Loading...
HomeMy WebLinkAboutNorth Newport Center PC_500-600 Blk Newport Center Dr (PA2007-151CITY OF NEWPORT BEACH PLANNING COMMISSION STAFF REPORT November 15, 2007 Agenda Item 4 SUBJECT: North Newport Center Planned Community (PA2007 -151) 500 -600 Blk Newport Center Drive, 42000 Blk San Joaquin Plaza ■ Code Amendment No. CA2007 -007 ■ PC Development Plan Amendment No. PD2007 -003 ■ Development Agreement No. DA2007 -002 ■ Traffic Study No. TS2007 -001 APPLICANT: The Irvine Company CONTACT: Patrick J. Alford, Senior Planner (949) 644 -3235 palfordi(cDcitv.newport- beach.ca.us PROJECT SUMMARY The following discretionary approvals are requested or required in order to implement the project as proposed: Code Amendment No. CA2007 -007 to change the zoning classification of Block 600 from the Administrative Financial Professional (APF) District to the Planned Community (PC) District and the open space comer lots in Block 500 and Block 600 from the Open Space (OS) District to the Planned Community (PC) District. Planned Community Development Plan Amendment No. PD2007 -003 to adopt a new Planned Community Development Plan for Fashion Island, Block 600 and portions of San Joaquin Plaza and Block 500 and to remove these areas from the San Joaquin Plaza Planned Community Development Plan and the Block 500 Planned Community Development Plan. 3. Development Agreement No. DA2007 -002 to vest development rights and establish a public benefit contribution to the City. 4. Traffic Study No. TS2007 -001 to evaluate potential traffic impacts and circulation system improvements. 5. An Affordable Housing Implementation Plan specifying how the development will meet the City's affordable housing goal. 6. Transfer of Development Rights finding that the transfer is consistent with the intent of the General Plan and will not result in any adverse traffic impacts. FA • is North Newport Center PC November 15, 2007 Page 3 GENERAL PLAN ZONING A,I� 1 K# !•K • 9'r; . corky„ t„v f v ' *" (♦"r 'a LOCATION GENERAL PLAN ZONING CURRENT USE San Joaquin Plaza Planned Community (PC- Regional Commercial (CR); 19); Administrative, Regional shopping center; hotel ON-SITE Mixed Use Horizontal 3 Professional, Financial Business and professional (MU -1-13); Open Space (OS) (APF); Block 500 Planned offices Community (PC -46); Open Space OS Single Unit Residential Attached (RS -A); Single NORTH Unit Residential Big Canyon Planned Single -unit residential; multiple - Detached (RS -D); Community (PC -8) unit residential Multiple Unit Residential RM SOUTH Medical Commercial Administrative, Professional, Financial Business and professional Office (CO-M) offices Mixed Use Horizontal 3 Block 500 Planned EAST (MU -H3); Medical Community (PC -46); Business, medical and Commercial Office (CO- Block 400 Planned professional offices M) Communi PC -28 Administrative, Professional, Financial General Commercial (APF); Land Rover (CG); Public Facilities Planned Community (PC- Service station; automobile (PF); Private Institutional 20); Government, dealership; NBPD /Fire Station (PF); Regional Educational, and No. 3; museum; business and WEST Commercial Office (CO- Institutional Facilities professional office; hotel; R); Visitor Serving (GEIF); Block 500 multiple -unit residential Commercial (CV); Planned Community (PC- Multiple Unit Residential 46); Block 800 Planned (RM) Community (PC -23); Multiple Family Residential MFR North Newport Center PC November 15, 2007 Page 4 TRODUCTION Proiect Settin The proposed North Newport Center Planned Community is located in Newport Center /Fashion Island, a regional center of business and commerce that includes major retail, professional office, entertainment, recreation, and residential. The proposed Planned Community consists of Fashion Island, Block 600, and portions of San Joaquin Plaza and Block 500. Fashion Island (approximately 75 acres) is developed with a regional shopping center consisting of anchor department stores, retail stores, restaurants, and a cinema. Block 600 (approximately 25 acres) is developed with the 295 -room Island Hotel and high -rise business and professional office buildings and parking structures. The subject portion of Block 500 (approximately 15 acres) is developed with high -rise and low -rise business, professional and medical office buildings and surface parking. The subject portion of San Joaquin Plaza (approximately 23 acres) is developed with a complex of low -rise business and professional offices, a parking structure, and surface parking. The areas surrounding the proposed Planned Community are developed. To the north of San Joaquin Plaza, Block 600, and Block 500, and across San Joaquin Hills Road, land uses include residential and a golf course within the Big Canyon Planned Community (PC -8). To the south and west is low -rise and mid -rise business, medical and professional office development. To west of Fashion Island is the Granville residential community, the Newport Beach Marriott Hotel, and business and professional offices. To the west of San Joaquin Plaza is a mix of institutional and commercial uses and public facilities. Project Description The proposed North Newport Center Planned Community Development Plan (Exhibit 10) is a set of land use, development and administrative regulations for Fashion Island, Block 600 and portions of San Joaquin Plaza and Block 500 (identified by the shaded areas on the Vicinity Map). The PC Development Plan includes a set of Design Regulations, which expand upon the regulations of the Development Plan and are intended to insure that future development implement the Land Use Element policies for Newport Center. If adopted, the PC Development will replace the existing Planned Community Development Plan for Fashion Island (PC -35). The Planned Community Development Plans for San Joaquin Plaza (PC -19) and Block 500 (PC -46) will be amended to remove the North Newport Center properties (Exhibits 11 and 12, respectively). Districting Maps No. 48, No. 49, and No. 50 (Exhibits 13, 14, and 15, respectively) would be amended to reflect the zoning reclassification of Block 600 from the Administrative Financial Professional (APF) District to the Planned Community (PC) District and the "open space corner" lots in Block 500 and Block 600 from the Open WN North Newport Center PC November 15, 2007 Page 5 Space (OS) District to the Planned Community (PC) District. The "open space corner" lots would continue to be limited to landscaping and project identification signs. The project includes a transfer of development rights, which will allow development rights to be transferred through a change in location of use and /or a conversion of non- residential use to any other non - residential use allowed by the General Plan. The proposed transfer of development rights will require a finding by the City Council that the transfer is consistent with the intent of the General Plan and will not result in any adverse traffic impacts. The project includes a development agreement (Exhibit 16), which is required by General Plan policy LU 6.14.8 and Section 15.45.020 of the Newport Beach Municipal Code. The development agreement vests development rights and establishes a public benefit contribution to the City. The project includes an Affordable Housing Implementation Plan (Exhibit 17), which provides options for how future development will meet the City's affordable housing goal. Background On July 25, 2006, the City Council certified Environmental Impact Report (SCH No 2006011119) for the City of Newport Beach General Plan 2006 Update. The FEIR addresses the potential environmental impacts associated with the build -out of the City, inclusive of Fashion Island, Block 500, Block 600, and San Joaquin Plaza (North Newport Center). On November 7, 2006, the General Plan 2006 Update is approved by voters. On March 13, 2007, the City Council adopts Ordinance No. 2007 -6 requiring development agreements for certain development projects, including those with 50 or more dwelling units and new non - residential development in Newport Center. On July 24, 2007, the application for the proposed project was submitted to the Planning Department. On August 14, 2007, the City Council authorized a committee of Mayor Rosansky and Mayor Pro Tern Selich to negotiate the proposed development agreement with the Irvine Company. On October 30, 2007, a special joint Planning Commission /City Council meeting was held to receive a presentation by the Irvine Company on the proposed North Newport Center Planned Community. IJ North Newport Center PC November 15, 2007 Page 6 DISCUSSION Analysis Proposed PC Development Plan Land Use and Development Regulations Newly created provisions within the General Plan allow for the introduction of new residential opportunities, new retail square footage, hotel units and expanded office development into the Newport Center /Fashion Island area. The proposed PC Development Plan has defined these opportunities and are generally grouped as Fashion Island Sub -Area and Mixed -Use Sub - Areas. The PC Development Plan also defines development limits which are consistent with those established by the General Plan and are identified in the table below. Development Limits Land Use Fashion Block Block San Joaquin Total Island 500 600 Plaza Regional 1,619, 525 1,619,525 Commercial sgeete 0 0 0 square feet 1,700 1,700 seats seats (27,500 Movie Theatre (27,500 0 0 0 square square feet) feet) Hotel (A) (B) 425(8) (B) 490 Residential 0 (C) (C) (C) 430 285,142 1,001,634 337,261 1,746,979 Office /Commercial 0 square square square square feet feet feet feet A. Hotel rooms are permitted in Fashion Island through the transfer of development rights. B. 65 additional hotel rooms may be located in Block 500, Block 600 or San Joaquin Plaza. C. Residential units are permitted in Block 500, Block 600 and San Joaquin Plaza so long as the total number of units does not exceed 430 units. Fashion Island Sub -Area: Fashion Island is the primary retail hub within Newport Center and is developed with retail, dining and commercial entertainment uses. Permitted uses for Fashion Island include uses in support of the existing retail, dining and commercial entertainment uses. Fashion Island is intended to be a vibrant regional North Newport Center PC November 15, 2007 Page 7 retail and entertainment center and a day /evening destination with a wide variety of uses which will serve visitors, residents and employees of the area. The total gross floor area for Fashion Island is 1,619,525 plus the 1,700 -seat movie theater. The movie theater building area is equivalent to and may be converted to 27,500 square feet of retail development. The conversion of the movie theater to retail space shall not require any additional parking. No residential uses are permitted within the Fashion Island sub- area boundary. Mixed -Use Sub - Areas: The Mixed -Use blocks include Block 500, Block 600 and San Joaquin Plaza. The Mixed -Use blocks are generally comprised of administrative, professional, and financial office uses. Block 600 contains hotel and related ancillary uses as well. This Development Plan allows for the diversification of land uses in order to encourage new and original uses consistent with the Mixed -Use concept as established in the General Plan. Permitted uses for the Mixed -Use blocks include offices, light general commercial, hotel, residential and other mixed uses in accordance with the General Plan MU -H3 land use designation. Up to 430 residential units and 490 hotel rooms are permitted within the Mixed -Use blocks. Development rights may be transferred through a change in location of use(s) and /or a conversion of non - residential use to any other non - residential use allowed by the General Plan and this Planned Community Development Plan or applicable zoning at the receiving site(s). Residential use may be relocated, but may not be converted to or from another use. The transfer of development rights may occur only if the transfer will not result in any adverse traffic impacts and will not result in greater intensity than development allowed without the transfer. Site Development Standards The following typical site development standards shall apply to the North Newport Center Planned Community. Most of the standards were established under previously approved PC Development Plans and reflect existing development conditions. Height: Allowable heights are determined by sub -area. All building heights are measured at finished grade. Fashion Island: The maximum heights of structures within Fashion Island are depicted below. These standards were established: 0 North Newport Center PC November 15, 2007 Page 8 Fashion Island Height Limits Building Type I Height Major Buildings 125' Mall Buildings 75' Parking Structures 55' Periphery Buildings 40' Block 500: The maximum height of all structures in Block 500 shall be 375 feet as measured from finished grade. Block 600: The maximum height of all structures in Block 600 shall be 375 feet as measured from finished grade. San Joaquin Plaza: The maximum height of all structures in San Joaquin Plaza shall be 65 feet as measured from finished grade. Standards for Buildings Over 200 Feet in Height: Aviation Compatibility — Proposed development is required to comply with the Airport Environs Land Use Plan (AELUP) for the John Wayne Airport: Shade Standards - Proposed structures over 200 feet in height that has the potential to shade residential areas north of San Joaquin Hills Road, are required to provide a shade study that will demonstrate that the new development will not add shade to the designated residential areas. Setbacks: Setbacks for the four sub -areas are listed below. Fashion Island Newport Center Drive: 10 feet; may be reduced to 0 feet by the Planning Director through the plan review process. Block 500 Newport Center Drive: 15 feet Santa Rosa: 15 feet San Joaquin Hills: 15 feet San Nicolas: 15 feet Block 600 Newport Center Drive: 15 feet Santa Cruz: 15 feet San Simeon: 15 feet San Joaquin Hills: 15 feet Santa Rosa: 15 feet Center Drive (e /w):0 feet I Center Drive (n /s): 0 feet San Joaquin Plaza San Joaquin Hills: 15 feet Santa Cruz: 15 feet San Clemente: 15 feet Santa Barbara: 15 feet Parking: North Newport Center PC November 15, 2007 Page 9 Parking requirements for North Newport Center are shown below. These standards have been established under prior PC Development Plans and are not proposed to be changed through the proposed PC Development Plan. North Newport Center Parking Requirements Land Use Parking Requirement Regional Commercial 3 spaces per 1,000 square feet Movie Theater 3 spaces per 1,000 square feet Office 1 space per 375 square feet Medical Office 1 space per 250 square feet Hotel Municipal Code Residential 2 spaces per unit includes 1 covered; plus 0.5 spaces per unit up to 50 units, then 0.25 spaces per unit thereafter for guest parking Other Municipal Code On- Street Parking - On- street parking can be counted towards the parking requirement. Specific areas are outlined below: Sub -Area On- Street Parking Fashion Island Adjacent on- street parking on Newport Center Drive Block 500 Adjacent on- street parking on Newport Center Drive and San Nicolas Block 600 Adjacent on- street parking on Newport Center Drive Valet Parking - Valet parking and satellite parking with shuffle service has been and will continue to be a component of the parking strategy for Newport Center /Fashion Island. Parking Management Plan - Parking management plans have been encouraged to be used as a tool to address potential issues in the PC Development Plan. Parking management plans may address issues such as modified parking requirements based upon complimentary peak hour demand of uses, off peak shared parking between sub- areas, drop off and valet services on private property, and tandem parking. Signs: I North Newport Center PC November 15, 2007 Page 10 All permanent and temporary signs in North Newport Center that are visible from public rights -of -way and public property will be regulated by the proposed PC Development Plan. Sign criteria had been developed under the previously approved PC Development Plans. The proposed PC Development Plan has translated the previous sign criteria into a comprehensive easy to use reference. No substantive changes to have been proposed. Residential Compatibility: Permitted uses in North Newport Center include uses and events that have the potential to generate noise. Due to the day /evening use of Fashion Island in particular, noise generating activities, lighting, odors from restaurants, and similar occurrences are produced and take place during all hours of operation. Such uses and events are required to comply with the City's Municipal Code regulating these uses. Disclosures shall be made to prospective buyers/tenants of residential developments that there is an expectation for noise levels higher than in typical suburban residential areas as part of the Mixed -Use concept within North Newport Center. Additionally, the disclosure shall indicate that there is an expectation for lighting, odors and similar occurrences in a Mixed -Use setting as compared to suburban residential areas. Residential Open Space Requirements: Open space standards have been developed for new residential development projects. Each project shall provide a minimum of 5 percent common outdoor open space accessible to all residents; common indoor space of at least 500 square feet; and private open space for at least 50 percent of all the dwelling units proposed. Plan Review Process Included within the proposed PC Development Plan is a new development review process. Currently, there is no formalized design review of development within the underlying PC Development Plan areas nor do the PC Development Plans contain comprehensive design requirements. Historically, review of development proposals relied upon a staff determination of consistency with the PC's site development standards and zoning requirements. Design standards rest solely on the commitment of the developer to provide good design proposals. In instances where a use permit was required for a particular use, a discretionary application was reviewed however, the review primarily focused on the use and not design. The PC Development Plan includes a new "Plan Review' process for new structures within the North Newport Center Planned Community district. Prior to the issuance of a building permit, all development proposals shall be subject to a Plan Review by the Planning Director to determine compliance with the Planned Community Development Plan and North Newport Center Design Regulations. Each Plan Review submittal is required to contain sufficient details for a thorough review of the relationships between uses on the site and on adjacent sites consistent with the Development Plan and the Design Regulations. Specific submittal requirements are outlined in the PC North Newport Center PC November 15, 2007 Page 11 Development Plan. Signs, tenant improvements, carts, kiosks, temporary structures and uses are exempt from this process review. Submittals shall be reviewed by the Planning Director, and the Planning Director shall approve the project with the following findings: 1. The proposed use and /or development is consistent with the General Plan. 2. The proposed use and /or development is consistent with the North Newport Center PC Development Plan and Design Regulations. The Planning Director action is the final action unless appealed in accordance with the Municipal Code. Design Regulations The proposed Design Regulations are intended to expand upon the standards set forth in the Planned Community Development Plan. All new commercial and residential development is subject to the Design Regulations. Review for compliance of projects under this section shall occur through the plan review process, as defined in the Development Plan, prior to building permit issuance. To ameliorate these limitations, several policies were included in the General Plan that are intended to guide future development within Newport Center /Fashion Island. The primary goal of these design regulations is to guide future development and to create mixed -use land uses that integrate new commercial and residential uses seamlessly with existing commercial, office, entertainment, and residential uses that are supported by a more pedestrian friendly environment. The Design Regulations are to be used in conjunction with other applicable codes, documents, and ordinances to assess compliance of proposed projects with the Planned Community Development Plan and the General Plan. The design standards have been grouped in four separate categories: Building Location and Massing; Landscape; Circulation; and Orientation, Identity, and Safety. Each of the categories contain design objectives that will be used to guide and evaluate proposed development in the PC Development Plan area. The following is a narrative for each of the design categories. Building Location and Massing: The building massing and location standards are intended to ensure that new development has an appropriate scale, is related to its use and location, and is properly integrated with adjoining land uses and features. Specific policies have been developed for site planning elements, building envelope, building character and style, building materials and colors, and parking structures. Landscape: The landscape standards are intended to ensure that new commercial and residential development preserves and enhances the existing landscape character of North Newport Center. Policies include overall landscape themes, perimeter and street landscape, parking lot landscaping and internal landscaping. 1Z North Newport Center PC November 15, 2007 Page 12 Circulation: The proposed circulation criteria will be used to ensure that new commercial and residential development enhance existing circulation patterns by maintaining existing, upgrading existing and providing new street and walkway connections. Specific standards include streets and pedestrian activity, service and emergency and parking lots Orientation. Identity, and Safety: The design standards for orientation, identity, and safety are intended to ensure that new commercial and residential development promotes wayfinding for residents and visitors, strengthens North Newport Center's sense of place, and produces a safe environment. Standards include gateway and entrances, view corridors, landmarks, signage and lighting. General Plan Consistency The General Plan contains several policies that allow for the introduction of new residential opportunities, new retail square footage, hotel units and expanded office development into the Newport Center /Fashion Island District. These policies place an emphasis on "the improvement of the area's pedestrian character, by improving connectivity among the 'superblocks', installing streetscape amenities and concentrating buildings along Newport Center Drive and pedestrian walkways and public spaces ". The primary goal of these policies is to create a mixed -use district that integrates new commercial and residential uses seamlessly with existing commercial, office, entertainment, and residential uses that are supported by a more pedestrian friendly environment. This, in turn, will further the City's goal of providing opportunities for residents to reside near jobs, commerce, recreation and entertainment activities. The proposed PC Development Plan and Design Regulations are consistent with the policies outlined in the General Plan for future development in the Newport Center/ Fashion Island. Listed below are the specific policies from the Land Use Element for Newport Center and Fashion Island that the proposed PC Development Plan and Design Regulations are required to be consistent with. LU 6.14.4 Development Scale: Reinforce the original design concept for Newport Center by concentrating the greatest building mass and height in the northeasterly section along San Joaquin Hills Road, where the natural topography is highest and progressively scaling down building mass and height to follow the lower elevations toward the southwesterly edge along East Coast Highway. The proposed PC Development Plan and Design Regulations are consistent with this policy. Siting and building envelope standards in the Design Regulations will ensure that the massing and scale of new development will follow existing topography and elevations. 13 North Newport Center PC November 15, 2007 Page 13 LU 6.14.5 Urban Form: Encourage that some new development be located and designed to orient to the inner side of Newport Center Drive, establishing physical and visual continuity that diminishes the dominance of surface parking lots and encourages pedestrian activity. The proposed PC Development Plan and Design Regulations contain several standards that encourage a strong street presence for new buildings as well as maintain features that would enhance and reinforce the existing pedestrian experience. LU 6.14.6 Pedestrian Connectivity and Amenity: Encourage that pedestrian access and uses within the district be improved with additional walkways and sreetscape amenities concurrent with the development of expanded and new uses. The proposed PC Development Plan and Design Regulations contain standards that preserve existing pedestrian links (crescent walk) and develop an internal pedestrian network of walks and paseos that link to existing and new development. LU 6.14.7 Fashion Island Architecture and Streetscape: Encourage that new development in Fashion Island complement and be of equivalent or higher design quality than existing buildings. Reinforce the existing promenades by encouraging retail expansion that enhances the storefront visibility to the promenades and provides an enjoyable retail and pedestrian experience. Additionally, new buildings shall be located on axes connecting Newport Center Drive with existing building to provide visual and physical connectivity with adjoining uses, where practical. The PC Development Plan and Design Regulations are consistent with this policy. Standards within the Design Regulations require that new development be of equivalent or higher standard than existing buildings. Specifically, the building character and style, circulation and orientation and identity sections of the Design Regulations contain standards that meet this land use policy. Transfer of Development Rights The General Plan allows a transfer of development rights within Newport Center in accordance with the following Land Use Element policy: LU 6.14.3 Transfers of Development Rights Development rights may be transferred within Newport Center, subject to the approval of the City with the finding that the transfer is consistent with the General Plan and that the transfer will not result in any adverse traffic impacts. The Irvine Company is proposing to transfer a portion of the existing development rights from Block 600 to Block 500. The transfer includes the conversion of 195 unbuilt hotel rooms to office space, and the transfer of this entitlement to Block 500. It also includes the removal of the following existing uses from Block 600, and transfer of this iy North Newport Center PC November 15, 2007 Page 14 entitlement to Block 500: 17,300 square feet of health club, 16,444 square feet of restaurant, and 8,289 square feet of office. Up to 72,000 square feet of the transferred development rights could be used for a new City Hall in Block 500. The City retained Austin -Foust Associates, Inc. to analyze the traffic impacts of the proposed transfer; their report, Newport Center Trip Transfer Traffic Study, is included in the environmental Addendum. The traffic analysis is based on PM peak hour trip generation, since this is the time of day when Newport Beach's circulation system experiences the most congestion. A total of 339 PM peak hour trips are projected to be generated from the existing and entitled uses proposed to be eliminated from Block 600. Allowing for 72,000 square feet in a new City Hall, (with a higher trip generation rate than for general office use), 205,161 square feet of office entitlement could be transferred to Block 600 and maintain the same overall trip generation for North Newport Center (338 trips). To ensure that the transfer of development rights does not result in more density than allowed by the General Plan, staff also conducted an intensity analysis, shown below. Unbuilt Entitlement: 30 hotel rooms from original Four Seasons entitlement 100 room hotel expansion (GPA 97 -3 -D) 65 hotel rooms from 2006 General Plan Subtotal Development to be Removed. Family Fitness Palm Gardens Miscellaneous office Subtotal TOTAL AVAILABLE FOR TRANSFER Deduction for City Hall Available for office development in Block 500 30,000 sq. ft. 142,500 sq. ft. 92,625 so. ft. 265,125 sq. ft. 17,300 sq. ft. 16,447 sq. ft. 8,829 so. ft. 42,036 sq. ft. 307,161 sq. ft. 72,000 so. ft. 235,161 sq. ft. To comply with both the General Plan intensity limits and the policy that a transfer of development rights may not result in adverse traffic impacts, only the lower entitlement number resulting from the two analyses may be transferred. Therefore, 205,161 square feet may be transferred to Block 500 for office development, and a City Hall of 72,000 square feet may be developed in Block 500. /g North Newport Center PC November 15, 2007 Page 15 Development Agreement The North Newport Center project is required to be the subject of a development agreement by General Plan policy LU 6.14.8, which reads, LU 6.14.8 Development Agreements Require the execution of Development Agreements for residential and mixed -use development projects that use the residential 450 units identified in Table LU2 (Anomaly Locations). Development Agreements shall define the improvements and benefits to be contributed by the developer in exchange for the City's commitment for the number, density, and location of the housing units. Municipal Code section 15.45.020 also requires a development agreement for this project because it is required by the General Plan, requires a Zoning Code amendment, and includes the development of more than 50 residential units as well as new non- residential development in Newport Center. The City Council appointed a committee (Mayor Rosansky and Mayor Pro Tern Selich) to negotiate the North Newport Center Development Agreement with The Irvine Company. A draft of the Agreement (formally titled "Zoning Implementation and Public Benefit Agreement') they are recommending is attached (Exhibit 16). Major provisions of the Agreement are outlined below, with reference to the relevant section of the Agreement. 1. Cancellation of Circulation Improvement and Open Space Agreement and Bonita Canyon Annexation and Development Agreement (Section 2) 2. Vesting of rights to develop 75,000 sq. ft. of retail space, 205,161 square feet of office space (through the transfer of development rights) and 430 residential uses in North Newport Center for 20 years (Sections 6.2, 11) 3. Payment of in -lieu park fees for 430 residential units, including early payment of a portion of fees ($5,600,000) as a matching grant for OASIS Senior Center (Section 4.1) 4. Payment of public benefit fee ($27,090,000) to fund construction of new City Hall building at any location, or other municipal purpose (Section 4.2) 5. Construction of third eastbound turn lane at MacArthur Boulevard and San Joaquin Hills Road (Section 7.3) 6. Circulation enhancements in the North Newport Center area, including widening of Avocado Avenue between San Miguel Drive and San Joaquin Hills Road, and enhancement of San Miguel Drive between Avocado Avenue and MacArthur Boulevard (including dedication of right -of -way) (Sections 4.4, 4.5) /I North Newport Center PC November 15, 2007 Page 16 7. Dedication of the site north of San Miguel Drive, west of MacArthur Boulevard, south of San Joaquin Hills Road and east of Avocado Avenue for open space, if a new City Hall is constructed on a site in Newport Center other than Block 500 (Section 4.6) 8. Four -year option for the City to purchase a site in Block 500 for City Hall as well as the use of 300 to 375 parking spaces in a new parking structure (Section 4.8) 9. Limit on future increases in development fees (Section 5.2) 10.1-imit on future amendments to Municipal Code pertaining to development of the North Newport Center property (Section 8.2) The City Council committee and staff believe that the proposed development agreement satisfies the requirements of the General Plan policy for Newport Center development agreements. It species circulation improvements for which The Irvine Company will be responsible, as well as benefits to be contributed in the areas of park fees, City Hall site and funding, and dedication of street right -of -way and open space. The agreement also vests The Irvine Company's right to build 430 residential units in Blocks 500 or 600 or San Joaquin Plaza. Municipal Code Section 15.45.040 describes the required contents of all development agreements. The North Newport Center Development Agreement specifies the term, and the permitted uses, density and intensity of development, as described in the list above. Through the Planned Community Development Plan being considered concurrently and included as an exhibit to the Agreement, maximum height and size of proposed buildings are addressed. Article 4 of the Agreement describes the required dedications of land to the City, as well as other public benefits. These provisions include all of the required elements of a development agreement. Municipal Code Section 15.45.050 provides that the Planning Commission shall hold a public hearing on a development agreement, but does not provide guidance regarding the Commission's review or recommendation responsibility. Staff recommends that the Commission consider whether the proposed Agreement meets the requirements of the General Plan and the Municipal Code, and whether the public benefits, taken as a whole, are appropriate benefits to support the development rights vested by the Agreement and the term of the Agreement. The details of the public benefits are more appropriate subjects for consideration by the City Council. Traffic Phasing Ordinance Municipal Code Chapter 15.40 (Traffic Phasing Ordinance, or TPO) requires that a traffic study be prepared and findings be made before building permits may be approved for certain projects. The North Newport Center project is early in the development process, and building permits for individual projects will not be requested for some time. Therefore, the project is not required to comply with the TPO at this time. However, the applicant has elected to comply with TPO requirements early, r'7 North Newport Center PC November 15, 2007 Page 17 following the provisions of Section 15.40.030.6.2 for a "Comprehensive Phased Land Use Development and Circulation System Improvement." These provisions apply to a project that is not expected to be complete within 60 months of approval, and include different findings than for a shorter term project. All of the findings in Section 15.40.030.B.2, discussed below, are required for project approval. a. The project must be subject to a development agreement that requires circulation improvements early in the development phasing program. The City and The Irvine Company are parties to an existing development agreement known as the Circulation Improvement and Open Space Agreement ( CIOSA). Through this agreement, The Irvine Company made early payment of fair share fees and provided or facilitated financing so the City could complete circulation improvements earlier than it otherwise could have. While the Company made full payment of fair share fees, it developed only 88% of the residential units that CIOSA allowed, and not all of the commercial development that was allowed. During the 2006 General Plan update, entitlement for the remaining units and commercial floor area was removed from the CIOSA properties. The 2006 General Plan also added residential entitlement to Newport Center, which the Company proposes to implement in the North Newport Center project. The circulation improvements already completed pursuant to CIOSA could be considered improvements early in the development phasing program of the North Newport Center project. CIOSA circulation projects that benefit Newport Center are the following. 1. Frontage improvements along Jamboree Road at access to the Newporter North property. A traffic signal at the intersection of Santa Cruz Drive and San Clemente Drive in Newport Center Block 800 2. Construction of half- section of MacArthur Boulevard to ultimate width along frontage of the Freeway Reservation property 3. Construction of half - section of MacArthur Boulevard to ultimate width along frontage of The Irvine Company's property at Newport Village 4. Construction of half- section of MacArthur Boulevard to ultimate width along frontage of Big Canyon Area 16 5. Widening of MacArthur Boulevard between Ford Road and the San Joaquin Hills Transportation Corridor to provide for a minimum of six travel lanes and a minimum of three northbound travel lanes 6. Dedication of right of way along the west side of MacArthur Boulevard between Pacific Coast Highway and San Joaquin Hills Road The proposed Development Agreement specifies that construction of the third eastbound turn lane at the intersection of MacArthur Boulevard and San Joaquin Hills Road will be completed prior to issuance of a certificate of occupancy for the /8 North Newport Center PC November 15, 2007 Page 18 first building constructed under the Agreement, but in no event later than 60 months after the operative date of the Agreement. In addition, the applicant will dedicate right -cf -way for widening of San Miguel Drive between Avocado Avenue and MacArthur Boulevard when the City completes a design for this improvement. This could occur early in the development phasing. b. The traffic study must demonstrate that the portion of the project expected to be completed within 60 months of approval -- or the project, with circulation improvements by the proponent -- will not cause nor make worse an unsatisfactory level of service at any impacted primary intersection. The City retained Austin -Foust Associates, Inc. to prepare a traffic study as required by the TPO, and it is included in the environmental Addendum. The study used the worst case assumption that all development in the project would be completed within 60 months, specifically by 2009. Impacts were identified at three intersections. The PM peak hour level of service (LOS) at MacArthur Boulevard and San Joaquin Hills Road would change from D, which is satisfactory, to E, which is unsatisfactory. The AM peak hour LOS at Goldenrod Avenue and Coast Highway also would change from D to E. Marguerite Avenue and Coast Highway would experience LOS E during both AM and PM peak hours without the project; the project would make this unsatisfactory LOS worse. Because the Development Agreement includes an improvement (third eastbound turn lane) that will eliminate the impact at MacArthur Boulevard and San Joaquin Hills Road, the finding can be made with regard to one of the three impacted intersections. c. The Land Use and Circulation Elements of the General Plan are not made inconsistent by the impact of project trips (including circulation improvements) when added to development anticipated based on the General Plan and Zoning Ordinance. The development included in the North Newport Center project is consistent with the 2006 General Plan; in fact, the Planned Community Development Plan is the first zoning document prepared to implement the General Plan. The Zoning Ordinance currently in effect may allow more development, and therefore result in more trips than the General Plan. However, City Council Resolution No. 2007- 3 establishes an interim development review process until the Zoning Code is rewritten to be consistent with the General Plan. This Resolution provides that no land use, or density or intensity of use, may be permitted unless it is consistent with both the General Plan and the Zoning Code. Implementation of this Resolution will prevent the project from resulting in inconsistency between the General Plan elements. The circulation improvement noted in the previous finding is included in the Circulation Element. Finally, the Circulation Element, unlike the TPO, establishes LOS E as satisfactory for the two impacted intersections for which no improvement is included in the project. North Newport Center PC November 15, 2007 Page 19 d. The project is required, during the 60 months immediately after approval, to construct circulation improvements such that: 1. Project trips will not cause nor make worse an unsatisfactory level of service at any impacted intersection for which there is a feasible improvement. The improvement to MacArthur Boulevard and San Joaquin Hills Road will be completed within 60 months of project approval and will eliminate the project's impact at this intersection. In approving the General Plan, the City Council found that there are not feasible improvements for the other two impacted intersections, and the adopted Circulation Element establishes LOS E as the standard for these intersections. 2. The benefits from the circulation improvements by the project proponent outweigh the adverse impact of project trips at any impacted primary intersection for which there are no feasible improvements. The project causes the intersection of MacArthur Boulevard and San Joaquin Hills Road to change from LOS D to E; however, the increase in the PM peak hour intersection capacity utilization (ICU) is only .027. The applicant's agreement to construct the improvement is therefore beyond what would be required to mitigate the impact of this project alone. This, in addition to the earlier CIOSA improvements discussed in finding "a" above, could be considered to outweigh the adverse impact of project trips at the two Coast Highway intersections, for which there are no feasible improvements. Staffs analysis shows that findings "a," "c" and "d" can be made, but finding V cannot be fully made because the two Coast Highway intersections will experience unsatisfactory levels of service and there are no feasible improvements. When the TPO findings cannot be made, the ordinance allows the Planning Commission or City Council to find that the project will result in benefits that outweigh the project's anticipated negative impact on the circulation system. This finding requires a 517 vote of the members eligible to vote. As outlined in the discussion of the Development Agreement, the North Newport Center project would result in public benefits including early payment of park fees, availability of a site for City Hall, funding for the construction of City Hall at any location the City chooses, and circulation improvements at locations in the vicinity of the project other than "impacted primary intersections." These benefits could be considered to outweigh the traffic impacts at two intersections for which there are no feasible improvements and which meet the General Plan LOS standard, even with full project implementation. It should be noted that the project analyzed in the traffic study is slightly different from the project being considered in the other actions for this item. The traffic study assumes that the 430 residential units will be developed in Block 600, and it does not include 2L) North Newport Center PC November 15, 2007 Page 20 development of a 72,000 square foot City Hall. If The Irvine Company decides to develop housing units in Block 500 and /or San Joaquin Plaza, another traffic study may be required to comply with the TPO. Likewise, development of City Hall, or 72,000 square feet of other office space if the City decides to build on a site other than Block 500, will be subject to requirements of the TPO. Affordable Housing Implementation Plan The Housing Element Program 2.2.1 requires that an Affordable Housing Implementation Plan (AHIP) be prepared for projects with more than 50 residential units. The proposed AHIP for the North Newport Center project (Exhibit 17) provides that the developer will meet the City's goal that an average of 15% of new units be affordable to lower income households. The exact method of providing affordable units has not been specified, but two options are included. The Irvine Company owns the former Child Time site on San Miguel Drive, which is now vacant. The General Plan allows ten residential units on the site. If the State mandated density bonus of 35% for a fully affordable development is applied, the site can accommodate 14 units. These units would be maintained as affordable for a minimum of 30 years. Whether or not The Irvine Company elects to build on the Child Time site, they will record covenants on existing apartments along San Joaquin Hills Road (The Bays) to maintain them as affordable units for 30 years. The number of affordable units provided in The Bays will depend on whether the Child Time site is used, and on the income level served by the affordable units. Fewer units are required at lower income levels, because the subsidy required for these units is higher. For the 430 units included in the North Newport Center project, 65 units (15 %) affordable to low- income households are required. The number of very low- income units required is 43 (10 %), and the moderate - income requirement is 86 units (20 %). The AHIP indicates that the affordable units will be provided incrementally, with one- third of the requirement provided with each 100 market rate units. This schedule will result in meeting the entire affordable requirement before all of the market rate units are built. Under both options, the affordable housing would be provided off site from the project. Staff finds this to be an acceptable solution for this project. Both off -site locations are close enough to North Newport Center that they can provide housing for employees, with The Bays being in walking distance of the project site. The proposed AHIP satisfies the requirements of the Housing Element. Environmental Review An Addendum to the Final Environmental Impact Report (SCH No 2006011119) certified on July 25, 2006 was prepared in accordance with the provisions of the California Environmental Quality Act (CEQA), Public Resources Code § §21000, et seq., and the State CEQA Guidelines, California Code of Regulations § §15000, et seq. The ZI North Newport Center PC November 15, 2007 • Page 21 purpose of the Addendum is to analyze the potential differences between the impacts evaluated in the General Plan EIR and those that would be associated with the proposed project. The potential impacts associated with these proposed changes would either be the same or less than the anticipated levels ascribed in the certified General Plan EIR. In addition, there are no substantial changes to the circumstances under which future development projects subject to the 2006 General Plan and PC Development Plan would be undertaken. Public Notice Notice of this hearing was published in the Daily Pilot, mailed to property owners within 300 feet of the property and posted at the site a minimum of 10 days in advance of this hearing consistent with the Municipal Code. Additionally, the item appeared upon the agenda for this meeting, which was posted at City Hall and on the city website. Submitted by: v Sharon Z. Wood, As ant City Manager • EXHIBITS (in the order they are referenced within the report) 1. Draft resolution recommending approval of the Addendum 2. Addendum to FEIR for the City of Newport Beach General Plan 2006 Update (under separate cover) 3. Draft resolution recommending approval of CA2007 -007 and PD2007 -003 4. Draft resolution recommending of Development Agreement DA2007 -002 5. Draft resolution recommending approval of Traffic Study TS2007 -001 6. Draft resolution recommending approval of the Affordable Housing Implementation Plan 7. Draft resolution recommending approval of an amendment to the San Joaquin Plaza PC Text 8. Draft resolution recommending approval of an amendment to the Block 500 PC Text 9. Draft resolution recommending approval of the Transfer of Development Rights 10. North Newport Center Planned Community Development Plan (under separate cover) 11. Amended San Joaquin Plaza Planned Community Development Plan 12. Amended Block 500 Planned Community Development Plan 13. Amended Districting Map No. 48 14. Amended Districting Map No. 49 15. Amended Districting Map No. 50 16. Development Agreement 17. Affordable Housing Implementation Plan RIUSERSIPLMShareMPA'sIPAs - 20071PA20 0 7- 1 51120 0 7.11.15 PC Staff Report.doc • 2z 11 The draft resolutions (Exhibit 1 and 3 -9) will be • delivered next week. 0 ADDENDUM TO THE CITY OF NEWPORT BEACH GENERAL PLAN 2006 UPDATE FINAL PROGRAM ENVIRONMENTAL IMPACT REPORT Prepared by: City of Newport Beach Community Development Department 3300 Newport Boulevard Newport Beach, California 92658 -8915 November 2007 Addendum to City of Newport Beach General Plan 2006 Update On TABLE OF CONTENTS 0 Section Page Section1.0 Introduction ........................................................................... ............................1 -1 1.1 Purpose of Addendum ........................................... ............................... 1 -1 1.2 Previous Environmental Documentation and discretionary actions....... 1 -2 Section 2.0 Project Description ............................................................ ............................... 2-1 2.1 Project Location .................................................... ............................... 2 -1 2.2 Project Characteristics .......................................... ............................... 2-1 2.2.1 North Newport Center PC Text .................. ............................... 2 -1 2.2.2 Transfer of Development Rights ................ ............................... 2 -3 2.2.3 Phased Land Use Development and Circulation Improvement Plan (TPO Approval) .................................. ............................... 2-3 2.2.4 Affordable Housing Implementation Plan (AH/P) ...................... 2 -4 2.2.5 Development Agreement .............................. ............................2 -4 2.2.6 Discretionary Actions .................................... ............................2 -4 Section 3.0 Environmental Analysis ..................................................... ............................... 3-1 3.1 Aesthetics ............................................................. ............................... 3-1 3.2 Agricultural Resources .......................................... ............................... 3-4 3.3 Air Quality ............................................................. ............................... 3 -4 3.4 Biological Resources ............................................. ............................... 3-8 3.5 Cultural Resources ................................................... ...........................3 -10 3.6 Geology, Soils, and Mineral Resources .................... ...........................3 -12 3.7 Hazards and Hazardous Materials ................................... ' ................... 3 -14 3.8 Hydrology and Water Quality ..... ............................... ...........................3 -17 3.9 Land Use and Planning ............................................ ...........................3 -20 3.10 Noise ........................................................................ ...........................3 -24 3.11 Population and Housing ........................................... ...........................3 -26 3.12 Public Services ......................................................... ...........................3 -28 3.13 Recreation and Open Space .................................... ...........................3 -31 3.14 Transportation/Traffic ............................................... ...........................3 -33 3.15 Utilities and Service Systems ................................... ...........................3 -45 R.•P101WS NewDOn'JO 1 r Dan A dentlom-110907 doc I Addendum to City of Newport Beach General Plan 2006 Update EIR TABLES Table Pan 1 Development Area Summary ....................................................... ............................... 2-3 2 Trip Generation Summary ............................................................... ...........................3 -35 3 One Percent Analysis ...................................................................... ...........................3 -36 4 ICU Summary ................................................... ............................... ...........................3 -40 5 Converted Uses ............................................... ............................... ...........................3 -42 EXHIBITS Exhibit Follows Page 1 Local Vicinity Map ........................................................................ ............................... 2 -2 2 Fashion Island, Block 500, Block 600, San Joaquin Boundaries ... ............................... 2 -2 3 Existing and Proposed Zoning Designations ................................ ............................... 