PROJECT SUMMARY
An amendment to the Newport Beach Municipal Code ( "NBMC ") to update regulations
regarding wireless telecommunication facilities ( "telecom facilities "). Regulations
currently contained in Chapter 15.70 would be updated and relocated to Title 20
(Planning and Zoning). Chapter 15.70 would be rescinded in its entirety.
RECOMMENDED ACTION
1) Conduct a public hearing; and
2) Adopt Resolution No. _ (Attachment No. PC 1) recommending that City Council
approve an amendment to the NBMC to update regulations regarding telecom
facilities, and consolidate all provisions currently contained in Title 13 (Streets,
Sidewalks and Public Property) and Title 15 (Buildings and Construction) within a
proposed new chapter in Title 20 (Chapter 20.49 Wireless Telecommunications
Facilities); and repeal Chapter 15.70 in its entirety.
Project Description
The proposed code amendment is a comprehensive update to the existing Wireless
Telecommunications Facilities Ordinance (the telecom ordinance). The amendment is
intended to balance the needs of the community and the increasing demand for wireless
networks, while mitigating the impact of telecom facilities in the community through
effective design and screening techniques. The proposed amendment is also intended
to reflect changes in federal and state law.
Currently, provisions regulating telecom facilities are contained in Chapter 15.70, as
well as Chapter 13.20 (Public Rights -of -Way) that regulates installations in the public
right -of -way. While no changes will be made to Chapter 13.20, the proposed update
would consolidate all provisions regulating telecom facilities into a new chapter in the
Zoning Code and new or modified telecom facilities would be regulated as land uses.
Wireless Telecommunications Facilities Ordinance (PA2012 -057)
July 19, 2012
Page 2
Background
The current regulations for telecom facilities were adopted by City Council in October
2002. Prior to that time, all telecom facilities were processed as a ministerial project
through a building permit application. At the time Chapter 15.70 was adopted, state and
federal case law suggested cities were somewhat limited in how telecom facilities could
be regulated. More recent case law favors more appropriate local control to ensure the
compatibility of telecom facilities with surrounding land uses. The typical land use
evaluation process by local jurisdictions through the Zoning Code is also supported by
current case law and it is a process commonly used today.
The City's existing telecom ordinance does not reflect current case law, and it has not
been updated to reflect new industry practices, changes in federal law or changes in
state law since its adoption in 2002. Under the existing regulations, all applications for a
telecom facility are reviewed by the "Planning Director" (now considered the Community
Development Director) as a "telecom permit" to determine if the proposed facility
conforms to the technology, height, location and design standards of the code. The
Community Development Director is designated as the review authority for proposed
telecom facilities that meet established criteria. The City Council is the review authority
for telecom facilities that do not conform to the height, location and /or design standards,
and for facilities that are more noticeable and aesthetically conspicuous (such as a false
tree, monopole, or lattice tower). Neither review process requires a public notice or a
public hearing.
At the March 27, 2012, City Council Study Session, staff presented an overview of the
existing telecom ordinance, and identified sections that could be updated to reflect
current case law, as well as areas of the code that could be improved based upon
staffs experience with applying existing regulations. Staff proposed that the telecom
ordinance be updated to address a variety of identified issues, and that all regulations
related to telecom facilities be consolidated into the Zoning Code. At the conclusion of
the study session, City Council requested staff to proceed with revisions to the telecom
ordinance as recommended.
Federal Law and Radio Frequency Emissions Safety
In 1996, the U.S. Congress added a section to the Communications Act of 1934 to
promote the expansion of personal wireless communications service, adding Section
332(c)(7). This section preserves local zoning authority over the "placement,
construction, and modification of personal wireless service facilities," while imposing
certain federal requirements. Specifically, Section 332(c)(7) requires that state or local
government decisions regarding telecom facilities shall not:
a. Unreasonably discriminate among providers of functionally equivalent services;
or
b. Prohibit or have the effect of prohibiting the provision of personal wireless
services; or
Wireless Telecommunications Facilities Ordinance (PA2012 -057)
July 19, 2012
Page 3
c. Regulate the placement, construction, and modification of personal wireless
facilities on the basis of the environmental effects of radio frequency (RF)
emissions to the extent that such facilities comply with the Federal
Communications Commission's (FCC) regulations concerning such emissions.
Congress has delegated sole national authority to the FCC to set radio frequency
standards in the United States. While federal law prohibits a City from setting its own
RF emissions safety standards (or even adopting the FCC's standards as its own), it
does permit a City to determine whether a proposed telecom facility meets applicable
FCC regulations. Once the review authority is satisfied that the RF emissions of a
proposed telecom facility are within the federal thresholds, a City's review of a proposed
project can only be based on applicable zoning criteria as set forth in local ordinances.
DISCUSSION
The following discussion highlights the key issues with the existing telecom ordinance,
and the proposed revision in the draft ordinance to address these issues.
1. Public Notice /Public Hearing Process and Review Authority
a. Existing Provisions: The current regulations do not provide a process or
requirement for public notices or public hearings for telecom permit applications.
The Community Development Director is the review authority for telecom
facilities that conform to the requirements of the code, and notices of a public
meeting are only mailed when a special review is required by City Council for
larger, more conspicuous types of telecom facilities (e.g., a false tree, monopole,
or lattice tower), or a facility proposed to be located in certain residential zoning
districts.
b. Proposed Revision: The draft ordinance requires that all applicants for a
proposed telecom facility must apply for a Minor Use Permit, Conditional Use
Permit, or Limited Term Permit, depending on the location, design, method of
installation, and duration of a proposed telecom facility. All applications would
require a public notice and public hearing' consistent with provisions in the
Zoning Code, and the Zoning Administrator or Planning Commission is the
designated review authority. This proposed revision would provide for public
input through the public hearing process.
2. Appeal Process
a. Existing Provisions: Currently, only the applicant may appeal a decision on a
telecom permit application reviewed by the Community Development Director.
' Applications for a Limited Term Permit for a facility proposed to operate less than 90 days do not require
a public hearing.
Wireless Telecommunications Facilities Ordinance (PA2012 -057)
July 19, 2012
Page 4
b. Proposed Revision: The draft ordinance includes an appeal process that is
consistent with the Zoning Code, which would allow any interested party to
initiate an appeal. Decisions of the Zoning Administrator may be appealed to the
Planning Commission, and decisions of the Planning Commission may be
appealed to the City Council, consistent with the City's current practice for other
types of development applications.
3. Installations in the Public Right -of -Way
a. Existing Provisions: The existing code does not provide specific procedures for
applications to install a telecom facility in the public right -of -way.
b. Proposed Revision: The draft ordinance includes a process, design standards
and criteria for the installation of telecom facilities in the public right -of -way,
consistent with procedures for installations on private property (i.e. public
hearings would be conducted, and a ministerial encroachment permit would still
be required).
4. Design Standards and Criteria
a. Existing Provisions: Existing design standards do not reflect changes in
technology, and do not effectively encourage telecom facilities to be camouflaged
or designed to look as inconspicuous as possible.
b. Proposed Revision: The design standards have been updated to reflect
technological changes. Design criteria have been included to encourage
camouflage design techniques based on the method of installation. Proposed
telecom facilities that are designed to make the installation, operations and
appearance of the facility as inconspicuous as possible and visually compatible
with the surrounding area are subject to public review before the Zoning
Administrator, whereas telecom facilities that are more visually conspicuous are
subject to public review before the Planning Commission.
5. Deviation to Height Limitations and Location Requirements
a. Existing Provisions: The existing ordinance does not provide a process for a
project proponent to request to modify or deviate from the allowed height limits or
prohibited location requirements.
b. Proposed Revision: By placing regulations for telecom facilities in the Zoning
Code, a project proponent seeking to exceed the height requirement could
submit a Variance application. Such an application would be processed no
differently than other Variance applications and a public hearing before the
Planning Commission would result.
Wireless Telecommunications Facilities Ordinance (PA2012 -057)
July 19, 2012
Page 5
6. Setback Requirements
a. Existing Provisions: The existing ordinance requires that setbacks be measured
from the part of the telecom facility closest to the applicable lot line or structure,
and prohibits the location of a telecom facility within any required setback
established by the Zoning Code, unless given special approval by the City
Council.
Proposed Revision: The setback requirements in the draft ordinance have been
updated to provide an additional setback or "fall zone" for ground- mounted
"wireless towers ,2 for safety purposes in the event of involuntary damage where
the "wireless tower" topples or falls over. The new required setback would be the
greater distance of either the required setback established in the Zoning Code, or
110 percent (110 %) of the height of the "wireless tower," unless the review
authority determines a smaller setback is appropriate. For an example, in a
nonresidential district where the required setback is five feet and a freestanding
"wireless tower" is proposed to be 25 feet in height, the "wireless tower" must be
set back a minimum of 27.5 feet from the property line.
7. Modification of Existing Telecom Facilities
a. Existing Provisions: The existing ordinance includes provisions which allows the
City to review and modify a telecom permit based on "changed circumstances"
such as an increase in the height or size of any part of the facility; additional
impairment of the views from surrounding properties, an increase in size or
change in shape of the antenna or supporting structure; change in color or
materials; change in location; or increase in signal output above permissible
exposure limits established by FCC guidelines.
b. Proposed Revision: The draft ordinance includes regulations consistent with new
federal law3 regarding the operation and modification of existing telecom
facilities. Criteria is included in the draft ordinance establishing what constitutes
a substantial change to an existing telecom facility, including increasing or
decreasing by five percent (5 %) or more the height, width, or depth in any
direction of any portion of the existing "wireless tower' or "base station." When
modifications to the physical dimensions of an existing telecom facility are less
than five percent (5 %), the proposed modifications would be subject to ministerial
review and approval (e.g. a building permit or encroachment permit). Changes to
an existing telecom facility that are five percent (5 %) or more would be
considered a substantial change and shall require the processing of a new
discretionary permit application consistent with the provisions of the draft
ordinance. The five percent (5 %) threshold is proposed to minimize aesthetic
impacts and protect public views in the community.
2 "Wireless towers' are defined in the draft telecom ordinance as "any structure built for the sole or
primary purpose of supporting antennas used to provide wireless services authorized by the FCC."
Section 6409(a) of the Middle Class Tax Relief and Job Creation Act of 2012 regarding deployment of
telecom facilities was signed into effect February 22, 2012.
Wireless Telecommunications Facilities Ordinance (PA2012 -057)
July 19, 2012
Page 6
8. Zoning District Land Uses and Permit Requirements
In addition to amending the Zoning Code to add the proposed new Chapter 20.49,
the allowed uses and permit requirement tables in the following sections would be
updated to reflect the zoning districts in which telecom facilities are allowed and the
permit required to establish the telecom facility.
Section 20.18.020 Residential Zoning Districts Land Uses and Permit
Requirements
Section 20.20.020 Commercial Zoning Districts Land Uses and Permit
Requirements
Section 20.22.020 Mixed -Use Zoning Districts Land Uses and Permit
Requirements
Section 20.24.020 Industrial Zoning Districts Land Uses and Permit Requirements
Section 20.26.020 Special Purpose Zoning Districts Land Uses and Permit
Requirements
Under the existing and proposed telecom ordinance, telecom facilities are allowed in
all commercial, mixed -use, and industrial zoning districts, as well as on properties
zoned for public facilities, private institutions, and active public or private recreational
uses.
a. Existing Provisions: Under the existing telecom ordinance, telecom facilities are
prohibited in the following locations unless given special approval by City Council:
"on common area lots or other non - residential lots within residential districts; within
any required setback established in the Zoning Code; or, on multifamily structures on
lots zoned MFR." Telecom facilities are prohibited on "residential lots4" and in the
"Open Space- Passive (OSP) zoning district, unless facilities are co- located on an
existing utility tower within a utility easement area."
b. Proposed Revision: 'Prohibited Locations" has been updated to prohibit telecom
facilities on properties zoned for single - family development, two- family development,
or multi -unit residential developments consisting of four dwelling units or less, and to
include an exception to allow telecom facilities in an Open Space zoning district
when collocated on an existing telecom facility or site (e.g., the Laidlaw Gas
Recovery Facility in the Newport Coast area is located on land designated as Open
Space, but contains four different telecom facilities). The "General Development and
Design Standards" includes a provision that all telecom facilities comply with the
required setback established for the zoning district in which the facility is proposed to
be located.
The summary above represents the key changes to the draft telecom ordinance and
permitted uses of the Zoning Code. Due to the complexity of the changes, a
4 Under Section 15.70.030 (Definitions) a `residential lot' means a lot containing, or zoned for, one or
more dwelling units in the R -1, R -1.5, R -2, or in the residential portions of the PC of SP Districts.
Wireless Telecommunications Facilities Ordinance (PA2012 -057)
July 19, 2012
Page 7
strikeout/underline version of Chapter 15.70 could not be prepared. For this reason,
staff has prepared a table (Attachment No. PC 2) that lists each section of the existing
telecom ordinance and the proposed new or modified sections, and provides more
detail regarding the proposed changes or additions. A copy of Chapter 15.70, the
existing telecom ordinance is attached (Attachment No PC 3), as well as a draft copy of
the proposed new telecom ordinance, Chapter 20.49 (Exhibit "A" of the draft
Resolution).
Environmental Review
Staff recommends that the Planning Commission adopt the draft resolution
recommending that City Council find this code amendment is not subject to the
California Environmental Quality Act ( "CEQA ") pursuant to Sections 15060(c)(2) (the
activity will not result in a direct or reasonably foreseeable indirect physical change in
the environment), and 15060(c)(3) (the activity is not a project as defined in Section
15378) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3,
because the code amendment in and of itself has no potential for resulting in physical
changes to the environment, directly or indirectly. Furthermore, each application
submitted for a new or modified telecom facility will be reviewed individually to
determine if the project is subject to CEQA and requires additional environmental
review, or if the project is exempt from CEQA. For these reasons, this code
amendment is not subject to CEQA.
Public Notice
Notice of this Planning Commission hearing was provided as a one - eighth page display
ad in the Daily Pilot on July 7, 2012, as required by the NBMC and Government Code
Section 65091. Notice was also provided on the City's website.
Prepared by:
Submitted by:
1� ' 7�i11
•,j�i .
ATTACHMENTS
PC 1 Draft Resolution
PC 2 Summary of Proposed Changes to Telecom Ordinance
PC 3 Existing Chapter 15.70
Attachment No. PC 1
Draft Resolution
RESOLUTION NO.
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF NEWPORT BEACH RECOMMENDING CITY COUNCIL
ADOPTION OF CODE AMENDMENT NO. 2012 -004 UPDATING
REGULATIONS FOR WIRELESS TELECOMMUNICATIONS
FACILITIES (PA2012 -057)
THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
Chapter 15.70 ( "Wireless Telecommunications Facilities ") of the Newport Beach
Municipal Code ( "NBMC ") was adopted by the Newport Beach City Council in October
2002, and has not been modified since adoption.
2. At the March 27, 2012, City Council Study Session, the Newport Beach City Council
directed staff to prepare revisions to the existing regulations for Wireless
Telecommunications Facilities ( "Telecom Facilities ").
3. City staff has prepared a comprehensive update to the existing regulations for Telecom
Facilities, and consolidated all provisions currently contained in Chapter 13.20 (Public
Rights -of -Way) and Chapter 15.70 (Wireless Telecommunications Facilities) into a new
chapter in the Zoning Code (Chapter 20.49 Wireless Telecommunications Facilities).
4. Chapter 20.66 of the City's Zoning Code requires the Planning Commission to conduct
one or more public hearings before making a recommendation to City Council on a
proposed zoning code amendment.
5. A public hearing was held on July 19, 2012, in the City Hall Council Chambers, 3300
Newport Boulevard, Newport Beach, California. A notice of time, place and purpose of
the meeting was given in accordance with the Newport Beach Municipal Code.
Evidence, both written and oral, was presented to, and considered by, the Planning
Commission at this meeting.
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
The Planning Commission recommends that the City Council find this code amendment is not
subject to the California Environmental Quality Act ( "CEQA ") pursuant to Sections
15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical
change in the environment), and 15060(c)(3) (the activity is not a project as defined in
Section 15378) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3,
because the code amendment in and of itself has no potential for resulting in physical
changes to the environment, directly or indirectly. Furthermore, each application submitted
for a new or modified Telecom Facility will be reviewed individually to determine if the project
is subject to CEQA and requires additional environmental review, or if the project is exempt
from CEQA. For these reasons, this code amendment is not subject to CEQA.
Planning Commission Resolution No.
Paqe 2 of 3
SECTION 3. FINDINGS.
1. The code amendment reflects changes in federal and state law enacted since
adoption of Chapter 15.70, as well as advances in technology and industry practices.
2. The code amendment includes a requirement for public notices and public hearings
that will provide a process where the public will have an opportunity to effectively
participate in the review process.
3. The code amendment is intended to balance the needs of the community and the
increasing demand for wireless networks, while evaluating the compatibility of a
Telecom Facility with surrounding land uses. The regulations and development
standards set forth in Chapter 20.49 are intended to mitigate the impact of Telecom
Facilities in the community through effective location, design and screening
techniques.
4. The code amendment will not constitute a hazard to public convenience, health,
interest, safety, or general welfare of the community because the regulations establish
effective location, design and operational criteria that are intended to protect the public
health in compliance with safety standards established by the Federal
Communications Commission ( "FCC "), and to improve the aesthetics of Telecom
Facilities in the community. The regulations and design standards set forth in Chapter
20.49 are not intended to limit an individual's ability to receive wireless
telecommunications services nor create unfair competition among wireless
telecommunication service providers.
5. Section 704 of the 1996 Telecommunications Act (47 U.S.C. Section 332(c)) preempts
local regulation of the placement, construction, and modification of Telecom Facilities
on the basis of the environmental effects of radio frequency emissions to the extent
that such Facilities comply with the applicable FCC regulations.
6. Consolidating all regulations and development standards for Telecom Facilities from
Chapter 15.70 and Chapter 13.20 of the NBMC into a new chapter in the Zoning Code
(Chapter 20.49) will allow for consistent and efficient administration of the code.
SECTION 4. DECISION.
NOW, THEREFORE, BE IT RESOLVED:
The Planning Commission of the City of Newport Beach hereby recommends that the City
Council of the City of Newport Beach approve Code Amendment No. 2012 -004 as shown in
Exhibit "A" and Exhibit "B," and repeal Chapter 15.70 of the Newport Beach Municipal Code in
its entirety.
Tmplt: 05/16/2012
Planning Commission Resolution No.
Paqe 3 of 3
PASSED, APPROVED AND ADOPTED THIS 19th DAY OF JULY, 2012.
AYES:
NOES:
ABSTAIN:
ABSENT:
BY:
Michael Toerge, Chairman
As
Fred Ameri, Secretary
Brenda Wisneski, AICP, Zoning Administrator
Tmplt: 05/16/2012
EXHIBIT "A"
Chapter 20.49 — Wireless Telecommunications Facilities
Sections:
20.49.010 — Purpose and Intent
20.49.020 — General Provisions
20.49.030 — Definitions
20.49.040 —Available Technology
20.49.050 — Location Preferences
20.49.060 — General Development and Design Standards
20.49.070 — Permit Review Procedures
20.49.080 — Permit Implementation, Time Limits, Duration, and Appeals
20.49.090 — Agreement for Use of City -owned or City -held Trust Property
20.49.100 — Modification of Existing Telecom Facilities
20.49.110 — Operational and Radio Frequency Compliance and Emissions Report
20.49.120 — Right to Review or Revoke Permit
20.49.130 — Removal of Telecom Facilities
20.49.010 — Purpose and Intent.
A. Purpose. The purpose of this Chapter is to provide for wireless telecommunication facilities
( "Telecom Facilities ") on public and private property consistent with federal law while
ensuring public safety, reducing the visual effects of telecom equipment on public
streetscapes, protecting scenic, ocean and coastal public views, and otherwise mitigating
the impacts of such facilities. More specifically, the regulations contained herein are
intended to:
1. Encourage the location of Antennas in non - residential areas.
2. Strongly encourage Collocation at new and existing Antenna sites.
3. Encourage Telecom Facilities to be located in areas where adverse impacts on the
community and public views are minimized.
B. The provisions of this Chapter are not intended and shall not be interpreted to prohibit or to
have the effect of prohibiting telecom services. This Chapter shall be applied to providers,
operators, and maintainers of wireless services regardless of whether authorized by state or
federal regulations. This Chapter shall not be applied in such a manner as to unreasonably
discriminate among providers of functionally equivalent telecom services.
20.49.020 — General Provisions.
A. Applicability. These regulations are applicable to all Telecom Facilities providing voice
and /or data transmission such as, but not limited to, cell phone, internet and radio relay
stations.
B. Permit and /or Agreement Required.
1. Prior to construction of any Telecom Facility in the City, the applicant shall obtain a
Minor Use Permit (MUP), Conditional Use Permit (CUP), or Limited Term Permit (LTP),
depending on the proposed location and Antenna Classes, in accordance with Section
20.49.070 (Permit Review Procedures).
Page 11
2. Applicants who obtain a MUP, CUP or LTP (and an encroachment permit, if required) for
any Telecom Facility approved to be located on any City -owned property or City -held
Trust property, shall enter into an agreement prepared and executed by the City
Manager or its designee prior to construction of the Facility, consistent with Section
20.49.090 (Agreement for Use of City -owned or City -held Trust Property).
C. Exempt Facilities. The following types of facilities are exempt from the provisions of this
Chapter:
1. Amateur radio antennas and receiving satellite dish antennas, and citizen band radio
antennas regulated by Section 20.48.190 (Satellite Antennas and Amateur Radio
Facilities).
2. Dish and other antennas subject to the FCC Over - the -Air Reception Devices ( "OTARD ")
rule, 47 C.F.R. § 1.4000 that are designed and used to receive video programming
signals from (a) direct broadcast satellite services, or (b) television broadcast stations, or
(c) for wireless cable service.
3. During an emergency, as defined by Title 2 of the NBMC, the City Manager, Director of
Emergency Services or Assistant Director of Emergency Services shall have the
authority to approve the placement of a Telecom Facility in any district on a temporary
basis not exceeding ninety (90) calendar days from the date of authorization. Such
authorization may be extended by the City on a showing of good cause.
4. Facilities exempt from some or all of the provisions of this Chapter by operation of state
or federal law to the extent so determined by the City.
5. Systems installed or operated at the direction of the City or its contractor.
D. Other Regulations. Notwithstanding the provisions of this Chapter, all Telecom Facilities
within the City shall comply with the following requirements:
1. Rules, regulations, policies, or conditions in any permit, license, or agreement issued by
a local, state or federal agency which has jurisdiction over the Telecom Facility.
2. Rules, regulations and standards of the Federal Communications Commission (FCC)
and the California Public Utilities Commission (CPUC).
E. Regulations not in Conflict or Preempted. All Telecom Facilities within the City shall
comply with the following requirements unless in conflict with or preempted by the provisions
of this Chapter:
1. All applicable City design guidelines and standards.
2. Requirements established by any other provision of the Municipal Code and by any
other ordinance and regulation of the City.
F. Legal Nonconforming Facility. Any Telecom Facility that is lawfully constructed, erected,
or approved prior to the effective date of this Chapter, or for which the application for a
proposed Telecom Facility is deemed complete prior to the effective date of this Chapter, in
compliance with all applicable laws, and which Facility does not conform to the requirements
of this Chapter shall be accepted and allowed as a legal nonconforming Facility if otherwise
approved and constructed. Legal nonconforming Telecom Facilities shall comply at all times
with the laws, ordinances, and regulations in effect at the time the application was deemed
complete, and any applicable federal and state laws as they may be amended or enacted,
and shall at all times comply with any conditions of approval.
Page 12
20.49.030 — Definitions.
For the purposes of this Chapter, the following definitions shall apply
Antenna. Antenna means a device used to transmit and /or receive radio or electromagnetic
waves between earth and /or satellite -based systems, such as reflecting discs, panels,
microwave dishes, whip antennas, Antennas, arrays, or other similar devices.
Antenna Array. Antenna Array means Antennas having transmission and /or reception
elements extending in more than one direction, and directional Antennas mounted upon and
rotated through a vertical mast or tower interconnecting the beam and Antenna support, all of
which elements are deemed to be part of the Antenna.
Antenna Classes. Antenna Classes are Telecom Facilities and the attendant Support
Equipment separated into distinct "antenna classes."
Base Station. Base Station means the electronic equipment at a Telecom Facility installed and
operated by the Telecom Operator that together perform the initial signal transmission and
signal control functions. Base Station does not include the Antennas and Antenna support
structure, or the Support Equipment, nor does it include any portion of DAS.
City -owned or City -held Trust Property. City -owned or City -held Trust Property means all
real property and improvements owned, operated or controlled by the City, other than the public
right -of -way, within the City's jurisdiction, including but is not limited to City Hall, Police and Fire
facilities, recreational facilities, parks, libraries, monuments, signs, streetlights and traffic control
standards.
Collocation. Collocation means an arrangement whereby multiple Telecom Facilities are
installed on the same building or structure.
Distributed Antenna System, DAS. Distributed Antenna System (DAS) means a network of
one or more Antennas and fiber optic nodes typically mounted to streetlight poles, or utility
structures, which provide access and signal transfer services to one or more third -party wireless
service providers. DAS also includes the equipment location, sometimes called a "hub" or
"hotel" where the DAS network is interconnected with third -party wireless service providers to
provide the signal transfer services.
FCC. FCC means the Federal Communications Commission, the federal regulatory agency
charged with regulating interstate and international communications by radio, television, wire,
satellite, and cable.
Feasible. Feasible means capable of being accomplished in a successful manner within a
reasonable period of time, taking into account environmental, physical, legal and technological
factors.
Lattice Tower. Lattice Tower means a freestanding open framework structure used to support
Antennas, typically with three or four support legs of open metal crossbeams or crossbars.
Monopole. Monopole means a single free - standing pole or pole -based structure solely used to
act as or support a Telecom Antenna or Antenna Arrays.
Page 13
Operator or Telecom Operator. Operator or Telecom Operator means any person, firm,
corporation, company, or other entity that directly or indirectly owns, leases, runs, manages, or
otherwise controls a Telecom Facility or facilities within the City.
Public Right -of -Way. Public Right -of -Way or ( "PROW ") means the improved or unimproved
surface of any street, or similar public way of any nature, dedicated or improved for vehicular,
bicycle, and /or pedestrian related use. PROW includes public streets, roads, lanes, alleys,
sidewalks, medians, parkways and landscaped lots.
Stealth or Stealth Facility. Stealth or Stealth Facility means a Telecom Facility in which the
Antenna, and the Support Equipment, are completely hidden from view in a monument, cupola,
pole -based structure, or other concealing structure which either mimics, or which also serves
as, a natural or architectural feature. Concealing structures which are obviously not such a
natural or architectural feature to the average observer do not qualify within this definition.
Support Equipment. Support Equipment means the physical, electrical and /or electronic
equipment included within a Telecom Facility used to house, power, and /or contribute to the
processing of signals from or to the Facility's Antenna or Antennas, including but not limited to
cabling, air conditioning units, equipment cabinets, pedestals, and electric service meters.
Support Equipment does not include the Base Station, DAS, Antennas or the building or
structure to which the Antennas are attached.
Telecommunication(s) Facility, Telecom Facility, Telecom Facilities, Wireless
Telecommunications Facility, or Facility. Telecommunication(s) Facility, Telecom Facility,
Telecom Facilities, Wireless Telecommunications Facility, or simply Facility or Facilities means
an installation that sends and /or receives wireless radio frequency signals or electromagnetic
waves, including but not limited to directional, omni - directional and parabolic antennas,
structures or towers to support receiving and /or transmitting devices, supporting equipment and
structures, and the land or structure on which they are all situated. The term does not include
mobile transmitting devices, such as vehicle or hand held radios /telephones and their
associated transmitting antennas.
Utility Pole. Utility Pole means a single freestanding pole used to support services provided by
a public or private utility provider.
Utility Tower. Utility Tower shall mean an open framework structure (see lattice tower) or steel
pole used to support electric transmission facilities.
Wireless Tower. Wireless Tower means any structure built for the sole or primary purpose of
supporting Antennas used to provide wireless services authorized by the FCC. A Distributed
Antenna System (DAS) installed pursuant to a Certificate of Public Convenience and Necessity
(CPCN) issued by the California Public Utilities Commission on a water tower, utility tower,
street light, or other structures built or rebuilt or replaced primarily for a purpose other than
supporting wireless services authorized by the FCC, including any structure installed pursuant
to California Public Utility Code Section 7901, is not a Wireless Tower for purposes of this
definition. For an example only, a prior- existing light standard which is replaced with a new light
standard to permit the addition of Antennas shall not be considered a Wireless Tower, but rather
a replacement light standard.
`EM
20.49.040 — Available Technology.
All Telecom Facilities approved under this Chapter shall utilize the most efficient, diminutive,
and least obtrusive available technology in order to minimize the number of Telecom Facilities in
the City and reduce their visual impact on the community and public views.
20.49.050 — Location Preferences.
A. Preferred Locations. The following is the order of preference for the location and
installation of Telecom Facilities, from highest priority location and technique to lowest.
Antenna Classes are the Telecom Facilities and their attendant accessory/Support
Equipment separated into the following distinct Antenna Classes based on observed
aesthetic impacts, as follows:
Class 1 (Camouflaged /Screened): A Telecom Facility with Antennas mounted on an existing
or proposed non - residential building or other structure not primarily intended to be an
antenna support structure. The Antennas, Base Station, and Support Equipment are fully
screened so that they are not visible to the general public. Typical examples include:
• Wall or roof mounted Antennas that are screened behind radio - frequency transparent,
visually- opaque screen walls that match or complement existing exterior surfaces of the
building or structure to which they are attached.
• Antennas designed to be incorporated within an architectural feature of a building or
structure such as a steeple, cross, cupola, sign, monument, clock tower or other
architectural element.
• Base Station equipment that is contained within an existing structure, or placed into a
new attached structure that matches or complements the existing exterior surfaces of
the building or structure
Class 2 (Collocation): A Telecom Facility with Antennas and /or Base Stations co- located on
an approved existing Telecom Facility and mounted in the same manner with materially the
same or improved screening, or the same camouflage design techniques as the approved or
existing Telecom Facility. Class 2 Collocation Telecom Facilities also may incorporate flush -
to -grade underground Base Station enclosures including flush -to -grade vents, or vents that
extend no more than 24 inches above the finished grade and are screened from public view.
Class 3 (Visible): A Telecom Facility with Antennas mounted on an existing non - residential
building, structure, pole, light standard, Utility Tower, and /or Lattice Tower. The structure is
treated with some camouflage design techniques, but the Antenna panels and some
portions of the pole, light standards, Utility Tower, or Lattice Tower are still visible. Typical
examples include:
Antennas mounted on the exterior of an existing building so that the panels are visible,
but painted to match the color and texture of the building or structure.
Antennas flush- mounted atop an existing pole or light standard that are unscreened or
un- camouflaged, or attached to an existing pole or light standard utilizing a cylindrical
Antenna unit that replicates the diameter and color of the pole or standards.
Antenna panels installed on existing electrical or other Utility Towers, or existing Lattice
Towers.
Page 15
Class 4 (Freestanding Structure): A Facility with Antennas mounted on a new freestanding
structure constructed for the sole or primary purpose of supporting the Telecom Facility. The
Telecom Facility is designed to replicate a natural feature or is a Monopole or Lattice Tower.
