HomeMy WebLinkAboutCapital Improvement Plan 2011r
CITY OF NEWPORT BEACH
wt
�-
r -
Fiscal Year 2010-11
t
y
wt
�-
r -
Fiscal Year 2010-11
Intentionally Blank
City of Newport Beach
CAPITAL IMPROVEMENT PROGRAM
Fiscal Year 2010 -2011
�I
V
TO
CITY COUNCIL
Mayor Keith D. Curry
Mayor Pro Tem Michael F. Henn
Council Member Leslie J. Daigle
Council Member Nancy Gardner
Council Member Steven Rosansky
Council Member Edward D. Selich
Council Member Don Webb
CITY MANAGER
David A. Kiff
PUBLIC WORKS DIRECTOR
Stephen G. Badum
Cover photo location: Crystal Cove State Beach
Cover photo & design: Maurice Turner, City Employee
The City of Newport Beach Capital Improvement Program (CIP) serves as a plan for the provision of public improvements, special
projects, on -going maintenance programs, and the implementation of the City's master plans. Projects in the CIP include
improvements and major maintenance on arterial highways, local streets, and alleys; storm drain and water quality improvements; bay,
pier, and beach improvements; park and facility improvements; water and wastewater system improvements; transportation safety and
traffic signal improvements; and planning programs and studies.
CIP Budget by Category
FY 2010 -2011
(includes rebudgets)
Miscellaneous
Wastewater
$1.9, 3.5%
$.8, 1.6%
Facilities
Water
$1.7, 3.1%
$2.3, 4.4 °31
water quality
and
Environmental
Streets and
$2.9, 5.4%
Drainage
$23.5, 44.5%
Parks, Harbors
and Beaches
$18.2, 34.5%
Traffic
$1.5, 2.9%
dollars in millions
The adopted FY 2010 -11 CIP consists of 64 projects representing nearly
$24 million in new appropriations and more than $29 million in
rebudgeted funds for a total CIP budget of $52,916,798. Major funding
initiatives include Rhine Channel Dredging, Big Canyon Restoration,
Bridge Seismic Retrofit Construction, Jamboree Road Bridge Widening
and Jamboree Road Improvements at Bristol and Fairchild. Significant
work continues this fiscal year on major facilities projects such as the
Civic Center and Park, Marina Park, and Sunset Ridge Park.
Given the current fiscal climate, the development of the proposed CIP
was limited to meeting Council priorities and master plan requirements.
As a result, the adopted FY 2010 -11 CIP represents a 12.9 percent
decrease in total funding compared to the adopted FY 2009 -10 CIP.
Essential projects were prioritized and summarized by available funds
and presented to the City Council for consideration. Funding of capital
projects is derived from multiple funding sources.
Also, projects are organized by primary function or benefit into one of the
following categories: Facilities; Streets and Drainage; Traffic; Parks,
Harbors and Beaches; Water Quality and Environmental; Water;
Wastewater; and Miscellaneous, as shown in the chart to the left.
Highlights of the adopted CIP budget for FY 2010 -11 are presented by category as follows:
Facilities
Projects organized under Facilities include construction, rehabilitation and repair of City buildings and facilities. Major projects within
this category approximate $1.7 million and include:
• Design and environmental for new Civic Center ($1,000,000)
• Incidental construction related expenses and furniture, fixtures and equipment (FF &E) for the Oasis Senior Center ($568,350)
• Repairs and improvements to Caroll Beek Community Center and Police Facility ($95,000)
Streets and Drainage
Projects organized under Streets and Drainage include construction, rehabilitation and repair of City roads, alleys, medians, bridges,
sidewalks, streetlights, slopes and tide structures. Projects within this category exceed $23.5 million and major highlights include:
• Street and alley construction and rehabilitation, including Central Balboa Peninsula Rehabilitation, Harbor Hills — Newport
Heights Pavement Rehabilitation, Dover Drive, Westcliff Drive, Avon Street, Tustin Avenue, Ocean View Avenue, Irvine
Avenue Realignment — University Drive to Bristol Street, Jamboree Road Improvements — Bristol /Fairchild, Lido Isle Street
Rehabilitation, Ocean Front Alley Replacement, Peninsula Point Alley Replacement and Grade Adjustments for Utility
Structures ($10,548,800)
• Bridge improvements ($8,372,800)
• Streetlighting ($1,947,500)
• Drainage and tide structures ($1,101,500)
• Slurry seal projects ($730,000)
• Sidewalk improvements ($556,000)
• Median and landscape improvements ($361,800)
Traffic
Projects organized under Traffic include traffic signal system maintenance and improvements, neighborhood traffic management,
pedestrian improvements and signage. Projects within this category exceed $1.5 million and major highlights include:
• Traffic signal modernization ($980,000)
• Traffic signal rehabilitation ($225,000)
• Parking lot construction ($260,000)
• Transportation modeling and planning ($45,000)
Parks, Harbors and Beaches
Projects organized under Parks, Harbors and Beaches include improvements or repairs to the City's parks, harbors, docks, wharfs,
piers and beaches. Projects within this category exceed $18.2 million and major highlights include:
• Park improvements, including Sunset Ridge Park, Marina Park, Eastbluff Park playground equipment, and San Miguel Park
Staircase Repair ($13,199,200)
• Harbor improvements, including Rhine Channel Dredging, Lower Harbor Dredging and Newport Harbor dredging permit
($4,447,500)
• Beach improvements, including Ocean Pier Evaluation and Maintenance ($600,000)
Water Quality and Environmental
Projects organized under Water Quality and Environmental include studies, improvements and programs that benefit the City's natural
resources. Projects within this category approximate $2.9 million and major highlights include:
• Big Canyon Wash Restoration ($1,575,000)
• Buck Gully Canyon stabilization and flood control project ($1,034,900)
• Runoff reduction and irrigation improvements ($273,100)
Water and Wastewater
Projects organized under Water and Wastewater are funded from respective service charges and are used for the rehabilitation and
expansion of these services. Projects within these categories approximate $3.2 million and major highlights include:
• Water transmission and main improvements ($2,325,000)
• Sewer main improvements ($425,000)
• Sewer pipeline improvements and master planning ($440,000)
Miscellaneous
Projects organized under Miscellaneous are ones that do not fit into any other category and include capital purchases and special
projects. Projects within these categories exceed $1.8 million and highlights include:
• Santa Ana Heights utility undergrounding ($1,230,000)
• Capital purchases and repairs ($476,700)
• CIP project management ($170,000)
Conclusion
The City continues to undertake an ambitious and wide - ranging capital improvement program. The projects, both significant and
diverse, will serve all areas of the City. It is the City's policy to appropriate sufficient funds for all projects scheduled during the coming
budget year. Many of the projects require multiple year terms to complete them. In such cases, only the current phase identified to be
completed during FY 2010 -2011 is budgeted and appropriated. Subsequent phases of a project and projects requiring more time or
funding are reconsidered at the appropriate time. Our project delivery team of engineers, support staff and consultants are tasked with
managing more complex workloads while maintaining high quality standards. Creative project management solutions and alternative
delivery methods continue to play a key role in our future success.
Schedule
Updated project information is available online through the internet. Real -time information on capital projects, such as schedules,
budget and contacts, can be searched by location (map format) or by title (log format.) Projects are filtered by phase including
planning, design, construction, completion. Information on projects being done within the City's limits by other public agencies is also
included on the City's construction map. To access the Public Works construction map, go to www .newportbeachca.gov /publicworks.
iv
City of Newport Beach
Capital Improvement Program
Adopted FY2010 -2011
TABLE OF CONTENTS
FACILITIES
Caroll Beek Community Center Improvements
Civic Center and Park
Oasis Senior Center Rebuild
Police Facilitv Generator Replacement
STREETS AND DRAINAGE
1
2
3
4
19th Street Tidegate Retrofit 5
Balboa Island and Harbor Bulkhead and Seawall Repairs 6
Bridge Maintenance Program 7
Bridge Seismic Retrofit Construction 8
Bristol Street North Landscape Improvements 9
Central Balboa Peninsula Pavement Rehabilitation 10
China Cove Slope and Drainage Improvements
11
Energy Efficiency Streetlight Improvements
12
Grade Adjustments for Utility Structures
13
Harbor View Hills / Newport Heights Pavement Rehabilitation
14
Irvine Avenue Realignment - University Drive to Bristol Street
15
Jamboree Road Bridge Widening
16
Jamboree Road Improvements - Bristol / Fairchild
17
Lido Isle Street Rehabilitation
18
Mariners Mile Business Area Improvements 19
Median Maintenance Strips - Citvwide 20
TOC -1
STREETS AND DRAINAGE CONTINUED
Ocean Front Alley Replacement
21
Pearl Avenue Tidal Structure and Valve
22
Peninsula Point Alley Replacement
23
San Miguel Drive Street Improvements
24
Sidewalk, Curb and Gutter Replacement and ADA Improvements
25
Slurry Seal Program
26
Street Rehabilitation
27
Streetlight Conversion Program 28
West Balboa Median Improvements 29
Westcliff Drive Median Renovation 30
TRAFFIC
Balboa Boulevard at Washington Street Parking Lot 31
EIR / Preliminary Plans 32
Traffic Signal Modernization: Phases 4 and 7 33
Traffic Signal Modernization: Phase 5 34
Traffic Signal Rehabilitation Program 35
Transportation Model Maintenance 36
PARKS, HARBORS AND BEACHES
Bonita Canyon Sports Park Improvements 37
Eastbluff Park Playground Equipment 38
Lower Harbor Dredging 39
Marina Park 40
Newport Harbor Dredging Permit 41
Ocean Pier Evaluation and Maintenance 42
Rhine Channel Dredging 43
Rhine Channel Wharf Repair and Public Dock 44
San Miguel Park Staircase Repair 45
Sunset Ridqe Park 46
TOC -2
WATER QUALITY AND ENVIRONMENTAL
WATER
Big Canyon Wash Restoration 47
Buck Gully Canyon Stabilization and Flood Control 48
Irrigation - Citywide Central Computer System 49
Irrigation - Smart Controller Program 50
Uooer Bav Comorehensive Resource Manaaement Plan 51
Central Balboa Water and Sewer Main Improvements 53
Corona del Mar Transmission Main Improvements 54
Corona del Mar Water Interconnect Replacement 55
WASTEWATER
Balboa Island Sewer Main Improvements 57
Master Plan Improvements 58
Sewer Pipeline Point Repairs and Lining 59
Wastewater Master Plan 60
MISCELLANEOUS
CIP Project Management
61
Corporation Yard Fleet Shop CNG Modification
62
Newport Coast Community Center AV Equipment
63
Parking Meters Replacement
64
Santa Ana Heights Utility Undergrounding
65
Tsunami Warnina Svstem
66
TOC -3
zqqq
City of Newport Beach
Capital Improvement Program
Adopted FY2010 -2011
ALPHABETICAL INDEX
Project Page
19th Street Tidegate Retrofit
Balboa Boulevard at Washington Street Parking Lot
Balboa Island and Harbor Bulkhead and Seawall Repairs
Balboa Island Sewer Main Improvements
Big Canyon Wash Restoration
Bonita Canyon Sports Park Improvements
Bridge Maintenance Program
Bridge Seismic Retrofit Construction
Bristol Street North Landscape Improvements
Buck Gully Canyon Stabilization and Flood Control
Caroll Beek Community Center Improvements
Central Balboa Peninsula Pavement Rehabilitation
Central Balboa Water and Sewer Main Improvements
China Cove Slope and Drainage Improvements
CIP Project Management
Civic Center and Park
Corona del Mar Transmission Main Improvements
Corona del Mar Water Interconnect Replacement
Corooration Yard Fleet Shoo CNG Modification
Alpha -1
5
31
6
57
47
37
7
8
9
48
1
10
53
11
61
2
54
55
62
Eastbluff Park Playground Equipment
38
EIR / Preliminary Plans
32
Energy Efficiency Streetlight Improvements
12
Grade Adjustments for Utility Structures
13
Harbor View Hills / Newport Heights Pavement Rehabilitation
14
Irrigation - Citywide Central Computer System
49
Irrigation - Smart Controller Program
50
Irvine Avenue Realignment - University Drive to Bristol Street
15
Jamboree Road Bridge Widening
16
Jamboree Road Improvements - Bristol / Fairchild
17
Lido Isle Street Rehabilitation
18
Lower Harbor Dredging
39
Marina Park
40
Mariners Mile Business Area Improvements
19
Master Plan Improvements
58
Median Maintenance Strips - Citywide
20
Newport Coast Community Center AV Equipment
63
Newport Harbor Dredging Permit
41
Oasis Senior Center Rebuild
3
Ocean Front Alley Replacement
21
Ocean Pier Evaluation and Maintenance
42
Parking Meters Replacement
64
Pearl Avenue Tidal Structure and Valve
22
Peninsula Point Alley Replacement
23
Alpha -2
Police Facility Generator Replacement
4
Rhine Channel Dredging
43
Rhine Channel Wharf Repair and Public Dock
44
San Miguel Drive Street Improvements
24
San Miguel Park Staircase Repair
45
Santa Ana Heights Utility Undergrounding
65
Sewer Pipeline Point Repairs and Lining
59
Sidewalk, Curb and Gutter Replacement and ADA Improvements
25
Slurry Seal Program
26
Street Rehabilitation
27
Streetlight Conversion Program
28
Sunset Ridge Park
46
Traffic Signal Modernization: Phases 4 and 7
33
Traffic Signal Modernization: Phase 5
34
Traffic Signal Rehabilitation Program
35
Transportation Model Maintenance
36
Tsunami Warning System
66
Upper Bay Comprehensive Resource Management Plan
51
Wastewater Master Plan
60
West Balboa Median Improvements
29
Westcliff Drive Median Renovation
30
Alpha -3
zqqq
Project Listing by Category
Facilities
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
1
7011
C1002023
Caroll Beek Community Center Improvements
Recreation /SS
$0
$20,000
$20,000
1
7251
C1002023
Caroll Beek Community Center Improvements
Recreation /SS
$0
$60,000
$60,000
2
7410
C1002009
Civic Center and Park
Public Works
$0
$1,000,000
$1,000,000
3
7453
C1002007
Oasis Senior Center Rebuild
Public Works
$568,350
$0
$568,350
4
7019
C1820918
Police Facility Generator Replacement
Public Works
$15,000
$0
$15,000
8
7181
C5100695
Total Facilities
Public Works
$583,350
$1,080,000
$1,663,350
Streets and Drainage
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
5
7012
C2502006
19th Street Tidegate Retrofit
General Svcs.
