Loading...
HomeMy WebLinkAbout03_Bella Cara Dermatology General Plan Amendment_PA2010-102CITY OF NEWPORT BEACH PLANNING COMMISSION STAFF REPORT October 7, 2010 Agenda Item No. 3 SUBJECT: Bella Cara Dermatology General Plan Amendment 481 -495 Old Newport Boulevard (PA2010 -102) • General Plan Amendment No. GP2010 -003 • Use Permit No. UP2010 -019 • Lot Merger No. LM2010 -005 APPLICANT: CDO Properties, LLC PLANNER: Jaime Murillo, Associate Planner (949) 644 -3209, imurillo(a)-newportbeachca.gov PROJECT SUMMARY The applicant is seeking a General Plan Amendment (GPA) to accommodate the development of a 9,500- square -foot office building containing 4,000 square feet of medical office space and 5,500 square feet of general office space. The following applications are requested or required in order to implement the project as presently designed: 1. An amendment to the Land Use Element of the General Plan to increase the allowable floor area for the project site from 8,030 square feet (0.5 FAR) to a maximum development limit of 9,500 square feet (approx. 0.59 FAR). 2. A use permit to allow portions of the building to exceed the 32 -foot base height limit. 3. An 11 -space off - street parking credit commensurate with the number of on- street parking spaces available along the project frontage. 4. A lot merger to combine three lots and 20 feet of the adjacent abandoned right -of -way into one parcel. RECOMMENDATION 1) Conduct a public hearing; and 2) Adopt Resolution No. (Attachment No. PC1) recommending that the City Council approve General Plan Amendment No. GP2008 -001, Use Permit No. UP2010 -019, the 11 -space off- street parking credit, and Lot Merger No. LM 2010- 005, subject to findings and conditions. N Bella Cara Dermatology GPA October 7, 2010 Page 2 VICINITY MAP ■ '�/ • %' mar' `'� � : a _S f«. ) i= .4b GENERAL PLAN ZONING foe,� .1 � r + + w LOCATION GENERAL PLAN ZONING CURRENT USE Old Newport Boulevard Vehicle washing facility, vacant General Commercial Specific Plan /Retail ON-SITE Office (CO-G) Service Commercial (SP- buildings, and abandoned cargo _.. containers EAST COG I SP -9IRSC I Office, and public park spa, WEST Medical Commercial Controlled Manufacturing Hoag Health Center medical A Bella Cara Dermatology GPA October 7, 2010 Page 3 INTRODUCTION Proiect Settin The 0.37 -acre (16,060 square feet) project site is bounded by Old Newport Boulevard to the east and Newport Boulevard to the west. The property is triangular in shape, narrowing substantially at northern portion of site. The site is located on the top of slope approximately 18 feet above Newport Boulevard. The property consists of three legal lots and a portion of an abandoned right -of -way adjacent to the three lots. The property is currently developed with four buildings totaling 4,726 square feet (0.29 FAR combined). Three of the buildings are currently vacant and are in a state of disrepair. On -site parking for these buildings is currently fenced off and is utilized for the storage of cargo containers, vehicles, and boats. The fourth building is occupied by Newport Auto Detail, a car wash and detailing facility, whose water capture pit partially encroaches into the public right -of -way. A total of 18 perpendicular parking spaces are currently available along the project frontage within the Old Newport Boulevard right -of- way and no sidewalk currently exists. To the west of the project site, across Newport Boulevard, is the Hoag Health Center medical office complex and the City's corporate yard. To the north are general office buildings and the City's boundary with Costa Mesa beyond. To the east are a public park, and auto repair facility, a day spa, and an office building. To the south are retail and office buildings. Project Description The applicant is proposing to demolish the existing buildings on -site, merge the lots and portion of abandoned right -of -way into one parcel (Attachment No. PC2 -Lot Merger Plans), and construct a 9,500- square -foot office building (Attachment No. PC3- Project Plans). The proposed building would consist of three levels: one level of parking and two levels of office space above. The first office level (2 "d floor) would contain 6,022 square feet of gross floor area. The second office level (3`d floor) would contain 3,478 square feet of gross floor area. A total of 31 parking spaces are proposed on -site and would accessible from a single driveway from Old Newport Boulevard. Due to the slope of the property, the parking level would be partially below grade on the southerly portion of the property and at grade at the driveway entrance near the northern end of the property. The southerly portion of the parking area would be. partially covered by the office levels above. A sidewalk is proposed to be constructed along the project frontage and the on- street parking within the Old Newport Boulevard right -of -way is proposed to be reconfigured to City standard specifications as 11 parallel parking spaces. The building's architecture is of a contemporary design with curvilinear parapet walls and roof lines. The maximum proposed height of the main building roof, as measured S Bella Cara Dermatology GPA October 7, 2010 Page 4 from existing grade, is 35 feet 8 inches to the top of the wave - shaped roof. A decorative sail feature is proposed, which measure 36 feet 10 inches above existing grade. To accommodate the applicant's medical practice, 4,000 square feet of floor area is proposed to be utilized for medical office use and the remaining 5,500 square feet of floor area would be limited for general office use only. Background The applicant acquired the property in 2008 and has received a building permit in February of 2010, to construct an .8,023- square -foot (0.5 FAR) medical office building. The building is of similar design as the subject proposal, with the exception of a smaller 3`d level (2,001 square feet) and roof lines that comply with the height limit. An 11 -space off - street parking credit was granted by the Planning Director as allowed by the Zoning Code, commensurate with the number of available parking spaces along the Old Newport Boulevard frontage. Unfortunately, due to the current economic conditions, the applicant has been unable to secure financing to construct the permitted version of the project. The applicant claims that their lenders are unwilling to finance the construction of the project due to the high construction costs. The applicant claims that with the additional 1,477 square feet of floor area, the value of the project increases sufficiently to enable the lenders to finance the project. Therefore, the applicant has submitted this subject application request. DISCUSSION General Plan The inability to acquire financing is not typically justification to support a GPA request for additional entitlement; however, in this case the property is severely constrained due to the shape of the lot. According to the applicant, the shape of the lot not only creates design constraints with the parking layout, but increase the cost of construction significantly because structural columns cannot be uniformly spaced (i.e., typical rectangular building), requiring a structural steel frame that utilizes angular moment connections. In addition, the soils report indicates that the existing soils of the site are comprised of loose fill, which cannot bear the weight of the building. Per the recommendations of the soils report, excavation of 10 feet of soil is required and infill with better soil and recompaction is required. Also, because of the slope of the property, construction of a retaining wall is required to level the building pad and to support the foundation of the adjacent building to the south. The applicant states that the construction cost of a similar sized building on a rectangular and level lot, with soils of adequate bearing capacity, would cost 30 percent less (PC4- Construction Cost Letter). 21 Bella Cara Dermatology GPA October 7, 2010 Page 5 General Plan Policies The project site is located within the Old Newport Boulevard commercial corridor. The Land Use Element of the General Plan designates the site General Commercial Office (CO -G) with a maximum allowable development limit of 0.5 FAR. The CO -G designation is intended to provide for administrative, professional, and medical offices with limited accessory retail and service uses. The proposed office building would be consistent with this designation; however, the applicant is requesting to increase the allowable development limit from 8,023 square feet (0.5 FAR) to a maximum development limit of 9,500 square feet (approx. 0.59 FAR). The General Plan includes several goals and policies related to development in the City and indicates that, with the completion of Newport Boulevard as the primary entry into the City, vehicular trips have shifted away from Old Newport Boulevard. This results in a reduction in the corridor's economic vitality, which has significantly changed the land use mix in the area. Therefore, the General Plan includes a specific goal and several policies pertaining to development in the Old Newport Boulevard corridor area. In the Old Newport Boulevard area, the General Plan provides for the development of professional offices, retail, and other uses that support Hoag Hospital, and retail uses serving the adjoining residential neighborhoods. A complete consistency analysis of each of the applicable General Plan policies has been completed and attached as Attachment PC No. 5) and concludes that the project is consistent with each of the adopted goals and policies. In considering the proposed GPA to increase the development intensity of the project site, the Planning Commission should specifically consider the following Land Use Element policy: LU 3.2 Growth and Change Enhance existing neighborhoods, districts, and corridors, allowing for re -use and infill with uses that are complementary in type, form, scale, and character. Changes in use and /or densitylintensity should be considered only in those areas that are economically underperforming, are necessary to accommodate Newport Beach's share of projected regional population growth, improve the relationship and reduce commuting distance between home and jobs, or enhance the values that distinguish Newport Beach as a special place to live for its residents. The scale of growth and new development shall be coordinated with the provision of adequate infrastructure and public services, including standards for acceptable traffic level of service. (Imp 1. 1, 2.1, 5.1, 10.2, 16.2, 16.3, 17.1, 18.1, 19.1, 22. 