HomeMy WebLinkAboutCapital Improvement Plan 2008City of Newport Beach
CAPITAL IMPROVEMENT PROGRAM
Fiscal Period 2007 -2008
City Council
Mayor Steven Rosansky
Mayor Pro Tern Edward D. Selich
Council Member Keith D. Curry
Council Member Leslie J. Daigle
Council Member Nancy Gardner
Council Member Michael F. Henn
Council Member Don Webb
City Manager Public Works Director
Homer L. Bludau Stephen G. Badum
CAPITAL IMPROVEMENT PROGRAM
The City of Newport Beach Capital Improvement Program (CIP) serves as a plan for the provision of public improvements, special
projects, on -going maintenance programs, and the implementation of the City's master plans. Projects in the CIP include
improvements and major maintenance on arterial highways, local streets, and alleys; storm drain and water quality improvements; bay,
pier, and beach improvements; park and facility improvements; water and wastewater system improvements; transportation safety and
traffic signal improvements; and planning programs and studies.
2007 -2008 Capital Improvement Projects by Fund
(Includes Rebudgets)
Building Excise Tax GICSVEnvironmental
Water Enterprise 1% Liability
5%
Wastewater Enterprise To nsp, & Giou./ osff1c
3% Congestion RaIIeVCCEG
Tme & submerged lama ati
5% Gontrlbutni
8%
General Fond
23%
Santa Ana Hags. Projects
21%
Arterial Highways
Rehabilitation Program
Gas Tax 2%
11% Masi M Traina,daWn
Funding
10%
The FY 2007 -08 CIP consists of over 140 projects representing over
$23 million in new appropriations and nearly $18 million in
rebudgeted funds. The CIP was developed with input from all City
departments, citizen input, and City Council members who identified
needs in their respective areas. The individual project requests
were compiled by each department and then submitted to the Public
Works Department in early 2007. The projects were prioritized and
summarized by available funds and reviewed by the Public Works
Director. A Public Works CIP review team then met with
representatives from each Department to discuss funding priorities.
The projects recommended for approval were presented to the City
Manager in March and were again discussed with each Department
Director. The process was finalized in April and packaged for
distribution to the City Council.
Funding of the capital projects, including preliminary estimates for projects to be rebudgeted, is derived from multiple funding sources,
and is shown in the chart above. Projects are organized by primary function or benefit into one of the following categories: Facilities;
Streets and Drainage; Traffic; Parks, Harbors and Beaches; Water Quality and Environmental; Water; Wastewater; and Miscellaneous.
Highlights of the new appropriations are presented by category as follows:
Facilities
Projects organized under Facilities include construction, rehabilitation and repair of City buildings and facilities. Major projects within
this category exceed $2.4 million and include:
• Repairs and improvements to various public safety facilities, including the police facility, fire stations and lifeguard
headquarters ($1,606,565)
• Repairs and improvements to other City facilities, including the Corporation Yard, Oasis Senior Center, Community Youth
Center and Little Corona restroom ($463,550)
• Furnishings, fixtures and equipment for Newport Coast Community Center ($253,200)
• Other capital purchases, including Central Library generator, Central Library HVAC and City Hall carpeting ($105,300)
Streets and Drainage
Projects organized under Streets and Drainage include construction, rehabilitation and repair of City roads, medians, bridges,
sidewalks, streetlights storm drains, tide structures, and parking lots. Projects within this category exceed $14.6 million and major
highlights include:
• Street and alley construction and rehabilitation, including Superior Avenue Rehabilitation, Eastbluff Drive Rehabilitation,
Corona del Mar south of Coast Highway Rehabilitation, Birch Street Rehabilitation, Balboa Village Alley Replacement and
Irvine Avenue Realignment ($6,402,700)
• Bridge improvements ($1,997,200)
• Sidewalk improvements ($1,520,245)
• Slurry seal projects ($1,301,000)
• Storm drains and tide structures ($1,153,700)
• Median and landscape improvements ($1,642,100)
• Streetlighting ($593,500)
Traffic
Projects organized under Traffic include traffic signal system maintenance and improvements, neighborhood traffic management,
pedestrian improvements and signage. Projects within this category exceed $4.4 million and major highlights include:
• Traffic signal modernization ($2,371,685)
• Other traffic signal installation, maintenance and improvements ($802,800)
• Signs ($459,800)
• Pedestrian improvements ($549,100)
• Neighborhood traffic management and studies ($279,200)
Parks, Harbors and Beaches
Projects organized under Parks, Harbors and Beaches include improvements or repairs to the City's parks, harbors, docks, wharfs,
piers and beaches. Projects within this category exceed $6 million and major highlights include:
• Park improvements, including Mariners Park improvements, Sunset Ridge Park design, Newport Center Park, Santa Ana
Heights passive park, park lighting at Buffalo Hills, Bonita Creek and San Miguel parks, tennis court fencing and playground
equipment ($3,822,175)
• Harbor improvements, including public docks access improvements, Rhine Wharf Channel Public Dock, and Rhine Wharf
Channel repair ($1,088,300)
• Beach improvements, including sand replenishment, eelgrass mitigation, beach observation camera system and pier repairs
($1,101,400)
Water Quality and Environmental
Projects organized under Water Quality and Environmental include studies, improvements and programs that benefit the City's natural
resources. Projects within this category approximate $2.5 million and major highlights include:
• Various studies, resource management plans, assessments and restoration projects ($993,519)
• Semeniuk Slough dredging ($650,000)
• Runoff reduction and irrigation improvements ($612,100)
• Buck Gully Maintenance Road and Wetlands project ($252,300)
Water and Wastewater
Projects organized under Water and Wastewater are funded from respective service charges and are used for the rehabilitation and
expansion of these services. Projects within these categories exceed $2.6 million and major highlights include:
• Water transmission and water main improvements ($1,464,000)
• Water well rehabilitation ($150,000)
• Sewer force main and lateral improvements ($600,000)
• Sewer pump station improvements ($334,000)
• Wastewater master plan ($67,200)
Miscellaneous
Projects organized under Miscellaneous are ones that do not fit into any other category and include capital purchases and special
projects. Projects within these categories exceed $8.8 million and highlights include:
• Santa Ana Heights utility undergrounding ($7,411,200)
• Oil Field improvements ($453,400)
• Slope repairs and project management ($270,000)
• Equipment purchases ($257,700)
• Computer related purchases ($242,880)
• Tsunami Warning System ($200,000)
Conclusion
The City continues to undertake an ambitious and wide - ranging capital improvement program. The projects, both significant and
diverse, will serve all areas of the City. It is the City's policy to appropriate sufficient funds for all projects scheduled during the coming
budget year. Many of the projects require multiple year terms to complete them. In such cases, only the current phase identified to be
completed during FY 2007 -2008 is budgeted and appropriated. Subsequent phases of a project and projects requiring more time or
funding are reconsidered at the appropriate time.
iv
City of Newport Beach
Capital Improvement Program
FY 2007 -2008
TABLE OF CONTENTS
FACILITIES
Central Library Electrical Repair and Generator
Central Library HVAC Repairs
City Hall Carpet Replacement - Revenue Division
Corporation Yard Building G Roof Repair and Rehabilitation
Corporation Yard Fleet Maintenance Locker Room
CYC Rehabilitation
1
2
3
Fire Facilities Assessment and Preliminary Design 7
Fire Station 1 Gender Modifications 8
Fire Station 3 Water Pipe Replacement
9
Fire Station 7 Telecommunications and Networking
10
Lifeguard Headquarters Communications Switch
11
Little Corona Restroom Facility
12
Newport Coast Community Center Furnishings
13
Oasis Senior Center Retrofit
14
Police Facility Gas Pump Canopy Repair
15
Police Facility Generator Replacement
16
Police Facility Security and Jail Video System
17
Police Facility Upper Level Office Remodel
18
Police Front Lobby Rehabilitation
19
Santa Ana Heights Equestrian Facilities
20
TOC -1
STREETS AND DRAINAGE
26th Street Tidal Structure and Bulkhead Repair
21
36th Street and Finley Avenue Bulkhead Repair
22
38th Street Tidal Structure/ Motorized Tide Valve
23
Arroyo Park Parking Lot Slurry Seal
24
Avon Street and Tustin Avenue Parking Lot Slurry Seal
25
Balboa Island Bulkhead Coping Repairs
26
Balboa Village Alley Replacement
27
Bayside Drive Street Rehabilitation
28
Birch Street Rehabilitation
29
Bridge Seismic Retrofit Construction
30
Coast Highway Median Improvements
31
Coast Highway Sidewalk - Morning Canyon Road to Seaward Road
32
Corona del Mar Area Parking Lots Slurry Seal
33
Corona del Mar South of Coast Hwy Street Rehabilitation
34
Dove Street Rehabilitation
35
Dover Drive Medians Renovation
36
Dover Drive Sidewalk
37
East Bay Avenue and A Street Rehabilitation
38
East Bay Storm Drain Upgrade/ Tidal Valve Installation
39
Eastbluff Drive Street Rehabilitation
40
EIR /Preliminary Plans
41
Indian Spring Lane Subdrain
42
Irvine Avenue Realignment - University Drive to Bristol Street
43
Irvine Terrace Landscape Improvements
44
Irvine Terrace Slurry Seal
45
TOC -2
STREETS AND DRAINAGE CONTINUED
Jamboree Road Bridge Widening
46
Median Maintenance Strips - Citywide
47
Newport Boulevard Right Turn Lane at Hospital Road
48
Newport Heights Slurry Seal
49
Newport Shores Street End Improvements
50
Polaris Drive and Santiago Drive Subdrain
51
Rivo Alto Bulkhead Coping Repairs
52
San Joaquin Hills Road Median Trees
53
Sidewalk, Curb and Gutter Replacement and ADA Improvements
54
Spyglass Hill Road Subdrain
55
Street and Bikeway Improvements
56
Streetlight Replacement Program
57
Superior Avenue Median Improvements
58
Superior Avenue Street Rehabilitation
59
Via Lido Crib Wall Replacement
60
West Balboa Boulevard Slurry Seal (12th to 16th Streets)
61
Westcliff Drive Medians Renovation
62
TRAFFIC
Bayside Waterfront Walkway to Balboa Island Bridge
63
Bristol Street Sign Bridge Improvements
64
Directional, Wayfinding and Monument Signage
65
Flashing Crosswalk - Newport Boulevard at 23rd Street
66
Iris Avenue and Coast Highway Traffic Signal
67
Neighborhood Traffic Management Improvements
68
Pedestrian Coastal Access Improvements
69
Traffic Signal Modernization: Ph. 1 Newport Center Area
70
Traffic Signal Modernization: Ph. 2 Jamboree Road
72
Traffic Signal Modernization: Ph. 3 Airport Area
72
TOC -3
TRAFFIC CONTINUED
Traffic Signal Preemption System 73
Traffic Signal Replacement Program 74
Transportation Model Maintenance 75
West Coast Hiahwav Vision Plan 76
PARKS, HARBORS AND BEACHES
American Legion Dock Repair
77
Back Bay View Park Replenishment and Enhancement
78
Balboa Parking Lot Equipment Replacement Project
79
Balboa Yacht Basin Electrical System Repairs
80
Balboa Yacht Basin Security System
81
Beach Observation Camera System
82
Beach Sand Study and Replenishment Program
83
Bonita Creek Park and San Miguel Park Light Replacement
84
Buffalo Hills Park Lighting
85
Cliff Drive Park Stairway and Handrail Replacement
86
Coastal Sand Replenishment Cooperative Project
87
Eelgrass Mitigation Bank
88
Mariners Park Improvements
89
Mariners Park Playground Replacement
90
Mariners Park Restroom Desiqn
91
Newport Center Park 93
Newport Island Park Playground Equipment 94
Parks Grants 95
Ocean Pier Repairs and Inspection 96
Public Docks Access Improvements 97
Public Safetv Beach Camera Monitorina Svstem 98
TOC -4
PARKS, HARBORS AND BEACHES CONTINUED
Rhine Channel Wharf Repair and Public Dock 99
Santa Ana Heights Mesa -Birch Park 100
Sunset Ridge Park - Design 101
Tennis Court Fencing Replacement 102
West Newport Park at Orange Street Playground Equipment 103
WATER QUALITY AND ENVIRONMENTAL
Areas of Special Biological Significance Assessment
104
Areas of Special Biological Significance Implementation
105
Big Canyon Creek Restoration
106
Buck Gully Maintenance Road and Wetland Project
107
Buck Gully Resource Management Plan
108
Eelgrass Study
109
Irrigation - Citywide Central Computer System
110
Irrigation - Newport Coast Central Computer System
111
Irrigation - Smart Controller Program
112
Newport Coast Runoff Reduction Program
113
Newport Coast Watershed Program
114
Semeniuk Slough Dredging Project
115
Upper Bay and Harbor Area Management Plan
116
Upper Bay Comprehensive Resource Management Plan
117
WATER
Bay Crossings Water Transmission Main Replacement
118
Ocean Birch Drive Water Main Replacement
119
Ocean Front Alley Water Main Replacement
120
Water Well Rehabilitation
121
TOC -5
WASTEWATER
Buck Gully Sewer Force Main Replacement
122
Ocean Front Alley Sewer Lateral Replacement
123
Sewer Pump Station Master Plan Improvements
124
Wastewater Master Plan
125
MISCELLANEOUS
Building Inspection Data Wireless Technology
126
CIP Project Management
127
City Aerial Mapping
128
Fire Department Technology
129
Holmatro Tool Replacement
130
Library Public Use Computer Replacement
131
Ocean Safety Operations Technical Equipment
132
Oil Field Improvement Program
133
Parking Meters Replacement
134
Public Safety 800 MHz Radio Exchange
135
Public Safety Equipment Storage Module
136
Records Management
137
Rescue Boat Engine Purchase
138
Santa Ana Heights Utility Undergrounding
139
Slope Repairs
140
Tsunami Warning Svstem
141
TOC -6
City of Newport Beach
Capital Improvement Program
FY 2007 -2008
ALPHABETICAL INDEX
Project Page
26th Street Tidal Structure and Bulkhead
36th Street and Finley Avenue Bulkhead Repair
38th Street Tidal Structure/ Motorized Tide Valve
American Legion Dock Repair
Areas of Special Bioloaical Sianificance Assessment
21
22
23
77
104
Areas of Special Biological Significance Implementation 105
Arrovo Park Parkins Lot Slurry Seal 24
Avon Street and Tustin Avenue Parking Lot Slurry Seal
25
Back Bay View Park Replenishment and Enhancement
78
Balboa Island Bulkhead Coping Repairs
26
Balboa Parking Lot Equipment Replacement Project
79
Balboa Village Alley Replacement
27
Balboa Yacht Basin Electrical Svstem ReDalrs
80
Balboa Yacht Basin Security System 81
Bay Crossings Water Transmission Main Replacement 118
Bayside Drive Street Rehabilitation 28
Bayside Waterfront Walkwav to Balboa Island Bridae 63
Beach Observation Camera System 82
Beach Sand Studv and Replenishment Program 83
Creek Restoration
Alpha -1
106
Birch Street Rehabilitation
29
Bonita Creek Park and San Miguel Park Light Replacement
84
Bridge Seismic Retrofit Construction
30
Bristol Street Sign Bridge Improvements
64
Buck Gully Maintenance Road and Wetland Project
107
Buck Gully Resource Management Plan
108
Buck Gully Sewer Force Main Replacement
122
Buffalo Hills Park Liohtino
85
Building Inspection Data Wireless Technology 126
Central Library Electrical Repair and Generator 1
Central Library HVAC Repairs 2
CIP Project Management 127
City Aerial Mapping
128
City Hall Carpet Replacement - Revenue Division
3
Cliff Drive Park Stairway and Handrail Replacement
86
Coast Highway Median Improvements
31
Coast Highway Sidewalk - Morning Canyon Road to Seaward Road
32
Coastal Sand Replenishment Cooperative Project
87
Corona del Mar Area Parking Lots Slurry Seal
33
Corona del Mar South of Coast Hwy Street Rehabilitation
34
Corporation Yard Building G Roof Repair and Rehabilitation
4
Corporation Yard Fleet Maintenance Locker Room
5
CYC Rehabilitation
6
Directional, Wayfinding and Monument Signage
65
Dove Street Rehabilitation
35
Dover Drive Medians Renovation
36
Alpha -2
Dover Drive Sidewalk 37
East Bay Avenue and A Street Rehabilitation 38
East Bay Storm Drain Upgrade/ Tidal Valve Installation 39
Eastbluff Drive Street Rehabilitation 40
Eelgrass Mitigation Bank 88
Eelgrass Study 109
EIR /Preliminary Plans 41
Fire Department Technology 129
Fire Facilities Assessment and Preliminary Design 7
Fire Station 1 Gender Modifications 8
Fire Station 3 Water Pipe Replacement
9
Fire Station 7 Telecommunications and Networking
10
Flashing Crosswalk - Newport Boulevard at 23rd Street
66
Holmatro Tool Replacement
130
Indian Spring Lane Subdrain
42
Iris Avenue and Coast Highway Traffic Signal
67
Irrigation - Citywide Central Computer System
110
Irrigation - Newport Coast Central Computer System
111
Irrigation - Smart Controller Program
112
Irvine Avenue Realignment - University Drive to Bristol Street
43
Irvine Terrace Landscape Improvements
44
Irvine Terrace Slurry Seal
45
Jamboree Road Bridge Widening
46
Library Public Use Computer Replacement
131
Lifeguard Headquarters Communications Switch
11
Little Corona Restroom Facilitv
12
Alpha -3
Mariners Park Improvements
89
Mariners Park Playground Replacement
90
Mariners Park Restroom Design
91
Median Maintenance Strips - Citywide
47
Mooring Layout Design
92
Neighborhood Traffic Management Improvements
68
Newport Boulevard Right Turn Lane at Hospital Road
48
Newport Center Park
93
Newport Coast Community Center Furnishings
13
Newport Coast Runoff Reduction Program
113
Newport Coast Watershed Program
114
Newport Heights Slurry Seal
49
Newport Island Park Playground Equipment
94
Newport Shores Street End Improvements
50
Oasis Senior Center Retrofit
14
Ocean Birch Drive Water Main Replacement
119
Ocean Front Alley Sewer Lateral Replacement
123
Ocean Front Alley Water Main Replacement
120
Ocean Pier Repairs and Inspection
96
Ocean Safety Operations Technical Equipment
132
Oil Field Improvement Program
133
Parking Meters Replacement
134
Parks Grants
95
Pedestrian Coastal Access Improvements
69
Polaris Drive and Santiago Drive Subdrain
51
Police Facility Gas Pump Canoov Repair
15
Alpha -4
Police Facility Generator Replacement
16
Police Facility Security and Jail Video System
17
Police Facility Upper Level Office Remodel
18
Police Front Lobby Rehabilitation
19
Public Docks Access Improvements
97
Public Safety 800 MHz Radio Exchange
135
Public Safety Beach Camera Monitoring System
98
Public Safety Equipment Storage Module
136
Records Management
137
Rescue Boat Engine Purchase
138
Rhine Channel Wharf Repair and Public Dock
99
Rivo Alto Bulkhead Coping Repairs
52
San Joaquin Hills Road Median Trees
53
Santa Ana Heights Equestrian Facilities
20
Santa Ana Heights Mesa -Birch Park
100
Santa Ana Heights Utility Undergrounding
139
Semeniuk Slough Dredging Project
115
Sewer Pump Station Master Plan Improvements
124
Sidewalk, Curb and Gutter Replacement and ADA Improvements
54
Slope Repairs
140
Spyglass Hill Road Subdrain
55
Street and Bikeway Improvements
56
Streetlight Replacement Program
57
Sunset Ridge Park - Design
101
Superior Avenue Median Improvements
58
Superior Avenue Street Rehabilitation
59
Alpha -5
Tennis Court Fencing Replacement 102
Traffic Signal Modernization: Ph. 1 Newport Center Area 70
Traffic Signal Modernization: Ph. 2 Jamboree Road 71
Traffic Signal Modernization: Ph. 3 Airport Area Design 72
Traffic Signal Preemption System 73
Traffic Signal Replacement Proaram 74
Transportation Model Maintenance 75
Tsunami Warnino Svstem 141
Upper Bay and Harbor Area Management Plan 116
Upper Bay Comprehensive Resource Management Plan 117
Via Lido Crib Wall Replacement 60
Wastewater Master Plan 125
Water Well Rehabilitation
121
West Balboa Boulevard Slurry Seal (12th to 16th Streets)
61
West Coast Highway Vision Plan
76
West Newport Park at Orange Street Playground Equipment
103
Westcliff Drive Medians Renovation
62
Alpha -6
Project Listing by Category
Facilities
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
1
7019
C1002000
Central Library Electrical Repair and Generator
Library
$0
$50,000
$50,000
2
7271
C4050781
Central Library HVAC Repairs
Library
$40,300
$0
$40,300
3
7019
C3140363
City Hall Carpet Replacement - Revenue Division
General Svcs.
$0
$15,000
$15,000
4
7011
C1002002
Corporation Yard Building G Roof Repair and Rehabilitation
General Svcs.
$0
$120,000
$120,000
5
7011
C1002001
Corporation Yard Fleet Maintenance Locker Room
General Svcs.
$0
$65,000
$65,000
6
7011
C4120806
CYC Rehabilitation
Recreation /SS
$48,600
$50,000
$98,600
7
7011
C5100762
Fire Facilities Assessment and Preliminary Design
Public Works
$80,000
$200,000
$280,000
8
7011
C2320527
Fire Station 1 Gender Modifications
Fire
$0
$180,000
$180,000
8
7271
C2320527
Fire Station 1 Gender Modifications
Fire
$74,800
$0
$74,800
9
7011
C2320856
Fire Station 3 Water Pipe Replacement
Fire
$0
$30,000
$30,000
9
7271
C2320856
Fire Station 3 Water Pipe Replacement
Fire
$65,000
$0
$65,000
10
7017
C1002003
Fire Station 7 Telecommunications and Networking
Fire
$0
$55,000
$55,000
11
7017
C1002005
Lifeguard Headquarters Communications Switch
Fire
$0
$140,000
$140,000
12
7011
C5100907
Little Corona Restroom Facility
General Svcs.
$46,200
$0
$46,200
13
7019
C5100977
Newport Coast Community Center Furnishings
Recreation /SS
$253,200
$0
$253,200
14
7011
C4410761
Oasis Senior Center Retrofit
Recreation /SS
$52,100
$0
$52,100
15
7019
C1820825
Police Facility Gas Pump Canopy Repair
Police
$25,000
$0
$25,000
16
7019
C1820918
Police Facility Generator Replacement
Police
$76,165
$115,000
$191,165
17
7017
C1810819
Police Facility Security and Jail Video System
Police
$40,000
$182,000
$222,000
18
7011
C1002004
Police Facility Upper Level Office Remodel
Police
$0
$50,000
$50,000
19
7011
C1820808
Police Front Lobby Rehabilitation
Police
$49,900
$200,000
$249,900
19
7251
C1820808
Police Front Lobby Rehabilitation
Police
$43,700
$0
$43,700
20
7459
C5100866
Santa Ana Heights Equestrian Facilities
City Manager
$81,650
$0
$81,650
Total Facilities
$976,615
$1,452,000
$2,428,615
Category-1
Streets and Drainage
Page Fund Project
21 7231 C5100887
22
23
24
25
26
27
27
28
29
29
29
30
30
31
32
33
34
35
36
37
37
37
38
39
40
41
42
7231
7231
7013
7013
7231
7013
7501
7181
7181
7191
7285
7181
7251
7013
7254
7013
7281
7181
7013
7013
7261
7432
7181
7231
7181
7181
7012
C2502000
C2502001
C2002000
C2002001
C5100835
C5100277
C5100277
C2002002
C5100830
C5100830
C5100830
C5100695
C5100695
C5200932
C2002005
C2002003
C2002004
C2002006
C2002007
C5100854
C5100854
C5100854
C2002008
C2502002
C2002009
C5100070
C5100903
Title
26th Street Tidal Structure and Bulkhead Repair
36th Street and Finley Avenue Bulkhead Repair
38th Street Tidal Structure/ Motorized Tide Valve
Arroyo Park Parking Lot Slurry Seal
Avon Street and Tustin Avenue Parking Lot Slurry Seal
Balboa Island Bulkhead Coping Repairs
Balboa Village Alley Replacement
Balboa Village Alley Replacement
Bayside Drive Street Rehabilitation
Birch Street Rehabilitation
Birch Street Rehabilitation
Birch Street Rehabilitation
Bridge Seismic Retrofit Construction
Bridge Seismic Retrofit Construction
Coast Highway Median Improvements
Coast Highway Sidewalk - Morning Canyon to Seaward
Corona del Mar Area Parking Lots Slurry Seal
Corona del Mar South of Coast Hwy Street Rehabilitation
Dove Street Rehabilitation
Dover Drive Medians Renovation
Dover Drive Sidewalk
Dover Drive Sidewalk
Dover Drive Sidewalk
East Bay Avenue and A Street Rehabilitation
East Bay Storm Drain Upgrade/ Tidal Valve Installation
Eastbluff Drive Street Rehabilitation
EIR /Preliminary Plans
Indian Spring Lane Subdrain
Category-2
Department
General Svcs.
General Svcs.
General Svcs.
Public Works
Public Works
City Manager
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
General Svcs.
Public Works
Public Works
Public Works
Public Works
General Svcs.
Public Works
Public Works
Public Works
Rebudget
$250,000
$0
$0
$0
$0
$160,700
$200,000
$200,000
$0
$293,000
$176,000
$253,000
$312,400
$1,270,700
$410,500
$0
$0
$0
$0
$0
$0
$102,645
$278,500
$0
$0
$0
$50,000
$50,000
Budget
$0
$75,000
$135,000
$48,000
$69,000
$0
$0
$0
$211,000
$0
$0
$0
$0
$0
$0
$250,000
$120,000
$1,000,000
$97,000
$125,000
$84,000
$0
$0
$113,000
$30,000
$1,180,000
$0
$0
Total
$250,000
$75,000
$135,000
$48,000
$69,000
$160,700
$200,000
$200,000
$211,000
$293,000
$176,000
$253,000
$312,400
$1,270,700
$410,500
$250,000
$120,000
$1,000,000
$97,000
$125,000
$84,000
$102,645
$278,500
$113,000
$30,000
$1,180,000
$50,000
$50,000
Streets and Drainage continued
Page
Fund
Project
Title
43
7261
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
43
7432
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
44
7013
C3170904
Irvine Terrace Landscape Improvements
44
7251
C3170904
Irvine Terrace Landscape Improvements
45
7181
C2002010
Irvine Terrace Slurry Seal
46
7261
C5100784
Jamboree Road Bridge Widening
46
7284
C5100784
Jamboree Road Bridge Widening
47
7013
C2001008
Median Maintenance Strips - Citywide
48
7181
C5200737
Newport Boulevard Right Turn Lane at Hospital Road
49
7181
C2002011
Newport Heights Slurry Seal
50
7028
C5100828
Newport Shores Street End Improvements
51
7012
C5100915
Polaris Drive and Santiago Drive Subdrain
52
7231
C5100837
Rivo Alto Bulkhead Coping Repairs
53
7013
C2002012
San Joaquin Hills Road Median Trees
54
7013
C5100020
Sidewalk, Curb and Gutter Replacement and ADA Impr
54
7161
C5100549
Sidewalk, Curb and Gutter Replacement and ADA Impr
55
7012
C5100925
Spyglass Hill Road Subdrain
56
7181
C5100302
Street and Bikeway Improvements
56
7281
C5100019
Street and Bikeway Improvements
57
7013
C5300035
Streetlight Replacement Program
58
7181
C5100870
Superior Avenue Median Improvements
58
7251
C5100870
Superior Avenue Median Improvements
58
7531
C5600292
Superior Avenue Median Improvements
59
7181
C5100927
Superior Avenue Street Rehabilitation
59
7285
C5100927
Superior Avenue Street Rehabilitation
60
7013
C5100738
Via Lido Crib Wall Replacement
61
7181
C2002013
West Balboa Boulevard Slurry Seal (12th to 16th Streets)
62
7013
C2002014
Westclitt Drive Medians Renovation
$8,559,445
$6,051,000
Total Streets and Drainage
Category-3
Department
Rebudget
Budget
Total
Public Works
$330,200
$0
$330,200
Public Works
$800,000
$0
$800,000
Public Works
$130,000
$0
$130,000
Public Works
$20,000
$0
$20,000
Public Works
$0
$395,000
$395,000
Public Works
$299,100
$0
$299,100
Public Works
$115,000
$0
$115,000
General Svcs.
