HomeMy WebLinkAboutCapital Improvement Program 2013Newport $eacA civic seater, 2012,
ArcAiteetarae Readeriag
Newport $cacA city Mate, circa 19506,
pAoto eoartesy 6raage eoaaty ArcAlves
City of Newport Beach
Fiscal Year 2012 -13
F
Capital Improvement Program
4 1FORr.. � 0
PC
c,9LI R��P
CAPITAL IMPROVEMENT PROGRAM
The City of Newport Beach Capital Improvement Program (CIP) serves as a plan for the provision of public improvements,
special projects, on -going maintenance programs, and the implementation of the City's master plans. Projects in the CIP include
improvements and major maintenance on arterial highways, local streets, and alleys; storm drain and water quality
improvements; harbor, bay, pier, and beach improvements; park and facility improvements; water and wastewater system
improvements; transportation safety and traffic signal improvements; and planning programs and studies.
The adopted FY 2012 -13 CIP consists of 68 projects representing nearly $21 million in new appropriations and about $32 million
in rebudgeted funds for a total CIP budget of $52,860,727. Major funding initiatives include park facility improvements, road and
pavement rehabilitations, and restructuring and replacement of water distributions and piping. Significant work continues this
fiscal year on projects such as Marina Park, Sunset Ridge Park, and the Big Canyon Reservoir Floating Cover Replacement.
Projects are organized by primary
function or benefit into one of the
following categories: Facilities;
Streets and Drainage; Traffic;
Parks, Harbors and Beaches;
Water Quality and Environmental;
Water; Wastewater; and
Miscellaneous. Given the current
fiscal climate, the development of
the adopted CIP was limited to
meeting Council priorities and
master plan requirements.
Essential projects were prioritized
and summarized by available funds
and were presented to the City
Council for approval. Funding of
capital projects is derived from
multiple funding sources.
Miscellaneous $1,171
Wastewater$584 2% Facilities $3,340
1 " %° �. 1. 7%
Water $8,965
17%
Water Quality & Streets & Drainage
Environmental $2,127" $16,362
4% 32%
Traffic $1,682
Parks, Harbors, & 3%
Beaches $17,282 Dollars in Thousands
34%
FY 2012 -13 CIP Budget by Category (total)
Highlights of the adopted CIP budget for FY 2012 -13 are presented by category as follows:
Facilities
Projects organized under Facilities include construction, rehabilitation and repair of City buildings and facilities. Major projects
within this category approximate $3.2 million and include:
• Civic Center Construction ($2,316,717)
• Central Library HVAC Refurbishment ($340,000)
• Current City Hall Interim Use Plan and Master Facilities Strategic Planning ($287,601)
• Big Canyon Reservoir Auxiliary Maintenance Yard Design ($140,000)
• Lifeguard Headquarters and Balboa Yacht Basin Facility Improvements ($158,585)
Streets and Drainage
Projects organized under Streets and Drainage include construction, rehabilitation and repair of City roads, alleys, medians,
bridges, sidewalks, streetlights, slopes and tide structures. Projects within this category exceed $16.4 million and major
highlights include:
• Street and alley construction and rehabilitation, including: 15th Street Pavement Overlay, Asphalt Alley Replacement,
Balboa Boulevard Channel Road Pavement Reconstruction, Bay Avenue Pavement Rehabilitation, Bayside Area
Pavement Rehabilitation, Central Balboa and Bayfront South Alley Reconstruction, Jamboree Road Improvements,
Major Arterial Streets Repair Program, Newport Boulevard 32nd Street Modification, and Old Newport Boulevard West
Coast Highway Modification ($11,308,736)
• Drainage and tide structures ($2,878,216)
• Landscape and streetscape design and improvements ($840,000)
• Slurry Seal Program ($635,000)
• Sidewalk and concrete improvements ($500,000)
• Streetlighting and bridge improvements ($300,000)
Traffic
Projects organized under Traffic include traffic signal system maintenance and improvements, neighborhood traffic management,
pedestrian improvements and signage. Projects within this category exceed $2 million and major highlights include:
• Traffic signal modernization ($816,900)
• Traffic signal rehabilitation ($700,000)
• Traffic and monument signs ($140,000)
• Pedestrian and bicycle facilities ($311,500)
Parks, Harbors and Beaches
Projects organized under Parks, Harbors and Beaches include improvements or repairs to the City's parks, harbors, docks,
wharfs, piers and beaches. Projects within this category exceed $17.3 million and major highlights include:
Park improvements — Sunset Ridge Park, Marina Park, and Playground Equipment Replacements ($16,136,006)
Harbor improvements — Balboa Marina Public Dock, Balboa Yacht Basin Mooring Support Services Improvements,
Eelgrass Survey, Lower Harbor Dredging, Mooring Field Realignment, Seawall and Bulkhead Modifications, and
Vessel Waste Pumpout Station Replacement ($905,000)
Beach improvements — Bay Beach Sand Management ($300,000)
Water Quality and Environmental
Projects organized under Water Quality and Environmental include studies, improvements, and programs that benefit the City's
natural resources. Projects within this category exceed $2 million and major highlights include:
Big Canyon Wash Restoration ($1,575,000)
Newport Coast ASBS Protection Program ($462,000)
Water and Wastewater
Projects organized under Water and Wastewater are funded from respective service charges and are used for the rehabilitation
and expansion of these services. Projects within these categories exceed $9.5 million and major highlights include:
• Water transmission and main improvements ($8,930,766)
• Sewer main improvements ($458,900)
• Wastewater master planning ($125,000)
Miscellaneous
Projects organized under Miscellaneous are ones that do not fit into any other category and include capital purchases and
special projects. Projects within these categories exceed $2.2 million and highlights include:
• Santa Ana Heights utility undergrounding ($1,170,800)
• SCE Rule 20A Credits Purchase ($974,000)
• Local Coastal Program Plan Implementation ($75,000)
Conclusion
The City continues to undertake an ambitious and wide- ranging capital improvement program. The projects, both significant and
diverse, serve all areas of the City. It is the City's policy to appropriate sufficient funds for all projects scheduled during the
coming budget year. Many of the projects require multiple year terms to complete them. In such cases, only the current phase
identified to be completed during FY 2012 -13 is budgeted and appropriated. Subsequent phases of a project and /or projects
requiring more time or funding are reconsidered at the appropriate time. Our project delivery team of engineers, support staff
and consultants are tasked with managing more complex workloads while maintaining high quality standards. Creative project
management solutions and alternative delivery methods continue to play a key role in our success.
iv
FACILITIES
City of Newport Beach
Capital Improvement Program
Adopted FY2012 -2013
TABLE OF CONTENTS
Project Page
Balboa Yacht Basin Facility Improvements 1
Big Canyon Reservoir Auxiliary Maintenance Yard 2
Central Library HVAC Refurbishment 3
City Hall Interim Use Plan 4
Civic Center and Park 5
Lifeguard Headquarters Rehabilitation
Master Facilities Plan - Planninq Efforts
STREETS AND DRAINAGE
n
G
■
19th Street Tidegate Retrofit
9
Asphalt Alley Replacement
10
Balboa Boulevard Channel Road Pavement Reconstruction
11
Balboa Boulevard Landscaping
12
Bay Avenue Pavement Rehabilitation
13
Bayside Drive Area Pavement Rehabilitation
14
Bayside Drive Riverside Avenue Storm Drain Improvements 15
Bristol Street South Median Landscaping 16
Central Balboa and Bavfront South Allev Reconstruction 17
China Cove Slope and Drainage Improvements
18
Corona del Mar Entry Improvements
19
Dover Drive Peninsula Point Pavement Rehabilitation Design
20
Jamboree Road Improvements - Bristol / Fairchild
21
Jamboree Road Improvements - MacArthur to Campus
22
Major Arterial Streets Repair Proaram
23
Newport Boulevard 32nd Street Modification 24
Old Newport Boulevard Streetscaoe 25
TOC -1
STREETS AND DRAINAGE CONTINUED
TRAFFIC
Old Newport Boulevard West Coast Highway Modifications 26
Park Avenue Over Grand Canal Bridae Replacement 27
Sidewalk, Curb and Gutter Replacement and ADA Improvements 28
Storm Drain Interceptors 30
Storm Drain System Repairs and Sliplining 31
Tideoate Retrofit and uporades 33
Bayside Cove Public Walkway 34
Citywide Street Sionaae. Strioina and Markina 35
East Coast Highway Signal Rehabilitation 36
Eastbluff Bicycle Lane at Jamboree Road 37
Newport Coast Drive Monument Sians 38
Traffic Sign Inventory and Reflectivity Assessment 39
Traffic Siqnal Equipment Enhancement Proqram 40
Traffic Sianal Modernization: Phase 6 41
Traffic Signal Rehabilitation Program 42
PARKS, HARBORS AND BEACHES
Balboa Yacht Basin Mooring Support Services Improvements 44
Bav Beach Sand Manaaement 45
Eelgrass Survey -Lower Harbor Shoreline 46
Lower Harbor Dredqinq 47
Marina Park 48
Playground Equipment Replacement 50
Seawall and Bulkhead Modifications 51
Vessel Waste Pumpout Station Replacement 53
TOC -2
WATER QUALITY AND ENVIRONMENTAL
WATER
Coast ASBS Protection
55
16th Street Pump Station Capacity Modifications
56
Big Canyon Reservoir Floating Cover Replacement
57
Corona del Mar Water Transmission Main Improvements
58
Pump Station and Well Site VFD Improvements
59
Transmission Main Cathodic Program
60
Water Main Master Plan Proqram
61
157-1 1-412115%I12FA
Big Canyon Port Streets Sewer Diversion Improvements
62
Saint James Road Sewer Relocation
63
Sewer Pipeline Point Repairs and Lining
64
Wastewater Master Plan Rate Studv
65
MISCELLANEOUS
Local Coastal Program Plan Implementation 66
Santa Ana Heights Utility Undergrounding 67
SCE Rule 20A Credits Purchase 68
TOC -3
PC
c,9LI R��P
City of Newport Beach
Capital Improvement Program
Adopted FY2012 -2013
ALPHABETICAL INDEX
Project Page
15th Street Pavement Overlay
16th Street Pump Station Capacity Modifications
19th Street Tidegate Retrofit
Asphalt Alley Replacement
Balboa Boulevard Channel Road Pavement Reconstruction
Balboa Boulevard Landscaping
Balboa Marina Public Dock
Balboa Yacht Basin Facility Improvements
Balboa Yacht Basin Mooring Support Services Improven
Bay Avenue Pavement Rehabilitation
Bay Beach Sand Management
Bayside Cove Public Walkway
Bayside Drive Area Pavement Rehabilitation
Bayside Drive Riverside Avenue Storm Drain Improvemf
Big Canyon Port Streets Sewer Diversion Improvements
Big Canyon Reservoir Auxiliary Maintenance Yard
Big Canyon Reservoir Floating Cover Replacement
Big Canyon Wash Restoration
Bristol Street South Median Landscaping
Central Balboa and Bayfront South Alley Reconstruction
Alpha -1
8
56
9
10
11
12
43
1
44
13
45
34
14
15
62
2
57
54
16
17
Central Library HVAC Refurbishment
3
China Cove Slope and Drainage Improvements
18
City Hall Interim Use Plan
4
Citywide Street Signange, Striping and Marking
35
Civic Center and Park
5
Corona del Mar Entry Improvements
19
Corona del Mar Water Transmission Main Improvements
58
Dover Drive Peninsula Point Pavement Rehabilitation Design