1, 23.1, 23.2) As previously stated, the applicant asserts that lenders will not provide financing needed to construct a building approved at the permitted 0.5 FAR limit due to the high construction costs associated with the property. If this is the case, the proposed GPA for increased intensity could be considered consistent with LU 3.2 as follows: I Bella Cara Dermatology GPA October 7, 2010 Page 6 • The General Plan recognizes the Old Newport Boulevard corridor as an area that has experienced reduced economic vitality. • The increased intensity would provide an economic stimulus needed to accommodate the redevelopment of three separate, nonconforming and underperforming properties into one medical /general office building. • As stated in the General Plan, Newport Beach residents desire high quality development and redevelopment of underperforming, nonconforming properties. • Redevelopment of the subject property may help revitalize the corridor and encourage redevelopment of other underperforming properties within the Old Newport Boulevard corridor. • The project site is served by existing infrastructure and public services. The proposed increase in intensity will not necessitate any expansion of existing infrastructure. • The project is forecast to generate 206 new average daily trips (ADT), which is below the initial screening threshold of the City's Traffic Phasing Ordinance (TPO). Projects that generate less than 300 ADT are exempt from having to prepare a traffic study per the TPO as they are not expected to impact the acceptable levels of service for traffic in the area. It should also be noted that prior to the 2006 comprehensive update to the City's General Plan, the 1988 Land Use Element permitted a maximum FAR of 0.75 for commercial uses located within the Old Newport Boulevard corridor area, provided existing lots are consolidated into a single development site. The lot consolidation incentive was provided as a method of encouraging the redevelopment and upgrading of Old Newport Boulevard as a commercial district with retail sales and office opportunities. When the 2006 comprehensive update to the General Plan was adopted, the provisions for increased FAR limitations with lot consolidation were eliminated from the Old Newport Boulevard corridor area of the General Plan. Although no longer applicable, this GPA request is consistent with the previous maximum permitted. FAR allowed under the 1988 Land Use Element and implements the long- standing goal of redevelopment for the area. Staff supports the proposed GPA for the increased intensity as the property is significantly dilapidated, and it's irregular shape, relatively shallow lot depth, and poor soil conditions has proven to be a constraint to redeveloping the property. The GPA request could provide the economic stimulus needed to accommodate redevelopment of this property that is highly visible from Newport Boulevard and fronts a major entry corridor into the City. I Bella Cara Dermatology GPA October 7, 2010 Page 7 General Plan Changes — Table LU2 As indicated above, the primary benefit of approving the proposed GPA would be the resulting redevelopment and consolidation of three separate properties into one unified development. Amendments to the General Plan are legislative, and as such, conditions of approval may not be imposed on the GPA requiring that the merger of parcels actually occur. Therefore, should this proposed GPA be approved, staff is recommending that a new anomaly (Anomaly No. 79) be created within the Land Use Element that limits the project site to a 0.5 FAR, but which includes provisions for a maximum development limit of 9,500 square feet, provided all three legal lots and portion of abandoned right -of -way adjacent to the lots are consolidated into one parcel to provided unified site design. See Attachment No. PC6 for draft changes to Land Use Element. Charter Section 423 (Measure S) Charter Section 423 requires voter approval of any major General Plan amendment to the General Plan. A major General Plan amendment is one that significantly increases allowed density or intensity by 40,000 square feet of non - residential floor area, or increases traffic by more than 100 peak hour vehicle trips, or increases residential dwelling units by 100 units. These thresholds apply to the total of increases resulting from the amendment itself, plus 80 percent of the increases resulting from prior amendments affecting the same neighborhood (defined as a Statistical Area as shown in the General Plan Land Use Element) and adopted within the preceding ten years. The project site for which the General Plan amendment is proposed is located within Statistical Area H1 of the General Plan Land Use Element, and would result in an increase of 1,470 square feet of non - residential floor area. Based on the trip generation rates contained in the Council Policy A -18 (blended commercial rate), the proposed project is forecast to generate an additional 4 a.m. peak hour trips and 6 p.m. peak hour trips. There has been one prior amendment approved within Statistical Area H1 since adoption of the 2006 General Plan (GP2008 -001), which was adopted on March 9, 2010. Table 1 below shows the area and peak hour trips analysis for the prior amendment and the proposed project: ' r_o�" "' "'° nc nn� " " "' ° "` ( 10,290 sq.ft. (80 %) 30.87 a.m. trips (80 %) 41.16 a.m. trips (80 %) n Proposed 1 1,470sq.ft. (100 %) 4.41 a.m. trips 100% 5.88 p.m. trips (100 %) Total 1 11,760 sq.n. i _35.28 a.m. trips I _ 47.04 p.m. trips I a Bella Cara Dermatology GPA October 7, 2010 Page 8 The proposed GPA does not create any new dwelling units and as indicated in the above table, the proposed General Plan amendment does not exceed the non- residential floor area threshold, and does not exceed the peak hour vehicle trips threshold. Therefore, none of the three thresholds that require a vote pursuant to Charter Section 423 are exceeded. If the proposed General Plan amendment is approved by City Council, the amendment will become a prior amendment and 80 percent of the increases will be tracked for ten years for any proposed future amendments. Zoning & Site Desiqn Zoning Compliance The project is located within the Retail, Service & Commercial (RSC) land use designation of the Old Newport Boulevard Specific Plan (SP -9) District. The purpose of the Specific Plan is to establish policies to guide the orderly development and improvement of the Old Newport Boulevard area. Goals of the Specific Plan include: enhancing the appearance, access, and identifying the area as one of the primary entry points into the City; encouraging the redevelopment and upgrading of Old Newport Boulevard as a commercial district with retail sales and office opportunities; establishing guidelines and standards for new development, public improvements, and landscaping that will encourage harmonious transitions and minimize conflicts between different land uses; and improving access, viability, and parking in order to encourage visitor traffic and increase business activity within the district. The Specific Plan also implements the development incentives for lot consolidation of the 1988 Land Use Element, which are no longer applicable. Redevelopment of the project site as a professional office /medical building is consistent with, and encouraged by, the Specific Plan. The project complies with the basic SP- 9lRSC development standards related to lot size, setbacks, landscaping, building bulk, and parking. However, portions of the building roof and decorative wall and sail features exceed the base height limit. The following table provides a summary of the project's compliance with applicable development standards: -_ — s_; .#te 2 Zmiin'z.?Lrtiate Aerr La lme t "� u ire Manctards- Lot Size 5,000 s uare feet min. 16,060 square feet (requires a lot merger) Setbacks Front 0 0 at first level; setbacks increase at upper levels up to 18'9" Side 0 0 first level; increases to 5'5 "" at upper levels (south) Rear 0 0 at first level; setbacks increase at upper levels up to 20'4" /v Bella Cara Dermatology GPA October 7, 2010 Pape 9 Use Permit for Increased Height The project site is located in the 32/50 -foot Height Limitation Zone, which permits buildings and structures to exceed the 32 -foot base height limit, up to the maximum height limit of 50 feet, through the approval of a use permit. Ridges of pitched roofs are permitted to exceed the height limit by 5 additional feet, so long as the average roof height does not exceed the height limit. The project is proposed to exceed the 32 -foot base height limit by having an average roof height of 33 -feet 10- inches. The peak height of the building is approximately 35 feet 8 inches, which is below the maximum ridge height permitted by Code. In addition, the applicant is proposing to exceed the base height limit with a decorative parapet wall adjacent to the 3`d level deck (32 feet 10 '/2 inches high) and a decorative sail feature (36 feet 10 inches high). .�- ,3tandard� Main building: Midpoint- 33 feet 10 inches 32 feet for flat roofs, midpoint of Ridge- 35 feet 8 inches sloping roofs, or parapet walls Decorative parapet wall- 32 feet 10 Height inches 37 feet to ridge of sloping roofs (requires use permit) Decorative sail feature: 36 feet 10 inches (requires use permit) 0.75 or 12,045 square feet max. 10,498 square feet (approx. 0.65) Building Bulk (approx. 0.84 or 13,590 square feet permitted if GPA approved) 42 spaces total 42 spaces total Medical: 1 space /200 square feet Parking General office: 1 space /250 square 31 spaces off - street feet 11 spaces on- street (requires approval of parking credit) 1. 8% of site (1,285 sf total); 2. 1 tree /50' of frontage (8 1. 2,648 sf total (16.5 %) trees req'd) 2. 8 trees provided Landscaping 3. Trees shall be planted within 5' of front or side PL 3. Complies 4. 3' wide perimeter planting 4. 3 to 4 feet provided b/t exterior parking and public street Use Permit for Increased Height The project site is located in the 32/50 -foot Height Limitation Zone, which permits buildings and structures to exceed the 32 -foot base height limit, up to the maximum height limit of 50 feet, through the approval of a use permit. Ridges of pitched roofs are permitted to exceed the height limit by 5 additional feet, so long as the average roof height does not exceed the height limit. The project is proposed to exceed the 32 -foot base height limit by having an average roof height of 33 -feet 10- inches. The peak height of the building is approximately 35 feet 8 inches, which is below the maximum ridge height permitted by Code. In addition, the applicant is proposing to exceed the base height limit with a decorative parapet wall adjacent to the 3`d level deck (32 feet 10 '/2 inches high) and a decorative sail feature (36 feet 10 inches high). Bella Cara Dermatology GPA October 7, 2010 Page 10 Per Section 20.65.055 of the Zoning Code, the Planning Commission is required to make the following findings in order to approve a use permit to exceed the base height limit: 1. The increased building height would result in more public visual open space and views than is required by the basic height limit in any zone. Particular attention shall be given to the location of the structure on the lot, the percentage of ground cover, and the treatment of all setback and open areas. 2. The increased building height would result in a more desirable architectural treatment of the building and a stronger and more appealing visual character of the area than is required by the basic height limit in any zone. 3. The increased building height would not result in undesirable or abrupt scale relationships being created between the structure and existing developments or public spaces. Particular attention shall be given to the total bulk of the structure including both horizontal and vertical dimensions. 