Loading...
HomeMy WebLinkAboutAppendix B - UrbemisPage:1 713/2008 8:06:25 AM Urbemis 2007 Version 9.2.4 Combined Summer Emissions Reports (Pounds /Day) File Name: F: \USERS \PLN \Shared \Russells Shortcuts \Big Canyon Urbemis \1 Big Canyon.urb924 Project Name: single family dwelling Project Location: Orange County On -Road Vehicle Emissions Based on: Version : Emfac2007 V2.3 Nov 1 2006 Off -Road Vehicle Emissions Based on: OFFROAD2007 Page: 2 7/3/2008 8:06:25 AM Summary Report: CONSTRUCTION EMISSION ESTIMATES ROG LM QQ aM PM10 Dust PM10 Exhaust PM10 PM2.5 Dust PM2 5 PM2.5 0.02 OPERATIONAL (VEHICLE) EMISSION ESTIMATES 136.00 S02 Exhaust 2009 TOTALS (Ibs /day unmitigated) 5.22 54.43 2424 0.03 9.72 2.47 12.19 2.05 2.27 4.31 2010 TOTALS (Ibs /day unmitigated) 13.24 26.26 13.89 0.00 9.61 1.30 10.91 2.01 1.20 120 AREA SOURCE EMISSION ESTIMATES Construction Unmitigated Detail Report: CONSTRUCTION EMISSION ESTIMATES Summer Pounds Per Day, Unmitigated ROG NOx CO CO S02 PM10 PM2.5 CO2 0.06 0.00 0.00 0.00 20.86 CO S02 PM10 PM2.5 CO2 1.24 0.00 0.19 0.04 115.14 CO ROG NOx TOTALS (Ibs /day, unmitigated) 0.06 0.02 OPERATIONAL (VEHICLE) EMISSION ESTIMATES 136.00 S02 PM10 Dust ROG NOx TOTALS (Ibs /day, unmitigated) 0.10 0.12 SUM OF AREA SOURCE AND OPERATIONAL EMISSION ESTIMATES ROG NOx TOTALS (Ibs /day, unmitigated) 0.16 0.14 Construction Unmitigated Detail Report: CONSTRUCTION EMISSION ESTIMATES Summer Pounds Per Day, Unmitigated ROG NOx CO CO S02 PM10 PM2.5 CO2 0.06 0.00 0.00 0.00 20.86 CO S02 PM10 PM2.5 CO2 1.24 0.00 0.19 0.04 115.14 CO S02 PM10 PM2.5 CO2 1.30 0.00 0.19 0.04 136.00 S02 PM10 Dust PM10 Exhaust PM10 PM2.5 Dust PM2.5 Exhaust PM2.5 CO2 5,903.80 2,541.30 CO2 Page: 3 7/3/2008 8:06:25 AM Time Slice 0110112009- 0110212009 1.26 8.22 5.84 0.00 0.01 0.64 0.65 0.00 0.59 0.59 824.78 Active Days: 2 Demolition 01/01/2009- 1.26 822 5.84 0.00 0.01 0.64 0.65 0.00 0.59 0.59 824.78 01/0312009 Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Demo Off Road Diesel 1.23 8.15 4.78 0.00 0.00 0.64 0.64 0.00 0.59 0.59 700.30 Demo On Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Demo Worker Trips 0.03 0.06 1.06 0.00 0.01 0.00 0.01 0.00 0.00 0.00 124.48 Time Slice 01/0512009- 01123/2009 5.22 54.43 24.24 0.03 9.72 2.47 12.19 2.05 2.27 4.31 5.903.80 Active Days: 15 Mass Grading 01/05/2009- 5.22 54.43 24.24 0.03 9.72 2.47 12.19 2.05 2.27 4.31 5,903.80 01/25/2009 Mass Grading Dust 0.00 0.00 0.00 0.00 9.60 0.00 9.60 2.00 0.00 2.00 0.00 Mass Grading Off Road Diesel 3.18 26.46 12.98 0.00 0.00 1.33 1.33 0.00 1.23 1.23 2,247.32 Mass Grading On Road Diesel 2.00 27.91 10.21 0.03 0.12 1.13 1.25 0.04 1.04 1.08 3,532.00 Mass Grading Worker Trips 0.03 0.06 1.06 0.00 0.01 0.00 0.01 0.00 0.00 0.00 124.48 Time Slice 01/2612009- 01/30/2009 2.21 18.96 9.38 0.00 0.01 0.93 0.94 0.00 0.86 0.86 1,839.12 Active Days: 5 Trenching 01126/2009- 01/30/2009 2.21 18.96 9.38 0.00 0.01 0.93 0.94 0.00 0.86 0.86 1,839.12 Trenching Off Road Diesel 2.18 18.90 8.32 0.00 0.00 0.93 0.93 0.00 0.86 0.86 1,714.64 Trenching Worker Trips 0.03 0.06 1.06 0.00 0.01 0.00 0.01 0.00 0.00 0.00 124.48 Time Slice 02/0212009- 12131/2009 1.30 9.83 5.11 0.00 0.00 0.64 0.64 0.00 0.58 0.58 916.02 Active Days: 239 Building 01/31/2009- 0113112010 1.30 9.83 5.11 0.00 0.00 0.64 0.64 0.00 0.58 0.58 916.02 Building Off Road Diesel 1.30 9.79 4.94 0.00 0.00 0.63 0.63 0.00 0.58 0.58 893.39 Building Vendor Trips 0.00 0.03 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.70 Building Worker Trips 0.00 0.01 0.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.93 Page: 4 7/3/2008 8:06:25 AM Time Slice 01/01/2010 - 01/29/2010 1.21 9.20 4.97 0.00 0.00 0.58 0.58 0.00 0.53 0.53 916.01 Active Days: 21 Building 01/31/2009- 01/31/2010 1.21 920 4.97 0.00 0.00 0.58 0.58 0.00 0.53 0.53 916.01 Building Off Road Diesel 1.21 9.16 4.81 0.00 0.00 0.58 0.58 0.00 0.53 0.53 893.39 Building Vendor Trips 0.00 0.02 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.70 Building Worker Trips 0.00 0.01 0.