$0
$200,000
$200,000
Public Works
$5,300
$0
$5,300
Public Works
$0
$580,000
$580,000
Public Works
$15,500
$0
$15,500
Public Works
$270,000
$0
$270,000
Public Works
$108,000
$0
$108,000
Public Works
$0
$50,000
$50,000
General Svcs.
$70,600
$625,000
$695,600
General Svcs.
$54,500
$55,000
$109,500
Public Works
$75,000
$0
$75,000
Public Works
$176,000
$0
$176,000
Public Works
$0
$200,000
$200,000
Utilities
$353,500
$240,000
$593,500
Public Works
$376,600
$0
$376,600
Public Works
$200,000
$0
$200,000
Public Works
$50,000
$0
$50,000
Public Works
$623,500
$0
$623,500
Public Works
$400,000
$0
$400,000
Public Works
$79,200
$0
$79,200
Public Works
$0
$89,000
$89,000
General Svcs.
$0
$80,000
$80,000
$8,559,445
$6,051,000
$14,610,445
Traffic
Rebudget
Budget
Total
Page
Fund
Project
Title
63
7231
C5100894
Bayside Waterfront Walkway to Balboa Island Bridge
64
7253
C5100898
Bristol Street Sign Bridge Improvements
65
7014
C2700813
Directional, Wayfinding and Monument Signage
65
7014
C3140789
Directional, Wayfinding and Monument Signage
65
7261
C2700813
Directional, Wayfinding and Monument Signage
66
7013
C3002000
Flashing Crosswalk - Newport Boulevard at 23rd Street
67
7261
C3002001
Iris Avenue and Coast Highway Traffic Signal
67
7281
C3002001
Iris Avenue and Coast Highway Traffic Signal
68
7013
C5200407
Neighborhood Traffic Management Improvements
68
7181
C5200407
Neighborhood Traffic Management Improvements
69
7028
C5100014
Pedestrian Coastal Access Improvements
70
7261
C5200699
Traffic Signal Modernization: Ph. 1 Newport Center Area
70
7261
C5200852
Traffic Signal Modernization: Ph. 1 Newport Center Area
70
7281
C5200852
Traffic Signal Modernization: Ph. 1 Newport Center Area
70
7284
C5200852
Traffic Signal Modernization: Ph. 1 Newport Center Area
71
7281
C3002002
Traffic Signal Modernization: Ph. 2 Jamboree Road
71
7284
C3002002
Traffic Signal Modernization: Ph. 2 Jamboree Road
72
7281
C3002003
Traffic Signal Modernization: Ph. 3 Airport Area
72
7284
C3002003
Traffic Signal Modernization: Ph. 3 Airport Area
73
7261
C5200408
Traffic Signal Preemption System
74
7261
C5200068
Traffic Signal Replacement Program
74
7281
C5200068
Traffic Signal Replacement Program
75
7261
C5200143
Transportation Model Maintenance
76
7261
C5100793
West Coast Highway Vision Plan
Total Traffic
Category-4
Department
Rebudget
Budget
Total
Public Works
$40,000
$0
$40,000
Public Works
$0
$100,000
$100,000
Planning
$0
$225,000
$225,000
City Manager
$32,500
$0
$32,500
Planning
$102,300
$0
$102,300
Public Works
$0
$110,000
$110,000
Public Works
$0
$100,000
$100,000
Public Works
$0
$180,000
$180,000
Public Works
$0
$150,000
$150,000
Public Works
$49,200
$0
$49,200
Public Works
$199,100
$200,000
$399,100
Public Works
$335,000
$0
$335,000
Public Works
$59,400
$0
$59,400
Public Works
$0
$200,000
$200,000
Public Works
$477,285
$0
$477,285
Public Works
$0
$750,000
$750,000
Public Works
$0
$300,000
$300,000
Public Works
$0
$150,000
$150,000
Public Works
$0
$100,000
$100,000
Public Works
$0
$16,000
$16,000
Public Works
$251,800
$0
$251,800
Public Works
$0
$240,000
$240,000
Public Works
$15,000
$0
$15,000
Public Works
$80,000
$0
$80,000
$1,641,585
$2,821,000
$4,462,585
Parks, Harbors and Beaches
Page
Fund
Project
Title
77
7231
C2371834
American Legion Dock Repair
77
7251
C2371834
American Legion Dock Repair
78
7015
C3170933
Back Bay View Park Replenishment and Enhancement
79
7231
C2370608
Balboa Parking Lot Equipment Replacement Project
80
7231
C2370892
Balboa Yacht Basin Electrical System Repairs
81
7231
C2373771
Balboa Yacht Basin Security System
82
7017
C4802000
Beach Observation Camera System
83
7028
C5100282
Beach Sand Study and Replenishment Program
84
7015
C5300895
Bonita Creek Park and San Miguel Park Light Replacement
85
7015
C4002000
Buffalo Hills Park Lighting
86
7015
C3170816
Cliff Drive Park Stairway and Handrail Replacement
87
7231
C5100282
Coastal Sand Replenishment Cooperative Project
88
7231
C2370522
Eelgrass Mitigation Bank
89
7015
C5100817
Mariners Park Improvements
89
7251
C5100817
Mariners Park Improvements
90
7251
C4120908
Mariners Park Playground Replacement
91
7015
C5100909
Mariners Park Restroom Design
92
7231
C2371772
Mooring Layout Design
93
7021
C4120656
Newport Center Park
93
7251
C4120656
Newport Center Park
94
7015
C4002001
Newport Island Park Playground Equipment
95
7251
C4310708
Parks Grants: ADA Compliance
95
7251
C4310885
Parks Grants: Tire Derived Products
96
7231
C5100836
Ocean Pier Repairs and Inspection
97
7231
C4402000
Public Docks Access Improvements
98
7017
C1820980
Public Safety Beach Camera Monitoring System
99
7231
C5100921
Rhine Channel Wharf Repair and Public Dock
99
7251
C5100865
Rhine Channel Wharf Repair and Public Dock
100
7459
C5100867
Santa Ana Heights Mesa -Birch Park
Category-5
Department
Rebudget
Budget
Total
City Manager
$15,000
$0
$15,000
City Manager
$65,000
$0
$65,000
General Svcs.
$46,750
$300,000
$346,750
City Manager
$0
$70,000
$70,000
City Manager
$65,000
$0
$65,000
City Manager
$33,300
$0
$33,300
Fire
$0
$38,000
$38,000
Public Works
$0
$200,000
$200,000
Utilities
$125,000
$0
$125,000
Public Works
$0
$215,000
$215,000
Public Works
$100,000
$100,000
$200,000
City Manager
$0
$100,000
$100,000
City Manager
$89,000
$50,000
$139,000
Public Works
$896,200
$0
$896,200
Public Works
$329,905
$0
$329,905
Recreation /SS
$3,071
$0
$3,071
Public Works
$26,000
$0
$26,000
City Manager
$100,000
$0
$100,000
Public Works
$200,000
$0
$200,000
Public Works
$600,000
$0
$600,000
Recreation /SS
$0
$60,000
$60,000
Recreation /SS
$89,977
$0
$89,977
Recreation /SS
$10,522
$0
$10,522
Public Works
$0
$500,000
$500,000
City Manager
$0
$140,000
$140,000
Police
$154,400
$0
$154,400
Public Works
$330,000
$0
$330,000
Public Works
$0
$240,000
$240,000
City Manager
$219,750
$128,000
$347,750
Parks, Harbors and Beaches continued
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
101
7021
C5100515
Sunset Ridge Park - Design
Public Works
$150,000
$0
$150,000
102
7015
C4120928
Tennis Court Fencing Replacement
Recreation /SS
$130,000
$0
$130,000
103
7015
C4120931
West Newport Park at Orange Street Playground Equipment
Recreation /SS
$0
$32,000
$32,000
103
7271
C4120931
West Newport Park at Orange Street Playground Equipment
Recreation /SS
$0
$60,000
$60,000
107
7014
C5100659
Total Parks, Harbors and Beaches
Public Works
$3,778,875
$2,233,000
$6,011,875
Water Quality and Environmental
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
104
7014
C5100889
Areas of Special Biological Significance Assessment
Public Works
$0
$100.000
$100,000
104
7255
C5100889
Areas of Special Biological Significance Assessment
Public Works
$2,299
$0
$2,299
105
7231
C5100890
Areas of Special Biological Significance Implementation
Public Works
$56,300
$0
$56,300
106
7231
C5100709
Big Canyon Creek Restoration
Public Works
$41,350
$0
$41,350
107
7014
C5100659
Buck Gully Maintenance Road and Wetland Project
Public Works
$47,500
$0
$47,500
107
7255
C5100659
Buck Gully Maintenance Road and Wetland Project
Public Works
$69,800
$0
$69,800
107
7501
C5100659
Buck Gully Maintenance Road and Wetland Project
Public Works
$0
$135,000
$135,000
108
7014
C5002018
Buck Gully Resource Management Plan
City Manager
$0
$170,000
$170,000
109
7255
C2370902
Eelgrass Study
Public Works
$250,000
$0
$250,000
110
7503
C5500637
Irrigation - Citywide Central Computer System
General Svcs.
$0
$90,000
$90,000
111
7015
C3130764
Irrigation - Newport Coast Central Computer System
General Svcs.
$0
$100,000
$100,000
112
7255
C5100969
Irrigation - Smart Controller Program
Public Works
$142,100
$0
$142,100
113
7014
C5002000
Newport Coast Runoff Reduction Program
Public Works
$0
$280,000
$280,000
114
7014
C5100912
Newport Coast Watershed Program
Public Works
$93,000
$0
$93,000
114
7255
C5100912
Newport Coast Watershed Program
Public Works
$55,000
$0
$55,000
115
7014
C5100923
Semeniuk Slough Dredging Project
Public Works
$0
$350,000
$350,000
115
7251
C5100923
Semeniuk Slough Dredging Project
Public Works
$0
$300,000
$300,000
116
7231
C0310929
Upper Bay and Harbor Area Management Plan
Public Works
$92,700
$0
$92,700
116
7255
C0310929
Upper Bay and Harbor Area Management Plan
Public Works
$12,870
$0
$12,870
117
7014
C5002017
Upper Bay Comprehensive Resource Management Plan
City Manager
$0
$120,000
$120,000
Total Water Quality and Environmental
$862,919
$1,645,000
$2,507,919
Category-6
Water
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
118
7501
C5500978
Bay Crossings Water Transmission Main Replacement
Utilities
$300,000
$0
$300,000
119
7501
C6002001
Ocean Birch Drive Water Main Replacement
Utilities
$0
$414,000
$414,000
120
7501
C6002000
Ocean Front Alley Water Main Replacement
Utilities
$750,000
$0
$750,000
121
7503
C5500460
Water Well Rehabilitation
Utilities
$0
$150,000
$150,000
Total Water
$1,050,000
$564,000
$1,614,000
Wastewater
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
122
7531
C5600861
Buck Gully Sewer Force Main Replacement
Utilities
$0
$350,000
$350,000
123
7531
C7002000
Ocean Front Alley Sewer Lateral Replacement
Utilities
$0
$250,000
$250,000
124
7532
C5600100
Sewer Pump Station Master Plan Improvements
Utilities
$200,000
$134,000
$334,000
125
7531
C5600934
Wastewater Master Plan
Utilities
$17,200
$50,000
$67,200
Total Wastewater
$217,200
$784,000
$1,001,200
Category-7
Miscellaneous
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
126
7017
C2920900
Building Inspection Data Wireless Technology
Building
$90,000
$0
$90,000
127
7014
C8002000
CIP Project Management
Public Works
$0
$170,000
$170,000
128
7181
C5100763
City Aerial Mapping
Public Works
$10,000
$0
$10,000
129
7017
C8002001
Fire Department Technology: Early Notification Alerting
Fire
$0
$75,000
$75,000
129
7017
C2310620
Fire Department Technology: Facilities Management
Fire
$7,200
$0
$7,200
129
7017
C2310911
Fire Department Technology: FireView Software
Fire
$7,680
$11,000
$18,680
130
7271
C2320920
Holmatro Tool Replacement
Fire
$13,700
$0
$13,700
131
7271
C4009617
Library Public Use Computer Replacement
Library
$0
$34,000
$34,000
132
7295
C5100566
Ocean Safety Operations Technical Equipment
Fire
$8,000
$0
$8,000
133
7231
C5400053
Oil Field Improvement Program
Utilities
$453,400
$0
$453,400
134
7024
C0620935
Parking Meters Replacement
Admin. Svcs.
$0
$105,000
$105,000
135
7271
C8002002
Public Safety 800 MHz Radio Exchange
Fire
$0
$66,000
$66,000
136
7019
C8002003
Public Safety Equipment Storage Module
Fire
$0
$15,000
$15,000
137
7181
C5100733
Records Management
Public Works
$10,000
$0
$10,000
137
7281
C5100733
Records Management
Public Works
$17,000
$0
$17,000
138
7019
C8002004
Rescue Boat Engine Purchase
Fire
$0
$31,000
$31,000
139
7459
C5100879
Santa Ana Heights Utility Undergrounding
City Manager
$11,200
$7,400,000
$7,411,200
140
7014
C5100814
Slope Repairs
Public Works
$100,000
$0
$100,000
141
7017
C8002026
Tsunami Warning System
Fire
$0
$200,000
$200,000
Total Miscellaneous
$728,180
$8,107,000
$8,835,180
Totalfor All Categories $17,814,819 $23,657,000 $41,471,819
Category-8
Project Listing by Requesting Department
Page
Fund
Project
Title
Category
Rebudget
Budget
Total
Administrative Services
134
7024
C0620935
Parking Meters Replacement
Miscellaneous
$0
$105,000
$105,000
Total Administrative Services
$0
$105,000
$105,000
Building
26
7017
C2920900
Building Inspection Data Wireless Technology
Miscellaneous
$90,000
$0
$90,000
Total Building
$90,000
$0
$90,000
City Manager
77
7231
C2371834
American Legion Dock Repair
Prks /Hrbrs /Bchs
$15,000
$0
$15,000
77
7251
C2371834
American Legion Dock Repair
Prks /Hrbrs /Bchs
$65,000
$0
$65,000
26
7231
C5100835
Balboa Island Bulkhead Coping Repairs
Prks /Hrbrs /Bchs
$160,700
$0
$160,700
79
7231
C2370608
Balboa Parking Lot Equipment Replacement Project
Prks /Hrbrs /Bchs
$0
$70,000
$70,000
80
7231
C2370892
Balboa Yacht Basin Electrical System Repairs
Prks /Hrbrs /Bchs
$65,000
$0
$65,000
81
7231
C2373771
Balboa Yacht Basin Security System
Prks /Hrbrs /Bchs
$33,300
$0
$33,300
108
7014
C5002018
Buck Gully Resource Management Plan
Wtr Qual /Environ
$0
$170,000
$170,000
87
7231
C5100282
Coastal Sand Replenishment Cooperative Project
Prks /Hrbrs /Bchs
$0
$100,000
$100,000
65
7014
C3140789
Directional, Wayfinding and Monument Signage
Traffic
$32,500
$0
$32,500
88
7231
C2370522
Eelgrass Mitigation Bank
Prks /Hrbrs /Bchs
$89,000
$50,000
$139,000
92
7231
C2371772
Mooring Layout Design
Prks /Hrbrs /Bchs
$100,000
$0
$100,000
97
7231
C4402000
Public Docks Access Improvements
Prks /Hrbrs /Bchs
$0
$140,000
$140,000
20
7459
C5100866
Santa Ana Heights Equestrian Facilities
Facilities
$81,650
$0
$81,650
100
7459
C5100867
Santa Ana Heights Mesa -Birch Park
Prks /Hrbrs /Bchs
$219,750
$128,000
$347,750
139
7459
C5100879
Santa Ana Heights Utility Undergrounding
Miscellaneous
$11,200
$7,400,000
$7,411,200
117
7014
C5002017
Upper Bay Comprehensive Resource Management Plan
Wtr Qua[ /Environ
$0
$120,000
$120,000
Total City Manager
$873,100
$8,178,000
$9,051,100
Department -1
Page Fund
Fire
7231
82
7017
129
7017
129
7017
129
7017
8
7011
8
7271
9
7011
9
7271
10
7017
130
7271
11
7017
132
7295
135
7271
136
7019
138
7019
141
7017
General Services
21
7231
22
7231
23
7231
78
7015
3
4
5
36
7019
7011
7011
Project Title
C4802000
Beach Observation Camera System
C8002001
Fire Department Technology: Early Notification Alerting
C2310620
Fire Department Technology: Facilities Management
C2310911
Fire Department Technology: FireView Software
C2320527
Fire Station 1 Gender Modifications
C2320527
Fire Station 1 Gender Modifications
C2320856
Fire Station 3 Water Pipe Replacement
C2320856
Fire Station 3 Water Pipe Replacement
C1002003
Fire Station 7 Telecommunications and Networking
C2320920
Holmatro Tool Replacement
C1002005
Lifeguard Headquarters Communications Switch
C5100566
Ocean Safety Operations Technical Equipment
C8002002
Public Safety 800 MHz Radio Exchange
C8002003
Public Safety Equipment Storage Module
C8002004
Rescue Boat Engine Purchase
C8002026
Tsunami Warning System
Facilities
Total Fire
C5100887
26th Street Tidal Structure and Bulkhead Repair
C2502000
36th Street and Finley Avenue Bulkhead Repair
C2502001
38th Street Tidal Structure/ Motorized Tide Valve
C3170933
Back Bay View Park Replenishment and Enhancement
C3140363
City Hall Carpet Replacement - Revenue Division
C1002002
Corporation Yard Building G Roof Repair and Rehabilitation
C1002001
Corporation Yard Fleet Maintenance Locker Room
7013 C2002007 Dover Drive Medians Renovation
7231 C2002007 East Bay Storm Drain Upgrade/ Tidal Valve Installation
Department -2
Category
Rebudget
Budget
Total
Prks /Hrbrs /Bchs
$0
$38,000
$38,000
Miscellaneous
$0
$75,000
$75,000
Miscellaneous
$0
$7,200
$7,200
Miscellaneous
$7,680
$11,000
$18,680
Facilities
$0
$180,000
$180,000
Facilities
$74,800
$0
$74,800
Facilities
$0
$30,000
$30,000
Facilities
$65,000
$0
$65,000
Facilities
$0
$55,000
$55,000
Miscellaneous
$13,700
$0
$13,700
Facilities
$0
$140,000
$140,000
Miscellaneous
$8,000
$0
$8,000
Miscellaneous
$0
$66,000
$66,000
Miscellaneous
$0
$15,000
$15,000
Miscellaneous
$0
$31,000
$31,000
Miscellaneous
$0
$200,000
$200,000
$169,180
$848,200
$1,017,380
Streets /Drainage
$250,000
$0
$250,000
Streets /Drainage
$0
$75,000
$75,000
Streets /Drainage
$0
$135,000
$135,000
Prks /Hrbrs /Bchs
$46,750
$300,000
$346,750
Facilities
$0
$15,000
$15,000
Facilities
$0
$120,000
$120,000
Facilities
$0
$65,000
$65,000
Streets /Drainage
$0
$125,000
$125,000
Streets /Drainage
$0
$30,000
$30,000
Page
Fund
Project
Title
Category
Rebudget
Budget
Total
General Services continued
39
7503
C5500637
Irrigation - Citywide Central Computer System
Wtr Qual /Environ
$0
$90,000
$90,000
111
7015
C3130764
Irrigation - Newport Coast Central Computer System
Wtr Qual /Environ
$0
$100,000
$100,000
12
7011
C5100907
Little Corona Restroom Facility
Facilities
$46,200
$0
$46,200
47
7013
C2001008
Median Maintenance Strips - Citywide
Streets /Drainage
$0
$200,000
$200,000
54
7013
C5100020
Sidewalk, Curb and Gutter Replacement and ADA Impr
Streets /Drainage
$70,600
$625,000
$695,600
54
7161
C5100549
Sidewalk, Curb and Gutter Replacement and ADA Impr
Streets /Drainage
$54,500
$55,000
$109,500
62
7013
C2002014
Westcliff Drive Medians Renovation
Streets /Drainage
$0
$80,000
$80,000
Total General Services
$468,050
$2,015,000
$2,483,050
Library
1
7019
C1002000
Central Library Electrical Repair and Generator
Facilities
$0
$50,000
$50,000
2
7271
C4050781
Central Library HVAC Repairs
Facilities
$40,300
$0
$40,300
131
7271
C4009617
Library Public Use Computer Replacement
Miscellaneous
$0
$34,000
$34,000
Total Library
$40,300
$84,000
$124,300
Planning
65
7014
C2700813
Directional, Wayfinding and Monument Signage
Traffic
$0
$225,000
$225,000
65
7261
C2700813
Directional, Wayfinding and Monument Signage
Traffic
$102,300
$0
$102,300
Total Planning
$102,300
$225,000
$327,300
Police
15
7019
C1820825
Police Facility Gas Pump Canopy Repair
Facilities
$25,000
$0
$25,000
16
7019
C1820918
Police Facility Generator Replacement
Facilities
$76,165
$115,000
$191,165
17
7017
C1810819
Police Facility Security and Jail Video System
Facilities
$40,000
$182,000
$222,000
18
7011
C1002004
Police Facility Upper Level Office Remodel
Facilities
$0
$50,000
$50,000
19
7011
C1820808
Police Front Lobby Rehabilitation
Facilities
$49,900
$200,000
$249,900
19
7251
C1820808
Police Front Lobby Rehabilitation
Facilities
$43,700
$0
$43,700
98
7017
C1820980
Public Safety Beach Camera Monitoring System
Prks /Hrbrs /Bchs
$154,400
$0
$154,400
Total Police
$389,165
$547,000
$936,165
Department -3
Page Fund Project Title Category Rebudget Budget Total
Public Works
104
7014
104
7255
105
7231
24
7013
25
7013
27
7013
27
28
63
83
106
29
29
29
30
30
64
107
107
107
85
127
128
86
31
32
33
7501
7181
7231
7028
7231
7181
7191
7285
7181
7251
7253
7014
7255
7501
7015
7014
7181
7015
7013
7254
7013
C5100889
Areas of Special Biological Significance Assessment
Wtr Qual /Environ
$0
$100,000
$100,000
C5100889
Areas of Special Biological Significance Assessment
Wtr Qual /Environ
$2,299
$0
$2,299
C5100890
Areas of Special Biological Significance Implementation
Wtr Qual /Environ
$56,300
$0
$56,300
C2002000
Arroyo Park Parking Lot Slurry Seal
Streets /Drainage
$0
$48,000
$48,000
C2002001
Avon Street and Tustin Avenue Parking Lot Slurry Seal
Streets /Drainage
$0
$69,000
$69,000
C5100277
Balboa Village Alley Replacement
Streets /Drainage
$200,000
$0
$200,000
C5100277
Balboa Village Alley Replacement
Streets /Drainage
$200,000
$0
$200,000
C2002002
Bayside Drive Street Rehabilitation
Streets /Drainage
$0
$211,000
$211,000
C5100894
Bayside Waterfront Walkway to Balboa Island Bridge
Traffic
$40,000
$0
$40,000
C5100282
Beach Sand Study and Replenishment Program
Prks /Hrbrs /Bchs
$0
$200,000
$200,000
C5100709
Big Canyon Creek Restoration
Wtr Qual /Environ
$41,350
$0
$41,350
C5100830
Birch Street Rehabilitation
Streets /Drainage
$293,000
$0
$293,000
C5100830
Birch Street Rehabilitation
Streets /Drainage
$176,000
$0
$176,000
C5100830
Birch Street Rehabilitation
Streets /Drainage
$253,000
$0
$253,000
C5100695
Bridge Seismic Retrofit Construction
Streets /Drainage
$312,400
$0
$312,400
C5100695
Bridge Seismic Retrofit Construction
Streets /Drainage
$1,270,700
$0
$1,270,700
C5100898
Bristol Street Sign Bridge Improvements
Traffic
$0
$100,000
$100,000
C5100659
Buck Gully Maintenance Road and Wetland Project
Wtr Qual /Environ
$47,500
$0
$47,500
C5100659
Buck Gully Maintenance Road and Wetland Project
Wtr Qua[ /Environ
$69,800
$0
$69,800
C5100659
Buck Gully Maintenance Road and Wetland Project
Wtr Qual /Environ
$0
$135,000
$135,000
C4002000
Buffalo Hills Park Lighting
Prks /Hrbrs /Bchs
$0
$215,000
$215,000
C8002000
CIP Project Management
Miscellaneous
$0
$170,000
$170,000
C5100763
City Aerial Mapping
Miscellaneous
$10,000
$0
$10,000
C3170816
Cliff Drive Park Stairway and Handrail Replacement
Prks /Hrbrs /Bchs
$100,000
$100,000
$200,000
C5200932
Coast Highway Median Improvements
Streets /Drainage
$410,500
$0
$410,500
C2002005
Coast Highway Sidewalk - Morning Canyon to Seaward
Streets /Drainage
$0
$250,000
$250,000
C2002003
Corona del Mar Area Parking Lots Slurry Seal
Streets /Drainage
$0
$120,000
$120,000
Department -4
Page Fund Project Title
Public Works continued
34
7281
C2002004
35
7181
C2002006
37
7013
C5100854
37
7261
C5100854
37
7432
C5100854
38
7181
C2002008
40
7181
C2002009
109
7255
C2370902
41
7181
C5100070
7
7011
C5100762
66
7013
C3002000
42
7012
C5100903
67
7261
C3002001
67
7281
C3002001
112
7255
C5100969
43
7261
C5100470
43
7432
C5100470
44
7013
C3170904
44
7251
C3170904
45
7181
C2002010
46
7261
C5100784
46
7284
C5100784
89
7015
C5100817
89
7251
C5100817
91
7015
C5100909
68
7013
C5200407
68
7181
C5200407
Category Rebudget Budget Total
Corona del Mar South of Coast Hwy Street Rehabilitation