4. The structure shall have no more floor area than could have been achieved without the use permit. The triangular shape of the lot renders the northern and most narrow portion of the property unsuitable for building floor area or parking. As such, the narrow portion of the site has been proposed to be a landscaped as an open space area. A total of 16.5 percent of the site is proposed to be landscaped, double the minimum percentage required. The resulting lot coverage equates to 57 percent of the property. The building's architecture is of contemporary design with a nautical /ocean type theme. The wave- shaped roof, curvilinear parapet walls, and decorative sail feature add visual interest to the design of the building and would enhance the character of the site. To minimize the massing and scale of the building as viewed from Old Newport Boulevard and Newport Boulevard, the proposed design includes step backs at each of the office levels, concentrating the massing towards the interior of the property. The project only exceeds the 32 -foot average roof height limitation by 1 -foot 8- inches and complies with the 37 -foot maximum peak height limitation for the area. Therefore, when comparing this project to other newly constructed buildings that maximize the height, such as the newer two -story and three -story buildings along Old Newport Boulevard, there should be no visible or abrupt difference is height. The property located immediately to the south is an older one -story structure located on the shared property line; however, the curved roof lines visually help to minimize the bulk of the building by gradually lowering the roof height to the side property line. The 2 "d and 3`d level of the building are also setback 5 feet 5 inches from the side property line, allowing more light and air to the adjacent property. Bella Cara Dermatology GPA October 7, 2010 Page 11 The project architect has conceptually designed an alternative plan that would fully comply with the height limit and achieve the same floor area as the proposed design (see Sheet A002 of project plans). As illustrated on the plans, the additional floor area could be located on the 2nd level of the building; however, due to the triangular shape of the lot, the resulting office space would be an undesirable width for leasing purposes. This design would also significantly increase the lot coverage of the property and reduce the amount of visual open space that would be afforded across the property frontage. The decorative parapet wall and sail are architectural features that will not negatively impact views or the amount of open space provided on the site, but merely complement the architecture style of the building. Staff believes sufficient facts exist in support of these findings and has included such facts in attached draft resolution. Parking Credit Based on the Zoning Code parking requirements, a total of 42 parking spaces are required for the project as proposed based on the following formulas: 42 The project proposes a total of 31 parking spaces on -site. The applicant is seeking an off - street parking credit for the remaining 11 spaces. Pursuant to Section 20.46.040.E of the Old Newport Boulevard Specific Plan, developments which maintain a 50 -foot (full height curb) separation between driveway approaches on Old Newport Boulevard may be granted an off - street parking credit commensurate with the number of on- street parking spaces that are available along that frontage. This parking credit is offered as an incentive for lot consolidation to provide unified site design. The project as proposed maintains a separation greater than 200 feet between driveway approaches. A total of 18 perpendicular parking spaces are currently available along the project frontage within the Old Newport Boulevard right -of -way. The applicant is required to construct a sidewalk along the project frontage and reconfigure the on- street parking spaces to City standard specifications which will result in a total of 11 on- street spaces remaining available. The granting of an off - street parking credit is discretionary; however, the Specific Plan does not provide any findings which must be made. In this case, staff believes that lV, Bella Cara Dermatology GPA October 7, 2010 Page 12 allowing the parking credit enables the consolidation of the three lots into one unified site and the redevelopment of a prominent property that frames the entry into the City. Lot Merger The property consists of three legal lots and a portion of an abandoned right -of -way adjacent to the three lots, which the applicant is proposing to consolidate into one unified site. Pursuant to Section 19.68.030 of the Municipal Code, mergers of continuous lots involving four or fewer parcels under one ownership are authorized with the approval of a lot merger. The following findings are required to be made prior to approving a lot merger: A. Approval of the merger will not, under the circumstances of this particular case, be detrimental to the health, safety, peace, comfort and general welfare of persons residing or working in the neighborhood of such proposed use or be detrimental or injurious to property and improvements in the neighborhood or the general welfare of the City, and further that the proposed lot merger is consistent with the legislative intent of Title 19. B. The lots to be merged are under common fee ownership at the time of the merger. C. The lots as merged will be consistent or will be more closely compatible with the applicable zoning regulations and will be consistent with other regulations relating to the subject property including, but not limited to, the General Plan and any applicable Coastal Plan or Specific Plan. D. Neither the lots as merged nor adjoining parcels will be deprived of legal access as a result of the merger. E. The lots as merged will be consistent with the surrounding pattern of development and will not create an excessively large lot that is not compatible with the surrounding development. The existing lots and portion of the abandoned right -of -way are currently held in common ownership by CDO Properties, LLC. The lot merger will be consistent with the applicable SP -9 /RSC district regulations and other regulations relating to the subject property. The resulting parcel will be 16,060 square feet in area, exceeding the minimum lot area requirements of 2,375 square feet, and no setback nonconformities would be directly created by the proposed merger. Neither the merged parcel nor the adjoining parcel will be deprived of legal access as a result of the merger as vehicular access to and from Old Newport Boulevard will remain unchanged. The Old Newport Boulevard commercial corridor area consists of lots of varying size. Many properties have been merged allowing for redevelopment of properties previously developed as a seperate sites. The proposed lot merger would remove the lot lines on the y Bella Cara Dermatology GPA October 7, 2010 Page 13 subject property to permit the redevelopment of the lots as a single, unified site, and would not result in a development pattern, which is inconsistent with the existing development on Old Newport Boulevard. Staff believes sufficient facts exist in support of these findings and has included such facts in attached draft resolution. Environmental Review The project is categorically exempt under Section 15303, of the California Environmental Quality Act (CEQA) Guidelines — New Construction or Conversion of Small Structures. In urbanized areas, this exemption permits the construction of a new commercial building not exceeding 10,000 square feet in floor area on sites zoned for such use, not involving the use of significant amounts of hazardous substances, where all necessary public services and facilities area available, and the surrounding area is not environmentally sensitive. The project as proposed meets the terms of this exemption. Summary Staff supports the proposed GPA for the increased intensity as the property is significantly dilapidated and it's irregular shape, poor soils conditions, and related high construction costs has proven to be a constraint to redeveloping the property. In addition to contributing to blight within the Old Newport Boulevard commercial corridor, the property is highly visible from Newport Boulevard and is one of the first properties visible as visitors enter the City. Approval of the GPA request should provide the economic stimulus needed to accommodate redevelopment of this property and will enhance the appearance of this primary entry point into the City. Staff believes the proposed General Plan amendment does not conflict with the goals and policies of the General Plan, and the proposed project can be found consistent with the General Plan. The proposed project does not exceed any of the thresholds established by Charter Section 423 that would require a vote of the electorate. The use permit request for the height increase is nominal, and when compared to other newly constructed buildings that maximize the height, such as the newer two -story and three -story buildings along Old Newport Boulevard, there should be no visible or abrupt difference height. The wave- shaped roof, curvilinear parapet walls, and decorative sail feature add visual interest to the design of the building and would enhance the character of the area. Alternatives Should the Planning Commission conclude that the project as proposed would not be compatible with the surrounding uses and /or that any increased intensity request is inappropriate, the project should be denied, or modified to address the issues of Bella Cara Dermatology GPA October 7, 2010 Page 14 concern. If a redesigned project is advisable, staff recommends a continuance to allow the applicant to revise their plans accordingly should this course of action be sought. Public Notice Notice of this hearing was published in the Daily Pilot, mailed to property owners within 300 feet of the property (excluding roads and waterways) and posted at the site a minimum of 10 days in advance of this hearing consistent with the Municipal Code. The item also appeared upon the agenda for this meeting, which was posted at City Hall and on the city website. Prepared by: Submitted by: Jaime Murillo, Associate Planner es C. Campbell, Acting Planning Director ATTACHMENTS PC 1 Draft Resolution with Findings and Conditions PC 2 Lot Merger Plan PC 3 Project Plans PC 4 Construction PC 5 General Plan PC 6 General Plan Cost Letter Consistency Analysis Changes — Table LU2 Attachment No. PC 1 Draft Resolution With Findings and Conditions /g RESOLUTION NO. A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH RECOMMENDING APPROVAL OF GENERAL PLAN AMENDMENT NO. GP2010 -003 WITH A MAXIMUM DEVELOPMENT LIMIT OF 9,500 SQUARE FEET, APPROVAL OF USE PERMIT NO. UP20010 -019, LOT MERGER NO. LM2010 -005, AND THE REQUESTED OFF - STREET PARKING CREDIT FOR A PROFESSIONAL OFFICE PROJECT LOCATED AT 481 -495 OLD NEWPORT BOULEVARD (PA2010- 102) THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. An application was filed by CDO Properties, LLC, with respect to properties located at 481 -495 Old Newport Boulevard, and legally described as Lots 1, 2, and 3, of Block 9, Tract 27 together with the southeast half of the 40 -foot abandoned right -of -way adjacent to lots 1, 2, and 3 in Block 9, Tract 27, requesting a General Plan Amendment (GPA) to accommodate the development of a 9,500- square -foot office building containing 4,000 square feet of medical office space and 5,500 square feet of general office space. The following applications are requested or required in order to implement the project as proposed: a. An amendment to the Land Use Element of the General Plan to increase the allowable floor area for the project site from 8,030 square feet (0.5 FAR) to a maximum development limit of 9,500 square feet (approx. 