The Antennas are either unscreened and visible, or camouflaged /designed to blend in with
their surroundings. Typical examples include:
• Antennas mounted inside or behind elements that replicate natural features such as
rocks and shrubbery and located in hillsides or other natural areas where the Telecom
Facility blends into the surrounding vegetation or topography (e.g. false rocks or
shrubbery).
• A Telecom Facility consisting of Antennas mounted on or inside a freestanding structure
that uses camouflage to disguise the Antennas (e.g. monotree, flagpole, or other
freestanding structure).
• A Telecom Facility consisting of Antennas on the exterior of a freestanding structure that
is unscreened /un- camouflaged (e.g. Monopoles or Lattice Tower).
Class 5 (Temporary): A Wireless Tower, Antennas and /or Base Station, and associated
Support Equipment system that is a temporary Telecom Facility on a site until a permanent
(separately approved) Telecom Facility to provide coverage for the same general area is
operational but such placement of a temporary Telecom Facility shall not exceed 1 year,
consistent with Section 20.52.040. A Wireless Tower, Antennas and /or Base Station, and
associated Support Equipment system that is a temporary Telecom Facility located on a site
in connection with a special event, as that term may be defined in Municipal Code Section
11.03.020 (General Provisions), may be allowed only upon approval of a Special Events
Permit, as regulated by Chapter 11.03. Class 5 installations include but are not limited to
equipment mounted on trailers, trucks, skids, or similar portable platforms.
B. Prohibited Locations. Telecom Facilities are prohibited in the following locations:
1. On properties zoned for single -unit or two -unit residential development, including
equivalent PC District designation.
2. On properties zoned for multi -unit residential development and mixed -use development
consisting of four (4) dwelling units or less.
3. In the Open Space (OS) zoning district, unless Telecom Facilities are collocated on an
existing Utility Tower within a utility easement area, or collocated on an existing Telecom
Facility.
C. Installations in the Public Right -of -Way. All Telecom Facilities proposed to be located in
the public right -of way shall comply with the provisions of Title 13, and notwithstanding any
provisions contained in Title 13 to the contrary, shall be subject to the following:
1. All Support Equipment shall be placed below grade in the public right -of -way where the
existing utility services (e.g., telephone, power, cable TV) are located underground.
Exception: Any pedestal meter required for the purpose of providing electrical service
power for the proposed Telecom Facility may be allowed to be installed above ground in
a public right -of -way.
2. Whenever Feasible, new Antennas proposed to be installed in public right -of -way shall
be placed on existing or replacement utility structures, light standards, or other existing
vertical structures.
3. Any proposed installation in the public right -of -way shall comply with all requirements of
the Americans with Disability Act (ADA), and all other laws, rules, and regulations.
Page 16
D. Collocation Installations.
1. When Required. To limit the adverse visual effects of and proliferation of individual
Telecom Facilities in the City, a new Telecom Facility proposed within one thousand
(1,000) feet of an existing Telecom Facility shall be required to collocate on the same
building or structure as the existing Telecom Facility. Exception: If the reviewing
authority determines, based on compelling evidence submitted by the applicant, that
Collocation of one or more new Telecom Facilities within one thousand (1000) feet of an
existing Telecom Facility is not Feasible, and all findings required to grant approval of a
MUP, CUP or LTP for a Telecom Facility can be met, then such Collocation shall not be
required.
2. Condition Requiring Future Collocation. In approving a Telecom Facility, the review
authority may impose a condition of approval providing for future Collocation of Telecom
Facilities by other carriers at the same site.
20.49.060 — General Development and Design Standards.
A. General Criteria. All Telecom Facilities shall employ design techniques to minimize visual
impacts and provide appropriate screening to result in the least intrusive means of providing
the service. Such techniques shall be employed to make the installation, appearance and
operations of the Telecom Facility as visually inconspicuous as possible. To the greatest
extent Feasible, Telecom Facilities shall be designed to minimize the visual impact of the
Telecom Facility by means of location, placement, height, screening, landscaping, and
camouflage, and shall be compatible with existing architectural elements, building materials,
other building characteristics, and the surrounding area. Where an existing structure is
replaced to allow for the addition of a Telecom Facility, the replacement structure shall retair
as its primary use and purpose that of the prior- existing structure. For an example, where a
streetlight standard is replaced with a different streetlight standard to allow for the additional
installation of Antennas, the primary use shall remain as a streetlight.
In addition to the other design standards of this Section, the following criteria shall be
considered by the review authority in connection with its processing of any MUP, CUP or
LTP for a Telecom Facility:
1. Blending. The extent to which the proposed Telecom Facility blends into the surrounding
environment or is architecturally compatible and integrated into the structure.
2. Screening. The extent to which the proposed Telecom Facility is concealed, screened or
camouflaged by existing or proposed new topography, vegetation, buildings or other
structures.
3. Size. The total size of the proposed Telecom Facility, particularly in relation to
surrounding and supporting structures.
4. Location. Proposed Telecom Facilities shall be located so as to utilize existing natural or
man -made features in the vicinity of the Telecom Facility, including topography,
vegetation, buildings, or other structures to provide the greatest amount of visual
screening and blending with the predominant visual backdrop.
B. Public View Protection. Telecom Facilities involving a site adjacent to an identified public
view point or corridor, as identified in General Plan Policy NR 20.3 (Public Views), shall be
reviewed to evaluate the potential impact to public views consistent with Section 20.30.100
(Public View Protection).
Page 17
C. Height. All Telecom Facilities shall comply with Antenna height restrictions, if any, required
by the Federal Aviation Administration, and shall comply with Section 20.30.060.E. (Airport
Environs Land Use Plan (AELUP) for John Wayne Airport and Airport Land Use
Commission (ALUC) Review Requirements) as may be in force at the time the Telecom
Facility is permitted or modified.
1. Maximum Height. Antennas shall be installed at the minimum height possible to provide
average service to the Telecom Operator's proposed service area. In any case, no
Antenna or other telecom equipment or screening structure shall extend higher than the
following maximum height limits:
a. Telecom Facilities installed on existing streetlight standards, traffic control standards,
Utility Poles, Utility Towers or other similar structures within the public right -of -way
shall not exceed 35 feet in height above the finished grade.
b. Telecom Facilities may be installed on existing Utility Poles or Utility Towers that
exceed 35 feet above the finished grade where the purposes of the existing Utility
Pole or Utility Tower is to carry electricity or provide other wireless data transmission
provided that the top of the Antenna does not extend above the top of the Utility Pole
or Utility Tower.
c. Telecom Facilities installed in ground- mounted flagpoles may be installed at a
maximum height of 35 feet in nonresidential districts only, and shall not exceed 24
inches in width at the base of the flagpole and also shall not exceed 20 inches in
width at the top of the flagpole. As a condition of approval, flagpole sites shall
comply with 4 U.S.C. § 1 et seq. (the "U.S. Flag Code ").
d. Telecom Facilities may be installed on buildings or other structures to extend up to 5
feet above the base height limit established in Part 2 (Zoning Districts, Allowable
Uses, and Zoning District Standards) for the zoning district in which the Telecom
Facility is located.
e. Applications for the installation of Telecom Facilities proposed to be greater than 5
feet above the base height limit may be installed up to the maximum height limit for
the zoning district in which the Telecom Facility is located in accordance with Section
20.30.060.C.2 (Height Limit Areas), subject to review and action by the Planning
Commission. The Planning Commission may approve or conditionally approve a
CUP for a Telecom Facility to exceed the base height limit by more than 5 feet after
making all of the required findings in Section 20.49.070.H (Permit Review
Procedures).
2. Over - Height Buildings or Structures. Stealth Telecom Facilities may be installed within or
on structures that are permitted to exceed the height limit for the zoning district in which
the structure is located, either by right under Title 20 or which have received a
discretionary approval, so long as the height of the structure is not being increased. The
standard of review shall be based on the type of installation and Antenna Classes being
used.
D. Setbacks. Proposed Telecom Facilities shall comply with the required setback established
by the development standards for the zoning district in which the Telecom Facility is
proposed to be located. Setbacks shall be measured from the part of the Telecom Facility
closest to the applicable lot line or structure. For ground- mounted Wireless Towers installed
on public property or private property, unless the review authority determines a smaller
setback would be appropriate based on the surrounding development or uses, the setback
.l-
shall be the greater of: a) the required setback established by the development standards
for the zoning district in which the Telecom Facility is proposed to be located; or b) 110% of
the maximum height of the Wireless Tower including any Antenna or Antenna enclosures
attached thereto.
E. Design Techniques. Design techniques shall result in the installation of a Telecom Facility
that is in scale with the surrounding area, hides the installation from predominant views from
surrounding properties, and prevents the Telecom Facility from visually dominating the
surrounding area. Design techniques may include the following:
1. Screening elements to camouflage, disguise, or otherwise hide the Telecom Facility from
view from surrounding uses.
2. Painting and /or coloring the Telecom Facility to blend into the predominant visual
backdrop.
3. Siting the Telecom Facility to utilize existing features (buildings, topography, vegetation,
etc.) to screen, camouflage, or hide the Telecom Facility.
4. Utilizing simulated natural features (trees, rocks, etc.) to screen, camouflage, or hide the
Telecom Facility.
5. Providing Telecom Facilities of a size that, as determined by the City, is not visually
obtrusive such that any effort to screen the Telecom Facility would create greater visual
impacts than the Telecom Facility itself.
F. Screening Standards. Following is a non - exclusive list of potential design and screening
techniques that should be considered based on the following Antenna Classes:
For Class 1 (Camouflaged /Screened) Antenna Installations:
a. All Telecom Facility components, including all Antenna panels and Support Equipment,
shall be fully screened, and mounted either inside the building or structure, or behind the
proposed screening elements and not on the exterior face of the building or structure.
b. Screening materials shall match in color, size, proportion, style, and quality with the
exterior design and architectural character of the structure and the surrounding visual
environment. If determined necessary by the reviewing authority, screening to avoid
adverse impacts to views from land or buildings at higher elevations shall be required.
c. In conditions where the Antennas and Support Equipment are installed within a new
freestanding structure, (an architectural feature such as a steeple, religious symbol or
tower, cupola, clock tower, sign, etc.), the installation shall blend in the predominant
visual backdrop so it appears to be a decorative and attractive architectural feature.
2. For Class 2 (Collocation) Antenna Installations:
a. A Collocation installation shall use screening methods materially similar to those used on
the existing Telecom Facility and shall not diminish the screening of the existing
Telecom Facility.
b. If determined necessary by the review authority, use of other improved and appropriate
screening methods may be required to screen the Antennas, Base Station, and Support
Equipment from public view.
3. For Class 3 (Visible) Antenna Installations:
a. Building or structure mounted Antennas shall be painted or otherwise coated to match or
complement the predominant color of the structure on which they are mounted and shall
be compatible with the architectural texture and materials of the building to which the
`EM
Antennas are mounted. No cables and mounting brackets or any other associated
equipment or wires shall be visible from above, below or the side of the Antennas.
b. All Antenna components and Support Equipment shall be treated with exterior coatings
of a color and texture to match the predominant visual background and /or adjacent
architecture so as to visually blend in with the surrounding development. Subdued
colors and non - reflective materials that blend with surrounding materials and colors shall
be used.
c. Antenna installations in the public right -of -way and /or on an existing or replacement
streetlight pole or traffic control standard shall be limited to Antennas, Supporting
Equipment, and cable components that are compatible in scale and proportion to
streetlights and traffic control standards and the poles on which they are mounted. All
transmission or amplification equipment such as remote radio units, tower mounted
amplifiers and surge suppressors shall be mounted inside the streetlight pole or traffic
control standard without increasing the pole width or shall be mounted in a flush -to-
grade enclosure adjacent to the base of the pole.
d. Antenna installations on existing or replacement streetlight poles, traffic control
standards, or Utility Poles shall be screened by means of canisters, radomes, shrouds
other screening measures whenever Feasible, and treated with exterior coatings of a
color and texture to match the existing pole. If Antennas are proposed to be installed
without screening, they shall be flush - mounted to the pole and shall be treated with
exterior coatings of a color and texture to match the existing pole.
e. Antennas shall be mounted on existing poles wherever Feasible. If a new pole is
proposed to replace the existing pole, the replacement pole shall be consistent with the
size, shape, style and design of the existing pole, including any attached light arms.
4. For Class 4 (Freestanding Structure) Antenna Installations:
a. For a false rock, the proposed screen structure shall match in scale and color other rock
outcroppings in the general vicinity of the proposed site. A false rock screen may not be
considered appropriate in areas that do not have natural rock outcroppings.
b. The installation of a false tree (such as but without limitation a monopine or monopalm,
or false shrubbery) shall be designed for and located in a setting that is compatible with
the proposed screening method. Such installations shall be situated so as to utilize
existing natural or manmade features including topography, vegetation, buildings, or
other structures to provide the greatest amount of visual screening. For false trees or
shrubbery installations, all Antennas and Antenna supports shall be contained within the
canopy of the tree design, and other vegetation comparable to that replicated in the
proposed screen structure shall be prevalent in the immediate vicinity of the antenna
site, and the addition of new comparable living vegetation may be necessary to enhance
the false tree or shrubbery screen structure.
c. The installation of a new Monopole or Lattice Tower is prohibited unless the applicant by
use of compelling evidence can show to the satisfaction of the review authority that
higher priority locations or Stealth Facilities are either not available or are not Feasible.
5. For Class 5 (Temporary) Antenna Installations:
a. A temporary Telecom Facility installation may require screening to reduce visual impacts
depending on the duration of the permit and the setting of the proposed site. If
screening methods are determined to be necessary by the review authority, the
appropriate screening methods will be determined through the permitting process
reflecting the temporary nature of the Telecom Facility.
Page 110
6. Support Equipment. All Support Equipment associated with the operation of any Telecom
Facility including but not limited to the Base Station shall be placed or mounted in the least
visually obtrusive location possible, and shall be screened from view. The following is a
non - exclusive list of potential screening techniques that may be utilized based on the type of
installation:
a. Building- Mounted Facilities. For building or structure - mounted Antenna installations,
Support Equipment for the Telecom Facility may be located inside the building, in an
underground vault, or on the roof of the building that the Telecom Facility is located on,
provided that both the equipment and screening materials are painted the color of the
building, roof, and /or surroundings. All screening materials for roof - mounted Telecom
Facilities shall be of a quality and design compatible with the architecture, color, texture
and materials of the building to which it is mounted. If determined necessary by the
review authority, screening to avoid adverse impacts to views from land or buildings at
higher elevations shall be required.
b. Freestanding Facilities. For freestanding Telecom Facilities installations, not mounted on
a building or structure, Support Equipment for the Telecom Facility:
• Shall be visually screened by locating the Support Equipment in a fully enclosed
building or in an underground vault, or
• Shall be screened in a security enclosure consisting of walls and /or landscaping
to effectively screen the Support Equipment at the time of installation. All wall
and landscaping materials shall be selected so that the resulting screening will
be visually integrated with the architecture and landscape architecture of the
surroundings.
• Screening enclosures may utilize graffiti- resistant and climb- resistant vinyl -clad
chain link with a "closed- mesh" design (i.e. one -inch gaps) or may consist of an
alternate enclosure design approved by the review authority. In general, the
screening enclosure shall be made of non - reflective material and painted or
camouflaged to blend with surrounding materials and colors.
c. Installations in a Public Right -of -Way. Support Equipment approved to be located above
ground in a public right -of -way shall be painted or otherwise coated to be visually
compatible with the existing or replacement pole, lighting and /or traffic signal equipment
without substantially increasing the width of the structure.
G. Night Lighting. Telecom Facilities shall not be lighted except for security lighting at the
lowest intensity necessary for that purpose or as may be required by the U.S. Flag Code.
Such lighting shall be shielded so that direct illumination does not directly shine on nearby
properties. The review authority shall consult with the Police Department regarding
proposed security lighting for Telecom Facilities on a case -by -case basis.
H. Signs and Advertising. No advertising signage or identifying logos shall be displayed on
any Telecom Facility except for small identification, address, warning, and similar
information plates. Such information plates shall be identified in the telecom application and
shall be subject to approval by the review authority. Signage required by state or federal
regulations shall be allowed in its smallest permissible size.
Page 111
Nonconformities. A proposed Telecom Facility shall not create any new or increased
nonconformities as defined in the Zoning Code, such as, but not limited to, a reduction in
and /or elimination of, required parking, landscaping, or loading zones.
J. Maintenance. The Telecom Operator shall be responsible for maintenance of the Telecom
Facility in a manner consistent with the original approval of the Telecom Facility, including
but not limited to the following:
1. Any missing, discolored, or damaged camouflage or screening shall be restored to its
original permitted condition.
2. All graffiti on any components of the Telecom Facility shall be removed promptly in
accordance the Newport Beach Municipal Code.
3. All landscaping required for the Telecom Facility shall be maintained in a healthy
condition at all times, and shall be promptly replaced if dead or dying.
4. All Telecom Facilities shall be kept clean and free of litter.
5. All equipment cabinets shall display a legible contact number for reporting maintenance
problems to the Facility Operator.
6. If a flagpole is used for a Telecom Facility, flags shall be flown and shall be properly
maintained at all times. The use of the United States flag shall comply with the
provisions of the U.S. Flag Code.
20.49.070 — Permit Review Procedures.
The procedures and requirements for preparation, filing, and processing of a permit application
for a Telecom Facility shall be as specified in Chapter 20.50 (Permit Application Filing and
Processing) unless otherwise noted below.
A. Permit Required. All applicants for Telecom Facilities shall apply for a MUP, CUP or LTP,
from the Community Development Department, depending on the Antenna Class, height,
and duration, as specified in the table below:
Table 4 -1
Permit Requirements for Telecom Facilities
Antenna Class
Location of Proposed Telecom Facility
Located in a
Located inside or
Located inside or
Nonresidential
within 150 feet of any
within 150 feet of
District more than
Open Space District
any Residential
150 feet from a
or Public Park or
District or
Residential (or
Public Facility zoned
Equivalent PC
Equivalent PC)
PR or PF
District
District or Open
Space District or
Public Park or
Public Facility
zoned PR or PF
Class 1 Antenna (a)
MUP
MUP
MUP
(Camouflaged/Screened)
Class 2 Antenna (a) (b)
MUP
MUP
CUP
Collocation
Class 3 Antenna (a)
MUP
MUP
CUP
Visible
Page 112
Antenna Class
Location of Proposed Telecom Facility
Class 4 Antenna (a) (c)
MUP
CUP
CUP
(Freestanding Structure
Class 5 Antenna (a) (c) (d)
LTP
LTP
LTP
(Temporary)
(a) Any application for a Telecom Facility that proposes to exceed the base height limit of
the applicable zoning district in which the Telecom Facility is located by greater than five
(5) feet shall require review and action of a CUP by the Planning Commission. Pursuant
to this provision, an application that would otherwise be subject to review by the Zoning
Administrator would become subject to review by the Planning Commission. The
Planning Commission may approve or conditionally approve a CUP, subject to the
required findings in Subparagraph H, below.
(b) The review procedure for Collocated Telecom Facilities shall be consistent with the
applicable review procedure as identified elsewhere in this table depending on the type
of installation and Antenna Class being proposed for the Collocation, unless the
Collocated Telecom Facility meets the requirements of California Government Code §
65850.6, or involves the Collocation of new transmission equipment and is consistent
with the provisions in Section 20.49.100 (Modification of Existing Telecom Facilities).
(c) Antennas mounted on or within flagpoles, and temporary Telecom Facilities shall not be
permitted on properties either used or zoned residentially.
(d) Temporary Telecom Facilities shall be subject to the standard of review for an LTP,
pursuant to Section 20.52.040 (Limited Term Permits).
B. Application Submission Requirements for Telecom Facilities on City -owned or City -
held Trust Properties. Prior to the submittal for any application for any Telecom Facility
located on any City -owned property or City -held trust property, the applicant shall first obtain
written authorization from the City Manager or its designee to submit an application.
C. Fee. All costs associated with the permit application review shall be the responsibility of the
applicant, including any expense incurred for any outside technical or legal services in
connection with the application.
D. Review Process. Review of applications for all Telecom Facilities in City shall be consistent
with Chapter 20.50 (Permit Application Filing and Processing), and the FCC Declaratory
Ruling FCC 09 -99 ( "Shot Clock ") deadlines.
E. Review of Collocated Facilities. Notwithstanding any provision of this Chapter to the
contrary, pursuant to California Government Code section 65850.6 (as amended or
superseded), the addition of a new Telecom Facility to an existing Telecom Facility resulting
in the establishment of a Collocated Telecom Facility shall be a permitted use not requiring
a discretionary permit provided the underlying Telecom Facility was granted a discretionary
permit and was subject to either an environmental impact report, mitigated negative
declaration or negative declaration. If such a Collocated Telecom Facility does not satisfy
all of the requirements of Government Code section 65850.6, it shall be reviewed pursuant
the review procedures contained in Section 20.49.070 (Permit Review Procedures).
F. Emergency Communications Review. At the time an application is submitted to the
Community Development Department, a copy of the Plans, Map, and Emission Standards
shall be sent to the Chief of the Newport Beach Police Department. The Police Department
or its designee shall review the plan's potential conflict with emergency communications.
Page 113
The review may include a pre - installation test of the Telecom Facility to determine if any
interference exists. If the Police Department determines that the proposal has a high
probability that the Telecom Facility will interfere with emergency communications devices,
the applicant shall work with the Police Department to avoid interference. .
G. Public Notice and Public Hearing Requirements. An application for a Telecom Facility
shall require a public notice, and a public hearing shall be conducted, in compliance with
Chapter 20.62 (Public Hearings).
H. Required Findings for Telecom Facilities. The following findings shall apply to all
Telecom Facilities:
1. General. The review authority indicated in Table 4 -1 may approve or conditionally
approve an application for a Telecom Facility only after first finding each of the required
findings for a MUP or CUP pursuant to Section 20.52.020 (Conditional Use Permits and
Minor Use Permits), or an LTP pursuant to Section 20.52.040 (Limited Term Permits), and
each of the following:
a. The proposed Telecom Facility is visually compatible with the surrounding
neighborhood.
b. The proposed Telecom Facility complies with the technology, height, location and desigr
standards, as provided for in this Chapter.
c. An alternative site(s) located further from a Residential District, Public Park or Public
Facility cannot feasibly fulfill the coverage needs fulfilled by the installation at the
proposed site.
d. An alternative Antenna construction plan that would result in a higher priority Antenna
Class category for the proposed Telecom Facility is not available or reasonably Feasible
and desirable under the circumstances.
2. Findings to Increase Height. The review authority may approve, or conditionally approve
an application for a Telecom Facility which includes a request to exceed the base height
limit for the zoning district in which the Telecom Facility is located by more than 5 feet only
after making each of the following findings in addition to the required findings above, as well
the required findings for a MUP or CUP pursuant to Section 20.52.020 (Conditional Use
Permits and Minor Use Permits), or an LTP pursuant to Section 20.52.040 (Limited Term
Permits):
a. The increased height will not result in undesirable or abrupt scale changes or
relationships being created between the proposed Telecom Facility and existing
adjacent developments or public spaces.
b. Establishment of the Telecom Facility at the requested height is necessary to provide
service.
20.49.080 — Permit Implementation, Time Limits, Extensions, and Appeals.
A. The process for implementation or "exercising" of permits issued for a Telecom Facility, time
limits, and extensions, shall be in accordance with Chapter 20.54 (Permit Implementation,
Time Limits, and Extensions).
B. Appeals. Any appeal of the decision of the review authority of an application for a Telecom
Facility shall be processed in compliance with Chapter 20.64 (Appeals).
Page 114
20.49.090 — Agreement for Use of City -Owned or City -Held Trust Property.
When applying for a permit pursuant to this Chapter, all Telecom Facilities located on City -
owned or City -held trust property shall require a license agreement approved as to form by the
City Attorney, and as to substance (including, but not limited to, compensation, term, insurance
requirements, bonding requirements, and hold harmless provisions) by the City Manager,
consistent with provisions in the City Council Policy Manual.
Prior to entering into an agreement, the applicant shall obtain a MUP, CUP or LTP. Upon the
issuance of a MUP, CUP or LTP, as required, and upon entering into an agreement, the
applicant shall obtain any and all other necessary permits, including, encroachment permits for
work to be completed in the public right -of -way, building permits, etc. All costs of said permits
shall be at the sole and complete responsibility of the applicant. All work shall be performed in
accordance with the applicable City standards and requirements.
20.49.100 — Modification of Existing Telecom Facilities.
Notwithstanding any provision in this Chapter of the Zoning Code, a request for a modification of
an existing Wireless Tower or Base Station that involves:
a. The Collocation of new transmission equipment;
b. The removal of existing transmission equipment; or
c. The replacement of existing transmission equipment
shall be subject to a ministerial review and approval without the processing of a discretionary
permit provided that such modification does not substantially change any of the physical
dimensions of such Wireless Tower or Base Station from the dimensions approved as part of
the original discretionary permit for the Wireless Tower or Base Station.
However, any modification to a Wireless Tower or Base Station which substantially changes the
physical dimensions of either the Wireless Tower or Base Station, and any other modification to
a Telecom Facility that does not qualify as a Wireless Tower or Base Station, shall be subject to
the permits and authorizations required by this Chapter.
"Substantially Change the Physical Dimensions" means any of the following, and refers to a
single change, or a series of changes over time (whether made by the same or different entities)
viewed against the City approval(s) for the Wireless Tower or Base Station as existing on
February 22, 2012, that individually or cumulatively have any of the effects described below:
a. Changing any physical dimension of the Wireless Tower or Base Station in a manner that
creates a violation of any safety code adopted by the City, or by the state or federal
government.
b. Changing the physical dimension of a Stealth Facility on a Wireless Tower, where the
changes would be inconsistent with the design of the Stealth Facility, or make the Wireless
Tower more visible.
c. Changing the physical dimension would require work that would intrude upon the public
right -of -way, or any environmentally sensitive area.
d. Increasing or decreasing by five percent (5 %) or more any of the following:
Page 115
• The height, width, or depth in any direction of any portion of the Wireless Tower or Base
Station; or
• The area required for structures required to support the Wireless Tower, including but
not limited to guy wires as approved and constructed through the discretionary permit
process
Provided that in no event shall the height is increased to exceed the maximum height
permitted in the applicable zoning district under the City's regulations.
e. Increasing by more than five percent (5 %) any of the height, width, depth or area
encompassed within any structure or object enclosing the Wireless Tower, such as a fence
or line of shrubs or bushes.
f. Increasing any of an existing Antenna Array's depth, circumference, or horizontal radius
from the Wireless Tower in any direction by more than five percent (5 %).
g. Adding more than two Antenna Arrays to an existing Wireless Tower, or adding Antenna
Arrays that, if the Antenna Array were an existing Antenna Array, would be of such depth,
circumference or radius as to fall outside of item f (above), unless such Antenna Arrays were
approved pursuant to Government Code Section 65850.6.
h. The mounting of the new or replacement transmission equipment would involve installing
new equipment cabinet(s) not permitted under the initial approval and that will not fit within
the existing enclosure for the Wireless Tower or Base Station, or would require installation of
a new cabinet or enclosure, excluding new equipment and cabinets that will be installed
underground. (Note: the proposed installation of a power back -up system [i.e., gas /diesel
generator, fuel cell, battery system, etc.] is not Collocation of new transmission equipment.)
i. Any increase in any physical dimension of a Wireless Tower or Base Station or any
equipment related thereto or any enclosure thereof at a Legal Nonconforming Facility.
Each application submitted under this section for a modification to an existing Wireless Tower or
Base Station shall be accompanied by:
1. A detailed description of the proposed modifications to the existing Telecom Facility(ies);
2. A photograph or description of the Wireless Tower as originally constructed, if available;
a current photograph of the existing Wireless Tower and /or Base Station; and, a graphic
depiction of the Wireless Tower and /or Base Station after modification showing all
relevant dimensions;
3. A detailed description of all construction that will be performed in connection with the
proposed modification; and
4. A written statement signed and stamped by a professional engineer, licensed and
qualified in California, attesting that the proposed modifications to be performed will not
trigger discretionary review under this section.
Any permit issued will be conditioned, and may be revoked, and the Telecom Facility required to
be removed or restored to its pre- modification condition if:
a. Any material statement made with respect to the Telecom Facility is false; or
b. The modifications as actually made would have triggered a discretionary review.
20.49.110 — Operational and Radio Frequency Compliance and Emissions Report.
At all times, the operator shall ensure that its Telecom Facilities shall comply with the most
current regulatory, operations standards, and radio frequency emissions standards adopted by
Page 116
the FCC. The operator shall be responsible for obtaining and maintaining the most current
information from the FCC regarding allowable radio frequency emissions and all other
applicable regulations and standards. Said information shall be made available by the operator
upon request at the discretion of the Community Development Director.
Within thirty (30) days after installation of a Telecom Facility, a radio frequency (RF) compliance
and emissions report prepared by a qualified RF engineer acceptable to the City shall be
submitted in order to demonstrate that the Telecom Facility is operating at the approved
frequency and complies with FCC standards for radio frequency emissions safety as defined in
47 C.F.R. § 1.1307 et seq. Such report shall be based on actual field transmission
measurements of the Telecom Facility operating at its maximum effective radiated power level,
rather than on estimations or computer projections. If the report shows that the Telecom Facility
does not comply with the FCC's 'General Population /Uncontrolled Exposure' standard as
defined in 47 C.F.R. § 1.1310 Note 2 to Table 1, the Director shall require that use of the
Telecom Facility be suspended until a new report has been submitted confirming such
compliance.
Upon any proposed increase of at least ten percent (10 %) in the effective radiated power or any
proposed change in frequency use of the Telecom Facility by the Telecom Operator, the
Telecom Operator shall be required to provide an updated certified radio frequency (RF)
compliance and RF emissions safety report.
A qualified independent radio frequency engineer, selected and under contract to the City, may
be retained to review said certifications for compliance with FCC regulations. All costs
associated with the City's review of these certifications shall be the responsibility of the
permittee, which shall promptly reimburse City for the cost of the review.
20.49.120 — Right to Review or Revoke Permit.
The reservation of right to review any permit for a Telecom Facility granted by the City is in
addition to, and not in lieu of, the right of the City to review and revoke or modify any permit
granted or approved hereunder for any violations of the conditions imposed on such permit.
20.49.130 — Removal of Telecom Facilities.
A. Discontinued Use. Any Telecom Operator who intends to abandon or discontinue use of a
Telecom Facility must notify the Community Development Director by certified mail no less
than thirty (30) days prior to such abandonment or discontinuance of use. The Telecom
Operator or owner of the affected real property shall have ninety (90) days from the date of
abandonment or discontinuance, or a reasonable additional time as may be approved by the
Community Development Director, within which to complete one of the following actions:
1. Reactivate use of the Telecom Facility;
2. Transfer the rights to use the Telecom Facility to another Telecom Operator and the
Telecom Operator immediately commences use within a reasonable period of time as
determined by the Community Development Director;
3. Remove the Telecom Facility and restore the site.
B. Abandonment. Any Telecom Facility that is not operated for transmission and /or reception
for a continuous period of ninety (90) days or whose Telecom Operator did not remove the
Telecom Facility in accordance with Subsection A shall be deemed abandoned. Upon a
Page 117
finding of abandonment, the City shall provide notice to the Telecom Operator last known to
use such Facility and, if applicable, the owner of the affected real property, providing thirty
days from the date of the notice within which to complete one of the following actions:
1. Reactivate use of the Telecom Facility;
2. Transfer the rights to use the Telecom Facility to another Telecom Operator who has
agreed to reactivate the Telecom Facility within 30 days of the transfer;
3. Remove the Telecom Facility and restore the site.
C. Removal by City.
1. The City may remove an abandoned Telecom Facility, repair any and all damage to the
premises caused by such removal, and otherwise restore the premises as is appropriate
to be in compliance with applicable codes at any time after thirty (30) days following the
notice of abandonment.
