HomeMy WebLinkAbout09/18/2003Planning Commission Minutes 09/18/2003
CITY OF NEWPORT BEACH
• Planning Commission Minutes
September 18, 2003
Regular Meeting - 6:30 p.m.
•
•
Page 1 of 13
file : //H: \Plancomm \2003PC \0918.htm
10/24/2003
INDEX
ROLL CALL
Commissioners Eaton, Cole, Toerge, McDaniel, Selich, Kiser and Tucker -
all present
STAFF PRESENT:
Patricia Temple, Planning Director
Robin Clauson, Assistant City Attorney
Rich Edmonston, Transportation/Development Services Manager
James Campbell, Senior Planner
Gregg Ramirez, Associate Planner
Ginger Varin, Planning Commission Executive Secretary
PUBLIC COMMENTS:
PUBLIC
COMMENTS
None
POSTING OF THE AGENDA:
POSTING OF
THE AGENDA
The Planning Commission Agenda was posted on Friday, September 12,
2003.
CONSENT CALENDAR
MINUTES of the adjourned and regular meeting of September 4, 2003.
ITEM NO. 1
Motion was made by Commissioner Tucker, and voted on to approve the
Approved
minutes of September 4, 2003.
Ayes:
Eaton, Cole, Toerge, McDaniel, Selich, Kiser and Tucker
Noes:
None
Absent:
None
Abstain:
None
SUBJECT: General Plan Amendment Initiations
ITEM NO. 2
3450 Via Oporto and 707 East Balboa Boulevard
PA2003 -212
Adopt Resolution recommending initiation of the General Plan Amendments
Recommended
(GP12003 -006 and GPI 2003 -007) to the City Council and initiate Code
for Initiation
file : //H: \Plancomm \2003PC \0918.htm
10/24/2003
Planning Commission Minutes 09/18/2003 Page 2 of 13
Amendment (CA2003 -008)
• Commissioner Kiser removed this item from the consent calendar
questioning the proposed intensity limit of 350 seats for the Balboa Theater
as noted in the staff report.
oner Toerge suggested adding the address in Section 1 of
resolution for specificity.
mmissioner Kiser noted he was not in favor of this initiation on
Iboa Theater due to the intensity of use and approving 350 seats. He
did not have enough information upon which to base an opinion rela
parking.
Ms. Temple noted that this is an initiation level only, not an approval. There
will be a complete analysis later as to the issues involved should this item
be initiated and come back for public hearing. This number of seats
represents a significant reduction from the existing facility.
Motion was made by Commissioner Tucker to adopt resolution
recommending initiation of the General Plan Amendments (GPI 2003 -006
and GPI 2003 -007) to the City Council and initiating a Code Amendment
(CA 2003 -008).
. Public comment was opened.
Public comment was closed.
Ayes: Eaton, Cole, Toerge, McDaniel, Selich and Tucker
Noes: Kiser
Absent: None
Abstain: None
HEARING ITEMS
Velardo Variance and Modification (PA2003 -048) ITEM NO. 3
3809 Channel Place I PA2003 -048
test for a Variance to allow a proposed single - family residence tol Removed from
ed the established floor area limit and a Modification Permit to allow Calendar
proposed residence to encroach within the front, side and rear
applicant has withdrawn this application and will be re- submitting at
date.
• IPublic comment was opened.
comment was closed.
file: //H: \Plancomm \2003PC \0918.htm 10/24/2003
E
•
•
Planning Commission Minutes 09/18/2003
Page 3 of 13
Motion was made by Commissioner Kiser to remove this item from the
calendar.
Ayes:
Eaton, Cole, Toerge, McDaniel, Selich, Kiser and Tucker
Noes:
None
Absent:
None
Abstain:
None
SUBJECT: Yuki Sushi Corporation (PA2003 -163)
ITEM NO.4
3601 Jamboree Road, Suite 15B
PA2003 -163
Requests the approval of a Use Permit pursuant to the Alcoholic Beverage
Approved
Ordinance for the sale of beer and wine for on -site consumption at a new
restaurant that is permitted to operate under an existing Specialty food
Service Permit. Since the Specialty Food Service Permit prohibited alcohol
sales, the Use Permit also includes the full service, small scale eating and
drinking establishment as defined by the current Zoning Code. If approved,
this Use Permit would supersede the existing Special Food Service Permit
and create a single Use Permit for this location.