0.59 FAR). b. A use permit to allow portions of the building to exceed the 32 -foot base height limit. C. An 11 -space off - street parking credit commensurate with the number of on- street parking spaces available along the project frontage. d. A lot merger to combine three lots and 20 feet of the adjacent abandoned right -of- way into one parcel. 2. The subject property is located within the Old Newport Boulevard Specific Plan (SP -9); Retail Service Commercial (RSC) Zoning District and the General Plan Land Use Element category is General Commercial Office (CO -G). 3. The subject property is not located within the coastal zone. 4. A public hearing was held by the Planning Commission on October 7, 2010, in the City Hall Council Chambers, 3300 Newport Boulevard, Newport Beach, California. A notice of time, place and purpose of the meeting was given in accordance with the Newport Planning Commission Resolution No. _ Paqe 2 of 14 Beach Municipal Code. Evidence, both written and oral, was presented to, and considered by, the City Council at this meeting. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. This project has been determined to be categorically exempt under the requirements of the California Environmental Quality Act under Class 3 (New Construction or Conversion of Small Structures). In urbanized areas, this exemption permits the construction of a new commercial building not exceeding 10,000 square feet in floor area on sites zoned for such use, not involving the use of significant amounts of hazardous substances, where all necessary public services and facilities area available, and the surrounding area is not environmentally sensitive. The project as proposed meets the terms of this exemption. SECTION 3. REQUIRED FINDINGS. 1. The project site is located within the Old Newport Boulevard commercial corridor. The Land Use Element of the General Plan designates the site General Commercial Office (CO -G), which is intended to provide for administrative, professional, and medical offices with limited accessory retail and service uses. The proposed office building would be consistent with this designation. 2. General Plan Policy LU 3.2 encourages the enhancement of existing neighborhoods, districts, and corridors, by allowing for re -use and infill with uses that are complementary in type, form, scale, and character. The policy states that changes in use and /or density /intensity should be considered only in those areas that are economically underperforming, are necessary to accommodate Newport Beach's share of projected regional population growth, improve the relationship and reduce commuting distance between home and jobs, or enhance the values that distinguish Newport Beach as a special place to live for its residents. The scale of growth and new development shall be coordinated with the provision of adequate infrastructure and public services, including standards for acceptable traffic level of service. The proposed GPA for increased intensity is consistent with General Plan Policy LU 3.2 as follows: a. The General Plan recognizes the Old Newport Boulevard corridor as an area that has experienced reduced economic vitality. b. The increased intensity would provide an economic stimulus needed to accommodate the redevelopment of three separate, nonconforming and underperforming properties into one medical /general office building. c. As stated in the General Plan, Newport Beach residents desire high quality development and redevelopment of underperforming, nonconforming properties. Tmpit: 11123/09 �U Planning Commission Resolution No. _ Page 3 of 14 d. Redevelopment of the subject property may help revitalize the corridor and encourage redevelopment of other underperforming properties within the Old Newport Boulevard corridor. e. The project site is served by existing infrastructure and public services. The proposed increase in intensity will not necessitate any expansion of existing infrastructure. f. The project is forecast to generate 206 new average daily trips (ADT), which is below the initial screening threshold of the City's Traffic Phasing Ordinance (TPO). Projects that generate less than 300 ADT are exempt from having to prepare a traffic study per the TPO as they are not expected to impact the acceptable levels of service for traffic in the area. g. The property is significantly dilapidated and it's irregular shape, poor soils conditions, and related high construction costs has proven to be a constraint to redeveloping the property. In addition to contributing to blight within the Old Newport Boulevard commercial corridor, the property is highly visible from Newport Boulevard and is one of the first properties visible as visitors enter the City. Approval of the GPA could provide the economic stimulus needed to accommodate redevelopment of this property and will enhance the appearance of this major entry point into the City. 3. Charter Section 423 requires that all proposed General Plan Amendments be reviewed to determine if the square footage (for non - residential projects), peak hour vehicle trip, or dwelling units thresholds would be exceeded as the means to determine whether a vote by the electorate would be required to approve the General Plan Amendment. Pursuant to Council Policy A -18, voter approval is not required as the proposed General Plan Amendment represents a cumulative increase (including prior amendments) of 11,760, square feet and an increase of 35.28 a.m. and 47.04 p.m. peak hour trips. Therefore, the project and prior amendments do not cumulatively exceed Charter Section 423 thresholds as to require a vote of the electorate 4. The project is located in the 32/50 -foot height limitation zone that permits buildings and structures to exceed the 32 -foot height limit up to a maximum of 50 feet through the approval of a use permit. Ridges of pitched roofs are permitted to exceed the height limit by 5 additional feet, so long as the average roof height does not exceed the height limit. The project is proposed to exceed the 32 -foot base height limit by having an average roof height of 33 -feet 10- inches. The peak height of the building is approximately 35 feet 8 inches, which is below the maximum ridge height permitted by code. In addition, the applicant is proposing to exceed the base height limit with a decorative parapet wall adjacent to the 3`d level deck (32 feet 10 '/ inches high) and a decorative sail feature (36 feet 10 inches high). In accordance with Section 20.65.055 of the Newport Beach Municipal Code, the following findings and facts in support of such findings are set forth: Tmplt: 11/23/09 Planning Commission Resolution No. _ Page 4 of 14 Finding: A. The increased building height would result in more public visual open space and views than is required by the basic height limit in any zone. Particular attention shall be given to the location of the structure on the lot, the percentage of ground cover, and the treatment of all setback and open areas. Facts in Support of Finding: A -1. No public views or view corridors exist across or adjacent to the subject property. The project site has relatively long frontages on Old Newport Boulevard and Newport Boulevard (approx. 300 feet); however, the project been designed to focus the building bulk on the southerly, less constrained portion of the site, leaving the northerly half of the project frontage as open and uncovered. A -2. The triangular shape of the lot renders the northern and most narrow portion of the property unsuitable for building floor area or parking. As such, the narrow portion of the site has been proposed to be a landscaped as an open space area. A total of 16.5- percent of the site is proposed to be landscaped, double the minimum percentage required. The resulting lot coverage equates to 57- percent of the property. A -3. The project architect has conceptually designed an alternative plan that would fully comply with the height limit and achieve the same floor area as the proposed design; however, the additional floor area would be located on the 2nd level of the building. Due to the triangular shape of the lot, the resulting office space would be an undesirable width for leasing purposes. This design would also significantly increase the lot coverage of the property and reduce the amount of visual open space that would be afforded across the property frontage. A -4. The decorative parapet wall and sail are architectural features that will not negatively impact views or the amount of open space provided on the site, but merely complement the architecture style of the building. Finding: B. The_ increased building height would result in a more desirable architectural treatment of the building and a stronger and more appealing visual character of the area than is required by the basic height limit in any zone. Facts in Support of Finding: B -1. The building's architecture is a contemporary design with a nautical /ocean type theme. The wave - shaped roof, curvilinear parapet walls, and decorative sail Tmplt: 11/23/09 Planning Commission Resolution No. _ Paqe 5 of 14 feature add visual interest to the design of the building and would enhance the character of the area. B -2. An alternative design that maintains the 32 -foot height limit would require the additional floor area to be located on the 2nd level of the building, significantly increasing the lot coverage and increasing the massing across the project frontage. Finding: C. The increased building height would not result in undesirable or abrupt scale relationships being created between the structure and existing developments or public spaces. Particular attention shall be given to the total bulk of the structure including both horizontal and vertical dimensions. Facts in Support of Finding: C -1. To minimize the massing and scale of the building as viewed from Old Newport Boulevard and Newport Boulevard, the proposed design includes step backs at each of the office levels, concentrating the massing towards the interior of the property. C -2. The project only exceeds the 32 -foot average roof height limitation by 1 -foot 8- inches and complies with the 37 -foot maximum peak height limitation for the area. Therefore, when comparing this project to other newly constructed buildings that maximize the height, such as the newer two -story and three -story buildings along Old Newport Boulevard, there should be no visible or abrupt difference is height. The property located immediately to the south is an older one -story structure located on the shared property line; however, the curved, roof lines visually help to minimize the bulk of the building by gradually lowering the roof height to the side property line. The 2nd and 3d level of the building are also setback 5 feet 5 inches from the side property line, allowing more light and air to the adjacent property. Finding: D. The structure shall have no more floor area than could have been achieved without the use permit. Facts in Support of Finding: E -1. The proposed structures will have no more floor area than could have been achieved without requesting