2 -2 0 • R Praj c a Newport J011 Draft Adtlendum- 11090] dm it Table of Contents 0 E 11 Addendum to 0tv of Newport Beach General Plan 2006 Update SECTION 1.0 INTRODUCTION 1.1 PURPOSE OF ADDENDUM This document, prepared pursuant to the California Environmental Quality Act (CEQA), constitutes an Addendum to the City of Newport Beach General Plan 2006 Update Program Final Environmental Impact Report (EIR) Screencheck No. 2006011119 certified on July 25, 2006. This Addendum was prepared in accordance with the provisions of the California Environmental Quality Act (CEQA), Public Resources Code § §21000, et seq., and the State CEQA Guidelines, California Code of Regulations § §15000, et seq. CEQA Guidelines §15164(a) states that "the lead agency or a responsible agency shall prepare an addendum to a previously certified EIR if some changes or additions are necessary but none of the conditions described in Section 15162 calling for preparation of a subsequent EIR have occurred." Pursuant to CEQA Guidelines §15162(a), a subsequent Environmental Impact Report (EIR) or Negative Declaration is only required when: (1) Substantial changes are proposed in the project which will require major revisions of the previous EIR or negative declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; (2) Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR or Negative Declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or (3) New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete or the Negative Declaration was adopted, shows any of the following: (A) The project will have one or more significant effects not discussed in the previous EIR or negative declaration; (B) Significant effects previously examined will be substantially more severe than shown in the previous EIR; (C) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or (D) Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative. R Plojeas Newpon'401 I DlaR Addendum 11090].dp 16 Introduction Addendum to City of Newport Beach General Plan 2006 Update EIR The proposed North Newport Center Project includes the following City actions to implement the 2006 General Plan: 1. Approval of a zoning amendment to adopt the North Newport Center Planned Community Development Plan (herein referred to as the North Newport Center PC Text), including the reclassification of property to the Planned Community (PC) District and amendment to two existing Planned Community Development Plans; Approval of a transfer of development rights, pursuant to General Plan policy, to convert unbuilt hotel entitlement to office entitlement and to relocate this entitlement and existing office and commercial development from Block 600 to Block 500; 3. Approval of a traffic study of the North Newport Center Phased Land Use Development and Circulation System Improvement Plan pursuant to the Traffic Phasing Ordinance (herein referred to as the TPO approval); 4. Approval of an Affordable Housing Implementation Plan (herein referred to as the AHIP) pursuant to the 2006 General Plan Housing Element; and 5. Approval of a Zoning Implementation and Public Benefit Agreement between the City of Newport Beach and The Irvine Company Concerning North Newport Center (herein referred to as the Development Agreement) pursuant to Newport Beach Municipal Code Section 15.45, Development Agreements The purpose of this Addendum is to analyze the potential differences between the impacts evaluated in the City of Newport Beach General Plan 2006 Update Final EIR, hereafter referred to as the General Plan EIR, and those that would be associated with the North Newport Center Project. As described in detail herein, there are no new significant impacts resulting from these changes nor is there any substantial increase in the severity of any previously identified environmental impacts. The potential impacts associated with these proposed changes would either be the same or less than the anticipated levels ascribed in the certified General Plan EIR. In addition, there are no substantial changes to the circumstances under which future development projects subject to the 2006 General Plan and PC Text would be undertaken. Therefore, in accordance with CEQA Guidelines §15164, this Addendum to the certified General Plan Final EIR is the appropriate environmental documentation for the North Newport Center PC Text. Pursuant to §15367 of the State CEQA Guidelines, the City of Newport Beach (City) is the lead agency for the project. The lead agency is the public agency that has the principal responsibility for carrying out or approving a project that may have a significant effect upon the environment. Newport Beach has the authority for project approval and certification of the accompanying environmental documentation. In taking action on any of the approvals outlined in Section 2.0, Project Description, the City, as the lead agency and decision making body, must consider the whole of the data presented in the General Plan EIR and this Addendum to the General Plan EIR. 1.2 PREVIOUS ENVIRONMENTAL DOCUMENTATION AND DISCRETIONARY ACTIONS The General Plan EIR was certified by the Newport Beach City Council on July 25, 2006, as adequately addressing the potential environmental impacts associated with the buildout of the City of Newport Beach, inclusive of Fashion Island, Block 500, Block 500, and San Joaquin Plaza (North Newport Center). The location of North Newport Center, approvals granted, and actions being addressed as part of this Addendum to the General Plan EIR are further addressed in Section 2.0, Project Description. The adopted 2006 General Plan placed the R P,aeds Ne onVOYLO,ah Addendum- noeoido t -p Addendum to City of Newport Beach General Plan 2008 Update On following designations on the four sub -areas included in the Project and analyzed full implementation of entitlements for Fashion Island, Block 500, Block 600, and San Joaquin Plaza. Fashion Island Regional Commercial (CR) Block 500 Mixed Use Horizontal 3 (MU -H3) and Open Space (OS) Block 600 Mixed Use Horizontal 3 (MU -H3) and Open Space (OS) San Joaquin Plaza Mixed Use Horizontal 3 (MU -H3) and Open Space (OS) When a project is large and complex, such as a General Plan update, and will be implemented over a multi -year period, a Program EIR enables the lead agency to approve the overall program. When individual activities within the program are proposed, the agency is then required to examine the individual activities to determine if their effects were fully analyzed in the Program EIR. Consistent with CEQA Guidelines §15162, the lead agency can approve the activities as being within the scope of the project covered by the Program EIR. The State CEQA Guidelines §15168(a) defines a Program EIR as: ...an EIR which may be prepared on a series of actions that can be characterized as one large project and are related either: (1) Geographically, (2) A logical parts in the chain of contemplated actions, (3) In connection with issuance of rules, regulations, plans, or other general criteria to govern the conduct of a continuing program, or (4) As individual activities carried out under the same authorizing statutory or regulatory authority and having generally similar environmental effects which can be mitigated in similar ways. The State CEQA Guidelines §15168(c)(2) states: (2) If the agency finds that pursuant to Section 15162, no new effects could occur or no new mitigation measures would be required, the agency can approve the activity as being within the scope of the project covered by the program EIR, and no new environmental document would be required. As previously noted, CEQA Guidelines §15162(a) states that a subsequent EIR is not necessary in the absence of the following: (1) substantial changes to the project, (2) substantial changes to the project circumstances, or (3) new information of substantial importance. Use of a Program EIR for the update of the General Plan afforded the City many advantages that would not be realized if projects had been evaluated on an action -by- action basis. These advantages are outlined in CEQA Guidelines §15168(b), which states: `The Program EIR can: (1) Provide an occasion for a more exhaustive consideration of effects and alternatives than would be practical in an EIR on an individual action, (2) Ensure consideration of cumulative impacts that might be slighted in a case - by -case analysis, (3) Avoid duplicative reconsideration of basic policy considerations, R Proleas New oTJ011 Aral [Addendum- 11OW7.doc 1 -3 Addendum to City of Newport Beach General Plan 2006 Update EIR (4) Allow the Lead Agency to consider broad policy alternatives and program - wide mitigation measures at an early time when the agency has greater flexibility to deal with basic problems or cumulative impacts, and (5) Allow reduction in paperwork." Page 1 -1 of the General Plan EIR states: 'This EIR has been prepared as a Program EIR pursuant to Section 15168 of the CEQA Guidelines... This EIR will review the existing conditions of the City of Newport Beach and the Planning Area, analyze potential environmental impacts from implementation of the proposed General Plan Update, identify policies from the proposed General Plan Update that serve to reduce and minimize impacts, and identify additional mitigation measures, if necessary, to reduce potentially significant impacts of the General Plan Update." Page 1 -4 of the General Plan EIR states: 'This EIR has been prepared to analyze potentially significant environmental impacts associated with future development resulting from implementation of the proposed General Plan Update, and also addresses appropriate and feasible mitigation measures or project alternatives that would minimize or eliminate these impacts." Page 1 -5 states: 'The proposed General Plan Update will serve as a comprehensive document that will guide future potential growth and development within the City ... The EIR will analyze all aspects of the proposed General Plan Update to determine whether any aspect of the project, either individually or cumulatively, may cause a significant effect on the environment with regards to the environmental issues [identified in the EIR]." As such, the General Plan Final EIR assessed potential impacts associated with the implementation of land uses set forth in the General Plan, including land use changes due to full implementation of entitlements for Fashion Island, Block 500, Block 600, and San Joaquin Plaza under the General Plan Update. Page 3-15 of the General Plan EIR states: 'The Plan allows for expanded retail opportunities at Fashion Island, including an additional anchor department store and ancillary shops, another hotel or additions to existing hotels, and 600 additional housing units." The Draft EIR for the City of Newport Beach General Plan Update analyzed 600 housing units in Newport Center, which includes Fashion Island, Block 500, Block 600, and San Joaquin Plaza. Through Planning Commission and City Council hearings the 600 housing units were reduced to a maximum of 450 units. This reduction is reflected in Volume 1A -Final Environmental Impact Report (Draft EIR Changes and Responses to Comments). The 2006 General Plan also documented the approval of these 450 residential units for Newport Center a Of the 450 units permitted in Newport Center by the adopted 2006 General Plan, 430 units are incorporated into this proposed PC Text Amendment. Previous Discretionary Actions The following City of Newport Beach Ordinances and Resolutions related to development of the four sub -areas are listed below and incorporated herein by reference and made a part hereof: Fashion Island Planned Community Development Plan (adopted November 23, 1987) Amendment No. 632, Ordinance No. 87 -45, November 23, 1987 Amendment No. 699; Resolution No. 90 -7, February 12, 1990 Amendment No. 701, Resolution No. 91 -22, March 11, 1991 Amendment No. 811, Resolution No. 94 -102, November 14, 1994 i a City of Newport Beach, General Plan, July 25, 2006, Table LU -2, pages 3 -18 to 3.20. R ProJW5%Newpon'J011,DraR Addendum. 110907 doc 1 -4 introduction 11 0 �1 U Addendum to City of Newport Beach General Plan 2006 Update EIR Amendment No. 825, Resolution No. 95 -115, October 9, 1995 Amendment No. 889, Ordinance No. 99 -27, November 8, 1999 PD 2002 -002, Ordinance No. 2003 -001, January 28, 2003 Block 500 Amendment No. 827, Ordinance No. 95 -32, August 28, 1995 San Joaquin Plaza Ordinance No. 1649, adopted by the City of Newport Beach on December 22, 1975 (Amendment No. 455) Amendment No. 1: March 12, 1979, P.C. Amendment No. 527; Resolution No. 9517 Amendment No. 2: November 23, 1987, P.C. Amendment No. 653; Resolution No. 87 -164 Amendment No. 3: January 13, 1992, P.C. Amendment No. 729; Resolution No. 92 -5 Amendment No. 4: April 27, 1992, P.C. Amendment No. 755; Resolution No. 92 -33 Amendment No. 5: October 9, 1995, P.C. Amendment No. 825, Resolution No. 95 -115 Amendment No. 6: March 22, 2005, Code Amendment No. 2004 -013; Resolution No. 1656, Ordinance 2005 -3 Block 600 Ordinance No. 1719, adopted by the City of Newport Beach on March 28, 1977 (Amendment No. 483) Ordinance No. 92 -45, adopted by the City of Newport Beach on November 9, 1992 (Amendment No. 771) GPA 97 -3 (D), adopted by the City of Newport Beach on June 22, 1998 (Resolution No. 98- 48) R Preens NewparU411%Draft Add Num- 110W7tl c 1 -r5 Introduction Addendum to City of Newport Beach General Plan 2006 Update E!R SECTION 2.0 PROJECT DESCRIPTION 2.1 PROJECT LOCATION Fashion Island, Block 500, Block 600, and San Joaquin Plaza are located in Newport Center in the City of Newport Beach, California. As depicted in Exhibit 1, Newport Center is generally bound by San Joaquin Hills Road to the northeast, MacArthur Boulevard to the southeast, Jamboree Road to the northwest, and Coast Highway to the southwest. Fashion Island is an approximate 75 -acre regional shopping center located in the center of Newport Center; Newport Center Drive is a ring road that connects to a roadway system providing access to the various blocks that form Newport Center. Block 500 (approximately 15 acres) is generally bound by San Joaquin Hills Road to the northeast, an internal access road and Avocado Avenue to the south, Newport Center Drive to the southwest, and Santa Rosa Drive to the west. Block 600 (approximately 25 acres) is generally bound by San Joaquin Hills Road to the northeast, Santa Rosa Drive to the southeast, Newport Center Drive to the southwest, and Santa Cruz Drive to the west. San Joaquin Plaza (approximately 23 acres) is generally bound by San Joaquin Hills Road to the northwest, San Clemente Drive to the south, Santa Cruz Drive to the east, and Santa Barbara Drive and internal access roads to the west. The four sites are depicted on Exhibit 2. The areas surrounding Fashion Island, Block 500, Block 600, and San Joaquin Plaza are developed. To the north of Block 500, Block 600, and San Joaquin Plaza across San Joaquin Hills Road, land uses include residential and a golf course within The Big Canyon Planned Community (PC 8). Uses to the south of Fashion Island are predominately commercial. To the south of Block 500 are medical and commercial office uses. To the south of San Joaquin Plaza are multi - family residential and commercial office uses. To the west are commercial uses, residential uses, the Marriott Hotel, and the Newport Beach Country Club. To the east, across MacArthur Boulevard are residential uses. 2.2 PROJECT CHARACTERISTICS 2.2.1 North Newport Center PC Text The City of Newport Beach Municipal Code allows a 'Planned Community District" to address land use designation and regulations in Planned Communities. The proposed project is the adoption of the North Newport Center PC Text, which incorporates Fashion Island, Block 600, and portions of Block 500 and San Joaquin Plaza owned by The Irvine Company (Applicant) into a single Planned Community District. Concurrently, the existing Block 500 PC Text and the San Joaquin Plaza PC Text would be amended to remove identified portions of Block 500 and San Joaquin Plaza from their respective Planned Community Districts, and the Newport Beach Zoning Code would be amended to remove Block 600 from the Administrative Professional Financial zoning district. The purposes of a Planned Community District, as stated in the Municipal Code are as follows: 20.35.10 Specific Purposes The PC district is intended to: A. To provide for the classification and development of parcels of land as coordinated, comprehensive projects so as to take advantage of the R: Proledv NewOWM I I%bran Addendum -110907 WC 2 -1 En vironmental Analysis Addendum to City of Newport Beach General Plan 2006 Update EIR superior environment which can result from large -scale community planning; B. To allow diversification of land uses as they relate to each other in a physical and environmental arrangement while insuring substantial compliance with the spirit, intent and provisions of this Code; C. To include various types of land uses, consistent with the General Plan, through the adoption of a development plan and text materials which set forth land use relationships and development standards. The PC Text has been prepared to implement and be consistent with the adopted 2006 City of Newport Beach General Plan (General Plan) and City of Newport Beach General Plan 2006 Update Final EIR (General Plan EIR). The proposed PC Text reflects the uses and designations permitted under the 2006 General Plan. No changes to the existing 2006 General Plan land use designations are required. The existing General Plan land uses designations for the four sub- areas are as follows: Fashion Island Regional Commercial (CR) Block 500 Mixed Use Horizontal 3 (MU -H3) and Open Space (OS) Block 600 Mixed Use Horizontal 3 (MU -H3) and Open Space (OS) San Joaquin Plaza Mixed Use Horizontal 3 (MU -H3) and Open Space (OS) The existing zoning designations for the four sub -areas are as follows. Adoption of the North Newport Center PC Text would incorporate Fashion Island, Block 600, and portions of Block 500 and San Joaquin Plaza owned by The Irvine Company (Applicant) to create the North Newport Center PC Text. The existing and proposed zoning designations are shown on Exhibit 3. Fashion Island Planned Community (PC -35 Fashion Island) Block 500 Planned Community (PC -46 Block 500) Block 600 Administrative, Professional, Financial (APF); Open Space (OS) San Joaquin Plaza Planned Community (PC -19 San Joaquin Plaza) As identified on Table 1, the proposed amendment to the PC Text would incorporate the intensities set forth in the adopted 2006 General Plan. Future implementation of entitlements for Fashion Island, Block 500, Block 600, and San Joaquin Plaza would not allow for any increase in development intensities beyond that permitted by the General Plan for these sub - areas. The PC Text identifies the permitted land uses and development standards that will be used to guide future development. As previously noted, Fashion Island is a regional shopping center located in the center of the larger Newport Center area. The proposed PC Text envisions Fashion Island to incorporate uses including retail, restaurants, bars, theater /nightclubs and services. The proposed PC Text provides that Blocks 500 and 600 and San Joaquin Plaza may be developed as a regional mixed use center incorporating administrative, professional, and financial uses together with hotel and residential uses and retail and other commercial uses. R PrOlecrS NOWPOn.pn Olaf' Aldlldum- 110907.dw 2 -2 Environmental Analysis AN ��•� <� w P Y AZ 71Y-17 4r "a Q F < /�. Lra e„° Ohs �ei�y t/ ^�L•y� �r7- y�"(4r P r ✓ ¢r I W ;Ttl 2r=,. i2 '. S All� lA�'�?'�'0 Y 4 P l.r / Qp' ry � �� S � �I {�/.•� � .,l a fit'+ \ �'4jo, r v,, �� \� ti� 4•' �s (V UIY\.�Of/QY(f1� , \ ' � p may}-, \ - � �tf ✓ :�,ii�; f9, � ' •t+Rtsa4 -`"§� +- t�� '`� � *s�V � S\ �# • o �t �ep� R/�4�,� ice' 141, Av IT Ir I kN ato • i� �.�. _ s�ASH Os /. LOC% V�CISL'lAf/OH' Soo s " yh� ��, ?.I •K �'Q_ > c l n \ ay�is w o Y 4'@n. 0 i Addendum to ON of Newport Beach General Plan 2006 Uodafe On TABLE 1 DEVELOPMENT AREA SUMMARY 2.2.2 Transfer of Development Rights The 2006 General Plan also allows a transfer of development rights within Newport Center in accordance with the following Land Use Element policy: LU 6.14.3 Transfers of Development Rights Development rights may be transferred within Newport Center, subject to the approval of the City with the finding that the transfer is consistent with the General Plan and that the transfer will not result in any adverse traffic impacts. As part of the Project, The Irvine Company, herein referred to as Applicant, is proposing to transfer a portion of the existing development rights from Block 600 to Block 500. The transfer includes the conversion of 165 unbuilt hotel rooms to office space, and the transfer of this entitlement to Block 500. It also includes the removal of the following existing uses from Block 600, and transfer of this entitlement to Block 500: 17,300 square feet (sf) of health club, 16,444 sf of restaurant, and 8,289 sf of office. Up to 72,000 sf of the transferred development rights could be used for a new City Hall in Block 500. 2.2.3 Phased Land Use Development and Circulation Improvement Plan (TPO Approval) The Project is not expected to be completed within 60 months of approval, and it includes a circulation improvement plan, explained in detail in the Development Agreement. The Project therefore qualifies as a Phased Land Use Development and Circulation Improvement Plan under the City's Traffic Phasing Ordinance, Municipal Code §15.40.030.B.2. A traffic study has been prepared pursuant to the Traffic Phasing Ordinance, and "feasible mitigation" (consistent with the 2006 General Plan Circulation Element) is part of the Project. This mitigation is that the Applicant will construct a third eastbound turn lane at the intersection of MacArthur Boulevard and San Joaquin Hills Road. Consistent with the TPO, this improvement will be completed early in the development phasing (i.e., before issuance of a certificate of occupancy for the first building [other than a parking structure]) constructed as part of the Project, but in no event later than 60 months from the operative date of the Development Agreement. In addition, the Applicant will work with the City on design and development of circulation enhancements in the North Newport Center area, consistent with the General Plan Circulation Element, including R'ProjeMNewpon'J01,.Drah AdMndum- 110907.doc 2 -3 Environmen tal A nalysis San Joaquin Fashion Island Block 500 Block 600 Plaza Land Use (75 acres) (15.29 acres) (25 acres) (23.2 acres) Total Regional Commercial 1,619,525 sf 0 0 0 1,619,525 sf Movie Theatre 1,700 seats 1,700 seats (27,500 sf) (27,500 sf) Hotel (a) (b) 425 rooms (b) (b) 490 rooms Residential 0 (c) (c) (c) 430 du Office /Commercial 0 285,142 sf 1,001,634 sf 337,261 sf 1,746,979 sf st.. square feet du: dwelling unit a Hotel rooms are permitted in Fashion Island through the transfer of available square footage. b 65 hotel rooms may be relocated in either Block 500, Block 600, or San Joaquin Plaza. In no case shall the total number of hotel rooms In the Fashion Island/Block 500/Block 800 /San Joaquin Plaza Planned Community exceed 490. C, Residential units are permitted in Block 500, Block 600, and San Joaquin Plaza. In no case shall the total number of dwelling units exceed 430. 2.2.2 Transfer of Development Rights The 2006 General Plan also allows a transfer of development rights within Newport Center in accordance with the following Land Use Element policy: LU 6.14.3 Transfers of Development Rights Development rights may be transferred within Newport Center, subject to the approval of the City with the finding that the transfer is consistent with the General Plan and that the transfer will not result in any adverse traffic impacts. As part of the Project, The Irvine Company, herein referred to as Applicant, is proposing to transfer a portion of the existing development rights from Block 600 to Block 500. The transfer includes the conversion of 165 unbuilt hotel rooms to office space, and the transfer of this entitlement to Block 500. It also includes the removal of the following existing uses from Block 600, and transfer of this entitlement to Block 500: 17,300 square feet (sf) of health club, 16,444 sf of restaurant, and 8,289 sf of office. Up to 72,000 sf of the transferred development rights could be used for a new City Hall in Block 500. 2.2.3 Phased Land Use Development and Circulation Improvement Plan (TPO Approval) The Project is not expected to be completed within 60 months of approval, and it includes a circulation improvement plan, explained in detail in the Development Agreement. The Project therefore qualifies as a Phased Land Use Development and Circulation Improvement Plan under the City's Traffic Phasing Ordinance, Municipal Code §15.40.030.B.2. A traffic study has been prepared pursuant to the Traffic Phasing Ordinance, and "feasible mitigation" (consistent with the 2006 General Plan Circulation Element) is part of the Project. This mitigation is that the Applicant will construct a third eastbound turn lane at the intersection of MacArthur Boulevard and San Joaquin Hills Road. Consistent with the TPO, this improvement will be completed early in the development phasing (i.e., before issuance of a certificate of occupancy for the first building [other than a parking structure]) constructed as part of the Project, but in no event later than 60 months from the operative date of the Development Agreement. In addition, the Applicant will work with the City on design and development of circulation enhancements in the North Newport Center area, consistent with the General Plan Circulation Element, including R'ProjeMNewpon'J01,.Drah AdMndum- 110907.doc 2 -3 Environmen tal A nalysis Addendum to City of Newport Beach General Plan 2006 Update Eln widening of Avocado Avenue between San Miguel Drive and San Nicolas Drive, dedication of public right -of -way and enhancement of San Miguel Drive between MacArthur Boulevard and Avocado Avenue, and installation of traffic signals on Newport Center Drive. 2.2.4 Affordable Housing Implementation Plan (AHIP) The 2006 General Plan Housing Element requires an Affordable Housing Implementation Plan (AHIP) for any development including more than 50 dwelling units. The North Newport Center AHIP describes how the Applicant would provide affordable housing to meet the Housing Element goal of 15 percent. The Applicant may build new affordable units, restrict income and rent levels for existing apartments in the vicinity of North Newport Center, or a combination of these methods. The exact number of units may vary, depending on the income levels served, and all units must be affordable for a period of 30 years. 2.2.5 Development Agreement As a part of the project, a Development Agreement is proposed between the City of Newport Beach and The Irvine Company. Key provisions of the proposed Development Agreement are as follows. • Cancellation of Circulation Improvement and Open Space Agreement and Bonita Canyon Annexation and Development Agreement • Vesting of North Newport Center development rights for 20 years • Payment of in -lieu park fees for 430 residential units, including early payment of a portion of fees as matching grant for OASIS Senior Center • Payment of public benefit fee to fund construction of new City Hall building or other municipal purpose • Circulation enhancements in the North Newport Center area • Four -year option for the City to purchase a site in Block 500 for City Hall as well as the use of 375 parking spaces. • Dedication of the site north of San Miguel Drive, west of MacArthur Boulevard, south of San Joaquin Hills Road and east of Avocado Avenue for open space, if a new City Hall is constructed on a site in Newport Center other than Block 500 • Limit on future increases in development fees • Limit on future amendments to Municipal Code pertaining to development of the North Newport Center property 2.2.6 Discretionary Actions The City of Newport Beach, as the lead agency for the Project, would rely on the City of Newport Beach General Plan 2006 Update Program Final EIR and this Addendum as the primary environmental documentation for the approval of the discretionary actions discussed below. • Approval of the Addendum to the City of Newport Beach General_ Plan 2006 Update Final Program EIR: The North Newport Center Project requires the acceptance R' Proleds Nepon J0l PDrftM ¢ndum-11097tloc 2 -4 Environmental Analysis • Addendum to City of Newport Beach General Plan 2006 Update Eln of the environmental document as having been prepared in compliance with CEQA and the State and City CEQA Guidelines, as well as certification that the information contained in the City of Newport Beach General Plan 2006 Update Final Program EIR and this Addendum was considered in the final decisions on the Project. Approval of the Planned Community Development Plan and Design Regulations Amendment No. PD2007 -003 as the North Newport Center Planned Community Development Plan and Design Regulations: The Project includes the adoption of the North Newport Center Planned Community Development Plan to incorporate Fashion Island, Block 600, and portions of Block 500 and San Joaquin Plaza owned by The Irvine Company into one PC District, and to provide consistency between the 2006 General Plan and the zoning designation for the four sub -areas of North Newport Center. Additionally, the Block 500 and San Joaquin Plaza PC Texts would be modified to remove areas to be included in the North Newport Center PC Text. • Code Amendment CA2007 -007: An amendment to Municipal Code is required to change the zoning classification of Block 600 from Administrative Financial Professional (APF) to Planned Community (PC) District and the open space corner lots in Block 500 and Block 600 from the Open Space (OS) District to the Planned Community (PC) District. • Approval of Transfer of Development Rights: The project includes the transfer of development rights from Block 600 to Block 500 pursuant to General Plan policy. The transfer of development rights requires approval of the City Council. • Traffic Study No. TS2007 -001: In accordance with Municipal Code Title 15, Chapter 15.40, the project is a Comprehensive Phased Land Use Development and Circulation System Improvement Plan as all phases of construction are not anticipated to be completed within 60 months of approval and the project is subject to a Development Agreement. As such, a Traffic Phasing Ordinance study has been prepared. • North Newport Center Planned Community Affordable Housing Implementation Plan: An Affordable Housing Implementation Plan is required by the 2006 General Plan Housing Element, and is included in the Project. • Development Agreement No. DA2007 -002: The Development Agreement between the City and Applicant would vest development rights and establish public benefit s to the City. R PIONOYNe.POn JOtt Drab Mdem.m410909000 2 -5 Environmental Analysis Addendum to City of Newport Beach General Plan 2006 Update On SECTION 3.0 ENVIRONMENTAL ANALYSIS The analysis in this document will evaluate if the potential impacts associated with the subsequent approvals outlined in Section 2.0, Project Description, are substantially the same as those addressed in City of Newport Beach General Plan 2006 Update Final Program EIR. This evaluation includes a determination as to whether Project implementation would result in any new significant impacts or a substantial increase in a previously identified significant impact. If the comparative analysis identifies that there would be no change in impact from that identified in the General Plan EIR, a determination of "No Substantial Change from Previous Analysis" has been made. This analysis provides the City of Newport Beach with the factual basis for determining whether any changes in the project, any changes in circumstances, or any new information since the General Plan EIR was certified require additional environmental review or preparation of a subsequent or supplemental EIR. 3.1 AESTHETICS The following thresholds of significance are as set forth in the General Plan EIR. It states: "For purposes of this EIR, implementation of the proposed project would have a significant adverse impact on aesthetic/visual quality if it would result in any of the following: • Have a substantial adverse effect a scenic vista • Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a State scenic highway • Substantially degrade the existing visual character or quality of the site and its surroundings • Create a new source of substantial light or glare, which would adversely affect day or nighttime views in the area" No Substantial Change from Previous Analysis. Aesthetic and visual impacts have been previously analyzed as part of the General Plan EIR, which was prepared and certified pursuant to State and City CEQA Guidelines. Minor additions and/or clarifications are needed to make the previous document adequate to cover the actions that are currently proposed, which are documented below and serve as an Addendum to the General Plan EIR. Summary Analysis Have a Substantial Adverse Effect a Scenic Vista Page 4.1 -6 of the City of Newport Beach General Plan 2006 Update Final Program EIR (General Plan EIR) identifies that there are no officially designated scenic highways within the City. As such, Fashion Island, Block 500, Block 600, and San Joaquin Plaza are not designated as scenic vistas or located within a scenic preservation zone. Page 4.1 -9 of the General Plan EIR ident if ies a public coastal view is located along Newport Center Drive from Newport Center Drive east to west extending to.Farallon Drive /Granville Drive, the beginning of which is located is approximately 0.45 miles south of Block 600 and at the southern edge of Fashion Island. The General Plan EIR states that "...existing and future development would be regulated by the a+ProjensNewponvoi i oran Addendum. 110907 duo 3 -1 EnvlrOnmentalAnaWiS Addendum to City of Newport Beach General Plan 2006 Update E1n proposed General Plan Update policies, and scenic vistas would not be adversely affected. Therefore, impacts to scenic vistas would be less than significant." a Substantially Damage Scenic Resources, Including, but not Limited to, Trees, Rock Outcroppings, and Historic Buildings within a State Scenic Highway The General Plan EIR identifies that there are no officially designated scenic highways in the City. State Route 1 (Coast Highway) is eligible for State Scenic Highway designation. Coast Highway is not contiguous to the Project. The General Plan EIR further states "Consequently, because no scenic highways are currently designated within the City, implementation of the proposed General Plan Update would have no impact." Substantially Degrade the Existing Visual Character or Quality of the Site and Its Surroundings The General Plan EIR identifies Newport Center /Fashion Island as an area of high overall visual quality (see page 4.1 -18). It further states "In these areas, new development allowed under the proposed General Plan Update would be done in such a way as to fit into the existing visual setting. Policy LU 1.1 requires that new development 'maintain and enhance' existing development." Policy LU 1.1 states: Maintain and enhance the beneficial and unique character of the different neighborhoods, business districts, and harbor that together identify Newport Beach. Locate and design development to reflect Newport Beach's topography, architectural diversity, and view sheds (See page 4.1 -24) Fashion Island, Block 500, Block 600, and San Joaquin Plaza are within the City's high -rise height limitation zone. Fashion Island height limits range from 40 feet to 125 feet as detailed in Section 5d. Development within Block 500 and Block 600 is permitted up to 375 feet high. The height limit for San Joaquin Plaza is 65 feet. Fashion Island is currently developed with retail, entertainment, services and supporting uses that serve local and regional residents. Block 500 is developed with general office and medical uses. Block 600 is currently developed with high - rise office and hotel buildings. San Joaquin Plaza contains business and professional office uses. Full implementation of entitlements for Fashion Island, Block 500, Block 600, and San Joaquin Plaza would be required to comply with the City's high -rise height limitations, compliment the height of existing buildings in Newport Center, and not create a significant shadow, or shading, impact. Shading describes the effect of shadows cast on adjacent areas by proposed structures. The proposed PC Text requires a that shade and shadow study be prepared for any structure over 200 feet in height that has the potential to affect the residential area located north of San Joaquin Hills Road (Big Canyon). The purpose of the study is to ensure that new development will not result in added shade and shadow to the residential area beyond existing conditions for more than three hours between the hours of 9 AM and 3 PM Pacific Standard Time, or for more than four hours between the hours of 9 AM and 5 PM Pacific Daylight Time. The General Plan EIR notes that the 2006 General Plan includes policies associated with aesthetic improvements such as landscaping, pedestrian amenities, and design standards for architecture and lighting. Future development projects in North Newport Center would be required to conform to these General Plan standards as well as standards set forth in the PC . Text and its Design Regulations. The General Plan EIR states 'Thus, the visual character would change as development intensity increased, but the impacts would not be considered R PrgeM Newport J011 Dr.11 AdOendum .11 OM7 doc 3 -2 Environmental Analysis 0 Addendum to Ctly of Newport Beach General Plan 2006 Update EIR significantly adverse.... Therefore, the proposed General Plan Update would have a less -than- significant impact on the visual character of developed urban areas." (See page 4.1 -19) Create a New Source of Substantial Light or Glare, Which Would Adversely Affect Day or Nighttime Views In the Area The General Plan EIR notes that the city is primarily built out and currently has significant amounts of ambient light. It further notes that new development could create new sources of light and glare from uses such as exterior building lighting, parking lots and structures, reflective building surfaces, and vehicular headlines. Sources of light and glare could affect adjacent sensitive land uses generally considered to be undeveloped land and residential uses adjacent to commercial or industrial uses. The 2006 General Plan includes policies to address potential nighttime lighting impacts. These include policies to prevent lighting spillage onto adjacent properties while other policies allow the integration of land uses with requirements for addressing lighting for land use compatibility. The General Plan EIR states `Therefore, with implementation of the above - mentioned policies, nighttime lighting impacts and potential spillover would be les than significant" (See page 4.1 -22) The proposed Planned Community Development Plan and Design Regulations also contain lighting provisions to implement these General Plan policies. Mitigation Program Policies of the 2006 General Plan were adopted as a mitigation program that minimized impacts associated with buildout of the City of Newport Beach, including the implementation of future development in Fashion Island, Block 500, Block 600, and San Joaquin Plaza. The following condition is included in the North Newport Center PC Text relating shade and shadow: Prior to issuance of a building permit for a structure over 200 feet in height that has the potential to shade residential areas north of San Joaquin Hills Road, a shade study shall be prepared by the Applicant and submitted to the City. The shade study shall demonstrate that the new development will not add shade to the designated residential areas beyond existing conditions for more than three hours between the hours of 9 AM and 3 PM Pacific Standard Time, or for more than four hours between the hours of 9 AM and 5 PM Pacific Daylight Time. The shade study shall be prepared to the satisfaction of the Planning Director and the Planning Director shall determine conformance with the standards identified herein as part of the plan review process. Level of Significance After Mitigation Consistent with the findings of the General Plan EIR, the General Plan EIR states "...all other project impacts associates with aesthetics and visual resources would be less than significant under the proposed Newport Beach General Plan Update. "2 Finding of Conslstencv With General Plan EIR Pursuant to Section 15162 of the CEQA Guidelines, the City of Newport Beach has determined, on the basis of substantial evidence in the light of the whole record, that the North Newport Center Project does not propose substantial changes to the project, no substantial changes would occur which would require major revisions to the General Plan EIR, and no new 2 Visual impacts associated with Banning Ranch were found to be unavoidable. Banning Ranch is not a part of the North Newport Center Project. R- Projwa Ne Ori JO11 Drah Addendum-110901 dm 3.3 Environmental Analysis Addendum to City of Newport Beach General Plan 2006 Update EIR information of substantial importance has been revealed since the certification of the General Plan EIR. 3.2 AGRICULTURAL RESOURCES The General Plan EIR identifies that the topic of Agricultural Resources was focused out because the City of Newport Beach contains no designated farmland by the California Department of Conservation, Farmland Mapping Program, 3 no land designated Farmland would be converted to non - agricultural use as a result of implementation of the 2006 General Plan, no sites in the City are zoned for agricultural use, and no sites would be affected by a Williamson Act contract. (See page 6 -4) 3.3 AIR QUALITY The following thresholds of significance are as set forth in the General Plan EIR. it states: "For purposes of this EIR, implementation of the proposed project would have a significant adverse impact on air quality if it would result in any of the following: • Conflict with or obstruct implementation of the applicable air quality plan • Violate any air quality standard or contribute substantially to an existing or projected air quality violation • Result in a cumulatively considerable net increase of any criteria pollutant for which the project is in non- attainment under an applicable federal or State ambient air quality standard • Expose sensitive receptors to substantial pollutant concentrations • Create objectionable odors affecting a substantial number of people" No Substantial Change from Previous Analysis. Air quality impacts have been previously analyzed as part of the General Plan EIR, which was prepared and certified pursuant to State and City CEQA Guidelines. Minor additions and /or clarifications are needed to make the previous document adequate to cover the actions that are currently proposed, which are documented below and serve as an Addendum to the General Plan EIR. Summary Analysis Conflict With or Obstruct implementation of the Applicable Air Quality Plan Result in a Cumulatively Considerable Net Increase of any Criteria Pollutant for Which the Project Is In Non - Attainment Under An Applicable Federal Or State Ambient Air Quality Standard The General Plan EIR identifies that projects that are consistent with the South Coast Air Quality Management District (SCAQMD) 2003 Air Quality Management Plan (AQMP) are those whose use and activities are consistent with the applicable assumptions used in the development of the AQMP. Because the growth projections assumed for buildout of the 2006 General Plan are higher than what would have been assumed in the AQMP, the "...proposed General Plan Update would not be consistent with the AQMP attainment forecasts and • 3 California Department of Conservation, Farmland Mapping program, important Farmland in California 2004 Map (2004) R Piogevs,Newpon J01 T 0r1h Aa1e�G,m- 1t0907.da 3 -4 Environmental Analysis Addendum to City of Newport Beach General Plan 2006 Update EIR attainment of the standards could be delayed.... this impact would be significant" This was identified as a project and cumulative unavoidable impact. • As previously identified in Table 1 of this Addendum, total development (existing and future) for Fashion Island is 1,619,525 sf of regional commercial uses and 1,000 movie theatre seats; hotel uses are permitted through a transfer of development rights. Total development (existing and future) for Block 600 is 1,001,634 sf of office /commercial and 425 hotel rooms. Total office /commercial development is 285,142 sf for Block 500 and 337,261 sf for San Joaquin Plaza. In addition, 430 residential units and 65 hotel rooms may be developed in Blocks 500 or 600 or San Joaquin Plaza. Through the transfer of development rights included in the Project, the entitlement for 165 new hotel rooms and 42,036 sf of office /commercial use allocated to Block 600 is to be transferred to Block 500 for the development of 205,161 sf of office /commercial use in Block 500.The Project does not propose any new land uses, nor any additional intensity of development, not previously permitted and contemplated in the 2006 General Plan for the four sub - areas. As such, the Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Violate Any Air Quality Standard or Contribute Substantially to an Existing or Projected Air Quality Violation The General Plan EIR identifies that construction related emissions could be mitigated but would be expected to remain significant and unavoidable. Future development in North Newport Center consistent with the assumptions of the 2006 General Plan may involve excavation, grading operations, building construction, and demolition of existing structures and pavement. All development will be required to comply with standard construction practices as set forth in the SCAQMD Handbook, including best management practices (BMPs) for the control of emissions. BMPs include control of fugitive dust through watering exposed surfaces, covering exposed ground, and sweeping streets. Additional measures involve construction traffic emission control including ensuring all vehicles and equipment are operating efficiently. It is anticipated that standard control measures would reduce potential impacts of air emissions and odors. Page 4.2 -13 of the General Plan EIR states: `Implementation of the proposed General Plan Update would result in construction emissions that would contribute substantially to an existing or projected air quality violation." The General Plan EIR evaluated the effects of full implementation of entitlements for Fashion Island, Block 500, Block 600, and San Joaquin Plaza on air quality and accounted for construction impacts. The General Plan EIR concluded that despite implementation of General Plan Policies NR 8.1 through NR 8.5, which would help to reduce construction- related air quality impacts, the development contemplated in the General Plan would result in a significant and unavoidable air quality impact. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Expose Sensitive Receptors to Substantial Pollutant Concentrations The General Plan notes that the implementation of General Plan land uses is not expected to expose existing or future sensitive uses within the City to substantial carbon monoxide (CO) concentrations. This impact was determined to be less than significant for all uses in the City. As such, this conclusion would also be applicable to the North Newport Center Project. R p.oiWs'NewpomJOlrOrefl Pd dum -11 9 7doc 3 -5 Environmental Analysis Addendum to City of Newport Beach General Plan 2006 Update Eln Create Objectionable Odors Affecting a Substantial Number of People Odors can occur from construction activities related to the operation of construction vehicles and the application of architectural coatings. Odors can also occur from operation of uses such as restaurants, manufacturing facilities, etc. The General Plan EIR notes uses such as restaurants are typically required to have ventilation systems; trash receptacles are required by City and Health Department regulations. The General Plan EIR states that "Consequently, implementation of the proposed General Plan Update would not create objectionable odors affecting a substantial number of people within the City and potential impacts would be less than significant" (See page 4.2 -17). No land uses or activities would be permitted in the North Newport Center District that would result in changes in the conclusions set forth in the General Plan EIR. Climate Change The proposed North Newport Center Project serves to implement the principal goals of the 2006 General Plan. These goals and policies include the following:° • A successful mixed -use district that integrates an economic and commercial center serving the needs of Newport Beach residents and the subregion, with expanded opportunities for residents to live close to jobs, commerce, entertainment, and recreation, and is supported by a pedestrian - friendly environment. • Provide the opportunity for limited residential, hotel, and office development in accordance with the limits specified by Tables LU1 and LU2. • Provide the opportunity for an additional anchor tenant, other retail, and /or entertainment and supporting uses that complement, are integrated with, and enhance the economic vitality of existing development. • Encourage that some new development be located and designed to orient to the inner side of Newport Center Drive, establishing physical and visual continuity that diminishes the dominance of surface parking lots and encourages pedestrian activity. • Encourage that pedestrian access and connections among uses within the district be improved with additional walkways and streetscape amenities concurrent with the development of expanded and new uses. • Encourage that new development in Fashion Island complement and be of equivalent or higher design quality than existing buildings. Reinforce the existing promenades by encouraging retail expansion that enhances the storefront visibility to the promenades and provides an enjoyable retail and pedestrian experience. Full implementation of entitlements for Fashion Island, Block 500, Block 600, and San Joaquin Plaza consistent with the 2006 General Plan will assist the City in achieving its General Plan goals. Regarding long- term air quality impacts, the General Plan EIR states that the nature of Newport Center has the capacity to contribute to decreases in vehicle miles traveled because • Ibid., pages 3.97 to 3 -98. A Pro,ws�w.po6JoTl olanamema m.iiosoraoc 3 -6 Environmental Analysis Addendum to City of Newport Beach General Plan 2006 Update EIR the project area promotes a mixed -use, pedestrian - friendly district.5 The Project is not expected • to result in any climate change impacts due to greenhouse gas emissions beyond the impacts of the development set forth in the General Plan EIR. The General Plan EIR analyzed air quality impacts associated with buildout of future development in the City, inclusive of Fashion Island, Block 500, Block 600, and San Joaquin Plaza. The analysis included carbon dioxide (CO2) and other greenhouse gas emissions. As discussed above, the Project would not generate any new air quality impacts not already identified in the General Plan EIR. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. With respect to global climate change resulting from greenhouse gas emissions, no "new information of substantial importance" on climate change is now available that was not known and could not have been known when the City approved the General Plan EIR in 2006. For example, in 1979, the National Research Council published "Carbon Dioxide and Climate: A Scientific Assessment," which concluded that climate change was an accelerating phenomenon partly due to human activity. Numerous studies conducted before and after the National Research Council report reached similar conclusions. The State of California adopted legislation in 2002 requiring the California Air Resources Board to develop regulations limiting greenhouse gas emissions from automobiles. Consideration of strategies to control emissions of greenhouse gases which may contribute in some manner to global climate change is under consideration at all regulatory levels; however, there is no one agency responsible for regulating greenhouse gases, and there are no established standards to evaluate the significance of greenhouse gas emissions. However, the most common greenhouse gas emissions are from vehicle emissions (both construction and operational) and operational emissions from energy consumption. These issues have been addressed in General Plan EIR. Analyses prepared for or by California State Agencies on climate change issues do not provide for the provision of specific measures to incorporate into particular projects to reduce greenhouse gas emissions, except for generalized recommendations about such matters as encouraging jobs/housing proximity. The California Energy Commission recently explained that accessibility and mixed use are two factors that reduce vehicles trips, which are a major source of greenhouse gas emissions in California .6 The Project's incremental contribution to any cumulative global climate change impact is mitigated by various characteristics of the Project that serve to render its contribution less than cumulatively considerable. One of the main concerns raised by those concerned about the effect of greenhouse gases on climate change is that "leap frog" -type development would serve to potentially increase the number of vehicle miles traveled and consequently increase those vehicular emissions (i.e., CO2 that contribute to greenhouse gases). The Project would allow for in -fill, mixed use development in an urbanized setting thereby providing opportunities to reduce vehicle trips. • 5 City of Newport Beach, Final Environmental Impact Report for the General Plan 2006 Update (State Clearinghouse No 2006011119), July 26, 2006, page 4.2 -12. 