Associate Planner, Gregg Ramirez noted that the Police Department
approves 6:00 a.m. to 11:00 p.m. for the hours of operation for the interior
of the restaurant; however, they recommend the patio be closed at 10:00
p.m., which is standard for outdoor dining areas. These hours are referred
to in condition 14.
Victor Peter Tous, P. O. Box 7890, Huntington Beach speaking for the
applicant noted that they accept the revision to condition 14 allowing the
outdoor dining open to 10:00 p.m., and agree to and understand the rest of
the conditions of approval.
Public comment was opened.
Public comment was closed.
Motion was made by Commissioner Toerge to approve Use Permit No.
2003 -024 subject to findings and the revision to condition 14 allowing
outdoor dining until 10:00 p.m.
Commissioner Kiser noted condition 26 to read, 'Full menu food service
shall be available feFerder+n6 at all times that the restaurant
establishment is open for business.' The maker of the motion agreed.
Ayes:
Eaton, Cole, Toerge, McDaniel, Selich, Kiser and Tucker
Noes:
None
Absent:
None
Abstain:
None
file : //H:1Plancomm12003PC10918.htm
10/24/2003
Planning Commission Minutes 09/18/2003
Page 4 of 13
. SUBJECT: Tabak Variance (PA2003 -180) ITEM NO. 5
3431 Ocean Boulevard PA2003 -180
applicant proposes to demolish an existing structure and construct al Variance was
v four -story residence. The applicant is requesting a variance to allow denied and
24 -foot height limit to be exceeded. In addition, the applicant requests Modification
amendment to a previously approved Modification Permit to encroach Amendment
i the 10 -foot front yard setback by 8 feet. was approved
Planner, James Campbell gave an overview of the staff
. The existing property will be torn down and a new residence
constructed that will meet all applicable guidelines and standards of
the Municipal Code except for the height of the structure and the front
yard setback.
. The front yard setback has been reduced to 5 feet with the previously
approved Modification; however, the applicant is requesting an
additional 3 feet of encroachment for a total of 10 feet of
encroachment.
. Staff recommends approval of that Modification Permit request
. The variance would not encroach above the top of the curb height but
would encroach above the 24 foot height limit.
. The topography of the property is a steep bluff faced property, which
makes it difficult to construct a residence; however, the applicant has
chosen to excavate the entire bluff to construct the proposed new
residence and thereby eliminate the impediment. The previously
approved designs modification complies with the height limit as well
as achieves the allowable maximum buildable area of the property of
7,321 square feet.
. Granting of the variance application is not necessary as the previously
approved plans allow for the maximum buildable area and full use
and enjoyment of the property.
. The purpose of the height limit is to preserve the character and scale
of the community. The modification to the structure the applicant is
proposing, the actual height and mass is not overly large; however,
the stated purpose for doing this is to achieve a private view.
Approval of this variance application would therefore, be a granting of
special privilege.
. Photographic exhibits were presented noting the location of the
residence; existing conditions of the bluff area; comparisons with
file : //H:1Plancomm12003PC10918.htm 10/24/2003
Planning Commission Minutes 09/18/2003 Page 5 of 13
I neighboring properties; property access; front yard setback; vii
from the ocean side; and plans depicting portions proposed to
.
above the height limits.
mmissioner Selich clarified that in reviewing the variance
mmission is looking at the total project. Under finding 3 in the
iort, 'the purpose of the height limit is to preserve the scale and chara
the community.' If we found some other aspects of the project
Feting that finding, does that give us sufficient grounds to evaluate
iperty, or are we solely evaluating that portion of the project that exce
height limit?
Clauson answered that to the extent the rest of the project drives
I to exceed the height limit, then you would look at the entire project.
1, Commissioner Selich referring to page 4 of the staff re
to the General Plan consistency, to what relevance does
of Policy D have to our discussion this evening?
Ms. Clauson answered in one way it has relevance as to one of 1
determination of the findings is the fact that the surrounding location
impacted by topography and the general plan provisions in regards
coastal bluff, so that is a consideration that can be made in the findings tl
you are considering.