20
East Coast Highway Signal Rehabilitation
36
Eastbluff Bicycle Lane at Jamboree Road
37
Eelgrass Survey -Lower Harbor Shoreline
46
Jamboree Road Improvements - Bristol I Fairchild
21
Jamboree Road Improvements - MacArthur to Campus
11
Lifeguard Headquarters Rehabilitation
6
Local Coastal Program Plan Implementation
66
Lower Harbor Dredging
47
Major Arterial Streets Repair Program
23
Marina Park
48
Master Facilities Plan - Planning Efforts
7
Mooring Field Realignment
49
Newport Boulevard 32nd Street Modification
24
Newport Coast ASBS Protection Program
47
Newport Coast Drive Monument Signs
38
Old Newport Boulevard Streetscape
25
Old Newport Boulevard West Coast Highway Modifications
26
Alpha -2
Park Avenue Over Grand Canal Bridge Replacement
27
Playground Equipment Replacement
50
Pump Station and Well Site VFD Improvements
59
Saint James Road Sewer Relocation
63
Santa Ana Heights Utility Undergrounding
67
SCE Rule 20A Credits Purchase
68
Seawall and Bulkhead Modifications
51
Sewer Pipeline Point Repairs and Lining
64
Sidewalk, Curb and Gutter Replacement and ADA Improvements
28
Slurry Seal Program
29
Storm Drain Interceptors
30
Storm Drain System Repairs and Sliplining
31
Streetlight Replacement Program
32
Sunset Ridge Park
52
Tidegate Retrofit and Upgrades
33
Traffic Sign Inventory and Reflectivity Assessment
39
Traffic Signal Equipment Enhancement Program
40
Traffic Signal Modernization: Phase 6
41
Traffic Signal Rehabilitation Program
42
Transmission Main Cathodic Program
60
Vessel Waste Pumpout Station Replacement
53
Wastewater Master Plan Rate Study
65
Water Main Master Plan Proqram
61
Alpha -3
PC
c,9LI R��P
Project Listing by Category
Facilities
Page
Fund
Project
Title
Rebudget
Budget
Total
1
7231
C1002036
Balboa Yacht Basin Facility Improvements
$39,585
$35,000
$74,585
2
7014
C1002039
Big Canyon Reservoir Auxiliary Maintenance Yard
$0
$100,000
$100,000
2
7502
C1002039
Big Canyon Reservoir Auxiliary Maintenance Yard
$0
$20,000
$20,000
2
7541
C1002039
Big Canyon Reservoir Auxiliary Maintenance Yard
$0
$20,000
$20,000
3
7271
C1002021
Central Library HVAC Refurbishment
$0
$340,000
$340,000
4
7011
C1002040
City Hall Interim Use Plan
$0
$100,000
$100,000
5
7410
C1002009
Civic Center and Park
$577,844
$0
$577,844
5
7410
C1002030
Civic Center Construction
$704,349
$0
$704,349
5
7410
C1002035
Civic Center OCIP Loss Claims
$1,034,524
$0
$1,034,524
6
7414
C1002037
Lifeguard Headquarters Rehabilitation
$84,000
$0
$84,000
7
7415
C1002038
Master Facilities Plan - Planning Efforts
$187,601
$0
$187,601
Reconstruction
$0
$21,000
Total Facilities
$2,627,903
$615,000
$3,242,903
Streets and Drainage
Page
Fund
Project
Title
Rebudget
Budget
Total
8
7181
C2002042
15th Street Pavement Overlay
$235,000
$0
$235,000
8
7281
C2002042
15th Street Pavement Overlay
$130,000
$0
$130,000
8
7502
C2002042
15th Street Pavement Overlay
$10,000
$0
$10,000
9
7012
C2502006
19th Street Tidegate Retrofit
$32,075
$0
$32,075
9
7231
C2502006
19th Street Tidegate Retrofit
$49
$0
$49
10
7013
C2002057
Asphalt Alley Replacement
$0
$360,000
$360,000
11
7013
C2002058
Balboa Boulevard Channel Road Pavement
Reconstruction
$0
$440,000
$440,000
11
7185
C2002058
Balboa Boulevard Channel Road Pavement
Reconstruction
$0
$692,224
$692,224
11
7281
C2002058
Balboa Boulevard Channel Road Pavement
Reconstruction
$0
$807,776
$807,776
11
7502
C2002058
Balboa Boulevard Channel Road Pavement
Reconstruction
$0
$21,000
$21,000
11
7541
C2002058
Balboa Boulevard Channel Road Pavement
Reconstruction
$0
$14,500
$14,500
12
7013
C2002063
Balboa Boulevard Landscaping
$0
$265,000
$265,000
13
7181
C2002044
Bay Avenue Pavement Rehabilitation
$1,652,552
$0
$1,652,552
13
7502
C2002044
Bay Avenue Pavement Rehabilitation
$15,000
$0
$15,000
13
7541
C2002044
Bay Avenue Pavement Rehabilitation
$10,000
$0
$10,000
Category
-1
Streets and Drainage
Page
Fund
Project
Title
14
7181
C2002061
Bayside Drive Area Pavement Rehabilitation
14
7502
C2002061
Bayside Drive Area Pavement Rehabilitation
14
7541
C2002061
Bayside Drive Area Pavement Rehabilitation
15
7012
C2502011
Bayside Drive Riverside Avenue Storm Drain Improvements
16
7013
C2002064
Bristol Street South Median Landscaping
16
7251
C2002064
Bristol Street South Median Landscaping
17
7013
C2002059
Central Balboa and Bayfront South Alley Reconstruction
17
7511
C2002059
Central Balboa and Bayfront South Alley Reconstruction
18
7012
C2502003
China Cove Slope and Drainage Improvements
18
7014
C8002008
China Cove Slope and Drainage Improvements
19
7013
C2002065
Corona del Mar Entry Improvements
20
7281
C2002045
Dover Drive Peninsula Point Pavement Rehab. Design
21
7261
C2002019
Jamboree Road Improvements - Bristol /Fairchild
21
7284
C2002019
Jamboree Road Improvements - Bristol /Fairchild
22
7181
C2002062
Jamboree Road Improvements - MacArthur to Campus
23
7253
C2002047
Major Arterial Streets Repair Program
23
7281
C2002047
Major Arterial Streets Repair Program
24
7181
C2002048
Newport Boulevard 32nd Street Modification
24
7284
C2002048
Newport Boulevard 32nd Street Modification
25
7013
C2002066
Old Newport Boulevard Streetscape
26
7013
C2002060
Old Newport Boulevard West Coast Highway Modifications
26
7284
C2002060
Old Newport Boulevard West Coast Highway Modifications
27
7251
C2002067
Park Avenue Over Grand Canal Bridge Replacement
28
7013
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
28
7161
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
29
7013
C2001011
Slurry Seal Program
30
7012
C2502010
Storm Drain Interceptors
30
7284
C2502010
Storm Drain Interceptors
31
7012
C2502014
Storm Drain System Repairs and Sliplining
32
7013
C2201000
Streetlight Replacement Program
33
7231
C2502009
Tidegate Retrofit and Upgrades
Total Streets and Drainage
Category -2
Rebudget
Budget
Total
$0
$1,564,300
$1,564,300
$0
$57,200
$57,200
$0
$58,500
$58,500
$49,792
$0
$49,792
$0
$125,000
$125,000
$0
$375,000
$375,000
$0
$200,000
$200,000
$0
$500,000
$500,000
$200,000
$0
$200,000
$102,500
$0
$102,500
$0
$25,000
$25,000
$200,000
$0
$200,000
$168,900
$0
$168,900
$2,401,784
$0
$2,401,784
$0
$500,000
$500,000
$0
$327,000
$327,000
$233,000
$0
$233,000
$75,000
$50,000
$125,000
$225,000
$0
$225,000
$0
$50,000
$50,000
$0
$90,000
$90,000
$0
$270,000
$270,000
$0
$150,000
$150,000
$0
$400,000
$400,000
$0
$100,000
$100,000
$0
$635,000
$635,000
$143,800
$200,000
$343,800
$150,000
$600,000
$750,000
$0
$700,000
$700,000
$0
$150,000
$150,000
$500,000
$200,000
$700,000
$6,534,452
$9,927,500
$16,461,952
Traffic
Page
Fund
Project
Title
34
7014
C3002020
Bayside Cove Public Walkway
35
7013
C3002016
Citywide Street Signage, Striping and Marking
36
7254
C3002019
East Coast Highway Signal Rehabilitation
37
7013
C3002021
Eastbluff Bicycle Lane at Jamboree Road
37
7251
C3002021
Eastbluff Bicycle Lane at Jamboree Road
38
7014
C3002022
Newport Coast Drive Monument Signs
39
7181
C3002015
Traffic Sign Inventory and Reflectivity Assessment
40
7013
C3001008
Traffic Signal Equipment Enhancement Program
41
7181
C3002018
Traffic Signal Modernization: Phase 6
41
7284
C3002018
Traffic Signal Modernization: Phase 6
42
7013
C3001007
Traffic Signal Rehabilitation Program
53
7251
C4402014
Total Traffic
Parks, Harbors and Beaches
Page
Fund
Project
Title
43
7231
C4402009
Balboa Marina Public Dock
44
7231
C4402006
Balboa Yacht Basin Mooring Support Services Improv.
45
7231
C4801003
Bay Beach Sand Management
46
7231
C4402012
Eelgrass Survey - Lower Harbor Shoreline
47
7231
C4402003
Lower Harbor Dredging
48
7411
C4002002
Marina Park
49
7231
C4402013
Mooring Field Realignment
50
7271
C4001000
Playground Equipment Replacement
51
7231
C4402007
Seawall and Bulkhead Modifications
52
7412
C5100515
Sunset Ridge Park
53
7231
C4402014
Vessel Waste Pumpout Station Replacement
53
7251
C4402014
Vessel Waste Pumpout Station Replacement
Total Parks, Harbors and Beaches
Category -3
Rebudget
Budget
Total
$0
$40,000
$40,000
$0
$75,000
$75,000
$0
$300,000
$300,000
$0
$35,500
$35,500
$0
$236,000
$236,000
$0
$50,000
$50,000
$90,000
$0
$90,000
$0
$100,000
$100,000
$0
$336,900
$336,900
$0
$480,000
$480,000
$0
$300,000
$300,000
$90,000
$1,953,400
$2,043,400
Rebudget
Budget
Total
$20,000
$105,000
$125,000
$25,000
$0
$25,000
$0
$300,000
$300,000
$0
$50,000
$50,000
$100,000
$0
$100,000
$6,811,730
$0
$6,811,730
$0
$25,000
$25,000
$0
$65,000
$65,000
$0
$500,000
$500,000
$9,259,276
$0
$9,259,276
$0
$20,000
$20,000
$0
$60,000
$60,000
$16,216,006
$1,125,000
$17,341,006
Water Quality and Environmental
Fund
Project
Title
Ptige
fund
Project
Title
Rebudget
Budget
Total
54
7014
C5002004
Big Canyon Wash Restoration
$75,000
$0
$75,000
54
7251
C5002004
Big Canyon Wash Restoration
$1,500,000
$0
$1,500,000
55
7255
C5002005
Newport Coast ASBS Protection Program
$305,000
$0
$305,000
55
7255
C5002007
Newport Coast ASBS Protection Program
$45,000
$0
$45,000
55
7255
C5002008
Newport Coast ASBS Protection Program
$112,000
$0
$112,000
$0
$1,500,000
$1,500,000
Total Water Quality and Environmental
$2,037,000
$0
$2,037,000
Water
Page
Fund
Project
Title
Rebudget
Budget
Total
56
7513
C6002010
16th Street Pump Station Capacity Modifications
$100,000
$0
$100,000
57
7511
C6002011
Big Canyon Reservoir Floating Cover Replacement
$0
$3,965,000
$3,965,000
58
7511
C6002008
Corona del Mar Water Transmission Main Improvements
$2,765,766
$0
$2,765,766
59
7502
C6002013
Pump Station and Well Site VFD Improvements
$0
$450,000
$450,000
60
7502
C6002012
Transmission Main Cathodic Program
$0
$150,000
$150,000
61
7511
C6001000
Water Main Master Plan Program
$0
$1,500,000
$1,500,000
fund
Project
Title
Total Water
$2,865,766
$6,065,000
$8,930,766
Wastewater
Page
Fund
Project
Title
Rebudget
Budget
Total
62
7541
C7002004
Big Canyon Port Streets Sewer Diversion Improvements
$150,000
$0
$150,000
63
7541
C7002005
Saint James Road Sewer Relocation
$233,900
$0
$233,900
64
7541
C7001002
Sewer Pipeline Point Repairs and Lining
$0
$75,000
$75,000
65
7541
C5600934
Wastewater Master Plan Rate Study
$100,000
$25,000
$125,000
Total Wastewater
$483,900
$100,000
$583,900
Miscellaneous
Page
fund
Project
Title
Rebudget
Budget
Total
66
7014
C8002031
Local Coastal Program Plan Implementation
$0
$75,000
$75,000
67
7459
C5100879
Santa Ana Heights Utility Undergrounding
$1,170,800
$0
$1,170,800
68
7014
C8002022
SCE Rule 20A Credits Purchase
$0
$974,000
$974,000
Total Miscellaneous
$1,170,800
$1,049,000
$2,219,800
Totalfor All Categories $32,025,827 $20,834,900 $52,860,727
Category -4
Project Listing by Funding Source
Page
Fund
General Fund
Category
Rebudget
Budget
Total
7011
Facilities
4
C1002040
City Hall Interim Use Plan
Facilities
$0
$100,000
$100,000
Total Facilities
$0
$100,000
$100,000
7012
Drainage
9
C2502006
19th Street Tidegate Retrofit
Streets /Drainage
$32,075
$0
$32,075
15
C2502011
Bayside Drive Riverside Avenue Storm Drain Improvements
Streets /Drainage
$49,792
$0
$49,792
18
C2502003
China Cove Slope and Drainage Improvements
Streets /Drainage
$200,000
$0
$200,000
30
C2502010
Storm Drain Interceptors
Streets /Drainage
$143,800
$200,000
$343,800
31
C2502014
Storm Drain System Repairs and Sliplining
Streets /Drainage
$0
$700,000
$700,000
Total Drainage
$425,667
$900,000
$1,325,667
7013
Streets
