HomeMy WebLinkAboutCapital Improvement Program 2012City of Newport Beach
CAPITAL IMPROVEMENT PROGRAM
Fiscal Year 2011 -2012
�I
V
CITY COUNCIL
Mayor Michael E. Henn
Mayor Pro Tem Nancy Gardner
Council Member Keith D. Curry
Council Member Leslie J. Daigle
Council Member Rush N. Hill, II
Council Member Steven Rosansky
Council Member Edward D. Selich
CITY MANAGER
David A. Kiff
PUBLIC WORKS DIRECTOR
Stephen G. Badum
CAPITAL IMPROVEMENT PROGRAM
The City of Newport Beach Capital Improvement Program (CIP) serves as a plan for the provision of public improvements,
special projects, on -going maintenance programs, and the implementation of the City's master plans. Projects in the CIP include
improvements and major maintenance on arterial highways, local streets, and alleys; storm drain and water quality
improvements; harbor, bay, pier, and beach improvements; park and facility improvements; water and wastewater system
improvements; transportation safety and traffic signal improvements; and planning programs and studies.
E�
Perks
The adopted FY 2011 -12 CIP consists of 56 projects
representing more than $26 million in new
appropriations and over $31 million in rebudgeted
funds for a total CIP budget of $57,497,180. Major
funding initiatives include harbor and bay dredging,
traffic signal and signage improvements, water
transmission main improvements and environmental
restoration. Significant work continues this fiscal year
on major facilities projects such as the Civic Center and
Park, Marina Park, and Sunset Ridge Park.
Projects are organized by primary function or benefit
into one of the following categories: Facilities; Streets
and Drainage; Traffic; Parks, Harbors and Beaches;
Water Quality and Environmental; Water; Wastewater;
and Miscellaneous, as shown in the chart here.
Given the current fiscal climate, the development of the adopted CIP was limited to meeting Council priorities and master plan
requirements. Essential projects were prioritized and summarized by available funds and are presented to the City Council for
consideration. Funding of capital projects is derived from multiple funding sources.
Highlights of the adopted CIP budget for FY 2011 -12 are presented by category as follows:
Facilities
Projects organized under Facilities include construction, rehabilitation and repair of City buildings and facilities. Major projects
within this category exceed $3.9 million and include:
• Civic Center construction and insurance ($3,214,300)
• Lifeguard Headquarters replacement design ($400,000)
• Master Facilities planning efforts ($300,000)
• Balboa Yacht Basin improvements ($50,000)
Streets and Drainage
Projects organized under Streets and Drainage include construction, rehabilitation and repair of City roads, alleys, medians,
bridges, sidewalks, streetlights, slopes and tide structures. Projects within this category exceed $16.3 million and major
highlights include:
• Street and alley construction and rehabilitation, including Abalone and Crystal Avenue pavement rehabilitation, Bay
Avenue pavement rehabilitation, Dover Drive and Peninsula Point pavement design, Harbor View Hills and Newport
Heights pavement rehabilitation, Irvine Avenue realignment, Jamboree Road improvements, major arterial streets
repair program, Newport Boulevard and 32nd Street modification and Peninsula Point alley replacement ($10,875,400)
• Slurry seal projects ($2,220,000)
• Drainage and tide structures ($1,652,000)
• Streetlighting ($1,000,000)
• Sidewalk and concrete improvements ($500,000)
• Landscape improvements ($72,900)
Traffic
Projects organized under Traffic include traffic signal system maintenance and improvements, neighborhood traffic management,
pedestrian improvements and signage. Projects within this category exceed $2.4 million and major highlights include:
• Traffic signal modernization ($1,619,300)
• Traffic signal rehabilitation ($575,000)
• Traffic striping, signage, and assessment ($230,000)
Parks, Harbors and Beaches
Projects organized under Parks, Harbors and Beaches include improvements or repairs to the City's parks, harbors, docks,
wharfs, piers and beaches. Projects within this category exceed $23.9 million and major highlights include:
Park improvements - Sunset Ridge Park, Marina Park and Bonita Canyon Sports Park ($18,688,600)
Harbor improvements — Balboa Marina public pier feasibility study, Balboa Yacht Basin mooring support services
improvements, bulkhead repairs, sealing and groin rehabilitation, Eelgrass mapping and dredging of Linda Isle, Lower
Harbor, Rhine Channel and Semeniuk Slough ($5,180,350)
Beach improvements — China Cove and Little Island beach management ($50,000)
Water Quality and Environmental
Projects organized under Water Quality and Environmental include studies, improvements and programs that benefit the City's
natural resources. Projects within this category approximate $5.2 million and major highlights include:
• Buck Gully Canyon stabilization and flood control project ($1,759,600)
• Big Canyon Wash Restoration ($1,575,000)
• Newport Coast Protection Implementation Program ($1,775,000)
• Irrigation - citywide central computer system ($90,000)
Water and Wastewater
Projects organized under Water and Wastewater are funded from respective service charges and are used for the rehabilitation
and expansion of these services. Projects within these categories approximate $4.4 million and major highlights include:
Water transmission and main improvements ($3,600,000)
Sewer main improvements ($700,000)
Wastewater master planning ($100,000)
Miscellaneous
Projects organized under Miscellaneous are ones that do not fit into any other category and include capital purchases and
special projects. Projects within these categories exceed $1.2 million and highlights include:
• Santa Ana Heights utility undergrounding ($1,175,600)
• Underground Utility Credits ($94,130)
Conclusion
The City continues to undertake an ambitious and wide- ranging capital improvement program. The projects, both significant and
diverse, serve all areas of the City. It is the City's policy to appropriate sufficient funds for all projects scheduled during the
coming budget year. Many of the projects require multiple year terms to complete them. In such cases, only the current phase
identified to be completed during FY 2011 -2012 is budgeted and appropriated. Subsequent phases of a project and projects
requiring more time or funding are reconsidered at the appropriate time. Our project delivery team of engineers, support staff
and consultants are tasked with managing more complex workloads while maintaining high quality standards. Creative project
management solutions and alternative delivery methods continue to play a key role in our future success.
Schedule
Updated project information is available online. Real -time information on capital projects, such as schedules, budget and
contacts, can be searched by location (map format) or by title (log format). Projects can be filtered by phase including planning,
design, construction, completion. Information on projects being done within the City's limits by other public agencies is also
included on the City's construction map. To access the Public Works construction map, go to
www.newportbeachca.gov/publicworks.
iv
City of Newport Beach
Capital Improvement Program
Adopted FY2011 -2012
TABLE OF CONTENTS
Project Page
FACILITIES
Balboa Yacht Basin Facility Improvements 1
Civic Center 2
Lifeguard Headquarters Replacement 3
Master Facilities Plan -- Planning Efforts 4
STREETS AND DRAINAGE
15th Street Pavement Overlay
5
19th Street Tidegate Retrofit
6
Abalone and Crystal Pavement Rehabilitation
7
Bay Avenue Pavement Rehabilitation
8
Bayside Drive, Riverside Avenue Storm Drain Improvements
9
Bristol Street North Landscape Improvements
10
China Cove Slope and Drainage Improvements
11
Dover Drive, Peninsula Point Pavement Rehabilitation - Design
12
Fashion Island and Area Streets Overlay and Slurry
13
Harbor View Hills / Newport Heights Pavement Rehabilitation
14
Irvine Avenue Realignment - University Drive to Bristol Street
15
Jamboree Road Improvements - Bristol / Fairchild
16
Major Arterial Streets Repair Program
17
Newport Boulevard, 32nd Street Modification
18
Peninsula Point Alley Replacement
19
Sidewalk, Curb and Gutter Replacement and ADA Improvements
20
TOC -1
STREETS AND DRAINAGE CONTINUED
Slurry Seal Program
Storm Drain Interceptor:
Streetlight Conversion F
Tidegate Retrofit and UG
TRAFFIC
21
22
23
24
Citywide Street Signage, Striping and Marking 25
Fashion Island Road Ring Striping Plan 26
Traffic Sign Inventory and Reflectivity Assessment 27
Traffic Signal Modernization: Phase 5 28
Traffic Siqnal Rehabilitation Proqram 29
PARKS, HARBORS AND BEACHES
Balboa Marina Public Pier Feasibility Study
31
Balboa Yacht Basin Mooring Support Services Improvements
32
Bonita Canyon Sports Park
33
Bulkhead Repairs, Sealing and Groin Rehabilitation
34
China Cove and Little Island Beach Management
35
Eelgrass Mapping
36
Linda Isle Dredging
37
Lower Harbor Dredging
38
Marina Park
39
Rhine Channel Dredging
40
Semeniuk Slough Dredging
41
Sunset Ridqe Park
42
TOC -2
WATER QUALITY AND ENVIRONMENTAL
WATER
Big Canyon Wash Restoration 43
Buck Gully Canyon Stabilization and Flood Control 44
Irrigation - Citywide Central Computer System 45
Newoort Coast Protection Imolementation Program 46
16th Street Pump Station Capacity Modifications 47
Corona del Mar Water Transmission Main Improvements 48
Saint James Road Water Main Replacement 49
Water Main Master Plan Proqram 50
WASTEWATER
Big Canyon and Port Streets Sewer Diversion Improvements 51
Saint James Road Sewer Relocation 52
Sewer Pipeline Point Repairs and Lining 53
Wastewater Master Plan 54
MISCELLANEOUS
Santa Ana Heights Utility Undergrounding 55
Underaround Utilitv Credits 56
TOC -3
City of Newport Beach
Capital Improvement Program
Adopted FY 2011 -2012
/_11:1: /_1- 1=111IKII01ZIQ W1
15th Street Pavement Overlay
16th Street Pump Station Capacity Modifications
19th Street Tidegate Retrofit
Abalone and Crystal Pavement Rehabilitation
5
47
6
7
Balboa Marina Public Pier Feasibility Study
31
Balboa Yacht Basin Facility Improvements
1
Balboa Yacht Basin Mooring Support Services Improvements
32
Bay Avenue Pavement Rehabilitation
8
Bayside Drive, Riverside Avenue Storm Drain Improvements
9
Big Canyon and Port Streets Sewer Diversion Improvements
51
Big Canyon Wash Restoration
43
Bonita Canyon Sports Park
33
Bristol Street North Landscape Improvements
10
Buck Gully Canyon Stabilization and Flood Control
44
Bulkehead Repairs, Sealing and Groin Rehabilitation
34
China Cove and Little Island Beach Management
35
China Cove Slope and Drainage Improvements
11
Citywide Street Signage, Striping and Marking
25
Civic Center
2
Alpha -1
Dover Drive, Peninsula Point Pavement Rehabilitation - Design
12
Eelgrass Mapping
36
Fashion Island and Area Streets Overlay and Slurry
13
Fashion Island Road Ring Striping Plan
26
Harbor View Hills / Newport Heights Pavement Rehabilitation
14
Irrigation - Citywide Central Computer System
45
Irvine Avenue Realignment - University Drive to Bristol Street
15
Jamboree Road Improvements - Bristol / Fairchild
16
Lifeguard Headquarters Replacement
3
Linda Isle Dredging
37
Lower Harbor Dredging
38
Major Arterial Streets Repair Program
17
Marina Park
39
Master Facilities Plan -- Planning Efforts
4
Newport Boulevard, 32nd Street Modification
18
Newport Coast Protection Implementation Program
46
Peninsula Point Alley Replacement
19
Rhine Channel Dredging
40
Saint James Road Sewer Relocation
52
Saint James Road Water Main Replacement
49
Santa Ana Heights Utility Undergrounding
55
Semeniuk Slough Dredging
41
Sewer Pipeline Point Repairs and Lining
53
Alpha -2
Sidewalk, Curb and Gutter Replacement and ADA Improvements 20
Slurry Seal Proaram 21
Storm Drain Interceptors
22
Streetlight Conversion Program
23
Sunset Ridge Park
42
Tidegate Retrofit and Upgrades
24
Traffic Sign Inventory and Reflectivity Assessment
27
Traffic Signal Modernization: Phase 5
28
Traffic Signal Rehabilitation Program
29
Underground Utility Credits
56
Wastewater Master Plan
Water Main Master Plan Program
54
50
Alpha -3
Project Listing by Category
Facilities
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
1
7231
C1002036
Balboa Yacht Basin Facility Improvements
Public Works
$0
$50,000
$50,000
2
7410
C1002009
Civic Center
Public Works
$1,641,700
$0
$1,641,700
2
7410
C1002028
Civic Center OCIP Insurance
Public Works
$250,000
$0
$250,000
2
7410
C1002034
Civic Center OCIP Premiums
Public Works
$260,000
$0
$260,000
2
7410
C1002035
Civic Center OCIP Loss Claims
Public Works
$1,062,600
$0
$1,062,600
3
7414
C1002037
Lifeguard Headquarters Replacement
Fire
$0
$400,000
$400,000
4
7415
C1002038
Master Facilities Plan - Planning Efforts
Public Works
$0
$300,000
$300,000
Total Facilities
$3,214,300
$750,000
$3,964,300
Streets and Drainage
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
5
7181
C2002042
15th Street Pavement Overlay
Public Works
$0
$235,000
$235,000
5
7281
C2002042
15th Street Pavement Overlay
Public Works
$0
$130,000
$130,000
5
7511
C2002042
15th Street Pavement Overlay
Public Works
$0
$10,000
$10,000
6
7012
C2502006
19th Street Tidegate Retrofit
Public Works
$149,500
$0
$149,500
6
7231
C2502006
19th Street Tidegate Retrofit
Public Works
$100,000
$0
$100,000
7
7281
C2002043
Abalone and Crystal Pavement Rehabilitation
Public Works
$0
$398,000
$398,000
7
7511
C2002043
Abalone and Crystal Pavement Rehabilitation
Public Works
$0
$2,000
$2,000
8
7181
C2002044
Bay Avenue Pavement Rehabilitation
Public Works
$0
$2,175,000
$2,175,000
8
7511
C2002044
Bay Avenue Pavement Rehabilitation
Public Works
$0
$15,000
$15,000
8
7541
C2002044
Bay Avenue Pavement Rehabilitation
Public Works
$0
$10,000
$10,000
9
7012
C2502011
Bayside Drive, Riverside Avenue Storm Drain Improvements
Public Works
$0
$300,000
$300,000
10
7253
C2002028
Bristol Street North Landscape Improvements
Public Works
$72,900
$0
$72,900
11
7012
C2502003
China Cove Slope and Drainage Improvements
Public Works
$200,000
$0
$200,000
11
7014
C8002008
China Cove Slope and Drainage Improvements
Public Works
$102,500
$0
$102,500
12
7281
C2002045
Dover Dr, Peninsula Point Pavement Rehabilitation Design
Public Works
$0
$200,000
$200,000
13
7281
C2002046
Fashion Island and Area Streets Overlay and Slurry
Public Works
$0
$1,080,000
$1,080,000
13
7511
C2002046
Fashion Island and Area Streets Overlay and Slurry
Public Works
$0
$50,000
$50,000
13
7541
C2002046
Fashion Island and Area Streets Overlay and Slurry
Public Works
$0
$15,000
$15,000
Category-1
Streets and Drainage
Page
Fund
Project
Title
14
7281
C2002039
Harbor View Hills / Newport Heights Pavement Rehab.