$0
$150,000
$150,000
5
7231
C2502006
19th Street Tidegate Retrofit
General Svcs.
$100,000
$0
$100,000
6
7231
C4402002
Balboa Island / Harbor Bulkhead and Seawall Repairs
Public Works
$395,000
$0
$395,000
7
7181
C2001010
Bridge Maintenance Program
Public Works
$250,000
$0
$250,000
7
7281
C2001010
Bridge Maintenance Program
Public Works
$0
$75,000
$75,000
8
7181
C5100695
Bridge Seismic Retrofit Construction
Public Works
$312,400
$0
$312,400
8
7251
C5100695
Bridge Seismic Retrofit Construction
Public Works
$1,942,800
$0
$1,942,800
9
7253
C2002028
Bristol Street North Landscape Improvements
Public Works
$73,000
$0
$73,000
10
7181
C2002017
Central Balboa Peninsula Pavement Rehabilitation
Public Works
$1,285,350
$0
$1,285,350
11
7012
C2502003
China Cove Slope and Drainage Improvements
Public Works
$246,400
$0
$246,400
11
7014
C8002008
China Cove Slope and Drainage Improvements
Public Works
$110,154
$0
$110,154
12
7251
C2202003
Energy Efficient Streetlight Improvements
Public Works
$853,000
$0
$853,000
13
7013
C2002038
Grade Adjustments for Utility Structures
Public Works
$0
$20,000
$20,000
13
7511
C2002038
Grade Adjustments for Utility Structures
Public Works
$0
$65,000
$65,000
13
7531
C2002038
Grade Adjustments for Utility Structures
Public Works
$0
$65,000
$65,000
14
7281
C2002039
Harbor View Hills / Newport Heights Pavement Rehab.
Public Works
$0
$1,190,000
$1,190,000
14
7511
C2002039
Harbor View Hills/ Newport Heights Pavement Rehab.
Public Works
$0
$22,500
$22,500
14
7531
C2002039
Harbor View Hills/ Newport Heights Pavement Rehab.
Public Works
$0
$26,500
$26,500
15
7181
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
Public Works
$0
$600,000
$600,000
15
7261
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
Public Works
$2,900
$0
$2,900
15
7511
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
Public Works
$0
$200,000
$200,000
Category-1
Streets and Drainage
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
16
7261
C5100784
Jamboree Road Bridge Widening
Public Works
$259,190
$3,650,000
$3,909,190
16
7281
C5100784
Jamboree Road Bridge Widening
Public Works
$470,000
$347,000
$817,000
16
7284
C5100784
Jamboree Road Bridge Widening
Public Works
$1,066,400
$0
$1,066,400
17
7261
C2002019
Jamboree Road Improvements Bristol / Fairchild
Public Works
$232,800
$0
$232,800
17
7284
C2002019
Jamboree Road Improvements Bristol / Fairchild
Public Works
$633,953
$2,364,459
$2,998,412
18
7281
C2002021
Lido Isle Street Rehabilitation
Public Works
$0
$700,000
$700,000
18
7511
C2002021
Lido Isle Street Rehabilitation
Public Works
$0
$3,000
$3,000
18
7531
C2002021
Lido Isle Street Rehabilitation
Public Works
$0
$15,000
$15,000
19
7013
C2002036
Mariners Mile Business Area Improvements
Public Works
$75,000
$0
$75,000
20
7013
C2001008
Median Maintenance Strips - Citywide
Public Works
$70,800
$0
$70,800
21
7013
C2002033
Ocean Front Alley Replacement
Public Works
$500,000
$0
$500,000
21
7511
C2002033
Ocean Front Alley Replacement
Public Works
$200,000
$0
$200,000
22
7231
C2502007
Pearl Avenue / South Bayfront Tidal Structure / Valve
Public Works
$100,000
$0
$100,000
23
7013
C5100277
Peninsula Point Alley Replacement
Public Works
$47,000
$0
$47,000
23
7013
C2002040
Peninsula Point Alley Replacement
Public Works
$0
$55,000
$55,000
23
7511
C2002040
Peninsula Point Alley Replacement
Public Works
$0
$70,000
$70,000
24
7251
C2002038
San Miguel Drive Street Improvements
Public Works
$851,670
$0
$851,670
24
7432
C2002038
San Miguel Drive Street Improvements
Public Works
$450,330
$0
$450,330
25
7013
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
General Svcs.
$156,000
$200,000
$356,000
25
7161
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
General Svcs.
$0
$50,000
$50,000
25
7181
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
General Svcs.
$0
$150,000
$150,000
26
7013
C2001011
Slurry Seal Program
Public Works
$100,000
$0
$100,000
26
7181
C2001011
Slurry Seal Program
Public Works
$0
$630,000
$630,000
27
7013
C2002025
Street Rehabilitation
Public Works
$55,000
$0
$55,000
27
7181
C2002018
Street Rehabilitation
Public Works
$420,000
$0
$420,000
27
7191
C2002024
Street Rehabilitation
Public Works
$197,344
$0
$197,344
27
7281
C2002024
Street Rehabilitation
Public Works
$276,000
$0
$276,000
28
7013
C2202000
Streetlight Conversion Program
Public Works
$134,500
$0
$134,500
28
7013
C2202002
Streetlight Conversion Program
Public Works
$680,000
$280,000
$960,000
29
7013
C2002034
West Balboa Median Improvements
Public Works
$23,375
$0
$23,375
30
7013
C2002014
Westcliff Drive Medians Renovaton
Public Works
$48,119
$0
$48,119
Total Streets and Drainage
$12,618,485
$10,928,459
$23,546,944
Category-2
Traffic
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
31
7024
C3002008
Balboa Boulevard at Washington Street Parking Lot
City Manager
$99,000
$161,000
$260,000
32
7191
C5100070
EIR / Preliminary Plans
Public Works
$25,000
$0
$25,000
33
7261
C3001007
Traffic Signal Modernization: Phases 4 and 7
Public Works
$130,000
$0
$130,000
34
7261
C3002009
Traffic Signal Modernization: Phase 5
Public Works
$0
$850,000
$850,000
35
7181
C3001007
Traffic Signal Rehabilitation Program
Public Works
$0
$225,000
$225,000
36
7181
C3001003
Transportation Model Maintenance
Public Works
$0
$10,000
$10,000
36
7261
C3001003
Transportation Model Maintenance
Public Works
$10,000
$0
$10,000
Total Traffic
$264,000
$1,246,000
$1,510,000
Parks,
Harbors and Beaches
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
37
7411
C4120616
Bonita Canyon Sports Park Improvements
Recreation /SS
$100,000
$0
$100,000
38
7015
C4002004
Eastbluff Park Playground Equipment
Recreation /SS
$52,325
$0
$52,325
38
7271
C4002004
Eastbluff Park Playground Equipment
Recreation /SS
$25,000
$0
$25,000
39
7231
C4402003
Lower Harbor Dredging
City Manager
$0
$100,000
$100,000
40
7411
C4002002
Marina Park
Public Works
$1,789,700
$1,400,000
$3,189,700
41
7231
C4401001
Newport Harbor Dredging Permit
City Manager
$198,000
$100,000
$298,000
42
7231
C4801001
Ocean Pier Evaluation and Maintenance
Public Works
$0
$600,000
$600,000
43
7231
C4402004
Rhine Channel Dredging
City Manager
$0
$4,000,000
$4,000,000
44
7231
C5100921
Rhine Channel Wharf Repair and Public Dock
City Manager
$49,538
$0
$49,538
45
7271
C4002009
San Miguel Park Staircase Repair
General Svcs.
$0
$25,000
$25,000
46
7412
C5100515
Sunset Ridge Park
Public Works
$9,807,205
$0
$9,807,205
Total Parks, Harbors and Beaches
$12,021,768
$6,225,000
$18,246,768
Water Quality and Environmental
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
47
7014
C5002004
Big Canyon Wash Restoration
Public Works
$0
$75,000
$75,000
47
7251
C5002004
Big Canyon Wash Restoration
Public Works
$0
$1,500,000
$1,500,000
48
7014
C5002002
Buck Gully Canyon Stabilization / Flood Control
Public Works
$1,034,900
$0
$1,034,900
49
7513
C5500637
Irrigation - Citywide Central Computer System
General Svcs.
$0
$90,000
$90,000
50
7014
C5100969
Irrigation - Smart Controller Program
Public Works
$57,258
$0
$57,258
50
7255
C5100969
Irrigation - Smart Controller Program
Public Works
$101,860
$0
$101,860
51
7014
C5002017
Upper Bay Comprehensive Resurce Management Plan
City Manager
$24,000
$0
$24,000
Total Water Quality and Environmental
$1,218,018
$1,665,000
$2,883,018
Category -3
Water
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
53
7511
C6002004
Central Balboa Water and Sewer Main Improvements
Public Works
$0
$1,500,000
$1,500,000
53
7531
C6002004
Central Balboa Water and Sewer Main Improvements
Public Works
$0
$500,000
$500,000
54
7511
C6002008
Corona del Mar Transmission Main Improvements
Utilities
$0
$250,000
$250,000
55
7511
C6002005
Corona del Mar Water Interconnect Replacement
Utilities
$75,000
$0
$75,000
Total Water
$75,000
$2,250,000
$2,325,000
Wastewater
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
57
7531
C7002003
Balboa Island Sewer Main Improvements
Public Works
$400,000
$0
$400,000
58
7531
C5600292
Master Plan Improvements
Public Works
$10,000
$0
$10,000
58
7532
C5600100
Master Plan Improvements
Public Works
$15,000
$0
$15,000
59
7531
C7001002
Sewer Pipeline Point Repairs and Lining
Public Works
$86,100
$250,000
$336,100
60
7531
C5600934
Wastewater Master Plan
Public Works
$103,952
$0
$103,952
Total Wastewater
$615,052
$250,000
$865,052
Miscellaneous
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
61
7014
C8002000
CIP Project Management
Public Works
$70,000
$100,000
$170,000
62
7611
C8002014
Corp Yard Fleet Shop CNG Modification
General Svcs.
$82,000
$0
$82,000
63
7019
C5100977
Newport Coast Community Center AV Equipment
Recreation /SS
$131,900
$0
$131,900
64
7024
C8001000
Parking Meters Replacement
Admin. Svcs.
$95,000
$0
$95,000
65
7459
C5100879
Santa Ana Heights Utility Undergrounding
City Manager
$1,230,000
$0
$1,230,000
66
7017
C8002026
Tsunami Warning System
Public Works
$167,766
$0
$167,766
Total Miscellaneous
$1,776,666
$100,000
$1,876,666
Total for All Categories $29,172,339 $23,744,459 $52,916,798
Category -4
Project Listing by Requesting Department
Page Fund Project Title
Administrative Services
64 7024 C8001000 Parking Meters Replacement
Total Administrative Services
City Manager
Category Rebudget Budget Total
Miscellaneous $95,000 $0 595,000
$95,000 $0 $95,000
31
7024
C3002008
Balboa Boulevard at Washington Street Parking Lot
Traffic
$99,000
$161,000
$260,000
39
7231
C4402003
Lower Harbor Dredging
Prks /Hrbrs /Bchs
$0
$100,000
$100,000
41
7231
C4401001
Newport Harbor Dredging Permit
Prks /Hrbrs /Bchs
$198,000
$100,000
$298,000
43
7231
C4402004
Rhine Channel Dredging
Prks /Hrbrs /Bchs
$0
$4,000,000
$4,000,000
44
7231
C5100921
Rhine Channel Wharf Repair and Public Dock
Prks /Hrbrs /Bchs
$49,538
$0
$49,538
65
7459
C5100879
Santa Ana Heights Utility Undergrounding
Miscellaneous
$1,230,000
$0
$1,230,000
51
7014
C5002017
Upper Bay Comprehensive Resource Management Plan
Wtr Qua[ /Environ
$24,000
$0
$24,000
Total City Manager
$1,600,538
$4,361,000
$5,961,538
General Services
5
7012
C2502006
19th Street Tidegate Retrofit
Streets /Drainage
$0
$150,000
$150,000
5
7231
C2502006
19th Street Tidegate Retrofit
Streets /Drainage
$100,000
$0
$100,000
62
7611
C8002014
Corp Yard Fleet Shop CNG Modification
Miscellaneous
$82,000
$0
$82,000
49
7513
C5500637
Irrigation - Citywide Central Computer System
Wtr Qual /Environ
$0
$90,000
$90,000
45
7271
C4002009
San Miguel Park Staircase Repair
Prks /Hrbrs /Bchs
$0
$25,000
$25,000
25
7013
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
Streets /Drainage
$156,000
$200,000
$356,000
25
7161
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
Streets /Drainage
$0
$50,000
$50,000
25
7181
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
Streets /Drainage
$0
$150,000
$150,000
Total General Services
$338,000
$665,000
$1,003,000
Police
4
7019
C1820918
Police Facility Generator Replacement
Facilities
$15,000
$0
$15,000
Total Police
$15,000
$0
$15,000
Department -1
Page
Fund
Project
Title
Category
Rebudget
Budget
Total
Public Works
6
7231
C4402002
Balboa Island and Harbor Bulkhead and Seawall Repairs
Streets /Drainage
$395,000
$0
$395,000
57
7531
C7002003
Balboa Island Sewer Main Improvements
Wastewater
$400,000
$0
$400,000
47
7014
C5002004
Big Canyon Wash Restoration
Wtr Qual /Environ
$0
$75,000
$75,000
47
7251
C5002004
Big Canyon Wash Restoration
Wtr Qual /Environ
$0
$1,500,000
$1,500,000
7
7181
C2001010
Bridge Maintenance Program
Streets /Drainage
$250,000
$0
$250,000
7
7281
C2001010
Bridge Maintenance Program
Streets /Drainage
$0
$75,000
$75,000
8
7181
C5100695
Bridge Seismic Retrofit Construction
Streets /Drainage
$312,400
$0
$312,400
8
7251
C5100695
Bridge Seismic Retrofit Construction
Streets /Drainage
$1,942,800
$0
$1,942,800
9
7253
C2002028
Bristol Street North Landscape Improvements
Streets /Drainage
$73,000
$0
$73,000
48
7014
C5002002
Buck Gully Canyon Stabilization / Flood Control
Wtr Qual /Environ
$1,034,900
$0
$1,034,900
10
7181
C2002017
Central Balboa Peninsula Pavement Rehabilitation
Streets /Drainage
$1,285,350
$0
$1,285,350
53
7511
C6002004
Central Balboa Water and Sewer Main Improvements
Water
$0
$1,500,000
$1,500,000
53
7531
C6002004
Central Balboa Water and Sewer Main Improvements
Water
$0
$500,000
$500,000
11
7012
C2502003
China Cove Slope and Drainage Improvements
Streets /Drainage
$246,400
$0
$246,400
11
7014
C8002008
China Cove Slope and Drainage Improvements
Streets /Drainage
$110,154
$0
$110,154
61
7014
C8002000
CIP Project Management
Miscellaneous
$70,000
$100,000
$170,000
2
7410
C1002009
Civic Center and Park
Facilities
$0
$1,000,000
$1,000,000
32
7181
C5100070
EIR / Preliminary Plans
Traffic
$25,000
$0
$25,000
12
7251
C2202003
Energy Efficient Streetlight Improvements
Streets /Drainage
$853,000
$0
$853,000
13
7013
C2002038
Grade Adjustments for Utility Structures
Streets /Drainage
$0
$20,000
$20,000
13
7511
C2002038
Grade Adjustments for Utility Structures
Streets /Drainage
$0
$65,000
$65,000
13
7531
C2002038
Grade Adjustments for Utility Structures
Streets /Drainage
$0
$65,000
$65,000
14
7281
C2002039
Harbor View Hills / Newport Heights Pavement Rehab.