6 California Energy Commission, The Role of Land Use in Meeting California's Energy and Climate Change Goals, Draft, June 26, 2007, pages 7, 17 -19. R Pro1eds'.NewpWJ01 PDraf Addendum - 110907 do 3.7 Environmental Analysis Addendum to City of Newport Beach General Plan 2006 Update Eln Mitigation Program Policies of the 2006 General Plan were adopted as a mitigation program that minimized impacts • associated with buildout of the City of Newport Beach, including the implementation of future development in Fashion Island, Block 500, Block 600, and San Joaquin Plaza. Level of Significance After Mitigation Consistent with the findings of the General Plan EIR, the General Plan EIR identifies that there are no feasible mitigation measures to reduce the impact of increased population on implementation of the AQMP; to reduce cumulative impacts associated with construction emissions; or to reduce operational activities. These impacts would be significant and unavoidable. Finding of Consistency With General Plan EIR Pursuant to Section 15162 of the CEQA Guidelines, the City of Newport Beach has determined, on the basis of substantial evidence in the light of the whole record, that the North Newport Center Project does not propose substantial changes to the project, no substantial changes would occur which would require major revisions to the General Plan EIR, and no new information of substantial importance has been revealed since the certification of the General Plan EIR. 3.4 BIOLOGICAL RESOURCES The following thresholds of significance are as set forth in the General Plan EIR. It states: "For purposes of this EIR, implementation of the proposed project would have a significant adverse • impact on biological resources if it would result in any of the following: • Have a substantial adverse effect, either directly or indirectly through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or the CDFG or USFWS • Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the CDFG or USFWS • Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means • Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites • Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance • Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat • conservation plan" R Proledss Newpon.1011 D,14Addendum- IIOW7doc 3 -8 En vironmental Analysis Addendum to City of Newport Beach General Plan 2006 update EIR No Substantial Change from Previous Analysis. Biological resources impacts have been previously analyzed as part of the General Plan EIR, which was prepared and certified pursuant • to State and City CEQA Guidelines. Minor additions and /or clarifications are needed to make the previous document adequate to cover the actions that are currently proposed, which are documented below and serve as an Addendum to the General Plan EIR. C7 Summary Analvsis Have a Substantial Adverse Effect, Either Directly or Indirectly Through Habitat Modifications, On Any Species Identified as a Candidate, Sensitive, or Special Status Species in Local or Regional Plans, Policies, or the CDFG or USFWS Have a Substantial Adverse Effect on Any Riparian Habitat or Other Sensitive Natural Community Identified in Local or Regional Plans, Policies, Regulations or By the CDFG or USFWS Have a Substantial Adverse Effect on Federally Protected Wetlands as Defined By Section 404 Of The Clean Water Act (Including, But Not Limited To, Marsh, Vernal Pool, Coastal, Etc.) Through Direct Removal, Filling, Hydrological Interruption, or Other Means Interfere Substantially With the Movement of Any Native Resident or Migratory Fish or Wildlife Species or With Established Native Resident or Migratory Wildlife Corridors, or Impede the Use of Native Wildlife Nursery Sites Conflict with Any Local Policies or Ordinances Protecting Biological Resources, Such As a Tree Preservation Policy or Ordinance Conflict with the Provisions of an Adopted Habitat Conservation Plan, Natural Community Conservation Plan, or Other Approved Local, Regional, or State Habitat Conservation Plan Fashion Island, Block 500, Block 600, and San Joaquin Plaza are located within Newport Center, a built urban environment. Landscaped areas within Fashion Island, Block 500, Block 600, and San Joaquin Plaza include non - native landscape materials including turf, trees, and plants. No wetlands or riparian habitat community exist in the sub - areas. The project would not have a substantial adverse effect on any species identified by the California Department of Fish and Game and the U.S. Fish and Wildlife Service as a species for concern because the site has been developed for the past 40 years and contains no habitat suitable for wildlife. Landscaping may be removed as a result of future development. The General Plan EIR notes that development could result in the removal of mature trees that may be used as perching and nesting sites for migratory birds and raptors. The General Plan EIR identifies mitigation associated with this potential impact and states "With compliance with these policies, impacts would be less than significant...." The County of Orange Natural Community Conservation Plan (NCCP) and the Habitat Conservation Plan (HCP) surveyed and mapped habitat vegetation and species throughout the County, including the four sub - areas. No candidate, sensitive or special status species were identified in the vicinity of the site. 7 Additionally, North Newport Center is identified as having no conservation value and is not included in the NCCP or HCP. U.S. Department of Interior Fish and Wildlife Service, Natural Community Conservation Plan, Habitat Conservation Plan, EIR, and EIS - County of Orange Central and Coastal Subregion, May 1996. R .Pro�egsWwPort 'd0if Draft Addendum 1 1o902.dw 3 -9 Environmental Analysis Addendum to City of Newport Beach General Plan 2006 Update EIR The General Plan EIR analyzes the potential biological effects associated with buildout of the 2006 General Plan, including Fashion Island, Block 500, Block 600, and San Joaquin Plaza. These sites would be required to comply with applicable 2006 General Plan policies regarding biological resources. Pages 4.3 -22, 4.3 -24, and 4.3 -27 of the Biological Resources Analysis in the General Plan EIR address development in Newport Center, inclusive of Fashion Island, Block 500, Block 600, and San Joaquin Plaza. Page 4.3 -27 identifies that that the 2006 General Plan policies ensure that build -out consistent with the General Plan would not impact native, resident, or migratory wildlife species or corridors. Mitigation Program Policies of the 2006 General Plan were adopted as a mitigation program that minimized impacts associated with buildout of the City of Newport Beach, including the implementation of future development in Fashion Island, Block 500, Block 600, and San Joaquin Plaza. Level of Significance After Mitigation Consistent with the findings of the General Plan EIR, the General Plan EIR identifies that compliance with existing federal, State, and local regulations would mitigate biological resources impacts to a level considered less than significant. Finding of Consistency With General Plan EIR Pursuant to Section 15162 of the CEQA Guidelines, the City of Newport Beach has determined, on the basis of substantial evidence in the light of the whole record, that the North Newport Center Project does not propose substantial changes to the project, no substantial changes would occur which would require major revisions to the General Plan EIR, and no new information of substantial importance has been revealed since the certification of the General Plan EIR. 3.5 CULTURAL RESOURCES The following thresholds of significance are as set forth in the General Plan EIR. It states: "For purposes of this EIR, implementation of the proposed project would have a significant adverse impact on cultural resources if it would result in any of the following: • Cause a substantial adverse change in the significance of a historical resource as defined in Section 15064.5 • Cause a substantial adverse change in the significance of an archaeological resource pursuant to Section 15064.5 • Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature • Disturb any human remains, including those interred outside of formal cemeteries" No Substantial Change from Previous Analysis. Cultural resources impacts have been previously analyzed as part of the General Plan EIR, which was prepared and certified pursuant to State and City CEQA Guidelines. Minor additions and /or clarifications are needed to make the previous document adequate to cover the actions that are currently proposed, which are documented below and serve as an Addendum to the General Plan EIR. R Rrgeds•NenpoNJO11 Orau Addendum- 11OW7dC 3 -10 Environmental Analysis 0 W Addendum to City of Newport Beach General Plan 2006 Summary AnaIvsIs Cause a Substantial Adverse Change in the Significance of a Historical Resource as Defined In Section 15064.5 The four sub -areas of the North Newport Center PC District are not identified as a historic area or an area containing historical resources by the City of Newport Beach General Plan. The Project would not result in any adverse physical or aesthetic effects to any building, structure, or object having historical, cultural, or religious significance. As such, no historic resources would be impacted by the Project. Cause a Substantial Adverse Change In the Significance of an Archaeological Resource Pursuant To Section 15064.5 Disturb Any Human Remains, Including Those Interred Outside of Formal Cemeteries The General Plan EIR notes that ground- disturbing activities can damage or destroy archaeological and /or Native American cultural resources. The 2006 General Plan contains policies to ensure the protection of such resources. The General Plan EIR states that "...implementation of the proposed General Plan Update policies would ensure that impacts to archaeological and Native American cultural resources would be less than significant..." (See page 4.4 -16) The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Directly or Indirectly Destroy a Unique Paleontological Resource or Site or Unique Geologic Feature Paleontological resources may be present in fossil- bearing soils and rock formations below the ground surface. Ground - disturbing activities in these soils and formations have the potential to damage or destroy these resources. The General Plan EIR states that compliance with General Plan policies "...would reduce this impact to a less- than - significant level by ensuring that paleontological resources would be subject to scientific recovery and evaluation..." (See page 4.4 -17) The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Mitigation Program Policies of the 2006 General Plan were adopted as a mitigation program that minimized impacts associated with buildout of the City of Newport Beach, including the implementation of future development in Fashion Island, Block 500, Block 600, and San Joaquin Plaza. Level of Significance After Mitigation Consistent with the findings of the General Pla n impacts to archaeological and paleontological mitigated to a level considered less than significant R..Prgem Newport Q011'.nrah natlepaom• t 1090Y.tlo0 3 -11 EIR, the General Plan EIR identifies that resources, and human remains could be Environmental Addendum to City of Newport Beach General Plan 2006 Update Eln Finding of Consistency With General Plan EIR Pursuant to Section 15162 of the CEQA Guidelines, the City of Newport Beach has determined, on the basis of substantial evidence in the light of the whole record, that the North Newport Center Project does not propose substantial changes to the project, no substantial changes would occur which would require major revisions to the General Plan EIR, and no new information of substantial importance has been revealed since the certification of the General Plan EIR. 3.6 GEOLOGY, SOILS, AND MINERAL RESOURCES The following thresholds of significance are as set forth in the General Plan EIR. It states: "Implementation of the proposed General Plan Update would result in a significant impact if the project would: • Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving — Rupture of a known earthquake fault, as delineated on the most recent Alquist - Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault — Strong seismic ground shaking — Seismic- related ground failure, including liquefaction — Landslides • Result in substantial soil erosion or the loss of top soil • Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off -site landslide, lateral spreading, subsidence, liquefaction or collapse • Be located on expansive soil, as defined in Table 18 1 B of the Uniform Building Code (1994), creating substantial risks to life or property • Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the State • Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan" No Substantial Change from Previous Analysis. Geology, soils, and mineral resources impacts have been previously analyzed as part of the General Plan EIR, which was prepared and certified pursuant to State and City CEQA Guidelines. Minor additions and /or clarifications are needed to make the previous document adequate to cover the actions that are currently proposed, which are documented below and serve as an Addendum to the General Plan EIR. Summary Analvsis Expose People or Structures to Potential Substantial Adverse Effects, Including the Risk of Loss, Injury, or Death Involving the Rupture of a Known Earthquake Fault, Strong . Ground Shaking, Seismic - Related Ground Failure, or Landslides R Prgeds'We PO 'JOI 1 .@af MVO dom- 110907 me 3 -12 Environmental Analysis Addendum to City of Newport Beach General Plan 2006 Update EIR The General Plan EIR notes that there are no Alquist - Priolo zones in the City; no impact would result. Policies are provided in the 2006 General Plan to ensure that adverse effects caused by seismic and geologic hazards are minimized. Moderate to large earthquakes would cause ground shaking in Newport Center, inclusive of Fashion Island, Block 500, Block 600, and San Joaquin Plaza. Compliance with regulations and policies of the General Plan EIR would "...ensure that impacts related to strong seismic ground shaking remain at a less -than- significant level." With respect to seismic - related ground failure, none of Newport Center is in an identified liquefaction area. Result In Substantial Sol[ Erosion or the Loss of Top Soil With respect to top soil, the General Plan EIR notes that most of the City is built out and top soil is not an issue. With respect to soil erosion, shoreline areas and coastal bluffs are highly susceptible to erosion from wave action and stream erosion. The four sub -areas are not located near the coast or bluff areas. All demolition and construction activities are required to comply with the California Building Code and other regional and local regulations (e.g., State Water Resources Control Board provisions) that require the implementation of measures to reduce soil erosion. The General Plan EIR identifies that potential impacts would be mitigated to a less than significant level. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a. previously identified significant impact as previously analyzed in the General Plan EIR. Be Located on Expansive Soil, as Defined In Table 18 1 B of the Uniform Building Code (1994), Creating Substantial Risks to Life or Property is The General Plan EIR considered buildout of the City, inclusive of Fashion Island, Block 500, Block 600, and San Joaquin Plaza in its geology analysis. Page 4.5 -13 of the General Plan EIR discusses the General Plan Update's concentration of development in areas including Fashion Island, Block 500, Block 600, and San Joaquin Plaza, and notes that the impact is considered less than significant. All four sub -areas have been subject to development which has required the analysis of soil conditions. With respect to soil characteristics, the certified Final EIR for the Island Hotel (formerly Four Seasons), dated October 21, 1983, discussed geology and soils in Newport Center. The Final EIR states that Newport Center is: ...part of an uplifted marine terrace of Pleistocene age. The marine terrace soils are composed essentially of weakly cemented to loose sands and silty sands which in parts of Newport Center reach a depth of as much as 50 feet. The upper one to two feet of this material have weathered to form a moderately expansive, clayey soil. The Pleistocene sediments are underlain by clay shales, clay siltstones, and sandstones of Miocene age, Monterey Formation. Because policies of the General Plan require that development not be located on unstable soils or geologic units, the General Plan EIR found that the potential impact was less than significant. The Uniform Building Code and California Building Code include regulations governing seismically resistant construction and construction to protect people and property from construction and building hazards. R P(01WS New00rtVO11 Dr80 A00e dumq 10907 d0C 3 -13 Environmental Analysis Addendum to City of Newport Beach General Plan 2006 Update On Result in the Loss of Availability of a Known Mineral Resource That Would Be Of Value to the Region and the Residents of the State . Result in the Loss of Availability of a Locally Important Mineral Resource Recovery. Site Delineated on a Local General Plan, Specific Plan, or Other Land Use Plan The General Plan EIR notes that implementation of the 2006 General Plan would not result in the loss of availability of known mineral resources of value to the region or the State. No impacts would occur. Mitigation Program Policies of the 2006 General Plan were adopted as a mitigation program that minimized impacts associated with buildout of the City of Newport Beach, including the implementation of future development in Fashion Island, Block 500, Block 600, and San Joaquin Plaza. Level of Significance After Mitigation Consistent with the findings of the General Plan EIR, the General Plan EIR identifies that impacts to geology and soils could be mitigated to a level considered less than significant. No mineral resources were identified. Finding of Consistency With General Plan EIR Pursuant to Section 15162 of the CEQA Guidelines, the City of Newport Beach has determined, on the basis of substantial evidence in the light of the whole record, that the North Newport Center Project does not propose substantial changes to the project, no substantial changes would occur which would require major revisions to the General Plan EIR, and no new information of substantial importance has been revealed since the certification of the General Plan EIR. 3.7 HAZARDS AND HAZARDOUS MATERIALS The following thresholds of significance are as set forth in the General Plan EIR. It states: "Implementation of the proposed project may have a significant adverse impact to the public or the environment through hazards and hazardous materials if it would result in any of the following: • Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials • Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment • Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one - quarter mile of an existing or proposed school • Be located on a site which is included on a list of hazardous materials site compiled pursuant to Government Code Section 65962.5, and as a result, would create a significant hazard to the public or the environment . R. Prolens newpon`dOI I Drah AEenacmn10907 aoc 3 -14 Environmental Analysis Addendum to City of Newport Beach General Plan 2006 Update EIR • For a project located within an airport land use plan, or where such a plan has not been developed, within two miles of a public airport or public use airport, • result in a safety hazard for people residing or working in the project area • Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan • Expose people or structures to a significant risk of loss, injury or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands" No Substantial Change from Previous Analysis. Hazards and hazardous material - related impacts have been previously analyzed as part of the General Plan EIR, which was prepared and certified pursuant to State and City CEQA Guidelines. Minor additions and /or clarifications are needed to make the previous document adequate to cover the actions that are currently proposed, which are documented below and serve as an Addendum to the General Plan EIR. Summary Analvsis Create a Significant Hazard to the Public or the Environment through the Routine Transport, Use, or Disposal of Hazardous Materials Emit Hazardous Emissions or Handle Hazardous or Acutely Hazardous Materials, Substances, or Waste within One - Quarter Mile of an Existing or Proposed School Be Located on a Site Which Is Included On A List Of Hazardous Materials Site Compiled Pursuant To Government Code Section 65962.5, and as a Result, Would Create a Significant Hazard To The Public Or The Environment Impair Implementation Of or Physically Interfere With an Adopted Emergency Response Plan or Emergency Evacuation Plan The General Plan EIR acknowledges that implementation of the 2006 General Plan land uses would result in an increase in commercial development that could increase the routine transport, use, storage, and disposal of hazardous materials. The General Plan also notes that construction activities can result in the exposure of hazardous materials (e.g., lead -based paint and asbestos). The City contains sites that have been identified as being contaminated by the release of hazardous substances into the soil; sites containing leaking underground storage tanks; and large and small generators of hazardous materials. The General Plan EIR notes that projects are required to comply with existing regulations and General Plan policies to protect construction workers and the public. Potential impacts were determined to be less than significant. Future development in North Newport Center could require the demolition of structures. Demolition and construction activities on the four sub -areas would also be subject to compliance with these regulations and policies. The Island Hotel (formerly Four Seasons) in Block 600 is listed as having a leaking underground storage tank (LUST).B A remediation plan has been submitted to the Orange County Local Oversight Program (Local Lead Agency) and to the Santa Ana Regional Water Quality Control Board. The conclusion of this effort is pending. The contaminant identified is diesel fuel. None of . the leaks that have been reported in the City have impacted a drinking source of groundwater. Ibid., Table 4.6 -5. R'TrgeM NewpOKJOi 1 DrWl Adde,ftm 110907 aoc 3 -15 EnvironmentalAnalysis Addendum to City of Newport Beach General Plan 2006 Update EIR As with all development in the City, the Project must comply with existing regulations and General Plan policies regarding hazardous materials. General Plan Policy S 7.3 educates residents and businesses about reducing or eliminating their use of hazardous materials. Policy S 7.6 requires that all users, producers, and transporters of hazardous materials and wastes clearly identify the materials and comply with applicable law. The General Plan EIR notes that increased population and development could result in congested traffic conditions. The 2006 General Plan identifies policies to ensure that the city's Emergency Management Plan is regularly updated, provides for efficient and orderly citywide evacuation, and ensures that emergency service personnel are knowledgeable of the relevant response plans for the City. Such information is also distributed through the community. General Plan policies for handling emergencies would reduce hazardous materials impacts due to growth to a less than significant level. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Expose People or Structures to a Significant Risk of Loss, Injury or Death Involving Wildland Fires, Including Where Wildlands Are Adjacent To Urbanized Areas or Where Residences Are Intermixed With Wildlands North Newport Center is not susceptible to wildland fires; the four sub -areas are completely surrounded by existing urban development. For a Project Located Within an Airport Land Use Plan, or Where Such a Plan has Not Been Developed, Within Two Miles Of a Public Airport Or Public Use Airport, Result In a Safety Hazard For People Residing Or Working In The Project Area The four sub -areas are identified in the Airport Environs Land Use Plan (AELUP) for the John Wayne Airport. The Airport Land Use Commission (ALUC) has found the City of Newport Beach to be a consistent agency with the AELUP. However, the AELUP requires that zone changes for consistent agencies be referred to the ALUC for a determination prior to City action. Therefore, the zone change has been forwarded to the ALUC, and a hearing is scheduled prior to public hearings before the City's Planning Commission and City Council. Additionally, the four sub -areas are within the AELUP Height Restriction Zone. Within this zone, notice to the Federal Aviation Administration (FAA) is required for construction or alteration to any building more than 200 feet above ground level. Prior to construction or alteration of a building more than 200 feet above ground level a Determination of No Hazard must be obtained from the FAA. A determination of No Hazard is the FAA's independent finding that a proposed structure will not pose a hazard to air navigation. The PC Text requires that any structure above 200 feet will be forwarded to the FAA for their independent analysis. Mitigation Program Policies of the 2006 General Plan were adopted as a mitigation program that minimized impacts associated with buildout of the City of Newport Beach, including the implementation of future development in Fashion Island, Block 500, Block 600, and San Joaquin Plaza. The following conditions are included in the North Newport Center PC Text relating the adherence to the AELUP and FAA restrictions: For development of structures that exceed 200 feet in height above ground level at a development site, applicants shall file a Notice of Proposed Construction or Alteration with the FAA (FAA Form 7460 -1). Following the FAA's Aeronautical Study of a project, K ,erojene Ne Pon JOt 1 '0-tt Add.ndum- 11090) U.c 3 -16 Environmental Analysis Addendum to City of Newport Beach General Plan 2006 Update EIR the project must comply with conditions of approval imposed or recommended by the FAA. Subsequent to the FAA findings, the City shall refer the project to the Airport Land Use Commission (ALUC) of Orange County for consistency analysis. 2. No buildings within the Fashion Island /Block 500 /Block 600 /San Joaquin Plaza Planned Community area should penetrate the FAA FAR Part 77 imaginary obstruction surface for John Wayne Airport. 3. Applicants shall file a Notice of Proposed Construction or Alteration with the FAA (Form 7460 -1) for any construction cranes that exceed 200 feet in height above ground level. Level of Significance After Mitigation Consistent with the findings of the General Plan EIR, the General Plan EIR identifies that impacts to hazards and hazardous materials relevant to the Project could be mitigated to a level considered less than significant. Finding of Consistency With General Plan EIR Pursuant to Section 15162 of the CEQA Guidelines, the City of Newport Beach has determined, on the basis of substantial evidence in the light of the whole record, that the North Newport Center Project does not propose substantial changes to the project, no substantial changes would occur which would require major revisions to the General Plan EIR, and no new information of substantial importance has been revealed since the certification of the General Plan EIR. 3.8 HYDROLOGY AND WATER QUALITY The following thresholds of significance are as set forth in the General Plan EIR. It states: "Implementation of the proposed project may have a significant adverse impact on hydrology and water quality, as well as the City's storm drain system, if it would result in any of the following: • Violate any water quality standards or waste discharge requirements • Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table. • Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off -site • Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff • Require or result in the construction and /or expansion of new storm drain infrastructure that would cause significant environmental effects • • Otherwise substantially degrade water quality R•Progens NewpOn'J011 Orafi WUeiM ml 10901 OOO 3 -17 Environmental Analysis Addendum to City of Newport Beach General Plan 2006 Update EIR • Place housing within a 100 -year flood hazard area as mapped on a Federal Flood Hazard Boundary or flood Insurance Rate Map or other flood hazard delineation map • Place within a 100 -year flood hazard area structures which would impede or redirect flows • Expose people or structures to a significant risk or loss, injury or death involving flooding, including flooding as a result of a levee or dam • Expose people or structures to significant risk or loss, injury or death involving inundation by seiche, tsunami, or mudflow" No Substantial Change from Previous Analysis. Hydrology and water quality impacts have been previously analyzed as part of the General Plan EIR, which was prepared and certified pursuant to State and City CEQA Guidelines. Minor additions and /or clarifications are needed to make the previous document adequate to cover the actions that are currently proposed, which are documented below and serve as an Addendum to the General Plan EIR. Summary Analvsis Violate Any Water Quality Standards or Waste Discharge Requirements Create or Contribute Runoff Water Which Would Exceed the Capacity of Existing or Planned Stormwater Drainage Systems or Provide Substantial Additional Sources of Polluted Runoff Otherwise Substantially Degrade Water Quality The General Plan EIR notes that the implementation of development set forth in the 2006 General Plan could result in an increase in pollutants in storm water and wastewater. However, water quality standards and waste discharge requirements would not be violated with compliance with regulations including but not limited to the State Water Resources Control Board Construction General Permit and preparation and implementation of Stormwater Pollution Prevention Plans required for compliance with the NPDES General Construction Stormwater Activity Permit. Permit and regulation compliance would be required for future development projects within Fashion Island, Block 500, Block 600, and San Joaquin Plaza. The City of Newport Beach Municipal Code ensures compliance with federal water quality standards. The Municipal Code also regulates grading, fill, drainage, and erosion control. All construction and development must comply with applicable federal, State, and City laws. Also, General Plan Update policies "would reduce the risk of water degradation from the operation of new developments to the maximum extent practicable. "9 The impact of development under the General Plan Update would be less than significant. As identified in the General Plan EIR, Policy NR 3.16 Street Drainage Systems states "Require all street drainage systems and other physical improvements created by the City, or developers of new subdivisions, to be designed, constructed, and maintained to minimize adverse impacts on water quality. Investigate the possibility of treating or diverting street drainage to minimize impacts to water bodies.i70 General Plan Policy LU 2.8, Adequate Infrastructure, states "Accommodate the types, densities, and mix of land uses that can be adequately supported by 9 Ibid.. page 4.7 -32. 10 Ibid., page 4.14.45. R .Prgens Newpawioi POrafl Addenwm 110907 doc 3 -18 Environmental Analysis 0 0 IL Addendum to City of Newport Beach General Plan 2006 update EIA transportation and utility infrastructure (water, sewer, storm drainage, energy, and so on) and public services (schools, parks, libraries, seniors, youth, police, fire, and so on).77 The General Plan EIR concludes that impacts are less than significant. General Plan Update Policies "would ensure that new development can be adequately supported by utilities such as storm drainage infrastructure ."12 Impacts are less than significant. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Substantially Deplete Groundwater Supplies or Interfere Substantially With Groundwater Recharge Such That There Would Be A Net Deficit in Aquifer Volume or a Lowering of the Local Groundwater Table The General Plan EIR notes that implementation of the General Plan could create additional impervious surfaces which could interfere with groundwater recharge. The General Plan EIR goes on to note that, however, intensification of development would not affect groundwater recharge. As the four sub -areas are currently developed, there would be no substantive change in the amount of impervious surfaces. The EIR finds that "new development would not substantially affect groundwater recharge. Potential impacts to groundwater recharge would be less than significant." 13 The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Require or Result In the Construction and/or Expansion of New Storm Drain Infrastructure That Would Cause Significant Environmental Effects On a citywide basis, the General Plan EIR notes that buildout may require the expansion of storm drains or the construction of new storm drain infrastructure. The existing site drainage has been designed to handle run off from existing structures on the four sub - areas. As future site - specific development is proposed, drainage plans will be developed. The General Plan EIR contains policies that ensure that new development can be adequately supported by utilities such as storm drain infrastructure. The General Plan EIR states "It is not anticipated that this construction of necessary storm drainage upgrades in and of itself would result in impacts separate from the General Plan Update." (See page 4.7 -37) The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Substantially Alter The Existing Drainage Pattern Of The Site Or Area, Including Through The Alteration of The Course Of A Stream Or River, Or Substantially Increase The Rate Or Amount Of Surface Runoff In A Manner Which Would Result In Flooding On- Or Off -Site Place Housing within a 100 -Year Flood Hazard Area as Mapped on a Federal Flood Hazard Boundary or Flood Insurance Rate Map or Other Flood Hazard Delineation Map Place Within a 100 -Year Flood Hazard Area Structures Which Would Impede or Redirect Flows " ibid., page 4.14.34. 12 Ibid., page 4.7 -36. 3 Ibid., page 4.7.33. R P,ojeds NGWp J011 Draft Mdend . -11090? doc 3.19 Environmental Analysis Addendum to City of Newport Beach General Plan 2006 Update Ein Expose People or Structures to A Significant Risk or Loss, Injury or Death Involving Flooding, Including Flooding As A Result Of A Levee or Dam Expose People or Structures to Significant Risk or Loss, Injury or Death Involving Inundation by Seiche, Tsunami, or Mudf low While the General Plan EIR identifies areas of the City that would be vulnerable to flooding and coastal wave systems, the Project is not located in a flood hazard zone14 nor is it proximate to the Pacific Ocean. No impacts are anticipated. Mitigation Program Policies of the 2006 General Plan were adopted as a.mitigation program that minimized impacts associated with buildout of the City of Newport Beach, including the implementation of future development in Fashion Island, Block 500, Block 600, and San Joaquin Plaza. Level of Signlficance After Mitigation Consistent with the findings of the General Plan EIR, the General Plan EIR identifies that impacts to hydrology and water quality could be mitigated to a level considered less than significant. Finding of Consistency With General Plan EIR Pursuant to Section 15162 of the CEQA Guidelines, the City of Newport Beach has determined, on the basis of substantial evidence in the light of the whole record, that the North Newport Center Project does not propose substantial changes to the project, no substantial changes would occur which would require major revisions to the General Plan EIR, and no new information of substantial importance has been revealed since the certification of the General Plan EIR. 3.9 LAND USE AND PLANNING The following thresholds of significance are as set forth in the General Plan EIR. It states: "Implementation of the proposed project may have a significant adverse impact on land use and planning if it would result in any of the following: • Intensify development within the Planning Area that creates incompatibilities with adjacent land uses • Physically divides an established community • Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect • Conflict with any applicable habitat conservation plan or natural community conservation plan" No Substantial Change from Previous Analysis. Land use impacts have been previously analyzed as part of the General Plan EIR, which was prepared and certified pursuant to State 16 Ibid., Figure 4.7 -3 Flood Zones. -,.o �-I— 1 111a naum nuvur"oc 3 -20 Environmental Analysis Addendum to City of Newport Beach General Plan 2006 Update EIR and City CEQA Guidelines. Minor additions and /or clarifications are needed to make the previous document adequate to cover the actions that are currently proposed, which are • documented below and serve as an Addendum to the General Plan EIR. Summary Analysis Intensify Development within the Planning Area that Creates Incompatibilities with Adjacent Land Uses Conflict with any Applicable Land Use Plan, Policy, Or Regulation Of An Agency With Jurisdiction Over The Project (Including, But Not Limited To The General Plan, Specific Plan, Local Coastal Program, Or Zoning Ordinance) Adopted For The Purpose Of Avoiding Or Mitigating An Environmental Effect The General Plan EIR notes that buildout of the 2006 General Plan land uses may result in new uses and structures at an increased intensity that creates incompatibilities with adjacent land uses. These incompatibilities can result from factors including differences in scale of development, noise and traffic levels, and hours of operation. Conflicts can also occur where mixed use development occurs. Newport Center /Fashion Island is a location in the City identified for mixed use development. The General Plan EIR describes this area as: Newport Center /Fashion Island is a regional center of business and commerce that includes major retail, professional office, entertainment, hotel, and residential uses in a master planned mixed use development. Fashion Island, a regional shopping center, forms the nucleus of Newport Center, and is framed by this mixture of office, entertainment, and residential. New land uses in this subarea include . additional commercial uses (approximately 430,000 square feet), approximately 600 multi - family residential units [reduced to 450 units in Final Program EIR] and approximately 250 additional hotel rooms. Residential units have existed in this area since the 1970's, and increased through the 1990s. No conflicts of use between the residential and commercial uses have existed previously in this area, as evidenced by the lack of complaints by area residents. Goals and policies contained in the proposed General Plan Update would serve to promote a mixed use, pedestrian - friendly district for this subarea that would continue commercial and residential uses. Policy LU 6.14.5 encourages improved pedestrian connections and streetscape amenities connecting the area's diverse districts. Goals contained in the proposed General Plan Update related to mixed use development (Goal 5.3) specifically articulate that such development should promote compatibility among uses. General Plan Policy LU 5.3.1 calls for the consideration of compatibility issues in project design of mixed use development. Thus, mixed use development under the proposed General Plan Update would be, by design, compatible with adjacent non - residential uses.15 0 15 Ibid., page 4.8 -11. R Proleas Newpatl J01 I %Dral Addendum 110909 dnc 3 -21 Environmental Analysis Addendum to ON of Newport Beach General Plan 2006 Update As previously noted in this Addendum, Fashion Island is a regional commercial center with retail uses, restaurants, bars, and theater /nightclubs. Block 500 includes office, administrative, professional, and financial uses. Block 600 includes hotel, office, administrative, professional and financial uses, and accessory uses. San Joaquin Plaza includes business and professional office uses. In addition to these four sub - areas, ,Newport Center includes the following sub- areas and land uses: Block Land Use 100 administrative and professional offices, limited accessory retail, financial, service, and entertainment uses 200 administrative and professional offices, limited accessory retail, financial, service, and entertainment uses 300 administrative and professional offices, limited accessory retail, financial, service, and entertainment uses 400 medical- related offices, short-term convalescent and long -term care services, professional offices, retail and other similar uses. 700 regional commercial office and multi - family residential 800 regional commercial office and multi- family residential 900 multi - family housing, visitor serving land uses Land uses outside of Newport Center include single - family and multi - family residences and a golf course in Big Canyon located north of Block 500, Block 600, and San Joaquin Plaza and across San Joaquin Hills Road. Single- family and multi - family residences and general commercial land uses are located east of Newport Center across MacArthur Boulevard. Parks /recreational land uses and single - family residences are located south of Newport Center, across Coast Highway. Open space, single - family residences, visitor - serving commercial and parks /recreational land uses are located west of Newport Center, across Jamboree Road. The General Plan land use designation for Fashion Island is Regional Commercial (CR). Page 3 -13 of the 2006 General Plan states that the CR designation "...is intended to provide retail, entertainment, service, and supporting uses that serve local and regional residents." The land use designations for Block 500, Block 600, and San Joaquin Plaza are Mixed Use Horizontal 3 (MU -H3) and Open Space (OS). As identified in the 2006 General Plan, 'The MU -H3 designation applies to properties located in Newport Center. It provides for the horizontal intermixing of regional commercial office hotel, multi - family residential and ancillary commercial uses."16 Page 3 -16 of the 2006 General Plan states that the OS designation "...is intended to provide areas for a range of public and private uses to protect, maintain, and enhance the community's natural resources." As a part of the proposed project, Block 600 would be rezoned from Administrative, Professional, and Financial (APF) and Open Space (OS) to Planned Community (PC). The North Newport Center PC Text would be adopted to incorporate Fashion Island, Block 600, and portions of Block 500 and San Joaquin Plaza owned by the Applicant into a single Planned Community District. The PC Text would reflect the land uses permitted for these sub -areas under the 2006 General Plan. The General Plan EIR states the following with respect to changes in land use for Newport Center and Fashion Island under the General Plan Update: The Plan allows for expanded retail opportunities at Fashion Island, including an additional anchor department store and ancillary shops, another hotel or additions to existing hotels, and 600 additional housing units [reduced to 450 in Final 16 City of Newport Beach, General Plan, July 25, 2006, page 3 -15. R.,Progeas-Newwn J01 i• Draft F dendum -i 10907 doc 3 -22 Environmental 0 1] Addendum to City of Newport Beach General Plan 2006 Update EIR Program EIR]... Plan policies encourage improved pedestrian connections and streetscape amenities connecting the area's diverse districts." Areas where mixed use development is currently located (e.g., Balboa Peninsula, Mariners' Mile and Newport Center /Fashion Island), would be allowed to develop with more mixed use ... In many locations, the addition of uses similar to existing uses would occur. For instance, additional retail facilities would be permitted in the Fashion Island /Newport Center Area... Where additional development that is the same as or similar to existing development could occur, these uses would be compatible.'a As previously addressed, the four sub -areas are identified in the Airport Environs Land Use Plan (AELUP) for the John Wayne Airport. The Airport Land Use Commission (ALUC) has found the City of Newport Beach to be a consistent agency with the AELUP. However, the AELUP requires that zone changes for consistent agencies be referred to the ALUC for a determination prior to City action. Therefore, the zone change has been forwarded to the ALUC, and a hearing is scheduled prior to public hearings before the City's Planning Commission and City Council. As noted, the General Plan EIR does not identify land use incompatibilities for Newport Center, inclusive of the four sub -areas of the Project. The Project is proposed to provide for zoning consistent with the 2006 General Plan land use designations for the four sub - areas. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Physically Divides an Established Community The General Plan EIR notes that the 2006 General Plan allows for "...limited infill development in select subareas within the City ... These types of proposed development would not divide established communities. Impacts would be less than significant" (See 4.8 -16) With respect to the Project, future development in the four sub -areas would not require the extension of roadways or other development features through developed areas that could physically divide the established community. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Conflict with Any Applicable Habitat Conservation Plan or Natural Community Conservation Plan As previously addressed, North Newport Center is identified as having no conservation value and is not included in the NCCP or HCP. Mltigation Program Policies of the 2006 General Plan were adopted as a mitigation program that minimized impacts associated with buildout of the City of Newport Beach, including the implementation of future development in Fashion Island, Block 500, Block 600, and San Joaquin Plaza. • 17 City of Newport Beach, Final Environmental Impact Report for the General Plan 2006 Update, July 26, 2006, page 3 -15. 18 Ibid., page 4.8 -9. R Projws�Newpm�)01 PDrah Addemdum- 110909 doc 323 Environmental Analysis Addendum to City or Newport Beach General Plan 2006 Update Ein Level of Significance After Mitigation Consistent with the findings of the General Plan EIR, the General Plan EIR identifies that impacts to land use impacts pertaining to the Project could be mitigated to a level considered less than significant. Findinq of Consistency With General Plan EIR Pursuant to Section 15162 of the CEQA Guidelines, the City of Newport Beach has determined, on the basis of substantial evidence in the light of the whole record, that the North Newport Center Project does not propose substantial changes to the project, no substantial changes would occur which would require major revisions to the General Plan EIR, and no new information of substantial importance has been revealed since the certification of the General Plan EIR. 3.10 NOISE The following thresholds of significance are as set forth in the General Plan EIR. It states ..implementation of the proposed project may have a significant adverse noise impact if it would result in any of the following: • Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies • Exposure of persons to or generation of excessive groundborne vibration or groundborne noise levels • A substantial permanent increase in ambient noise levels in the project vicinity above levels existing without the project • A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project • For a project within an airport land use plan, or where such a plan has not been adopted, within two miles of a public airport or public use airport, exposure of people residing or working in the project area to excessive noise levels" No Substantial Change from Previous Analysis. Noise impacts have been previously analyzed as part of the General Plan EIR, which was prepared and certified pursuant to State and City CEQA Guidelines. Minor additions and /or clarifications are needed to make the previous document adequate to cover the actions that are currently proposed, which are documented below and serve as an Addendum to the General Plan EIR. R P.geds Ne On'joi 1 0rau Addeiaum -i IM7,doc 3.24 Environmental Analysis • 0 0 0 Addendum to City of Newport Beach General Plan 2006 Update EIR Summary Analysis Exposure of Persons to or Generation of Noise Levels in Excess Of Standards Established In the Local General Plan or Noise Ordinance, or Applicable Standards of Other Agencies A Substantial Permanent Increase in Ambient Noise Levels in the Project Vicinity Above Levels Existing Without The Project The General Plan EIR identifies that locations throughout the City would experience changes in noise levels as a result of increased motor vehicles and development. Where existing land uses would be exposed to noise levels exceeding the City's noise standards as a result of future growth, the General Plan EIR identifies this as a significant impact. (See 4.9 -22) Figure 4.9-5 of the General Plan EIR identifies that the four sub -areas would be located within 60 CNEL to 65 CNEL future noise contours. These noise contours do not account for any intervening structures or other noise - attenuating features. Additionally, measures for noise attenuation where needed to comply with the City's noise standards are available and include the use of walls, berms, building insulation, double paned windows, etc. Traffic - related noise in the project vicinity has the potential to impact the four sub - areas. The General Plan EIR accounts for noise impacts due to new development under the General Plan Update. The EIR states that new development, "...would result from adoption of the proposed General Plan and regional growth would create noise that would affect new and existing receptors. Most of this noise would be produced by increased traffic on local roads. Many of the proposed General Plan policies, especially those associated with Goal N -2 (Transportation Noise) would reduce this impact.i19 The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Exposure of Persons to or Generation of Excessive Groundborne Vibration or Groundborne Noise Levels The General Plan EIR notes that vibration levels during construction that would exceed 72 vibration decibels (VdB) are considered significant. Such an impact would be specific to a construction site and would be dependent on the types of construction equipment in use and proximity to sensitive receptors and uses. Where construction activities that generate high levels of vibration could not be buffered from sensitive receptors and /or uses by approximately 150 feet, the General Plan EIR identifies that a significant impact would occur. With respect to the four sub - areas, there is a potential for such construction activities to occur under these conditions. As such, consistent with the findings of the General Plan EIR, such an impact would be significant. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. A Substantial Temporary or Periodic Increase in Ambient Noise Levels in the Project Vicinity above Levels Existing Without the Project Potential noise impacts are commonly divided into two groups: temporary and long term. Temporary impacts are usually associated with noise generated by construction activities. 19 City of Newport Beach, Final Environmental Impact Report for the General Plan 2006 Update (State Clearinghouse No. 2006011119), July 26, 2006, page 4.942. n.%P,ajeas'Newo J011 o,an Addendum - 110907 Mo 3 -25 Environmental Analysis Addendum to City of Newport Beach General Plan 2006 Update EIR Generally, construction noise represents a short-term impact on ambient noise levels. Noise generated by construction equipment (including trucks, graders, bulldozers, concrete mixers, • and portable generators) and construction activities can reach high levels. The greatest construction noise levels are typically generated by heavy construction equipment. The City's Noise Ordinance exempts construction activities from the noise level limits during specific hours of the day. Noise - generating construction activities are permitted during the hours between 7:00 AM and 6:30 PM Monday through Friday, between 8:00 AM to 6:00 PM on Saturdays, and at no time on Sundays or federal holidays. Compliance with the City's Noise Ordinance is considered to result in no significant short-term noise impacts. For A Project Within An Airport Land Use Plan, Or Where Such A Plan Has Not Been Adopted, Within Two Miles Of A Public Airport Or Public Use Airport, Exposure Of People Residing Or Working In The Project Area To Excessive Noise Levels As previously noted, Newport Center, inclusive of the four sub - areas, is located within the Airport Environs Land Use Plan (AELUP) for John Wayne Airport. However, the site is not within the either the AELUP 60 or 65 CNEL Noise Contour, and flight operations would not contribute significantly to the overall existing noise exposure on the site. No significant impacts on persons residing or working in the project area are anticipated as a result of project implementation because land use within the planning area boundaries of the AELUP must conform to noise standards, safety, and height restriction standards. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Mitigation Program Policies of the 2006 General Plan were adopted as a mitigation program that minimized impacts associated with buildout of the City of Newport Beach, including the implementation of future development in Fashion Island, Block 500, Block 600, and San Joaquin Plaza. Level of Slqnlficance After Mitigation Consistent with the findings of the General Plan EIR, the General Plan EIR identifies that impacts to noise impacts related to John Wayne Airport and construction activities could be mitigated to a level considered less than significant. Groundborne construction vibrations and long -term exposure to increased noise levels were identified to remain significant and. unavoidable. Finding of Consistency With General Plan EIR Pursuant to Section 15162 of the CEQA Guidelines, the City of Newport Beach has determined, on the basis of substantial evidence in the light of the whole record, that the North Newport Center Project does not propose substantial changes to the project, no substantial changes would occur which would require major revisions to the General Plan EIR, and no new information of substantial importance has been revealed since the certification of the General Plan EIR. 3.11 POPULATION AND HOUSING The following thresholds of significance are as set forth in the General Plan EIR. It states "...implementation of the proposed project may have a significant adverse impact on population and housing if it would result in any of the following: R ProiWs NewpwnJm rDratl Addendum-1 10 7 dm 3 -26 Environmental Analysis Addendum to City of Newport Beach General Plan 2006 Update OF? • Induce substantial population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through the extension of roads or other infrastructure) • Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere • Displace substantial numbers of people, necessitating the construction of replacement housing elsewhere" No Substantial Change from Previous Analysis. Population and housing impacts have been previously analyzed as part of the General Plan EIR, which was prepared and certified pursuant to State and City CEQA Guidelines. Minor additions and /or clarifications are needed to make the previous document adequate to cover the actions that are currently proposed, which are documented below and serve as an Addendum to the General Plan EIR. Summary Analvsis Induce Substantial Population Growth in an Area, Either Directly (For Example, By Proposing New Homes and Businesses) or Indirectly (For Example, Through the Extension of Roads or Other Infrastructure) The General Plan EIR finds that implementation of the 2006 General Plan would induce substantial growth either directly or indirectly. On a citywide basis, residential development would increase the number of units by 9,549 units (24 percent) over 2002 residential unit counts with a related population increase of 20,912 residents. These increases would exceed the Southern California Association of Governments (SCAG) projections. On a citywide basis, the City's projected population growth was considered significant. On a cumulative basis (countywide), the General Plan EIR noted that "...the proposed project would not result in substantial population growth beyond projections, and would not induce substantial population growth in an area, either directly or indirectly." (See pages 4.10 -5 and -6) Buildout of the 2006 General Plan was found to have a less than significant cumulative contribution to growth in the County. (See pages 4.10 -6 and -7) The General Plan EIR analysis was based on a project with 600 units in Newport Center. The adopted 2006 General Plan allows for the development of 450 residential units within the MU- H3 designation .20 Of the 450 units, 430 units are proposed for the North Newport PC District. Residential uses are permitted in Block 500, Block 600, and San Joaquin Plaza. The Project does not include a request for site - specific development, including any residential development. As such, the Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Displace Substantial Numbers of Existing Housing, Necessitating the Construction of Replacement Housing Elsewhere Displace Substantial Numbers of People, Necessitating the Construction of Replacement Housing Elsewhere The General Plan EIR states that the 2006 General Plan would not displace a substantial number of existing homes or residents and that no impact would occur. Development on the 20 City of Newport Beach, General Plan, July 25, 2006, page 3 -97. R%Proieas•.Newporl'=I Draft Addendum I IM7 doc 3 -27 Addendum to City of Newport Beach General Plan 2006 Update EIR four sub -areas would not require the displacement of any existing homes or residents. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, . implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Miti ation Proqram No policies were identified in the 2006 General Plan to reduce the substantial increase in growth in the City. Measures were adopted as a mitigation program that minimized impacts associated with resource impacts with buildout of the City of Newport Beach, including the implementation of future development in Fashion Island, Block 500, Block 600, and San Joaquin Plaza. Level of Significance After Mitigation Consistent with the findings of the General Plan EIR, the General Plan EIR identifies that impacts to population and housing would remain significant and unavoidable. Finding of Consistency With General Plan EIR Pursuant to Section 15162 of the CEQA Guidelines, the City of Newport Beach has determined, on the basis of substantial evidence in the light of the whole record, that the North Newport Center Project does not propose substantial changes to the project, no substantial changes would occur which would require major revisions to the General Plan EIR, and no new information of substantial importance has been revealed since the certification of the General Plan EIR. 3.12 PUBLIC SERVICES The following thresholds of significance are as set forth in the General Plan EIR. It identifies that implementation of the proposed General Plan Update may have a significant adverse impact on public services if it would result in any of the following: Result in substantial adverse environmental impacts associated with the provision of new or physically altered fire or police protection facilities, or schools or libraries; the need for new or physically altered fire or police protection facilities, or schools or libraries; the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, and other performance objectives No Substantial Change from Previous Analysis. Public service impacts have been previously analyzed as part of the General Plan EIR, which was prepared and certified pursuant to State and City CEQA Guidelines. Minor additions and /or clarifications are needed to make the previous document adequate to cover the actions that are currently proposed, which are documented below and serve as an Addendum to the General Plan EIR. r-I LJ R "�Prgeats'Newpw JO1I D.fl AOOeaOum- 110907 dw 3 -28 Environmental Analysis 0 Addendum to City of Newport Beach General Plan 2006 Update EIR Summary Analvsis Result in Substantial Adverse Environmental Impacts Associated with the Provision of New or Physically Altered Fire or Police Protection Facilities, or Schools or Libraries; the Need For New or Physically Altered Fire or Police Protection Facilities, or Schools or Libraries; The Construction of Which Could Cause Significant Environmental Impacts, in Order to Maintain Acceptable Service Ratios, Response Times, And Other Performance Objectives Fire Protection Fire stations are located throughout the City to provide prompt assistance to area residents. Each fire station operates within a specific district that comprises the immediate geographical area around the station. As identified on page 4.11 -3 of the General Plan EIR, Station 3 serves Newport Center. Station 3 has the following equipment and manpower: one Fire Chief; one fire engine with one Captain, one Engineer, and one Firefighter; one ladder truck with one Captain, one Engineer, and one Firefighter; and one paramedic van with two Firefighter Paramedics. The General Plan EIR states that in 2004, "eight fire stations serving the City of Newport Beach responded to a total of 8,863 incidents, which results in an average of about 1,107 incidents per station... These numbers are well within the number of calls recommended by the Insurance Service Office (ISO) when rating a community for fire insurance rates. Specifically, the ISO recommends that a second company be put in service in a fire station if that station receives more than 2,500 calls per year." The General Plan EIR identifies that implementation of the 2006 General Plan could increase the demand for fire protection services which could result in the need for additional fire facilities. Policies of the General Plan require that adequate infrastructure be provided with new development. As such, the General Plan EIR found that compliance with applicable regulations and policies of the 2006 General Plan would ensure that project- specific and cumulative impacts would be less than significant. All new development that would occur under the 2006 General Plan would be required to comply with all applicable federal, State, and local regulations governing the provision of fire protection services, including adequate fire access, fire flows, and number of hydrants. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Police Protection The General Plan EIR identifies that implementation of the 2006 General Plan could increase the demand for police protection services which could result in the need for additional police facilities. The General Plan EIR states that, 'The NBPD provides local police services to the City of Newport Beach. Centrally located at 870 Santa Barbara Drive, the NBPD provides services in crime prevention and investigation, community awareness programs, and other services such as traffic control "21 The EIR also states that the City of Newport Beach currently maintains an acceptable level of service and there are currently no immediate or near - future plans for expansion of police facilities, staff, or equipment inventory. Impacts to police services as a result of General Plan build -out would be less than significant because the "General Plan Update contains policies to ensure that adequate law enforcement is provided as the City experiences future development. For example, Policy LU 2.8 ensures that only land uses that can be adequately supported by the City's Public Services should be accommodated. Compliance with Z' City of Newport Beach, Final Environmental impact Report for the General Plan 2006 Update, July 26, 2006, page 4.11 -13. R. Progeds Newport JOI I Draft AWenaum -nOSO7 eoc 3 -29 Environmental Analysis Addendum to City of Newport Beach General Plan 2006 Update EIR this policy would ensure that adequate service ratios are maintained .,,22 Therefore, adequate service ratios are currently being provided and would be maintained as a result of General Plan policies. As such, the General Plan EIR found that compliance with applicable regulations and policies of the 2006 General Plan would ensure that project- specific and cumulative impacts would be less than significant. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Schools The Newport-Mesa Unified School District (NMUSD) provides educational services to the City of Newport Beach. The General Plan EIR identifies that the School District serves the majority of the City and has 32 public schools including 22 elementary schools, 2 junior high schools, 5 high schools, 2 alternative education centers, and 1 adult school. There are also several private schools in the City or local area that are available to the City's residents for educational services. According to NMUSD administrators, current school capacity is adequate. NMUSD does not currently identify any projected needs. The General Plan EIR states: In the City, implementation of the proposed General Plan Update would result in the construction of approximately 14,215 dwelling units over existing conditions within the City. The increase in dwelling units would increase enrollment in the local schools serving Newport Beach. Using California Department of Finance population projections, and assuming that approximately 20 percent of the potential increase in population would represent children attending grades K through 12, implementation of the proposed General Plan Update would result in an enrollment increase of approximately 6,230 students (3,115 elementary school students, 1,557 students for middle schools, and 1,558 high school students) .23 The General Plan EIR identifies that implementation of the 2006 General Plan would likely result in the construction of new school facilities for NMUSD; these impacts would be less than significant on a project and cumulative basis.24 The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Library Facilities The Newport Beach Public Library provides library services and resources to the City of Newport Beach. The Central Library, which occupies four acres on Avocado Avenue near Newport Center, is a 15,305 square foot building that serves as a school library as well as a public library. As stated in the General Plan EIR, Upon full build -out of the proposed General Plan Update, the population in the Planning Area would increase by 31,131. This increase in residents would increase the demand for library services and facilities. Policy LU 2.8 of the proposed General Plan Update would help ensure that adequate library facilities 22 Ibid., page 4.11 -16. 23 Ibid., page 4.11 -23. 24 Ibid., page 4.11 -24. R Projeas,Newpon J011'pr it Adoendum•L090I Ooc 3 -30 Addendum to City of Newport Beach General Plan 2006 Update EIR are provided to the City's residents and that public services can adequately • support new development... Due to the growing need for electronic resources, former service standards (e.g., a certain number of volumes per thousand residents) are no longer appropriate when assessing the needs of the NBPL. Therefore, increased development in the City does not necessarily immediately equate to an increase in total volumes or square feet of library space. The General Plan EIR identifies that the increase in population associated with the 2006 General Plan, inclusive of uses in Fashion Island, Block 500, Block 600, and San Joaquin Plaza, would not result in a significant impact to library services. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Mitigation Program Policies of the 2006 General Plan were adopted as a mitigation program that minimized impacts associated with buildout of the City of Newport Beach, including the implementation of future development in Fashion Island, Block 500, Block 600, and San Joaquin Plaza. Level of Significance After Mitigation Consistent with the findings of the General Plan EIR, the General Plan EIR identifies that impacts to public services would be less than significant. Finding of Consistency With General Plan EIR Pursuant to Section 15162 of the CEQA Guidelines, the City of Newport Beach has determined, on the basis of substantial evidence in the light of the whole record, that the North Newport Center Project does not propose substantial changes to the project, no substantial changes would occur which would require major revisions to the General Plan EIR, and no new information of substantial importance has been revealed since the certification of the General Plan EIR. 3.13 RECREATION AND OPEN SPACE The following thresholds of significance are as set forth in the General Plan EIR. It states that'... implementation of the proposed project may have a significant adverse impact on parks and recreational facilities if it would result in any of the following: • Increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated Include recreational facilities or require the construction or expansion of recreational facilities that might have an adverse physical effect on the environment • Result in substantial adverse physical impacts associated with the provision of new or physically altered government services, need for new or physically altered government facilities, the construction of which could cause significant 25 Ibid., page 4.11 -28. R Pr0Jed5\NeWP0r1%J011 Draft AddeMum- 110907 dm 3 -31 Environmental Analysis Addendum to City of Newport Beach General Alan 2008 Update Eln environmental impacts, in order to maintain acceptable service ratios or other performance objectives for parks No Substantial Change from Previous Analysis. Park and recreational facility impacts have been previously analyzed as part of the General Plan EIR, which was prepared and certified pursuant to State and City CEQA Guidelines. Minor additions and /or clarifications are needed to make the previous document adequate to cover the actions that are currently proposed, which are documented below and serve as an Addendum to the General Plan EIR. Summary Analysis Increase the Use of Existing Neighborhood and Regional Parks or Other Recreational Facilities Such That Substantial Physical Deterioration of the Facility Would Occur or Be Accelerated Include Recreational Facilities or Require the Construction or Expansion of Recreational Facilities That Might Have an Adverse Physical Effect on the Environment Result in Substantial Adverse Physical Impacts Associated With the Provision of New or Physically Altered Government Services, Need for New or Physically Altered Government Facilities, the Construction of Which Could Cause Significant Environmental Impacts, in Order to Maintain Acceptable Service Ratios or Other Performance Objectives for Parks The General Plan EIR identifies that the City has a deficiency of approximately 38.8 acres of park acreage, with 7 of 12 service areas experiencing a deficit of recreational acreage. Newport Center is in Service Area 9 and has 19 acres of existing parks, an excess of 8.1 acres of parks over the City standard of 5 acres per 1,000 persons. Page 4.12 -3 of the General Plan EIR identifies that a planned park in Newport Center "would help alleviate the citywide park deficit' although Newport Center has a park surplus. The Back Bay View Park was completed in 2005, and a new passive park, Newport Center Park, is planned for development. The General Plan EIR states that 'the construction and enhancement of park and recreational facilities and implementation of the goals and policies proposed in the General Plan would ensure that increased demand and use resulting from an increase in citywide population would not sign'rficantly accelerate the deterioration of existing recreational facilities. "2 The General Plan EIR notes the open space benefits that the Applicant has provided through the Circulation and Improvement and Open Space Agreement ( CIOSA). Page 4.12 -4 states: Some of the City's parks and open space areas consist of dedicated lands through the Circulation and Improvement and Open Space Agreement ( CIOSA). This agreement is between the City of Newport Beach and The Irvine Company, and has allowed building entitlements for The Irvine Company in exchange for payments for circulation projects, an interest free loan, and land for open space and potential senior housing sites for the City. The amount of open space land dedication was substantially more than what would have been required under the City's Park Dedication Ordinance. Six sites have been dedicated under CIOSA in Newport Beach, and include: Back Bay View Park, Newport Center Park (formerly Newport Village), Newporter Knoll, Freeway Reservation, Upper Castaways, and Harbor Cove. Another site, located at Jamboree Road and MacArthur Boulevard, has been offered for • 26 Ibid., page 4.12 -15. R prge= NewpoRJOn Dran AMeMUM -110907 ppc 3 -32 Environmental Analysis Addendum to City of !Newport Beach General Plan 2006 Update EIR dedication and will be dedicated upon issuance of a Certificate of Occupancy for final CIOSA project. The Applicant did not implement all of the development that was allowed pursuant to CIOSA, and provided more park and open space dedication than required for the development that was completed. Through the Development Agreement, the Project includes cancellation of CIOSA. The demand for park facilities that would have resulted from unbuilt entitlement in CIOSA would not be realized. As with new development projects throughout the City, future development in the four sub -areas would be required to comply with the 2006 General Plan Update policies on open space. Through the Development Agreement, the Project includes the payment of park in -lieu fees for 430 residential units, with half the total amount ($5,600,000) to be paid earlier than required. The General Plan EIR finds that compliance with General Plan Update would result in less than significant impacts to parks and recreational facilities. These policies include the requirement that future development dedicate land or pay in -lieu fees at a minimum of 5 acres of parkland per 1,000 persons, and require the use of funding from the City's Park Dedication Fee Ordinance to enhance existing parks and recreation facilities (General Plan Update Policies R1.1 and R2.1).2' General Plan Policy R 1.10 includes three planned parks in West Newport, Newport Center, and Newport Coast. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Mitigation Program Policies of the 2006 General Plan were adopted as a mitigation program that minimized impacts associated with buildout of the City of Newport Beach, including the implementation of future development in Fashion Island, Block 500, Block 600, and San Joaquin Plaza. Level of Slaniflcance After Mitigation Consistent with the findings of the General Plan EIR, the General Plan EIR identifies that impacts to parks and recreation facilities would be less than significant. Finding of Consistency With General Plan EIR Pursuant to Section 15162 of the CEQA Guidelines, the City of Newport Beach has determined, on the basis of substantial evidence in the light of the whole record, that the North Newport Center Project does not propose substantial changes to the project, no substantial changes would occur which would require major revisions to the General Plan EIR, and no new information of substantial importance has been revealed since the certification of the General Plan EIR. 3.14 TRANSPORTATION/TRAFFIC The following thresholds of significance areas set forth in the General Plan EIR. it states that'... implementation of the proposed project may have a significant adverse impact on transportation or circulation if it would result in any of the following: • Cause an increase in traffic which is substantial in relation to the existing traffic load and capacity of the street system (i.e., result in a substantial increase in Z' Ibid.. page 4.12 -17. R. ProjeOS'Newp0a J01 I'D,ah Mdendum- 110907 d0C 3 -33 Environmental Analysts Addendum to Cdy of Newport Beach General Plan 2006 Update EIR either the number of vehicle trips, the volume to capacity ratio on roads, or congestion at intersections) 0 • Exceed, either individually or cumulatively, a level of service standard established by the county congestion management agency for designated roads or highways • Result in a change in air traffic patterns, including either an increase in traffic levels or a change in locations that results in substantial safety risks • Substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment) • Result in inadequate emergency access • Result in inadequate parking capacity • Conflict with adopted policies, plans, or programs supporting alternative transportation (e.g., bus turnouts, bicycle racks)" No Substantial Change from Previous Analysis. Transportation impacts have been previously analyzed as part of the General Plan EIR, which was prepared and certified pursuant to State and City CEQA Guidelines. Minor additions and/or clarifications are needed to make the previous document adequate to cover the actions that are currently proposed, which are documented below and serve as an Addendum to the General Plan EIR. Summary Analysis 0 Cause an Increase in Traffic Which is Substantial In Relation to the Existing Traffic Load and Capacity of The Street System (i.e., Result In A Substantial Increase in Either the Number of Vehicle Trips, the Volume to Capacity Ratio on Roads, or Congestion at Intersections) The General Plan EIR identifies that implementation of the 2006 General Plan could result in a substantial increase in the number of vehicle trips, volume to capacity on roadways, and congestion at intersections when compared to existing conditions in the City. Deficiencies could also occur at freeway segments and ramps. Volume 1A of the General Plan Final EIR identifies that the traffic study accounts for use of currently unused development entitlements. On page 4.13 -1 of the General Plan EIR, the traffic analysis assumes buildout of the City, inclusive of Fashion Island, Block 500, Block 600, and San Joaquin Plaza, consistent with the 2006 General Plan. However, improvements are identified in the General Plan Circulation Element to mitigate citywide impacts to a level that is considered less than significant. However, the City s roadway system must also accommodate regional cumulative vehicular traffic. With improvements identified in the Circulation Element, cumulative impacts to intersection operations can be mitigated to a less than significant level. However, the City's contribution to cumulative impacts associated with freeway segments and ramps would remain significant and unavoidable. The Project is not expected to be completed within 60 months of approval, and it includes a circulation improvement plan, explained in detail in the Development Agreement. The Project therefore qualifies as a Phased Land Use Development and Circulation Improvement Plan under the City's Traffic Phasing Ordinance, Municipal Code §15.40.030.B.2. A traffic study has R Proleds'Newpon`JO11 0rah Addendum- 110907 C. 3 -34 Environmental 9 0 r� �J Addendum to City of Newport Beach General Plan 2006 Update EIR been prepared pursuant to the Traffic Phasing Ordinance, and 'feasible mitigation" (consistent with the 2006 General Plan Circulation Element) is part of the Project. The following provides a summary of the North Newport Center Traffic Phasing Ordinance Study prepared by Austin -Foust Associates, Inc. in November 2007. The study is included in its entirety as Appendix A. The Traffic Phasing Ordinance (TPO) traffic study included the analysis of 40 intersections in the City including 5 intersections on Newport Center Drive using the City's required TPO procedure. This procedure includes both a one percent test and, where necessary, an intersection capacity utilization (ICU) analysis. Consistent with the City's TPO analysis guidelines, the Project is analyzed under short-range conditions (existing volumes plus a regional growth factor and approved projects) without and with cumulative projects (i.e., projects reasonably expected to be complete within one year after project completion which are located within the City of Newport Beach or its Sphere of Influence). Trip Generation Distribution and Analysis. The applicable trip rates and incremental trip generation for the Project is presented in Table 2. The increase in traffic includes a credit for the removal of existing uses. The Project is forecast to generate a net increase over existing of 348 trips in the AM peak hour, 311 trips in the PM peak hour, and 2,399 daily trips. TABLE 2 TRIP GENERATION SUMMARY I Land Use Amount AM Peak Hour PM Peak Hour ADT In Out Total In Out Total TRIP RATES (ITE) Residential DU 0.06 0.28 0.34 0.24 0.14 0.38 4.18 Quality Restaurant TSF 0.66 0.15 0.81 5.02 2.47 7.49 89.95 Shopping Center TSF 0.19 0.12 0.31 0.77 0.84 1.61 16.79 Office (Regression Eq)a TSF 0.95 0.13 1.08 0.19 0.93 1.12 7.07 Health Club TSF 0.51 0.70 1.21 2.07 1.98 4.05 32.93 TRIP GENERATION Existing Uses to be Removed Block 600 Quality Restaurant 16.4 TSF 11 2 13 83 41 123 1,479 Office 8.3 TSF 8 1 9 2 8 10 59 Health Club 17.3 TSF 9 12 21 36 34 70 570 Total Credit -28 .15 -43 .121 -83 -203 -2,108 Proposed Uses Block 500 Office 205.2 TSF 195 27 222 39 191 230 1,451 Block 600 Residential 430 DU 26 120 146 103 60 163 1,797 Fashion Island Shopping Center 75.0 TSF 14 9 23 58 63 121 1,259 Total Proposed Trips 235 156 391 200 314 514 4,507 NET INCREASE 207 141 348 79 231 311 2,399 Trip rates per TSF determined from applying the ITE office regression equations to the existing (408 TSF) and proposed future (614 TSF) office use, and calculating the rates;based on the square footage increment (206 TSF). Source: Austin•FOUSt Associates, Inc. 2007 R Projects Newart JOl I'Dratt Addendum l IWW am 3-36 Environmental Analysis Addendum to City of Newport Beach General Plan 2006 Update ElR For trip distribution, an internal capture rate of 10 percent was used for residential and retail uses. This rate was determined based on ITE's recommended procedure and is consistent with the City's General Plan EIR traffic study, which used a 10 percent capture rate for mixed use areas. For the office space, a five percent internal capture rate was used. A separate trip assignment was prepared for each of the three separate uses (retail /shopping center, residential, and office) in the Project. These assignments, shown by individual uses in Figures A -1 through A -3 in Appendix A, are as follows: 1. North on MacArthur Boulevard 20 -40 percent 2. North on Jamboree Road 15 -30 percent 3• West on Coast Highway 15 -30 percent 4. East on Coast Highway 10 percent One Percent Analysis. The results of the TPO One Percent Analysis are presented in Table 3. This analysis identifies the intersections where the Project adds one percent or more to the background peak hour volume, in which case a more vigorous capacity analysis is performed. Opening year for the Project is assumed to be 2009; therefore, the project year for this analysis is 2010. Table 3 identifies that 39 traffic study area intersections have increases of one percent or greater of existing -plus- approved or existing -plus- approved - plus - cumulative volumes during the AM or PM peak hour. As a result, further analysis is required and a peak hour ICU analysis was conducted for the 39 locations. TABLE 3 ONE PERCENT ANALYSIS Intersection AM Peak Hour Project Volumes Peak Hour es Ng SB EB WB w/o W/CuE lve 1. MacArthur & Campus 8 20 0 0 5No No 2. MacArthur & Birch 8 20 20 0 No 3. MacArthur & Von Karman 8 20 0 0 No 4. Jamboree & Campus 8 20 0 0 Yes Yes 5. Jamboree & Birch 8 20 0 0 Yes Yes 6. MacArthur & Jamboree 8 20 8 20 No No 7. Bayview & Bristol South (EB) 0 0 32 0 No No 8. Jamboree &Bristol North (WB) 29 20 0 0 No No 9. Jamboree & Bristol South (EB) 26 20 31 0 No No 10. Jamboree & Bayview 30 52 0 0 No No 11. Jamboree & Eastbluff /University 35 52 0 0 No No 12. Jamboree & Bison 42 53 0 1 No No 13. Jamboree & Eastbluff /Ford 42 54 0 0 No No 14. Jamboree & San Joaquin Hills 0 54 0 42 No No 15. Jamboree & Santa Barbara 1 0 0 17 No No 16. Jamboree & Coast Highway 0 17 30 15 No No 17. MacArthur & Bison 33 61 6 21 No No 18. MacArthur & Ford /Bonita Canyon 39 80 0 0 No No 19. MacArthur & San Joaquin Hills 0 82 40 0 No No 20. MacArthur & San Miguel 1 0 11 7 No No 21. MacArthur & Coast Highway 0 11 2 19 No No 1122. Santa Cruz & San Joaquin Hills 35 0 54 7 No No H.PrgWs Newport JO l l Dralt Ada.,a.m -i I0 7 doc 3 -36 Environmental Analysis 0 10 S 0 Addendum to City of Newport Beach General Plan 2006 Update EIR TABLE 3 (Continued) ONE PERCENT ANALYSIS Intersection AM Peak Hour Project Volumes Less Than 1 %of Peak Hour Volumes NB se EB WB w/o Cumulative w/Cumuladve 23. Santa Rosa 8 San Joaquin Hills 36 0 49 4 No No 24. San Miguel 8 San Joaquin Hills 0 9 0 0 No No 25. Avocado 8 San Miguel 49 8 10 9 No No 26. Balboa/Superior 8 Coast Highway 0 0 11 18 No No 27. Newport 8 Coast Highway 0 10 11 18 No No 28. Riverside 8 Coast Highway 0 0 22 26 No No 29. Tustin 8 Coast Highway 0 0 22 26 No No 30. Dover /Bayshore 8 Coast Highway 0 9 22 32 No No 31. Bayside 8 Coast Highway 0 0 31 32 No No 32. Newport Center 8 Coast Highway 0 9 29 1 No No 33. Avocado 8 Coast Highway 0 7 28 18 No No 34. Goldenrod 8 Coast Highway 0 0 14 19 No No 35. Marguerite 8 Coast Highway 0 0 14 19 No No 36. Newport Center 8 Santa Barbara 0 0 2 1 No No 37. Santa Cruz 8 Newport Center 1 2 1 0 0 No No 38. Newport Center 8 Santa Rosa 6 30 0 0 No No 39. Newport Center 8 San Miguel 3 17 2 0 No No 40. Fashion Island 8 Newport Center 0 1 0 10 No No Intersection PM Peak Hour Project Volumes Less Than 1 %of Peak Hour volumes NB SB EB WB w/o Cumulative w/Cumulladve 1. MacArthur 8 Campus 21 6 0 0 No No 2. MacArthur 8 Birch 21 6 0 0 No No 3. MacArthur 8 Von Karmen 21 6 0 0 No No 4. Jamboree 8 Campus 21 6 0 0 Yes Yes 5. Jamboree 8 Birch 21 6 0 0 No No 6. MacArthur 8 Jamboree 21 6 21 6 No No 7. Bayview 8 Bristol South (EB) 0 0 18 0 Yes Yes 8. Jamboree 8 Bristol North (WB) 58 6 0 0 No No 9. Jamboree 8 Bristol South (EB) 28 6 15 0 No No 10. Jamboree 8 Bayview 57 25 0 0 No No 11. Jamboree 8 Eastbluff /University 59 25 0 2 No No 12. Jamboree 8 Bison 62 27 0 5 No No 13. Jamboree 8 Easibluff /Ford 62 32 0 0 No No 14. Jamboree 8 San Joaquin Hills 0 32 0 62 No No 15. Jamboree 8 Santa Barbara 6 0 0 5 Yes Yes 16. Jamboree 8 Coast Highway 0 5 13 31 No No 17. MacArthur 8 Bison 84 21 3 11 No No 18. MacArthur 8 Ford/Bonita Canyon 86 28 0 2 No No 19. MacArthur 8 San Joaquin Hills 0 30 87 0 No No 20, MacArt hur 8 San Miguel 4 0 9 0 Yes Yes 21. MacArthur 8 Coast Highway 0 3 15 2 Yes Yes 22. Santa Cruz 8 San Joaquin Hills 14 0 32 48 No No 23. Santa Rosa 8 San Joaquin Hills 59 0 10 14 No No R Pr oied. Ne wpdrtJO11'DramAddendum- lic9o7nac 3-37 EnvironmenfalAnatysis Addendum to City of Newport Beach General Plan 2006 Update EIR TABLE 3 (Continued) ONE PERCENT ANALYSIS Intersection AM Peak Hour Project Volumes Less Than 1% of Peak Hour Volumes NO SB EB WB w/o Cumulative w/CumulaUve 24. San Miguel R San Joaquin Hills 6 0 0 0 Yes Yes 25. Avocado R San Miguel 10 58 1 0 No No 26. Balboa/Superior R Coast Highway 0 0 8 15 Yes Yes 27. Newport R Coast Highway 0 4 8 15 Yes Yes 28. Riverside R Coast Highway 0 0 13 27 Yes Yes 29. Tustin R Coast Highway 0 0 13 27 No Yes 30. Dover /Bayshore R Coast Highway 0 1 13 37 No Yes 31. Bayside R Coast Highway 0 0 13 37 No No 32. Newport Center R Coast Highway 0 0 7 17 Yes Yes 33. Avocado R Coast Highway 0 48 2 0 No No 34. Goldenrod R Coast Highway 0 0 18 2 Yes Yes 35. Marguerite R Coast Highway 0 0 18 2 No Yes 36. Newport Center R Santa Barbara 0 0 9 9 No No 37. Santa Cruz R Newport Center 9 9 0 0 No No 38. Newport Center R Santa Rosa 26 15 0 0 No No 39. Newport Center R San Miguel 10 0 16 0 No No 40. Fashion Island R Newport Center 1 9 1 0 0 No No Source: Austin -Foust Associates, Inc., 2007 ICU Analysis. The results of the ICU analysis are presented in Table 4. A significant project impact is defined as an increase of 0.01 or more in the ICU value at an intersection that reaches LOS E or F. Examination of the results shows that the Project would result in a significant impact at three locations under existing - plus - approved - plus - cumulative conditions. These three locations with their respective with - project ICU values are: Intersection AM Project increment PM Project Increment 19. MacArthur Boulevard and San Joaquin Hills Road 0.73 0.040 0.93 0.027 34. Goldenrod Avenue and Coast Highway 0.91 0.006 0.85 0.005 34. Marguerite Avenue and Coast Highway 0.98 0.006 0.92 0.006 In summary, the Project would cause three traffic study area locations to exceed the TPO standard of LOS D. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. The Project would also allow for the transfer of some existing and entitled uses in Block 600 and replace it with office uses in Block 500. As part of the proposed transfer of uses, the Applicant and the City wish to reserve 72,000 sf of the office use for a possible new City Hall in Block 500. The transfer of development rights within Newport Center is allowed in accordance with the City of Newport Beach General Plan Policy LU 6.14.3 provided the transfer will not result in any adverse traffic impacts. A Trip Transfer Study was prepared by Austin -Foust Associates, Inc. in R P,.,Ws NewpOn J011 Draft AOOeAOU- 110907 OOC 338 Environmental Analysis LJ I� J 0 Addendum to City of Newport Beach General Plan 2006 Update EIR November 2007 to examine the conversion and transfer of the entitled uses into equivalent office uses on the basis of a PM peak hour trip generation equivalency basis. The study is summarized below and included in Appendix A. The transfer would allow for existing uses including a health club, restaurant, and office as well as remaining, but as yet unused entitlement for hotel uses in Block 600, with office use in Block 500. Existing uses in Block 600 equal 42,036 sf of office, restaurant and, health club uses. The unused entitlement in Block 600 is 195 hotel rooms. These entitled uses in Block 600 could be replaced in Block 500 with office use, 72,000 sf of which may be used for a new City Hall. The analysis is based upon use of the worst -case PM peak hour trip rates. Rates for the analysis were taken from the ITE 7h Edition Trip Generation publication. The trips generated by the uses proposed to be eliminated are presented in Table 5. As indicated, the uses included as the basis of the proposed transfer are projected to generate 339 PM peak hour trips. A potential new City Hall of 72,000 sf would generate 108 peak hour trips (based on a rate of 1.5 trips per 1,000 square feet [TSF]) leaving 231 trips, which can be allocated toward other uses. These 231 PM peak hour trips equate to 206,0001 sf of office use based on a trip rate of 1.12 trips/TSF. The Project consists of 205,161 sf of office space in Block 500. Therefore, the total PM peak hour trip generation associated with the converted uses proposed for Block 500 would be 338 trips. R Proiees Newpon'JO11'Draft Aaeeneum- IT 0907 dor, 3 -39 Environmental Analysis a w Q F v Q } a Q mW Q � E- N U + + a a n n ao n aNO fn0 N n N f0O fN0 aD pppp fO n 000 n n n N �0p n p n -I ano 0, co fO aD w O + C _R �' N N (") N CO n Ol N O N O n v V N o0 N (9 n N N N n CO (h n N N n pp N N (") N U N n n n v CO (h fh V N n oD CO + L �+ S +; a V n O1 n O aD O n N aD n f0 Ol N n N N Ol fO V O n n O1 1.03 n O1 0 O N 0 N n 0 p fO op fp n aD I� Ol n n N N fO n aD n aD + + Q 7 °o3 _c �xA Q V N o rl m n N N� op a N n� n� t� ,f0O V f0 N n n v DAD N (7 V i n N op aND W. . N N N fh n n fO 0 0 n f0 N V N N 0 n O1 n (h n CO P..,4 N n N N (`D N fO N N fO f0 n f0O � n A 0 n . (") N n fO Ol n n fo fO N o n V N p) fO O fO (") n (7 fO p) n V n n Ol N (") fO n aD n aD a cQ + N coo m N n N N LD pp pp (") f0O N pp N f0O f0O n y *Zr"o WW N fO coo r . N N N N O n O1 N N N CO n N C_ CO n 5 T x W a N fN0 M N pp 0 N N �p N �p N N N N V r e� V fNO. f0O f0O fNp. n N (7 P0D V e n n m W m N 0 N a C W v c m J = £ L o 'S N ycc 2 J cr J N m C a C N m O .o m 2 O m 0 2 O o J A 3 4 E L c no o o i a ru `c4 11 d S Q =a N W J a� + 1+2 a 1 �p 00 I� p I- OD 0) N N N C C 0>$ + + > c c Y Q 7 N E M W C I� N 0� WO 7 N (O N W C N [p M N W V 1 0)0, OHO n (pp n Ono g N N N C C y+ + maE q V W M- W 'It t0 I 0A C N t0 N N N N K W CL [Mp, CL cs + �c± N a ON n� M tq n ONO O N [p N N Wa CL cp n n N 0 INS, N N N C V + + Imll i4 M O M N n Q N u7 Q 00 N N R W M N n� N N ce n N N N C C mi x W n M C n n Q N N a n tnD N N to a N O O O O O g N _N S W OI N O C 6 O O n O �$$ U= U1 a ul U1 3 Rx y y "a 0 o- 0 "a o. a U a i - ,Zp c a m o U U c c c c m c J C O U C p 0 p p F d N C a U� W a r O. d N F❑ lo Z 6 Z (n Z Z LL O N M 6 s y O N M M M O+O M M M M M M C J fn 2 Addendum to City of Newport Beach General Plan 2006 Update EIR TABLE 5 CONVERTED USES In summary, the currently entitled uses in Block 600 (i.e., 195 hotel rooms and 42,036 sf of health club, retail, and office uses) proposed for transfer to Block 500 equate to 339 PM peak hour trips. These 339 trips would match the amount of PM peak hour trips projected to be generated by a new 72,000 sf City Hall plus another 205,161 sf of office use. Therefore, the proposed transfer of development rights would not result in any adverse traffic impacts. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Exceed, Either Individually or Cumulatively, a Level of Service Standard Established By the County Congestion Management Agency for Designated Roads or Highways The General Plan EIR identifies that all Congestion Management Plan arterials in the City would continue to operate at acceptable levels of service (LOS E or better) with implementation of the 2006 General Plan. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Result In A Change In Air Traffic Patterns, Including Either An Increase In Traffic Levels Or A Change In Locations That Results In Substantial Safety Risks As previously addressed in this Addendum, the four sub -areas are in the AELUP for the John Wayne Airport. The ALUC has found the City of Newport Beach to be a consistent agency with the AELUP. Additionally, the four sub -areas are within the AELUP Height Restriction Zone. Within this zone, notice to the Federal Aviation Administration (FAA) is required for construction or alteration to any building more than 200 feet above ground level. Prior to construction or alteration of a building more than 200 feet above ground level a Determination of No Hazard R rroleasNewp nJ011 Oratt ACCenoom-110907 eoc 3 -42 Environmental Analysis 0 PM PM Use (Entitled in Block 600) Peak Hour Rate Peak Trips Hotel (195 Rooms) — Unbuilt Entitlement 0.70 (ITE 310)' 136 Family Fitness (17,300° sf) — Existing 4.05 (ITE 492)c 70 Palm Gardens (16,447° sf) — Existing 7.49 (ITE 931)° 123 Eliminated Office (6,789° sf) — Existing 1.12 (ITE 710)0 8 Eliminated Office (1,500 sf) — Existing 1.12 (ITE 710)0 2 Total 339 Use (Proposed in Block 500) Office (205,161 sf) 1.12 (ITE 71 Of 230 City Hall (72,000 sf) 1.50 (ITE 750)' 108 Total 338 a Hotel (rates applied for each occupied room) b Per building permit information c Health Club (rates per TSF) d Quality Restaurant (rates per TSF) e Trip rate per TSF determined from applying the ITE office regression equation to the existing (408 TSF) and proposed future (614 TSF) office use, and calculating the rate based on the square footage increment (206 TSF) f Closest ITE rate (in both function and magnitude) to match the GP assumption for City Hall trip generation. Source: Austin -Foust Associates, Inc. 2007 In summary, the currently entitled uses in Block 600 (i.e., 195 hotel rooms and 42,036 sf of health club, retail, and office uses) proposed for transfer to Block 500 equate to 339 PM peak hour trips. These 339 trips would match the amount of PM peak hour trips projected to be generated by a new 72,000 sf City Hall plus another 205,161 sf of office use. Therefore, the proposed transfer of development rights would not result in any adverse traffic impacts. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Exceed, Either Individually or Cumulatively, a Level of Service Standard Established By the County Congestion Management Agency for Designated Roads or Highways The General Plan EIR identifies that all Congestion Management Plan arterials in the City would continue to operate at acceptable levels of service (LOS E or better) with implementation of the 2006 General Plan. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Result In A Change In Air Traffic Patterns, Including Either An Increase In Traffic Levels Or A Change In Locations That Results In Substantial Safety Risks As previously addressed in this Addendum, the four sub -areas are in the AELUP for the John Wayne Airport. The ALUC has found the City of Newport Beach to be a consistent agency with the AELUP. Additionally, the four sub -areas are within the AELUP Height Restriction Zone. Within this zone, notice to the Federal Aviation Administration (FAA) is required for construction or alteration to any building more than 200 feet above ground level. Prior to construction or alteration of a building more than 200 feet above ground level a Determination of No Hazard R rroleasNewp nJ011 Oratt ACCenoom-110907 eoc 3 -42 Environmental Analysis 0 Addendum to City of Newport Beach General Plan 2006 Update Ein must be obtained from the FAA. A determination of No Hazard is the FAA's independent finding • that a proposed structure will not pose a hazard to air navigation. The PC Text requires that any structure above 200 feet will be forwarded to the FAA for their independent analysis. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. As set forth in the General Plan EIR, impacts to John Wayne Airport operations with implementation of the 2006 General Plan are less than significant. Substantially increase Hazards Due To A Design Feature (e.g., Sharp Curves Or Dangerous Intersections) Or Incompatible Uses (e.g., Farm Equipment) The General Plan EIR notes that site - specific projects are not addressed in the 2006 General Plan. As such, it would speculative to determine if any particular project would be designed in a manner to cause safety hazards. The General Plan EIR does identify that none of the circulation improvements identified in the EIR would introduce safety hazards and would not result in significant impacts. With respect to the four sub - areas, as currently developed areas, it is expected that future development consistent with the 2006 General Plan would use the existing roadway system and as such would not cause safety hazards. Any traffic improvements for the Project are consistent with the assumptions set forth in the General Plan EIR, and as noted above, would not result in significant impacts. . The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Result in Inadequate Emergency Access As previously addressed in this Addendum, the General Plan EIR notes that increased population and development could result in congested traffic conditions. The 2006 General Plan identifies policies to ensure that the city's Emergency Management Plan is regularly updated, provides for efficient and orderly citywide evacuation, and ensures that emergency service personnel are knowledgeable of the relevant response plans for the City. Consistent with the findings of the General Plan EIR, the General Plan EIR identifies that traffic impacts related to emergency access would be less than significant with mitigation. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Result In Inadequate Parking Capacity The General Plan EIR does not identify Newport Center as an area of the City with limited parking availability. The North Newport Center Project, as with other projects in the City, would be required to comply with parking requirements identified in the City's Municipal Code. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Conflict with Adopted Policies, Plans, Or Programs Supporting Alternative Transportation (e.g., Bus Turnouts, Bicycle Racks) The 2006 General Plan Circulation Element includes policies related to transportation systems management, transportation demand management, etc. These policies encourage alternative modes of transportation. The General Plan EIR notes that implementation of the 2006 General Plan will not result in significant impacts. The Project is in conformance with the assumptions R PrGleVs%NewpadJOmDraft AWerdum- 110907dOG 3 -43 Environmental Analysis Addendum to City of Newport Beach General Plan 2006 Update EIR set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Mitigation Program Policies of the 2006 General Plan were adopted as a mitigation program that minimized impacts associated with buildout of the City of Newport Beach, including the implementation of future development in Fashion Island, Block 500, Block 600, and San Joaquin Plaza. The following mitigation would also be required for the Project: At MacArthur Boulevard and San Joaquin Hills Road, the Applicant shall construct a third eastbound left -turn lane. The intersection would operate at LOS D with the recommended improvement. This improvement is consistent with the General Plan. Consistent with the TPO, this improvement will be completed early in the development phasing (i.e., before issuance of a certificate of occupancy for the first building [other than a parking structure]) constructed as part of the Project, but in no event later than 60 months from the operative date of the Development Agreement. 2. The Applicant shall work with the City on design and development of circulation enhancements in the North Newport Center area, consistent with the General Plan Circulation Element, including widening of Avocado Avenue between San Miguel Drive and San Nicolas Drive, dedication of public right -of -way and enhancement of San Miguel Drive between MacArthur Boulevard and Avocado Avenue, and installation of traffic signals on Newport Center Drive. Level of Significance After Mitigation At the two other impacted intersections (Goldenrod Avenue at Coast Highway and Marguerite Avenue at Coast Highway), there are no feasible improvements available, a fact which has been recognized and accepted in the 2006 General Plan and General Plan EIR which accepts LOS E at these two intersections. Consistent with the findings of the General Plan EIR, the General Plan EIR identifies that traffic impacts related to intersections, Congestion Management Plan arterials, air traffic patterns, design hazards, emergency access, and parking would be less than significant with mitigation. No feasible mitigation has been identified in the General Plan EIR to reduce impacts to freeway mainlines and ramps; this impact remains significant and unavoidable. Finding of Consistency With General Plan EIR Pursuant to Section 15162 of the CEQA Guidelines, the City of Newport Beach has determined, on the basis of substantial evidence in the light of the whole record, that the North Newport Center Project does not propose substantial changes to the project, no substantial changes would occur which would require major revisions to the General Plan EIR, and no new information of substantial importance has been revealed since the certification of the General Plan EIR. 0 J01 roran A dwdum- 11090] dw 3 -44 Environmental Analysis Addendum to City of Newport Beach General Plan 2006 Update EIR 3.15 UTILITIES AND SERVICE SYSTEMS The following thresholds of significance are as set forth in the General Plan EIR. It identifies that implementation of the proposed General Plan Update may have a significant adverse impact on utilities and service systems if it would result in any of the following: • Require or result in the construction and /or expansion of water supply or wastewater facilities, or new energy or natural gas production or transmission facilities, the construction of which could cause significant environmental impacts • Have sufficient water supplies available to serve the project from existing entitlements and resources, or are new and expanded entitlements needed • Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board • Would the project be served by a landfill with insufficient permitted capacity to accommodate the project's solid waste disposal needs • Would the project fail to comply with applicable federal, State, and local statutes and regulations related to solid waste No Substantial Change from Previous Analysis. Utility and service system impacts have been previously analyzed as part of the General Plan EIR, which was prepared and certified pursuant to State and City CEQA Guidelines. Minor additions and /or clarifications are needed to make the previous document adequate to cover the actions that are currently proposed, which are documented below and serve as an Addendum to the General Plan EIR. Summary Analysis Require or Result in the Construction and/or Expansion of Water Supply or Wastewater Facilities, or New Energy or Natural Gas Production or Transmission Facilities, the Construction of Which Could Cause Significant Environmental Impacts Have Sufficient Water Supplies Available To Serve the Project from Existing Entitlements and Resources, or Are New and Expanded Entitlements Needed Water Supply and Treatment The General Plan EIR notes that buildout of the 2006 General Plan could require the construction of new and /or expanded water treatment plants or water conveyance systems, and that water demand may exceed existing water entitlements. Three sources provide water service to the City of Newport Beach: the City, Irvine Ranch Water District (IRWD), and Mesa Consolidated Water District (MCWD). Water supplied by the City is purchased from two sources. Groundwater is purchased from the Orange County Water District (OCWD) and imported water is purchased from the Metropolitan Water District of Orange County (MWDOC). The water supply assessment conducted for the General Plan EIR assumed full buildout of the 2006 General Plan land uses, inclusive of Fashion Island, Block 500, Block 600, and San Joaquin Plaza. Page 4.14 -20 of the General Plan EIR states: is MWDOC, the City's provider of imported water, IRWD, and Mesa have each indicated they can accommodate the additional demand from the proposed General Plan Update in addition to future growth assumed in the respective R PIORCa'N..POn X11 0ra0 Aldendum910907 me 3 -45 Environmental Analysis Addendum to City of Newport Beach General Alan 2006 Update EIR UWMPs [Urban Water Management Plans]. In addition, the implementation of conservation measures would be required on a project- specific basis and water . shortage contingency plans would further reduce additional water demand. Finally, future development is required to adhere to Section 10910 of the California Water Code. Therefore, the cumulative impact to water supply would be less than significant. In addition to MWDOC, IRWD and Mesa, OCWD projects that there would be sufficient groundwater supplies to meet any future demand requirements in Newport Beach.28 The General Plan EIR concluded that there is sufficient water supply to meet the needs of the City. The General Plan EIR also addressed potential affects of new development on groundwater supplies and concluded that impacts will be less than significant due to conservation policies in the 2006 General Plan. The City's Water Supply Plan accounted for the demand associated with buildout of the 2006 General Plan land uses. The 2006 General Plan includes policies to conserve water and reduce potential impacts to groundwater supply. Citywide, projects inclusive of development in the four sub -areas are required to comply with the City's fair share requirements and with General Plan Update policies on water conservation. Compliance makes impacts less than significant. The General Plan EIR states: "...any request for service resulting from new development would be subject to a site - specific evaluation of the existing water system's capacity to service the development. If improvements to the existing water system are required or additional facilities are needed, the property developer would be required to pay its fair share of the cost of all or portions of the needed improvements' General Plan Update goals and policies promote water conservation and limit water consumption. As such, impacts were found to be less than significant. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. The General Plan EIR states that: Additional development accommodated under the proposed General Plan Update would increase water use within the City, thus increasing the need for water treatment services... [the Metropolitan Water District] MWD can meet 100 percent of the Citys imported water needs until the year 2030 ... any request for service resulting from new development would be subject to a site - specific evaluation of the existing water system's capacity to service the development. If improvements to the existing water system are required or additional facilities are needed, the property developer would be required to pay its fair share of the cost of all or portions of the needed improvements 30 Impacts of the proposed project would be less than significant because General Plan Update Policy LU 2.8 directs the City to accommodate land uses that can be adequately supported by infrastructure, including water treatment and conveyance facilities. As such, adequate water infrastructure would be provided for all development assumed in the 2006 General Plan, inclusive of the four sub - areas. The General Plan EIR finds that "...because future development under the proposed General Plan Update would be required to adhere to existing regulations and the proposed policies identified above, no impact would result." (See 4.14 -30) The Project 28 ibid., page 4.14 -8. . 29Ibid., page 4.14 -17. 