• Ms. Temple added that in the resolution there is no finding related to I
General Plan because staff was not making a recommendation on I
variance. You have a proposal that must be evaluated against that polic
Staff evaluated it in light of prior Planning Commission and prior Coas
Commission actions that by doing the grading the footprint of the existi
development met that criteria. However, our views related to the coal
alteration provisions will continue to evolve. To the extent the request
approve the variance also drives the need to make that alteration, then tl
would also be a finding you could make.
sioner Selich asked for a comparison between this
and the approved variance two houses down the street
Campbell answered that this project comes down to a 35 foot I
itour. The Ensign variance had roughly a third of the property con
an to the 58 foot contour and 2/3 of that project would come down to
foot contour. The current project does go down the bluff a bit fur
)roximately 17 feet. Mr. Campbell then made the Ensign plans avail
the Commission to review.
. Commissioner Tucker noted that there are two issues, height limit variar
and how far down the bluff will be disturbed, which is driven by the pool.
the applicant didn't seek the variance, then the issue of the swimming pi
has already been decided. The only reason the issue of how far down 1
file : //H: \Plancomm \2003PC \0918.htm 10/24/2003
Planning Commission Minutes 09/18/2003 Page 6 of 13
bluff comes up is because the applicant is asking for something in additi
to what exists as a matter of right. How does the down the bluff issue w<
relate to the height variance issue, which has to do with a different area
he property? We can look at the totality of the circumstances if one asp4
affects the other, some interrelationship. I am not seeing how the work
the pool area relates to the variance request.
s. Clauson noted that to the extent that considerations of the coastal b
id preserving coastal bluff property is an element that might be used
ipport of a reason for the need for the variance to go up, then in
mtext of the overall approval of this project you can consider all the des
tributes of this project to the extent that they are driving the hei
crease. The applicant is saying that there is something about 1
operty that drives the need for this variance. The whole project and h
sits on the property and how it is impacted by the topography driving
:ed for a variance is relevant. They could still get it if all the approN
are granted and they were not asking for this variance. I don't think 1
ould look at the request for this variance in that vacuum, you would h�
look at the whole project.
ICont'nuing, Commissioner Tucker noted the manner in which the natui
grade was determined, we have a situation here where we are using tl
slab of the footprint of the prior structure as the natural grade. We have tt
plateau and then south of the plateau a 3 112 foot wide area where tl
. ariance request is primarily located. My concern is why the Butterfields c
not need a variance when their house was in identical circumstances,
must have been the pre- existing structure on the Butterfield
encompassed the entire building envelope for the next structure.
answered that appears to be the case noting, the difference is the
�r level of the house cantilevers over the existing retaining walls and
Jations. The area of the variance is directly above the sloping bluff as
sed to being above the existing retaining walls and foundation
lures. It is a different circumstance because this house cantilevers, so
is why there is a wedge shape area that puts the house above the
it limit if you want to put the new house in the same position as the
ina house.
nmissioner Tucker asked about the new construction and how far
Id go down the slope, and how much of the 17 feet was beyond whe
Ensign residence was at the 52 foot contour structure?
Campbell answered that the basement level is at 40 and 1/2 feet;
3 5 feet is due to the pool taking the project to the 35 foot contour.
Commissioner Eaton stated that to approve a suggested zone change
Commission or Council would have to make a finding of consistency,
the General Plan. Is that true for a variance or a use permit? If a varia
as to be approved, is there a necessity to make a finding of conforma
with the General Plan?
file : //H: \Plancomm \2003PC \0918.htm 10/24/2003
Planning Commission Minutes 09/18/2003 Page 7 of 13
Ms. Clauson answered that there is not a finding in the Code that requires
. consistency with the General Plan. There is some case law that use
permits do not require that consistency finding because the government
code talks about zoning ordinances being consistent with the general plan.
use permit and a variance are discretionary permits that allow for minor or
different variations from the provisions in the Zoning Code. If the Zoning
Code itself is consistent with the General Plan then variations from that,
unless they vary outside even what is allowed under the Land Use Element,
I think generally wouldn't have to have that same finding.
Commissioner Selich noted his belief that the project is not consistent with
General Plan Policy D, is that a valid reason to support the findings for
denial of the variance?
Ms. Clauson answered that in looking at a furtherance of a policy is that
whether the project would further the provisions of the Land Use, this might
be a finding that you could consider.