Streets /Drainage
$0
$1,000,000
$1,000,000
Dove Street Rehabilitation
Streets /Drainage
$0
$97,000
$97,000
Dover Drive Sidewalk
Streets /Drainage
$0
$84,000
$84,000
Dover Drive Sidewalk
Streets /Drainage
$102,645
$0
$102,645
Dover Drive Sidewalk
Streets /Drainage
$278,500
$0
$278,500
East Bay Avenue and A Street Rehabilitation
Streets /Drainage
$0
$113,000
$113,000
Eastbluff Drive Street Rehabilitation
Streets /Drainage
$0
$1,180,000
$1,180,000
Eelgrass Study
Prks /Hrbrs /Bchs
$250,000
$0
$250,000
EIR /Preliminary Plans
Streets /Drainage
$50,000
$0
$50,000
Fire Facilities Assessment and Preliminary Design
Facilities
$80,000
$200,000
$280,000
Flashing Crosswalk - Newport Boulevard at 23rd Street
Traffic
$0
$110,000
$110,000
Indian Spring Lane Subdrain
Streets /Drainage
$50,000
$0
$50,000
Iris Avenue and Coast Highway Traffic Signal
Traffic
$0
$100,000
$100,000
Iris Avenue and Coast Highway Traffic Signal
Traffic
$0
$180,000
$180,000
Irrigation - Smart Controller Program
Wtr Qual /Environ
$142,100
$0
$142,100
Irvine Avenue Realignment - University Dr to Bristol St
Streets /Drainage
$330,200
$0
$330,200
Irvine Avenue Realignment - University Dr to Bristol St
Streets /Drainage
$800,000
$0
$800,000
Irvine Terrace Landscape Improvements
Streets /Drainage
$130,000
$0
$130,000
Irvine Terrace Landscape Improvements
Streets /Drainage
$20,000
$0
$20,000
Irvine Terrace Slurry Seal
Streets /Drainage
$0
$395,000
$395,000
Jamboree Road Bridge Widening
Streets /Drainage
$299,100
$0
$299,100
Jamboree Road Bridge Widening
Streets /Drainage
$115,000
$0
$115,000
Mariners Park Improvements
Prks /Hrbrs /Bchs
$896,200
$0
$896,200
Mariners Park Improvements
Prks /Hrbrs /Bchs
$329,905
$0
$329,905
Mariners Par Restroom Design
Prks /Hrbrs /Bchs
$26,000
$0
$26,000
Neighborhood Traffic Management Improvements
Traffic
$0
$150,000
$150,000
Neighborhood Traffic Management Improvements
Traffic
$49,200
$0
$49,200
Department -5
Page Fund Project Title
Public Works continued
48
7181
C5200737
93
7021
C4120656
93
7251
C4120656
113
7014
C5002000
114
7014
C5100912
114
7255
C5100912
49
7181
C2002011
50
7028
C5100828
96
7231
C5100836
69
7028
C5100014
51
7012
C5100915
137
7181
C5100733
137
7281
C5100733
99
7231
C5100921
99
7251
C5100865
52
7231
C5100837
53
7013
C2002012
115
7014
C5100923
115
7251
C5100923
140
7014
C5100814
55
7012
C5100925
56
7281
C5100302
56
7281
C5100019
101
7021
C5100515
58
7181
C5100870
58
7251
C5100870
58
7531
C5600292
Category Rebudget Budget Total
Newport Boulevard Right Turn Lane at Hospital Road
Traff ic
$5,300
$0
$5,300
Newport Center Park
Prks /Hrbrs /Bchs
$200,000
$0
$200,000
Newport Center Park
Prks /Hrbrs /Bchs
$600,000
$0
$600,000
Newport Coast Runoff Reduction Program
Wtr Qual /Environ
$0
$280,000
$280,000
Newport Coast Watershed Program
Wtr Qual /Environ
$93,000
$0
$93,000
Newport Coast Watershed Program
Wtr Qua[ /Environ
$55,000
$0
$55,000
Newport Heights Slurry Seal
Streets /Drainage
$0
$580,000
$580,000
Newport Shores Street End Improvements
Streets /Drainage
$15,500
$0
$15,500
Ocean Pier Repairs and Inspection
Prks /Hrbrs /Bchs
$0
$500,000
$500,000
Pedestrian Coastal Access Improvements
Traff ic
$199,100
$200,000
$399,100
Polaris Drive and Santiago Drive Subdrain
Streets /Drainage
$270,000
$0
$270,000
Records Management
Miscellaneous
$10,000
$0
$10,000
Records Management
Miscellaneous
$17,000
$0
$17,000
Rhine Channel Wharf Repair and Public Dock
Prks /Hrbrs /Bchs
$330,000
$0
$330,000
Rhine Channel Wharf Repair and Public Dock
Prks /Hrbrs /Bchs
$0
$240,000
$240,000
Rivo Alto Bulkhead Coping Repairs
Streets /Drainage
$108,000
$0
$108,000
San Joaquin Hills Road Median Trees
Streets /Drainage
$0
$50,000
$50,000
Semeniuk Slough Dredging Project
Wtr Qual /Environ
$0
$300,000
$300,000
Semeniuk Slough Dredging Project
Wtr Qual /Environ
$0
$350,000
$350,000
Slope Repairs
Miscellaneous
$100,000
$0
$100,000
Spyglass Hill Road Subdrain
Streets /Drainage
$75,000
$0
$75,000
Street and Bikeway Improvements
Streets /Drainage
$176,000
$0
$176,000
Street and Bikeway Improvements
Streets /Drainage
$0
$200,000
$200,000
Sunset Ridge Park - Design
Prks /Hrbrs /Bchs
$150,000
$0
$150,000
Superior Avenue Median Improvements
Streets /Drainage
$376,600
$0
$376,600
Superior Avenue Median Improvements
Streets /Drainage
$200,000
$0
$200,000
Superior Avenue Median Improvements
Streets /Drainage
$50,000
$0
$50,000
Department -6
Page Fund Project Title
Public Works continued
59
7181
C5100927
59
7285
C5100927
70
7261
C5200699
70
7261
C5200852
70
7281
C5200852
70
7284
C5200852
71
7281
C3002002
71
7284
C3002002
72
7281
C3002003
72
7284
C3002003
73
7261
C5200408
74
7261
C5200068
74
7281
C5200068
75
7261
C5200143
116
7231
C0310929
116
7255
C0310929
60
7013
C5100738
61
7181
C2002013
76
7261
C5100793
Recreation/Senior Services
6
7011
C4120806
90
7251
C4120908
13
7019
C5100977
94
7015
C4002001
14
7011
C4410761
Category Rebudget Budget Total
Superior Avenue Street Rehabilitation
Streets /Drainage
$623,500
$0
$623,500
Superior Avenue Street Rehabilitation
Streets /Drainage
$400,000
$0
$400,000
Traffic Signal Modernization: Ph. 1 Newport Center Area
Traffic
$335,000
$0
$335,000
Traffic Signal Modernization: Ph. 1 Newport Center Area
Traffic
$59,400
$0
$59,400
Traffic Signal Modernization: Ph. 1 Newport Center Area
Traffic
$0
$200,000
$200,000
Traffic Signal Modernization: Ph. 1 Newport Center Area
Traffic
$477,285
$0
$477,285
Traffic Signal Modernization: Ph. 2 Jamboree Road
Traffic
$0
$750,000
$750,000
Traffic Signal Modernization: Ph. 2 Jamboree Road
Traffic
$0
$300,000
$300,000
Traffic Signal Modernization: Ph. 3 Airport Area
Traff ic
$0
$150,000
$150,000
Traffic Signal Modernization: Ph. 3 Airport Area
Traffic
$0
$100,000
$100,000
Traffic Signal Preemption System
Traffic
$0
$16,000
$16,000
Traffic Signal Replacement Program
Traffic
$251,800
$0
$251,800
Traffic Signal Replacement Program
Traffic
$0
$240,000
$240,000
Transportation Model Maintenance
Traff ic
$15,000
$0
$15,000
Upper Bay and Harbor Area Management Plan
Wtr Qual /Environ
$92,700
$0
$92,700
Upper Bay and Harbor Area Management Plan
Wtr Qual /Environ
$12,870
$0
$12,870
Via Lido Crib Wall Replacement
Streets /Drainage
$79,200
$0
$79,200
West Balboa Boulevard Slurry Seal (12th to 16th Streets)
Streets /Drainage
$0
$89,000
$89,000
West Coast Highway Vision Plan
Traff ic
$80,000
$0
$80,000
Total Public Works
$12,888,954
$9,872,000
$22,760,954
CYC Rehabilitation
Facilities
$48,600
$50,000
$98,600
Mariners Park Playground Replacement
Prks /Hrbrs /Bchs
$3,071
$0
$3,071
Newport Coast Community Center Furnishings
Facilities
$253,200
$0
$253,200
Newport Island Park Playground Equipment
Prks /Hrbrs /Bchs
$0
$60,000
$60,000
Oasis Senior Center Retrofit
Facilities
$52,100
$0
$52,100
Department -7
Page Fund Project Title
RecreationlSenior Services continued
Category Rebudget Budget Total
95
7251
C4310708
Parks Grants: ADA Compliance
Prks /Hrbrs /Bchs
$89,977
$0
$89,977
95
7251
C4310885
Parks Grants: Tire Derived Products
Prks /Hrbrs /Bchs
$10,522
$0
$10,522
102
7015
C4120928
Tennis Court Fencing Replacement
Prks /Hrbrs /Bchs
$130,000
$0
$130,000
103
7015
C4120931
West Newport Park at Orange Street Playground Equipment
Prks /Hrbrs /Bchs
$0
$32,000
$32,000
103
7271
04120931
West Newport Park at Orange Street Playground Equipment
Prks /Hrbrs /Bchs
$0
$60,000
$60,000
Total Recreation /Senior Services
$587,470
$202,000
$789,470
Utilities
118
7501
C5500978
Bay Crossings Water Transmission Main Replacement
Water
$300,000
$0
$300,000
84
7015
C5300895
Bonita Creek Park and San Miguel Park Light Replacement
Prks /Hrbrs /Bchs
$125,000
$0
$125,000
122
7531
C5600861
Buck Gully Sewer Force Main Replacement
Wastewater
$0
$350,000
$350,000
119
7501
C6002001
Ocean Birch Drive Water Main Replacement
Water
$0
$414,000
$414,000
123
7531
C7002000
Ocean Front Alley Sewer Lateral Replacement
Wastewater
$0
$250,000
$250,000
120
7501
C6002000
Ocean Front Alley Water Main Replacement
Water
$750,000
$0
$750,000
133
7231
C5400053
Oil Field Improvement Program
Miscellaneous
$453,400
$0
$453,400
124
7532
C5600100
Sewer Pump Station Master Plan Improvements
Wastewater
$200,000
$134,000
$334,000
57
7013
C5300035
Streetlight Replacement Program
Streets /Drainage
$353,500
$240,000
$593,500
125
7531
C5600934
Wastewater Master Plan
Wastewater
$17,200
$50,000
$67,200
121
7503
C5500460
Water Well Rehabilitation
Water
$0
$150,000
$150,000
Total Utilities
$2,199,100
$1,588,000
$3,787,100
Total forAll Funds $17,807,619 $23,664,200 $41,471,819
Department -8
Project Listing by Funding Source
Page
Fund
General Fund
Category
Department
Rebudget
Budget
Total
7011
Facilities Rehab and Remodel
4
C1002002
Corporation Yard Building G Roof Repair and Rehabilitation
Facilities
General Svcs.
$0
$120,000
$120,000
5
C1002001
Corporation Yard Fleet Maintenance Locker Room
Facilities
General Svcs.
$0
$65,000
$65,000
6
C4120806
CYC Rehabilitation
Facilities
Recreation /SS
$48,600
$50,000
$98,600
7
C5100762
Fire Facilities Assessment and Preliminary Design
Facilities
Public Works
$80,000
$200,000
$280,000
8
C2320527
Fire Station 1 Gender Modifications
Facilities
Fire
$0
$180,000
$180,000
9
C2320856
Fire Station 3 Water Pipe Replacement
Facilities
Fire
$0
$30,000
$30,000
12
C5100907
Little Corona Restroom Facility
Facilities
General Svcs.
$46,200
$0
$46,200
14
C4410761
Oasis Senior Center Retrofit
Facilities
Recreation /SS
$52,100
$0
$52,100
18
C1002004
Police Facility Upper Level Office Remodel
Facilities
Police
$0
$50,000
$50,000
19
C1820808
Police Front Lobby Rehabilitation
Facilities
Police
$49,900
$200,000
$249,900
Total Facilities Rehab and Remodel
$276,800
$895,000
$1,171,800
7012
Drainage
42
C5100903
Indian Spring Lane Subdrain
Streets /Drainage
Public Works
$50,000
$0
$50,000
50
C5100915
Polaris Drive and Santiago Drive Subdrain
Streets /Drainage
Public Works
$270,000
$0
$270,000
54
C5100925
Spyglass Hill Road Subdrain
Streets /Drainage
Public Works
$75,000
$0
$75,000
Total Drainage
$395,000
$0
$395,000
7013
Streets
24
C2002000
Arroyo Park Parking Lot Slurry Seal
Streets /Drainage
Public Works
$0
$48,000
$48,000
25
C2002001
Avon Street and Tustin Avenue Parking Lot Slurry Seal
Streets /Drainage
Public Works
$0
$69,000
$69,000
27
C5100277
Balboa Village Alley Replacement
Streets /Drainage
Utilities
$200,000
$0
$200,000
31
C5200932
Coast Highway Median Improvements
Streets /Drainage
Public Works
$410,500
$0
$410,500
33
C2002003
Corona del Mar Area Parking Lots Slurry Seal
Streets /Drainage
Public Works
$0
$120,000
$120,000
Funding -1
Page Fund General Fund
7013 Streets continued
Category Department Rebudget Budget Total
36
C2002007
Dover Drive Medians Renovation
Streets /Drainage
General Svcs.
$0
$125,000
$125,000
37
C5100854
Dover Drive Sidewalk
Streets /Drainage
Public Works
$0
$84,000
$84,000
65
C3002000
Flashing Crosswalk - Newport Boulevard at 23rd Street
Traffic
Public Works
$0
$110,000
$110,000
44
C3170904
Irvine Terrace Landscape Improvements
Streets /Drainage
Public Works
$130,000
$0
$130,000
47
C2001008
Median Maintenance Strips - Citywide
Streets /Drainage
General Svcs.
$0
$200,000
$200,000
67
C5200407
Neighborhood Traffic Management Improvements
Traffic
Public Works
$0
$150,000
$150,000
52
C2002012
San Joaquin Hills Road Median Trees
Streets /Drainage
Public Works
$0
$50,000
$50,000
53
C5100020
Sidewalk, Curb and Gutter Replacement and ADA Impr
Streets /Drainage
General Svcs.
$70,600
$625,000
$695,600
56
C5300035
Streetlight Replacement Program
Streets /Drainage
Utilities
$353,500
$240,000
$593,500
59
C5100738
Via Lido Crib Wall Replacement
Streets /Drainage
Public Works
$79,200
$0
$79,200
61
C2002014
Westcliff Drive Medians Renovation
Streets /Drainage
General Svcs.
$0
$80,000
$80,000
Total Streets
$1,243,800
$1,901,000
$3,144,800
7014 Miscellaneous
104
C5100889
Areas of Special Biological Significance Assessment
Wtr Qual /Environ
Public Works
$0
$100,000
$100,000
107
C5100659
Buck Gully Maintenance Road and Wetland Project
Wtr Qual /Environ
Public Works
$47,500
$0
$47,500
106
C5002018
Buck Gully Resource Management Plan
Wtr Qual /Environ
City Manager
$0
$170,000
$170,000
127
C8002000
CIP Project Management
Miscellaneous
Public Works
$0
$170,000
$170,000
64
02700813
Directional, Wayfinding and Monument Signage
Traffic
Planning
$0
$225,000
$225,000
64
03140789
Directional, Wayfinding and Monument Signage
Traffic
City Manager
$32,500
$0
$32,500
113
C5002000
Newport Coast Runoff Reduction Program
Wtr Qual /Environ
Public Works
$0
$280,000
$280,000
114
C5100912
Newport Coast Watershed Program
Wtr Qual /Environ
Public Works
$93,000
$0
$93,000
115
C5100923
Semeniuk Slough Dredging Project
Wtr Qual /Environ
Public Works
$0
$350,000
$350,000
140
C5100814
Slope Repairs
Miscellaneous
Public Works
$100,000
$0
$100,000
117
C5002017
Upper Bay Comprehensive Resource Management Plan
Wtr Qual /Environ
City Manager
$0
$120,000
$120,000
Total Miscellaneous
$273,000
$1,415,000
$1,688,000
Funding -2
Page
Fund
General Fund
Category
Department
Rebudget
Budget
Total
7015
Parks
78
C3170933
Back Bay View Park Replenishment and Enhancement
Prks /Hrbrs /Bchs
General Svcs.
$46,750
$300,000
$346,750
84
C5300895
Bonita Creek Park and San Miguel Park Light Replacement
Prks /Hrbrs /Bchs
Utilities
$125,000
$0
$125,000
85
C4002000
Buffalo Hills Park Lighting
Prks /Hrbrs /Bchs
Public Works
$0
$215,000
$215,000
86
C3170816
Cliff Drive Park Stairway and Handrail Replacement
Prks /Hrbrs /Bchs
Public Works
$100,000
$100,000
$200,000
111
03130764
Irrigation - Newport Coast Central Computer System
Wtr Qual /Environ
General Svcs.
$0
$100,000
$100,000
89
C5100817
Mariners Park Improvements
Prks /Hrbrs /Bchs
Public Works
$896,200
$0
$896,200
91
C5100909
Mariners Park Restroom Design
Prks /Hrbrs /Bchs
Public Works
$26,000
$0
$26,000
94
C4002001
Newport Island Park Playground Equipment
Prks /Hrbrs /Bchs
Recreation /SS
$0
$60,000
$60,000
102
C4120928
Tennis Court Fencing Replacement
Prks /Hrbrs /Bchs
Recreation /SS
$130,000
$0
$130,000
103
C4120931
West Newport Park at Orange Street Playground Equipment
Prks /Hrbrs /Bchs
Recreation /SS
$0
$32,000
$32,000
Total Parks
$1,323,950
$807,000
$2,130,950
7017
Automation and Communications
82
C4802000
Beach Observation Camera System
Prks /Hrbrs /Bchs
Fire
$0
$38,000
$38,000
126
C2920900
Building Inspection Data Wireless Technology
Miscellaneous
Building
$90,000
$0
$90,000
129
C8002001
Fire Department Technology: Early Notification Alerting
Miscellaneous
Fire
$0
$75,000
$75,000
129
C2310620
Fire Department Technology: Fire Facilities Management
Miscellaneous
Fire
$7,200
$0
$7,200
129
C2310911
Fire Department Technology: FireView Software
Miscellaneous
Fire
$7,680
$11,000
$18,680
10
C1002003
Fire Station 7 Telecommunications and Networking
Facilities
Fire
$0
$55,000
$55,000
11
C1002005
Lifeguard Headquarters Communications Switch
Facilities
Fire
$0
$140,000
$140,000
17
C1810819
Police Facility Security and Jail Video System
Facilities
Police
$40,000
$182,000
$222,000
98
C1820980
Public Safety Beach Camera Monitoring System
Prks /Hrbrs /Bchs
Police
$154,400
$0
$154,400
141
C8002026
Tsunami Warning System
Miscellaneous
Fire
$0
$200,000
$200,000
Total Automation and Communications
$299,280
$701,000
$1,000,280
Funding -3
Page Fund General Fund
7021 Park - In Lieu
93 C4120656 Newport Center Park
101 C5100515 Sunset Ridge Park -
Total Park - In Lieu
Category Department Rebudget Budget Total
Facilities
7019
Capital Purchase and Repair
1
C1002000
Central Library Electrical Repair and Generator
3
C3140363
City Hall Carpet Replacement - Revenue Division
13
C5100977
Newport Coast Community Center Furnishings
15
C1820825
Police Facility Gas Pump Canopy Repair
16
C1820918
Police Facility Generator Replacement
136
C8002003
Public Safety Equipment Storage Module
138
C8002004
Rescue Boat Engine Purchase
$191,165
Miscellaneous
Total Capital Purchase and Repair
7021 Park - In Lieu
93 C4120656 Newport Center Park
101 C5100515 Sunset Ridge Park -
Total Park - In Lieu
Category Department Rebudget Budget Total
Facilities
Library
$0
$50,000
$50,000
Facilities
General Svcs.
$0
$15,000
$15,000
Facilities
Recreation /SS
$253,200
$0
$253,200
Facilities
Police
$25,000
$0
$25,000
Facilities
Police
$76,165
$115,000
$191,165
Miscellaneous
Fire
$0
$15,000
$15,000
Miscellaneous
Fire /Lifeguard
$0
$31,000
$31,000
Prks /Hrbrs /Bchs
Public Works
$354,365
$226,000
$580,365
Prks /Hrbrs /Bchs Public Works $200,000 $0 $200,000
Prks /Hrbrs /Bchs Public Works $150,000 $0 $150,000
$350,000 $0 $350,000
Funding -4
7024
Neighborhood Enhancement
134
C0620935
Parking Meters Replacement
Miscellaneous
Admin. Svcs.
$0
$105,000
$105,000
Total Neighborhood Enhancement
$0
$105,000
$105,000
7028
Oceanfront Encroachment
83
C5100282
Beach Sand Study and Replenishment Program
Prks /Hrbrs /Bchs
Public Works
$0
$200,000
$200,000
49
C5100828
Newport Shores Street End Improvements
Streets /Drainage
Public Works
$15,500
$0
$15,500
69
C5100014
Pedestrian Coastal Access Improvements
Traffic
Public Works
$199,100
$200,000
$399,100
Total Oceanfront Encroachment
$214,600
$400,000
$614,600
Funding -4
Page Fund CDBG Category Department Rebudget Budget Total
7161 CDBG
53 C5100549 Sidewalk, Curb and Gutter Replacement and ADA Impr Streets /Drainage General Svcs. $54,500 $55,000 $109,500
Total CDBG $54,500 $55,000 $109,500
Page Fund Gas Tax Category Department Rebudget Budget Total
7181 Gas Tax
28
C2002002
Bayside Drive Street Rehabilitation
Streets /Drainage
Public Works
$0
$211,000
$211,000
29
C5100830
Birch Street Rehabilitation
Streets /Drainage
Public Works
$293,000
$0
$293,000
30
C5100695
Bridge Seismic Retrofit Construction
Streets /Drainage
Public Works
$312,400
$0
$312,400
128
C5100763
City Aerial Mapping
Miscellaneous
Public Works
$10,000
$0
$10,000
35
C2002006
Dove Street Rehabilitation
Streets /Drainage
Public Works
$0
$97,000
$97,000
38
C2002008
East Bay Avenue and A Street Rehabilitation
Streets /Drainage
Public Works
$0
$113,000
$113,000
40
C2002009
Eastbluff Drive Street Rehabilitation
Streets /Drainage
Public Works
$0
$1,180,000
$1,180,000
41
C5100070
EIR /Preliminary Plans
Streets /Drainage
Public Works
$50,000
$0
$50,000
45
C2002010
Irvine Terrace Slurry Seal
Streets /Drainage
Public Works
$0
$395,000
$395,000
67
C5200407
Neighborhood Traffic Management Improvements
Traffic
Public Works
$49,200
$0
$49,200
68
C5200737
Newport Boulevard Right Turn Lane at Hospital Road
Streets /Drainage
Public Works
$5,300
$0
$5,300
48
C2002011
Newport Heights Slurry Seal
Streets /Drainage
Public Works
$0
$580,000
$580,000
137
C5100733
Records Management
Miscellaneous
Public Works
$10,000
$0
$10,000
55
C5100302
Street and Bikeway Improvements
Streets /Drainage
Public Works
$176,000
$0
$176,000
57
C5100870
Superior Avenue Median Improvements
Streets /Drainage
Public Works
$376,600
$0
$376,600
58
C5100927
Superior Avenue Street Rehabilitation
Streets /Drainage
Public Works
$623,500
$0
$623,500
60
C2002013
West Balboa Boulevard Slurry Seal (12th to 16th Streets)
Streets /Drainage
Public Works
$0
$89,000
$89,000
Total Gas Tax
$1,906,000
$2,665,000
$4,571,000
Funding -5
Page Fund Traffic Congestion Relief Category
7191 Traffic Congestion Relief
29 C5100830 Birch Street Rehabilitation
Total Traffic Congestion Relief
Page
Fund
Tide and Submerged Lands
Category
General Svcs.
7231
Tide and Submerged Lands
$75,000
21
C5100887
26th Street Tidal Structure and Bulkhead Repair
Streets /Drainage
22
C2502000
36th Street and Finley Avenue Bulkhead Repair
Streets /Drainage
23
C2502001
38th Street Tidal Structure/ Motorized Tide Valve
Streets /Drainage
77
C2371834
American Legion Dock Repair
Prks /Hrbrs /Bchs
105
C5100890
Areas of Special Biological Significance Implementation
Wtr Qual /Environ
26
C5100835
Balboa Island Bulkhead Coping Repairs
Streets /Drainage
79
C2370608
Balboa Parking Lot Equipment Replacement Project
Prks /Hrbrs /Bchs
80
C2370892
Balboa Yacht Basin Electrical System Repairs
Prks /Hrbrs /Bchs
81
C2373771
Balboa Yacht Basin Security System
Prks /Hrbrs /Bchs
62
C5100894
Bayside Waterfront Walkway to Balboa Island Bridge
Traffic
106
C5100709
Big Canyon Creek Restoration
Wtr Qual /Environ
87
C5100282
Coastal Sand Replenishment Cooperative Project
Prks /Hrbrs /Bchs
39
C2502002
East Bay Storm Drain Upgrade/ Tidal Valve Installation
Streets /Drainage
88
C2370522
Eelgrass Mitigation Bank
Prks /Hrbrs /Bchs
92
C2371772
Mooring Layout Design
Prks /Hrbrs /Bchs
96
C5100836
Ocean Pier Repairs and Inspection
Prks /Hrbrs /Bchs
133
C5400053
Oil Field Improvement Program
Miscellaneous
97
C4402000
Public Docks Access Improvements
Prks /Hrbrs /Bchs
99
C5100921
Rhine Channel Wharf Repair and Public Dock
Prks /Hrbrs /Bchs
Funding -6
Department Rebudget Budget Total
Public Works
$176,000 $0 $176,000
Department Rebudget Budget Total
General Svcs.