Streets /Drainage
$0
$1,190,000
$1,190,000
14
7511
C2002039
Harbor View Hills / Newport Heights Pavement Rehab.
Streets /Drainage
$0
$22,500
$22,500
14
7531
C2002039
Harbor View Hills / Newport Heights Pavement Rehab.
Streets /Drainage
$0
$26,500
$26,500
50
7014
C5100969
Irrigation - Smart Controller Program
Wtr Qual /Environ
$57,258
$0
$57,258
50
7255
C5100969
Irrigation - Smart Controller Program
Wtr Qual /Environ
$101,860
$0
$101,860
15
7181
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
Streets /Drainage
$0
$600,000
$600,000
15
7261
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
Streets /Drainage
$2,900
$0
$2,900
15
7511
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
Streets /Drainage
$0
$200,000
$200,000
Department -2
Page
Fund
Project
Title
Category
Rebudget
Budget
Total
Public Works continued
16
7261
C5100784
Jamboree Road Bridge Widening
Streets /Drainage
$259,190
$3,650,000
$3,909,190
16
7281
C5100784
Jamboree Road Bridge Widening
Streets /Drainage
$470,000
$347,000
$817,000
16
7284
C5100784
Jamboree Road Bridge Widening
Streets /Drainage
$1,066,400
$0
$1,066,400
17
7261
C2002019
Jamboree Road Improvements Bristol / Fairchild
Streets /Drainage
$232,800
$0
$232,800
17
7284
C2002019
Jamboree Road Improvements Bristol / Fairchild
Streets /Drainage
$633,953
$2,364,459
$2,998,412
18
7281
C2002021
Lido Isle Street Rehabilitation
Streets /Drainage
$0
$700,000
$700,000
18
7511
C2002021
Lido Isle Street Rehabilitation
Streets /Drainage
$0
$3,000
$3,000
18
7531
C2002021
Lido Isle Street Rehabilitation
Streets /Drainage
$0
$15,000
$15,000
40
7411
C4002002
Marina Park
Prks /Hrbrs /Bchs
$1,789,700
$1,400,000
$3,189,700
19
7013
C2002036
Mariners Mile Business Area Improvements
Streets /Drainage
$75,000
$0
$75,000
58
7531
C5600292
Master Plan Improvements
Wastewater
$10,000
$0
$10,000
58
7532
C5600292
Master Plan Improvements
Wastewater
$15,000
$0
$15,000
20
7013
C2001008
Median Maintenance Strips - Citywide
Streets /Drainage
$70,800
$0
$70,800
3
7453
C1002007
Oasis Senior Center Rebuild
Facilities
$568,350
$0
$568,350
21
7013
C2002033
Ocean Front Alley Replacement
Streets /Drainage
$500,000
$0
$500,000
21
7511
C2002033
Ocean Front Alley Replacement
Streets /Drainage
$200,000
$0
$200,000
42
7231
C4801001
Ocean Pier Evaluation and Maintenance
Prks /Hrbrs /Bchs
$0
$600,000
$600,000
22
7231
C2502007
Pearl Avenue Tidal Structure and Valve
Streets /Drainage
$100,000
$0
$100,000
23
7013
C2002040
Peninsula Point Alley Replacement
Streets /Drainage
$0
$55,000
$55,000
23
7013
C5100277
Peninsula Point Alley Replacement
Streets /Drainage
$47,000
$0
$47,000
23
7511
C2002040
Peninsula Point Alley Replacement
Streets /Drainage
$0
$70,000
$70,000
24
7251
C2002038
San Miguel Drive Street Improvements
Streets /Drainage
$851,670
$0
$851,670
24
7432
C2002038
San Miguel Drive Street Improvements
Streets /Drainage
$450,330
$0
$450,330
59
7531
C7001002
Sewer Pipeline Point Repairs and Lining
Wastewater
$86,100
$250,000
$336,100
26
7013
C2001011
Slurry Seal Program
Streets /Drainage
$100,000
$0
$100,000
26
7181
C2001011
Slurry Seal Program
Streets /Drainage
$0
$630,000
$630,000
27
7013
C2002025
Street Rehabilitation
Streets /Drainage
$55,000
$0
$55,000
27
7181
C2002018
Street Rehabilitation
Streets /Drainage
$420,000
$0
$420,000
27
7191
C2002024
Street Rehabilitation
Streets /Drainage
$197,344
$0
$197,344
27
7281
C2002024
Street Rehabilitation
Streets /Drainage
$276,000
$0
$276,000
Department -3
Page Fund Project Title
Public Works continued
Category Rebudget Budget Total
28
7013
C2202000
Streetlight Conversion Program
Streets /Drainage
$134,500
$0
$134,500
28
7013
C2202002
Streetlight Conversion Program
Streets /Drainage
$680,000
$280,000
$960,000
46
7412
C5100515
Sunset Ridge Park
Prks /Hrbrs /Bchs
$9,807,205
$0
$9,807,205
33
7261
C3001007
Traffic Signal Modernization: Phases 4 and 7
Traffic
$130,000
$0
$130,000
34
7261
C3002009
Traffic Signal Modernization: Phase 5
Traffic
$0
$850,000
$850,000
35
7181
C3001007
Traffic Signal Rehabilitation Program
Traffic
$0
$225,000
$225,000
36
7181
C3001003
Transportation Model Maintenance
Traffic
$0
$10,000
$10,000
36
7261
C3001003
Transportation Model Maintenance
Traffic
$10,000
$0
$10,000
66
7017
C8002026
Tsunami Warning System
Miscellaneous
$167,766
$0
$167,766
60
7531
C5600934
Wastewater Master Plan
Wastewater
$103,952
$0
$103,952
29
7013
C2002034
West Balboa Median Improvements
Streets /Drainage
$23,375
$0
$23,375
30
7013
C2002014
Westcliff Drive Median Renovation
Streets /Drainage
$48,119
$0
$48,119
Total Public Works
$26,739,576
$18,388,459
$45,128,035
Recreation/Senior
Services
37
7441
C4120616
Bonita Canyon Sports Park Improvements
Prks /Hrbrs /Bchs
$100,000
$0
$100,000
1
7011
C1002023
Carol Beek Community Center Improvements
Facilities
$0
$20,000
$20,000
1
7251
C1002023
Carol] Beek Community Center Improvements
Facilities
$0
$60,000
$60,000
38
7015
C4002004
Eastbluff Park Playground Equipment
Prks /Hrbrs /Bchs
$52,325
$0
$52,325
38
7271
C4002004
Eastbluff Park Playground Equipment
Prks /Hrbrs /Bchs
$25,000
$0
$25,000
63
7019
C5100977
Newport Coast Community Center AV Equipment
Miscellaneous
$131,900
$0
$131,900
Total Recreation/SeniorServices
$309,225
$80,000
$389,225
Utilities
54
7511
C6002008
Corona del Mar Transmission Main Improvements
Water
$0
$250,000
$250,000
55
7511
C6002005
Corona del Mar Water Interconnect Replacement
Water
$75,000
$0
$75,000
Total Utilities
$75,000
$250,000
$325,000
Totalfor All Funds $29,172,339 $23,744,459 $52,916,798
Department -4
Project Listing by Funding Source
Page Fund General Fund
7011 Facilities
1 C1002023 Caroll Beek Communitv Center
Total Facilities
Category Department
Facilities Public Works
Rebudget Budget Total
$0 $20,000 $20,000
$0 $20,000 $20,000
Funding -1
7012
Drainage
5
C2502006
19th Street Tidegate Retrofit
Streets /Drainage
General Svcs.
$0
$150,000
$150,000
11
C2502003
China Cove Slope and Drainage Improvements
Streets /Drainage
Public Works
$246,400
$0
$246,400
Total Drainage
$246,400
$150,000
$396,400
7013
Streets
13
C2002038
Grade Adjustments for Utility Structures
Streets /Drainage
Public Works
$0
$20,000
$20,000
19
C2002036
Mariners Mile Business Area Improvements
Streets /Drainage
Public Works
$75,000
$0
$75,000
20
C2001008
Median Maintenance Strips - Citywide
Streets /Drainage
Public Works
$70,800
$0
$70,800
21
C2002033
Ocean Front Alley Replacement
Streets /Drainage
Public Works
$500,000
$0
$500,000
23
C5100277
Peninsula Point Alley Replacement
Streets /Drainage
Public Works
$47,000
$0
$47,000
23
C2002040
Peninsula Point Alley Replacement
Streets /Drainage
Public Works
$0
$55,000
$55,000
25
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
Streets /Drainage
General Svcs.
$156,000
$200,000
$356,000
26
C2001011
Slurry Seal Program
Streets /Drainage
Public Works
$100,000
$0
$100,000
27
C2002025
Street Rehabilitation
Streets /Drainage
Public Works
$55,000
$0
$55,000
28
C2202000
Streetlight Conversion Program
Streets /Drainage
Public Works
$134,500
$0
$134,500
28
C2202002
Streetlight Conversion Program
Streets /Drainage
Public Works
$680,000
$280,000
$960,000
29
C2002034
West Balboa Median Improvements
Streets /Drainage
Public Works
$23,375
$0
$23,375
30
C2002014
Westcliff Drive Median Renovation
Streets /Drainage
Public Works
$48,119
$0
$48,119
Total Streets
$1,889,794
$555,000
$2,444,794
7014
Miscellaneous
47
C5002004
Big Canyon Wash Restoration
Wtr Qual /Environ
Public Works
$0
$75,000
$75,000
48
C5002002
Buck Gully Canyon Stabilization / Flood Control
Wtr Qual /Environ
Public Works
$1,034,900
$0
$1,034,900
11
C8002008
China Cove Slope and Drainage Improvements
Streets /Drainage
Public Works
$110,154
$0
$110,154
61
C8002000
CIP Project Management
Miscellaneous
Public Works
$70,000
$100,000
$170,000
Funding -1
Page
Fund
General Fund
Category
Department
Rebur/get
Budget
Total
7014
Miscellaneous
59
C5100969
Irrigation - Smart Controller Program
Wtr Qual /Environ
Public Works
$57,258
$0
$57,258
51
C5002017
Upper Bay Comprehensive Resource Management Plan
Wtr Qual/Environ
City Manager
$24,000
$0
$24,000
Total Miscellaneous
$1,296,312
$175,000
$1,471,312
7015
Parks
38
C4002004
Eastbluff Park Playground Equipment
Prks /Hrbrs /Bchs
Recreation /SS
$52,325
$0
$52,325
Total Parks
$52,325
$0
$52,325
7017
Automation and Communications
66
08002026
Tsunami Warning System
Miscellaneous
Public Works
$167,766
$0
$167,766
Total Automation and Communications
$167,766
$0
$167,766
7019
Capital Purchase
63
C5100977
Newport Coast Community Center AV Equipment
Miscellaneous
Recreation /SS
$131,900
$0
$131,900
4
C1820918
Police Facility Generator Replacement
Facilities
Police
$15,000
$0
$15,000
Total Capital Purchase
$146,900
$0
$146,900
7024 Neighborhood Enhancement
31 C3002008 Balboa Boulevard at Washington Street Parking Lot
64 C8001000 Parkine Meters Replacement
Total Neighborhood Enhancement
Page Fund CDBG
7161 CDBG
25 C2001009 Sidewalk, Curb and Gutter Repl. and ADA
Total CDBG
Traffic City Manager
Miscellaneous Admin. Svcs.
$99,000 $161,000 $260,000
$194,000 $161,000 $355,000
Category Department Rebudget Budget Total
eets /Drainage General Svcs. $0 $50,000 $50,000
$0 $50,000 $50,000
Funding -2
Page
Fund
Gas Tax
Category
Department
Rebudget
Budget
Total
7181
Gas Tax
7
C2001010
Bridge Maintenance Program
Streets /Drainage
Public Works
$250,000
$0
$250,000
8
C5100695
Bridge Seismic Retrofit Construction
Streets /Drainage
Public Works
$312,400
$0
$312,400
10
C2002017
Central Balboa Peninsula Pavement Rehabilitation
Streets /Drainage
Public Works
$1,285,350
$0
$1,285,350
32
C5100070
EIR / Preliminary Plans
Traffic
Public Works
$25,000
$0
$25,000
15
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
Streets /Drainage
Public Works
$0
$600,000
$600,000
25
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
Streets /Drainage
General Svcs.
$0
$150,000
$150,000
26
C2001011
Slurry Seal Program
Streets /Drainage
Public Works
$0
$630,000
$630,000
27
C2002018
Street Rehabilitation
Streets /Drainage
Public Works
$420,000
$0
$420,000
35
C3001007
Traffic Signal Rehabilitation Program
Traffic
Public Works
$0
$225,000
$225,000
36
C3001003
Transportation Model Maintenance
Traffic
Public Works
$0
$10,000
$10,000
Total Gas Tax
$2,292,750
$1,615,000
$3,907,750
Page Fund Traffic Congestion Relief Category Department Rebudget Budget Total
7191 Traffic Congestion Relief
27 C2002024 Street Rehabilitation Streets /Drainage Public Works $197,344 $0 $197,344
Total Traffic Congestion Relief $197,344 $0 $197,344
Page
Fund
Tide and Submerged Lands
Category
Department
Rebudget
Budget
Total
7231
Tide and Submerged Lands
5
C2502006
19th Street Tidegate Retrofit
Streets /Drainage
General Svcs.