30 City of Newport Beach, Final Environmental Impact Report for the General Plan 2006 Update, July 26, 2006, page 4.14 -17. R Praled5 Newppd J01 r Drafl Addendum 11 0907 dpc 3 -46 Environmental Analysis Addendum to City of Newport Beach General Alan 2006 Update EIR is in conformance with the assumptions set forth in the General Plan EIR. Therefore, 10 implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR, Natural Gas CJ Southern California Gas Company (SCGC) provides natural gas service for the City of Newport Beach. The General Plan EIR states: Any expansion of service necessitated by implementation of the proposed General Plan Update would be in accordance with SCGC's policies and extension rules on file with the California Public Utilities Commission at the time contractual agreements are made. Because the natural gas demand projected for the proposed General Plan Update would not exceed available or planned supply, new infrastructure would not be required to serve the proposed project. Therefore, no impact would result.31 The Project is expected not to have a significant impact on natural gas supplies because natural gas demand projected for General Plan buildout, inclusive of the four sub - areas, would not exceed available or planned supply and because new infrastructure would not be needed to serve the four sub - areas. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Exceed Wastewater Treatment Requirements of the Applicable Regional Water Quality Control Board Require or Result in the Construction and/or Expansion of Water Supply or Wastewater Facilities, or New Energy or Natural Gas Production or Transmission Facilities, the Construction of Which Could Cause Significant Environmental Impacts Have Sufficient Water Supplies Available To Serve the Project from Existing Entitlements and Resources, or Are New and Expanded Entitlements Needed Sewer Systems Wastewater from the City's sewer system is treated by the Orange County Sanitation District (OCSD). The General Plan EIR identifies that a majority of the City's sewage flow is pumped to the OCSD Plant No. 2; flows from the portion of the City north of the Corona del Mar Freeway (State Rout 73) are pumped to Plant No. 1. The General Plan EIR states: ...policies under the proposed General Plan Update require the renovation of all older sewer pump stations and the installation of new plumbing according to most recent standards, and implementation of the Sewer System Management Plan and Sewer Master Plan. Implementation of the proposed General Plan Update policies requires adequate wastewater facilities and conveyance systems to be available to the City residents. Therefore, impacts to the wastewater treatment facilities associated with increased growth in the City would be less than significant.32 31 Ibid., page 4.14.50. 32 Ibid., page 4.14 -32. R ProfedsNeMOMdA11 Draft AddeMum I I W07,doc 3.47 Environmental Analysis Addendum to City of Newport Beach General Alan 2006 Update EIR Impacts from implementation of the 2006 General Plan, inclusive of the Project, are expected to have a less than significant impact to sewer systems because implementation of the Sewer System Management Plan and Sewer Master Plan, in conjunction with General Plan policies relating to sewer systems, would reduce impacts to a less than significant level. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Would the Project be Served by a Landfill with Insufficient Permitted Capacity to Accommodate the Project's Solid Waste Disposal Needs Would the Project Fail to Comply With Applicable Federal, State, and Local Statutes and Regulatlons Related to Solid Waste Solid Waste Disposal As noted in the General Plan EIR, the Frank R. Bowerman Sanitary Landfill serves the City, and states: The increase in solid waste generated by the development under the proposed General Plan Update would not exceed capacity of the landfill. In addition, AB 939 mandates the reduction of solid waste disposal in landfills. Consequently, this analysis assumes a worst -case scenario, as it is anticipated that at least approximately 50 percent of the estimated increase in solid waste generation could be diverted (or approximately 10,830 tonslyear). Therefore, the Frank R. Bowerman Sanitary Landfill would have sufficient capacity to serve the increased development within the City under the proposed General Plan Update 33 Citywide buildout under the 2006 General Plan assumptions would not have an impact on solid waste generation or disposal at the Bowerman Landfill. However, on a cumulative basis, the General Plan EIR "without approved specific plans for substantial expansion of the landfill facilities that serve the County, solid waste generation from approved and foreseeable cumulative prop ects in the project area vicinity would exacerbate regional landfill capacity issues in the future: Cumulative impacts are considered significant and unavoidable. The Project is in conformance with the assumptions set forth in the General Plan EIR. Therefore, implementation of the Project would not result in any new impacts or increase the severity of a previously identified significant impact as previously analyzed in the General Plan EIR. Mitigation Program Policies of the 2006 General Plan were adopted as a mitigation program that minimized impacts associated with buildout of the City of Newport Beach, including the implementation of future development in Fashion Island, Block 500, Block 600, and San Joaquin Plaza. Level of Significance After Mitigation Consistent with the findings of the General Plan EIR, the General Plan EIR identifies that all utility and service system impacts can be mitigated to a level of less than significant with the exception of cumulative impacts to landfill capacity; this impact remains significant and unavoidable. a Ibid., page 4.14.44. 34 Ibid., page 4.14.45. R .Projeds NewMaQ01 rDran Addendum.11M7 dog 3-48 Analysis Addendum to City of Newport Beach General Plan 2006 Update EIR Findinq of Consistencv With General Plan EIR Is Pursuant to Section 15162 of the CEQA Guidelines, the City of Newport Beach has determined, on the basis of substantial evidence in the light of the whole record, that the North Newport Center Project does not propose substantial changes to the project, no substantial changes would occur which would require major revisions to the General Plan EIR, and no new information of substantial importance has been revealed since the certification of the General Plan EIR. 11 0 R Prod MNewpon JOl l`Drafl Md ndum -IIN07 4oa 3 -49 Environmental Analysis 0 APPENDIX A TRAFFIC STUDIES is LJ 0 i FINAL City of Newport Beach NEWPORT CENTER TRIP TRANSFER TRAFFIC STUDY Prepared by: Austin -Foust Associates, Inc. 2223 Wellington Avenue, Suite 300 Santa Ana, California 92701 -3161 (714) 667 -0496 November 7, 2007 . City of Newport Beach NEWPORT CENTER TRIP TRANSFER TRAFFIC STUDY As part of the proposed North Newport Center Project, The Irvine Company is proposing to remove some existing and entitled uses in Block 600 and replace them with office uses in Block 500. As part of the proposed transfer of uses, The Irvine Company and the City wish to reserve 72,000 square feet of the converted uses for a new City Hall building in Block 500. The transfer of development rights within Newport Center is allowed in accordance with the City of Newport Beach General Plan Policy LU 6.14.3 provided the transfer will not result in any adverse traffic impacts. Austin -Foust Associates, Inc. (AFA) examined the conversion and transfer of the entitled uses into equivalent office uses on the basis of a PM peak hour trip generation equivalency basis. ANALYSIS The transfer involves existing uses including a health club, restaurant, and office as well as remaining, but as yet unused entitlement for hotel uses in Block 600, which will be replaced by office use in Block 500. The existing uses in Block 600 amount to 42,036 square feet (sf) of office, restaurant and health club uses. The unused entitlement in Block 600 is 195 hotel rooms. These entitled uses in Block 600 are to be replaced in Block 500 with office use, 72,000 sf of which may be used for a new City Hall. The analysis is based upon use of the worst case PM peak hour trip rates. Rates for the analysis were taken from ITE's 7h Edition Trip Generation publication. The trips generated by the uses proposed to be eliminated are calculated in Table 1. As indicated, the uses included as the basis of the proposed transfer are projected to generate 339 PM peak hour trips. A potential new City Hall of 72,000 sf would generate 108 peak hour trips (based on a rate of 1.5 trips per thousand square feet) leaving 231 trips, which can be allocated toward other uses. These 231 PM peak hour trips equate to 206,000± sf of office use based on a trip rate of 1.12 trips/TSF. The proposed project consists of 205,161 sf of office space in Block 500. Therefore, the total PM peak hour trip generation associated with the converted uses proposed for Block 500 would be 338 trips. Newport Center Trip Transfer I At�tin -Foust Associates, Inc. 'I'ra is Snidy 017080rpi.dac Table I CONVERTED USES PM PM Use Entitled in Block 600 Peak Honr Rate Peak Tri s Hotel 195 Rooms) — nbuilt Entitlement 0.70 ITE 310 ' 136 Famil Fitness 17,300* -A 4.05 ITE 492' 70 Palm Gardens 16,447* s — Existin 7.49 ITE 931 123 Eliminated Office 6,789* s — Existin 1.12 ITE 710 4 8 Eliminated Office 1,500 s — Existin 1.12 ITE 710 4 2 TOTAL 339 Use jProposed in Block 500 Office 205,161 s 1.12 ITE 710 4 230 Ci Hall 72,000 s 1.50 ITE 750 4 108 TOTAL 338 * Per building permit information. ' Hotel (rates applied for each occupied room) 'Health Club (rates per TSF) 3 Quality Restaurant (rates per TSF) 4 Trip rate per TSF determined from applying the ITE office regression equation to the existing (408 TSF) and proposed future (614 TSF) office use, and calculating the rate based on the square footage increment (206 TSF) 5 Closest ITE rate (in both function and magnitude) to match the GP assumption for City Hall trip generation. Newport Center Trip'1'mnsfcr ? Auatin-Foul Asurciates. Inc. Trat}ic SNdy 017080rpt.doc 0 • CONCLUSION 0 9 In summary, it is concluded that the currently entitled uses in Block 600 Newport Center (i.e., 195 hotel rooms and 42,036 sf of health club, retail, and office uses) proposed for transfer to Block 500 equate to 339 PM peak hour trips. These 339 trips would match the amount of PM peak hour trips projected to be generated by a new 72,000 sf City Halt plus another 205,161 sf of office use. Therefore, the proposed transfer of development rights will not result in any adverse traffic impacts. Newport ('enter Trip Transfer 3 Austin -Foust Assuciates. Inc. 'fratfic Study 017080rpt.doc FINAL City of Newport Beach NORTH NEWPORT CENTER TRAFFIC PHASING ORDINANCE TRAFFIC STUDY Prepared by: Austin -Foust Associates, Inc. 2223 Wellington Avenue, Suite 300 Santa Ana, California 92701 -3161 (714) 667 -0496 November 6, 2007 J • NORTH NEWPORT CENTER TRAFFIC PHASING ORDINANCE TRAFFIC STUDY A project comprised of 430 residential dwelling units in Block 600, 205,161 square feet (sf) of office space in Block 500, and 75,000 sf of retail shopping center space in Fashion Island is proposed within Newport Center. In addition, a total of 42,036 sf of existing office, restaurant, and health club uses will be removed from Block 600. ANALYSIS A Traffic Phasing Ordinance (TPO) traffic study was conducted for the proposed project. A total of 40 intersections within the City including five intersections on Newport Center Drive (the interior ring road around Fashion Island) were examined using the City's required TPO procedure. This procedure includes both a one percent test and, where necessary, an intersection capacity utilization (ICU) analysis. Consistent with the City's TPO analysis guidelines, the project is analyzed under short-range conditions (existing volumes plus a regional growth factor and approved projects) without and with cumulative projects (i.e., projects reasonably expected to be complete within one year after project completion which are located within the City of Newport Beach or its sphere of influence). Trip Generation Distribution and Analysis The applicable trip rates and incremental trip generation for the proposed project is presented in Table 1. The increase in traffic includes a credit for the proposed removals of existing uses. The proposed project is forecast to generate a net increase over existing of 348 trips in the AM peak hour, 31 t trips in the PM peak hour, and 2,399 trips daily. For trip distribution, an internal capture rate of 10 percent was utilized for the residential and retail uses. This rate was determined based on ITE's recommended procedure (see calculations in Appendix) and is consistent with the City's General Plan traffic study, which also utilizes 10 percent for mixed use areas. For the office space, a five percent internal capture rate was utilized. North Newport Center I Austin -Foust Associates. Inc. Traffic Phasing Ordinance' I'raHic Study 017080tpo.doc North Ncwpun C'cnicr 2 Au.,on -Foust Assoeiales, Inc. '1'raftic Phasing ONtuunec'rntfic Study 0 17001p due 0 0 Table 1 TRIP GENERATION SUMMARY Land Use Amount In AM Peak Hour Out Total PM Peak Hour ADT In Out Total TRIP RATES ITE Residential DU 0.06 0.28 0.34 0.24 .0.14 0.38 4.18 Quality Restaurant TSF 0.66 0.15 0.81 5.02 2.47 7.49 89.95 Shopping Center TSF 0.19 0.12 0.31 0.77 0.84 1.61 16.79 Office (Regression E * TSF 0.95 0.13 1.08 0.19 0.93 1.12 7.07 Health Club TSF 0.51 0.70 1.21 2.07 1.98 4.05 32.93 TRIP GENERATION Existing Uses to be Removed Block 600 Quality Restaurant 16.4 TSF 11 2 13 83 41 123 1,479 Office 8.3 TSF 8 1 9 2 8 10 59 Health Club 17.3 TSF 9 12 21 36 34 70 570 Total Credit -28 -15 -43 -121 -83 -203 -2,108 Proposed Uses Block 500 Office 1205.2 TSF 195 27 222 39 191 230 1,451 Block 600 Residential 430 DU 26 120 146 103 60 163 1,797 Fashion Island Shopping Ctr 75.0 TSF 14 9 23 58 63 121 1 259 Total Proposed Trips 235 156 391 200 314 514 4,507 NETINCREASE 207 141 348 79 231 J7311 2,399 * Trip rates per TSF determined from applying the ITE office regression equations to the existing (408 TSF) and proposed future (614 TSF) office use, and calculating the rates based on the square footage increment (206 TSF). North Ncwpun C'cnicr 2 Au.,on -Foust Assoeiales, Inc. '1'raftic Phasing ONtuunec'rntfic Study 0 17001p due 0 0 0 • A separate trip assignment was prepared for each of the three separate uses (retail/shopping center, residential, and office) in the proposed project. These assignments, shown by individual uses in Figures A -1 through A -3 in the Appendix, are basically as follows: 1. North on MacArthur Boulevard 20-40 percent 2. North on Jamboree Road 15 -30 percent 3. West on Coast Highway 15 -30 percent 4. East on Coast Highway 10 percent One Percent Analysis The results of the TPO One Percent Analysis are listed in Table 2. This analysis identifies the intersections where the project adds one percent or more to the background peak hour volume, in which case a more vigorous capacity analysis is performed. Opening year for the project is assumed to be 2009; therefore, the project year for this analysis is 2010. Examination of Table 2 reveals that 39 study intersections showed increases of one percent or greater of existing -plus- approved or existing -plus- approved- plus - cumulative volumes during the AM or PM peak hour. As a result, further analysis is required and a peak hour ICU analysis was conducted for the 39 locations. ICU Analysis The results of the ICU analysis are presented in Table 3. A significant project impact is defined as an increase of .01 or more in the ICU value at an intersection that reaches LOS "E" or "F ". Examination of the results shows that the project causes a significant impact at three locations under existing -plus- approved - plus - cumulative conditions. These three locations with their respective with - project ICU values are: Intersection AM Project Increment PM Project Increment 19. MacArthur Boulevard and San Joaquin Hills Road .73 .040 .93 .027 34. Goldenrod Avenue and Coast Highway .91 .006 .85 .005 34. Marguerite Avenue and Coast I li hwa .98 .006 .92 .006 Nunh N %Ton Center 3 Atwin -Foust Asm,dates. Inv. 'I'mniv Phasing Ordinnnve rmtfiv Study 0 I 7080tpa.da —'W Ncwp,n ('cntcr '1'raftic pha.ing Ordinancc'I raRic SnWy ; Auatin -Fouxt . \sucmta. Inc. 1117080tpo.dtx 0 0 0 `J Table 2 (Cont.) SUMMARY OF ONE PERCENT ANALYSIS Intersection PM Peak Hour Project Volumes Less Than 1% of Peak Hour Volumes NB SB Ell) WB w/o Cumulative w /Cumulative 1. MacArthur & Campus 21 6 0 0 No No 2. MacArthur & Birch 21 6 0 0 No No 3. MacArthur & Von Karman 21 6 0 0 No No 4. Jamboree & Campus 21 6 0 0 Yes Yes 5. Jamboree & Birch 21 6 0 0 No No 6. MacArthur & Jamboree 21 6 21 6 No No 7. Bayview & Bristol South (EB ) 0 0 18 0 Yes Yes 8. Jamboree & Bristol North (WB) 58 6 0 0 No No 9. Jamboree & Bristol South (EB) 28 6 15 0 No No 10. Jamboree & Bayview 57 25 0 0 No No 11. Jamboree & Eastbluff/University 59 25 0 2 No No 12. Jamboree & Bison 62 27 0 5 No No 13. Jamboree & Eastbluff /Ford 62 32 0 0 No No 14. Jamboree & San Joaquin Hills 0 32 0 62 No No 15. Jamboree & Santa Barbara 6 0 0 5 Yes Yes 16. Jamboree & Coast Highway 0 5 13 31 No No 17. MacArthur & Bison 84 21 3 11 No No 18. MacArthur & Ford/Bonita Canyon 86 28 0 2 No No 19. MacArthur & San Joaquin Hills 0 30 87 0 No No 20. MacArthur & San Mi el 4 0 9 0 Yes Yes 21. MacArthur & Coast Highway 0 3 15 2 Yes Yes 22. Santa Cruz & San Joaquin Hills 14 0 32 48 No No 23. Santa Rosa & San Joaquin Hills 59 0 10 14 No No 24. San Miguel & San Joaquin Hills 6 0 0 0 Yes Yes 25. Avocado & San Miguel 10 1 58 1 0 No No 26. Balboa/Superior & Coast Highway 0 0 8 15 Yes Yes 27. Newport & Coast Highway 0 4 8 15 Yes Yes 28. Riverside & Coast Highway 0 0 13 27 Yes Yes 29. Tustin & Coast Highway 0 0 13 27 No Yes 30. Dover/Bayshorc & Coast Highway 0 1 13 37 No Yes 31. Ba side & Coast Highway 0 0 13 37 No No 32. Newport Center & Coast Highway 0 0 7 17 Yes Yes 33. Avocado & Coast Highway 0 48 2 0 No No 34. Goldenrod & Coast Hi hwa 0 0 18 2 Yes Yes 35. Marguerite & Coast Hi hwa 0 0 18 2 No Yes 36. Newport Center & Santa Barbara 0 0 9 9 No No 37. Santa Cruz & Newport Center 9 9 0 0 No No 38. Newport Center & Santa Rosa 26 15 0 0 No No 39. Newport Center & San Mi guel 10 0 16 0 No No 40. Fashion Island & Newport Center 1 9 0 0 No No North Newport ('enter 1'ruftic Phasing Ordinance 'I'raBic Study .Austin -Foust Associates. Inc. 017090tpa.doc + u .7 C+ L V > O +e> r U oa.= o Q pp � V 7 W M M 7 h r QD 00 QD Q V� d � r C• QD C• W O h r h b� OO O r DD r 00 P r r N�� W a r 00 � � C• + O R L p wdUQN�Me�r'P�,�c�v�i.r �vhi��°r°�aO�arvM V vnaNO ONO allo + y� r r b DD W r b N C �O r r r Oho � L � V + M ^ + L bq =a 'L .Y! x C 0 3 X 3 0 y 9 vJaJw°�alo7�� alaJaJai3SaJaJaJv av V .G C'7 @S 3S °� dJ dJ @J dJ a1 3S !., T Z r °— Lo C, -o uou °� uv off° i E E� E E E E R N R N R� m ro °> 3�� �_ • e��� °x'07 A �- �.= °- .- '°, =°-�c, '•,�'�'�'�'�'v�v�v�Qv�Zw'F -s •� - CI ri �r. .G r` 00 T O •" ^! ri `"t vi �O r` 00 D\ Z °' O Z N 9 • • V O y w � x O O w f 2 e f + u Q i+ p L4 X�+ G h 4 00 r r� N M r 1, W� 4 M N N � N N NIT� M d + + � i a W U a e} 00 r N y 9 i On �O 00 D• N N V Via C 4 � 7 [r] L G+ + + �Q i h o° N N N V O + in d4 Gd 5 M+ O O� 1� O vt N vt N N C a :•' U �° a a °o � o� E u xUZ ,xS y Nvi vim v n y ¢ �`v,Z C4 oU uU3l �' y� v v m !r v O dd N N C o o p w v a� �O CIZ QC7�ZriiZZw 'o v V O y w � x O O w f 2 e f CONCLUSION i In summary, it is concluded that the project causes three study locations to exceed the TPO standard of LOS "D ". At MacArthur Boulevard and San Joaquin Hills Road, the addition of a third eastbound left-turn lane is recommended as mitigation. The intersection will operate at LOS "D" with the recommended improvement. This improvement is consistent with the General Plan. At the two other impacted intersections (Goldenrod Avenue at Coast Highway and Marguerite Avenue at Coast Highway), there are no feasible improvements available, a fact which has been recognized and accepted in the General Plan which accepts LOS "E" at these two intersections. The intersections along Newport Center Drive currently operate at LOS "A" during the AM and PM peak hours. With the addition of project traffic, these intersections will continue to operate at LOS "A" 0 • North Neu port Center 8 'I ra is Phamng Ordinance '1'I nrtic Study Auatin -Fnuu \suuiates. Inc. 1) 170gOtpu.doc 0 L� North Newport Center 'I mf is Phasmy, Ordinance (raffle Study APPENDIX A Ass.xiaics, Inc. 0170M(Itpu.duc 0 9 Table A -I APPROVED AND CUMULATIVE PROJECTS SUMMARY Approved Projects Fashion Island Expansion Newport Lexus Tem lebat Yahm Expansion Birch Medical Office Complex Ford Redevelopment Saafar Fine Indian Cuisine CIOSA — Irvine Project St. Mark Presbyterian Church Ne ort Dunes St. Andrews Presbyterian Church 1401 Dove Street Corporate Plaza West 494/496 Old Newport Boulevard Manner's Mile Gateway 401 Old Newport Boulevard Land Rover NB Service Center Newport Technology Center OL A Church Expansion 1901 Westcliff Surgical Center 2300 Newport Boulevard Hoa& Hos ital Phase III Cumulative Projects Mariners Church Ne ort Ridge Exodus Community Center and Tarbut V'Torah Ex ansion Hoa Health Center Newport Coast Nonh Newport Caner '1'rafic Phasing Ordinance Traffic Swdy A -_ Ausiin -Foust Associaics. Inc. 017090ipoAoc Figure A -1 GENERAL PROJECT DISTRIBUTION RESIDENTIAL Newport Center Development A_g Traffic Phasing Ordinance Traffic Study Austin -Foust Associates, Inc. OI7080tpoFigA -Ldwg 0 i 0 0 0 Figure A -2 GENERAL PROJECT DISTRIBUTION - RETAIL Newport Center Development A -4 Austin -Foust Associates, Inc. Traffic Phasing Ordinance Traffic Study 017080tpoFigA -2.dwg Figure A -3 GENERAL PROJECT DISTRIBUTION OFFICE Newport Center Development A -5 Traffic Phasing Ordinance Traffic Study Austin -Foust Associates, Inc. 017080tpoFigA -3.dwg 0 • PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 1 -6 1% Traffic Volume Analysis 0 Intersection: 1. MacArthur & Campus Existing Traffic Volumes Based on Average Winter /Spring 2006 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected I% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM-PEAKPERIOD Northbound 1000 40 16 0 1056 11 8 Southbound 1478 s9 25 0 1562 16 20 Eastbound 1323 0 10 0 1333 13 0 Westbound 368 0 2 0 370 4 0 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. Pm PEAK .EERIOD Northbound 1361 54 30 0 1445 14 21 Southbound 1905 76 26 0 2007 20 6 Eastbound 993 0 5 0 998 10 0 Westbound 1367 0 6 0 1373 14 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 1 -6 I% Traffic Volume Analysis Intersection: 2. MacArthur& Birch Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume I% of Projected Project Peak 1 Hour Peak 1 Hour Volume Volume AM PEAK PERIOD Northbound 1892 57 11 0 1960 20 8 Southbound 1094 33 26 0 1153 12 20 Eastbound 554 0 7 0 561 6 p Westbound 232 0 0 0 232 2 0 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 1318 40 17 0 1375 14 21 Southbound 2306 69 28 0 2403 24 6 Eastbound 525 0 14 0 539 5 0 Westbound 937 0 2 0 939 9 0 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be I% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO A -7 FULL OCCUPANCY YEAR: 2010 o d lie Westbound 899 0 8 0 907 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 How Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO A -s 9 0 FULL OCCUPANCY YEAR: 2010 1 % Traffic Volume Analysis Intersection: 3. MacArthur & Von Kaman Existing Traffic Volumes Based on Average Winter /Spring 2006 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 % of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM-PEAK PERIOD Northbound 1903 76 9 0 1988 20 8 Southbound 627 25 14 0 666 7 20 Eastbound 155 0 5 0 160 2 0 Westbound 302 0 3 0 305 3 0 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 1014 41 16 0 1071 11 21 Southbound 1097 44 18 0 1159 12 6 Eastbound 640 0 15 0 655 7 0 lie Westbound 899 0 8 0 907 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 How Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO A -s 9 0 FULL OCCUPANCY YEAR: 2010 Westbound 769 0 5 0 774 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO A -9 a 0 FULL OCCUPANCY YEAR: 2010 r 1% Traffic Volume Analysis Intersection: 4. Jamboree & Campus Existing Traffic Volumes Based on Average Winter /Spring 2006 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 %of Projected Project Approach Pen4 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction "Ume Volume Volume Volume Volume Volume Volume AM PEAK PERrOn Nonncound 1520 61 26 0 1607 16 8 Southbound 85 46 0 2265 23 20 Eastbound 290 0 4 0 294 3 0 Westbc % ;" 45 0 3 0 848 8 0 = => Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection C 4city Utilization (ICU) Analysis is required. PM PEAKPERIOD Northbound 2025 81 45 0 2151 22 21 Southbound 2413 97 42 0 2552 26 6 Eastbound 1086 0 2 0 1088 11 0 Westbound 769 0 5 0 774 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO A -9 a 0 FULL OCCUPANCY YEAR: 2010 r Westbound 7 0 0 0 7 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. Northbound Southbound 0 0 1844 74 52 1% Traffic Volume Analysis 1970 20 21 2346 94 45 0 2485 25 6 Intersection: S. Jamboree & Birch Existing Traffic Volumes Based on Average Winter /Spring 2006 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 %of projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 1648 66 28 0 1742 17 8 Southbound 2051 82 57 0 2190 22 20 Eastbound 194 0 0 0 194 2 0 Westbound 7 0 0 0 7 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. Northbound Southbound 0 0 1844 74 52 0 1970 20 21 2346 94 45 0 2485 25 6 Eastbound 509 0 1 0 510 5 0 Westbound 14 0 0 0 14 0 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO • A -m FULL OCCUPANCY YEAR: 2010 1% Traffic Volume Analysis Intersection: 6. MacArthur & Jamboree • Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume 1% of Projected Peak 1 Hour Volume Project Peak 1 Hour Volume AM PEAK PERIOD Northbound 1648 49 28 D 1725 17 6 Southbound 2D51 62 42 D 2155 22 2D Eastbound 194 6 35 D 235 2 8 Wes Wound 7 D 56 D 63 1 2D Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 1844 55 36 0 1935 19 21 Southbound 2346 70 77 0 2493 25 6 Eastbound 509 15 47 0 571 6 21 Westbound 14 0 45 0 59 1 6 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 91 A -II 1r u A -12 I % Traffic Volume Analysis Intersection: 7. Bayview & Bristol South (ES) Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 480 0 0 0 480 5 0 Southbound 0 0 0 0 0 0 0 Eastbound 3107 0 78 0 3185 32 32 Westbound 0 0 0 0 0 0 0 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 641 0 0 0 641 6 0 Southbound 0 0 0 0 0 0 0 Eastbound 3057 0 80 0 3137 31 18 Westbound 0 0 0 0 0 0 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 1r u A -12 Westbound 0 0 0 0 0 0 1 Traffic Volume Analysis Project AM Traffic is estimated to be less than I% of Projected AM Peak 1 Hour Traffic Volume. • Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection: 8. Jamboree & Bristol North (WB) Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Existing Traffic Volumes Based on Average Winter /Spring 2006 30 58 Southbound 1971 79 54 0 2104 21 Peak 1 Hour Approved Cumulative Eastbound 0 0 0 0 0 0 0 Westhound 0 0 0 0 0 Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 3370 135 52 0 3557 36 29 Southbound 1050 42 51 0 1143 11 20 Eastbound 0 0 0 0 0 0 0 Westbound 0 0 0 0 0 0 0 Project AM Traffic is estimated to be less than I% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 2849 114 70 0 3033 30 58 Southbound 1971 79 54 0 2104 21 6 Eastbound 0 0 0 0 0 0 0 Westhound 0 0 0 0 0 0 0 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO A -13 FULL OCCUPANCY YEAR: 2010 •� • 1r u -14 1% Traffic Volume Analysis Intersection: 9. Jamboree & Bristol South (EB) Existing Traffic Volumes Based on Average Winter/Spring 2006 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 11% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 2187 87 75 0 2349 23 26 Southbound 675 27 51 0 753 8 20 Eastbound 2831 0 78 0 2909 29 31 Westbound 0 0 0 0 0 0 0 Project AM Traffic is estimated to be less than 1 %of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 1958 78 118 0 2154 22 28 Southbound 1241 50 52 0 1343 13 6 Eastbound 3273 0 80 0 3353 34 15 Westbound 0 0 0 0 0 0 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 1r u -14 I% Traffic Volume Analysis Intersection: 10. Jamboree & Bayview Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 1935 58 75 0 2068 21 30 Southbound 2006 60 51 0 2117 21 52 Eastbound 88 0 0 0 88 1 0 Westbound 100 0 0 0 100 1 0. I Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 1758 53 118 0 1929 19 57 Southbound 2383 71 52 0 2506 25 25 Eastbound 399 0 0 0 399 4 0 Westbound 170 0 0 0 170 2 0 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis Is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 • A -IS . 1 % Traffic Volume Analysis Intersection: 11. Jamboree & Eastbluff /University, Existing Traffic Volumes Based on Average Winter/Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERLO4 Northbound 1718 52 70 0 1840 18 35 Southbound 1669 50 113 0 1832 18 52 Eastbound 534 0 1 0 535 5 0 Westbound 618 0 5 0 623 6 0 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 1678 50 123 0 1851 19 59 Southbound 2477 74 109 0 2660 27 25 Eastbound 351 0 0 0 351 4 0 Westbound 438 0 10 0 448 Project PM Traffic is estimated to be less than 11% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO 4 2 FULL OCCUPANCY YEAR: 2010 A -16 1% Traffic Volume Analysis . Intersection: 12, Jamboree 8 Bison Existing Traffic Volumes Based on Average Winter/Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 1547 46 60 0 1653 17 42 Southbound 1993 60 105 0 2158 22 53 Eastbound 187 0 0 0 187 2 0 Westbound 319 0 5 0 324 3 1 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required, PM PEAK PERIOD Northbound 1807 54 108 0 1969 20 62 Southbound 2302 69 107 0 2478 25 27 Eastbound 102 0 1 0 103 1 0 Westbound 464 0 6 0 470 5 5 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis Is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 • A -17 r -I `.-A A -1% 1% Traffic Volume Analysis Intersection: 13. Jamboree S Eastbluff/Ford Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AAS.PEAK PERLQD Northbound 1762 53 70 0 1885 19 42 Southbound 1769 53 105 0 1927 19 54 Eastbound 742 0 9 0 751 8 0 Westbound 522 0 12 0 534 5 0 Project AM Traffic is estimated to be less than I% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PAS PEAK PER1013 Northbound 2355 71 125 0 2551 26 62 Southbound 2225 67 94 0 2386 24 32 Eastbound 533 0 4 0 537 5 0 Westbound 373 0 4 0 377 4 0 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic 1s estimated to be 1 %or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT North Newport Center TPO FULL OCCUPANCY YEAR: 2010 r -I `.-A A -1% Westbound 295 0 98 0 393 Project PM Traffic is estimated to be less than I %of Projected PM Peak f Hour Traffic Volume. =_> Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO A -19 4 62 FULL OCCUPANCY YEAR: 2010 1% Traffic Volume Analysis • Intersection: 14. Jamboree & San Joaquin Hills Existing Traffic Volumes Based on Average Winter/Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM_2EAK PERIOD Northbound 1313 39 163 0 1515 15 0 Southbound 1929 58 275 0 2262 23 54 Eastbound 350 0 0 0 350 4 0 Westbound 182 0 38 0 220 2 42 Project AM Traffic is estimated to be less than I% of Projected AM Peak 1 Hour Traffic Volume. =_> Project AM Traffic is estimated to be 1% Or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 1800 54 243 0 2097 21 0 Southbound 2415 72 255 0 2742 27 32 Eastbound 253 0 12 0 265 3 0 Westbound 295 0 98 0 393 Project PM Traffic is estimated to be less than I %of Projected PM Peak f Hour Traffic Volume. =_> Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO A -19 4 62 FULL OCCUPANCY YEAR: 2010 r� A -'_I1 I % Traffic Volume Analysis Intersection: 15. Jamboree R Santa Barbara Existing Traffic Volumes Based on Average Winter/Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 1554 47 53 0 1654 17 1 Southbound 1392 42 123 0 1557 16 0 Eastbound 73 0 6 0 79 1 0 Westbound 146 0 6 0 152 2 17 Project AM Traffic is estimated to be less than 11% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 1246 37 91 0 1374 14 6 Southbound 2100 63 88 0 2251 23 0 Eastbound 38 0 3 0 41 0 0 Westbound 974 0 8 0 982 10 5 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 r� A -'_I1 Eastbound 3049 91 89 0 3229 11% Traffic Volume Analysis 30 Westbound 1252 38 33 0 1323 13 15 Intersection: 16. Jamboree & Coast Hwy = => Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume. Existing Traffic Volumes Based on Average Winter /Spring 2007 PM PEAK PERIOD Peak 1 Hour Approved Cumulative Northbound 398 12 3 0 413 4 0 Southbound Existing Regional Projects Projects Projected 1% of Projected Project 26 Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Project PM Traffic is estimated to be lass than 1 %of Projected PM Peak 1 Hour Traffic Volume. Direction Volume Volume Volume Volume Volume Volume Volume Intersection Capacity Utilization (ICU) Analysis is required. AM PEAK_PERIOD Northbound 488 15 1 0 504 5 0 Southbound 1101 33 106 0 1240 12 17 Eastbound 3049 91 89 0 3229 32 30 Westbound 1252 38 33 0 1323 13 15 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. = => Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 398 12 3 0 413 4 0 Southbound 2060 62 85 0 2207 22 5 Eastbound 2438 73 121 0 2632 26 13 Westbound 2323 70 63 0 2456 25 31 Project PM Traffic is estimated to be lass than 1 %of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO A -_'1 FULL OCCUPANCY YEAR: 2010 9 1• Westbound 694 0 2 0 696 7 21 Project AM Traffic is estimated to be less than 1 %of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. Northbound 2829 85 19 0 2933 29 I% Traffic Volume Analysis Southbound 3252 98 28 0 3378 34 21 Eastbound 597 0 8 0 605 6 3 Westbound 770 0 1 0 771 8 11 Intersection: 17. MacArthur & Bison Existing Traffic Volumes Based on Average Winter/Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected I% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 2817 85 2 0 2904 29 33 Southbound 2357 71 5 0 2433 24 61 Eastbound 604 0 7 0 611 6 6 1• Westbound 694 0 2 0 696 7 21 Project AM Traffic is estimated to be less than 1 %of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. Northbound 2829 85 19 0 2933 29 84 Southbound 3252 98 28 0 3378 34 21 Eastbound 597 0 8 0 605 6 3 Westbound 770 0 1 0 771 8 11 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysisis required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -22 1% Traffic Volume Analysis Intersection: 18. MacArthur & Ford/Bonita Canyon Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected I% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM-PEAK PERIOD Northbound 2108 63 8 0 2179 22 39 Southbound 2465 74 11 0 2550 26 80 . Eastbound 426 0 4 0 430 4 0 Westbound 1775 0 10 0 1785 18 0 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. F"EAK PERIOD Northbound 2877 86 33 0 2996 30 86 Southbound 3151 95 23 0 3269 33 28 li Eastbound 387 0 2 0 389 4 0 Westbound 992 0 12 0 1004 10 2 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated In be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -23 PROJECT: North Newport Center TPO 1• A -24 FULL OCCUPANCY YEAR: 2010 I % Traffic Volume Analysis Intersection: 19. MacArthur 8 San Joaquin Hills Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AMPEAK PERIOD Northbound 1652 50 19 0 1721 17 0 Southbound 2520 76 43 0 2639 26 82 Eastbound 591 0 8 0 599 6 40 Westbound 750 0. 8 0 758 8 0 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic Is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. • PM PEAK PERIOD Northbound 2016 60 46 0 2122 21 0 Southbound 2628 79 54 0 2761 28 30 Eastbound 1062 0 55 0 1117 11 87 Westbound 878 0 8 0 886 9 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Tragic is estimated to be I% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO 1• A -24 FULL OCCUPANCY YEAR: 2010 A -25 1% Traffic Volume Analysis Intersection: 20. MacArthur 8 San Miguel Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 %of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 1883 56 8 0 1947 19 1 Southbound 1765 53 7 0 1825 18 0 Eastbound 190 0 5 0 195 2 11 Westhound 426 0 1 0 427 4 7 Project AM Traffic Is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 1376 41 11 0 1428 14 4 Southbound 2017 61 11 0 2089 21 0 Eastbound 1535 0 29• 0 1564 16 9 Westhound 478 0 12 0 490 5 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -25 u Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -26 11% Traffic Volume Analysis Intersection: 21. MacArthur & Coast Hwy Existing Traffic Volumes Based on Average Winter/Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peek 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 0 0 0 0 0 0 0 Southbound 908 27 3 0 938 9 11 Eastbound 1842 55 10 0 1907 19 2 Westbound 1986 60 12 0 2058 21 19 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 0 0 0 0 0 0 0 Southbound 1832 55 4 0 1691 19 3 Eastbound 1864 56 13 0 1933 19 15 Westbound 1929 58 10 0 1997 20 2 u Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -26 PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -27 1% Traffic Volume Analysis Intersection: 22. Santa Cruz & San Joaquin Hills Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 11% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 72 0 4 0 76 1 35 Southbound 55 0 2 0 57 1 0 Eastbound 748 0 2 0 750 8 54 Westbound 495 0 2 0 497 5 7 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. • PM PEAK PERIOD Northbound 469 0 0 0 469 5 14 Southbound 72 0 2 0 74 1 0 Eastbound 578 0 2 0 580 6 32 Westbound 586 0 2 0 588 6 48 Project PM Traffic is estimated to be less than 1 %of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -27 r A -'x 1% Traffic Volume Analysis Intersection: 23, Santa Rosa & San Joaquin Hills Existing Traffic Volumes Based on Average Winter/Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 %of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 108 0 26 0 134 1 36 Southbound 115 0 0 0 115 1 0 Eastbound 428 0 20 0 448 4 49 Westbound 1032 0 26 0 1058 11 4 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 567 0 67 0 634 6 59 Southbound 98 0 0 0 98 1 0 Eastbound 729 0 26 0 755 8 10 Westbound 580 0 64 0 644 6 14 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 r A -'x Westbound 936 0 4 0 940 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 720 0 28 0 748 9 0 i 7 6 Southbound 423 0 15 0 438 4 11% Traffc Volume Analysis Eastbound 959 0 0 0 959 10 0 Intersection: 24. San Miguel & San Joaquin Hills 1115 0 16 0 1131 11 0 PROJECT: Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. North Newport Center TPO FULL OCCUPANCY YEAR: Existing Traffic Volumes Based on Average Winter/Spring 2007 i Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 322 0 0 0 322 3 0 Southbound 485 0 0 0 485 5 9 Eastbound 729 0 2 0 731 7 0 Westbound 936 0 4 0 940 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 720 0 28 0 748 9 0 i 7 6 Southbound 423 0 15 0 438 4 0'. Eastbound 959 0 0 0 959 10 0 Westbound 1115 0 16 0 1131 11 0 PROJECT: Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. North Newport Center TPO FULL OCCUPANCY YEAR: 2010 i r� U A -30 1% Traffic Volume Analysis Intersection: 25. Avocado & San Miguel Existing Traffic Volumes Based on Average Winter /Spring 2003 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 392 0 0 0 392 4 49 Southbound 118 0 0 0 118 1 8 Eastbound 208 0 0 0 208 2 10 Westbound 1089 0 0 0 1089 11 9 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 891 0 0 0 891 9 10 Southbound 372 0 0 0 372 4 58 Eastbound 724 0 22 0 746 7 1 Westbound 742 0 16 0 758 8 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 r� U A -30 A -31 1% Traffic Volume Analysis Intersection: 26. Balboa/Superior & Coast Hwy Existing Traffic Volumes Based on Average Winter /Spring 2006 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 618 0 31 0 649 6 0 Southbow 479 0 26 0 505 5 0 Eastbound 3468 139 168 0 3775 38 11 Wes, uno 34 28 0 911 9 18 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. P-11 K PERIOD Northbound 535 0 10 0 545 5 0 Southbound 1136 0 162 0 1300 13 0 Eastbound 1649 66 73 0 1788 18 8 Westbound 2446 98 62 0 2606 26 15 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -31 r� �J A -3. 1% Traffic Volume Analysis Intersection: 27. Newport & Coast Hwy Existing Traffic Volumes Based on Average Winter/Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 0 0 0 0 0 0 0 Southbound 653 20 49 0 722 7 10 Eastbound 2562 77 7 0 2646 26 11 Westbound 1098 33 27 0 1158 12 16 Project AM Traffic is estimated to be less than 1°% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1°% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 0 0 0 0 0 0 0 Southbound 1087 33 118 0 1238 12 4 Eastbound 1534 46 77 0 1657 17 8 Westbound 2411 72 14 0 2497 25 15 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 r� �J A -3. A -33 I% Traffic Volume Analysis Intersection: 28. Riverside & Coast Hwy Existing Traffic Volumes Based on Average Winter /Spring 2006 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 8 0 0 0 8 0 0 Southbound 401 0 2 0 403 4 0 Eastbound 2392 96 94 0 2582 26 22 Westbound 1309 52 130 0 1491 15 26 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 47 0 0 0 47 0 0 Southbound 524 0 2 0 526 5 0 Eastbound 1817 73 181 0 2071 21 13 Westbound 2523 101 134 0 2758 28 27 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -33 . 1% Traffic Volume Analysis Intersection: 29. Tustin & Coast Hwy Existing Traffic Volumes Based on Average Winter /Spring 2006 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 %of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 0 0 0 0 0 0 0 Southbound 52 0 0 0 52 1 0 Eastbound 2268 91 86 0 2445 24 22 Westbound 1276 51 55 0 1382 14 26 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. =_> Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 7 0 0 0 7 0 0 Southbound 85 0 0 0 85 1 0 Eastbound 1587 63 91 0 1741 17 13 Westbound 2509 100 103 0 2712 27 27 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 f, u A -b4 PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2DlD A -35 1% Traffic Volume Analysis Intersection: 30. Dover /Bayshore & Coast Hwy Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1%of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 74 0 0 0 74 1 0 Southbound 976 0 24 0 1000 10 9 Eastbound 2421 73 81 0 2575 26 22 Westbound 1720 52 61 0 1833 18 32 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. =_> Project AM Traffic is estimated to be I% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 119 D 0 0 119 1 0 Southbound 1310 0 41 0 1351 14 1 Eastbound 1630 49 118 0 1797 18 13 Westbound 3341 100 92 D 3533 35 37 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2DlD A -35 r� �J A -3G 1 % Traffic Volume Analysis Intersection: 31. Bayside & Coast Hwy Existing Traffic Volumes Based on Average Winter /Spring 2006 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 %of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 446 0 4 0 450 5 0 Southbound 46 0 62 0 108 1 0 Eastbound 3170 127 71 0 3368 34 31 Westbound 1483 59 39 0 1581 18 32 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 523 0 5 0 528 5 0 Southbound 68 0 100 0 168 2 0 Eastbound 2419 97 91 0 2607 26 13 Westbound 3129 125 56 0 3310 33 37 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. __> Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 r� �J A -3G Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 q.i7 Westbound 1447 43 16 0 1506 1 % Traffic Volume Analysis 1 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Intersection: 32. Newport Center & Coast Hwy Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. Existing Traffic Volumes Based on Average Winte (Spring 2007 PM PEAK PERIOD Peak 1 Hour Approved Cumulative Northbound 0 0 0 0 0 0 0 Existing Regional Projects Projects Projected 1 %of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour 2041 61 13 0 2115 Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 0 0 0 0 0 0 0 Southbound 128 0 9 0 137 1 9 Eastbound 1905 57 10 0 1972 20 29 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 q.i7 Westbound 1447 43 16 0 1506 15 1 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 0 0 0 0 0 0 0 Southbound 680 0 34 0 714 7 0 Eastbound 1874 56 26 0 1956 20 7 Westbound 2041 61 13 0 2115 21 17 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 q.i7 1 -3x 1 % Traffic Volume Analysis • Intersection: 33. Avocado & Coast Hwy Existing Traffic Volumes Based on Average WinteriSpring 2006 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 305 0 0 0 305 3 0 Southbound 143 0 0 0 143 1 7 Eastbound 1480 59 6 0 1545 15 28 Westbound 1398 56 15 0 1469 15 18 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. _ => Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 362 0 0 0 362 4 0 Southbound 705 0 1 0 706 7 48 Eastbound 1684 67 11 0 1762 18 2 Westbound 1603 64 7 0 1674 17 0 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 1 -3x A -3U 1 % Traffic Volume Analysis Intersection: 34, Goldenrod & Coast Hwy Existing Traffic Volumes Based on Average Winter/Spring 2006 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1%of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 133 0 0 0 133 1 0 Southbound 59 0 1 0 60 1 0 Eastbound 1187 47 6 0 1240 12 14 Westbound 1990 80 10 0 2080 21 19 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Intersection Capacity Utilization (ICU) Analysis is required. Traffic Volume. PM PEAK PERIOD Northbound 135 0 0 0 135 1 0 Southbound 75 0 0 0 75 1 0 Eastbound 1782 71 8 0 1861 19 18 Westbound 1742 70 7 0 1819 18 2 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -3U A -40 1 % Traffic Volume Analysis • Intersection: 35. Marguerite & Coast Hwy Existing Traffic Volumes Based on Average Winter /Spring 2006 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 249 0 0 0 249 2 0 Southbound 243 0 0 0 243 2 0 Eastbound 1233 49 5 0 1287 13 18 Westbound 1821 73 10 0 1904 19 2 Pmject AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. _ => PmiW AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 241 0 0 0 241 2 0 Southbound 254 0 0 0 254 3 0 Eastbound 1799 72 7 0 1878 19 14 Westbound 1460 58 7 0 1525 15 19 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU)Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -40 A 41 1% Traffic Volume Analysis Intersection: 36. Newport Center & Santa Barbara Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 %of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 223 0 0 0 223 2 0 Southbound 126 0 0 0 126 1 0 Eastbound 227 0 0 0 227 2 2 Westbound 13 0 0 0 13 0 1 Project AM Traffic is estimated to be less than i % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Intersection Capacity Utilization (ICU) Analysis is required. Traffic Volume, PM PEAK PERIOD Northbound 291 0 0 0 291 3 0 Southbound 289 0 0 0 289 3 0 Eastbound 267 0 0 0 267 3 9 Westbound 91 0 0 0 91 1 9 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 • A 41 1 -3'_ 11% Traffic Volume Analysis Intersection: 37. Santa Cruz & Newport Center Existing Traffic Volumes Based on Average Winter/Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 11% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 69 0 0 0 69 1 1 Southbound 166 0 0 0 166 2 2 Eastbound 117 0 0 0 117 1 0 Westbound 181 0 0 0 181 2 0 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 274 0 0 0 274 3 9 Southbound 255 0 0 0 255 3 9 Eastbound 235 0 0 0 235 2 0 Westbound 299 0 0 0 299 3 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 1 -3'_ Eastbound 214 0 0 0 214 2 0 Westbound 298 0 0 0 298 3 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be i% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO A -43 FULL OCCUPANCY YEAR: 2010 1 %Traffic Volume Analysis Intersection: 38. Newport Center & Santa Rosa Existing Traffic Volumes Based on Average WinterlSpring 2003 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 122 0 0 0 122 1 6 Southbound 313 0 0 0 313 3 30 Eastbound 85 0 0 0 85 1 0 Westbound 274 0 0 0 274 3 0 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 278 0 0 0 278 3 26 Southbound 392 0 0 0 392 4 15 Eastbound 214 0 0 0 214 2 0 Westbound 298 0 0 0 298 3 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be i% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO A -43 FULL OCCUPANCY YEAR: 2010 Eastbound 390 0 0 0 390 Westbound 685 0 0 0 685 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume Intersection Capacity Utilization (ICU) Anatysis is required. PROJECT: North Newport Center TPO AJi 4 16 7 0 FULL OCCUPANCY YEAR: 2010 1 % Traffic Volume Analysis • Intersection: 39. Newport Center & San Miguel Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 % of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAKRFRI04 Northbound 322 0 0 0 322 3 3 Southbound 130 0 0 0 130 1 17 Eastbound 69 0 0 0 69 1 2 Westhound 377 0 0 0 377 4 0 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 376 0 0 0 376 4 10 Southbound 388 0 0 0 388 4 0 Eastbound 390 0 0 0 390 Westbound 685 0 0 0 685 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume Intersection Capacity Utilization (ICU) Anatysis is required. PROJECT: North Newport Center TPO AJi 4 16 7 0 FULL OCCUPANCY YEAR: 2010 A-45 1% Traffic Volume Analysis Intersection: 40. Newport Center /Fashion Island & Newport Center Existing Traffic Volumes Based on Average Winter/Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 % of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume A@LP_EAK PERIOD Northbound 501 0 0 0 501 5 0 Southbound .15 0 0 0 15 0 1 Eastbound 229 0 0 0 229 2 0 Westbound 121 0 0 0 121 1 10 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysts is required. PM PEAK PERIOD Northbound 431 0 0 0 431 4 1 Southbound 156 0 0 0 156 2 9 Eastbound 342 0 0 0 342 3 0 Westbound 511 0 0 0 511 5 0 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A-45 A -46 1 % Traffic Volume Analysis Intersection: 1. MacArthur & Campus Existing Traffic Volumes Based on Average Winter /Spring 2006 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 %of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 1000 40 16 150 1206 12 8 Southbound 1478 59 25 58 1620 16 20 Eastbound 1323 0 10 0 1333 13 0 Westbound 368 0 2 0 370 4 0 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 1361 54 30 101 1546 15 21 Southbound 1905 76 26 155 2162 22 6 Eastbound 993 0 5 0 998 10 0 Westbound 1367 0 6 0 1373 14 0 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -46 0 1% Traffic Volume Analysis Intersection: 2. MacArthur 8 Birch Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 %of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume Northbound AM PEAK PERIOD 1892 57 11 150 2110 21 8 Southbound 1094 33 26 58 1211 12 20 Eastbound 554 0 7 0 561 6 0 Westbound 232 0 0 0 232 2 0 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 1318 40 17 101 1476 15 21 Southbound 2306 69 28 155 2558 26 6 Eastbound 525 0 14 0 539 5 0 Westbound 937 0 2 0 939 9 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A-41 Southbound 627 25 14 58 724 1 % Traffic Volume Analysis 20 Eastbound 155 0 5 0 160 2 0 Westbound Intersection: 3. MacArthur & Von Karman 3 0 Northbound Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD 1014 41 16 125 1196 12 ' 21 Existing Traffic Volumes Based on Average WinteriSpring 2006 13 6 Eastbound 640 D 15 0 655 7 Peak 1 Hour Approved Cumulative Westbound 899 D 6 21 928 9 D Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 1903 76 9 168 2156 22 8 Southbound 627 25 14 58 724 7 20 Eastbound 155 0 5 0 160 2 0 Westbound 302 0 3 25 330 3 0 Northbound Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD 1014 41 16 125 1196 12 ' 21 Southbound 1097 44 18 155 1314 13 6 Eastbound 640 D 15 0 655 7 0 Westbound 899 D 6 21 928 9 D Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2D1D A-Jk •I • 1 % Traffic Volume Analysis Intersection: 4. Jamboree & Campus Existing Traffic Volumes Based on Average Winter /Spring 2006 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 %of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 1520 61 26 173 1780 18 8 Southbound 2134 85 46 71 2336 23 20 Eastbound 290 0 4 0 294 3 0 Westbound 845 0 3 0 848 8 0 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 2025 81 45 119 2270 23 21 Southbound 2413 97 42 179 2731 27 6 Eastbound 1086 0 2 0 1088 11 0 Westbound 769 0 5 0 774 8 0 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -49 A-M 1% Traffic Volume Analysis • Intersection: 5. Jamboree & Birch Existing Traffic Volumes Based on Average Winter /Spring 2006 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 % of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PEROD Northbound 1648 66 28 173 1915 19 8 Southbound 2051 82 57 71 2261 23 20 Eastbound 194 0 0 0 194 2 0 Westbound 7 0 0 0 7 0 0 Project AM Traffic is estimated to be less than I% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 1844 74 52 119 2089 21 21 Southbound 2346 94 45 179 2664 27 6 Eastbound 509 0 1 0 510 5 0 Westbound 14 0 0 0 14 0 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A-M r� 1 A -51 1% Traffic Volume Analysis Intersection: 6. MacArthur & Jamboree Existing Traffic Volumes Based on Average Winter/Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 1648 49 28 166 1891 19 8 Southbound 2051 62 42 82 2237 22 20 Eastbound 194 6 35 174 409 4 8 Westbound 7 0 56 71 134 1 20 Project AM Traffic is estimated to be less than I% of Projected AM Peak 1 Hour Traffic Volume. > Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 1844 55 36 138 2073 21 21 Southbound 2346 70 77 176 2669 27 6 Eastbound 509 15 47 106 677 7 21 Westbound 14 0 45 179 238 2 6 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 r� 1 A -51 1 % Traffic Volume Analysis Westbound 0 0 0 0 0 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO AS? 0 0 111 0 FULL OCCUPANCY YEAR: 2010 Aft MW Intersection: 7. Bayview & Bristol South (EB) Existing Traffic Volumes Based on Average WinterlSpring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected I% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 480 0 0 0 480 5 0 Southbound 0 0 0 0 0 0 0 Eastbound 3107 0 78 0 3185 32 32 Westbound 0 0 0 0 0 0 0 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 641 0 0 0 641 6 0 Southbound 0 0 0 0 0 0 0 Eastbound 3057 0 80 0 3137 31 18 Westbound 0 0 0 0 0 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO AS? 0 0 111 0 FULL OCCUPANCY YEAR: 2010 Aft MW PROJECT: North Newport Center TPO 0 A -53 FULL OCCUPANCY YEAR: 2010 Eastbound 0 0 0 0 0 1% Traffic Volume Analysis 0 Westbound 0 0 0 0 0 0 0 Intersection: 8. Jamboree & Bristol North (WB) Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Existing Traffic Volumes Based on Average Winter /Spring 2006 Peak 1 Hour Approved Cumulative PM EAK PERIQQ Existing Regional Projects Projects Projected 1 %of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour 0 0 0 0 0 Direction Volume Volume Volume Volume Volume Volume Volume 0 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. AM PEAK PEFU Intersection Capacity Utilization (ICU) Analysis is required. Northbound 3370 135 52 173 3730 37 29 Southbound 1050 42 51 51 1194 12 20 PROJECT: North Newport Center TPO 0 A -53 FULL OCCUPANCY YEAR: 2010 Eastbound 0 0 0 0 0 0 0 Westbound 0 0 0 0 0 0 0 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM EAK PERIQQ Northbound 2849 114 70 107 3140 31 58 Southbound 1971 79 54 177 2281 23 6 Easthound 0 0 0 0 0 0 0 Westbound 0 0 0 0 0 0 0 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO 0 A -53 FULL OCCUPANCY YEAR: 2010 PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 i A -54 11% Traffic Volume Analysis . Intersection: 9. Jamboree & Bristol South (EB) Existing Traffic Volumes Based on Average Winter /Spring 2006 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PFAK PERIOD Northbound 2187 87 75 173 2522 25 26 Southbound 675 27 51 51 804 8 20 Eastbound 2831 0 78 0 2909 29 31 Westbound 0 0 0 0 0 0 0 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. __> Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 1958 78 118 107 2261 23 28 Southbound 1241 50 52 177 1520 15 6 Eastbound 3273 0 80 0 3353 34 15 Westhound 0 0 0 0 0 0 0 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 i A -54 • Eastbound 88 0 0 0 88 1% Traffic Volume Analysis 0 Westbound 100 0 0 0 100 1 0 Intersection: 10. Jamboree 8 Bayview Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Existing Traffic Volumes Based on Average Winter /Spring 2007 Intersection Capacity Utilization (ICU) Analysis is required. Peak 1 Hour Approved Cumulative PM PEAK PERIOD Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour 399 0 0 0 399 Direction Volume Volume Volume Volume Volume Volume Volume 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. AM_P_EAK PERIOD Intersection Capacity Utilization (ICU) Analysis is required. Northbound 1935 58 75 173 2241 22 30 Southbound 2006 60 51 51 2168 22 52 A -SS Eastbound 88 0 0 0 88 1 0 Westbound 100 0 0 0 100 1 0 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 1758 53 118 107 2036 20 57 Southbound 2383 71 52 177 2683 27 25 Eastbound 399 0 0 0 399 4 0 Westbound 170 0 0 0 170 2 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -SS 1 % Traffic Volume Analysis Westbound 438 D 1D 8D 528 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume Intersection Capacity Ublizaton (ICU) Analysis is required. PROJECT: North Newport Center TPO A ->h 5 2 FULL OCCUPANCY YEAR: 2D1 D 0 0 Intersection: 11. Jamboree & Easlbluff /University, Existing Traffic Volumes Based on Average Winder /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1%of Projected Project Approach Peak 1 Hour Growth Pearl Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM.P_EAK_PERIOD Northbound 1718 52 7D 248 2D88 21 35 Southbound 1669 50 113 51 1883 19 52 Eastbound 534 0 1 D 535 5 D Wastbound 618 D 5 22 645 6 0 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 1678 5D 123 155 2D06 20 59 Southbound 2477 74 1D9 177 2837 28 25 Eastbound 351 D D D 351 4 D Westbound 438 D 1D 8D 528 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume Intersection Capacity Ublizaton (ICU) Analysis is required. PROJECT: North Newport Center TPO A ->h 5 2 FULL OCCUPANCY YEAR: 2D1 D 0 0 • 1% Traffic Volume Analysis Intersection: 12. Jamboree & Bison Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 1547 46 60 2112 3765 38 42 Southbound 1993 60 105 73 2231 22 53 Eastbound 187 0 0 0 187 2 0 Westbound 319 0 5 37 361 4 1 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. • __> Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 1807 54 108 132 2101 21 62 Southbound 2302 69 107 257 2735 27 27 Easthound 102 0 1 0 103 1 0 Westbound 464 0 6 23 493 5 5 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis Is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A - ?7 1 % Traffic Volume Analysis • Intersection: 13. Jamboree & Eastbluff/Ford Existing Traffic Volumes Based on Average Winter/Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 1762 53 70 212 2097 21 42 Southbound 1769 53 105 62 1989 20 54 Eastbound 742 0 9 18 769 8 0 Westbound 522 0 12 117 651 7 0 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. • PM PEAK PERIOD Northbound 2355 71 125 168 2719 27 62 Southbound 2225 67 94 220 2606 26 32 Eastbound 533 0 4 63 600 6 0 Westbound 373 0 4 71 448 4 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -;x Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1 %or greater of Projected AM Peak 1 Hour Traffic Volume. . Intersection Capacity Utilization (ICU) Analysis is required. Northbound 18D0 54 243 148 2245 1 % Traffic Volume Analysis D Southbound 2415 72 255 232 2974 • 32 Intersection: 14. Jamboree & San Joaquin Hills 253 D 12 D 265 3 D Westbound 295 D 98 2D 413 Existing Traffic Volumes Based on Average Winter /Spring 2DD7 _ => Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume: Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected I% of Projected Project Approach Peak 1 Hour GmMh Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 1313 39 163 178 1693 17 0 Southbound 1929 58 275 103 2365 24 54 Eastbound 350 D D D 35D 4 D Westbound 182 D 38 34 254 3 42 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1 %or greater of Projected AM Peak 1 Hour Traffic Volume. . Intersection Capacity Utilization (ICU) Analysis is required. Northbound 18D0 54 243 148 2245 22 D Southbound 2415 72 255 232 2974 30 32 Eastbound 253 D 12 D 265 3 D Westbound 295 D 98 2D 413 4 62 _ => Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume: Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO • % -5d FULL OCCUPANCY YEAR: 2D1D I% Traffic Volume Analysis Intersection: 15. Jamboree & Santa Barbara Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 1554 47 53 178 1832 18 1 Southbound 1392 42 123 94 1651 17 0 Eastbound 73 0 6 0 79 1 0 Westbound 146 0 6 0 152 2 17 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. 