14
7511
C2002039
Harbor View Hills / Newport Heights Pavement Rehab.
14
7541
C2002039
Harbor View Hills / Newport Heights Pavement Rehab.
15
7181
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
15
7261
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
15
7511
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
16
7261
C2002019
Jamboree Road Improvements - Bristol /Fairchild
16
7284
C2002019
Jamboree Road Improvements - Bristol /Fairchild
17
7281
C2002047
Major Arterial Streets Repair Program
18
7181
C2002048
Newport Boulevard, 32nd Street Modification
18
7284
C2002048
Newport Boulevard, 32nd Street Modification
19
7013
C2002040
Peninsula Point Alley Replacement
19
7511
C2002040
Peninsula Point Alley Replacement
19
7541
C2002040
Peninsula Point Alley Replacement
20
7013
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
20
7161
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
21
7013
C2001011
Slurry Seal Program
22
7012
C2502010
Storm Drain Interceptors
22
7284
C2502010
Storm Drain Interceptors
23
7013
C2202002
Streetlight Conversion Program
24
7231
C2502009
Tidegate Retrofit and Upgrades
Total Streets and Drainage
Traffic
Department
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Municipal Ops.
Municipal Ops.
Public Works
Public Works
Public Works
Municipal Ops.
Public Works
Page
Fund
Project
Title
Department
25
7181
C3002016
Citywide Street Signage, Striping and Marking
Public Works
26
7261
C3002014
Fashion Island Ring Road Striping Plan
Public Works
27
7181
C3002015
Traffic Sign Inventory and Reflectivity Assessment
Public Works
28
7261
C3002009
Traffic Signal Modernization: Phase 5
Public Works
29
7181
C3001007
Traffic Signal Rehabilitation Program
Public Works
Total Traffic
Category-2
Rebudget
$1,345,300
$22,500
$26,500
$600,000
$0
$200,000
$232,200
$2,996,400
$0
$0
$0
$55,000
$47,500
$0
$0
$0
$0
$0
$0
$900,000
$0
$7,050,300
Budget
$0
$0
$0
$0
$1,000,000
$0
$0
$0
$250,000
$75,000
$225,000
$300,000
$600,000
$100,000
$450,000
$50,000
$700,000
$150,000
$150,000
$100,000
$500,000
$9,270,000
Total
$1,345,300
$22,500
$26,500
$600,000
$1,000,000
$200,000
$232,200
$2,996,400
$250,000
$75,000
$225,000
$355,000
$647,500
$100,000
$450,000
$50,000
$700,000
$150,000
$150,000
$1,000,000
$500,000
$16,320,300
Rebudget
Budget
Total
$0
$50,000
$50,000
$0
$90,000
$90,000
$0
$90,000
$90,000
$719,300
$900,000
$1,619,300
$200,000
$375,000
$575,000
$919,300
$1,505,000
$2,424,300
Parks, Harbors and Beaches
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
31
7231
C4402009
Balboa Marina Public Pier Feasibility Study
Public Works
$0
$20,000
$20,000
32
7231
C4402006
Balboa Yacht Basin Mooring Support Services Improv.
Public Works
$0
$25,000
$25,000
33
7441
C4120616
Bonita Canyon Sports Park
Recreation /SS
$68,200
$0
$68,200
34
7231
C4402007
Bulkhead Repairs, Sealing and Groin Rehabilitation
Public Works
$0
$400,000
$400,000
35
7231
C4402008
China Cove and Little Island Beach Management
Public Works
$0
$50,000
$50,000
36
7231
C4402010
Eelgrass Mapping
Public Works
$0
$25,000
$25,000
37
7231
C4402011
Linda Isle Dredging
Public Works
$0
$30,000
$30,000
38
7231
C4402003
Lower Harbor Dredging
Public Works
$100,000
$0
$100,000
39
7411
C4002002
Marina Park
Public Works
$784,000
$8,275,000
$9,059,000
40
7231
C4402004
Rhine Channel Dredging
Public Works
$3,999,500
$0
$3,999,500
40
7231
C4402005
Rhine Channel Dredging
Public Works
$80,850
$0
$80,850
41
7231
C5100923
Semeniuk Slough Dredging
Public Works
$0
$500,000
$500,000
42
7412
C5100515
Sunset Ridge Park
Public Works
$9,561,400
$0
$9,561,400
Total Parks, Harbors and Beaches
$14,593,950
$9,325,000
$23,918,950
Water Quality and Environmental
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
43
7014
C5002004
Big Canyon Wash Restoration
Public Works
$75,000
$0
$75,000
43
7251
C5002004
Big Canyon Wash Restoration
Public Works
$1,500,000
$0
$1,500,000
44
7014
C5002002
Buck Gully Canyon Stabilization and Flood Control
Public Works
$1,034,600
$0
$1,034,600
44
7255
C5002002
Buck Gully Canyon Stabilization and Flood Control
Public Works
$0
$725,000
$725,000
45
7513
C5500637
Irrigation - Citywide Central Computer System
Municipal Ops.
$0
$90,000
$90,000
46
7255
C5002005
Newport Coast Protection Implementation Program
Public Works
$0
$305,000
$305,000
46
7255
C5002006
Newport Coast Protection Implementation Program
Public Works
$563,000
$0
$563,000
46
7255
C5002007
Newport Coast Protection Implementation Program
Public Works
$795,000
$0
$795,000
46
7255
C5002008
Newport Coast Protection Implementation Program
Public Works
$112,000
$0
$112,000
Total Water Quality and Environmental
$4,079,600
$1,120,000
$5,199,600
Category -3
Water
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
47
7513
C6002010
16th Street Pump Station Capacity Modifications
Municipal Ops.
$0
$100,000
$100,000
48
7511
C6002008
Corona del Mar Water Transmission Main Improvements
Municipal Ops.
$0
$2,800,000
$2,800,000
49
7511
C6002009
Saint James Road Water Main Replacement
Municipal Ops.
$0
$200,000
$200,000
50
7511
C6001000
Water Main Master Plan Program
Municipal Ops.
$0
$500,000
$500,000
Total Water
$0
$3,600,000
$3,600,000
Wastewater
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
51
7541
C7002004
Big Canyon / Port Streets Sewer Diversion Improvements
Municipal Ops.
$0
$150,000
$150,000
52
7541
C7002005
Saint James Road Sewer Relocation
Municipal Ops.
$0
$250,000
$250,000
53
7541
C7001002
Sewer Pipeline Point Repairs and Lining
Municipal Ops.
$225,000
$75,000
$300,000
54
7541
C5600934
Wastewater Master Plan
Municipal Ops.
$100,000
$0
$100,000
Total Wastewater
$325,000
$475,000
$800,000
Miscellaneous
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
55
7459
C5100879
Santa Ana Heights Utility Undergrounding
Public Works
$1,175,600
$0
$1,175,600
56
7014
C8002022
Underground Utility Credits
Public Works
$0
$94,130
$94,130
Total Miscellaneous
$1,175,600
$94,130
$1,269,730
Total for All Categories
Category -4
$31,358,050 $26,139,130 $57,497,180
Project Listing by Requesting Department
Page
Fund
Project
Title
Category
Bebudget
Budget
Total
Fire
3
7414
C1002037
Lifeguard Headquarters Replacement
Facilities
$0
$400,000
$400,000
Total Fire
$0
$400,000
$400,000
Municipal Operations
47
7513
C6002010
16th Street Pump Station Capacity Modifications
Water
$0
$100,000
$100,000
51
7541
C7002004
Big Canyon and Port Streets Sewer Diversion Improvements
Wastewater
$0
$150,000
$150,000
48
7511
C6002008
Corona del Mar Water Transmission Main Improvements
Water
$0
$2,800,000
$2,800,000
45
7513
C5500637
Irrigation - Citywide Central Computer System
Wtr Qual /Environ
$0
$90,000
$90,000
52
7541
C7002005
Saint James Road Sewer Relocation
Wastewater
$0
$250,000
$250,000
49
7511
C6002009
Saint James Road Water Main Replacement
Water
$0
$200,000
$200,000
53
7541
C7001002
Sewer Pipeline Point Repairs and Lining
Wastewater
$225,000
$75,000
$300,000
20
7013
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
Streets /Drainage
$0
$450,000
$450,000
20
7161
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
Streets /Drainage
$0
$50,000
$50,000
23
7013
C2202002
Streetlight Conversion Program
Streets /Drainage
$900,000
$100,000
$1,000,000
54
7541
C5600934
Wastewater Master Plan
Wastewater
$100,000
$0
$100,000
50
7511
C6001000
Water Main Master Plan Program
Water
$0
$500,000
$500,000
Total Municipal Operations
$1,225,000
$4,765,000
$5,990,000
Public Works
5
7181
C2002042
15th Street Pavement Overlay
Streets /Drainage
$0
$235,000
$235,000
5
7281
C2002042
15th Street Pavement Overlay
Streets /Drainage
$0
$130,000
$130,000
5
7511
C2002042
15th Street Pavement Overlay
Streets /Drainage
$0
$10,000
$10,000
6
7012
C2502006
19th Street Tidegate Retrofit
Streets /Drainage
$149,500
$0
$149,500
6
7231
C2502006
19th Street Tidegate Retrofit
Streets /Drainage
$100,000
$0
$100,000
7
7281
C2002043
Abalone and Crystal Pavement Rehabilitation
Streets /Drainage
$0
$398,000
$398,000
7
7511
C2002043
Abalone and Crystal Pavement Rehabilitation
Streets /Drainage
$0
$2,000
$2,000
31
7231
C4402009
Balboa Marina Public Pier Feasibility Study
Prks /Hrbrs /Bchs
$0
$20,000
$20,000
1
7231
C1002036
Balboa Yacht Basin Facility Improvements
Facilities
$0
$50,000
$50,000
Department -1
Page Fund Project Title
Category Rebudget Budget Total
Public Works continued
32
7231
C4402006
Balboa Yacht Basin Mooring Support Services Improv.
