Loading...
HomeMy WebLinkAbout03_Newport Bay Marina_PA2001-210CITY OF NEWPORT BEACH PLANNING COMMISSION STAFF REPORT August 5, 2010 Agenda Item #3 SUBJECT: Newport Bay Marina — PA2001 -210 2300 Newport Boulevard APPLICANT: ETCO Development, Inc. PLANNER: James Campbell, Principal Planner (949) 644 -3210 PROJECT SUMMARY Review and approval of a Construction Traffic Management and Control Plan and a Parking Management Plan for the Newport Bay Marina project. RECOMMENDATION Conduct a public hearing and approve the Construction Traffic Management and Control Plan (Attachment PC -1) and Parking Management Plan (Attachment PC -2). DISCUSSION In December of 2006, the Planning Commission approved the Newport Bay Marina project. The project is a mixed use development consisting of 27 residential units and approximately 36,000 square feet of retail and office uses on a 2.3 acre site in the McFadden Square area between Newport Boulevard and the Rhine Channel (vicinity map below). Condition #50 requires the preparation of a Construction Traffic Management and Control Plan and it also requires the Commission's review and approval. Condition #64 requires the preparation of a Parking Management Plan subject to Planning Commission review and approval. The conditions require that this review be conducted at a public hearing with notice to owners of properties within 300 feet of the site. Notice of this hearing was mailed on July 23, 2010, and the notice appeared in the Daily Pilot on July 24, 2010. The City's Traffic Engineer has reviewed and approved both plans. Planning Commission approval is required prior to the issuance of building permits, pursuant to Condition #50 and Condition #64, which is anticipated to be in the coming weeks. If the Commission desires clarification that cannot be addressed during the hearing, changes to the plans can be directed. Newport Bay Marina August 5, 2010 Page 2 VICINITY MAP � } 9 /.(isa r y c e /f J. 'a � 40fry���i �1,� ♦ 11N�St O w'j� h � 2 , ! . -" . -43fl GENERAL PLAN ZONING ,i ' ry' N MV -W[ tr SP-0 I yy � NM ]6 VV'4C LOCATION GENERAL PLAN ZONING CURRENT USE ON -SITE MU -W2 SP -6 RMC Retail, marine industrial, office NORTH MU -W2 SP -6 RMC Restaurants SOUTH MU -W2 SP -6 RMC Restaurant, retail, ship and EAST Newport Ba Newport Bay Newport Ba WEST MU -W2. RT & RS-D— SP -6 RMC , R -2 &=R=-1[ Commercial & residential Newport Bay Marina August 5, 2010 Page 3 The project consists of a large subterranean parking garage with three building levels above (Attachment PC -3). The parking garage will occupy almost the entire site. The level above the parking garage will be retail or office uses and the central public plaza that will provide physical and visual access to the waterfront. The two building levels above are residential with the exception of Building C, which is all commercial. There is a central driveway atop the parking garage that is accessed by two ramps that provides access to residential parking, commercial deliveries and some commercial parking. 1. Construction Traffic Management and Control Plan In 2006, the Commission wanted detailed information about traffic and parking management during construction given the large -scale nature of the project. In summary, the plan provides for on -site and off -site construction worker parking and on- site deliveries of construction materials. Off -site parking would either be at the Lido Marina Village parking structure or at a lot in Santa Ana. In either case, a shuttle van would be used. Once the on -site parking garage is completed (Phase 1 of the overall project) construction workers will park in the garage. 2. Parking Management Plan In 2006, the Commission wanted detailed information about the management of parking after construction. Parking for residents within separate garages, guests and commercial activities is accessible from the central driveway above the subterranean parking garage. The applicant plans no specific controls for access to this parking. Parking within the subterranean garage is for the marina, commercial activities and several residential guest spaces. The entire garage will be open to the public and there will be a pay station with a 30 minute grace period. The garage will be monitored 4 times daily. Prepared by: J s Campbell, incipal Planner ATTACHMENTS Submitted by: 4! _L r p F PC -1: Construction Traffic Management and Control Plan PC -2: Parking Management Plan PC -3: Concept site plan ATTACHMENT PC -1 Construction Traffic Managemenand Control Plan Page Intentionally Blank Construction Traffic Management and Control Plan for 2300 Newport Blvd - Newport Beach, California Revised Draft (v.2) Prepared by: TEP Transportation Engineering and Planning, Inc. P.O. Box 18355 Irvine, CA 92623 Contact: Craig S. Neustaedter, PE California Registered Traffic Engineer, License #: TR1433 Phone (909) 263 -0383 Prepared for ETCO Development Inc. Attn: Roger Hatch 2222 Newport Blvd., Second Floor Newport Beach, CA 92663Phone (949) 200 -7223 June 11. 