$250,000
$0
$250,000
General Svcs.
$0
$75,000
$75,000
General Svcs.
$0
$135,000
$135,000
City Manager
$15,000
$0
$15,000
Public Works
$56,300
$0
$56,300
Public Works
$160,700
$0
$160,700
City Manager
$0
$70,000
$70,000
City Manager
$65,000
$0
$65,000
City Manager
$33,300
$0
$33,300
Public Works
$40,000
$0
$40,000
Public Works
$41,350
$0
$41,350
City Manager
$0
$100,000
$100,000
General Svcs.
$0
$30,000
$30,000
City Manager
$89,000
$50,000
$139,000
City Manager
$100,000
$0
$100,000
Public Works
$0
$500,000
$500,000
Utilities
$453,400
$0
$453,400
City Manager
$0
$140,000
$140,000
Public Works
$330,000
$0
$330,000
Page
Fund
Tide and Submerged Lands
Category
Department
Rebudget
Budget
Total
7231
Tide and Submerged Lands continued
51
C5100837
Rivo Alto Bulkhead Coping Repairs
Streets /Drainage
Public Works
$108,000
$0
$108,000
116
C0310929
Upper Bay and Harbor Area Management Plan
Wtr Qual /Environ
Public Works
$92,700
$0
$92,700
Total Tide and Submerged Lands
$1,834,750
$1,100,000
$2,934,750
Total Tide and Submerged Lands
$1,834,750
$1,100,000
Page
Fund
Contributions
Category
Department
Rebudget
Budget
Total
7251
Contributions
77
C2371834
American Legion Dock Repair
Prks /Hrbrs /Bchs
City Manager
$65,000
$0
$65,000
30
C5100695
Bridge Seismic Retrofit Construction
Streets /Drainage
Public Works
$1,270,700
$0
$1,270,700
44
C3170904
Irvine Terrace Landscape Improvements
Streets /Drainage
Public Works
$20,000
$0
$20,000
89
C5100817
Mariners Park Improvements
Prks /Hrbrs /Bchs
Public Works
$329,905
$0
$329,905
90
C4120908
Mariners Park Playground Replacement
Prks /Hrbrs /Bchs
Recreation /SS
$3,071
$0
$3,071
93
C4120656
Newport Center Park
Prks /Hrbrs /Bchs
Public Works
$600,000
$0
$600,000
95
C4310708
Parks Grants: ADA Compliance
Prks /Hrbrs /Bchs
Recreation /SS
$89,977
$0
$89,977
95
C4310885
Parks Grants: Tire Derived Products
Prks /Hrbrs /Bchs
Recreation /SS
$10,522
$0
$10,522
19
C1820808
Police Front Lobby Rehabilitation
Facilities
Police
$43,700
$0
$43,700
99
C5100865
Rhine Channel Wharf Repair and Public Dock
Prks /Hrbrs /Bchs
Public Works
$0
$240,000
$240,000
115
C5100923
Semeniuk Slough Dredging Project
WtrQual /Environ
Public Works
$0
$300,000
$300,000
57
C5100870
Superior Avenue Median Improvements
Streets /Drainage
Public Works
$200,000
$0
$200,000
Total Contributions
$2,632,875
$540,000
$3,172,875
7253
Bristol Street Relinquishment
63
C5100898
Bristol Street Sign Bridge Improvements
Traffic
Public Works
$0
$100,000
$100,000
Total Bristol Street Relinquishment
$0
$100,000
$100,000
Funding -7
Fund Contributions Category Department Rebudget Budget Total
7254 PCH Relinquishment
32 C2002005 Coast Highway Sidewalk - Morning Canyon to Seaward Streets /Drainage Public Works $0 $250,000 $250,000
Total PCH Relinquishment $0 $250,000 $250,000
Total Environmental Contributions
Funding -8
$2,299
7255
Environmental Contributions
$69,800
$0
104
C5100889
Areas of Special Biological Significance Assessment
Wtr Qual /Environ
Public Works
107
C5100659
Buck Gully Maintenance Road and Wetland Project
Wtr Qual /Environ
Public Works
109
C2370902
Eelgrass Study
WtrQual /Environ
Public Works
112
C5100969
Irrigation - Smart Controller Program
Wtr Qual /Environ
Public Works
114
C5100912
Newport Coast Watershed Program
Wtr Qual /Environ
Public Works
116
C0310929
Upper Bay and Harbor Area Management Plan
Wtr Qual /Environ
Public Works
Total Environmental Contributions
Funding -8
$2,299
$0
$2,299
$69,800
$0
$69,800
$250,000
$0
$250,000
$142,100
$0
$142,100
$55,000
$0
$55,000
$12,870
$0
$12,870
$532,069
$0
$532,069
Page Fund Transportation and Circulation
Category Department Rebudget Budget Total
Page Fund Building Excise Tax
Category Department Rebudget Budget Total
7261
Transportation and Circulation
64
C2700813
Directional, Wayfinding and Monument Signage
Traffic
Planning
$102,300
$0
$102,300
37
C5100854
Dover Drive Sidewalk
Streets /Drainage
Public Works
$102,645
$0
$102,645
66
C3002001
Iris Avenue and Coast Highway Traffic Signal
Traffic
Public Works
$0
$100,000
$100,000
43
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
Streets /Drainage
Public Works
$330,200
$0
$330,200
46
C5100784
Jamboree Road Bridge Widening
Streets /Drainage
Public Works
$299,100
$0
$299,100
70
C5200699
Traffic Signal Modernization: Ph. 1 Newport Center Area
Traffic
Public Works
$335,000
$0
$335,000
70
C5200852
Traffic Signal Modernization: Ph. 1 Newport Center Area
Traffic
Public Works
$59,400
$0
$59,400
73
C5200408
Traffic Signal Preemption System
Traffic
Public Works
$0
$16,000
$16,000
74
C5200068
Traffic Signal Replacement Program
Traffic
Public Works
$251,800
$0
$251,800
75
C5200143
Transportation Model Maintenance
Traffic
Public Works
$15,000
$0
$15,000
76
C5100793
West Coast Highway Vision Plan
Traffic
Public Works
$80,000
$0
$80,000
Total Transportation and Circulation
$1,575,445
$116,000
$1,691,445
Page Fund Building Excise Tax
Category Department Rebudget Budget Total
Funding -9
7271
Building Excise Tax
2
C4050781
Central Library HVAC Repairs
Facilities
Library
$40,300
$0
$40,300
8
C2320527
Fire Station 1 Gender Modifications
Facilities
Fire
$74,800
$0
$74,800
9
C2320856
Fire Station 3 Water Pipe Replacement
Facilities
Fire
$65,000
$0
$65,000
130
C2320920
Holmatro Tool Replacement
Miscellaneous
Fire
$13,700
$0
$13,700
131
C4009617
Library Public Use Computer Replacement
Miscellaneous
Library
$0
$34,000
$34,000
135
C8002002
Public Safety 800 MHz Radio Exchange
Miscellaneous
Fire
$0
$66,000
$66,000
103
C4120931
West Newport Park at Orange Street Playground Equipment
Prks /Hrbrs /Bchs
Recreation /SS
$0
$60,000
$60,000
Total Building Excise Tax
$193,800
$160,000
$353,800
Funding -9
Page Fund Measure M
7281 Measure M Turnback
34
C2002004
Corona del Mar South of Coast Hwy Street Rehabilitation
66
C3002001
Iris Avenue and Coast Highway Traffic Signal
137
C5100733
Records Management
55
C5100019
Street and Bikeway Improvements
70
C5200852
Traffic Signal Modernization: Ph. 1 Newport Center Area
71
C3002002
Traffic Signal Modernization: Ph. 2 Jamboree Road
72
C3002003
Traffic Signal Modernization: Ph. 3 Airport Area
74
C5200068
Traffic Siqnal Replacement Proqram
Total Measure M Turnback
Category
Streets /Drainage
Traffic
Miscellaneous
Streets /Drainage
Traffic
Traffic
Traffic
Traffic
Page Fund Arterial Highways Rehabilition Program
Category
Department
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Department
Rebudget
$0
$0
$17,000
$0
$0
$0
$0
$0
$17,000
$115,000
$477,285
$0
$592,285
Rebudget
Budget
$1,000,000
$180,000
$0
$200,000
$200,000
$750,000
$150,000
$240,000
$2,720,000
$0
$0
$300,000
$100,000
$400,000
Budget
Total
$1,000,000
$180,000
$17,000
$200,000
$200,000
$750,000
$150,000
$240,000
$2,737,000
$115,000
$477,285
$300,000
$100,000
$992,285
Total
7285 Arterial Highways Rehabilitation Program
29 C5100830 Birch Street Rehabilitation Streets /Drainage Public Works $253,000 $0 $253,000
58 C5100927 Superior Avenue Street Rehabilitation Streets /Drainage Public Works $400,000 $0 $400,000
Total AHRP $653,000 $0 $653,000
Funding -10
7284
Measure M Competitive
46
C5100784
Jamboree Road Bridge Widening
Streets /Drainage
70
C5200852
Traffic Signal Modernization:
Ph. 1 Newport Center Area
Traffic
71
03002002
Traffic Signal Modernization:
Ph. 2 Jamboree Road
Traffic
72
C3002003
Traffic Signal Modernization:
Ph. 3 Airport Area
Traffic
Total Measure M Competitive
Page Fund Arterial Highways Rehabilition Program
Category
Department
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Department
Rebudget
$0
$0
$17,000
$0
$0
$0
$0
$0
$17,000
$115,000
$477,285
$0
$592,285
Rebudget
Budget
$1,000,000
$180,000
$0
$200,000
$200,000
$750,000
$150,000
$240,000
$2,720,000
$0
$0
$300,000
$100,000
$400,000
Budget
Total
$1,000,000
$180,000
$17,000
$200,000
$200,000
$750,000
$150,000
$240,000
$2,737,000
$115,000
$477,285
$300,000
$100,000
$992,285
Total
7285 Arterial Highways Rehabilitation Program
29 C5100830 Birch Street Rehabilitation Streets /Drainage Public Works $253,000 $0 $253,000
58 C5100927 Superior Avenue Street Rehabilitation Streets /Drainage Public Works $400,000 $0 $400,000
Total AHRP $653,000 $0 $653,000
Funding -10
Page Fund Oil Spill Remediation Category Department Rebudget Budget Total
7295 Oil Spill Remediation
132 C5100566 Ocean Safety Operations Techical Equipment Miscellaneous Fire $8,000 $0 $8,000
Total Oil Spill Remediation $8,000 $0 $6,000
Page Fund CIOSA Category Department Rebudget Budget Total
7432 CIOSA
37 C5100854 Dover Drive Sidewalk Streets /Drainage Public Works $278,500 $0 $278,500
43 C5100470 Irvine Avenue Realignment - University Dr to Bristol St Streets /Drainage Public Works $800,000 $0 $800,000
Total CIOSA $1,078,500 $0 $1,078,500
Page
Fund
Santa Ana Heights
Category
Department
Rebudget
Budget
Total
7459
Santa Ana Heights Projects
20
C5100866
Santa Ana Heights Equestrian Facilities
Facilities
City Manager
$81,650
$0
$81,650
100
C5100867
Santa Ana Heights Mesa -Birch Park
Prks /Hrbrs /Bchs
City Manager
$219,750
$128,000
$347,750
139
C5100879
Santa Ana Heights Utility Undergrounding
Miscellaneous
City Manager
$11,200
$7,400,000
$7,411,200
Total Santa Ana Heights Projects
$312,600
$7,528,000
$7,840,600
Funding -11
Page Fund Water Enterprise
Category Department Rebudget Budget Total
Page
7501
Water Distribution and Piping
Category
Department
Rebudget
Budget
Total
27
C5100277
Balboa Village Alley Replacement
Water
Public Works
$200,000
$0
$200,000
118
C5500978
Bay Crossings Water Transmission Main Replacement
Water
Utilities
$300,000
$0
$300,000
107
C5100659
Buck Gully Maintenance Road and Wetland Project
Wtr Qual /Environ
Public Works
$0
$135,000
$135,000
119
C6002001
Ocean Birch Drive Water Main Replacement
Water
Utilities
$0
$414,000
$414,000
120
C6002000
Ocean Front Alley Water Main Replacement
Water
Utilities
$750,000
$0
$750,000
Total Water Distribution and Piping
$1,250,000
$549,000
$1,799,000
7503
Pumping and Operating
110
C5500637
Irrigation - Citywide Central Computer System
Wtr Qual /Environ
General Svcs.
$0
$90,000
$90,000
121
C5500460
Water Well Rehabilitation
Water
Utilities
$0
$150,000
$150,000
Total Pumping and Operating
$0
$240,000
$240,000
Page
Fund
Wastewater Enterprise
Category
Department
Rebudget
Budget
Total
7531
Sewer Main Replacement
122
05600861
Buck Gully Sewer Force Main Replacement
Wastewater
Utilities
$0
$350,000
$350,000
123
C7002000
Ocean Front Alley Sewer Lateral Replacement
Wastewater
Utilities
$0
$250,000
$250,000
57
C5600292
Superior Avenue Median Improvements
Streets /Drainage
Public Works
$50,000
$0
$50,000
125
C5600934
Wastewater Master Plan
Wastewater
Utilities
$17,200
$50,000
$67,200
Total Sewer Main Replacement
$67,200
$650,000
$717,200
Funding -12
7532 Sewer Pump Station Improvement
124 C5600100 Sewer Pump Station Master Plan
Total Sewer Pump Station Improvement
Total for All Funds
Wastewater Utilities $200.000 $134,000
$200,000 $134,000
Funding -13
$334,000
$334,000
$17,814,819 $23,657,000 $41,471,819
Project Fund Summary
Fund Funding Source
FY 2007 -2008 Adopted Budget
010 General Fund
Rebudget
Budget
Total
7011
Facilities Rehab and Remodel
$276,800
$895,000
$1,171,800
7012
Drainage
$395,000
$0
$395,000
7013
Streets
$1,243,800
$1,901,000
$3,144,800
7014
Miscellaneous
$273,000
$1,415,000
$1,688,000
7015
Parks
$1,323,950
$807,000
$2,130,950
7017
Automation and Communications
$299,280
$701,000
$1,000,280
7019
Capital Purchase and Repair
$354,365
$226,000
$580,365
7021
Park - In Lieu
$350,000
$0
$350,000
7024
Neighborhood Enhancement
$0
$105,000
$105,000
7028
Oceanfront Encroachment
$214,600
$400,000
$614,600
Total General Fund $4,730,795
$6,450,000
$11,180,795
160 CDBG Rebudget Budget Total
7161 CDBG $54,500 $55,000 $109,500
180 Gas Tax
7181 Gas Tax
Total CDBG $54,500 $55,000 $109,500
Total Gas Tax
Summary-1
Rebudget
$1,906,000
Budget
$2,665,000
$1,906,000
$2,665,000
Total
$4,571.000
$4,571,000
Fund Fundina Source FY 2007 -2008 Adopted B
190 Traffic Congestion Relief Rebudget Budget Total
7191 Traffic Congestion Relief $176,000 $0 $176,000
Total Traffic Congestion Relief $176,000 $0 $176,000
230 Tide and Submerged Lands Rebudget Budget Total
7231 Tide and Submerged Lands $1,834,750 $1,100,000 $2,934,750
Total Tide and Submerged Lands $1,834,750 $1,100,000 $2,934,750
250 Contributions
Rebudget
Budget
Total
7251
Contributions
$2,632,875
$540,000
$3,172,875
7253
Bristol Street Relinquishment
$0
$100,000
$100,000
7254
PCH Relinquishment
$0
$250,000
$250,000
7255
Environmental Contributions
$532,069
$0
$532,069
Total Contributions $3,164,944
$890,000
$4,054,944
260 Transportation and Circulation
Rebudget
Budget
Total
7261 Transportation and Circulation
$1,575,445
$116,000
$1,691,445
Total Transportation and Circulation
$1,575,445
$116,000
$1,691,445
Summary-2
Fund Funding Source FY 2007 -2008 Adopted Budget
270 Building Excise Tax Rebudget Budget Total
7271 Building Excise Tax $193,800 $160,000 $353,800
Total Building Excise Tax $193,800 $160,000 $353,800
280 Measure M Rebudget Budget Total
7281 Measure M Turnback $17,000 $2,720,000 $2,737,000
7284 Measure M Competitive $592,285 $400,000 $992,285
Total Measure M $609,285 $3,120,000 $3,729,285
285 Arterial Highways Rehabilitation Program Rebudget Budget Total
7285 AHRP $653,000 $0 $653,000
Total AHRP $653,000
$0 $653,000
295 Oil Spill Remediation Rebudget Budget Total
7295 Oil Spill Remediation $8,000 $0 $8,000
Total Oil Spill Remediation $8,000 $0 $8,000
430 CIOSA
7432 CIOSA
Rebudget Budget Total
$1,078,500 $0 $1,078,500
Total CIOSA $1,078,500
Summary-3
$0 $1,078,500
Fund Fundina Source FY 2007 -2008 Adopted B
459 Santa Ana Heights
7459 Santa Ana
Rebudget Budget
$312,600 $7.528,000
Total Santa Ana Heights $312,600 $7,528,000
Total
$7,840,600
$7,840,600
500 Water Enterprise Rebudget Budget Total
7501 Water Distribution and Piping $1,250,000 $549,000 $1,799,000
7503 Pumping and Operating $0 $240,000 $240,000
Total Water Enterprise $1,250,000 $789,000 $2,039,000
530 Wastewater Enterprise Rebudget Budget Total
7531 Sewer Main Replacement $67,200 $650,000 $717,200
7532 Sewer Pump Station Improvement $200,000 $134,000 $334,000
Total Wastewater Enterprise $267,200 $784,000 $1,051,200
Total forAll CIP Projects $17,814,819 $23,657,000 $41,471,819
Summary-4
Facilities
Page Fund Project Title
1
7019
C1002000
Central Library Electrical Repair and Generator
2
7271
C4050781
Central Library HVAC Repairs
3
7019
C3140363
City Hall Carpet Replacement - Revenue Division
4
7011
C1002002
Corporation Yard Building G Roof Repair and Rehabilitation
5
7011
C1002001
Corporation Yard Fleet Maintenance Locker Room
6
7011
C4120806
CYC Rehabilitation
7
7011
C5100762
Fire Facilities Assessment and Preliminary Design
8
7011
C2320527
Fire Station 1 Gender Modifications
8
7271
C2320527
Fire Station 1 Gender Modifications
9
7011
C2320856
Fire Station 3 Water Pipe Replacement
9
7271
C2320856
Fire Station 3 Water Pipe Replacement
10
7017
C1002003
Fire Station 7 Telecommunications and Networking
11
7017
C1002005
Lifeguard Headquarters Communications Switch
12
7011
C5100907
Little Corona Restroom Facility
13
7019
C5100977
Newport Coast Community Center Furnishings
14
7011
C4410761
Oasis Senior Center Retrofit
15
7019
C1820825
Police Facility Gas Pump Canopy Repair
16
7019
C1820918
Police Facility Generator Replacement
17
7017
C1810819
Police Facility Security and Jail Video System
18
7011
C1002004
Police Facility Upper Level Office Remodel
19
7011
C1820808
Police Front Lobby Rehabilitation
19
7251
C1820808
Police Front Lobby Rehabilitation
20
7459
C5100866
Santa Ana Heights Equestrian Facilities
Total Facilities
Department
Rebudget
Budget
Total
Library
$0
$50,000
$50,000
Library
$40,300
$0
$40,300
General Svcs.
$0
$15,000
$15,000
General Svcs.
$0
$120,000
$120,000
General Svcs.
$0
$65,000
$65,000
Recreation /SS
$48,600
$50,000
$98,600
Public Works
$80,000
$200,000
$280,000
Fire
$0
$180,000
$180,000
Fire
$74,800
$0
$74,800
Fire
$0
$30,000
$30,000
Fire
$65,000
$0
$65,000
Fire
$0
$55,000
$55,000
Fire
$0
$140,000
$140,000
General Svcs.
$46,200
$0
$46,200
Recreation /SS
$253,200
$0
$253,200
Recreation /SS
$52,100
$0
$52,100
Police
$25,000
$0
$25,000
Police
$76,165
$115,000
$191,165
Police
$40,000
$182,000
$222,000
Police
$0
$50,000
$50,000
Police
$49,900
$200,000
$249,900
Police
$43,700
$0
$43,700
City Manager
$81,650
$0
$81,650
$976,615
$1,452,000
$2,428,615
Central Library Electrical Repair and Generator
Requesting Department: Library
Category: Facilities
This project includes replacement of the light switch panels at the Central Library and upgrade of the current battery backup in the computer
room. The new UPS backup unit will be able to address the growing number of servers and computer equipment in use at the Central
Library and will ensure the safety of the Library's data and equipment. Also included in this project is the installation of a new backup
generator used to keep the sump pumps running during a power outage.
Location:
Central Library - 1000 Avocado Street
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$50,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$50,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7019
C1002000
$0
$50,000
$0
$0
$0
$0
TOTAL
$0
$50,000
PROJECT TOTAL $50,000
Central Library HVAC Repairs
Requesting Department: Library Category: Facilities
The HVAC at the Central Library is deteriorated and needs three specific repairs to continue proper functioning. SCAQMD requires
replacement or retrofit of the boiler. The copper condenser coils on the HVAC chiller have eroded in the marine environment and need to
be replaced ($27,000 for two coils and $40,000 for four coils). The HVAC hot water check system valves need to be repaired to allow the
alternate use of the two valves and efficient use of the equipment.
Location:
Central Library - 1000 Avocado Street
Funding:
Building Excise Tax
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$40,300
$0
$0
$0
$0
Total
$40,300
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
BET
7271
C4050781
$40,300
$0
$0
$0
$0
$0
TOTAL
$40,300
$0
PROJECT TOTAL $40,300
2
City Hall Carpet Replacement - Revenue Division
Requesting Department: General Services
Category: Facilities
This project will provide for replacement of carpeting in the Revenue Division of Building B at City Hall.
Location:
City Hall - 3300 Newport Boulevard
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$15,000
$0
$0
$0
$0
Total
$15,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7019
C3140363
$0 $15,000
$0 $0
TOTAL
$0 $15,000
PROJECT TOTAL 1 $15,000
3
Corporation Yard Building G Roof Repair and Rehabilitation
Requesting Department: General Services
Category: Facilities
This project involves the rehabilitation of Building G in the Corporation Yard. A section of the steel roof structure purlins, gable trim, valley
gutters, painting, and bird netting will be repaired and replaced and new office areas will be constructed.
Location:
Corporation Yard - 592 Superior Avenue
Funding:
General Fund
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $120,000
Other $0
Total $120,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7011
C1002002
$0
$120,000
$0 $0
$0 $0
TOTAL
$0 $120,000
PROJECT TOTAL 1 $120,000
4
Corporation Yard Fleet Maintenance Locker Room
Requesting Department: General Services Category: Facilities
This project will provide for the renovation of restrooms and the locker room area in the Automotive Shop of the Corporation Yard Building
D. Current locker room and restroom space is undersized. The area for locker space will be expanded to accommodate 16 fleet
maintenance staff members. An architect and private contractor will perform various services for the project, including design, demolition,
construction, and plumbing.
Location:
Corporation Yard - 592 Superior Avenue
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$65,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$65,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7011
C1002001
$0
$65,000
$0
$0
$0
$0
TOTAL
$0
$65,000
PROJECT TOTAL $65,000
s
Community Youth Center (CYC) Rehabilitation
Requesting Department: Recreation / Senior Services Category: Facilities
This project provides for the construction of safety glass walls and doors to create three separate rooms for classes. The first phase will
consist of adding safety glass walls and doors to structure the enclosed classrooms. Some duct work will have to be done to allow proper
flow of the HVAC system. The second phase would be to reseal all of the skylights and make necessary roof repairs to correct leaks
occuring at the center.
Location:
Community Youth Center
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$98,600
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$98,600
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7011
C4120806
$48,600
$50,000
$0
$0
$0
$0
TOTAL
$48,600
$50,000
PROJECT TOTAL $98,600
0
Fire Facilities Assessment and Preliminary Design
Requesting Department: Public Works Category: Facilities
This project provides for a needs assessment to be performed to address the condition of existing fire facilities and establish a long -term
building replacement program. Preliminary design is included in this project. Future years will include design and construction of
recommended replacement facilities and assessment of other city facilities.
Location:
n/a
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$280,000
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$280,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7011
C5100762
$80,000
$200,000
$0
$0
$0
$0
TOTAL
$80,000
$200,000
PROJECT TOTAL 1 $280,000
7
Fire Station 1 Gender Modifications
Requesting Department: Fire Category: Facilities
This project provides for gender modifications to the existing configuration of Fire Station No. 1 to allow for separate male and female
facilities, including separate restrooms and privacy areas for sleeping and dressing.
Location:
Fire Station No. 1 - 110 Balboa Boulevard East
Funding:
General Fund and Building Excise Tax
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $254,800
Other $0
Total $254,800
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7011
C2320527
$0
$180,000
BET
7271
C2320527
$74,8001
$0
$0
$0
TOTAL
$74,800
$180,000
PROJECT TOTAL 1 $254,800
0
Fire Station 3 Water Pipe Replacement
Requesting Department: Fire Category: Facilities
This project will re -pipe the hot and cold water supply in Fire Station No. 3. The hot water will be zoned using tankless or high efficiency hot
water heaters to reduce the cost of day -to -day operations. The station is experiencing several leaks each year due to the age of the
building. Repairing the pipes will be cost effective compared to handling the leaks on an emergency basis and should help to minimize
outages and related property damage.
Location:
Fire Station No. 3 - 868 Santa Barbara Drive
Funding:
General Fund and Building Excise Tax
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$95,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$95,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7011
C2320856
$0
$30,000
BET
7271
C2320856
$65,000
$0
$0
$0
TOTAL
$65,000
$30,000
PROJECT TOTAL $95,000
0
Fire Station 7 Telecommunications and Networking
Requesting Department: Fire
Category: Facilities
This project provides basic communications and high -speed networking for broadband applications such as streaming video for training and
EOC communications from Fire Station No. 7 to City Hall, Utilities Yard, and General Services Yard. It is proposed to use licensed
microwave. This proposal is an extension of the City's broadband licensed microwave wide area network (WAN) and complies with the
City's IT Division recommendations.
Location:
Fire Station No. 7 - 20401 Acacia Avenue
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$55,000
$0
$0
$0
$0
Total
$55,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7017
C1002003
$0
$55,000
$0
$0
$0
$0
TOTAL
$0
$55,000
PROJECT TOTAL $55,000
10
Lifeguard Headquarters Communications Switch
Requesting Department: Fire
Category: Facilities
This project will replace the existing telephone switch with a digital switch that will allow for wireless circuits for tower and lifeguard dispatch
communications. The switch will significantly reduce telephone system maintenance and service costs.