Pks /Hrbrs /Bchs
$0
$25,000
$25,000
8
7181
C2002044
Bay Avenue Pavement Rehabilitation
Streets /Drainage
$0
$2,175,000
$2,175,000
8
7511
C2002044
Bay Avenue Pavement Rehabilitation
Streets /Drainage
$0
$15,000
$15,000
8
7541
C2002044
Bay Avenue Pavement Rehabilitation
Streets /Drainage
$0
$10,000
$10,000
9
7012
C2502011
Bayside Drive, Riverside Avenue Storm Drain Improvements
Streets /Drainage
$0
$300,000
$300,000
43
7014
C5002004
Big Canyon Wash Restoration
Wtr Qual /Environ
$75,000
$0
$75,000
43
7251
C5002004
Big Canyon Wash Restoration
Wtr Qual /Environ
$1,500,000
$0
$1,500,000
10
7253
C2002028
Bristol Street North Landscape Improvements
Streets /Drainage
$72,900
$0
$72,900
44
7014
C5002002
Buck Gully Canyon Stabilization and Flood Control
Wtr Qual /Environ
$1,034,600
$0
$1,034,600
44
7255
C5002002
Buck Gully Canyon Stabilization and Flood Control
Wtr Qual /Environ
$0
$725,000
$725,000
34
7231
C4402007
Bulkhead Repairs, Sealing and Groin Rehabilitation
Pks /Hrbrs /Bchs
$0
$400,000
$400,000
35
7231
C4402008
China Cove and Little Island Beach Management
Pks /Hrbrs /Bchs
$0
$50,000
$50,000
11
7012
C2502003
China Cove Slope and Drainage Improvements
Streets /Drainage
$200,000
$0
$200,000
11
7014
C8002008
China Cove Slope and Drainage Improvements
Streets /Drainage
$102,500
$0
$102,500
25
7181
C3002016
Citywide Street Signage, Striping and Marking
Traffic
$0
$50,000
$50,000
2
7410
C1002009
Civic Center
Facilities
$1,641,700
$0
$1,641,700
2
7410
C1002028
Civic Center OCIP Insurance
Facilities
$250,000
$0
$250,000
2
7410
C1002034
Civic Center OCIP Premiums
Facilities
$260,000
$0
$260,000
2
7410
C1002035
Civic Center OCIP Loss Claims
Facilities
$1,062,600
$0
$1,062,600
12
7281
C2002045
Dover Dr, Peninsula Point Pavement Rehabilitation Design
Streets /Drainage
$0
$200,000
$200,000
36
7231
C4402010
Eelgrass Mapping
Prks /Hrbrs /Bchs
$0
$25,000
$25,000
13
7281
C2002046
Fashion Island and Area Streets Overlay and Slurry
Streets /Drainage
$0
$1,080,000
$1,080,000
13
7511
C2002046
Fashion Island and Area Streets Overlay and Slurry
Streets /Drainage
$0
$50,000
$50,000
13
7541
C2002046
Fashion Island and Area Streets Overlay and Slurry
Streets /Drainage
$0
$15,000
$15,000
25
7261
C3002014
Fashion Island Ring Road Striping Plan
Traffic
$0
$90,000
$90,000
14
7281
C2002039
Harbor View Hills / Newport Heights Pavement Rehab.
Streets /Drainage
$1,345,300
$0
$1,345,300
14
7511
C2002039
Harbor View Hills / Newport Heights Pavement Rehab.
Streets /Drainage
$22,500
$0
$22,500
14
7541
C2002039
Harbor View Hills / Newport Heights Pavement Rehab.
Streets /Drainage
$26,500
$0
$26,500
15
7181
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
Streets /Drainage
$600,000
$0
$600,000
15
7261
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
Streets /Drainage
$0
$1,000,000
$1,000,000
15
7511
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
Streets /Drainage
$200,000
$0
$200,000
Department -2
Page Fund Project Title
Category Rebudget Budget Total
Public Works continued
16
7261
C2002019
Jamboree Road Improvements - Bristol /Fairchild
Streets /Drainage
$232,200
$0
$232,200
16
7284
C2002019
Jamboree Road Improvements - Bristol /Fairchild
Streets /Drainage
$2,996,400
$0
$2,996,400
37
7231
C4402011
Linda Isle Dredging
Prks /Hrbrs /Bchs
$0
$30,000
$30,000
38
7231
C4402003
Lower Harbor Dredging
Prks /Hrbrs /Bchs
$100,000
$0
$100,000
17
7281
C2002047
Major Arterial Streets Repair Program
Streets /Drainage
$0
$250,000
$250,000
39
7411
C4002002
Marina Park
Prks /Hrbrs /Bchs
$784,000
$8,275,000
$9,059,000
4
7415
C1002038
Master Facilities Plan - Planning Efforts
Facilities
$0
$300,000
$300,000
18
7181
C2002048
Newport Boulevard, 32nd Street Modification
Streets /Drainage
$0
$75,000
$75,000
18
7284
C2002048
Newport Boulevard, 32nd Street Modification
Streets /Drainage
$0
$225,000
$225,000
46
7255
C5002005
Newport Coast Protection Implementation Program
Wtr Qual /Environ
$0
$305,000
$305,000
46
7255
C5002006
Newport Coast Protection Implementation Program
Wtr Qual /Environ
$563,000
$0
$563,000
46
7255
C5002007
Newport Coast Protection Implementation Program
Wtr Qual /Environ
$795,000
$0
$795,000
46
7255
C5002008
Newport Coast Protection Implementation Program
Wtr Qual /Environ
$112,000
$0
$112,000
19
7013
C2002040
Peninsula Point Alley Replacement
Streets /Drainage
$55,000
$300,000
$355,000
19
7511
C2002040
Peninsula Point Alley Replacement
Streets /Drainage
$47,500
$600,000
$647,500
19
7541
C2002040
Peninsula Point Alley Replacement
Streets /Drainage
$0
$100,000
$100,000
40
7231
C4402004
Rhine Channel Dredging
Prks /Hrbrs /Bchs
$3,999,500
$0
$3,999,500
40
7231
C4402005
Rhine Channel Dredging
Prks /Hrbrs /Bchs
$80,850
$0
$80,850
55
7459
C5100879
Santa Ana Heights Utility Undergrounding
Miscellaneous
$1,175,600
$0
$1,175,600
41
7231
C5100923
Semeniuk Slough Dredging
Prks /Hrbrs /Bchs
$0
$500,000
$500,000
21
7013
C2001011
Slurry Seal Program
Streets /Drainage
$0
$700,000
$700,000
22
7012
C2502010
Storm Drain Interceptors
Streets /Drainage
$0
$150,000
$150,000
22
7284
C2502010
Storm Drain Interceptors
Streets /Drainage
$0
$150,000
$150,000
42
7412
C5100515
Sunset Ridge Park
Prks /Hrbrs /Bchs
$9,561,400
$0
$9,561,400
24
7231
C2502009
Tidegate Retrofit and Upgrades
Streets /Drainage
$0
$500,000
$500,000
27
7181
C3002015
Traffic Sign Inventory and Reflectivity Assessment
Traffic
$0
$90,000
$90,000
28
7261
C3002009
Traffic Signal Modernization: Phase 5
Traffic
$719,300
$900,000
$1,619,300
29
7181
C3001007
Traffic Signal Rehabilitation Program
Traffic
$200,000
$375,000
$575,000
56
7014
C8002022
Underground Utility Credits
Miscellaneous
$0
$94,130
$94,130
Total Public Works
$30,064,850
$20,974,130
$51,038,980
Department -3
Page Fund Project Title
Recreation /Senior Services
33 7441 C4120616 Bonita Canyon Sports Park
Total Recreation/Senior Services
Total for All Funds
Department -4
Category Rebudget Budget Total
Prks /Hrbrs /Bchs $68,200 $0 $68,200
$68,200 $0 $68,200
$31,358,050 $26,139,130 $57,497,180
Project Listing by Funding Source
Page Fund General Fund
Category Department Rebudget Budget Total
Funding -1
7012
Drainage
6
C2502006
19th Street Tidegate Retrofit
Streets /Drainage
Public Works
$149,500
$0
$149,500
9
C2502011
Bayside Drive, Riverside Avenue Storm Drain Improvements
Streets /Drainage
Public Works
$0
$300,000
$300,000
11
C2502003
China Cove Slope and Drainage Improvements
Streets /Drainage
Public Works
$200,000
$0
$200,000
22
C2502010
Storm Drain Interceptors
Streets /Drainage
Public Works
$0
$150,000
$150,000
Total Drainage
$349,500
$450,000
$799,500
7013
Streets
19
C2002040
Peninsula Point Alley Replacement
Streets /Drainage
Public Works
$55,000
$300,000
$355,000
20
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
Streets /Drainage
Municipal Ops.
$0
$450,000
$450,000
21
C2001011
Slurry Seal Program
Streets /Drainage
Public Works
$0
$700,000
$700,000
23
C2202002
Streetlight Conversion Program
Streets /Drainage
Municipal Ops.
$900,000
$100,000
$1,000,000
Total Streets
$955,000
$1,550,000
$2,505,000
7014
Miscellaneous
43
C5002004
Big Canyon Wash Restoration
Wtr Qual /Environ
Public Works
$75,000
$0
$75,000
44
C5002002
Buck Gully Canyon Stabilization and Flood Control
Wtr Qua[ /Environ
Public Works
$1,034,600
$0
$1,034,600
11
C8002008
China Cove Slope and Drainage Improvements
Streets /Drainage
Public Works
$102,500
$0
$102,500
56
C8002022
Underground Utility Credits
Miscellaneous
Public Works
$0
$94,130
$94,130
Total Miscellaneous
$1,212,100
$94,130
$1,306,230
Total
tt
$2,094,130
$4,610,730
Page
Fund
CDBG
Category
Department
Rebudget
Budget
Total
7161
CDBG
20
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
Streets /Drainage
Municipal Ops.
$0
$50,000
$50,000
Total CDBG
$0
$50,000
$50,000
Funding -1
Page Fund Gas Tax
5
8
25
15
18
27
29
7181
C2002042
C2002044
C3002016
C5100470
C2002048
C3002015
C3001007
Gas Tax
15th Street Pavement Overlay
Bay Avenue Pavement Rehabilitation
Citywide Street Signage, Striping and Marking
Irvine Avenue Realignment - University Dr to Bristol St
Newport Boulevard, 32nd Street Modification
Traffic Sign Inventory and Reflectivity Assessment
Traffic Sianal Rehabilitation Proaram
Page Fund Tide and Submerged Lands
6
31
1
32
34
35
36
37
38
40
40
41
24
Total Gas Tax
7231 Tide and Submerged Lands
C2502006 19th Street Tidegate Retrofit
C4402009 Balboa Marina Public Pier Feasibility Study
C1002036 Balboa Yacht Basin Facility Improvements
C4402006 Balboa Yacht Basin Mooring Support Services Improv.