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.92 Time Slice 02/01/2010 - 02/05/2010 3.12 26_26 13_89 0.00 961 1.30 10_91 2.01 1.20 120 2,541.30 Active Days: 5 Fine Grading 02/0112010- 3.12 26.26 13.89 0.00 9.61 1.30 10.91 2.01 1.20 3.20 2,541.30 02/05/2010 Fine Grading Dust 0.00 0.00 0.00 0.00 9.60 0.00 9.60 2.00 0.00 2.00 0.00 Fine Grading Off Road Diesel 3.00 24.99 12.46 0.00 0.00 1.25 1.25 0.00 1.15 1.15 2,247.32 Fine Grading On Road Diesel 0.09 1.22 0.45 0.00 0.01 0.05 0.05 0.00 0.04 0.05 169.54 Fine Grading Worker Trips 0.03 0.06 0.98 0.00 0.01 0.00 0.01 0.00 0.00 0.00 124.44 Time Slice 02/08/2010- 02/1112010 2.33 13.04 9.09 QO0 0.02 1.07 1.09 0.01 0.99 0.99 1,343.06 Active Days: 4 Asphalt 02 /06/2010- 02/11/2010 2.33 13.04 9.09 0.00 0.02 1.07 1.09 0.01 0.99 0.99 1,343.06 Paving Off -Gas 0.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Paving Off Road Diesel 1.95 11.89 6.98 0.00 0.00 1.03 1.03 0.00 0.94 0.94 979.23 Paving On Road Diesel 0.08 1.05 0.38 0.00 0.00 0.04 0.05 0.00 0.04 0.04 146.06 Paving Worker Trips 0.05 0.10 1.72 0.00 0.01 0.01 0.02 0.00 0.00 0.01 217.78 Time Slice 02/12/2010 - 02/12/2010 13.24 0.03 0.60 0.00 0.00 0.00 0.01 0.00 0.00 0.00 75.60 Active Days: 1 Coating 02/12/2010 - 02/13/2010 13.24 0.03 0.60 0.00 0.00 0.00 0.01 0.00 0.00 0.00 75.60 Architectural Coating 13.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Coating Worker Trips 0.02 0.03 0.60 0.00 0.00 0.00 0.01 0.00 0.00 0.00 75.60 Page: 5 7/3/2008 8:06:25 AM Phase: Demolition 0110112009 - 01/0312009 - Default Demolition Description Building Volume Total (cubic feet): 0 Building Volume Daily (cubic feet): 0 On Road Truck Travel (VMT): 0 Off -Road Equipment: 1 Concrete /Industrial Saws (10 hp) operating at a 0.73 load factor for 8 hours per day 1 Rubber Tired Dozers (357 hp) operating at a 0.59 load factor for 1 hours per day 2 Tractors /Loaders /Backhoes (108 hp) operating at a 0.55 load factor for 6 hours per day Phase: Fine Grading 02/01/2010 - 02/05/2010 - Default Fine Site Grading /Excavation Description Total Acres Disturbed: 1.9 Maximum Daily Acreage Disturbed: 0.48 Fugitive Dust Level of Detail: Default 20 Ibs per acre -day On Road Truck Travel (VMT): 40 Off -Road Equipment: 1 Graders (174 hp) operating at a 0.61 load factor for 6 hours per day 1 Rubber Tired Dozers (357 hp) operating at a 0.59 load factor for 6 hours per day 1 Tractors /Loaders /Backhoes (108 hp) operating at a 0.55 load factor for 7 hours per day 1 Water Trucks (189 hp) operating at a 0.5 load factor for 8 hours per day Phase: Mass Grading 0110512009 - 01/25/2009 - Default Mass Site Grading /Excavation Description Total Acres Disturbed: 1.9 Maximum Daily Acreage Disturbed: 0.48 Fugitive Dust Level of Detail: Default 20 Ibs per acre -day On Road Truck Travel (VMT): 833.33 Off -Road Equipment: Page: 6 7/3/2008 8:06:25 AM 1 Graders (174 hp) operating at a 0.61 load factor for 6 hours per day 1 Rubber Tired. Dozers (357 hp) operating at a 0.59 load factor for 6 hours per day 1 Tractors /Loaders /Backhoes (108 hp) operating at a 0.55 load factor for 7 hours per day 1 Water Trucks (189 hp) operating at a 0.5 load factor for 8 hours per day Phase: Trenching 01/26/2009 - 01/30/2009 - Default Trenching Description Off -Road Equipment: 2 Excavators (168 hp) operating at a 0.57 load factor for 8 hours per day 1 Other General Industrial Equipment (238 hp) operating at a 0.51 load factor for 8 hours per day 1 Tractors /Loaders /Backhoes (108 hp) operating at a 0.55 load factor for 0 hours per day Phase: Paving 02/06/2010 - 02/11/2010 - Default Paving Description Acres to be Paved: 0.48 Off -Road Equipment: 4 Cement and Mortar Mixers (10 hp) operating at a 0.56 load factor for 6 hours per day 1 Pavers If 00 hp) operating at a 0.62 load factor for 7 hours per day 1 Rollers (95 hp) operating at a 0.56 load factor for 7 hours per day 1 Tractors /Loaders /Backhoes (108 hp) operating at a 0.55 load factor for 7 hours per day Phase: Building Construction 01/31/2009 - 01/3112010 - Default Building Construction