2. If the City removes the Telecom Facility, the City may, but shall not be required to, store
the removed Telecom Facility or any part thereof. The owner of the premises upon which
the abandoned Telecom Facility was located and all prior operators of the Telecom
Facility shall be jointly liable for the entire cost of such removal, repair, restoration and
storage, and shall remit payment to the City promptly after demand therefore is made. In
addition, the City Council, at its option, may utilize any financial security required in
conjunction with granting the telecom permit as reimbursement for such costs. Also, in
lieu of storing the removed Telecom Facility, the City may convert it to the City's use, sell
it, or dispose of it in any manner deemed by the City to be appropriate.
D. City Lien on Property. Until the cost of removal, repair, restoration and storage is paid in
full, a lien shall be placed on the abandoned personal property and any real property on
which the Telecom Facility was located for the full amount of the cost of removal, repair,
restoration and storage. The City Clerk shall cause the lien to be recorded with the Orange
County Recorder, with the costs of filing, processing, and release of such City Lien being
added to the other costs listed in this Section D.
Page 118
EXHIBIT "B"
Section 20.18.020 Residential Zoning Districts Land Uses and Permit Requirements
Section 20.20.020 Commercial Zoning Districts Land Uses and Permit Requirements
Section 20.22.020 Mixed -Use Zoning Districts Land Uses and Permit Requirements
Section 20.24.020 Industrial Zoning Districts Land Uses and Permit Requirements
Section 20.26.020 Special Purpose Zoning Districts Land Uses and Permit
Requirements
A. 20.18.020 Residential Zoning Districts Land Uses and Permit Requirements.
A. Allowed Land Uses,
1. Table 2 -1 indicates the uses allowed within each residential zoning district and the permit
required to establish the use, if any, in compliance with Part 5 of this title (Planning Permit
Procedures).
2. Residential uses represent the primary allowed use, and only those additional uses that are
complementary to, and can exist in harmony with, the residential character of each zoning district
may be allowed as accessory, conditionally permitted, and /or temporary uses.
B. Prohibited Land Uses. A table cell with " —" means that the listed land use is prohibited in that zoning
district.
C. Applicable Regulations. The last column in the table ( "Specific Use Regulations ") may include a
reference to additional regulations that apply to the use.
Residential Zoning Districts
Permit Requirements
P Permitted by Right
TABLE 2 -1
CUP Conditional Use Permit (Section 20.52.020)
ALLOWED USES AND PERMIT
CUP- Conditional Use Permit in Residential Zoning Districts
REQUIREMENTS
HO (Section 20.52.030)
MUP Minor Use Permit (Section 20.52.020)
LTP Limited Term Permit (Section 20.52.040)
— Not Allowed
Land Use
See Part 7 of this title for land
use definitions.
See Chapter 20_12 for unlisted
R -BI
RM
Specific Use
uses.
R -A
R -1 **
R -2
RMD
Regulations
Residential Uses
Home Occupations
P
P
P
P
Section 20.48.110
Single -Unit Dwellings— Attached
—
—
P
P
Section 20.48.180
Single -Unit Dwellings— Detached
P
P
P
P
Section 20.48.180
Multi -Unit Dwellings
—
—
—
P
Two -Unit Dwellings
P
P
Section 20.48.180
Accessory Dwelling Units
MUP
MUP
Visitor Accommodations, Residential
Bed and Breakfast Inns — —
CUP -HO
CUP -HO I Section 20.48.060
Short -Term Lodging — —
P
P Chapter 5.95
Care Use sr
Adult Day Care
Small (6 or fewer)
I P
P
P
P
I Section 20.48.070
Large (7 to 14)
MUP
MUP
MUP
MUP
Section 20.48.070
Child Day Care
Small (8 or fewer)
P
P
P
P
Section 20.48.070
Large (9 to 14)
MUP
MUP
MUP
MUP
Section 20.48.070
Day Care, General
—
—
CUP -HO
CUP -HO
Residential Care Facilities
Limited (6 or fewer) Licensed
P
P
P
P
Section 20.48.170
Limited (6 or fewer) Unlicensed
—
—
—
CUP -HO
Section 20.48.170
General (7 or more) Licensed
—
—
—
CUP -HO
Section 20.48.170
General (7 or more) Unlicensed
—
CUP -HO
Section 20.48.170
Integral Facilities /Integral Uses
—
—
—
CUP -HO
Section 20.48.170
Parolee- Probationer Home
Other Uses
Parking Facility
—
MUP
—
MUP
—
MUP
—
MUP
Convalescent Facilities
CUP
Utilities, Minor
P
IP
P
P
Utilities, Major
CUP
CUP
CUP
CUP
Wireless Telecommunication
Facilities
MUP /CUP /LTP
Chapter 20.49
1.8.1 FP'Pqq T-PIAAAFRFA1_RiAAt RR
P20*14 PS
988 nh..pteF
Accessory Structures and Uses
P
P
P
P
Animal- Keeping
P
P
P
P
Section 20.48.040
Personal Property Sales
P
P
P
P
Section 20.48.150
Special Events
See Chapter 11_03
Temporary Uses LTP LTP LTP LTP Section 20.52.040
Uses Not Listed. Land uses that are not listed in the table above, or are not shown in a particular zoning
district, are not allowed, except as provided by Chapter 20.12 (Interpretation of Zoning Code Provisions).
** Includes R -1- 6,000, R -1- 7,200, and R -1- 10,000.
A. 20.20.020 Commercial Zoning Districts Land Uses and Permit Requirements.
A. Allowed Land Uses. Tables 2 -4 and 2 -5 indicate the uses allowed within each zoning district and the
permit required to establish the use, if any, in compliance with Part 5 of this title (Planning Permit
Procedures).
B. Prohibited Land Uses. Any table cell with " —" means that the listed land use is prohibited in that
specific zoning district.
C. Applicable Regulations. The last column in the tables ( "Specific Use Regulations ") may include a
reference to additional regulations that apply to the use.
Commercial Office Zoning Districts
Permit Requirements
P
Permitted by Right
TABLE 2 -4
ALLOWED USES AND PERMIT
CUP
Conditional Use Permit (Section 20.52.020)
REQUIREMENTS
MUP
Minor Use Permit (Section 20.52.020)
LTP
Limited Term Permit (Section 20.52.040)
—
Not allowed
Land Use
See Part 7 of this title for
Specific Use
land use definitions.
OA
OG
OM
OR
Regulations
See Chapter 20_12 for
unlisted uses.
Industry, Manufacturing and Processing, and Warehousing Uses
Handicraft Industry
P
Industry, Small (less than 5,000 sq.
MUP
ft.)
Personal Storage (mini storage)
P
Research and Development,
P
P
P
P
General
Research and Development,
MUP
MUP
MUP
MUP
Restricted
Recreation, Education, and Public Assembly Uses
Assembly /Meeting Facilities
Small -5,000 sq. ft. or less
(religious assembly may be
larger than 5,000 sq. ft.)
CUP
CUP
CUP
CUP
Commercial Recreation and
Entertainment
CUP
Cultural Institutions
P
P
Schools, Public and Private
CUP
CUP
—
CUP
Schools, Related to Medical
Professions
MUP
MUP
MUP
MUP
Retail Trade Uses
Alcohol Sales (off -sale)
MUP
MUP
MUP
MUP
Section 20.48.030
Alcohol Sales (off - sale), Accessory
Only
P
MUP
MUP
P
Retail Sales (less than 10,000 sq.
ft.)
MUP
P
P
P
Retail Sales (10,000 sq. ft. or
greater)
CUP
Pharmacy, Medical Supplies
P
P
P
P
Service Uses — Business, Financial, Medical, and Professional
ATM
P
P
P
P
Convalescent Facilities
—
—
P
—
Emergency Health Facilities /Urgent
Care
P
P
P
P
Financial Institutions and Related
Services
P
P
P
P
Hospitals
—
—
CUP
—
Offices— Business
P
P
P
P
Offices — Corporate
P
P
—
P
Offices — Medical and Dental
P
P
P
P
Offices — Professional
P
P
P
P
Outpatient Surgery Facility
P
P
P
P
Service Uses — General
Ambulance Services
P
—
P
—
Animal Sales and Services
Animal Boarding /Kennels
P
CUP
Section 20.48.050
Animal Grooming
P
MUP
—
MUP
Section 20.48.050
Veterinary Services
P
CUP
CUP
CUP
Section 20.48.050
Artists' Studios
P
P
—
P
Catering Services
P
P
—
P
Day Care — General
MUP
MUP
MUP
MUP
Eating and Drinking Establishments
Accessory Food Service (open
to public)
P
P
P
P
Section 20.48.090
Bars, Lounges, and Nightclubs
CUP
CUP
Section 20.48.090
Fast Food (no late hours) (1)(2)
P /MUP
P /MUP
Section 20.48.090
Fast Food (with late hours) (1)
MUP
MUP
—
—
Section 20.48.090
Food Service (no alcohol, no
late hours) (1)(2)
P /MUP
P /MUP
P /MUP
P /MUP
Section 20.48.090
Food Service (no late hours) (1)
MUP
MUP
MUP
MUP
Section 20.48.090
Food Service (with late hours)
(1)
CUP
CUP
CUP
CUP
Section 20.48.090
Take -Out Service, Limited (2)
P /MUP
P /MUP
P /MUP
P /MUP
Section 20.48.090
Emergency Shelters
P
Section 20.48.100
Funeral Homes and Mortuaries,
without crematorium
MUP
MUP
MUP
MUP
Funeral Homes and Mortuaries,
with crematorium
CUP
CUP
CUP
CUP
Health /Fitness Facilities
Small -2,000 sq. ft. or less
P
P
P
P
Large —Over 2,000 sq. ft.
MUP
MUP
MUP
MUP
Laboratories
P
P
P
P
Maintenance and Repair Services
P
P
—
P
Massage Establishments
MUP
MUP
MUP
MUP
Chapter 5.50
Section 20.48.120
Massage Services, Accessory
MUP
MUP
MUP
MUP
Section 20.48.120
Personal Services, General
P
P
P
P
Personal Services, Restricted
MUP
MUP
MUP
MUP
Postal Services
P
P
P
P
Printing and Duplicating Services
P
P
P
P
Smoking Lounges
Visitor Accommodations, Nonresidential
Hotels, Motels, and Time Shares
CUP
—
CUP
—
Transportation, Communications, and Infrastructure Uses
Communication Facilities
P
P
—
P
Heliports and Helistops (3)
CUP
—
CUP
CUP
Parking Facilities
MUP
MUP
MUP
MUP
Parking Structures, adjacent to
residential district
—
CUP
CUP
—
Utilities, Minor
P
P
P
P
Utilities, Major
CUP
CUP
CUP
CUP
Wireless
CUP /MUP /LTP
CUP /MUP /LTP
CUP /MUP /LTP
CUP /MUP /LTP
Chapter 20.49
Telecommunication
Facilities
Chaptep
Vehicle Rental, Sale, and Service Uses
Vehicle Sales, Office Only
P
P
—
P
Vehicle /Equipment Rentals
Office Only
P
P
—
P
Vehicles for Hire
CUP
Vehicle /Equipment Rentals and
Sales
CUP
Vehicle /Equipment Repair
General
CUP
Limited
MUP
Vehicle /Equipment Services
Automobile Washing /Detailing,
self- service or accessory
MUP
MUP
—
MUP
Service Stations
CUP
Section 20.48.210
Other Use
Accessory Structures and Uses
P P P P
Drive - Through Facilities
MUP MUP
MUP
MUP
Section 20.48.080
Outdoor Storage and Display
P P
P
P
Section 20.48.140
Special Events
Chapter 11.03
Temporary Uses
LTP
LTP
LTP
LTP
Section 20.52.040
Uses Not Listed. Land uses that are not listed in the table above, or are not shown in a particular zoning
district are not allowed, except as otherwise provided by Section 20.12.020 (Rules of Interpretation).
(1) Late Hours. Facilities with late hours shall mean facilities that offer service and are open to the public past
11:00 p.m. any day of the week.
(2) Permitted or Minor Use Permit Required.
a. A minor use permit shall be required for any use located within five hundred (500) feet, property line to
property line, of any residential zoning district.
b. A minor use permit shall be required for any use that maintains late hours.
(3) Applicants for City approval of a heliport or helistop shall provide evidence that the proposed heliport or
helistop complies fully with State of California permit procedures and with all conditions of approval imposed
by the Federal Aviation Administration (FAA), the Airport Land Use Commission for Orange County (ALUC),
and by the Caltrans Division of Aeronautics.
Commercial Retail Zoning Districts
Permit Requirements
TABLE 2 -5
P Permitted by Right
ALLOWED USES
CUP Conditional Use Permit (Section 20.52.020)
AND PERMIT
REQUIREMENTS
MUP Minor Use Permit (Section 20.52.020)
LTP Limited Term Permit (Section 20.52.040)
— Not allowed
Land Use
Specific
See Part 7 of
CC
CG
CM
CN
CV
Use
this title for land
Regulations
use definitions.
See Chapter
20_12 for
unlisted uses.
Industry, Manufacturing and Processing, and Warehousing Uses
Handicraft Industry
I P
P
P
P
P
Recreation, Education, and Public Assembly Uses
Assembly /Meeting
CUP
CUP
CUP
CUP
CUP
Facilities
Commercial
CUP
CUP
CUP
CUP
CUP
Recreation and
Entertainment
Cultural Institutions
P
P
MUP
—
P
Schools, Public and
—
CUP
CUP
CUP
CUP
Private
Retail Trade Uses
Alcohol Sales (off- MUP
MUP
MUP MUP
MUP
Section
sale)
20.48.030
Alcohol Sales (off-
P
P
P
P
P
sale), Accessory
Only
Bulk merchandise
—
P
—
P
—
Marine Rentals and Sales
Boat Rentals and
—
CUP
CUP
—
CUP
Sales
Marine Retail
P
P
P
—
P
Sales
Retail Sales
P
P
P
P
—
Visitor- Serving Retail
P
—
—
—
P
Service Uses — Business, Financial, Medical, and Professional
ATM
P
P
P
P
P
Emergency Health
MUP
MUP
MUP
Facility /Urgent Care
(above 1 st floor only)
Financial Institutions
P
P
—
P
P
and Related Services
Offices — Corporate
(above 1st floor only)
P
P
P
P
—
Offices— Business
P
P
P
P
P
Offices — Medical and
Dental
P
P
—
P
P
Offices—
Professional (above
1 st floor only)
P
P
P
P
P
Outpatient Surgery
Facility (above 1st
floor only)
MUP
MUP
P
Service Uses — General
Ambulance Services
—
MUP
—
—
—
Animal Sales and Services
Animal
Boarding /Kennels
CUP
CUP
—
CUP
—
Section
20.48.050
Animal Grooming
P
P
—
P
P
Section
20.48.050
Animal Retail
Sales
P
P
—
P
P
Section
20.48.050
Veterinary
Services
CUP
CUP
—
CUP
—
Section
20.48.050
Artists' Studios
P
P
P
P
P
Catering Services
—
P
P
P
P
Day Care, General
MUP
MUP
—
MUP
MUP
Eating and Drinking Establishments
Accessory Food
Service (open to
public)
P
P
P
P
P
Section
20.48.090
Bars, Lounges,
and Nightclubs
CUP
CUP
CUP
CUP
CUP
Section
20.48.090
Fast Food (no late
hours) (1)(2)
P /MUP
P /MUP
P /MUP
P /MUP
P /MUP
Section
20.48.090
Fast Food (with
MUP
MUP
MUP
MUP
MUP
Section
late hours) (1)
20.48.090
Food Service (no
P /MUP
P /MUP
P /MUP
P /MUP
P /MUP
Section
alcohol, no late
20.48.090
hours) (1)(2)
Food Service (no
MUP
MUP
MUP
MUP
MUP
Section
late hours) (1)
20.48.090
Food Service (with
CUP
CUP
CUP
CUP
CUP
Section
late hours) (1)
20.48.090
Take -Out Service,
P /MUP
P /MUP
P /MUP
P /MUP
P /MUP
Section
Limited (2)
20.48.090
Funeral Homes and
—
MUP
—
—
—
Mortuaries, without
crematorium
Funeral Homes and
—
CUP
—
—
—
Mortuaries, with
crematorium
Health /Fitness Facilities
Small -2,000 sq.
P
P
P
P
P
ft. or less
Large —Over
MUP
MUP
MUP
MUP
MUP
2,000 sq. ft.
Laboratories
—
P
—
—
Maintenance and
P
P
—
P
—
Repair Services
Marine Services
Boat Storage
—
—
CUP
—
Boat Yards
—
—
CUP
—
Entertainment and
—
—
P
—
P
Title 17
Excursion
Services
Marine Service
—
—
CUP
—
CUP
Stations
Water
—
—
MUP
—
MUP
Transportation
Services
Massage
Establishments
MUP
MUP
—
MUP
MUP
Chapter 5.50
Section
20.48.120
Massage Services,
Accessory
MUP
MUP
—
MUP
MUP
Section
20.48.120
Nail Salons
P
P
—
P
P
Personal Services,
General
P
P
—
P
P
Personal Services,
Restricted
MUP
MUP
—
MUP
MUP
Studio
P
P
—
P
P
Postal Services
P
P
—
P
P
Printing and
Duplicating Services
P
P
—
P
—
Recycling Facilities
Collection
Facility —Small
MUP
MUP
—
MUP
—
Section
20.48.160
Smoking Lounges
Visitor Accommodations
Bed and Breakfast
Inns
MUP
MUP
MUP
—
MUP
Section
20.48.060
Hotels and Motels
CUP
CUP
CUP
—
CUP
RV Parks
CUP
Time Share
Facilities
—
CUP
—
—
CUP
Section
20.48.220
Transportation, Communications, and Infrastructure Uses
Communication
Facilities
MUP
P
MUP
—
P
Marinas
Title 17
Marina Support
Facilities
—
—
MUP
—
MUP
Parking Facilities
MUP
MUP
MUP
MUP
MUP
Parking Structure,
adjacent to
CUP
CUP
—
CUP
CUP
residential zoning
district
Utilities, Minor
P
P
P
P
P
Utilities, Major
CUP
CUP
CUP
CUP
CUP
Wireless
Telecommunication
MUP /CUP /LTP
MUP /CUP /LTP
MUP /CUP /LTP
MUP /CUP /LTP
MUP /CUP /LTP
Chapter
20.49
Facilities
Vehicle Rental, Sale, and Service Uses
Vehicle /Equipment Rentals
General
—
CUP
CUP
Office Only
P
P
P
P
P
Limited
P
P
P
—
P
Vehicles for Hire
—
CUP
—
—
CUP
Vehicle /Equipment Repair
General
—
CUP
—
—
—
Limited
MUP
MUP
MUP
Vehicle Sales, Office
Only
P
P
P
P
P
Vehicle /Equipment Services
Automobile
Washing /Detailing,
full service
—
MUP
—
MUP
MUP
Automobile
Washing /Detailing,
self- service or
accessory
P
P
—
P
MUP
Service Stations
CUP
CUP
—
CUP
CUP
Section
20.48.210
Other Uses
Accessory Structures
and Uses
P
P
P
P
P
Drive - Through
MUP
MUP
MUP
MUP
MUP
Section
Facilities
20.48.080
Special Events
Chapter 11.03
Outdoor Storage and
P
P
P
P
P
Section
Display
1
20.48.140
Temporary Uses
LTP
LTP
LTP
LTP
LTP
Section
20.52.040
Uses Not Listed. Land uses that are not listed in the table above, or are not shown in a particular zoning
district, are not allowed, except as otherwise provided by Section 20.12.020 (Rules of Interpretation).
(1) Late Hours. Facilities with late hours shall mean facilities that offer service and are open to the public past
11:00 p.m. any day of the week.
(2) Permitted or Minor Use Permit Required.
a. A minor use permit shall be required for any use located within five hundred (500) feet, property line to
property line, of any residential zoning district.
b. A minor use permit shall be required for any use that maintains late hours.
A. 20.22.020 Mixed -Use Zoning Districts Land Uses and Permit Requirements.
A. Allowed Land Uses. Tables 2 -8, 2 -9, and 2 -10 indicate the uses allowed within each zoning district
and the permit required to establish each use, in compliance with Part 5 of this title (Planning Permit
Procedures).
B. Prohibited Land Uses. Any table cell with " —" means that the listed land use is prohibited in that
specific zoning district.
C. Applicable Regulations. The last column in the tables ( "Specific Use Regulations ") may include a
reference to additional regulations that apply to the use.
Mixed -Use Zoning Districts
Permit Requirements
P
Permitted by Right
TABLE 2 -8
ALLOWED USES AND
CUP
Conditional Use Permit (Section 20.52.020)
PERMIT REQUIREMENTS
MUP
Minor Use Permit (Section 20.52.020)
LTP
Limited Term Permit (Section 20.52.040)
—
Not Allowed*
Land Use
See Part 7 of this title for
land use definitions.
MU -V
MU -MM (6)
MU -DW
MU -CV /15th
St. (7)
Specific Use
Regulations
See Chapter 20_12 for
unlisted uses.
Industry, Manufacturing and Processing, Warehousing Uses
Handicraft Industry
P
P
P
P
Industry, Marine - Related
—
CUP
—
MUP
Research and Development
P
P
P
P
Recreation, Education, and Public Assembly Uses
Assembly /Meeting Facilities
CUP
CUP
CUP
CUP
Commercial Recreation and
CUP
CUP
CUP
CUP
Entertainment
Cultural Institutions
P
P
P
P
Schools, Public and Private
I CUP
I CUP
CUP
I CUP
Residential Use ,
Single -Unit Dwellings
Located on 1st floor
—
—
—
P (3)
Section
20.48.130
Located above 1st floor
P (1)
P (3)
Section
20.48.130
Multi -Unit Dwellings
Located on 1st floor
—
P (1)(2)
P (1)
P (3)
Section
20.48.130
Located above 1st floor
P (1)
P (1)(2)
P (1)
P (3)
Section
20.48.130
Two -Unit Dwellings
Located on 1 st floor
—
—
—
P (3)
Section
20.48.130
Located above 1st floor
P (1)
P (3)
Section
20.48.130
Home Occupations
P
P (1)
P
P
Section
20.48.130
Live -Work Units
P
P (1)(2)
P
P (3)
Care Uses
Adult Day Care
Small (6 or fewer)
P
P
P
P
Child Day Care
Small (8 or fewer)
P
P
P
P
Section
20.48.070
Day Care, General
—
MUP
—
MUP
Section
20.48.070
Retail Trade Uses
Alcohol Sales (off -sale)
MUP
MUP
—
MUP
Section
20.48.030
Alcohol Sales (off - sale),
Accessory Only
P
P
P
P
Marine Rentals and Sales
Boat Rentals and Sales
CUP
P
—
CUP
Marine Retail Sales
P
P
P
P
Retail Sales
P
P
P
P
Service Uses — Business, Financial, Medical, and Professional
ATMs
P
P
P
P
Emergency Health Care /Urgent
Care
MUP
MUP
MUP
MUP
Financial Institutions and
Related Services
P
P
P
P
Offices — Business
P
P
P
P
Offices — Medical and Dental
P
P
P
P
Offices — Professional
P
P
P
P
Service Uses — General
Animal Sales and Services
Animal Grooming
P
P
P
P
Section
20.48.050
Animal Retail Sales
P
P
—
P
Section
20.48.050
Veterinary Services
—
CUP
CUP
—
Section
20.48.050
Artists' Studios
P
P
P
P
Eating and Drinking Establishments
Accessory food service (open
to public)
P
P
P
P
Section
20.48.090
Fast Food (no late hours)
(4)(5)
P /MUP
P /MUP
—
P /MUP
Section
20.48.090
Fast Food (with late hours)
(4)
MUP
MUP
—
MUP
Section
20.48.090
Food Service (no late hours)
(4)(5)
P /MUP
P /MUP
—
P /MUP
Section
20.48.090
Food Service (with late hours)
(4)
CUP
CUP
—
CUP
Section
20.48.090
Take -Out Service, Limited (5)
P /MUP
P /MUP
—
P /MUP
Section
20.48.090
Health /Fitness Facilities
Small -2,000 sq. ft. or less
P
P
MUP
P
Large —Over 2,000 sq. ft
CUP
CUP
—
CUP
Laboratories
—
—
P
—
Maintenance and Repair
Services
P
P
—
P
Marine Services
Entertainment and Excursion
Services
P
P
—
P
Title 17
Marine Service Stations
CUP
Personal Services
Massage Establishments
MUP
MUP
MUP
MUP
Chapter 5.50
Section
20.48.120
Massage Services,
Accessory
MUP
MUP
MUP
MUP
Section
20.48.120
Nail Salons
P
P
P
P
Personal Services, General
P
P
P
P
Personal Services, Restricted
MUP
MUP
MUP
MUP
Studio
MUP
MUP
MUP
MUP
Postal Services
P
P
P
P
Printing and Duplicating
Services
P
P
P
P
Smoking Lounges
Visitor Accommodations
Hotels, Motels, and Time
Shares
CUP
CUP
—
CUP
Bed and Breakfast Inns
—
CUP
—
—
Transportation, Communications, and Infrastructure Uses
Parking Facility
MUP
MUP
MUP (2)
MUP (2)
Marinas
Title 17
Marina Support Facilities
MUP
MUP
—
MUP
Utilities, Minor
P
P
P
P
Utilities, Major
CUP
CUP
CUP
CUP
Wireless Telecommunication
MUP /CUP /LTP
MUP /CUP /LTP
MUP /CUP /LTP
MUP /CUP /LTP
Chapter 20.49
Facilities
rh apteF
Vehicle Rental, Sale, and Service Uses
Vehicle /Equipment Rentals
Office Only
P
P
P
P
Limited (no outdoor storage)
—
MUP
—
—
Vehicle /Equipment Repair
Limited
—
MUP
—
—
Vehicle Sales
—
CUP
—
—
Vehicle Sales, Office Only
P
P
P
—
Vehicle /Equipment Services
Automobile Washing
—
CUP
—
—
Service Stations
—
CUP
—
—
Section
20.48.210
Other Uses
Accessory Structures and Uses
MUP
MUP
MUP MUP
Outdoor Storage and Display
MUP
MUP
MUP
MUP
Section
20.48.140
Personal Property Sales
P
P
P
P
Section
20.48.150
Special Events
Chapter 11_03
Temporary Uses
LTP
LTP
LTP
LTP
Section
20.52.040
Uses Not Listed. Land uses that are not listed in the table above, or are not shown in a particular zoning
district, are not allowed, except as otherwise provided by Section 20.12.020 (Rules of Interpretation).
(1) Allowed only as part of a mixed -use development. Refer to Section 20.48.130 (Mixed -Use Projects) for
additional development standards.
(2) Not allowed to front onto Coast Highway. Coast Highway frontage shall be limited to nonresidential uses.
See Table 2 -10 (Development Standards for Vertical and Horizontal Mixed -Use Zoning Districts).
(3) Not allowed on lots at street intersections unless part of a mixed -use or live -work structure.
(4) Late Hours. Facilities with late hours shall mean facilities that offer service and are open to the public after
11:00 p.m. any day of the week.
(5) Permitted or Minor Use Permit Required.
a. A minor use permit shall be required for any use located within five hundred (500) feet, property line to
property line, of any residential zoning district.
b. A minor use permit shall be required for any use that maintains late hours.
(6) Properties fronting on Coast Highway shall be developed with nonresidential uses as allowed in Table 2-
9. Properties to the rear of the commercial frontage may be developed for freestanding nonresidential uses,
multi -unit residential dwelling units, or mixed -use structures that integrate multi -unit residential above the
ground floor with nonresidential uses on the ground floor. See Table 2 -10 (Development Standards for
Vertical and Horizontal Mixed -Use Zoning Districts).
(7) Mixed -use or commercial structures are required on lots at street intersections and are allowed, but not
required, on other lots.
Mixed -Use Zoning Districts
Permit Requirements
P
Permitted by Right
CUP
Conditional Use Permit
TABLE 2 -9
(Section 20.52.020)
ALLOWED USES AND PERMIT REQUIREMENTS
Minor Use Permit (Section
MUP
20.52.020)
Limited Term Permit
LTP
(Section 20.52.040)
—
Not allowed
Land Use
Specific Use
See Part 7 of this title for land use definitions.
MU -W1 (5)(6)
MU -W2
Regulations
See Chapter 20_12 for unlisted uses.
Industry, Manufacturing and Processing, Warehousing Uses
Handicraft Industry
P
P
Industry, Marine - Related
P
P
Research and Development
P
P
Recreation, Education, and Public Assembly Uses
Assembly /Meeting Facilities
Small -5,000 sq. ft. or less (religious assembly may be
larger than 5,000 sq. ft.)
CUP
CUP
Commercial Recreation and Entertainment
CUP
CUP
Cultural Institutions
P
P
Parks and Recreational Facilities
CUP
CUP
Schools, Public and Private CUP CUP
Residential Uses
Single -Unit Dwellings
Located on 1st floor
—
—
Located above 1st floor
P (1)
P (2)
Section
20.48.130
Multi -Unit Dwellings
Located on 1st floor
—
—
Located above 1 st floor
P (1)
P (2)
Section
20.48.130
Two -Unit Dwellings
Located on 1st floor
—
—
Located above 1 st floor
P (1)
P (2)
Home Occupations
P
P (2)
Section
20.48.110
Care Uses
Adult Day Care
Small (6 or fewer)
P
P
Child Day Care
Small (8 or fewer)
P
P
Section
20.48.070
Day Care, General
—
MUP
Section
20.48.070
Retail Trade Uses
Alcohol Sales (off -sale)
MUP
MUP
Section
20.48.030
Alcohol Sales (off - sale), Accessory Only
P
P
Marine Rentals and Sales
Boat Rentals and Sales
P
P
Marine Retail Sales
P
P
Retail Sales
P
P
Visitor - Serving Retail
P
P
Service Uses — Business, Financial, Medical, and Professional
ATMs
P
P
Emergency Health Facilities /Urgent Care
—
P
Financial Institutions and Related Services (above 1st floor
only)
P
P
Offices — Business
P
P
Offices — Medical and Dental (above 1st floor only)
—
P
Offices — Profession
P
P
Service Uses — General
Animal Retail Sales
MUP
MUP
Section
20.48.050
Artists' Studios
P
P
Eating and Drinking Establishments
Accessory Food Service (open to public)
P
P
Section
20.48.090
Fast Food (no late hours) (3)(4)
P /MUP
P /MUP
Section
20.48.090
Fast Food (with late hours) (3)
MUP
MUP
Section
20.48.090
Food Service (no alcohol, no late hours) (3)(4)
P /MUP
P /MUP
Section
20.48.090
Food Service (no late hours) (3)
MUP
MUP
Section
20.48.090
Food Service (with late hours) (3)
CUP
CUP
Section
20.48.090
Take -Out Service — Limited (3) (4)
P /MUP
P /MUP
Section
20.48.090
Health /Fitness Facilities
Small -2,000 sq. ft. or less
P
P
Maintenance and Repair Services
P
P
Marine Services
Boat Storage
CUP
CUP
Boat Yards
CUP
CUP
Entertainment and Excursion Services
P
P
Marine Service Stations
CUP
CUP
Water Transportation Services
P
P
Personal Services
Massage Establishments
MUP
MUP
Chapter 5.50
Section
20.48.120
Massage Services, Accessory
MUP
MUP
Section
20.48.120
Nail Salons
P
P
Personal Services, General
P
P
Personal Services, Restricted
MUP
MUP
Smoking Lounges
Visitor Accommodations
Hotels, Motels, Bed and Breakfast Inns, and Time Shares
CUP
CUP
Transportation, Communications, and Infrastructure
Parking Facilities
MUP
MUP
Communication Facilities
P
P
Heliports and Helistops (7)
CUP
CUP
Marinas
Title 17
Marina Support Facilities
MUP
MUP
Utilities, Minor
P
P
Utilities, Major
CUP
CUP
ireless Telecommunication Facilities
MUP /CUP /LTP
MUP /CUP /LTP
Chapter 20.49
inicat on Facilities
Chapter
Other Uses
Accessory Structures and Uses
MUP
MUP
Outdoor Storage and Display
MUP
MUP
Section
20.48.140
Personal Property Sales
P
P
Section
20.48.150
Special Events
Chapter 11.03
Temporary Uses
LTP
LTP
Section
20.52.040
Uses Not Listed. Land uses that are not listed in the table above, or are not shown in a particular zoning
district, are not allowed, except as otherwise provided by Section 20.12.020 (Rules of Interpretation).