$100,000
$0
$100,000
6
C4402002
Balboa Island and Harbor Bulkhead and Seawall Repairs
Streets /Drainage
Public Works
$395,000
$0
$395,000
39
C4402003
Lower Harbor Dredging
Prks /Hrbrs /Bchs
City Manager
$0
$100,000
$100,000
41
C4401001
Newport Harbor Dredging Permit
Prks /Hrbrs /Bchs
City Manager
$198,000
$100,000
$298,000
42
C4801001
Ocean Pier Evaluation and Maintenance
Prks /Hrbrs /Bchs
Public Works
$0
$600,000
$600,000
22
C2502007
Pearl Avenue Tidal Structure and Valve
Streets /Drainage
Public Works
$100,000
$0
$100,000
Funding -3
Page Fund Tide and Submerged Lands
7231 Tide and Submerged Lands
43 C4402004 Rhine Channel Dredging
44 C5100921 Rhine Channel Wharf Repair and Public Dock
Total Tide and Submerged Lands
Category Department Rebudget Budget
Prks /Hrbrs /Bchs City Manager $0 $4,000,000
Prks /Hrbrs /Bchs City Manager $49,538 $0
$842,538 $4,800,000
Total
$4,000,000
$49,538
$5,642,538
Page
Fund
Contributions
Category
Department
Rebudget
Budget
Total
7251
Contributions
47
C5002004
Big Canyon Wash Restoration
Wtr Qual /Environ
Public Works
$0
$1,500,000
$1,500,000
8
C5100695
Bridge Seismic Retrofit Construction
Streets /Drainage
Public Works
$1,942,800
$0
$1,942,800
1
C1002023
Caroll Beek Community Center Improvements
Facilities
Recreation /SS
$0
$60,000
$60,000
12
C2202003
Energy Efficient Streetlight Improvements
Streets /Drainage
Public Works
$853,000
$0
$853,000
24
C2002038
San Miguel Drive Street Improvements
Streets /Drainage
Public Works
$851,670
$0
$851,670
Total Contributions
$3,647,470
$1,560,000
$5,207,470
7253
Bristol Street Relinquishment
9
C2002028
Bristol Street North Landscape Improvements
Streets /Drainage
Public Works
$73,000
$0
$73,000
Total Bristol Street Relinquishment
$73,000
$0
$73,000
7255
Environmental Contributions
50
C5100969
Irrigation - Smart Controller Program
Wtr Qual /Environ
Public Works
$101,860
$0
$101,860
Total Environmental Contributions
$101,860
$0
$101,860
Funding -4
Page Fund Transportation and Circulation
Page Fund Building Excise Tax
7271 Building Excise Tax
38 C4002004 Eastbluff Park Playground Equipment
45 C4002009 San Miguel Park Staircase Repair
Total Building Excise Tax
Category
7261
Transportation and Circulation
15
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
16
C5100784
Jamboree Road Bridge Widening
17
C2002019
Jamboree Road Improvements Bristol / Fairchild
33
C3001007
Traffic Signal Modernization: Phases 4 and 7
34
C3002009
Traffic Signal Modernization: Phase 5
36
C3001003
Transportation Model Maintenance
Public Works
$130,000
Total Transportation and Circulation
Page Fund Building Excise Tax
7271 Building Excise Tax
38 C4002004 Eastbluff Park Playground Equipment
45 C4002009 San Miguel Park Staircase Repair
Total Building Excise Tax
Category
Department
Rebudget
Budget
Total
Streets /Drainage
Public Works
$2,900
$0
$2,900
Streets /Drainage
Public Works
$259,190
$3,650,000
$3,909,190
Streets /Drainage
Public Works
$232,800
$0
$232,800
Traffic
Public Works
$130,000
$0
$130,000
Traffic
Public Works
$0
$850,000
$850,000
Traffic
Public Works
$10,000
$0
$10,000
Streets /Drainage
Public Works
$634,890
$4,500,000
$5,134,890
Category Department Rebudget Budget Total
Prks /Hrbrs /Bchs Recreation /SS $25,000 $0 $25,000
Prks /Hrbrs /Bchs General Svcs. $0 $25.,000 $25,000
$25,000 $25,000 $50,000
Page
Fund
Measure M
Category
Department
Rebudget
Budget
Total
7281
Measure M Turnback
7
C2001010
Bridge Maintenance Program
Streets /Drainage
Public Works
$0
$75,000
$75,000
14
C2002039
Harbor View Hills / Newport Heights Pavement Rehab.
Streets /Drainage
Public Works
$0
$1,190,000
$1,190,000
16
C5100784
Jamboree Road Bridge Widening
Streets /Drainage
Public Works
$470,000
$347,000
$817,000
18
C2002021
Lido Isle Street Rehabilitation
Streets /Drainage
Public Works
$0
$700,000
$700,000
27
C2002024
Street Rehabilitation
Streets /Drainage
Public Works
$276,000
$0
$276,000
Total Measure MTurnback
$746,000
$2,312,000
$3,058,000
Funding -5
Page Fund
Measure M Category Department
Rebudget
Budget
Total
7284
Measure M Competitive
16 C5100784
Jamboree Road Bridge Widening Streets /Drainage Public Works
$1,066,400
$0
$1,066,400
17 C2002019
Jamboree Road Improvements Bristol / Fairchild Streets /Drainage Public Works
$633,953
$2,364,459
$2,998,412
Total Measure M Competitive
$1,700,353
$2,364,459
$4,064,812
Page Fund Major Facilities Master Plan
7410 Civic Center
2 C1002009 Civic Center and Park
7411 Marina Park
40 C4002002 Marina Park
7412 Sunset Ridge Park
46 C5100515 Sunset Ridge Park
7453 Oasis Senior Center
3 C1002007 Oasis Senior Center Rebuild
Category Department Rebudget
Facilities Public Works
Total Civic Center
Prks /Hrbrs /Bchs Public Works
Total Marina Park
Prks /Hrbrs /Bchs Public Works
Total Sunset Ridge Park
Total Oasis Senior Center
Facilities Public Works
$0
$0
Budget
$1,000,000
$1,000,000
Total
$1,000,000
$1,000,000
$1,789,700 $1,400,000 $3,189,700
$9,807,205 $0 $9,807,205
$568,350 $0 $568,350
Page Fund CIOSA Category Department Rebudget Budget Total
7432 CIOSA
24 C2002038 San Miguel Drive Street Improvements Streets /Drainage Public Works $450,330 $0 $450,330
Total CIOSA $450,330 $0 $450,330
Funding -6
Page Fund Bonita Canyon Development Category Department Rebudget Budget Total
7441 Bonita Canyon Development
37 C4120616 Bonita Canyon Sports Park Improvements Prks /Hrbrs /Bchs Recreation /SS $100,000 $0 $100,000
Total Bonita Canyon Development $100,000 $0 $100,000
Page Fund Santa Ana Heights Category Department Rebudget Budget Total
7459 Santa Ana Heights Projects
66 C5100879 Santa Ana Heights Utility Undergrounding Miscellaneous City Manager $1,230,000 $0 $1,230,000
Total Santa Ana Heights Projects $1,230,000 $0 $1,230,000
Page
Fund
Water Enterprise
Category
Department
Rebudget
Budget
Total
7511
Water Distribution and Piping
53
C6002004
Central Balboa Water and Sewer Main Improvements
Water
Public Works
$0
$1,500,000
$1,500,000
54
C6002008
Corona del Mar Transmission Main Improvements
Water
Utilities
$0
$250,000
$250,000
55
C6002005
Corona del Mar Water Interconnect Replacement
Water
Utilities
$75,000
$0
$75,000
13
C2002038
Grade Adjustments for Utility Structures
Streets /Drainage
Public Works
$0
$65,000
$65,000
14
C2002039
Harbor View Hills / Newport Heights Pavement Rehab.
Streets /Drainage
Public Works
$0
$22,500
$22,500
15
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
Streets /Drainage
Public Works
$0
$200,000
$200,000
18
C2002021
Lido Isle Street Rehabilitation
Streets /Drainage
Public Works
$0
$3,000
$3,000
21
C2002033
Ocean Front Alley Replacement
Streets /Drainage
Public Works
$200,000
$0
$200,000
23
C2002040
Peninsula Point Alley Replacement
Streets /Drainage
Public Works
$0
$70,000
$70,000
Total Water Distribution and Piping
$275,000
$2,110,500
$2,385,500
7513
Pumping and Operating
49
C5500637
Irrigation - Citywide Central Computer System
Wtr Qua] /Environ
General Svcs.
$0
$90,000
$90,000
Total Pumping and Operating
$0
$90,000
$90,000
Funding -7
Page
Fund
Wastewater Enterprise
Category
Department
Rebudget
Budget
Total
7531
Sewer Main Replacement
57
C7002003
Balboa Island Sewer Main Improvements
Wastewater
Public Works
$400,000
$0
$400,000
53
C6002004
Central Balboa Water and Sewer Main Improvements
Water
Public Works
$0
$500,000
$500,000
13
C2002038
Grade Adjustments for Utility Structures
Streets /Drainage
Public Works
$0
$65,000
$65,000
14
C2002039
Harbor View Hills / Newport Heights Pavement Rehab.
Streets /Drainage
Public Works
$0
$26,500
$26,500
18
C2002021
Lido Isle Street Rehabilitation
Streets /Drainage
Public Works
$0
$15,000
$15,000
58
C5600292
Master Plan Improvements
Wastewater
Public Works
$10,000
$0
$10,000
59
C7001002
Sewer Pipeline Point Repairs and Lining
Wastewater
Public Works
$86,100
$250,000
$336,100
60
C5600934
Wastewater Master Plan
Wastewater
Public Works
$103,952
$0
$103,952
Total Sewer Main Replacement
$600,052
$856,500
$1,456,552
7532
Sewer Pump Station Improvement
58
C5600100
Master Plan Improvements
Wastewater
Public Works
$15,000
$0
$15,000
Total Sewer Pump Station Improvement
$15,000
$0
$15,000
Total Wastewater Enterprise
$615,052
$856,500
Page
Fund
Equipment Maintenance
Category
Department
Rebudget
Budget
Total
7611
Equipment Maintenance
62
C8002014
Corp Yard Fleet Shop CNG Modification
Miscellaneous
General Svcs.
$82,000
$0
$82,000
Total Equipment Maintenance
$82,000
$0
$82,000
Total for All Funds
Funding -8
$29,172,339 $23,744,459 $52,916,798
Project Fund Summary
Fund Fundinq Source
FY 2010 -2011 Adopted
010 General Fund
Rebudget
Budget
Total
7011
Facilities
$0
$20,000
$20,000
7012
Drainage
$246,400
$150,000
$396,400
7013
Streets
$1,889,794
$555,000
$2,444,794
7014
Miscellaneous
$1,296,312
$175,000
$1,471,312
7015
Parks
$52,325
$0
$52,325
7017
Automation and Communications
$167,766
$0
$167,766
7019
Capital Purchase
$146,900
$0
$146,900
7024
Neighborhood Enhancement
$194,000
$161,000
$355,000
Total General Fund $3,993,497
$1,061,000
$5,054,497
160 CDBG Rebudget Budget Total
7161 CDBG $0 $50,000 $50,000
Total CDBG $0 $50,000 $50,000
180 Gas Tax
7181 Gas Tax
Rebudget
$2,292,750
Budget
$1,615,000
Total
$3,907,750
Total Gas Tax $2,292,750
$1,615,000
$3,907,750
190 Traffic Congestion Relief
Rebudget
Budget
Total
7191 Traffic Congestion Relief
$197,344
$0
$197,344
Total Gas Tax $197,344
$0
$197,344
Summary-1
Fund Funding Source FY 2010 -2011 Adopted B
230
Tide and Submerged Lands
Rebudget
Budget
Total
7231 Tide and Submerged Lands
$842,538
$4,800,000
$5,642,538
Total Tide and Submerged Lands
$842,538
$4,800,000
$5,642,538
Contributions
250
Rebudget
Budget
Total
7251 Contributions
$3,647,470
$1,560,000
$5,207,470
7253 Bristol Street Relinquishment
$73,000
$0
$73,000
7255 Environmental Contributions
$101,860
$0
$101,860
Total Contributions
$3,822,330
$1,560,000
$5,382,330
Transportation and Circulation
Budget
260
Rebudget
Total
7261 Transportation and Circulation
$634,890
$4,500,000
$5,134,890
Total Transportation and Circulation
$634,890
$4,500,000
$5,134,890
Building Excise Tax
Rebudget
270
Budget
Total
7271 Building Excise Tax
$25,000
$25,000
$50,000
Total Building Excise Tax
$25,000
$25,000
$50,000
280 Measure M Rebudget Budget Total
7281 Measure M Turnback $746,000 $2,312,000 $3,058,000
7284 Measure M Competitive $1,700,353 $2,364,459 $4,064,812
Total Measure M $2,446,353 $4,676,459 $7,122,812
Summary-2
Fund Funding Source FY 2010 -2011 Adopted B
440 Bonita Canyon Development Rebudget Budget Total
7441 Bonita Canyon Development $100,000 $0 $100,000
Total Bonita Canyon Development $100,000 $0 $100,000
Santa Ana Heights Rebudget Budget Total
459 7459 Santa Ana Heights Projects $1,230,000 $0 $1,230,000
Total Santa Ana Heights $1,230,000 $0 $1,230,000
500 Water Enterprise Rebudget Budget Total
7511 Water Distribution and Piping $275,000 $2,110,500 $2,385,500
7513 Pumping and Operating $0 $90,000 $90,000
Total Water Enterprise $275,000 $2,200,500 $2,475,500
Summary-3
Major Facilities Master Plan
Rebudget
Budget
Total
410
7410
Civic Center
$0
$1,000,000
$1,000,000
411
7411
Marina Park
$1,789,700
$1,400,000
$3,189,700
412
7412
Sunset Ridge Park
$9,807,205
$0
$9,807,205
453
7453
Oasis Senior Center
$568,350
$0
$568,350
Total Major Facilities Master Plan
$12,165,255
$2,400,000
$14,565,255
430
Rebudget
Budget
Total
CIOSA
7432
CIOSA
$450,330
$0
$450,330
Total CIOSA
$450,330
$0
$450,330
440 Bonita Canyon Development Rebudget Budget Total
7441 Bonita Canyon Development $100,000 $0 $100,000
Total Bonita Canyon Development $100,000 $0 $100,000
Santa Ana Heights Rebudget Budget Total
459 7459 Santa Ana Heights Projects $1,230,000 $0 $1,230,000
Total Santa Ana Heights $1,230,000 $0 $1,230,000
500 Water Enterprise Rebudget Budget Total
7511 Water Distribution and Piping $275,000 $2,110,500 $2,385,500
7513 Pumping and Operating $0 $90,000 $90,000
Total Water Enterprise $275,000 $2,200,500 $2,475,500
Summary-3
Fund Fundina Source
530 Wastewater Enterprise
7531 Sewer Main Replacement
7532 Sewer Pump Station Impr
FY 2010 -2011 Adopted B
Rebudget Budget Total
$600,052 $856,500 $1,456,552
ements $15,000 $0 $15,000
Total Wastewater Enterprise $615,052 $856,500 $1,471,552
610 Equipment Maintenance Rebudget Budget Total
7611 Equipment Maintenance $82,000 $0 $82,000
Total Equipment Maintenance $82,000 $0 $82,000
Total for All CIP Projects
Summary-4
$29,172,339 $23,744,459 $52,916,798
Facilities
Page
Fund
Project
Title
Department
1
7011
C1002023
Caroll Beek Community Center Improvements
Recreation /SS
1
7251
C1002023
Caroll Beek Community Center Improvements
Recreation /SS
2
7410
C1002009
Civic Center and Park
Public Works
3
7453
C1002007
Oasis Senior Center Rebuild
Public Works
4
7019
C1820918
Police Facility Generator Replacement
Public Works
Total Facilities
Rebudget
Budget
Total
$0
$20,000
$20,000
$0
$60,000
$60,000
$0
$1,000,000
$1,000,000
$568,350
$0
$568,350
$15,000
$0
$15,000
$583,350
$1,080,000
$1,663,350
zqqq
Caroll Beek Community Center Improvements
Requesting Department: Recreation / Senior Services
Category: Facilities
This project provides for minor updating of the interior of the Caroll Beek Community Center on Balboa Island. The work includes electrical,
plumbing, cabinetry millwork, paint, and other trades. The plans and specifications will be prepared by staff. The construction will be
performed by a private contractor.