C4402007 Bulkhead Repairs, Sealing and Groin Rehabilitation
C4402008 China Cove and Little Island Beach Management
C4402010 Eelgrass Mapping
C4402011 Linda Isle Dredging
C4402003 Lower Harbor Dredging
C4402004 Rhine Channel Dredging
C4402005 Rhine Channel Dredging
C5100923 Semeniuk Slough Dredging
C2502009 Tidegate Retrofit and Upgrades
Total Tide and Submerged Lands
Category
Streets /Drainage
Streets /Drainage
Traffic
Streets /Drainage
Streets /Drainage
Traffic
Traffic
Category
Streets /Drainage
Prks /Hrbrs /Bchs
Facilities
Pks /Hrbrs /Bchs
Pks /Hrbrs /Bchs
Pks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Funding -2
Department
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Department
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Rebudget
$0
$0
$0
$600,000
$0
$0
$200,000
$800,000
Rebudget
$100,000
$0
$0
$0
$0
$0
$0
$0
$100,000
$3,999,500
$80,850
$0
$0
$4,280,350
Budget
$235,000
$2,175,000
$50,000
$0
$75,000
$90,000
$375,000
$3,000,000
Budget
$0
$20,000
$50,000
$25,000
$400,000
$50,000
$25,000
$30,000
$0
$0
$0
$500,000
$500,000
$1,600,000
Total
$235,000
$2,175,000
$50,000
$600,000
$75,000
$90,000
$575,000
$3,800,000
Total
$100,000
$20,000
$50,000
$25,000
$400,000
$50,000
$25,000
$30,000
$100,000
$3,999;500
$80,850
$500,000
$500,000
$5,880,350
Page
Fund
Contributions
Category
Department
Rebudget
Budget
Total
Irvine Avenue Realignment - University Dr to Bristol St
7251
Contributions
Jamboree Road Improvements - Bristol /Fairchild
28
C3002009
Traffic Signal Modernization: Phase 5
$900,000
43
C5002004
Big Canyon Wash Restoration
Wtr Qual /Environ
Public Works
$1,500,000
$0
$1,500,000
Total Contributions
$1,500,000
$0
$1,500,000
Page
Fund
Bristol Street Relinquishment
Category
Department
Rebudget
Budget
Total
10
C2002028
Bristol Street North Landscape Improvements
Streets /Drainage
Public Works
$72,900
$0
$72,900
Total Bristol Street Relinquishment
$72,900
$0
$72,900
Page
Fund
Contributions
Category
Department
Rebudget
Budget
Total
7255
Environmental Contributions
44
C5002002
Buck Gully Canyon Stabilization and Flood Control
Wtr Qual /Environ
Public Works
$0
$725,000
$725,000
46
C5002005
Newport Coast Protection Implementation Program
Wtr Qual /Environ
Public Works
$0
$305,000
$305,000
46
C5002006
Newport Coast Protection Implementation Program
Wtr Qual /Environ
Public Works
$563,000
$0
$563,000
46
C5002007
Newport Coast Protection Implementation Program
Wtr Qual /Environ
Public Works
$795,000
$0
$795,000
46
C5002008
Newport Coast Protection Implementation Program
Wtr Qual /Environ
Public Works
$112,000
$0
$112,000
Total Environmental Contributions
$1,470,000
$1,030,000
$2,500,000
Page Fund Transportation and Circulation
Category Department Rebudget Budget
Traffic
7261
Transportation and Circulation
26
C3002014
Fashion Island Ring Road Striping Plan
15
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
16
C2002019
Jamboree Road Improvements - Bristol /Fairchild
28
C3002009
Traffic Signal Modernization: Phase 5
Category Department Rebudget Budget
Traffic
Public Works
$0
$90,000
Streets /Drainage
Public Works
$0
$1,000,000
Streets /Drainage
Public Works
$232,200
$0
Traffic
Public Works
$719,300
$900,000
Total
$90,000
$1,000,000
$232,200
$1,619,300
Total Transportation and Circulation $951,500 $1,990,000 $2,941,500
Funding -3
Page
Fund
Measure M
Budget
7281
Measure M Turnback
5
C2002042
15th Street Pavement Overlay
7
C2002043
Abalone and Crystal Pavement Rehabilitation
12
C2002045
Dover Dr, Peninsula Point Pavement Rehabilitation Design
13
C2002046
Fashion Island and Area Streets Overlay and Slurry
14
C2002039
Harbor View Hills / Newport Heights Pavement Rehab.
17
C2002047
Maior Arterial Streets Repair Program
Total Measure M Turnback
Page Fund Measure M
7284 Measure M Competitive
16 C2002019 Jamboree Road Improvements - Bristol /Fairchild
18 C2002048 Newport Boulevard, 32nd Street Modification
22 C2502010 Storm Drain Interceptors
Total Measure M Competitive
Page
Fund
Major Facilities Master Plan
Budget
7410
Civic Center
2
C1002009
Civic Center
2
C1002028
Civic Center OCIP Insurance
2
C1002034
Civic Center OCIP Premiums
2
C1002035
Civic Center OCIP Loss Claims
7411 Marina Park
39 C4002002 Marina Park
Total Civic Center
Total Marina Park
Category
Department
Rebudget
Budget
Total
Streets /Drainage
Public Works
$0
$130,000
$130,000
Streets /Drainage
Public Works
$0
$398,000
$398,000
Streets /Drainage
Public Works
$0
$200,000
$200,000
Streets /Drainage
Public Works
$0
$1,080,000
$1,080,000
Streets /Drainage
Public Works
$1,345,300
$0
$1,345,300
Streets /Drainage
Public Works
$0
$250,000
$250,000
$1,345,300
$2,058,000
$3,403,300
Category
Department
Rebudget
Budget
Total
Streets /Drainage
Public Works
$2,996,400
$0
$2,996,400
Streets /Drainage
Public Works
$0
$225,000
$225,000
Streets /Drainage
Public Works
$0
$150,000
$150,000
$2,996,400
$375,000
$3,371,400
Category
Department
Rebudget
Budget
Total
Facilities
Public Works
$1,641,700
$0
$1,641,700
Facilities
Public Works
$250,000
$0
$250,000
Facilities
Public Works
$260,000
$0
$260,000
Facilities
Public Works
$1,062,600
$0
$1,062,600
$3,214,300
$0
$3,214,300
Prks /Hrbrs /Bchs Public Works
Funding -4
$784,000 $8,275,000 $9,059,000
$784,000 $8,275,000 $9,059,000
Page
Fund
Major Facilities Master Plan
Category
Department
Rebudget
Budget
Total
7412
Sunset Ridge Park
42
C5100515
Sunset Ridge Park
Prks /Hrbrs /Bchs
Public Works
$9,561,400
$0
$9,561,400
Total Sunset Ridge Park
$9,561,400
$0
$9,561,400
7,414
Lifeguard Headquarters
3
C1002037
Lifeguard Headquarters Replacement
Facilities
Fire
$0
$400,000
$400,000
Total Lifeguard Headquarters
$0
$400,000
$400,000
7415
Strategic Planning
4
C1002038
Master Facilities Plan - Planning Efforts
Facilities
Public Works
$0
$300,000
$300,000
Total Strategic Planning
$0
$300,000
$300,000
Total
00
$8,975,000
$22,534,700
Page
Fund
Bonita Canyon Development
Category
Department
Rebudget
Budget
Total
7441
Bonita Canyon Development
33
C4120616
Bonita Canyon Sports Park
Prks /Hrbrs /Bchs
Recreation /SS
$68,200
$0
$68,200
Total Bonita Canyon Development
$68,200
$0
$68,200
Page Fund Santa Ana Heights Category Department Rebudget Budget Total
7459 Santa Ana Heights Projects
55 C5100879 Santa Ana Heights Utility Undergrounding Miscellaneous Public Works $1,175,600 $0 $1,175,600
Total Santa Ana Heights Projects $1,175,600 $0 $1,175,600
Funding -5
Page
Fund
Water Enterprise
Category
Department
Rebudget
Budget
Total
7511
Water Distribution and Piping
5
C2002042
15th Street Pavement Overlay
Streets /Drainage
Public Works
$0
$10,000
$10,000
7
C2002043
Abalone and Crystal Pavement Rehabilitation
Streets /Drainage
Public Works
$0
$2,000
$2,000
8
C2002044
Bay Avenue Pavement Rehabilitation
Streets /Drainage
Public Works
$0
$15,000
$15,000
48
C6002008
Corona del Mar Water Transmission Main Improvements
Water
Municipal Ops.
$0
$2,800,000
$2,800,000
13
C2002046
Fashion Island and Area Streets Overlay and Slurry
Streets /Drainage
Public Works
$0
$50,000
$50,000
14
C2002039
Harbor View Hills / Newport Heights Pavement Rehab.
Streets /Drainage
Public Works
$22,500
$0
$22,500
15
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
Streets /Drainage
Public Works
$200,000
$0
$200,000
19
C2002040
Peninsula Point Alley Replacement
Streets /Drainage
Public Works
$47,500
$600,000
$647,500
49
C6002009
Saint James Road Water Main Replacement
Water
Municipal Ops.
$0
$200,000
$200,000
50
C6001000
Water Main Master Plan Program
Water
Municipal Ops.
$0
$500,000
$500,000
Total Water Distribution and Piping
$270,000
$4,177,000
$4,447,000
Page
Fund
Water Enterprise
Category
Department
Rebudget
Budget
Total
7513
Pumping and Operating
47
C6002010
16th Street Pump Station Capacity Modifications
Water
Municipal Ops.
$0
$100,000
$100,000
45
C5500637
Irrigation - Citywide Central Computer System
Wtr Qual /Environ
Municipal Ops.
$0
$90,000
$90,000
Total Pumping and Operating
$0
$190,000
$190,000
Funding -6
Page Fund Wastewater Enterprise
Total Sewer Main Replacement
Total for All Funds
Category
7541
Sewer Main Replacement
8
C2002044
Bay Avenue Pavement Rehabilitation
51
C7002004
Big Canyon and Port Streets Sewer Diversion Improvements
13
C2002046
Fashion Island and Area Streets Overlay and Slurry
14
C2002039
Harbor View Hills / Newport Heights Pavement Rehab.
19
C2002040
Peninsula Point Alley Replacement
52
C7002005
Saint James Road Sewer Relocation
53
C7001002
Sewer Pipeline Point Repairs and Lining
54
C5600934
Wastewater Master Plan
Total Sewer Main Replacement
Total for All Funds
Category
Department
Rebudget
Budget
Total
Streets /Drainage
Public Works
$0
$10,000
$10,000
Wastewater
Municipal Ops.
$0
$150,000
$150,000
Streets /Drainage
Public Works
$0
$15,000
$15,000
Streets /Drainage
Public Works
$26,500
$0
$26,500
Streets /Drainage
Public Works
$0
$100,000
$100,000
Wastewater
Municipal Ops.
$0
$250,000
$250,000
Wastewater
Municipal Ops.
$225,000
$75,000
$300,000
Wastewater
Municipal Ops.
$100,000
$0
$100,000
$351,500
$600,000
$951,500
Funding -7
$31,358,050 $26,139,130 $57,497,180
Project Fund Summary
Fund Fundina Source
FY 2011 -2012 Adooted Bu
010
General Fund
Rebudget
Budget
Total
7012
Drainage
$349,500
$450,000
$799,500
7013
Streets
$955,000
$1,550,000
$2,505,000
7014
Miscellaneous
$1,212,100
$94,130
$1,306,230
Total General Fund
$2,516,600
$2,094,130
$4,610,730
160
CDBG
Rebudget
Budget
Total
7161
CDBG
$0
$50,000
$50,000
Total CDBG
$0
$50,000
$50,000
180
Gas Tax
Rebudget
Budget
Total
7181
Gas Tax
$800,000
$3,000,000
$3,800,000
Total Gas Tax
$800,000
$3,000,000
$3,800,000
230
Tide and Submerged Lands
Rebudget
Budget
Total
7231
Tide and Submerged Lands
$4,280,350
$1,600,000
$5,880,350
Total Tide and Submerged Lands
$4,280,350
$1,600,000
$5,880,350
250
Contributions
Rebudget
Budget
Total
7251
Contributions
$1,500,000
$0
$1,500,000
7253
Bristol Street Relinquishment
$72,900
$0
$72,900
7255
Environmental Contributions
$1,470,000
$1,030,000
$2,500,000
Total Contributions
$3,042,900
$1,030,000
$4,072,900
Summary-1
Fund
Funding Source
FY 2011 -2012 Adopted Budget
260
Transportation and Circulation
Rebudget
Budget
Total
7261 Transportation and Circulation
$951,500
$1,990,000
$2,941,500
Total Transportation and Circulation
$951,500
$1,990,000
$2,941,500
280
Measure M
Rebudget
Budget
Total
7281 Measure M Turnback
$1,345,300
$2,058,000
$3,403,300
7284 Measure M Competitive
$2,996,400
$375,000
$3,371,400
Total Measure M
$4,341,700
$2,433,000
$6,774,700
Major Facilities Master Plan
Rebudget
Budget
Total
410
7410 Civic Center
$3,214,300
$0
$3,214,300
411
7411 Marina Park
$784,000
$8,275,000
$9,059,000
412
7412 Sunset Ridge Park
$9,561,400
$0
$9,561,400
414
7414 Lifeguard Headquarters
$0
$400,000
$400,000
415
7415 Strategic Planning
$0
$300,000
$300,000
Total Major Facilities Master Plan
$13,559,700
$8,975,000
$22,534,700
440 Bonita Canyon Development Rebudget Budget Total
7441 Bonita Canyon Development $68,200 $0 $68,200
Total Bonita Canyon Development $68,200 $0 $68,200
Santa Ana Heights Rebudget Budget Total
459 7459 Santa Ana Heights Projects $1,175,600 $0 $1,175,600
Total Santa Ana Heights $1,175,600 $0 $1,175,600
Summary-2
Fund Funding Source
FY 2011 -2012 Adopted Budget
500 Water Enterprise
Rebudget
Budget
Total
7511 Water Distribution and Piping
$270,000
$4,177,000
$4,447,000
7513 Pumping and Operating
$0
$190,000
$190,000
Total Water Enterprise
$270,000
$4,367,000
$4,637,000
540 Wastewater Enterprise
Rebudget
Budget
Total
7541 Sewer Main Replacemew
$351,500
$600,000
$951,500
Total Wastewater Enterprise
$351,500
$600,000
$951,500
Total for All CIP Projects
$31,358,050
$26,139,130 $57,497,180
Summary-3
Facilities
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
1
7231
C1002036
Balboa Yacht Basin Facility Improvements
Public Works
$0
$50,000
$50,000
2
7410
C1002009
Civic Center
Public Works
$1,641,700
$0
$1,641,700
2
7410
C1002028
Civic Center OCIP Insurance
Public Works
$250,000
$0
$250,000
2
7410
C1002034
Civic Center OCIP Premiums
Public Works
$260,000
$0
$260,000
2
7410
C1002035
Civic Center OCIP Loss Claims
Public Works
$1,062,600
$0
$1,062,600
3
7414
C1002037
Lifeguard Headquarters Replacement
Fire
$0
$400,000
$400,000
4
7415
C1002038
Master Facilities Plan - Planning Efforts
Public Works
$0
$300,000
$300,000
Total Facilities
$3,214,300
$750,000
$3,964,300
Balboa Yacht Basin Facility Improvements
Requesting Department: Public Works Category: Facilities
This project makes facility improvements to Balboa Yacht Basin, the City's public marina, which has 170 boat slips and is nearly 25 years
old. Specific improvements will be determined during design. Most likely, improvements will include general dock maintenance as well as
general aesthetic improvements (painting, signage, and upkeep repairs.)