21111-P_EAK PERIOD Northbound 1246 37 91 148 1522 15 6 Southbound 2100 63 88 194 2445 24 0 Easthound 38 0 3 0 41 0 0 Westbound 974 0 8 0 982 10 5 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -W PROJECT: North Newport Center TPO 0 A -51 FULL OCCUPANCY YEAR: 2D1D 1 % Traffic Volume Analysis Intersection: 16. Jamboree & Coast Hwy Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 488 15 1 0 504 5 D Southbound 1101 33 106 94 1334 13 17 Eastbound 3049 91 89 120 3349 33 3D Westbound 1252 38 33 471 1794 18 15 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 398 12 3 0 413 4 D Southbound 2060 62 85 194 2401 24 5 Eastbound 2438 73 121 390 3022 3D 13 Westbound 2323 70 63 317 2773 28 31 Project PM Traffic is esthrvated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO 0 A -51 FULL OCCUPANCY YEAR: 2D1D 1% Traffic Volume Analysis . Intersection: 17. MacArthur & Bison Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 %of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM-PEAK PERIOD Northbound 2617 85 2 151 3055 31 33 Southbound 2357 71 5 49 2482 25 61 Eastbound 604 0 7 11 622 6 6 Westbound 694 0 2 52 748 7 21 Pmject AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 2829 85 19 93 3026 30 84 Southbound 3252 98 28 170 3548 35 21 Eastbound 597 0 8 37 642 6 3 Westbound 770 0 1 32 803 8 11 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -62 • 1% Traffic Volume Analysis Intersection: 18. MacArthur & Ford /Bonita Canyon Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 %of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIO Northbound 2108 63 8 183 2362 24 39 Southbound 2465 74 11 45 2595 26 80 Eastbound 426 0 4 15 445 4 0 Westbound 1775 0 10 222 2007 20 0 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 2877 86 33 145 3141 31 86 Southbound 3151 95 23 155 3424 34 2B Eastbound 387 0 2 54 443 4 0 Westbound 992 0 12 169 1173 12 2 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume, Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO 0 A -63 FULL OCCUPANCY YEAR: 2010 PROJECT: North Newport Center TPO A -W FULL OCCUPANCY YEAR: 2010 1% Traffic Volume Analysis Intersection: 19. MacArthur & San Joaquin Hills Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected I%of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 1652 50 19 145 1866 19 0 Southbound 2620 76 43 99 2738 27 82 Eastbound 591 0 8 46 645 6 40 Westbound 750 0 8 191 949 9 0 Project AM Traffic Is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 2016 60 46 183 2305 23 0 Southbound 2628 79 54 190 2951 30 30 Eastbound 1062 0 55 100 1217 12 87 Westbound 878 0 8 139 1025 10 0 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO A -W FULL OCCUPANCY YEAR: 2010 • 1 % Traffic Volume Analysis 1 -65 Eastbound Intersection: 20. MacArthur 8 San Miguel 2 11 Westbound 426 0 1 0 427 Existing Traffic Volumes Based on Average Winter /Spring 2007 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Peak 1 Hour Approved Cumulative Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. Existing Regional Projects Projects Projected I% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume Southbound 2017 61 11 182 2271 23 0 Eastbound 1535 0 29 37 1601 AM PEAK PERIOD 9 Wastbound Northbound 1883 56 8 182 2129 21 1 Southbound 1765 53 7 142 1967 20 0 1 -65 Eastbound 190 0 5 12 207 2 11 Westbound 426 0 1 0 427 4 7 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 1376 41 11 205 1633 16 4 Southbound 2017 61 11 182 2271 23 0 Eastbound 1535 0 29 37 1601 16 9 Wastbound 478 0 12 0 490 5 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 1 -65 1% Traffic Volume Analysis • Intersection: 21. MacArthur & Coast Hwy Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 0 0 0 0 0 0 p Southbound 908 27 3 152 1090 11 11 Eastbound 1842 55 10 145 2052 21 2 Westbound 1986 60 12 474 2532 25 19 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be I% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 0 0 0 0 0 0 0 Southbound 1832 55 4 220 2111 21 3 Eastbound 1864 56 13 456 2389 24 15 Westbound 1929 58 10 286 2283 23 2 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 4 -66 • 1% Traffic Volume Analysis Intersection: 22. Santa Cruz & San Joaquin Hills E�dsting Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 %of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Flour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 72 0 4 0 76 1 35 Southbound 55 0 2 10 67 1 0 Eastbound 748 0 2 9 759 8 54 Westbound 495 0 2 41 538 5 7 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 469 0 0 0 469 5 14 Southbound 72 0 2 9 83 1 0 Eastbound 578 0 2 38 618 6 32 Westbound 586 0 2 30 618 6 48 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR 2010 A -n7 1% Traffic Volume Analysis . Intersection: 23. Santa Rosa & San Joaquin Hills Existing Traffic Volumes Based on Average Winter/Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Projected Peak 1 Hour Volume 11% of Projected Peak 1 Hour Volume Project Peak 1 Hour Volume AM PEAK PERIOD Northbound 108 0 26 11 145 1 36 Southbound 115 0 0 15 130 1 0 Eastbound 428 0 20 19 467 5 49 Westbound 1032 0 26 91 1149 11 4 Project AM Traffic is estimated to be less than 1% of Projected App Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Intersection Capacity Utilization (ICU) Analysis is required. Volume. PM PEAK PERIOD Northbound 567 0 67 42 676 7 59 Southbound 98 0 0 12 110 1 0 Eastbound 729 0 26 47 802 8 10 Westbound 580 0 64 69 713 7 14, Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume.' Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 • A -fix . 1 % Traffic Volume Analysis Intersection: 24. San Miguel & San Joaquin Hills Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 %of Projected Pmject Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 322 0 0 0 322 3 0 Southbound 485 0 0 0 485 5 9 Eastbound 729 0 2 63 794 g 0 Westbound 936 0 4 191 1131 11 0 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 720 0 28 0 748 7 6 Southbound 423 0 15 0 438 4 0 Eastbound 959 0 0 216 1175 12 0 Westbound 1115 0 16 137 1268 13 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 F— 1 L_ J A -fig 1% Traffic Volume Analysis •i • Westbound 742 0 16 22 780 8 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 i A -1n Intersection: 25. Avocado & San Miguel Existing Traffic Volumes Based on Average Winter /Spring 2003 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected I% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 392 0 0 0 392 4 49 Southbound 118 0 0 0 118 1 8 Eastbound 208 0 0 12 220 2 10 Westbound 1089 0 0 37 1126 11 9 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 891 0 0 0 891 9 10 Southbound 372 0 0 0 372 4 58 Eastbound 724 0 22 37 783 8 1 •i • Westbound 742 0 16 22 780 8 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 i A -1n . 1% Traffic Volume Analysis Intersection: 26. Balboa/Superior 8 Coast Hwy Existing Traffic Volumes Based on Average Winter /Spring 2006 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 %of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 618 0 31 14 663 7 0 Southbound 479 0 26 52 557 6 0 Eastbound 3468 139 168 102 3877 39 11 Westbound 849 34 28 231 1142 11 18 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 535 0 10 15 560 6 0 Southbound 1138 0 162 221 1521 15 0 Eastbound 1649 66 73 219 2007 20 8 Westbound 2446 98 62 142 2748 27 15 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 i A -71 1% Traffic Volume Analysis Intersection: 27. Newport & Coast Hwy Existing Traffic Volumes Based on Average Winter/Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected Approach Peak 1 Hour Growth Peak 1 Hour Peak i Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume 1 %of Projected Peak 1 Hour Volume Project Peak 1 Hour Volume AM PEAK PERIOD Northbound 0 0 0 0 0 0 0 Southbound 653 20 49 17 739 7 10 Eastbound 2562 77 7 67 2713 27 11 Westbound 1098 33 27 235 1393 14 18 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD�, Northbound 0 0 0 0 0 0 ', 0 Southbound 1087 33 118 85 1323 13 4 Eastbound 1534 46 77 238 1895 19 8 Westbound 2411 • 72 14 145 2642 26 15 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 i; A.72 • 1 % Traffic Volume Analysis Intersection: 28. Riverside 8 Coast Hwy Existing Traffic Volumes Based on Average Winter /Spring 2006 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 % of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERLO� Northbound B 0 0 0 8 0 0 Southbound 401 0 2 5 406 4 0 Eastbound 2392 96 94 89 2671 27 22 Westbound 1309 52 130 281 1772 18 26 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 47 0 0 0 47 0 0 Southbound 524 0 2 4 530 5 0 Eastbound 1817 73 181 327 2398 24 13 Westbound 2523 101 134 195 2953 30 27 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 7 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 10 A.71 Southbound 1 % Traffic Volume Analysis 1 0 Eastbound 2268 91 86 94 2539 Intersection: 29. Tustin & Coast Hwy 22 Westbound 1276 51 55 280 1662 17 Existing Traffic Volumes Based on Average Winter /Spring 2006 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD 7 0 0 0 7 0 0 Peak 1 Hour Approved Cumulative 85 0 0 0 85 1 0 Eastbound Existing Regional Projects Projects Projected 1 %of Projected Project Westbound Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 0 0 0 0 0 0 0 Southbound 52 0 0 0 52 1 0 Eastbound 2268 91 86 94 2539 25 22 Westbound 1276 51 55 280 1662 17 26 Northbound Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD 7 0 0 0 7 0 0 Southbound 85 0 0 0 85 1 0 Eastbound 1587 63 91 332 2073 21 13 Westbound 2509 100 103 197 2909 29 27 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -7J 0 . 1 % Traffic Volume Analysis Intersection: 30. DoverBayshore & Coast Hwy Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected I% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM.PEAK PERIOD Northbound 74 0 0 0 74 1 0 Southbound 976 0 24 28 1028 10 9 Eastbound 2421 73 81 94 2669 27 22 Westbound 1720 52 61 360 2193 22 32 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 119 0 0 0 119 1 0 Southbound 1310 0 41 83 1434 14 1 Eastbound 1630 49 118 332 2129 21 13 Westbound 3341 100 92 248 3781 38 37 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -75 1% Traffic Volume Analysis' Intersection: 31. Bayside & Coast Hwy Existing Traffic Volumes Based on Average Winter /Spnng 2006 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 446 0 4 0 450 5 0 Southbound 46 0 62 5 113 1 0 Eastbound 3170 127 71 116 3484 35 31 Westbound 1483 59 39 351 1932 19 32 ProJect AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 523 0 5 0 528 5 0 Southbound 68 0 100 4 172 2 0 Eastbound 2419 97 91 365 2992 30 13 Westbound 3129 125 56 238 3548 35 37 Project PM Traffic is estimated to be less than 1 %of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -76 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT North Newport Center TPO FULL OCCUPANCY YEAR: 2010 0 A -77 1% Traffic Volume Analysis Intersection: 32. Newport Center & Coast Hwy Existing Traffic Volumes Based on Average Winter/Spring 2007 Peak i Hour Approved Cumulative Existing Regional Projects Projects Projected 1 %of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PFAK.PERIOD Northbound 0 0 0 0 0 0 0 Southbound 128 0 9 0 137 1 9 Eastbound 1905 57 10 156 2128 21 29 Westbound 1447 43 16 469 1975 20 1 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. 12111111P.I= AK-PERIOD Northbound 0 0 0 0 0 0 0 Southbound 680 0 34 0 714 7 0 Eastbound 1874 56 26 513 2469 25 7 Westbound 2041 61 13 317 2432 24 17 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT North Newport Center TPO FULL OCCUPANCY YEAR: 2010 0 A -77 1% Traffic Volume Analysis 0 Intersection: 33. Avocado 8 Coast Hwy Existing Traffic Volumes Based on Average Winter/Spring 2006 Peak 1 Hour Approved Cumulalive Existing Regional Projects Projects Projected Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume 1 %of Projected Peak 1 Hour Volume Project Peak 1 Hour Volume AM PEAK PERIOD Northbound 305 0 0 0 305 3 0 Southbound 143 0 0 0 143 1 7 Eastbound 1480 59 6 156 1701 17 28 Westbound 1398 56 15 469 1938 19 18 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. 0 PM PEAK PERIOD Northbound 362 0 0 0 362 4 0 Southbound 705 0 1 0 706 7 48 Easthound 1684 67 11 513 2275 23 2 Westhound 1603 64 7 317 1991 20 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -7x PROJECT: North Newport Center TPO is k -79 FULL OCCUPANCY YEAR: 2010 1% Traffic Volume Analysis Intersection: 34. Goldenrod & Coast Hwy Existing Traffic Volumes Based on Average Winter /Spring 2006 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 0/a of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 133 '0 0 0 133 1 0 Southbound 59 0 1 0 60 1 0 Eastbound 1187 47 6 159 1399 14 14 Westbound 1990 80 10 502 2582 26 19 Project AM Traffic is estimated to be less than 1% of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 135 0 0 0 135 1 0 Southbound 75 0 0 0 75 1 0 Eastbound 1782 71 8 527 2388 24 18 Westbound 1742 70 7 317 2136 21 2 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO is k -79 FULL OCCUPANCY YEAR: 2010 Westbound 1821 73 10 515 2419 1 % Traffic Volume Analysis 19 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. Intersection: 35. Marguerite & Coast Hwy PM PEAK PERIOD Northbound 241 0 0 0 241 2 Existing Traffic Volumes Based on Average Winter /Spring 2006 254 0 0 13 267 3 0 Eastbound 1799 72 7 527 2405 Peak 1 Hour Approved Cumulative 18 Westbound 1460 58 7 324 1849 18 2 Existing Regional Projects Projects Projected 1% of Projected Project Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 249 0 0 0 249 2 0 Southbound 243 0 0 3 246 2 0 Eastbound 1233 49 5 159 1446 14 14 Westbound 1821 73 10 515 2419 24 19 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1 % or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 241 0 0 0 241 2 0 Southbound 254 0 0 13 267 3 0 Eastbound 1799 72 7 527 2405 24 18 Westbound 1460 58 7 324 1849 18 2 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO A -80 FULL OCCUPANCY YEAR: 2010 0 1% Traffic Volume Analysis A-81 Eastbound Intersection: 36, Newport Center & Santa Barbara 2 2 Westbound 13 0 0 0 13 Existing Traffic Volumes Based on Average WinterfSpdng 2007 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Peak 1 Hour Approved Cumulative Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume Southbound 289 0 0 0 289 3 0 Eastbound 267 0 0 0 267 AM PEAK PERIOD 9 Westbound Northbound 223 0 0 0 223 2 0 Southbound 126 0 0 0 126 1 0 A-81 Eastbound 227 0 0 0 227 2 2 Westbound 13 0 0 0 13 0 1 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 291 0 0 0 291 3 0 Southbound 289 0 0 0 289 3 0 Eastbound 267 0 0 0 267 3 9 Westbound 91 0 0 0 91 1 9 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A-81 Southbound 1% Traffic Volume Analysis 2 2 Eastbound 117 0 0 0 117 1 Intersection: 37. Santa Cruz & Newport Center Westbound 181 0 0 0 181 2 0 Existing Traffic Volumes Based on Average Winter /Spring 2007 Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Peak 1 Hour Approved Cumulative Intersection Capacity Utilization (ICU) Analysis is required. Existing Regional Projects Projects Projected 1 %of Projected Project 274 0 0 0 274 Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour 9 Direction Volume Volume Volume Volume Volume Volume Volume 299 0 0 0 299 3 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. AM PEAK PERIOD Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Northbound 69 0 0 0 69 1 1 2010 Southbound 166 0 0 0 166 2 2 Eastbound 117 0 0 0 117 1 0 Westbound 181 0 0 0 181 2 0 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 274 0 0 0 274 3 9 Southbound 255 0 0 0 255 3 9 Eastbound 235 0 0 0 235 2 0 Westbound 299 0 0 0 299 3 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 n -N? 0 0 r� u 4 -K3 1% Traffic Volume Analysis Intersection: 38. Newport Center & Santa Rosa Existing Traffic Volumes Based on Average Winter /Spring 2003 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected I% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 122 0 0 0 122 1 6 Southbound 313 0 0 0 313 3 30 Eastbound 85 0 0 0 85 1 0 Westbound 274 0 0 0 274 3 0 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK-PERIOD Northbound 278 0 0 0 278 3 26 Southbound 392 0 0 0 392 4 15 Eastbound 214 0 0 0 214 2 0 Westbound 298 0 0 0 298 3 0 Project PM Traffic is estimated to be less than 1% of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 r� u 4 -K3 A -84 I % Traffic Volume Analysis • Intersection: 39. Newport Center 8 San Miguel Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 %of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 322 0 0 0 322 3 3 Southbound 130 0 0 0 130 1 17 Eastbound 69 0 0 0 69 1 2 Westbound 377 0 0 0 377 4 0 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 376 0 0 0 376 4 10 Southbound 388 0 0 0 388 4 0 Eastbound 390 0 0 0 390 4 16 Westbound 685 0 0 0 685 7 0 Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1 % or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -84 . 1 % Traffic Volume Analysis Intersection: 40. Newport Center /Fashion Island & Newport Center Existing Traffic Volumes Based on Average Winter /Spring 2007 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 %of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 501 0 0 0 501 5 0 Southbound 15 0 0 0 15 0 1 Eastbound 229 0 0 0 229 2 0 Westbound 121 0 0 0 121 1 10 Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be 1% or greater of Projected AM Peak 1 Hour Traffic Volume, Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 431 0 0 0 431 4 1 Southbound 156 0 0 0 156 2 9 Eastbound 342 0 0 0 342 3 0 Westbound 511 0 0 0 511 5 0 Pmject PM Traffic is estimated to be less than 1 % of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be 1% or greater of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: North Newport Center TPO FULL OCCUPANCY YEAR: 2010 A -xi 1. MacArthur F Campus Existing TOTAL CAPACITY UTILIZATION .496 .764 Existing + Growth + Approved + Project AM PK HOUR PM PK HOUR A14 PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 53 .533 155 .591* NBT 4 6400 897 .140* 1171 .183 NBR 1 1600 50 .031 35 .022 SBL 1 1600 261 .16 3* 131 .082 SET 4 6400 918 .143 i138 .113* SBR 1 1600 299 .187 666 .416 EBL 2 3200 458 .143 336 .105' EBT 3 4800 778 .180* 455 .137 EBR 0 0 87 0 202 89 WBL 2 3200 43 .013* 132 .041 WET 3 4800 225 .047 :080 .225* WBR f .221' 100 f 155 Right Turn Adjustment SBR .164* TOTAL CAPACITY UTILIZATION .496 .764 Existing + Growth + Approved + Project A14 PK HOUR AM PK HOUR PM PK HOUR LANES LANES CAPACITY VOL V/C VOL VIC NBL 1 1600 55 .034 157 .098* NET 4 6400 955 .i49* 1265 .198 NBR 1 1600 50 .031 37 .023 SBL 1 1600 261 .163* 131 .082 SBT 4 64C0 998 .156 1181 .185* SBR . 1 1600 301 .188 669 .418 EEL 2 3200 461 .144 338 .106* EST 3 4830 782 .131* 4755 .141 EBR 0 u 89 204 254 85:. W3L 2 3280 44 .3:4` 1 35 ,542 1.51 3 483C 22' .47 1382 .221' WBR f 1:3 i5E SBP TOTAL CAPACITY UTILIZATION .507 .767 A -86 Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C . NBL 1 1600 55 .034 157 .098* NBT 4 6400 947 .148* 1244 .194 NBR 1 1600 50 .031 37 .023 SBL 1 1600 261 .163* 131 .082 SBT 4 6400 978 .153 1175 .184* SBR 1 1600 301 .188 669 .418 EBL 2 3200 461 .144 338 .106* EST 3 4800 782 .181* 475 .141 EBR 0 0 89 204 WBL 2 3200 44 .0141 135 .042 WBT 3 4800 227 .047 1082 .225' WBR f 100 156 Right Turn Adjustment SBR .154* TOTAL CAPACITY UTILIZATION .506 .767 Existing + Growth + Approved + Cumulative A14 PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 55 .034 157 .098' NET 4 6400 1C97 .111* 1345 .210 NBR 1 160C 50 .031 37 .023 SBL 1 1600 261 .163• 131 .082 SET 4 6400 1036 .162 1330 .208* SBR 1 1600 301 .188 669 .418 EBL 2 3200 461 .144 338 .106* EBT 3 4800 782 .181* 475 .141 E3R C C 89 204 85:. 2 1260 44 314' _35 .042 UBT 3 4E0b 227 .^147 i082 .225* iiO.R 1:3 i5E SBP .:35' TOTAL CAPACITY UTILIZATION .529 .767 0 1 0 1. MacArthur a Campus Wsting + Growth + Approved + Cumulative + project AM PK HOUR PM PK HOUR LANES CAPACITY VCL V/C VOL V/C NBL 1 i600 55 .034 157 .098' NBT 4 6400 1105 .173' 1366 .213 HER 1 1600 50 .031 37 .023 SBL 1 1600 261 .163' 131 ,082 SBT 4 6406 1056 .165 1336 .209' SBR 1 1600 301 .188 669 .418 EBL 2 3200 461 .144 338 ,106' EBT 3 4800 782 .181• 475 .141 EBR 0 0 89 204 WBL 2 3200 44 .014' 135 .042 WBT 3 4800 227 .047 1082 .225• WBR 1 100 156 R'ght Turn Adjustment SBR .129` TOTAL CAPACITY UTILIZATIOM ,531 .767 0 A -87 2. MacArthur G Birch Existing EEL 0 0 123 294 AM PK HOUR PM PK HOUR 3 4800 372 .115* LANES CAPACITY VOL VIC VOL WC NBL 1 1600 0 .029 113 .071* NET 3 4800 1741 .363* 1183 .246 NOR f 1336 104 NOR 22 SOL 1 1600 146 .091* 69 .043 SET 4 6400 771 .148 2067 .350* SOR 0 0 177 SBR 170 0 EEL 0 0 123 294 EBT 3 4800 372 .115* 207 .109* EBR 0 0 59 24 CAPACITY WBL 1 1600 21 .013 103 .064 WBT 2 3200 164 .051* 694 .217* WBR f 47 140 NET Note: Assumes E/W Split Phasing 1953 .401* Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL VIC NBL 1 1600 48 .030 113 .071* NOT 3 4800 1803 .316* 1235 .257 NOR f 104 22 SBL 1 1600 146 .091* 69 .043 SOT 4 6400 815 .156 2150 .364* SBR 0 0 182 177 EEL 0 0 128 306 EBT 3 4800 372 .117* 208 .113* EBR 0 0 61 26 f•K 1 '600 21 .013 103 .064 WBT 2 3206 164 .051* 696 .218* WBR f 47 140 Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION .620 .747 TOTAL CAPACITY UTILIZATION .635 .766 Existing + Growth + Approved + Project AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 1 1600 48 .030 113 .071* NOT 3 4800 1811 .317* 1256 .262 NOR f 104 22 SBL 1 1600 146 .091* 69 .043 SOT 4 6400 835 .159 2156 .365* SBR 0 C 182 177 EBL 0 0 128 306 EBT 3 490C 372 .117* 208 .1:3* E5R G C 6: 2E 4781, _ 1650 21 .Ci3 103 .664 WBT 2 320, 164 .95;* 696 .2.8* ay 4' Ic6 NoCe: Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 1 1600 48 .030 113 .011* NET 3 4800 1953 .401* 1336 .278 NOR f 104 22 SBL 1 1600 146 .091* 69 .043 SET 4 6400 813 .165 2305 .388* SBR 0 0 182 177 EEL 0 0 128 306 EBT 3 4800 3 ?2 .117* 2C8 .113* EBR v" v 6i 26 WB:. 1 :600 2_ .G13 _03 .364 WK 2 320: :E4 .05I* 696 .2 :8* WBR f 47 '40 Nate: AsSore5 $?i'_ P zS:r3 TOTAL CAPACITY UTILIZATION .636 .767 TOTAL CAPACITY UTILIZATION A -89 .666 .790 is • 2. MacArthur F Birch Existing + Growth + Approved + Cumulative + project AM PK FOUR PM PH HOUR LANES CAPACITY VOL VC VCL VIC NBL 1 '600 48 .030 113 .37:' NBT 3 4800 '961 .409' 1357 .283 NBR f 104 22 SBL 1 1600 146 .091* 69 .543 SBT 4 6400 893 .168 2311 .389' SBR 0 0 182 :77 EBL 0 0 128 306 EBT 3 4800 372 .117' 208 .113' EBR 0 0 61 26 WBL 1 1600 21 .013 103 .064 WBT 2 3200 164 .051' 696 .218` NBR f 4" 140 Nate: Assures E/W Split Phasing 0 TOTAL CAPACITY UTILIZATION .668 .791 0 A-x9 3. MacArthur 6 Von Kaman 4D Existing Cumulative AM PK HOUR PM PK AM PK HOUR PM PK HOUR VOL LANES CAPACITY VOL V/C VOL Vic NBL .081 1600 129 .081 71 .044' NET 3 4800 974 .203' 788 .164 NBR f 179 800 SBL 155 1600 SBL 1 1600 36 .023* 34 .021 SET 3 4000 394 .082 962 .200' SBR f 105 197 EEL 101 1600 EEL 1 1600 35 .022 137 .086 EBT 2 3200 84 .026' 222 .069' EBR f 283 36 H2L 2B1 :ES9 WBL 1 1600 102 .064* 682 .426' WET 2 3200 184 .058 152 .048 HER f 65 16 65 TOTAL CAPACITY UTILIZATION .316 .739 Existing + Growth + Approved + Project AM PK HOUR LANES CAPACITY VOL V/C NBL 1 1600 130 .081 NET 3 4900 1029 .214' NBR f 801 SBL 1 1600 36 .023' SET 3 4800 441 .092 SBR f 199 EEL 1 1600 38 .024 EST 2 3200 86 .021' BR f 36 ?181 i .661 IC4 .065' Wd: 2 323' i85 -58 ABR i6 PM PK HOUR VOL V/C 75 .041* 853 .118 155 34 .021 1020 .213' 105 144 .090 228 .071' 263 E86 .4291 IE6 .;49 E5 Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 130 .081 75 .041' NET 3 4800 1021 .213' 832 .173 NBR f 801 155 SBL 1 1600 36 .023' 34 .021 SET 3 4600 421 .086 1014 .211' SBR f 199 105 EEL 1 1600 38 .024 144 .090 EST 2 3200 86 .021' 228 .011` EBR f 36 283 WBL 1 1600 104 .065' 686 .429' WET 2 3200 185 .059 156 .049 WAR f 16 65 TOTAL CAPACITY UTILIZATION .32E .758 0 Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 130 .081 75 .041' NET 3 4800 1P1 .244' 933 .194 NBR f 819 179 SBL 1 1600 36 .023' 34 .021 SET 3 4800 479 .100 1169 .244' SBR f 199 105 EEL 1 1600 38 .024 144 .090 EST 2 3200 B6 .027# 228 .011' ZSR f 36 283 H2L :ES9 i29 .061' 707 .492' 1!BT 2 3250 185 .C58 .S6 .059 '112P f ;6 65 TOTAL CAPACITY UTILIZATION .329 .768 TOTAL CAPACITY UTILIZATION .375 .884 0 A-90 3. MacArthur F Von Kalman Existing + Growth + Approved + Cumulative + Project AM PK HOUR PM PK HOER LANES CAPACIT? VOL V/C VOL V/C NBL 1 1600 130 .061 75 .041' NBT 3 4800 1179 .246• 954 ,;99 NBR f 819 179 SBL 1 1600 36 .023* 34 .021 SET 3 4800 499 .104 1175 .245* SBR f 199 105 EBL 1 1600 38 .024 144 .090 EBT 2 3200 B6 .027* 228 .011* EBR f 36 283 WBL 1 1600 129 .081* 707 .442* WBT 2 3200 185 .058 156 .049 WBR f 16 65 TOTAL CAPACITY UTILIZATION .377 .885 0 A -91 5. Jamboree 6 Birch Existing TOTAL CAPACITY UTILIZATION .555 .642 Existing + Growth + Approved + Project AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL V/C NBL 1 1603 275 .172' 216 .135' NET 3 480C 1463 .305 1763 .368 NBR 0 0 1 3 SBL 1 1600 4 .003 6 .004 SET 3 4800 1729 .360' 1982 .413' SBR f 459 483 EEL C 0 148 349 E3T 2 3200 5 .048' 6 .111' EBR f 41 155 W6: G 0 48" 2 .194' :4 .GG3• ER 4 N.'e: A.. =. s E/A Spi" P ^.as:u I. TOTAL CAPACITY UTILIZATION .584 .668 A -92 0 Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1.600 275 .112* 216 .135' NET 3 4800 1455 .303 1742 .364 HER 0 0 1 3 SBL 1 1600 4 .003 6 .004 SET 3 4800 1709 .356' 1976 .412' SBR f 459 483 EEL 0 0 148 349 EST 2 3200 5 .048' 6 .111' EBR f 41 155 NBL 0 0 1 0 WET 1 1600 2 .004' 14 .009' WBR 0 0 4 0 Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION .588 .667 0 Existing + Growth + Approved + Cumulative AM PK HOUR PH PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL . 1600 275 .172' 216 .135' NET 3 4800 1628 .339 1861 .388 NBR 0 0 1 3 SBL 1 1600 4 .003 6 .004 SET 3 4800 1780 .371' 2155 .449' SBR f 459 483 EEL G 0 148 349 EST 2 32GO 5 .048' 6 .111' EBR f 41 155 WSL C C 3 WB' . 16,0 2 .,,4' :4 .909' I.BR J 1 4 0 Ere: Assumes E/W Sp; -- rsas:eg TOTAL CAPACITY UTILIZATION .595 .704 0 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 275 .112' 216 .135' NET 3 4800 1372 .286 1625 .339 NBR 0 0 1 3 EEL 1 1600 4 .003 6 .004 SET 3 4800 1589 .331` 1051 .387' SBR f 458 483 EEL 0 0 148 349 EBT 2 3200 5 .048' 6 .111' EBR f 41 154 WBL 0 0 1 0 WET 1 1600 2 .004' 14 .009' W8R 0 6 4 0 Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION .555 .642 Existing + Growth + Approved + Project AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL V/C NBL 1 1603 275 .172' 216 .135' NET 3 480C 1463 .305 1763 .368 NBR 0 0 1 3 SBL 1 1600 4 .003 6 .004 SET 3 4800 1729 .360' 1982 .413' SBR f 459 483 EEL C 0 148 349 E3T 2 3200 5 .048' 6 .111' EBR f 41 155 W6: G 0 48" 2 .194' :4 .GG3• ER 4 N.'e: A.. =. s E/A Spi" P ^.as:u I. TOTAL CAPACITY UTILIZATION .584 .668 A -92 0 Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1.600 275 .112* 216 .135' NET 3 4800 1455 .303 1742 .364 HER 0 0 1 3 SBL 1 1600 4 .003 6 .004 SET 3 4800 1709 .356' 1976 .412' SBR f 459 483 EEL 0 0 148 349 EST 2 3200 5 .048' 6 .111' EBR f 41 155 NBL 0 0 1 0 WET 1 1600 2 .004' 14 .009' WBR 0 0 4 0 Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION .588 .667 0 Existing + Growth + Approved + Cumulative AM PK HOUR PH PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL . 1600 275 .172' 216 .135' NET 3 4800 1628 .339 1861 .388 NBR 0 0 1 3 SBL 1 1600 4 .003 6 .004 SET 3 4800 1780 .371' 2155 .449' SBR f 459 483 EEL G 0 148 349 EST 2 32GO 5 .048' 6 .111' EBR f 41 155 WSL C C 3 WB' . 16,0 2 .,,4' :4 .909' I.BR J 1 4 0 Ere: Assumes E/W Sp; -- rsas:eg TOTAL CAPACITY UTILIZATION .595 .704 0 S. Jamboree i Birch Existing 4 Growth 4 Approved 4 Cumulative 4 Project AM PK HOUR PM PR HOUR 'ANES CAPACITY VOL V/C VOL V/C NBL 1 1600 275 .172* 216 .135* NBT 3 4800 1636 .341 1882 .393 NBR 0 0 1 3 SBL I 1600 4 ,003 6 .004 SBT 3 4800 1800 .375' 2161 .450* SBR f 459 483 EBL 0 0 148 349 EBT 2 3200 5 .048* 6 .111* EBR f 41 155 WBL 0 0 1 0 WBT 1 1600 2 .004* 14 .009' WBR C 0 4 0 Note: Assumes £/W Split Phasing • TOTAL CAPACITY UTILIZATION .599 .705 0 A-91 6. MacArthur F Jamboree Existing Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR AM PK LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 214 .067 250 .078* NET 3 4800 1689 .352' 539 .112 NBR 1 1600 482 .301 333 .208 SBL 2 3200 85 .027' 208 .065 SET 3 4800 304 .063 1479 .308' SBR f .324' 97 f 256 110 EEL 2 3200 432 .135 199 .062 EBT 3 4800 989 .206' 864 .180" EBR f .192' 215 f 51 215 WBL 2 3200 313 .098' 612 .191' NBT 3 4800 632 .132 1026 .214 '4BR f .228 183 f 103 197 Existing + Regional Growth + Approved AM PK HOUR AM PK AM PK HOUR PM PK HOUR VOL LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 222 .069 262 .082` NET 3 4800 1759 .366' 579 .121 NBR 1 1600 483 .302 333 .208 SBL 2 3200 93 .029' 230 .072 SET 3 4800 334 .070 1557 .324' SBR f 110 276 2 EEL 2 3200 446 .139 216 .068 EBT 3 4800 1039 .216' 920 .192' EBR f 215 51 WBL 2 3200 313 .098' 613 .192' WET 3 4800 693 .144 1092 .228 WBR f 197 113 TOTAL CAPACITY UTILIZATION .683 .757 TOTAL CAPACITY UTILIZATION .709 .790 Existing + Growth + Approved + Project AM PK HOUR AM PK LANES CAPACITY VOL V/C NBL 2 3200 222 .069 NET 3 4800 1767 .368' NBR 1 1600 483 .302 SBL 2 3200 93 .029' SET 3 4800 354 .074 S3R f 2 110 93 EEL 2 3200 446 .139 LET 3 4800 1047 .218' EBR f 215 hSL 2 3200 313 .998' WET, 3 4607 7;3 .149 NBR f 1194 :97 1015 PM PK HOUR VOL V/C 262 .082' 670 .125 333 .208 230 .072 1563 .326' 27 6 216 .768 941 .196' 51 613 .192' ;798 .229 1:3 Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NE:. 2 3200 222 .069 262 .082' NET 3 4800 1907 .397* 693 .144 HER 1 1600 501 .313 357 .223 SBL 2 3200 93 .029' 230 .072 SET 3 4800 410 .085 1715 .357' SBR f Il6 294 EEL 2 3200 465 .145 227 .071 EBT 3 4806 1194 .249' 1015 .211' EBR f 215 51 WK 2 3200 338 106• 634 .198' WBT 3 4607 739 .154 1250 .260 N5R f 19+ :I3 TOTAL CAPACITY UTILIZATION .713 .796 TOTAL CAPACITY UTILIZATION .781 .8As A-94 1] • 6. MacArthur i Jamboree Existing + Growth + Approved + Cumulative + Project AM PK HOUR PM PK HOUR LANES CAPACITY 'VOL V/C VOL V/C NBL 2 3200 222 .069 262 .0821 NBT 3 4800 1915 .399' 714 .149 NBR 1 1600 501 .313 357 .223 SBL 2 3200 93 .029' 230 .072 SBT 3 4800 430 .090 1721 .359` SBR f 116 294 EBL 2 3200 465 .145 227 .071 EBT 3 4800 1202 .250' 1036 .216^ EBR f 215 51 WBL 2 3200 338 .106' 634 .198' wK 3 4800 759 .158 1256 .262 51BR f 191 113 TOTAL CAPACITY UTILIZATION .784 .855 �J E A-95 7. Bayviex G Bristol south (EB) Existing TOTAL CAPACITY UTILIZATION .573 .655 Existing + Growth + Approved + Project AM PA HOUR PM PR HOUR AM PW HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 0 0 NET 0 0 0 0 0 0 NBA 2 3200 480 .150 641 .200 SBL 0 0 0 0 0 0 SET 0 0 0 0 0 0 SBR 0 0 0 0 0 0 EBL 0 0 0 0 0 0 EBT 4 6400 2709 .423* 2913 .455* EBR 1 1600 398 .249 144 .090 WBL 0 0 0 J 0 v WBT 0 0 0 0 WBR 0 0 0 7 0 G Right Turn Adjustment NBR .150* NBR .200* TOTAL CAPACITY UTILIZATION .573 .655 Existing + Growth + Approved + Project AM PW HOUR AM PR HOUR PM PR HOUR LANES LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 0 NET NET 0 0 0 0 0 NBR NBR 2 3200 480 .150 641 .200 SBL 0 0 0 0 0 SET SET 0 0 0 0 0 SBR SBR 0 0 0 0 0 ESL EEL 0 0 0 0 0 EBT EBT 4 6400 2819 .440* 3012 .471* E3R i :600 396 .249 144 .090 W6:, J v 0 v WK WBT 7 0 iSR i.BR 7 i G 0 C Ad. stmenr F:gF_ -.cr.. �crsr._ YE4 ._., NBR .211^1 TOTAL CAPACITY UTILIZATION .590 .671 A 96 Existing + Regional Growth + Approved AM PW HOUR PM PE HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NET 0 0 0 0 NBR 2 3200 480 .150 641 .200 SBL 0 0 0 0 SBT 0 0 0 0 SBR 0 0 0 0 EEL 0 0 0 0 EST 4 6400 2787 .435* 2994 .468` EBR 1 1600 398 .249 144 .090 WBL 0 0 0 0 NET 0 0 0 0 WBR 0 0 0 0 Right Turn Adjustment NBR .150* NBR .200* TOTAL CAPACITY UTILIZATION .585 .668 0 Existing + Growth + Approved + Cunalative AM PW HOUR PM PE HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NET 0 0 0 0 NBR 2 3200 480 .150 641 .200 SBL 0 0 0 0 SET 0 0 0 0 SBR 0 0 0 0 ESL 0 0 0 0 EBT 4 6400 2787 .435* 2994 .468* EBR 1 160C 398 .249 :44 .090 XK 0 J 0 WK 6 0 iSR $ 0 Ad. stmenr NBR ._,. NBR .2791 TOTAL CAPACITY UTILIZATION .585 .668 • 7. Bayviex 6 Bristol South (EB) Existing + Growth + Approved + Cumulative + Project AM PK HOUR PH PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NET 0 0 0 0 NBR 2 3200 480 .150 641 .200 SBL 0 0 0 0 SBT 0 0 0 0 SBR 0 0 0 0 EBL 0 0 0 0 EBT 4 6400 2819 .440' 3012 .411' EBR 1 1600 398 .249 144 .090 NBL 0 0 0 0 WBT 0 0 0 0 NBR 0 0 0 0 Right Turn Ad)ustmnt NBR .150' NBR .200' TOTAL CAPACITY UTILIZATION .590 .671 0 A-197 S. Jamboree t Bristol North (WE) Existing AM PK HOUR PM PK HOUR :.ANES CAPAC:TY VOL VIC VOL VIC NBL 2 3200 1267 .402' 723 .226* NBT 2 3200 1391 .435 1293 .404 NBR f 692 833 SBL 0 0 0 0 SET 2.5 6400 645 .164' 1216 .308' SBR 1.5 405 755 EBL 0 0 0 0 EBT 0 0 0 0 EBR 0 0 0 0 WBL 0 0 0 0 WBT 0 0 0 0 WBR 0 0 0 0 TOTAL CAPACITY UTILIZATION .566 ,534 Existing + Growth + Approved + Project AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL VIC NBL 2 3200 1304 .409* 745 .233* NET 2 3200 1491 .466 1414 .442 NBR f 713 870 SBL 0 0 0 0 SET 2.5 6400 741 .179* 1323 .325* SBR 1.5 406 757 EBL 0 0 0 0 EBT 0 0 0 0 EBR C 0 0 0 WK 0 C 0 G WBT C C G G WBP 0 C TOTAL CAPACITY UTILIZATION .587 .558 A-48 Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 2 3200 1304 .408• 745 .233' NBT 2 3200 1483 .463 1393 .435 NBR f 692 833 SBL 0 0 0 0 SET 2.5 6400 721 .176" 1317 .324' SHP 1.5 406 757 EBL 0 0 0 0 EST 0 0 0 0 EBR 0 0 0 0 WBL 0 0 0 0 WBT 0 0 0 0 WBR 0 0 0 0 TOTAL CAPACITY UTILIZATION .584 .557 Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NIL 2 3200 1304 .408' 745 .233* NBT 2 3200 1656 .518 1500 .469 NBR f 692 833 SBL 0 0 0 0 SBT 2.5 6400 772 .184' 1494 .352* SBR 1.5 406 757 EBL 0 0 0 0 EBT 0 0 0 0 EHR 0 0 C WK C 0 0 0 nBT 0 0 0 0 WBR 3 6 TOTAL CAPACITY UTILIZATION .592 .585 0 40 • • B. Jamboree G Bristol North (WB) Existing + Growth + Approved + Cumulative + Project AM PK HOUR PM PK 3OUR CANES CAPACITY VOL V/C VOi. V/C NBL 2 3207 1304 .408' 745 .233, NET 2 3200 1664 .520 1521 .475 NBR 1 713 870 SBL 0 0 0 0 SET 2.5 6400 792 .187* 1500 .353e SBR 1.5 406 757 EEL 0 0 0 0 EBT 0 0 0 0 HER 0 0 0 0 WBL 0 0 0 0 WK 0 0 0 0 WBR 0 7 0 0 TOTAL CAPACITY UTILIZATION .595 .586 0 0 A-99 9. Jamboree d Bristol South (EB) Existing TOTAL CAPACITY UTILIZATION .657 .673 Existing + Growth + Approved + Project AM PK HOUR PM PK FOUR AM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 V/C 0 NET 5 8000 2127 .273* 1843 .245 NBR 0 0 60 .297* '15 SBL 0 0 0 60 0 SET 3 4800 675 .141 1241 .259' SBR 0 0 0 3 0 EEL 1.5 1349 1229 .384* 973 (.414)* EBT 1.5 4800 434 .271 1015 .414 EBR 2 3200 1168 .365 1285 .402 WBL 0 0 0 .277 0 WET 0 0 0 1265 0 WBR. 0 0 0 0 TOTAL CAPACITY UTILIZATION .657 .673 Existing + Growth + Approved + Project AM PK HOUR AM PK HOUR PM PK HOUR LANES LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 0 NET NET 5 8000 2313 .297* 2063 .272 NBA 0 0 60 115 115 SBL SBL 0 0 0 0 0 SET SET 3 4800 773 .161 1349 .281* SBR 0 0 0 0 0 EEL EEL 1.5 1232 1232 .365* 981 (.4171* EBT EBT 1.5 1809 443 .277 1920 .417 EBR 2 3203 1265 .395 1168 .428 C 0 0 WET 0 0 v ; i3R L'5 ?. C 5 C R:get - -n A*5cre-_ ; :.-, Ac3scCe -.0 LER .;C;* EBP .5." Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NET 5 8000 2287 .293* 2035 .269 NBR 0 0 60 115 SBL 0 0 0 0 SET 3 4800 753 .157 1343 .280 - SBR 0 0 0 0 EEL 1.5 1232 .385* 981 EE? 1.5 4900 444 .278 1023 .418* EBR 2 3200 1233 .385 1350 .422 WBL 0 0 0 0 WE 0 0 0 0 WBR 0 0 0 0 Right Turn Adjustment EBR .004* TOTAL CAPACITY UTILIZATION .678 702 Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NET 5 8000 2460 .315* 2142 .282 NBR 0 0 60 115 SBL 0 0 0 0 SET 3 4600 804 .168 1520 .317* SBR 0 0 0 0 EEL 1.5 1232 .365* 991 EBT 1.5 48CO 444 .278 1023 .418* EBR 2 320C 123 3 .335 :350 .422 iiBL C 0 0 WET 0 6 v i3R 1 1 5 R:get - -n A*5cre-_ LER .;C;* TOTAL CAPACITY UTILIZATION .682 .709 TOTAL CAPACITY UTILIZATION .700 n -100 739 is 0 0 • 9. Jamboree 4 Bristol South (EB) Existing + Growth + Ap LANES CAPACITY NBL 0 0 NBT 5 8000 HER 0 0 SBL 0 0 SBT 3 4800 SBR 0 0 EBL 1.5 EBT 1.5 4800 EBR 2 3250 WBL 0 0 MT 0 0 WBR 0 0 Right Turn Adjustment )roved + Cumulative + Project AM PK HOUR PM PN 30UR 7CL V/C VOL V/C 0 0 2486 .318' 2170 .286 60 115 0 0 824 .172 1526 .318' 0 0 1232 .385* 981 1.41714 443 .277 1520 .417 1265 .395 1368 .429 0 0 0 0 0 0 EBR .011• TUTA, CAPACITY UTILIZATION .703 .746 0 0 A -IM 10. Jamboree S Bayview Existing LANES CAPACITY NBL I 1600 NET 4 6400 NBR 0 0 SBL I 1600 SET 4 6400 SBR 1 1600 EEL 2 3200 EBT 1 1600 EBR 1 1600 AM PK HOUR PM PK HOUR VOL 119 1760 56 79 1658 269 34 12 42 V/C 074 284' 049' 259 168 011 008' 026 VOL VIC 57 .036 1650 .266" 51 191 .119' 2111 .330 81 .051 162 .051' 11 .00' 226 .141 WK 1 1600 17 .011' 37 .023 WBT 1 Iso0 4 .0D3 3 .002' VIER 1 1600 79 .049 130 .081 Right Turn Adjustment WBR .004' EBR .070' TOTAL CAPACITY UTILIZATION .356 .508 Existing + Growth + Approved + Project 41 PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL I 1600 119 .074* 57 .036 NET 4 6400 1918 .308 1075 .301` NBR 0 0 56 51 SBL I 1600 79 .549 191 .119' SET 4 6400 1076 .293' 2316 .362 SBR I 1600 269 .168 81 .051 EEL 2 320C 34 .011 162 .551' EST 1 160; 12 .008' 11 M-1 E3R 51 1630 42 .926 226 .i41 K5L 1 ,tw SET .611' 31 .,23 riBC - -6:C SBR .793 1600 .)O2• 7:BR 81 ,..,� '3 .49 .30 ,CBe .011 162 .051' EST 1 1600 12 Existing + Regional Growth + Approved AM PK HOUR AM PK HOUR PM PK HOUR VOL LANES CAPACITY VOL VIC VOL VIC NBL I 1600 119 .074' 57 .036 NET 4 6400 1888 .304 1818 .292' NBR 0 0 56 SBL 51 1600 SBL 1 1690 79 .049 191 .119` SET 4 6400 1824 .285' 2291 .358 SBR I 1600 269 .168 81 .051 EBL 2 3200 34 .011 162 .051' EST 1 1600 12 .008' 11 .007 EBR 1 1600 42 .026 226 .141 WEL 1 1600 17 ,011' 37 .023 WBT I 16GO 4 .003 3 .002' WBR 1 1600 79 .049 130 .081 Right Turn Adjustment ESR EBR .071' TOTAL CAPACITY UTILIZATION .378 .535 Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPAMY VOL VIC VOL VIC NBL I 1600 113 .074 57 .036 NET 4 6400 2061 .331' 1925 .309' NBR 0 0 56 51 SBL I 1600 79 .049' 191 .119' SET 4 6400 1875 .293 2468 .386 SBR 1 1600 269 .168 81 .051 EEL 2 3200 34 .011 162 .051` SET 1. 1600 12 .008' 11 .007 SBR 1 1.60G 42 .026 226 .14'. NBL .6L, ;:1' 37 ,123 WE, . .a0 4 ..R� 3 ..C2' WBP _ 1cli i9 .043 i3G .06: =.g ^.t '..[r. Fdys•..r:r.: :.BP. ..,, ESR TOTAL CAPACITY UTILIZATION .386 .54D TOTAL CAPACITY UTILIZATION .403 .560 A -102 CJ r 1 • 10. Jamboree 6 Bayview Existing + Growth + Approved + Cumulative + Project AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 119 .074 57 .036 NBT 4 6400 2091 .335' 1982 .318* NBR 0 0 56 5i SBL 1 1600 79 .049* 191 .119' SBT 4 6400 1927 .301 2493 .390 SBR 1 1600 269 .168 91 .051 EBL 2 3200 34 .Oil 162 .051' EBT 1 1600 12 .008* 11 .007 EBR 1 1600 42 .026 226 .141 WBL 1 1600 17 .011* 37 .023 WBT 1 1600 4 .003 3 .002* WBR 1 1600 79 .049 130 .081 Right Turn Adjustment WBR .004* EBR .076- 0 TOTAL CAPACITY UTILIZATION .407 .566 0 A- 10.1 11. Jamboree 6 University Existing AM PK HOUR LANES CAPACITY VOL V/C NBL 1 1600 71 .044 NBT 3 4800 1457 .304' NBR 1 1600 190 .119 SBL 2 3200 61 .019* SET 3 4800 1295 .270 SBR 1 1600 313 .196 EBL 1.5 1600 393 .123 EST 0.5 3200 108 .157* EBR f 157 33 SBT WBL 1.5 1499 295 2085 WBT 1.5 4800 15B .094* WBR f .266 165 1.5 Note: Assumes E/W Split Phasing PM PK HOUR VOL ✓/C 38 .024* i386 .289 254 .159 155 .048 1896 .395' 426 .266 223 102 .102* 26 216 129 .072* 93 TOTAL CAPACITY UTILIZATION .574 .593 Existing + Growth + Approved + Project AM PK HOUR AM PK HOUR PM PK HOUR CAPACITY LANES CAPACITY VOL V/C VOL V/C NEL 1 1600 71 .044• 38 .024* NET 3 4600 1600 .333 1601 .334 NBR 1 1600 196 .123 263 .164 SBL 2 3200 61 .019 157 .049 SBT 3 4600 1499 .312* 2085 .434* SBA 1 :600 313 .196 426 .266 EBL 1.5 393 223 0.5 EBT 0.5 3260 109 .:51* 102 .:,2* EBR f 33 26 ... 4.51 i.5 .099 236 .,95* 226 :.' iiBT. -.5 4E00 :59 .095* 129 .J74� WBR f :63 95 E� =: Ass,res E",,, So::t TOTAL CAPACITY UTILIZATION .608 .634 .t -ins Existing + Regional Growth + Approved . AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 71 .044 38 .024* NBT 3 4800 1570 .327' 1544 .322 NBR 1 1600 191 .119 261 .163 SBL 2 3200 61 .019' 157 .049 SBT 3 4800 1447 .301 2060 .429' SBR 1 1600 313 .196 426. .266 EBL 1.5 393 223 EST 0.5 3200 109 .157* 102 .102' EBR f 33 26 WBL 1.5 296 224 WBT 1.5 4800 159 .095* 129 .074* WBR f 169 95 Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION .598 .629 Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPACITY VO;, V/C VOL V/C NBL 1 1600 71 .044 38 .024' NBT 3 4800 1743 .363* 1651 .344 NBA 1 1600 266 .166 309 .193 SBL 2 3200 61 .019' 157 .049 SBT 3 4800 1498 .312 2237 .466* SBR 1 1600 313 .196 426 .266 EBL 1.5 393 223 EBT 0.5 3200 109 .151* 102 .102* EBR f 33 26 WB:. ... 3:8 .099 304 .,95* WBT :.' 1810 .59 .J99' 129 .081 ,NBR f _„ 95 L-te: nSsj7e5 E/i* Sp::: TOTAL CAPACITY UTILIZATION .638 .687 11 L 0 0 11. Jamboree a University Existing + Growth + Approved + Cumulative + Project P;1 PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 71 .044 38 .024' NET 3 4800 17,73 .369* 1708 .356 NBR 1 1600 271 .169 3:1 .194 SBL 2 3200 61 .019* 157 .049 SET 3 4800 1550 .323 2262 .471* SBR 1 1600 313 .196 426 .266 EEL 1.5 393 223 EBT 0.5 3200 109 .157' 102 .102' EBR f 33 26 WBL 1.5 318 .099 306 .096' WBT 1.5 4800 159 .099' 129 .081 WBR f 169 95 Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION .644 .693 r, 0 N -105 12. Jamboree i Bison Existing TOTAL CAPACITY UTILIZATION .465 .518 Existing + Growth + Approved + Project All PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL VIC NBL 0 0 0 0 NET 3 4800 1480 ,352' 1883 .422` NBA 0 0 208 144 SBL 2 3200 200 .063' 196 .061' SBT 3 4800 1803 ,376 2182 .455 SBR 1 1600 196 .123 118 .074 EBL 1 1600 116 .073' 67 .042 EBT 0 0 0 1 EBR 7: 35 NBL 2 320; i48 .546 26: .M, W3" 0 0 p ARR 2 52,0 179 .;56 :94 .061 TOTAL CAPACITY UTILIZATION .497 .571 A -106 •I Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 0 0 0 0 NBT 3 4800 1444 .343' 1824 ,409' NBR 0 0 202 141 SBL 2 3200 200 .063' 196 .061' S8T 3 4800 1750 .365 2155 ,449 SBR 1 1600 196 .123 118 .074 EBL 1 1600 116 .073' 67 .042 EBT 0 0 0 1 EBR f 71 35 WBL 2 3200 145 .045 276 .086' WBT 0 0 0 0 WBR 2 3200 179 ,056 194 .061 Right Turn Adjustment WBR ,009' TOTAL CAPACITY UTILIZATION .488 .556 . Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR N1 PK -HOUR LANES CAPACITY VOL VIC VOL VIC NBL 0 0 0 0 0 NET 3 4890 1346 .322' 1669 .376, NBA 0 0 201 0 138 SBL 2 3200 196 .061' 181 .057* SBT 3 4800 1601 .334 2003 .417 SBR 1 1600 196 ,123 118 .074 EBL i 1600 116 .073' 67 ,042 EBT 0 0 0 0 0 EBR f EBR 71 35 WBL 2 3200 144 .045 273 .085' WET 0 0 0 0 WBR 2 3200 175 .055 191 .060 Right Turn Adjustment WBR .009' TOTAL CAPACITY UTILIZATION .465 .518 Existing + Growth + Approved + Project All PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL VIC NBL 0 0 0 0 NET 3 4800 1480 ,352' 1883 .422` NBA 0 0 208 144 SBL 2 3200 200 .063' 196 .061' SBT 3 4800 1803 ,376 2182 .455 SBR 1 1600 196 .123 118 .074 EBL 1 1600 116 .073' 67 .042 EBT 0 0 0 1 EBR 7: 35 NBL 2 320; i48 .546 26: .M, W3" 0 0 p ARR 2 52,0 179 .;56 :94 .061 TOTAL CAPACITY UTILIZATION .497 .571 A -106 •I Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 0 0 0 0 NBT 3 4800 1444 .343' 1824 ,409' NBR 0 0 202 141 SBL 2 3200 200 .063' 196 .061' S8T 3 4800 1750 .365 2155 ,449 SBR 1 1600 196 .123 118 .074 EBL 1 1600 116 .073' 67 .042 EBT 0 0 0 1 EBR f 71 35 WBL 2 3200 145 .045 276 .086' WBT 0 0 0 0 WBR 2 3200 179 ,056 194 .061 Right Turn Adjustment WBR ,009' TOTAL CAPACITY UTILIZATION .488 .556 . Existing + Growth + Approved + Cumulative N1 PK -HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 0 0 0 0 NBT 3 4800 1656 .387` 1956 .437' NBR 0 0 202 141 SBL 2 3200 211 .066' 233 .073' SBT 3 4800 1812 .378 2375 .495 SBR 1 1606 196 .123 118 .074 EBL 1 1601 116 .073' 67 .042 EBT 0 0 0 1 EBR f 7i 35 WBL 2 320, 145 .045 276 .686' WcF 2 i2 ;6 216 .;68 2:7 . ',63 TOTAL CAPACITY UTILIZATION .544 .596 0 12. Jamboree i Bison existing + Growth + Approved + Cumulative + Project AM PK FOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NBT 3 4600 1692 .396' 2015 .450' NBR 0 0 208 144 SBL 2 3200 211 .066* 233 .073' SBT 3 4800 1865 .389 2402 .500 SBR 1 1600 196 .123 118 .G74 EBL 1 1600 116 .073' 67 .042 EBT 0 0 0 1 EBR f 71 35 WBL 2 3200 146 .046 281 .088' WBT 0 0 0 0 WBR 2 3200 216 .068 217 .068 Right Turn Adjustment WE .Cip . TOTAL CAPACITY UTILIZATION .553 .611 0 A -107 13. Jamboree S Ford Existing AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 364 .114' 362 .113' NET 3 4800 1300 .291 1785 .415 NBR 0 0 98 208 SBL 1 1600 61 .03E 44 .028 SBT 3 4800 1541 .321' 2132 .444' SBA 1 1600 161 .104 49 .031 EEL 1.5 232 66 .041 EST 1.5 4800 239 .098* 212 .066' EBR f 271 255 WBL 1.5 131 .082 181 WET 1.5 4800 358 .112' 157 .070' WBR 1 1600 33 .021 35 .0422 Note: Assumes E/W Split Phasing Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 367 .115' 366 .114' NBT 3 4800 1405 .313 1955 .452 NBR 0 0 99 213 SBL 1 1600 61 .038 45 .028 SBT 3 4800 1691 .352' 2289 .477` SBR 1 1600 158 .105 49 .031 EEL 1.5 233 66 .041 EST 1.5 4800 244 .599' 212 .066' EBR f 274 259 WK 1.5 133 .083 185 WBT 1.5 4800 368 .115' 157 .071' WBR 1 1600 34 .021 35 .022 Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION .645 .693 TOTAL CAPACITY UTILIZATION .681 .728 Existing + Growth + Approved + Project AM PK AM PK HOUR PM PK HOUR VOL LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 367 .115* 366 .114' NBT 3 4800 1447 .322 2017 .465 NBR D 0 99 SBL 213 1600 SBL 1 1600 61 .038 45 .028 SBT 3 4800 1745 .364` 2321 .484' SBR 1 16C0 168 .105 49 .031 EEL 1.5 66 233 EST 66 .041 EST '_.5 4900 244 .099* 212 .066' EBR f 268 274 WBL 253 iBL ?.5 2:8 133 .563 '35 46;5 W6: i. `, 48:G 368 .42:5' 157 .0742' WBR .:35 '. 6CG 424 .12: 35 .522 Nctc: Ass -mes EIW So-' it P ^as1..o Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPACI ?Y VOL V/C VOL V/C NBL 2 3200 316 .11B' 371 .116' NET 3 4800 1595 .356 2074 .486 HER 0 0 112 257 SBL 1 1600 67 .042 67 .042 SBT 3 4800 1747 .364' 2487 .518' SBR 1 1600 168 .105 49 .031 EBL i.5 233 66 .041 EST 1.5 4600 259 .103` 266 .083' E3R f 277 268 WBL .. `. :77 .::1 2:8 46;5 4'; .IK- 190 .583' WER. -69; 56 .:35 45 .030 Ass reS E. 7: Spit Pzas. :C TOTAL CAPACITY UTILIZATION .693 .735 TOTAL CAPACITY UTILIZATION .716 .800 AAA 0 0 0 13. Jamboree 6 Ford Existing + Growth + Approved + Cumulative + Project AM PK HOUR PM PK YOUR LANES CAPACITY VOL V/C VOL 4/C NBL 2 3200 316 .118' 371 .116* NBT 3 4800 1637 .364 2136 .495 NBA 0 1 112 257 SBL 1 1600 67 .042 67 .042 SK 3 4800 '- -801 .315' 2519 .525* SBR 1 160C 168 .'M 49 .G31 EK 1.5 233 66 .Ml EBT 1.5 4800 259 .103' 266 .083` EBR -" 277 268 WBL 1.5 177 .li: 210 WET 1.: 4800 419 .131' 190 .083* WBR 1 160, 56 .015 48 .930 Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION .727 .807 • 4 -hi9 14. Jamboree i San Joaquin Hills Existing TOTAL CAPACITY UTILIZATION .567 .581 Existing + Growth + Approved + Project AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 i600 41 .G26 67 .042 NBT 3 4800 1143 .238' 1598 .333+ NBR f 1760 129 NBA 135 SBL 2 3200 665 .208' 443 .138' SBT 3 4800 1227 .256 1855 .386 SBR f 2012 37 SBA 117 EBL 1.5 117 258 .081' 162 .051' EBT 1.5 4800 33 .021 34 .021 ERR f 39 59 EBR 57 WBL 1.5 57 128 .040' 189 .059' WBT 1.5 4800 12 .008 39 .024 WBR 1 1600 42 .026 67 .042 Note: Assumes E/W Split Phasing 1`4 .:09 TOTAL CAPACITY UTILIZATION .567 .581 Existing + Growth + Approved + Project AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 41 .026 68 .043 NBT 3 4800 1253 .261' 1760 .367' NBA f 134 145 SBL 2 3200 724 .226' 504 .158' SBT 3 4800 1407 .293 2012 .419 SBA f 37 117 EBL 1.5 258 .081' 153 .G5? EST 1,5 48CO 33 .021 39 .024 EBR f `.9 57 WBL 1..5 :44 .G45' 205 .064, 430; 12 .758 39 .324 W5R i :6CC 96 .0 ?0 1`4 .:09 TOTAL CAPACITY UTILIZATION .613 .640 A -I 10 Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 41 .G26 68 .043 NBT 3 4800 1253 .261' 1760 .367' NBR f 134 145 SBL 2 3200 670 .209' 472 .148" SBT 3 4800 1407 .293 2012 .419 SBR f 37 117 EBL 1.5 258 .081' 163 .051' EBT i.5 4800 33 .021 39 .024 EBR f 59 57 WBL 1.5 144 .045' 205 .064' WBT 1.5 4800 12 .008 39 .024 WBR 1 1600 54 .034 112 .070 Note: Assumes EM Split Phasing TOTAL CAPACITY UTILIZATION .596 .630 Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 41 .026 68 .043 NET 3 4890 1431 .298' 1908 .398' NBR f 134 145 SBL 2 3200 679 .212' 510 .159' SBT 3 4800 1501 .313 2206 .460 SBR f 37 117 EBL 1.5 258 .GKI 163 .051' EBT 1.5 480: 33 .021 39 .024 ERR f 59 57 WB:, 1.5 :44 .043' 203 .064' YBT 1.5 4603 12 .COB 39 .024 WBR :SOG 88 .C55 132 .i83 K °:e1 nsS.Ies E''6: B. _t ?has:. ".y TOTAL CAPACITY UTILIZATION .536 .672 40 40 0 0 14. Jamboree i San Joaquin Sills Existing + Growth + Appro71908 + Project M PK HCOR LANES CAPACITY OL V/C NBL 1 1600 68 .043 NBT 3 4800 18 .398' NBR f 45 SBL 2 3200 733 .229' 542 .169* SBT 3 4800 1501 .313 2206 .460 SBR f 37 117 EBL i.5 258 .081* 163 .051, EBT 1.5 4800 33 .021 39 .024 EBR f 59 57 WBL 1.5 144 .045° 205 .064' WBT 1.5 4800 12 .008 39 .024 WBR 1 1600 130 .081 194 .i2l Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION .653 .682 0 • A -III 15. Jamboree 6 Santa Barbara Existing AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 1 1600 6 .004 9 .006` NET 3 4800 1225 .255' 1118 .233 NBR 1 1600 323 .202 119 .074 SBL 2 3200 560 .175' 291 .091 SBT 3 4800 809 .169 1781 .371' SBA 1 1600 23 .014 28 .018 EBL 1 1600 62 .039` 26 .016' EBT 1 1600 3 .007 8 .008 EBR 0 0 8 4 kIBL 1.5 5i 307 WBT 0.5 3200 2 .0178 5 .998' WBR 1 1600 93 .058 662 .414 Right Turn Adjustment WBR .208' Note: Assumes E /Y7 Split Phasing TOTAL CAPACITY UTILIZATION .486 .699 Existing + Growth + Approved + Project AM PK AM PK HOUR PM PK HOUR LANES LANES CAPACITY VOL VIC VOL VIC NEL 1 1600 6 .004 9 .006' NBT 3 4800 1315 .214' 1242 .259 NBR 1 1600 324 .203 126 .079 SBL 2 3200 514 .179' 295 .C92 SBT 3 4800 941 .196 1911 .398' SBR 1 ;60G 24 .015 34 .021 EBL L 1660 66 .043' 28 .018' EBT I .600 ? .GG7 9 .008 EBR 0 8 8 q 4 WK WBL i.3 52 69 368 3i3 WK. ';ST i.5 J2pJ 2 .622# 6 . -,C' i.BR .36-' X69 .4 =: TOTAL CAPACITY UTILIZATION .518 ,731 A•I 12 Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 1 1600 6 .004 9 .006' NBT 3 4800 1315 .214' 1242 .259 NBR 1 1600 323 .202 120 .075 SBL 2 3200 574 .179* 295 .092 SBT 3 4800 941 .196 1911 .398' SBR 1 1600 24 .015 34 .021 EBL 1 1600 68 .043' 28 .018' EBT 1 1600 3 .007 9 .008 EBR 0 0 8 4 WBL 1.5 52 308 "T 0.5 3200 2 .017' 6 .098' WBR 1 1600 98 .061 669 .418 Right Turn Adjustment WBR .211' Noce: Assumes E /F1 Split Phasing TOTAL CAPACITY UTILIZATION .513 .731 Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPAMY VOL VIC VOL VIC NBL 1 1600 6 .004 9 .006' NBT 3 4800 1493 .311` 1390 .290 NBR 1 1600 323 .202 120 .075 SBL 2 3200 574 .179' 295 .092 SBT 3 4800 1035 .216 2105 .439# SBR 1 1600 24 .015 34 .021 EBL 1 1603 68 .643' 28 .018' EBT L :660 3 .C37 9 .9C8 EBR G C 8 q WK _.5 52 368 WK. ,.5 _2,0 2 .