HomeMy WebLinkAbout2.0_Irvine CompanyCITY OF NEWPORT BEACH
PLANNING COMMISSION STAFF REPORT
May 5, 2011 Meeting
Agenda Item 2
SUBJECT: Establishment of In -Lieu Fair Share Fee Credit toward North Newport
Center for Construction of a Third Eastbound Left Turn Lane on San
Joaquin Hills Road at MacArthur Boulevard
APPLICANT: Irvine Company
PLANNER: James Campbell, Acting Planning Director
949 - 644 -3228, icampbell(o)newportbeachca.gov
PROJECT SUMMARY
An additional eastbound left turn lane from San Joaquin Hills Road to MacArthur
Boulevard is proposed to be built by the Irvine Company. Consistent with provisions of
both the Fair Share Ordinance (NPB Municipal Code, Chapter 15.38 — Attachment PC-
1) and the North Newport Center Development Agreement, Planning Commission
approval of the in -lieu credit towards the Fair Share Fees is requested.
RECOMMENDATION
Adopt Resolution No. approving staff's recommendation of the amount of in -lieu
contributions deemed applicable towards Fair Share Fees due to construction of the
third eastbound left turn lane on San Joaquin Hills Road at MacArthur Boulevard
(Attachment PC -2).
INTRODUCTION
Project Setting
The proposed improvements at the intersection of San Joaquin Hills Road and
MacArthur Boulevard are located near the northwesterly corner of the North Newport
Center Planned Community (PC -56). PC -56 currently consists of Fashion Island, a
portion of Block 100, a portion of Block 400, a portion of Block 500, Block 600, a portion
of San Joaquin Plaza as well as a portion of Block 800. Fashion Island is developed
with a regional shopping center consisting of anchor department stores, retail stores,
restaurants and a cinema. Other blocks within Newport Center are developed with office
buildings, hotels, surface parking, parking structures and landscaped open space. The
subject intersection, being located adjacent to Newport Center, does handle a
significant portion of traffic traveling to and from Newport Center as well as serving both
city -based and regional traffic.
Irvine Company Fair Share Fee Credit Establishment
May 5, 2011
Page 2
A
w t
``' e' � • is �' � '..
> e
Project Description
The applicant plans on implementing the required third eastbound left turn lane from
San Joaquin Hills Road to MacArthur and proposes to have the estimated costs
associated with its implementation considered as an in -lieu contribution under the City's
Fair Share Traffic Contribution Ordinance. The proposed improvements are consistent
with improvements anticipated in the Circulation Element of the General Plan adopted in
2007 as well as with improvements assumed within the City's Fair Share Fee
Ordinance.
Irvine Company Fair Share Fee Credit Establishment
May 5, 2011
Page 3
Background
The need to construct a third left eastbound turn lane on San Joaquin Hills Road at its
intersection with MacArthur was identified during City approval of the North Newport
Center Planned Community (PC -56) and associated Zoning Implementation and Public
Benefit Agreement (DA 2007 -002) adopted on December 18, 2007. The ability for the
Irvine Company to satisfy portions of its obligation to pay Fair Share Traffic Fees
through in -lieu contributions, specifically including the subject improvements is stated in
Section 4.3 of the subject Development Agreement. Furthermore, the subject
Development Agreement document indicates that, in accordance with provisions of the
City's Fair Share Traffic Contribution Ordinance, that establishment of in -lieu
contributions requires the approval of the City Planning Commission.
Analysis
The applicant prepared and submitted a conceptual design and engineer's estimate for
construction of the subject third left turn lane. It was intended to reflect a level of
improvements consistent with those assumed in the Circulation Element of the adopted
General Plan and in the conceptual improvements and cost estimates prepared in
support of the on -going update of the City's Fair Share Fee Ordinance. Public Works
staff has reviewed the conceptual plan and accompanying Preliminary Cost Estimate
submitted by the applicant (See attached letter dated April 13, 2011 and accompanying
attachments) and found them to be consistent with the level of improvements planned
for this western leg of this intersection in both the Circulation Element of the General
Plan as well as in conceptual plans and cost estimates prepared in support of the City's
process to update the Fair Share Fees. Therefore, it is recommended that the amount
of $368,000 be established as the amount of in -lieu contributions to be credited as the
Fair Share Fee exposure is calculated for the 650 Newport Center Drive Project. While
this estimated amount is likely to change upon final construction of the improvements,
the correct amount will be determined upon completion of the improvements and the
final in -lieu credit amount will be modified accordingly.