2010 No. TRH I433 b t - fle -7 zo,V Construction Traffic Management and Control Plan for 2300 Newport blvd a Newport Beach, California Revised Draft (v.2) Background ETCO Development has been approved by the City of Newport Beach to redevelop property located at 2300 Newport Blvd. The project consists of the removal of several existing structures which will be replaced by a mixed use development. This report is submitted for the City's consideration to satisfy the project Condition of Approval #50 in Resolution # 1706 which calls for the preparation of a construction traffic management and control plan. The project location is shown on Figure 1. The project site plan at deck level is shown as Figure 2. Proiect Phasing The project is to be constructed in six phases which are described in Table 1. Phases 5a and 5b described in Table 1 may be constructed simultaneously, depending upon market factors. Combining the two sub - phases would not alter the construction parking demand, but would serve to expedite project completion. Construction Parking Construction parking needs vary by phase of development. During Phases 1 and 2, all construction worker parking will be accommodated on -site and prohibited from parking on City streets. Figure 3 shows the location where construction workers will park on site. During Phases 3, 4, 5a and 5b when the parking structure will be constructed, employees will park off -site. During these phases, employees will be parked at a remote location and transported to the work site. During Phase 6, after construction of the parking garage is completed, workers will be parked on site. Also, if Phase 5b is done after Phase 5a, instead of concurrently, construction workers will park in the completed north portion of the parking garage. The preferred site to accommodate construction worker parking is the Lido Marina Village Garage. A letter from the manager of this facility is included as an attachment to this report which states that parking for construction workers will be provided at the garage. Also, the manager states that an alternative site is available for construction worker parking if the Lido Marina Village Garage becomes temporarily unavailable. This location is at 202 W. Washington Ave. in Santa Ana. Figure 1 Vicinity Map C5 Newport Bexh 2w 5t 2eth St 1� Fl 4 � ti Q+ lab Aly ISO yds Z`¢g� OOG06 Mn0AlCwpwtlm O]006 NAYlEQ O AMD Z z m Y v O A y w O C m G A Q rre� \f L� p9gggg R; 1+ g_ 22NDST REET O � F N T P F T Fi um a 2300 NEWPORT BLVD. DECK LEVEL PLAN f l ,� to rM N t as m d .Q M I 3 m m a m m m m >1 O N r co O r O r O r r Y U 7 H U of C C 0 N m N N p '� — O Z N U C Ct C= O N O_ O. N N O C U O 0 +_" U U N :3 0 0 y t E- C m m N C O` U N 'O U V U V G d m i N G.� O 7 7 L 7 3'O 02 U > m 03: m� > w O C N t N Cn E N N E N m U_ C Y C N co 7 C> N d E `� N X y O M O L 0 0 0 0'0 O.O0� co a W NLU a U CIO (n0 m N p p 0 , Q O p O r N O N O r N O N r N O r O N m N N y O N N O N N T C E m Z Z m a N 7 j E E i9 'O N n U > Z w W LL a U) a) N C O >+ T >. .L. N C E :3 to p Ln E E E V m V 01 00 00 N r C O N+ + N r N co CO p_ A E a 0 U N 0 O N C m 7 E .N 'O U 7 N 0 O U N T m E m O C m m N tmq m t a + v Figure 3 2300 NEWPORT BLVD. ON SITE CONSTRUCTION PARKING LOCATION (PROJECT BOUNDARIES ARE APPROXIMATE) N N TEP) NOT TO SCALE $ tnnapen.tl.n Enpinwrinp.M v4mInG.Inc. The following summarizes the estimated number of construction personnel and vehicles expected during each phase: Phase 1: 20 vehicles - 20 on -site employees*. Phase 2: 20 -30 vehicles - 20 to 30 on -site employees. Phase 3: 20 -30 vehicles - 20 to 30 on -site employees. Phase 4: 40 -60 vehicles - 40 to 60 on -site employees. Phase 5a: 50 -70 vehicles - 50 to 70 on -site employees. Phase 5b: 50 -70 vehicles - 50 to 70 on -site employees. Phase 6: 30 vehicles - 30 on -.site employees. *all estimates are approximate Parking Shuttle During implementation of off -site parking, the contractor will use a shuttle service to transport workers to and from the project site. A 12 passenger