10
C2002057
Asphalt Alley Replacement
Streets /Drainage
$0
$360,000
$360,000
11
C2002058
Balboa Boulevard Channel Road Pavement Reconstruction
Streets /Drainage
$0
$440,000
$440,000
12
C2002063
Balboa Boulevard Landscaping
Streets /Drainage
$0
$265,000
$265,000
16
C2002064
Bristol Street South Median Landscaping
Streets /Drainage
$0
$125,000
$125,000
17
C2002059
Central Balboa and BWront South Alley Reconstruction
Streets /Drainage
$0
$200,000
$200,000
35
C3002016
Citywide Street Signage, Striping and Marking
Traffic
$0
$75,000
$75,000
19
C2002065
Corona del Mar Entry Improvements
Streets /Drainage
$0
$25,000
$25,000
37
C3002021
Eastbluff Bicycle Lane at Jamboree Road
Traffic
$0
$35,500
$35,500
25
C2002066
Old Newport Boulevard Streetscape
Streets /Drainage
$0
$50,000
$50,000
26
C2002060
Old Newport Boulevard West Coast Highway Modifications
Streets /Drainage
$0
$90,000
$90,000
28
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
Streets /Drainage
$0
$400,000
$400,000
29
C2001011
Slurry Seal Program
Streets /Drainage
$0
$635,000
$635,000
32
C2201000
Streetlight Replacement Program
Streets /Drainage
$0
$150,000
$150,000
40
C3001008
Traffic Signal Equipment Enhancement Program
Traffic
$0
$100,000
$100,000
42
C3001007
Traffic Signal Rehabilitation Program
Traffic
$0
$300,000
$300,000
Total Streets
$0
$3,250,500
$3,250,500
Funding -1
Page
Fund
General Fund
Category
Rebudget
Budget
Total
7014
Miscellaneous
34
C3002020
Bayside Cove Public Walkway
Traffic
$0
$40,000
$40,000
2
C1002039
Big Canyon Reservoir Auxiliary Maintenance Yard
Facilities
$0
$100,000
$100,000
54
C5002004
Big Canyon Wash Restoration
Wtr Qual /Environ
$75,000
$0
$75,000
18
C8002008
China Cove Slope and Drainage Improvements
Streets /Drainage
$102,500
$0
$102,500
66
C8002031
Local Coastal Program Plan Implementation
Miscellaneous
$0
$75,000
$75,000
38
C3002022
Newport Coast Drive Monument Signs
Traffic
$0
$50,000
$50,000
68
C8002022
SCE Rule 20A Credits Purchase
Miscellaneous
$0
$974,000
$974,000
Total Miscellaneous
$177,500
$1,239,000
$1,416,500
Total General Fund
$603,167
tt
$6,092,667
Page
Fund
CDBG
Category
Rebudget
Budget
Total
7161
CDBG
28
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
Streets /Drainage
$0
$100,000
$100,000
Total CDBG
$0
$100,000
$100,000
Page
Fund
Gas Tax
Category
Rebudget
Budget
Total
7181
Gas Tax
8
C2002042
15th Street Pavement Overlay
Streets /Drainage
$235,000
$0
$235,000
13
C2002044
Bay Avenue Pavement Rehabilitation
Streets /Drainage
$1,652,552
$0
$1,652,552
14
C2002061
Bayside Drive Area Pavement Rehabilitation
Streets /Drainage
$0
$1,564,300
$1,564,300
22
C2002062
Jamboree Road Improvements - MacArthur to Campus
Streets /Drainage
$0
$500,000
$500,000
24
C2002048
Newport Boulevard 32nd Street Modification
Streets /Drainage
$75,000
$50,000
$125,000
39
C3002015
Traffic Sign Inventory and Reflectivity Assessment
Traffic
$90,000
$0
$90,000
41
C3002018
Traffic Signal Modernization: Phase 6
Traffic
$0
$336,900
$336,900
Total Gas Tax
$2,052,552
$2,451,200
$4,503,752
Funding -2
Page Fund Local Transportation Improvements
7185 Proposition 1B
11 C2002058 Balboa Boulevard Channel Road Pavement Reconstruction
Total Local Transportation Improvements
Page Fund Tide and Submerged Lands
Category Rebudget Budget Total
$0 $692,224 $692,224
Category
7231
Tide and Submerged Lands
9
C2502006
19th Street Tidegate Retrofit
43
C4402009
Balboa Marina Public Dock
1
C1002036
Balboa Yacht Basin Facility Improvements
44
C4402006
Balboa Yacht Basin Mooring Support Services Improv.
45
C4801003
Bay Beach Sand Management
46
C4402012
Eelgrass Survey - Lower Harbor Shoreline
47
C4402003
Lower Harbor Dredging
49
C4402013
Mooring Field Realignment
51
C4402007
Seawall and Bulkhead Modifications
33
C2502009
Tidegate Retrofit and Upgrades
53
C4402014
Vessel Waste Pumpout Station Replacement
Prks /Hrbrs /Bchs
$0
Total Tide and Submerged Lands
Category Rebudget Budget Total
$0 $692,224 $692,224
Category
Rebudget
Budget
Total
Streets /Drainage
$49
$0
$49
Prks /Hrbrs /Bchs
$20,000
$105,000
$125,000
Facilities
$39,585
$35,000
$74,585
Prks /Hrbrs /Bchs
$25,000
$0
$25,000
Prks /Hrbrs /Bchs
$0
$300,000
$300,000
Prks /Hrbrs /Bchs
$0
$50,000
$50,000
Prks /Hrbrs /Bchs
$100,000
$0
$100,000
Prks /Hrbrs /Bchs
$0
$25,000
$25,000
Prks /Hrbrs /Bchs
$0
$500,000
$500,000
Streets /Drainage
$500,000
$200,000
$700,000
Prks /Hrbrs /Bchs
$0
$20,000
$20,000
$60,000
$684,634
$1,235,000
$1,919,634
Page
Fund
Contributions
Category
Rebudget
Budget
Total
7251
Contributions
54
C5002004
Big Canyon Wash Restoration
Wtr Qua]. /Environ
$1,500,000
$0
$1,500,000
16
C2002064
Bristol Street South Median Landscaping
Streets /Drainage
$0
$375,000
$375,000
37
C3002021
Eastbluff Bicycle Lane at Jamboree Road
Traffic
$0
$236,000
$236,000
27
C2002067
Park Avenue Over Grand Canal Bridge Replacement
Streets /Drainage
$0
$150,000
$150,000
53
C4402014
Vessel Waste Pumpout Station Replacement
Prks /Hrbrs /Bchs
$0
$60,000
$60,000
Total Contributions
$1,500,000
$821,000
$2,321,000
Funding -3
Page Fund Bristol Street Relinquishment
Category Rebudget Budget Total
Page Fund Transportation and Circulation
Category Rebudget Budget Total
7261 Transportation and Circulation
21 C2002019 Jamboree Road Improvements - Bristol /Fairchild Streets /Drainage $168,900 $0 $168,900
Total Transportation and Circulation $168,900 $0 $168,900
Page Fund Building Excise Tax
Category Rebudget Budget Total
7271 Building Excise Tax
3 C1002021 Central Library HVAC Refurbishment Facilities $0 $340,000 $340,000
50 C4001000 Playground Equipment Replacement Prks /Hrbrs /Bchs $0 $65,000 $65,000
Total Building Excise Tax $0 $405,000 $405,000
Funding -4
7253
Contributions
23
C2002047
Major Arterial Streets Repair Program
Streets /Drainage
$0
$327,000
$327,000
Total Bristol Street Relinquishment
$0
$327,000
$327,000
Page
Fund
PCH Relinquishment
Category
Rebudget
Budget
Total
7254
Contributions
36
C3002019
East Coast Highway Signal Rehabilitation
Traffic
$0
$300,000
$300,000
Total PCHRelinquishment
$0
$300,000
$300,000
Page
Fund
Environmental Contributions
Category
Rebudget
Budget
Total
7255
Environmental Contributions
55
C5002005
Newport Coast ASBS Protection Program
Wtr Qua[ /Environ
$305,000
$0
$305,000
55
C5002007
Newport Coast ASBS Protection Program
Wtr Qual /Environ
$45,000
$0
$45,000
55
C5002008
Newport Coast ASBS Protection Program
Wtr Qual /Environ
$112,000
$0
$112,000
Total Environmental Contributions
$462,000
$0
$462,000
Page Fund Transportation and Circulation
Category Rebudget Budget Total
7261 Transportation and Circulation
21 C2002019 Jamboree Road Improvements - Bristol /Fairchild Streets /Drainage $168,900 $0 $168,900
Total Transportation and Circulation $168,900 $0 $168,900
Page Fund Building Excise Tax
Category Rebudget Budget Total
7271 Building Excise Tax
3 C1002021 Central Library HVAC Refurbishment Facilities $0 $340,000 $340,000
50 C4001000 Playground Equipment Replacement Prks /Hrbrs /Bchs $0 $65,000 $65,000
Total Building Excise Tax $0 $405,000 $405,000
Funding -4
Page Fund Measure M
Category Rebudget Budget Total
Page Fund Measure M
7281
Measure M Turnback
21
C2002019
Jamboree Road Improvements - Bristol /Fairchild
24
8
C2002042
15th Street Pavement Overlay
Streets /Drainage
$130,000
$0
$130,000
11
C2002058
Balboa Boulevard Channel Road Pavement Reconstruction
Streets /Drainage
$0
$807,776
$807,776
20
C2002045
Dover Drive Peninsula Point Pavement Rehab. Design
Streets /Drainage
$200,000
$0
$200,000
23
C2002047
Major Arterial Streets Repair Program
Streets /Drainage
$233,000
$0
$233,000
Total Measure M Turnback
Total Civic Center
$563,000
$807,776
$1,370,776
Page Fund Measure M
Total Measure M Competitive
Category
7284
Measure M Competitive
21
C2002019
Jamboree Road Improvements - Bristol /Fairchild
24
C2002048
Newport Boulevard 32nd Street Modification
26
C2002060
Old Newport Boulevard West Coast Highway Modifications
30
C2502010
Storm Drain Interceptors
41
C3002018
Traffic Signal Modernization: Phase 6
Total Measure M Competitive
Category
Rebudget
Budget
food
Streets /Drainage
$2,401,784
$0
$2,401,784
Streets /Drainage
$225,000
$0
$225,000
Streets /Drainage
$0
$270,000
$270,000
Streets /Drainage
$150,000
$600,000
$750,000
Traffic
$0
$480,000
$480,000
Facilities
$2,776,784
$1,350,000
$4,126,784
Page
Fund
Major Facilities Master Plan
Category
Rebudget
Budget
Total
7410
Civic Center
5
C1002009
Civic Center and Park
Facilities
$577,844
$0
$577,844
5
C1002030
Civic Center Construction
Facilities
$704,349
$0
$704,349
5
C1002035
Civic Center OCIP Loss Claims
Facilities
$1,034,524
$0
$1,034,524
Total Civic Center
$2,316,717
$0
$2,316,717
7411
Marina Park
48
C4002002
Marina Park
Prks /Hrbrs /Bchs
$6,811,730
$0
$6,811,730
Total Marina Park
$6,811,730
$0
$6,811,730
7412
Sunset Ridge Park
52
C5100515
Sunset Ridge Park
Prks /Hrbrs /Bchs
$9,259,276
$0
$9,259,276
Total Sunset Ridge Park
$9,259,276
$0
$9,259,276
Funding -5
Page Fund
Major Facilities Master Plan Category
Rebudget
Budget
Total
7414
Lifeguard Headquarters
7502
Capital Water Non- Master Plan
6 C1002037
Lifeguard Headquarters Rehabilitation Facilities
$84,000
$0
$84,000
C2002042
Total Lifeguard Headquarters
$84,000
$0
$84,000
7415
Strategic Planning
C2002058
Balboa Boulevard Channel Road Pavement Reconstruction
Streets /Drainage
7 C1002038
Master Facilities Plan Planning Efforts Facilities
$187,601
$0
$187,601
Bay Avenue Pavement Rehabilitation
Total Strategic Planning
$187,601
$0
$187,601
Page Fund Santa Ana Heights Category Rebudget Budget Total
7459 Santa Ana Heights Projects
67 C5100879 Santa Ana Heights Utility Undergrounding Miscellaneous $1,170,800 $0 $1,170,800
Total Santa Ana Heights Projects $1,170,800 $0 $1,170,800
Page
Fund
Water Enterprise
Category
Rebudget
Budget
Total
7502
Capital Water Non- Master Plan
8
C2002042
15th Street Pavement Overlay
Streets /Drainage
$10,000
$0
$10,000
11
C2002058
Balboa Boulevard Channel Road Pavement Reconstruction
Streets /Drainage
$0
$21,000
$21,000
13
C2002044
Bay Avenue Pavement Rehabilitation
Streets /Drainage
$15,000
$0
$15,000
14
C2002061
Bayside Drive Area Pavement Rehabilitation
Streets /Drainage
$0
$57,200
$57,200
2
C1002039
Big Canyon Reservoir Auxiliary Maintenance Yard
Facilities
$0
$20,000
$20,000
59
C6002013
Pump Station and Well Site VFD Improvements
Water
$0
$450,000
$450,000
60
C6002012
Transmission Main Cathodic Program
Water
$0
$150,000
$150,000
Total Non - Master Plan
$25,000
$698,200
$723,200
7511
Capital Water Master Plan Distribution and Piping
57
C6002011
Big Canyon Reservoir Floating Cover Replacement
Water
$0
$3,965,000
$3,965,000
17
C2002059
Central Balboa and Bayfront South Alley Reconstruction
Water
$0
$500,000
$500,000
58
C6002008
Corona del Mar Water Transmission Main Improvements
Water
$2,765,766
$0
$2,765,766
61
C6001000
Water Main Master Plan Program
Water
$0
$1,500,000
$1,500,000
Total Water Distribution and Piping
$2,765,766
$5,965,000
$8,730,766
Funding -6
Page Fund Water Enterprise Category
7513 Capital Water Master Plan Pumping and Operating
56 C6002010 16th Street Pump Station Capacity Modifications Water
Total Pumping and Operating
Page
Fund
Wastewater Enterprise
Category
$14,500
7541
Sewer Main Replacement