Location:
Lifeguard Headquarters - 70 Newport Pier
Funding:
General Fund
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $140,000
Other $0
Total $140,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7017
C1002005
$0
$140,000
$0
$0
$0
$0
TOTAL
$0
$140,000
PROJECT TOTAL 1 $140,000
11
Little Corona Restroom Facility
Requesting Department: General Services Category: Facilities
The project would provide for the design and Coastal Permit processing to replace an undersized 1956 masonry restroom facility that is
heavily used by students and beach visitors. The current facility has two fixtures on the women's side and two fixtures on the men's side.
The 338 - square foot facility would be replaced with a 700- square foot facility which would double the capacity of the restrooms and would
make the facility ADA compliant.
Location:
Little Corona Beach
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$46,200
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$46,200
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7011
C5100907
$46,200
$0
$0
$0
$0
$0
TOTAL
$46,200
$0
PROJECT TOTAL $46,200
12
Newport Coast Community Center Furnishings
Requesting Department: Recreation / Senior Services
Category: Facilities
The Newport Coast Community Center is expected to be completed in September 2007. This project provides for furniture, fixtures and
equipment for the new center, including but not limited to furniture, computer equipment and connections, AV and sound equipment, stage
lighting, security systems, signs, and recreational equipment.
Location:
Newport Coast Community Center - 6401 San Joaquin Hills Road
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$253,200
$0
$0
$0
$0
Total
$253,200
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7019
C5100977
$253,200
$0
$0
$0
$0
$0
TOTAL
$253,200
$0
PROJECT TOTAL 1 $253,200
13
Oasis Senior Center Retrofit
Requesting Department: Recreation / Senior Services Category: Facilities
The Oasis Senior Center has two sets of front doors that are manually operated. An automated door is proposed to be installed to
accomodate visitors that use walkers and wheelchairs. This door would be relocated to the center of the lobby and would be a sliding style
so as not to interfere with the ingress and egress of seniors. Construction includes refacing the front of the building to include the
installation of an electric door. The flooring in the lobby will also be replaced as part of this project.
Location:
Oasis Senior Center - 800 Marguerite Avenue
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$52,100
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$52,100
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7011
C4410761
$52,100
$0
$0
$0
$0
$0
TOTAL
$52,100
$0
PROJECT TOTAL $52,100
14
Police Facilty Gas Pump Canopy
Requesting Department: Police Category: Facilities
This project will involve the replacement of the existing gas pump canopy just north of the Police Facility. This canopy is subjected to
intense downdraft force from the police helicopter as it approaches the rooftop helipad. The current structure is not designed to withstand
the intense downdraft of the helicopter and has been recommended for replacement or retrofit.
Location:
Police Facility - 870 Santa Barbara Drive
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$25,000
$0
$0
$0
$0
Total
$25,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7019
C1820825
$25,000
$0
$0
$0
$0
$0
TOTAL
$25,000
$0
PROJECTTOTALI $25,000
15
Police Facility Generator Replacement
Requesting Department: Police
Category: Facilities
This project involves the replacement of the existing emergency generator and electrical service panels. In the event of a loss of electric
power, the emergency generator supports all of the essential functions including the emergency operations center, dispatch center and jail.
The existing emergency generator and electrical service panels are insufficient to support the current emergency operational needs.
Location:
Police Facility - 870 Santa Barbara Drive
Funding:
General Fund
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2007 -08 FY 2008 -09 FY 2010 -11 FY 2011 -12 FY 2012 -13
$0
$0
$0
$191.165
$191,165
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
M
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7019
C1820918
$76,165
$115,000
$0
$0
$0
$0
TOTAL
$76,165
$115,000
PROJECT TOTAL 1 $191,165
M
Police Facility Security and Jail Video System
Requesting Department: Police
Category: Facilities
This project will replace an existing video monitoring system within the Police Jail Facility with a digital video and audio recording system.
To minimize liability exposure, all activity is monitored and recorded via an extensive video camera system. The current system is an
outdated VHS system which does not provide for simultaneous video and audio recording and is difficult to support due to the age of the
equipment. Technological advances in the area will allow for increased functionality for custodial staff and for management to investigate
allegations and claims against the City.
Location:
Police Facility - 870 Santa Barbara Drive
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$222,000
$0
$0
$0
$0
Total
$222,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7017
C1810819
$40,000
$182,000
$0
$0
$0
$0
TOTAL
$40,000
$182,000
PROJECT TOTAL 1 $222,000
17
Police Facility Upper Level Office Remodel
Requesting Department: Police
Category: Facilities
Several areas of the Police Department are in need of moderate rehabilitation to improve a variety of ergonomic functions as well as office
workspace dynamics and general appearance.
Location:
Police Facility - 870 Santa Barbara Drive
Funding:
General Fund
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $50,000
Other $0
Total $50,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7011
C1002004
$0
$50,000
$0 $0
$0 $0
TOTAL
$0 $50,000
PROJECT TOTAL 1 $50,000
18
Police Front Lobby Rehabilitation
Requesting Department: Police Category: Facilities
This project involves the rehabilitation of the Police Facility front lobby and includes the addition of display enclosures to preserve and
exhibit historical artifacts associated with the Newport Beach Police Department. The project involves fixing ceilings, walls and flooring to
allow for better interaction with the public. A portion of the project is privately funded to include a NBPD historical museum to consist of two
enclosed display cases on either side of the lobby.
Location:
Police Facility - 870 Santa Barbara Drive
Funding:
General Fund and Contributions (private donor)
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$293,600
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$293,600
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7011
C1820808
$49,900
$200,000
Contributions
7251
C1820808
$43,700
$0
$0
$0
TOTAL
$93,600 $200,000
PROJECT TOTAL $293,600
19
Santa Ana Heights Equestrian Facilities
Requesting Department: City Manager Category: Facilities
This project provides for the design and construction of equestrian facilities in Santa Ana Heights, including up to three horse arena /rings
and related infrastructure (footings, water quality protective measures, landscaping, seating area, and more). The project will be
constructed on land owned by the Orange County Flood Control District (OCFCD). The completed project will be managed by the Back Bay
Equestrians, a local non - profit equestrian group, with City oversight.
Location:
East of the Santa Ana /Delhi Flood Control Channel between Mesa Drive and Upper Newport Bay in Santa Ana Heights
Funding:
Contributions (County of Orange Redevelopment Agency)
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$81,650
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$81,650
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Contributions
7459
C5100866
$81,650
$0
$0
$0
$0
$0
TOTAL
$81,650
$0
PROJECTTOTALI $81,650
20
Streets and Drainage
Page Fund Project Title
Department Rebudget Budget Total
21
7231
C5100887
26th Street Tidal Structure and Bulkhead Repair
General Svcs.
$250,000
$0
$250,000
22
7231
C2502000
36th Street and Finley Avenue Bulkhead Repair
General Svcs.
$0
$75,000
$75,000
23
7231
C2502001
38th Street Tidal Structure/ Motorized Tide Valve
General Svcs.
$0
$135,000
$135,000
24
7013
C2002000
Arroyo Park Parking Lot Slurry Seal
Public Works
$0
$48,000
$48,000
25
7013
C2002001
Avon Street and Tustin Avenue Parking Lot Slurry Seal
Public Works
$0
$69,000
$69,000
26
7231
C5100835
Balboa Island Bulkhead Coping Repairs
City Manager
$160,700
$0
$160,700
27
7013
C5100277
Balboa Village Alley Replacement
Public Works
$200,000
$0
$200,000
27
7501
C5100277
Balboa Village Alley Replacement
Public Works
$200,000
$0
$200,000
28
7181
C2002002
Bayside Drive Street Rehabilitation
Public Works
$0
$211,000
$211,000
29
7181
C5100830
Birch Street Rehabilitation
Public Works
$293,000
$0
$293,000
29
7191
C5100830
Birch Street Rehabilitation
Public Works
$176,000
$0
$176,000
29
7285
C5100830
Birch Street Rehabilitation
Public Works
$253,000
$0
$253,000
30
7181
C5100695
Bridge Seismic Retrofit Construction
Public Works
$312,400
$0
$312,400
30
7251
C5100695
Bridge Seismic Retrofit Construction
Public Works
$1,270,700
$0
$1,270,700
31
7013
C5200932
Coast Highway Median Improvements
Public Works
$410,500
$0
$410,500
32
7254
C2002005
Coast Highway Sidewalk - Morning Canyon to Seaward
Public Works
$0
$250,000
$250,000
33
7013
C2002003
Corona del Mar Area Parking Lots Slurry Seal
Public Works
$0
$120,000
$120,000
34
7281
C2002004
Corona del Mar South of Coast Hwy Street Rehabilitation
Public Works
$0
$1,000,000
$1,000,000
35
7181
C2002006
Dove Street Rehabilitation
Public Works
$0
$97,000
$97,000
36
7013
C2002007
Dover Drive Medians Renovation
General Svcs.
$0
$125,000
$125,000
37
7013
C5100854
Dover Drive Sidewalk
Public Works
$0
$84,000
$84,000
37
7261
C5100854
Dover Drive Sidewalk
Public Works
$102,645
$0
$102,645
37
7432
C5100854
Dover Drive Sidewalk
Public Works
$278,500
$0
$278,500
38
7181
C2002008
East Bay Avenue and A Street Rehabilitation
Public Works
$0
$113,000
$113,000
39
7231
C2502002
East Bay Storm Drain Upgrade/ Tidal Valve Installation
General Svcs.
$0
$30,000
$30,000
40
7181
C2002009
Eastbluff Drive Street Rehabilitation
Public Works
$0
$1,180,000
$1,180,000
41
7181
C5100070
EIR/Preliminary Plans
Public Works
$50,000
$0
$50,000
42
7012
C5100903
Indian Spring Lane Subdrain
Public Works
$50,000
$0
$50,000
43
7261
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
Public Works
$330,200
$0
$330,200
Streets and Drainage continued
Page Fund Project Title
43
7432
C5100470
44
7013
C3170904
44
7251
C3170904
45
7181
C2002010
46
7261
C5100784
46
7284
C5100784
47
7013
C2001008
48
7181
C5200737
49
7181
C2002011
50
7028
C5100828
51
7012
C5100915
52
7231
C5100837
53
7013
C2002012
54
7013
C5100020
54
7161
C5100549
55
7012
C5100925
56
7181
C5100302
56
7281
C5100019
57
7013
C5300035
58
7181
C5100870
58
7251
C5100870
58
7531
C5600292
59
7181
C5100927
59
7285
C5100927
60
7013
C5100738
61
7181
C2002013
62
7013
C2002014
Irvine Avenue Realignment - University Dr to Bristol St
Irvine Terrace Landscape Improvements
Irvine Terrace Landscape Improvements
Irvine Terrace Slurry Seal
Jamboree Road Bridge Widening
Jamboree Road Bridge Widening
Median Maintenance Strips - Citywide
Newport Boulevard Right Turn Lane at Hospital Road
Newport Heights Slurry Seal
Newport Shores Street End Improvements
Polaris Drive and Santiago Drive Subdrain
Rive Alto Bulkhead Coping Repairs
San Joaquin Hills Road Median Trees
Sidewalk, Curb and Gutter Replacement and ADA Impr
Sidewalk, Curb and Gutter Replacement and ADA Impr
Spyglass Hill Road Subdrain
Street and Bikeway Improvements
Street and Bikeway Improvements
Streetlight Replacement Program
Superior Avenue Median Improvements
Superior Avenue Median Improvements
Superior Avenue Median Improvements
Superior Avenue Street Rehabilitation
Superior Avenue Street Rehabilitation
Via Lido Crib Wall Replacement
West Balboa Boulevard Slurry Seal (12th to 16th Streets)
Westcliff Drive Medians Renovation
Total Streets and Drainage
Department
Rebudget
Budget
Total
Public Works
$800,000
$0
$800,000
Public Works
$130,000
$0
$130,000
Public Works
$20,000
$0
$20,000
Public Works
$0
$395,000
$395,000
Public Works
$299,100
$0
$299,100
Public Works
$115,000
$0
$115,000
General Svcs.
$0
$200,000
$200,000
Public Works
$5,300
$0
$5,300
Public Works
$0
$580,000
$580,000
Public Works
$15,500
$0
$15,500
Public Works
$270,000
$0
$270,000
Public Works
$108,000
$0
$108,000
Public Works
$0
$50,000
$50,000
General Svcs.
$70,600
$625,000
$695,600
General Svcs.
$54,500
$55,000
$109,500
Public Works
$75,000
$0
$75,000
Public Works
$176,000
$0
$176,000
Public Works
$0
$200,000
$200,000
Utilities
$353,500
$240,000
$593,500
Public Works
$376,600
$0
$376,600
Public Works
$200,000
$0
$200,000
Public Works
$50,000
$0
$50,000
Public Works
$623,500
$0
$623,500
Public Works
$400,000
$0
$400,000
Public Works
$79,200
$0
$79,200
Public Works
$0
$89,000
$89,000
General Svcs.
$0
$80,000
$80,000
$8,559,445
$6,051,000
$14,610,445
26th Street Tidal Structure and Bulkhead Repair
Requesting Department: General Services
Category: Streets and Drainage
The project replaces a 1993 manually operated 30" Waterman tide valve, tidal stucture, piping, bulkhead, and coping which are nearing the
end of their useful lives resulting from exposure in a marine environment. This project provides for the construction of a new tidal structure,
coping, bulkhead, and the installation of a new 24" tide gate, motor, pedestal and associated piping.
Location:
26th Street
Funding:
Tide and Submerged Lands
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $250,000
Other $0
Total $250,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C5100887
$250,000
$0
$0
$0
$0
$0
TOTAL
$250,000
$0
PROJECT TOTAL 1 $250,000
21
36th Street and Finley Avenue Bulkhead Repair
Requesting Department: General Services
Category: Streets and Drainage
This project provides for the repair or replacement of a bulkhead that is cracked and has separated from an adjoining bulkhead on private
property. Additionally, old concrete blocks have begun to crack and need to be replaced with concrete poured in place.
Location:
36th Street and Finley Avenue
Funding:
Tide and Submerged Lands
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $75,000
Other $0
Total $75,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C2502000
$0
$75,000
$0
$0
$0
$0
TOTAL
$0
$75,000
PROJECT TOTAL $75,000
22
38th Street Tidal Structure / Motorized Tide Valve
Requesting Department: General Services
Category: Streets and Drainage
This project will replace a manually operated 30 -inch Fresno tide valve and tidal structure that is aging and exposed to a marine
environment. The valve is opened and closed an average of 20 days per month, is constantly submerged in salt water, and is instrumental
in keeping the area of 38th Street and Balboa Boulevard dry during high tides. This project will provide for the construction of a new tidal
structure with a stainless steel interior ladder and the installation of a new 24 -inch Waterman tide gate, auma motor, and pedestal.
Location:
38th Street between River Avenue and Lake Avenue
Funding:
Tide and Submerged Lands
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$135,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$135,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C2502001
$0
$135,000
$0
$0
$0
$0
TOTAL
$0
$135,000
PROJECT TOTAL 1 $135,000
23
Arroyo Park Parking Lot Slurry Seal
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for the application of a slurry seal to the existing parking lot at Arroyo Park. City staff will prepare plans and
specifications. Construction will be performed by a private contractor.
Location:
Arroyo Park - 1411 Bayswater Drive
Funding:
General Fund
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $48,000
Other $0
Total $48,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002000
$0
$48,000
$0
$0
$0
$0
TOTAL
$0
$48,000
PROJECT TOTAL $48,000
24
Avon Street and Tustin Avenue Parking Lot Slurry Seal
Requesting Department: Public Works Category: Streets and Drainage
This project provides for the application of a slurry seal to the existing parking lot. Minor roadway crack sealing and reconstruction are also
included. City staff will prepare plans and specifications. Construction will be performed by a private contractor.
Location:
Avon Street and Tustin Avenue
Funding:
General Fund
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $69,000
Other $0
Total $69,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002001
$0
$69,000
$0
$0
$0
$0
TOTAL
$0
$69,000
PROJECT TOTAL $69,000
25
Balboa Island Coping Repairs
Requesting Department: City Manager Category: Streets and Drainage
This project will remove and reconstruct bulkhead copings at various locations around Balboa and Little Balboa Islands.
Location:
To be determined by consultant's study
Funding:
Tide and Submerged Lands
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $160,700
Other $0
Total $160,700
FY 2008 -09
$0
$0
$0
a
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET $ BUDGET $
Tide and Submerged Lands 7231 C5100835 $160,700 9
TOTAL I $160,700 $0
PROJECT TOTAL 1 $160,700
KV
Balboa Village Alley Replacement
Requesting Department: Public Works
Category: Streets and Drainage
This program provides for the reconstruction of existing asphalt alleys throughout the City with concrete. Priority will be given to areas
where other projects are planned, such as undergrounding districts, water, or sewer main replacement projects. This year's project focuses
on alleys impacted by the water main and undergrounding district construction (Assessment District No. 75) in the Balboa Village area. The
plans and specifications are to be provided by Public Works staff. Construction will be performed by a private contractor.
Location:
Ocean Front Alley between A Street and Adams Street
Funding:
General Fund and Water Enterprise Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$400,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$400,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C5100277
$200,000
$0
Water Enterprise
7501
C5100277
$200,000
$0
$0
$0
TOTAL
$400,000
$0
PROJECT TOTAL 1 $400,000
27
Bayside Drive Street Rehabilitation
Requesting Department: Public Works Category: Streets and Drainage
This project will provide a grind and overlay of the street with rubberized asphalt concrete and remove and replace deteriorated concrete
improvements. City staff will prepare plans and specifications. Construction will be performed by a private contractor.
Location:
Bayside Drive - Jamboree Road to El Paseo Drive
Funding:
Gas Tax
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $211,000
Other $0
Total $211,000
FUNDING SOURCE
Gas Tax
FY 2008 -09
$0
$0
$0
a
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
DIVISION NO. PROJECT NO. REBUDGET $
7181 C2002002 $0
$0
FY 2012 -13
$0
$0
$0
$0
$0
BUDGET $
$211,000
M1
TOTAL I $0 $211,000
PROJECT TOTAL 1 $211,000
28
Birch Street Rehabilitation
Requesting Department: Public Works Category: Streets and Drainage
This project will grind and overlay the street with rubberized asphalt concrete and remove and replace deteriorated crossgutter, curb, gutter
and sidewalk. City staff will prepare plans and specifications. Construction will be performed by a private contractor.
Location:
Birch Street - Bristol Street North to MacArthur Boulevard
Funding:
Gas Tax, Traffic Congestion Relief and AHRP
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $722,000
Other $0
Total $722,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
Gas Tax
Traffic Congestion Relief
AHRP
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
7181
C5100830
$293,000
$0
7191
C5100830
$176,000
$0
7285
C5100830
$253,0001
$0
TOTAL
$722,000
$0
PROJECT TOTAL 1 $722,000
29
Bridge Seismic Retrofit Construction
Requesting Department: Public Works
Category: Streets and Drainage
This project will retrofit three City -owned bridges that are deemed "subject to collapse" according to Caltrans' analytical procedures. The
City has completed a seismic study of the bridges and has been notified by Caltrans to proceed with the project. Plans and specifications
will be prepared by a consultant. Construction will be performed by a private contractor.
Location:
Jamboree Road over San Diego Creek (east and west) and Goldenrod Avenue pedestrian bridge over Bayside Drive
Funding:
Gas Tax and Contributions (FHWA)
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$1,583,100
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$1,583,100
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7181
C5100695
$312,400
$0
Contributions
7251
C5100695
$1,270,700
$0
$0
$0
TOTAL
$1,583,100
$0
PROJECTTOTALI $1,583,100
30
Coast Highway Median Improvements
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for the next phase of improvements to the medians along Coast Highway in the Corona del Mar business district near
the intersections of Goldenrod Avenue and Poppy Avenue. Work includes removal and construction of median concrete curb,
miscellaneous asphalt, signing and striping, landscape planting and irrigation, jacking and boring of sleeves, installation of conduits and
wiring, and other incidental items.
Location:
East Coast Highway at Goldenrod Avenue and Poppy Avenue
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$410,500
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$410,500
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C5200932
$410,500
$0
$0
$0
$0
$0
TOTAL
$410,500
$0
PROJECT TOTAL $410,500
31
Coast Highway Sidewalk - Morning Canyon Road to Seaward Road
Requesting Department: Public Works Category: Streets and Drainage
This project provides for the construction of a sidewalk along East Coast Highway from Morning Canyon Road to Seaward Road.
Location:
East Coast Highway - Morning Canyon Road to Seaward Road
Funding:
PCH Relinquishment
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $250,000
Other $0
Total $250,000
FUNDING SOURCE
PCH Relinquishment
FY 2008 -09
$0
$0
$0
a
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
DIVISION NO. PROJECT NO. REBUDGET $ BUDGET $
7254 C2002005 $O $250,000
$0 $0
TOTAL I $0 $250,000
PROJECT TOTAL 1 $250,000
32
Corona del Mar Area Parking Lots Slurry Seal
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for the application of a slurry seal to the existing bike trail along Coast Highway between Jamboree Road and Avocado
Avenue. This project also provides for the application of slurry seal to the parking lots at Grant Howald Park and San Joaquin Hills Park.
City staff will prepare plans and specifications. Construction will be performed by a private contractor.
Location:
Coast Highway - Jamboree Road to Avocado Avenue, Grant Howald Park and San Joaquin Hills Park
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$120,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$120,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002003
$0
$120,000
$0
$0
$0
$0
TOTAL
$0
$120,000
PROJECT TOTAL 1 $120,000
33
Corona
del Mar South
of Coast Highway Street
Rehabilitation
Requesting Department:
Public Works
Category:
Streets and Drainage
This project provides for the grind and overlay of the streets with rubberized asphalt concrete and removal and replacement of deteriorated
concrete sections. City staff will prepare plans and specifications. Construction will be performed by a private contractor.
Location:
Corona del Mar - South of Coast Highway
Funding:
Measure M Turnback
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,000,000
Other $0
Total $1,000,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Measure M Turnback
7281
C2002004
$0
$1,000,000
$O
$0
$0
$0
TOTAL
$0 $1,000,000
PROJECT TOTAL 1 $1,000,000
34
Dove Street Rehabilitation
Requesting Department: Public Works Category: Streets and Drainage
This project will provide a grind and overlay of the street with rubberized asphalt concrete and removal and replacement of deteriorated
concrete sections. City staff will prepare plans and specifications. Construction will be performed by a private contractor.
Location:
Dove Street - Campus Drive to Birch Street
Funding:
Gas Tax
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $97,000
Other $0
Total $97,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002006
$0
$97,000
$0
$0
$0
$0
TOTAL
$0
$97,000
PROJECT TOTAL $97,000
35
Dover Drive Medians Renovation
Requesting Department: General Services
Category: Streets and Drainage
This project will renovate 11,500 square feet of planter in the medians along Dover Drive, between West Coast Highway and Westcliff
Drive. Currently the medians are watered manually with a water truck multiple times a week. This generates runoff onto City streets, is an
inefficient irrigation of plants, and negatively affects the health of the plants. The project includes construction of an irrigation system
connected to the City's automated system and installation of new shrubs and groundcover. The trees currently in place would be retained.
Location:
Dover Drive - West Coast Highway and Westcliff Drive
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$125,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$125,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002007
$0
$125,000
$0
$0
$0
$0
TOTAL
$0
$125,000
PROJECT TOTAL 1 $125,000
KE
Dover Drive Sidewalk
Requesting Department: Public Works Category: Streets and Drainage
This project will construct a sidewalk, retaining wall, and environmental mitigations along Dover Drive adjacent to Castaways Park. Design
and permitting are underway by a consultant.
Location:
East side of Dover Drive - 16th Street to Coast Highway
Funding:
General Fund, Transportation and Circulation and CIOSA
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $465,145
Other $0
Total $465,145
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C5100854
$0
$84,000
Transportation and Circulation
7261
C5100854
$102,645
$0
CIOSA
7432
C5100854
$278,5001
$0
TOTAL
$381,145
$84,000
PROJECT TOTAL 1 $465,145
37
East Bay Avenue and A Street Rehabilitation
Requesting Department: Public Works
Category: Streets and Drainage
This project will provide a grind and overlay of the streets with rubberized asphalt concrete and removal and replacement of deteriorated
concrete sections. City staff will prepare plans and specifications. Construction will be performed by a private contractor.
Location:
East Bay Avenue between Main Street and A Street and A Street between Bay Avenue and Balboa Boulevard
Funding:
Gas Tax
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $113,000
Other $0
Total $113,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002008
$0
$113,000
$0
$0
$0
$0
TOTAL
$0
$113,000
PROJECT TOTAL 1 $113,000
38
East
Bay Storm Drain
Upgrade / Tidal Valve
Installation
Requesting Department:
General Services
Category:
Streets and Drainage
This project provides for the replacement of 65 feet of old and deteriorated 12 -inch corrugated pipe that is currently blocked off during
periods of high tides with a rubber plug. Also, a new catch basin and a six -inch Fresno tide gate would be installed to update this tidal
structure with a more effective plugging system.
Location:
807 East Bay
Funding:
Tide and Submerged Lands
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $30,000
Other $0
Total $30,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C2502002
$0
$30,000
$0
$0
$0
$0
TOTAL
$0
$30,000
PROJECT TOTAL $30,000
39
Eastbluff Drive Street Rehabilitation
Requesting Department: Public Works
Category: Streets and Drainage
This project will provide a grind and overlay of the streets with rubberized asphalt concrete and removal and replacement of deteriorated
concrete sections. City staff will prepare plans and specifications. Construction will be performed by a private contractor.
Location:
Eastbluff Drive, Vista del Sol and portions of Vista del Oro
Funding:
Gas Tax
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,180,000
Other $0
Total $1,180,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002009
$0
$1,180,000
$0
$0
$0
$0
TOTAL
$0
$1,180,000
PROJECTTOTALI $1,180,000
40
EIR / Preliminary Plans
Requesting Department: Public Works Category: Streets and Drainage
This program provides for the preparation of environmental documents, preliminary engineering studies and reports for future street
projects.
Location:
n/a
Funding:
Gas Tax
FY 2007 -08
Design /Environmental $50,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $50,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C5100070
$50,000 $0
$O $0
$0, $0
TOTAL
$50,000 $0
PROJECT TOTAL 1 $50,000
41
Indian Spring Lane Subdrain
Requesting Department: Public Works
Category: Streets and Drainage
This project will intercept subterranean waters that currently percolate up through the roadway and cause damage to the pavement.
Location:
Indian Spring Lane
Funding:
General Fund
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $50,000
Other $0
Total $50,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7012
C5100903
$50,000
$0
$0 $0
$0, $0
TOTAL
$50,000 $0
PROJECT TOTAL 1 $50,000
42
Irvine Avenue Realignment - University to Bristol
Requesting Department: Public Works
Category: Streets and Drainage
This project provides the City's portion of the funding for the realignment of Irvine Avenue. Plans and specifications will be administered by
the County of Orange and construction will be performed by a private contractor under County administration.