(1) May only be located on lots with a minimum of two hundred (200) lineal feet of frontage on Coast
Highway. Refer to Section 20.48.130 (Mixed -Use Projects) for additional development standards.
(2) May only be located above a commercial use and not a parking use. Refer to Section 20.48.130 (Mixed-
Use Projects) for additional development standards.
(3) Late Hours. Facilities with late hours shall mean facilities that offer service and are open to the public past
11:00 p.m. any day of the week.
(4) Permitted or Minor Use Permit Required.
a. A minor use permit shall be required for any use located within five hundred (500) feet, property line to
property line, of any residential zoning district.
b. A minor use permit shall be required for any use that maintains late hours.
(5) Approval of a minor site development review, in compliance with Section 20.52.080, shall be required
prior to any development to ensure that the uses are fully integrated and that potential impacts from their
differing activities are fully mitigated.
(6) A minimum of fifty (50) percent of the square footage of a mixed -use development shall be used for
nonresidential uses.
(7) Applicants for City approval of a heliport or helistop shall provide evidence that the proposed heliport or
helistop complies fully with State of California permit procedures and with any and all conditions of approval
imposed by the Federal Aviation Administration (FAA), the Airport Land Use Commission for Orange County
(ALUC), and by the Caltrans Division of Aeronautics.
A. 20.24.020 Industrial Zoning District Land Uses and Permit Requirements.
A. Allowed Land Uses. Table 2 -12 indicates the uses allowed within each zoning district and the permit
required to establish each use, in compliance with Part 5 of this title (Planning Permit Procedures).
B. Prohibited Land Uses. Any table cell with " —" means that the listed land use is prohibited in that
specific zoning district.
C. Applicable Regulations. The last column in the tables ( "Specific Use Regulations') may include a
reference to additional regulations that apply to the use.
Industrial Zoning District
Permit Requirements
P
Permitted by Right
TABLE 2 -12
Conditional Use Permit (Section
ALLOWED USES AND PERMIT
CUP
20.52.020)
REQUIREMENTS
MUP
Minor Use Permit (Section 20.52.020)
LTP
Limited Term Permit (Section 20.52.040)
—
Not allowed
Land Use
See Part 7 of this title for land use
IG
Specific Use Regulations
definitions.
See Chapter 20_12 for unlisted uses.
Industry, Manufacturing and Processing, Warehousing Uses
Food Processing
P
Handicraft Industry
P
Industry
Small- 10,000 sq. ft. or less
P
Large —Over 10,000 sq. ft.
MUP
Personal Storage (Mini Storage)
MUP
Research and Development, General
P
Research and Development, Restricted
MUP
Warehousing
Small- 10,000 sq. ft. or less
P
Large —Over 10,000 sq. ft
MUP
Wholesaling
P
Recreation, Education, and Public Assembly Uses
Assembly /Meeting Facilities
CUP
Retail Trade Uses
Alcohol Sales (off -sale)
MUP
Section 20.48.030
Alcohol Sales (off - sale), Accessory Only
P
Building Materials and Services
P
Contractor's Storage Yards
MUP
Marine Rentals and Sales
Boat Rentals and Sales
MUP
Marine Retail Sales
P
Retail Sales
P
Service Uses — Business, Financial, Medical, and Professional
ATMs
P
Offices — Business and Professional
P
Service Uses — General
Ambulance Services
P
Animal Sales and Services
Animal Boarding /Kennels
MUP
Section 20.48.050
Animal Grooming
P
Section 20.48.050
Animal Hospitals /Clinics
MUP
Section 20.48.050
Animal Retail Sales
P
Section 20.48.050
Catering Services
P
Eating and Drinking Establishments
Take -Out Service— Limited
P
Section 20.48.090
Funeral Homes and Mortuaries
CUP
Health /Fitness Facilities
Small -2,000 sq. ft. or less
P
Large —Over 2,000 sq. ft.
MUP
Laboratories
P
Maintenance and Repair Services
P
Marine Services
Boat Storage
MUP
Boat Yards
MUP
Personal Services
Studios
P
Postal Services
P
Printing and Duplicating Services
P
Recycling Facilities
Collection Facility —Large
CUP
Section 20.48.160
Collection Facility —Small
MUP
Section 20.48.160
Transportation, Communications, and Infrastructure Uses
Communication Facilities
P
Heliports and Helistops (1)
CUP
Parking Facilities
P
Utilities, Minor
P
Utilities, Major
CUP
Wireless Telecommunication Facilities
MUP /CUP /LTP
Chapter 20.49
Vehicle Rental, Sale, and Service Uses
Vehicle /Equipment Rentals
Office Only
P
Limited
P
Vehicles for Hire
CUP
Vehicle /Equipment Rentals and Sales
MUP
Vehicle /Equipment Repair
General
CUP
Limited
MUP
Vehicle /Equipment Services
Automobile Washing /Detailing
MUP
Service Stations
CUP
Section 20.48.210
Vehicle Storage
Other Us.
Accessory Structures and Uses
MUP
P
Caretaker Residence
P
Drive - Through Facilities
CUP
Section 20.48.080
Outdoor Storage and Display
MUP
Section 20.48.140
Special Events
Chapter 11.03
Temporary Uses
LTP
Section 20.52.040
Uses Not Listed. Land uses that are not listed in the table above, or are not shown in a particular zoning
district, are not allowed, except as otherwise provided by Section 20.12.020 (Rules of Interpretation).
(1) Applicants for City approval of a heliport or helistop shall provide evidence that the proposed heliport or
helistop complies fully with State of California permit procedures and with any and all conditions of approval
imposed by the Federal Aviation Administration (FAA), the Airport Land Use Commission for Orange County
(ALUC), and by the Caltrans Division of Aeronautics.
A. 20.26.020 Special Purpose Zoning Districts Land Uses and Permit
Requirements.
A. Allowed Land Uses. Table 2 -14 indicates the uses allowed within each zoning district and the permit
required to establish each use, in compliance with Part 5 of this title (Planning Permit Procedures).
B. Prohibited Land Uses. Any table cell with " —" means that the listed land use is prohibited in that
specific zoning district.
C. Applicable Regulations. The last column in the tables ( "Specific Use Regulations ") may include a
reference to additional regulations that apply to the use.
Special Purpose Zoning Districts
Permit Requirements
P Permitted by Right
TABLE 2 -14
ALLOWED USES AND
CUP Conditional Use Permit (Section 20.52.020)
PERMIT REQUIREMENTS
MUP Minor Use Permit (Section 20.52.020)
LTP Limited Term Permit (Section 20.52.040)
— Not allowed
Land Use
See Part 7 of this title for
Specific Use
land use definitions.
OS
PF
PI
PR
Regulations
See Chapter 20_12 for
unlisted uses.
Recreation, Education, and Public Assembly Uses
Assembly /Meeting Facilities
—
MUP
MUP
MUP
Commercial Recreation and
MUP
CUP
Entertainment
Cultural Institutions
—
MUP
MUP
MUP
Parks and Recreational Facilities
Active
—
MUP
MUP
MUP
Passive
MUP
MUP
MUP
MUP
Marine and Wildlife Preserves
MUP
Schools, Public and Private
—
MUP
MUP
—
Care Uses
Congregate Care Home
—
—
MUP
—
Convalescent Facilities
—
—
MUP
—
Day Care, General
—
MUP
MUP
—
Section
20.48.070
Emergency Health
Facility /Urgent Care
—
—
MUP
—
Hospital
—
—
MUP
—
Residential Care, Accessory
Use Only
—
MUP
MUP
Retail Trade Uses
Alcohol Sales (on- sale),
Accessory Only
MUP
CUP
Service Uses — General
Eating and Drinking Establishments
Accessory (open to public)
MUP
MUP
Section
20.48.090
Emergency Shelters
—
—
P
—
Section
20.48.100
Governmental Facilities
—
MUP
—
MUP
Marine Services —Boat Storage
and Boat Yard, Accessory Only
—
MUP
MUP
MUP
Transportation, Communications, and Infrastructure
Parking Facilities, Accessory
Only
—
MUP
MUP
MUP
Heliports and Helistops (1)
—
MUP
—
—
Marinas
MC Title 17
Marina Support Facilities
—
MUP
MUP
MUP
Utilities, Minor
P
P
P
P
Utilities, Major
CUP
CUP
CUP
CUP
Wireless Telecommunication
—
MUP /CUP /LTP
MUP /CUP /LTP
MUP /CUP /LTP
Chapter20.49
Facilities
As
Chapter �n
Other Uses
Accessory Structures and Uses MUP MUP MUP MUP
Special Events Chapter 11.03
Temporary Uses LTP `7 LTP LTP Section
20.52.040
Uses Not Listed. Land uses that are not listed in the table above, or are not shown in a particular zoning
district, are not allowed, except as otherwise provided by Section 20.12.020 (Rules of Interpretation).
(1) Applicants for City approval of a heliport or helistop shall provide evidence that the proposed heliport or
helistop complies fully with State of California permit procedures and with any and all conditions of approval
imposed by the Federal Aviation Administration (FAA), the Airport Land Use Commission for Orange County
(ALUC), and by the Caltrans Division of Aeronautics.
(2) Wireless Telecommunication Facilities are prohibited in the OS Zoning District unless collocated
on an existing Utility Tower within a utility easement area, or collocated on an existing Telecom
Facility (Section 20.49.050.13)
Attachment No. PC 2
Summary of Proposed Changes to
Telecom Ordinance
ATTACHMENT No. PC 2
Summary of Proposed Changes to Telecom Ordinance
Existing Section
Proposed Changes /Comments
Proposed Section
15.70.010 Purpose and Intent
No policy change; minor wording changes to state the provisions of this Chapter apply to all providers and
Replaced by
operators of wireless services whether authorized by state or federal regulations.
20.49.010 Purpose and Intent
15.70.020 General Provisions
. Revised to require an application for a conditional use permit (CUP), minor use permit (MUP), or limited
Replaced by
term permit for any telecom facility, depending on method of installation, or duration of telecom facility.
20.49.020 General Provisions
. Revised to include requirement for encroachment permits for facilities located in the public right -of -way.
Revised to include requirement of a license agreement for any facility located on City -owned property.
• Updated to identify types of facilities that are exempt from regulations of this Chapter. Includes
exemption of systems installed or operated by the City (as currently provided for in existing Section
15.70.110).
Provision added regarding legal nonconforming facilities.
15.70.030 Definitions
. Definitions added to reflect current industry standards (words such as "base station," "wireless tower,"
Replaced by
or "distributed antenna system (DAS) ").
20.49.030 Definitions
. Definitions updated to ensure consistency with Chapter 13.20 (Public Rights -of -Way) of the NBMC.
• Definitions added to identify types of telecom facilities as an antenna class based on aesthetic impacts
and method of installation.
15.70.040 Available Technology
No policy change; minor wording changes only.
Replaced by
20.49.040 Available Technology
15.70.050 Height and Location
. Height regulations moved to "Development and Design Standards' in proposed Section 20.49.060
Replaced by
(page 2).
20.49.050 Location Preferences
. Location categories (such as a "wall, roof or existing co- location structure or site ") identified as a new
distinct antenna class. Examples of typical telecom facilities provided for each antenna class.
• Minor changes to priority order of location preference of a telecom facility, based on antenna class.
• Prohibited locations updated to prohibit telecom facilities on single - family development, two - family
development, or multi -unit residential developments consisting of 4 dwelling units or less. Exception to
allow telecom facilities in an Open Space zoning district when collocated on an existing nonconforming
telecom facility or site.
Regulations for installations in the public right-of-way added.
Page 1
Existing Section
Proposed Changes /Comments
Proposed Section
15.70.060 Design Standards
0 Height regulations moved to this section (from existing Section 15.70.050).
Replaced by
a Height subsection revised to allow telecom facility antennas, equipment, or screen structures to be
20.49.060 General Development
installed:
and Design Standards
• up to 5 feet above base height limit for the zoning district in which the telecom facility is located with
approval of MUP, or
• up to the maximum height limit with approval of a CUP.
For example, for a commercial retail zoning district within the Shoreline Height Limit Zone, the base
height limit is 26 feet with a flat roof, or 31 feet with a sloped roof, and the maximum height limit is 35
feet with a flat roof, or 40 feet with a sloped roof. The existing telecom ordinance allows antennas to be
installed up to the maximum height limit, or in this example up to 35 feet if disguised or screened within
a flat roof structure or 40 feet if disguised or screened within a sloped roof structure.
• Provision added to require telecom facilities to comply with Airport Environs Land Use Plan and Airport
Land Use Commission review requirements.
• Setback requirements updated to require an additional setback or "fall zone' for ground- mounted
"wireless towers" in the event of involuntary damage, which would be the greater distance of either the
required setback established by the Zoning Code or 110% of the height of the "wireless tower."
• Detailed design and screening techniques added based on antenna class.
• Requirement added for evaluation of potential impacts to public views.
• Maintenance requirements added.
15.70.070 Permit Review
• Table added to reflect type of permit required based on location of facility, and antenna class (i.e.,
Procedures
MUP, CUP, or LTP).
Replaced by
. Public notice and public hearing requirements added, consistent with Chapter 20.62 of the Zoning
20.49.070 Permit Review
Code. All applications for a telecom facility require a public hearing before the Zoning Administrator or
Procedures
Planning Commission, with appeal provisions to the City Council.
• Findings for telecom facilities added, including additional findings for applications which request to
exceed height limits.
15.70.080 Radiation Report
a Radiation report requirements moved to proposed Section 20.49.110 (page 3).
Proposed New Section
• Process for implementation of permits, time limits, and extensions for telecom facilities added,
20.49.080 Permit Implementation,
consistent with Chapter 20.54 of Zoning Code.
Time Limits, Duration, and Appeals
• Appeal procedures consistent with Chapter 20.64 of the Zoning Code added, allowing any interested
party to appeal a decision on an application.
15.70.090 Right to Review or
• Regulations regarding the right to remove or revoke a telecom permit granted by the City revised and
Revoke Permit
moved to proposed Section 20.49.120 (page 3).
• Regulations regarding changed circumstances updated and moved to proposed Section 20.49.100
(page 3.
Page 2
Existing Section
Proposed ChangestComments
Proposed Section
Proposed New Section
a
Proposed Section 20.49.090 added, requiring a license agreement for any telecom facility located on
20.49.090 Agreement for Use of
City property.
City -owned or City -held Trust
0
Procedure for processing license agreements described in Council Policy L -23.
Property
15.70.100 Removal of Telecom
.
Section 15.70.100 moved to proposed Section 20.49.130 (below).
Facilities
Proposed New Section
.
Proposed Section 20.49.100 added to provide regulations consistent with federal law for modifications
20.49.100 Modification of Existing
to existing telecom facilities.
Telecom Facilities
0
Modifications to existing facilities that do not "substantially change the physical dimensions' of the
telecom facility are subject to a ministerial review and approval and do not require processing of a
discretionary permit, as required by federal regulations.
•
Changes to existing facilities that meet the criteria of "substantially change the physical dimensions' by
increasing or decreasing by 5% or more the height, width, or depth in any direction of any portion of the
existing "wireless tower'" or "base station" will require the processing of a new discretionary permit.
15.70.110 Exemption for City
0
Section 15.70.110 (Exemption for City Systems) relocated and updated in proposed Section 20.49.020
Systems
General Provisions).
Proposed New Section
.
Radiation report requirements unchanged from existing Section 15.70.080.
20.49.110 Operational and Radio
.
Provision added to require compliance with the most current regulatory and operational standards
Frequency Compliance and
adopted by the FCC.
Radiation Report
.
Provision added to require an updated RF compliance report be prepared and submitted upon any
proposed increase of at least 10% in effective radiated power or change in frequency use of the
telecom facility.
Proposed New Section
.
Moved from existing Section 15.70.090 to proposed new section.
20.49.120 Right to Review or
.
Provisions regarding `changed circumstance" (subsection A.) deleted.
Revoke Permit
0
No policy change or revisions to provision regarding right to revoke or modify permit subsection B.).
Proposed New Section
.
Moved from existing Section 15.70.100 to this proposed new section.
20.49.130 Removal of Telecom
.
No policy change; minor revisions to text providing Community Development Director the ability to
Facilities
exercise discretion as to what constitutes a "reasonable period of time" when an operator proposes to
transfer rights to another operator.
Page 3
The "Allowed Uses and Permit Requirements" tables in the following sections of the Zoning Code would be updated to
reflect the zoning districts in which telecom facilities are allowed and the permit required to establish a telecom facility.
Under the existing and proposed telecom ordinance, telecom facilities are allowed in all commercial, mixed -use, and
industrial zoning districts, as well as on properties zoned for public facilities, private institutions, and active public or
private recreational uses.
Table
Existing Code Section
Table 2 -1 Residential Zoning Districts
Section 20.18.020 — Residential Zoning Districts Land Uses and Permit Requirements
Table 2 -4 Commercial Office Zoning Districts
Table 2 -5 Commercial Retail Zoning Districts
Section 20.20.020 — Commercial Zoning Districts Land Uses and Permit Requirements
Tables 2 -8 and 2 -9 Mixed -Use Zoning Districts
Section 20.22.020 — Mixed -Use Zoning Districts Land Uses and Permit Requirements
Table 2 -12 Industrial Zoning District
Section 20.24.020 — Industrial Zoning Districts Land Uses and Permit Requirements
Table 2 -14 Special Purpose Zoning Districts
Section 20.26.020 — Special Purpose Zoning Districts Land Uses and Permit Requirements
Page 4
Attachment No. PC 3
Existing Chapter 15.70
Sections:
15.70.010
15.70.020
15.70.030
15.70.040
1 5.70.050
15.70.060
15.70.070
15.70.080
15.70.090
15.70.100
15.70.110
Chapter 15.70
WIRELESS TELECOMMUNICATION FACILITIES
Purpose and Intent.
General Provisions.
Definitions.
Available Technology.
Height and Location.
Design Standards.
Permit Review Procedures.
Radiation Report.
Right to Review or Revoke Permit
Removal of Telecom Facilities.
Violation a Misdemeanor.
15.70.010 Purpose and Intent.
A. Purpose. The purpose of this chapter is to provide for wireless telecommunication ( "telecom ")
facilities on public and private property consistent with federal law while ensuring public safety, reducing
the visual effects of telecom equipment on public streetscapes, protecting scenic, ocean and coastal
views, and otherwise mitigating the impacts of such facilities. More specifically, the regulations contained
herein are intended to:
1. Encourage the location of antennas in non - residential areas.
2. Strongly encourage co- location at new and existing antenna sites.
3. Encourage telecom facilities to be located in areas where adverse impacts on the
community and on public views are minimized.
B. The provisions of this chapter are not intended and shall not be interpreted to prohibit or to have the
effect of prohibiting telecom services. This chapter shall not be applied in such a manner as to
unreasonably discriminate among providers of functionally equivalent telecom services. (Ord. 2002 -24 § 1
(part), 2002)
15.70.020 General Provisions.
A. Applicability. These regulations are applicable to telecom facilities providing voice and /or data
transmission such as, but not limited to, cell phone and radio relay stations.
B. Exempt Facilities. Amateur radio and receiving satellite dish antennas regulated by Chapter 20.61 are
exempt from the provisions of this chapter.
C. Permit Required. A permit shall be required for all telecom facilities regulated by this chapter in
accordance with Section 15.70.070.
D. Other Regulations. All telecom facilities within the City shall comply with the provisions of this chapter
and the following requirements:
Conditions in any permit or license issued by a local, state or federal agency which has
jurisdiction over the telecom facility.
2. Rules, regulations and standards of the Federal Communications Commission (FCC) and
the California Public Utilities Commission (CPUC).
3. Easements, covenants, conditions or restrictions on the underlying real property.
4. The Uniform Building Code, Uniform Fire Code, Uniform Mechanical Code and National
Electrical Code, as amended by state or local law or regulation.
5. The provisions of Title 13 to the extent the telecom facilities are proposed to be located on
or within the public right of way.
E. Regulations not in Conflict or Preempted. All telecom facilities within the City shall comply with the
following requirements unless in conflict with or preempted by the provisions of this chapter:
Design guidelines or standards in any applicable specific plan within the Newport Beach
Zoning Code (Title 20).
2. Requirements established by any other provision of the Municipal Code or by any other
ordinance or regulation of the City, other than those listed in paragraph D of this section.
F. Setbacks. Setbacks shall be measured from the part of the telecom facility closest to the applicable
lot line or structure.
G. Maintenance. The telecom operator shall maintain the telecom facility in a manner consistent with
the original approval of the facility.
H. Non - Conformities. A proposed telecom facility shall not create any new or increased non -
conformities as defined in the Zoning Code, such as, but not limited to, a reduction in and /or elimination
of, parking, landscaping, or loading zones. (Ord. 2002 -24 § 1 (part), 2002)
15.70.030 Definitions.
For the purposes of this chapter, certain terms shall have meanings as follows:
A. Antenna means a device used to transmit and /or receive radio or electromagnetic waves between
earth and /or satellite -based systems, such as reflecting discs, panels, microwave dishes, whip antennas,
antennas, arrays, or other similar devices.
B. Antenna Array shall mean antennas having active elements extending in more than one direction,
and directional antennas mounted upon and rotated through a vertical mast or tower interconnecting the
beam and antenna support, all of which elements are deemed to be part of the antenna.
C. City means the City of Newport Beach.
D. City Council or Council means the City Council of the City of Newport Beach.
E. City Property means all real property and improvements owned, operated or controlled by City, other
than public right of way, within the City's jurisdiction. City Property includes, but is not limited to City Hall,
Police and Fire facilities, recreational facilities, parks, libraries, streetlights and traffic lights.
F. Co- location means an arrangement whereby multiple telecom facilities owned or operated by
different telecom operators share the same structure or site.
G. Department Director or Reviewing Department Director means either the Planning Director or the
Public Works Director, as applicable.
H. FCC means the Federal Communications Commission.
I. Feasible means capable of being accomplished in a successful manner within a reasonable period of
time, taking into account environmental, physical, legal and technological factors.
J. Lattice Tower means an open framework structure used to support antennas, typically with three or
four support legs.
K. Monopole means a single free - standing pole used to act as or support a telecom antenna or antenna
arrays.
L. Operator or Telecom Operator means any person, firm, corporation, company, or other entity that
directly or indirectly owns, leases, runs, manages, or otherwise controls a telecom facility or facilities
within the City.
M. Planning Director means the Planning Director of the City or his or her designee.
N. Public Right of Way or ('PROW ") means any public way, or rights -of -way, now laid out or dedicated,
and the space on, above or below it, and all extensions thereof and additions thereto, owned, operated
and /or controlled by the City or subject to an easement owned by City. PROW includes public streets,
roads, lanes, alleys, sidewalks, medians, parkways and landscaped lots.
O. Public Works Director means the Public Works Director of the City or his or her designee.
P. Residential Lot means a lot containing, or zoned for, one or more dwelling units in the R -1, R -1.5, R-
2, or in the residential portions of the PC or SP Districts.
Q. Reviewing Authority means the person or body authorized under the provisions of this chapter to
review and act upon a telecom application, i.e. either a specified staff department director or the City
Council.
R. Stealth or Stealth Facility means a telecom facility in which the antenna, and sometimes the support
equipment, are hidden from view in a false tree, monument, cupola, or other concealing structure which
either mimics, or which also serves as, a natural or architectural feature. Concealing structures which are
obviously not such a natural or architectural feature to the average observer do not qualify within this
definition.
S. Support Equipment means the physical, electrical and /or electronic equipment included within a
telecom facility used to house, power, and /or process signals from or to the facility's antenna or antennas.
T. Telecommunication(s) Facility, Telecom Facility, Wireless Telecommunications Facility, or simply
Facility means an installation that sends and /or receives wireless radio frequency signals or
electromagnetic waves, including but not limited to directional, omni directional and parabolic antennas,
structures or towers to support receiving and /or transmitting devices, supporting equipment and
structures, and the land or structure on which they are all situated. The term does not include mobile
transmitting devices, such as vehicle or hand held radios /telephones and their associated transmitting
antennas.
U. Title 20 or Zoning Code means Title 20 of the Newport Beach Municipal Code.
V. Utility Tower shall mean an open framework structure or steel pole used to support electric
transmission facilities.
W. Zoning District or District means an area of the City designated on the official Districting Maps and
subject to a uniform set of permitted land uses and development standards. (Ord. 2002 -24 § 1 (part),
2002)
15.70.040 Available Technology.
All telecom facilities approved under this Chapter shall utilize the most efficient and diminutive available
technology in order to minimize the number of facilities and reduce their visual impact. (Ord. 2002 -24 § 1
(part), 2002)
15.70.050 Height and Location.
A. Height.
Maximum Height. No antenna or other telecom equipment or screening structure shall
extend higher than the following maximum height limits:
a. Thirty -five (35) feet for antennas on streetlights, traffic control standards, utility
distribution poles, or other similar structures within the public right -of -way. Antennas may
be placed on existing utility poles that exceed thirty -five (35) feet, where the purpose of the
existing utility pole is to carry electricity, provided that the top of the antenna does not
exceed the top of the pole.
b. For all other telecom facilities, the maximum height of antennas shall be the upper
maximum building height allowed in the zoning district as specified in the Zoning Code (for
example, no higher than thirty -five (35) feet in the "26/35 Foot Height Limitation Zone ").
2. Over - Height Antennas. The City Council may approve antennas up to fifteen (15) feet above
the preceding maximum building height limitations under the special review provisions of Section
15.70.070 of this Chapter.
3. "Stealth" Telecommunication Installations within Structures. Stealth facilities may be
installed within structures that are permitted to exceed the above stated height limits, either by
right under Title 20 or which have received a Use Permit.
B. Location.
Location Categories and Location Priorities. Locations for telecom facilities shall be selected
according to the following priority order:
a. Wall, roof or existing co- location structure or site;
b. Existing pole, light standard, or utility tower;
c. Commercial sign or architectural feature;
d. New or existing "stealth" structure other than a false tree;
e. New false tree;
f. New "Slim Jim" monopole (i.e. with no antenna elements other than the pole itself);
g. New standard monopole with attached antenna elements;
h. New lattice tower.
2. Special Requirements. Proposals for telecom facilities at location categories "e" through "h"
in Section 15.070.050B(1) shall require special review by the City Council under the provisions
of Section 15.70.070 of this chapter. In such cases, the applicant shall be required to show to the
satisfaction of the Council that:
a. Higher priority locations are either not available or are not feasible;
b. Establishment of a facility on a new standard monopole or lattice tower is necessary to
provide service; and
c. Lack of such a facility would result in a denial of service.
3. Other Locations Requiring Special Approval. Telecom facilities are prohibited in the
following locations unless given special approval by the City Council under the provisions of
Section 15.70.070:
a. On common area lots or other non - residential lots within residential districts.
b. Within any required setback established in the Zoning Code.
c. On multifamily structures on lots zoned MFR.
4. Prohibited Locations. Telecom facilities are prohibited in the following locations:
a. On residential lots.
b. In the Open Space - Passive (OSP) zoning district, unless facilities are co- located on an
existing utility tower within a utility easement area.
C. Co- Location Requirements.
1. Co- Location Required. To limit the adverse visual effects of a proliferation of telecom sites in
the City, a new telecom facility proposed within one thousand (1000) feet of an existing facility
shall be required to co- locate on the same site as the existing facility unless the reviewing
authority determines, based on evidence submitted by the applicant, that such co- location is not
feasible.
2. Co- Location Limitations. No more than three telecom facilities may co- locate at a single site
unless the reviewing authority finds that:
a. The net visual effect of locating an additional facility at a co- location site will be less
than establishing a new location; or
b. Based on evidence submitted by the applicant, there is no available feasible alternate
location for a proposed new facility.
3. Condition Requiring Future Co- Location. In approving a telecom facility, the reviewing
authority may impose a condition of approval allowing future co- location of telecom facilities by
other carriers at the same site. (Ord. 2002 -24 § 1 (part), 2002)
15.70.060 Design Standards.
A. General Criteria. In addition to the other design standards of this Section, the following criteria shall
be considered by the reviewing authority in connection with its processing of any telecom permit.
Blending. The extent to which the proposed facility blends into the surrounding environment
or is architecturally integrated into structure.
2. Screening. The extent to which the proposed facility is concealed, screened or camouflaged
by existing or proposed new topography, vegetation, buildings or other structures.
3. Size. The total size of the proposed facility, particularly in relation to surrounding and
supporting structures.
B. Free - Standing Antennas. Antennas and any poles or other structures erected to support antennas
shall be visually compatible with surrounding buildings and vegetation. The reviewing authority may
require that the antenna be colored to blend into the sky or other background.
C. Roof - Mounted Antennas. Roof - mounted antennas, except whip antennas, shall be blended or
screened from public view in a manner consistent with the building's architectural style, color and
materials including, if determined necessary by the reviewing authority, screening to avoid adverse
impacts to views from land or buildings at higher elevations.
D. Wall- Mounted Antennas. Wall- mounted antennas shall be painted to match the color of the wall on
which they are mounted. Cables and mounting brackets shall be hidden. Shrouds may be required by the
reviewing authority to screen wall- mounted antennas.
E. Support Equipment.
1. Building- Mounted Installations. For building- mounted installations, support equipment for the
facility shall be placed within the building. If the reviewing authority determines that such building
placement is not feasible, the equipment shall be roof - mounted in an enclosure or shall
otherwise be screened from public view in a manner approved by the reviewing authority. Roof -
mounted equipment shall comply with the height limits applicable to the building per the Zoning
Code. All screening used in connection with a building- mounted facility shall be compatible with
the architecture, color, texture and materials of the building to which it is mounted.