Description Off -Road Equipment: 1 Cranes (399 hp) operating at a 0.43 load factor for 4 hours per day 2 Forklifts (145 hp) operating at a 0.3 load factor for 6 hours per day 1 Tractors /Loaders /Backhoes (108 hp) operating at a 0.55 load factor for 8 hours per day Phase: Architectural Coating 02/12/2010 - 0211312010 - slury seal Rule: Residential Interior Coatings begins 01/01/2005 ends 06130/2008 specifies a VOC of 100 Rule: Residential Interior Coatings begins 07/01/2008 ends 1213112040 specifies a VOC of 50 Rule: Residential Exterior Coatings begins 01/01/2005 ends 06/30/2008 specifies a VOC of 250 Rule: Residential Exterior Coatings begins 07/01/2008 ends 12/31/2040 specifies a VOC of 100 Page: 7 7/3/2008 8:06:25 AM Rule: Nonresidential Interior Coatings begins 01/01/2005 ends 12/3112040 specifies a VOC of 250 Rule: Nonresidential Exterior Coatings begins 0110112005 ends 12/3112040 specifies a VOC of 250 Area Source Unmitigated Detail Report: AREA SOURCE EMISSION ESTIMATES Summer Pounds Per Day, Unmitigated Source BQa NM Q4 am PM10 PMZ 5 CQ2 Natural Gas 0.00 0.02 0.01 0.00 0.00 0.00 20.79 Hearth - No Summer Emissions Landscape 0.01 0.00 0.05 0.00 0.00 0.00 0.07 Consumer Products 0.05 Architectural Coatings 0.00 TOTALS (Ibs /day, unmitigated) 0.06 0.02 0.06 0.00 0.00 0.00 20.86 Area Source Changes to Defaults Length of summer period for landscape equipment changed from 365 days to 90 days Operational Unmitigated Detail Report: OPERATIONAL EMISSION ESTIMATES Summer Pounds Per Day, Unmitigated Source ROG NOX CO SO2 PM10 PM25 CO2 Single family housing 0.10 0.12 1.24 0.00 0.19 0.04 115.14 TOTALS (Ibs /day, unmitigated) 0.10 0.12 1.24 0.00 0.19 0.04 115.14 Operational Settings: Page: 8 7/3/2008 8:06:25 AM Does not include correction for passby trips Does not include double counting adjustment for internal trips Analysis Year: 2009 Temperature (F): 80 Season: Summer Emfac: Version : Emfac2007 V2.3 Nov 1 2006 Land Use Type Single family housing Vehicle Type Light Auto Light Truck < 3750 Ibs Light Truck 3751 -5750 Ibs Mad Truck 5751 -8500 Ibs Lite -Heavy Truck 8501- 10,000 Ibs Lite -Heavy Truck 10,001- 14,000 Ibs Med -Heavy Truck 14,001- 33,000 Ibs Heavy -Heavy Truck 33,001- 60,000 Ibs Other Bus Urban Bus Motorcycle School Bus Motor Home Summary of Land Acreage Trip Rate Uses Unit Type No. Units Total Trips Total WIT 1.90 11.15 dwelling units 1.00 11.15 112.65 11.15 112.65 Vehicle Fleet Percent Type Mix Non - Catalyst Catalyst Diesel 51.5 1.4 98.2 0.4 7.0 2.9 94.2 2.9 23.8 0.4 99.6 0.0 10.6 0.9 99.1 0.0 1.6 0.0 81.2 18.8 0.5 0.0 60.0 40.0 0.9 0.0 22.2 77.8 0.2 0.0 0.0 100.0 0.1 0.0 0.0 100.0 0.0 0.0 0.0 0.0 2.9 72.4 27.6 0.0 0.1 0.0 0.0 100.0 0.8 0.0 87.5 12.5 Page:9 7/312008 8:06:25 AM Urban Trip Length (miles) Rural Trip Length (miles) Trip speeds (mph) % of Trips - Residential % of Trips - Commercial (by land use) Travel Conditions Residential Commercial Home -Work Home -Shop Home -Other Commute Non -Work Customer 12.7 7.0 9.5 13.3 7.4 8.9 17.6 12.1 14.9 15.4 9.6 12.6 30.0 30.0 30.0 30.0 30.0 30.0 32.9 18.0 49.1 Page:1 713/2008 8:06:40 AM Urbemis 2007 Version 9.2.4 Combined Winter Emissions Reports (Pounds /Day) File Name: F: \USERS \PLN \Shared \Russells Shortcuts \Big Canyon Urbemis \1 Big Canyon.urb924 Project Name: single family dwelling Project Location: Orange County On -Road Vehicle Emissions Based on: Version : Emfac2007 V2.3 Nov 1 2006 Off -Road Vehicle Emissions Based on: OFFROAD2007 Page: 2 7/3/2008 8:06:40 AM Summary Report: CONSTRUCTION EMISSION ESTIMATES ROG LM QQ aM PM10 Dust PM10 Exhaust PM10 PM2.5 Dust PM2 5 PM2.5 0.03 OPERATIONAL (VEHICLE) EMISSION ESTIMATES 143.97 S02 Exhaust 2009 TOTALS (Ibs /day unmitigated) 5.22 54.43 2424 0.03 9.72 2.47 12.19 2.05 2.27 4.31 2010 TOTALS (Ibs /day unmitigated) 13.24 26.26 13.89 0.00 9.61 1.30 10.91 2.01 1.20 120 AREA SOURCE EMISSION ESTIMATES Construction Unmitigated Detail Report: CONSTRUCTION EMISSION ESTIMATES Winter Pounds Per Day, Unmitigated ROG NOx CO CO S02 PM10 PM2.5 