Location:
Irvine Avenue - University Drive to Bristol Street South
Funding:
Transportation and Circulation and CIOSA
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,130,200
Other $0
Total $1,130,200
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Transportation and Circulation
7261
C5100470
$330,200
$0
CIOSA
7432
C5100470
$800,0001 $0
$0, $0
TOTAL
$1,130,200 $0
PROJECT TOTAL 1 $1,130,200
43
Irvine Terrace Landscape Improvements
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for the design and construction of landscape improvements along Coast Highway adjacent to Irvine Terrace. Irvine
Terrace Community Association will contribute $20,000 plus plan preparations for the project. The majority of funding will be provided by
the General Fund.
Location:
East Coast Highway - Jamboree Road to Avocado Avenue
Funding:
General Fund and Contributions (Irvine Terrace Community Association)
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $150,000
Other $0
Total $150,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C3170904
$130,000
$0
Contributions
7251
C3170904
$20,0001 $0
$0, $0
TOTAL
$150,000 $0
PROJECT TOTAL 1 $150,000
44
Irvine Terrace Slurry Seal
Requesting Department: Public Works Category: Streets and Drainage
This project provides for a slurry seal to be placed on the streets in and around the Irvine Terrace area. Plans and specifications will be
prepared by City staff. A private contractor will be retained to complete construction.
Location:
Irvine Terrace
Funding:
Gas Tax
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $395,000
Other $0
Total $395,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002010
$0
$395,000
$0 $0
$0 $0
TOTAL
$0 $395,000
PROJECT TOTAL 1 $395,000
45
Jamboree Road Bridge Widening
Requesting Department: Public Works
Category: Streets and Drainage
This portion of the project will provide funding to obtain the right -of -way for the improvements to widen the roadway on Jamboree Road over
State Route 73. This estimated $6 million construction project is proposed to be funded with Measure M and State dollars in subsequent
fiscal years. Design and permitting are underway.
Location:
Jamboree Road - MacArthur Boulevard to Bayview Avenue
Funding:
Transportation and Circulation and Measure M Competitive
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$414,100
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$414,100
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Transportation and Circulation
7261
C5100784
$299,100
$0
Measure M Competitive
7284
C5100784
$115,000
$0
$0
$0
TOTAL
$414,100
$0
PROJECT TOTAL 1 $414,100
M
Median Maintenance Strips - Citywide
Requesting Department: General Services
Category: Streets and Drainage
This project provides for the replacement of existing Bomanite concrete found in the median strips located throughout the city. The buckled
maintenance strips pose a safety hazard for City staff and contract employees working and operating equipment on medians adjacent to
fast moving traffic. Construction of this project can be combined with the annual sidewalk, curb and gutter replacement program for cost
savings.
Location:
Citywide
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$200,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$200,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2001008
$0
$200,000
$0
$0
$0
$0
TOTAL
$0
$200,000
PROJECT TOTAL 1 $200,000
47
Newport Boulevard Right Turn Lane at Hospital Road
Requesting Department: Public Works
Category: Streets and Drainage
This project adds a right turn lane on southbound Newport Boulevard to facilitate traffic turning onto Hospital Road. Construction began in
FY 2006 -2007. This budget provides for remaining incidentals to complete the project.
Location:
Newport Boulevard at Hospital Road
Funding:
Gas Tax
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$5,300
$0
$0
$0
$0
Total
$5,300
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C5200737
$5,300
$0
$0
$0
$_0
$0
TOTAL
$5,300
$0
PROJECT TOTAL 1 $5,300
48
Requesting Department: Public Works
Newport Heights Slurry Seal
Category: Streets and Drainage
This project provides for a slurry seal to be placed on the streets in and around the Newport Heights area. Plans and specifications will be
prepared by City staff. A private contractor will be retained to complete construction.
Location:
Newport Heights
Funding:
Gas Tax
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $580,000
Other $0
Total $580,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002011
$0
$580,000
$0 $0
$0 $0
TOTAL
$0 $580,000
PROJECT TOTAL 1 $580,000
49
Newport Shores Street End Improvements
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for landscaping, walkway and storm drain facilities at the easterly end of Canal Street. Construction began in FY 2006-
2007.
Location:
Canal Street / 62nd Street in Newport Shores Tract
Funding:
General Fund
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $15,500
Other $0
Total $15,500
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7028
C5100828
$15,500
$0
$O $0
$0, $0
TOTAL
$15,500 $0
PROJECT TOTAL 1 $15,500
50
Polaris Drive and Santiago Drive Subdrain
Requesting Department: Public Works Category: Streets and Drainage
This project will replace an existing subdrain system between Polaris and Santiago Drives. The improvements will intercept subterranean
waters that currently percolate up through the roadway and private property and cause damage to the pavement.
Location:
Polaris Drive - Galaxy Drive to south of North Star Lane
Funding:
General Fund
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $270,000
Other $0
Total $270,000
FY 2008 -09
$0
$0
$0
a
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET $ BUDGET $
General Fund 7012 C5100915 $270,000 1
TOTAL I $270,000 $0
PROJECT TOTAL 1 $270,000
51
Rivo Alto Bulkhead Coping Repairs
Requesting Department: Public Works Category: Streets and Drainage
This project will replace an existing subdrain system between Polaris and Santiago Drives. The improvements will intercept subterranean
waters that currently percolate up through the roadway and private property and cause damage to the pavement.
Location:
Along Alley 337 -B and the parking lot behind Wachovia Bank
Funding:
Tide and Submerged Lands
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $108,000
Other $0
Total $108,000
FY 2008 -09
$0
$0
$0
a
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET $ BUDGET $
Tide and Submeraed Lands 7231 C5100837 $108,000 1
TOTAL I $108,000 $0
PROJECT TOTAL 1 $108,000
52
San Joaquin Hills Road Median Trees
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for the planting of trees in the median of San Joaquin Hills Road between Jamboree Road and MacArthur Boulevard.
Location:
San Joaquin Hills Road - Jamboree Road and MacArthur Boulevard
Funding:
General Fund
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $50,000
Other $0
Total $50,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002012
$0
$50,000
$0 $0
$0 $0
TOTAL
$0 $50,000
PROJECT TOTAL 1 $50,000
53
Sidewalk,
Curb and Gutter
Replacement and ADA
Improvements
Requesting Department:
General Services
Category:
Streets and Drainage
This project will provide for the replacement of defective sidewalks, curbs, gutters and cross gutters for areas with standard specifications
and where decorative colors are used. Americans with Disabilities Act improvements will be included where necessary. Community
Development Block Grant (CDBG) funds provide for the construction of curb access ramps to improve pedestrian and wheelchair access.
CDBG funds provides for approximately 40 curb access ramps at selected locations annually. Work will be performed by a private
contractor.
Location:
Bay Knolls and Westcliff areas
Funding:
General Fund and CDBG
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$805,100
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$805,100
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C5100020
$70,600
$625,000
CDBG
7161
C5100549
$54,5001 $55,_000
$0, $0
TOTAL
$125,100 $680,000
PROJECT TOTAL 1 $805,100
54
Spyglass Hill Road Subdrain
Requesting Department: Public Works
Category: Streets and Drainage
This project will intercept subterranean waters that currently percolate up through the roadway and cause damage to the pavement.
Location:
Spyglass Hills Road
Funding:
General Fund
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $75,000
Other $0
Total $75,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7012
C5100925
$75,000
$0
$0 $0
$0, $0
TOTAL
$75,000 $0
PROJECT TOTAL 1 $75,000
55
Street and Bikeway Improvements
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for the resurfacing and slurry sealing various streets, bikeways, and parking lot pavements.
Location:
To be determined
Funding:
Gas Tax and Measure M Turnback
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $376,000
Other $0
Total $376,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
Gas Tax
Measure M Turnback
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
7181
C5100302
$176,000
$0
7281
C5100019
$0
$0
$200,_000
$0
TOTAL
$176,000
$200,000
PROJECT TOTAL 1 $376,000
Streetlight Replacement Program
Requesting Department: Utilities Category: Streets and Drainage
This project provides for the replacement of obsolete streetlights. Many of these lights were installed more than 40 years ago. Replacement
parts are no longer available. This year's project will focus on the replacement of steel poles throughout the City. Aged steel poles are
subject to failure and are particularly vulnerable in high winds.
Location:
Citywide
Funding:
General Fund
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $593,500
Other $0
Total $593,500
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C5300035
$353,500
$240,000
$0
$0
$0
$0
TOTAL
$353,500
$240,000
PROJECT TOTAL 1 $593,500
57
Superior Avenue Median Improvements
Requesting Department: Public Works
Category: Streets and Drainage
This project will provide for the design of a raised, landscaped median on Superior Avenue near Hoag Hospital. Partial funding will be
provided by monies from administrative fees received from Hoag Hospital for assistance with its financing. Plans and specifications will be
prepared by a consultant and /or Public Works staff. Construction will be performed by a private contractor.
Location:
Superior Avenue from West Coast Highway to the northern city limits
Funding:
Gas Tax, Contributions (Hoag Hospital), and Wastewater Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$626,600
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$626,600
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C5100870
$376,600
$0
Contributions
7251
C5100870
$200,000
$0
Wastewater Enterprise
7531
C5600292
$50,000
$0
TOTAL
$626,600
$0
PROJECT TOTAL 1 $626,600
58
Superior Avenue Street Rehabilitation
Requesting Department: Public Works
Category: Streets and Drainage
This project will provide a grind and overlay of the street with rubberized asphalt concrete and removal and replacement of deteriorated
concrete sections. City staff will prepare plans and specifications. Construction will be performed by a private contractor.
Location:
Superior Avenue from West Coast Highway to the northern city limits
Funding:
Gas Tax and AHRP
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,023,500
Other $0
Total $1,023,500
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C5100927
$623,500
$0
AHRP
7285
C5100927
$400,000
$0
$0
$0
TOTAL
$1,023,500
$0
PROJECTTOTALI $1,023,500
59
Via Lido Crib Wall Replacement
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for excavation, removal and replacement of the concrete crib wall. This project will also provide lateral support for Via
Lido Bridge and the utility conduits that are located under the bridge. The existing crib wall is deteriorated to the point of collapse. Plans
and specifications will be developed by Public Works, and construction will be performed by a private contractor.
Location:
Citywide
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$79,200
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$79,200
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C5100738
$79,200
$0
$0
$0
$0
$0
TOTAL
$79,200
$0
PROJECTTOTALI $79,200
[I
West Balboa Boulevard Slurry Seal
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for an application of slurry seal to the existing roadway. Minor roadway crack sealing and reconstruction are also
included in this project. City staff will prepare plans and specifications. Construction will be performed by a private contractor.
Location:
Balboa Boulevard - 12th Street to 16th Street
Funding:
Gas Tax
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $89,000
Other $0
Total $89,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002013
$0
$89,000
$0
$0
$0
$0
TOTAL
$0
$89,000
PROJECT TOTAL $89,000
61
Westcliff Drive Medians Renovation
Requesting Department: General Services
Category: Streets and Drainage
This project will renovate approximately 6,900 square feet of planter area within the Westcliff Drive medians, between Irvine Avenue and
Dover Drive. Currently, the medians are watered manually with a water truck multiple times a week. This generates runoff onto City
streets, is an inefficient irrigation of plants, and negatively affects the health of the plants. The project includes construction of an irrigation
system connected to the City's automated system and installation of new shrubs and groundcover. The trees currently in place would be
retained.
Location:
Westcliff Drive - Irvine Avenue to Dover Drive
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$80,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$80,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002014
$0
$80,000
$0
$0
$0
$0
TOTAL
$0
$80,000
PROJECT TOTAL $80,000
E1=
Traffic
Page Fund Project Title
63
7231
C5100894
Bayside Waterfront Walkway to Balboa Island Bridge
64
7253
C5100898
Bristol Street Sign Bridge Improvements
65
7014
C2700813
Directional, Wayfinding and Monument Signage
65
7014
C3140789
Directional, Wayfinding and Monument Signage
65
7261
C2700813
Directional, Wayfinding and Monument Signage
66
7013
C3002000
Flashing Crosswalk - Newport Boulevard at 23rd Street
67
7261
C3002001
Iris Avenue and Coast Highway Traffic Signal
67
7281
C3002001
Iris Avenue and Coast Highway Traffic Signal
68
7013
C5200407
Neighborhood Traffic Management Improvements
68
7181
C5200407
Neighborhood Traffic Management Improvements
69
7028
C5100014
Pedestrian Coastal Access Improvements
70
7261
C5200699
Traffic Signal Modernization: Ph. 1 Newport Center Area
70
7261
C5200852
Traffic Signal Modernization: Ph. 1 Newport Center Area
70
7281
C5200852
Traffic Signal Modernization: Ph. 1 Newport Center Area
70
7284
C5200852
Traffic Signal Modernization: Ph. 1 Newport Center Area
71
7281
C3002002
Traffic Signal Modernization: Ph. 2 Jamboree Road
71
7284
C3002002
Traffic Signal Modernization: Ph. 2 Jamboree Road
72
7281
C3002003
Traffic Signal Modernization: Ph. 3 Airport Area
72
7284
C3002003
Traffic Signal Modernization: Ph. 3 Airport Area
73
7261
C5200408
Traffic Signal Preemption System
74
7261
C5200068
Traffic Signal Replacement Program
74
7281
C5200068
Traffic Signal Replacement Program
75
7261
C5200143
Transportation Model Maintenance
76
7261
C5100793
West Coast Highway Vision Plan
Total Traffic
Department
Rebudget
Budget
Total
Public Works
$40,000
$0
$40,000
Public Works
$0
$100,000
$100,000
Planning
$0
$225,000
$225,000
City Manager
$32,500
$0
$32,500
Planning
$102,300
$0
$102,300
Public Works
$0
$110,000
$110,000
Public Works
$0
$100,000
$100,000
Public Works
$0
$180,000
$180,000
Public Works
$0
$150,000
$150,000
Public Works
$49,200
$0
$49,200
Public Works
$199,100
$200,000
$399,100
Public Works
$335,000
$0
$335,000
Public Works
$59,400
$0
$59,400
Public Works
$0
$200,000
$200,000
Public Works
$477,285
$0
$477,285
Public Works
$0
$750,000
$750,000
Public Works
$0
$300,000
$300,000
Public Works
$0
$150,000
$150,000
Public Works
$0
$100,000
$100,000
Public Works
$0
$16,000
$16,000
Public Works
$251,800
$0
$251,800
Public Works
$0
$240,000
$240,000
Public Works
$15,000
$0
$15,000
Public Works
$80,000
$0
$80,000
$1,641,585
$2,821,000
$4,462,585
Bayside Waterfront Walkway to Balboa Island Bridge
Requesting Department: Public Works
Category: Traffic
This project provides for the design of an accessible pedestrian connection between the Bayside Drive Waterfront walkway and Marine
Avenue at Balboa Island Bridge. The walkway will be built in conjunction with a private waterfront construction project at 919 Bayside Drive.
Location:
Bayside Drive and Marine Avenue
Funding:
Tide and Submerged Lands
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $40,000
Other $0
Total $40,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C5100894
$40,000
$0
$0
$0
$0
$0
TOTAL
$40,000
$0
PROJECTTOTALI $40,000
63
Bristol Street Sign Bridge Improvements
Requesting Department: Public Works Category: Traffic
This project provides for the relocation of the existing sign bridges on Bristol Street North at Campus Drive and Bristol Street South at
Jamboree Road. The relocation of the sign bridges will provide for improved advance visibility of the traffic signals at these intersections and
will improve traffic safety. This project also will facilitate other work to lengthen the turn pockets at these locations.
Location:
Bristol Street North at Campus Drive and Bristol Street South at Jamboree Road
Funding:
Bristol Street Relinquishment
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$100,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$100,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Bristol Street Relinquishment
7253
C5100898
$0
$100,000
$0
$0
$0
$0
TOTAL
$0
$100,000
PROJECT TOTAL 1 $100,000
64
Directional, Wayfinding and Monument Signage
Requesting Department: Planning and City Manager Category: Traffic
This project will fund, construct and install approximately 104 new wayfinding & directional signs. The design is specified from the Citywide
Wayfinding and Directional Signage Program. These signs will be constructed and installed under contract along roadway routes in, and at
important entrances to Newport Beach, and will include replacement of currently out -of -date or non - existent monument signs. This project
also provides for a consultant to complete conceptual design and plans and construction for a new entryway monument sign to be placed
on Newport Coast Drive near Sage High School.
Location:
Citywide and Newport Coast Drive
Funding:
General Fund and Transportation and Circulation
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$359,800
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$359,800
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C2700813
$0
$225,000
General Fund
7014
C3140789
$32,500
$0
Transportation and Circulation
7261
C2700813
$102,300
$0
TOTAL
$134,800
$225,000
PROJECT TOTAL 1 $359,800
65
Flashing Crosswalk - Newport Boulevard at 23rd Street
Requesting Department: Public Works
Category: Traffic
This project provides for installation of new flashing crosswalk on Newport Boulevard at 23rd Street similar to the one installed on Coast
Highway at Orchid Avenue. This project will improve pedestrian safety between bayside commercial and residential areas to McFadden
Square and Newport Pier.
Location:
Newport Boulevard at 23rd Street
Funding:
General Fund
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $110,000
Other $0
Total $110,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C3002000
$0
$110,000
$0
$0
$0
$0
TOTAL
$0
$110,000
PROJECT TOTAL 1 $110,000
M.
Iris Avenue and Coast Highway Traffic Signal
Requesting Department: Public Works
Category: Traffic
This project provides for installation of a new traffic signal at the intersection of Coast Highway and Iris Avenue. A traffic signal at this
location will improve pedestrian safety and the safety of motorists transitioning from Iris Avenue to Coast Highway.
Location:
Coast Highway at Iris Avenue
Funding:
Transportation and Circulation and Measure M Turnback
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $280,000
Other $0
Total $280,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Transportation and Circulation
7261
C3002001
$0
$100,000
Measure M Turnback
7281
C3002001
$0
$180,000
$0
$0
TOTAL
$0
T $280,000
PROJECT TOTAL 1 $280,000
67
Neighborhood Traffic Management Improvements
Requesting Department: Public Works Category: Traffic
This project provides for construction of various traffic control channelization improvements, such as raised islands, road bumps, pavement
markings, restriping, and other minor improvements to enhance traffic safety and manage neighborhood traffic according to Council Policy
criteria. Projects will be identified by staff through neighborhood traffic studies. Plans and specifications will be prepared by a consultant
and /or Public Works staff. Work will be performed by a private contractor and City crews.
Location:
Citywide
Funding:
General Fund and Gas Tax
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$199,200
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$199,200
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C5200407
$0
$150,000
Gas Tax
7181
C5200407
$49,200
$0
$0
$0
TOTAL
$49,200
$150,000
PROJECT TOTAL 1 $199,200
Pedestrian Coastal Access Improvements
Requesting Department: Public Works Category: Traffic
This project provides for improvements for pedestrian circulation and coastal access. Pursuant to an agreement with the Coastal
Commission, the City is required to construct coastal access improvements with funds generated through the permit revenues from property
owners of oceanfront encroachments. The focus of this project is to construct a 6 -ft wide sidewalk and plant parkway street trees within the
City's 10 -ft parkway on the south side of River Avenue from Balboa Boulevard to 49th Street. Plans and specifications will be prepared by
private consultants and /or staff. Construction work will be performed by a private contractor.
Location:
River Avenue - Balboa Boulevard to 49th Street
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$399,100
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$399,100
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7028
C5100014
$199,100
$200,000
$0
$0
$0
$0
TOTAL
$199,100
$200,000
PROJECT TOTAL 1 $399,100
K";
Traffic Signal Modernization: Phase 1 Newport Center Area
Requesting Department: Public Works Category: Traffic
Traffic Signal Modernization is a multi -year, multi - phased program to update the City's traffic signal system. The resultant system will allow
staff the flexibility to implement real time adjustments and to improve the efficiency of the system during peak hours, special events,
construction activities, and emergencies. Phase 1 of this program, which began in FY 2006 -07, provides for the modernization of traffic
signal equipment at 21 intersections on MacArthur Boulevard, Coast Highway, Avocado Avenue and San Joaquin Hills Road.
Location:
Newport Center Area
Funding:
Transportation and Circulation, Measure M Turnback and Measure M Competitive
FUNDING SOURCE
Transportation and Circulation
Transportation and Circulation
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$1,071,685
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$1,071,685
$0
$0
$0
$0
FUNDING SOURCE
Transportation and Circulation
Transportation and Circulation
DIVISION NO.
7261
7261
7281
7484
PROJECT NO.
REBUDGET $
BUDGET $
C5200699
$335,000
$0
C5200852
$59,400
$0
Measure M Turnback
C5200852
$0
$_200,000
$0
Measure M Competitive
C5200852
$477,285
TOTAL
$871,685 $200,000
PROJECT TOTAL 1 $1,071,685
70
Traffic Signal Modernization: Phase 2 Jamboree Road
Requesting Department: Public Works Category: Traffic
Traffic Signal Modernization is a multi -year, multi - phased program to update the City's traffic signal system. The resultant system will allow
staff the flexibility to implement real time adjustments and to improve the efficiency of the system during peak hours, special events,
construction activities, and emergencies. Phase 2 of this program provides for the modernization of traffic signal equipment at 11
intersections on Jamboree Road. This work also includes installation of new CCTV cameras and extensive fiber communications and
rewiring of traffic equipment cabinets.
Location:
Jamboree Road
Funding:
Measure M Turnback and Measure M Competitive
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$1,050,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$1,050,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Measure M Turnback
7281
C3002002
$0
$750,000
Measure M Competitive
7284
C3002002
$0
$300,000
$0
$0
TOTAL
$0
$1,050,000
PROJECTTOTALI $1,050,000
71
Traffic Signal Modernization: Phase 3 Airport Area
Requesting Department: Public Works Category: Traffic
Traffic Signal Modernization is a multi -year, multi - phased program to update the City's traffic signal system. The resultant system will allow
staff the flexibility to implement real time adjustments and to improve the efficiency of the system during peak hours, special events,
construction activities, and emergencies. Phase 3 of this program provides for the design of modern traffic signal equipment at 19
intersections in the airport area. Work in subsequent years will include the installation of the equipment, related CCTV cameras and fiber
communications and rewiring of traffic equipment cabinets.
Location:
Airport Area
Funding:
Measure M Turnback and Measure M Competitive
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$250,000
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$250,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Measure M Turnback
7281
C3002003
$0
$150,000
Measure M Competitive
7284
C3002003
$0
$100,000
$0
$0
TOTAL
$0
$250,000
PROJECT TOTAL 1 $250,000
72
Traffic Signal Preemption System
Requesting Department: Public Works Category: Traffic
This project provides for the installation of traffic signal preemption (Opticom) systems for Fire Department vehicles at various locations.
Plans and specifications will be prepared by Public Works staff. This project allows for four signals to be retrofitted each year. Completion
of the project will improve emergency response time and safety of fire and rescue staff.
Location:
Citywide
Funding:
Transportation and Circulation
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$16,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$16,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Transportation and Circulation
7261
C5200408
$0
$16,000
$0
$0
$0
$0
TOTAL
$0
$16,000
PROJECT TOTAL $16,000
73
Traffic Signal Replacement Program
Requesting Department: Public Works
Category: Traffic
This project provides for the replacement and maintenance of existing controllers, poles, and related signal equipment. Plans and
specifications will be prepared by a consultant and /or Public Works staff. Construction work will be completed by a private contractor.
Location:
Citywide
Funding:
Transportation and Circulation and Measure M Turnback
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $491,800
Other $0
Total $491,800
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Transportation and Circulation
7261
C5200068
$251,800
$0
Measure M Turnback
7281
C5200068
$0
$240,000
$0
$0
TOTAL
$251,800
T $240,000
PROJECT TOTAL 1 $491,800
74
Transportation Model Maintenance
Requesting Department: Public Works
Category: Traffic
This project provides for the annual updating of the transportation model required by changes in land use and circulation within the City and
surrounding portions of Orange County. Modeling will be performed by a consultant with input from Transportation and Development
Services staff in cooperation with the Planning Division.
Location:
Citywide
Funding:
Transportation and Circulation
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$15,000
$0
$0
$0
$0
Total
$15,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Transportation and Circulation
7261
C5200143
$15,000
$0
$0
$0
$0
$0
TOTAL
$15,000
$0
PROJECTTOTALI $15,000
75
West Coast Highway Vision Plan
Requesting Department: Public Works
Category: Traffic
A consultant will be retained to review options for West Coast Highway land use, landscaping, and aesthetic enhancements and will make
recommendations for future improvements.
Location:
West Coast Highway - Santa Ana River to Arches interchange
Funding:
Transportation and Circulation
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$80,000
$0
$0
$0
$0
Total
$80,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Transportation and Circulation
7261
C5100793
$80,000 $0
$0 $0
$0, $0
TOTAL
$80,000 $0
PROJECT TOTAL 1 $80,000
Parks, Harbors and Beaches
Page Fund Project Title
Department Rebudget Budget Total
77
7231
C2371834
American Legion Dock Repair
City Manager
$15,000
$0
$15,000
77
7251
C2371834
American Legion Dock Repair
City Manager
$65,000
$0
$65,000
78
7015
C3170933
Back Bay View Park Replenishment and Enhancement
General Svcs.