Location:
115 Agate, Balboa Island
Funding:
General Fund and Contributions (Proposition 40 Grant)
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$0
$0
$80,000
$0
$80,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7011
C1002023
$0
$20,000
Contributions
7251
C1002023
$0
$60,000
$0
$0
TOTAL
$0
$80,000
PROJECT TOTAL 1 $80,000
Requesting Department: Public Works
Civic Center and Park
Category: Facilities
The Civic Center project proposes design and construction of six primary components including: (1) an approximately 98,000 sf office
building, community meeting room, and Council Chambers; (2) a 450 -space parking structure; (3) an approximately 17,000 sf expansion of
the Central Library that includes connection to the City Office Building area; (4) a dedicated 4,800 sf Emergency Operations Center; (5)
construction of a 14.3 acre public park that includes a dog park, bridges over wetlands, view outlooks, pedestrian overcrossing of San
Miguel Drive; and (6) a Civic Green.
Location:
1100 Avocado Avenue
Funding:
Major Facilities Master Plan
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$1,000,000
$0
$0
$0
$1,000,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Major Facilities Master Plan
7410
C1002009
$0
$1,000,000
$0
$0
$0
$0
TOTAL
$0
$1,000,000
PROJECT TOTAL 1 $1,000,000
Oasis Senior Center Rebuild
Requesting Department: Public Works Category: Facilities
Construction of a new Oasis Senior Center facility began in spring 2009 and is expected to be completed by fall 2010. This project provides
for incidental construction related expenses, furniture, fixtures and equipment, including gym and computer lab equipment.
Location:
800 Marguerite Avenue
Funding:
Major Facilities Master Plan
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $568,350
Total $568,350
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Major Facilities Master Plan
7453
C1002007
$568,350
$0
$0
$0
$0
$0
TOTAL
$568,350
$0
PROJECT TOTAL $568,350
3
Police Facility Generator Replacement
Requesting Department: Public Works
Category: Facilities
This project completes the replacement of the existing emergency generator and electrical service panels. In the event of a loss of electric
power, the emergency generator supports all essential functions including the Emergency Operations Center, dispatch center and jail. The
existing emergency generator and electrical service panels are insufficient to support the current emergency operational needs.
Location:
Police Facility - 870 Santa Barbara Drive
Funding:
General Fund
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$0
$0
$15,000
$0
$15,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7019
C1820918
$15,000
$0
$0
$0
TOTAL
$0
$0
$15,000
$0
PROJECT TOTAL 1 $15,000
4
Streets and Drainage
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
5
7012
C2502006
19th Street Tidegate Retrofit
General Svcs.
$0
$150,000
$150,000
5
7231
C2502006
19th Street Tidegate Retrofit
General Svcs.
$100,000
$0
$100,000
6
7231
C4402002
Balboa Island / Harbor Bulkhead and Seawall Repairs
Public Works
$395,000
$0
$395,000
7
7181
C2001010
Bridge Maintenance Program
Public Works
$250,000
$0
$250,000
7
7281
C2001010
Bridge Maintenance Program
Public Works
$0
$75,000
$75,000
8
7181
C5100695
Bridge Seismic Retrofit Construction
Public Works
$312,400
$0
$312,400
8
7251
C5100695
Bridge Seismic Retrofit Construction
Public Works
$1,942,800
$0
$1,942,800
9
7253
C2002028
Bristol Street North Landscape Improvements
Public Works
$73,000
$0
$73,000
10
7181
C2002017
Central Balboa Peninsula Pavement Rehabilitation
Public Works
$1,285,350
$0
$1,285,350
11
7012
C2502003
China Cove Slope and Drainage Improvements
Public Works
$246,400
$0
$246,400
11
7014
C8002008
China Cove Slope and Drainage Improvements
Public Works
$110,154
$0
$110,154
12
7251
C2202003
Energy Efficient Streetlight Improvements
Public Works
$853,000
$0
$853,000
13
7013
C2002038
Grade Adjustments for Utility Structures
Public Works
$0
$20,000
$20,000
13
7511
C2002038
Grade Adjustments for Utility Structures
Public Works
$0
$65,000
$65,000
13
7531
C2002038
Grade Adjustments for Utility Structures
Public Works
$0
$65,000
$65,000
14
7281
C2002039
Harbor View Hills / Newport Heights Pavement Rehab.
Public Works
$0
$1,190,000
$1,190,000
14
7511
C2002039
Harbor View Hills/ Newport Heights Pavement Rehab.
Public Works
$0
$22,500
$22,500
14
7531
C2002039
Harbor View Hills/ Newport Heights Pavement Rehab.
Public Works
$0
$26,500
$26,500
15
7181
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
Public Works
$0
$600,000
$600,000
15
7261
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
Public Works
$2,900
$0
$2,900
15
7511
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
Public Works
$0
$200,000
$200,000
16
7261
C5100784
Jamboree Road Bridge Widening
Public Works
$259,190
$3,650,000
$3,909,190
16
7281
C5100784
Jamboree Road Bridge Widening
Public Works
$470,000
$347,000
$817,000
16
7284
C5100784
Jamboree Road Bridge Widening
Public Works
$1,066,400
$0
$1,066,400
17
7261
C2002019
Jamboree Road Improvements Bristol / Fairchild
Public Works
$232,800
$0
$232,800
17
7284
C2002019
Jamboree Road Improvements Bristol / Fairchild
Public Works
$633,953
$2,364,459
$2,998,412
18
7281
C2002021
Lido Isle Street Rehabilitation
Public Works
$0
$700,000
$700,000
18
7511
C2002021
Lido Isle Street Rehabilitation
Public Works
$0
$3,000
$3,000
18
7531
C2002021
Lido Isle Street Rehabilitation
Public Works
$0
$15,000
$15,000
Streets and Drainage
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
19
7013
C2002036
Mariners Mile Business Area Improvements
Public Works
$75,000
$0
$75,000
20
7013
C2001008
Median Maintenance Strips - Citywide
Public Works
$70,800
$0
$70,800
21
7013
C2002033
Ocean Front Alley Replacement
Public Works
$500,000
$0
$500,000
21
7511
C2002033
Ocean Front Alley Replacement
Public Works
$200,000
$0
$200,000
22
7231
C2502007
Pearl Avenue / South Bayfront Tidal Structure / Valve
Public Works
$100,000
$0
$100,000
23
7013
C5100277
Peninsula Point Alley Replacement
Public Works
$47,000
$0
$47,000
23
7013
C2002040
Peninsula Point Alley Replacement
Public Works
$0
$55,000
$55,000
23
7511
C2002040
Peninsula Point Alley Replacement
Public Works
$0
$70,000
$70,000
24
7251
C2002038
San Miguel Drive Street Improvements
Public Works
$851,670
$0
$851,670
24
7432
C2002038
San Miguel Drive Street Improvements
Public Works
$450,330
$0
$450,330
25
7013
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
General Svcs.
$156,000
$200,000
$356,000
25
7161
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
General Svcs.
$0
$50,000
$50,000
25
7181
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
General Svcs.
$0
$150,000
$150,000
26
7013
C2001011
Slurry Seal Program
Public Works
$100,000
$0
$100,000
26
7181
C2001011
Slurry Seal Program
Public Works
$0
$630,000
$630,000
27
7013
C2002025
Street Rehabilitation
Public Works
$55,000
$0
$55,000
27
7181
C2002018
Street Rehabilitation
Public Works
$420,000
$0
$420,000
27
7191
C2002024
Street Rehabilitation
Public Works
$197,344
$0
$197,344
27
7281
C2002024
Street Rehabilitation
Public Works
$276,000
$0
$276,000
28
7013
C2202000
Streetlight Conversion Program
Public Works
$134,500
$0
$134,500
28
7013
C2202002
Streetlight Conversion Program
Public Works
$680,000
$280,000
$960,000
29
7013
C2002034
West Balboa Median Improvements
Public Works
$23,375
$0
$23,375
30
7013
C2002014
Westcliff Drive Medians Renovaton
Public Works
$48,119
$0
$48,119
Total Streets and Drainage
$12,618,485
$10,928,459
$23,546,944
19th Street Tidegate Retrofit
Requesting Department: General Services
Category: Streets and Drainage
This project provides for the installation of a new tidegate and /or a pump station at the 19th Street street end. The existing valve operates
approximately twenty times per month, is submerged in salt water at all times, and requires frequent maintenance and repairs. This unit is
responsible for keeping the immediate vicinity dry during high tide events.
Location:
19th Street
Funding:
General Fund and Tide and Submerged Lands
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$0
$0
$250,000
$0
$250,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7012
C2502006
$0
$150,000
Tide and Submerged Lands
7231
C2502006
$100,000
$0
TOTAL
$0
$0
$100,000
$150,000
PROJECT TOTAL 1 $250,000
5
Balboa Island and Harbor Bulkhead and Seawall Repairs
Requesting Department: Public Works Category: Streets and Drainage
Balboa Island, Little Balboa Island and other City -owned harbor bayfront seawalls and bulkheads experience seawater infiltration at various
locations. This program identifies and makes long -term improvements needed to maintain aging infrastructure and to reduce water ponding
along perimeter walkways. This project also includes raising a portion of existing bulkhead near Edgewater Avenue and Island Avenue.
Also, the condition of seawall on Balboa Island will be assessed.
Location:
Seawalls, bulkheads and copings surrounding Balboa Island, Little Balboa Island and other City maintained harbor bayfronts
Funding:
Tide and Submerged Lands
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $395,000
Other $0
Total $395,000
FUNDING SOURCE
DIVISION NCQ
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402002
$395,000
$0
$0
$0
$0
$0
TOTAL
$395,000 $0
PROJECT TOTAL $395,000
0
Bridge Maintenance Program
Requesting Department: Public Works
Category: Streets and Drainage
This program provides for the routine inspection and maintenance of City bridges. This year's activities include deck sealing Jamboree
Road over San Diego Creek, repairing deck spalls and joint seal on Newport Island Bridge, sealing cracks in columns on Balboa Island
Bridge, repairing deck spalls and sidewalk on Collins Island Bridge, sealing deck cracks on Bonita Canyon wildlife undercrossing and
backfilling abutment erosion at Bonita Canyon over Bonita Canyon Creek and Bonita Canyon over San Joaquin Reservoir overflow.
Location:
Citywide
Funding:
Gas Tax and Measure M Turnback
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $325,000
Other $0
Total $325,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2001010
$250,000
$0
Measure M Turnback
7281
C2001010
$0
$75,000
$0
$0
TOTAL
$250,000
$75,000
PROJECT TOTAL 1 $325,000
Bridge Seismic Retrofit Construction
Requesting Department: Public Works
Category: Streets and Drainage
This project will retrofit three City -owned bridges that are deemed "subject to collapse" according to Caltrans' analytical procedures. The
City has completed a seismic study of the bridges and has been notified by Caltrans to proceed with the project. Plans and specifications
have been prepared by a consultant. Construction will be performed by a private contractor. This project may be eligible for increased
programmed funds from FHWA and State funding which could offset the amount of gas tax funding needed.
Location:
Jamboree Road over San Diego Creek (east and west) and Goldenrod Avenue pedestrian bridge over Bayside Drive
Funding:
Gas Tax and Contributions (FHWA)
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$0
$0
$2,255,200
$0
$2,255,200
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C5100695
$312,400
$0
Contributions
7251
C5100695
$1,942,800
$0
$0
$0
TOTAL
$2,255,200
$0
PROJECT TOTAL 1 $2,255,200
Bristol Street North Landscape Improvements
Requesting Department: Public Works
Category: Streets and Drainage
The project includes hiring a landscape architect to review the existing shoulder and planting areas along Bristol Street North between
Jamboree Road and Campus Drive (adjacent to SR -73) and to develop several options for landscaping.
Location:
Bristol Street North between Jamboree Road and Campus Drive
Funding:
Bristol Street Relinquishment
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$73,000
$0
$0
$0
$73,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Bristol Street Relinquishment
7253
C2002028
$73,000
$0
$0
$0
TOTAL
$0
$0
$73,000
$0
PROJECT TOTAL 1 $73,000
9
Central Balboa Peninsula Pavement Rehabilitation
Requesting Department: Public Works
Category: Streets and Drainage
This project involves removing and reconstructing existing concrete pavement on streets impacted by utility undergrounding construction in
the Balboa Peninsula area (Assessment District 101.) Deteriorated concrete curb, gutter and sidewalk will be removed and reconstructed.
Additional funding ($200,000) will be provided by Assessment District 101 Street Rehabilitation fund.