CO2 0.44 0.00 0.07 0.06 39.82 CO S02 PM10 PM2.5 CO2 1.19 0.00 0.19 0.04 104.15 CO ROG NOx TOTALS (Ibs /day, unmitigated) 0.21 0.03 OPERATIONAL (VEHICLE) EMISSION ESTIMATES 143.97 S02 PM10 Dust ROG NOx TOTALS (Ibs /day, unmitigated) 0.11 0.15 SUM OF AREA SOURCE AND OPERATIONAL EMISSION ESTIMATES ROG NOx TOTALS (Ibs /day, unmitigated) 0.32 0.18 Construction Unmitigated Detail Report: CONSTRUCTION EMISSION ESTIMATES Winter Pounds Per Day, Unmitigated ROG NOx CO CO S02 PM10 PM2.5 CO2 0.44 0.00 0.07 0.06 39.82 CO S02 PM10 PM2.5 CO2 1.19 0.00 0.19 0.04 104.15 CO S02 PM10 PM2.5 CO2 1.63 0.00 0.26 0.10 143.97 S02 PM10 Dust PM10 Exhaust PM10 PM2.5 Dust PM2.5 Exhaust PM2.5 CO2 5,903.80 2,541.30 CO2 Page: 3 7/3/2008 8:06:40 AM Time Slice 0110112009- 0110212009 1.26 8.22 5.84 0.00 0.01 0.64 0.65 0.00 0.59 0.59 824.78 Active Days: 2 Demolition 01/01/2009- 1.26 822 5.84 0.00 0.01 0.64 0.65 0.00 0.59 0.59 824.78 01/0312009 Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Demo Off Road Diesel 1.23 8.15 4.78 0.00 0.00 0.64 0.64 0.00 0.59 0.59 700.30 Demo On Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Demo Worker Trips 0.03 0.06 1.06 0.00 0.01 0.00 0.01 0.00 0.00 0.00 124.48 Time Slice 01/0512009- 01123/2009 5.22 54.43 24.24 0.03 9.72 2.47 12.19 2.05 2.27 4.31 5.903.80 Active Days: 15 Mass Grading 01/05/2009- 5.22 54.43 24.24 0.03 9.72 2.47 12.19 2.05 2.27 4.31 5,903.80 01/25/2009 Mass Grading Dust 0.00 0.00 0.00 0.00 9.60 0.00 9.60 2.00 0.00 2.00 0.00 Mass Grading Off Road Diesel 3.18 26.46 12.98 0.00 0.00 1.33 1.33 0.00 1.23 1.23 2,247.32 Mass Grading On Road Diesel 2.00 27.91 10.21 0.03 0.12 1.13 1.25 0.04 1.04 1.08 3,532.00 Mass Grading Worker Trips 0.03 0.06 1.06 0.00 0.01 0.00 0.01 0.00 0.00 0.00 124.48 Time Slice 01/2612009- 01/30/2009 2.21 18.96 9.38 0.00 0.01 0.93 0.94 0.00 0.86 0.86 1,839.12 Active Days: 5 Trenching 01126/2009- 01/30/2009 2.21 18.96 9.38 0.00 0.01 0.93 0.94 0.00 0.86 0.86 1,839.12 Trenching Off Road Diesel 2.18 18.90 8.32 0.00 0.00 0.93 0.93 0.00 0.86 0.86 1,714.64 Trenching Worker Trips 0.03 0.06 1.06 0.00 0.01 0.00 0.01 0.00 0.00 0.00 124.48 Time Slice 02/0212009- 12131/2009 1.30 9.83 5.11 0.00 0.00 0.64 0.64 0.00 0.58 0.58 916.02 Active Days: 239 Building 01/31/2009- 0113112010 1.30 9.83 5.11 0.00 0.00 0.64 0.64 0.00 0.58 0.58 916.02 Building Off Road Diesel 1.30 9.79 4.94 0.00 0.00 0.63 0.63 0.00 0.58 0.58 893.39 Building Vendor Trips 0.00 0.03 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.70 Building Worker Trips 0.00 0.01 0.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.93 Page: 4 7/3/2008 8:06:40 AM Time Slice 01/01/2010 - 01/29/2010 1.21 9.20 4.97 0.00 0.00 0.58 0.58 0.00 0.53 0.53 916.01 Active Days: 21 Building 01/31/2009- 01/31/2010 1.21 920 4.97 0.00 0.00 0.58 0.58 0.00 0.53 0.53 916.01 Building Off Road Diesel 1.21 9.16 4.81 0.00 0.00 0.58 0.58 0.00 0.53 0.53 893.39 Building Vendor Trips 0.00 0.02 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.70 Building Worker Trips 0.00 0.01 0.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.92 Time Slice 02/01/2010 - 02/05/2010 3.12 26_26 13_89 0.00 961 1.30 10_91 2.01 1.20 120 2,541.30 Active Days: 5 Fine Grading 02/0112010- 3.12 26.26 13.89 0.00 9.61 1.30 10.91 2.01 1.20 3.20 2,541.30 02/05/2010 Fine Grading Dust 0.00 0.00 0.00 0.00 9.60 0.00 9.60 2.00 0.00 2.00 0.00 Fine Grading Off Road Diesel 3.00 24.99 12.46 0.00 0.00 1.25 1.25 0.00 1.15 1.15 2,247.32 Fine Grading On Road Diesel 0.09 1.22 0.45 0.00 0.01 0.05 0.05 0.00 0.04 0.05 169.54 Fine Grading Worker Trips 0.03 0.06 0.98 0.00 0.01 0.00 0.01 0.00 0.00 0.00 124.44 Time Slice 02/08/2010- 02/1112010 2.33 13.04 9.09 QO0 0.02 1.07 1.09 0.01 0.99 0.99 1,343.06 Active Days: 4 Asphalt 02 /06/2010- 02/11/2010 2.33 13.04 9.09 0.00 0.02 1.07 1.09 0.01 0.99 0.99 1,343.06 Paving Off -Gas 0.