„LI' 6 .G98' .36-' X69 .4 =: TOTAL CAPACITY UTILIZATION .550 .765 n L..J I , 0 0 15. Jamboree 6 Santa Barbara Existing : Growth : Approved t Cunalative : Project AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 1 1600 6 .004 9 .006' NET 3 4800 1493 .311' 1390 .290 NBR 1 1600 324 .203 126 .079 SBL 2 3200 574 .179' 295 .092 SET 3 4600 1035 .216 2105 .439* SBR 1 1600 24 .015 34 .C21 EEL 1 1600 68 .043' 28 .018' EST 1 1600 3 M1 9 .008 EBR 0 0 8 4 WBL 1.5 69 313 WBT 0.5 3200 2 .922* 6 .100" WBR 1 :600 98 .061 669 .418 Right Turn Adjustment WBR .202' Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION .555 .765 A -113 16. Jamboree 6 Coast Hwy Existing AM PK HOUR AM PK HOUR PM PR ROUR LANES AM PK FOUR PM PK HOUR VOL LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 20 .013 37 .023 NET 2 3200 374 .146• 265 .113' NBR 0 0 94 SBL 96 1600 SBL 1 1600 137 .086' 176 .110' SET 2 3200 206 .064 431 .135 SBR f 1576 758 EEL 1453 4800 EEL 3 4800 1228 .256' 778 .162' EBT 4 6400 1806 .285 1635 .259 EBR 0 0 13 WBL 2: 3207 WEL 2 3200 94 .029 202 .063 WBT 4 6400 1069 .167` 1952 .305' WEN f i75 89 169 TOTAL CAPACITY UTILIZATION .655 .690 Existing + Growth + Approved + Project AM PK HOUR AM PK HOUR PM PR ROUR LANES LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 20 .013 38 .024 NET 2 3200 375 .147' 266 .114' HER 0 0 94 98 38 SBL SBL 1 1600 147 .092' 189 .1181 SBT 2 3200 207 .065 434 .136 SBR f 924 897 1596 1576 EBL EEL 3 4800 1315 .2741 893 .1861 EBT 4 E400 1929 .304 1726 .274 EBR 0 0 ;4 25 25 MB'_ WBL 2 3207 94 .G29 27; .064 WE" 4 c4C�G 1:49 .:6v` 2559 .329' WER I 24 69 277 i75 TOTAL CAPACITY UTILIZATION .693 .746 A -I 14 Existing + Regional Growth + Approved AM PK HOUR All PK HOUR F1 PK HOUR LANES LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 20 .013 38 .024 NET 2 3200 375 .147' 266 .114' NBR 0 0 94 98 98 SBL SBL 1 1600 147 .092' 189 .118' SET 2 3200 207 .065 434 .136 SBR f 924 880 1596 1571 EBL EEL 3 4800 1314 .274' 887 .185' EBT 4 6400 1900 .299 1719 .273 EBR 0 0 14 25 25 MB'_ WEL 2 3200 94 .029 205 .064 WET 4 6400 1134 .1771 2068 .323' WBR f 24 89 277 173 TOTAL CAPACITY UTILIZATION .690 .740 Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL V/C NBL 1 1600 29 .013 38 .024 NET 2 3200 375 .147' 266 .1141 HER 0 0 94 98 SBL 1 1600 197 .123' 358 .224' SET 2 3200 207 .065 434 .136 SBR f 924 1596 EBL 3 4800 1327 .2761 931 .1941 EBT 4 6400 2007 .316 2065 .327 EBR 0 0 14 25 MB'_ 2 320:, 54 .G29 2C .064 WET 4 6400 :44G .224' 2281 _356' 'riBF. [ 24 277 TOTAL CAPACITY UTILIZATION .771 .888 C� u E 9 16. Jamboree 6 Coast Hwy Existing + Growth + Approved + Cumulative + Project AM PK HOUR PN PK HCUR LANES CAPACITY VOL V/C VOL ' //C NBL 1 1600 20 .013 3S .324 NBT 2 3200 375 .147* 266 .114* NBR 0 0 94 98 SBL 1 1600 197 .123* 358 .224* SBT 2 3200 207 .065 434 .136 SBR f 941 1601 EBL 3 4800 1328 .277* 937 .195* EBT 4 6400 2036 .320 2072 .328 EBR 0 0 14 25 WBL 2 3200 94 .C29 205 .064 14K 4 64DD 1455 .227* 2312 .361* WBR f 254 277 TOTAL CAPACITY UTILIZATION .774 .894 9 L_J A -I 15 17. MacArthur 6 Bison Bxisting AM PK FOUR PK PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 197 .062 192 .060* NET 4 6400 2466 .385' 2454 .383 NBR f 154 183 SBL 2 3200 76 .024" 224 .070 SET 4 6400 2018 .315 2707 .423* SBR 1 1600 263 .164 321 .20i EEL 2 3200 224 .070 192 .060 EDT 2 3200 218 .068* 191 .060* EBR f 162 214 WBL 2 3200 383 .120* 363 .113* WET 2 3200 217 .066 266 .083 WER 1 1600 94 .059 141 .088 Ll Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL V/C NBL 2 3200 198 .962 196 .061' NBT 4 6400 2542 .397* 2542 .397 NBR f 154 184 SBL 2 3200 76 .024` 224 .070 SRI 4 6400 2081 .325 2802 .438* SBR 1 1600 266 .166 335 .209 EEL 2 3200 229 .072 198 .062 EDT 2 3200 219 .068* 191 .060* EBR f 163 216 WBL 2 3200 384 .120* 363 .113* WBT 2 3200 218 .068 267 .083 WBR I 1600 95 .059 141 .088 TOTAL CAPACITY UTILIZATION .597 .656 TOTAL CAPACITY UTILIZATION .609 .672 Existing + Growth + Approved + Project AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3290 198 .062 196 .061* NET 4 6400 2567 .401* 2605 .407 NBR 162 205 SBL 2 3200 76 .024* 224 .070 SET 4 6400 2142 .335 2823 .441* SBR 1 1600 266 .166 335 .209 EEL 2 3200 229 .072 198 .G62 EDT 2 3200 225 .070* 194 .061* EBR f 163 216 WEL 2 3200 4G4 .126* 369 W6_ 2 32rr,0 219 .362 272 .085 iIBR i60C ,. .059 i4i .058 Existing + Growth + Approved + Cunulative AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NEL 2 3200 198 .062 196 .061* NET 4 6400 2693 .4214 2635 .412 NBR f 154 184 SBL 2 3200 80 .025* 239 .015 SET 4 6400 2126 .332 2957 .462* SBR 1 1600 266 .166 335 .209 EEL 2 3200 229 .072 198 .062 EBT 2 3290 230 .072* 228 .071* EBR f 163 216 WB1 2 3209 384 .:20, 363 .113* 143T 2 32GG 255 .687 29G .,91 ''7SR ' :66G .069 :S0 .G94 TOTAL CAPACITY UTILIZATION .621 .678 TOTAL CAPACITY UTILIZATION .638 .707 1 -116 • 17. MacArthur 6 Bison Existing + Growth + Approved + Cmulative + project AM PA HOUR ?M H HOUR LANES CAPACITY VOL V1C VOL 71C NBL 2 3200 198 .062 196 .061' NBT 4 6400 2718 .425* 2698 .422 NBR f :62 205 S81, 2 3200 80 .025* 239 .075 SET 4 6400 2187 .342 2978 .465* SBR 1 :690 266 .166 335 .209 EBL 2 3200 229 .072 198 .C62 EBT 2 3200 236 .014* 231 .012' EBR f 163 216 WK 2 3200 4U4 .126* 369 .115* WBT 2 3200 256 .0BD 295 .392 WBR 1 1600 110 .069 1:0 .094 TOTAL CAPACITY UTILIZATION .650 .713 0 A.I 17 18. MacArthur i Ford /Bonita Canyon Existing TOTAL CAPACITY UTILIZATION .721 .775 Existing + Growth + Approved + Project P24 PK HOUR PM PK HOUR AM PK HOUR LANES CAPACITY VOL V/C VOL VIC NBL 2 3200 107 .033 61 .019 NET 4 6400 1918 .300' 2348 .367' NBR f .394' 83 f 468 92 SBL 2 3200 529 .165' 774 .2421 SBT 4 6400 1923 .300 2328 .364 SBR f .383 13 f 49 13 EBL 2 3200 39 .012 27 .108 EBT 2 3200 266 .0831 299 .093' EBR 1 1600 121 .076 61 .039 WBL 2 3200 552 .1731 232 .073' WET 2 3200 323 .301 280 .088 'WBR f .083 900 f 480 96: TOTAL CAPACITY UTILIZATION .721 .775 Existing + Growth + Approved + Project AM PK HOUR AM PK HOUR PM PK HOUR LANES LANES CAPACITY VOL VIC VOL VIC NBL 2 3200 108 .034 63 .020 NET 4 6400 2013 .315' 2520 .394' HER f 159 92 556 483 SBL SBL 2 3200 529 .165' 775 .2421 SET 4 6400 2072 .324 2448 .383 SBR f 13 13 50 50 EEL EEL 2 32CO 40 .01.3 27 .008 EBT 2 3200 261 .083' 300 .094' EBR 1 1600 123 .077 62 .,39 WBL 2 3203 56; .:75' 245 .C77' WET 2 32,6 323 ..C1 26: .083 tiER f 94: 96: `.:3 430 TOTAL CAPACITY UTILIZATION .738 .887 A -i 18 Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 2 3200 108 .034 63 .020 NBT 4 6400 1979 .309' 2436 .381+ NBR f 87 4B1 SBL 2 3200 529 .165' 775 .242' SST 4 6400 1992 .311 2420 .378 SBR f 13 50 EBL 2 3200 40 .C13 27 .008 EBT 2 3200 267 .083" 300 .094' EBR 1 1600 123 .077 62 .039 WBL 2 3200 561 .1751 243 .016` WBT 2 3200 323 .101 2B1 .088 WBR I 901 480 TOTAL CAPACITY UTILIZATION .732 .793 Existing + Growth + Approved + Cumnlative AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 2 3270 108 .034 63 .020 NET 4 6400 2190 .327' 2,506 .392' NBR f 159 556 SBL 2 3200 540 .169' 815 .255' SET 4 6400 2026 .317 2535 .396 SBR f 13 50 EEL 2 3210 40 .013 27 .008 EET 2 3200 282 .068' 354 .III' EBR 1 1600 123 .011 62 .039 WBL 2 '233 623 .175- 318 WET 2 32,0 441 . :33 352 .,99• .1C A53 f 94: `.:3 TOTAL CAPACITY UTILIZATION .779 .857 0 C� 0 18. MacArthur d Ford/Bonita Canyon 0 0 Existing + Growth + Approved + Cumulative + Project AM PR 'HOUR PM PK HOUR LANES IAPACfT7 VOL V/C VOL V/C NBL 2 3200 108 .034 63 .020 NBT 4 64C0 2124 .332' 2590 .4G5* NBR f 164 558 S8L 2 3200 540 .169' 815 .255' SBT 4 6400 2106 .329 2563 .400 SBR f 13 50 EBL 2 3200 40 .013 27 .008 EBT 2 3200 282 .3884 354 .111* EBR 1 1600 123 .077 fit .039 WBL 2 3200 625 .195' 320 .lC0* WBT 2 3200 441 '38 352 .;10 WBR f 941 503 TOTAL CAPACITY UTILIZATION .784 .871 A -119 19. MacArthur 6 San Joaquin Hills. Existing AM PK HOUR AM PK HOUR PM PK HOUR AM PK HOUR PM PK HOUR VOL LANES CAPACITY VOL V/C VOL V/C N3L 2 3200 133 .042' III .035 NET 3 4800 1327 .276 1879 .391* NBR 1. 1600 192 .120 26 .016 SBL 2 3200 272 .085 498 .156' SBT 3 4800 1761 .367• 1882 .392 SBR f 293 487 EBL 248 3200 EEL 2 3200 449 .1404 551 .172• EDT 3 4800 105 .030 348 .106 EBR 0 0 37 NBL 163 16GG WBL I 1600 9 .006 47 .029 MST 2 3200 322 .101' 306 .096' WBR f `e5 419 525 TOTAL CAPACITY UTILIZATION .658 .815 Existing + Growth + Approved + Project AM PK HOUR AM PK HOUR PM PK HOUR LANES LANES CAPACITY VOL V/C 'JOE V/C NBL 2 3200 143 .045* 122 .0'8 MET 3 4800 1376 .287 1965 .4�9* NBA I 1600 192 .120 26 .016 SBL 2 3200 275 .086 503 .157' SK 3 4800 1843 .384' 1954 .407 SBR f 494 576 263 293 EBL EBL 2 3200 493 .154• 666 .208* EDT 3 4800 108 .030 39 .107 EBR 0 0 17 163 163 WBL NBL I 16GG 9 .006 47 .629 INET 2 12CC 323 .CG3' 3i3 .:96* WBP. F 419 4ia 525 `e5 TOTAL CAPACITY UTILIZATION .686 .072 A -120 Existing + Regional Growth + Approved AM PK HOUR AM PK HOUR PM PK HOUR LANES LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 143 .045' 122 .038 NBT 3 4800 1376 .287 1965 .409* NBR 1 1600 192 .120 26 .016 SBL 2 3200 275 .086 503 .157' SBT 3 4800 1843 .384* 1954 .407 SBR f 523 494 293 263 EBL EBL 2 3200 453 .142' 579 .181• EDT 3 4600 108 .030 350 .107 EBR 0 0 37 163 163 8BL WBL I 1600 9 .006 47 .029 WBT 2 3200 329 .103' 313 .098' WBR f 419 525 TOTAL CAPACITY UTILIZATION .674 .845 Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 143 .045' 122 .038 NET 3 4800 1492 .311 2046 .426' NBR I 1600 221 .118 128 .080 SBL 2 3200 291 .091 549 .172a SBT 3 4600 1897 .3954 2068 .431 SBR f 523 293 EBL 2 3200 481 .159' 611 .191' EDT 3 4800 126 .034 418 .121 EBR 0 0 37 163 8BL i =656 9� .061 115 .072 'WB". 2 32vi 392 .i23* 3353 VIER f TOTAL CAPACITY UTILIZATION .713 .899 0 • E 0 �J 0 19. MacArthur i San Joaquin Bills Existing + Growth + Approved + Cumulative + Project + Growth + Appr + Cumul + AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 143 .045' 122 .538 NBT. 3 4800 1492 .311 2046 .426' NBR 1 1600 221 .138 128 .080 SBL 2 3200 291 .091 549 .172' SBT 3 4609 1891 .395' 2168 .431 SBR f .395' 605 .431 323 f EEL 2 3200 521 .163' 698 .218' EST 3 4800 126 .834 41B .121 EBA 0 0 37 .121 163 0 WBL 1 1600 97 .061 115 .072 WBT 2 3200 392 .123' 353 .110' WBR f .123' 459 .110' 536 f Exist + Growth + Appr + Cumul + Project w /Mitigation AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 143 .045' 122 .038 NBT 3 4800 1492 .311 2046 .426' NBR 1 1600 221 .138 128 .080 SBL 2 3200 291 .091 549 .172' SBT 3 4800 1691 .395' 2066 .431 SBR f 605 323 EBL 3 4800 521 .109' 698 .145' EBT 3 4800 126 .034 418 .121 EBR 0 0 37 163 WBL 1 1600 97 .061 115 .072 WBT 2 3200 392 .123' 353 .110' WBR f 459 556 TOTAL CAPACITY UTILIZATION .726 .926 TOTAL CAPACITY UTILIZATION A-121 .672 .853 20. MacArthur L San Niguel Existing TOTAL CAPACITY UTILIZATION .443 .710 Existing + Growth + Approved + Project AM PK HOUR PM PK HOUR AM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 87 .027 98 .031' NBT 3 48OG 1514 .315' 1000 .2C8 NBR 1 1600 282 .176 278 .174 SBL 2 3200 7 .002' 9 .GG3 SBT 3 4600 1209 .252 1500 .313' SBR 1 1600 549 .343 578 .318 EBL 2 3200 86 .027 909 .284' EBT 2 3200 73 .033* 472 .196 EBR 0 0 31 0 154 42 WK 2 3200 224 .010` 217 .068 WET 2 320C 164 .063 232 .082' WBR 0 0 38 5 29 35 Right Turn Adjustment SBR .023' 5:men TOTAL CAPACITY UTILIZATION .443 .710 Existing + Growth + Approved + Project AM PK HOUR AM PK HOUR PM PK HOUR LANES LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 88 .028 104 .033 - NBT 3 4800 1567 .326' 1039 .216 NBR 1 1600 282 .176 278 .174 SBL 2 3200 9 .0O3* 13 .004 SBT 3 4900 1247 .260 1549 .323• SBR 1 1600 551 .344 511 An EBL 2 3200 88 .028 916 .286' EBT 2 3200 75 .037, 490 .205 EBR 0 0 42 201 167 .42L WK 2 3206 224 .077- 217 .068 ART 2 7207 172 .066 237 .G83• 5 36 35 29 29 5:men TOTAL CAPACITY UTILIZATION .448 .725 1 -122 Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 87 .027 100 .031* NBT 3 4800 1567 .326` 1039 .216 NBR 1 1600 282 .176 278 .174 SBL 2 3200 9 .003' 13 .004 SBT 3 4800 1247 .260 1549 .323' SBR 1 1600 551 .344 511 .319 EBL 2 3200 88 .028 916 .286' EBT 2 3200 75 .033 484 .203 EBR 0 0 31 164 WBL 2 3200 224 .070` 217 .068 NBT 2 3200 165 .063 244 .885' WBR 0 0 38 29 Right Turn Adjustment SBR .012• TOTAL CAPACITY UTILIZATION .444 .725 Existing + Growth + Approved + Cumulative AM PK HOUR PM PY HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3280 124 .039 122 .038' NBT 3 4800 1712 .357' 1222 .255 NBR 1 1600 282 .176 278 .174 SBL 2 3200 9 .003' 13 .009 SBT 3 4800 1369 .269 1731 .361• SBR 1 i600 551 .344 511 .319 SBL 2 3200 88 .02B 916 .286' EBT 2 3200 75 .037• 484 .214 EBR 0 G 43 201 .42L 2 32',G 223 .670' 217 .968 FBT 2 328., 165 .C63 244 .1185' O; BR. 5 36 29 TOTAL CAPACITY UTILIZATION .467 .770 0 • 20. MacArthur a San Miguel Existing + Growth + Approved + Cumulative + Project AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 2 3200 125 .039 126 .C39* NET 3 4800 1712 .357* 1222 .255 HER 1 1600 282 .176 278 .174 SBL 2 3200 9 .003' 13 .004 SBT 3 4800 1389 .289 1731 .361' SBR 1 1600 551 .344 511 .319 EBL 2 3200 88 .02B 916 .286* EBT 2 3200 l5 .04�* 490 .21P EBR 0 0 54 204 WBL 2 3200 224 .070* 217 .068 WBT 2 3200 172 .066 237 .083' WBR 0 0 38 29 TOTAL CAPACITY UTILIZATION .470 .769 E 0 A -123 21. MacArthur i Coast Hwy Existing TOTAL CAPACITY UTILIZATION .705 .640 Existing + Growth + Approved + Project 41 PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 0 0 0 0 NBT 0 0 0 0 NBR 0 0 0 0 SBL 2 3200 601 .188* 861 .269" SBT 0 0 0 0 SBR f 348 1033 EBL 2 3200 988 .309* 535 .167* EST 3 4860 923 ,192 1412 .294 EBR 0 6 0 C 5L U 0 WK 3 4860 I:53 .247' ".;94 .22 %' i3R 9:8 9 � 4 TOTAL CAPACITY UTILIZATION .738 .664 A -121 0 Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC N3L 0 0 0 0 NBT 0 9 0 0 NBR 0 0 0 0 SBL 2 3200 590 .184* 858 .268' SBT 0 C 0 0 SBR f 348 1033 ESL 2 3200 988 .309' 535 .167* EST 3 4800 921 .192 1397 .291 EBR G 0 0 0 NBL 0 0 0 0 NBT 3 4605 1141 .238" 1096 .228" WBR f 917 900 TOTAL CAPACITY UTILIZATION .731 .663 40 Existing + Growth + Approved + Cumulative AIM PK HOUR PM PK HOUR HOUR LANES CAPACITY VOL VIC VOL VIC NBL 0 0 0 0 0 0 NBT 0 0 0 0 0 0 NBR 0 0 0 G 0 0 SBL 2 3200 571 .178' 829 .259' SBT 0 0 0 0 0 0 SBR f f 337 450 1003 1119 EBL 2 3200 954 .298' 515 .161' EBT 3 4800 888 .165 1349 .281 ERR 0 0 0 0 0 0 NBL 0 0 0 0 WBT 3 4800 1099 .229* 1058 .220* WBR f f 887 871 TOTAL CAPACITY UTILIZATION .705 .640 Existing + Growth + Approved + Project 41 PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 0 0 0 0 NBT 0 0 0 0 NBR 0 0 0 0 SBL 2 3200 601 .188* 861 .269" SBT 0 0 0 0 SBR f 348 1033 EBL 2 3200 988 .309* 535 .167* EST 3 4860 923 ,192 1412 .294 EBR 0 6 0 C 5L U 0 WK 3 4860 I:53 .247' ".;94 .22 %' i3R 9:8 9 � 4 TOTAL CAPACITY UTILIZATION .738 .664 A -121 0 Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC N3L 0 0 0 0 NBT 0 9 0 0 NBR 0 0 0 0 SBL 2 3200 590 .184* 858 .268' SBT 0 C 0 0 SBR f 348 1033 ESL 2 3200 988 .309' 535 .167* EST 3 4800 921 .192 1397 .291 EBR G 0 0 0 NBL 0 0 0 0 NBT 3 4605 1141 .238" 1096 .228" WBR f 917 900 TOTAL CAPACITY UTILIZATION .731 .663 40 Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 0 0 0 0 NBT 0 0 0 0 NBR G 0 G 0 SBL 2 3200 640 .200* 992 .310* SBT 0 0 0 0 SBR f 450 1119 EBL 2 3200 1036 .324* 654 ,204' `.BT ., 480, :029 .214 1'91 .373 EBR 0 0 0 27 _ SKc ::06 .310 1321 .2'6* ASP f TOTAL CAPACITY UTILIZATION .838 .790 0 21. MacArthur i Coast Hwy Wsting + Growth + Approved + Cumulative + Project AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C 'Vol V/C NBL 0 0 0 0 NET 0 0 0 0 NBR 0 0 0 0 S3L 2 3200 651 .2031 995 .3'_1� SBT 0 0 0 0 SBR f 450 1119 EEL 2 3200 1036 .329* 654 .209' EBT 3 4800 1031 .215 1806 .376 EBR 0 0 0 0 WBL 0 0 0 0 NET 3 4800 1526 .318* 1325 .2761 WBR f 1053 990 TOTAL CAPACITY UTILIZATION .845 .791 0 A -125 22. Santa Cruz a San Joaquin Rills Existing AM PK HOUR AN PK HOUR LANES CAPACITY VOL AM PK HOUR PM PK HOUR 2 LANES CAPACITY VOL VIC VOL VIC NBL 2 3200 60 .019• 413 .129' NBT 1 1600 2 .008 12 .035 NBR C a 10 a 44 23 SBL 1 1600 21 .013 22 .014 SBT 2 3200 11 .007' S .003' SBR 0 0 23 .014 45 .028 EEL 1 1600 30 .019 55 .034` EST 3 4800 494 .150' 324 .101 EBR a a 224 .125 199 .124 WBL 1 1600 181 .113' 54 .034 WBT 3 4800 286 .065 495 .111' WBR 0 a 28 37 TOTAL CAPACITY UTILIZATION .289 .277 Existing + Growth + Approved + Project AM PK HOUR AN PK HOUR LANES CAPACITY VOL VIC NBL 2 3200 96 .039' NET 1 1630 2 .008 NBR a a 11 1 SBL 1 1600 21 .013 SBT 2 3230 12 .008` SBR a a 23 .014 EBL 1 1600 30 .019 EBT 3 4800 544 .161' EBR 0 0 229 23 AK 1 1607 :82 ._141 NBT 3 4960 293 .06i N3R 3 C 2E .150' PM PK HCUR VOL V/C 427 .133• 12 .035 44 23 .014 5 .0031 45 .028 55 .0341 334 .1C4 222 .139 34 .C34 544 .121' TOTAL CAPACITY UTILIZATION .313 .291 A -12h Existing + Regional Growth + Approved AN PK HOUR AM PK HOUR PM PK HOUR CAPACITY LANES CAPACITY VOL VIC VOL VIC NBL 2 3200 61 .019' 413 .129' NBT 1 1600 2 .008 12 .035 NBR 0 0 11 44 1 SBL 1 1606 21 .013 23 .014 SBT 2 3200 12 .008' S .003' SBR 0 0 23 .014 45 .028 EBL 1 1600 30 .019 55 .034' EBT 3 4800 495 .150' 324 .101 EBR 0 0 224 .125 200 .125 WBL 1 1600 182 .114' 54 .034 WBT 3 4800 286 .065 496 .iii' WBR 0 0 28 37 TOTAL CAPACITY UTILIZATION .291 .277 Existing + Growth + Approved + Cwolative AN PK HOUR P14 PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 2 3200 61 .0191 413 .1291 NBT 1 1600 2 .008 12 .035 NBR 0 0 11 44 SBL 1 1600 31 .019 32 .020 SBT 2 3200 12 .008' S .003• SBR 0 0 23 .014 45 .028 EBL 1 1600 30 .019 55 .034' EBT 3 4800 504 .:52' 362 .113 ERR 0 0 224 200 .125 11BL 1 1E00 1'.2 .1i41 54 .034 WK 4800 ii! .674 516 .!:I- Nn C 35 47 TOTAL CAPACITY UTILIZATION .293 .283 • 17J 1 0 22, Santa Cruz d San Joaquin Sills Existing + Growth + Approved + Cumulative + Project AM PK HOUR PM P3 HOUR LANES CAPACITY VOL V/C VOL V/C N& 2 3200 96 .030* 427 .i33* NET 1 1600 2 .G08 12 .035 NOR 0 0 11 44 SBL 1 1600 31 .019 32 .020 SET 2 3200 12 .008* 5 .003* SBR 0 0 23 .014 45 .028 EBL 1 1600 30 .019 55 .034* EBT 3 4800 553 .163* 372 .116 EBR 0 0 229 222 .139 WBL 1 1600 132 .114* 54 .034 08T 3 4800 327 .075 564 .127* WOO. 0 0 35 47 TOTAL CAPACITY UTILIZATION .315 .297 0 A -1'_7 23. Santa Rosa 6 San Joaquin Hills Existing PM PK HOUR VOL VIC 167 .104' 28 .018 372 .233 61 .042 7 .004' 24 .015 36 .023 597 .1441 96 250 .078" 244 .069 86 NSR .1081 Existing + Regional Growth + Approved AM PK FOUR LANES CAPACITY VOL VIC NBL 1 1600 35 .522 NBT 1 1600 6 .004E NBR 1 1600 67 .042 SBL 1 1600 66 .0411 SET 1 1600 13 .008 SBR 1 1600 36 .023 EBL 1 1600 33 .021 EST 3 4800 253 .079, EBR 0 0 142 .089 WBL 2 3200 531 .1661 WBT 3 4800 445 .104 WBR a 0 56 4800 Right Turn Adjustment .0811 602 PM PK HOUR VOL VIC 167 .104' 28 .018 372 .233 61 .042 7 .004' 24 .015 36 .023 597 .1441 96 250 .078" 244 .069 86 NSR .1081 Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES LANES CAPACITY VOL VlC VOL VlC NBL 1 1600 46 .029 175 .109+ NBT 1 1600 6 .004' 2B .018 NBR 1 1600 70 .044 398 ,249 SBL 1 1600 66 .041' 67 .042 SBT 1 1600 13 .008 7 .004' SBR 1 1600 36 .023 24 .015 EBL 1 1600 34 ,021 36 .023 EBT 3 4800 256 .0811 602 .1481 EBR 0 0 149 .093 106 WBL WBL 2 3200 538 .168' 274 .086' Wei 3 4800 463 .108 269 .074 HER 0 0 56 86 86 ?act Right Turn Adjustment � 4 .,:5' NBR .1131 TOTAL CAPACITY UTILIZATION .290 .438 TOTAL CAPACITY UTILIZATION .294 Existing + Growth + Approved + Project AM PH HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL i 1600 53 .033 223 .139* NBT 1 1606 6 .004' 28 .018 NBR 1 1600 99 .062 409 .256 SBL 1 :600 66 .041' 67 .042 SET 1 1600 13 .008 7 .004' SBR 1 1600 16 .023 24 .015 EBL 1 1600 34 .021 36 .023 EBT 3 4800 258 .081' 6C2 .150* EBR 0 0 198 .124 ii6 WBL 2 3200 542 .i69' 288 .690' NBT 3 48;0 443 .,9 269 .,74 WER 0 56 86 ?act :.,... 6d ;:;'rsct � 4 .,:5' 131 .:b7• TOTAL CAPACITY UTILIZATION .310 .470 A-[28 .460 Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL V1C NBL 1 ;600 46 .029 175 .109' NET 1 1600 6 .004* 28 .018 NBR 1 1600 81 .051 440 .275 SBL 1 1600 81 .051* 79 .049 SET 1 1600 13 .008 7 .004,• SBR 1 1600 36 .023 24 .015 EBL 1 1600 34 .021 36 .023 EBT 3 4800 217 .081' 649 .1571 EBR 0 0 :49 .093 106 WBL 2 3205 577 .180. 299 .093' WK 483: K4 .:i9 299 .083 'n ER TOTAL CAPACITY UTILIZATION .322 .504 L] 4D 0 0 23. Santa Rosa 6 San Joaquin Hills Existing + Growth + Approved + Cumulative + Project AM PA HOGR PM 2K FOUR LANES CAPACITY VOL V/C VOL V/C NEL 1 1600 53 .033 223 .129' NBT 1 1600 6 .004' 28 .018 NBR 1 1600 110 .069 451 .282 SBL 1 1600 81 .051` 79 .049 SBT 1 1600 13 .008 7 .004' SBR 1 1600 36 .023 24 .015 EBL L 1600 34 .021 36 .023 EST 3 4800 277 .087- 643 .159' M, C 9 198 .124 116 WBL 2 3260 581 .182- 313 .093' WBT 3 4800 504 .119 299 .083 MR C 0 67 100 Right Turn Adjustment ESP .002' NBR .1'4- TOTAL CAPACITY UTILIZATION .326 .514 0 r 1 A. 121) 24. San Miguel F San Joaquin Hills Existing AM PK HOUR AM PK HOUR LANES CAPACITY VOL AM PK HOUR P14 PK HOUR _ LANES CAPACITY VOL VIC VOL '• //' NBL 1 1600 2 .001 11 .007 NET 2 3200 229 .100* 499 .222* NBR 0 .133 91 a 210 102 SBL 1 1600 67 .042* 85 .053* SBT 2 3200 316 .131 241 .106 SBR 0 0 102 ;6;0 97 133* EEL 2 3200 214 .067 514 .161* EST 3 4800 492 .107* 431 .093 ERA 0 0 23 '_ 14 1 WBL 1 1600 213 .133* 264 .165 WET 3 4800 6E3 .151 784 .177* WBR a a 60 67 TOTAL CAPACITY UTILISATION .382 .613 Existing + Growth + Approved + Project AM PK HOUR AM PK HOUR LANES CAPACITY VOL VIC NBL _ 1600 2 .001 NET 2 3290 229 .100* NBR a 0 90 2 SBL 1 1600 67 .042* SET 2 3200 325 .133 SBR a 0 102 1600 EEL 2 3200 214 .067 EST 3 4800 493 .108* EBR 0 a 23 102 WBL _ ;6;0 2.3 133* SBT _ 48 v3 6E: .161* K5R 0 I 6; .108* PM PK HOUR VOL VIC 11 .007 514 .228* 215 85 .053* 248 .108 97 514 .161* 431 .093 14 266 .166 IEc 1771 E7 TOTAL CAPACITY UTILIZATION .383 .619 n -tan Existing + Regional Growth + Approved AM PK HOUR AM PK HOUR PM PK HOUR CAPACITY LANES CAPACITY VOL VIC VOL VIC NBL 1 1600 2 .001 11 .007 NET 2 3200 229 .100* 505 .226* NBR 0 0 91 218 1 SBL i 1600 67 .042* 85 .053* SET 2 3200 316 .131 249 .108 SBR 0 0 102 97 2 EEL 2 3200 214 .067 514 .161* EBT 3 4800 493 .108* 431 .093 EBR 0 0 23 14 '_ WBL 1 1600 215 .134* 272 .170 WBT 3 4800 663 .151 784 .177* WBR 0 a 60 67 TOTAL CAPACITY UTILIZATION .384 .617 Existing + Growth + Approved + Cmiative AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 1 1600 2 .001 11 .007 NET 2 3200 229 .100* 505 .226* NBR a a 91 218 SBL 1 1600 67 .042* 85 .053* SET 2 3200 316 .131 249 .108 SBR 0 0 102 97 EEL 2 3200 214 .067* 514 .161* EST 3 4800 556 A21 647 .138 EBR 0 a 23 14 W3L '_ :600 2'5 .'34 272 .170 WET = 4300 854 .19;* 921 .2C6* 1125 9 5C 61 TOTAL CAPACITY UTILIZATION 399 .646 `J 0 0 24. San Miguel i San Joaquin Sills Existing + Growth + Approved + Cumulative + Project AM PK HOUR PM PK HCUR LANES CAPAC :TY VOL V(C VOL Vic NBL 1 1600 2 .001 11 W, NET 2 3200 229 .100' 514 .228' NBR 0 0 90 215 SBL 1 1600 61 .042* 85 .053* SBT 2 3206 325 .133 248 .108 SBR 0 0 102 97 EBL 2 3200 214 .067' 514 .161" EBT 3 4800 556 .121 647 .138 EBR 0 0 23 '_4 WBL 1 1600 213 .133 266 .166 WET 3 4800 954 .190* 921 .206* WBR 0 0 6G 67 TOTAL CAPACITY UTILIZATION .399 .648 0 0 A.I!1 25. Avocado F San Niguel Existing TOTAL CAPACITY UTILIZATION .480 .748 Existing + Growth + Approved + Project AM PK HOUR PM PK HOUR AM PK HCUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 123 .077 176 .110* NET 1 1600 148 .093* 60 .038 NBR 1 1600 121 .076 655 .409 SBL 1 1600 51 .032* 222 .139 SET 1 1600 51 .032 129 .081" SBR 1 1600 16 .010 21 .013 EEL 1 1600 7 .004 182 .114* EST 2 3200 148 .063* 444 .169 EBR 0 0 53 EBR 98 0 WBL 1 1600 467 .292* 174 .109 NET 2 3200 435 .194 492 .178* WBR 0 0 187 ?i3R 76 Right "urn Adjustment r8 NBR .265* TOTAL CAPACITY UTILIZATION .480 .748 Existing + Growth + Approved + Project AM PK HCUR AM PK HOUR PM PK HOUR CAPACITY LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 123 .077 176 .1L0* NET 1 1600 197 .123* 70 .044 HER 1 1600 121 .076 655 .409 SBL 1 1600 52 .033* 232 .145 SET 1 1600 58 .036 177 .111* SBR 1 1600 16 .010 21 .013 EEL 1 1600 7 .004 182 .114* EBT 2 3200 158 .C66* 467 .177 EBR 0 0 53 98 WEi. 1 1600 46E .292* -14 .109 WET 2 32GC 434 .197 572 .'6'* ?i3R :E7 I 9 7 r8 N3R .244' TOTAL CAPACITY UTILIZATION .514 .760 A -132 0 Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 123 .077 176 .110* NET 1 1600 148 .093* 60 .038 NBR 1 1600 121 .076 655 .409 SBL 1 1600 51 .032* 222 .139 SET 1 1600 51 .032 129 .081* SBR 1 1600 16 .010 21 .013 EEL 1 1600 7 .004 182 .114* EST 2 3200 148 .063* 466 .176 EBR 0 0 53 98 WBL 1 1600 467 .292* 174 .109 WET 2 3200 435 .194 508 .183* WBR 0 0 187 76 Right Turn Adjustment NBR .266* TOTAL CAPACITY UTILIZATION .480 .754 0 Existing + Growth + Approved + Cumulative AM PK HCUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 123 .077 176 .110* NET 1 1600 148 .093* 60 .038 NBR 1 1600 121 .076 655 .409 SBL 1 1600 51 .032* 222 .139 SET 1 1600 51 .032 129 .081* SBR 1 1600 16 .010 21 .013 EBL i 1600 7 .004 182 .114* EST 2 3210 160 .067* 503 .188 EBR G ;, 53 98 'WBL 16.0 467 .292* 114 .109 NET 2 3260 472 .20E 53C .i69* 'r'BP u 3 :E7 76 TOTAL CAPACITY UTILIZATION .484 .765 0 9 25. Avocado 6 San Niguel Existing + Growth + Approved + CSmulative + Project AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL '✓IC NBL 1 1600 123 .077 176 .1i0* NBT 1 1600 191 .123' 70 .044 NBR 1 1600 121 .076 655 .409 SBL 1 1600 52 .G33* 232 .145 SBT 1 1600 58 .036 177 .111' SBR 1 1600 16 .010 21 .013 EBL 1 1600 7 .G04 '82 ,114 - EBT 2 3200 170 .010* 504 .188 EBR 0 0 53 98 WBL 1 1600 467 .292' 174 .109 WBT 2 3200 471 .209 524 .188* WBR 0 0 :97 78 Right Turn Adjustment NBR ,2W TOTAL CAPACITY UTILIZATION .518 .770 0 A- 1.13 26. Superior /Balboa 6 Coast Hwy Existing AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 1.5 202 261 NET 1.5 4800 327 .129* 209 .111* NBR 0 89 65 SBL 1.5 170 163 SBT 1.5 4800 122 .061' 237 .083* SBR 2 3200 187 .058 738 .231 EBL 2 3200 988 .309 255 .080* EDT 3 4800 2242 .467* 1169 .244 EBR 1 1600 238 .149 225 .141 WEL 1 1600 61 .038* 147 .092 WBT 4 6400 582 .121 2165 .359* WBR 0 0 206 .129 134 Right Turn Adjustment SBR .088* Note: Assumes NIS Split Phasing TOTAL CAPACITY UTILIZATION .695 .721 Existing + Growth + Approved + Project AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 1.5 203 261 NBT 1.5 4800 357 .135* 218 .114* NBR 0 89 66 EEL 1.5 170 163 S3T 1.5 4800 128 .062* 269 .090* SBR 2 3200 237 .065 868 .271 EBL 2 3200 1:11 .347 293 .692` E5:' 3 46G0 2388 .498* 156 .262 EBR :6C0 238 .149 228 .:43 71BL 6: 2B' '.47 .;92 WE? 4 64Gi 651 . -34 2329 .385* 2;6 TOTAL CAPACITY UTILIZATION .733 .793 A -131 Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 1.5 203 261 NET 1.5 4800 357 .135* 218 .114* NBR 0 89 66 SBL 1.5 170 163 SBT 1.5 4800 128 .062* 269 .090` SBR 2 3200 207 .065 868 .271 EBL 2 3200 1111 .347 293 .092* EDT 3 4800 2377 .495* 1248 .260 EBR 1 1600 238 .149 228 .143 WBL 1 1600 61 .038* 147 .092 WET 4 6400 633 .131 2314 .383* WBR 0 0 206 134 Right Turn Adjustment SBR .112* Note: Assumes NIS Split Phasing TOTAL CAPACITY UTILIZATION .730 .791 Existing + Growth + Approved + Cmulative AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NHL 1.5 203 261 NBT 1.5 4800 371 .138* 233 .117* NBR 0 89 66 SBL 1.5 193 242 SBT 1.5 4800 134 .0681 297 .112* SBR 2 3200 230 .072 982 .307 EBL 2 3200 :167 .365 354 .M1 EDT 3 4800 2423 .5G5* 1406 .293 EBR. - :6GG 258 .149 228 .143 :E,0 6: .:38* :47 .',92 NET 6430 '86 .64 24,9 .405* nE3 0 252 .: -c ..- .t. ...... .._. J? .. :2. TOTAL CAPACITY UTILIZATION .749 .857 n U Is • 26. Superior /Balboa i Coast Hwy Existing + Growth + Approved + Cumulative + Project AM PK HOUR PM PR HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1.5 203 261 NBT 1.5 4800 371 .138' 233 .lilt NBR 0 89 66 SBL 1.5 193 242 SBT 1.5 4600 134 .068' 297 .112` SBR 2 3200 230 .072 982 .307 EBL 2 3209 1167 .365 354 .111' EBT 3 4800 2434 .507' 1414 .295 EBR 1 1600 238 .149 228 .143 WBL 1 1600 61 .038` :47 .092 W5T 4 6400 806 .168 2424 .407' NBR O 0 282 .176 191 Right Tarn Adjustment SBR .112' Note: Assumes N/S Split Phasir.9 0 TOTAL CAPACITY UTILIZATION .751 .859 I 1 1 -135 27. Newport 6 Coast Hwy Existing AM PH HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NBT 0 0 0 PM PK HOUR 0 LANES NBR 0 0 0 V/C 0 V/C SBL 2 3200 384 .120* 617 .193' SBT 0 0 0 NBT 0 0 SBR 1 1600 269 .168 470 .294 EBL 0 0 0 0 0 0 EBT 2 3200 2075 .648* 1267 .396* ERR f 487 .229* 267 0 WBL 0 0 0 0 0 SBR WBT 3 4600 979 .204 1848 .385 WBR f 370 EBL 563 0 Right Turn Adjustment 0 0 SBR .093* TOTAL CAPACITY UTILIZATION .768 .682 Existing + Growth + Approved + Project AM PK HOUR AM PK HOUR PM PK HOUR LANES LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 0 NBT NBT 0 0 0 0 0 NBR NBR 0 0 0 0 0 SIN, SBL 2 3200 419 .131* 732 .229* SBT 0 0 0 0 0 SBR SBR 1 1600 313 .196 510 .319 EBL 0 0 0 0 0 EBT EBT 2 3260 2151 .672* 1383 .432* EBR 1 5CE 506 282 282 WEI. W5L C G C C W3T W3T 3 4800 I053 .219 1332 .433 W °BR 385 361 584 5d, cg.- 3_ght '5555 ,;S C.T.P ^[ SBP ..i9' 553 .;68' TOTAL CAPACITY UTILIZATION .803 .729 A -136 Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NET 0 0 0 0 NBR 0 0 0 0 SBL 2 3200 409 .128* 728 .228* SBT 0 0 0 0 SBR 1 1600 313 .196 510 .319 EBL 0 0 0 0 EBT 2 3200 2140 .669* 1375 .430* ERR 1 506 282 WIN, 0 0 0 0 WBT 3 4800 1035 .216 1917 .399 WBR f 381 580 Right Turn Adjustment SBR .068* TOTAL CAPACITY UTILIZATION .797 .726 Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NBT 0 0 0 0 NBR 0 0 0 0 SIN, 2 3200 426 .133* 813 .254* SBT 0 0 0 0 SBR 1 1600 313 .196 510 .319 EBL 0 G 0 0 EBT 2 3200 2207 .690* 1613 .504* EBR I 5CE 282 WEI. B C 0 C W3T 3 490G _265 .264 2656 .429 5738 f 385 584 cg.- 5555. Ad- us,:".P. SBP ..i9' TOTAL CAPACITY UTILIZATION .823 .767 0 • 27. Newport 6 Coast Hwy 0 Existing + Growth + Approved + Cumulative + Project AM PR FOUR PM PR HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NBT 0 0 0 0 NBR 0 0 0 0 SBL 2 3200 436 .136' 817 .255' SBT 0 0 0 0 SBR 1 1600 313 .196 510 .319 EEL 0 0 0 0 EBT 2 3206 2218 .693` 1621 .507* ` -BR f 506 282 WBL 0 0 0 0 WET 3 48GO 1284 .268 2073 .432 WBR f 385 584 Right Turn Adjustment SBR .008' TOTAL CAPACITY OTILIIATION .829 .770 A-137 28. Riverside 6 Coast M Existing AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 O 2 (.001}* 26 NET 1 1600 6 .005 7 .029* NBR 0 0 0 14 SBL 0 0 85 841052)* SET 1600 15 063* 7 057 SER 1 1600 301 188 433 271 EBL 1 1600 280 175 268 168* EBT 2 3200 2094 660* 1528 484 EBR 0 0 18 21 WBL 1 1600 9 .006* 28 018 WBT 3 4800 1232 257 2430 .506* WEIR 1 1600 68 043 65 041 Right Turn Adjustment SBR ,038* Note: Assumes Right -Turn Overiap for SBR TOTAL CAPACITY UTILIZATION .730 .793 Existing + Growth + Approved + Project AM PK AM Pit HOUR PM PK HOUR LANES CAPACITY VOL V/C COL V/C NBL 0 0 2 001}* 26 NET 1 1600 6 .005 7 NBR 0 0 0 14 .029* SBL 0 0 87 86 1 05414 SET 1 1600 15 064* 7 .058 SBR 1 1600 301 188 433 .271 EBL 1 1600 ?80 175 268 168* EBT 2 3200 2294 .723' 1783 .168* 564 EBR 0 0 ;9 2! WBL 600 9 .CO6* 23 Ci8 ;1BT 3 4SOr .436 _'99 268; ;59* SBR 6OD 69 .543 68 ;4's '. TOTAL CAPACITY UTILIZATION .794 .846 A -I3R Existing + Regional Growth + Approved AM PK HOUR PY PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 2 ( 01 26 NET 1 1600 6 .005 7 .029* NBR 0 0 0 14 SBL 0 0 87 86 {,054)* SET 1 1600 15 .064* 7 .058 SBR 1 1600 301 188 433 .271 EBL 1 1600 280 .175 268 .168* SET 2 3200 2272 716* 1770 .560 EBR 0 0 18 21 IVBL 1 1600 9 006* 28 .018 WET 3 4800 1410 294 2658 554* WBR 1 1600 69 .043 68 043 Right Turn Adjustment SBR .036* Note Assumes Right -Turn Overlap for SBR TOTAL CAPACITY UTILIZATION .787 .841 Existing + Growth + Approved + Cumulative AM PK HOUR PM P1.029* LANES CAPACITY VOL V/C VOL NBL 0 0 2 ( 001 J * 26 NBT 1 1600 6 005 7 NBR 0 0 0 14 SBL 0 0 92 901.056)* SET 1 1600 15 .067* 7 .061 SBR 1 1600 301 188 433 .271 EBL 1 1600 280 .175 268 168* EBT 2 3200 2361 .743* 2097 662 E3R G 0 18 2: F,3L 1611C 9 006' 28 .5:8 'BT 3 4900 .687 35, I-849 594' BR a50 73 146 G45 '. TOTAL CAPACITY UTILIZATION .817 .881 0 0 0 0 28. Riverside 6 Coast Huy Existing + Growth + Approved + Cumulative + Project AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 2 (.00G* 26 NET 1 1600 6 005 7 029* NBR 0 0 0 14 SBL 0 0 92 90 (.0561* SET 1 1600 15 .067` 7 061 SBR 1 1600 301 .188 433 27'. EBL 1 1600 280 175 268 .168* EBT 2 3200 2383 .750* 2ilO 666 EBR 0 0 18 21 11E1. 1 1600 9 006* 28 .0'.8 WET 3 4800 1713 357 2876 599` WBR 1 1600 73 .046 72 045 Right Turn Adjustment SER .034" Note: Assumes Right Turn Overlap for SBR • TOTAL CAPACITY UTILIZATION .824 .886 0 A -137 29. Tustin 6 Coast Hwy Existing AM PK F%R PM PK HOUR :ANES CAPACITY VOL VIC VOL VIC NBL 0 0 0 1 (.001)` NBT 1 1600 0 .000 0 .004 NBR 0 0 0 6 SBL 0 0 36 45 SBT 1 1600 0 .033' 0 .053E SBR 0 0 16 40 EBL 1 1600 27 .017 32 .020' EBT 2 3200 2241 .700" 1548 .486 EBR 0 6 0 7 W8L 1 1600 1 .001' 0 .500 WBT 3 4800 1236 .258 2462 .513' WBR 1 1600 39 .024 47 .029 Existing + Regional Growth + Approved AM PK HOUR AM PK HOUR PM PK HOUR CAPACITY LANES CAPACITY VOL VIC VOL VIC NBL 0 0 0 w 1 1.0011` W NBT 1 1600 0 .000 0 .004 NBR 0 0 0 6 0 SBL 0 0 36 45 1 SET 1 1600 0 .033' 0 .053' SBR 0 0 16 40 1 EBL 1 1600 27 .017 32 .020` EBT 2 3200 2417 .755, 17D1 .534 EBR 0 0 0 7 i ML 1 1600 1 .001' 0 .000 NBT 3 4800 1340 .279 2663 .555' WBR 1 1600 39 .024 47 .029 TOTAL CAPACITY UTILIZATION .734 .587 TOTAL CAPACITY UTILIZATION .789 .629 Existing + Growth + Approved + Project AM PK HOUR AM PK HOUR PM PK HOUR CAPACITY LANES CAPACITY VOL V/C VOL VIC NBL 0 0 0 w 1 4.O W NBT 1 :600 0 .000 G .004 NBR 0 0 0 6 0 SBL 0 0 36 45 1 SET 1 1600 0 .033' 0 .053' SBR 0 0 16 40 1 EBL 1 1600 27 .017 32 .020' EBT 2 3200 2439 .762' 1714 .536 EBB 0 G 0 7 i NBL 1 :560 1 .101' o .030 WET 3 {870 .3366 .265 2696 .561• +;3R i iSGL 1.9 .724 47 .029 Existing + Growth + Approved + Cmaative AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 0 0 0 1 {.O w NBT 1 1600 0 .000 0 .004 NBR 0 D 0 6 SBL 0 0 36 45 SBT 1 1600 G .033` 0 .053` SBR 0 0 16 40 EBL 1 1600 27 .017 32 .020 EBT 2 3200 2511 .785• 2033 .638' EBR 0 G 0 7 WBL i :650 G .000 W6" 3 48,0 :629 .338 2660 .596 W9R i50: 39 .024 47 .,L7 TOTAL CAPACITY UTILIZATION .796 .634 TOTAL CAPACITY UTILIZATION .819 .692 A•u0 • 0 0 29. Tustin i Coast Hwy i • Existing + Growth + Approved + Cumulative + project AM PH HOUR PM PH HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 1 (.00W NOT 1 1609 0 .000 0 .064 NOR 0 0 0 6 SOL 0 0 36 45 SOT 1 1600 0 .033* 0 .053* SBA 0 0 16 40 EBL 1 1600 27 .017 32 .020 EST 2 3200 2533 .792* 2046 .642* EBR 0 0 0 7 VOL 1 1600 1 .001* 0 .100 WBT 3 4800 1646 .343 2887 .601 WEE 1 1600 39 .024 47 .029 TOTAL CAPACITY UTILIZATION .826 .696 30. Dover d Coast Huy Existing TOTAL CAPACITY UTILIZATION .674 .742 Existing + Growth + Approved + Project AM PK HOUR PM PK HOUR AN PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 1 1600 15 .009 36 .023 NET 2 3200 38 .018` 49 .026" NBR 0 0 21 0 34 21 SBL 3 4800 621 .171' 105B .220' SET I 1600 31 .019 77 .048 SBR 1 1600 124 .078 175 .109 EBL 2 3200 143 .045 133 .042' EST 3 4600 2251 .475' 1457 .312 ERR 0 0 27 0 40 27 WBL I 1600 16 .010` 55 .034 NET 3 4800 1207 .251 2178 .454' WBR f .490' 497 f 1108 5.2 TOTAL CAPACITY UTILIZATION .674 .742 Existing + Growth + Approved + Project AN PK HOUR AM PK HOUR PM PK HOUR LANES LANES CAPACITY VOL VIC VOL VIC NBL 1 1600 15 .069 36 .023 NBT 2 3200 38 .018' 49 .026' NBR 0 0 21 34 34 SBL SBL 3 4800 835 .114" 1072 .223' SBT 1 1600 31 .019 77 .04B SBR I 1600 142 .089 203 .127 EBL 2 3200 157 .049 170 .053+ EBT 3 4800 2408 .501' 1595 .341 EBR 0 0 27 40 49 ;43L W8L I ;690 16 .O,G' 55 .034 WBT 3 480E 1321 .275 2352 .490' WBR f 586 5.2 ;:E9 1:29 TOTAL CAPACITY UTILIZATION .709 .792 n -112 Existing + Regional Growth + Approved AN PK HOUR AM PK HOUR PM PK HOUR LANES LANES CAPACITY VOL VIC VOL VIC NBL 1 1600 15 .009 36 .023 NET 2 3200 38 .018' 49 .026' NBR 0 0 21 34 34 SBL SBL 3 4800 826 .172` 1071 .223` SBT 1 1600 31 .019 77 .048 SBR 1 1600 142 .089 203 .127 EBL 2 3200 157 .049 170 .053' EST 3 4800 2385 .503' 1582 .338 EBR 0 0 27 40 40 ;43L WBL 1 1600 16 .010 55 .034 WBT 3 4800 1295 .270 2325 .484' WBR f 586 506 ;:E9 1118 TOTAL CAPACITY UTILIZATION .703 .786 Existing + Growth + Approved + Cumulative AN PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 1 1600 15 .009 36 .023 NET 2 3200 38 .018' 49 .026' NBR 0 0 21 34 SBL 3 4800 854 .178' 1154 .240' SBT 1 1600 31 .019 77 .048 SBR 1 1600 142 .089 203 .127 EBL 2 3200 157 .049 170 .053` EBT 3 4800 2480 .522' 1914 .407 EBR 0 0 27 40 ;43L i '870 16 .0:0' 55 .034 WB: 3 48',0 1575 .328 2522 .525' WBR I 586 ;:E9 TOTAL CAPACITY UTILIZATION .728 .844 • 0 J 0 30. Dover d Coast Evy Existing + Growth + Approved + Cumulative + Project AA PK HOUR PN. PR HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 15 .009 36 .023 NBT 2 3200 38 .Oi9* 49 .026' NBR 0 O 21 34 SBL 3 4800 863 .180' 1155 .241' SBT 1 1600 31 .019 77 .048 SBR 1 1600 142 .089 203 .127 EBL 2 3200 157 .049 170 .053' EST 3 4800 2502 .527' 1927 .410 EBR 0 0 27 40 WBL 1 1600 16 .010' 55 .034 WBT 3 4800 1E01 .334 2549 .531• WBR f 592 1119 TOTAL CAPACITY UTILIZATION .735 .851 \-143 31. Bayside L Coast Hwy Existing AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 2.5 394 477 NET 0.5 4800 17 .093* '7 ,'09* NBR 0 35 29 SBL 1 1600 19 .012 27 .017 SET 1 1600 9 .017* 11 .026* SBR 0 0 18 30 EBL 1 1600 26 .016 48 .030* EST 3 4800 2800 .583* 1947 .406 EBR 1 1600 344 .215 424 .265 WBL 1 1600 62 .039* 74 .046 WBT 4 6400 1407 .222 3026 .477* WBR 0 0 14 29 Note: Assumes NIS Split Phasing TOTAL CAPACITY UTILIZATION .732 .642 Existing + Growth + Approved + Project AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 2.5 397 482 NBT 0.5 4800 17 .994* ;7 .1100* NBR 0 36 29 SBL 1 1600 63 .039* 98 .061* SBT 1 1600 9 .028 ;1 .044 SBR 0 0 36 59 EEL 1 '600 61 .038 74 .046* EBT 3 4800 2917 .62G* 2396 .437 EBR _ ;600 346 .216 431 .269 W3;. 1 :6C0 62 .039* 74 .046 W37 4 64:7 =534 .252 3245 .5__' f@5 v I; 23 TOTAL CAPACITY UTILIZATION .792 .728 A -144 Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 2.5 397 482 NET 0.5 4800 17 .094* 17 .110* NBR 0 36 29 SBL 1 1600 63 .039* 98 .061* SET 1 1500 9 .028 11 .044 SBR 0 0 36 59 EEL 1 1600 61 .038 74 .046* EST 3 4800 2946 .6,4* 2083 .434 ERR 1 1600 346 .216 431 .269 WBL _ 1600 62 .039* 74 .046 WBT 4 6400 1502 .237 3203 .505* WBR 0 0 14 29 Note: Assumes NIS Split Masirg TOTAL CAPACITY UTILIZATION .766 .722 Existing + Growth + Approved + Comlative Alt PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 2.5 397 482 NET 0.5 4800 17 .094* 17 .110' NBR 0 36 29 SBL 1 1600 68 .043* 102 .064* SRI 1 1600 9 .028 11 .044 SBA 0 0 36 59 EBL 1 1610 51 .038 74 .046' EBT. 3 4800 3G62 .638* 2468 .514 78R '_ 1.609 346 .Z!6 431 .259 ,BL 1 :610 62 .039' 74 .C46 4 54GC :349 .152 343. .542' 575R Z _5 33 apitc TOTAL CAPACITY UTILIZATION .614 362 • • 0 31. Bayside c Coast Hwy Existing + Growth + Approved + Cumulative + Project AM PK HOUR PM PK HOUR LRNES CAPACITY VOL VIC VOL VIC NBL 2.5 397 482 NBT 0.5 4800 11 .094' 17 .i10' NBR 0 36 29 SBL 1 1600 E8 .G43* 102 .064' 58T 1 1600 9 .028 11 .044 SBR 0 0 36 59 EBL 1 1600 61 .038 14 .C46' EBT 3 4800 3093 .644° 2481 .517 EBR 1 1600 346 .216 431 .269 WBL 1 1600 62 .039' 74 .046 W8T 4 6400 1881 .291 3414 .548` WBR 0 0 18 33 Note: Assumes NIS Split Phasing TOTAL CAPACITY UTILIZATION .820 .768 A -135 32. Newport Center d Coast Hwy Existing TOTAL CAPACITY UTILIZATION .356 .532 Existing + Growth + Approved + Project AM PK HOUR Pt4 PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 0 0 0 0 NBT 0 0 0 0 NBR 0 0 0 0 SBL 2 3200 44 .014* 135 .042* SET 0 0 0 0 SBR f 102 572 EBL 2 3200 268 .084 321 .100* EST 3 4800 1726 .360* 1633 .340 EBR 0 0 0 0 WBL 0 0 9 0 WB: i 4880 1278 .266 :973 .411* .13R f 223 :54 TOTAL CAPACITY UTILIZATION .374 .553 A•146 Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 5 0 0 0 NBT 0 0 0 0 NBR 0 0 0 0 SBL 2 3200 46 .814* 144 .045* SBT 5 0 0 0 SBR f 91 570 EBL 2 3200 268 .9B4 320 .100* EST 3 4800 1697 .354* 1627 .339 EBR 0 0 0 0 WBL 0 "v 0 0 WBT 3 4800 1274 .265 1944 .405* WBR f 226 166 TOTAL CAPACITY UTILIZATION .366 .550 Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 0 0 0 0 NBT 0 0 0 0 NBR 0 0 0 0 SBL 2 3200 46 .014* 144 .045* SBT 0 0 0 0 SBR f 91 570 ESL 2 3200 268 .084' 320 .100* EBT 3 4800 1853 .386 2140 .446 ESE 0 0 0 0 WBL 0 0 6 0 WBT 3 4805 1143 ,363* 2261 .411' WBR I 1 226 :66 TOTAL CAPACITY UTILIZATION .461 .616 [_J AM PK HOUR PM PH HOUR LANES CAPACITY VOL VIC VOL VIC NBL 0 0 0 0 NBT 0 0 0 0 NBR 0 0 0 0 SBL 2 3200 46 .014' 141 .044' SBT 0 0 0 0 SBR f 82 539 EBL 2 3200 263 .082 307 .096* EST 3 4800 1642 .342* 1567 .326 EBR 0 0 0 0 WBL 0 0 0 0 WBT 3 4800 1222 .255 1981 .392* WBR f 225 160 TOTAL CAPACITY UTILIZATION .356 .532 Existing + Growth + Approved + Project AM PK HOUR Pt4 PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 0 0 0 0 NBT 0 0 0 0 NBR 0 0 0 0 SBL 2 3200 44 .014* 135 .042* SET 0 0 0 0 SBR f 102 572 EBL 2 3200 268 .084 321 .100* EST 3 4800 1726 .360* 1633 .340 EBR 0 0 0 0 WBL 0 0 9 0 WB: i 4880 1278 .266 :973 .411* .13R f 223 :54 TOTAL CAPACITY UTILIZATION .374 .553 A•146 Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 5 0 0 0 NBT 0 0 0 0 NBR 0 0 0 0 SBL 2 3200 46 .814* 144 .045* SBT 5 0 0 0 SBR f 91 570 EBL 2 3200 268 .9B4 320 .100* EST 3 4800 1697 .354* 1627 .339 EBR 0 0 0 0 WBL 0 "v 0 0 WBT 3 4800 1274 .265 1944 .405* WBR f 226 166 TOTAL CAPACITY UTILIZATION .366 .550 Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 0 0 0 0 NBT 0 0 0 0 NBR 0 0 0 0 SBL 2 3200 46 .014* 144 .045* SBT 0 0 0 0 SBR f 91 570 ESL 2 3200 268 .084' 320 .100* EBT 3 4800 1853 .386 2140 .446 ESE 0 0 0 0 WBL 0 0 6 0 WBT 3 4805 1143 ,363* 2261 .411' WBR I 1 226 :66 TOTAL CAPACITY UTILIZATION .461 .616 [_J 0 32. Newport Center i Coast Nwy Existing + Growth + Approved + Cunulative + Project AM PK HOUR PM PK HOUR WES CAPACITYt VOL WC VOL V.�C NBL 0 0 0 0 NBT 0 0 0 0 NBR 0 0 0 0 SBL 2 3200 44 .014' 135 .042' SBT 0 0 0 0 SBR f 102 572 EBL 2 3200 268 .084` 321 .100' EBT 3 4800 1882 .392 2146 .441 EBR 0 0 0 0 WBL 0 0 0 0 WBT 3 4809 1141 .3W 2290 .411* WBR f 223 154 TOTAL CAPACITY UTILIZATION .462 .619 E 0 A -1.37 33. Avocado 6 Coast Ewy Existing TOTAL CAPACITY UTILIZATION .490 .602 Existing + Growth + Approved + Project AM PK HOUR PM PR HOUR LANES CAPACITY VOL VIC VOL VIC NBL 1 1600 78 .049 109 .068* NBT 1 1600 106 .066* 90 .056 NBR 1 1600 121 .076 163 .102 SBL 1.5 .102 50 1.5 300 53 SBT 0.5 3200 43 .029* 130 .134' SBR f .140' 50 f 275 54 EBL 1 1600 199 .1241 120 .075 EBT 3 4800 1233 .267 1494 .326' EBR 0 0 48 0 70 48 WBL 1 1600 95 .059 119 .074* WBT 3 4800 1126 .271' 1365 .309 WBR 0 0 177 0 119 197 Note: Assumes NIS Split Phasing F.ss:r.es N/S Sp__t ? as: ^g TOTAL CAPACITY UTILIZATION .490 .602 Existing + Growth + Approved + Project AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 1 1600 78 .049 109 .068* NBT 1 1600 106 .066* 90 .556 NBR 1 1600 121 .076 163 .102 SBL 1.5 53 319 SBT 0.5 3200 43 .030* 130 .140' SBR f 54 305 EBL 1 1600 228 .143* 126 .079 EBT 3 4800 1287 .278 1560 .340* EBR 0 0 48 71 '1BL 1600 9� .059 119 .374' W311 3 4803 1184 .2888* '.421 .322 i;BR 0 C 197 123 F.ss:r.es N/S Sp__t ? as: ^g TOTAL CAPACITY UTILIZATION .527 .622 A- 14X Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 1 1600 78 .049 109 .068' NBT 1 1600 1G6 .066' 90 .056 NBR 1 1600 121 .076 163 .102 SBL 1.5 50 300 SBT 0.5 3200 43 .029* 130 .134' SBR f 50 276 EBL 1 1600 199 .124* 120 .075 EBT 3 4800 1288 .278 1564 .341' EBR 0 0 48 71 WBL 1 1'600 95 .059 119 .074' WBT 3 4800 1186 .284' 1427 .322 WBR 0 0 177 119 Note: Assumes NIS Split Phasing TOTAL CAPACITY UTILIZATION .503 .617 Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL VIC NBL 1 1600 78 .G49 109 .568' NBT 1 1600 106 .066" 90 .056 NBR 1 1600 121 .076 163 .102 SBL 1.5 50 300 SBT 0.5 3200 43 .029* 130 .134* SBR f 50 276 EBL 1 1600 199 .124* 120 .075 EBT 3 4800 1444 .311 2077 .4481 EBR G C 48 71 WK 1 1600 95 .553 119 074` WBT 3 480; :655 .382- 1744 .338 WBR. Nc_e: ASS'me5 TOTAL CAPACITY UTILIZATION .601 .724 10 I II I, III • 33. Avocado G coast Hwy 0 0 Existing + Growth + Approved + Cumuli AM PK HOUR LANES CAPACITY VOL V/C NBL 1 1600 78 .049 NBT 1 :600 106 .566' NBR 1 1600 121 .076 SBL 1.5 53 SBT 0.5 32C0 43 .030k SBR f 54 EBL 1 1600 228 .143* EBT 3 4800 1443 .311 EBR 0 0 48 WBL 1 1600 95 .059 WBT 3 4800 1653 .385` HER 0 0 197 Note: Assumes NIS Split Phasing tive + Project PM PK HOUR VOL V/C i09 .068` 90 .056 163 .102 319 130 .140' 305 126 .079 2573 .447* 71 119 .074- 1738 .388 123 +V +'w ueACixx UTILIZATION .624 .729 A -149 34. Goldenrod d Coast Hwy Existing Existing + Regional Growth + Approved AM PK FOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 0 0 106 110 1.069)* NBT 1 1600 0 .083* 0 .OB4 NBR 0 0 2' 25 SBL 0 0 41 1.0261* 47 SBT 1 1600 5 .038 5 .047* SBR 0 0 14 23 EBL 1 1600 16 ,010* 39 .024 EBT 2 3200 1183 .382 1794 .569* ERR 0 0 39 26 WBL 1 1600 44 .028 26 .016* WBT 2 32C0 2022 .635* 1778 .560 WBR 0 0 11 13 TOTAL CAPACITY UTILIZATION .726 .677 TOTAL CAPACITY UTILIZATION .754 .701 Existing + Growth + Approved + Project AM PK HOUR PM PK HOUR LANES CAPACITY. VOL VIC VOL VIC NBL 0 0 106 110 (.069)* NBT 1 1600 0 .083* 0 .OB4 NBR 0 0 27 25 SBL 0 0 41 (.5261* 47 SBT 1 1600 5 .038 5 .047* SBR 0 0 14 23 EBL 1 1600 16 .Cio* 39 .024 EST 2 3200 1197 .3B6 1812 .574* ERR 0 0 39 26 WBL 1 1600 44 .025 26 .016* WBT 2 32x0 22041 .641* ;73; .56C BR G C 1 :3 Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR AM PK LANES CAPACITY VOL VIC VOL VIC NBL C 0 106 VIC 110 1.069)' NBT 1 1600 0 .083* 0 .084 NBR 0 0 27 .CB3* 25 SBL 0 0 40 1.0251* 27 47 SBT 1 1600 5 .037 5 .047* SBR 0 3 14 1 23 EBL 1 1600 16 .010* 39 .024 BET 2 3200 1132 .366 1717 .545* ERR 0 0 39 39 26 WBL 1 1600 44 .028 26 .016* WBT 2 3200 1935 .608* 1103 .536 WBR 5 G 11 160" 13 Existing + Regional Growth + Approved AM PK FOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 0 0 106 110 1.069)* NBT 1 1600 0 .083* 0 .OB4 NBR 0 0 2' 25 SBL 0 0 41 1.0261* 47 SBT 1 1600 5 .038 5 .047* SBR 0 0 14 23 EBL 1 1600 16 ,010* 39 .024 EBT 2 3200 1183 .382 1794 .569* ERR 0 0 39 26 WBL 1 1600 44 .028 26 .016* WBT 2 32C0 2022 .635* 1778 .560 WBR 0 0 11 13 TOTAL CAPACITY UTILIZATION .726 .677 TOTAL CAPACITY UTILIZATION .754 .701 Existing + Growth + Approved + Project AM PK HOUR PM PK HOUR LANES CAPACITY. VOL VIC VOL VIC NBL 0 0 106 110 (.069)* NBT 1 1600 0 .083* 0 .OB4 NBR 0 0 27 25 SBL 0 0 41 (.5261* 47 SBT 1 1600 5 .038 5 .047* SBR 0 0 14 23 EBL 1 1600 16 .Cio* 39 .024 EST 2 3200 1197 .3B6 1812 .574* ERR 0 0 39 26 WBL 1 1600 44 .025 26 .016* WBT 2 32x0 22041 .641* ;73; .56C BR G C 1 :3 Existing + Growth + Approved + Cumulative AM PK FOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 0 0 106 110 {.0691* NET 1 1600 0 .CB3* 0 .OB4 NBR 0 0 27 25 SBL 0 O 41 1.0261' 41 SBT 1 1600 5 .038 5 .047* SBR 0 0 14 23 EBL 1 1600 16 .010* 39 .024 M 2 3200 1342 .432 2321 .733* ERR 0 0 39 26 W3L 1 160" 44 .026 26 .016* WBT 2 3200 2524 .792* 2G95 .659 BR C C 3 TOTAL CAPACITY UTILIZATION .760 .706 TOTAL CAPACITY UTILIZATION .911 .865 A -150 0 0 • 34. Goldenrod d Coast Hwy Existing + Growth + Approved + Cumulative + Project AM PR HOUR PM PA HOUR LANES CAPACITY VOL VIC VOL V/C NBL 0 0 106 1.10 (.069)' NBT 1 1600 0 .083' 0 .084 NBR 6 0 27 25 SBL 0 0 41 (.026)1 47 SBT 1 1600 5 .038 5 .047' SBR 0 0 14 23 EBL 1 1600 16 .010' 39 .024 EBT 2 3200 1356 .436 2339 .739' EBR 0 0 39 26 WBL 1 1600 44 .028 26 .016' WBT 2 3200 2543 .79B- 2097 .659 WBR 0 0 11 13 TOTAL CAPACITY UTILIZATION .917 .911 is A -151 35. Marguerite & Coast Hwy Existing Cunalative AM PK HOUR PM PK AM PK HOUR PM PK HOUR VOL LANES CAPACITY VOL VIC VOL VIC NBL 1 1600 121 ,075' 94 .059* NET i 1600 73 .081 71 .092 NBA 0 0 56 SBL 76 1600 SBL 1 1600 49 .031 92 .058 SBT '. 1600 67 ,121* 84 .10:* SBR 0 0 127 EBL 79 1600 EBL 1 1600 48 .030* 55 .034 EBT 2 3200 1104 .345 1687 .527* EBB I 1E00 61 ,051 57 .036 WBL 1 1600 24 .015 63 .039` WBT 2 3200 1764 .562* 1366 .437 WBR 0 0 33 31 TOTAL CAPACITY UTILIZATION .788 .726 Existing + Growth + Approved + PrOlOct AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL 'J /C NBL 1 1600 120 .075' 94 .059* NBT 1 1600 73 .081 71 .092 NBR 0 0 56 16 SBL 1 1600 49 .031 92 .058 SBT 1 1606 67 .121* 84 .101* SBR 0 0 127 78 EBL 1 1601 48 .030* 55 .034 EBT 2 3200 1167 .365 1779 .556' E5R 1 160G 81 ,051 57 .036 WBL 1 160G 24 A115 63 .439* ''9K 2 325C :864 .593* i43G .457 WBR 7 0 13 3' TOTAL CAPACITY UTILIZATION .819 .755 A.152 Existing + Regional Growth + Approved Cunalative AM PK HOUR PM PK HOUR LANES LANES CAPACITY VOL VIC VOL VIC NBL 1 1600 127 .075` 94 .059* NET 1 1600 73 .081 71 .092 NBR 0 0 56 76 76 SBL SBL 1 1600 49 .031 92 .058 SET 1 1600 61 .121* 84 .101' SBR 0 0 127 78 78 EBL EBL 1 1600 48 .030* 55 .034 EBT 2 3200 1153 .360 1761 .550* EBR 1 1600 81 .051 57 .036 W8L 1 1600 24 .015 63 .039* WBT 2 3200 1845 .587* 1428 .456 WBR a 0 33 36 31 TOTAL CAPACITY UTILIZATION .813 .749 Existing + Growth + Approved + Cunalative AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 1 i6GO 120 .075* 94 .059* NBT 1 1600 73 .OBI 71 .092 NBR 0 0 56 76 SBL 1 11600 52 .033 105 .066 SBT 1 1600 67 .121* 84 .101* SBR 0 0 127 78 EBL 1 1600 48 .030' 55 .034 EBT 2 3230 1312 .410 2288 .715* EBR 1 1600 8. .051 57 .036 WBL i 160: 24 .015 63 .039* K8T 2 3250 234'. .748* :745 .551 WBR ., 46 36 TOTAL CAPACITY UTILIZATION .974 .914 0 • 35. Marguerite 6 Coast Hwy 0 • Existing + Grovth + Approved + Cumulative + Project AM PR HOUR PM PR HOUR LANES CAPACITY VCL VIC VOL VIC NBL 1 1600 12C .075' 94 .059' NBT 1 1600 73 .081 71 .092 NBR 0 C 56 76 SBL 1 1600 52 .033 105 .066 SBT 1 1600 67 .i21` 84 .101' SBR 0 0 127 78 EBL 1 1600 48 .030' 55 .034 EBT 2 3200 1326 .414 2306 .721 ' ERR 1 1600 81 .051 57 .036 WK 1 1600 24 .015 63 .039' WET 2 3200 2366 .154' 1747 .558 19BR 0 0 46 38 TOTAL CAPACITY UTILIZATION .980 .920 A-153 36. Newport Center 6 Santa Barbara Existing PM PK HOUR VOL V/C 155 .097* 102 .032 34 .021 42 .026 180 .056* 67 .042 38 .024 97 .061* 132 .083 23 f. 014]* 44 .028 24 Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 75 .047* 155 .097* NBT 2 3200 134 .042 102 .032 NBR 1 1600 14 .009 34 .021 SBL 1 1600 11 .007 42 .026 SBT 2 3200 76 .024' 1BO .056* SBR 1 1600 39 .024 67 .042 EBL 1 1600 34 .021* 38 .024 EBT 2 3200 28 .018 97 .061' EBR 0 0 165 .103 132 .083 WBL 0 0 2 23 (.0141* WBT 2 3200 5 .004* 44 .028 WBR 0 0 6 .004 24 Right Turn Adjustment EBR .044* TOTAL CAPACITY UTILIZATION .140 .228 TOTAL CAPACITY UTILIZATION .140 Existing + Growth + Approved + Project AM PK HOUR LANES CAPACITY VOL V/C NHL 1 1600 75 .0W NBT 2 3200 134 .042 NBR 1 '600 14 .009 SBL 1 1600 11 .007 SET 2 3200 76 .024* SBR 1 1600 39 .024 EBL 1 1600 34 .021* EBT 2 3200 28 .018 EBR 0 0 165 .103 WBL 0 0 2 .042 WBT 2 3205 5 .004* 148R 0 0 6 .009 Right Turn Ad3ustment EBR .044* PM PK HOUR VOL V/C 155 .097* 102 .032 34 .021 42 .026 180 .056* 67 .042 38 .024 97 .061* 132 .083 23 f. 014]* 44 .028 24 Existing + Regional Growth + Approved AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 75 .047* 155 .097* NBT 2 3200 134 .042 102 .032 NBR 1 1600 14 .009 34 .021 SBL 1 1600 11 .007 42 .026 SBT 2 3200 76 .024' 1BO .056* SBR 1 1600 39 .024 67 .042 EBL 1 1600 34 .021* 38 .024 EBT 2 3200 28 .018 97 .061' EBR 0 0 165 .103 132 .083 WBL 0 0 2 23 (.0141* WBT 2 3200 5 .004* 44 .028 WBR 0 0 6 .004 24 Right Turn Adjustment EBR .044* TOTAL CAPACITY UTILIZATION .140 .228 TOTAL CAPACITY UTILIZATION .140 Existing + Growth + Approved + Project AM PK HOUR PM PK HOUR LANES CAPACITY 'VOL V/C VOL V/C NBL i 1EO0 75 .C47* 155 .097* NBT 2 3200 134 .542 102 .032 NBR 1 1600 14 .009 34 .021 SBL 1 1600 11 .007 42 .026 SBT 2 2200 76 .024* 180 .056* SBR 1 1600 39 .024 67 .042 EBL 1 1600 34 .021* 38 .024 EBT 2 3200 30 .C19 iO6 .066* EBR 0 0 1,65 .1153 132 .083 ;J51 0 G 2 23 I.C141* 1195 2 329'. 6 .L34* 53 .531 E6R C 6 24 P:;t.t :..