise indicated, keep the legs of a bend in the same plane and the straight legs of offsets parallel. Do not use diagonal runs except when specifically noted in the drawings. Provide a waterproof label on each end of the pull rope to indicate the destination of the other end. Conduits entering vaults shall terminate flush with the inside walls of each pull box. Conduits entering vaults and pull boxes shall be capped or sealed to prevent ingress of water, debris, and other foreign matters into the conduit. Immediately prior to installing cables, conduits shall be blown out with compressed air until all foreign material is removed. After cables have been installed, the ends of conduits shall be sealed with a reusable mechanical plug. Page 57 of 70 Conduit and fittings shall be supplied with an ultraviolet inhibitor Within pull box, conduit shall be placed to provide a minimum clearance of two (2) inches between the lowest portion of the opening and the bottom of the pull box. And there shall be a minimum clearance of eight (8) inches between the top portion of the opening and the top of the pull box. Conduit shall enter the pull box at not more than a 45-degree angle. In addition, conduit may not be terminated less than 45 degrees to the ground level, except for pull boxes with extension. Conduit ends shall be terminated three (3) inches above the gravel surface and nine (9) inches clearance between the top of the bushing and the top of the pull box shall be provided. Within the splice vault, the conduit shall be laid no closer than two (2) inches from any wall of the splice vault. After conductors/cables have been installed, the exposed end of conduits remaining in pull boxes and controller cabinets shall be sealed with a sealing compound as approved by the Engineer. Direction Bore Conduit shall be installed by directional drilling method at the locations shown on the Plans, unless specified otherwise by the Engineers. Drilling pits shall be kept at least two (2) feet clear of the edge of any type of pavement wherever possible. Conduit alignment shall be located under stamped pedestrian crosswalks to prevent check pits in special pavement. Excessive use of water, such that pavement might be undermined or subgrade softened, will not be permitted. Trenching Trenching in Newport Beach right of way shall conform to Newport Beach Standards Installation of conduit in unpaved areas (dirt) shall conform to the following: Conduit shall be placed in a trench approximately two (2) inches wider than the outside diameter of the conduit to be installed. Trench shall not exceed eight (8) inches in width. A minimum of thirty- (30) inches of cover to the top of the conduit is required. For all pull boxes the trench may be hand dug to required depth. Where cover to top of conduit is less than thirty- (30) inches, the conduit shall be placed in the bottom of the trench and the trench shall be backfilled with sand -cement slurry backfill, containing not less than two (2) sacks (188 pounds) of cement per cubic yard of Type I or II Portland cement added per cubic yard of imported sand and sufficient water for workability. The top four (4) inches shall be backfilled and compacted with native soil. Page 58 of 70 701-14 SERVICES Electrical service shall be modified Caltrans Type II or Type III -BF, unless otherwise shown on the Plans, and furnished by the Contractor. It shall be equipped with five (5) circuit breakers (100-amp main, 15-amp IISNS (internally illuminated street name sign), 30-amp lighting, and 15-amp spare, and 50-amp signal) and test blocks inside cabinet. For Type II enclosures refer to Caltrans Standard Plan ES-213 and City Standard Drawing Nos. 909 and 910 (P and R cabinets). For Type III -BF enclosures refer to Caltrans Standard Plan ES-2E for further details. Service enclosure shall be powder coated white inside and out Federal color #17875 to match the traffic signal cabinet and battery backup cabinet. If service equipment cabinet design deviates in any way from the details shown on the Plans, details of such deviation shall be submitted to the Engineer for review before fabrication of the contract cabinet. If deemed necessary by the Engineer, one complete prototype cabinet shall be delivered to the Engineer for review at least 30 days before fabrication of the contract fixtures. The prototype cabinet will be returned to the Contractor and, if permitted by the Engineer, the cabinet may be installed in the work. It shall be the Contractor's responsibility to verify the location of service to