2. Ground - Mounted Installations. For ground- mounted installations, support equipment shall be
screened in a security enclosure approved by the reviewing authority. Such screening
enclosures may utilize graffiti- resistant and climb- resistant vinyl -clad chain link with a "closed-
mesh" design (i.e. one -inch gaps) or may consist of an alternate enclosure design approved by
the reviewing authority. In general, the screening enclosure shall be made of non - reflective
material and painted or camouflaged to blend with surrounding materials and colors. Buffer
landscaping may also be required if the reviewing authority determines that additional screening
is necessary due to the location of the site and that irrigation water is available.
3. Installations in Public Right -of -Way. Telecom Facilities and or support equipment proposed
to be located in the public right -of -way shall comply with the provisions of Title 13. In addition,
ground- mounted equipment in the public right -of -way shall comply with all requirements of the
Americans with Disabilities Act (ADA).
F. Night Lighting. Telecom facilities shall not be lighted except for security lighting at the lowest intensity
necessary for that purpose. Such lighting shall be shielded so that direct rays do not shine on nearby
properties. The reviewing authority shall consult with the Police Department regarding proposed security
lighting for telecom facilities on a case -by -case basis.
G. Signs and Advertising. No advertising signage or identifying logos shall be displayed on any telecom
facility except for small identification, address, warning, and similar information plates. Such information
plates shall be identified in the telecom application and shall be subject to approval by the reviewing
authority. (Ord. 2002 -24 § 1 (part), 2002)
15.70.070 Permit Review Procedures.
A. Reviewing Authority. All applicants for telecom facilities not within the public right -of -way shall apply
for a permit from the Planning Department as follows:
Private or City -Owned Property. Facilities on private property or on City -owned property
shall be reviewed by the Planning Director as a "Telecom Permit ".
2. Referral to City Council. The Planning Director may refer any application to the City Council
for special review under the procedures set out in Paragraph F of this Section.
B. Submission Requirements. Applications for telecom facilities shall be accompanied by the following
documentation in a form and containing information acceptable to the reviewing authority:
Plans. Site Plans and Elevations drawn to scale.
2. Justification. A brief narrative, accompanied by written documentation where appropriate,
which explains the purpose of the facility and validates the applicant's efforts to comply with the
design, location, and co- location standards of this chapter.
3. Maps. A map or maps showing the geographic area to be served by the facility. In order to
facilitate planning and gauge the need for future telecom facilities, the reviewing department
director may also require the operator to submit a comprehensive plan of the operator's existing
and future facilities that are or may be placed within the city limits of Newport Beach.
4. Visual Simulations. Visual simulations showing "before" and "after" views of the proposed
facility, unless the reviewing department director determines that such simulations are not
necessary for the application in question. Consideration shall be given to views from both public
areas and private residences.
5. Emission Standards and Non - Interference Data. Documentation showing the specific
frequency range that the facility will use upon and throughout activation, certification that the
facility will continuously comply with FCC emissions standards, and that use of the telecom
facility will not interfere with other communication, radio, or television transmission or reception.
6. Property Ownership. Evidence of ownership of the real property on which the proposed
telecom facility will be located, or if the applicant does not own the real property, the name and
mailing address of the real property owner(s), and evidence of authorization from the real
property owner to place the facility on the property.
7. Wind Load Calculations. For proposed antenna installations on new monopoles, utility poles,
or other structures subject to wind loads, the applicant shall submit wind load calculations
prepared or approved by an engineer registered in California. The wind load calculations shall
show, to the satisfaction of the reviewing authority, that the resulting installation will be safe and
secure under wind load conditions. The calculations shall take into account other existing
attachments to the supporting structure and potential future antennas co- located on the structure
by other operators.
8. Mailing List. If public notice is required by the reviewing authority, a list of property owners
within three hundred (300) feet of the proposed telecom facility taken from the latest assessor
rolls.
9. Supporting Materials. Additional supporting materials as deemed necessary by the
reviewing department director to complete review of the proposal. Supporting materials may
include, but are not limited to, color and material sample boards, proposed informational
signage, and landscaping plans.
10. Fee. Applications shall be accompanied by a fee established by resolution of the City
Council to defray all estimated costs and expenses incidental to review and processing of the
application, including any expense incurred by the Police Department or for any outside
technical or legal services to review the application. This fee shall be in addition to other fees
required by the Municipal Code.
C. Review Process for Proposals on City Property. Review of telecom applications for facilities on City
property shall be as follows:
1. Filing. Applications shall be submitted to the Planning Director for facilities on City property
shall undergo initial staff review for compliance with the provisions of this Chapter and Title 13.
Within thirty (30) days of filing, the reviewing department director shall notify the applicant in
writing whether the application is complete. If an application is determined to be not complete,
the notification shall identify those parts of the application which are incomplete and shall
indicate the manner in which they can be made complete.
2. Emergency Communications Review. At the same time as the Applicant submits an
application to the Planning Director, the Applicant shall submit the Plans, Map, and Emission
Standards and Non - Interference Data (parts 1, 3, and 5 of the Submission Requirements) to the
Newport Beach Police Department. The Police Department or its designee shall review the
plan's potential conflict with emergency communications. The review may include a pre -
installation test of the facility to determine if any interference exists. If the Police Department
determines that the proposal has a high probability that its facilities will interfere with emergency
communications devices, the applicant shall be given the opportunity to modify the proposal, to
avoid interference. If the proposal is not modified, the reviewing department director shall deny
the proposal.
3. Director's Action. Within thirty (30) days of the determination that the application is
complete, the Planning Director shall take action on the application based on the following
criteria:
a. If the director determines that the facility conforms to the technology height, location
and design standards of Sections 15.70.040, 15.70.050 and 15.70.060 of this chapter, he
or she shall approve the application with or without conditions of approval.
b. If the director determines that the facility does not conform to one or more standards,
he or she shall inform the applicant of the discrepancy and give the applicant the option of
amending the application to eliminate the discrepancy. If the discrepancy is not eliminated,
the director shall deny the application.
c. If the director determines that conformity to standards are in doubt, he or she shall
refer the application to the City Council for Special Review under the procedures set out in
Paragraph F of this Section.
4. Applicant Notification. After action on the application, the director shall cause the applicant
to be notified in writing within five business days of the decision. The applicant may appeal
decisions by the director in accordance with Paragraph E of this section.
5. City Manager Action. When a permit for a telecom facility on City -owned property or facilities
is approved, the Planning Director shall forward the permit to the City Manager, who shall
prepare and execute an Agreement based upon a term and rental amount adopted under City
Council policy.
6. City Council Action. Where applicable (including proposals to site facilities in Location
Categories in Section 15.70.050[B][1][e -h]), the City Manager shall forward the agreement and
final telecom permit to the City Council for final approval. The City Council may approve,
approve subject to modifications, or deny the agreement and telecom permit. The City Council
retains the right to refuse approval of an agreement at any time and for any reason. Should the
City Council deny the agreement, the agreement and permit shall not be executed.
7. Notification to Applicant. The City Clerk shall notify the applicant in writing within five
business days of the City Council's decision.
D. Review Process for Private Property. Review of telecom applications for facilities on private property
shall be as follows:
1. Filing. Submission of application to the Planning Director and initial staff review. Within thirty
(30) days of filing, the Director shall cause the applicant to be notified in writing whether the
application is complete. If an application is determined to be not complete, the notification shall
identify those parts of the application which are incomplete and shall indicate the manner in
which they can be made complete.
2. Emergency Communications Review. At the same time as the Applicant submits an
application to the Planning Director, the Applicant shall submit the Plans, Map, and Emission
Standards and Non - Interference Data (parts 1, 3, and 5 of the Submission Requirements) to the
Newport Beach Police Department. The Police Department or its designee shall review the
plan's potential conflict with emergency communications. The review may include a pre -
installation test of the facility to determine if any interference exists. If the Police Department
determines that the proposal has a high probability that its facilities will interfere with emergency
communications devices, the applicant shall work with the Police Department to modify the
installation or location of facility to avoid interference to the maximum extent practicable.
3. Director's Action. Within thirty (30) days after the determination that the application is
complete, the Planning Director shall approve, approve subject to conditions, or deny the
telecom permit under the same procedures and criteria as set out in Paragraph C of this Section.
The Director shall then cause the applicant to be notified in writing within five business days of
the decision. The applicant may appeal decisions by the Director in accordance with Paragraph
E of this Section.
E. Appeals to City Council. Within fourteen (14) days of the date of written notification of action by the
reviewing department director, the applicant may appeal any denial of the application or any conditions of
approval to the City Council. The City Council shall hear all appeals within sixty (60) days of filing of the
appeal. The City Council's action on appeals shall be final. If the final action is denial, the City Council
shall adopt a Resolution setting forth the reasons for denial.
F. Special Review by Council. Because of their potential for greater- than -usual visual or other impacts
on nearby property owners, residents, and businesses, applications for the telecom facilities identified
below shall require special review by the City Council.
Applicability. Proposals requiring special review include the following:
a. Telecom antennas up to fifteen (15) feet above the upper maximum height limit as
provided in 15.70.050(A).
b. Telecom facilities at locations identified as requiring special review in Section
15.70.050(B).
c. Any telecom application which the department director determines requires special
review in order to serve the public interest.
2. Special Review Procedures. Applications subject to special review shall be reviewed under
the following procedures:
a. Notification describing the proposal and the date and time of City Council review shall
be mailed at least ten (10) days in advance of the City Council review date to property
owners of record within three hundred (300) feet of the proposed location of the telecom
facility. However, such notification shall not constitute a public hearing notice and non -
receipt of such notification shall in no way nullify any approval or denial of a telecom facility.
b. No formal public hearing shall be required in conjunction with review of a proposed
telecom facility. However, the City Council may hear and consider comments from the
public during its review of the application.
3. Council Action. The City Council shall take action on the telecom permit within sixty (60)
days after the determination that the application is complete. Applications subject to special
review may be approved by the City Council if it makes the following findings:
a. The approval is necessary to allow the facility to function as intended and identified
alternatives to the proposal are not feasible.
b. The approved facility will not result in conditions which are materially detrimental to
nearby property owners, residents, and businesses, nor to public health or safety.
The City Council may approve, approve subject to conditions, or deny the telecom permit.
4. Notification to Applicant. The City Clerk shall notify the applicant in writing within five
business days of the City Council's decision. (Ord. 2002 -24 § 1 (part), 2002)
15.70.080 Radio Frequency Compliance and Radiation Report.
Within thirty (30) days after installation of a telecom facility, a radio frequency (RF) compliance and
radiation report prepared by a qualified RF engineer acceptable to the City shall be submitted in order to
demonstrate that the facility is operating at the approved frequency and complies with FCC standards for
radiation. If the report shows that the facility does not so comply, the reviewing director shall require that
use of the facility be suspended until a new report has been submitted confirming such compliance. (Ord.
2002 -24 § 1 (part), 2002)
15.70.090 Right to Review or Revoke Permit.
A. Changed Circumstance. Any telecom permit approved pursuant to this Chapter shall be granted by
the City with the reservation of the right and jurisdiction to review and modify the permit (including the
conditions of approval) based on changed circumstances. Changed circumstances include, but are not
limited to, the following in relation to the telecom facility and its specifications in the approved application
and /or conditions of approval:
1. An increase in the height or size of any part of the facility;
2. Additional impairment of the views from surrounding properties;
3. Increase in size or change in the shape of the antenna or supporting structure;
4. A change in the facility's color or materials;
5. A substantial change in location on the site;
6. An effective increase in signal output above the maximum permissible exposure (MPE)
limits imposed by the radio frequency emissions guidelines of the FCC.
The operator shall notify the Reviewing Department Director of any proposal to cause one or more of the
changed circumstances shown in 1 -6 above. Any changed circumstance shall require the operator to
apply for a modification of the original telecom permit. Before implementing any changed circumstance,
the operator must obtain a modified telecom permit and any related building or other permits required by
the City.
B. Additional Right to Revoke or Modify Permit. The reservation of right to review any telecom permit
granted by the City is in addition to, and not in lieu of, the right of the City to review and revoke or modify
any permit granted or approved hereunder for any violations of the conditions imposed on such permit.
After due notice to the telecom operator, the City Council may revoke any telecom permit upon finding
that the facility or the operator has violated any law regulating the telecom facility or has failed to comply
with the requirements of this Chapter, the telecom permit, any applicable agreement, or any condition of
approval. Upon such revocation, the City Council may require removal of the facility. (Ord. 2002 -24 § 1
(part), 2002)
15.70.100 Removal of Telecom Facilities.
A. Discontinued Use. Any operator who intends to abandon or discontinue use of a telecom facility must
notify the Planning Director by certified mail no less than thirty (30) days prior to such action. The
operator or owner of the affected real property shall have ninety (90) days from the date of abandonment
or discontinuance, or a reasonable time as may be approved by the Planning Director, within which to
complete one of the following actions:
Reactivate use of the telecom facility;
2. Transfer the rights to use the telecom facility to another operator and the operator
immediately commences use;
3. Remove the telecom facility and restore the site.
B. Abandonment. Any telecom facility that is not operated for a continuous period of one hundred eighty
(180) days or whose operator did not remove the telecom facility in accordance with Subsection A shall
be deemed abandoned. Upon a finding of abandonment, the City shall provide notice to the telecom
carrier last known to use such facility and, if applicable, the owner of the affected real property, providing
thirty days from the date of the notice within which to complete one of the following actions:
Reactivate use of the telecom facility;
2. Transfer the rights to use the telecom facility to another operator;
3. Remove the telecom facility and restore the site.
C. Removal by City.
1. The City may remove an abandoned facility, repair any and all damage to the premises
caused by such removal, and otherwise restore the premises as is appropriate to be in
compliance with applicable codes at any time after thirty (30) days following the notice of
abandonment.
2. If the City removes the telecom facility, the City may, but shall not be required to, store the
removed facility or any part thereof. The owner of the premises upon which the abandoned
facility was located and all prior operators of the facility shall be jointly liable for the entire cost of
such removal, repair, restoration and storage, and shall remit payment to the City promptly after
demand therefore is made. In addition, the City Council, at its option, may utilize any financial
security required in conjunction with granting the telecom permit as reimbursement for such
costs. Also, in lieu of storing the removed facility, the City may convert it to the City's use, sell it,
or dispose of it in any manner deemed by the City to be appropriate.
D. City Lien on Property. Until the cost of removal, repair, restoration and storage is paid in full, a lien
shall be placed on the abandoned personal property and any real property on which the facility was
located for the full amount of the cost of removal, repair, restoration and storage. The City Clerk shall
cause the lien to be recorded with the Orange County Recorder. (Ord. 2002 -24 § 1 (part), 2002)
15.70.110 Exemption for City Systems.
Systems installed or operated at the direction of the City or its contractor shall be exempt from this
chapter. (Ord. 2002 -24 § 1 (part), 2002)
ADDITIONAL
MATERIALS
RECEIVED
STAFF PRESENTATION
City of Newport Beach
Planning Commission Meeting
J u ly Zg, 2012
Wireless Telecommunications
Facilities Ordinance
Code Amendment No. 2012-004
Project Description
Comprehensive update to existing Wireless
Telecommunications Facilities Ordinance
Intended to:
Balance needs of community
Increasing demand for wireless networks
Mitigate the impact of telecom facilities
Reflect changes in federal and state law
Project Description (continued)
- Existing regulations contained in Title 15 and
Title 13
Propose to consolidate into single chapter in
Title 20
New or modified telecom facilities regulated as a
land use
Background
Telecom Ordinance adopted by City Council in
October 2002
Existing regulations have not been updated
since adoption by City Council
Background (continued)
■ Staff presented overview of existing
regulations at a March 2012CityCouncil
Study Session
City Council directed staff to proceed with
revisions to the telecom ordinance
Federal Law and Radio Frequency
Emissions Safety
- Federal law preserves local zoning authority,
while imposing certain requirements
State and local agencies are prohibited from
regulating on the basis of radio frequency
(RF) emissions
Proposed Code Amendment
Key issues identified in existing ordinance
Proposed revisions in draft ordinance
Public Notice /Public Hearing
Process and Review Authority
Existing Provisions:
All applications reviewed by Community
Development Director as a "telecom permit"
Community Development Director is review
authority for facilities that meet established
criteria
Public Notice /Public Hearing
Process and Review Authority
Existing Provisions (continued):
City Council is review authority for:
Facilities that do not conform,
Larger more conspicuous facilities, and /or
Facilities located in certain residential
districts
Neither review process requires a public
notice or a public hearing
Public Notice /Public Hearing
Process and Review Authority
Proposed Revision:
Applicants required to apply for Minor Use
Permit; Conditional Use Permit; or Limited
Term Permit
Public notice /public hearing required
Zoning Administrator or Planning
Commission designated review authorities
Appeal Process
Existing Provisions:
Only applicant may appeal decision
Community Development Director
by the
Appeal Process
Proposed Revision:
Appeal process consistent with existing
provisions in the Zoning Code
Planning Commission would be appellant
authority on Zoning Administrator decisions
City Council would be appellant authority on
Planning Commission decisions
Installations in the
Public Right -of -Way
Existing Provisions:
Specific procedures not provided for facilities
installed in the public right -of -way
Installations in the Public Right -of-
Way
Proposed Revision:
Process and design standards included
Public hearings would be conducted
Building and /or encroachment permits would
be required
IRH
s.
`1
k Pp
Design Standards and Criteria
Existing Provisions:
Standards do not encourage applicants to
design camouflaged facilities
Standards have not been updated to reflect
changes in technology
Design Standards and Criteria
Proposed Revision:
Design standards updated to encourage
camouflage
Facilities visually compatible and /or
inconspicuous reviewed by Zoning Admin.
Larger or conspicuous facilities reviewed by
Planning Commission
:im r. nf:r.�rl:rns a WMM ►Ti r.
a
Ix
of Fn r.nf:T:■M RUM Ws:r!
I �
�B 1i
j� ®1
i.,
I-
FW
Deviation to Height Limitations and
Location Requirements
Existing Provisions:
Do not include process to request to modify
or deviate
Deviation to Height Limitations and
Location Requirements
Proposed Revision:
With regulations in Zoning Code, applicants
could request a Variance
Review and public hearings conducted
Planning Commission
Setback Requirements
Existing Provisions:
Setbacks measured from the part of facility
closest to the lot line or structure
Facilities prohibited from being located in
required setbacks, unless special approval by
City Council
Setback Requirements
Proposed Revision:
Updated to provide
additional "fall zone" for
ground- mounted "Wireless Towers"
Additional setback provided for safety
purposes; would be the greater of either:
Code- required setback; or
1zo% of the height of the "Wireless Tower'
Modification of Existing Telecom
Facilities
Existing Provisions:
Allows City to review and modify a telecom
permit based on 'changed circumstances"
Modification of Existing Telecom
Facilities
Proposed Revision:
Updated regulations consistent with federal
law
Changes less than 5% subject to ministerial
review and approval
Changes 5% or more require processing of a
new discretionary application
Zoning District Land Uses and
Permit Requirements
Existing Provisions:
Facilities prohibited unless given special
approval by City Council on:
Common area or non - residential lots
Any required setback
Multifamily structures
■ Also prohibited on:
Residential lots
Open Space district, unless on utility tower
Zoning District Land Uses and
Permit Requirements
Proposed Revision:
Updated to prohibit
telecom facilities on:
Single- family development
Two- family development
Multi- family development of 4 units or less
Exception added to allow telecom facilities in
Open Space when co- located on existing
telecom facility or site
Conclusion
Staff welcomes public comments on the draft
ordinance; and
Recommends continuance to August 23, 2012
core
DEVELOPMENT SERVICES
7/18/12
Janet Johnson Brown
Associate Planner
City of Newport Beach
3300 Newport Blvd.
Newport Beach, CA 92663
Dear Ms. Brown,
Item 5a: Additional Materials Received
Planning Commission July 19, 2012
PA2012 -057
Setting the new standard
Core Development Services
2749 Saturn Street
Brea, CA 92821
714) 729 -8404
mfelten@core.us.com
On behalf of Core Communications, I would like to thank for the opportunity to provide feedback
regarding the City's proposed Wireless Communications Facilities Ordinance. I commend planning staff
and the City for determining that an updated ordinance is needed to allow for a uniform set of
standards that each application will be subject to.
Below are our comments regarding the proposed ordinance amendment. Given our many concerns I
feel it would be best if the city would continue this item to a later date to allow for an outreach meeting
with the industry. I have found that a dialogue with City staff allows for the industry to understand
staff's intent behind each requirement and also allows staff to understand the possible effects certain
requirements may have. By understanding the goals and intent of both sides I feel that City staff will
develop an ordinance that continues to achieve the City's objectives and protects the wellbeing of all
those involved.
The following discussion highlights are an area of a concern:
1. Public Notice /Public Hearing Process and Review Authority, specifically Section 20.49.070(G): It
should not necessary for all proposed projects to go through the hearing process. The City
should utilize a set of objective design standards and if a carrier meets them, there should be no
reason to go before any discretionary body, regardless of location. A streamlined process, such
as an administrative approval, is recommended for sites that are co- located, building or roof -
mounted, or located on utility infrastructures such as SCE towers. The code should explore
incentives for applicants to bring forth quality proposals, such as a simplified review process.
The City of Anaheim's code demonstrates this type of review, which has increased the wireless
telecommunications coverage in the City and while upholding the quality of installations
proposed.
2. Installations in the Public Right -of -Way, specifically Section 20.49.050(C): Requiring a full
conditional use permit for all proposals in the public right -of -way seems overly cumbersome. If
planning review is determined to be absolutely necessary, I recommended a streamlined
administrative process. Public right -of -way sites are typically located on existing structures, such
as light poles, therefore the aesthetic impact is minimal. I recommend only requiring specific
design standards for these specific sites that the carrier will have to adhere to and if those
core
DEVELOPMENT SERVICES
design standards are followed the site is approved. If it the site is unable to meet the City's
design standards, then at that time the discretionary planning process maybe required. For
example, the City of Laguna Niguel has design standards that were adopted by the City Council.
If a proposal is unable to conform to those standards then it must go through the planning
process. Another example is the City of Tustin which only requires public right -of -way sites to
go through an administrative design review process. Furthermore, subsection (1) requires all
support equipment be placed below grade. As you may or may not be aware the industry tries
to stay away from vaults at all costs. Facilities flood due to rains and the required flush -mount
vents. When this occurs, sites go "off air ", creating a gap in coverage, not to mention the fact
that it could cost hundreds of thousands of dollars to repair even one facility. When a site goes
"off air" the community will lose needed and required coverage. Additionally, some carriers'
facilities often include an emergency generator which requires ventilations and specific
clearance requirements that would not be able to be enclosed or vaulted. While it is
understood that often Public Right -of -Way installations have very little space for equipment and
vaulting may be the only option, there are occasionally circumstances where the equipment can
be located above ground while being screened. Therefore, by limiting equipment to be
undergrounded only, those occasions are restricted.
3. Design Standards and Criteria, specifically Section 20.49.060: Again, I commend the City for
instituting design requirements; however, as stated above should the city institute a set of
objective design standards and the carrier meets them, there should be no reason to go before
any discretionary body, regardless of location. In this situation the aesthetic impacts are no
longer of a concern given the facility meets code. A streamlined process, such as an
administrative approval, is recommended for sites that meet the required design standards.
Furthermore, the code should explore incentives for applicants to bring forth quality proposals,
such as a streamlined review process.
4. Deviation to Height Limitations and Location Requirements, specifically Section 20.49.060(0)(1).
Subsection (c) should be revisited as several schools, churches, and other public institutions are
often in residentially zoned districts and typically they have flagpoles in front of their
establishments. In the event there are no other options to locate antennas and equipment
within a steeple, some other portion of the building, or a more appropriate stealth design;
prohibiting flagpoles in residential zones may inadvertently cause a prohibition of service. In
those cases where the current proposed code would allow a flagpole installation, 35' is an
extremely restrictive height. As previously stated, wireless telecommunications antennas
require line of site free of obstructions. Given that a great majority of buildings within the City
are multiple stories and some areas of the City have topography challenges, 35' will not likely
provide the necessary line of site. Therefore, it is recommended that no height limit be
specified. The restriction of a 24" diameter pole is also extremely limiting. Often carriers
core
DEVELOPMENT SERVICES
require at least 30" or more due to different technology and azimuth requirements. Again, it is
recommended that a larger diameter measurement be provided or the size is left unspecified.
Height may also be an issue in Subsection (d) having adverse implications on roof - mounted
installations. The City is a beach community and often buildings are constructed to the
maximum height limit. Only allowing five feet above base height limit may not be enough to
allow for screening and many carriers' antenna technology. Some carriers have antennas in
lengths of up to eight feet. Additionally, five feet may not be enough to meet EME safety
standards depending on where on the rooftop the antennas are proposed. Therefore, it is
extremely likely that majority of all rooftop installations will be greater than five feet above the
base height limit requiring heightened review. This could potentially cause an architecturally
integrated rooftop installation to proceed through a longer, more cumbersome process because
it cannot meet the narrow five foot height limitation.
5. Setback Requirements, specifically Section 20.49.060(D): Wireless facilities are required to go
through building plan check and demonstrate that they are structurally sound, just as any other
building in the City would be required. However, no other building in the City is required to
provide a "fall zone ", yet the proposed wireless code amendment will require a 110% "fall zone"
setback for any new ground mounted wireless facility. It is unclear why wireless
telecommunications facilities would be held to a different standard. Additionally, as previously
stated, wireless telecommunications antennas must have an unobstructed line of site which will
often require the antennas to be much taller than the 25' example stated in the staff report. In
fact, the average height of concealed ground mounted facilities will likely be around 55', to
allow for a 45' centerline of antennas and additional camouflaging above the antennas.
Therefore, if a 55' ground- mounted facility were proposed the 110% setback would be
605from all properties lines, which would likely inadvertently prohibit any ground- mounted
wireless facilities on the majority of properties within the City.
6. Modification of Existing Telecom Facilities: Given the recent "Tax Relief Act" legislation, I
recommend the City handle all modification requests as ministerial permits. Limiting any
change to 5% or less, as the current ordinance amendment proposes, may potentially prohibit
any maintenance or equipment changes /additions that will increase the efficiency or technology
of the facility .
7. Zoning District Land Uses and Permit Requirements: The City should not prohibit a wireless
installation in any zone. This opens the possibility of the City prohibiting telecommunications
services. Prohibiting an installation outright in any zone may cause the City to unknowingly
create a barrier to entry which inadvertently regulates the business affairs of a wireless
company. This is likely not the intention of the City and therefore I recommend that the City
adopt specific design standards for the residential and open space zones to protect the integrity
of the area. Also, many properties may be zoned residential, but are not used for residential
core
DEVELOPMENT SERVICES
purposes, which should be taken into consideration. It should be noted that many cities have
found having wireless facilities in their parks zoned either residential or open space has created
an avenue of revenue for the City.
The entire ordinance is quite lengthy, somewhat burdensome and may provide a barrier for wireless
services to be provided to the Newport Beach community. Given the concerns explained in the text
above, I feel it would be best if the City would continue this item to a later date to allow for an outreach
meeting with the industry. I would like to thank the City for notifying us of this proposed amendment
and look forward to working together in crafting a lawful ordinance that protects the residents and
businesses of the City of Newport Beach along with operation of the wireless industry.
Yours truly,
a" 5a
w
Michelle Felten
Senior Project Manager
aw
Delivered via Email
The Honorable Michael Toerge
Chairman, Planning Commission
City of Newport Beach
3300 Newport Blvd.
Newport Beach, CA 92663
Item 5b: Additional Material Received
Planning Commission July 19, 2012
Kyle C. Powell AT&T Services, Inc. T: 916.341.3504
General Attorney 1215 K Street, Suite 1800 F: 916.443.6836
Sacramento, CA 95814 kyla.powellOatt.com
Subject: Proposed Amendment to Wireless Telecommunications Facilities Ordinance (PA2012 -057),
Code Amendment No. 2012 -004
Dear Chairman Toerge:
AT &T appreciates the opportunity to provide comments to the Planning Commission on the proposed
amendment to the City of Newport Beach's {City) Wireless Telecommunications Facilities Ordinance.
AT &T has been providing communications service in Southern California for over a hundred years and its
affiliate has been providing wireless telecommunications services since the late 1980's. AT &T is eager to
work with the City in its efforts to address concerns about placement of wireless facilities within the
City.
AT &T is most concerned about aspects of the proposed amendments that would directly impact the
ability of the wireless telecommunications industry to provide service to residents, businesses and
visitors in Newport Beach, who rely on cellphones and other wireless devices in their daily lives. As you
are no doubt aware, the proposed amendments would affect not only cellphones, but wireless data of
all kinds (including audio signals, video signals, computer files, e-mail and data of all kinds that now use
wireless transmission) are affected.
Over all, we believe the proposed amendments are overly specific and restrictive and could give rise to a
host of future issues and problems that may require further ordinance modifications. For example, by
providing unique definitions of terms like "base station" that deviate from specific federal law
definitions and is but one component of a wireless facility under 47 U.S.C.A 332, the City risks running
afoul of Section 332 protections, creating a prohibition on wireless service, and having the entire
ordinance preempted. We recommend that the City instead treat wireless facilities more like other
facilities and not regulate them. Below, we provide the applicable law and our specific concerns.
APPLICABLE LAW
The federal Telecommunications Act of 1996, 47 U.S.C.A. 151 et seq. (1996) regulates the deployment of
wireless telecommunication service. Section 332(c)(3) gives the FCC certain authority that is exclusive
and which preempts conflicting acts by state or local governments. Section 332(c)(3)(7) of the Act,
while recognizing that local zoning authority is preserved, requires that local regulation not
"unreasonably discriminate among providers of functionally equivalent services" and not "prohibit or
have the effect of prohibiting the provision of personal wireless services."
July 18, 2011
Page 2
Also recently enacted at the federal level, section 6409(a) of the Middle Class Tax Relief and Job
Creation Action of 2012 (47 U.S.C.A. § 1455(a)(2012)) provides that "a State or local government may
not deny, and shall approve, any eligible facilities request for a modification of an existing wireless
tower or base station that does not substantially change the physical dimensions of such tower or base
station." An "eligible facilities request" includes any request to modify an existing wireless tower or base
station that involves collocation, removal, or replacement of transmission equipment. (Id.)
California state law also impacts placement of communication facilities within the public rights -of -way.
Wireless and wireline carriers, as "telephone corporations," have access rights to the public rights -of-
way under Section 7901 of the California Public Utilities Code. A telephone corporation enjoys a vested
right under Section 7901 to construct "telephone lines" and "necessary fixtures" "along and upon any
public road." California courts have long upheld this vested right to enter and use the public right -of-
way.
In our view, the City possesses only a limited right to curtail the rights of telephone corporations under
Section 7901. Section 7901.1(a) grants to the City only the ability to exercise "reasonable control as to
the time, place and manner in which roads ... are accessed." Section 7901.1(b) provides that any
municipal regulations "at a minimum, be applied to all entities in an equivalent manner," thereby
imposing a duty on the City to regulate in a non - discriminatory manner.
COMMENTS
As mentioned above, some of the provisions of the proposed amendments might constitute a
prohibition of services under the federal Telecommunications Act. A number of the special
requirements outlined in the Proposed Ordinance relating to wireless facilities placed in the public
rights -of -way also appear to go well beyond the regulation permitted under Section 7901 of the Public
Utility Code. Finally, we believe the proposed amendment conflicts with Section 6409(a) of the Middle
Class Tax Relief and Job Creation Act of 2012. We identify some of the problematic provisions in more
detail below.