$0
11
C2002058
Balboa Boulevard Channel Road Pavement Reconstruction
Streets /Drainage
13
C2002044
Bay Avenue Pavement Rehabilitation
Streets /Drainage
14
C2002061
Bayside Drive Area Pavement Rehabilitation
Streets /Drainage
62
C7002004
Big Canyon Port Streets Sewer Diversion Improvements
Wastewater
2
C1002039
Big Canyon Reservoir Auxiliary Maintenance Yard
Facilities
63
C7002005
Saint James Road Sewer Relocation
Wastewater
64
C7001002
Sewer Pipeline Point Repairs and Lining
Wastewater
65
C5600934
Wastewater Master Plan Rate Study
Wastewater
Total Sewer Main Replacement
Total for All Funds
Funding -7
Rebudget Budget Total
5100.000 SO 5100,000
$100,000 $0 $100,000
Rebudget
Budget
Total
$0
$14,500
$14,500
$10,000
$0
$10,000
$0
$58,500
$58,500
$150,000
$0
$150,000
$0
$20,000
$20,000
$233,900
$0
$233,900
$0
$75,000
$75,000
$100,000
$25,000
$125,000
$493,900
$193,000
$686,900
$32,025,827 $20,834,900 $52,860,727
PC
c,9LI R��P
Project Fund Summary
Fund Fundinq Source
FY 2012 -2013 Adopted
10
General Fund
Rebudget
Budget
Total
7011 Facilities
$0
$100,000
$100,000
7012 Drainage
$425,667
$900,000
$1,325,667
7013 Streets
$0
$3,250,500
$3,250,500
7014 Miscellaneous
$177,500
$1,239,000
$1,416,500
Total General Fund
$603,167
$5,489,500
$6,092,667
160
CDBG
Rebudget
Budget
Total
7161 CDBG
$0
$100,000
$100,000
Total CDBG
$0
$100,000
$100,000
180
Gas Tax
Rebudget
Budget
Total
7181 Gas Tax
$2,052,552
$2,451,200
$4,503,752
Total Gas Tax
$2,052,552
$2,451,200
$4,503,752
185
Local Transportation Improvements
Rebudget
Budget
Total
7185 Proposition IB
SO
$692,224
$692,224
Total Local Transportation Improvements
$0
$692,224
$692,224
230
Tide and Submerged Lands
Rebudget
Budget
Total
7231 Tide and Submerged Lands
$684,634
$1,235,000
$1,919,634
Total Tide and Submerged Lands
$684,634
$1,235,000
$1,919,634
Summary-1
Fund Fundina Source
FY 2012 -2013 Adopted B
250 Contributions
Rebudget
Budget
Total
7251 Contributions
$1,500,000
$821,000
$2,321,000
7253 Bristol Street Relinquishment
$0
$327,000
$327,000
7254 PCH Relinquishment
$0
$300,000
$300,000
7255 Environmental Contributions
$462,000
$0
$462,000
Total Contributions
$1,962,000
$1,448,000
$3,410,000
260 Transportation and Circulation
Rebudget
Budget
Total
Rebudget
Budget
Total
7261 Transportation and Circulation
$168,900
$0
$168,900
Total Transportation and Circulation
$168,900
$0
$168,900
270 Building Excise Tax Rebudget Budget Total
7271 Building Excise Tax $0 $405,000 $405,000
Total Building Excise Tax $0 $405,000 $405,000
280
Measure M
Rebudget
Budget
Total
7281 Measure M Turnback
$563,000
$807,776
$1,370,776
7284 Measure M Competitive
$2,776,784
$1,350,000
$4,126,784
Total Measure M
$3,339,784
$2,157,776
$5,497,560
Major Facilities Master Plan
Rebudget
Budget
Total
410
7410 Civic Center
$2,316,717
$0
$2,316,717
411
7411 Marina Park
$6,811,730
$0
$6,811,730
412
7412 Sunset Ridge Park
$9,259,276
$0
$9,259,276
414
7414 Lifeguard Headquarters
$84,000
$0
$84,000
415
7415 Strategic Planning
$187,601
$0
$187,601
Total Major Facilities Master Plan
$18,659,324
$0
$18,659,324
Summary-2
Fund Fundina Source FY 2012 -2013 Adopted B
Santa Ana Heights Rebudget Budget Total
459 7459 Santa Ana Heights Projects $1,170,800 $0 $1,170,800
Total Santa Ana Heights $1,170,800 $0 $1,170,800
500 Water Enterprise
Rebudget
Budget
Total
7502 Non - Master Plan
$25,000
$698,200
$723,200
7511 Water Distribution and Piping
$2,765,766
$5,965,000
$8,730,766
7513 Pumping and Operating
$100,000
$0
$100,000
Total Water Enterprise $2,890,766
$6,663,200
$9,553,966
530 Wastewater Enterprise Rebudget Budget Total
7541 Sewer Main Replacement $493,900 $193,000 $686,900
Total Wastewater Enterprise $493,900 $193,000 $686,900
Totalfor All CIP Projects $32,025,827 $20,834,900 $52,860,727
Summary-3
PC
c,9LI R��P
Facilities
Page
Fund
Project
Title
1
7231
C1002036
Balboa Yacht Basin Facility Improvements
2
7014
C1002039
Big Canyon Reservoir Auxiliary Maintenance Yard
2
7502
C1002039
Big Canyon Reservoir Auxiliary Maintenance Yard
2
7541
C1002039
Big Canyon Reservoir Auxiliary Maintenance Yard
3
7271
C1002021
Central Library HVAC Refurbishment
4
7011
C1002040
City Hall Interim Use Plan
5
7410
C1002009
Civic Center and Park
5
7410
C1002030
Civic Center Construction
5
7410
C1002035
Civic Center OCIP Loss Claims
6
7414
C1002037
Lifeguard Headquarters Rehabilitation
7
7415
C1002038
Master Facilities Plan - Planning Efforts
Total Facilities
Rebudget
Budget
Total
$39,585
$35,000
$74,585
$0
$100,000
$100,000
$0
$20,000
$20,000
$0
$20,000
$20,000
$0
$340,000
$340,000
$0
$100,000
$100,000
$577,844
$0
$577,844
$704,349
$0
$704,349
$1,034,524
$0
$1,034,524
$84,000
$0
$84,000
$187,601
$0
$187,601
$2,627,903
$615,000
$3,242,903
PC
c,9LI R��P
Balboa Yacht Basin Facility Improvements
Requesting Department: Public Works Category: Facilities
This project makes facility improvements to Balboa Yacht Basin, the City's public marina, which has 170 boat slips and is nearly 25 years
old. Improvements will include general dock maintenance as well as general aesthetic improvements (painting, signage, and upkeep
repairs.) Specifically, exterior painting of City -owned buildings at the Balboa Yacht Basin will be included. It has been many years since
these buildings were painted. New exterior coats of paint will protect the buildings against effects of the marine environment and will reduce
future maintenance and repair costs.
Location:
Balboa Yacht Basin, 829 Harbor Island Drive
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $74,585
Other $0
Total $74,585
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C1002036
$39,585
$35,000
$0
$0
$0
$0
$0
$0
TOTAL
$39,585
$35,000
PROJECT TOTAL 1 $74,585
1
Big Canyon Reservoir Auxiliary Maintenance Yard
Requesting Department: Public Works Category: Facilities
This project consists of concept development, design and permitting of a redefined Auxiliary Maintenance Yard on the current Big Canyon
Reservoir property. The site currently includes materials storage and laydown areas, two garage storage units and two resident buildings.
Consistent with efforts to combine the City's corporate and utilities yards, along with a need to more efficiently serve the east side of the
City, a revised and updated auxiliary yard is needed.
Location:
Big Canyon Reservoir
FY 2012 -13
Design /Environmental $140,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $140,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C1002039
$0
$100,000
Water Enterprise
7502
C1002039
$0
$20,000
Wastewater Enterprise
7541
C1002039
$0
$20,000
TOTAL
$0
$140,000
PROJECT TOTAL 1 $140,000
2
Central Library HVAC Refurbishment
Requesting Department: Library Services
Category: Facilities
The existing Central Library HVAC system was put into service in 1994. Since then, only the main chiller has been replaced and the system
has received periodic maintenance and repairs. An examination confirmed that the existing HVAC system has many deferred maintenance
items and components that need to be corrected for it to function properly and to achieve optimal efficiency. A private consultant will be
retained to audit the existing system and prepare plans and specifications to replace existing control systems, fans, motors, pumps, ducting,
and other components. Repairs will be integrated with the new system to be installed in the expanded wing. Construction will be performed
by a private contractor.
Location:
Central Library, 1000 Avocado Avenue
FY 2012 -13
Design /Environmental $40,000
Right -of -Way, Land Acquisition $0
Construction $300,000
Other $0
Total $340,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Building Excise Tax
7271
C1002021
$0
$340,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$340,000
PROJECT TOTAL 1 $340,000
3
City Hall Interim Use Plan
Requesting Department: Public Works Category: Facilities
This project involves City staff and /or a private consultant developing an interim plan for the closing down and securing of the current City
Hall site while the ultimate reuse of the property is developed and permitted. Construction will remove all furnishings and significant items,
secure the existing building in place, fence off interior corridors between the various buildings, and decommission certain utilities. Also, the
project will convert existing employee parking areas to public parking. Staff will also have the existing facility tested to identify possible
areas of special concern such as lead paint and asbestos.
Location:
City Hall, 3300 Newport Boulevard
FY 2012 -13
Design /Environmental $20,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $80,000
Total $100,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7011
C1002040
$0
$100,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$100,000
PROJECT TOTAL 1 $100,000
4
Civic Center and Park
Requesting Department: Public Works Category: Facilities
The Civic Center and Park Project includes a City Hall building, one of the City's largest parks, a 450 -space parking structure, and an
expansion of the Newport Beach Central Library. Construction is underway and is scheduled to be completed by the end of 2012 with move -
in early 2013.
Location:
1100 Avocado Avenue
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,282,193
Other $1,034,524
Total $2,316,717
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Civic Center and Park
7410
C1002009
$577,844
$0
Civic Center Construction
7410
C1002030
$704,349
$0
Civic Center OCIP Loss Claims
7410
C1002035
$1,034,524
$0
$0
TOTAL
$2,316,717
$0
PROJECT TOTAL 1 $2,316,717
5
Lifeguard Headquarters Rehabilitation
Requesting Department: Fire Category: Facilities
The Lifeguard Headquarters was built in 1962 and partly remodeled in 1988. Existing staff areas, computer and communications room, and
HVAC systems are inadequate and outdated. Electrical, plumbing and other metal components are corroding. The project will remove
several interior offices and partitions to create a large second floor meeting and training room that will also serve as a classroom for the
Junior Lifeguard program. The existing lower level and garage will be reconstructed for more efficient use of space, storage, and vehicles
parking. The building exterior should require only minor repair work, possibly new windows and painting.
Location:
Newport Pier at McFadden Plaza
FY 2012 -13
Design /Environmental $84,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $84,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Major Facilities Master Plan
7414
C1002037
$84,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$84,000
$0
PROJECT TOTAL 1 $84,000
2
Master Facilities Plan - Planning Efforts
Requesting Department: Public Works Category: Facilities
This project provides for necessary studies and concept development needed to further refine the Major Facilities Financing Plan. It also
includes developing both interim and long term use plans for the current City Hall site on Newport Boulevard. Once the new Civic Center on
Avocado is constructed and occupied, a plan is needed to modify, address and secure the abandoned location for the period when long
term concepts and plans for the site are developed and approved.