the increased height. An additional floor area could be located on the 2nd level of the building; however, due to the triangular shape of the lot, the resulting office space would be an unpractical width and undesirable for leasing purposes. Adding the floor area to the 3`d level enables more efficient use of space and better layout for the office building. TmpIC 11!23109 Planning Commission Resolution No. _ Page 6 of 14 5. The project proposes a total of 42 parking spaces, 11 of which are located on- street. Pursuant to Section 20.46.040.E of the Old Newport Boulevard Specific Plan, developments which maintain a 50 -foot (full height curb) separation between driveway approaches on Old Newport Boulevard may be granted an off - street parking credit equal to the number of on- street parking spaces available along that frontage. The project as proposed maintains a separation greater than 200 feet between driveway approaches. Allowing the parking credit is appropriate in this case because it enables the consolidation of three lots into one unified site and the redevelopment of a prominent property that frames the entry into the City. 6. The property consists of three legal lots and a portion of an abandoned right -of -way adjacent to the three lots, which the applicant is proposing to consolidate into one unified site. Pursuant to Section 19.68.030 of the Municipal Code, mergers of continuous lots involving four or fewer parcels under one ownership are authorized with the approval of a lot merger. The following findings and facts in support of such findings are set forth: Finding: A. Approval of the merger will not, under the circumstances of this particular case, be detrimental to the health, safety, peace, comfort and general welfare of persons residing or working in the neighborhood of such proposed use or be detrimental or injurious to property and improvements in the neighborhood or the general welfare of the City, and further that the proposed lot merger is consistent with the legislative intent of Title 19. Facts in Support of Finding: A -1. The subject lots are currently developed with several single -story commercial buildings, which cross the interior property lines of Lots 1, 2, and 3. Per Section 19.04.035 of the Municipal Code (Development Across Property Lines), structures cannot be constructed across property lines. With the approval of the lot merger and the demolition of the existing structures, the proposed new office building can be constructed on the project site in conformance with the Code. A -2. The project is similar to the development of other properties on Old Newport Boulevard which have merged smaller lots into larger development sites; these developments have not been detrimental to the health, safety, peace, comfort or general welfare of persons residing or working in the neighborhood or injurious to property and improvements in the neighborhood or the general welfare of the City. Finding: B. The lots to be merged are under common fee ownership at the time of the merger. Tmplt: 11/23/09 Planning Commission Resolution No. _ Paae 7 of 14 Facts in Support of Finding: B -1. Lots 1, 2, and 3, Block 9, Tract 27 together with the southeast half of the 40 -foot abandoned right -of -way adjacent to lots 1, 2, and 3 in Block 9, Tract 27 are under common ownership by CDO Properties, LLC. Finding: C. The lots as merged will be consistent or will be more closely compatible with the applicable zoning regulations and will be consistent with other regulations relating to the subject property including, but not limited to, the General Plan and any applicable Coastal Plan or Specific Plan. Facts in Support of Finding: C -1. The lot merger will be consistent with the applicable SP -9 /RSC district regulations and other regulations relating to the subject property. The resulting parcel will be 16,060 square feet in area, exceeding the minimum lot area requirements of 2,375 square feet, and no setback nonconformities would be directly created by the proposed merger. C -2. The Land Use Element of the General Plan designates the subject site as General Commercial Office (CO -G), which is intended to provide for administrative, professional, and medical offices with limited accessory retail and service uses. The lot merger will allow for the construction of a new office building, consistent with the intent of the CO -G land use designation. C -3. The lots are not located within the coastal zone. Finding: D. Neither the lots as merged nor adjoining parcels will be deprived of legal access as a result of the merger. Facts in Support of Finding: D -1. Neither the merged parcel nor the adjoining parcel will be deprived of legal access as a result of the merger as vehicular access to and from Old Newport Boulevard will remain unchanged. E. The lots as merged will be consistent with the surrounding pattern of development and will not create an excessively large lot that is not compatible with the surrounding development. Tmplt: 11/23/09 Planning Commission Resolution No. _ Page 8 of 14 Facts in Support of Finding: E -1. The Old Newport Boulevard commercial corridor area consists of lots of varying size. Within the area, many properties have been merged allowing for redevelopment of properties previously developed as a separate sites. The proposed lot merger would remove the lot lines on the subject property to permit the redevelopment of the lots as a single, unified site, and would not result in a development pattern, which is inconsistent with the existing development on Old Newport Boulevard. 7. In accordance with Section 19.08.030.A.3 (Waiver of Parcel Map Requirement) of the City of Newport Beach Municipal Code, the Planning Commission may approve a waiver of the parcel map requirement in cases where no more than three parcels are eliminated. The following finding and facts in support of such finding are set forth: Findinq: A. That the proposed division of land complies with requirements as to area, improvement and design, flood water drainage control, appropriate improved public roads and property access, sanitary disposal facilities, water supply availability, environmental protection, and other applicable requirements of Title 19, the Zoning Code, the General Plan, and any applicable Coastal Plan or Specific Plan Facts in Support of Finding: A -1. The proposed division of land complies with requirements as to area, improvement and design, flood water drainage control, appropriate improved public roads, sanitary disposal facilities, water supply availability, environmental protection and other applicable requirements of Title 19 and Title 20 of the Newport Beach Municipal Code and the General Plan. A -2. Approval of the proposed lot merger would remove the existing lot lines, and allow the property to remain as a single site for redevelopment. The lot merger in and of itself would not change the land use, density, and intensity. The proposed merged parcel would comply with all design standards and improvements required for new subdivisions by Title 19, the Zoning Code, and General Plan. A -3. The proposed lot merger does not result in the elimination of more than three lots SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Planning Commission of the City of Newport Beach does hereby recommend that the City Council approve General Plan Amendment No. GP2010 -003, Use Permit No. Tmplt: 11/23/09 Planning Commission Resolution No. _ Page 9 of 14 UP2010 -019, Lot Merger No. LM2010 -005 and the requested off - street parking credit, subject to the conditions set forth in Exhibit "A ". 2. This action shall become final and effective fourteen days after the adoption of this Resolution unless within such time an appeal is filed with the City Clerk in accordance with the provisions of Title 20 Planning and Zoning, of the Newport Beach Municipal Code. PASSED, APPROVED AND ADOPTED THIS 7TH DAY OF OCTOBER, 2010. AYES: NOES: BY: BY: Earl McDaniel, Chairman Michael Toerge, Secretary ATTEST: CITY CLERK Tmpil: 11/23109 Planning Commission Resolution No. Paae 10 of 14 EXHIBIT "A CONDITIONS OF APPROVAL (Project- specific conditions are in italics) PLANNING 1. The development shall be in substantial conformance with the approved site plan, floor plans, roof plans, and building elevations stamped and dated with the date of this approval. (Except as modified by applicable conditions of approval.) 2. Use Permit No. UP2010 -019 and Lot Merger No. LM 2010 -005 shall expire unless exercised within 24 months from the date of approval as specified in Section 20.93.050 of the Newport Beach Municipal Code, unless an extension is otherwise granted. 3. An off - street parking credit of 11 spaces shall be granted commensurate with the number of on- street parking spaces available along the Old Newport Boulevard frontage. 4. A maximum of 4, 000 square feet of gross floor area shall be utilized for medical office use. The remaining 5,500 square feet of gross floor area shall be limited to general office use, or use of equivalent parking demand. 5. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 6. The applicant shall comply with all federal, state, and local laws. Material violation of any of those laws in connection with the use may be cause for revocation of this Use Permit. 7. This approval was based on the particulars of the individual case and does not in and of itself or in combination with other approvals in the vicinity or Citywide constitute a precedent for future approvals or decisions. 8. This Use Permit and Lot Merger may be modified or revoked by the City Council or Planning Commission should they determine that the proposed uses or conditions under which it is being operated or maintained is detrimental to the public health, welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance. 9. Any change in operational characteristics, expansion in area, or other modification to the approved plans, shall require an amendment to this Use Permit or the processing of new permits. 10. All landscape materials and irrigation systems shall be maintained in accordance with the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing and Tmplt: 11/23/09 �G Planning Commission Resolution No. _ Page 11 of 14 trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 11. Landscaping shall comply with all applicable landscaping standards contained within Section 20.46.040 of the Zoning Code. No deviations are permitted. 12. Reclaimed water shall be used whenever available, assuming it is economically feasible. 13. New landscaping shall incorporate drought - tolerant plant materials and drip irrigation systems where possible. 14. Water leaving the project site due to over - irrigation of landscape shall be minimized. If an incident such as this is reported, a representative from the Code Enforcement Division shall visit the location, investigate, inform and notice the responsible party, and, as appropriate, cite the responsible party and /or shut off the irrigation water. 15. Watering shall be done during the early morning or evening hours (between 4:00 p.m. and 9:00 a.m.) to minimize evaporation the following morning. 16. All leaks shall be investigated by a representative from the Code Enforcement Division and the Applicant shall complete all required repairs. 17. Water should not be used to clean paved surfaces such as sidewalks, driveways, parking areas, etc. except to alleviate immediate safety or sanitation hazards. 