HomeMy WebLinkAbout1765 - Traffic Phasing PlanORDINANCE NO. 1765
C• AN ORDINANCE OF THE CITY OF NEWPORT BEACH
ADDING CHAPTER 15.40 TO THE NEWPORT BEACH
MUNICIPAL CODE ESTABLISHING A TRAFFIC PHASING
PLAN TO COORDINATE DEVELOPMENT OF CERTAIN
PROJECTS WITH TRANSPORTATION FACILITIES IN
NEWPORT BEACH
The City Council of the City of Newport Beach DOES
ORDAIN as follows:
SECTION 1. Chapter 15.40 is hereby added to the
Newport Beach Municipal Code to read as follows:
"CHAPTER 15.40
TRAFFIC PHASING ORDINANCE
\0
Sections
15.40.010 Finding.
15.40.020 Purpose.
15.40.030 Traffic Impact Limitation.
15.40.040 Definitions.
15.40.050 Procedure.
15.40.060 Fees.
15.40.070 Appeal.
15.40.080 Severability.
15.40.010 Finding. The City Council of the City
of Newport Beach finds that congestion of streets and inter-
sections, traffic accidents, interference with emergency
vehicles, and general overcrowding of existing neighborhoods
have resulted, or will soon result, from inadequate phasing
of commercial, industrial and residential growth, in relation
• to traffic capacity, which is harmful to the public health,
safety and general welfare.
L
1r�
u
C J
K.•
2
15.40.020 Purpose. The City Council of the
City of Newport Beach declares that aggravation of these
conditions can be avoided, eliminated or alleviated by
enacting the following, designed to permit major develop-
ment only in those areas of the City of Newport Beach
where adequate transportation facilities exist or will.be
installed in conjunction with the development to accommodate
the traffic generated by such development.
15.40.030 Traffic Impact Limitation. (A) Limitation.
No building or grading permit shall be issued, and no construc-
tion shall be commenced, for any project not exempt from this
Chapter until the Planning Commission of the City of Newport
Beach shall make a written finding that the proposed project,
including traffic mitigation measures:
(i) will neither cause nor make worse an unsatisfactory
level of traffic service on any 'major,' 'primary - modified'
or 'primary' street; or
(ii) shall be excepted pursuant to subsection (D) of
this section; provided, however, that such finding shall
state the exception granted and the facts which justify the
exception.
(B) Hearing. The Planning Commission shall hold
a public hearing, noticed in the manner provided in Section
20.80.050(B) of the Newport Beach Municipal Code, and shall
make its written findings supported by the weight of the
evidence.
(C) Exemption. Any commercial or industrial project
which has a gross floor area equal to or less than 10,000
square feet, or any residential project of 10 dwelling units
or less shall be exempt from the requirements of this Chapter.
(D) Exceptions. The Planning Commission shall
except any project from the requirements of this Chapter:
-2-
y f .A,.
performed and incurred substantial liabilities for work
and materials necessary therefor. No change causing a
substantial increase in traffic volumes may be made in such
project, except in accordance with the provisions of this
Chapter;
(ii) if it shall find that traffic during any 2.5 hour
peak traffic period on each street which will have an
unsatisfactory level of traffic service prior to, or as a
result of, the project will be increased less than 1% by
traffic generated from the project during that 2.5 hour period;
(iii). if, by a vote of four- fifths (4 /5ths) of the members
eligible to vote, it shall make a decision, supported by a
written finding setting forth its reasons therefor, that the
benefits of the project outweigh the project's anticipated
negative impact on transportation facilities. The City:
Council shall not grant the exception under this subsection
(iii) on appeal or review until it shall have first made the
findings required by this subsection supported by an affirmative
vote of four - fifths (4 /5ths) of its members eligible to vote.
(E) Action. The application for any building,
grading or other permit on a project, which is not exempt
from this Chapter,, shall be approved, conditionally approved
or denied within one year from the date on which said appli-
cation has been received and accepted as complete by the City.
• Any appeal to the City Council from an action by.the Planning
Commission on an application or a determination by the City
Council to review an application, shall be made within the
-3-
(i)
if it shall find that the
City has issued a
building.or
grading permit for the
project prior to the
•
effective
date of this Chapter and
that the person to whom
such permit
was issued has in good
faith and in reliance
upon such
permit diligently commenced
construction and
performed and incurred substantial liabilities for work
and materials necessary therefor. No change causing a
substantial increase in traffic volumes may be made in such
project, except in accordance with the provisions of this
Chapter;
(ii) if it shall find that traffic during any 2.5 hour
peak traffic period on each street which will have an
unsatisfactory level of traffic service prior to, or as a
result of, the project will be increased less than 1% by
traffic generated from the project during that 2.5 hour period;
(iii). if, by a vote of four- fifths (4 /5ths) of the members
eligible to vote, it shall make a decision, supported by a
written finding setting forth its reasons therefor, that the
benefits of the project outweigh the project's anticipated
negative impact on transportation facilities. The City:
Council shall not grant the exception under this subsection
(iii) on appeal or review until it shall have first made the
findings required by this subsection supported by an affirmative
vote of four - fifths (4 /5ths) of its members eligible to vote.