Location:
3300 Newport Boulevard and other City facility locations
FY 2012 -13
Design /Environmental $187,601
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $187,601
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Major Facilities Master Plan
7415
C1002038
$187,601
$0
$0
$0
$0
$0
$0
$0
TOTAL
$187,601
$0
PROJECT TOTAL 1 $187,601
7
Streets and Drainage
Page
Fund
Project
Title
Rebudget
Budget
Total
8
7181
C2002042
15th Street Pavement Overlay
$235,000
$0
$235,000
8
7281
C2002042
15th Street Pavement Overlay
$130,000
$0
$130,000
8
7502
C2002042
15th Street Pavement Overlay
$10,000
$0
$10,000
9
7012
C2502006
19th Street Tidegate Retrofit
$32,075
$0
$32,075
9
7231
C2502006
19th Street Tidegate Retrofit
$49
$0
$49
10
7013
C2002057
Asphalt Alley Replacement
$0
$360,000
$360,000
11
7013
C2002058
Balboa Boulevard Channel Road Pavement Reconstruction
$0
$440,000
$440,000
11
7185
C2002058
Balboa Boulevard Channel Road Pavement Reconstruction
$0
$692,224
$692,224
11
7281
C2002058
Balboa Boulevard Channel Road Pavement Reconstruction
$0
$807,776
$807,776
11
7502
C2002058
Balboa Boulevard Channel Road Pavement Reconstruction
$0
$21,000
$21,000
11
7541
C2002058
Balboa Boulevard Channel Road Pavement Reconstruction
$0
$14,500
$14,500
12
7013
C2002063
Balboa Boulevard Landscaping
$0
$265,000
$265,000
13
7181
C2002044
Bay Avenue Pavement Rehabilitation
$1,652,552
$0
$1,652,552
13
7502
C2002044
Bay Avenue Pavement Rehabilitation
$15,000
$0
$15,000
13
7541
C2002044
Bay Avenue Pavement Rehabilitation
$10,000
$0
$10,000
14
7181
C2002061
Bayside Drive Area Pavement Rehabilitation
$0
$1,564,300
$1,564,300
14
7502
C2002061
Bayside Drive Area Pavement Rehabilitation
$0
$57,200
$57,200
14
7541
C2002061
Bayside Drive Area Pavement Rehabilitation
$0
$58,500
$58,500
15
7012
C2502011
Bayside Drive Riverside Avenue Storm Drain Improvements
$49,792
$0
$49,792
16
7013
C2002064
Bristol Street South Median Landscaping
$0
$125,000
$125,000
16
7251
C2002064
Bristol Street South Median Landscaping
$0
$375,000
$375,000
17
7013
C2002059
Central Balboa and Bayfront South Alley Reconstruction
$0
$200,000
$200,000
17
7511
C2002059
Central Balboa and Bayfront South Alley Reconstruction
$0
$500,000
$500,000
18
7012
C2502003
China Cove Slope and Drainage Improvements
$200,000
$0
$200,000
18
7014
C8002008
China Cove Slope and Drainage Improvements
$102,500
$0
$102,500
19
7013
C2002065
Corona del Mar Entry Improvements
$0
$25,000
$25,000
20
7281
C2002045
Dover Drive Peninsula Point Pavement Rehab. Design
$200,000
$0
$200,000
Streets and Drainage
Page
Fund
Project
Title
21
7261
C2002019
Jamboree Road Improvements - Bristol /Fairchild
21
7284
C2002019
Jamboree Road Improvements - Bristol /Fairchild
22
7181
C2002062
Jamboree Road Improvements - MacArthur to Campus
23
7253
C2002047
Major Arterial Streets Repair Program
23
7281
C2002047
Major Arterial Streets Repair Program
24
7181
C2002048
Newport Boulevard 32nd Street Modification
24
7284
C2002048
Newport Boulevard 32nd Street Modification
25
7013
C2002066
Old Newport Boulevard Streetscape
26
7013
C2002060
Old Newport Boulevard West Coast Highway Modifications
26
7284
C2002060
Old Newport Boulevard West Coast Highway Modifications
27
7251
C2002067
Park Avenue Over Grand Canal Bridge Replacement
28
7013
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
28
7161
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
29
7013
C2001011
Slurry Seal Program
30
7012
C2502010
Storm Drain Interceptors
30
7284
C2502010
Storm Drain Interceptors
31
7012
C2502014
Storm Drain System Repairs and Sliplining
32
7013
C2201000
Streetlight Replacement Program
33
7231
C2502009
Tidegate Retrofit and Upgrades
Total Streets and Drainage
Rebudget
Budget
Total
$168,900
$0
$168,900
$2,401,784
$0
$2,401,784
$0
$500,000
$500,000
$0
$327,000
$327,000
$233,000
$0
$233,000
$75,000
$50,000
$125,000
$225,000
$0
$225,000
$0
$50,000
$50,000
$0
$90,000
$90,000
$0
$270,000
$270,000
$0
$150,000
$150,000
$0
$400,000
$400,000
$0
$100,000
$100,000
$0
$635,000
$635,000
$143,800
$200,000
$343,800
$150,000
$600,000
$750,000
$0
$700,000
$700,000
$0
$150,000
$150,000
$500,000
$200,000
$700,000
$6,534,452
$9,927,500
$16,461,952
15th Street Pavement Overlay
Requesting Department: Public Works
Category: Streets and Drainage
This project involves overlaying and /or reconstructing asphalt pavement on 15th Street between Old Newport Boulevard and Redlands
Avenue. Due to many past edge grinding and overlaying operations, the existing street cross slope is relatively steep and needs to be
reconstructed. Deteriorated concrete curb, gutter and sidewalk will also be removed and reconstructed. Existing utilities will be adjusted to
grade. Since half of 15th Street is located in the City of Costa Mesa, staff will prepare a reimbursement agreement with Costa Mesa to fund
its portion of this project. Plans and specifications will be prepared by staff. Construction will be performed by a private contractor.
Location:
15th Street between Old Newport Boulevard and Redlands Avenue
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $375,000
Other $0
Total $375,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002042
$235,000
$0
Measure M Turnback
7281
C2002042
$130,000
$0
Water Enterprise
7502
C2002042
$10,000
$0
$0
$0
TOTAL
$375,000
$0
PROJECT TOTAL 1 $375,000
0
19th Street Tidegate Retrofit
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for the installation of a new tidegate and /or a pump station at the 19th Street street end. The existing valve operates
approximately twenty times per month, is submerged in salt water at all times, and requires frequent maintenance and repairs. This unit is
responsible for keeping the immediate vicinity dry during high tide events. A construction contract was awarded May 22, 2012.
Location:
19th Street
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $32,124
Total $32,124
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7012
C2502006
$32,075
$0
Tide and Submerged Lands
7231
C2502006
$49
$0
$0
$0
$0
$0
TOTAL
$32,124
$0
PROJECT TOTAL 1 $32,124
9
Requesting Department: Public Works
Asphalt Alley Replacement
Category: Streets and Drainage
This project involves reconstructing various deteriorated asphalt alleys in the City. This year's effort focuses on the Newport Heights
community. Plans and specifications will be prepared by staff. Construction will be performed by a private contractor.
Location:
Various alleys in Newport Heights community
FY 2012 -13
Design /Environmental $50,000
Right -of -Way, Land Acquisition $0
Construction $310,000
Other $0
Total $360,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002057
$0
$360,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$360,000
PROJECT TOTAL 1 $360,000
10
Balboa Boulevard Channel Road Pavement Reconstruction
Requesting Department: Public Works Category: Streets and Drainage
This project involves removing and reconstructing concrete pavement on Balboa Boulevard and Channel Road in the Peninsula Point
community. Existing utilities will be adjusted to grade. Plans and specifications will be prepared by either a consultant or staff.
Location:
Balboa Boulevard - G Street to Granada Avenue and Channel Road - Granada Avenue to south end
FY 2012 -13
Design /Environmental $180,000
Right -of -Way, Land Acquisition $0
Construction $1,795,500
Other $0
Total $1,975,500
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002058
$0
$440,000
Proposition 1 B
7185
C2002058
$0
$692,224
Measure M
7281
C2002058
$0
$807,776
Water Enterprise
7502
C2002058
$0
$21,000
Wastewater Enterprise
7541
C2002058
$0
$14,500
TOTAL
$0
$1,975,500
PROJECT TOTAL 1 $1,975,500
11
Balboa Boulevard Landscaping
Requesting Department: Public Works
Category: Streets and Drainage
This project will retain the design services of a private landscape architect to prepare plans and specifications to install a new irrigation
system and new landscaping along Balboa Boulevard between 22nd Street and West Coast Highway. Construction is not a part of this
year's funding.
Location:
Balboa Boulevard - 22nd Street to West Coast Highway
FY 2012 -13
Design /Environmental $265,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $265,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002063
$0
$265,000
$0
$0
$0
$0
$0
$0
$0
$0
TOTAL
$0
$265,000
PROJECT TOTAL 1 $265,000
12
Bay Avenue Pavement Rehabilitation
Requesting Department: Public Works
Category: Streets and Drainage
This project involves removing and reconstructing deteriorated concrete pavement on Bay Avenue. Deteriorated concrete curb, gutter and
sidewalk will also be removed and reconstructed. Existing utilities will be adjusted to grade. Plans and specifications will be prepared by
staff. Construction will be performed by a private contractor.
Location:
Bay Avenue, 15th Street to 10th Street, 9th Street to 7th Street and Island Avenue to Palm Street
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,677,552
Other $0
Total $1,677,552
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002044
$1,652,552
$0
Water Enterprise
7502
C2002044
$15,000
$0
Wastewater Enterprise
7541
C2002044
$10,000
$0
$0
$0
TOTAL
$1,677,552
$0
PROJECT TOTAL 1 $1,677,552
13
Bayside Drive Area Pavement Rehabilitation
Requesting Department: Public Works Category: Streets and Drainage
This project involves grinding and overlaying the asphalt concrete pavement on Harbor Island Drive and Road, Bayside Drive and Avocado
Avenue. Deteriorated concrete curb, gutter and sidewalk will also be removed and reconstructed. Existing utilities will be adjusted to grade.
Plans and specifications will be prepared by staff. Construction will be performed by a private contractor.
Location:
Harbor Island Drive - Bayside Drive to east end, Harbor Island Road - Harbor Island Drive to south end, Bayside Drive - East Coast
Highway to Jamboree Road and El Paseo Drive to Marguerite Avenue, Avocado Avenue - East Coast Highway to San Nicolas Drive
FY 2012 -13
Design /Environmental $100,000
Right -of -Way, Land Acquisition $0
Construction $1,580,000
Other $0
Total $1,680,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002061
$0
$1,564,300
Water Enterprise
7502
C2002061
$0
$57,200
Wastewater Enterprise
7541
C2002061
$0
$58,500
$0
$0
TOTAL
$0
$1,680,000
PROJECT TOTAL 1 $1,680,000
14
Bayside Drive Riverside Avenue Storm Drain Improvements
Requesting Department: Public Works Category: Streets and Drainage
This project will design and reconstruct two existing storm drain segments to correct capacity restrictions. Plans and specifications will be
prepared by staff. Construction is being performed by a private contractor. The construction contract for Various Storm Drain
Improvements was awarded March 13, 2012.
Location:
Bayside Drive and Riverside Avenue
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $49,792
Total $49,792
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7012
C2502011
$49,792
$0
$0
$0
$0
$0
$0
$0
TOTAL
$49,792
$0
PROJECT TOTAL $49,792
15
Bristol Street South Median Landscaping
Requesting Department: Public Works
Category: Streets and Drainage
Plans and specifications to install a new irrigation system and landscaping at this location are currently shelf ready. Federal TEA grant
applications are expected to be announced and awarded later this year. Should the City be awarded grant funds, staff will proceed with
construction of this project pursuant to the Citizens Advisory Panel and Council approved concept plan. Additional construction oversight
services will also be needed from the project's consulting Landscape Architect. Construction will be performed by a private contractor. A
specialty sign contractor will install a new monument sign within the project work limits.
Location:
Bristol Street South - between Campus Drive and Jamboree Road
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $500,000
Other $0
Total $500,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002064
$0
$125,000
Contributions
7251
C2002064
$0
$375,000
$0
$0
$0
$0
TOTAL
$0
$500,000
PROJECT TOTAL 1 $500,000
M
Central Balboa and Bayfront South Alley Reconstruction
Requesting Department: Public Works Category: Streets and Drainage
This project involves removing and reconstructing existing concrete pavement impacted by utility undergrounding construction in the Central
Balboa area. Assessment District 100 is contributing $1,200,000 towards this project. In addition, Bayfront South Alley at the intersection
of Agate Avenue will also be reconstructed. Plans and specifications will be prepared by staff. Construction will be performed by a private
contractor.
Location:
Central Balboa Alleys - Various alleys between 13th Street and Adams Street south of Balboa Boulevard and Bayfront South Alley - 150
feet on both sides of Agate Avenue
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $700,000
Other $0
Total $700,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002059
$0
$200,000
Water Enterprise
7511
C2002059
$0
$500,000
$0
$0
$0
$0
TOTAL
$0
$700,000
PROJECT TOTAL 1 $700,000
17
China Cove Slope and Drainage Improvements
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for slope stabilization and drainage improvements at China Cove. Improvements will help minimize the threat of
failures and protect the integrity of Ocean Boulevard.
Location:
China Cove
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $302,500
Other $0
Total $302,500
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7012
C2502003
$200,000
$0
General Fund
7014
C8002008
$102,500
$0
$0
$0
$0
$0
TOTAL
$302,500
$0
PROJECT TOTAL $302,500
18
Corona del Mar Entry Improvements
Requesting Department: Public Works
Category: Streets and Drainage
Corona del Mar Entry is one of five revitalization priority areas reviewed in 2011 -2012. A concept plan was prepared for a beautification
project along the south side of East Coast Highway from Avocado Avenue to Dahlia Avenue. This year's effort will install and then remove
a trial traffic lane reconfiguration to determine the feasibility of moving forward with proposed improvements.