Location:
Island Avenue, Anade Avenue, Montero Avenue, Medina Way
Funding:
Gas Tax
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,285,350
Other $0
Total $1,285,350
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002017
$1,285,350
$0
$0
$0
$0
$0
TOTAL
$1,285,350
$0
PROJECT TOTAL 1 $1,285,350
10
China Cove Slope and Drainage Improvements
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for slope stabilization and drainage improvements at China Cove. Improvements will help minimize the threat of
failures and protect the integrity of Ocean Boulevard.
Location:
China Cove
Funding:
General Fund
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $356,554
Other $0
Total $356,554
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7012
C2502003
$246,400
$0
General Fund
7014
C8002008
$110,154
$0
$o
$0
TOTAL
$356,554
$0
PROJECT TOTAL $356,554
11
Energy Efficient Streetlight Improvements
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for mobilization, traffic control, distributing construction notifications, construction surveying, concrete improvements,
installing, removing and relocating street lighting facilities and appurtenances, and all other items to complete work in place. The work will
be performed by a private contractor.
Location:
Various Locations
Funding:
Contributions (Federal Energy Efficiency and Conservation Block Grant)
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$0
$0
$853,000
$0
$853,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Contributions
7251
C2202003
$853,000
$0
$0
$0
TOTAL
$0
$0
$853,000
$0
PROJECT TOTAL 1 $853,000
12
Grade Adjustments for Utility Structures
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for adjusting water valve boxes and sewer access covers to grade. Priority will be given to work performed in
conjunction with street resurfacing and reconstruction. This year's project focuses on the Big Canyon residential community where several
valve covers are failing and need replacement.
Location:
Big Canyon residental area
Funding:
General Fund, Water Enterprise and Wastewater Enterprise
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$0
$0
$150,000
$0
$150,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002038
$0
$20,000
Water Enterprise
7511
C2002038
$0
$65,000
Wastewater Enterprise
7531
C2002038
$0
$65,000
TOTAL
$0
$150,000
PROJECT TOTAL 1 $150,000
13
Harbor View Hills South / Newport Heights Pavement Rehabilitation
Requesting Department: Public Works Category: Streets and Drainage
This project involves grinding and installing an asphalt overlay on various streets in the Harbor View Hills South and Newport Heights areas.
Deteriorated concrete curb, gutter and sidewalk also will be removed and reconstructed and water valves and sewer manholes will be
adjusted to grade. Plans and specifications will be prepared by staff. Construction will be performed by a private contractor.
Location:
Harbor View Hills South and Newport Heights area
Funding:
Measure M Turnback, Water Enterprise, Wastewater Enterprise
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$0
$0
$1,239,000
$0
$1,239,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Measure M Turnback
7281
C2002039
$0
$1,190,000
Water Enterprise
7511
C2002039
$0
$22,500
Wastewater Enterprise
7531
C2002039
$0
$26,500
TOTAL
$0
$1,239,000
PROJECT TOTAL 1 $1,239,000
14
Irvine Avenue Realignment - University Drive to Bristol Street
Requesting Department: Public Works Category: Streets and Drainage
This project provides the City's portion of the funding of the project cost for the realignment of Irvine Avenue. Plans and specifications were
administered by the County of Orange and construction was performed by a private contractor under County administration.
Location:
Irvine Avenue - University Drive to Bristol Street South
Funding:
Gas Tax, Transportation and Circulation and Water Enterprise
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $802,900
Other $0
Total $802,900
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C5100470
$0
$600,000
Transportation and Circulation
7261
C5100470
$2,900
$0
Water Enterprise
7511
C5100470
$0
$200,000
$0
$0
TOTAL
$2,900
$800,000
PROJECT TOTAL 1 $802,900
15
Jamboree Road Bridge Widening
Requesting Department: Public Works
Category: Streets and Drainage
This project involves widening Jamboree Road Bridge over State Route 73 Freeway by 24 feet to provide an additional through lane in each
direction. Plans and specifications are complete and right -of -way certification and permitting should be complete by summer 2010.
Construction administration and resident engineering services will be provided by a consultant.
Location:
Jamboree Road - MacArthur Boulevard to Bayview Avenue
Funding:
Transportation and Circulation (IBC Settlement), Measure M Turnback, and Measure M Competitive (right -of -way and construction)
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$0
$764,922
$5,027,668
$0
$5,792,590
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Transportation and Circulation
7261 C5100784
$259,190
$3,650,000
Measure M Turnback
7281
C5100784
$470,000
$347,000
Measure M Competitive ( R)
7284
C5100784
$115,000
$0
Measure M Competitive ( C)
7284
C5100784
$951,400
$0
TOTAL
$1,795,590
$3,997,000
PROJECT TOTAL 1 $5,792,590
16
Jamboree
Road Improvements
- Bristol Street North
to Fairchild Road
Requesting Department:
Public Works
Category:
Streets and Drainage
This project includes the widening of Jamboree Road at the intersection of MacArthur Boulevard as called for in the General Plan. The
project provides for an additional northbound thru lane on Jamboree Road and an additional southbound left turn lane on Jamboree Road
onto MacArthur Boulevard. This project also involves right -of -way aquisition and roadway widening in the City of Irvine and is dependent on
their cooperation and assistance.
Location:
Jamboree Road from Bristol Street North to Fairchild Road
Funding:
Transportation and Circulation and Measure M Competitive
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$0
$0
$3,231,212
$0
$3,231,212
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Transportation and Circulation
7261
C2002019
$232,800
$0
Measure M Competitive
7284
C2002019
$633,953
$2,364,459
$0
$0
TOTAL
$866,753
$2,364,459
PROJECT TOTAL 1 $3,231,212
17
Lido Isle Street Rehabilitation
Requesting Department: Public Works
Category: Streets and Drainage
This third phase completes the pavement rehabilitation on Lido Isle. It involves grinding and installing asphalt overlay on the remaining
north -south streets, east of Via Koron. Deteriorated concrete curb, gutter, and sidewalk will also be removed and reconstructed. Water
valves and sewer manholes will be raised to grade. Plans and specifications will be prepared by a consultant. Construction will be
performed by a private contractor.
Location:
Lido Isle
Funding:
Measure M Turnback, Water Enterprise and Wastewater Enterprise
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$0
$0
$718,000
$0
$718,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Measure M Turnback
7281
C2002021
$0
$700,000
Water Enterprise
7511
C2002021
$0
$3,000
Wastewater Enterprise
7531
C2002021
$0
$15,000
TOTAL
$0
$718,000
PROJECT TOTAL 1 $718,000
18
Mariners Mile Business Area Improvements
Requesting Department: Public Works Category: Street and Drainage
This project includes the installation irrigation lines, trees, and tree grates on Riverside Avenue and decorative paving at intersections of
Riverside Avenue and Avon Street and Tustin Avenue and Avon Street. Design and construction of these improvements will be
incorporated into the Dover Drive, Tustin Avenue, Avon Street rehabilitation project that will be constructed this year.
Location:
Coast Highway between Riverside Avenue and Tustin Avenue and Avon Street
Funding:
General Fund
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$0
$0
$75,000
$0
$75,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002036
$75,000
$0
$0
$0
TOTAL
$0
$0
$75,000
$0
PROJECT TOTAL 1 $75,000
19
Median Maintenance Strips - Citywide
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for the replacement of existing Bomanite concrete found in the median strips located throughout the City.
Construction of this project began in April 2007. The remaining funds may be combined with the annual sidewalk, curb and gutter
replacement program for correction of additional locations.
Location:
Citywide
Funding:
General Fund
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$0
$0
$70,800
$0
$70,800
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2001008
$70,800
$0
$0
$0
TOTAL
$0
$0
$70,800
$0
PROJECT TOTAL 1 $70,800
20
Ocean Front Alley Replacement
Requesting Department: Public Works
Category: Streets and Drainage
This project involves the reconstruction of ocean front alleys. This project focuses on alleys and streets impacted by utility undergrounding
construction (Assessment District 99). Plans and specifications will be prepared by City staff. Construction will be performed by a private
contractor. Additional funding ($200,000) will be provided by Assessment District 99 Street Rehabilitation fund.
Location:
Ocean Front alleys between 15th Street and McFadden Place
Funding:
General Fund and Water Enterprise
FY 2010 -11
Design /Environmental $50,000
Right -of -Way, Land Acquisition $0
Construction $650,000
Other $0
Total $700,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002033
$500,000
$0
Water Enterprise
7511
C2002033
$200,000
$0
$0
$0
TOTAL
$700,000
$0
PROJECT TOTAL $700,000
21
Pearl
Avenue and
South Bayfront Tidal Structure
and Valve
Requesting Department:
Public Works
Category:
Streets and Drainage
This project provides for the installation of a new 24 -inch valve, stainless steel interior ladder, access door and outlet pipe. The current
valve is opened and closed an average of twenty days per month, is constantly submerged in salt water and is instrumental in keeping the
area between Garnet and Agate Streets along South Bayfront on Balboa Island dry during high tide episodes.
Location:
Pearl Avenue and South Bayfront
Funding:
Tide and Submerged Lands
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $100,000
Other $0
Total $100,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C2502007
$100,000
$0
$0
$0
$0
$0
TOTAL
$100,000
$0
PROJECT TOTAL $100,000
22
Peninsula Point Alley Replacement
Requesting Department: Public Works
Category: Streets and Drainage
This project involves the design of various alleys within the Peninsula Point community. The project focuses on the alleys impacted by
recent utility undergrounding construction (Assessment District 103). Plans and specifications will be prepared by staff. Construction will
be performed by a private contractor in the following fiscal year. Additional funding ($75,000) will be provided by Assessment District 103.
Location:
Peninsula Point Area
Funding:
General Fund and Water Enterprise
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$172,000
$0
$0
$0
$172,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C5100277
$47,000
$0
General Fund
7013
C2002040
$0
$55,000
Water Enterprise
7511
C2002040
$0
$70,000
TOTAL
$47,000
$125,000
PROJECT TOTAL 1 $172,000
23
San Miguel Drive Street Improvements
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for constructing roadway improvements for street widening, which includes roadway reconstruction, curb and gutter,
catch basin, storm drain, sidewalk, curb ramps, traffic signal system modification, raised median construction, signing and striping, and all
other incidental work. Work will be performed by a private contractor.
Location:
San Miguel Drive at Avocado
Funding:
Contributions (The Irvine Company Zoning Implementation and Public Benefit Agreement) and CIOSA
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$0
$0
$1,302,000
$0
$1,302,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Contributions
7251
C2002038
$851,670
$0
CIOSA
7432
C2002038
$450,330
$0
$0
$0
TOTAL
$1,302,000
$0
PROJECT TOTAL 1 $1,302,000
24
Sidewalk, Curb and Gutter Replacement and ADA Improvements
Requesting Department: General Services Category: Streets and Drainage
This project provides for the replacement of defective sidewalks, curbs, gutters and cross gutters throughout the city. Americans with
Disabilities Act curb ramp improvements will be included where necessary. Work will be performed by a private contractor.
Location:
Citywide
Funding:
General Fund, CDBG, and Gas Tax
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $556,000
Other $0
Total $556,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2001009
$156,000
$200,000
CDBG
7161
C2001009
$0
$50,000
Gas Tax
7181
C2001009
$0
$150,000
TOTAL
$156,000
$400,000
PROJECT TOTAL $556,000
25
Slurry Seal Program
Requesting Department: Public Works
Category: Streets and Drainage
This project involves slurry sealing various streets in the Eastbluff, North Ford, Upper Bay, Santa Ana Heights, and airport areas. Plans and
specifications will be prepared by staff. Construction will be performed by a private contractor.
Location:
Eastbluff, North Ford, Upper Bay, Santa Ana Heights, and airport areas
Funding:
General Fund and Gas Tax
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$0
$0
$730,000
$0
$730,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2001011
$100,000
$0
Gas Tax
7181
C2001011
$0
$630,000
$0
$0
TOTAL
$100,000
$630,000
PROJECT TOTAL 1 $730,000
PER
Street Rehabilitation
Requesting Department: Public Works
Category: Streets and Drainage
This project includes reconstruction of street pavement on Dover Drive (east of channel) between Irvine Avenue and Westcliff Drive;
Westcliff Drive between Dover Drive and Santiago Drive; Tustin Avenue from West Coast Highway to Ocean View Avenue, Avon Street
from Riverside Avenue to Tustin Avenue; and Ocean View Avenue from Avon Street to Tustin Avenue. City staff will prepare plans and
specifications. Construction will be performed by a private contractor.
Location:
Dover Drive, Westcliff Drive, Tustin Avenue, Avon Street and Ocean View
Funding:
General Fund, Gas Tax, Traffic Congestion Relief and Measure M Turnback
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $948,344
Other $0
Total $948,344
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002025
$55,000
$0
Gas Tax
7181
C2002018
$420,000
$0
Trafic Congestion Relief
7191
C2002024
$197,344
$0
Measure M Turnback
7281
C2002024
$276,000
$0
TOTAL
$948,344
$0
PROJECT TOTAL 1 $948,344
27
Streetlight Conversion Program
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for the replacement of obsolete streetlights, conduit, wire, pull boxes and service cabinets. Many of these lights were
installed more than 40 years ago. Replacement parts are no longer available. This year's project focuses on Bayside Drive and Harbor
Island Road. Future year efforts will continue to address the recommendations in the 15 -year Streetlight Replacement Master Plan.
Location:
Bayside Drive and Harbor Island Road
Funding:
General Fund
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,094,500
Other $0
Total $1,094,500
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2202000
$134,500
$0
General Fund
7013
C2202002
$680,000
$280,000
$0
$0
TOTAL
$814,500
$280,000
PROJECT TOTAL 1 $1,094,500
28
West Balboa Median Improvements
Requesting Department: Public Works
Category: Streets and Drainage
This project includes hiring a landscape architect to design landscape and irrigation plans, as well as develop specifications and a cost
estimate for median and parkway landscaping areas along Balboa Boulevard between 22nd Street and Coast Highway. Funding for
construction will be considered in upcoming fiscal years.
Location:
Balboa Boulevard between 22nd Street and Coast Highway
Funding:
General Fund
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$23,375
$0
$0
$0
$23,375
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002034
$23,375
$0
$0
$0
TOTAL
$0
$0
$23,375
$0
PROJECT TOTAL 1 $23,375
29
Westcliff Drive Median Renovation
Requesting Department: Public Works
Category: Streets and Drainage
This project will renovate approximately 6,900 square feet of deteriorated curb in the planter area of the Westcliff Drive medians, between
Irvine Avenue and Dover Drive. Currently, the medians are watered manually with a water truck multiple times a week. This generates
runoff onto City streets, is an inefficient irrigation of plants, and negatively affects the health of the plants. The project includes
replacement of damaged curb, construction of an irrigation system connected to the City's automated system, and installation of new
shrubs and groundcover. The trees currently in place would be retained.