Location:
Balboa Yacht Basin, 829 Harbor Island Drive
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $50,000
Other $0
Total $50,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C1002036
$0
$50,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$50,000
PROJECT TOTAL 1 $50,000
Civic Center
Requesting Department: Public Works
Category: Facilities
The Civic Center and Park Project includes a city hall building, one of the city's largest parks, a 450 -space parking structure, and an
expansion of the Newport Beach Central Library. Construction is underway and is scheduled to be completed by the end of 2012. The
current total cost estimate for all project components is $128 million.
Location:
1100 Avocado Avenue
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2011 -12
$0
$0
$1,641,700
$1,572,600
$3,214,300
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Civic Center
7410
C1002009
$1,641,700
$0
OCIP Insurance
7410
C1002028
$250,000
$0
OCIP Premiums
7410
C1002034
$260,000
$0
OCIP Loss Claims
7410
C1002035
$1,062,600
$0
TOTAL
$3,214,300
$0
PROJECT TOTAL 1 $3,214,300
Lifeguard Headquarters Replacement
Requesting Department: Fire Category: Facilities
This project provides for necessary studies, concept development and design effort needed to develop plans to replace the current
Lifeguard Headquarters. Future construction will include a new, more efficient central tower at Newport Pier and a small tower and Junior
Lifeguard's meeting room at Balboa Pier.
Location:
Newport and Balboa Piers
FY 2011 -12
Design /Environmental $400,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $400,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Major Facilities Master
7414
C1002037
$0
$400,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$400,000
PROJECT TOTAL 1 $400,000
Master Facilities Plan -- Planning Efforts
Requesting Department: Public Works Category: Facilities
This project provides for necessary studies and concept development needed to further refine the Major Facilities Financing Plan. It also
includes developing both interim and long term use plans for the current City Hall site on Newport Boulevard. Once the new Civic Center on
Avocado is constructed and occupied, a plan is needed to modify, address and secure the abandoned location for the period when long
term concepts and plans for the site are developed and approved.
Location:
3300 Newport Boulevard and other City facility locations
FY 2011 -12
Design /Environmental $300,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $300,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Major Facilities Master
7415
C1002038
$0
$300,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$300,000
PROJECT TOTAL 1 $300,000
4
Streets and Drainage
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
5
7181
C2002042
15th Street Pavement Overlay
Public Works
$0
$235,000
$235,000
5
7281
C2002042
15th Street Pavement Overlay
Public Works
$0
$130,000
$130,000
5
7511
C2002042
15th Street Pavement Overlay
Public Works
$0
$10,000
$10,000
6
7012
C2502006
19th Street Tidegate Retrofit
Public Works
$149,500
$0
$149,500
6
7231
C2502006
19th Street Tidegate Retrofit
Public Works
$100,000
$0
$100,000
7
7281
C2002043
Abalone and Crystal Pavement Rehabilitation
Public Works
$0
$398,000
$398,000
7
7511
C2002043
Abalone and Crystal Pavement Rehabilitation
Public Works
$0
$2,000
$2,000
8
7181
C2002044
Bay Avenue Pavement Rehabilitation
Public Works
$0
$2,175,000
$2,175,000
8
7511
C2002044
Bay Avenue Pavement Rehabilitation
Public Works
$0
$15,000
$15,000
8
7541
C2002044
Bay Avenue Pavement Rehabilitation
Public Works
$0
$10,000
$10,000
9
7012
C2502011
Bayside Drive, Riverside Avenue Storm Drain Improvements
Public Works
$0
$300,000
$300,000
10
7253
C2002028
Bristol Street North Landscape Improvements
Public Works
$72,900
$0
$72,900
11
7012
C2502003
China Cove Slope and Drainage Improvements
Public Works
$200,000
$0
$200,000
11
7014
C8002008
China Cove Slope and Drainage Improvements
Public Works
$102,500
$0
$102,500
12
7281
C2002045
Dover Dr, Peninsula Point Pavement Rehabilitation Design
Public Works
$0
$200,000
$200,000
13
7281
C2002046
Fashion Island and Area Streets Overlay and Slurry
Public Works
$0
$1,080,000
$1,080,000
13
7511
C2002046
Fashion Island and Area Streets Overlay and Slurry
Public Works
$0
$50,000
$50,000
13
7541
C2002046
Fashion Island and Area Streets Overlay and Slurry
Public Works
$0
$15,000
$15,000
14
7281
C2002039
Harbor View Hills/ Newport Heights Pavement Rehab.
Public Works
$1,345,300
$0
$1,345,300
14
7511
C2002039
Harbor View Hills / Newport Heights Pavement Rehab.
Public Works
$22,500
$0
$22,500
14
7541
C2002039
Harbor View Hills/ Newport Heights Pavement Rehab.
Public Works
$26,500
$0
$26,500
15
7181
C5100470
Irvine Avenue Realignment - University Or to Bristol St
Public Works
$600,000
$0
$600,000
15
7261
C5100470
Irvine Avenue Realignment - University Or to Bristol St
Public Works
$0
$1,000,000
$1,000,000
15
7511
C5100470
Irvine Avenue Realignment - University Dr to Bristol St
Public Works
$200,000
$0
$200,000
16
7261
C2002019
Jamboree Road Improvements - Bristol /Fairchild
Public Works
$232,200
$0
$232,200
16
7284
C2002019
Jamboree Road Improvements - Bristol /Fairchild
Public Works
$2,996,400
$0
$2,996,400
17
7281
C2002047
Major Arterial Streets Repair Program
Public Works
$0
$250,000
$250,000
Streets and Drainage continued
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
18
7181
C2002048
Newport Boulevard, 32nd Street Modification
Public Works
$0
$75,000
$75,000
18
7284
C2002048
Newport Boulevard, 32nd Street Modification
Public Works
$0
$225,000
$225,000
19
7013
C2002040
Peninsula Point Alley Replacement
Public Works
$55,000
$300,000
$355,000
19
7511
C2002040
Peninsula Point Alley Replacement
Public Works
$47,500
$600,000
$647,500
19
7541
C2002040
Peninsula Point Alley Replacement
Public Works
$0
$100,000
$100,000
20
7013
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
Municipal Ops.
$0
$450,000
$450,000
20
7161
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
Municipal Ops.
$0
$50,000
$50,000
21
7013
C2001011
Slurry Seal Program
Public Works
$0
$700,000
$700,000
22
7012
C2502010
Storm Drain Interceptors
Public Works
$0
$150,000
$150,000
22
7284
C2502010
Storm Drain Interceptors
Public Works
$0
$150,000
$150,000
23
7013
C2202002
Streetlight Conversion Program
Municipal Ops.
$900,000
$100,000
$1,000,000
24
7231
C2502009
Tidegate Retrofit and Upgrades
Public Works
$0
$500,000
$500,000
Total Streets and Drainage
$7,050,300
$9,270,000
$16,320,300
15th Street Pavement Overlay
Requesting Department: Public Works
Category: Streets and Drainage
This project involves overlaying and /or reconstructing asphalt pavement on 15th Street between Old Newport Boulevard and Redlands
Avenue. Due to many past edge grinding and overlaying operations, the existing street cross slope is relatively steep and needs to be
reconstructed. Deteriorated concrete curb, gutter and sidewalk will also be removed and reconstructed. Existing utilities will be adjusted to
grade. Since half of 15th Street is located in the City of Costa Mesa, staff will prepare a reimbursement agreement with Costa Mesa to fund
its portion of this project. Plans and specifications will be prepared by staff. Construction will be performed by a private contractor.
Location:
15th Street between Old Newport Boulevard and Redlands Avenue
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $375,000
Other $0
Total $375,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002042
$0
$235,000
Measure M Turnback
7281
C2002042
$0
$130,000
Water Enterprise
7511
C2002042
$0
$10,000
$0
$0
TOTAL
$0
$375,000
PROJECT TOTAL 1 $375,000
19th Street Tidegate Retrofit
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for the installation of a new tidegate and /or a pump station at the 19th Street street end. The existing valve operates
approximately twenty times per month, is submerged in salt water at all times, and requires frequent maintenance and repairs. This unit is
responsible for keeping the immediate vicinity dry during high tide events.
Location:
19th Street
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $249,500
Other $0
Total $249,500
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7012
C2502006
$149,500
$0
Tide and Submerged Lands
7231
C2502006
$100,000
$0
$0
$0
$0
$0
TOTAL
$249,500
$0
PROJECT TOTAL 1 $249,500
2
Abalone and Crystal Street Pavement Rehabilitation
Requesting Department: Public Works
Category: Streets and Drainage
This project involves the concrete street replacement for these two streets. The plans will be prepared by staff. Construction will be
performed by a private contractor.
Location:
Abalone and Crystal Street on Little Island
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $400,000
Other $0
Total $400,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Measure M Turnback
7281
C2002043
$0
$398,000
Water Enterprise
7511
C2002043
$0
$2,000
$0
$0
$0
$0
TOTAL
$0
$400,000
PROJECT TOTAL 1 $400,000
Bay Avenue Pavement Rehabilitation
Requesting Department: Public Works
Category: Streets and Drainage
This project involves removing and reconstructing deteriorated concrete pavement on Bay Avenue. Deteriorated concrete curb, gutter and
sidewalk will also be removed and reconstructed. Existing utilities will be adjusted to grade. Plans and specifications will be prepared by
staff. Construction will be performed by a private contractor.
Location:
Bay Avenue, 15th Street to 10th Street, 9th Street to 7th Street and Island Avenue to Palm Street
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $2,200,000
Other $0
Total $2,200,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002044
$0
$2,175,000
Water Enterprise
7511
C2002044
$0
$15,000
Wastewater Enterprise
7541
C2002044
$0
$10,000
$0
$0
TOTAL
$0
$2,200,000
PROJECT TOTAL 1 $2,200,000
M
Bayside
Drive and
Riverside Avenue Storm Drain
Improvements
Requesting Department:
Public Works
Category:
Streets and Drainage
This project will design and reconstruct two existing storm drain segments to correct capacity restrictions. Plans and specifications will be
prepared by staff. Construction will be performed by a private contractor.
Location:
Bayside Drive and Riverside Avenue
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $300,000
Other $0
Total $300,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7012
C2502011
$0
$300,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$300,000
PROJECT TOTAL 1 $300,000
9
Bristol Street North Landscape Improvements
Requesting Department: Public Works
Category: Streets and Drainage
The project includes hiring a landscape architect to review the existing shoulder and planting areas along Bristol Street North between
Jamboree Road and Campus Drive (adjacent to SR -73) and to develop several options for landscaping.