make arrangements for necessary connection for the traffic signal and lighting system. If an alternate service location is necessary due to a utility conflict or Edison requirement. The alternate location shall be approved by the Engineer. The Contractor shall contact Edison within three days of receiving the Notice to Proceed. Contractor is responsible to determine and verify the exact location of electrical service. Failure to comply shall be a basis for rejecting requests for additional working days based upon utility company delays. When scheduling with Edison staff, please allow up to three weeks prior to the turn -on or any event requiring energizing/de-energizing of an electrical service. 701-17 TRAFFIC SIGNAL CONSTRUCTION 701-17.4 Wiring, Conductors and Cable. 701-17.4.4 Interconnect. The twisted pair cable shall be installed in new and existing conduit as shown on the Plans. The new cable shall be terminated on existing terminal blocks located in the traffic signal controller cabinets as shown on the Plans. The new twisted pair cable will support communications with existing twisted pair cable, as shown on the Plans. Proposed and existing twisted pair cables contain 12 pairs. The Contractor shall terminate the new twisted pair cable to match pairs of the existing twisted pair cable. Page 59 of 70 Communication Link Testing The twisted pair cable will support Ethernet over copper communications along at the locations shown on the Plans. This will require one pair of the twisted pair cable to create a daisy -chain communications link between the Ethernet switches at the project intersections. Upon installation of the new twisted pair cable at the locations as shown on the Plans, the Contractor shall test the signal strength of all twisted pair cables between the intersections listed above. Note that this requires the Contractor to test not only the new twisted pair cable installed as the locations as shown on the Plans, but also to test existing twisted pair cable. This information shall be provided to the Engineer to determine the optimum pair of twisted pair cables to use between each intersection listed above for Ethernet communications. The Contractor shall provide all personnel, equipment, instrumentation, and materials necessary to perform all testing herein. Results of test to be submitted to the City in a CD. Submitted to both Contractor and Engineer and shall be made part of the Operations and Maintenance Manual. 701-17.4.5 Fiber Optic Cable. Fiber optic cables shall be installed in continuous lengths without intermediate splices throughout the project, except at the location(s) specified in the Plans. When ordering fiber optic cable, the Contractor shall exercise extreme caution so as to ensure that no additional splicing, beyond that indicated in the Plans, shall be required. Should the Contractor believe additional splices are required; this matter shall be immediately brought to the attention of the Engineer for resolution. The Contractor shall install the fiber optic cable in strict adherence to the manufacturer's recommended procedures. Care shall be taken to avoid cable damage during handling and placing. Fiber optic cable is sensitive to excessive pulling, bending and crush forces. The minimum bending and maximum tension requirements for installing the fiber optic cables shall be according to the manufacturer's specifications. Cable installation personnel shall be familiar with the cable manufacturer's recommended procedures including, but not limited to the following: Proper attachment to the cable strength elements for pulling during installation. Cable tensile limitations and tension monitoring procedures. Cable bending radius limitations. The installation of loose tube fiber on Caltrans right-of-way shall be installed per Caltrans standards. Contractor shall be responsible for making himself/herself fully aware of the Caltrans standards. Page 60 of 70 Mechanical aids may be used to assist cable installation. The pulling eye/sheath termination or cable grip hardware on the optical fiber cables shall not be pulled over any sheave blocks. Field installed pulling grips with a rotating type swivel shall be used to pull the fiber optic cable. A Corning Cable System GRP series or equivalent woven wire type of grip is recommended. When power equipment is used to install optical fiber cabling, the pulling speed shall not exceed 30 meters per minute. The pulling tension and bending radii limitation for optical fiber cables shall not be exceeded under any circumstances. A