Location:
East Coast Highway at MacArthur Boulevard
FY 2012 -13
Design /Environmental $25,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $25,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002065
$0
$25,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$25,000
PROJECT TOTAL 1 $25,000
19
Dover Drive Peninsula Point Pavement Rehabilitation
Requesting Department: Public Works
Category: Streets and Drainage
This project involves development of engineering plans and bid packages for overlaying and /or reconstructing the asphalt pavement on
Dover Drive and on Westcliff. Replacement of deteriorated concrete street pavement, curb, gutter and sidewalk in Peninsula Point area will
also be included. Existing landscaped medians will be updated. Existing utilities will be adjusted to grade. Various concrete streets in the
Peninsula Point community will be reconstructed. Staff or a private consultant will prepare the plans and specifications in FY 12.
Construction may begin after the OC Sanitation District Dover Drive Trunk Sewer Replacement Project is completed. Construction will be
performed by a private contractor.
Location:
Dover Drive - Irvine Avenue to Coast Highway, Westcliff - Dover Drive to Irvine Avenue, and various streets in the Peninsula Point area
FY 2012 -13
Design /Environmental $200,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $200,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Measure M Turnback
7281
C2002045
$200,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$200,000
$0
PROJECT TOTAL 1 $200,000
20
Jamboree
Road Improvements -
Bristol Street North to
Fairchild Road
Requesting Department:
Public Works
Category:
Streets and Drainage
This project includes the widening of Jamboree Road at the intersection of MacArthur Boulevard as called for in the General Plan. The
project provides for an additional northbound thru lane on Jamboree Road and an additional southbound left turn lane on Jamboree Road
onto MacArthur Boulevard. This project also involves right -of -way acquisition and roadway widening in the City of Irvine and is dependent
on their cooperation and assistance.
Location:
Jamboree Road from Bristol Street North to Fairchild Road
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $2,570,684
Other $0
Total $2,570,684
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Transportation and Circulation
7261
C2002019
$168,900
$0
Measure M Competitive
7284
C2002019
$2,401,784
$0
$0
$0
$0
$0
TOTAL
$2,570,684
$0
PROJECT TOTAL $2,570,684
21
Jamboree
Road Improvements
- MacArthur Blvd to
Campus Drive
Requesting Department:
Public Works
Category:
Streets and Drainage
This is a joint project with the City of Irvine and involves grinding and overlaying the asphalt concrete pavement on Jamboree Road
between MacArthur Boulevard and Campus Drive. The City boundary is along the street centerline. The two cities will enter into a
cooperative agreement with the City of Irvine being the lead agency. Plans and specifications will be prepared by a consultant.
Construction will be performed by a private contractor.
Location:
Jamboree Road from MacArthur Boulevard to Campus Drive
FY 2012 -13
Design /Environmental $50,000
Right -of -Way, Land Acquisition $0
Construction $450,000
Other $0
Total $500,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002062
$0
$500,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$500,000
PROJECT TOTAL 1 $500,000
22
Major Arterial Streets Repair Program
Requesting Department: Public Works
Category: Streets and Drainage
This project involves isolated asphalt pavement repairs on several major arterials including Bristol Street South, Newport Coast Drive and
Jamboree Road. Plans and specifications will be prepared by staff. Construction will be performed by a private contractor.
Location:
Isolated areas on Bristol Street South, Newport Coast Drive and Jamboree Road
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $560,000
Other $0
Total $560,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Bristol Street Relinquishment
7253
C2002047
$0
$327,000
Measure M Turnback
7281
C2002047
$233,000
$0
$0
$0
$0
$0
TOTAL
$233,000
$327,000
PROJECT TOTAL 1 $560,000
23
Newport Boulevard 32nd Street Modification
Requesting Department: Public Works Category: Streets and Drainage
This project involves widening Newport Boulevard to accommodate one additional northbound through lane from 30th Street to 32nd Street
and one additional southbound through lane from Via Lido to 32nd Street teminating as a right -turn only lane at 32nd Street. Staff
submitted a funding application to OCTA under the current Measure M2 call for projects. If successful, an additional $225,000 will be
available for environmental and design efforts. Plans and specs will be prepared by a consultant. Right -of -way acquisition construction will
be applied for and completed in the following fiscal years.
Location:
Newport Boulevard from Via Lido to 30th Street
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $50,000
Construction $300,000
Other $0
Design /Environmental $350,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002048
$75,000
$50,000
Measure M Competitive
7284
C2002048
$225,000
$0
$0
$0
$0
$0
TOTAL
$300,000
$50,000
PROJECT TOTAL 1 $350,000
24
Old Newport Boulevard Streetscape
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for the preparation of a concept plan to develop and provide for new and enhanced street parking and landscaping
along Old Newport Boulevard between Catalina Drive and 15th Street.
Location:
Old Newport Boulevard between Catalina Drive and 15th Street
FY 2012 -13
Design /Environmental $50,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Design /Environmental $50,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002066
$0
$50,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$50,000
PROJECT TOTAL 1 $50,000
25
Old Newport Boulevard West Coast Highway Modifications
Requesting Department: Public Works Category: Streets and Drainage
This project involves widening the westbound side of West Coast Highway at Old Newport Boulevard to accommodate a third through lane,
a right turn pocket and a bike lane. Old Newport Boulevard will also be realigned to maximize the right turn pocket storage length and
improve roadway geometrics. Additional right -of -way from Caltrans will be required. Staff submitted a funding application to OCTA under
the current Measure M2 call for projects. If successful, the City will be required to participate with a 25 percent funding match ($90,000) for
the design of this project. Plans and specifications will be prepared by a consultant. Construction will be performed by a private contractor.
Location:
Intersection of Old Newport Boulevard and West Coast Highway
FY 2012 -13
Design /Environmental $360,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Design /Environmental $360,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002060
$0
$90,000
Measure M Competitive
7284
C2002060
$0
$270,000
$0
$0
$0
$0
TOTAL
$0
$360,000
PROJECT TOTAL 1 $360,000
26
Park Avenue Over Grand Canal Bridge Replacement
Requesting Department: Public Works
Category: Streets and Drainage
This project will initiate concept design for the Little Balboa Island Bridge replacement. The project will produce design alternatives to
evaluate the best form for the replacement bridge.
Location:
Balboa Island and Little Balboa Island
FY 2012 -13
Design /Environmental $150,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Design /Environmental $150,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Contributions
7251
C2002067
$0
$150,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$150,000
PROJECT TOTAL 1 $150,000
27
Sidewalk, Curb and Gutter Replacement and ADA Improvements
Requesting Department: Municipal Operations Category: Streets and Drainage
This project provides for the replacement of sidewalks, curbs, gutters, and cross gutters. Construction of curb access ramps to improve
pedestrian and wheelchair access in accordance with the Americans with Disabilities Act (ADA) is included. Plans and specifications will be
prepared by staff. Work will be performed by a private contractor.
Location:
Focus on West Newport, Newport Shores and Balboa Peninsula communities; other locations may be addressed funding permitting.
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $500,000
Other $0
Total $500,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2001009
$0
$400,000
CDBG
7161
C2001009
$0
$100,000
$0
$0
$0
$0
TOTAL
$0
$500,000
PROJECT TOTAL 1 $500,000
28
Slurry Seal Program
Requesting Department: Public Works
Category: Streets and Drainage
This project involves slurry sealing residential streets in West Newport, Newport Shores and Balboa Peninsula communities, and various
streets on the west side of the City. In addition, public parking lots within this area will be seal coated. Plans and specifications will be
prepared by staff. Construction will be performed by a private contractor.
Location:
West Newport, Newport Shores and Balboa Peninsula communities and various streets on the west side of the City
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $635,000
Other $0
Total $635,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2001011
$0
$635,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$635,000
PROJECT TOTAL 1 $635,000
29
Requesting Department: Public Works
Storm Drain Interceptors
Category: Streets and Drainage
Measure M provides funds for cleaning urban and storm runoff associated with our main transportation corridors. Public Works and
Municipal Operations have identified several locations where storm interceptors or infiltration galleries could be installed to clean water
before it enters the bay or ocean. Tier II funding will provide for installation of CDS units on storm drains to capture trash, aromatic
hydrocarbons, sediment and other constituents. Measure M funds require a 25 -50 percent match depending on the grant tier.
Location:
Various locations where storm drain discharge to the ocean or bay. New funding will be applied towards Bayside Drive near Carnation
Avenue, El Paseo near Bayside Drive, Pelican Point HOA, Backbay Drive near the Hyatt, and a 5th location to be determined.
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,093,800
Other $0
Total $1,093,800
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7012
C2502010
$143,800
$200,000
Measure M Competitive
7284
C2502010
$150,000
$600,000
$0
$0
$0
$0
TOTAL
$293,800
$800,000
PROJECT TOTAL 1 $1,093,800
30
Storm Drain System Repairs and Sliplining
Requesting Department: Public Works
Category: Streets and Drainage
The City owns and operates an extensive drainage system, including corrugated metal drainage pipes (CMP) built into roads and housing
tracts in the 1960s and earlier. Many CMPs have deteriorated and have required unscheduled or urgent repairs recently. This project
retains the services of a private pipeline video inspection firm to assess the condition of existing CMPs. Staff will prepare the plans and
specifications for a private contractor to make proactive, nondestructive pipe sliplining repairs to return the pipelines to full service. This
project will fund needed drainage repairs as they are encountered during this project.
Location:
Citywide
Design/Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2012 -13
$0
$0
$700,000
$700,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7012
C2502014
$0
$700,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$700,000
PROJECT TOTAL 1 $700,000
31
Streetlight Replacement Program
Requesting Department: Municipal Operations
Category: Streets and Drainage
This project is a continuation of the City's 15 -year Streetlight Replacement Master Plan. This year's focus is on the areas around Newport
Harbor High School and Irvine Avenue between Santiago Drive and Santa Isabel Avenue. Many of these lights were installed more than 40
years ago. Replacement parts are no longer available. Work includes replacing obsolete streetlights, conduits, wires, pull boxes and
service cabinets.
Location:
Areas around Newport Harbor High School and Irvine Avenue between Santiago Drive and Santa Isabel Avenue
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $150,000
Other $0
Total $150,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2201000
$0
$150,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$150,000
PROJECT TOTAL 1 $150,000
32
Tidegate Retrofit and Upgrades
Requesting Department: Public Works
Category: Streets and Drainage
This project provides for the installation of new tidegates and hardware to replace existing deteriorated and high maintenance units within
Balboa Peninsula and Balboa Island. Provisions for automated operations to reduce maintenance costs will be implemented to the extent
possible.
Location:
Balboa Island and Balboa Peninsula
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $700,000
Other $0
Total $700,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C2502009
$500,000
$200,000
$0
$0
$0
$0
$0
$0
TOTAL
$500,000
$200,000
PROJECT TOTAL 1 $700,000
33
Traffic
Page
Fund
Project
Title
34
7014
C3002020
Bayside Cove Public Walkway
35
7013
C3002016
Citywide Street Signage, Striping and Marking
36
7254
C3002019
East Coast Highway Signal Rehabilitation
37
7013
C3002021
Eastbluff Bicycle Lane at Jamboree Road
37
7251
C3002021
Eastbluff Bicycle Lane at Jamboree Road
38
7014
C3002022
Newport Coast Drive Monument Signs
39
7181
C3002015
Traffic Sign Inventory and Reflectivity Assessment
40
7013
C3001008
Traffic Signal Equipment Enhancement Program
41
7181
C3002018
Traffic Signal Modernization: Phase 6
41
7284
C3002018
Traffic Signal Modernization: Phase 6
42
7013
C3001007
Traffic Signal Rehabilitation Program
Total Traffic
Rebudget
Budget
Total
$0
$40,000
$40,000
$0
$75,000
$75,000
$0
$300,000
$300,000
$0
$35,500
$35,500
$0
$236,000
$236,000
$0
$50,000
$50,000
$90,000
$0
$90,000
$0
$100,000
$100,000
$0
$336,900
$336,900
$0
$480,000
$480,000
$0
$300,000
$300,000
$90,000
$1,953,400
$2,043,400
PC
c,9LI R��P
Bayside Cove Public Walkway
Requesting Department: Public Works
Category: Traffic
This project completes the link necessary to make the existing public walkway which runs along the waterside of Bayside Cove accessible
by the public. Efforts involve design and approvals towards the construction of a public walkway.
Location:
Bayside Cove - Bayside Drive near Marine Avenue
FY 2012 -13
Design /Environmental $40,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $40,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C3002020
$0
$40,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$40,000
PROJECT TOTAL 1 $40,000
34
Citywide Street Signage, Striping and Marking
Requesting Department: Public Works Category: Traffic
This project completes various traffic signing, striping and pavement markings and other minor improvements to enhance traffic safety.
Plans will be prepared by staff. Work will be performed by a private contractor or City crews.
Location:
Citywide
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $75,000
Total $75,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C3002016
$0
$75,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$75,000
PROJECT TOTAL 1 $75,000
35
East Coast Highway Signal Rehabilitation
Requesting Department: Public Works
Category: Traffic
The project includes design of traffic signal rehabilitation work for the existing traffic signal equipment along East Coast Highway in Corona
del Mar. Work involves replacing hardware including control equipment, signal poles, and cabinets, and re- wiring of the intersections. Plans
and specifications will be prepared by a consultant.