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Paving Off Road Diesel 1.95 11.89 6.98 0.00 0.00 1.03 1.03 0.00 0.94 0.94 979.23 Paving On Road Diesel 0.08 1.05 0.38 0.00 0.00 0.04 0.05 0.00 0.04 0.04 146.06 Paving Worker Trips 0.05 0.10 1.72 0.00 0.01 0.01 0.02 0.00 0.00 0.01 217.78 Time Slice 02/12/2010 - 02/12/2010 13.24 0.03 0.60 0.00 0.00 0.00 0.01 0.00 0.00 0.00 75.60 Active Days: 1 Coating 02/12/2010 - 02/13/2010 13.24 0.03 0.60 0.00 0.00 0.00 0.01 0.00 0.00 0.00 75.60 Architectural Coating 13.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Coating Worker Trips 0.02 0.03 0.60 0.00 0.00 0.00 0.01 0.00 0.00 0.00 75.60 Page: 5 7/3/2008 8:06:40 AM Phase: Demolition 0110112009 - 01/0312009 - Default Demolition Description Building Volume Total (cubic feet): 0 Building Volume Daily (cubic feet): 0 On Road Truck Travel (VMT): 0 Off -Road Equipment: 1 Concrete /Industrial Saws (10 hp) operating at a 0.73 load factor for 8 hours per day 1 Rubber Tired Dozers (357 hp) operating at a 0.59 load factor for 1 hours per day 2 Tractors /Loaders /Backhoes (108 hp) operating at a 0.55 load factor for 6 hours per day Phase: Fine Grading 02/01/2010 - 02/05/2010 - Default Fine Site Grading /Excavation Description Total Acres Disturbed: 1.9 Maximum Daily Acreage Disturbed: 0.48 Fugitive Dust Level of Detail: Default 20 Ibs per acre -day On Road Truck Travel (VMT): 40 Off -Road Equipment: 1 Graders (174 hp) operating at a 0.61 load factor for 6 hours per day 1 Rubber Tired Dozers (357 hp) operating at a 0.59 load factor for 6 hours per day 1 Tractors /Loaders /Backhoes (108 hp) operating at a 0.55 load factor for 7 hours per day 1 Water Trucks (189 hp) operating at a 0.5 load factor for 8 hours per day Phase: Mass Grading 0110512009 - 01/25/2009 - Default Mass Site Grading /Excavation Description Total Acres Disturbed: 1.9 Maximum Daily Acreage Disturbed: 0.48 Fugitive Dust Level of Detail: Default 20 Ibs per acre -day On Road Truck Travel (VMT): 833.33 Off -Road Equipment: Page: 6 7/3/2008 8:06:40 AM 1 Graders (174 hp) operating at a 0.61 load factor for 6 hours per day 1 Rubber Tired. Dozers (357 hp) operating at a 0.59 load factor for 6 hours per day 1 Tractors /Loaders /Backhoes (108 hp) operating at a 0.55 load factor for 7 hours per day 1 Water Trucks (189 hp) operating at a 0.5 load factor for 8 hours per day Phase: Trenching 01/26/2009 - 01/30/2009 - Default Trenching Description Off -Road Equipment: 2 Excavators (168 hp) operating at a 0.57 load factor for 8 hours per day 1 Other General Industrial Equipment (238 hp) operating at a 0.51 load factor for 8 hours per day 1 Tractors /Loaders /Backhoes (108 hp) operating at a 0.55 load factor for 0 hours per day Phase: Paving 02/06/2010 - 02/11/2010 - Default Paving Description Acres to be Paved: 0.48 Off -Road Equipment: 4 Cement and Mortar Mixers (10 hp) operating at a 0.56 load factor for 6 hours per day 1 Pavers If 00 hp) operating at a 0.62 load factor for 7 hours per day 1 Rollers (95 hp) operating at a 0.56 load factor for 7 hours per day 1 Tractors /Loaders /Backhoes (108 hp) operating at a 0.55 load factor for 7 hours per day Phase: Building Construction 01/31/2009 - 01/3112010 - Default Building Construction Description Off -Road Equipment: 1 Cranes (399 hp) operating at a 0.43 load factor for 4 hours per day 2 Forklifts (145 hp) operating at a 0.3 load factor for 6 hours per day 1 Tractors /Loaders /Backhoes (108 hp) operating at a 0.55 load factor for 8 hours per day Phase: Architectural Coating 02/12/2010 - 0211312010 - slury seal Rule: Residential Interior Coatings begins 01/01/2005 ends 06130/2008 specifies a VOC of 100 Rule: Residential Interior Coatings begins 07/01/2008 ends 1213112040 specifies a VOC of 50 Rule: Residential Exterior Coatings begins 01/01/2005 ends 06/30/2008 specifies a VOC of 250 Rule: Residential Exterior Coatings begins 07/01/2008 ends 12/31/2040 specifies a VOC of 100 Page: 7 7/3/2008 8:06:40 AM Rule: Nonresidential Interior Coatings begins 01/01/2005 ends 12/3112040 specifies a VOC of 250 Rule: Nonresidential Exterior Coatings begins 0110112005 ends 12/3112040 specifies a VOC of 250 Area Source Unmitigated Detail Report: AREA SOURCE EMISSION