van will be utilized for the shuttle service. Contractor tools will be stored on -site during the phases when workers must park off -site. At the Lido Marina Village Garage, the shuttle pickup /drop off point will be within the parking structure. The shuttle pickup and drop off point at the project will be on -site. The shuttle van will travel between the two points via Newport Blvd. Details of the route are as follows Parking Garage to Project Site Via Lido to Newport Blvd. left on Newport Blvd. left on 22nd St. left on The Arcade Project Site to Parking Garage The Arcade to 22nd St. right on 22nd St. right on Newport Blvd. right on 28th St. /Lafayette Road left on Via Lido 6 Construction Timing /Hours of Operation The following conditions shall apply with respect to construction timing and hours of operation: 1) The normal hours for all construction activity at the project site, including hauling of material to and from the site will be Monday through Friday between the hours of 7 a.m. and 3:30 p.m. 2) To avoid the peak traffic hours during summer months (defined as beginning the Friday preceding Memorial Day and ending on Labor Day), hauling and deliveries will not be allowed between 7:00 a.m. to 10:00 a.m., and after 3 p.m. Except Phase 3, at least part of each project phase will occur during summer months. No street or lane closures will occur during summer months. The estimated number of trucks servicing the project site for each phase is shown on Table 1. 3) No work will be allowed on weekends or holidays. 4) Concrete pours will occur during Phases 2, 4, 5a, 5b, and 6. Pours may occur over a continuous 8 to 10 hour period, over several consecutive weekdays. No trucks involved in the concrete pours will require staging on public streets. Haul Routes The following conditions shall apply with respect to haul routes and hauling activities: 1) The haul route to and from the project site will be Newport Blvd. to the 55 Freeway. Materials being delivered to, or removed from the project site during the construction and /or demolition period will be scheduled so as to minimize the inconvenience experienced by the public. The project developer will be required to obtain a Haul Route Permit before commencing any construction activities. 2) The project developer will hire a hauling contractor. The hauling contractor will prepare a truck haul route plan, which would include the approximate number of truck trips (also described under the mitigation measure(s) in the EIR), the hours during which transport activities are expected to occur and measures to keep all haul routes clean and free of debris /gravel /dirt attributable to the hauling operation of the project site. The truck haul route plan will also include information regarding the maximum number of trucks expected during peak summertime and off -peak non - summer hours. 3) During the excavation and hauling phase, the staging of construction vehicles will be accommodated on -site to the maximum extent possible. No staging of haul vehicles will be done in public right of way. 4) All haul trucks will be radio equipped to avoid any queuing of trucks in the public right of way including, but not limited to Newport Peninsula area during peak summer months. 5) All delivery of material and storage of material will occur on- site. To minimize disruption to vehicular traffic on Newport Blvd., access to the site will be taken via the traffic signal at 21 st St. and Newport Blvd. to The Arcade. 6) The City of Newport Beach Public Works Department will be notified prior to beginning any haul period. If hauling is suspended, the City will be notified when hauling will resume. 7) All trucks and construction personnel traffic will enter and exit the site using the existing driveway from The Arcade. All truck traffic will be coordinated at times which will cause the least inconvenience to the public. 8) All trucks and construction - related vehicles exiting the project site will be directed to yield at all times to public traffic. 9) Flaggers will be used to guide and control traffic, to minimize inconvenience to the public and enhance vehicle and pedestrian safety. As needed, flaggers will be used whenever trucks leaving the project site may impede the flow of traffic along Newport Blvd. 10)During concrete pours, concrete delivery trucks will be accommodated on -site. This will include the on -site provision of at least three queuing spaces, one each for vehicles preparing to exit the site, vehicles delivering concrete and vehicles waiting to deliver. All trucks will be radio equipped so that trucks call be dispatched from the concrete batch plant as needed to avoid queuing in the area of the project site. No staging of trucks will be permitted within the public right -of -way. 11)The contractor will install an 8 foot high wood fence along the project site perimeter before excavation begins as a pedestrian safety precaution. 