tension measuring device or break -away swivel shall be placed between the pull line and the end of the cable to ensure that the tension does not exceed 80 percent of recommended tension or 2225 N, whichever is less. A ball bearing swivel shall be utilized between the pull line and the end of the cable to prevent the cable from twisting during installation. Large diameter wheels, pulling sheaves, and cable guides shall be used to maintain the appropriate bending radius. During cable installation, the bend radius shall be maintained at a minimum of twenty times the outside diameter of the cable. The cable shall not be stressed beyond the minimum bend radius at any time during installation. Tension monitoring shall be provided at all times during the pulling operation and shall be accomplished using commercial dynamometers or load -cell instruments. Fiber optic cable shall be installed using a cable pulling lubricant recommended by both the fiber optic cable and the conduit manufacturer, and a non-abrasive pull rope/tape conforming to the provisions described under "Conduit" elsewhere in these Special Provisions. Cable lubricant shall be compatible with the fiber optic cable outer sheath and existing cable where fiber cable is installed in a conduit with other existing cable. Lubricant shall be applied according to the manufacturer's recommendations. Contractor's personnel shall be stationed at each vault and pull box through which the cable is to be pulled to lubricate and prevent kinking or other damage to the cable. The Contractor shall submit detailed installation procedures (pull plans) for review twenty (20) working days prior to pulling in each optical fiber segment. The pull plan shall state the exact operational procedures to be utilized and identifies the physical locations for equipment placement, proposed equipment setup at each location, location of the manpower, the pulling methodology and the estimated pulling tensions for each pull section. The Contractor shall provide the pulling tension calculations and any backup information with the pull plan. Where the fiber optic cable is installed in existing conduit or utility ducts that contain existing cables, the Contractor shall install the fiber in conduit without removal of the existing cables, unless otherwise specified on the Plans. The Contractor shall be responsible for replacing any cables damaged during removal and reinstallation at the cost of the Contractor and not the Engineer or the City. Cable slack shall be provided for each cable at each fiber optic splice location, as shown on the Plans and as specified in these Special Provisions. Cable slack shall be divided Page 61 of 70 equally on each side of a splice closure or pull box. Sufficient slack shall also be provided at all pull boxes to facilitate placing the optical fiber cable against the side of the pull box. At all pull boxes and cable vaults, cable slack, as shown on the Plans, shall be left by the Contractor for all installed fiber cable. Cable slack shall be coiled and secured to the racking hardware with tie wraps. The Contractor shall ensure that the minimum bending radius of the optical fiber cable is not compromised when preparing this stored cable slack. Following installation of the cable in duct, all duct entrances in cabinets, pull boxes and vaults shall be sealed with mechanical plugs; or at the discretion of the Engineer, duct sealing compound, to prevent the ingress of moisture, foreign materials and rodents. Splicing Fiber optic cable shall be installed without splices except where specifically allowed on the Plans or described in these Special Provisions. The single -mode fiber optic cables designated as mainline cable shall be spliced only at pull box locations as shown on the Plans. When splicing into a mainline cable, only those fibers associated with a specific traffic control device shall be severed. All other fibers shall remain intact. The Engineer may allow additional splices between these specified locations. Splicing - Optical fibers shall be spliced using the fusion splice method and the insertion loss shall not exceed 0.07 dB of loss per splice. Field splicing is permitted for the following: • Connection of cable reel sections. • Connection of a mainline cable to a drop cable. • Connection of service drop cable or breakout cable to an optical fiber pigtail at traffic equipment cabinets or the patch panels in a hub equipment cabinet or at the TMC. • Connection of the mainline cable to an optical fiber pigtail at the FDU in the