Section 20.49.030 — Definitions
Base Station — The definition provided by City for "Base Station" is too restrictive and should not exclude
DAS. Alternatively, we request the City's language be modified more broadly to: "A Telecom Facility
installed and operated by the Telecom Operator for signal transmission and reception." The second
sentence regarding antennas and DAS should be excluded from this definition.
Wireless Tower— Only the first sentence should apply. The remaining part of this definition
inappropriately narrows the meaning of a wireless tower.
Section 20.49.040 — Available Technology
We do not believe this section is relevant. It attempts to codify the choice of technology used in sites.
Although it does not explicitly state various technologies, it is inappropriate for the City to dictate what
technology carriers select. For example, under this section, the City could insist that AT &T use DAS or
any other "efficient, diminutive, and least obtrusive available technology" as opposed to a Macro Site.
Section 20.49.050 (B) - Prohibited locations
We do not believe the City should impose blanket prohibitions on certain locations within the City's
Jurisdiction. What if the only available site is in a prohibited location? Carriers should have the
July 18, 2012
Page 3
opportunity to at least attempt or work with the City to build a site at any location in the City if that is
the only available means.
Section 20.49.060 — General Development and Design Standards (Also in Same Section Subsection (E))
Some of the stealthing standards and guidelines in this section and referenced in other sections may not
be feasible, such as using surrounding vegetation and structures to camouflage a site. To the extent that
such techniques need only be considered but are not required to be implemented, this section may be
workable. However, if the City intends to mandate these guidelines and standards, that is problematic,
as natural vegetation and structures can impair or block RF signals.
Section 20.49.060 (C) - Height
There are maximum height standards which may not work from an RF perspective, although we
recognize that variances can be granted.
Section 20.49.060 (D) - Setback
The setback requirement for a wireless tower is 110% of the height of the tower including the antennas
or enclosures. Newport Beach is a densely populated area and this setback requirement could
effectively prohibit new wireless towers as this requirement may be very difficult to meet in many parts
of the City.
Section 20.49.100 — Modification of Existing Telecom Facilities
This section appears to be an attempt to codify Section 6409(a) of the Middle Class Tax Relief and Job
Creation Act of 2012. Under Section 6409(a) any facility modification that falls under and complies with
Section 6409 must be approved by the City. Section 6409 is not discretionary. We do not believe the City
should set standards and definitions that restrict or define the applicability of the Federal Statute, as it
appears to do in this section. It is appropriate for the City to describe how it will comply, but it should
not attempt to redefine the elements of Section 6409.
We hope the City finds these comments to the proposed amendment helpful. We welcome the
opportunity to work with the City staff to discuss our legal and practical concerns and to develop
solutions amenable to both AT &T and the City.
Sincerely,
?Ky I a C. ell
Cc: Bradley Hillgren, Vice Chair, City of Newport Beach Planning Commission
Members, City of Newport Beach Planning Commission
Janet Johnson Brown, Associate Planner
Item 5c: Additional Material Received calwa
PIA2012- 57mmission July 19, 2012
PCIA
July 19, 2012
VIA ELECTRONIC MAIL
Newport Beach Planning Commission
c/o Janet Johnson Brown, Associate Planner
City of Newport Beach
3300 Newport Blvd.
Newport Beach, CA 92663
jbrown @newportbeachca.gov
Re: Proposed Amendments to Wireless Telecommunications Facilities Ordinance
Dear Ms. Brown,
PCIA —The Wireless Infrastructure Association ( "PCIA" )l and the California Wireless
Association ( "CalWA ")2 writes to provide comment on the City of Newport Beach's proposed
amendment to the Newport Beach Municipal Code to update regulations regarding wireless
telecommunications facilities in light of the scheduled public hearing on the matter before the
Planning Commission on Thursday, July 19, 2012. Attached please find the proposed
amendments marked with comments. PCIA and CalWA respectfully request that Planning
Commission defer action on this item until the industry has had an opportunity to sit down with
staff and discuss the concerns reflected within this letter and in the attached mark -up.
PCIA and CalWA applaud the City of Newport Beach for recognizing that there have
been numerous changes in Federal and State law regarding local regulation of wireless facilities,
as well as a tremendous increase in the demand for wireless services that required the industry to
change how it responds and keeps up with demand from its subscribers, especially in
sophisticated communities like Newport Beach. We encourage the City to craft an ordinance that
enables logical and intelligent deployment with an objective set of standards that comply with
state and federal law and allows the timely provision of quality wireless service. To this end, in
order to ensure that Newport Beach's efforts to modernize its wireless ordinance are as
comprehensive as possible, PCIA and CalWA offer the attached mark -up of the draft
amendments.
'PCIA is the national trade association representing the wireless infrastructure industry. PCIA's members develop,
own, manage, and operate towers, rooftop wireless sites, and other facilities for the provision of all types of wireless,
broadcasting and telecommunications services. With a mandate to facilitate the deployment of wireless
infrastructure, PCIA and its members partner with communities across the nation to effect solutions for wireless
infrastructure deployment that are responsive to the unique sensitivities and concerns of these communities.
'CaIWA is a non -profit organization made up of volunteers who work in the wireless /telecommunications industry
throughout California. Its goal is to raise awareness about the benefits of and to promote the wireless industry, to
educate the public and political leaders on issues of importance to the wireless industry, and to cultivate working
relationships within and between the industry, the public and political leaders.
PCIA
calwa
Despite the importance of wireless services and its potential for job creation, local review
of the placement of wireless facilities remains a persistent barrier to the deployment of wireless
infrastructure. For example, the proposed amendments to Newport Beach's Municipal Code
could better facilitate the deployment of wireless infrastructure in order to bring wireless service
to Newport Beach's residents. PCIA and CalWA hope to work together with the Planning
Commission to find a solution for wireless infrastructure deployment that is responsive to the
City of Newport Beach's needs and concerns. For this reason, PCIA and CalWA urge that
Planning Commission defer action on this item to allow time to consider and discuss the
industry's concerns.
The Need for Wireless Infrastructure
Wireless services, from basic voice communication to mobile broadband, enable
communication, productivity, mobility, and public safety. Wireless infrastructure is the backbone
of wireless networks; without it, wireless services cannot be delivered to users. Wireless
infrastructure enables use of spectrum by providing the vital link between the end -user and the
network. The strategic deployment of wireless infrastructure improves the efficient use of limited
spectrum resources, which in turn improves the performance of wireless services.
Wireless providers are currently undertaking a multi- faceted effort to deliver next -
generation wireless services, such as 4G LTE, in addition to ensuring that current and next -
generation networks have the capacity to handle the surge in traffic that comes with the increased
adoption rates of smartphones, tablets and other data devices. Wireless networks must adapt to
growing capacity demands due to an 1,800 percent increase in traffic on U.S. wireless networks
in the last four years and a projected growth of eighteen times current levels of mobile data
traffic in the next five years.4 Mobile Internet users are projected to outnumber wireline Internet
users by 2015, when a majority of Americans will utilize a wireless device as their primary
internet access tools This will result in two billion networked mobile devices by 2015.6
The need for rapid deployment extends beyond mere consumer convenience. More than
70 percent of all emergency calls are placed using a wireless device .7 The ability to access fire,
rescue and police services may be significantly hindered without wireless infrastructure,
especially for those relying on wireless as their sole form of voice communications. As noted by
the Federal Communications Commission ( "FCC "),
[T]he deployment of facilities without unreasonable delay is vital to promote public
safety, including the availability of wireless 911, throughout the nation. The importance
of wireless communications for public safety is critical, especially as consumers
'Mobile Future, 2011 Mobile Year In Review (Dec. 2011), available at http://mobilefuture.org/page/- /images /2011-
MYIR.pdf.
Quentin Hardy, The Explosion of Mobile Video, N.Y. Times, Feb. 14, 2012, available at
http : //bits.blogs.nytimes.com/2012 /02/14 /the- explosion -of- mobile- video /.
s Hayley Tsukayama, IDC: Mobile Internet Users to Outnumber Wireline Users by 2015, Washington Post, Sept. 12,
2011, available at http : / /www.washingtonpost.com/blogs /post - tech/post/idc- mobile- intemet- users -to- outnumber-
wireline- users -by- 2015 12011 /09 /12 /gIQAkZP7MK_blog.html ?wprss =post -tech.
' Mobile Future, 2011 Mobile Year In Review.
7 FCC.gov, Guide: Wireless 911 Services, available at http: / /www.fcc.gov /guides /wireless -911- services.
PCIA
calwa
increasingly rely upon their personal wireless service devices as their primary method of
communication!
As NENA observes:
Calls must be able to be made from as many locations as possible and dropped calls must
be prevented. This is especially true for wireless 9 -1 -1 calls which must get through to
the right Public Safety Answering Point ( "PSAP ") and must be as accurate as technically
possible to ensure an effective response. Increased availability and reliability of
commercial and public safety wireless service, along with improved 9 -1 -1 location
accuracy, all depend on the presence of sufficient wireless towers.9
For this reason, decisions on siting requests made by the personal wireless service industry were
not intended by Congress to be subjected "to any but the generally applicable time frames for
zoning decision [s].i10 Thus, the adoption of special procedural schemes unique to wireless siting
requests should be avoided.
The FCC Shotclock Declaratory Ruling and the California Permit Streamlining Act
In addition to the provisions of Section 337(c)(7) of the Communications Act of 1934
referred to in the staff report, subsection (13)(ii) of that section contains another requirement that
the City should keep in mind when crafting its new ordinance. That provision requires that a
"local government or instrumentality thereof shall act on any request for authorization to place,
construct, or modify personal wireless service facilities within a reasonable period of time after
the request is duly filed with such government or instrumentality, taking into account the nature
and scope of such request."
The FCC recently adopted a Declaratory Ruling on November 18, 2009 under this
subsection holding that "a `reasonable period of time' is, presumptively, 90 days to process
personal wireless service facility siting applications requesting collocations, and, also
presumptively, 150 days to process all other applications. "" Given the rate at which demand for
advanced wireless services has been growing, and in particular the growth in the demand for
bandwidth as a result of adoption of smart phones and wireless- enabled laptops and tablets, the
need for speedy local approvals of proposed wireless deployments has become truly critical to
providing the wireless services consumers demand.
Indeed, the FCC's presumptive timeframe for action may be superfluous given that
California law has, for decades, contained absolute deadlines by which action must be taken. As
you are no doubt aware, the California Permit Streamlining Act imposes a 60 -day time limit for
approving or denying a requested permit afler a project has been determined to be categorically
s Petition for Declaratory Ruling To Clark Provisions of Section 332(C)(7)(B) To Ensure Timely Siting Review and
To Preempt Under Section 253 State and Local Ordinances That Classify All Wireless Siting Proposals as
Requiring a Variance, Declaratory Ruling, 24 FCC Rcd 13994, 14021 ¶ 71 (2009) ( "Shot Clock Ruling "), recon.
denied, 25 FCC Rcd 11157 (2010), affd, City of Arlington, Tex., et al. v. FCC, 2012 U.S. App. LEXIS 1252 (5th
Cir. 2012).
'Shot Clock Ruling, at 36.
0 H.R. Conf. Rep. No. 104 -458, 104th Congress, 2nd Sess. 208 (1996).
" Shotclock Ruling.
PCIA
calwa
�___
exempt from CEQA12 or a negative declaration or mitigated negative declaration has been
adopted. 13
The Wireless Provisions in Middle Class Tax Relief and Job Creation Act of 2012
Staff failed to mention the Middle Class Tax Relief and Job Creation Act of 2012,
enacted with bipartisan support and signed into law by President Obama on February 22, 2012.
One of the measures included in the Act was the creation of a nationwide interoperable
broadband network for first responders. In addition to authorizing the FCC to allocate necessary
spectrum for this new interoperable network, the Act also contained provisions designed to
establish voluntary incentive auctions of wireless spectrum, which are expected to raise $15
billion over the next eleven years. Seven billion dollars of the auction proceeds have been
allocated for public safety broadband network build out.
The Act reflects an implicit acknowledgement that realizing the financial viability of the
spectrum auctioned depends on the ease with which purchasers can deploy the infrastructure
needed to utilize it. At the same time, it allays local concerns over the potential impact of the
construction of new sites. In a carefully crafted attempt to address both industry and local
concerns, Section 6409 of the Act streamlines, and thereby incentivizes the use of, modification
of existing sites in lieu of new builds. Although the staff proposals reflect a similar recognition
of the need for streamlined review of modifications, PCIA and Ca1WA provide herewith a
detailed explanation of this recent law due to concerns that the definitions provided in the report
fail to reflect those adopted and utilized by the FCC.
Section 6409 of the Act requires state and local governments to approve an eligible
facilities request for the modification of an existing wireless tower or base station that does not
substantially change the physical dimensions of such tower or base station. Section 6409 applies
to "eligible facilities requests" for modification of existing wireless towers and base stations. The
Act defines "eligible facilities request" as any request for modification of an existing wireless
tower or base station that involves:
• Collocation of new transmission equipment;
• Removal of transmission equipment; or
• Replacement of transmission equipment.
Many of the terms employed in the section are concepts that were hammered out in negotiations
between local government and industry representatives in an agreement that was adopted by
reference in regulations promulgated by the FCC. Thus, for example, "collocation" has been
defined as "the mounting or installation of an antenna on an existing tower, building or structure
for the purpose of transmitting and /or receiving radio frequency signals for communications
purposes." 14
12 Gov. Code § 65950(a)(4).
"Gov. Code § 65950(a)(3).
14 Nationwide Programmatic Agreement for the Collocation of Wireless Antennas (2001), available at 47
C.F.R. Part I, Appendix B ( "Collocation Agreement "). See also Petition for Declaratory Ruling To Clarify
Provisions ofSection 332(C)(7)(B) To Ensure Timely Siting Review and To Preempt Under Section 253 State
and Local Ordinances That ClassifyAll Wireless Siting Proposals as Requiring a Variance, Declaratory Ruling, 24
El
PCIA
__
The same agreement also addressed the issue of what constitutes a substantial change in the
size of a tower:
The mounting of the proposed antenna on the tower would increase the existing height of the
tower by more than 10 %, or by the height of one additional antenna array with separation
from the nearest existing antenna not to exceed twenty feet, whichever is greater, except that
the mounting of the proposed antenna may exceed the size limits set forth in this paragraph if
necessary to avoid interference with existing antennas; or
The mounting of the proposed antenna would involve the installation of more than the
standard number of new equipment cabinets for the technology involved, not to exceed four,
or more than one new equipment shelter; or
The mounting of the proposed antenna would involve adding an appurtenance to the body of
the tower that would protrude from the edge of the tower more than twenty feet, or more than
the width of the tower structure at the level of the appurtenance, whichever is greater, except
that the mounting of the proposed antenna may exceed the size limits set forth in this
paragraph if necessary to shelter the antenna from inclement weather or to connect the
antenna to the tower via cable; or
The mounting of the proposed antenna would involve excavation outside the current tower
site, defined as the current boundaries of the leased or owned property surrounding the tower
and any access or utility easements currently related to the site. 15
In this agreement, a "tower" is defined as "any structure built for the sole or primary purpose of
supporting FCC - licensed antennas and their associated facilities. 16 While the concept of a "base
station" is not referenced in the agreement, the term has a long - established meaning consistently
used throughout both FCC regulations and case law, namely a fixed location from which
wireless signals are transmitted. For example, FCC regulations define a "base station" as "[a]
station at a specified site authorized to communicate with mobile stations;" or "A land station in
the land mobile service." 17 We urge the Planning Commission to use these well recognized
definitions within its Ordinance.
FCC Red 13994, 14021 1171 (2009) ( "Shot Clock Ruling "), recon. denied, 25 FCC Red 11157 (2010), affil, City
of Arlington, Tex., et al. v. FCC, 2012 U.S. App. LEXIS 1252 (5th Cit. 2012).
"Collocation Agreement, note, above.
16 Id.
"See, e.g., 47 C.F.R. § §24.5, 90.7.
PCIA
Conclusion
calwa
Reliable wireless communications are no longer a luxury. Wireless facilities provide a
platform for broadband accessibility, creating a link from the City of Newport Beach to the
world through high -speed Internet access. The City of Newport Beach has an opportunity to
facilitate expanded wireless coverage to its citizens, businesses, and first responders by moving
forward with amending its code in consideration of the wireless infrastructure industries'
suggestions provided herewith.
PCIA and CalWA hope to participate in the ordinance revision process as it develops, if
Planning Commission defers action on this item to consider the industry's concerns. We
appreciate your support to further our mutual goal of implementing and deploying responsible
and timely wireless infrastructure to serve the City of Newport Beach, CA.
Sincerely,
/s/
Julian Quattlebaum
Co- Chair, Regulatory Committee
California Wireless Association (CalWA)
800 S. Pacific Coast Hwy # 448
Redondo Beach, CA 90277
310 - 356 -6950
jq @channellawgroup.com
/s/
Sean Scully
Co- Chair, Regulatory Committee
California Wireless Association (CalWA)
800 S. Pacific Coast Hwy # 448
Redondo Beach, CA 90277
818 - 426 -6028
permittech @verizon.net
/s/
Kara Leibin Azocar
Government Affairs Counsel
PCIA —The Wireless Infrastructure Association
901 N. Washington St., Suite 600
Alexandria, VA 22314
703 -535 -7451
Kara.Azocar@pcia.com
EXHIBIT "A"
20.49.010 — Purpose and Intent.
A. Purpose. The purpose of this Chapter is to provide for wireless telecommunication facilities
( "Telecom Facilities ") on public and private property consistent with federal law while
ensuring public safety, reducing the visual effects of telecom equipment on public
streetscapes, protecting scenic, ocean and coastal public views, and otherwise mitigating
the impacts of such facilities. More specifically, the regulations contained herein are
intended to:
1. Encourage the location of Antennas in non - residential areas.
2. Strongly encourage Collocation at new and existing Antenna sites.
3. Encourage Telecom Facilities to be located in areas where adverse impacts on the
community and public views are minimized.
B. The provisions of this Chapter are not intended and shall not be interpreted to prohibit or to
have the effect of prohibiting telecom services. This Chapter shall be applied to providers,
operators, and maintainers of wireless services regardless of whether authorized by state or
federal regulations. This Chapter shall not be applied in such a manner as to unreasonably
discriminate among providers of functionally equivalent telecom services.
20.49.020 — General Provisions.
A. Applicability. These regulations are applicable to all Telecom Facilities providing voice
and /or data transmission such as, but not limited to, cell phone, internet and radio relay
stations.
B. Permit and /or Agreement Required.
1. Prior to construction of any Telecom Facility in the City, the applicant shall obtain a
Minor Use Permit (MUP), Conditional Use Permit (CUP), or Limited Term Permit (LTP),
depending on the proposed location and Antenna Classes, in accordance with Section
20.49.070 (Permit Review Procedures).
CalWA Comment No. 2: This section needs to incorporate a reference to 20.49.100 where there Page 11
could be ministerial permits issued for modifications. Also CalWA recommends a ministerial
permit be an option for Class 1 and Class 2 facilities under the circumstance when the facilities
are located in non - residential zones and are otherwise not visible.
CalWA Comment No. 1: Some
Chapter 20.49 — Wireless Telecommunications Facilities
recognition that this land use is in
fact a "utility" (as defined in the
Sections:
States Constitution) and additional
20.49.010 — Purpose and Intent
tolerance and balance similarly to
20.49.020 — General Provisions
how other utilities are viewed
aesthetically should be afforded this
20.49.030 — Definitions
critical land use as well. This
20.49.040 — Available Technology
"purpose" raises aesthetics above all
20.49.050 — Location Preferences
other considerations unfairly as
20.49.060 — General Development and Design Standards
compared to other utility land uses.
20.49.070 — Permit Review Procedures
20.49.080 — Permit Implementation, Time Limits, Duration, and Appeals
20.49.090 — Agreement for Use of City -owned or City -held Trust Property
20.49.100 — Modification of Existing Telecom Facilities
20.49.110 — Operational and Radio Frequency Compliance and Emissio s Report
20.49.120 — Right to Review or Revoke Permit
20.49.130 — Removal of Telecom Facilities
20.49.010 — Purpose and Intent.
A. Purpose. The purpose of this Chapter is to provide for wireless telecommunication facilities
( "Telecom Facilities ") on public and private property consistent with federal law while
ensuring public safety, reducing the visual effects of telecom equipment on public
streetscapes, protecting scenic, ocean and coastal public views, and otherwise mitigating
the impacts of such facilities. More specifically, the regulations contained herein are
intended to:
1. Encourage the location of Antennas in non - residential areas.
2. Strongly encourage Collocation at new and existing Antenna sites.
3. Encourage Telecom Facilities to be located in areas where adverse impacts on the
community and public views are minimized.
B. The provisions of this Chapter are not intended and shall not be interpreted to prohibit or to
have the effect of prohibiting telecom services. This Chapter shall be applied to providers,
operators, and maintainers of wireless services regardless of whether authorized by state or
federal regulations. This Chapter shall not be applied in such a manner as to unreasonably
discriminate among providers of functionally equivalent telecom services.
20.49.020 — General Provisions.
A. Applicability. These regulations are applicable to all Telecom Facilities providing voice
and /or data transmission such as, but not limited to, cell phone, internet and radio relay
stations.
B. Permit and /or Agreement Required.
1. Prior to construction of any Telecom Facility in the City, the applicant shall obtain a
Minor Use Permit (MUP), Conditional Use Permit (CUP), or Limited Term Permit (LTP),
depending on the proposed location and Antenna Classes, in accordance with Section
20.49.070 (Permit Review Procedures).
CalWA Comment No. 2: This section needs to incorporate a reference to 20.49.100 where there Page 11
could be ministerial permits issued for modifications. Also CalWA recommends a ministerial
permit be an option for Class 1 and Class 2 facilities under the circumstance when the facilities
are located in non - residential zones and are otherwise not visible.
2. Applicants who obtain a MUP, CUP or LTP (and an encroachment permit, if required) for
any Telecom Facility approved to be located on any City -owned property or City -held
Trust property, shall enter into an agreement prepared and executed by the City
Manager or its designee prior to construction of the Facility, consistent with Section
20.49.090 (Agreement for Use of City -owned or City -held Trust Property).
C. Exempt Facilities. The following types of facilities are exempt from the provisions of this
Chapter:
1. Amateur radio antennas and receiving satellite dish antennas, and citizen band radio
antennas regulated by Section 20.48.190 (Satellite Antennas and Amateur Radio
Facilities).
2. Dish and other antennas subject to the FCC Over - the -Air Reception Devices ( "OTARD ")
rule, 47 C.F.R. § 1.4000 that are designed and used to receive video programming
signals from (a) direct broadcast satellite services, or (b) television broadcast stations, or
(c) for wireless cable service.
3. During an emergency, as defined by Title 2 of the NBMC, the City Manager, Director of
Emergency Services or Assistant Director of Emergency Services shall have the
authority to approve the placement of a Telecom Facility in any district on a temporary
basis not exceeding ninety (90) calendar days from the date of authorization. Such
authorization may be extended by the City on a showing of good cause.
4. Facilities exempt from some or all of the provisions of this Chapter by operation of state
or federal law to the extent so determined by the City.
5. Systems installed or operated at the direction of the City or its contractor.
D. Other Regulations. Notwithstanding the provisions of this Chapter, all Telecom Facilities
within the City shall comply with the following requirements:
1. Rules, regulations, policies, or conditions in any permit, license, or agreement issued by
a local, state or federal agency which has jurisdiction over the Telecom Facility.
2. Rules, regulations and standards of the Federal Communications Commission (FCC)
and the California Public Utilities Commission (CPUC).
E. Regulations not in Conflict or Preempted. All Telecom Facilities within the City shall
comply with the following requirements unless in conflict with or preempted by the provisions
of this Chapter:
1. All applicable City design guidelines and standards.
2. Requirements established by any other provision of the Municipal Code and by any
other ordinance and regulation of the City.
F. Legal Nonconforming Facility. Any Telecom Facility that is lawfully constructed, erected,
or approved prior to the effective date of this Chapter, or for which the application for a
proposed Telecom Facility is deemed complete prior to the effective date of this Chapter, in
compliance with all applicable laws, and which Facility does not conform to the requirements
of this Chapter shall be accepted and allowed as a legal nonconforming Facility if otherwise
approved and constructed. Legal nonconforming Telecom Facilities shall comply at all times
with the laws, ordinances, and regulations in effect at the time the application was deemed
complete, and any applicable federal and state laws as they may be amended or enacted,
and shall at all times comply with any conditions of approval.
CaIWA Comment No. 3: Are legal nonconforming amortizations applicable under Page 12
any circumstances to WTF's that are classified as "Legal Nonconforming Facilities "?
CaIWA Comment No. 4: The definition of "Base
Station" should include the entire structure and
antenna facilities as defined by the FCC.
20.49.030 — Definitions.
For the purposes of this Chapter, the following definitions shall apply
Antenna. Antenna means a device used to transmit and /or receive radio or electromagnetic
waves between earth and /or satellite -based systems, such as reflecting discs, panels,
microwave dishes, whip antennas, Antennas, arrays, or other similar devices.
Antenna Array. Antenna Array means Antennas having transmission and /or reception
elements extending in more than one direction, and directional Antennas mounted upon and
rotated through a vertical mast or tower interconnecting the beam and Antenna support, all of
which elements are deemed to be part of the Antenna.
Antenna Classes. Antenna Classes are Telecom Facilities and the attendant Support
Equipment separated into distinct "antenna classes."
Base Station. Base Station means the electronic equipment at a Telecom Facility installed and
operated by the Telecom Operator that together perform the initial signal transmission and
signal control functions. Base Station does not include the Antennas and Antenna support
structure, or the Support Equipment, nor does it include any portion of DAS.
City -owned or City -held Trust Property. City -owned or City -held Trust Property means all
real property and improvements owned, operated or controlled by the City, other than the public
right -of -way, within the City's jurisdiction, including but is not limited to City Hall, Police and Fire
facilities, recreational facilities, parks, libraries, monuments, signs, streetlights and traffic control
standards.
Collocation. Collocation means an arrangement whereby multiple Telecom Facilities are
installed on the same building or structure.
Distributed Antenna System, DAS. Distributed Antenna System (DAS) means a network of
one or more Antennas and fiber optic nodes typically mounted to streetlight poles, or utility
structures, which provide access and signal transfer services to one or more third -party wireless
service providers. DAS also includes the equipment location, sometimes called a "hub" or
"hotel" where the DAS network is interconnected with third -party wireless service providers to
provide the signal transfer services.
FCC. FCC means the Federal Communications Commission, the federal regulatory agency
charged with regulating interstate and international communications by radio, television, wire,
satellite, and cable.
Feasible. Feasible means capable of being accomplished in a successful manner within a
reasonable period of time, taking into account environmental, physical, legal and technological
factors.
Lattice Tower. Lattice Tower means a freestanding open framework structure used to support
Antennas, typically with three or four support legs of open metal crossbeams or crossbars.
Monopole. Monopole means a single free - standing pole or pole -based structure solely used to
act as or support a Telecom Antenna or Antenna Arrays.
Page 13
CalWA Comment No. 5: This component of the definition is
not clear as "Base Station" and "Suport Equipment" would
seem to be inclusive of each other. Please clarify.
Operator or Telecom Operator. Operator or Telecom Operator means any person, firm,
corporation, company, or other entity that directly or indirectly owns, leases, runs, manages, or
otherwise controls a Telecom Facility or facilities within the City.
Public Right -of -Way. Public Right -of -Way or ( "PROW ") means the improved or unimproved
surface of any street, or similar public way of any nature, dedicated or improved for vehicular,
bicycle, and /or pedestrian related use. PROW includes public streets, roads, lanes, alleys,
sidewalks, medians, parkways and landscaped lots.
Stealth or Stealth Facility. Stealth or Stealth Facility means a Telecom Facility in which the
Antenna, and the Support Equipment, are completely hidden from view in a monument, cupola,
pole -based structure, or other concealing structure which either mimics, or which also serves
as, a natural or architectural feature. Concealing structures which are obviously not such a
natural or architectural feature to the average observer do not qualify within this definition.
Support Equipment. Support Equipment means the physical, electrical and /or electronic
equipment included within a Telecom Facility used to house, power, and /or contribute to the
processing of signals from or to the Facility's Antenna or Antennas, including but not limited to
cabling, air conditioning units, equipment cabinets, pedestals, and electric service meters.
Support Equipment does not include the Base Station, DAS, Antennas or the building or
structure to which the Antennas are attached.
Telecommunication(s) Facility, Telecom Facility, Telecom Facilities, Wireless
Telecommunications Facility, or Facility. Telecommunication(s) Facility, Telecom Facility,
Telecom Facilities, Wireless Telecommunications Facility, or simply Facility or Facilities means
an installation that sends and /or receives wireless radio frequency signals or electromagnetic
waves, including but not limited to directional, omni - directional and parabolic antennas,
structures or towers to support receiving and /or transmitting devices, supporting equipment and
structures, and the land or structure on which they are all situated. The term does not include
mobile transmitting devices, such as vehicle or hand held radios /telephones and their
associated transmitting antennas.
Utility Pole. Utility Pole means a single freestanding pole used to support services provided by
a public or private utility provider.
Utility Tower. Utility Tower shall mean an open framework structure (see lattice tower) or steel
pole used to support electric transmission facilities.
Wireless Tower. Wireless Tower means any structure built for the sole or primary purpose of
supporting Antennas used to provide wireless services authorized by the FCC. A Distributed
Antenna System (DAS) installed pursuant to a Certificate of Public Convenience and Necessity
(CPCN) issued by the California Public Utilities Commission on a water tower, utility tower,
street light, or other structures built or rebuilt or replaced primarily for a purpose other than
supporting wireless services authorized by the FCC, including any structure installed pursuant
to California Public Utility Code Section 7901, is not a Wireless Tower for purposes of this
definition. For an example only, a prior- existing light standard which is replaced with a new light
standard to permit the addition of Antennas shall not be considered a Wireless Tower, but rather
a replacement light standard.
Page 14
CaIWA Comment No. 6: Overemphasis of "aesthetics ". More
tolerance and balance should be afforded this land use in
recognition of the critical infrastructure and "utility" that it is.
20.49.040 — Available Technology.
All Telecom Facilities approved under this Chapter shall utilize the most efficient, diminutive,
and least obtrusive available technology in order to minimize the number of Telecom Facilities in
the City and reduce their visual impact on the community and public views.
20.49.050 — Location Preferences.
A. Preferred Locations. The following is the order of preference for the location and
installation of Telecom Facilities, from highest priority location and technique to lowest.
Antenna Classes are the Telecom Facilities and their attendant accessory/Support
Equipment separated into the following distinct Antenna Classes based on observed
aesthetic impacts, as follows:
Class 1 (Camouflaged /Screened): A Telecom Facility with Antennas mounted on an existing
or proposed non - residential building or other structure not primarily intended to be an
antenna support structure. The Antennas, Base Station, and Support Equipment are fully
screened so that they are not visible to the general public. Typical examples include:
•
Wall or roof mounted Antennas that are screened behind radio - frequency transparent,
visually- opaque screen walls that match or complement existing exterior surfaces of the
building or structure to which they are attached.
CaIWA Comment •
Antennas designed to be incorporated within an architectural feature of a building or
No. 7: This
structure such as a steeple, cross, cupola, sign, monument, clock tower or other
additional
architectural element.
requirement is
not warranted
Base Station equipment that is contained within an existing structure, or placed into a
nor relavent to a
new attached structure that matches or complements the existing exterior surfaces of
p g
Collocation.
the building or structure
Please remove.