12)The contractor will have a designated employee controlling the logistics of all deliveries. No unscheduled deliveries will be accepted. Construction managers and /or security guards will be continuously on -site during all project phases and will turn away unscheduled deliveries. All materials requiring assembly will be accommodated on -site. 13)To minimize construction vehicle delay and queuing on City streets, all construction vehicles will be equipped with two -way radios, so that radio communication could be established between drivers and a traffic controller at the project site and entry in to the site could be coordinated and facilitated appropriately. 14) All trucks leaving the site during excavation operations will be watered down before entering the City streets and shall be covered or have water applied to the exposed surface to prevent dust from impacting the surrounding areas. If there is any accumulation of construction mud at the entrances to the project site or nearby streets, such areas should be cleaned (swept). The contractor will comply with the Best Management Practices (BMPs) as stipulated in the approved SWPPP and Water Quality Management Plans. 15) A traffic control plan will be prepared, signed and stamped by a California Registered Traffic Engineer for any temporary street, sidewalk, parking or lane closures. A Temporary Street and Sidewalk Closure Permit will be obtained from the City of Newport Beach Public Works Department, Traffic Engineering Division for the above mentioned closures. No full street closures will be required. 16) When project construction commences, a contractor will be hired to truck debris to landfills and disposal locations in compliance with city of Newport Beach and Orange County regulations. 8 Roger D. Hatch Division President Southern California Division etco HOMES, Inc. 2222 Newport Boulevard, 2nd Floor Newport Beach, CA 92663 Main: (310) 691 -5500 Direct Line: (949) 20C -7221 Direct eFax. (949) 200-7251 Cell: (949) 812 -1702 May 27, 2010 Mr. Hatch, *,W, fhrc .404 This letter is to confirm that I currently have monthly parking available for off site construction parking for the proposed construction project located on the Balboa Peninsula in Newport Beach, CA. Per our agreement we are authorized in the course of our normal daily operations ". to operate a parking facility on the property 24 hours a day, 7 days a week as an independent contractor under the ferns and conditions...' We currently provide monthly parking at this location and have for many years. Monthly parking is currently available for normal sized, half -ton trucks and vehicles at our locations in Newport Beach or Santa Ana on a month to month basis from a cost ranging from $89.00 /month to $29 /month per vehicle. Some of the locations at which I currently have parking available are Lido Marina Village Garage - 3400 Via Lido Newport Beach, CA 92663 160 stalls) 589.00 /month per vehicle. Pick up of the personnel with the shuttle van would be from the exterior of the parking structure and on private property. Vehicles that would be parked at the Lido Marina Village Garage would be required to Park on the too floor of the structure to allow for use of the rest of the structure by hourly parking. Workers would remain at the top of the structure until the shuttle arrives and they would be notified by phone or radio. We have limited additional non - garage parking for normal sized vehicles with height restrictions (racks, lifted) located at the 3400 Via Lido Newport Beach, CA 92663 location. Please coordinate any oversized parking with me directly. Additional, cost effective, car pool areas are available: 202 W. Washington Ave Santa Ana, CA 92701 (44 stalls) $29.00 /month per vehicle Open air, no height restrictions, pick up on site. I do not have any parking that would accommodate oversized vehicles. box trucks, semis, concrete trucks, cranes, pump trucks, etc. and these large items would need to be staged separately. Best Regards, Hugh W. Bowles City Manager for Diamond Parking Services. LLC 1200 North Main