TMC or at the field location as shown on the Plans. • Connection of two or more mainline fiber optic cables as shown on the Plans. The Contractor shall not exceed the maximum number of field splices permitted as shown on the Plans. Completed splices shall be placed in a splice tray. The splice tray shall then be placed in a watertight splice enclosure. Field splices shall be conducted only at locations as shown on the Plans as an approved splice location. All splicing equipment shall be in good working order, properly calibrated, and meeting all industry standards and safety regulations. Cable preparation, closure installation, and splicing shall be accomplished in accordance with accepted and approved industry standards. Page 62 of 70 Using a mid -span splicing method, a drop cable shall be joined to the fibers in the fiber optic cable span. The termination splices shall be placed in a splice tray and the splice tray(s) shall then be placed in a watertight splice closure. Equipment cabinets shall be equipped with splice trays suitable for storage and protection of each single -mode optical fiber pigtail and the splice connection to cable fibers. Equipment cabinets shall be equipped with a suitable means for routing and securing of cables, fibers, and pigtails to prevent damage to fibers during all regular operation and maintenance functions All splices shall be protected with a thermal shrink sleeve. All fibers shall be labeled in the splice tray with permanent vinyl markers. Pigtail ends shall also be labeled to identify the destination of the fiber. Pigtail ends shall also be labeled to identify the destination of the fiber. Upon completion of the splicing operation, all waste material shall be deposited in suitable containers, removed from the job site, and disposed of in an environmentally acceptable manner. Fiber Optic Cable Assemblies Cable assemblies (connectors, pigtails and jumpers) shall be products of the same manufacturer. The cable used for cable assemblies shall be made of fiber meeting the performance requirements of these Special Provisions for the fiber optic cable being connected, except that the operating temperature shall be modified to -20' C. to +70' C. Manufacturer's attenuation test results shall be provided for all cable assemblies. The outer jacket of jumpers shall be yellow. Optical Fiber Connectors - All optical fiber termination components shall meet or exceed the applicable provisions of TIA/EIA-455-B, Standard Test Procedure for Fiber Optic Fibers, Cables, Transducers, Sensors, Connecting and Terminating Devices, and Other Fiber Optic Components. All optical fiber connectors shall be of industry standard approved connector for single - mode optical fiber and shall meet or exceed the applicable provisions of TIA/EIA-455-2C (FOTP-2), Impact Test Measurements for Fiber Optic Devices, TIA/EIA-455-5B (FOTP- 5), Humidity Test Procedure for Fiber Optic Components, and TIA/EIA-455-34A (FOTP- 34), Interconnection Device Insertion Loss Test. When tested in accordance with FOTP —2, the connector assembly will be subjected to ten impact cycles by being dropped from a height of 1.5 m. The maximum insertion loss measured before and after the impacts should be < 0.50 dB. The mean insertion loss of the before and after impacts should be < 0.30 dB. The insertion loss increase measured before and after the impacts should be < 0.30 dB. The maximum reflectance measured before and after the impacts should be < 40 dB. When tested in accordance with FOTP — 5, the connector assembly will be subjected to test conditions of 75 °C and 95% relative humidity for 7 days. Measurements Page 63 of 70 of loss and reflectance will be made at the beginning of the test, at a minimum of six hour intervals during the test, and at the end of the test. The maximum insertion loss measured before, during, or after the test should be < 0.50 dB. The mean insertion loss of the before, during, or after the test should be < 0.30 dB. The insertion loss increase measured before, during, or after the test should be < 0.30 dB. The maximum reflectance measured before, during, or after the test should be < 40 dB. Optical fiber connectors shall satisfy all of the interface parameters of equipment components as may be defined by the transmission equipment specifications. All optical fiber connector assemblies shall be machine polished for low back -reflection and low insertion losses at both 1310 nm and 1550 nm operating wavelengths. Single -mode pigtails shall be provided with factory pre-connectorized single -mode connectors. Connectors shall have maximum insertion loss of 0.27 dB or better. Connectors shall have a stainless -steel barrel (coupling nut) with a bayonet connection design, ceramic (zirconia) ferrule. Each connector shall be capable of 200 repeated matings with a total maximum additional increase in insertion loss after 200 matings limited to 0.30 dB. Each connector shall have a return loss (back reflection) equal to or better than 55 dB. All connectors shall be factory -assembled and tested. There shall be no fabrication of connectors in the field. All unmated connectors shall have protective caps installed. Couplers - Couplers shall be made of nickel plated zinc or a glass reinforced polymer that is consistent with the material forming the associated approved connector. The design mechanism for mounting the coupler to the connector panel may be flanged or threaded but shall coincide with the connector panel punch -outs. All coupler sleeves shall be ceramic of the split clamshell or cloverleaf design. The temperature operating range for couplers shall be the same as that specified for the connectors. Pigtails - Pigtails shall be of simplex (one fiber) construction, in 900 (Dm tight -buffer form, surrounded by aramid for strength, with a connector on one end. The outer jacket shall be yellow PVC with a nominal diameter of 3 mm, marked with the manufacturer's identification information. All pigtails shall be of adequate length for the intended connection purpose, but not less than one meter in length. Pigtails installed in conduit shall follow the installation procedures outlined for fiber optic cables, except that the pulling tension shall not exceed 500 N (110 Ibf.). Jumpers - Jumpers shall be duplex. All jumpers shall be at least two (2) meters in length, sufficient to avoid stress, and allow orderly routing. Jumpers shall have appropriate connectors on both ends. Fiber Assignments The fiber assignments tables and schematics will be provided as part of the Plans. Page 64 of 70 Fiber Optic Cable Link Testing The installed optical fiber cable shall be tested for compliance with the transmission requirements of this specification, the cable and hardware manufacturer's specifications, and prescribed industry standards and practices. The Contractor shall provide all personnel, equipment, instrumentation, and materials necessary to perform all testing herein. Multiple tests shall be required prior to shipment as well as before and after installation of the cable. The results of these tests shall be logged and posted in the cabinet and in a conspicuous location for future comparisons. Documentation of all test results shall be provided to the Engineer within two working days after the field tests are performed. The documentation shall also be made part of and submitted as part of the Operations & Maintenance Manual. The types of acceptance tests required by the City of fiber optic cable system certification are: Documentation of compliance with the fiber specifications, as specified in these Technical Provisions, shall be supplied by the fiber manufacturer. Before shipment, but while on the shipping reel, 100% of all fibers shall be tested for attenuation. Copies of the results shall be: - Maintained on file by the fiber manufacturer, with a file ID number for a period of five (5) years. - Attached to each fiber cable shipping reel in a waterproof pouch. - Results of test to be submitted to the city in a CD. - Submitted to both Contractor and Engineer and shall be made part of the Operations and Maintenance Manual. Continuity Testing (Before Installation) The fiber cable shall be physically inspected on delivery and the attenuation shall be measured for 100% of the fibers. In addition, the continuity test procedure shall be used on short links (less than 300 feet) of the cable system during construction to validate continuity of fiber elements. Failure of any single fiber within the cable to comply with these Technical Provisions shall be cause for rejection of the entire reel. Test results shall be recorded, dated, compared and filed with the copy accompanying the shipping reel in a waterproof pouch. Attenuation deviations of greater than 5% from the shipping records shall be brought to the attention of the Engineer. The cable shall not be installed until completion of this test sequence and the Engineer provides written approval. Copies of traces and test results shall be submitted to the Engineer in a CD. If test results are unsatisfactory, the reel(s) of fiber optic cable shall