Summary
The proposed improvements are consistent with those identified for this intersection
location in both the Circulation Element of the General Plan and the City's Fair Share
Fee Ordinance improvement program. Furthermore, the means of estimating the in -lieu
credit are consistent with requirements of both the City's Fair Share Fee Contribution
Ordinance, as well as the North Newport Center Development Agreement.
Irvine Company Fair Share Fee Credit Establishment
May 5, 2011
Page 4
Environmental Review
The construction of the left turn lane on San Joaquin Hills Drive was contemplated in
the City's General Plan Circulation Element and analyzed in the City's 2006 General
Plan Update Environmental Impact Report. The approval of the associated in -lieu fees
and credits is an action that is consistent with the City's Fair Share Ordinance and the
North Newport Center Zoning Implementation and Public Benefit Agreement. This
action is covered by the general rule that the California Environmental Quality Act
(CEQA) applies only to projects that have the potential for causing a significant effect on
the environment (Section 15061.b.3 of the CEQA Guidelines). It can be seen with
certainty that there is no possibility that his activity will have a significant effect on the
environment. Therefore, this activity is not subject to CEQA.
Public Notice
Notice to the public has been provided with the posting of the agenda for this meeting in
accordance with the Brown Act.
Prepared and submitted by
James DN nl -lames CampbellSo-Clty o ( Newport
Seam, owPlamnmg Departmem,
Campbell te;2011.04.is1=8.420700bea9o.
James W. Campbell, Acting Planning Director
ATTACHMENTS
PC 1 Section 15.38.080 (In Lieu Contributions)
PC 2 Draft Resolution
PC 3 Letter from Irvine Company dated April 13, 2011
Attachment PC -1
Section 15.38.080 (In Lieu Contributions)
15.38.080 In Lieu Contributions.
The provisions of this chapter may be satisfied, in whole or in part, by the dedication of
right -of -way, or the construction of roadway or related improvements necessary to the
implementation of the master plan of streets and highways, as set forth herein:
A. In lieu credit may be given for master plan of streets and highways improvements
which are not assumed to be required of adjacent developments pursuant to the
Subdivision Map Act, and are included in the fair share implementation resolution.
B. In lieu credit may be given where application of the traffic phasing ordinance to a
specific development results in improvements that are shown on the master plan of
streets and highways, except:
1. Improvements required pursuant to the traffic phasing ordinance that may
be or are temporary in nature, or those improvements that may have to be
relocated, altered or removed in the future, shall not be eligible for consideration
as an in lieu contribution.
2. Improvements required pursuant to the traffic phasing ordinance that
exceed the requirements of the master plan of streets and highways, that are
necessary to accommodate a specific development, shall not be eligible for
consideration as an in lieu contribution.
C. Acceptance of all proposed in lieu contributions shall be subject to the approval of
the Planning Commission or the City Council on appeal or review. (Ord. 94 -19 (part),
1994: Ord. 84 -16 (part), 1984)
Attachment PC -2
Draft Resolution
RESOLUTION NO.
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF NEWPORT BEACH APPROVING AN IN -LIEU FEE
CREDIT FOR THE 650 NEWPORT CENTER DRIVE PROJECT
IN THE NORTH NEWPORT CENTER PLANNED COMMUNITY
(PC -56)
THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. A request for review of development plans for construction of a building in Block 600 of
the North Newport Center Planned Community ( NNCPC) was submitted by Irvine
Company as applicant. The development is consistent with the City's General Plan and
the NNCPC but is subject to review by the City of Newport Beach. No discretionary
approvals are required.
2. In conjunction with construction of the building, located at 650 Newport Center Drive,
Irvine Company intends to construct a third eastbound left turn lane on San Joaquin Hills
Road.
3. The proposed roadway improvements will implement the requirement of Section 7.3 of
the North Newport Center Development Agreement and are consistent with
improvements anticipated in the Circulation Element of the General Plan and included in
the City's Fair Share Fee Program.
4. The applicant prepared and submitted a conceptual design and engineer's estimate for
construction of the subject left turn lane that reflected a level of improvements consistent
with those assumed in the Circulation Element. Staff has reviewed the conceptual plan
and accompanying preliminary cost estimate and found them consistent with the
Circulation Element and the City's Fair Share Fees.
5. Consistent with Section 15.38.080 of the City's Fair Share Traffic Contribution Ordinance
for In -lieu Fees and the provisions of the Fair Share Traffic Fees Section (4.3) of the
North Newport Center Development Agreement, Irvine Company has requested that in-
lieu fee credits for the intersection improvements in the amount of $368,000 be
approved. It is understood that the amount of the in -lieu fee credit will be subject to
adjustment based on the actual costs incurred to implement the project.