Chairperson McDaniel noted that a letter from the Butterfields was received
and distributed to the Commission.
Fleetwood Joiner, architect in Newport Beach, spoke representing the
applicant stating the following:
•
• This project has been to the Coastal Commission for removal of a
stairway and replaced with something that is built on grade.
• This project is in compliance with the Coastal Commission and has a
design approval with the City.
• We are seeking this variance for architectural appurtenance reasons,
which would beautify the home as far as sitting on the bluff.
• The variance will put us in line with the adjacent residence and to the
point that the existing home now sits.
• We are not asking to go out any further than the existing home or
adjacent home sits.
• Referring to a diagram, he further stated that the project is not going
down to the 35 foot level, existing house and allowable envelope for
new construction; referenced adjacent homes; the variance request
represents a 16 foot depth at 3 1/2 to 4 feet extension, an area for
more shadow line for a piece of glass and a corner piece about 6
inches by 6 inches as well as an encroachment in the front yard that
staff has recommended approval.
• We did not put a pitched roof on this design; the proposed project is 3
1/2 feet below curb height, and are not obstructing the street view
anymore than currently exists.
• If the variance is approved, we will have to go back to the Coastal
Commission.
• . The design 'zig zags' to adhere to the envelope lines.
Commissioner Eaton then asked about the difference between the two
sides of the building as to how much of an encroachment there is. The staff
file: //H: \Plancomm\2003PC \0918.htm 10/24/2003
Planning Commission Minutes 09/18/2003 Page 8 of 13
(report shows different encroachments on the north and south sides. I
• Mr. Campbell answered that the drawing presented by the architect
represents encroachments of the proposed structure beyond the existing
house (indicated by red dash lines). Referring to the exhibit presented by
the architect, the light blue dash lines shaded area below the red dashed
lines is where the proposed house would exceed the 24 foot height limit.
He then referred to Exhibit A6 of the drawings in the packet that shows the
section near the north and south elevations. The north side has lower
grade and a larger encroachment than the south side of the property. The
proposed structure would encroach vertically approximately 21 feet on the
north side and 12 feet on the south side and approximately 4 feet
horizontally away from the bluffs.
)mmissioner Cole verified that the reason the variance is being requested
purely for architectural design, or are there other reasons that might
pact the enjoyment of the home if the homeowner had to live within the
isting envelope.
Joiner answered, yes it is for architectural reasons to create more
adow line to the building. We are maintaining the same vertical footprint.
Commission inquiry he added that they want to be adjacent to the home
A to them as that infringes upon the applicant's views and there is. a
vacv issue as well.
is IPublic comment was opened.
Marvin Nevis, citizen of the City and representing Helen Anderson and Rod
Jones, other neighbors who were unable to attend, noted that they oppose
the granting of the variance on the westerly side of Ocean Boulevard that
deals with height as it infringes on the views not only theirs but people
walking up and down Ocean Boulevard. Ocean Boulevard rises as you go
up the southerly side of the street so what is below the street line at one
position is not below the street line at another position. The people who
come to our boulevard will see roof tops and not what you used to be able
to see. That street is owned by the City and part of the land that is being
used by these people is owned by the City. The City has leased some of
the land to them, which is fine. I do not see the need for increasing height
limits on a house beyond the limits provided by the Code, which in some
respect, may affect views for people across the street, down the street or
walking down the street. We agree that the variance be denied and urge
that the modification permit be denied. It appears that there is no
'ustification for allowing that variance to be approved. At Commission
inquiry, he stated that if the height was below the street line at the lowest
level of Ocean Boulevard, he would not object to the variance. But if it is
below the street line at the highest level of Ocean Boulevard, I would
. object. That is what is happening here and that is what happened on the
Butterfelds project as well. I don't think that the fact that the Butterfelds
house was built and approved, should be a basis for you to allow it to
happen again.
file : //H: \Plancomm \2003PC \0918.htm 10/24/2003
Planning Commission Minutes 09/18/2003 Page 9 of 13
Nick Reed, citizen of Newport Beach noted that the Code is there for a
reason. If you continue to grant variances to the Code, then eventually you
will have changed the Code. If you are for growth and to attract more
wealth to this area, I don't think it should be done through variances, it
should be done through changes to the Code. I urge that you deny the
variance request on this residence because if you do approve it, then it will
be easier for the next house to get a variance. You will be changing the
character of the bluff.