(E) Action. The application for any building,
grading or other permit on a project, which is not exempt
from this Chapter,, shall be approved, conditionally approved
or denied within one year from the date on which said appli-
cation has been received and accepted as complete by the City.
• Any appeal to the City Council from an action by.the Planning
Commission on an application or a determination by the City
Council to review an application, shall be made within the
-3-
•
•
time periods set out in Sections 20.80.070 and 20.80.075
of the Newport Beach Municipal Code. In the event action
is not taken on an application within the time limits
hereof, such failure shall be deemed approval of the project
which otherwise is consistent with the ordinances and
General Plan of the City of Newport Beach.
15.40.040 Definitions. The following terms used
in this Chapter shall have the meanings indicated below:
UNSATISFACTORY LEVEL OF TRAFFIC. SERVICE means peak period
traffic service which is worse than Level of Service 'D'
for more than one hour determined according to standard
traffic engineering practices.
PROJECT shall be determined by reference to the California
Environmental Quality Act [California Public Resources
Code §§ 21000 et seq.] and the administrative guidelines
established thereunder.
LEVEL OF SERVICE 'D' shall mean that level of traffic
service set forth as 'Level of Service 'D'' in the Highway
Capacity Manual (1965) or any subsequent edition thereof,
provided, however, that such level of service shall not
exceed the most appropriate of the following criteria, as
applicable:
(i) intersection capacity utilization of 0.90;
(ii) 1,450 vehicles per hour using the Critical
Movement Summation Method;
(iii) volume- capacity ratio of 0.90; or
(iv) other criteria selected by the City Traffic
Engineer which are consistent with subsection (i) through
(iii) above.
-4-
C
•
•
A*
'MAJOR,' 'PRIMARY - MODIFIED' or 'PRIMARY' street shall be
defined by the General Plan of the City of Newport Beach,
Circulation Element.
ELIGIBLE TO VOTE shall mean all members lawfully holding office
except those disqualified from voting due to a conflict of
interest.
15.40.050 Procedure. Subject to review by the
Planning Commission, the City Traffic Engineer, exercising
professional discretion, shall:
(A) Determine traffic periods, streets and
intersections which will be significantly affected by the
proposed project, taking into account the type, character
and location of the proposed project, as well as the
character of the streets which will serve the project;
(B) Determine if the project, when complete, will
cause or make worse an unsatisfactory level of traffic
services at any such street or intersection;
(C) Transmit these determinations to the Planning
Commission with recommendations.
15.40.060 Fees. The application shall be accompanied
by a fee as established by resolution of the City Council to
defray the expense of administering this Chapter.
15.40.070 . Appeal. (A) The determination of the
Planning Commission shall be final unless there shall be an
appeal by the applicant or any other person pursuant to the
procedure set forth in Section 20.80.070 of the Newport Beach
Municipal Code. Such appeal shall be limited to evidence
presented before, and the findings of, the Planning Commission.
(B) The City Council shall have a Right of Review
as set forth in Section 20.80.075 of the Newport Beach Munici-
pal Code; as limited above
-5-
�F� x
0
(C) The City Council shall make its written
finding in the same manner as set forth in Section 15.40.030
of this Chapter.
15.40.080 Severability. If any section or portion
of this Chapter is declared invalid, the remaining sections
or portions are to be considered valid."
SECTION 2. The City Council shall amend the General
Plan of the City of Newport Beach to conform to.this Ordinance.
SECTION 3. This Ordinance shall be published once in
the official newspaper of the City and shall be effective thirty
(30) days after the date of its adoption.
This Ordinance was introduced at a regular meeting of
the City Council of the City of Newport Beach held on the 12th.
day of June , 1978, and was adopted on the 26th
day of June
ATTEST:
City C erk
1978, by the following vote, to wit:
AYES, COUNCILMEN: Hart, Hummel, Ryckoff,
Williams
NOES, COUNCILMEN: Heather, McInnis
ABSENT COUNCILMEN: Strauss
CITY CLERK OE7THE CITY OF F LWFOAT B&M Y
JUN 2 8 1978 �
BATE
T
DDO /kb
6/13/78