Location:
East Coast Highway from Jamboree Road to Newport Coast Drive
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $300,000
Other $0
Total $300,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
PCH Relinquishment
7254
C3002019
$0
$300,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$300,000
PROJECT TOTAL 1 $300,000
36
Eastbluff Bicycle Lane at Jamboree Road
Requesting Department: Public Works
Category: Traffic
This project provides for design and construction to widen the south side of Eastbluff Drive between Jamboree Road and Mar Vista Drive by
five (5) feet to accommodate and continue an on- street bicycle lane on the south side of the street. The project is being submitted to
OCTA for possible grant funding. If awarded grant funds, the design will be performed by a consulant and construction by a private
contractor.
Location:
Eastbluff Drive between Jamboree Road and Mar Vista Drive
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $271,500
Other $0
Total $271,500
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C3002021
$0
$35,500
Contributions
7251
C3002021
$0
$236,000
$0
$0
$0
$0
TOTAL
$0
$271,500
PROJECT TOTAL 1 $271,500
37
Newport Coast Drive Monument Signs
Requesting Department: Public Works
Category: Traffic
Currently, there are no gateway monument signs in Newport Coast. This project will retain the services of a private consultant to complete
construction bid documents needed to construct two gateway -type monument signs along with its support components, limited irrigation
system and landscaping modification at two locations. The locations are: 1) Newport Coast Drive just southerly of the SR73 toll road; and
2) on East Coast Highway east of Reef Point. Construction work will be performed by a private contractor.
Location:
Newport Coast Drive south of SR73 and East Coast Highway at Reef Point
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $50,000
Other $0
Total $50,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C3002021
$0
$50,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$50,000
PROJECT TOTAL 1 $50,000
38
Traffic Sign Inventory and Reflectivity Assessment
Requesting Department: Public Works Category: Traffic
This project involves a citywide inventory of existing traffic signs and creation of a GIS layer and database for the sign inventory.
Additionally, the project includes an assessment of the retro - reflectivity of existing traffic signs to ensure the City meets current standards
enforced by the California Manual of Uniform Traffic Devices (MUTCD). Sign inventory and retro - reflectivity assessment will be performed
by a private contractor. Creation of GIS layer and database will be performed by a private contractor and /or City staff.
Location:
Citywide
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $90,000
Total $90,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C3002015
$90,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$90,000
$0
PROJECT TOTAL 1 $90,000
39
Traffic Signal Equipment Enhancement Program
Requesting Department: Public Works Category: Traffic
This project provides funding to replace worn out poles, cabinets and equipment on a proactive maintenance basis over and above basic
rehabilitation, repairs and maintenance. The goal of to extend the life of existing facilities without having to undergo major replacement and
to improve streetscape aesthetics where traffic signals exist.
Location:
Citywide
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $100,000
Total $100,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C3001008
$0
$100,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$100,000
PROJECT TOTAL 1 $100,000
40
Traffic Signal Modernization: Phase 6
Requesting Department: Public Works
Category: Traffic
Traffic Signal Modernization is a multi -year, multi - phased program to update the City's traffic signal system. Staff applied for, and received
Competitive Measure M Grant funding from OCTA to complete Phase 6 of the City's traffic signal modernization program. Phase 6 includes
installation of new hardware, fiber optic cable upgrades and CCTV cameras to intersections along San Joaquin Hills Road and Newport
Coast Drive.
Location:
San Joaquin Hills Road and Newport Coast Drive
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $816,900
Other $0
Total $816,900
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C3002018
$0
$336,900
Measure M Competitive
7284
C3002018
$0
$480,000
$0
$0
$0
$0
TOTAL
$0
$816,900
PROJECT TOTAL 1 $816,900
41
Traffic Signal Rehabilitation Program
Requesting Department: Public Works
Category: Traffic
This project provides for rehabilitation and maintenance of existing traffic signal equipment throughout the City. Work includes replacement
of hardware including control equipment, signal poles, cabinets, and re- wiring select traffic signals. Plans and specifications will be prepared
by a consultant and /or staff. Construction will be completed by a private contractor.
Location:
Citywide
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $300,000
Other $0
Total $300,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C3001007
$0
$300,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$300,000
PROJECT TOTAL 1 $300,000
42
Parks, Harbors and Beaches
Page
Fund
Project
Title
43
7231
C4402009
Balboa Marina Public Dock
44
7231
C4402006
Balboa Yacht Basin Mooring Support Services Improv.
45
7231
C4801003
Bay Beach Sand Management
46
7231
C4402012
Eelgrass Survey - Lower Harbor Shoreline
47
7231
C4402003
Lower Harbor Dredging
48
7411
C4002002
Marina Park
49
7231
C4402013
Mooring Field Realignment
50
7271
C4001000
Playground Equipment Replacement
51
7231
C4402007
Seawall and Bulkhead Modifications
52
7412
C5100515
Sunset Ridge Park
53
7231
C4402014
Vessel Waste Pumpout Station Replacement
53
7251
C4402014
Vessel Waste Pumpout Station Replacement
Total Parks, Harbors and Beaches
Rebudget
Budget
Total
$20,000
$105,000
$125,000
$25,000
$0
$25,000
$0
$300,000
$300,000
$0
$50,000
$50,000
$100,000
$0
$100,000
$6,811,730
$0
$6,811,730
$0
$25,000
$25,000
$0
$65,000
$65,000
$0
$500,000
$500,000
$9,259,276
$0
$9,259,276
$0
$20,000
$20,000
$0
$60,000
$60,000
$16,216,006
$1,125,000
$17,341,006
PC
c,9LI R��P
Requesting Department: Public Works
Balboa Marina Public Dock
Category: Parks, Harbors and Beaches
This is a joint project between The Irvine Company, which is adding slips to its existing private marina at 201 E. Coast Highway, and the
City, which proposes to build a public dock at the same location on private property. This budget is for the entitlement process only (CEQA,
permitting, and studies.) The Irvine Company proposes to fund an estimated $680,000 towards this entitlement effort with the City funding
an additional $125,000. It is anticipated that dock construction would commence in FY 2013 -14. The Irvine Company would fund the entire
construction project including the public dock component.
Location:
201 E. Coast Highway
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $125,000
Total $125,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402009
$20,000
$105,000
$0
$0
$0
$0
$0
$0
TOTAL
$20,000
$105,000
PROJECT TOTAL 1 $125,000
43
Balboa Yacht Basin Mooring Support Services Improvements
Requesting Department: Public Works Category: Parks, Harbors and Beaches
This project improves amenities for mooring permittees at the City owned Balboa Yacht Basin. This project will satisfy half of the mooring
fields while the other half will be satisfied with the future Marina Park facility. New amenities consist of 1) providing temporary, free slips for
mooring permittees for access to service their boats for short periods of time (2 -3 hours); 2) providing two power slip pedestals to be used
with a credit card; 3) potential dinghy storage racks; and 4) potential dinghy dock located at the bulkhead between docks D and E.
Location:
Balboa Yacht Basin
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $25,000
Other $0
Total $25,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402006
$25,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$25,000
$0
PROJECT TOTAL 1 $25,000
44
Bay Beach Sand Management
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
This project consists of normal sand maintenance and replenishment operations throughout the harbor's bay beaches including Balboa
Island, China Cove, Lido Isle and other locations. Additionally, some maintenance work may be undertaken on specific ocean beaches
such as Corona del Mar, and West Newport.
Location:
Various bay beaches throughout Newport Harbor
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $300,000
Total $300,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4801003
$0
$300,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$300,000
PROJECT TOTAL 1 $300,000
45
Eelgrass Survey - Lower Harbor Shoreline
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
This project consists of taking a survey of eelgrass along the lower harbor shoreline and some basic water quality analysis (light, salinity,
temperature, dissolved oxygen.) This project will help the City maintain accurate data on eelgrass distribution and quantity. These are both
important aspects for the City to understand as negotiations are underway with State and local agencies for a Newport Beach specific
eelgrass plan.
Location:
Lower Harbor shoreline
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $50,000
Total $50,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402012
$0
$50,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$50,000
PROJECT TOTAL 1 $50,000
46
Requesting Department: Public Works
Lower Harbor Dredging
Category: Parks, Harbors and Beaches
This project involves working with the US Army Corps of Engineers to develop permit documentation and approvals to dredge the entire
lower harbor area back to its design depth.
Location:
Lower Newport Bay
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $100,000
Other $0
Total $100,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402003
$100,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$100,000
$0
PROJECT TOTAL 1 $100,000
47
Marina Park
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
The Marina Park project proposes new visitor- serving marina facilities, an aquatics sports building, a community center and community
park. The Environmental Impact Report was completed in spring 2010. Upon approval by the Coastal Commission, the project's plans and
specifications will be completed by the consultant team and the project will be put out for bid. The first bid packages will be for demolition of
existing facilities and construction of the new Marina.
Location:
West Balboa Boulevard between 15th and 19th Streets
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $6,811,730
Other $0
Total $6,811,730
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Major Facilities Master Plan
7411
C4002002
$6,811,730
$0
$0
$0
$0
$0
$0
$0
TOTAL
$6,811,730
$0
PROJECT TOTAL 1 $6,811,730
48
Requesting Department: Public Works
Mooring Field Realignment
Category: Parks, Harbors and Beaches
This project consists of realigning the City's mooring fields so that all vessels are situated inside their respective fields. Harbor Resources is
in the process of obtaining federal approval for realigning the mooring fields. This project will move the individual moorings into their newly
defined field.
Location:
Mooring areas throughout Newport Harbor
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $25,000
Total $25,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402013
$0
$25,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$25,000
PROJECT TOTAL 1 $25,000
49
Playground Equipment Replacement
Requesting Department: Recreation and Senior Services
Category: Parks, Harbors and Beaches
This project will replace the existing deteriorated playground surfacing materials with new poured -in -place resilient rubber surfacing at
Mariners Park. The project also replaces the existing playground climber equipment at West Newport Park.
Location:
Mariners Park and West Newport Park
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $65,000
Total $65,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Building Excise Tax
7271
C4001000
$0
$65,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$65,000
PROJECT TOTAL 1 $65,000
50
Seawall and Bulkhead Modifications
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
This project primarily involves the selection and hiring of a consultant team to begin the process of developing conceptual design and plans
for the eventual replacement of the entire seawall around both Balboa Islands. Design efforts will also include public outreach and concept
approval, necessary CEQA review, technical support and assistance with State Lands, California Coastal Commission, other regulatory
reviews and permitting, final plan development, and construction phasing. A couple of other city bulkhead walls will be reviewed.
Necessary rehabilitations may be undertaken as part of this budgeted item.
Location:
Balboa Islands and various other locations (typically street ends) that have public walls needing rehabilitation
FY 2012 -13
Design /Environmental $500,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $500,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402007
$0
$500,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$500,000
PROJECT TOTAL 1 $500,000
51
Sunset Ridge Park
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
The project provides a new park in West Newport with active and passive uses. When completed, Sunset Ridge Park will provide baseball
and soccer fields, restrooms and picnic facilities, flower gardens and coastal views. The project also includes the creation of several acres
of environmental habitat for endangered species.
Location:
West Coast Highway and Superior Avenue
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $9,259,276
Other $0
Total $9,259,276
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Major Facilities Master Plan
7412
C5100515
$9,259,276
$0
$0
$0
$0
$0
$0
$0
TOTAL
$9,259,276
$0
PROJECT TOTAL $9,259,276
52
Vessel Waste Pumpout Station Replacement
Requesting Department: Public Works
Category: Parks, Harbors and Beaches
This project consists of replacing the harbor's five vessel waste pumpout stations which are aging and have exceeded their expected life
due to heavy usage by the public. The Department of Boating and Waterways provides grants to cover 75% of the cost of purchase and
installation. Majority funding for this project comes from a grant from the Department of Boating and Waterways.
Location:
Pumpout stations are located at Washington Street, Fernando Street, 15th Street, and the Balboa Yacht Basin
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $80,000
Total $80,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402014
$0
$20,000
Contributions
7251
04402014
$0
$60,000
$0
$0
$0
$0
TOTAL
$0
$80,000
PROJECT TOTAL 1 $80,000
53
Water Quality and Environmental
Page
Fund
Project
Title
54
7251
C5002004
Big Canyon Wash Restoration
54
7014
C5002004
Big Canyon Wash Restoration
55
7255
C5002005
Newport Coast ASBS Protection Program
55
7255
C5002007
Newport Coast ASBS Protection Program
55
7255
C5002008
Newport Coast ASBS Protection Program
Total Water Quality and Environmental
Rebudget
Budget
Total
$1,500,000
$0
$1,500,000
$75,000
$0
$75,000
$305,000
$0
$305,000
$45,000
$0
$45,000
$112,000
$0
$112,000
$2,037,000
$0
$2,037,000
PC
c,9LI R��P
Big Canyon Wash Restoration
Requesting Department: Public Works
Category: Water Quality and Environmental
Upland locations of the Big Canyon Wash area west of Jamboree Road will be targeted for restoration including removing invasive plants,
replanting with native plants and restoring trails. This is the first phase of the multi -phase plan to restore the canyon.