6. On May 5, 2011, in the City Hall Council Chambers, 3300 Newport Boulevard, Newport
Beach, California, the Planning Commission considered the request. A notice of time,
place and purpose of the meeting was given in accordance with the Newport Beach
Municipal Code. Evidence, both written and oral, was presented to, and considered by,
the Planning Commission at this meeting.
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION
This action is covered by the general rule that the California Environmental Quality Act (CEQA)
applies only to projects that have the potential for causing a significant effect on the
environment (Section 15061.b.3 of the CEQA Guidelines). It can be seen with certainty that
there is no possibility that this activity will have a significant effect on the environment.
Therefore, this activity is not subject to CEQA.
NOW, THEREFORE, BE IT RESOLVED:
The Planning Commission hereby approves the In -lieu Fee Credit established for the proposed
improvements to San Joaquin Hills Road consistent with the Circulation Element of the General
Plan and the Fair Share Traffic Contribution Ordinance.
PASSED, APPROVED AND ADOPTED THIS Sth DAY OF MAY, 2011.
AYES:
NOES:
ABSTAIN:
ABSENT:
BY:
ME
Earl McDaniel, Chairman
Michael Toerge, Secretary
Attachment PC -3
Letter from Irvine Company
dated April 13, 2011
Since 1564
April 13, 2011
Mr. Steve Badum
Public Works Director
City of Newport ]Beach
3300 Newport Boulevard
Newport Beach, CA 92658 -8915
Dear Steve:
This letter is submitted to request initiation of the process to establish an in lieu credit towards
the Fair Share Fees for the 650 Newport Center Drive Project for improvements to the
intersection of MacArthur and San Joaquin Hills Road.
The Irvine Company intends to construct a third eastbound left turn lane on San Joaquin Hills
Road in conjunction with the proposed 650 Newport Center Drive Project. The proposed
improvements (shown on the attached Exhibit) will implement the requirement from Section 7.3
of the North Newport Center Development Agreement and are consistent with improvements to
this intersection that are included in the City's Fair Share Fee Program. Therefore, consistent
with the In -Lieu Contributions Section (15.38.080) of the Fair Share Traffic Contribution
Ordinance and the provisions of the Fair Share Traffic Fees Section (4.3) of the North Newport
Center Development Agreement, it is requested that the in -lieu credit for these improvements be
established.
The attached conceptual plan for implementation of the additional left turn lane incorporates
input received from City staff during prior reviews and serves as the basis of the attached
Engineer's estimate of costs for the subject improvement. As you are aware, the attached
estimate has been prepared to be consistent with both the methodology and unit price
assumptions utilized in the estimate for improvements to the subject intersection that is
incorporated in the current cost estimates being used to update the Fair Share Fee Program.
Therefore, this estimate is submitted to serve as the basis for establishing the in -lieu credit
applicable to the 650 Newport Center Drive Project at this time, while recognizing that the final
amount of this in -lieu credit will be subject to adjustment based on the actual costs incurred to
implement this project.
Please call with any questions that may arise regarding this request or the attached materials or if
additional information is necessary to complete the process of establishing this in -lieu credit.
550 Newport Center Drive, Newport Beach, CA 92660 949.720.2000
We appreciate the opportunity to have worked with you and your staff during preparation of the
conceptual plan and associated cost estimate and look forward to working together to implement
this important master planned traffic improvement.