Location:
Westcliff Drive - Irvine Avenue to Dover Drive
Funding:
General Fund
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $48,119
Other $0
Total $48,119
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002014
$48,119
$0
$0
$0
$0
$0
TOTAL
$48,119
$0
PROJECT TOTAL $48,119
30
Traffic
Page
Fund
Project
Title
Department
31
7024
C3002008
Balboa Boulevard at Washington Street Parking Lot
City Manager
32
7191
C5100070
EIR / Preliminary Plans
Public Works
33
7261
C3001007
Traffic Signal Modernization: Phases 4 and 7
Public Works
34
7261
C3002009
Traffic Signal Modernization: Phase 5
Public Works
35
7181
C3001007
Traffic Signal Rehabilitation Program
Public Works
36
7181
C3001003
Transportation Model Maintenance
Public Works
36
7261
C3001003
Transportation Model Maintenance
Public Works
Total Traffic
Rebudget
Budget
Total
$99,000
$161,000
$260,000
$25,000
$0
$25,000
$130,000
$0
$130,000
$0
$850,000
$850,000
$0
$225,000
$225,000
$0
$10,000
$10,000
$10,000
$0
$10,000
$264,000
$1,246,000
$1,510,000
zqqq
Balboa Boulevard at Washington Street Parking Lot
Requesting Department: City Manager Category: Traffic
This project provides for the removal of the former Balboa Market and the construction of a new landscaped municipal parking lot with thirty -
three (33) on -site parking spaces and one (1) additional on- street parking space. Configuration and landscaping will be coordinated with
the adjacent existing Palm Street parking lot. Existing parking meters at the Palm Street parking lot will be replaced with a new parking pay
station. A second parking pay station will be installed at the new parking lot. Plans and specifications will be prepared by staff.
Construction work will be performed by a private contractor.
Location:
608 E. Balboa Boulevard
Funding:
General Fund
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $260,000
Other $0
Total $260,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7024
C3002008
$99,000
$161,000
$0
$0
TOTAL
$0
$0
$99,000
$161,000
PROJECT TOTAL 1 $260,000
31
EIR / Preliminary Plans
Requesting Department: Public Works Category: Traffic
This program provides for the preparation of necessary environmental documents, preliminary engineering studies and reports for future
street projects.
Location:
n/a
Funding:
Gas Tax
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $25,000
Total $25,000
FUNDING SOURCE
DIVISION NCQ
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C5100070
$25,000
$0
$0
$0
$0
$0
TOTAL
$25,000 $0
PROJECT TOTAL $25,000
32
Traffic Signal Modernization: Phases 4 and 7
Requesting Department: Public Works
Category: Traffic
Traffic Signal Modernization is a multi -year, multi - phased program to update the City's traffic signal system to allow the implemention of real
time adjustments for the efficiency of traffic flow during peak hours, special events, construction activities, and emergencies. Phases 4 and
7 of this program provides for the modernization of traffic signal equipment in the areas of Balboa Peninsula, Superior Avenue and Irvine
Avenue. This work also includes installation of new CCTV cameras at select locations and extensive fiber communications and rewiring of
traffic equipment cabinets. Design will be completed by a consultant.
Location:
Balboa Peninsula, Superior Avenue and Irvine Avenue
Funding:
Transportation and Circulation
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $130,000
Other $0
Total $130,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Transportation and Circulation
7261
C3001007
$130,000
$0
$0
$0
$0
$0
TOTAL
$130,000
$0
PROJECT TOTAL $130,000
33
Traffic Signal Modernization: Phase 5
Requesting Department: Public Works
Category: Traffic
Traffic Signal Modernization is a multi -year, multi - phased program to update the City's traffic signal system. The resultant system allows
staff flexibility to implement real time adjustments, improve the efficiency of traffic flow by improving timing and coordination of the signal
system during peak hours as well as special events, improve system reliability, and shorten response time to problems by using automatic
software monitoring combined with visual CCTV live feedback. The Newport Center project (phase 5) includes hardware and fiber optic
cable upgrades to a total of 11 existing intersections. Installation of 3 new CCTV cameras will provide views of all major entry points to
Fashion Island. This work also includes the installation of a new signal at Anacapa Drive and Newport Center Drive and left turn signal
phasing and lane modifications at San Miguel Road and Newport Center Drive.
Location:
Various locations in Newport Center
Funding:
Transportation and Circulation (The Irvine Company Newport Center Traffic Improvements)
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $850,000
Other $0
Total $850,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Transportation and Circulation
7261
C3002009
$0
$850,000
$0
$0
$0
$0
TOTAL
$0
$850,000
PROJECT TOTAL 1 $850,000
34
Traffic Signal Rehabilitation Program
Requesting Department: Public Works
Category: Traffic
This project provides for the rehabilitation and maintenance of existing traffic signal equipment throughout the City. The work includes
replacement of hardware including signal poles, cabinets, and re- wiring of traffic signal loops. Plans and specifications will be prepared by
a consultant and /or Public Works staff. Construction work will be completed by a private contractor.
Location:
Citywide
Funding:
Gas Tax
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $225,000
Other $0
Total $225,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C3001007
$0
$225,000
$0
$0
$0
$0
TOTAL
$0
$225,000
PROJECT TOTAL 1 $225,000
35
Transportation Model Maintenance
Requesting Department: Public Works
Category: Traffic
This project provides for the annual updating of the transportation model required by changes in land use and circulation within the City and
surrounding portions of Orange County. Modeling will be performed by a consultant with input from Transportation and Development
Services staff in cooperation with the Planning Department.
Location:
Citywide
Funding:
Gas Tax and Transportation and Circulation
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $20,000
Total $20,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C3001003
$0
$10,000
Transportation and Circulation
7261
C3001003
$10,000
$0
$0
$0
TOTAL
$10,000
$10,000
PROJECT TOTAL $20,000
36
Parks, Harbors and Beaches
Page
Fund
Project
Title
Department
37
7411
C4120616
Bonita Canyon Sports Park Improvements
Recreation /SS
38
7015
C4002004
Eastbluff Park Playground Equipment
Recreation /SS
38
7271
C4002004
Eastbluff Park Playground Equipment
Recreation /SS
39
7231
C4402003
Lower Harbor Dredging
City Manager
40
7411
C4002002
Marina Park
Public Works
41
7231
C4401001
Newport Harbor Dredging Permit
City Manager
42
7231
C4801001
Ocean Pier Evaluation and Maintenance
Public Works
43
7231
C4402004
Rhine Channel Dredging
City Manager
44
7231
C5100921
Rhine Channel Wharf Repair and Public Dock
City Manager
45
7271
C4002009
San Miguel Park Staircase Repair
General Svcs.
46
7412
C5100515
Sunset Ridge Park
Public Works
Total Parks, Harbors and Beaches
Rebudget
Budget
Total
$100,000
$0
$100,000
$52,325
$0
$52,325
$25,000
$0
$25,000
$0
$100,000
$100,000
$1,789,700
$1,400,000
$3,189,700
$198,000
$100,000
$298,000
$0
$600,000
$600,000
$0
$4,000,000
$4,000,000
$49,538
$0
$49,538
$0
$25,000
$25,000
$9,807,205
$0
$9,807,205
$12,021,768 $6,225,000 $18,246,768
zqqq
Bonita Canyon Sports Park Improvements
Requesting Department: Recreation and Senior Services
Category: Parks, Harbors and Beaches
This project provides for construction of additional shade structures at West Park; construction of backstops at fields 1 -4; installation of
safety surfacing at tot lots; and plant and tree in -fills throughout the park including MacArthur and Manning tract areas.
Location:
Bonita Canyon Sports Park
Funding:
Bonita Canyon Development
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$0
$0
$100,000
$0
$100,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Bonita Canyon Development
7441
C4120616
$100,000
$0
$0
$0
TOTAL
$0
$0
$100,000
$0
PROJECT TOTAL 1 $100,000
37
Eastbluff Park Playground Equipment
Requesting Department: Recreation and Senior Services
Category: Parks, Harbors and Beaches
This project replaces playground equipment and poured in place surfacing at Eastbluff Park to meet current safety and access standards.
The project removes and exports existing rubberized surfacing and sand and installs 2,100 square feet of new surfacing material and new
playground equipment.
Location:
Eastbluff Park
Funding:
General Fund and Building Excise Tax
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $77,325
Other $0
Total $77,325
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7015
C4002004
$52,325
$0
Building Excise Tax
7271
C4002004
$25,000
$0
$0
$0
TOTAL
$77,325
$0
PROJECT TOTAL $77,325
38
Requesting Department: City Manager
Lower Harbor Dredging
Category: Parks, Harbors and Beaches
This project involves working with the US Army Corps of Engineers to develop permit documentation and approvals to dredge the entire
lower harbor area back to its design depth.
Location:
Lower Newport Bay
Funding:
Tide and Submerged Lands
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $100,000
Total $100,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402003
$0
$100,000
$0
$0
TOTAL
$0
$0
$0
$100,000
PROJECT TOTAL 1 $100,000
39
Marina Park
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
The Marina Park project proposes a new visitor - serving marina facilities, an aquatics sports building, a community center and community
park. The Environmental Impact Report was completed in spring 2010. The next step involves approval and permitting by the California
Coastal Commission. That review is expected to begin in summer 2010. Upon approval by the Coastal Commission, the project's plans and
specifications will be completed by the consultant team and the project will be put out for bid.
Location:
West Balboa Boulevard between 15th and 18th Streets
Funding:
Major Facilities Master Plan
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$1,189,700
$0
$2,000,000
$0
$3,189,700
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Major Facilities Master Plan
7411
C4002002
$1,789,700
$1,400,000
TOTAL
$1,789,700
$1,400,000
PROJECTTOTALI $3,189,700
40
Newport Harbor Dredging Permit
Requesting Department: City Manager
Category: Parks, Harbors and Beaches
The current Regional General Permit governing dredging and dock construction for residential and commerical properties in Newport
Harbor will expire in September 2011. Preparation of a new permit will take two or more years to complete. This project focuses on
collecting data samples for nearshore dredging sediment testing.
Location:
Newport Bay
Funding:
Tide and Submerged Lands
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $298,000
Total $298,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4401001
$198,000
$100,000
$0
$0
$0
$0
TOTAL
$198,000 $100,000
PROJECT TOTAL $298,000
41
Ocean Pier Evaluation and Maintenance
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
This project will fund maintenance to Newport and Balboa Piers. Piles and support structure repairs will be completed as documented in an
Ocean Pier Inspection Report to be completed as part of the project. These piers are inspected for marine infestations, storm, and wave
damage as well as deterioration defects every two years.
Location:
Newport and Balboa Piers
Funding:
Tide and Submerged Lands
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$50,000
$0
$550,000
$0
$600,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4801001
$0
$600,000
$0
$0
TOTAL
$0
$0
$0
$600,000
PROJECT TOTAL 1 $600,000
42
Requesting Department: City Manager
Rhine Channel Dredging
Category: Parks, Harbors and Beaches
This project involves developing necessary plans, working with regulatory agencies and obtaining required permits to dredge sediments out
of Rhine Channel.
Location:
Rhine Channel
Funding:
Tide and Submerged Lands
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$0
$0
$4,000,000
$0
$4,000,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402004
$0
$4,000,000
$0
$0
TOTAL
$0
$0
$0
$4,000,000
PROJECT TOTAL 1 $4,000,000
43
Rhine Channel Wharf Repair and Public Dock
Requesting Department: City Manager
Category: Parks, Harbors and Beaches
This project provides for repairs to the Rhine Channel Wharf and construction of a new 100' x 8' dock for transient boater use at Rhine
Wharf. The wharf has deteriorated and its strength has been compromised. Providing a transient boater dock in this area is a high priority
for the Harbor Commission. A private contractor will be retained to complete the repairs and new construction.
Location:
Rhine Channel adjacent to Lido Park Drive
Funding:
Tide and Submerged Lands
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $49,538
Other $0
Total $49,538
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C5100921
$49,538
$0
$0
$0
$0
$0
TOTAL
$49,538
$0
PROJECTTOTALI $49,538
44
San Miguel Park Staircase Repair
Requesting Department: General Services
Category: Parks, Harbors and Beaches
This project provides for rehabilitation of existing concrete and timber staircase along San Joaquin Hills Road leading to San Miguel Park
field above. The existing staircase is aged and needs to be repaired to maintain its functionality.
Location:
San Miguel Park
Funding:
Building Excise Tax
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$0
$0
$25,000
$0
$25,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Building Excise Tax
7271
C4002009
$0
$25,000
$0
$0
TOTAL
$0
$0
$0
$25,000
PROJECT TOTAL 1 $25,000
45
Sunset Ridge Park
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
This project provides a new park in West Newport with active and passive uses. The City purchased property from Caltrans in 2006,
prepared a preliminary Park Concept Plan in spring 2008, and authorized the completion of plans and specifications to construct the park
along with associated environmental documentation and Coastal Commission permitting in December 2008. Coastal permitting is expected
through December 2010. Construction of the park, entry road and traffic signal at Coast Highway can begin in spring 2011.
Location:
West Coast Highway and Superior Avenue
Funding:
Major Facilities Master Plan
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$0
$0
$9,807,205
$0
$9,807,205
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Major Facilities Master Plan
7412
C5100515
$9,807,205
$0
$0
$0
$0
$0
TOTAL
$9,807,205
$0
PROJECT TOTAL 1 $9,807,205
46
Water Quality and Environmental
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
47
7014
C5002004
Big Canyon Wash Restoration
Public Works
$0
$75,000
$75,000
47
7251
C5002004
Big Canyon Wash Restoration
Public Works
$0
$1,500,000
$1,500,000
48
7014
C5002002
Buck Gully Canyon Stabilization / Flood Control
Public Works
$1,034,900
$0
$1,034,900
49
7513
C5500637
Irrigation - Citywide Central Computer System
General Svcs.