Location:
Bristol Street North between Jamboree Road and Campus Drive
FY 2011 -12
Design /Environmental $72,900
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $72,900
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Bristol Street Relinquishment
7253
C2002028
$72,900
$0
$0
$0
$0
$0
$0
$0
TOTAL
$72,900
$0
PROJECT TOTAL 1 $72,900
10
China Cove Slope and Drainage Improvements
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for slope stabilization and drainage improvements at China Cove. Improvements will help minimize the threat of
failures and protect the integrity of Ocean Boulevard.
Location:
China Cove
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $302,500
Other $0
Total $302,500
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7012
C2502003
$200,000
$0
General Fund
7014
C8002008
$102,500
$0
$0
$0
$0
$0
TOTAL
$302,500
$0
PROJECT TOTAL 1 $302,500
11
Dover Drive and Peninsula Point Pavement Rehabilitation
Requesting Department: Public Works Category: Streets and Drainage
This project involves development of engineering plans and bid packages for overlaying and /or reconstructing the asphalt pavement on
Dover Drive and on Westcliff. Replacement of deteriorated concrete street pavement, curb, gutter and sidewalk in Peninsula Point area will
also be included. Existing landscaped medians will be updated. Existing utilities will be adjusted to grade. Various concrete streets in the
Peninsula Point community will be reconstructed. Staff or a private consultant will prepare the plans and specifications in FY 12.
Construction may begin after the OC Sanitation District Dover Drive Trunk Sewer Replacement Project is completed in FY 2012 -2013.
Construction will be performed by a private contractor.
Location:
Dover Dr - Irvine Ave to Coast Hwy, Westcliff - Dover Dr to Irvine Ave, and various streets in the Peninsula Point area
FY 2011 -12
Design /Environmental $200,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $200,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Measure M Turnback
7281
C2002045
$0
$200,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$200,000
PROJECT TOTAL 1 $200,000
12
Fashion Island and Area Streets Overlay and Slurry
Requesting Department: Public Works
Category: Streets and Drainage
This project involves asphalt overlaying various streets in the Newport Center (Fashion Island) community. Deteriorated concrete curb,
gutter and sidewalk will also be removed and reconstructed. Newport Center Drive will be restriped to allow additional curbside parking.
Existing utilities will be adjusted to grade. Plans and specifications will be prepared by staff. Construction will be performed by a private
contractor.
Location:
Various streets in the Newport Center and Fashion Island area
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,145,000
Other $0
Total $1,145,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Measure M Turnback
7281
C2002046
$0
$1,080,000
Water Enterprise
7511
C2002046
$0
$50,000
Wastewater Enterprise
7541
C2002046
$0
$15,000
$0
$0
TOTAL
$0
$1,145,000
PROJECT TOTAL 1 $1,145,000
13
Harbor View Hills South / Newport Heights Pavement Rehabilitation
Requesting Department: Public Works Category: Streets and Drainage
This project involves grinding and installing an asphalt overlay on various streets in the Harbor View Hills South and Newport Heights areas.
Deteriorated concrete curb, gutter and sidewalk also will be removed and reconstructed and water valves and sewer manholes will be
adjusted to grade. Plans and specifications will be prepared by staff. Construction will be performed by a private contractor.
Location:
Harbor View Hills South and Newport Heights area
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,394,300
Other $0
Total $1,394,300
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Measure M Turnback
7281
C2002039
$1,345,300
$0
Water Enterprise
7511
C2002039
$22,500
$0
Wastewater Enterprise
7541
C2002039
$26,500
$0
$0
$0
TOTAL
$1,394,300
$0
PROJECT TOTAL 1 $1,394,300
14
Irvine Avenue Realignment - University Drive to Bristol Street
Requesting Department: Public Works Category: Streets and Drainage
This project provides the City's portion of the funding of the project cost for the realignment of Irvine Avenue. Plans and specifications were
administered by the County of Orange and construction was performed by a private contractor under County administration.
Location:
Irvine Avenue - University Drive to Bristol Street South
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,800,000
Other $0
Total $1,800,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C5100470
$600,000
$0
Transportation and Circulation
7261
C5100470
$0
$1,000,000
Water Enterprise
7511
C5100470
$200,000
$0
$0
$0
TOTAL
$800,0001
$1,000,000
PROJECT TOTAL 1 $1,800,000
15
Jamboree
Road Improvements -
Bristol Street North to
Fairchild Road
Requesting Department:
Public Works
Category:
Streets and Drainage
This project includes the widening of Jamboree Road at the intersection of MacArthur Boulevard as called for in the General Plan. The
project provides for an additional northbound thru lane on Jamboree Road and an additional southbound left turn lane on Jamboree Road
onto MacArthur Boulevard. This project also involves right -of -way acquisition and roadway widening in the City of Irvine and is dependent
on their cooperation and assistance.
Location:
Jamboree Road from Bristol Street North to Fairchild Road
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $3,228,600
Other $0
Total $3,228,600
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Transportation and Circulation
7261
C2002019
$232,200
$0
Measure M Competitive
7284
C2002019
$2,996,400
$0
$0
$0
$0
$0
TOTAL
$3,228,600
$0
PROJECT TOTAL 1 $3,228,600
16
Major Arterial Street Repair Program
Requesting Department: Public Works
Category: Streets and Drainage
This project involves isolated asphalt pavement repairs on several major arterials including Bristol Street South, Newport Coast Drive and
Jamboree Road. Plans and specifications will be prepared by staff. Construction will be performed by a private contractor.
Location:
Isolated areas on Bristol Street South, Newport Coast Drive and Jamboree Road
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $250,000
Other $0
Total $250,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Measure M Turnback
7281
C2002047
$0
$250,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$250,000
PROJECT TOTAL 1 $250,000
17
Newport Boulevard and 32nd Street Modification
Requesting Department: Public Works
Category: Streets and Drainage
This project involves widening Newport Boulevard to accommodate one additional northbound through lane from 30th Street to 32nd Street
and one additional southbound through lane from Via Lido to 32nd Street teminating as a right -turn only lane at 32nd Street. Staff
submitted a funding application to OCTA under the current Measure M2 call for projects. If successful, an additional $225,000 will be
available for environmental and design efforts. Plans and specs will be prepared by a consultant. Right -of -way acquisition construction will
be applied for and completed in the following fiscal years.
Location:
Newport Boulevard from Via Lido to 30th Street
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $300,000
Other $0
Total $300,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002048
$0
$75,000
Measure M Competitive
7284
C2002048
$0
$225,000
$0
$0
$0
$0
TOTAL
$0
$300,000
PROJECT TOTAL 1 $300,000
ID
Peninsula Point Alley Replacement
Requesting Department: Public Works
Category: Streets and Drainage
This project involves removing and reconstructing deteriorated concrete alleys and streets in the Peninsula Point community. The project
focuses on the alleys impacted by the recent utility undergrounding construction (Assessment District 103). Plans and specifications will be
prepared by staff. Construction will be performed by a private contractor.
Location:
Various alleys and streets in the Peninsula Point community
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,102,500
Other $0
Total $1,102,500
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002040
$55,000
$300,000
Water Enterprise
7511
C2002040
$47,500
$600,000
Wastewater Enterprise
7541
C2002040
$0
$100,000
$0
$0
TOTAL
$102,5001
$1,000,000
PROJECT TOTAL 1 $1,102,500
19
Sidewalk, Curb and Gutter Replacement and ADA Improvements
Requesting Department: Municipal Operations Category: Streets and Drainage
This project provides for the replacement of sidewalks, curbs, gutters, and cross gutters. Construction of curb access ramps to improve
pedestrian and wheelchair access in accordance with the Americans with Disabilities Act (ADA) is included. Work will be performed by a
private contractor. Also, the City's Americans with Disabilities Act (ADA) Transition Plan (PLAN) was prepared many years ago. Funds are
included for a specialty consultant to review the City's existing PLAN documents; spot survey and document City facilities; and to prepare
an updated PLAN. The City will make improvements as specified in the updated PLAN to satisfy operational requirements.
Location:
Citywide
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $450,000
Other $50,000
Total $500,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2001009
$0
$450,000
CDBG
7161
C2001009
$0
$50,000
$0
$0
$0
$0
TOTAL
$0
$500,000
PROJECT TOTAL 1 $500,000
20
Slurry Seal Program
Requesting Department: Public Works
Category: Streets and Drainage
This project involves slurry sealing various streets in the Eastbluff, North Ford, Upper Bay, Santa Ana Heights, and airport areas. Plans and
specifications will be prepared by staff. Construction will be performed by a private contractor.
Location:
Eastbluff, North Ford, Upper Bay, Santa Ana Heights, and airport areas
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $700,000
Other $0
Total $700,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2001011
$0
$700,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$700,000
PROJECT TOTAL 1 $700,000
21
Requesting Department: Public Works
Storm Drain Interceptors
Category: Streets and Drainage
Measure M provides funds for cleaning urban and storm runoff associated with our main transportation corridors. Public Works and
Municipal Operations have identified several locations where storm interceptors or infiltration galleries could be installed to clean water
before it enters the bay or ocean. Measure M funds require a 50 percent match.
Location:
Various locations where storm drain discharge to the ocean or bay
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $300,000
Other $0
Total $300,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7012
C2502010
$0
$150,000
Measure M Competitive
7284
C2502010
$0
$150,000
$0
$0
$0
$0
TOTAL
$0
$300,000
PROJECT TOTAL 1 $300,000
22
Streetlight Conversion Program
Requesting Department: Municipal Operations
Category: Streets and Drainage
This project provides for the replacement of obsolete streetlights, conduit, wire, pull boxes and service cabinets. New energy efficient LED
light fixtures will be incorporated into streetlight replacement. Many of these lights were installed more than 40 years ago. Many
replacement parts are no longer available. This year's project focuses on the Westcliff area. Future year efforts will continue to address the
recommendations in the 15 -year Streetlight Replacement Master Plan.
Location:
Westcliff - Circuit 73
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2011 -12
$0
$0
$1,000,000
$0
$1,000,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2202002
$900,000
$100,000
$0
$0
$0
$0
$0
$0
TOTAL
$900,000
$100,000
PROJECT TOTAL 1 $1,000,000
23
Tidegate Retrofit and Upgrades
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for the installation of new tidegates and hardware to replace existing deteriorated and high maintenance units within
Balboa Peninsula and Balboa Island. Provisions for automated operations to reduce maintenance costs will be implemented to the extent
possible.
Location:
Balboa Island and Balboa Peninsula
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $500,000
Other $0
Total $500,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C2502009
$0
$500,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$500,000
PROJECT TOTAL 1 $500,000
24
FM. iS
Page
Fund
Project
Title
Department
$50,000
$0
$90,000
$90,000
$0
25
7181
C3002016
Citywide Street Signage, Striping and Marking
Public Works
26
7261
C3002014
Fashion Island Ring Road Striping Plan
Public Works
27
7181
C3002015
Traffic Sign Inventory and Reflectivity Assessment
Public Works
28
7261
C3002009
Traffic Signal Modernization: Phase 5
Public Works
29
7181
C3001007
Traffic Signal Rehabilitation Program
Public Works
Total Tra%fic
Rebudget
Budget
Total
$0
$50,000
$50,000
$0
$90,000
$90,000
$0
$90,000
$90,000
$719,300
$900,000
$1,619,300
$200,000
$375,000
$575,000
$919,300
$1,505,000
$2,424,300
Citywide Street Signage, Striping and Marking
Requesting Department: Public Works Category: Traffic
This project completes various traffic signing, striping and pavement markings and other minor improvements to enhance traffic safety.
Plans will be prepared by staff. Work will be performed by a private contractor or city crews.
Location:
Citywide
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $50,000
Total $50,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C3002016
$0
$50,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$50,000
PROJECT TOTAL 1 $50,000
25
Fashion Island Ring Road Striping Plan
Requesting Department: Public Works
Category: Traffic
This project consists of the design and installation of traffic signing, striping and pavement markings modifications on Newport Center Drive
East and Newport Center Drive West as well as connecting streets. Public Works staff will work with The Irvine Company to define the
striping changes which will establish additional parking in Newport Center. The funding for the project is covered by contributions approved
in the Newport Center Transportation Improvement Program Agreement with The Irvine Company as approved by the City Council on
February 22, 2011. Plans will be prepared by staff. Work will be performed by a private contractor.