ESTIMATES Winter Pounds Per Day, Unmitigated Source BQQ NM Q4 am PPM10 PM2.5 X42 Natural Gas 0.00 0.02 0.01 0.00 0.00 0.00 20.79 Hearth 0.16 0.01 0.43 0.00 0.07 0.06 19.03 Landscaping - No Winter Emissions Consumer Products 0.05 Architectural Coatings 0.00 TOTALS (Ibs /day, unmitigated) 0.21 0.03 0.44 0.00 0.07 0.06 39.82 Area Source Changes to Defaults Length of summer period for landscape equipment changed from 365 days to 90 days Operational Unmitigated Detail Report: OPERATIONAL EMISSION ESTIMATES Winter Pounds Per Day, Unmitigated Source ROG NOX Single family housing 0.11 0.15 TOTALS (Ibs /day, unmitigated) 0.11 0.15 Operational Settings: CO SO2 PM10 PM25 CO2 1.19 0.00 0.19 0.04 104.15 1.19 0.00 0.19 0.04 104.15 Page: 8 7/3/2008 8:06:40 AM Does not include correction for passby trips Does not include double counting adjustment for internal trips Analysis Year: 2009 Temperature (F): 60 Season: Winter Emfac: Version : Emfac2007 V2.3 Nov 1 2006 Land Use Type Single family housing Vehicle Type Light Auto Light Truck < 3750 Ibs Light Truck 3751 -5750 Ibs Mad Truck 5751 -8500 Ibs Lite -Heavy Truck 8501- 10,000 Ibs Lite -Heavy Truck 10,001- 14,000 Ibs Med -Heavy Truck 14,001- 33,000 Ibs Heavy -Heavy Truck 33,001- 60,000 Ibs Other Bus Urban Bus Motorcycle School Bus Motor Home Summary of Land Acreage Trip Rate Uses Unit Type No. Units Total Trips Total VMT 1.90 11.15 dwelling units 1.00 11.15 112.65 11.15 112.65 Vehicle Fleet Percent Type Mix Non - Catalyst Catalyst Diesel 51.5 1.4 98.2 0.4 7.0 2.9 94.2 2.9 23.8 0.4 99.6 0.0 10.6 0.9 99.1 0.0 1.6 0.0 81.2 18.8 0.5 0.0 60.0 40.0 0.9 0.0 22.2 77.8 0.2 0.0 0.0 100.0 0.1 0.0 0.0 100.0 0.0 0.0 0.0 0.0 2.9 72.4 27.6 0.0 0.1 0.0 0.0 100.0 0.8 0.0 87.5 12.5 Page:9 7/312008 8:06:40 AM Urban Trip Length (miles) Rural Trip Length (miles) Trip speeds (mph) % of Trips - Residential % of Trips - Commercial (by land use) Travel Conditions Residential Commercial Home -Work Home -Shop Home -Other Commute Non -Work Customer 12.7 7.0 9.5 13.3 7.4 8.9 17.6 12.1 14.9 15.4 9.6 12.6 30.0 30.0 30.0 30.0 30.0 30.0 32.9 18.0 49.1 Page:1 7/312008 8:06:49 AM Urbemis 2007 Version 9.2.4 Combined Annual Emissions Reports (TonsNear) File Name: F: \USERS \PLN \Shared \Russells Shortcuts \Big Canyon Urbemis \1 Big Canyon.urb924 Project Name: single family dwelling Project Location: Orange County On -Road Vehicle Emissions Based on: Version : Emfac2007 V2.3 Nov 1 2006 Off -Road Vehicle Emissions Based on: OFFROAD2007 Page: 2 7/3/2008 8:06:49 AM Summary Report: CONSTRUCTION EMISSION ESTIMATES EQL ROG NOx L(22 PM10 Dust PM10 Exhaust PM10 PM2 5 Dust PM2.5 PM2.5 0.00 OPERATIONAL (VEHICLE) EMISSION ESTIMATES 24.27 S02 Exhaust 2009 TOTALS (tons /year unmitigated) 0.20 1.64 0.82 0.00 0.07 0.10 0.17 0.02 0.09 0.10 2010 TOTALS (tons /year unmitigated) 0.03 0.19 0.11 0.00 0.02 0.01 0.04 0.01 0.01 0.02 AREA SOURCE EMISSION ESTIMATES Construction Unmitigated Detail Report: CONSTRUCTION EMISSION ESTIMATES Annual Tons Per Year, Unmitigated ROG NOx CO CO S02 PM10 PM2.5 CO2 0.01 0.00 0.00 0.00 3.93 CO S02 PM10 PM2.5 CO2 0.22 0.00 0.04 0.01 20.34 CO ROG NOx TOTALS (tons /year, unmitigated) 0.01 0.00 OPERATIONAL (VEHICLE) EMISSION ESTIMATES 24.27 S02 PM10 Dust ROG NOx TOTALS (tons /year, unmitigated) 0.02 0.02 SUM OF AREA SOURCE AND OPERATIONAL EMISSION ESTIMATES ROG NOx TOTALS (tons /year, unmitigated) 0.03 0.02 Construction Unmitigated Detail Report: CONSTRUCTION EMISSION ESTIMATES Annual Tons Per Year, Unmitigated ROG NOx CO CO S02 PM10 PM2.5 CO2 0.01 0.00 0.00 0.00 3.93 CO S02 PM10 PM2.5 CO2 0.22 0.00 0.04 0.01 20.34 CO S02 PM10 PM2.5 CO2 0.23 0.00 0.04 0.01 24.27 S02 PM10 Dust PM10 Exhaust PM10 PM2.5 Dust PM2.5 Exhaust PM2.5 CO2 159.16 18.70 CO2 Page: 3 7/3/2008 8:06:49 AM 2009 Demolition 01/01/2009- 01 /0312009 Fugitive Dust Demo Off Road Diesel Demo On Road Diesel Demo Worker Trips Mass Grading 01/05/2009- 01 /25/2009 Mass Grading Dust Mass Grading Off Road Diesel Mass Grading On Road Diesel Mass Grading Worker Trips Trenching 