$46,750
$300,000
$346,750
79
7231
C2370608
Balboa Parking Lot Equipment Replacement Project
City Manager
$0
$70,000
$70,000
80
7231
C2370892
Balboa Yacht Basin Electrical System Repairs
City Manager
$65,000
$0
$65,000
81
7231
C2373771
Balboa Yacht Basin Security System
City Manager
$33,300
$0
$33,300
82
7017
C4802000
Beach Observation Camera System
Fire
$0
$38,000
$38,000
83
7028
C5100282
Beach Sand Study and Replenishment Program
Public Works
$0
$200,000
$200,000
84
7015
C5300895
Bonita Creek Park and San Miguel Park Light Replacement
Utilities
$125,000
$0
$125,000
85
7015
C4002000
Buffalo Hills Park Lighting
Public Works
$0
$215,000
$215,000
86
7015
C3170816
Cliff Drive Park Stairway and Handrail Replacement
Public Works
$100,000
$100,000
$200,000
87
7231
C5100282
Coastal Sand Replenishment Cooperative Project
City Manager
$0
$100,000
$100,000
88
7231
C2370522
Eelgrass Mitigation Bank
City Manager
$89,000
$50,000
$139,000
89
7015
C5100817
Mariners Park Improvements
Public Works
$896,200
$0
$896,200
89
7251
C5100817
Mariners Park Improvements
Public Works
$329,905
$0
$329,905
90
7251
C4120908
Mariners Park Playground Replacement
Recreation /SS
$3,071
$0
$3,071
91
7015
C5100909
Mariners Park Restroom Design
Public Works
$26,000
$0
$26,000
92
7231
C2371772
Mooring Layout Design
City Manager
$100,000
$0
$100,000
93
7021
C4120656
Newport Center Park
Public Works
$200,000
$0
$200,000
93
7251
C4120656
Newport Center Park
Public Works
$600,000
$0
$600,000
94
7015
C4002001
Newport Island Park Playground Equipment
Recreation /SS
$0
$60,000
$60,000
95
7251
C4310708
Parks Grants: ADA Compliance
Recreation /SS
$89,977
$0
$89,977
95
7251
C4310885
Parks Grants: Tire Derived Products
Recreation /SS
$10,522
$0
$10,522
96
7231
C5100836
Ocean Pier Repairs and Inspection
Public Works
$0
$500,000
$500,000
97
7231
C4402000
Public Docks Access Improvements
City Manager
$0
$140,000
$140,000
Parks, Harbors and Beaches continued
Page Fund Project Title
Department Rebudget Budget Total
98
7017
C1820980
Public Safety Beach Camera Monitoring System
Police
$154,400
$0
$154,400
99
7231
C5100921
Rhine Channel Wharf Repair and Public Dock
Public Works
$330,000
$0
$330,000
99
7251
C5100865
Rhine Channel Wharf Repair and Public Dock
Public Works
$0
$240,000
$240,000
100
7459
C5100867
Santa Ana Heights Mesa -Birch Park
City Manager
$219,750
$128,000
$347,750
101
7021
C5100515
Sunset Ridge Park - Design
Public Works
$150,000
$0
$150,000
102
7015
C4120928
Tennis Court Fencing Replacement
Recreation /SS
$130,000
$0
$130,000
103
7015
C4120931
West Newport Park at Orange Street Playground Equipment
Recreation /SS
$0
$32,000
$32,000
103
7271
C4120931
West Newport Park at Orange Street Playground Equipment
Recreation /SS
$0
$60,000
$60,000
Total Parks, Harbors and Beaches
$3,778,875
$2,233,000
$6,011,875
American Legion Dock Repairs
Requesting Department: City Manager
Category: Parks, Harbors and Beaches
A dock, pier and gangway were built by the City on the American Legion lease property in FY 1988/89 to comply with a Regional Water
Quality Control Board order. The structure is now heavily dry rotted and limited for public use. The structure needs total replacement,
including the pilings which are PVC pipe filled with concrete. Since the City is required to maintain a pumpout in this part of the harbor, the
system has temporarily moved to the 15th Street Public Pier.
Location:
Adjacent to 15th Street public beach within the American Legion lease property
Funding:
Tide and Submerged Lands and Contributions
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$80,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$80,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C2371834
$15,000
$0
Contributions
7251
C2371834
$65,0001 $0
$0, $0
TOTAL
$80,000 $0
PROJECT TOTAL 1 $80,000
77
Back Bay View Park Replenishment and Enhancement
Requesting Department: General Services Category: Parks, Harbors and Beaches
This project will be used for natural park meadow enhancements at Back Bay View Park. This project provides for enhanced plantings of
native sedge and grasses within the meadow areas of Back Bay View Park for an improved year round green and attractive appearance
and the construction of additional park amenities.
Location:
Back Bay View Park
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$346,750
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$346,750
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7015
C3170933
$46,750
$300,000
$O
$0
$0, $0
TOTAL
$46,750 $300,000
PROJECT TOTAL 1 $346,750
78
Balboa Parking Lot Equipment Replacement
Requesting Department: City Manager Category: Parks, Harbors and Beaches
This project provides for replacement of barrier gates, ticket dispensers, specialized computer equipment, a generator and security cameras
at Balboa Parking Lot. The parking lot ticket machines, gate control arms and security system are subject to the marine salt air which
causes corrosion. A small back -up generator is included with this project to provide for the safety of staff working at night and to continue
operations in the event of power outages which occur frequently at this location.
Location:
Balboa Parking Lot
Funding:
Tide and Submerged Lands
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$70,000
$0
$0
$0
$0
Total
$70,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C2370608
$0
$70,000
$0
$0
$0
$0
TOTAL
$0
$70,000
PROJECT TOTAL $70,000
79
Balboa Yacht Basin Electrical System Repairs
Requesting Department: City Manager
Category: Parks, Harbors and Beaches
This project will repair electrical pedestals and meters at 172 slips in Balboa Yacht Basin and replace and relocate the main electrical
panels servicing 41 rental garages. Many problems have been encountered with the nearly 20 year old electrical system in recent years.
Many boaters have appliances such as refrigerators and freezers and electrical system failures pose not only saftety issues but also loss of
personal property.
Location:
Balboa Yacht Basin
Funding:
Tide and Submerged Lands
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$65,000
$0
$0
$0
$0
Total
$65,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C2370892
$65,000
$0
$0
$0
$0
$0
TOTAL
$65,000
$0
PROJECTTOTALI $65,000
all
Balboa Yacht Basin Security System
Requesting Department: City Manager
Category: Parks, Harbors and Beaches
The Balboa Yacht Basin has been plagued with theft and vandalism. Tenants are concerned about personal safety as well as loss of their
property. This project is proposed to provide security cameras and gangway gates as recommended by the Newport Beach Police
Department.
Location:
Balboa Yacht Basin
Funding:
Tide and Submerged Lands
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$33,300
$0
$0
$0
$0
Total
$33,300
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C2373771
$33,300 $0
$0 $0
$0, $0
TOTAL
$33,300 $0
PROJECT TOTAL 1 $33,300
91111
Beach Observation Camera System
Requesting Department: Fire Category: Parks, Harbors and Beaches
This third phase of the Beach Observation System will provide five (5) additional cameras to the existing inventory.
Location:
To be determined
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$38,000
$0
$0
$0
$0
Total
$38,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7017
C4802000
$0 $38,000
$0 — $0
$0 $0
TOTAL
$0 $38,000
PROJECT TOTAL 1 $38,000
9E
Beach Sand Study and Replenishment Program
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
Beach profiles are continually monitored along the oceanfront to address sand migration. This project will focus on the preparation of
contract documents and permitting for the proposed transportation of approximately 30,000 cubic yards of sand from just south of the Santa
Ana River mouth to the groin fields between 36th and 52nd Streets as recommended in the, "State of the Newport Beach Coast Report,"
prepared by Moffat and Nichol in 2006. Implementation costs will be requested in future years once permits are secured.
Location:
n/a
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$200,000
$0
$0
$0
$0
Total
$200,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7028
C5100282
$0
$200,000
$0
$0
$0
$0
TOTAL
$0
$200,000
PROJECT TOTAL 1 $200,000
9
Bonita Creek Park and San Miguel Park Light Replacement
Requesting Department: Utilities Category: Parks, Harbors and Beaches
This project provides for the replacement of deteriorating park lighting. The current steel streetlights were installed as part of the original
park development and are rusting. All 22 poles in the Bonita Creek Park and 13 poles in the San Miguel Park need to be replaced with City
standard concrete post top poles.
Location:
Bonita Creek Park and San Miguel Park
Funding:
General Fund
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $125,000
Other $0
Total $125,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7015
C5300895
$125,000
$0
$0
$0
$0
$0
TOTAL
$125,000
$0
PROJECT TOTAL 1 $125,000
K,
Requesting Department: Public Works
Buffalo Hills Park Lighting
Category: Parks, Harbors and Beaches
This project will provide for the installation of bollard lights in Buffalo Hills Park and Harbor View Nature Park.
Location:
Buffalo Hills Park - Newport Hills Drive East/West and Ford Road
Funding:
General Fund
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $215,000
Other $0
Total $215,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7015
C4002000
$0
$215,000
$0 $0
$0 $0
TOTAL
$0 $215,000
PROJECT TOTAL 1 $215,000
m
Cliff Drive Park Stairway and Handrail Replacements
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
This project provides for replacement of existing stairways that demonstrate both wear and wood rot. The project would include replacing
the existing handrails to meet City Municipal and OSHA codes. Work will be performed by a private contractor.
Location:
Cliff Drive Park - Riverside Drive at Cliff Drive
Funding:
General Fund
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $200,000
Other $0
Total $200,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7015
C3170816
$100,000
$100,000
$O
$0
$0, $0
TOTAL
$100,000 $100,000
PROJECT TOTAL 1 $200,000
I
Coastal Sand Replenishment Cooperative Project
Requesting Department: City Manager
Category: Parks, Harbors and Beaches
This project reoccurs approximately every six years as a multi- agency beach replenishment project. Coastal cities, State Department of
Boating and Waterways, and Army Corps of Engineers share the cost of placing sand at a feeder beach located in Surfside Sunset Beach.
Sand erodes from the feeder beach and replenishes sand down the coast to the westerly breakwater entrance at Newport Harbor. A
supplement of sand from Newport Slough also will be placed in the nearshore zone at West Newport. City of Newport Beach typically pays
about 1 % of the total cost of this regional sand management program.
Location:
n/a
Funding:
Tide and Submerged Lands
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$100,000
$0
$0
$0
$0
Total
$100,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C5100282
$0
$100,000
$0
$0
$0
$0
TOTAL
$0
$100,000
PROJECT TOTAL 1 $100,000
95
Requesting Department: City Manager
Eelgrass Mitigation Bank
Category: Parks, Harbors and Beaches
This project will fund the maintenance of eelgrass (Zostera marina) mitigation banks in the Upper and Lower Newport Bays. Planting
mitigation banks is necessary to provide cost effective and safe navigation (via dredging) in and around piers, docks and marinas. This
project will assist the City's efforts to develop a Harbor Area Management Plan (HAMP) to protect and enhance beneficial uses of Newport
Bay. Costs will be recovered when State agencies grant permission to sell mitigation credits to harbor permittees. This project will also
provide for the annual monitoring of existing eelgrass resources.
Location:
Entire Lower Bay and a portion of Upper bay (De Anza and Castaways)
Funding:
Tide and Submerged Lands
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$139,000
$0
$0
$0
$0
Total
$139,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C2370522
$89,000
$50,000
$0
$0
$0
$0
TOTAL
$89,000
$50,000
PROJECT TOTAL 1 $139,000
0
Mariners Park Improvements
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
This project will design and construct improvements to Mariners Park which will include parking, entrance plaza, walkways, safety lighting,
irrigation system, turf and landscaping, ball fields, and fencing. These facilities were impacted with the construction of the Donna and John
Crean Mariners Branch Library. Plans and specifications will be developed by a consultant and /or Public Works staff. Construction will be
performed by a private contractor.
Location:
Mariners Park - Irvine Avenue and Dover Drive
Funding:
General Fund and Contributions (Workforce Housing Grant $254,000 and Roberti Z'Berg Harris Grant $71,000)
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$1,226,105
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$1,226,105
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7015
C5100817
$896,200
$0
Contributions
7251
C5100817
$329,905
$0
$0
$0
TOTAL
$1,226,105
$0
PROJECTTOTALI $1,226,105
Il
Mariners Park Playground Replacement
Requesting Department: Recreation / Senior Services
Category: Parks, Harbors and Beaches
This project replaced the Mariners Park playground equipment in FY 2006 -2007. The project provided upgraded equipment meeting
current ADA and safety requirements. This budget provides for remaining incidentals to complete the project.
Location:
Mariners Park - Irvine Avenue and Dover Drive
Funding:
Contributions (Roberti Z'Berg Harris Grant)
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$3,071
$0
$0
$0
$0
Total
$3,071
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Contributions
7251
C4120908
$3,071
$0
$0
$0
$0
$0
TOTAL
$3,071
$0
PROJECT TOTAL 1 $3,071
Mariners Park Restroom Design
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
This project will design a combined restroom and storage building at Mariners Park. The building will replace facilities that will be removed
as part of the Mariners Park Improvements project.
Location:
Mariners Park - Irvine Avenue and Dover Drive
Funding:
General Fund
FY 2007 -08
Design /Environmental $26,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $26,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7015
C5100909
$26,000 $0
$O $0
$0, $0
TOTAL
$26,000 $0
PROJECT TOTAL 1 $26,000
91
Requesting Department: City Manager
Mooring Layout Design
Category: Parks, Harbors and Beaches
The Army Corps of Engineers, City, and County of Orange collectively delineated mooring areas in Newport Bay over 60 years ago. Since
then, the moorings have ventured outside of the original perimeter boundaries and have caused problems with safe navigation and dredging
of federal navigation channels. A new layout needs to be designed that places all existing moorings within approved boundaries and
provides for the construction of ten new moorings. The proposed plan will have a public outreach element to ease problems anticipated
with implementation.
Location:
Mooring areas in Lower Newport Bay
Funding:
Tide and Submerged Lands
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$100,000
$0
$0
$0
$0
Total
$100,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C2371772
$100,000
$0
$0
$0
$0
$0
TOTAL
$100,000
$0
PROJECT TOTAL 1 $100,000
9F
Newport Center Park
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
The project will construct a passive use park north of the Central Library in two phases. The first phase consists of a 30 lot parking lot with
access off Farallon, traffic signal modifications, a passive park located in the central portion of the parcel, restrooms, a tot lot and an
amphitheater. The second phase includes a 100 space parking lot north of the library, landscaped slope areas, an ADA accessible path to
the amphitheater construction of a California native garden. A consultant is preparing construction documents and permit applications. A
private contractor will complete the construction of the park in phases.
Location:
Newport Center
Funding:
General Fund and Contributions (private donor)
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$100,000
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$700,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$800,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7021
C4120656
$200,000
$0
Contributions
7251
C4120656
$600,000
$0
$0
$0
TOTAL
$800,000
$0
PROJECT TOTAL 1 $800,000
93
Newport Island Park Playground Equipment
Requesting Department: Recreation / Senior Services Category: Parks, Harbors and Beaches
This project provides for the replacement of playground equipment. The present equipment is eleven (11) years old and is badly rusted.
Location:
Newport Island Park - 39th Street and Marcus
Funding:
General Fund
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $60,000
Other $0
Total $60,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7015
C4002001
$0
$60,000
$0
$0
$0
$0
TOTAL
$0
$60,000
PROJECT TOTAL $60,000
94
Parks Grants
Requesting Department: Recreation / Senior Services Category: Parks, Harbors and Beaches
The City of Newport Beach has been awarded two State grants for parks related improvements. The first is a per capita allocation from
Proposition 12 Bond Act funds. These funds have been used to bring the City's playground equipment in compliance with the Americans
with Disabilities Act. Nearly $90,000 has been carried forward for use in the current fiscal year. The second represents remaining funds
($10,500) from a grant from the California Integrated Waste Management Board for the purchase of tire derived products to be used in
playgrounds or play surfaces.
Location:
Citywide
Funding:
Contributions
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$100,499
$0
$0
$0
$0
Total
$100,499
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Contributions
7251
C4310708
$89,977
$0
Contributions
7251
C4310885
$10,522
$0
$0
$0
TOTAL
$100,499
$0
PROJECT TOTAL 1 $100,499
95
Ocean Pier Repairs and Inspection
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
This project will fund Newport Pier and Balboa Pier repairs as documented in the Ocean Pier Inspection Report dated April 2007. The
project will provide funding to inspect and report on the condition of the City's ocean piers for the next phase of repairs. These piers are
inspected for marine infestations and storm and deterioration defects.
Location:
Newport and Balboa Piers
Funding:
Tide and Submerged Lands
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$450,000
$0
$0
$0
$0
Other
$50,000
$0
$0
$0
$0
Total
$500,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C5100836
$0
$500,000
$0
$0
$0
$0
TOTAL
$0
$500,000
PROJECT TOTAL 1 $500,000
M
Public Docks Access Improvements
Requesting Department: City Manager
Category: Parks, Harbors and Beaches
This project proposes to reconfigure the public docks at Fernando Street, 15th Street and 19th Street to allow increased dinghy tie -ups.
Providing dinghy berthing at these heavily used docks has been a priority for the Harbor Commission during the past several years.
Location:
Public docks at Fernando Street, 15th Street and 19th Street
Funding:
Tide and Submerged Lands
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2007 -08
$0
$0
$140,000
$140,000
FUNDING SOURCE
Tide and Submerged Lands
FY 2008 -09
$0
$0
$0
FY 2010 -11
$0
$0
$0
$0
DIVISION NO. PROJECT NO
7231 C4402000
TOTAL
FY 2011 -12
$0
$0
$0
$0
$0
REBUDGET$
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
BUDGET $
$140,OC
$140,000
PROJECT TOTAL 1 $140,000
97
Public Safety Beach Camera Monitoring System
Requesting Department: Police
Category: Parks, Harbors and Beaches
This project provides for the installation of a camera monitoring system at Corona del Mar State Beach, Little Corona and the Wedge. The
system will be used to assist Police personnel to remotely monitor these areas between the hours of 10 p.m. and 6 a.m. in order to more
efficiently deploy officers when there is activity requiring law enforcement attention.
Location:
Corona del Mar State Beach
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$154,400
$0
$0
$0
$0
Total
$154,400
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7017
C1820980
$154,400
$0
$0
$0
$0
$0
TOTAL
$154,400
$0
PROJECT TOTAL $154,400
Rhine Channel Wharf Repair and Public Dock
Requesting Department: City Manager
Category: Parks, Harbors and Beaches
This project provides for repairs to the Rhine Channel Wharf and construction of a 100' x 8' dock for transient boater use at Rhine Wharf.
The wharf has deteriorated and its strength has been compromised. Providing a transient boater dock in this area is a high priority for the
Harbor Commission. A private contractor will be retained to complete the repairs and new construction.
Location:
Rhine Channel adjacent to Lido Park Drive
Funding:
Tide and Submerged Lands and Contributions (919 Bayside development)
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$570,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$570,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C5100921
$330,000
$0
Contributions
7251
C5100865
$O
$0
$240,_000
$0
TOTAL
$330,000
$240,000
PROJECT TOTAL 1 $570,000
Santa Ana Heights Mesa -Birch Park
Requesting Department: City Manager
Category: Parks, Harbors and Beaches
This project will construct a 0.8 -acre view park at the corner of Mesa Drive and Birch Street in Santa Ana Heights. It provides for clearing
and grading the site and constructing lighted walkways, benches, a drinking fountain, an irrigation system, and passive park landscaping
(including native grasses and trees.) Plans and specifications have been prepared by a consultant. Construction will be performed by a
private contractor.
Location:
Mesa Drive and Birch Street
Funding:
Contributions (County of Orange Redevelopment Agency)
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$347,750
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$347,750
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Contributions
7459
C5100867
$219,750
$128,000
$0
$0
$0
$0
TOTAL
$219,750
$128,000
PROJECT TOTAL 1 $347,750
100
Requesting Department: Public Works
Sunset Ridge Park Design
Category: Parks, Harbors and Beaches
This project provides for the design of a park area with active and passive uses upon two parcels of land totaling 14.8 acres. Negotiations
were completed in FY 2006 -07 to obtain parcels from the State of California. Design can proceed once right -of -way is obtained. Concept
plans and public outreach efforts have been completed.
Location:
West Coast Highway and Superior Avenue
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$150,000
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$150,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7021
C5100515
$150,000
$0
$0
$0
$0
$0
TOTAL
$150,000
$0
PROJECT TOTAL 1 $150,000
101
Tennis Court Fencing Replacement
Requesting Department: Recreation / Senior Services
Category: Parks, Harbors and Beaches
This project consists of replacing the fencing and windscreens at two tennis courts located at Grant Howald /CYC and four tennis courts at
West Newport Park. The fencing has become worn and rusted. For the West Newport Park project, the fencing, gates, and windscreens
need to be replaced and some minor work needs to be done to the poles. For Grant Howald /CYC, all existing fencing, posts, gates and
windscreens need to replaced. After fencing is completed for both areas, the tennis courts will need to be resurfaced.
Location:
Grant Howald Park and West Newport Park
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$130,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$130,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7015
C4120928
$130,000
$0
$0
$0
$0
$0
TOTAL
$130,000
$0
PROJECT TOTAL 1 $130,000
102
West
Newport Park at Orange
Street Playground
Equipment
Requesting Department:
Recreation / Senior Services
Category:
Parks, Harbors and Beaches
This project provides for the replacement of the playground at West Newport Park at Orange Street. The equipment is damaged and salt
breeze has caused the components to deteriorate faster than normal.
Location:
West Newport Park - Seashore Drive at Orange Street
Funding:
General Fund and Building Excise Tax
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $92,000
Other $0
Total $92,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7015
C4120931
$0
$32,000
BET
7271
C4120931
$0
$0
$60,000
$0
TOTAL
$0
$92,000
PROJECT TOTAL 1 $92,000
103
Water Quality and Environmental
Page Fund Project Title
104
7014
C5100889
104
7255
C5100889
105
7231
C5100890
106
7231
C5100709
107
7014
C5100659
107
7255
C5100659
107
7501
C5100659
108
7014
C5002018
109
7255
C2370902
110
7503
C5500637
111
7015
C3130764
112
7255
C5100969
113
7014
C5002000
114
7014
C5100912
114
7255
C5100912
115
7014
C5100923
115
7251
C5100923
116
7231
C0310929
116
7255
C0310929
117
7014
C5002017
Areas of Special Biological Significance Assessment
Areas of Special Biological Significance Assessment
Areas of Special Biological Significance Implementation
Big Canyon Creek Restoration
Buck Gully Maintenance Road and Wetland Project
Buck Gully Maintenance Road and Wetland Project
Buck Gully Maintenance Road and Wetland Project
Buck Gully Resource Management Plan
Eelgrass Study
Irrigation - Citywide Central Computer System
Irrigation - Newport Coast Central Computer System
Irrigation - Smart Controller Program
Newport Coast Runoff Reduction Program
Newport Coast Watershed Program
Newport Coast Watershed Program
Semeniuk Slough Dredging Project
Semeniuk Slough Dredging Project
Upper Bay and Harbor Area Management Plan
Upper Bay and Harbor Area Management Plan
Upper Bay Comprehensive Resource Management Plan
Total Water Quality and Environmental
Department
Rebudget
Budget
Total
Public Works
$0
$100,000
$100,000
Public Works
$2,299
$0
$2,299
Public Works
$56,300
$0
$56,300
Public Works
$41,350
$0
$41,350
Public Works
$47,500
$0
$47,500
Public Works
$69,800
$0
$69,800
Public Works
$0
$135,000
$135,000
City Manager
$0
$170,000
$170,000
Public Works
$250,000
$0
$250,000
General Svcs.
$0
$90,000
$90,000
General Svcs.
$0
$100,000
$100,000
Public Works
$142,100
$0
$142,100
Public Works
$0
$280,000
$280,000
Public Works
$93,000
$0
$93,000
Public Works
$55,000
$0
$55,000
Public Works
$0
$350,000
$350,000
Public Works
$0
$300,000
$300,000
Public Works
$92,700
$0
$92,700
Public Works
$12,870
$0
$12,870
City Manager
$0
$120,000
$120,000
$862,919
$1,645,000
$2,507,919
Areas of Special Biological Significance Assessment
Requesting Department: Public Works
Category: Water Quality and Environmental
Four studies were conducted in FY 2006/07 to identify and quantify impacts having negative effects on the the Areas of Special Biological
Significanace (ASBS). The results of these studies will be analyzed and compiled into a report with findings and recommendations for
future projects to mitigate these effects. This report will serve as the basis for future ASBS implementation projects.
Location:
Bay and coastal areas
Funding:
General Fund and Environmental Contributions (State ICWMP)
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$102,299
$0
$0
$0
$0
Total
$102,299
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C5100889
$0
$100,000
Environmental Contributions
7255
C5100889
$2,299
$0
$0
$0
TOTAL
$2,299
$100,000
PROJECT TOTAL 1 $102,299
104
Areas of Special Biological Significance Implementation
Requesting Department: Public Works Category: Water Quality and Environmental
This is a continuation of projects started in FY 2006 -07 within Areas of Special Biological Significance (ASBS). Work tasks include long-
term monitoring, community outreach, introduction of key species in local waters, promotion of Best Management Practices and project
management.
Location:
Buck Gully, Little Corona, Newport Coast area
Funding:
Tide and Submerged Lands
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$56,300
$0
$0
$0
$0
Total
$56,300
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NQ.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C5100890
$56,300
$0
$0
$0
$0
$0
TOTAL
$56,300
$0
PROJECTTOTALI $56,300
105
Big Canyon Creek Restoration
Requesting Department: Public Works
Category: Water Quality and Environmental
This is a multi- agency project involving the City, Department of Fish and Game, County of Orange, State Water Resources Control Board,
State Coastal Conservancy, and Newport Bay Naturalists and Friends to restore the 54 -acre Big Canyon Nature Park and its major
waterway, Big Canyon Creek.
Location:
Big Canyon Nature Park
Funding:
Tide and Submerged Lands
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$41,350
$0
$0
$0
$0
Total
$41,350
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C5100709
$41,350
$0
$0
$0
$0
$0
TOTAL
$41,350
$0
PROJECTTOTALI $41,350
106
Buck Gully Maintenance Road and Wetland Project
Requesting Department: Public Works
Category: Water Quality and Environmental
This project will install drop structures upstream and downstream of the maintenance road crossing over Buck Creek. Access will be
achieved from 5th Avenue and Poppy Street into Buck Gully. The sides of the road crossing will be be sealed with concrete to create
upstream and downstream culvert headwalls. Non - native vegetation will be removed upstream and downstream in the vicinity of the road
crossing and replanted with native materials.
Location:
Road crossing of Buck Creek in Buck Gully near Poppy Avenue and Fifth Avenue
Funding:
General Fund, Contributions Buck Gully Grant ($75,000) and Newport Coast Watershed Grant ($10,000) and Water Enterprise Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$252,300
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$252,300
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C5100659
$47,500
$0
Contributions
7255
C5100659
$69,800
$0
Water Enterprise
7501
C5100659
$0
$135,000
TOTAL
$117,300
$135,000
PROJECT TOTAL 1 $252,300
107
Buck Gully Resource Management Plan
Requesting Department: City Manager
Category: Water Quality and Environmental
This project would put into place a detailed Resource and Recreation Management Plan for Buck Gully detailing a workplan for up to a 20
year series of capital improvement projects to address public access, fire safety, water quality and native restoration. Consultants will be
retained to complete the plan and to present and defend the plan to the resources agencies involved in overseeing the lands within the
Natural Communities Conservation Plan.
Location:
Buck Gully - inland of 5th Avenue to Newport Coast Drive and San Joaquin Hills Road
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$170,000
$0
$0
$0
$0
Total
$170,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C5002018
$0
$170,000
$0
$0
$0
$0
TOTAL
$0
$170,000
PROJECT TOTAL 1 $170,000
108
Eelgrass Study
Requesting Department: Public Works
Category: Water Quality and Environmental
This project provides for a consultant to determine factors (such as location, light, algae competition and pollutants) that are important for
eelgrass to thrive. Work tasks include research, developing and implementing field studies and preparing an assessment for review by the
Bay Area Management Planning TAC. Funding is expected from the State Water Resources Control Board 2006 Consolidated Grant
program. Maintenance and monitoring costs are projected at $25,000 per year.