Location:
Newport Center Drive East and Newport Center Drive West
FUNDING SOURCE
FY 2011 -12
Design /Environmental
$0
Right -of -Way, Land Acquisition
$0
Construction
$0
Other
$90,000
Total
$90,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Transportation and Circulation
7261
C3002014
$0
$90,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$90,000
PROJECT TOTAL 1 $90,000
26
Traffic Sign Inventory and Reflectivity Assessment
Requesting Department: Public Works
Category: Traffic
This project involves a city -wide inventory of existing traffic signs and creation of a GIS layer and database for the sign inventory.
Additionally, the project includes an assessment of the retro - reflectivity of existing traffic signs to ensure the City meets current standards
enforced by the California Manual of Uniform Traffic Devices (MUTCD). Sign inventory and retro - reflectivity assessment will be performed
by a private contractor. Creation of GIS layer and database will be performed by a private contractor and /or City staff.
Location:
Citywide
FUNDING SOURCE
FY 2011 -12
Design /Environmental
$0
Right -of -Way, Land Acquisition
$0
Construction
$0
Other
$90,000
Total
$90,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C3002015
$0
$90,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$90,000
PROJECT TOTAL 1 $90,000
27
Traffic Signal Modernization: Phase 5
Requesting Department: Public Works
Category: Traffic
Traffic Signal Modernization is a multi -year, multi - phased program to update the City's traffic signal system. Phase 5 includes hardware
and fiber optic cable upgrades to 11 intersections in and around Newport Center. Installation of 3 new CCTV cameras will provide views of
all major entry points to Fashion Island. This work also includes the installation of a new signal at Anacapa Drive and Newport Center Drive
and left turn signal phasing and lane modifications at San Miguel Road and Newport Center Drive.
Location:
Newport Center
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2011 -12
$0
$0
$1,619,300
$0
$1,619,300
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Transportation and Circulation
7261
C3002009
$719,300
$900,000
$0
$0
$0
$0
$0
$0
TOTAL
$719,300
$900,000
PROJECT TOTAL 1 $1,619,300
In
Traffic Signal Rehabilitation Program
Requesting Department: Public Works
Category: Traffic
This project provides for the rehabilitation and maintenance of existing traffic signal equipment throughout the City. Work includes
replacement of hardware including control equipment, signal poles, cabinets, and re- wiring select traffic signals. Plans and specifications
will be prepared by a consultant and /or staff. Construction work will be completed by a private contractor.
Location:
Citywide
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $575,000
Other $0
Total $575,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C3001007
$200,000
$375,000
$0
$0
$0
$0
$0
$0
TOTAL
$200,0001
$375,000
PROJECT TOTAL 1 $575,000
29
Intentionally Blank
30
Parks, Harbors and Beaches
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
31
7231
C4402009
Balboa Marina Public Pier Feasibility Study
Public Works
$0
$20,000
$20,000
32
7231
C4402006
Balboa Yacht Basin Mooring Support Services Improv.
Public Works
$0
$25,000
$25,000
33
7441
C4120616
Bonita Canyon Sports Park
Recreation /SS
$68,200
$0
$68,200
34
7231
C4402007
Bulkhead Repairs, Sealing and Groin Rehabilitation
Public Works
$0
$400,000
$400,000
35
7231
C4402008
China Cove and Little Island Beach Management
Public Works
$0
$50,000
$50,000
36
7231
C4402010
Eelgrass Mapping
Public Works
$0
$25,000
$25,000
37
7231
C4402011
Linda Isle Dredging
Public Works
$0
$30,000
$30,000
38
7231
C4402003
Lower Harbor Dredging
Public Works
$100,000
$0
$100,000
39
7411
C4002002
Marina Park
Public Works
$784,000
$8,275,000
$9,059,000
40
7231
C4402004
Rhine Channel Dredging
Public Works
$3,999,500
$0
$3,999,500
40
7231
C4402005
Rhine Channel Dredging
Public Works
$80,850
$0
$80,850
41
7231
C5100923
Semeniuk Slough Dredging
Public Works
$0
$500,000
$500,000
42
7412
C5100515
Sunset Ridge Park
Public Works
$9,561,400
$0
$9,561,400
Total Parks, Harbors and Beaches
$14,593,950
$9,325,000
$23,918,950
Balboa Marina Public Pier Feasibility Study
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
This project consists of a feasibility study for installing a new public pier on the Irvine Company's property where the former Nautical
Museum vessel was located by the Pacific Coast Highway Bridge and Balboa Marina. The Irvine Company is open to exploring this
concept as a potential future project. This study also explores the feasibility for installing a new public pier on the City beach at the base of
the Lido Isle bridge.
Location:
Pacific Coast Highway and Balboa Marina and Lido Isle bridge
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $20,000
Total $20,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402009
$0
$20,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$20,000
PROJECT TOTAL 1 $20,000
31
Balboa Yacht Basin Mooring Support Services Improvements
Requesting Department: Public Works Category: Parks, Harbors and Beaches
This project improves amenities for mooring permittees at the City owned Balboa Yacht Basin. This project will satisfy half of the mooring
fields while the other half will be satisfied with the future Marina Park facility. New amenities consist of 1) providing temporary, free slips for
mooring permittees for access to service their boats for short periods of time (2 -3 hours); 2) providing two power slip pedestals to be used
with a credit card; 3) potential dinghy storage racks; and 4) potential dinghy dock located at the bulkhead between docks D and E.
Location:
Balboa Yacht Basin
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $25,000
Other $0
Total $25,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402006
$0
$25,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$25,000
PROJECT TOTAL 1 $25,000
32
Bonita Canyon Sports Park
Requesting Department: Recreation / Senior Services
Category: Parks, Harbors and Beaches
This project completes construction of additional shade structures at West Park; construction of backstops at fields 1 -4; installation of safety
surfacing at tot lots; and plant and tree in -fills throughout the park including MacArthur and Manning tract areas.
Location:
Bonita Canyon Sports Park
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $68,200
Other $0
Total $68,200
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Bonita Canyon Development
7441
C4120616
$68,200
$0
$0
$0
$0
$0
$0
$0
TOTAL
$68,200
$0
PROJECT TOTAL 1 $68,200
33
Bulkhead Repairs, Sealing and Groin Rehabilitation
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
Some seawalls and bulkheads at various locations around Balboa Island, Little Balboa Island perimeters and other city property and harbor
frontages experience seawater infiltration at high tides. This project identifies and makes long -term improvements needed to maintain
aging infrastructure and reduce water ponding from the seawater infiltration. It also replaces some of Little Balboa Island's existing
deteriorated groins along South Bay Front and East Bay Front with new groins made of more durable materials.
Location:
Balboa Island and Little Balboa Island
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $400,000
Other $0
Total $400,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402007
$0
$400,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$400,000
PROJECT TOTAL 1 $400,000
34
China Cove and Little Balboa Island Beach Management
Requesting Department: Public Works Category: Parks, Harbors and Beaches
This project includes developing and implementing a plan for sand replenishment at the "Little" China Cove beach and the Balboa Island
beaches at Jade and Abalone Avenues on South Bay Front. Both of these projects require a comprehensive sand management strategy to
ensure sand does not disappear when dispersed. It is likely sand will need to be imported from an outside source. Factors such as
eelgrass and groins will affect the success of this project.
Location:
China Cove beach, Jade and Abalone beaches on South Bay Front, Little Island
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $50,000
Total $50,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402008
$0
$50,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$50,000
PROJECT TOTAL 1 $50,000
35
Eelgrass Mapping
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
This project consists of mapping eelgrass in the main channels of the harbor, along with some basic water quality analysis (light, salinity,
temperature, dissolved oxygen.) Eelgrass in the channels was last mapped about two years ago. This project will help the City maintain
accurate data on eelgrass distribution and quantity. These are both important aspects for the City to understand as negotiations are
underway with State and local agencies for a Newport Beach specific eelgrass plan.
Location:
Newport Harbor - Main channels
FUNDING SOURCE
FY 2011 -12
Design /Environmental
$0
Right -of -Way, Land Acquisition
$0
Construction
$0
Other
$25,000
Total
$25,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402010
$0
$25,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$25,000
PROJECT TOTAL 1 $25,000
.IZO
Linda Isle Channel Dredging
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
This project will test sediment in the channel between Linda Isle and Harbor Island and the narrow channel on the backside of Linda Isle.
This is a joint project between the City (responsible for the backside channel - 33% of project area) and the County (responsible for the
Linda Isle /Harbor Island channel - 67% of project area). Physical material sampling and analysis of results will determine if the material is
suitable for beach replenishment or ocean disposal. Sediment testing is a required step prior to dredging. Dredging is not anticipated this
year; rather, the goal is to be prepared for future partnership opportunities with the federal government.
Location:
Linda Isle /Harbor Island Channel and backside of Linda Isle
FUNDING SOURCE
FY 2011 -12
Design /Environmental
$0
Right -of -Way, Land Acquisition
$0
Construction
$0
Other
$30,000
Total
$30,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402011
$0
$30,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$30,000
PROJECT TOTAL 1 $30,000
37
Requesting Department: Public Works
Lower Harbor Dredging
Category: Parks, Harbors and Beaches
This project involves working with the US Army Corps of Engineers to develop permit documentation and approvals to dredge the entire
lower harbor area back to its design depth.
Location:
Lower Newport Bay
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $100,000
Other $0
Total $100,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402003
$100,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$100,000
$0
PROJECT TOTAL 1 $100,000
IM
Marina Park
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
The Marina Park project proposes new visitor - serving marina facilities, an aquatics sports building, a community center and community
park. The Environmental Impact Report was completed in spring 2010. Upon approval by the Coastal Commission, the project's plans and
specifications will be completed by the consultant team and the project will be put out for bid. The first bid packages will be for demolition of
existing facilities and construction of the new Marina.
Location:
West Balboa Boulevard between 15th and 19th Streets
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $9,059,000
Other $0
Total $9,059,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Major Facilities Master
7411
C4002002
$784,000
$8,275,000
$0
$0
$0
$0
$0
$0
TOTAL
$784,000
$8,275,000
PROJECT TOTAL 1 $9,059,000
10
Requesting Department: Public Works
Rhine Channel Dredging
Category: Parks, Harbors and Beaches
A construction project to dredge sediments out of Rhine Channel was awarded in Spring 2011. This project provides for construction costs
to dredge Rhine Channel. The scope also includes dredging a small area near Marina Park, a portion of the American Legion marina and
the 15th Street public pier area. Additional work associated with the Lido Yacht Anchorage will be funded by a contribution from the Curci
Companies.
Location:
Rhine Channel
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $4,080,350
Other $0
Total $4,080,350
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402004
$3,999,500
$0
Tide and Submerged Lands
7231
C4402005
$80,850
$0
$0
$0
$0
$0
TOTAL
$4,080,3501
$0
PROJECT TOTAL 1 $4,080,350
40
Requesting Department: Public Works
Semeniuk Slough Dredging
Category: Parks, Harbors and Beaches
In a cooperative program with the Corps of Engineers, Semeniuk Slough would be dredged (City project) along with the Newport Slough
(Corps project). Staff will prepare the design, CEQA documents and permit applications. Consultants will perform the biological study and
bathymetry with coordination from the Corps. Construction cost is highly dependent on sediment disposal method. Construction is
anticipated to begin in Spring 2012.
Location:
West Newport
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $500,000
Other $0
Total $500,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C5100923
$0
$500,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$500,000
PROJECT TOTAL 1 $500,000
41
Sunset Ridge Park
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
The project provides a new park in West Newport with active and passive uses. When completed, Sunset Ridge Park will provide baseball
and soccer fields, restrooms and picnic facilities, flower gardens and coastal views. The project also includes the creation of several acres
of prime habitat for the threatened California Gnatcatcher. The habitat area will be located on part of the southerly portion of the Banning
Ranch property that is being provided to the City to permit public access to the park. Construction of the park, entry road and traffic signal
at Coast Highway is expected to begin by the end of 2011.
Location:
West Coast Highway and Superior Avenue
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2011 -12
$0
$0
$9,561,400
$0
$9,561,400
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Major Facilities Master
7412
C5100515
$9,561,400
$0
$0
$0
$0
$0
$0
$0
TOTAL
$9,561,400
$0
PROJECT TOTAL 1 $9,561,400
42
Water Quality and Environmental
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
43
7014
C5002004
Big Canyon Wash Restoration
Public Works
$75,000
$0
$75,000
43
7251
C5002004
Big Canyon Wash Restoration
Public Works
$1,500,000
$0
$1,500,000
44
7014
C5002002
Buck Gully Canyon Stabilization and Flood Control
Public Works
$1,034,600
$0
$1,034,600
44
7255
C5002002
Buck Gully Canyon Stabilization and Flood Control
Public Works
$0
$725,000
$725,000
45
7513
C5500637
Irrigation - Citywide Central Computer System
Municipal Ops.