be rejected. The rejected reel(s) of cable shall be replaced with new reel(s) of cable at the Contractor's expense. The new reel(s) of cable shall be tested upon delivery as described herein. Page 65 of 70 Cable continuity shall be verified using a visual light source, typically a 635-nm laser diode. For cables with insertion loss of less than 3 dB, the light source shall be the Corning Cable System OS-1 OOD test set, a RIFOCS 263A visual fault finder, or equivalent. The continuity test procedure shall also be used to verify continuity on all fibers prior to measuring pre -installation attenuation using an Optical Time Domain Reflectometer (OTDR). This ensures that the fibers are completely continuous from end to end, since single -ended OTDR tests cannot reveal fiber discontinuities close to the cable endpoints. Continuity Testing (After Installation) These tests shall occur after the termination process has been completed. Each point- to-point link shall be tested for optical power loss with an OTDR in both directions. The connectors shall be identified by numbered colored tape, where each tape color shall be consistent throughout the project. The Contractor shall use OTDR testing to ensure that each fiber is one continuous length (contains no splices within the cable structure) and meets the attenuation specifications of the manufacturer and cognizant industry standards. OTDR measurements made before the cable installation provide baseline data for comparison to post -installation OTDR tests. The OTDR test also provides useful measurements and documentation for the installed system. Therefore, OTDR traces shall be generated into a hard copy and software file on a CD for the purpose of developing historical as -built, documentation regarding the cable's condition before and after it was installed. The hard -copy and CD documentation shall be provided to the City. The recordings shall also be made part of and submitted as part of the Operations & Maintenance Manual. If specialized software (i.e. other than Microsoft Office Products) is needed to access and read OTDR electronic test results, the Contractor shall provide licensed software to the City at no cost. Prior to conducting OTDR tests, the Contractor shall provide the City with information regarding the test equipment to be utilized (manufacturer and model number) plus the equipment calibration procedures that will be utilized by the Contractor. Quality tests shall consider both attenuation and localized loss discontinuities. The OTDR shall be equipped with a switchable, dual wavelength module with 1300 nm and 1550 nm light sources, and be compatible with single mode test fibers. The OTDR shall either be capable of writing to a floppy disk or configured with a plotter to provide a hard copy record of each test measurement. The OTDR shall be equipped with sufficient internal masking to allow the entire cable section to be tested. This may be achieved by using an optical fiber pigtail of sufficient length to display the required cable section, or by using an OTDR with sufficient normalization to display the required cable section. A hard copy XY plot shall be provided to the City for all fiber optic tests. All traces shall display the entire length of cable under test, highlighting any localized loss discontinuities. The trace shall display fiber length (in meter/feet), fiber loss (dB), and Page 66 of 70 average fiber attenuation (in dB/mile) as measured between two markers placed as near to the opposite ends of the fiber under test as is possible while still allowing an accurate reading. Time averaging shall be used to improve the display signal-to-noise ratio. If connectors exist in the cable under test, then two traces shall be recorded. One trace shall record the fiber loss (dB) and average attenuation (dB/mile) of the entire cable link, including connectors. The second trace shall display a magnified view of the connector regions, revealing the connector losses (dB). All connector losses shall be measured using the Least Squares Approximation (LSA) or 5-point splice loss measurement technique. The OTDR trace shall also include the following information: • The date and time of the test • The Cable ID number • The fiber color or ID number • The optical wavelength used for the test • The refractive index setting of the OTDR • The pulse width setting of the OTDR *The averaging interval of the test Each connector shall be tested for optical loss using an OTDR. Measure each connector in both directions, at 1550 nm, for single mode