Location:
Big Canyon bounded by Jamboree Road to the east, Eastbluff Apartments and Villa Granada community to the north,
Backbay Drive to the west, and Park Newport community to the south.
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,575,000
Other $0
Total $1,575,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C5002004
$75,000
$0
Contributions
7251
C5002004
$1,500,000
$0
$0
$0
$0
$0
TOTAL
$1,575,000
$0
PROJECT TOTAL 1 $1,575,000
54
Newport Coast ASBS Protection Program
Requesting Department: Public Works
Category: Water Quality and Environmental
With receipt of State Proposition 84 grant funds, several water quality improvements are planned in the Newport Coast and Big Canyon
watersheds and Areas of Special Biological Significance (ASBS). One project improves Crystal Cove State Park's easterly parking lot and
redesigns the pond area at the mouth of Los Trancos State Park ($305,000). Staff is responsible for securing permitting and environmental
documents. Construction is anticipated to start in FY 2012 -13. Funds will also support tasks for the Runoff Reduction Program and Public
Impact Reduction Program ($112,000) including the design of informational signage at Little Corona and other ASBS sites and purchase of
a vehicle to house "Touch Tanks" with marine life.
Location:
Newport Coast and Big Canyon watersheds and adjacent Areas of Special Biological Significance
Design/Environmental
Right -of -Way, Land Acquisition
Construction
FY 2012 -13
$0
$0
$305,000
Other $157,000
Total $462,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Environmental Contributions
7255
C5002005
$305,000
$0
Environmental Contributions
7255
C5002007
$45,000
$0
Environmental Contributions
7255
C5002008
$112,000
$0
$0
TOTAL
$462,000
$0
PROJECT TOTAL 1 $462,000
55
►/, - A
Page
Fund
Project
Title
Rebudget
Budget
Total
56
7513
C6002010
16th Street Pump Station Capacity Modifications
$100,000
$0
$100,000
57
7511
C6002011
Big Canyon Reservoir Floating Cover Replacement
$0
$3,965,000
$3,965,000
58
7511
C6002008
Corona del Mar Water Transmission Main Improvements
$2,765,766
$0
$2,765,766
59
7502
C6002013
Pump Station and Well Site VFD Improvements
$0
$450,000
$450,000
60
7502
C6002012
Transmission Main Cathodic Program
$0
$150,000
$150,000
61
7511
C6001000
Water Main Master Plan Program
$0
$1,500,000
$1,500,000
Total Water
$2,865,766
$6,065,000
$8,930,766
PC
c,9LI R��P
16th Street Pump Station Capacity Modifications
Requesting Department: Municipal Operations Category: Water
This project will identify pump station improvements at the 16th Street Pump Station located at the City's Utilities Yard. The station was
constructed in 1995 as part of the Groundwater Development Project. Staff identified possible improvements to increase capacity and
improve efficiency. The pumps and motors are aging and need to be replaced. Upsizing the motors and installing variable frequency
drives to replace the fixed starters may be considered. This year's efforts will focus on pre- design to review possible options for the
station.
Location:
16th Street Utilities Yard
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $100,000
Total $100,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7513
C6002010
$100,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$100,000
$0
PROJECT TOTAL 1 $100,000
56
Big Canyon Reservoir Floating Cover Replacement
Requesting Department: Municipal Operations Category: Water
This project involves removing and replacing the floating cover at the Big Canyon Reservoir. The floating cover was installed in 2005 and is
showing signs of failure. Plans and specifications will be prepared by consultant. Construction will be performed by a private contractor.
Location:
Big Canyon Reservoir
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $3,965,000
Other $0
Total $3,965,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7511
C6002011
$0
$3,965,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$3,965,000
PROJECT TOTAL 1 $3,965,000
57
Corona del Mar Water Transmission Main Improvements
Requesting Department: Municipal Operations Category: Water
This project will construct a new 36 -inch Transmission Main between the Big Canyon Reservoir and East Coast Highway at MacArthur
Boulevard. The project also installs a 24 -inch Transmission Main between East Coast Highway and Bayside Drive that serves the
Peninsula Point area. Water supply and fire flow to the eastern portion of the system will be improved as identified in the City's Water
Master Plan. The project also includes the replacement and relocation of a connection to the Metropolitan Water District System (CM -1) in
the same general area. Plans and specifications are currently being prepared by consultant. Construction will be performed by a private
contractor.
Location:
San Miguel Drive, MacArthur Boulevard and Carnation Avenue
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $2,765,766
Other $0
Total $2,765,766
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7511
C6002008
$2,765,766
$0
$0
$0
$0
$0
$0
$0
TOTAL
$2,765,766
$0
PROJECT TOTAL 1 $2,765,766
58
Pump Station and Well Site VFD Improvements
Requesting Department: Municipal Operations
Category: Water
The project involves removing and replacing the existing electrical starters and motors at the Dolphin and Tamura Wells and 16th Street
pump station with new variable frequency drive starters and inverter motors. Water production efficiency is expected to be improved and
electrical consumption reduced by approximately 25 percent. Energy savings and incentives will in turn pay for the project costs. The
calculated payback period for the Dolphin and Tamura Wells is estimated to be one year. There are currently five booster pumps at the
16th Street station. Depending on the number of pumps that will be improved as part of this project, the maximum payback period is
estimated to be six years. Plans and specifications will be prepared by consultant. Construction will be performed by a private contractor.
Location:
16th Street Utilities Yard and Fountain Valley Well Field
FY 2012 -13
Design /Environmental $50,000
Right -of -Way, Land Acquisition $0
Construction $400,000
Other $0
Total $450,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7502
C6002013
$0
$450,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$450,000
PROJECT TOTAL 1 $450,000
59
Transmission Main Cathodic Program
Requesting Department: Municipal Operations Category: Water
This project involves the replacement of sacrificial anodes that were installed when the major transmission mains were built in the mid
1990s as part of the groundwater development system. Anodes were placed on these metal pipelines to minimize corrosion of the
pipelines and extend their useful life. A recent report has shown that the anodes have been depleted and that corrosion is now able to
impact the transmission mains. It is recommended that new anodes be installed throughout the various transmission main systems. Plans
and specifications will be prepared by consultant. Construction will be performed by a private contractor.
Location:
Various
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $150,000
Other $0
Total $150,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7502
C6002012
$0
$150,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$150,000
PROJECT TOTAL 1 $150,000
ED
Water Main Master Plan Program
Requesting Department: Municipal Operations Category: Water
This project involves the removal and replacement of older cast iron water mains identified in the Water Master Plan. This year's project will
focus on pipelines near River Avenue between 41st and 44th Streets that have experienced breaks several times in the past few years.
Lines in Corona del Mar south of East Coast Highway will also be replaced in concert with the CDM Transmission Main Project. Other
smaller segments might also be replaced throughout other parts of the City. Plans and specifications will be prepared by staff.
Construction will be performed by a private contractor.
Location:
Various
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,500,000
Other $0
Total $1,500,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7511
C6001000
$0
$1,500,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$1,500,000
PROJECT TOTAL 1 $1,500,000
61
Page
Fund
Project
Title Department
Rebudget
Budget
Total
62
7541
C7002004
Big Canyon / Port Streets Sewer Diversion Improvements
$150,000
$0
$150,000
63
7541
C7002005
Saint James Road Sewer Relocation
$233,900
$0
$233,900
64
7541
C7001002
Sewer Pipeline Point Repairs and Lining
$0
$75,000
$75,000
65
7541
C5600934
Wastewater Master Plan Rate Study
$100,000
$25,000
$125,000
Total Wastewater
$483,900
$100,000
$583,900
PC
c,9LI R��P
Big Canyon and Port Streets Sewer Diversion Improvements
Requesting Department: Municipal Operations Category: Wastewater
Two subdrains and an underdrain in the vicinity of Big Canyon Reservoir are suspected to have high concentrations of selenium. Low flow
diversions to the sewer of these sources will help reduce downstream impacts. Staff will design diversions at three points (Port Streets,
Yacht Streets, Reservoir) to the sanitary sewer.
Location:
San Miguel Drive and Newport Hill Drive East
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $150,000
Other $0
Total $150,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Wastewater Enterprise
7541
C7002004
$150,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$150,000
$0
PROJECT TOTAL 1 $150,000
FE'
Saint James Road Sewer Relocation
Requesting Department: Municipal Operations Category: Wastewater
This project relocates the sewer main behind homes along Saint James Road to a property below the hillside at 745 Dover Drive. Plans are
underway to construct a new medical office building at 745 Dover Drive. With the lot cleared, there is an opportunity to move the hillside
sewer to a more accessible location, which was recommended in a recently completed Master Plan. Plans will be prepared by staff and /or
a consultant. Construction will be performed by a private contractor.
Location:
St. James Road and 745 Dover Drive
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $233,900
Other $0
Total $233,900
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Wastewater Enterprise
7541
C7002005
$233,900
$0
$0
$0
$0
$0
$0
$0
TOTAL
$233,900
$0
PROJECT TOTAL 1 $233,900
63
Sewer Pipeline Point Repairs and Lining
Requesting Department: Municipal Operations Category: Wastewater
Wastewater Discharge Regulations require the City wastewater system to be inspected with cameras. Sewer line areas discovered to be
damaged, deteriorated or problematic are packaged into projects so repairs can be made. This program funds these ongoing repair
projects.
Location:
Citywide
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $75,000
Other $0
Total $75,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Wastewater Enterprise
7541
C7001002
$0
$75,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$75,000
PROJECT TOTAL 1 $75,000
64
Wastewater Master Plan Rate Study
Requesting Department: Municipal Operations Category: Wastewater
This project provides funding for a comprehensive Wastewater and Reclaimed Water Rate Study. Staff recently completed the Wastewater
Master Plan. The next step is to determine the necessary funding to construct recommended improvements and to review the City's rate
structure. Also, the reclaimed water system, constructed ten years ago by the Orange County Water District, will be studied to assess
current and potential future users for maximum use. Reclaimed water rates were set when the reclaimed water system was constructed.
The work also includes an analysis of those rates as part of wastewater rate structure review.
Location:
N/A
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $125,000
Total $125,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Wastewater Enterprise
7541
C5600934
$100,000
$25,000
$0
$0
$0
$0
$0
$0
TOTAL
$100,000
$25,000
PROJECT TOTAL 1 $125,000
65
Miscellaneous
Page
Fund
Project
Title
66
7014
C8002031
Local Coastal Program Plan Implementation
67
7459
C5100879
Santa Ana Heights Utility Undergrounding
68
7014
C8002022
SCE Rule 20A Credits Purchase
Total Miscellaneous
Department
Rebudget
$0
$1,170,800
$0
$1,170,800
Budget
$75,000
$0
$974,000
$1,049,000
Total
$75,000
$1,170,800
$974,000
$2,219,800
PC
c,9LI R��P
Local Coastal Program Plan Implementation
Requesting Department: Community Development Category: Miscellaneous
The City has a certified Coastal Land Use Plan (LUP), but has not yet developed its Implementation Plan (IP). Approximately 70 "Approval
in Concepts" are processed each year. A certified LCP eliminates the burden of obtaining coastal development permits from the Coastal
Commission, reducing time and expenses to develop in the community. Development of the IP would require assistance from an outside
consultant to write the document, develop the CEQA documentation and conduct a public outreach program. Special studies may also be
required such as assessing alternative transportation (shuttles, off - peninsula parking, etc) and lower cost visitor accommodations.
Location:
N/A
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $75,000
Total $75,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C8002031
$0
$75,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$75,000
PROJECT TOTAL 1 $75,000
M
Santa Ana Heights Utility Undergrounding
Requesting Department: Public Works Category: Miscellaneous
This project provided for the design and construction of underground utility facilities in Santa Ana Heights and rehabilitation of the area's
streets pursuant to City Council action on October 11, 2005, and County Board of Supervisors action on March 27, 2007. The Amended
Engineer's Report and Revised Boundary Map and related agreements with the County of Orange were approved by the City Council at its
meeting of March 24, 2009.
Location:
Santa Ana Heights
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,170,800
Other $0
Total $1,170,800
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Santa Ana Heights
7459
C5100879
$1,170,800
$0
$0
$0
$0
$0
$0
$0
TOTAL
$1,170,800
$0
PROJECT TOTAL $1,170,800
67
SCE Rule 20A Credits Purchase
Requesting Department: Public Works Category: Miscellaneous
This provides funding for the purchase of SCE Rule 20A utility undergrounding funding credits from other agencies willing to sell their
surplus credits. Last fiscal year, the City was able to purchase surplus credit at a 50% discount from another City. Staff expects to
purchase additional Rule 20A credits this fiscal year with similar terms to advance the City's next Rule 20A priority project. Rule 20A
projects generally convert overhead utility facilities to underground where there is a benefit to the general public such as along a major
traffic corridor.
Location:
N/A
FY 2012 -13
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $974,000
Total $974,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C8002022
$0
$974,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$974,000
PROJECT TOTAL 1 $974,000
02