$0
$90,000
$90,000
46
7255
C5002005
Newport Coast Protection Implementation Program
Public Works
$0
$305,000
$305,000
46
7255
C5002006
Newport Coast Protection Implementation Program
Public Works
$563,000
$0
$563,000
46
7255
C5002007
Newport Coast Protection Implementation Program
Public Works
$795,000
$0
$795,000
46
7255
C5002008
Newport Coast Protection Implementation Program
Public Works
$112,000
$0
$112,000
Total Water Quality and Environmental
$4,079,600
$1,120,000
$5,199,600
Big Canyon Wash Restoration
Requesting Department: Public Works Category: Water Quality and Environmental
Upland locations of the Big Canyon Wash area west of Jamboree Road will be targeted for restoration including removing invasive plants,
replanting with native plants and restoring trails. This is the first phase of the multi -phase plan to restore the canyon.
Location:
Big Canyon bounded by Jamboree Road to the east, Eastbluff Apartments and Villa Granada community to the north,
Backbay Drive to the west, and Park Newport community to the south.
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,575,000
Other $0
Total $1,575,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C5002004
$75,000
$0
Contributions
7251
C5002004
$1,500,000
$0
$0
$0
$0
$0
TOTAL
$1,575,000
$0
PROJECT TOTAL 1 $1,575,000
43
Buck Gully Canyon Stabilization and Flood Control
Requesting Department: Public Works
Category: Water Quality and Environmental
This project will build drop structures and weirs to stabilize erosion in lower Buck Gully. Additionally, water quality improvement features will
be installed including an infiltration gallery for the Evening Canyon storm drain that outlets near the mouth of Buck Gully. Proposition 84
ASBS funds will partially support construction of this project.
Location:
Lower Buck Gully
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,759,600
Other $0
Total $1,759,600
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C5002002
$1,034,600
$0
Environmental Contributions
7255
C5002002
$0
$725,000
$0
$0
$0
$0
TOTAL
$1,034,600
$725,000
PROJECT TOTAL 1 $1,759,600
44
Irrigation - Citywide Central Computer System
Requesting Department: Municipal Operations
Category: Water Quality and Environmental
This project provides for the installation of an irrigation computer system and necessary equipment at a selection of City park satellite
locations. Various elements of the system were installed in previous phases at other locations. The long -term goal is to have all parks
linked to a central computerized irrigation system to better monitor and conserve water.
Location:
Citywide
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $90,000
Total $90,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7513
C5500637
$0
$90,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$90,000
PROJECT TOTAL 1 $90,000
45
Newport Coast Protection Implementation Program
Requesting Department: Public Works
Category: Water Quality and Environmental
With receipt of State Proposition 84 grant funds, several water quality improvements are planned in the Newport Coast and Big Canyon
watersheds and Areas of Special Biological Significance (ASBS). One project improves Crystal Cove State Park's easterly parking lot and
redesigns the pond area at the mouth of Los Trancos State Park ($305,000). Staff is responsible for securing permitting and environmental
documents. Construction is anticipated to start in FY 2012 -13. Funds will also support a contract with a consultant to perform water quality
assessments and ASBS monitoring ($563,000), tasks for the Runoff Reduction Program ($795,000) and Public Impact Reduction Program
($112,000).
Location:
Newport Coast and Big Canyon watersheds and adjacent Areas of Special Biological Significance
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2011 -12
$0
$0
$1,775,000
$0
$1,775,000
FUNDING SOURCE
DIVISION NO. PROJECT NO.
REBUDGET $
BUDGET $
Environmental Contributions
7255
C5002005
$0
$305,000
Environmental Contributions
7255
C5002006
$563,000
$0
Environmental Contributions
7255
05002007
$795,000
$0
Environmental Contributions
7255
C5002008
$112,000
$0
TOTAL
$1,470,000
$305,000
PROJECT TOTAL 1 $1,775,000
46
Page
Fund
Project
Title
Department
Rebudget
Budget
Total
47
7513
C6002010
16th Street Pump Station Capacity Modifications
Municipal Ops.
$0
$100,000
$100,000
48
7511
C6002008
Corona del Mar Water Transmission Main Improvements
Municipal Ops.
$0
$2,800,000
$2,800,000
49
7511
C6002009
Saint James Road Water Main Replacement
Municipal Ops.
$0
$200,000
$200,000
50
7511
C6001000
Water Main Master Plan Program
Municipal Ops.
$0
$500,000
$500,000
Total Water
$0
$3,600,000
$3,600,000
16th Street Pump Station Capacity Modifications
Requesting Department: Municipal Operations Category: Water
This project will identify pump station improvements at the 16th Street Pump Station located at the City's Utilities Yard. The station was
constructed in 1995 as part of the Groundwater Development Project. Staff identified possible improvements to increase capacity and
improve efficiency. The pumps and motors are aging and need to be replaced. Upsizing the motors and installing variable frequency
drives to replace the fixed starters may be considered. This year's efforts will focus on pre- design to review possible options for the
station.
Location:
949 W. 16th Street
FY 2011 -12
Design /Environmental $100,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $100,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7513
C6002010
$0
$100,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$100,000
PROJECT TOTAL 1 $100,000
47
Corona del Mar Water Transmission Main Improvements
Requesting Department: Municipal Operations
Category: Water
This project will construct a new 36 -inch Transmission Main between the Big Canyon Reservoir and East Coast Highway at MacArthur
Boulevard. The project also installs a 24 -inch Transmission Main between East Coast Highway and Bayside Drive that serves the
Peninsula Point area. Water supply and fire flow to the eastern portion of the system will be improved as identified in the City's Water
Master Plan. The project also includes the replacement and relocation of a connection to the Metropolitan Water District System (CM -1) in
the same general area. Plans and specifications are currently being prepared by consultant. Construction will be performed by a private
contractor.
Location:
San Miguel Drive, MacArthur Boulevard and Carnation Avenue
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2011 -12
$0
$0
$2,800,000
$0
$2,800,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7511
C6002008
$0
$2,800,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$2,800,000
PROJECT TOTAL 1 $2,800,000
M
Saint James Road Water Main Replacement
Requesting Department: Municipal Operations Category: Water
This project removes and replaces asbestos cement water main pipeline that was constructed in 1963. The main is proposed to be
replaced to avoid possible future breaks on the main. Plans and specifications will be prepared by staff. Construction will be performed by
a private contractor.
Location:
Saint James Road
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $200,000
Other $0
Total $200,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7511
C6002009
$0
$200,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$200,000
PROJECT TOTAL 1 $200,000
49
Water Main Master Plan Program
Requesting Department: Municipal Operations
Category: Water
This project removes and replaces older cast iron water mains identified in the Water Master Plan. This year's project focuses on pipelines
near 32nd Street and Newport Boulevard. Lines in Corona del Mar north of East Coast Highway also are targeted to be complete before
the planned slurry seal of the streets in the area. Other smaller segments may be replaced throughout other parts of the City. Plans and
specifications will be prepared by staff. Construction will be performed by a private contractor.
Location:
32nd Street and Newport Boulevard, Corona del Mar north of East Coast Highway
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $500,000
Other $0
Total $500,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7511
C6001000
$0
$500,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$500,000
PROJECT TOTAL 1 $500,000
50
Wastewater
Page
Fund
Project
Title
Department
$150,000
$0
$250,000
$250,000
$225,000
51
7541
C7002004
Big Canyon / Port Streets Sewer Diversion Improvements
Municipal Ops.
52
7541
C7002005
Saint James Road Sewer Relocation
Municipal Ops.
53
7541
C7001002
Sewer Pipeline Point Repairs and Lining
Municipal Ops.
54
7541
C5600934
Wastewater Master Plan
Municipal Ops.
Total Wastewater
Rebudget
Budget
Total
$0
$150,000
$150,000
$0
$250,000
$250,000
$225,000
$75,000
$300,000
$100,000
$0
$100,000
$325,000
$475,000
$800,000
Big Canyon and Port Streets Sewer Diversion Improvements
Requesting Department: Municipal Operations Category: Wastewater
Two subdrains and an underdrain in the vicinity of Big Canyon Reservoir are suspected to have high concentrations of selenium. Low flow
diversions to the sewer of these sources will help reduce downstream impacts. Staff will design diversions at three points (Port Streets,
Yacht Streets, Reservoir) to the sanitary sewer.
Location:
San Miguel Drive and Newport Hill Drive East
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $150,000
Other $0
Total $150,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Wastewater Enterprise
7541
C7002004
$0
$150,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$150,000
PROJECT TOTAL 1 $150,000
51
Saint James Road Sewer Relocation
Requesting Department: Municipal Operations Category: Wastewater
This project relocates the sewer main behind homes along Saint James Road to a property below the hillside at 745 Dover Drive. Plans are
underway to construct anew medical office building at 745 Dover Drive. With the lot cleared, there is an opportunity to move the hillside
sewer to a more accessible location, which was recommended in the recently completed Watergate Master Plan. Plans will be prepared by
staff and /or a consultant. Construction will be performed by a private contractor.
Location:
St. James Road and 745 Dover Drive
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $250,000
Other $0
Total $250,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Wastewater Enterprise
7541
C7002005
$0
$250,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$250,000
PROJECT TOTAL 1 $250,000
52
Sewer Pipeline Point Repairs and Lining
Requesting Department: Municipal Operations Category: Wastewater
Wastewater Discharge Regulations require the City wastewater system to be inspected with cameras. Sewerline areas discovered to be
damaged, deteriorated or problematic are packaged into projects so repairs can be made. This program funds these ongoing repair
projects.
Location:
Citywide
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $300,000
Other $0
Total $300,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Wastewater Enterprise
7541
C7001002
$225,000
$75,000
$0
$0
$0
$0
$0
$0
TOTAL
$225,0001
$75,000
PROJECT TOTAL 1 $300,000
53
Wastewater Master Plan
Requesting Department: Municipal Operations
Category: Wastewater
This project provides funding for a comprehensive Wastewater and Reclaimed Water Rate Study. Staff recently completed the Wastewater
Master Plan. The next step is to determine the necessary funding to construct recommended improvements and to review the City's rate
structure. Also, the reclaimed water system, constructed ten years ago by the Orange County Water District, will be studied to assess
current and potential future users for maximum use. Reclaimed water rates were set when the reclaimed water system was constructed.
The work also includes an analysis of those rates as part of wastewater rate structure review.
Location:
N/A
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $100,000
Total $100,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Wastewater Enterprise
7541
C5600934
$100,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$100,000
$0
PROJECT TOTAL 1 $100,000
54
Miscellaneous
Page
Fund Project
Title
Department
55
7459 C5100879
Santa Ana Heights Utility Undergrounding
Public Works
56
7014 C8002022
Underground Utility Credits
Public Works
Total Miscellaneous
Rebudget Budget Total
$1,175,600 $0 $1,175,600
$0 $94,130 $94,130
$1,175,600 $94,130 $1,269,730
Santa Ana Heights Utility Undergrounding
Requesting Department: Public Works Category: Miscellaneous
This project provides for the design and construction to underground utility facilities in Santa Ana Heights and rehabilitation of the area's
streets pursuant to City Council action on October 11, 2005, and County Board of Supervisors action on March 27, 2007. The Amended
Engineer's Report and Revised Boundary Map and related agreements with the County of Orange were approved by the City Council at its
meeting of March 24, 2009.
Location:
Santa Ana Heights
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,175,600
Other $0
Total $1,175,600
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Santa Ana Heights
7459
C5100879
$1,175,600
$0
$0
$0
$0
$0
$0
$0
TOTAL
$1,175,600
$0
PROJECT TOTAL 1 $1,175,600
55
Underground Utility Credits
Requesting Department: Public Works Category: Miscellaneous
California Public Utilities Commission Rule 20A establishes program funding for the undergrounding of overhead utilities by municipalities.
The City of Mission Viejo has unallocated Rule 20A funds and is offering to sell them to the City at a purchase rate of $0.50 on the dollar.
Future projects must produce a benefit to the general public and must meet certain criteria established by regulatory guidelines.
Location: N/A
FY 2011 -12
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $94,130
Total $94,130
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C8002022
$0
$94,130
$0
$0
$0
$0
$0
$0
TOTAL
$0
$94,130
PROJECT TOTAL 1 $94,130
56