Class 2 (Collocation): A Telecom Facility with Antennas and /or Base Stations co- located on
an approved existing Telecom Facility and mounted in the same manner with materially the
same or improved screening, or the same camouflage design techniques as the approved or
existing Telecom Facility. Class 2 Collocation Telecom Facilities also may incorporate flush -
to -grade underground Base Station enclosures including flush -to -grade vents, or vents that
extend no more than 24 inches above the finished grade and are screened from public view.
Class 3 (Visible): A Telecom Facility with Antennas mounted on an existing non - residential
building, structure, pole, light standard, Utility Tower, and /or Lattice Tower. The structure is
treated with some camouflage design techniques, but the Antenna panels and some
portions of the pole, light standards, Utility Tower, or Lattice Tower are still visible. Typical
examples include:
• Antennas mounted on the exterior of an existing building so that the panels are visible,
but painted to match the color and texture of the building or structure.
• Antennas flush- mounted atop an existing pole or light standard that are unscreened or
un- camouflaged, or attached to an existing pole or light standard utilizing a cylindrical
Antenna unit that replicates the diameter and color of the pole or standards.
• Antenna panels installed on existing electrical or other Utility Towers, or existing Lattice
Towers.
CaIWA Comment No. 8: WTF mounted on
existing utility infrastructure should be encourage
and promoted via Class 1 designation.
Page 15
CalWA Comment No. 9: This type of facility should
be Class 1. Please reclassify as a facility that is
within a rock or shrub type facility is very low profile
and minimimally visible, if at all.
CalWA
Comme\No..
10: These
types of
facilities should
be included
Class 4 (Freestanding Structure): A Facility with Antennas mounted on a new freestanding
structure constructed for the sole or primary purpose of supporting the Telecom Facility. The
Telecom Facility is designed to replicate a natural feature or is a Monopole or Lattice Tower.
The Antennas are either unscreened and visible, or camouflaged /designed to blend in with
their surroundings. Typical examples include:
with Class 3
type facilities •
as they are
11 stealthed/
camoflauged
and should be
incentivised.
Antennas mounted inside or behind elements that replicate natural features such as
rocks and shrubbery and located in hillsides or other natural areas where the Telecom
Facility blends into the surrounding vegetation or topography (e.g. false rocks or
shrubbery).
A Telecom Facility consisting of Antennas mounted on or inside a freestanding structure
that uses camouflage to disguise the Antennas (e.g. monotree, flagpole, or other
freestanding structure).
A Telecom Facility consisting of Antennas on the exterior of a freestanding structure that
is unscreened /un- camouflaged (e.g. Monopoles or Lattice Tower).
Class 5 (Temporary): A Wireless Tower, Antennas and /or Base Station, and associated
Support Equipment system that is a temporary Telecom Facility on a site until a permanent
(separately approved) Telecom Facility to provide coverage for the same general area is
operational but such placement of a temporary Telecom Facility shall not exceed 1 year,
consistent with Section 20.52.040. A Wireless Tower, Antennas and /or Base Station, and
associated Support Equipment system that is a temporary Telecom Facility located on a site
in connection with a special event, as that term may be defined in Municipal Code Section
11.03.020 (General Provisions), may be allowed only upon approval of a Special Events
Permit, as regulated by Chapter 11.03. Class 5 installations include but are not limited to
equipment mounted on trailers, trucks, skids, or similar portable platforms.
B. Prohibited Locations. Telecom Facilities are prohibited in the following locations:
CalWA
Comment No.
11: Facilities \�1
should be
permitted in 2.
these zones if
not utilized as 3.
a residential
use.
C.
CalWA
Comment No.
12: Open
space should
be a permitted
zone for this
critical utility
infrastructure.
On properties zoned for single -unit or two -unit residential development, including
equivalent PC District designation.
On properties zoned for multi -unit residential development and mixed -use development
consisting of four (4) dwelling units or less.
In the Open Space (OS) zoning district, unless Telecom Facilities are collocated on an
existing Utility Tower within a utility easement area, or collocated on an existing Telecom
Facility.
Installations in the Public Right -of -Way. All Telecom Facilities proposed to be located in
the public right -of way shall comply with the provisions of Title 13, and notwithstanding any
provisions contained in Title 13 to the contrary, shall be subject to the following:
1. All Support Equipment shall be placed below grade in the public right -of -way where the
existing utility services (e.g., telephone, power, cable TV) are located underground.
Exception: Any pedestal meter required for the purpose of providing electrical service
power for the proposed Telecom Facility may be allowed to be installed above ground in
a public right -of -way.
2. Whenever Feasible, new Antennas proposed to be installed in public right -of -way shall
be placed on existing or replacement utility structures, light standards, or other existing
vertical structures.
3. Any proposed installation in the public right -of -way shall comply with all requirements of
the Americans with Disability Act (ADA), and all other laws, rules, and regulations.
Page 16
CaIWA Comment No. 13: The "General Criteria" primarily focuses on
"aesthetics" and weights that criteria above all other concerns. No
other utility infrastructure must adhere to such unbalanced criteria
and wireless infrastructure. CalWA requests that the City begin to
look in a more balanced and tolerant manner towards this utility as
is afforded all other utility infrastructure.
D. Collocation Installations.
1. When Required. To limit the adverse visual effects of and proliferation of individual
Telecom Facilities in the City, a new Telecom Facility proposed within one thousand
(1,000) feet of an existing Telecom Facility shall be required to collocate on the same
building or structure as the existing Telecom Facility. Exception: If the reviewing
authority determines, based on compelling evidence submitted by the applicant, that
Collocation of one or more new Telecom Facilities within one thousand (1000) feet of an
existing Telecom Facility is not Feasible, and all findings required to grant approval of a
MUP, CUP or LTP for a Telecom Facility can be met, then such Collocation shall not be
required.
2. Condition Requiring Future Collocation. In approving a Telecom Facility, the review
authority may impose a condition of approval providing for future Collocation of Telecom
Facilities by other carriers at the same site.
20.49.060 — General Development and Design Standards.
A. General Criteria. All Telecom Facilities shall employ design techniques to minimize visual
impacts and provide appropriate screening to result in the least intrusive means of providing
the service. Such techniques shall be employed to make the installation, appearance and
operations of the Telecom Facility as visually inconspicuous as possible. To the greatest
extent Feasible, Telecom Facilities shall be designed to minimize the visual impact of the
Telecom Facility by means of location, placement, height, screening, landscaping, and
camouflage, and shall be compatible with existing architectural elements, building materials,
other building characteristics, and the surrounding area. Where an existing structure is
replaced to allow for the addition of a Telecom Facility, the replacement structure shall retair
as its primary use and purpose that of the prior- existing structure. For an example, where a
streetlight standard is replaced with a different streetlight standard to allow for the additional
installation of Antennas, the primary use shall remain as a streetlight.
In addition to the other design standards of this Section, the following criteria shall be
considered by the review authority in connection with its processing of any MUP, CUP or
LTP for a Telecom Facility:
1. Blending. The extent to which the proposed Telecom Facility blends into the surrounding
environment or is architecturally compatible and integrated into the structure.
2. Screening. The extent to which the proposed Telecom Facility is concealed, screened or
camouflaged by existing or proposed new topography, vegetation, buildings or other
structures.
3. Size. The total size of the proposed Telecom Facility, particularly in relation to
surrounding and supporting structures.
4. Location. Proposed Telecom Facilities shall be located so as to utilize existing natural or
man -made features in the vicinity of the Telecom Facility, including topography,
vegetation, buildings, or other structures to provide the greatest amount of visual
screening and blending with the predominant visual backdrop.
B. Public View Protection. Telecom Facilities involving a site adjacent to an identified public
view point or corridor, as identified in General Plan Policy NR 20.3 (Public Views), shall be
reviewed to evaluate the potential impact to public views consistent with Section 20.30.100
(Public View Protection).
Page 17
C. Height. All Telecom Facilities shall comply with Antenna height restrictions, if any, required
by the Federal Aviation Administration, and shall comply with Section 20.30.060.E. (Airport
Environs Land Use Plan (AELUP) for John Wayne Airport and Airport Land Use
Commission (ALUC) Review Requirements) as may be in force at the time the Telecom
Facility is permitted or modified.
1.
Maximum Height. Antennas shall be installed at the minimum height possible to provide
average service to the Telecom Operator's proposed service area. In any case, no
Antenna or other telecom equipment or screening structure shall extend higher than the
CaIWA Comment No.
following maximum height limits:
14: These types of
facilities should be
a. Telecom Facilities installed on existing streetlight standards, traffic control standards,
permitted in
Utility Poles, Utility Towers or other similar structures within the public right -of -way
residential districts
shall not exceed 35 feet in height above the finished grade.
that are developed
b. Telecom Facilities may be installed on existing Utility Poles or Utility Towers that
non - residential land
exceed 35 feet above the finished grade where the purposes of the existing Utility
uses.
Pole or Utility Tower is to carry electricity or provide other wireless data transmission
provided that the top of the Antenna does not extend above the top of the Utility Pole
or Utility Tower.
c. Telecom Facilities installed in ground- mounted flagpoles may be installed at a
CalWA Comment
maximum height of 35 feet in nonresidential districts only, and shall not exceed 24
No. 15: Additional
inches in width at the base of the flagpole and also shall not exceed 20 inches in
heights should be
width at the top of the flagpole. As a condition of approval, flagpole sites shall
permitted up to 10
above the
comply with 4 U.S.C. § 1 et seq. ( the "U.S. Flag Code").
base height as
d. Telecom Facilities may be installed on buildings or other structures to extend up to 5
additional height
feet above the base height limit established in Part 2 (Zoning Districts, Allowable
could result in
Uses, and Zoning District Standards) for the zoning district in which the Telecom
lesser overall
Facility is located.
facilities and will
e. Applications for the installation of Telecom Facilities proposed to be greater than 5
allow for additional
collocations further
feet above the base height limit may be installed up to the maximum height limit for
reducing the
the zoning district in which the Telecom Facility is located in accordance with Section
number of overall
20.30.060.C.2 (Height Limit Areas), subject to review and action by the Planning
facilities needed in
Commission. The Planning Commission may approve or conditionally approve a
the future.
CUP for a Telecom Facility to exceed the base height limit by more than 5 feet after
making all of the required findings in Section 20.49.070.H (Permit Review
Procedures).
2.
Over - Height Buildings or Structures. Stealth Telecom Facilities may be installed within or
on structures that are permitted to exceed the height limit for the zoning district in which
the structure is located, either by right under Title 20 or which have received a
discretionary approval, so long as the height of the structure is not being increased. The
standard of review shall be based on the type of installation and Antenna Classes being
used.
D. Setbacks. Proposed Telecom Facilities shall comply with the required setback established
by the development standards for the zoning district in which the Telecom Facility is
proposed to be located. Setbacks shall be measured from the part of the Telecom Facility
closest to the applicable lot line or structure. For ground- mounted Wireless Towers installed
on public property or private property, unless the review authority determines a smaller
setback would be appropriate based on the surrounding development or uses, the setback
CalWA Comment No. 17: This land use is by definition a "utility ". As CalWA Comment No. 16: This is
critical "utility infrastructure" some tolerance of "aesthetics" unecessary and could exclude many
associated with utility infrastructure needs to considered and afforded good opportunities for appropriate
this land use as it is afforded other "utilities ". Over emphasis of locations. This requirement should be
"aesthetics ", removed.
shall be the greater of: a) the required setback established by the development standards
for the zoning district in which the Telecom Facility is proposed to be located; or b) 110% of
the maximum height of the Wireless Tower including any Antenna or Antenna enclosures
attached thereto.
E. Design Techniques. Design techniques shall result in the installation of a Telecom Facility
that is in scale with the surrounding area, hides the installation from predominant views from
surrounding properties, and prevents the Telecom Facility from visually dominating the
surrounding area. Design techniques may include the following:
1. Screening elements to camouflage, disguise, or otherwise hide the Telecom Facility from
view from surrounding uses.
2. Painting and /or coloring the Telecom Facility to blend into the predominant visual
backdrop.
3. Siting the Telecom Facility to utilize existing features (buildings, topography, vegetation,
etc.) to screen, camouflage, or hide the Telecom Facility.
4. Utilizing simulated natural features (trees, rocks, etc.) to screen, camouflage, or hide the
Telecom Facility.
5. Providing Telecom Facilities of a size that, as determined by the City, is not visually
obtrusive such that any effort to screen the Telecom Facility would create greater visual
impacts than the Telecom Facility itself.
F. Screening Standards. Following is a non - exclusive list of potential design and screening
techniques that should be considered based on the following Antenna Classes:
CaIWA Comment
No. 17: How is
this section
anticipated to be
applied?
Wholesale
change out of
the WTF would
not be
acceptable.
Please clarify. 2.
For Class 1 (Camouflaged /Screened) Antenna Installations:
a. All Telecom Facility components, including all Antenna panels and Support Equipment,
shall be fully screened, and mounted either inside the building or structure, or behind the
proposed screening elements and not on the exterior face of the building or structure.
b. Screening materials shall match in color, size, proportion, style, and quality with the
exterior design and architectural character of the structure and the surrounding visual
environment. If determined necessary by the reviewing authority, screening to avoid
adverse impacts to views from land or buildings at higher elevations shall be required.
c. In conditions where the Antennas and Support Equipment are installed within a new
freestanding structure, (an architectural feature such as a steeple, religious symbol or
tower, cupola, clock tower, sign, etc.), the installation shall blend in the predominant
visual backdrop so it appears to be a decorative and attractive architectural feature.
For Class 2 (Collocation) Antenna Installations:
a. A Collocation installation shall use screening methods materially similar to those used on
the existing Telecom Facility and shall not diminish the screening of the existing
Telecom Facility.
b. If determined necessary by the review authority, use of other improved and appropriate
screening methods may be required to screen the Antennas, Base Station, and Support
Equipment from public view.
3. For Class 3 (Visible) Antenna Installations:
a. Building or structure mounted Antennas shall be painted or otherwise coated to match or
complement the predominant color of the structure on which they are mounted and shall
be compatible with the architectural texture and materials of the building to which the
Page 19
CalWA Comment No. 18A: The requirement for locating associated radio transmission / amplificaton
equipment inside the streetlight pole or traffic control standard "without increasing the pole width or
shall be mounted in a flush -to -grad enclosure adjacent to the base of the pole" is onerous and cost
prohibitive. It is also unequitable treatment when compared to other utility infrastructure within the
ROW. We request an option for above ground equipment be available.
Antennas are mounted. No cables and mounting brackets or any other associated
equipment or wires shall be visible from above, below or the side of the Antennas.
b. All Antenna components and Support Equipment shall be treated with exterior coatings
of a color and texture to match the predominant visual background and /or adjacent
architecture so as to visually blend in with the surrounding development. Subdued
colors and non - reflective materials that blend with surrounding materials and colors shall
proposed to replace the existing pole, the replacement pole shall be consistent with the
size, shape, style and design of the existing pole, including any attached light arms.
\For Class 4 (Freestanding Structure) Antenna Installations:
a. For a false rock, the proposed screen structure shall match in scale and color other rock
outcroppings in the general vicinity of the proposed site. A false rock screen may not be
considered appropriate in areas that do not have natural rock outcroppings.
b.
be used.
c.
Antenna installations in the public right -of -way and /or on an existing or replacement
20: In industrial/
manufacturing zones
streetlight pole or traffic control standard shall be limited to Antennas, Supporting
this design option is
Equipment, and cable components that are compatible in scale and proportion to
CalWA
streetlights and traffic control standards and the poles on which they are mounted. All
Comment No.
transmission or amplification equipment such as remote radio units, tower mounted
18: If this
amplifiers and surge suppressors shall be mounted inside the streetlight pole or traffic
additional
control standard without increasing the pole width or shall be mounted in a flush -to-
screening is
done this type
grade enclosure adjacent to the base of the pole.
of facility y d.
Antenna installations on existing or replacement streetlight poles, traffic control
should be
standards, or Utility Poles shall be screened by means of canisters, radomes, shrouds
Class 1.
other screening measures whenever Feasible, and treated with exterior coatings of a
color and texture to match the existing pole. If Antennas are proposed to be installed
CalWA Comment No.
without screening, they shall be flush- mounted to the pole and shall be treated with
19: This should be a
exterior coatings of a color and texture to match the existing pole.
Class 1 type facility..
Antennas shall be mounted on existing poles wherever Feasible. If a new pole is
proposed to replace the existing pole, the replacement pole shall be consistent with the
size, shape, style and design of the existing pole, including any attached light arms.
\For Class 4 (Freestanding Structure) Antenna Installations:
a. For a false rock, the proposed screen structure shall match in scale and color other rock
outcroppings in the general vicinity of the proposed site. A false rock screen may not be
considered appropriate in areas that do not have natural rock outcroppings.
b.
The installation of a false tree (such as but without limitation a monopine or monopalm,
CalWA Comment No.
or false shrubbery) shall be designed for and located in a setting that is compatible with
20: In industrial/
manufacturing zones
the proposed screening method. Such installations shall be situated so as to utilize
this design option is
existing natural or manmade features including topography, ve etation, buildings, or
9 9 9 9,
appropriate and
other structures to provide the greatest amount of visual screening. For false trees or
helps reduce costs of
shrubbery installations, all Antennas and Antenna supports shall be contained within the
facilities for all. Also
canopy of the tree design, and other vegetation comparable to that replicated in the
in proximity to
proposed screen structure shall be prevalent in the immediate vicinity of the antenna
transmission lattice
site, and the addition of new comparable living vegetation may be necessary to enhance
towers similar lattice
tower designs are
the false tree or shrubbery screen structure.
most appropriate. c.
The installation of a new Monopole or Lattice Tower is prohibited unless the applicant by
use of compelling evidence can show to the satisfaction of the review authority that
higher priority locations or Stealth Facilities are either not available or are not Feasible.
5. For Class 5 (Temporary) Antenna Installations:
a. A temporary Telecom Facility installation may require screening to reduce visual impacts
depending on the duration of the permit and the setting of the proposed site. If
screening methods are determined to be necessary by the review authority, the
appropriate screening methods will be determined through the permitting process
reflecting the temporary nature of the Telecom Facility.
Page 110
CalWA Comment No. 21: Need
clarification on this Class?
6. Support Equipment. All Support Equipment associated with the operation of any Telecom
Facility including but not limited to the Base Station shall be placed or mounted in the least
visually obtrusive location possible, and shall be screened from view. The following is a
non - exclusive list of potential screening techniques that may be utilized based on the type of
installation:
CalWA Comment a. Building- Mounted Facilities. For building or structure - mounted Antenna installations,
No. 22: This is
not a feasible ,Support Equipment for the Telecom Facility may be located inside the building, in an
option. should be underground vault, or on the roof of the building that the Telecom Facility is located on,
removed. provided that both the equipment and screening materials are painted the color of the
building, roof, and /or surroundings. All screening materials for roof - mounted Telecom
Facilities shall be of a quality and design compatible with the architecture, color, texture
and materials of the building to which it is mounted. If determined necessary by the
view authority, screening to avoid adverse impacts to views from land or buildings at
hi er elevations shall be required.
a build
CaIWA Comment No. 23
It is not feasible to
provide above ground
support equipment
within the pole without
some reasonable
increase in width being
permitted. This section
should be redrafted.
IF
I Facilities. For freestanding Telecom Facilities installations, not mounted on
structure, Support Equipment for the Telecom Facility:
Shall bkvisually screened by locating the Support Equipment in a fully enclosed
building or in an underground vault, or
Shall be screened in a security enclosure consisting of walls and /or landscaping
to effectively screen the Support Equipment at the time of installation. All wall
and landscaping materials shall be selected so that the resulting screening will
be visually integrated with the architecture and landscape architecture of the
surroundings.
Screening enclosures may utilize graffiti- resistant and climb- resistant vinyl -clad
chain link with a "closed- mesh" design (i.e. one -inch gaps) or may consist of an
alternate enclosure design approved by the review authority. In general, the
screening enclosure shall be made of non - reflective material and painted or
camouflaged to blend with surrounding materials and colors.
c Installations in a Public Right -of -Way. Support Equipment approved to be located above
ground in a public right -of -way shall be painted or otherwise coated to be visually
compatible with the existing or replacement pole, lighting and /or traffic signal equipment
without substantially increasing the width of the structure.
G. Night Lighting. Telecom Facilities shall not be lighted except for security lighting at the
lowest intensity necessary for that purpose or as may be required by the U.S. Flag Code.
Such lighting shall be shielded so that direct illumination does not directly shine on nearby
properties. The review authority shall consult with the Police Department regarding
proposed security lighting for Telecom Facilities on a case -by -case basis.
H. Signs and Advertising. No advertising signage or identifying logos shall be displayed on
any Telecom Facility except for small identification, address, warning, and similar
information plates. Such information plates shall be identified in the telecom application and
shall be subject to approval by the review authority. Signage required by state or federal
regulations shall be allowed in its smallest permissible size.
Page 111
I. Nonconformities. A proposed Telecom Facility shall not create any new or increased
nonconformities as defined in the Zoning Code, such as, but not limited to, a reduction in
and /or elimination of, required parking, landscaping, or loading zones.
J. Maintenance. The Telecom Operator shall be responsible for maintenance of the Telecom
Facility in a manner consistent with the original approval of the Telecom Facility, including
but not limited to the following:
CalWA Comment
1.
No. 25: For those
Facility
facilities that are
2.
not visible and not
Located inside or
within a residential
3.
zone nor within
within 150 feet of
150' of a
4
residential zone a
any Residential
ministerial permit
5.
option to
District or
incentivize and
6.
reduce processing
Equivalent PC
costs and time
Equivalent PC)
h Id
District
Any missing, discolored, or damaged camouflage or screening shall be restored to its
original permitted condition.
All graffiti on any components of the Telecom Facility shall be removed promptly in
accordance the Newport Beach Municipal Code.
All landscaping required for the Telecom Facility shall be maintained in a healthy
condition at all times, and shall be promptly replaced if dead or dying.
All Telecom Facilities shall be kept clean and free of litter.
All equipment cabinets shall display a legible contact number for reporting maintenance
problems to the Facility Operator.
If a flagpole is used for a Telecom Facility, flags shall be flown and shall be properly
maintained at all times. The use of the United States flag shall comply with the
s ou be an provisions of the U.S. Flag Code. CalWA Comment No 24: More incentivized zoning
option. do- principles should be incorporated into the "Permit
20.49.070 — Permit Review Procedures. Review Procedures ".
The procedures and requirements for preparation, filing, and processing of a permit application
for a Telecom Facility shall be as specified in Chapter 20.50 (Permit Application Filing and
Processing) unless otherwise noted below.
A. Permit Required. All applicants for Telecom Facilities shall apply for a MUP, CUP or LTP,
from the Community Development Department, depending on the Antenna Class, height,
and duration, as specified in the table below:
CalWA Cc
Nonresidc
ministeriz
the nonre
Table 4 -1
Permit Requirements for Telecom Facilities
Page 112
nent No.
cation
re a CUP.
ft Location
of Proposed Telecom
Facility
Located in a
Located inside or
Located inside or
mment No. 25: For
Nonresidential
within 150 feet of any
within 150 feet of
there should lesser
District more than
Open Space District
any Residential
pro
I o cess to further i ns entivize
pr
sidential locations.
150 feet from a
or Public Park or
District or
Residential (or
Public Facility zoned
Equivalent PC
Equivalent PC)
PR or PF
District
District or Open
CalWA Corr
Space District or
26: No Coll
Public Park or
should recl
Public Facility
zoned PR or PF
Class 1 Antenna (a)
MUP
MUP
MUP
(Camouflaged/Screened)
Class 2 Antenna (a) (b)
MUP
MUP
CUP
Collocation
Class 3 Antenna (a)
MUP
MUP
CUP
Visible
Page 112
nent No.
cation
re a CUP.
CalWA Comment No. 27: Should be CalWA Comment No. 28: For WTF located in
allowed via MUP if within height limits of Residential Zones with non - residential land
underlying zone and "stealthed ". uses, a MUP or ministerial permit should be
afforded if completely screened.
CalWA Comment No.
29: Is this for
emergency facilities?
Not clear/
Antenna Class
LYWt10n of Proposed Telecom Fa '
Class 4 Antenna (a) (c)
MUP
CUP
CUP
(Freestanding Structure
Class 5 Antenna (a) (c) (d)
LTP
LTP
LTP
(Temporary)
CalWA
Comment No. (a)
30: Has the City
conducted
Environmental
Reviews on
wireless
facilities as a
matter of
routine or are (b)
most facilities
determined to
be "Exempt"
from the
provisions of
CEQA
(Categorically). (C)
CalWA /-(d)
Comment No.
31: What is the
purpose of this
limitation? ThisB. Application Submission Requirements for Telecom Facilities on City -owned or City -
excludes held Trust Properties. Prior to the submittal for any application for any Telecom Facility
located on any City -owned property or City -held trust property, the applicant shall first obtain
written authorization from the City Manager or its designee to submit an application.
Any application for a Telecom Facility that proposes to exceed the base height limit of
the applicable zoning district in which the Telecom Facility is located by greater than five
(5) feet shall require review and action of a CUP by the Planning Commission. Pursuant
to this provision, an application that would otherwise be subject to review by the Zoning
Administrator would become subject to review by the Planning Commission. The
Planning Commission may approve or conditionally approve a CUP, subject to the
required findings in Subparagraph H, below.
The review procedure for Collocated Telecom Facilities shall be consistent with the
applicable review procedure as identified elsewhere in this table depending on the type
of installation and Antenna Class being proposed for the Collocation, unless the
Collocated Telecom Facility meets the requirements of California Government Code §
65850.6, or involves the Collocation of new transmission equipment and is consistent
with the provisions in Section 20.49.100 (Modification of Existing Telecom Facilities).
Antennas mounted on or within flagpoles, and temporary Telecom Facilities shall not be
permitted on properties either used or zoned residentially.
Temporary Telecom Facilities shall be subject to the standard of review for an LTP,
pursuant to Section 20.52.040 (Limited Term Permits).
numerous
appropriate
land use
locations that
are zoned C
residential but
may have other
land uses,ie.
churches whichl)
provide
excellent
locations in
proximity to
residential usesE.
where these
facilities are I
extremely /
necessary.
Fee. All costs associated with the permit application review shall be the responsibility of the
applicant, including any expense incurred for any outside technical or legal services in
connection with the application.
Review Process. Review of applications for all Telecom Facilities in City shall be consistent
with Chapter 20.50 (Permit Application Filing and Processing), and the FCC Declaratory
Ruling FCC 09 -99 ( "Shot Clock ") deadlines.
Review of Collocated Facilities. Notwithstanding any provision of this Chapter to the
contrary, pursuant to California Government Code section 65850.6 (as amended or
superseded), the addition of a new Telecom Facility to an existing Telecom Facility resulting
in the establishment of a Collocated Telecom Facility shall be a permitted use not requiring
a discretionary permit provided the underlying Telecom Facility was granted a discretionary
permit and was subject to either an environmental impact report, mitigated negative
declaration or negative declaration. If such a Collocated Telecom Facility does not satisfy
all of the requirements of Government Code section 65850.6, it shall be reviewed pursuant
the review procedures contained in Section 20.49.070 (Permit Review Procedures).
F. Emergency Communications Review. At the time an application is submitted to the
Community Development Department, a copy of the Plans, Map, and Emission Standards
shall be sent to the Chief of the Newport Beach Police Department. The Police Department
or its designee shall review the plan's potential conflict with emergency communications.
CalWA Comment No. 32: Has it been the practice to conduct a Pa 13
Environmental Reviews pursuant to CEQA for facilities in Newport g
Beach? If so then would this State Code section be invoked?
CalWA Comment No. 33: This requirement is inconsistent
with State and Federal Collocation laws. Some recognition of
the Class 1 type facility and collocations should be included
herein. Also further incentivization of process would be the
ministerial permit for Class 1 and collocations that are
consistent with State Code section, 65850.6.
The review may include a pre - installation test of the Telecom Facility to determine if any
interference exists. If the Police Department determines that the proposal has a high
probability that the Telecom Facility will interfere with emergency communications devices,
the applicant shall work with the Police Department to avoid interference. .
G. Public Notice and Public Hearing Requirements. An application for a Telecom Facility
shall require a public notice, and a public hearing shall be conducted, in compliance with
Chapter 20.62 (Public Hearings).
H. Required Findings for Telecom Facilities. The following findings shall apply to all
Telecom Facilities:
2. Findings to Increase Height. The review authority may approve, or conditionally approve
an application for a Telecom Facility which includes a request to exceed the base height
/limit for the zoning district in which the Telecom Facility is located by more than 5 feet only
after making each of the following findings in addition to the required findings above, as well
CalWA Comment the required findings for a MUP or CUP pursuant to Section 20.52.020 (Conditional Use
No. 35: Permits and Minor Use Permits), or an LTP pursuant to Section 20.52.040 (Limited Term
Additional Permits):
height should be
permitted as a. The increased height will not result in undesirable or abrupt scale changes or
required. An
addiitonal 5' relationships being created between the proposed Telecom Facility and existing
only is too adjacent developments or public spaces.
onerous and will b. Establishment of the Telecom Facility at the requested height is necessary to provide
result in many service.
more facilties
being required20.49.080 — Permit Implementation, Time Limits, Extensions, and Appeals.
A. The process for implementation or "exercising" of permits issued for a Telecom Facility, time
limits, and extensions, shall be in accordance with Chapter 20.54 (Permit Implementation,
Time Limits, and Extensions).
B. Appeals. Any appeal of the decision of the review authority of an application for a Telecom
Facility shall be processed in compliance with Chapter 20.64 (Appeals).
Page 114
1. General. The review authority indicated in Table 4 -1 may approve or conditionally
approve an application for a Telecom Facility only after first finding each of the required
CalWA Comment
findings for a MUP or CUP pursuant to Section 20.52.020 (Conditional Use Permits and
No. 34: These
Minor Use Permits), or an LTP pursuant to Section 20.52.040 (Limited Term Permits), and
criteria are
each of the following:
extremely
subjective and
. The proposed Telecom Facility is visually compatible with the surrounding
not consider th
neighborhood.
technical
requirements o.
\re.
The proposed Telecom Facility complies with the technology, height, location and design
the land use.
standards, as provided for in this Chapter.
These criteria a
An alternative site(s) located further from a Residential District, Public Park or Public
unbalanced with
Facility cannot feasibly fulfill the coverage needs fulfilled by the installation at the
overemphasis on
proposed site.
"aesthetics "'
d. An alternative Antenna construction plan that would result in a higher priority Antenna
Class category for the proposed Telecom Facility is not available or reasonably Feasible
and desirable under the circumstances.
2. Findings to Increase Height. The review authority may approve, or conditionally approve
an application for a Telecom Facility which includes a request to exceed the base height
/limit for the zoning district in which the Telecom Facility is located by more than 5 feet only
after making each of the following findings in addition to the required findings above, as well
CalWA Comment the required findings for a MUP or CUP pursuant to Section 20.52.020 (Conditional Use
No. 35: Permits and Minor Use Permits), or an LTP pursuant to Section 20.52.040 (Limited Term
Additional Permits):
height should be
permitted as a. The increased height will not result in undesirable or abrupt scale changes or
required. An
addiitonal 5' relationships being created between the proposed Telecom Facility and existing
only is too adjacent developments or public spaces.
onerous and will b. Establishment of the Telecom Facility at the requested height is necessary to provide
result in many service.
more facilties
being required20.49.080 — Permit Implementation, Time Limits, Extensions, and Appeals.