connectors. An XY plot, from the OTDR, shall be provided for each connector measurement. Connector loss shall meet or exceed the requirements of the connector specifications. The OTDR shall be calibrated for correct index of refraction to provide proper length measurement for the known length of reference fiber. Insertion Loss Testing (After Installation) Insertion loss testing is performed after the cable has been installed, terminated with connectors, and connected to the patch panels. It is used to closely emulate the losses incurred in a fully assembled optical data link. It measures actual losses through connector panels and fiber cable. A light source from an insertion loss test set directly replaces the data transmitter at the output launch point and an optical power meter replaces the data receiver at the data receiver input port. The Contractor shall conduct insertion loss testing on all installed and terminated optical fiber elements. Insertion loss test measurements for each fiber on each cable shall be documented by the Contractor and the results provided to the City. Testing shall be conducted at 1550 nm for all single mode cables. Total end -to -end loss for each fiber in each cable shall be within the fiber optic modem manufacturer's allowable loss budget specifications. If it is not, the Contractor shall take corrective measures to bring the cable link's insertion loss into compliance with the manufacturer's specifications, including remating and re -termination of the connectors, and/or replacement of the cable. The Contractor shall provide the City with information regarding what type of test equipment will be utilized (manufacturer and model number) plus the equipment Page 67 of 70 calibration procedures that will be utilized by the Contractor prior -to conducting this test routine. The test recordings for all fiber cables shall be provided on documentation sheets in a form to be determined by the City and submitted to the City within two (2) weeks after termination of the fiber elements. The recordings shall also be made part of and submitted as part of the Operations & Maintenance Manual, discussed elsewhere in these Special Provisions. Insertion Loss Test Equipment (Fiber Optic Cable) 1. Testing Light Source: An LED laser light source with a wavelength equal to the operational system wavelength shall be used. The LED shall be stable within 0.1 dB in output power over a time period sufficiently long to perform the measurement. 2. Launch Reference Cable: It shall provide for attachment to the light source. The launch reference cable shall be of the same fiber size and type as the fiber under test. To eliminate cladding modes, a self -mode -stripping cable or a low loss (-0.5 dB) mandrel wrap mode filter shall be used. 3. Power Meter: The detector in the power meter shall have an effective numerical aperture (NA) and active area that is larger than the fiber under test. The power meter shall have a sufficient measurement range to measure the insertion loss of the cable and connectors in the link. The power meter must be linear over the range of losses to be measured in the system and have sufficient resolution for the proposed measurements (0.05 dB). The power meter must be able to measure both absolute power in units of dBm and relative loss in units of dB. The power meter must also be able to change its calibration wavelength to match the system (1310 nm, or 1550 nm) operation wavelength. The meter shall be capable of measuring to -70 dBm. Page 68 of 70 Insertion Loss Test Procedures and Execution The Contractor shall provide all personnel, equipment, instrumentation and supplies as necessary to perform all testing. Zero Reference Cable: Connect the launch reference cable between the test light source and the power meter detector. Illuminate the reference cable and record the optical power as Ref. Power 1 in dBm. System Insertion Loss: The system to be tested shall be inserted between the launch reference cable and the power meter, completing the optical path from the LED to the power meter. Record the optical power shown on power meter as Test Power 1 in dBm. System Insertion Loss 1 is then calculated by the following equation: NOTE: Record insertion loss as a positive value. System Insertion Loss 1 (dB) = Ref. Power 1 (dBm) — Test Power 1 (dBm) The system under test shall then be tested from the other end in a similar fashion as above. Here, record the output of the launch reference cable as Ref. Power 2 and the output of the system link as Test Power 2. System