Street Suite 100 Santa Ana, CA 92701 Office (714) 542 -1464 Cell (714) 316 -4548 ATTACHMENT PC -2 Parking Management Plan Parking Management Plan for 2300 Newport Blvd - Newport Beach, California Revised Draft (v.3) Prepared by: TES Transportation Engineering and Planning, Inc. P.O. Box 18355 Irvine, CA 92623 Contact: Craig S. Neustaedter, PE California Registered Traffic Engineer, License #: TR1433 Phone (909) 263 -0383 Prepared for ETCO Development Inc. Attn: Roger Hatch 2222 Newport Blvd., Second Floor Newport Beach, CA 92663Phone (949) 200 -7223 July 8, 2010 No, rnoo+av 12 31:10 FJO'-_ re - 71Y/ "t J Parking Management Plan for 2300 Newport Blvd - Newport Beach, California Revised Draft (v.3) July 8, 2010 Purpose Statement This is a Parking Management Plan for the operation of the Newport Bay Marina located at 2300 Newport Blvd. in Newport Beach California (the Project). The purpose is to explain in detail the methods which will be used to professionally manage the parking structure. The primary purpose of the Parking Management Plan is to ensure that parking will be available for the use of the Project occupants and their visitors without negatively impacting the surrounding properties and roadways. This Parking Management Plan will demonstrate how parking will be provided for the project occupants and visitors while incorporating a public parking option. Background ETCO Development has been approved by the City of Newport Beach to redevelop property located at 2300 Newport Blvd. The conditions of approval for the Project (Resolution No. 1706) call for the submittal and approval of a Parking Management Plan. This report is submitted for the City's consideration in satisfaction of this requirement. The Project location is shown on Figure 1. Site Parking On -site parking will be provided on the Project's upper deck and in a below deck garage. The upper deck parking will be used by residents, their guests, and for commercial carports. The project site plan at deck level is shown as Figure 2. The project site plan for the below grade parking garage is shown as Figure 3. The parking garage will be primarily for visitors to on -site retail and office facilities. The garage will also have parking for marina users, residents' guests, and handicap parking. The general public will also be able to pay to park in the garage with demand for outside public parking to be controlled by setting rates or by attending the location during peak season. Rates will be closely managed to maintain the prevailing market rate for hourly parking. Maintaining the market rate will create stable parking demand benefitting the property by keeping demand local and parking accessible to the building. T Figure 1 Vicinity Map zmh Newport Beach g 1'a5, ibti` 6� 20th 5k C �y -- 4 y 00 0 1p6 4 gh a1b. s LJ V 11A m y 3 h 1,sg� C 01006 wc�dt c«N=.wa, a a000 nC M D aio 2 'l r D A r Q n x r � z LEGEND: � , I `y V .ry win 22NDSTRE c% KIT- 70 �� t►' 1 G Figure 2 2300 NEWPORT BLVD. DECK LEVEL PLAN G A a i pop" Q1 =VISITOR PARKING - // RESERVED FOR RESIDENTS' GUESTS O2 = LOADING 20NES- DELIVERIES N NOT TO SCALE 3 TEE) 1r••.wbu•n enY�.• •k r+..+�n be ■! Aftn F R � � min f•ati °YY �� � � a Rn -� • s miw r -' .n�.�.• �y�t.r R„ �9 ..a91s� 'l r D A r Q n x r � z LEGEND: � , I `y V .ry win 22NDSTRE c% KIT- 70 �� t►' 1 G Figure 2 2300 NEWPORT BLVD. DECK LEVEL PLAN G A a i pop" Q1 =VISITOR PARKING - // RESERVED FOR RESIDENTS' GUESTS O2 = LOADING 20NES- DELIVERIES N NOT TO SCALE 3 TEE) 1r••.wbu•n enY�.• •k r+..+�n be E It _ IT _ J o °.�`� m KE Fi um 3 2900 NEWPORT BLVD. PAWNG GARAGE 1O = PARKING PAY STATION 4 ® = PARKING PAY STATION �9 =TANDEM PARKING STALLS - RESERVED FOR TENANT KEMPLOYEES pd ® = RESIDENTIAL GUEST PARKING NOT TO SCALE q TEMP"o macuwdv ®si6�eiawcwiw¢smo The number of parking stalls provided on site conforms to the city's Municipal Code (Chapter 20.66) and is summarized as follows: Site Access Four driveways provide access to the upper deck and garage parking areas. The site access is summarized on Table 1. None of the driveways will be gated. Parking Management A parking management company will be retained to manage parking in accordance with the Parking Management Plan. The primary directive of the parking company will be to ensure parking is available to the tenants and their guests even during times of high external demand for parking. This will be achieved in part by utilizing the technology of the two electronic pay stations and in adjusting parking rates to control