01/26/2009- 01130/2009 Trenching Off Road Diesel Trenching Worker Trips Building 01/31/2009- 01/31/2010 Building Off Road Diesel Building Vendor Trips Building Worker Trips 0.20 1.64 0.82 0.00 0.07 0.10 0.17 0.02 0.09 0.10 159.16 0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.12 0.04 0.41 0.18 0.00 0.07 0.02 0.09 0.02 0.02 0.03 44.28 0.00 0.00 0.00 0.00 0.07 0.00 0.07 0.02 0.00 0.02 0.00 0.02 0.20 0.10 0.00 0.00 0.01 0.01 0.00 0.01 0.01 16.85 0.02 021 0.08 0.00 0.00 0.01 0.01 0.00 0.01 0.01 26.49 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.93 0.01 0.05 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.60 0.01 0.05 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.31 0.16 1.17 0.61 0.00 0.00 0.08 0.08 0.00 0.07 0.07 109.46 0.15 1.17 0.59 0.00 0.00 0.08 0.08 0.00 0.07 0.07 106.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.56 0.00 0.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.14 Page: 4 7/3/2008 8:06:49 AM 2010 0.03 0.19 0.11 0.00 0.02 0.01 0.04 0.01 0.01 0.02 18.70 Building 01/31/2009 - 01/31/2010 0.01 0.10 0.05 0.00 0.00 0.01 0.01 0.00 0.01 0.01 9.62 Building Off Road Diesel 0.01 0.10 0.05 0.00 0.00 0.01 0.01 0.00 0.01 0.01 9.38 Building Vendor Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.05 Building Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.19 Fine Grading 02/01/2010- 0.01 0.07 0.03 0.00 0.02 0.00 0.03 0.01 0.00 0.01 635 02/05/2010 Fine Grading Dust 0.00 0.00 0.00 0.00 0.02 0.00 0.02 0.01 0.00 0.01 0.00 Fine Grading Off Road Diesel 0.01 0.06 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.62 Fine Grading On Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.42 Fine Grading Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.31 Asphalt 02 /06/2010- 02/1112010 0.00 0.03 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.69 Paving Off -Gas 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Paving Off Road Diesel 0.00 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.96 Paving On Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.29 Paving Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.44 Coating 02/12/2010- 02/1312010 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.04 Architectural Coating 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Coating Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.04 Phase Assumptions Phase: Demolition 01/01/2009 - 01/03/2009 - Default Demolition Description Building Volume Total (cubic feet): 0 Building Volume Daily (cubic feet): 0 On Road Truck Travel (VMT): 0 Off -Road Equipment: Page: 5 7/3/2008 8:06:49 AM 1 Concrete /Industrial Saws (10 hp) operating at a 0.73 load factor for 8 hours per day 1 Rubber Tired. Dozers (357 hp) operating at a 0.59 load factor for 1 hours per day 2 Tractors /Loaders /Sackhoes (108 hp) operating at a 0.55 load factor for 6 hours per day Phase: Fine Grading 02/01/2010 - 02/0512010 - Default Fine Site Grading /Excavation Description Total Acres Disturbed: 1.9 Maximum Daily Acreage Disturbed: 0.48 Fugitive Dust Level of Detail: Default 20 Ibs per acre -day On Road Truck Travel (VMT): 40 Off -Road Equipment: 1 Graders (174 hp) operating at a 0.61 load factor for 6 hours per day 1 Rubber Tired. Dozers (357 hp) operating at a 0.59 load factor for 6 hours per day i Tractors /Loaders /Sackhoes (108 hp) operating at a 0.55 load factor for 7 hours per day 1 Water Trucks (189 hp) operating at a 0.5 load factor for 8 hours per day Phase: Mass Grading 01105/2009 - 01/25/2009 - Default Mass Site Grading /Excavation Description Total Acres Disturbed: 1.9 Maximum Daily Acreage Disturbed: 0.48 Fugitive Dust Level of Detail: Default 20 Ibs per acre -day On Road Truck Travel (VMT): 833.33 Off -Road Equipment: 1 Graders (174 hp) operating at a 0.61 load factor for 6 hours per day i Rubber Tired. Dozers (357 hp) operating at a 0.59 load factor for 6 hours per day 1 Tractors /Loaders /Sackhoes (108 hp) operating at a 0.55 load factor for 7 hours per day 1 Water Trucks (189 hp) operating at a 0.5 load