Gina Reed, citizen of Newport Beach urged the Commission to remember
that a lot of homes on that street have been built within the standards of
Code. She noted her concern of environmental issues and asked that
these be considered. At Commission inquiry, she noted that the building
may impair her views.
Commissioner Tucker asked if the area where the variance is being sought
would be visible from Ocean Boulevard including oblique angles. What is
the effect on the view corridor, as we have nothing that shows the line of
sight. It should resolve concerns that this is on the south side of the
structure and is a question of how much of the structure that is lawfully
going to be there will block the opportunity to see the area where the height
variance is being sought.
Mr. Campbell answered that the proposed structure will be higher than the
. existing structure by about three feet, but it will still be about three feet
below the level of curb adjacent to property. The existing house is already
non - conforming to the 24 foot height limit now. Referencing the
photographs of the existing residence, he noted the volume that would be
allowed and the oblique view that would be lost. The variance may affect
residents on the north side of Ocean Boulevard from that vantage point
whereby they would lose sight of some of the sand. The effect of this
encroachment will change with the vantage point. He noted additional
vantage points and views along the whole width of the house.
Don Kazarian, citizen of Newport Beach noted that the modification in the
front of this property is above ground and goes into the front setback and is
a big issue. This one house will be closer to Ocean Boulevard and is much
different than the Ensign project.
Lynn Butterfield, citizen of Newport Beach asked that the Commission
consider the consistency issue as it pertains to the Code because that is
what gives the quality of fife there. There are two other homeowners who
are at the City who are going to develop their property and await the
outcome of this hearing. She noted that the Code is supposed to be
followed.
. Public comment was closed.
Staff clarified that on the upper level of the residence, there is a proposed
terrace at the east side of the residence that will not block the view as noted
file : //H: \Plancomm\2003PC \0918.htm 10/24/2003
Planning Commission Minutes 09/18/2003 Page 11 of 13
variance. Being this close to Inspiration Point the further extension down
. the bluff is going to be particularly visible.
Commissioner Kiser stated he could not support the height variance for
previous comments adding that he supports the staff analysis for the
modification. He noted his concern of the homes going further down the
)mmissioner Tucker stated he supports the modification, the variance he
troubled about the concept of having a plateau that falls off and then the
aasurement is done in a different fashion. He stated that he believed the
dings could be made to support a variance. There ought to be a string
e so that all neighbors would be treated alike and that should limit where
a structure should be. I don't believe that the height variance has
iything to do with the proposed work down the bluff. At some point in time
are needs to be a defined limit on how far down the bluffs you can go.
)wever, I do not see anything in our Codes that presently gives us that
ithority. The rest of the project developing down the bluffs is not heading
the right direction. Commissioner Tucker noted he was going to be in the
inority on the variance, but in this case was happy to be on the losing
Chairperson McDaniel stated he is not in support of the variance. A
variance is to fix a problem, this is going to be a blank slate to start with and
• I don't see a need for anything different to take place here. I am
discouraged when we are building down the bluffs, but we have no authority
to deal with that. I suspect we are not going to rezone that area so we are
going to try to be as consistent as we can. If we did grant this request, it
would be a special privilege on a special piece of property.
sioner Selich noted that his comments were in addition to the
and recommendations in the staff report. Motion was made by
sioner Selich to deny the applicant's request for the variance and
the modification permit by adopting the resolution contained in
of the staff report.
imissioner Tucker asked the maker of the motion to split the motion in
so he could vote for the modification. The maker of the motion agreed.
was amended by Commissioner Selich to deny the applicant's
for the variance for reasons stated in the staff report and discussed.
Eaton, Cole, Toerge, McDaniel, Selich and Kiser
Tucker
Motion was continued by Commissioner Selich to approve the modification
. permit by adopting the resolution contained in Exhibit 1 of the staff report.
Ayes: Eaton, Cole, Toerge, Selich, Kiser and Tucker
Noes: McDaniel
file : //H:\Plancomm \2003PC \0918.htm 10/24/2003
Planning Commission Minutes 09/18/2003 Page 10 of 13
in previous descriptions. The actual encroachment on the upper level will
• be an open structure. The encroachment does not go across the whole
width of the structure at the upper level.