demand. Technology Figure 3 shows the location of the two electronic pay stations within the structure. These two electronic pay stations which will be employed within the garage are the same technology used by the City of Huntington Beach and the City of Riverside to control beach and street parking respectively. Figure 4 shows an example of the electronic pay station to be installed in the parking garage. The electronic pay stations will accept credit cards or cash. These electronic pay stations are also capable of employing a variety of rate schedules based upon parking demand. Rate schedules can be changed on site or remotely by computer to reduce demand from outside parking. Working closely with the property manager to understand lease requirements and hours of business operations will allow the garage to operate as a closely managed, shared use location. For example, when 5 Reqired Provided Use Quantit Code # Garage Upper Total y Deck Retail 20417 1/250 82 69 14 83 SF SF Office 13880 1/250 56 57 57 SF SF Residents 27 DUs 2 /DU 54 54 54 Guests .5 /DU 14 16 10 26 Marine 19 Slips .8 /Slip 15 15 15 Stalls Accessible 6 7 7 Total 222 164 78 242 Site Access Four driveways provide access to the upper deck and garage parking areas. The site access is summarized on Table 1. None of the driveways will be gated. Parking Management A parking management company will be retained to manage parking in accordance with the Parking Management Plan. The primary directive of the parking company will be to ensure parking is available to the tenants and their guests even during times of high external demand for parking. This will be achieved in part by utilizing the technology of the two electronic pay stations and in adjusting parking rates to control demand. Technology Figure 3 shows the location of the two electronic pay stations within the structure. These two electronic pay stations which will be employed within the garage are the same technology used by the City of Huntington Beach and the City of Riverside to control beach and street parking respectively. Figure 4 shows an example of the electronic pay station to be installed in the parking garage. The electronic pay stations will accept credit cards or cash. These electronic pay stations are also capable of employing a variety of rate schedules based upon parking demand. Rate schedules can be changed on site or remotely by computer to reduce demand from outside parking. Working closely with the property manager to understand lease requirements and hours of business operations will allow the garage to operate as a closely managed, shared use location. For example, when 5 -o M> W 0 a 3 d z 0 O M N m C r2 E m Ei 3 'L U) O N CL d y a3i a 0 z F Q 0 w m Q:. a' I ' T 91' 1 z a n o t d M_ N N a � O z N C VYJ N N N N O C .0 .0 , C ,C .N C 0. a Q L n a A N O 16 'o w w w� C C X X W N M N N, N N C N N W N y U Y YUU A m N N N v Of O) O LL d :D W m O. y N C C y m O H y N U H U W � l0 3 N y u 16 `� E N `t U N U CF a) 4) �'y-'�ooN��V U 12 E E 01 N E .�. y 6 0 y '� N (EpL O-' U U 0: cm 0 A O.' Ol N N pEp ��pp O: U U > 0 > 0 C L C L � d E E 7 O o 41 O C M c N 5 c O cm 49 0 d 0 E w Q C m C U O n 0. m z z Q Q L Figure 4 Examples of Parking Pay Station commercial tenants are closed on evenings and weekends, a certain portion of this parking can be used as public parking during these times. The proposed technology will allow for rate structures to be tailored specifically for the times of surplus parking capacity. Utilizing surplus parking during available times can reduce parking demand on the surrounding area ultimately serving the public. Three strategies will be used to manage on -site parking. These are described as follows: Year -Round Residential - Residents will be required to park in their units' reserved spaces on the deck level. Residents will be issued a hanging annual permit to facilitate on -site parking management. Grace Period — There will be a minimum grace period of at least 30 minutes for all parking. Short visits are local, present less of a parking impact and will be monitored with random patrols throughout the day. Residential Visitors — Per the Project's approved plan, residential visitors will be provided 10 stalls on the deck and 16 stalls in the parking garage. The stalls for residential visitors will be marked as reserved and will require a separate parking permit to be displayed. The location of the reserved stalls on the deck is shown on Figure 2 and in the parking garage on Figure 3. Other Reserved Parking - Six parking stalls in the parking garage are in the tandem configuration. These stalls will be reserved for on -site office or retail tenant employees. Stalls in tandem shall be reserved to the same unit or leased space. The location of these reserved tandem parking stalls is shown on Figure 3. Tenants /Employees - Tenants and employees will be issued hanging monthly permits which will allow parking at any time in any unreserved stall in the parking garage. Marina Parking - Marina slip renters will be issued annual hanging permits. 