18. All mechanical equipment shall be screened from view of adjacent properties and adjacent public streets within the limits authorized by this permit, and shall be sound attenuated in accordance with Chapter 10.26 of the Newport Beach Municipal Code, Community Noise Control. 19. All noise generated by the proposed use shall comply with the provisions of Chapter 10.26 and other applicable noise control requirements of the Newport Beach Municipal Code. The maximum noise shall be limited to no more than depicted below for the specified time periods unless the ambient noise level is higher: 20. Prior to the issuance of a building permit, the applicant shall pay any unpaid TmpiC 11/23109 Between the hours of 7:OOAM and 10:00PM Between the hours of 10:00PM and 7:OOAM Location Interior Exterior Interior Exterior Residential Property 45dBA 55dBA 40dBA 5OdBA Residential Property located within 100 feet of a commercial property 45dBA 60dBA 45dBA 50dBA Mixed Use Property 45dBA 60dBA 45dBA 50dBA Commercial Property N/A 65clBA N/A 6OdBA 20. Prior to the issuance of a building permit, the applicant shall pay any unpaid TmpiC 11/23109 Planning Commission Resolution No. _ Paae 12 of 14 administrative costs associated with the processing of this application to the Planning Department. 21. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by either the current business owner, property owner or the leasing agent. 22. Construction activities shall comply with Section 10.28.040 of the Newport Beach Municipal Code, which restricts hours of noise - generating construction activities that produce noise to between the hours of 7:00 a.m. and 6:30 p.m., Monday through Friday and 8:00 a.m. and 6:00 p.m. on Saturday. Noise - generating construction activities are not allowed on Sundays or Holidays. 23. All trash shall be stored within the building or within dumpsters stored in the trash enclosure (three walls and a gate,) or otherwise screened from view of neighboring properties, except when placed for pick -up by refuse collection agencies. The trash dumpsters shall have a top, which shall remain closed at all times, except when being loaded or while being collected by the refuse collection agency. 24. Trash receptacles for patrons shall be conveniently located both inside and outside of the establishment, however, not located on or within any public property or right -of- way. 25. The exterior of the business shall be maintained free of litter and graffiti at all times. The owner or operator shall provide for daily removal of trash, litter debris and graffiti from the premises and on all abutting sidewalks within 20 feet of the premises. 26. The applicant shall ensure that the trash dumpsters and /or receptacles are maintained to control odors. This may include the provision of either fully self- contained dumpsters or periodic steam cleaning of the dumpsters, if deemed necessary by the Planning Department. Cleaning and maintenance of trash dumpsters shall be done in compliance with the provisions of Title 14, including all future amendments (including Water Quality related requirements). 27. Prior to the issuance of building permits, the trash enclosure design shall be approved by the Planning Department. The trash enclosure shall be enclosed by three walls, a self closing, self latching gate and have a have a decorative, solid roof for aesthetic and screening purposes. The design of the enclosure shall be integrated with the design of the other on -site buildings and structures. 28. Storage outside of the building in the front or at the rear of the property shall be prohibited, with the exception of the "required trash container enclosure. 29. Prior to final of the building permit for any new construction on the properties, the Planning Department shall verify recordation of the lot merger document with the County Recorder. Tmpit 11/23/09 1 '\ i/ Planning Commission Resolution No. Paqe 13 of 14 30. Lighting shall be in compliance with applicable standards of the Zoning Code. Exterior on -site lighting shall be shielded and confined within site boundaries. No direct rays or glare are permitted to shine onto public streets or adjacent sites or create a public nuisance. "Walpak" type fixtures are not permitted. Parking area lighting shall have zero cut -off fixtures and light standards shall not exceed 24 feet in height. 31. The site shall not be excessively illuminated based on the luminance recommendations of the Illuminating Engineering Society of North America, or, if in the opinion of the Planning Director, the illumination creates an unacceptable negative impact on surrounding land uses or environmental resources. The Planning Director may order the dimming of light sources or other remediation upon finding that the site is excessively illuminated. 32. Prior to the issuance of building permits, the applicant shall prepare photometric study in conjunction with a final lighting plan for approval by the Planning Department. 33. Prior to issuance of the certificate of occupancy or final of building permits, the applicant shall schedule an evening inspection by the Code Enforcement Division to confirm control of light and glare specified in condition of approval No. 30. 34. All proposed signs shall be in conformance with the provision of Chapter 20.67 of the Newport Beach Municipal Code and shall be approved by the City Traffic Engineer if located adjacent to the vehicular ingress and egress. 35. Deliveries and refuse collection for the facility shall be prohibited between the hours of 10:00 p.m. and 8:00 a.m., daily, unless otherwise approved by the Planning Director, and may require an amendment to this use permit 36. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney's fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City's approval of the Bella Cara Dermatology General Plan Amendment including, but not limited to, the approval of General Plan Amendment No. GP2010 -003, Use Permit No. UP2010 -019, Lot Merger NO. LM2010 -005 & requested Off - Street Parking Credit, and the determination that the project is exempt under the requirements of the Califomia Environmental Quality Act. This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by applicant, City, and /or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees, and damages which City incurs in enforcing the indemnification provisions set forth in this condition. The applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition. Tmplt: 11/23109 3 Planning Commission Resolution No. _ Paqe 14 of 14 Building Department Conditions 37. The applicant is required to obtain all applicable permits from the City Building and Fire Departments. The construction plans must comply with the most recent, City- adopted version of the California Building Code. The construction plans must meet all applicable State Disabilities Access requirements. Public Works Conditions 38. An encroachment permit is required for all work activities within the public right -of -way. 39. The applicant shall construct a new curb, gutter, and a 6 -foot wide sidewalk along the project frontage on the Old Newport Boulevard right -of -way per City standards. Flowline of the new curb and gutter shall be located 34 feet west of the centerline of Old Newport Boulevard. 40. The proposed driveway approach to the subject property shall be constructed per City Standards and meet the criteria for commercial driveway approaches per City Council Policy L -2. 41. The existing catch basin adjacent to the project on Old Newport Boulevard just south of Orange Avenue shall be relocated to match the location of the new curb and gutter per City Standards. 42. The parking lot layout shall be per City Standard No. 805 -L -A and B. 43. Any improvements adjacent to driveway approaches shall comply with the City's sight distance requirement per City Standard No. 110 -L. 44. Damage to existing public improvements surrounding the development site by the private construction shall be repaired and additional construction within the public right -of -way may be required at the discretion of the Public Works Inspector. 45. All applicable Public Works Department plan check fees shall be paid prior to review of the lot merger and grant deeds. 46. Prior to recordation of the lot merger, grant deeds indicating the changes in titles of ownership should be submitted to the Public Works Department for review and approval. 47. The lot merger and grant deeds reviewed and approved by the Public Works Department should be filed concurrently with the County Recorder and County Assessor's Offices. Tmplt: 11/23/09 3 Attachment No. PC 2 Lot Merger Plans I 3o EXHIBIT "A" CITY OF NEWPORT BEACH LOT MERGER NO LM2010 -005 (LEGAL DESCRIPTION) OWNER EXISTING PARCEL PROPOSED PARCEL AP NUMBER REFERENCE NUMBER 425 - 271 -01 CDO PROPERTIES, LLC 425-271-02 EXISTING LEGAL DESK /PT /ON.• ALL THAT CERTAIN REAL PROPERTY SITUATED IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, DESCRIBED AS FOLLOWS' PARCEL 1: LOTS 1, 2 AND 3, IN BLOCK 9, OF TRACT NO. 27, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 9, PAGE 26 OF MISCELLANEOUS MAPS, IN THE OFFICE OF 7HE COUNTY RECORDER OF SAID ORANGE COUNTY. PARCEL 2: THAT PORTION OF THE SOUTHEASTERLY ONE -HALF OF THE 40 FOOT ROAD ADJACENT TO LOTS 1, 2 AND 3, IN BLOCK 9, OF TRACT NO. 27, IN THE CI7Y OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 9, PAGE 26 OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID ORANGE COUNTY, AS ABANDONED BY THE ORDER OF THE BOARD OF SUPERVISORS OF ORANGE COUNTY ON JUNE 25, 1929, PROPOSED LEGAL DESRIPTION,' ALL THAT PORTION OF LOTS 1, 2 AND 3, IN BLOCK 9, OF TRACT NO. 27, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 9, PAGE 26 OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID ORANGE COUNTY,• TOGETHER WITH THAT POR77ON OF THE SOUTHEASTERLY ONE -HALF OF THE 40 FOOT ROAD ADJACENT 70 L07S 1, 2 AND 3, IN BLOCK 9, OF 7RACT NO, 27, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 9, PAGE 26 OF MISCELLANEOUS MAPS, /N THE OFFICE OF THE COUNTY RECORDER OF SAID ORANGE COUNTY, AS ABANDONED BY THE ORDER OF 771E BOARD OF SUPERVISORS OF ORANGE COUNTY ON JUNE 25, 1929, DESCRIBED AS FOLLOWS., BEGINNING AT 7HE INTERSECTION OF THE NORTHWESTERLY PROD OF 77-IE SOUTHWESTERLY LINE OF SAID LOT 3 WI7H THE NORTHWESTERLY LINE OF SAID PORTION OF THE SOUTHEASTERLY ONE -HALF OF THE 40 FOOT ROAD' THENCE FROM SAID POINT OF BEGINNING ALONG SAID NORTHWES7ERLY LINE NORTH 32' 44' 21" EAST 34.97 FEET TO THE BEGINNING OF A NON - TANGENT CURVE, CONCAVE NORTHWESTERLY, HAVING A RADIUS OF 2,486.28 FEET, A RADIAL LINE BEARING FROM SAID POINT NORTH 57 06' 00" WEST' THENCE NORTHEASTERLY ALONG SAID CURVE 264.10 FEET THOUGH A CENTRAL ANGLE OF 06' 05' 10" TO THE WESTERLY LINE OF THE STRIP OF LAND 80 FEET WIDE DESCRIBED IN DEED FOR RIGHT OF WAY OF A PUBLIC HIGHWAY RECORDED JULY 27, 1927, IN BOOK 72, PAGE 129, OFFICIAL RECORDS, SAID WESTERLY LINE BEING A NON- TANGENT CURVE, CONCAVE EASTERLY AND HAVING A RADIUS OF 2,351.16 FEET, A RADIAL LINE BEARING FROM SAID POINT SOUTH 80' 23' 39" EAST; THENCE SOUTHERLY ALONG SAID CURVE 85.69 FEET THROUGH A CENTRAL ANGLE OF 02' 05' 18" TO A TANGENT LINE- THENCE SOUTH 07 31' 03" WEST 83.60 FEET TO THE BEGINNING OF A TANGENT CURVE, CONCAVE WESTERLY AND HAVING A RADIUS OF 947.80 FEET' THENCE SOUTHWESTERLY ALONG