$0
$90,000
$90,000
50
7014
C5100969
Irrigation - Smart Controller Program
Public Works
$57,258
$0
$57,258
50
7255
C5100969
Irrigation - Smart Controller Program
Public Works
$101,860
$0
$101,860
51
7014
C5002017
Upper Bay Comprehensive Resurce Management Plan
City Manager
$24,000
$0
$24,000
Total Water Quality and Environmental
$1,218,018
$1,665,000
$2,883,018
zqqq
Big Canyon Wash Restoration
Requesting Department: Public Works Category: Water Quality and Environmental
Upland locations of the Big Canyon Wash area west of Jamboree Road will be targeted for restoration including removing invasive plants,
replanting with native plants and restoring trails. This is the first phase of the multi -phase plan to restore the canyon.
Location:
Big Canyon bounded by Jamboree Road to the east, Eastbluff Apartments and Villa Granada community to the north,
Backbay Drive to the west, and Park Newport community to the south.
Funding:
General Fund and Contributions (Irvine Company Settlement)
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$75,000
$0
$1,500,000
$0
$1,575,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C5002004
$0
$75,000
Contributions
7251
C5002004
$0
$1,500,000
$0
$0
TOTAL
$0
$1,575,000
PROJECT TOTAL 1 $1,575,000
47
Buck Gully Canyon Stabilization and Flood Control
Requesting Department: Public Works
Category: Water Quality and Environmental
The primary goal of this project is to reduce erosion which currently threatens bank stability and habitat along the gully. The project is also
aimed to enhance wetland and riparian habitat to reduce the load of sediments and associated contaminants being transported through
Buck Gully into downstream environmentally sensitive marine life areas. The City has been awarded Proposition 84 ASBS funds by the
State to partially fund this project.
Location:
Buck Gully
Funding:
General Fund
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$34,900
$0
$1,000,000
$0
$1,034,900
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C5002002
$1,034,900
$0
$0
$0
$0
$0
TOTAL
$1,034,900
$0
PROJECT TOTAL 1 $1,034,900
48
Irrigation - Citywide Central Computer System
Requesting Department: General Services
Category: Water Quality and Environmental
This project provides for the installation of an irrigation computer system and necessary equipment at a selection of City park satellite
locations. Various elements of the system were installed in previous phases at other locations. The long -term goal is to have all parks
linked to a central computerized irrigation system to better monitor and conserve water.
Location:
Citywide
Funding:
Water Enterprise
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $90,000
Total $90,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7513
C5500637
$0
$90,000
$0
$0
$0
$0
TOTAL
$0I
$90,000
PROJECT TOTAL $90,000
49
Irrigation - Smart Controller Program
Requesting Department: Public Works
Category: Water Quality and Environmental
This project provides funding for property owners to install new weather based irrigation controllers. These controllers meter out the proper
amount of water to plants based on a set of parameters including weather conditions, sunlight, soil type, plant type, property slope and the
precipitation rate of the valve. Other work could include creating incentives for residents to upgrade leaking and inefficient irrigation
systems.
Location:
Citywide
Funding:
General Fund and Contributions (Cal -Fed Grant)
FY 2009 -10
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $159,118
Total $159,118
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C5100969
$57,258
$0
Contributions
7255
C5100969
$101,860
$0
$0
$0
TOTAL
$159,118
$0
PROJECT TOTAL 1 $159,118
50
Upper Bay Comprehensive Resource Management Plan
Requesting Department: City Manager Category: Water Quality and Environmental
This project begins the development of a Comprehensive Resource Management Plan (CRMP) to look at Newport Bay and its adjacent
lands and properties without limitation to jurisdictional boundaries. The CRMP would address management of Newport Bay facilities,
habitat restoration and species protection, educational and interpretative opportunities, public access, sediment management, TMDL
activities, scientific studies, and water quality protection. The CRMP would combine existing and outdated management plans into a single
document to address common issues. Funding is also programmed for a study in concert with Newport Bay Naturalists and Friends.
Location:
Newport Bay
Funding:
General Fund
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $24,000
Total $24,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C5002017
$24,000
$0
$0
$0
$0
$0
TOTAL
$24,000
$0
PROJECTTOTALI $24,000
51
zqqq
Water
Page
Fund
Project
Title
Department
53
7511
C6002004
Central Balboa Water and Sewer Main Improvements
Public Works
53
7531
C6002004
Central Balboa Water and Sewer Main Improvements
Public Works
54
7511
C6002008
Corona del Mar Transmission Main Improvements
Utilities
55
7511
C6002005
Corona del Mar Water Interconnect Replacement
Utilities
Total Water
Rebudget
Budget
Total
$0
$1,500,000
$1,500,000
$0
$500,000
$500,000
$0
$250,000
$250,000
$75,000
$0
$75,000
$75,000
$2,250,000
$2,325,000
zqqq
Central Balboa Water and Sewer Main Improvements
Requesting Department: Public Works
Category: Water
This project provides for the replacement of deteriorated cast iron water mains and values and sewer mains on the ocean front alley
between Adams and 13th Street as recommended by the 2008 Water Master Plan. Work is planned to be done prior to utility
undergounding in the area. The work also includes enlargement of water mains to improve operational efficiency of the water system and
improve fire protection. This project is being developed in concert with the planned Underground Utility District 100. Plans and
specifications are currently contracted to a consultant. Construction will be performed by a private contractor.
Location:
Oceanfront Alley between Adams and 13th Street
Funding:
Water Enterprise and Wastewater Enterprise
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$0
$0
$2,000,000
$0
$2,000,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7511
C6002004
$0
$1,500,000
Wastewater Enterprise
7531
C6002004
$0
$500,000
TOTAL
$0
$0
$0
$2,000,000
PROJECT TOTAL 1 $2,000,000
53
Corona del Mar Transmission Main Improvements
Requesting Department: Utilities
Category: Water
This project provides for the design of a new 36 -inch transmission main between the Big Canyon Reservoir and East Coast Highway at
MacArthur and a 24 -inch transmission main between East Coast Highway and Bayside Drive that serves the Peninsula Point area. The
project will improve water supply and fire flow to the eastern portion of the system as identified in the City's Water Master Plan.
Location:
MacArthur Boulevard between Pacific Coast Highway and San Joaquin Hills Road
Funding:
Water Enterprise
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$250,000
$0
$0
$0
$250,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7511
C6002008
$0
$250,000
$0
$0
TOTAL
$0
$0
$0
$250,000
PROJECT TOTAL 1 $250,000
54
Corona del Mar Water Interconnect Replacement
Requesting Department: Utilities
Category: Water
This project provides for a preliminary design effort for the replacement of a Metropolitan Water District (MWD) connection called CM -1
which supplies water to the Corona del Mar area. The structure is old and in need of replacement. It is located in the westbound slow lane
of East Coast Highway near Fernleaf Avenue. Currently, staff must close the travel lane to enter the structure to maintain and turn the
facility on and off. As such, this MWD connection is rarely used. This would be joint project with MWD and Laguna Beach County Water
District, which is also served by this connection.
Location:
Fernleaf Avenue at East Coast Highway
Funding:
Water Enterprise
FY 2010 -11
Design /Environmental $75,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $75,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7511
C6002005
$75,000
$0
$0
$0
$0
$0
TOTAL
$75,000
$0
PROJECTTOTALI $75,000
55
zqqq
Wastewater
Page
Fund
Project
57
7531
C7002003
58
7531
C5600292
58
7532
C5600100
59
7531
C7001002
60
7531
C5600934
Title
Balboa Island Sewer Main Improvements
Master Plan Improvements
Master Plan Improvements
Sewer Pipeline Point Repairs and Lining
Wastewater Master Plan
Total Wastewater
Department Rebudget
Public Works
$400,000
Public Works
$10,000
Public Works
$15,000
Public Works
$86,100
Public Works
$103,952
$0
$615,052
Budget
Total
$0
$400,000
$0
$10,000
$0
$15,000
$250,000
$336,100
$0
$103,952
$250,000 $865,052
zqqq
Balboa Island Sewer Main Improvements
Requesting Department: Public Works Category: Wastewater
This project replaces sewer laterals, installs sewer clean -outs and replaces or lines sewer mains on Balboa Island. Plans and specifications
will be prepared by staff. Construction will be performed by a private contractor.
Location:
Balboa Island
Funding:
Wastewater Enterprise
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $400,000
Other $0
Total $400,000
FUNDING SOURCE
DIVISION NCQ
PROJECT NO.
REBUDGET $
BUDGET $
Wastewater Enterprise
7531
C7002003
$400,000
$0
$0
$0
$0
$0
TOTAL
$400,000 $0
PROJECT TOTAL $400,000
57
Master Plan Improvements
Requesting Department: Public Works Category: Wastewater
This project provides for minor refurbishment and improvements to the City's wastewater mains and pump stations.
Location:
n/a
Funding:
Wastewater Enterprise
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $25,000
Total $25,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Wastewater Enterprise
7531
C5600292
$10,000
$0
Wastewater Enterprise
7532
C5600100
$15,000
$0
TOTAL
$0
$0
$25,000
$0
PROJECT TOTAL 1 $25,000
58
Sewer Pipeline Point Repairs and Lining
Requesting Department: Public Works Category: Wastewater
Wastewater Discharge Regulations require the City wastewater system to be inspected with cameras. Sewerline areas discovered to be
damaged, deteriorated or problematic are packaged into projects so repairs can be made. This program funds these ongoing repair
projects.
Location:
Citywide
Funding:
Wastewater Enterprise
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $336,100
Other $0
Total $336,100
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Wastewater Enterprise
7531
C7001002
$86,100
$250,000
$0
$0
$0
$0
TOTAL
$86,100
$250,000
PROJECT TOTAL 1 $336,100
59
Wastewater Master Plan
Requesting Department: Public Works Category: Wastewater
The Regional Water Quality Control Board (RWQCB) requires the City to update its Wastewater Master Plan on a regular basis. The
Wastewater Plan is nearly complete and was partially funded by a cooperative grant from Orange County Sanitation District (OCSD.)
Location:
n/a
Funding:
Wastewater Enterprise
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $103,952
Total $103,952
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Wastewater Enterprise
7531
C5600934
$103,952
$0
$0
$0
TOTAL
$0
$0
$103,952
$0
PROJECT TOTAL 1 $103,952
60
Miscellaneous
Page
Fund
Project
Title
Department
61
7014
C8002000
CIP Project Management
Public Works
62
7611
C8002014
Corp Yard Fleet Shop CNG Modification
General Svcs.
63
7019
C5100977
Newport Coast Community Center AV Equipment
Recreation /SS
64
7024
C8001000
Parking Meters Replacement
Admin. Svcs.
65
7459
C5100879
Santa Ana Heights Utility Undergrounding
City Manager
66
7017
C8002026
Tsunami Warning System
Public Works
Total Miscellaneous
Rebudget
Budget
Total
$70,000
$100,000
$170,000
$82,000
$0
$82,000
$131,900
$0
$131,900
$95,000
$0
$95,000
$1,230,000
$0
$1,230,000
$167,766
$0
$167,766
$1,776,666
$100,000
$1,876,666
zqqq
CIP Project Management
Requesting Department: Public Works Category: Miscellaneous
The City continues to undertake an ambitious and wide- ranging Capital Improvement Program (CIP). This project provides funding to retain
necessary consultants to assist Public Works staff with various design, construction management, construction inspection and project
management assignments to deliver projects efficiently and cost effectively.
Location:
n/a
Funding:
General Fund
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $170,000
Total $170,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C8002000
$70,000
$100,000
$0
$0
$0
$0
TOTAL
$70,000
$100,000
PROJECT TOTAL 1 $170,000
61
Corporation Yard Fleet Shop: CNG Modification
Requesting Department: General Services Category: Miscellaneous
This project modifies two existing equipment repair bays to conform to safety standards for the repair of Compressed Natural Gas (CNG)
vehicles. The work includes ventilation and electrical improvements. Also, a security camera system will be installed for the 24 -hour public
CNG fueling facility located at the Corporation Yard.
Location:
592 Superior Avenue
Funding:
Equipment Maintenance
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $82,000
Other $0
Total $82,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Equipment Maintenance
7611
C8002014
$82,000
$0
$0
$0
$0
$0
TOTAL
$82,000
$0
PROJECTTOTALI $82,000
a,
Newport Coast Community Center AV Equipment
Requesting Department: Recreation and Senior Services Category: Miscellaneous
This project provides for the design, construction, installation and training of audio and visual systems for the Newport Coast Commmunity
Center, including sound systems for the Newport Ridge and Willinger Rooms, sound systems and LCD projection for Pelican and Newport
Coast Rooms, and sound system, LCD projection and lighting for the gymnasium.
Location:
6401 San Joaquin Hills Road
Funding:
General Fund
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $131,900
Total $131,900
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7019
C5100977
$131,900
$0
$0
$0
$0
$0
TOTAL
$131,900
$0
PROJECT TOTAL $131,900
63
Parking Meters Replacement
Requesting Department: Administrative Services Category: Miscellaneous
This project provides for the annual replacement of approximately 200 of the City's 2600 parking meters. All new meters utilize digital
mechanisms. All replacement work will be performed by City staff.
Location:
Citywide
Funding:
General Fund
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $95,000
Total $95,000
FUNDING SOURCE
DIVISION NCQ
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7024
C8001000
$95,000
$0
$0
$0
$0
$0
TOTAL
$95,000 $0
PROJECT TOTAL $95,000
64
Santa Ana Heights Utility Undergrounding
Requesting Department: City Manager Category: Miscellaneous
This project provides for the design and construction to underground utility facilities in Santa Ana Heights and rehabilitation of the area's
streets pursuant to City Council action on October 11, 2005, and County Board of Supervisors action on March 27, 2007. The Amended
Engineer's Report and Revised Boundary Map and related agreements with the County of Orange were approved by the City Council at its
meeting of March 24, 2009.
Location:
Santa Ana Heights
Funding:
Santa Ana Heights
FY 2010 -11
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,230,000
Other $0
Total $1,230,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Santa Ana Heights
7459
C5100879
$1,230,000
$0
$0
$0
$0
$0
TOTAL
$1,230,000
$0
PROJECT TOTAL $1,230,000
65
Tsunami Warning System
Requesting Department: Public Works Category: Miscellaneous
This project provides for the installation and placement of three outdoor warning sirens to notify residents and or visitors should a tsunami is
generated and evacuation of beaches is necessitated. The sirens will be strategically placed in the Tsunami Inundation area pre- identified
in the City's Tsunami Incident Action Plan.
Location:
Balboa Peninsula
Funding:
General Fund
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2010 -11
$0
$0
$167,766
$0
$167,766
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7017
C8002026
$167,766
$0
$0
$0
TOTAL
$0
$0
$167,766
$0
PROJECT TOTAL 1 $167,766
Ef