A. The process for implementation or "exercising" of permits issued for a Telecom Facility, time
limits, and extensions, shall be in accordance with Chapter 20.54 (Permit Implementation,
Time Limits, and Extensions).
B. Appeals. Any appeal of the decision of the review authority of an application for a Telecom
Facility shall be processed in compliance with Chapter 20.64 (Appeals).
Page 114
CaIWA Comment No. 36: CaIWA requests that this process be concurrent
rather than linear.
20.49.090 — Agreement for Use of City -Owned or City -Held Trust Property.
When applying for a permit pursuant to this Chapter, all Telecom Facilities located on City -
owned or City -held trust property shall require a license agreement approved as to form by the
City Attorney, and as to substance (including, but not limited to, compensation, term, insurance
requirements, bonding requirements, and hold harmless provisions) by the City Manager,
consistent with provisions in the City Council Policy Manual.
Prior to entering into an agreement, the applicant shall obtain a MUP, CUP or LTP. Upon the
issuance of a MUP, CUP or LTP, as required, and upon entering into an agreement, the
applicant shall obtain any and all other necessary permits, including, encroachment permits for
work to be completed in the public right -of -way, building permits, etc. All costs of said permits
shall be at the sole and complete responsibility of the applicant. All work shall be performed in
accordance with the applicable City standards and requirements.
20.49.100 — Modification of Existing Telecom Facilities.
Notwithstanding any provision in this Chapter of the Zoning Code, a request for a modification of
an existing Wireless Tower or Base Station that involves:
CalWA Comment No. 37: What is an example of
a. The Collocation of new transmission equipment; a "Telecom Facility that does not qualify as a
b. The removal of existing transmission equipment; or Wireless Tower or Base Station ". Needs
c. The replacement of existing transmission equipment clarification.
shall be subject to a ministerial review and approval without the processing of a discretionary
permit provided that such modification does not substantially change any of the physical
dimensions of such Wireless Tower or Base Station from the dimensions approved as part of
the original discretionary permit for the Wireless Tower or Base Station.
However, any modification to a Wireless Tower or Base Station which substantially changes the
physical dimensions of either the Wireless Tower or Base Station, and any other modification to
a Telecom Facility that does not qualify as a Wireless Tower or Base Station, shall be subject to
the permits and authorizations required by this Chapter.
"Substantially Change the Physical Dimensions" means any of the following, and refers to a
single change, or a series of changes over time (whether made by the same or different entities)
viewed against the City approval(s) for the Wireless Tower or Base Station as existing on
February 22, 2012, that individually or cumulatively have any of the effects described below:
a. Changing any physical dimension of the Wireless Tower or Base Station in a manner that
creates a violation of any safety code adopted by the City, or by the state or federal
government.
b. Changing the physical dimension of a Stealth Facility on a Wireless Tower, where the
changes would be inconsistent with the design of the Stealth Facility, or make the Wireless
Tower more visible.
c. Changing the physical dimension would require work that would intrude upon the public
right -of -way, or any environmentally sensitive area.
d. Increasing or decreasing by five percent (5 %) or more any of the following:
CalWA Comment No. 38: Nearly any additional facilities incorporated onto an Ca WA Comment No. 39: This threshold
existing facility could be interpreted to "make the Wireless Tower more visible ". s vague and unclear. Delete or clarify.
This needs to be clarified and relaxed to accomodate collocations without being Page 15
determined to crossing this "threshold ".
CalWA Comment No. 40: This should be
increased to 10 %.
CalWA Comment No. 41: These additional
constraints are confusing and unclear.
Delete or clarify. A simple 10% increase it
volume is simple enough.
• The height, width, or depth in any direction of any portion of the Wireless Tower or Base
Station; or
• The area required for structures required to support the Wireless Tower, including but
not limited to guy wires as approved and constructed through the discretionary permit
process
Provided that in no event shall the height is increased to exceed the maximum height
permitted in the applicable zoning district under the City's regulations.
e. Increasing by more than five percent (5 %) any of the height, width, depth or area
encompassed within any structure or object enclosing the Wireless Tower, such as a fence
or line of shrubs or bushes.
f. Increasing any of an existing Antenna Array's depth, circumference, or horizontal radius
from the Wireless Tower in any direction by more than five percent (5 %).
g. Adding more than two Antenna Arrays to an existing Wireless Tower, or adding Antenna
Arrays that, if the Antenna Array were an existing Antenna Array, would be of such depth,
circumference or radius as to fall outside of item f (above), unless such Antenna Arrays were
approved pursuant to Government Code Section 65850.6.
h. The mounting of the new or replacement transmission equipment would involve installing
new equipment cabinet(s) not permitted under the initial approval and that will not fit within
the existing enclosure for the Wireless Tower or Base Station, or would require installation of
a new cabinet or enclosure, excluding new equipment and cabinets that will be installed
underground. (Note: the proposed installation of a power back -up system [i.e., gas /diesel
generator, fuel cell, battery system, etc.] is not Collocation of new transmission equipment.)
i. Any increase in any physical dimension of a Wireless Tower or Base Station or any
equipment related thereto or any enclosure thereof at a Legal Nonconforming Facility.
Each application submitted under this section for a modification to an existing Wireless Tower or
Base Station shall be accompanied by:
1. A detailed description of the proposed modifications to the existing Telecom Facility(ies);
2. A photograph or description of the Wireless Tower as originally constructed, if available;
a current photograph of the existing Wireless Tower and /or Base Station; and, a graphic
depiction of the Wireless Tower and /or Base Station after modification showing all
relevant dimensions;
3. A detailed description of all construction that will be performed in connection with the
proposed modification; and
4. A written statement signed and stamped by a professional engineer, licensed and
qualified in California, attesting that the proposed modifications to be performed will not
trigger discretionary review under this section.
Any permit issued will be conditioned, and may be revoked, and the Telecom Facility required to
be removed or restored to its pre- modification condition if:
a. Any material statement made with respect to the Telecom Facility is false; or
b. The modifications as actually made would have triggered a discretionary review.
20.49.110 — Operational and Radio Frequency Compliance and Emissions Report.
At all times, the operator shall ensure that its Telecom Facilities shall comply with the most
current regulatory, operations standards, and radio frequency emissions standards adopted by
Page 116
CaIWA Comment No. 42: CalWA has worked with jurisdictions
across the State. It is our experience that when additional
testing is required it is so far below allowable limits as set by
the FCC that is to be unwarranted. Please delete this
requirement as it adds additional burdens and expenses that
do not yeild meaningful information.
the FCC. The operator shall be responsible for obtaining and maintaining the most current
information from the FCC regarding allowable radio frequency emissions and all other
applicable regulations and standards. Said information shall be made available by the operator
upon request at the discretion of the Community Development Director.
Within thirty (30) days after installation of a Telecom Facility, a radio frequency (RF) compliance
and emissions report prepared by a qualified RF engineer acceptable to the City shall be
submitted in order to demonstrate that the Telecom Facility is operating at the approved
frequency and complies with FCC standards for radio frequency emissions safety as defined in
47 C.F.R. § 1.1307 et seq. Such report shall be based on actual field transmission
measurements of the Telecom Facility operating at its maximum effective radiated power level,
rather than on estimations or computer projections. If the report shows that the Telecom Facility
does not comply with the FCC's 'General Population /Uncontrolled Exposure' standard as
defined in 47 C.F.R. § 1.1310 Note 2 to Table 1, the Director shall require that use of the
Telecom Facility be suspended until a new report has been submitted confirming such
compliance.
Upon any proposed increase of at least ten percent (10 %) in the effective radiated power or any
proposed change in frequency use of the Telecom Facility by the Telecom Operator, the
Telecom Operator shall be required to provide an updated certified radio frequency (RF)
compliance and RF emissions safety report.
A qualified independent radio frequency engineer, selected and under contract to the City, may
be retained to review said certifications for compliance with FCC regulations. All costs
associated with the City's review of these certifications shall be the responsibility of the
permittee, which shall promptly reimburse City for the cost of the review.
20.49.120 — Right to Review or Revoke Permit.
The reservation of right to review any permit for a Telecom Facility granted by the City is in
addition to, and not in lieu of, the right of the City to review and revoke or modify any permit
granted or approved hereunder for any violations of the conditions imposed on such permit.
20.49.130 — Removal of Telecom Facilities.
A. Discontinued Use. Any Telecom Operator who intends to abandon or discontinue use of a
Telecom Facility must notify the Community Development Director by certified mail no less
than thirty (30) days prior to such abandonment or discontinuance of use. The Telecom
Operator or owner of the affected real property shall have ninety (90) days from the date of
abandonment or discontinuance, or a reasonable additional time as may be approved by the
Community Development Director, within which to complete one of the following actions:
1. Reactivate use of the Telecom Facility;
2. Transfer the rights to use the Telecom Facility to another Telecom Operator and the
Telecom Operator immediately commences use within a reasonable period of time as
determined by the Community Development Director;
3. Remove the Telecom Facility and restore the site.
B. Abandonment. Any Telecom Facility that is not operated for transmission and /or reception
for a continuous period of ninety (90) days or whose Telecom Operator did not remove the
Telecom Facility in accordance with Subsection A shall be deemed abandoned. Upon a
Page 117
finding of abandonment, the City shall provide notice to the Telecom Operator last known to
use such Facility and, if applicable, the owner of the affected real property, providing thirty
days from the date of the notice within which to complete one of the following actions:
1. Reactivate use of the Telecom Facility;
2. Transfer the rights to use the Telecom Facility to another Telecom Operator who has
agreed to reactivate the Telecom Facility within 30 days of the transfer;
3. Remove the Telecom Facility and restore the site.
C. Removal by City.
1. The City may remove an abandoned Telecom Facility, repair any and all damage to the
premises caused by such removal, and otherwise restore the premises as is appropriate
to be in compliance with applicable codes at any time after thirty (30) days following the
notice of abandonment.
2. If the City removes the Telecom Facility, the City may, but shall not be required to, store
the removed Telecom Facility or any part thereof. The owner of the premises upon which
the abandoned Telecom Facility was located and all prior operators of the Telecom
Facility shall be jointly liable for the entire cost of such removal, repair, restoration and
storage, and shall remit payment to the City promptly after demand therefore is made. In
addition, the City Council, at its option, may utilize any financial security required in
conjunction with granting the telecom permit as reimbursement for such costs. Also, in
lieu of storing the removed Telecom Facility, the City may convert it to the City's use, sell
it, or dispose of it in any manner deemed by the City to be appropriate.
D. City Lien on Property. Until the cost of removal, repair, restoration and storage is paid in
full, a lien shall be placed on the abandoned personal property and any real property on
which the Telecom Facility was located for the full amount of the cost of removal, repair,
restoration and storage. The City Clerk shall cause the lien to be recorded with the Orange
County Recorder, with the costs of filing, processing, and release of such City Lien being
added to the other costs listed in this Section D.
Page 118
5d: Additional Material Received
Planning Commission July 19, 2012
PA2012 -057
Newport Beach Wireless Ordinance (July 19, 2012 Version)
The following comments are on the version of the Wireless Telecommunications Facilities Ordinance
(PA2012 -057) / Code Amendment No. 2012 -004 presented to the Newport Beach Planning Commission
as Agenda Item 5 at its July 19, 2012 meeting.
The comments were prepared by Jim Mosher ( jimmosher @yahoo.com ), 2210 Private Road, Newport
Beach 92660 (949 -548 -6229) , and are a mix of what may seem major and minor points.
Disclosure
I live in a blufftop home on a "quiet" street overlooking Irvine Avenue, just north of Santiago
Road. I enjoy a view across the Upper Newport Bay Nature Reserve to Saddleback Peak in the
distance. The only unnatural object impairing my view is the top of a City -owned streetlight pole
in the public right -of -way along Irvine Avenue. In March 2007 the City Planning Department
(now Division) approved, without public notice, hearing or right of appeal, an application to
attach a pair of highly visible commercial cell antennas to the top of that pole. In November,
2008, without an clear authority from the City Council, the City Manager signed a long -term
lease for use of the City -owned pole, and in January, 2009 impacted residents were notified of
imminent construction by a contractor (which, to date, has not yet happened). Adding insult to
injury, this has been designated as a preferred site for future collocation.
As it turns out the application was approved based on fraudulent information submitted by the
applicant including maps which by failing to disclose a major wireless facility two blocks to the
north created the appearance of a major "hole" in coverage where none existed. As it also turns
out, under the existing telecom code the planner who approved the application should arguably
have referred the matter to a noticed public hearing before the City Council because of the
proposal's greater- than - normal impact on private views. In addition, the letting of a lease by the
City Manager, although consistent with the Council Policy, was, at least in my view, inconsistent
with the City Charter, which permits only the City Council to bind the City (an action which to
comply with the Brown Act would have to take place at a noticed public meeting). Finally, there
is an ongoing disagreement as to whether the approval was granted in perpetuity (the Planning
Division's interpretation), or if as an unexercised building permit issued subject to the Uniform
Building Code it expired (in the absence of any construction) 180 days after issuance (my
interpretation).
My neighbors and I expect no relief from the proposed Wireless Telecommunications Facilities
Ordinance since it says it does not affect the status of earlier approvals. Nonetheless this
example seems to me a paradigm of at least one situation in which a good telecom code would
preclude the issuance of a permit: cell equipment should not be sited where it impairs the
enjoyment of public or private property unless there is compelling evidence of a serious gap in
coverage that cannot be corrected in any less intrusive manner.
Although I appreciate staffs effort in "updating" the code, to the extent the new code would
permit the preceding facility to be approved I will find it wanting.
July 19, 2012 Wireless Ordinance comments by Jim Mosher Page 2 of 11
General Comments
The effort to update the City's wireless regulations and integrate them into the Zoning Code is
very commendable, particularly to the extent it brings them under the umbrella of uniform
hearing and appeal procedures applicable to other zoning /land use decisions.
That said, it seems unfortunate that the City's Media and Communications Committee no longer
exists, for this is potentially a major revision that would have seemed deserving of more public
outreach and input before reaching so finalized a state. Although I cannot guarantee they would
have participated, I personally know of others who have not been entirely happy with the current
process.
Where do the revised regulations belong?
The choice of numbering the commercial wireless regulations as "Chapter 20.49" appears to
place them in Title 20 (Zoning Code) under Part 4 (Standards for Specific Land Uses). However
that part currently contains only a single chapter (Chapter 20.48: Standards for Specific Land
Uses), and "Wireless Telecommunications Facilities" would seem logically to be a section under
that, much like Section 20.48.190 (Satellite Antennas and Amateur Radio Facilities). The
primary reason for not doing so seems to be that the use of a combination of letters and
numbers to designate the subsections within a section is more awkward than the decimal
scheme of numbering sections within a chapter. Yet a standalone chapter looks out of place
when all the other "Specific Land Uses" are sections within a single chapter.
Alternatively the commercial wireless regulations might belong as a separate chapter in Part 3
(Site Planning and Development Standards), much like Chapter 20.36 (Landscaping Standards)
or Chapter 20.42 (Sign Standards). Since those chapters are arranged alphabetically, "Wireless
Telecommunications Facilities" would be Chapter 20.47.
The proposed transplanting of the section of wireless- specific definitions from Title 15 to Title 20
as Section 20.49.030 (Definitions) is also awkward, for an effort was made to consolidate all the
definitions in the new Zoning Code in a single section: Chapter 20.70 (Definitions). Although an
exception has already been made in Chapter 20.42 (Sign Standards) — which has its own
definition section — consideration should perhaps be given to including a dedicated section of
wireless definitions in the "W" section of Chapter 20.70, rather than as a separate section within
the Wireless code where they are disconnected from the other zoning definitions.
Specific Comments
20.49.010 — Purpose and Intent.
Minor comments:
July 19, 2012 Wireless Ordinance comments by Jim Mosher Page 3 of 11
• Since the regulations of the California Public Utilities Commission also come into play,
the phrase in paragraph "A. Purpose" that says "consistent with federal law" should
perhaps say "consistent with state and federal law."
• The capitalization of words in the proposed ordinance is not entirely consistent with the
style used in the remainder of the current Zoning Code, although the latter itself has
many inconsistencies. "State" and "Federal" should perhaps be capitalized. Words like
"Antenna" and "Collocation" should perhaps not be, since defined terms are not
generally capitalized in most of the rest of the Zoning Code.
Major comment:
• Paragraph 'A. Purpose" differs from the existing code by a single word, yet despite the
claim in Attachment PC2 that there is "No policy change," this is in fact a major policy
change. The word "public" has been inserted into the phrase "protecting scenic,
ocean and coastal public views." Although staff has consistently claimed its presence
was implied, it was not there, and the idea that its presence was implied is contradicted
by existing Section 15.70.070 (Permit Review Procedures) where:
1. under paragraph B.4 (Visual Simulations) it says "Consideration shall be given
to views from both public areas and private residences." and
2. under paragraph F.3.b (Special Review by Council) a required finding for
approval by the Council is that "The approved facility will not result in
conditions which are materially detrimental to nearby property owners,
residents, and businesses, nor to public health or safety."
• In addition, Section 15.70.090 reserved to the City the modify or revoke the permit if
changed circumstances resulted in "Additional impairment of the views from
surrounding properties."
Likewise, the issuance of a permit for construction in the public right -or -way under
NBMC 13.20.070 (Issuance of a PROW Permit) requires consideration of the
adverse aesthetic effects of any above ground facilities.
• It is clear, then, that an objective of the existing telecom code is the minimization of
impacts on private as well as public views — a commitment that is abandoned, to the
detriment of the community, in the proposed revision.
20.49.020 — General Provisions.
Minor comment: in the old Section 15.70.020 the lettered sections were arranged
alphabetically. It is unclear if the new arrangement has a better logic to it.
• B. Permit and /or Agreement Required.
o This section seems redundant with Sections 20.49.070 and 20.49.090. to which it
refers. For example, Section 20.49.070.A. (Permit Required) restates the
July 19, 2012 Wireless Ordinance comments by Jim Mosher Page 4 of 11
requirements, and stating them in two places seems unwise: at best the
statements are consistent, at worst they contradict each other.
• C. Exempt Facilities.
o Paragraph 2 seems to refer to a subset of the items that are, or should be,
regulated by the code section referred to in paragraph 1.
The reference in paragraph 3 seems to be to Chapter 2.20 of the NMBC, rather
than to Title 2 in general (most of which doesn't have to do with emergencies).
• D. Other Regulations.
o Does "Notwithstanding" mean the same as "In addition to "?
o Three numbered clauses in the existing Section 15.70.020.D have been
removed. Two of them are probably subsumed in the new "E. Regulations not in
Conflict or Preempted," but the reasons for no longer requiring compliance with
"3. Easements, covenants, conditions or restrictions on the underlying real
property" are less obvious. The City has a reluctance to enforce covenants as
expressed in Chapter 20.10.C.1, but that reluctance to check compatibility should
not necessarily apply to wireless proposals, where the applicant is rarely the
landowner.
20.49.030 — Definitions.
General comments:
Again, the wireless - related definitions might more logically be placed in the "W" section
of Chapter 20.70 (Definitions). The City of Riverside does this nicely in Section
19.910.240 of their Municipal Code where they have a subsection of "W" devoted to
"Wireless telecommunication facilities" with the header explaining, among other things,
"The following definitions pertain to the regulation of telecommunications uses." They
have also, unlike Newport Beach, inserted their sign- specific definitions in the "S" section
with entries such as "Sign, spandrel."
• Many rather poor definitions have been copied over from the existing wireless code.
Many other ones really could be cleaned up.
Specific comments:
• Antenna.
o This definition is confused and circular, with "antenna" being included as an
example of an antenna.
o It seems, intentionally or not, to include the handheld cell phone at the consumer
end of the transaction.
July 19, 2012 Wireless Ordinance comments by Jim Mosher Page 5 of 11
o "Electromagnetic waves" includes light as well as radio- or microwave - frequency
emissions, so the definition would seem to include, probably inadvertently, such
things as a laser surveying system, or even an ordinary light.
Some examples from other cities:
o "Antenna, Antenna Array, Wireless Antenna Array, or Wireless
Telecommunications Antenna Array." One or more rods, poles, panels, discs, or
similar devices used for the transmission or reception of radio frequency signals,
that may include omni - directional antennas (whip), directional antennas (panel),
and parabolic antennas (disc), but excluding any support structure as defined
below.
"Antennas" - Any system of wires, poles, rods, reflecting discs, dishes, flat
panels, or similar devices, including "whip antennas ", attached to a
telecommunications tower, mast or other structure, which in combination with the
radio - frequency radiation generating equipment associated with a base station
are used for the transmission or reception of electromagnetic waves.
1." Antenna" means a device or system of wires, poles, rods, dishes or other
devices of similar function, used for the transmission and /or reception of radio
frequency signals for wireless communications, as described in the
Telecommunications Act of 1996. It may include an omni - directional antenna
( "whip "), a directional antenna ( "panel ") and parabolic antenna ( "disc "). It does
not include the support structure. 2. "Antenna Array' means a set of one or more
antennae.
• Antenna Array.
o This is a particularly inscrutable definition constructed out of inscrutable phrases,
especially since our definition of "antenna" includes "arrays." The very concise
definition of "Antenna Array" in "2" above seems better.
• Antenna Classes
o As it stands this seems a purely circular definition.
o A reference to proposed Section 20.49.050.A (where the "classes" are actually
defined) would seem helpful.
• Distributed Antenna System, DAS.
o I thought a DAS was a system of small, low- power, closely spaced antenna
stations. Does the reference to "third- party" mean it does not qualify as a DAS if
it is built and operated solely for the benefit of the installer?
• Feasible.
July 19, 2012 Wireless Ordinance comments by Jim Mosher Page 6 of 11
o Should the definition include economic factors?
• Stealth or Stealth Facility.
o False trees have been deleted, probably intentionally.
• Utility Tower.
o It is unclear why a steel pole is regarded as a "tower." Why would the material
matter?
• Wireless Tower.
o The intent of the reference to DAS is unclear. In the example, does it matter if
the antenna added is DAS or some other kind?
20.49.040 — Available Technology.
• It was unclear under the old code, and remains unclear why this clause is not included in
Section 20.49.020 (General Provisions).
20.49.050 — Location Preferences
• A. Preferred Locations
o Class 2 (Collocation)
• It is unclear why the spelling "co- located' is used in preference to
"collocated."
• My reading of this definition is that a completely unscreened facility is
Class 2 provided the facility to which new features are added was
originally unscreened. It is unclear why this would be a preferred over
more numerous but less visible installations.
• Reading further through the code I'm not sure "collocation" should be a
,.class" at all. In other parts it sounds like it is a construction technique
that could be applied to any one of the other classes.
o Class 3 (Visible)
• "a cylindrical Antenna unit that replicates the diameter and color of the
pole or standards" sounds like it might be Class 1, certainly if it was
incorporated into the normal length of the pole.
o Class 4 (Freestanding Structure)
• This class seems to encompass a wide range of structures, some of
which are much more obtrusive than others.
July 19, 2012 Wireless Ordinance comments by Jim Mosher Page 7 of 11
o Class 5 (Temporary)
• The meaning of "such placement of a temporary Telecom Facility shall
not exceed f year, consistent with Section 20.52.040" is less than clear
since Telecom Facilities are not mentioned in Section 20.52.040. Does
this mean that even though not mentioned there, the procedures of
Section 20.52.040 with a time limit of less than 1 year?
• C. Installations in the Public Right -of -Way.
o "Any pedestal meter required for the purpose of providing electrical service
power."
• Has this exception been made obsolete by Southern California Edison's
conversion to "SmartMeters" which do not need to be physically read by a
technician?
o "Any proposed installation in the public right -of -way shall comply with all
requirements of the Americans with Disability Act (ADA), and all other laws,
rules, and regulations."
• Isn't this redundant with the catch -all clauses in Section 20.49.020
(General Provisions, paragraphs D and E)?
• D. Collocation Installations
o In my view this section should be discretionary rather than mandatory. That is, it
should say "may be required to collocate' rather than "shall be required to
collocate." There is no one - size -fits all solution. Ideally the desirability of
collocation versus separate installations should be worked out during the public
hearing, but the decision has to be made early in the approval process.
o Condition Requiring Future Collocation
• If the preceding section is mandatory, this seems redundant with it — that
is all approvals would implicitly include this condition.
20.49.060 — General Development and Design Standards.
• A. General Criteria.
o "For an example, where a streetlight standard is replaced with a different
streetlight standard to allow for the additional installation of Antennas, the
primary use shall remain as a streetlight."
• It is unclear if this is meant as a definition or a design directive.
July 19, 2012 Wireless Ordinance comments by Jim Mosher Page 8 of 11
• The definition of "Wireless Tower" in Section 20.49.030 implies no
size or amount of antennae can ever cause a streetlight to
become a wireless tower?
• Does this mean there is some threshold at which that would
happen, and it is to be avoided?
• If so, should it be elaborated in one of the listed standards? Or is
it already implied in "Blending "?
• Apparently this is meant to be read similarly to the explanation of
Screening Standards in paragraph 20.49.060.F.3.c ( "compatible in scale
and proportion to streetlights and traffic control standards and the poles
on which they are mounted") but the tie -in is not immediately obvious to
me.
• B. Public View Protection.
As previously indicated this is a major step back from the present code which
protects both private and public views, and not just from the few (and somewhat
arbitrarily located) starred spots on the General Plan map.
Although the Zoning Code generally shuns private view protection it is not
unprecedented. For example commercial loading docks and roof - mounted
equipment are supposed to be screened from view from adjacent residences.
And more importantly, the telecom applicant is not normally a landowner
restricted to construction on a particular parcel of property
• C. Height
o The reminders about other codes (such as Section 20.30.060.E and 4 U.S.C. §
1) are helpful, but probably redundant with the catch -all applicability of all other
codes in Section 20.49.020 (General Provisions).
o Maximum Height.
• Since the definition of Telecom Facilities in Section 20.49.030 includes
the whole shebang (including the antennas, the support structure to which
they are attached and even the land on which it sits) the reference to
"Telecom Facilities" at the start of each lettered paragraph is at best
confusing. I think what is being regulated is the height at which antennas
(rather than Telecom Facilities) can be installed.
• Lettered paragraph "b" may need some words to clarify how it relates to
paragraph "a" — which it is possibly meant to supersede?
July 19, 2012 Wireless Ordinance comments by Jim Mosher Page 9 of 11
The references to 24 and 20 inches in lettered paragraph "c° are less than
clear. They seem to be an attempt to describe the flagpole rather than
the "facility," and I'm not sure how "at the top' is to be interpreted. My
recollection is cellphone "flagpoles" frequently have an enlarged
cylindrical section near the top (housing the antennas) with a small
decorative element above that.
o Over - Height Buildings or Structures
• Stealth Telecom Facilities can evidently be of Class 1, 2 or 4? Exactly
how that and "the type of installation" are to affect the review seems
vague.
o D. Setbacks
• The reference to "installed on public property or private property' seems
unnecessary. What other kinds of property are there?
o E. Design Techniques.
This subsection may have absorbed the protections of private views in
the existing code, but whether it is intended to include consideration of
private views or not is unclear.
o F. Screening Standards.
• Class 3:
"No cables and mounting brackets or any other associated
equipment or wires shall be visible from above, below or the side
of the Antennas."
o This sounds good, but may be unrealistic. I don't recall
ever seeing an installation with visible antenna panels in
which the mounting brackets and cables were not at least
partially visible.
• "Antenna installations on existing or replacement streetlight poles,
traffic control standards, or Utility Poles shall be screened by
means of canisters, radomes, shrouds other screening measures
whenever Feasible.."
o Large canisters and " radomes" added on top of streetlights
and other poles are not necessarily less obtrusive or
obnoxious than "exposed" antennas mounted flush to the
pole. It is not at all obvious why they would be preferred.
July 19, 2012 Wireless Ordinance comments by Jim Mosher Page 10 of 11
20.49.070 — Permit Review Procedures.
• A. Permit Required.
"Table 4 -1 Permit Requirements for Telecom Facilities"
• The index to the existing Zoning Code indicates Title 20 already contains
a "Table 4 -1 Animal- Keeping Standards" and a "Table 4 -2 Required
Setbacks for Structures Housing Domestic Farm Animals." It would
appear that if the proposed code is placed in Part 4 this table will need to
be renumbered.
• Note "a" where it says "depending on the type of installation and Antenna
Class being proposed for the Collocation" is confusing. I thought a
collocated installation was by definition Class 2.
• B. Application Submission Requirements for Telecom Facilities on City -owned or
City -held Trust Properties.
o It should be clearly stated that authorization by the written authorization from the
City Manager does not guarantee that a lease for use of the property will
ultimately be granted by the City Council.
• H. Required Findings for Telecom Facilities
o 1. General.
• The term "review authority' is used frequently in the proposed code. This
seems to be where it is defined. However it is defined by reference to
Table 4 -1, and that table is less than clear as to who or what the review
authority is in most cases.
• The proposed findings are substantially different from the ones the City
Council would currently have to make under Section 15.70.070.F.3.
• The basic requirement that the facility is needed to provide service seems
to be missing. Such a requirement is permitted by case law and needed
to prevent an unnecessary proliferation of facilities.
• The proposed findings seem to preclude placement in parks or on public
facilities, since such an application would have to be denied if any other
alternative is feasible. Since the City might want the revenue in
preference to installation on a nearby private building, the logic behind
this is unclear.
20.49.090 — Agreement for Use of City -Owned or City -Held Trust Property
Although outside the scope of the proposed code, I believe, as previously stated, that there is a
problem with the procedure of approving the leases formulated by the City Manager and City
July 19, 2012 Wireless Ordinance comments by Jim Mosher Page 11 of 11
Attorney for commercial use of public property as current described in Council Policy L -23 (The
Siting of Wireless Telecommunications Equipment on City- Owned Land). The agreement is
"approved" by lack of action on the part of the City Council, which I believe is inconsistent with
both the City Charter and the Brown Act. In addition Policy L -23 will require revision because it
currently refers to Chapter 15.70 (which is proposed to be repealed) and to provisions in Title 13
that were never implemented.
20.49.100 — Modification of Existing Telecom Facilities.
The reference under the definition of "Substantially change" to February 22, 2012 seems
oddly stated, and might seem to have the effect of making the following criteria
inapplicable to a facility that did not exist on that date?
20.49.120 — Right to Review or Revoke Permit.
The transplanting of this section from Section 15.70.090 does not seem to have been
entirely successful since it no longer explains all the circumstances under which the City
reserves the right to review or revoke the permit.
20.49.130 — Removal of Telecom Facilities.
o B. Abandonment.
o I have no problem with reducing the period from 180 days to 90 days, but the
reason for doing this is not explained in the staff report.
Omissions
In addition to lack of clarity regarding the minimization of impacts on private properties, the
proposed code omits important Submission Requirements currently found in Section 15.70.070.
These included the justification for the project, maps (including ones illustrating current
and proposed coverage), visual simulations (including ones showing impacts on nearby
residences), emission data, wind load calculations and evidence of permission to use
property. I don't know if some of this may be required for use permits in general, but much of it
seems wireless- specific and it is very difficult to see how the reviewing authorities could make
an intelligent decision about the application without this information.
Finally, I think the proposed code would benefit from comparison with how wireless applications
are handled by other California cities. I suspect that beyond the clearer definitions cited above,