SAID CURVE 135.59 FEET THROUGH A CENTRAL ANGLE OF O8' 11' 47" 70 A POINT OF INTERSECTION WITH A NON- TANGENT LINE, A RADIAL LINE BEARING FROM SAID POINT NORTH 74' 17' 09" WEST- THENCE NORTH 66' 23' 39" WEST 108.13 FEET TO THE POINT OF BEGINNING. al m EXHIBIT "B" CITY OF NEWPORT BEACH LOT MERGER NO LM2010 -005 (MAP) OWNER EXISTING PARCEL AP NUMBER PROPOSED PARCEL REFERENCE NUMBER CDO PROPERTIES, LLC 425 - 271 -01 425 - 271 -02 y \ SHEET 1 OF 2 A* ZA-e �\ 26m-- P. �® r'ou' C SCALE: 1"= 50' ® ®_ pj o`o1Q C 13 Tl3 C�? \ N my 1 5 C6 1 C i i cl y ` , CIS �_� C� � C9 Cg T16 �rp`NEW�P— p)R (PUB LIC STREE _BL / ® ._ _�. Nay Cl _ _ CONLD TE RpL /NE 6 ® 0 \ OLD CE P ` �- y 7C m '3'� EXHIBIT "B" cont. CITY OF NEWP0RT BEACH LOT MERGER NO LM2010 -005 (MAP) OWNER EXISTING PARCEL PROPOSED PARCEL AP NUMBER REFERENCE NUMBER CDO PROPERTIES, LLC 425 - 271 -01 425 - 271 -02 CURVE TABLE' SHEET 2 of 2 NO. DELTA RADIUS LENGTH TANGENT Cl 1'04'16" 2486.28' 46.48' 23.24' C2 1'43'11" 2486.28' 74.63' 37.32' C3 3'17'43" 2486.28' 142.99' 71.52' C4 2'25' 19" 2486.28' 105.10' 52.56' C5 6'05'10" 2486.28' 264.10' 132.18' C6 2'32'52" 970.00' 43.13' 21.57' C7 4'27'11" 970.00' 75.39' 37.71' C8 9'01'41" 970.00' 152.84' 76.58' C9 16'01'43" 970.00' 271.36' 136.57' C10 8'11'47" 947.80' 135.59' 67.91' C 1 1 2'05'18" 2351.16' 85.69' 42.85' C12 4'59'54" 957.40' 83.52' 41.79' C13 3'11'54" 957.40' 53.44' 26.73' C14 9'59'12" 2311.16' 402.83' 201.93' C15 12'20'36" 997.40' 214.87' 107.85' C16 16'01'43" 1000.00' 279.75' 140.80' C17 13'40'19" 867.55' 207.02' 104.00' TANGENT TABLE: T11 34.97' N 32'44'21 E T12 104.76' N 03'49'56" E N0. DISTANCE BEARING T13 83.60' T14 23.11' N N 07'31'03" 07'31'03" E E T1 130.68' N 66'23'39" W T15 60.49' N 07'31'03" E T2 108.13' N 66'23'39" W T16 83.60' N 07'31'03" E T3 22.55' N 66'23'39" W T17 107,65' S 19'51'39" W T4 111.70' N 67'34'43" W T18 110.55' S 03'49'56" W T5 80.46' N 67'34'43" W T19 RADIAL N 57'06'00" W T6 31.24' N 67'34'43" W T20 RADIAL N 63'11'10" W T7 90.99' N 68'10'38" W T21 RADIAL S 80'23'39" E T8 51.13' N 68'10'38" W T22 (RADIAL) N 74d17'9" W T9 39.86' N 68'10'38" W T10 39.89' N 19'51'39" E '3'� EXHIBIT "C" CITY OF NEWPORT BEACH LOT MERGER NO LM2010 -005 (SITE PLAN) OWNER EXISTING PARCEL PROPOSED PARCEL AP NUMBER REFERENCE NUMBER CDO PROPERTIES, LLC 425 - 271 -01 425-271-02 SCALE: 1"= 50' \ 4 ®Co 4940� ,. ®L® NEWPORT OLV®, 7 �' Attachment No. PC 3 Project Plans Q3 `/v 3G4CEi Q 35 493 OLD NEWPORT BLVD. \eFq NEWPT BEACH, CA 92663 111' -7" al [111 4f I NEWPORT BLVD } 94' -1 <8> 3 ,3 ,wsH EUCIOSUnE LANDSCAPED AREA 92' -4 \Y PARKING PROVIDED AND APPROVED (PERMIT #0149 -2009) wortw ' WAYLINE REGULAR ON SITE: 28 STALLS I ACCESSIBLE ON SITE: 3 STALLS,/ STREET PARKING: 11 STALLS //42 STALLS TO PARKING REQUIRED �� _ 4,000SF MEDICAL (6 /TIJOOj: 20 STALLS 5 SOOSF OFPIC@ .110001: 22 STALLS TOT REQUIRED: 42S1ALLS LOT AREA 16,060 SF LANDSCAPING REQUIRED If 1,286 SF LANDSCAPING PROVIDED (165%) 2,648 SF SITE tat FLOOR PLAN - PER PERMITTED PROJECT- NO REVISIONS PROPOSED BELLA CARA DERMATOLOGY ShaMM A001 BUILDING Dale acr m ,. mto 1 / � u 6,022 SF SUI [NO AREA ON THIS LEVEL / .- T DINT POSSIBLEL 1 IF ADDITIONAL 1, 7„TH) Fi. (UNPRACTICAL- v,vTFi) J i - -- - ,- OPEN CORRIDO / I I I„ o I . D1 D5 F G 2nd LEVEL OFRCE - PER PERMITTED PROJECT- NO REVISIONS PROPOSED SG - Vie• _ 1•_0- ram 493 OLD NEWPORT BLVD, BELLA CARA DERMATOLOGY NEWPORT BEACH, CA 92663 BUILDING Sheet #. A002 mm. O0f m 1. 2010 1 min PERMUTED AREA 2,001 SF T N `Y , N II 111 -- 111 -1n� I 1 LOTAREA 16,060 SF ALLOWED BUILDING AREA AT 0.5 FAR 8.030 SF v= BULK AREA CALCULATIONS /y` 1 ' /•' PERMITTED BUILDING AREA AT 0.5 FAR rn ` BULKAREA PERMITTED: [TOTAL LOT AREAX40.5+025)3 16,060SFx0.75 3RD FLOOR 6,022 SF 12,045 SF 3RD FLOOR 2.001 SF —_ TOTAL PERMITTED BUILDING AREA 8,0235E BULK AREA (WI GPA APPROVAL): [TOTAL LOT AREA X (0.591025) PROPOSED BUILDING AREA AT 0.62 FAR 16,060 SF x 0.84 2ND FLOOR 6,022 SF =13.490 SF 3RD FLOOR 3.478 SF ACTUAL BULK BLDG AREA TOTAL PROPOSED BUILDING AREA 9,500 SF (ENCLOSED BUILDING AREA+ ABOVE GRADE PARKING AREA) =10,498 SF ACTUALBULKAREA %: 65% 3rd LEVEL GENERAL OFFICE - PROPOSED ADDITION swe 1/16• - 1--0- 493 OLD NEWPORT BLVD. BELLA CARA DERMATOLOGY Shasta: A003 NEWPORT BEACH, CA 92663 BUILDING mm. WR) m 11 2010 493 OLD NEWPORT BLVD. XC NEWPT BEACH, CA 92663 ROOF PLAN OVER EX[SnNG GRADING BELLA CARA DERMATOLOGY BUILDING SG 1/w - 4-0' nXKH1TECTS 1-11a -V (]S-{',AM ElO5R4I PROPOSED L OIEI ROOF HEIGHT 0 N OP_ 3RD LEV�El , f _ _ M LEVEL -,STREET LEVEL 0 EKTR' AECA ',RaE) 9NT OF ROOF ABOVE MONG ME) - 4q -1, -all OLD NEWPORT BLVD. FRONT ELEVATION VARIES PER CML PCMS— — -- — -- ACUTE OLD NEWPORT BLVD. ELEVATION EXTERIOR ELEVATIONS mom 493 OLD NEWPORT BLVD. BELLA CARA DERMATOLOGY Sheett AQTS NEWPT BEACH, CA 92663 BUILDING DAM OCTOSER 1. 2010 Romms '10-111 lip oollm 11 7:= VARIES PER CML PCMS— — -- — -- ACUTE OLD NEWPORT BLVD. ELEVATION EXTERIOR ELEVATIONS mom 493 OLD NEWPORT BLVD. BELLA CARA DERMATOLOGY Sheett AQTS NEWPT BEACH, CA 92663 BUILDING DAM OCTOSER 1. 2010 PROPOSED ROOF HEGHT O NIDPOPMT +111' - 6'(33' -9" JHOYF E %5RlG CWDFj PROPOSED TOP OF ROOF RIDGE +113'- 6 "(J5 -10" A6N'E E>aSTNCD]SIINC G°jp£J`P �TOP CF ROOF PRDPOS TOP OF OECCRATW WALL \ V +1tb' -9" — — +111'- 0 "(3T -6' /EOJE ET45[NG (AApE) \ — 1 / / PROPOSED ROOF HEIGHT O MIDPOPINT (JG -0" IHTL gI511NG GPJJ — — �` —�(II +111' -8" (]5-12 ABOIE E1bTLVG 6RNEJ �. ROOF HEIGHT \\�— s — _ _ __PEMiEL KiLF Y:ICXT _A WSTNG OWE) CBUNG 3ND 0 0 0 0 0 0 ®0 0 +az• -r _ _ AT IFVEl P�MMNO VARES PE1t UMl �I (50• -W w(rvE E:9AikG GEgfk) 3RD LM + - T.K — _ I� NO LDU +fir -r 1ST LENT PARMNG VARIES PER OW. PIATS EXTERIOR NEWPORT BLVD. ELEVATION DECORATNE WAIL HEIGHT +11+'-4"(]5-10" LM EY8'IWG EN 'Y. ice^ EXTERIOR SIDE LOT ELEVATION EXTERIOR ELEVATIONS 493 an NEWPORT BLVD. BELLA CARA DERMATOLOGY Shfttt A006 NEWPT BEACH, CA 92663 BUILDING OAM JULY 41H 2010 C) / / \ Li z !); (# \(\ )) §)§ !!!!!4! ! || |!, ggO0ID 4 |! | | |! ; , & �\ \ \ \ \ \ � \ ƒ/ \� ) \ 5 \ §7 «f f! j )2 §) \� ] co (k )} \\ � I��Ciy,aliuf�l�imhnlhi�ll3liii nIIBEin 1 �Ini I{ 11n �BCaii, �1IIiP n 1P'In als; 1; d;nn 11 � atl.m:en..dadhEtrdtl. finll.. aii1: 6e11 21..1 3wd. i, P, tllui. diaP ....riim,6h.mnm:rdi.1.:..4.eu.il �� W � �� le�l�lil�i'I;i.lai� �I�lih9{ il!! iiltitindl�,fitl iilP�'il ';f U�, QWWW¢ � � lfhllE�diil lhil! iEl! nili�tiili�% �illflhl��( h�IiSiil��i! Ih�it��Pll 9dn15ililf l�hil!is�l;n�ll�iliynl�llllio � J m g 11 m.;1: 11. IL1. tllld, haaiild. avlal S.. Ax. nA! aFa! n.. m< s1 mE +u1lmnnelTl..flmdNla;ain.k6dmii N � $ ,W 1,11 I11' 1 RW� Ag 9 Q 2 tit � o 1 E y�(E¢� WIN L Fyel €gelle { t 3.IV oil P14e ` 3 Attachment No. PC 4 Construction Cost Letter October 1, 2010 Planning Department City of Newport Beach 3300 Newport Blvd. Newport Beach, Ca. 92663 Re: 493 Old Newport Blvd. Newport Beach, CA Permit # 0149.2009 Dear Planning Department: Below is a brief explanation of the construction cost on this project. 1. The soils at this place are loose fill, which is not suitable for bearing building weight. Per the recommendations of the soils report, excavation of approximately 10 feet of the soil must take place. Some of it may be reused on the site, but it takes expensive heavy duty equipment to do the excavation and recompaction. A big portion of the soil will have to be transported out of the site. Finding a place for it, is another expensive operation. Even the soils below this layer are not very strong for bearing a building, which drives the up the price of the structure. 2. The slope of the site requires retaining, which is always an expensive item. In our case there is a building right next to our retaining wall together with the permanent shoring that needs to be built which makes it even more difficult and costly. The site work, soils excavation and retaining walls come to more than a 114 of the construction cost. 3. The triangular shape of the lot contributes a great deal to the layout, the functionality and cost of the building. We designed this building starting from the parking layout on the site. Because the lot is not a rectangular shape with enough width, the parking cannot be optimized (leads to less spaces) and the structural columns cannot be uniformly spaced, which leads to a lot of angular moment connections driving the cost of the structure very high. Considering this and the weak soils, it is not surprising that more than a 1/4 of the construction cost is the structural steel frame. In other words, this building would be costing over 30% less than the current projected construction cost if it was on a wide enough rectangular lot with leveled topography and soils with good bearing capacity. Regards, Theodora Attanassova Wood Burghard Swain Architects 4850 Barranca Pkwy. Suite 203 Irvine, CA 92604 tel. 949 - 552 -2061 fax 949- 552 -9442 0 Attachment No. PC 5 General Plan Consistency Analysis e i GENERAL PLAN POLICY CONSISTENCY ANALYSIS Folic No._,: Pollc C one lstenc 'Axial sis Land Use Element LU 1.5 Economic Health. Encourage a local Consistent. The project would consolidate and economy that provides adequate commercial, redevelop three lots and a portion abandoned of office, industrial, and marine - oriented right -of -way that are currently occupied by a mix of opportunities that provide employment and vacant, dilapidated, and underperforming uses revenue to support high - quality community into a modern office building that would provide services. jobs and modest growth to the area. The project includes medical office use that would complement Hoag Hospital and allow for the consolidation of healthcare in Newport Beach to serve residents and the surrounding community. LU 3.1 Neighborhoods, Districts, Corridors, and Consistent. The project would be consistent with Open Spaces. Maintain Newport Beach's permitted uses for the site and would implement pattern of residential neighborhoods, business one of the primarily goals of the Old Newport and employment districts, commercial centers, Boulevard Specific Plan to redevelop the area as corridors, and harbor and ocean districts. a commercial district with retail sales and office opportunities. LU 3.2 Growth and change. Enhance existing Consistent. As indicated in the General Plan, the neighborhoods, districts, and corridors, completion of Newport Boulevard as the primary allowing for re -use and infill with uses that are entry to the City resulted in a shift of vehicular trips complementary in type, form, scale, and away from Old Newport Boulevard resulting in a character. reduction in the corridor's economic vitality which Changes in use and /or densitylintensity, should has significantly changed the land use mix. be considered only in those areas that are Without action to stimulate development, the economically underperforming, are necessary desired General Plan goals of providing to accommodate Newport Beach's share of professional offices to support Hoag Hospital may projected regional population growth, improve be difficult. The property has proven difficult to the relationship and reduce commuting redevelop due to its irregular lot configuration, distance between home and jobs, or enhance poor soils conditions, and related high the values that distinguish Newport Beach as a construction costs. Providing an increased special place to live for its residents. The scale development limit for the project site could provide of growth and new development shall be an economic stimulus