factor for 8 hours per day Phase: Trenching 01/26/2009 - 01/30/2009 - Default Trenching Description Off -Road Equipment: Page: 6 7/3/2008 8:06:49 AM 2 Excavators (168 hp) operating at a 0.57 load factor for 8 hours per day 1 Other General Industrial Equipment (238 hp) operating at a 0.51 load factor for 8 hours per day 1 Tractors /Loaders /Backhoes (108 hp) operating at a 0.55 load factor for 0 hours per day Phase: Paving 02/06/2010 - 02/11/2010 - Default Paving Description Acres to be Paved: 0.48 Off -Road Equipment: 4 Cement and Mortar Mixers (10 hp) operating at a 0.56 load factor for 6 hours per day 1 Pavers If 00 hp) operating at a 0.62 load factor for 7 hours per day 1 Rollers (95 hp) operating at a 0.56 load factor for 7 hours per day 1 Tractors /Loaders /Backhoes (108 hp) operating at a 0.55 load factor for 7 hours per day Phase: Building Construction 01/31/2009 - 01/3112010 - Default Building Construction Description Off -Road Equipment: 1 Cranes (399 hp) operating at a 0.43 load factor for 4 hours per day 2 Forklifts (145 hp) operating at a 0.3 load factor for 6 hours per day 1 Tractors /Loaders /Backhoes (108 hp) operating at a 0.55 load factor for 8 hours per day Phase: Architectural Coating 02/12/2010 - 0211312010 - slury seal Rule: Residential Interior Coatings begins 01/01/2005 ends 0613012008 specifies a VOC of 100 Rule: Residential Interior Coatings begins 07/01/2008 ends 1213112040 specifies a VOC of 50 Rule: Residential Exterior Coatings begins 01101/2005 ends 06/30/2008 specifies a VOC of 250 Rule: Residential Exterior Coatings begins 07/01/2008 ends 12/31/2040 specifies a VOC of 100 Rule: Nonresidential Interior Coatings begins 01/01/2005 ends 12/3112040 specifies a VOC of 250 Rule: Nonresidential Exterior Coatings begins 01/01/2005 ends 12/31/2040 specifies a VOC of 250 Page: 7 am PM10 7/3/2008 8:06:49 AM X42 0.00 Area Source Unmitigated Detail Report: 0.00 0.00 AREA SOURCE EMISSION ESTIMATES Annual Tons Per Year, Unmitigated Source ROG N4x Natural Gas 0.00 0.00 Hearth 0.00 0.00 Landscape 0.00 0.00 Consumer Products 0.01 Architectural Coatings 0.00 TOTALS (tons /year, unmitigated) 0.01 0.00 SR am PM10 PM2.5 X42 0.00 0.00 0.00 0.00 3.80 0.01 0.00 0.00 0.00 0.13 0.00 0.00 0.00 0.00 0.00 :rA1; 1D�Ie19' Area Source Changes to Defaults Length of summer period for landscape equipment changed from 365 days to 90 days Operational Unmitigated Detail Report: OPERATIONAL EMISSION ESTIMATES Annual Tons Per Year, Unmitigated Source ROG NOX Single family housing 0.02 0.02 TOTALS (tons /year, unmitigated) 0.02 0.02 Operational Settings: Does not include correction for passby trips Does not include double counting adjustment for internal trips Analysis Year: 2009 Season: Annual CO SO2 PM10 PM25 CO2 0.22 0.00 0.04 0.01 20.34 0.22 0.00 0.04 0.01 20.34 Page: 8 7/3/2008 8:06:49 AM Emfac: Version : Emfac2007 V2.3 Nov 1 2006 Land Use Type Single family housing Vehicle Type Light Auto Light Truck < 3750 Ibs Light Truck 3751 -5750 lbs Mad Truck 5751 -8500 Ibs Lite -Heavy Truck 8501 - 10,000 Ibs Lite -Heavy Truck 10,001- 14,000 Ibs Med -Heavy Truck 14,001- 33,000 Ibs Heavy -Heavy Truck 33,001- 60,000 Ibs Other Bus Urban Bus Motorcycle School Bus Motor Home Summary of Land Acreage Trip Rate Uses Unit Type No. Units Total Trips Total VMT 1.90 11.15 dwelling units 1.00 11.15 112.65 11.15 112.65 Vehicle Fleet Percent Type Mix Non - Catalyst Catalyst Diesel 51.5 1.4 98.2 0.4 7.0 2.9 94.2 2.9 23.8 0.4 99.6 0.0 10.6 0.9 99.1 0.0 1.6 0.0 81.2 18.8 0.5 0.0 60.0 40.0 0.9 0.0 22.2 77.8 0.2 0.0 0.0 100.0 0.1 0.0 0.0 100.0 0.0 0.0 0.0 0.0 2.9 72.4 27.6 0.0 0.1 0.0 0.0 100.0 0.8 0.0 87.5 12.5 Page:9 7/312008 8:06:49 AM Urban Trip Length (miles) Rural Trip Length (miles) Trip speeds (mph) % of Trips - Residential % of Trips - Commercial (by land use) Travel Conditions Residential Commercial Home -Work Home -Shop Home -Other Commute Non -Work Customer 12.7 7.0 9.5 13.3 7.4 8.9 17.6 12.1 14.9 15.4 9.6 12.6 30.0 30.0 30.0 30.0 30.0 30.0 32.9 18.0 49.1