Commissioner Tucker noted that there appears to be not much in the way
of view impairment but questioned where it is on the structure.
Commissioner Selich noted he is not in support of the variance. He noted
that he does not believe there is any impact on the view from Ocean
Boulevard, even at oblique angles you may be blotting out tiny views of the
sand. He noted his concern about the project is based upon something that
as done two years ago when the Commission sent a request to City
Council suggesting that the City look at what happens to structures that are
being built on the bluffs at Corona del Mar and what can be done legally
under the existing Code and what impact that would have on the bluffs.
The Council decided to defer any consideration on that to the development
of the Local Coastal Plan, which we are working on and are still quite a bit
away from conclusion. There will probably more defined criteria when the
plan is done than what we have now, which is a general statement in the
General Plan. My concern is that this project is going further down the bluff
than I think it should and it appears that if is not in conformance with our
policies in the General Plan. We took the right approach in the Ensign
project where they went down into the bluff, but the bottom level receded
down and the bluff face remained outside of it. It was basically a semi-
. subterranean bottom level, whereas this bottom level is completely open on
the ocean side of this project. It makes a big difference and the
appearance and alteration of the bluff is going to be much more significant
than the Ensign project. The problem is that this project did not take this
into consideration in its original design because the City has no policies or
design criteria to regulate bluff alteration. It comes back to us and they are
asking to exceed the height limit on a very small portion of the project,
here, with very minor modifications on this, they could build the project
under the existing Code exactly as it is proposed with the alteration down
the bluff. It presents a dilemma on how to evaluate this. I don't see I could
support a project that I think is encroaching too far into the bluff even
though I know the applicant could go back and make a few minor changes
to it and take a small portion out of the height encroachment area and be in
complete conformance with the City Codes. In looking at the totality of the
project, I can not support it.
Commissioner Cole noted he can not support the application. As a
Commission we have to find certain findings to grant a variance. Even
though we can make a case for several of them, I don't believe a case has
been made where there are extraordinary or exceptional circumstance
applying to the land, building or use.
•Commissioner Eaton noted he can not support the variance, he could
support the request for the modification. The findings for the modification
are different and the majority of the modification request is under ground
and will not be visible. I agree that we can not make the findings for the
file : //H:\Plancomm12003PC10918.htm 10/24/2003
Planning Commission Minutes 09/18/2003 Page 12 of 13
Absent: None
•Abstain] None
ADDITIONAL BUSINESS: ADDITIONAL
BUSINESS
a. City Council Follow -up - Ms. Temple noted that at the Council mee
the professional services agreement for the Regent Newport BE
project was approved, which is the hotel project at Marinapark, so
the official processing of that project has commenced. This pn
will come before the Planning Commission and then to the
Council.
b. Oral report from Planning Commission's representative to tl
Economic Development Committee - Commissioner Selich noted *
EDC discussed the Mariner's Mile improvement plans. TI
discussion also included mixed use development particularly as
relates to redevelopment of bay front property.
c. Report from Planning Commission's representatives to the
Plan Update Committee - no meeting.
d. Report from Planning Commission's representative to the Loy
Coastal Plan Update Committee - Commissioner Toerge noted tt
• comments from EQAC, Harbor Commission, staff and EDC as w
were discussed. The committee voted to wait for the second meeti
in October to receive and incorporate the changes from Coas
Commission staff. The report will then be distributed to members
the public and homeowner associations for review.
e. Matters which a Planning Commissioner would like staff to report
at a subsequent meeting - none.
Matters which a Planning Commissioner may wish to place on
future agenda for action and staff report - none.
g. Status Reports on Planning Commission requests - Ms. Temple n
that the meeting with special interest groups in regards to
proposed changes to modification permit findings has been schk
for September 25th at the City Council Chambers; the City Man
newsletter is available via email;
h. Project status - the South Coast Shipyard project response
comments period has been concluded and will result in
Environmental Impact Report being prepared.
i. Requests for excused absences - Commissioners Selich and Cole
• be excused from October 9th meeting.
ADJOURNMENT: 8:13 p.m.
MICHAEL TOERGE, SECRETARY
file : //H:\Plancomm \2003PC \0918.htm 10/24/2003