15 stalls will be reserved in the parking garage for marina users. Uniformed Parking Attendants - Parking attendants will monitor the location a minimum of 4 times daily, at varying times of the day. Attendants' duties will monitoring occupancy of parking stalls, chalking tires while recording times of arrival, obtaining computer print outs of vehicles who have paid, looking for displayed permits and monitoring for parking compliance. Vehicles found to be out of parking compliance will be issued a notice of violation. These notices will be tracked on a ParkTrack system which records every violation. By tracking violations the parking management company is able to identify repeat violators and remove vehicles by towing at the owners expense. This computerized tracking system allows for an accurate record of the number of violations and circumstances and assists in accuracy and preventing mistakes. The property manager and parking manager will have the ability to void a violation issued because of human error, or a permit not being displayed, or for any other valid reason. The ParkTrack system has an established track record of reliability and is used by many municipalities in tracking parking citations. Times of Low External Demand Low external demand is defined as times outside of peak season when parking demand is primarily driven by on -site users. Typically, these are weekdays outside of the summer season which runs from Memorial Day through Labor Day. Occasionally, special events occur outside of the weekends or summer season which generates high external demand. During times of low external demand, market parking rates past the 30 minute grace period will be established. Payment for the stall number in which the vehicle is parked will register the vehicle as approved to park. Rate structures will encourage public parking during times when there is a surplus of available on -site parking. At no time will the project parking rates for off -site users be as low as parking rates at city maintained parking lots. During periods of low external demand, the attendants will patrol the location 4 times a day at a minimum. Times of High External Demand High external demand periods are defined as times within peak season or during events when there is a high demand for businesses, services or recreation outside of the project. During these times, to prevent outside parking demand from excluding tenants and guest of the property, rates will be increased to reduce external demand for parking at this location. To encourage use by on -site visitors, coupon codes will be issued by the tenants to distribute to their visitors. These codes can reflect a 0% -100% discount in parking rates acting as a type of validation. Clients will be issued the coupon code which can be valid for a specific time period (summer, weekend, specific evenings). Clear signage will instruct first time visitors how to obtain a coupon code from vendors. During periods of high external demand, the attendant's patrols will be more frequent in monitoring for activity and parking occupancy. A minimum of 8 checks per day will be done during these periods. During peak parking events with high internal and external 22 parking demands, it may be necessary to close the parking garage to public parking to achieve the primary purpose of ensuring use of the garage for the project occupants and their visitors. This can be accomplished by attending the location and close monitoring with a full time employee. Valet Parking The use of on -site valet parking is currently not anticipated. Should valet parking be considered in the future, the property management will pursue obtaining the requisite use permit in accordance with Section 20.66.100 of the Newport Beach Municipal Code. Deliveries Deliveries will be made at the two designated loading zones on the project's upper deck shown on Figure 2. 10 Page Intentionally Blank ATTACHMENT PC -3 Concept site plan