Location:
Newport Harbor
Funding:
Environmental Contributions (State Water Resources Control Board 2006 Consolidated Grant)
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$250,000
$0
$0
$0
$0
Total
$250,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Environmental Contributions
7255
C2370902
$250,000
$0
$0
$0
$0
$0
TOTAL
$250,000
$0
PROJECT TOTAL 1 $250,000
109
Irrigation - Citywide Central Computer System
Requesting Department: General Services
Category: Water Quality and Environmental
This project provides for the installation of an irrigation computer system and necessary equipment at a selection of City park satellite
locations. Various elements of the system were installed in previous phases at other locations. The long -term goal is to have all parks
linked to a central computerized irrigation system to better monitor and conserve water.
Location:
Citywide
Funding:
Water Enterprise Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$90,000
$0
$0
$0
$0
Total
$90,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7503
C5500637
$0
$90,000
$0
$0
$0
$0
TOTAL
$0
$90,000
PROJECT TOTAL $90,000
110
Irrigation - Newport Coast Central Computer System
Requesting Department: General Services
Category: Water Quality and Environmental
This project provides for the installation of an irrigation computer system and necessary equipment at existing slope and median locations in
Newport Coast. Work will be performed by City staff and a private contractor. Computerized irrigation management systems reduce water
consumption up to 20% and the system will have a three to five -year payback from water savings.
Location:
Newport Coast
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$100,000
$0
$0
$0
$0
Total
$100,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7015
C3130764
$0
$100,000
$0
$0
$0
$0
TOTAL
$0
$100,000
PROJECT TOTAL 1 $100,000
ill
Irrigation - Smart Controller Program
Requesting Department: Public Works
Category: Water Quality and Environmental
This project provides funding for property owners to install new weather based irrigation controllers. These controllers meter out the proper
amount of water to plants based on a set of parameters including weather conditions, sunlight, soil type, plant type, property slope and the
precipitation rate of the valve. Other work could include creating incentives for residents to upgrade leaking and inefficient irrigation
systems.
Location:
Citywide
Funding:
Environmental Contributions (Cal -Fed Grant)
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2007 -08 FY 2008 -09 FY 2010 -11 FY 2011 -12 FY 2012 -13
$0
$0
$0
$142.100
$142,100
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
M
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Environmental Contributions
7255
C5100969
$142,100
$0
$0
$0
$0
$0
TOTAL
$142,100
$0
PROJECT TOTAL 1 $142,100
112
Newport Coast Runoff Reduction Program
Requesting Department: Public Works
Category: Water Quality and Environmental
The project will be used to fulfill grant match commitments to reduce runoff in Newport Coast. A portion of funds would be used to
purchase irrigation controllers and multi -port rotator nozzles for private and public use ($150,000). An educational kiosk and other
amenities will be built in conjunction with Roger's Gardens model garden currently under construction at its site on San Miguel Road
($50,000). This program also provides for flow monitoring of runoff to the Areas of Special Biological Significance and community education
($80,000).
Location:
Newport Coast
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$280,000
$0
$0
$0
$0
Total
$280,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C5002000
$0
$280,000
$0
$0
$0
$0
TOTAL
$0
$280,000
PROJECT TOTAL 1 $280,000
113
Newport Coast Watershed Program
Requesting Department: Public Works
Category: Water Quality and Environmental
This project provides funding for miscellaneous activities in the Newport Coast Watershed. Work started in FY 2006 -07 includes arundo
removal, modification of the Morning Canyon detention basin, design and construction of an interpretive facility, and design for the
modification of the Pelican Hill Golf Course Detention Basin to allow more sand and gravel to pass through the basin.
Location:
Newport Coast
Funding:
General Fund and Environmental Contributions (Proposition 13 Watershed Grant)
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$148,000
$0
$0
$0
$0
Total
$148,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C5100912
$93,000
$0
Environmental Contributions
7255
C5100912
$55,000
$0
$0
$0
TOTAL
$148,000
$0
PROJECT TOTAL 1 $148,000
114
Semeniuk Slough Dredging Project
Requesting Department: Public Works
Category: Water Quality and Environmental
This is a combined dredging project with the Corps of Engineers to include Semeniuk Slough with the dredging of Newport Slough and
Santa Ana River. Negotiations are continuing with the Corps to obtain federal commitment to participate in this project and to prepare
construction documents and regulatory entitlements. Efforts will also be made to construct a detention basin within Newport Banning
Ranch.
Location:
Semeniuk Slough, West Newport
Funding:
General Fund and Contributions
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$650,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$650,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C5100923
$0
$350,000
Contributions
7251
C5100923
$0
$300,000
$0
$0
TOTAL
$0
$650,000
PROJECT TOTAL 1 $650,000
115
Upper Bay and Harbor Area Management Plan
Requesting Department: Public Works
Category: Water Quality and Environmental
This project continues work to prepare a master plan identifying challenges and goals for the Upper Bay and Harbor areas, developing a
harbor policy, identifying and prioritizing studies and projects, determining funding requirements, and identifying funding sources (grants,
trusts, community and corporate donations).
Location:
Newport Harbor and Upper Bay
Funding:
Tide and Submerged Lands and Environmental Contributions (Proposition 50 Integrated Regional Water Management Planning Grant)
FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET $ BUDGET $
Tide and Submerged Lands 7231 C0310929 $92,700 $0
Environmental Contributions 7255 C0310929 $12,870 $0
$0 $0
TOTAL $105,570 $0
PROJECT TOTAL 1 $105,570
116
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$105,570
$0
$0
$0
$0
Total
$105,570
$0
$0
$0
$0
FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET $ BUDGET $
Tide and Submerged Lands 7231 C0310929 $92,700 $0
Environmental Contributions 7255 C0310929 $12,870 $0
$0 $0
TOTAL $105,570 $0
PROJECT TOTAL 1 $105,570
116
Upper Bay Comprehensive Resource Management Plan
Requesting Department: City Manager Category: Water Quality and Environmental
This project begins the development of a Comprehensive Resource Management Plan (CRMP) to look at Newport Bay and its adjacent
lands and properties without limitation to jurisdictional boundaries. The CRMP would address management of Newport Bay facilities,
habitat restoration and species protection, educational and interpretative opportunities, public access, sediment management, TMDL
activities including scientific studies, and water quality protection. The CRMP would combine existing and outdated management plans into
a single, implementable document to address common issues and programs.
Location:
Newport Bay
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$120,000
$0
$0
$0
$0
Total
$120,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C5002017
$120,000
$0
$0
$0
$0
$0
TOTAL
$120,000
$0
PROJECT TOTAL 1 $120,000
117
Water
Page Fund Project Title
118
7501
C5500978
Bay Crossings Water Transmission Main Replacement
119
7501
C6002001
Ocean Birch Drive Water Main Replacement
120
7501
C6002000
Ocean Front Alley Water Main Replacement
121
7503
C5500460
Water Well Rehabilitation
Total Water
Department
Utilities
Utilities
Utilities
Utilities
Rebudget Budget Total
$300,000 $0 $300,000
$0 $414,000 $414,000
$750,000 $0 $750,000
$0 $150,000 $150,000
$1,050,000 $564,000 $1,614,000
Bay Crossings Water Transmission Main Replacement
Requesting Department: Utilities Category: Water
This project provides for the replacement of deteriorating water transmission mains or installation of new mains pursuant to the Water
Master Plan. This project will begin the study and design efforts to replace bay crossings throughout the harbor. These critical lines serve
various island communities such as Balboa Island.
Location:
Various
Funding:
Water Enterprise Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$300,000
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$300,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7501
C5500978
$300,000
$0
$0
$0
$0
$0
TOTAL
$300,000
$0
PROJECT TOTAL 1 $300,000
118
Ocean Birch Drive Water Main Replacement
Requesting Department: Utilities Category: Water
This project provides for the replacement of deteriorated water mains in the older areas of the City. The work also includes enlargement of
mains and betterments to improve the operational efficiency of the water system and improve fire protection. This construction effort will
focus on valve replacement in concert with street improvement projects scheduled in this area.
Location:
Ocean Birch Drive
Funding:
Water Enterprise Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$414,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$414,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7501
C6002001
$0
$414,000
$0
$0
$0
$0
TOTAL
$0
T $414,000
PROJECT TOTAL 1 $414,000
119
Ocean Front Alley Water Main Replacement
Requesting Department: Utilities Category: Water
This project provides for the large replacement of programmed pipelines in accordance with the Water Master Plan. Scheduling of these
large projects is coordinated with planned undergrounding of utilities in the same area. This project intended to replace water mains within
the planned area of Assessment District 99 and the sewer main improvements in Balboa Peninsula. The timing of this project will be
reconsidered with the recent failure of Assessment District 99 to be formed.
Location:
Ocean Front Alley - 14th Street to 19th Street
Funding:
Water Enterprise Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$750,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$750,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7501
C6002000
$750,000
$0
$0
$0
$0
$0
TOTAL
$750,000
$0
PROJECT TOTAL 1 $750,000
120
Water Well Rehabilitation
Requesting Department: Utilities
This project provides for the rehabilitation of the City's water wells.
Location:
To be determined
Funding:
Water Enterprise Fund
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $150,000
Other $0
Total $150,000
FY 2008 -09
$0
$0
$0
a
Category: Water
FY 2010 -11
FY 2011 -12
FY 2012 -13
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0 $0 $0
FUNDING SOURCE DIVISION NO. PROJECT NO. REBUDGET $ BUDGET $
Water Enterprise 7503 C5500460 $0 $150,000
$0 $0
$0 $0
TOTAL $0 $150,000
PROJECT TOTAL 1 $150,000
121
Wastewater
Page Fund
Project Title
122
7531
C5600861
Buck Gully Sewer Force Main Replacement
123
7531
C7002000
Ocean Front Alley Sewer Lateral Replacement
124
7532
C5600100
Sewer Pump Station Master Plan Improvements
125
7531
C5600934
Wastewater Master Plan
Total Wastewater
Department
Utilities
Utilities
Utilities
Utilities
Rebudget
Budget
Total
$0
$350,000
$350,000
$0
$250,000
$250,000
$200,000
$134,000
$334,000
$17,200
$50,000
$67,200
$217,200
$784,000
$1,001,200
Buck Gully Sewer Force Main Replacement
Requesting Department: Utilities Category: Wastewater
This project provides for replacing and relocating the Buck Gully Sewer Force Main. The current force main terminates in the Oceanfront
Alley at Poppy Avenue. The new force main will extend up Poppy Avenue from Ocean Boulevard and terminate at East Coast Highway at
Hazel Drive. The new terminus allows for a more direct connection to the Orange County Sanitation District Trunk in East Coast Highway
and results in reduced flows in the Oceanfront Alley Sewer Main. The plans and specifications for this project will to be prepared by a
consultant. Construction will be performed by a private contractor.
Location:
Buck Gully
Funding:
Wastewater Enterprise Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$350,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$350,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Wastewater Enterprise
7531
C5600861
$0
$350,000
$0
$0
$0
$0
TOTAL
$0
$350,000
PROJECT TOTAL 1 $350,000
122
Ocean Front Alley Sewer Lateral Improvements
Requesting Department: Utilities
Category: Wastewater
This project provides for replacing and /or lining deteriorated sewer mains in accordance with the Master Plan of Sewers. This project
intended to replace sewer laterals and mains within the planned area of Assessment District 99 and water main improvements in Balboa
Peninsula. The timing of this project will be reconsidered with the recent failure of Assessment District 99 to be formed.
Location:
Ocean Front Alley - 14th Street to 20th Street
Funding:
Wastewater Enterprise Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$250,000
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$250,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Wastewater Enterprise
7531
C7002000
$0
$250,000
$0
$0
$0
$0
TOTAL
$0
$250,000
PROJECT TOTAL 1 $250,000
123
Sewer Pump Station Master Plan Improvements
Requesting Department: Utilities
Category: Wastewater
This project provides for the reconstruction, refurbishment and improvements to the City's wastewater pump stations as identified in the
Master Plan of Sewers. Worn pumps will be replaced with higher efficiency equipment. This year's project continues on the design for new
electrical controls at the Polaris Drive, Bren, Backbay, Harbor Ridge and Diamond Street pump stations. Upon completion of the
Wastewater Master Plan, currently underway, recommendations from the plan will be included in design efforts. Construction funds will be
requested in subsequent fiscal years after design estimates are completed.
Location:
n/a
Funding:
Wastewater Enterprise Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$334,000
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$334,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Wastewater Enterprise
7532
C5600100
$200,000
$134,000
$0
$0
$0
$0
TOTAL
$200,000
$134,000
PROJECT TOTAL 1 $334,000
124
Wastewater Master Plan
Requesting Department: Utilities Category: Wastewater
The Regional Water Quality Control Board (RWQCB) requires the City to update its Wastewater Master Plan on a regular basis. Since the
completion of the last master plan in 1996, the RWQCB is requiring several more in -depth studies to evaluate the conditions of the City's
sewer mains to ensure reliability against potential sanitary sewer overfows. Orange County Sanitation District (OCSD) has developed a
cooperative grant program to assist cities in reducing infiltration and inflow between systems. This project supplements funding
appropriated in FY 2006 -07 from the City and OCSD towards this effort.
Location:
n/a
Funding:
Wastewater Enterprise Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$67,200
$0
$0
$0
$0
Total
$67,200
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Wastewater Enterprise
7531
C5600934
$17,200
$50,000
$0
$0
$0
$0
TOTAL
$17,200
$50,000
PROJECTTOTALI $67,200
125
Miscellaneous
Page Fund Project Title
Department
126
7017
C2920900
Building Inspection Data Wireless Technology
Building
127
7014
C8002000
CIP Project Management
Public Works
128
7181
C5100763
City Aerial Mapping
Public Works
129
7017
C8002001
Fire Department Technology: Early Notification Alerting
Fire
129
7017
C2310620
Fire Department Technology: Facilities Management
Fire
129
7017
C2310911
Fire Department Technology: FireView Software
Fire
130
7271
C2320920
Holmatro Tool Replacement
Fire
131
7271
C4009617
Library Public Use Computer Replacement
Library
132
7295
C5100566
Ocean Safety Operations Technical Equipment
Fire
133
7231
C5400053
Oil Field Improvement Program
Utilities
134
7024
C0620935
Parking Meters Replacement
Admin. Svcs.
135
7271
C8002002
Public Safety 800 MHz Radio Exchange
Fire
136
7019
C8002003
Public Safety Equipment Storage Module
Fire
137
7181
C5100733
Records Management
Public Works
137
7281
C5100733
Records Management
Public Works
138
7019
C8002004
Rescue Boat Engine Purchase
Fire
139
7459
C5100879
Santa Ana Heights Utility Undergrounding
City Manager
140
7014
C5100814
Slope Repairs
Public Works
141
7017
C8002026
Tsunami Warning System
Fire
Total Miscellaneous
Rebudget
Budget
Total
$90,000
$0
$90,000
$0
$170,000
$170,000
$10,000
$0
$10,000
$0
$75,000
$75,000
$7,200
$0
$7,200
$7,680
$11,000
$18,680
$13,700
$0
$13,700
$0
$34,000
$34,000
$8,000
$0
$8,000
$453,400
$0
$453,400
$0
$105,000
$105,000
$0
$66,000
$66,000
$0
$15,000
$15,000
$10,000
$0
$10,000
$17,000
$0
$17,000
$0
$31,000
$31,000
$11,200
$7,400,000
$7,411,200
$100,000
$0
$100,000
$0
$200,000
$200,000
$728,180
$8,107,000
$8,835,180
Building Inspection Data Wireless Technology
Requesting Department: Building
Category: Miscellaneous
This project replaces field computer data collection hardware and software with an Accela wireless system that improves function and
service to customers by providing immediate updates to the permits database through wireless technology. Inspection results would be
available immediately through the internet or at City offices.
Location:
City Hall and field units
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$90,000
$0
$0
$0
$0
Total
$90,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7017
C2920900
$90,000
$0
$0
$0
$0
$0
TOTAL
$90,000
$0
PROJECT TOTAL $90,000
126
CIP Project Management
Requesting Department: Public Works Category: Miscellaneous
The City continues to undertake an ambitious and wide- ranging Capital Improvement Program (CIP). This project provides funding to retain
consultants to assist Public Works staff with construction management and project management to deliver projects efficiently and cost
effectively.
Location:
n/a
Funding:
General Fund
Schedule:
Desiqn Permittinq Award Start I Completion
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$170,000
$0
$0
$0
$0
Total
$170,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C8002000
$0
$170,000
$0
$0
$0
$0
TOTAL
$0
$170,000
PROJECT TOTAL 1 $170,000
127
City Aerial Mapping
Requesting Department: Public Works
Category: Miscellaneous
Recently, Merrick and Company generated 2 -foot contours within the City limits. Aerial photos were retaken, including Newport Coast, with
1 -foot contours. This project is substantially complete. The remaining funds will be used to produce large scale aerial maps for City
departments.
Location:
n/a
Funding:
Gas Tax
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$10,000
$0
$0
$0
$0
Total
$10,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C5100763
$10,000
$0
$0
$0
$0
$0
TOTAL
$10,000
$0
PROJECT TOTAL $10,000
128
Fire Department Technology
Requesting Department: Fire Category: Miscellaneous
This project provides for the purchase and installation of various computer related software and hardware. First, $75,000 is programmed
for Early Notification Alerting which is a computerized alerting system giving personnel early notification to respond to an emergency. The
system will be installed at Fire Station No. 5 and Fire Station No. 7. Second, $7,200 represents remaining funds from prior year
appropriations for the installation of technology to improve management oversight and operations. Third, $18,680 is budgeted to update
existing FireView software used to produce geographical representations of fire incidents and response times.
Location:
Fire Station No. 5 - 410 Marigold Avenue and Fire Station No. 7 - 20401 Acacia Street
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$100,880
$0
$0
$0
$0
Total
$100,880
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7017
C8002001
$0
$75,000
General Fund
7017
C2310620
$7,200
$0
General Fund
7017
C2310911
$7,680
$11,000
TOTAL
$14,880 $86,000
PROJECT TOTAL $100,880
129
Holmatro Tool Replacement
Requesting Department: Fire Category: Miscellaneous
This project replaces a major piece of capital equipment, a complete HOLMATRO (Jaws of Life) unit on Ladder Truck No. 63. The existing
unit is worn and beyond economical repair.
Location:
Ladder Truck No. 63 at Fire Station No. 3
Funding:
Building Excise Tax
FY 2007 -08
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $13,700
Total $13,700
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
BET
7271
C2320920
$13,7001 $0
$O $0
$0, $0
TOTAL
$13,700 $0
PROJECT TOTAL 1 $13,700
130
Library Public Use Computer Replacement
Requesting Department: Library
Category: Miscellaneous
This project provides for replacement of 32 desktop and 10 laptop computers used by the public at the Central Library and branch libraries.
This number represents one third of the total number of public use computers. These 42 computers are three years old and should be
replaced as recommended by the IT Division.
Location:
Various
Funding:
Building Excise Tax
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$34,000
$0
$0
$0
$0
Total
$34,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
BET
7271
C4009617
$0
$34,000
$0
$0
$0
$0
TOTAL
$0
$34,000
PROJECT TOTAL $34,000
131
Ocean Safety Operations Technical Equipment
Requesting Department: Fire
Category: Miscellaneous
This project provides for various ocean safety operations improvements such as remote beach cameras, modifications to the 800 MHz radio
system and upgrades to the Lifeguard Headquarters Communications Center.
Location:
Beach areas and Lifeguard Headquarters
Funding:
Oil Spill Remediation
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$8,000
$0
$0
$0
$0
Total
$8,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Oil Spill Remediation
7295
C5100566
$8,000 $0
$O $0
$0, $0
TOTAL
$8,000 $0
PROJECT TOTAL 1 $8,000
132
Oil Field Improvement Program
Requesting Department: Utilities Category: Miscellaneous
This project provides for modifications and improvements to the City's existing oil wells, oil pumping equipment, tank farm production,
storage facilities, water injection wells and oil, water, and gas transmission lines associated with the City's tidelands oil field. This year's
program will focus on the continued waterflooding of the existing oil layers in an effort to maximize production and increase revenues from
this operation. Plans and specifications will be prepared by private consultants and Utilities staff. Any construction or work will be
performed by a private contractor.
Location:
West Newport Oil Field
Funding:
Tide and Submerged Lands
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$453,400
$0
$0
$0
$0
Other
$0
$0
$0
$0
$0
Total
$453,400
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C5400053
$453,400
$0
$0
$0
$0
$0
TOTAL
$453,400
$0
PROJECT TOTAL $453,400
133
Parking Meters Replacement
Requesting Department: Administrative Services
Category: Miscellaneous
This project provides for the annual replacement of approximately 200 of the City's 2600 parking meters. All new meters utilize digital
mechanisms. All replacement work will be performed by City staff.
Location:
Citywide
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$105,000
$0
$0
$0
$0
Total
$105,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7024
C0620935
$0
$105,000
$0
$0
$0
$0
TOTAL
$0
$105,000
PROJECT TOTAL 1 $105,000
134
Public Safety 800 MHz Radio Exchange
Requesting Department: Fire
Category: Miscellaneous
This project replaces 30 old model (MTS 2000/3000) portable radios and exchanges them for newer Motorola model radios. The radio
equipment is an important part of the public safety radio system for the County of Orange allowing for both intra- agency and inter - agency
communications. The last radios were purchased 10 -13 years ago. The Orange County Sheriffs Department will provide a discount to
agencies that update their radios at this time.
Location:
n/a
Funding:
Building Excise Tax
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$66,000
$0
$0
$0
$0
Total
$66,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
BET
7271
C8002002
$0
$66,000
$0
$0
$0
$0
TOTAL
$0
$66,000
PROJECT TOTAL $66,000
135
Public Safety Equipment Storage Module
Requesting Department: Fire
Category: Miscellaneous
This project would provide for the purchase and installation of a storage module at Fire Station No. 7 to store training materials and
emergency equipment for the Citizen Emergency Response Team (CERT). Upon its opening in the fall of 2007, Fire Station No. 7 will
become the permanent home of CERT training.
Location:
Fire Station No. 7 - 20401 Acacia Avenue
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$15,000
$0
$0
$0
$0
Total
$15,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7019
C8002003
$0
$15,000
$0
$0
$0
$0
TOTAL
$0
$15,000
PROJECT TOTAL $15,000
136
Records Management
Requesting Department: Public Works Category: Miscellaneous
This project provides for the implementation of the Records Management Program for the Public Works Department. The program may
include the purchase of capital items including new filing systems, storage containers, or rental of off -site facilities.
Location:
City Hall
Funding:
Gas Tax and Measure M Turnback
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$27,000
$0
$0
$0
$0
Total
$27,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C5100733
$10,000
$0
Measure M Turnback
7281
C5100733
$17,000
$0
$0
$0
TOTAL
$27,000
$0
PROJECT TOTAL $27,000
137
Rescue Boat Engine Purchase
Requesting Department: Fire Category: Miscellaneous
All three boats used for rescue operations have new two 8.1 -liter engines. The Department has three boats that rely on spare engines.
This project provides for the purchase of two spare 8.1 -liter engines. This provides staff with a flexible service schedule for all three boats
while maintaining the ability to replace an engine in the event of a major failure.
Location:
n/a
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$31,000
$0
$0
$0
$0
Total
$31,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7019
C8002004
$0
$31,000
$0
$0
$0
$0
TOTAL
$0
$31,000
PROJECT TOTAL $31,000
138
Santa Ana Heights Utility Undergrounding
Requesting Department: City Manager
Category: Miscellaneous
This project provides for the design and construction to underground utility facilities in Santa Ana Heights pursuant to City Council action on
October 11, 2005, and County Board of Supervisors action on March 27, 2007.
Location:
Santa Ana Heights
Funding:
Contributions (County of Orange Redevelopment Agency)
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$7,411,200
$0
$0
$0
$0
Total
$7,411,200
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Contributions
7459
C5100879
$11,2001
$O
$0
$7,400,000
$0
$0
TOTAL
$11,200
$7,400,000
PROJECT TOTAL 1 $7,411,200
139
Slope Repairs
Requesting Department: Public Works
Category: Miscellaneous
This project will investigate slope failures at the following locations: Lookout Point, China Cove, and Cliff Drive Park. One or two other
locations may proceed through design. Additional funding may be needed to proceed through construction.
Location:
To be determined
Funding:
General Fund
FY 2007 -08
Design /Environmental $100,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $100,000
FY 2008 -09
$0
$0
$0
I
FY 2010 -11
$0
$0
$0
$0
FY 2011 -12
$0
$0
$0
$0
FY 2012 -13
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C5100814
$100,000
$0
$0
$0
$0
$0
TOTAL
$100,000
$0
PROJECT TOTAL 1 $100,000
140
Tsunami Warning System
Requesting Department: Fire Category: Miscellaneous
This project provides for the complete installation and placement of three outdoor warning sirens to notify residents and or visitors should a
tsunami is generated and evacuation of beaches is necessitated. The sirens will be strategically placed in the Tsunami Inundation area pre -
identified in the City's Tsunami Incident Action Plan.
Location:
n/a
Funding:
General Fund
FUNDING SOURCE
FY 2007 -08
FY 2008 -09
FY 2010 -11
FY 2011 -12
FY 2012 -13
Design /Environmental
$0
$0
$0
$0
$0
Right -of -Way, Land Acquisition
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
Other
$200,000
$0
$0
$0
$0
Total
$200,000
$0
$0
$0
$0
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7017
C8002026
$0
$200,000
$0
$0
$0
$0
TOTAL
$0
$200,000
PROJECT TOTAL 1 $200,000
141
Master Project Schedule
Legend
The Master Project Schedule demonstrates the anticipated delivery schedule for capital projects
proposed in the Preliminary FY 2007 -2008 Capital Improvement Program budget. Titles of
projects approved in prior capital improvement program budgets appear in black. Titles of new
projects appear in red. Subsequent updates will be distributed quarterly.
Timeline by Month
FY 2007 -08 DRAFT MASTER PROJECT SCHEDULE
Black Diamond:
Contract Award
Black Bar:
Project Duration
Green Bar:
Permitting /Study
Project Manager
Red Bar:
Construction
Red Title:
New Project
+�
(I I CIP Prgect Wa.Wmem- co�Yant(p. 111)$170,000) Mon 07,02)07 Mon
Cry Aa al Mapping Wn 07A 7 Fit
(1) Completion lip. 112) ($10.000) Mon 07102)07 Fn
City Mwl Catpot nopM nwnt - novetaMDhtwon Mon 07102007 Fn
(1)Design -(p.31 Mon 07102)07 Tua
(2) Award Tue0at14007 Tw
(3) Coneltuotion j$1 S. 000) Mon OWOW Fit
City Wide Sheet. Poriing Lot and Storm Mn lmpmvements - Manna Mon 02713106 TIM
Avenw. ISM 941o0t. Wost Bay Avonue otw Stn and 7th. Spyglass AMa.
M npor glow lolls Sohn Area. Seashore Dnve and CDM and A Street
Beach Panting Lots
Blue Bar:
Design
a$B
aeg
ago
Black Title:
Existing Project
apt
I%
Black Diamond:
Contract Award
Black Bar:
Project Duration
Green Bar:
Permitting /Study
Project Manager
Red Bar:
Construction