C
S ncerely,
x.w.,Okb
Dan Miller J
Sr. Vice President /
Cc: Tony Brine — City of Newport Beach
John Boslet — Irvine Company
Ron Keith — Irvine Company
Tim Carey — Irvine Company
I;
y._
0
�ul
oW
J
J
a�
w�
Uy
OJ
U=
a
a
O
0
z
w
8
a
q
_y $
a
2
U
U
pU
W
NEWPORT BEACH FAIRSHARE FEE PROGRAM UPDATE
PRELIMINARY COST ESTIMATES
Location: MacArthur /Sin Joaquin Hills Rd
Mitigation: Add Third SB Left Turn Lane
Date: 20/2011
Estimated by: P. McNab
h .Vda1Mi0l01006sacenhur61ghillgn t a sumeleaysl13Ula
DESCRIPTION OF WORK
UNIT PRICE
QUANTITY
COST
1
Mobilization
10.00%
$24,000
2
Clear & Grub
$10,000.00 / AC
$0
3
Remove Striping
$10.00 1 LF
1,350
$14,000
4
Remove Curb & Gutter
$30.00 / LF
$0
5
Remove Medlan Curb
$30.00 / LF
1,250
$38,000
6
Remove PCC Sidewalk
$7.00 1 SF
$0
7
Remove Pavement
54.00 I SF
1,260
$5,000
8
Remove Well
$10.00 I LF
$0
9
Remove Channel
$15.00 / LF
$0
10
Remove/Replace Chain Link Fence
$50.00 1 LF
$0
11
Reconstruct Metal Beam Guard Rail
$70.00 / LF
$0
12
Remove & Relocate Tree
$3,000.00 / FA
$0
13
Sawcut
$1.00 1 LF
900
$1,000
14
Relocate Street Light
$7,500.00 1 FA
2
$15,000
15
Modify Traf eSignal 5 stem
$25000.00 / EA
1
$25,000
16
Relocate Freeway Sign 2 post)
$1,000.00 / EA
$0
17
Relocate Sign 1 Post
$300.00 1 EA
$0
18
Reconstruct Overhead Sin
$50,000.00 1 EA
$0
19
Relocate Call Box
$2,000.00 / FA
$0
20
Relocate Power (Wood)
$25,000.00 I EA
$0
21
Relocate Catch Basin
$8,000.00 / EA
$0
22
Relocate Fire H drant
S2,500.00 / EA
$0
23
Relocate Bus Bench
$600.00 I EA
SO
24
Relocate Monument Wall
$5,000.00 / EA
SO
25
Relocate Utility Boxes
$500.00 / EA
50
26
Relocate Mein Water Valve
$5,000.00 1, EA
$0
27
Relocate Ulllil Vault
$3,000.00 1 EA
$0
2B
Ad usl Manhole to Grade
$1,500.00 / EA
$0
29
Adjust Water Meter
$500.00 / EA
$0
30
IAdjusl Water Valve
$500.00 / EA
$0
31
Adjust Minor Above Ground Utilities
$500.00 1 FA
$o
32
Modify Driveway
$5,000.00 / EA
$0
33
Earthwork
$12.00 / CY
$0
34
Construct PCC Pavement
$15.00 / SF
$0
35
Construct AC Pavement
$14.00 / SF
2,430
$34,000
36
Construct AC Overay
$3.00 1 SF
$0
37
Construct Slurry Seal
$0.25 / SF
$0
38
Construct Striping & Markin
$4.00 / LF
1.350
$5,000
39
Construct AC Dike
$7.00 / LF
$0
40
Construct Curb &Gutter
$30.00 / LF
$0
41
ICcnstmct Concrete Barrier
$50.00 I LF
$0
42
Construct Median Curb
$2000 1 LF
1,250
$25,000
43
Construct Medlan Concrete
510.00 / SF
2,300
$23,000
44
Construct Median/Parkway Landscaping
$10.00 1 SF
$0
45
Construct PCC Sidewalk
$7.00 1 SF
$0
46
Construct Access Rarnp
S5,000.00 / EA
$0
47
Construct Retaining Well
$50.00 / SF
$0
48
Construct Storm Drain Main
$100.00 / LF
$0
49
Construct RC8
$1.000.00 / LF
$0
50
Construct Headwall
$5,000.00 / EA
$0
51
Construct Concrete V -Ditch
$15.00 / LF
$0
52
lConstruct Bridge Widening
$500.00 / SF
$0
53
Construct Wail
$70.00 / LF
$0
54
Bulldln /Simcture Demolition 1 Story)
$10.00 / SF
$0
55
Traffic Control
B%
$15,000
56
Drainage Items
10%
$0
57
SWPPP Plan and Implementation
6%
$12000
CONSTRUCTION SUBTOTAL
$236000
RI hl -0f -Wa
100 / SF
$0
RIght-of-Way Management
5 / % it
$0
RIGHT -OF -WAY SUBTOTAL
p
TOTAL CONSTRUCTION & RIGHT -OF -WAY COST
Preliminary Project Development (10% of total Conslmcllon/RW cost)
Design Engineering /Adminlstration Costs (15% of total Conslruclion/RW cost)
Construction Engineering Costs /Adminlslratlon (10% of total Constmclion /RW cost)
Contingency (20% of Total ConslrucliordRW cosO
$236,000
$24,000
$36,000
$24,000
$48.000
TOTAL PROJECT COSTS
$368,000