to revitalize the corridor. coordinated with the provision of adequate The project site is within walking distance of an infrastructure and public services, including established residential neighborhood. Newport standards for acceptable traffic level of Beach residents desire high quality development service. and redevelopment of under- performing, non- conforming properties. The project would provide such redevelopment of the site and provide stimulus for the corridor. LU 5.2.1 Architecture and Site Design. Require that Consistent. The building's architecture is of new development within existing commercial contemporary design with curvilinear parapet walls districts centers and corridors complement and roof lines. To minimize the massing and scale existing uses and exhibit a high level of of the building as viewed from Old Newport architectural and site design ... Boulevard and Newport Boulevard, the proposed design includes step backs at each of the office levels, concentrating the massing towards the interior of the property. The use permit request for the height increase is nominal, and when compared to other newly constructed buildings that maximize the height, such as the newer two - story and three -story buildings along Old Newport Boulevard, there should be no visible or abrupt difference height. The wave - shaped roof, curvilinear parapet walls, and decorative sail feature add visual interest to the design of the building and would enhance the character of the area. LU 5.6.1 Compatible Development. Require _thatJ Consistent. The promegtwmould rovtde a modern J_. GENERAL PLAN POLICY CONSISTENCY ANALYSIS Rolicy No.. Policy, Consistency Analysis buildings and properties be designed to ensure office building in an area of the City designated for compatibility within and as interfaces between uses to support and complement Hoag Hospital. neighborhoods, districts, and corridors. The project is buffered from adjacent commercial development by Old Newport Boulevard to the east and Newport Boulevard to the west. The nearest residential structures are located approximately 150 feet to the east and are shielded from the project site by the commercial development located on the east side of Old Newport Boulevard. LU 5.6.2 Form and Environment. Require that new Consistent. Buildings within the Old Newport and renovated buildings be designed to avoid Boulevard commercial corridor consist of a wide the use of styles, colors, and materials that variety of different architectural styles, with no unusually impact the design character and consistent theme. The building's architecture is of quality of their location such as abrupt contemporary design with curvilinear parapet walls changes in scale, building form, architectural and roof lines. To minimize the massing and scale style, and the use of surface materials that of the building as viewed from Old Newport raise local temperatures, result in glare and Boulevard and Newport Boulevard, the proposed excessive illumination of adjoining properties design includes step backs at each of the office and open spaces, or adversely modify wind levels, concentrating the massing towards the patterns. interior of the property. The use permit request for the height increase is nominal, and when compared to other newly constructed buildings that maximize the height, such as the newer two - story and three -story buildings along Old Newport Boulevard, there should be no visible or abrupt difference height. The wave - shaped roof, curvilinear parapet walls, and decorative sail feature add visual interest to the design of the building and would enhance the character of the area. The project would serve to enhance the visual appearance and overall impression of the Old Newport Corridor. LU 5.6.3 Ambient Lighting. Require that outdoor Consistent. The project will be subject to lighting be located and designed to prevent conditions of approval intended to control light spillover onto adjoining properties or spillage and glare, including the requirement to significantly increase the overall ambient prepare a photometric survey to confirm that illumination of their location. illumination does not exceed one - foot - candle beyond property lines. LU 658.1 Priority Uses. Accommodate uses that serve Consistent. The proposed office building would adjoining residential neighborhoods, provide include medical and general office space that professional offices, and support Hoag would complement and support Hoag Hospital Hospital. and would provide medical services and facilities to the adjacent residential community. LU 6.18.3 Property Design. Require that buildings be Consistent. Pedestrian and vehicular access has located and designed to orient to the Old been designed to take access from the Old Newport Boulevard frontage, while the rear of Newport Boulevard frontage. Given the project's parcels on its west side shall incorporate high visibility from Newport Boulevard, the west landscape and design elements that are elevation incorporates significant architectural attractive when viewed from Newport detail and includes a decorative sail element. The Boulevard. west elevation is located above a landscaped slope and also incorporates additional landscaping elements. LU 6.18.4 Streetscape Design and Connectivity. Consistent. Proposed landscaping along the Old Develop a plan for streetscape improvements Newport Boulevard frontage would enhance the and improve street crossings to facilitate pedestrian environment in front of the site. The pedestrian access to Hoag Hospital and Applicant would be required to construct a discourage automobile trips. sidewalk in front of the property on Old Newport Boulevard providing better pedestrian access and connectivity to the neighborhood. The ro'ect N 2.1. CE 7.1 roadway system to accommodate projected traffic at the following level of service standards: A. Level of Service (LOS) "D" throughout the City, unless otherwise noted... Required Parking. Require that new development provide adequate, convenient parking for residents, guests, business patrons, and visitors. Require that all proposed projects are compatible with the noise environment through use of Table N2 [Land Use Compatibility Matrix], and enforce the interior and exterior noise standards shown in Table N3 [Noise and exterior noise standards outlined in Table N3, and in the City's Municipal Code to ensure that sensitive noise receptors are not exposed to excessive noise levels from stationary noise sources, such as heating, ventilation, and air Limiting Hours of Activity. Enforce the on hours of construction activity. Consistent. The project is forecast to generate 206 new average daily trips (ADT), which is below the initial screening threshold of the City's Traffic Phasing Ordinance (fPO). Projects that generate less than 300 ADT are exempt from having to prepare a traffic study per the TPO as they are not expected to impact the acceptable levels of service for traffic in the area. Potentially Consistent. The project requires a total of 42 parking spaces. 31 parking spaces are proposed on -site. In accordance with the provisions of the Old Newport Boulevard Specific Plan, the applicant is seeking an 11 -space parking credit commensurate with the number of spaces available along the project frontage. If approved, the project can be found consistent with this consistent. i ne project wouio De aevetopea in a noise environment compatible with the proposed use (an office use in an area less than 60 dBA CNEL). Office use is "clearly compatible" up to 65 dBA and "normally compatible" up to 75 dBA. comply with the Municipal Code (Section 10.26 provides for Community Noise Control). The project would be compatible with the existing and future noise environment. The project would not significantly increase stationary noise levels in the Consistent. The project would be required to comply with requirements of the Municipal Code (Section 10.26 addresses Community Noise Control; Section 10.28.040 addresses �tq Attachment No. PC 6 General Plan Changes — Table LU2 bo Anomaly Number Statistical Area Development Limit (so Development Limit Other Additional Information Land Use Designation 1 L4 MU -H2 460,095 471 Hotel Rooms (not included in total square footage) 2 L4 MU -112 1,060,146 3 L4 CO -G 734,641 4 L4 MU -1-12 250,176 5 L4 MU -112 32,500 6 L4 MU -H2 34,500 7 L4 MU -H2 81,372 8 L4 MU -H2 442,775 9 L4 CG 120,000 164 Hotel Rooms (included in total square footage) 10 L4 MU -H2 31,362 349 Hotel Rooms (not included in total square footage) 11 L4 CG 11,950 12 1.4 MU -H2 457,680 13 L4 CO -G 288,264 14 L4 CO- G /MU -H2 860,884 15 L4 MU -H2 228,214 16 L4 CO -G 344,231 17 L4 MU -1-12 33,292 304 Hotel Rooms (not included in total square footage) 18 L4 CG 225,280 19 L4 CG 228,530 21 J6 CO -G 687,000 Office: 660,000 sf Retail: 27,000 sf CV 300 Hotel Rooms 22 J6 CO -G 70,000 Restaurant: 8000 sf, or Office: 70,000 sf 23 K2 PR 15,000 24 L3 IG 89,624 25 L3 PI 84,585 26 L3 IG 33,940 27 L3 IG 86,000 28 L3 IG 110,600 29 L3 CG 47,500 30 M6 CG 54,000 31 L2 PR 75,000 32 L2 PI 34,000 33 M3 PI 163,680 Administrative Office and Support Facilitates: 30,000 sf Community Mausoleum and Garden Crypts: 121,680 sf Family Mausoleums: 12,000 sf 41 .. Anomaly Number Anomaly Statistical Area 11.6cations Land Use Designation Development Limit (sQ Development Limit Other Additional Information 34 L1 CO -R 484,348 35 L1 CO -R 199,095 36 L1 CO -R 227,797 37 L1 CO -R 131,201 2,050 Theater Seats (not included in total square footage) 38 L1 CO -M 443,627 39 L1 MU -H3 408,084 40 L1 MU -H3 1,426,634 425 Hotel Rooms (included in total Square Footage) 41 L1 CO -R 327,671 42 L1 CO -R 286,166 43 L1 CV 611 Hotel Rooms 44 L1 CR 1,619,525 1,700 Theater Seats (not included in total square footage) 45 L1 CO -G 162,364 46 L1 MU-H3/PR 3,725 24 Tennis Courts Residential permitted in accordance with MU -H3. 47 L1 CG 105,000 48 L1 MU -1-13 337,261 49 L1 PI 45,208 50 L1 CG 25,000 51 K1 PR 20,000 52 K1 CV 479 Hotel Rooms 53 K1 PR 567,500 See Settlement Agreement 54 it CM 2,000 55 H3 PI 119,440 56 A3 PI 1,343,238 990,349 sf Upper Campus 577,889 sf Lower Campus In no event shall the total combined gross Floor area of both campuses exceed the development limit of 1,343,238 sq. ft. 57 Intentionally Blank 58 J5 PR 20,000 59 H4 MU -W1 247,402 144 Dwelling Units (included in total square footage) 60 N CV 2,660,000 2,150 Hotel Rooms (included in total square footage) 61 N CV 125,000 62 L2 CG 2,300 63 G1 CN 66,000 64 M3 CN 74,000 65 M5 CN 80,000 66 J2 CN 138,500 67 D2 PI 20,000 68 L3 PI 71,150 I Table Anomaly Statistical Land Use Development Number Area Designation Limit (so Development Limit Other Additional Information 69 K2 CN 75,000 70 D2 RM -D Parking Structure for Bay Island (No Residential Units) 71 L1 CO -G 11,630 72 L1 CO -G 8,000 73 A3 CO -M 350,000 74 L1 PR 35,000 City Hall, and the administrative offices of the City of Newport 75 L1 PF Beach, and related parking, pursuant to Section 425 of the City Charter. 1.0 FAR permitted, provided 76 H7 CO -G 0.5 FAR all four legal lots are consolidated into one parcel to provide unified site design 77 H4 CV 240,000 157 hotel rooms(included in total square footage) 78 B5 CM 139,840 Development limit of 9,500 sf permitted, provided all 79 H1 CO-G 0.5 FAR three legal lots are consolidated into one parcel to provide unified site design