Insertion Loss 2 is calculated identically: System Insertion Loss 1 (dB) = Ref. Power 1 (dBm) — Test Power 1 (dBm) The results of the insertion loss testing shall be recorded along with the test date, name of person performing the test, and the brand name, model number and serial number of the equipment used during the test. All results shall be made part of and submitted as part of the Operations & Maintenance Manual, discussed elsewhere in these Special Provisions. Fiber Optic Cable Route Records The Contractor shall provide the City with a cable route diagram indicating the actual cable route and foot marks, for all intersections, directional change points in the cable routing, and all termination points. The Contractor shall record these points during cable installation. Cable system As -Built drawings showing the exact cable route shall be provided by the Contractor to the City. Information such as the location of slack cable and its quantity shall also be recorded in the cable route diagram. This information shall be included as part of the Operations & Maintenance Manual. Each fiber connectors and patch panel connectors shall be tagged with its fiber number and associated field element location. Each tag shall be permanently attached by a nylon tie -lock to the cable or connectors. The cable shall be tagged in each pull box. #10 Green Tracer Wire The Contractor shall furnish and install #10 green wire in all conduit segments where fiber optic cable is installed, as shown in the Plans, including all new and existing conduit segments where work is completed. All #10 wires entering a pull box shall be joined by a split -bolt connector. Page 69 of 70 701-17.6 Detectors. The number of sensor units and lead-in cables required to achieve the specified detection shall be installed. Lead loops shall be installed per CNB STD No. 923. Lead loops shall be modified Caltrans Type E, and placed immediately behind the limit line/crosswalk. Remaining presence loops shall be Type E, spaced 10 feet apart and installed per Caltrans Standard Plans ES-5A and ES-5B. Bicycle loops shall be Caltrans 3' x 6' Type D loop detector. All installed loop detectors shall be completely functional to the satisfaction of the Engineer prior to the turn -on of the modified traffic signal. 701-17.6.3 Inductive Loop Detectors All installed loop detectors shall be completely functional to the satisfaction of the Engineer within five consecutive working days after placement of pavement finish course. Page 70 of 70 "$Rul 3 g o a K g rn w a[oc <$m § §sY m y 8 __ = ooj s N §s, gs �a ti in b mg w It a D5,a @Ea e 7 0 ys aW "a § =F x � £ " _ e a b`a= � = F 3sa € as 8y a s §„ $ n " �§ a€ m S2 WS '> gg >f > - o 2H a8 m d 2 a � c z`u� � � � §_ .. ` § ow W a� § a a s7 ss"=s� gg w < o a� u - _ §as�a-s,� yg; a sg 3rF£s 1gs 1s s -c�`0 FMs W. a gal g 'I 1'6€1. J LMsip 5 �W oaWm If s bg <as sGa1 H w, 61 s" sce nA,; jg I§a .gA"� aIv .6€ Sss- N ^ g 2raile a§ ss?§a <".geg '§g§`j s"H a 3e _e- ~ s sms Qa �_ �m g RHO§�a �� � EgE�� g� m as as 7� � E� j=Y � €� � " R� �W as„" ba >� Aas §N �g2e3a g � ag a �� sxo gad§am � § " <E<g E =G'a� a H .5 Ya 4 m'= =_t om .s as �� § "amp 4b a3 §§ 3 Y O F� n a p w � �F- w bbbE Q rasa N a .... G Q 5.5 a Q oz V1 z Z a unm U O� a Y= Walm�?� U 5 m cccc U w LL z L o E b z HIM: z g � "¢Y7 w <EM910 � : L's Z a > F Vl�ih W Oo fi+}y . a U O z J n 31WpIpYNP YY-0m`UN G � G � 33 O®a❑0El°mi ;I z W W o 00 ® 9 T A 1 MIN e.ss�woi-sttmo\w'�.M^+••+\eavexwe\sumurmma4osua-mmsn\\ w zo c4cVm F l+l o W Z W `fi`nn N d o T d OO U m = ��liF U =Npa w w Q�Otil m� Y " §g U ?I §ye§ §§ - 9 4 / 1 0§� �nzaa 00000 0 El � e §-N R§ 3 N a @�s @ wad ��� § g§: � �ilea w§ as FeR ow G e _§ sa aK b� SS a �'�gsa�2 �r O3 8 P a 6 Z w w J Z ' cn IN IAA�JiS omemlmlm �llmmlllmm1100 olllllll��llmmlllmm1109 ol�►,11101111111111m1� 01►1IIIINIlmmmmlmm110 olllll 110 01►I111111\mlmmlmll IIII o111111110111111111110 01111111101111111111110 .. l" ® .. �a7¢z3r as a ,A, �0 6L.L 2�W� 9� i P 5Nb rvo` HE Uc f o R 21 �000 og O a3 M H a 3 a �a s� a s= a8 s9 "o s Roos o HE] 000000R semis LJ W - J d} a ✓'i �' ,OlSI�IB �,�+y 8 "� �-'� m 50 $ ��iyHO@B•K`Y � y5Ga3 a�bo i� "�E 5- o �aa���ms, a a 00 EI ITO o no o 4Wa : 6 Z12 S p a WP � a ❑ r� :oho i g� z A.- �a __ uW N� " o 0 000 o 0 000 0 0o a O 0 MEMO aaa...ci: o88S ow �wwe"eee� Dada �g32 :::Y2Y.°d� &YJ� o�ni z. o00tt � Z � a O Q O Q Z U_Lu ado0 m Qs K n N Q w��0 rra u W p o LL< Q (Z!) J Q N Z J C9 �= Z� U Z U i 5 , U U LLQ QKW d � a i:dh Z oE z =age=a c N _@ =zaV-cya ag�� z o �W =a a a� Oi Z o ' S �'�gj3 ys3 0� "a o 000 o0 0 0 0