^ A - Ust7e-t 33R .228 Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 15 .047* 155 .097* NBT 2 3200 134 .042 102 .032 HER 1 1600 14 .009 34 .021 SBL 1 1600 11 .007 42 .026 SBT 2 32CO 76 .024* 180 .056' SBR 1 1600 39 .024 67 .042 EBL 1 1600 34 .C21* 38 .024 EBT 2 320C 28 .C18 97 .061* E3R 0 0 '.65 .103 132 .083 WBL C 0 2 23 ;.G14j* W5' 2 325 5 .OG4* 44 .G28 ;J53 E .CC4 24 -..,n Aclls itent EBR -44 TOTAL CAPACITY UTILIZATION .140 .233 TOTAL CAPACITY UTILIZATION A -154 140 .228 0 0 1] • 36. Newport Center 6 Santa Barbara Existing + Growth + Approved + Cumulative + Project AM PK FOUR PM PK HOUR BANES CAPACITY VOL V/C VOL V/C NBL 1 :600 75 .047' 155 .797' NBT 2 3200 134 .042 102 .032 NBR 1 1600 14 .009 34 .021 SBL 1 1600 11 .007 42 .026 SBT 2 3200 76 .024' 180 .056' SBR 1 i600 39 .024 67 .042 EBL 1 '.600 34 .021' 38 .024 EBT 2 3290 30 .019 106 .066' EBR 0 0 165 .:03 132 .083 WBL 0 0 2 23 1.0141* WBT 2 3200 6 .004' 53 .031 WBR 0 0 6 24 Right Turn Ad;ustment EBR .044• 0 TOTAL CAPACITY UTILIZATION .140 .233 0 A -155 37. Santa Cruz 6 Newport Center Existing TOTAL CAPACITY UTILIZATION .117 .211 Existing + Growth + Approved + Project AM PH HOUR P11 PK HOUR AM PH HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 10 1.0061' 50 1.0311• NET 2 3200 32 .022 144 .086 NBR 0 0 27 3200 80 SBL 1 1600 25 .016 32 .020 SBT 1 1600 85 .053" 120 .075• SBR 1 1600 56 .035 103 .064 EEL 1 1600 35 .022 91 .057 EBT 2 3200 60 .019' 102 .032• ERR 1 1600 22 .014 92 .026 WBL 1 1600 63 .039` 116 .073" WBT 2 3200 84 .026 102 .032 WBR 1 1600 34 .021 BS .051 TOTAL CAPACITY UTILIZATION .117 .211 Existing + Growth + Approved + Project AM PH HOUR P21 PK HOUR AM PK HOUR PM PK HOUR VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL 0 0 10 (.006)^ 3200 50 (.031)' 144 NBT 2 3200 33 .022 153 .058 NBR 0 0 27 32 80 SBT SBL 1 1600 25 .016 32 .020 SBT 1 1600 87 .054• 129 .081^ SBR 1 1600 56 .035 103 .064 EBL 1 1600 35 .022 91 .057 EBT 2 3200 60 .019• 102 .032` EBR 1 1600 22 .014 42 .026 'WBL : 1660 63 .039^ 1=6 .713^ 7i8' 2 3270 94 .025 -02 .732 'tlBR 1 :57G 34 .02i 81 .65i TOTAL CAPACITY UTILIZATION .118 .217 A -156 Existing + Regional Growth + Approved AM PH HOUR P21 PK HOUR PM PK HOUR LANES LANES CAPACITY VOL V/C VOL V/C NBL 0 0 10 (.0061^ 50 (.031}• NBT NET 2 3200 32 .022 144 .086 NBR 0 0 27 80 SBL SBL 1 1600 25 .016 32 .020 SBT 1 1600 85 .053' 120 .075` SBR 1 1600 56 .035 103 .064 EBL 1 1600 35 .022 91 .057 EBT 2 3200 60 .019' 102 .032• EBR 1 1600 22 .014 42 .026 WBL 1 1600 63 .0391 116 .073' WBT 2 3200 84 .026 102 .032 WBR 1 1600 34 .021 81 .051 TOTAL CAPACITY UTILIZATION .117 .211 Existing + Growth + Approved + Cumulative AM PH HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 10 1.006}^ 50 1.0311^ NBT 2 3200 32 .022 144 .086 NBR 0 0 27 80 SBL 1 1600 25 .016 32 .020 SBT 1 1600 85 .053• 120 .075^ SBR 1 1600 56 .035 103 .064 EBL 1 1600 35 .022 91 .057 EBT 2 3200 60 .019^ 102 .032^ EBR i 1600 22 .014 42 .026 WK 1 1606 53 .033^ 1:6 .073' WBT 2 320r 54 .025 102 .632 :43R : :600 34 .521 8: .75: TOTAL CAPACITY UTILIZATION .117 .211 •I 0 37. Santa Cruz 6 Newport Center 0 Existing + Growth + Approved + Cumulative + Project AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 D (.006)* 50 (.031)` NBT 2 3200 33 .022 153 .C88 NBR 0 0 27 80 SBL 1 1600 25 .016 32 .020 SBT 1 1600 87 .054* 129 .081+ SBR 1 1600 56 .035 103 .C64 EBL 1 1600 35 .022 91 .057 EBT 2 3200 60 .019* 102 .032* EBR 1 1600 22 .014 42 .026 WBL 1 :600 63 .039* 116 .073* WBT 2 3200 84 .026 102 .032 WBR 1 1600 34 .021 81 .051 TOTAL CAPACITY UTILIZATION .11E .217 Ad i7 38. Newport Centex i Santa Rosa Existing AM PH HOUR PM PH HOUR LANES CAPACITY 'VOL V/C VOL V/C NBL 1 1600 31 .019 38 .024 NET 2 3280 69 .022* 204 .064* HER 1 1600 22 .014 36 .023 SBL 1 1600 87 .054* 80 .050' SET 2 3200 1B3 .057 228 .071 SBR 1 1600 43 .027 84 .053 EEL 0 0 20 84 EST 2 3200 39 .027* 67 .061* E3R 0 0 26 63 WBL 0.5 42 33 WET 2 4000 81 .032* 102 .034* HER 1 1.600 145 .091 163 .102 Right Turn Adjustment WBR .018* WBR .030* Note: Assumes EN Split Phasing Existing + Regional Growth + Approved AM PH HOUR PM PH HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 31 .019 38 .024 NET 2 3200 69 .022* 204 .064* HER 1 1600 22 .014 36 .023 SBL 1 1600 87 .054* 80 .050* SET 2 3200 183 .057 228 .071 SBR 1 1600 43 .027 84 .053 EEL 0 0 20 64 EBT 2 3200 39 .027* 67 .061* ERR 0 0 26 63 WBL 0.5 42 33 WET 2 4000 87 .032' 102 .034* WBR 1 1600 145 .091 163 .102 Right Turn Adjustment WBR .018* WBR .030* Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION .153 .245 TOTAL CAPACITY UTILIZATION .153 Existing + Growth + Approved + Project AM PH AM PH HOUR PM PH HCUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 31 .019* 28 .024 NET 2 3200 75 .023 230 .012* HER 1 1600 22 .014 36 .023 SBL 1 1600 87 .054 80 .050* SET 2 3200 213 .067* 243 .076 SBR 1 1600 43 .027 84 .053 EEL 0 8 20 64 EBT 2 3290 34 .925* 42 .053* EBR 0 0 26 63 .039 VILE �.5 42 33 'alE" [ 4C :0 .26 .;42' .2' .040` 7; 3P. : .4SL :45 .,9: :65 ..:2 P,#-_ 7,.... ra'.Sicer'. ;.B. '24* c;_ ?: ASSPES AIL .C::_ Pcasic: -r: .245 Existing + Growth + Approved + Cumulative AM PH HOUR PM PA HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1690 31 .019 38 .024 NET 2 3200 69 .022* 204 .064* HER 1 1600 22 .014 36 .023 SBL 1 1600 87 .054* 80 .050* SET 2 3280 183 .857 228 .071 SEP 1 1600 43 .027 84 .053 EEL 3 5 20 84 EK 2 3269 SC .83a* 109 .960* E 2 0 0 26 63 W5:. 0.5 42 83 'alE" [ 4C :0 .26 .;42' .2' .040` 7; 3P. : .4SL :45 .,9: :65 ..:2 P,#-_ 7,.... ra'.Sicer'. ;.B. '24* P;: ;a: Ass.ces E Sc:.. etas -r: TOTAL CAPACITY UTILIZATION .155 .239 TOTAL CAPACITY UTILIZATION A -159 156 .258 0 0 • 38. Newport Center d Santa Rosa 1] Existing + Growth + Approved + Cumulative + Project AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NET 1 1600 31 .019' 38 .024 NET 2 3200 75 .023 230 .072* NBR 1 1600 22 .014 36 .023 SBL 1 ;600 87 .054 60 .050* SBT 2 3200 213 .061* 243 .076 SBR 1 1600 43 .027 84 .053 EEL 0 0 20 84 EBT 2 3200 45 .028* 84 .012* EBR 0 0 26 63 WBL 0.5 42 33 WET 2 4000 115 .039* 95 .030* WBR 1 1600 145 .091 163 .102 Right Turn Adjustment WBR .005* WBR .034* Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION .158 .258 A- 1,9 39. Newport Center 6 San Niguel Existing AM PK HOUR PM PK HOUR TOTAL CAPACITY UTILIZATION .215 .412 Existing + Growth + Approved + Project LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 48 .030 98 .061, NBT 2 3200 147 .086* 98 .061 NBR 0 0 127 3203 180 .113 SBL 0 0 55 1.0341* 0 104 0 SET 2 3200 54 .041 174 .121* SBR 0 0 21 3200 110 .046 ESL 1 1600 13 .008 42 .026 EBT 2 3200 39 .012* 248 .078* ERR 1 1600 17 ,011 100 .C63 WBL 1 1600 132 .083' 243 .152* WBT 2 3200 138 .043 282 .068 WBR 1 1600 107 .067 160 .100 TOTAL CAPACITY UTILIZATION .215 .412 Existing + Growth + Approved + Project AM PK HOUR AM PK HOUR PM PK HOUR LANES LANES CAPACITY VOL V/C VOL V/C NBL 1 :600 48 .030 98 .061* NBT 2 3203 150 .087' 108 .068 NBR 0 0 .27 0 180 .113 SBL 0 0 62 1.0391* 54 .041 84 .121+ SBT 2 3200 64 .046 167 .113* SBR 0 0 21 .026 110 2 EBL 1 1600 13 .008 42 .026 EBT 2 3200 4i .013* 264 .083' EBR 1 1600 17 .011 100 .063 NBL 1 1600 132 .083* 243 .152* NBT 2 32,3 .42 ,044 296 .193 NBR 160G i0. .363 124 .084 TOTAL CAPACITY UTILIZATION .222 .409 A -](A) Existing + Regional Growth + Approved AM PK HOUR AN PK HOUR PM PK HOUR LANES LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 48 .030 98 .061' NBT 2 3200 147 .086* 98 .061 NBR 0 127 127 180 .113 SBL 0 0 55 (.034(* 104 SBT SET 2 3200 54 .041 174 .121+ SBR 0 0 21 110 EBL EBL 1 1600 13 .006 42 .026 EBT 2 3200 39 .012* 248 .078* EBR 1 1600 17 .011 100 .063 WBL 1 1600 132 .083* 243 .152* WET 2 3200 138 .043 262 .088 WBR 1 1600 107 .067 160 .100 TOTAL CAPACITY UTILIZATION .215 .412 Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 48 .033 98 .061* NBT 2 3200 147 .086* 98 .061 NBR 0 0 127 180 .113 SBL 0 0 55 (.034)* 104 SBT 2 3200 54 .041 174 .121* SBR 0 0 21 110 EBL 1 1600 13 .008 42 .026 EBT 2 3200 51' .016* 285 .089' EBR 1 i600 17 .011 100 .b63 WBL 1 1600 132 .793+ 243 .152* W3T 2 32CO .75 ,555 304 .,95 WBR i61C '.i7 .$67 160 .:CO TOTAL CAPACITY UTILIZATION .219 .423 0 0 39. Newport Center 6 San Miguel Existing + Growth + Approved + Cumulative + Project AM ?i HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 48 .030 98 .06:' NBT 2 3200 150 .087* 108 .068 NBR 0 0 121 1B0 .113 SBL 0 0 62 1.039♦' 84 SBT 2 3200 64 .046 167 .113' SBR 0 0 21 110 ESL 1 1600 13 .008 42 .026 EBT 2 3200 53 .017* 301 .094, EBR 1 :600 17 .011 100 .063 WBL 1 1600 132 .083' 243 .152' WBT 2 3200 179 .056 318 .099 WBR 1 1600 i01 .063 134 .084 TOTAL CAPACITY UTILIZATION .226 .420 0 A -161 40. Newport Center /Fashion Island d Newport Center Existing AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 1 1600 167 .104* :43 .089* NBT 2 3200 58 .018 169 .053 NBR 1 1600 276 .173 119 .074 SBL 1 1600 4 .003 41 .026 SBT 2 3200 10 .003' 112 .036' SER 0 0 1 1 3 4 EBL 1 1600 6 .004 22 .M EBT 2 3200 98 .031* 105 .033* EBR 1 1600 125 .078 215 .134 WK 1 1600 68 .043' 376 .235* WET 2 3200 41 .013 83 .026 WBR 1 1600 12 .00B 52 .333 Right Turn Adjustment NBR .037* EBR .034* Existing + Regional Growth + Approved AM PK HOUR AM PK HOUR PM PK HOUR CAPACITY LANES CAPACITY VOL VIC VOL VIC NBL 1 1600 167 .104* 143 .089* NBT 2 3200 58 .018 169 .053 NBR 1 1600 276 .113 119 .074 SBL 1 1600 4 .003 41 .026 SBT 2 3200 10 .003* 112 .036' SBR 0 0 1 EBL 3 1 EBL 1 1600 6 .004 22 .014 EBT 2 3200 9B .031* 105 .033* EBR 1 1600 125 .078 215 .134 WBL 1 1600 68 .043* 376 .235* WBT 2 32CO 41 .013 83 .026 WBR 1 1600 12 .008 52 .033 Right Turn Adjustment NBR .937' EBR .034* TOTAL CAPACITY UTILIZATION .218 .427 TOTAL CAPACITY UTILIZATION .218 .427 Existing + Growth + Approved + Project AM PK HOUR AM PK HOUR PM PK HOUR LANES LANES CAPACITY VOL VIC VOL VIC NBL 1 1600 167 .104* 143 .089* NBT 2 3200 60 .019 178 .056 NBR 1 1600 274 .171 111 .069 SBL 1 1600 4 .003 41 .026 SBT 2 3200 11 .004' i21 .039* SBR 0 0 1 3 3 EBL EBL 1 1600 6 .004 22 .014 EBT 2 3200 98 .031' 105 .033* EBR 1 1600 125 .078 215 .134 WBL i ic:0 '8 .C49' 369 .231* 2 2 327C 4: .313 33 .02E 95R '.6C6 1600 12 .;06 52 .033 :_rr. Ac3s :-e. ^_ 1w .S } -' :tR .:34' Existing + Growth + Approved + Cumulative AM PK HOUR PM PK HOUR LANES CAPACITY VOL VIC VOL VIC NBL 1 1600 167 .174* 143 .089* NET 2 3200 58 .018 169 .053 NBR 1 1600 276 .173 119 .074 SBL 1 1600 4 .003 41 .026 SBT 2 3200 10 .003' 112 .036' SBR 0 0 1 3 EBL 1 1600 6 .074 22 .014 EBT 2 3200 98 .031' 105 .033* EBR 1000 125 .01.8 21`. .134 W?: io60 o9 -43' 3.6 .235* WBT 2 32CG 4: .Ci? 83 .026 WBR 1 '.6C6 12 .C68 52 .G33 R:,,t : :_rr. Ac3s :-e. ^_ 1w .S } -' :tR .:34' TOTAL CAPACITY UTILIZATION .217 .426 TOTAL CAPACITY UTILIZATION .218 A -162 .427 Ll 0 • 40. Newport Center /Fashion Island 6 Newport Center i Existing + Growth + Approved + Cumulative + Project AM PK HOUR PH PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 167 .104* 143 .089* NBT 2 3200 60 .019 178 .056 HER 1 1600 274 .171 111 .069 SBL 1 1600 4 .003 41 .026 SBT 2 3200 11 .OS4* 121 .039* SBR 0 0 1 3 EBL 1 1600 6 .004 22 .014 EBT 2 3200 98 .031* 105 .033* EBR 1 1600 125 .078 215 .134 `'9BL 1 1600 7B .049* 369 .231* WBT 2 3200 41 .013 83 .026 WBR 1 1600 12 .009 52 .033 R.ght Turn Adjustment NBR .029* EBR .034* 0 TOPAZ CAPACITY UTILIZATION .217 .426 0 A -163 r� U North Newport Center Planned Community Development Plan (under separate cover) n • EXHIBIT 10 North Newport Center Planned Community Development Plan Land Uses, Development Standards &t Procedures Land Uses, Development Standards & Procedures Contents I. Introduction and Purpose of Development Plan A. Sub -Area Purpose .............................................................................................. ............................... l B. Relationship to Municipal Code ......................................................................... ..............................7 C. Relationship to North Newport Center Design Regulations .............................. ..............................7 II. Land Use and Development Regulations ............................................................. ............................... 9 A. Permitted Uses .................................................................................................... ..............................9 B. Development Limits ........................................................................................ ............................... 10 III. Site Development Standards .............................................................................. ............................... 13 A. Permitted Height of Structures ........................................................................ ............................... 13 B. Setback Requirements ..................................................................................... ............................... 14 C. Parking Requirements ....................................................................................... .............................15 D. Landscaping .................................................................................................... ............................... 16 E. Lighting ............................................................................................................. .............................16 F. Signs .................................................................................................................. .............................16 G. Residential Compatibility .................................................................................. .............................20 H. Residential Open Space Requirements .............................................................. .............................20 IV. Planned Community Development Plan Administration ................................... ............................... 23 A. Process for New Structures ............................................................................... .............................23 B. Process for New Signs ....................................................................................... .............................24 C. Transfer of Development Rights ....................................................................... .............................24 V. Definitions ............................................................................................................ .............................27 Appendix A — Design Regulations North Newport Center Planned Community Development Plan i 11!8107 Land Uses, Development Standards & Procedures Section I. Introduction and Purpose of Development Plan I. Introduction and Purpose of Development Plan The North Newport Center Planned Community district is comprised of four sub -areas that include Fashion Island, Block 500, Block 600 and San Joaquin Plaza. The sub -areas that comprise North Newport Center shall be governed by the North Newport Center Planned Community ( "PC ") Development Plan set forth herein, which includes land uses, development standards and administration. The City of Newport Beach Municipal Code allows a Planned Community Development Plan to address land use designations and regulations in Planned Communities. The North Newport Center PC Development Plan serves as the controlling zoning ordinance for the site and is authorized and intended to implement the provisions of the Newport Beach General Plan. A. Sub -Area Purpose Newport Center is a regional center comprised of major retail, professional office, entertainment, recreation and residential development within the City of Newport Beach. The North Newport Center site comprises approximately 138 acres along San Joaquin Hills Road and Newport Center Drive. The four sub -areas that make up the site including Fashion Island (75 acres), Block 500 (15 acres), Block 600 (25 acres), and San Joaquin Plaza (23 acres) are shown on Figure 1, and are described below. The General Plan identifies the goal of creating a successful Mixed -Use district that integrates economic and commercial centers serving the needs of Newport Beach residents and the sub - region, with expanded opportunities for residential development. Fashion Island is the primary retail hub within Newport Center and is developed with retail, dining and commercial entertainment uses. Permitted uses for Fashion Island include uses in support of the existing retail, dining and commercial entertainment uses. Fashion Island is intended to be a vibrant regional retail and entertainment center and a day /evening destination with a wide variety of uses which will serve visitors, residents and employees of the area. Figure 2, Fashion Island Sub -Area, shows the boundary of Fashion Island. The Mixed -Use blocks include Block 500, Block 600 and San Joaquin Plaza. The Mixed -Use blocks are generally comprised of administrative, professional, and financial office uses. Block 600 contains hotel and related ancillary uses as well. This Development Plan allows for the diversification of land uses in order to encourage new and original uses consistent with the Mixed -Use concept as established in the General Plan. Permitted uses for the Mixed -Use blocks include offices, light general commercial, hotel, residential and other mixed uses in accordance with the General Plan MU- H3 land use designation. The boundaries of the Mixed -Use blocks included in this Development Plan are shown in Figure 3, Block 500 Sub -Area, Figure 4, Block 600 Sub -Area, and Figure 5, San Joaquin Plaza Sub -Area, respectively. North Newport Center Planned Community Development Plan 1 11/8/07 m,_« Development Standards & -+_ Section r Introduction and Purpose of _elop e«_ \�7 \ / ƒ\ � Z.��. Figure ! — North Newport Center Planned Community North Newport Center __ __# Development Plan e_, <1 O arO Rd Land Uses, Development Standards & Procedures Section I. Introduction and Purpose of Development Plan z —WIP60 Cente, ;'-IT" MPlanned Community Not included in Planned Community 0 51 *1 O„ .---f4icolas Dr r 11 Figure 2 — Fashion Island Sub-Area North Newport Center Planned Community Development Plan 3 11/8/07 Land Uses, Development Standards & Procedures Section I. Introduction and Purpose of Development Plan San oaqUin ♦ Y -2 �: r V I J. y. Hills Fed _. 1 Y, J S o /as Dr -., ® Planned Community I Not included in Planned Community HN Figure 3 — Block 500 Sub -Area North Newport Center Planned Community Development Plan 4 1118107 t { t Land Uses, Development Standards & Procedures Section I. Introduction and Purpose of Development Plan North Newport Center Planned Community Development Plan 11/8/07 MPlanned Community Not included in Planned Community h '4 Figure 4 — Block 600 Sub -Area a m; I ° Land Uses, Development Standards & Procedures Section I. Introduction and Purpose of Development Plan ® Planned Community Not inducted in Planned Community HN Figure 5 — San Joaquin Plaza Sub -Area North Newport Center Planned Community Development Plan 6 1118107 Land Uses, Development Standards & Procedures Section I. Introduction and Purpose of Development Plan B. Relationship to Municipal Code Whenever the development regulations of this plan conflict with the regulations of the Newport Beach Municipal Code, the regulations contained herein shall prevail. The Municipal Code shall regulate this development whenever regulations are not provided within these district regulations. All words and phrases used in this North Newport Center PC Development Plan shall have the same meaning and definition as used in the City of Newport Beach Municipal Code unless defined differently in Section V — Definitions. The Municipal Code referred to herein is the version of the Code in effect on the date this Planned Community is approved and specifically includes Title 15 of the Municipal Code (Buildings and Construction) Title 19 of the Municipal Code (Subdivisions) and Title 20 of the Municipal Code (Planning and Zoning) but specifically excluding all other sections of the Municipal Code including Title 5 of the Municipal Code (Business Licenses and Regulations). C. Relationship to North Newport Center Design Regulations Development in North Newport Center shall be regulated by both the Development Plan and the Design Regulations, which is provided as Appendix A. North Newport Center Planned Community Development Plan rlrsro7 Land Uses, Development Standards & Procedures Section It Land Use and Development Regulations II. Land Use and Development Regulations A. Permitted Uses 1. General Permitted uses are those uses set forth in this Section for each sub -area as shown on Table 1. The uses identified within the table are not comprehensive but rather major use categories. Specific uses are permitted consistent with the definitions provided in Section V of this Development Plan. Uses determined to be accessory or ancillary to permitted uses, or residential support uses to permitted uses are also permitted. The Planning Director may determine other uses not specifically listed herein, provided they are consistent with the Regional Commercial and Mixed -Use General Plan districts, the purpose of this Planned Community Development Plan, and the purpose of the sub -area in which the property is located. Table 1 - North Newport Center Land Use Regulation Table Uses Fashion Island Block 500 Block 600 San Joaquin Plaza Banks /Savings and Loans P P P P - With drive through services MUP MUP MUP MUP Business, Goverment and Professional - P P P - Emergency Healthcare - P P P - Management and Leasing Offices P P P P - Office, Medical and Dental - P P P - Public Safety Facilities P P P P Commercial Recreation and Entertainment P MUP MUP MUP Cultural and Institutional UP P P P Day Care P P P P Day Spas MUP MUP MUP MUP Eating and Drinking Establishments P. P" P" P" - Bars/Cocktail Lounges MUP UP UP UP Personal Improvement MUP P P P - Health/FitnessClubs MUP P P P Personal Services P P P P Residential - P P P Retail Sales P P P P - Animal Sales and Services MUP MUP MUP MUP - Medical Retail P P P P Visitor Accommodations UP UP UP UP P = Permitted UP = Use Permit MUP = Hnor use Permit Issued by the Planning Director `= A Mnor Use Permit Issued by the Planning Director is Required for the Sale of Alcohol = A Use Permit is Required for the Sale of Alcohol — = Not Permitted North Newport Center Planned Community Development Plan 9 11/8/07 Land Uses, Development Standards & Procedures Section II. Land Use and Development Regulations 2. Open Space Corners The passive landscape areas on the following comers shall be limited to landscaping, and Project Identification Signs. San Joaquin Hills Road and Avocado, Avocado and San Nicolas Drive, San Joaquin Hills Road and Santa Rosa Drive, San Joaquin Hills Drive and Santa Cruz Drive (northwest and southeast comers), and San Joaquin Hills Drive and Jamboree Road. 3. Special Events The general regional Mixed -Use nature of North Newport Center results in a variety of special events and temporary uses throughout the year. Special community events, such as parades, trade shows, car shows, pageants, community concerts, outdoor displays, recreation/entertainment events and temporary structures are permitted within the North Newport Center Planned Community consistent with the following provisions: a. If the event takes place on private property within Fashion Island the event is not regulated so long as it does not displace required parking. Such events must comply with the City's Municipal Code related to noise control and other pertinent standards. b. If the event takes place anywhere else within North Newport Center or the public right - of -way, such events are permitted as long as they comply with the Municipal Code. B. Development Limits The development limits in this Development Plan are consistent with those established by the General Plan and are identified in Table 2 below. Development limits may be modified through the approval of a Transfer of Development Rights. Carts, kiosks, and temporary uses are permitted and are not counted towards square footage development limits. Table 2 — Development Limits A. Hotel rooms are permitted in Fashion Island through the transfer of development rights. B. 65 additional hotel rooms may be located in Block 500, Black 600 or San Joaquin Plaza. C. Residential units are permitted in Block 500, Block 600 and San Joaquin Plaza so long as the total number of units does not exceed 430 units. North Newport Center Planned Community Development Plan 10 11/8/07 Fashion San Joaquin Land Use Island Block 500 Block 600 plaza Total Regional Commercial 1,619,525 0 0 0 1,619,525 square feet square feet Movie Theatre 1,700 seats 0 0 0 1,700 seats (27,500 square (27,500 square feet) feet) Hotel A) B 425(B) (B) 490 Residential 0 (C) (C) C 430 Office/Commercial 0 285,142 1,001,634 337,261 1,746,979 square feet square feet square feet square feet A. Hotel rooms are permitted in Fashion Island through the transfer of development rights. B. 65 additional hotel rooms may be located in Block 500, Black 600 or San Joaquin Plaza. C. Residential units are permitted in Block 500, Block 600 and San Joaquin Plaza so long as the total number of units does not exceed 430 units. North Newport Center Planned Community Development Plan 10 11/8/07 Land Uses, Development Standards & Procedures Section II. Land Use and Development Regulations 1. Fashion Island The total gross floor area for Fashion Island is 1,619,525 plus the 1,700 -seat movie theater. The movie theater building area is equivalent to and may be converted to 27,500 square feet of retail development. The conversion of the movie theater to retail space shall not require any additional parking. The gross floor area for Regional Commercial development is the total horizontal floor area of all floors of a building within the exterior walls thereof, measured in square feet, exclusive of common areas such as, but not limited to: covered malls and walkways, carts, kiosks, open or roofed patio areas (defined by planters, awnings, shade structures, fences or rails), covered entries, covered parking, driveways or loading areas. 2. Mixed -Use Sub -Areas The Mixed -Use blocks include Block 500, Block 600 and San Joaquin Plaza. Up to 430 residential units and 490 hotel rooms are permitted within the Mixed -Use blocks. Residential and hotel uses are measured on a per unit basis. The gross floor area for all other permitted uses is the total enclosed area of all floors of a building measured to the outside face of the structural members in exterior walls, including halls, stairways, elevator shafts at each floor level, service and mechanical equipment rooms and basement or attic areas having a height of more than seven feet. Development limits for residential uses are based on unit counts, and are not within square footage limits. Resident support uses are not included in the square footage development limits and shall not require parking. 3. Transfer of Development Rights The transfer of development rights among sub -areas of this Planned Community and to /from other areas in the Newport Center/Fashion Island District identified in the General Plan is allowed in accordance with the General Plan. Development rights may be transferred through a change in location of use(s) and/or a conversion of non - residential use to any other non - residential use allowed by the General Plan and this Planned Community Development Plan or applicable zoning at the receiving site(s). Residential use may be relocated, but may not be converted to or from another use. The transfer of development rights may occur only if the transfer will not result in any adverse traffic impacts and will not result in greater intensity than development allowed without the transfer. North Newport Center Planned Community Development Plan 11 1118107 Land Uses, Development Standards & Procedures Section III. Site Development Standards 111. Site Development Standards The following site development standards shall apply to the North Newport Center Planned Community. A. Permitted Height of Structures 1. Standards for Allowable Heights Allowable heights are determined by sub -area. All building heights are measured at finished grade. Fashion Island: The maximum heights of structures within Fashion Island are depicted in Table 3, Fashion Island Height Limits. Table 3 — Fashion Island Height Limits Building Type Height Major Buildings 125' Mall Buildings 75' Parking Structures 55' Periphery Buildings 40' Block 500: The maximum height of all structures in Block 500 shall be 375 feet as measured from finished grade. Block 600: The maximum height of all structures in Block 600 shall be 375 feet as measured from finished grade. San Joaquin Plaza: The maximum height of all structures in San Joaquin Plaza shall be 65 feet as measured from finished grade. 2. Standards for Buildings Over 200 Feet in Height a. Aviation Compatibility Prior to issuance of building permits, the project applicant must demonstrate that the following conditions have been satisfied. New development shall be required to comply with the following conditions related to the Airport Environs Land Use Plan (AELUP) for the John Wayne Airport: For development of structures that exceed 200 feet in height above ground level at a development site, applicants shall file a Notice of Proposed Construction or Alteration with the Federal Aviation Administration (FAA) (FAA Form 7460 -1). Following the FAA's Aeronautical Study of the project, projects must comply with conditions of approval imposed or recommended by the FAA. Subsequent to the FAA findings, the City shall refer the project to the Airport Land Use Commission (ALUC) of Orange County for consistency analysis. North Newport Center Planned Community Development Plan 13 1118107 Land Uses, Development Standards & Procedures Section III. Site Development Standards 2. No buildings within the North Newport Center Planned Community area should penetrate the FAA Federal Aviation Regulations (FAR) Part 77 imaginary obstruction surface for John Wayne Airport. 3. Applicants shall file a Notice of Proposed Construction or Alteration with the FAA (Form 7460 -1) for any construction cranes that exceed 200 feet in height above ground level. b. Shade Standards Prior to issuance of a building permit for a structure over 200 feet in height that has the potential to shade residential areas north of San Joaquin Hills Road, a shade study shall be prepared by the applicant and submitted to the City. The shade study shall demonstrate that the new development will not add shade to the designated residential areas beyond existing conditions for more than three hours between the hours of 9:00 a.m. and 3:00 p.m. Pacific Standard Time, or for more than four hours between the hours of 9:00 a.m. and 5:00 p.m. Pacific Daylight Time. The shade study shall be prepared to the satisfaction of the Planning Director and the Planning Director shall determine conformance with the standards identified herein as part of the plan review process. B. Setback Requirements Setbacks for the four sub -areas are listed below. Setbacks for surface parking must be screened using hedges, landscaping or other similar methods. Unless otherwise stated, setbacks are the minimum distance from the face of curb to building, parking structure, or parking lot. Fashion Island Newport Center Drive: 10 feet; may be reduced to 0 feet by the Planning Director through the plan review process. Block 500 Newport Center Drive: 15 feet Santa Rosa: 15 feet San Joaquin Hills: 15 feet San Nicolas: 15 feet Block 600 Newport Center Drive: 15 feet Santa Cruz: 15 feet San Simeon: 15 feet San Joaquin Hills: 15 feet Santa Rosa: 15 feet Center Drive (e /w):0 feet Center Drive (n/s): 0 feet North Newport Center Planned Community Development Plan 14 111/8/07 Land Uses, Development Standards & Procedures Section 111. Site Development Standards San Joaquin Plaza San Joaquin Hills: 15 feet Santa Cruz: 15 feet San Clemente: 15 feet Santa Barbara: 15 feet C. Parking Requirements 1. General Standards Parking requirements are based on gross floor area (as defined in the Development Limits for Fashion Island) for regional commercial uses, net floor area for officelcommercial uses, and unit counts for hotel rooms and residential units. Kiosks for retail sales, covered or uncovered, shall not be included in the calculation of required parking. Accessory, ancillary and resident support uses for hotel and residential developments shall not be included in the calculation of required parking. Parking requirements for North Newport Center are shown below on Table 4, North Newport Center Parking Requirements. Table 4 - North Newport Center Parking Requirements Land Use Parking Requirement Regional Commercial 3 spaces per 1,000 square feet Movie Theater 3 spaces per 1,000 square feet Office 1 space per 375 square feet Medical Office 1 space per 250 square feet Hotel Municipal Code Residential 2 spaces per unit includes 1 covered; plus 0.5 spaces per unit up to 50 units, then 0.25 spaces per unit thereafter for guest parking Other I Municipal Code 2. On -Street Parking On- street parking shall be counted towards the parking requirement as shown in Table 5, On- Street Parking. Table 5 — On -Street Parking Sub -Area On -Street Parking Fashion Island Adjacent on-street parking on Newport Center Drive Block 500 Adjacent on- street parking on Newport Center Drive and San Nicolas Block 600 Adjacent on -street parking on Newport Center Drive 3. Valet Parking Valet parking and satellite parking with shuttle service that involves use of the public right -of -way shall require approval by the City Traffic Engineer. North Newport Center Planned Community Development Plan 15 11/8/07 Land Uses, Development Standards & Procedures Section III. Site Development Standards 4. Parking Management Plan Parking management plans may be prepared if the applicant wishes to deviate from the parking standards identified above. Parking management plans may address issues such as modified parking requirements based upon complimentary peak hour demand of uses, off peak shared parking between sub - areas, drop off and valet services on private property, and tandem parking. Parking management plans shall be prepared by an independent traffic engineer at the applicant's expense. Parking management plans shall be approved by the City Traffic Engineer prior to the issuance of building permits. A Landscaping Landscaping shall be installed subject to the following standards; and maintained in a healthy, weed - free condition, free of litter and so as not to interfere with traffic safety 1. Surface Parking Lot Landscaping: Parking lots shall be landscaped at a minimum of 1 tree per 5 parking spaces. The minimum size of trees shall be 24 -inch box. 2. Water Conservation: Satellite linked irrigation controllers or appropriate best management practices shall be incorporated into landscape design for new construction. E. Lighting Parking lots and walkways accessing building and parking areas shall be illuminated with a minimum maintained 0.5 foot - candle on the driving or walking surface during the hours of operation and one hour thereafter. Indirect, decorative halo banding along the top of buildings is permitted. F. Signs 1. General Sign Standards All permanent and temporary signs in North Newport Center that are visible from public right -of- ways and public property shall be consistent with the provisions of these sign standards, unless otherwise approved by the Planning Director. All permanent and temporary signs that are not visible from public right -of -ways are not limited in quantity, size, location, or design. Signs that are visible from public right -of -ways must consist of individual fabricated letters; or routed -out letters in an opaque background. Enclosed "box" or "can" signs are not permitted, unless they are logos. All commercial uses are permitted to place at each entry an incidental sign located at or below eye level to be visible to pedestrians, and shall not exceed six square feet. In addition to other signs permitted in this section, signs used to give direction to vehicular or pedestrian traffic are permitted. Said signs shall not contain advertising message and shall be subject to the review of the City Traffic Engineer to ensure adequate sight distance in accordance with the North Newport Center Planned Community Development Plan 16 1118107 Land Uses, Development Standards & Procedures Section III. Site Development Standards provisions of the Municipal Code. Directional signs that are visible from public right -of -ways are limited to a maximum of 10 square feet in size but are not limited in quantity, location, or design. Temporary signs that are visible from public right -of -ways and intended to be displayed for 60 days or less are permitted for purposes related to special events, holiday activities and store openings. Detailed standards for temporary signs are contained below. A comprehensive sign program may be prepared if the applicant wishes to deviate from the sign standards identified herein. Comprehensive sign programs shall be submitted for review and consideration in accordance with the provisions of the Municipal Code. 2. Restricted Sign Types Signs visible from public right -of -ways are subject to the following restrictions: a. No rotating, flashing, blinking, or signing with animation shall be permitted on a permanent basis. b. No signs shall be permitted which imitate or resemble official traffic signs or signals. C. No wind signs or audible signs are permitted. Animated signs visible from public streets are not allowed unless otherwise permitted by the Municipal Code. 3. Sign Standards for Fashion Island In addition to the general sign standards identified above, specific sign standards for Fashion Island are provided in Table 6, Fashion Island Sign Standards below. Table 6, Fashion Island Sign Standards North Newport Center Planned Community Development Plan 17 11!8!07 Maximum Sign Maximum Letter] Sign Type Location Maximum Number Size Logo Height Shopping Center Each vehicle entry drive 2 per entry drive 100 square feet — Identification Sign location (one on each side) 10 feet high Major Tenant Sign Exteriorwalls or parapets 1 sign per building — 10 feet of buildings elevation (maximum (sign illumination 4 signs for each permitted) major tenant) Freestanding Exterior wells or parapets 1 sign per building — 3 feet Commercial of buildings elevation (maximum (sign illumination 4 signs for each permitted) building or structure) Monument 1 per building 50 square feet — 5 feet high (sign Illumination permitted) North Newport Center Planned Community Development Plan 17 11!8!07 Land Uses, Development Standards & Procedures Section III. Site Development Standards 4. Sign Standards for Mixed -Use Blocks In addition to the general sign standards identified above, specific sign standards for the Mixed -Use blocks are provided in Table 7, Sign Standards for Mixed -Use Blocks below. Primary building address numbers shall be visible from the street (and/or pedestrian walkways in the case of necessity), and be located on the building so that they are visible from adjacent frontage roads and designated parking areas, except for the buildings at 500 and 550 Newport Center Drive, which have their primary address numbers on the cubes along Newport Center Drive. Secondary address signs may be located where appropriate for on -site orientation and safety. All address signs shall have a consistent color, design, and material for any given building. A single letter style is recommended. Table 7 — Sign Standards for Mixed -Use Blocks Maximum Sign Maximum Letter/ Sign Type Location Maximum Number Size Loo Height Tenant Sign Exterior elevations of 2 1 square foot per — Sign shopping center and (1 per corner) each lineal foot of (sign illumination Santa Cruz Drive at Newport facing Newport Center 15 feet high storefront (not to permitted) Drive exceed 100 square Santa Cruz Drive at San Joaquin 2 feet 24 inches Theater Signs Facing Newport Center 1 — Theater Name: San Clemente Drive at Santa Cruz Drive (Exterior wall or 5 feel high 18 inches 5 feet parapet of building which 12 feet wide Each Show Title: Tenant Identification theater occupies, free 1 5 feel high 3 Net high Signs standing, or on adjacent 5 feet wide 15 feet wide Between 500 and 550 Newport parking structure) 4 feet high 18 inches (sign illumination Center Drive 12 inches wide permitted) Store Address Signs Each entry to store 1 per store entry 6 square feet — Entry Marker Signs To be approved by 7 signs 36 square feet (with — Planning Director 2 -foot overhang) (sign illumination 15 feet high permitted) 4. Sign Standards for Mixed -Use Blocks In addition to the general sign standards identified above, specific sign standards for the Mixed -Use blocks are provided in Table 7, Sign Standards for Mixed -Use Blocks below. Primary building address numbers shall be visible from the street (and/or pedestrian walkways in the case of necessity), and be located on the building so that they are visible from adjacent frontage roads and designated parking areas, except for the buildings at 500 and 550 Newport Center Drive, which have their primary address numbers on the cubes along Newport Center Drive. Secondary address signs may be located where appropriate for on -site orientation and safety. All address signs shall have a consistent color, design, and material for any given building. A single letter style is recommended. Table 7 — Sign Standards for Mixed -Use Blocks 1. May include names of tenants and uses at Fashion Island. North Newport Center Planned Community Development Plan 18 1118/07 Maximum Maximum Letter/ Sign Type Location Maximum Number Sign Size Logo Height Project Identification Santa Rosa Drive at San Joaquin 2 15 feet high 24 inches Sign Hills Road' (1 per corner) 15 feet wide Santa Cruz Drive at Newport 1 15 feet high 24 inches Center Drive 15 feet wide Santa Cruz Drive at San Joaquin 2 15 feet high 24 inches Hills Road (l per comer) 15 feet wide San Clemente Drive at Santa Cruz 1 5 feel high 18 inches Drive 12 feet wide Tenant Identification San Nicolas Drive at Newport 1 5 feel high 5 inches Signs Center Drive 5 feet wide Between 500 and 550 Newport 1 4 feet high 18 inches Center Drive 12 inches wide 1. May include names of tenants and uses at Fashion Island. North Newport Center Planned Community Development Plan 18 1118/07 Land Uses, Development Standards & Procedures Section III. Site Development Standards 5. Temporary Signs The following standards are intended to produce consistent sign design for temporary signs within Newport Center. Temporary signs are to identify a future site or project; or a facility under development or offered for lease. Temporary signs that are visible from public right -of -ways and identify new construction or remodeling may be displayed for the duration of the construction period beyond the 60 -day limit. Signs mounted on a construction fence are allowed during construction. The top of the sign must be no greater than 20 feet above grade. Maximum Number: One (1) temporary sign is permitted on a site for each frontage street, up to two (2) signs per building, but not at the same comer of the building. 2. Sign copy shall be restricted to identification of the person, firm, company or corporation operating the use conducted on the site. North Newport Center Planned Community Development Plan 19 1118/07 Maximum Maximum Letter/ Sign Type Location Maximum Number Sign Size Logo Height Newport Center Drive and Santa 2 5 feet high 5 inches Rosa (l per coma ) 5 feet wide Newport Center Drive and San 1 5 feet high 5 inches Nicolas 5 feet wide Block 600: Along Newport Center 5 5 feet high 5 inches Drive 5 feet wide Block 600: Along Santa Cruz Drive 2 5 feet high 5 inches 5 feet wide San Joaquin Plaza: Along San 1 each 6 feet high 5 y: inches for Tenant Joaquin Hills Road; Santa Cruz 12 feet wide Identification Drive along San Clemente Drive 18 inches for Project San Clement Drive Identification Landscape Wall Sign Block 500: facing Newport Cella — — 18 inches Drive Block 600: facing streets 2 facing San Joaquin — 18 inches Hills; 5 facing Newport Center Drive;1 facing Santa Rosa Building Sign On building elevation 2 per Primary Tenant — Primary Tenant • 24 1 per Secondary inches Tenant Secondary Tenant - 16inches Building Address Signs On building elevation 1 each — 24 inches (additional address signs may be located where appropriate for cite orientation) Freestanding Building Santa Rosa Drive at Newport 1 each — 18 inches Address Signs Center Drive; San Nicolas Drive at Newport Center Drive; Santa Cruz at Newport Center Drive Advisory Signs Parking Lots As appropriate for 4 feet high — safety and orientation Drive Through Signs — 1 per tenant per 8 feet wide 15 inches elevation, up to 2 on walls of structure 5. Temporary Signs The following standards are intended to produce consistent sign design for temporary signs within Newport Center. Temporary signs are to identify a future site or project; or a facility under development or offered for lease. Temporary signs that are visible from public right -of -ways and identify new construction or remodeling may be displayed for the duration of the construction period beyond the 60 -day limit. Signs mounted on a construction fence are allowed during construction. The top of the sign must be no greater than 20 feet above grade. Maximum Number: One (1) temporary sign is permitted on a site for each frontage street, up to two (2) signs per building, but not at the same comer of the building. 2. Sign copy shall be restricted to identification of the person, firm, company or corporation operating the use conducted on the site. North Newport Center Planned Community Development Plan 19 1118/07 Land Uses, Development Standards & Procedures Section III. Site Development Standards Type: Single- or double -faced ground signs or wall signs. Location: If ground signs, they may be parallel or perpendicular to the roadway. If wall signs, they must be located below the sill of second floor windows. Design: Rectangular shape; rigid, permanent material; not fabric. Mounting Technique: Flush with building; entirely on glass or entirely on a wall surface; not overlapping glass or wall surface. Duration: Signs may exist from the time of lease or sale of the parcel until the construction and /or leasing of the facility is complete. G. Residential Compatibility In keeping with the purpose of Fashion Island and the Mixed -Use sub -areas, permitted uses in North Newport Center include uses and events that have the potential to generate noise. Due to the day /evening use of Fashion Island in particular, noise generating activities, lighting, odors from restaurants, and similar occurrences are produced and take place during all hours of operation. Such uses and events are required to comply with the City's Municipal Code regulating these uses. Disclosures shall be made to prospective buyers/tenants of residential developments that there is an expectation for noise levels higher than in typical suburban residential areas as part of the Mixed -Use concept within North Newport Center. Additionally, the disclosure shall indicate that there is an expectation for lighting, odors and similar occurrences in a Mixed -Use setting as compared to suburban residential areas. H. Residential Open Space Requirements The following open space standards shall apply to residential development projects: 1. Common Outdoor Open Space Each project shall provide common outdoor open space either at grade, podium level, or roof level. Common outdoor open space areas shall have a minimum dimension of 30 feet and may contain active and/or passive areas and a combination of hardscape and landscape features, but a minimum of 10 percent of the common outdoor open space must be landscaped. All common outdoor open space must be accessible to all residents. Projects shall provide a minimum of 5 percent common outdoor open space based on the residential lot area. 2. Common Indoor Space Each project shall provide at least one community room of at least 500 square feet for use by all residents of the project. The area should be located adjacent to, and accessible from, common outdoor open space. This area may contain active or passive recreational facilities or meeting space, and must be accessible through a common corridor. North Newport Center Planned Community Development Plan 20 11/8/07 Land Uses, Development Standards & Procedures Section III. Site Development Standards 3. Private Open Space At least 50 percent of all dwelling units shall provide private open space, on a balcony, patio, or roof terrace, with a minimum area of 30 square feet each and an average horizontal dimension of 6 feet. Balconies should be proportionately distributed throughout the project in relationship to floor levels and sizes of units. For any project 8 acres or larger, open space shall be provided in accordance with the General Plan. North Newport Center Planned Community Development Plan 21 11/8/07 Land Uses, Development Standards & Procedures Section IV. Planned Community Development Plan Administration IV. Planned Community Development Plan Administration A. Process for New Structures 1. Purpose and Intent The purpose of the Plan Review process is to provide for review of development proposals for new structures within the North Newport Center Planned Community district. Prior to the issuance of a building permit, all development proposals shall be subject to a Plan Review by the Planning Director for review to determine compliance with the Planned Community Development Plan and North Newport Center Design Regulations. Signs, tenant improvements, carts, kiosks, temporary structures and uses are exempt from this provision. 2. Submittal Contents Each Plan Review submittal or amendment thereof shall contain sufficient details for a thorough review of the relationships between uses on the site and on adjacent sites consistent with the Development Plan and the Design Regulations. At the discretion of the Planning Director, the requirements for submittal of a Plan Review may be altered from those set forth below when the Director determines that other information will be sufficient to allow a thorough review of the project by the approving authority. Submittals for Plan Review shall include plans that contain the following elements in addition to the City's submittal requirements for plan check: a. Existing Conditions including adjacent structures and proposed improvements b. Floor Plans C. Elevations that clearly demonstrate the architectural theme of each face of all structures, including walls and signs, illustrating the following: 1) All exterior materials 2) All exterior colors 3) Building heights d. Parking management plan (where applicable) e. Preliminary Landscape Plan, illustrating: I ) General location of all plant materials, by common and botanical names 2) Size of plant materials 3) Irrigation concept f. Lighting Plan, including: locations, fixture height, lighting fixture product type and technical specification g. Permitted and proposed floor area, number of hotel rooms, theater seats, and /or residential units h. Statement of consistency with the General Plan, Planned Community Development Plan and Design Regulations i. Any additional background and supporting information, studies or materials that the Planning Director deems necessary for a clear representation of the projects j. Shade analysis if required k. Open Space Plans for residential projects North Newport Center Planned Community Development Plan 23 1118/07 Land Uses, Development Standards & Procedures Section IV. Planned Community Development Plan Administration 3. Review and Action Submittals shall be reviewed by the Planning Director, and the Planning Director shall approve the project if he /she makes the following findings: a. The proposed use and /or development is consistent with the General Plan. b. The proposed use and/or development is consistent with the North Newport Center PC Development Plan and Design Regulations. The Planning Director action is the final action unless appealed in accordance with the Municipal Code. B. Process for New Signs Applications for new signs shall follow the process identified in the Municipal Code. Submittal shall be reviewed for consistency with the Development Plan and Design Regulations. C. Transfer of Development Rights The following procedure shall be used for the transfer of development rights. 1. The project applicant shall submit an application to the Planning Director, which identifies the quantity of entitlement (floor area, hotel rooms, theater seats) to be relocated, and the sending and receiving sites. If the requested transfer includes the conversion of non - residential uses, the application shall also identify the quantity of entitlement, by use category, before and after the transfer. 2. The City Traffic Engineer shall perform a traffic analysis to determine the total number of PM peak hour trips that would be generated by development allowed with and without the transfer. Trip generation rates shall be based on standard trip generation values in the current version of ITE's "Trip Generation," unless the Traffic Engineer determines that other rates are more valid for the uses involved in the transfer. 3. Depending on the location of the sending and receiving sites, the Traffic Engineer may determine that a more detailed traffic analysis is required to determine whether adverse traffic impacts will result from the transfer. This analysis shall demonstrate whether allowed development, with and without the transfer, would either cause or make worse an unsatisfactory level of service at any primary intersections for which there is no feasible mitigation. This analysis shall be consistent with the definitions and procedures contained in the Traffic Phasing Ordinance of the Municipal Code, except that "unsatisfactory level of service" shall be as specified in the General Plan. 4. If the transfer request involves the conversion of uses, the Planning Director shall perform a land use intensity analysis to determine the floor area that could be developed with and without the transfer. For purposes of this analysis, theater use shall be allocated 15 square feet per seat. Hotel use shall be allocated the number of square feet per room at which it is included in the General Plan. When the General Plan does not specify intensity for hotel rooms, it shall be as determined by the Planning Director. North Newport Center Planned Community Development Plan 24 1118/07 Land Uses, Development Standards & Procedures Section IV. Planned Community Development Plan Administration 5. Applications for transfer of development rights shall be considered by the City Council. The City Council shall approve a transfer of development rights only if it fmds that the transfer will result in no more trips and no greater intensity of land use than the development allowed without the transfer. In addition, if the traffic study in Subsection c. is required, the City Council shall approve the transfer only if it results in no greater traffic impact than the development allowed without the transfer. North Newport Center Planned Community Development Plan 25 1118/07 Land Uses, Development Standards & Procedures Section V. Definitions V. Definitions All words and phrases used in this North Newport Center PC shall have the same meaning and definition as used in the City of Newport Beach Municipal Code unless defined differently in this section. Advisory Sign: Any sign that contains direcfional or safety information; does not contain advertisements. Audible Signs: Any sign that uses equipment to communicate a message with sound or music. Banks/Savings & Loans: Establishments that provide a full range of retail banking and mortgage loan services to individuals and businesses. Includes only those institutions engaged in the on -site circulation of cash money. Also includes businesses offering check - cashing services. Drive- through or drive -up service included. Building Elevation: The exterior wall surface formed by one (1) side of the building. Business, Government and Professional: Offices of firms, individuals or organizations that provide professional, executive, management or administrative services (e.g., architectural, engineering, government, insurance, investment, legal, planning, etc.). Includes adminis- trative, clerical or public contact offices of a government agency, including incidental storage and maintenance of vehicles. Support retail and service uses also allowed. Emergency Health Care: Establishments that provide emergency medical service with no provision for continuing care on an inpatient basis. Public Safety Facilities: Police, fire, paramedic and emergency service facilities. Carts and Kiosks: Carts and kiosks are small, freestanding structures used for retail sales and services. Generally mobile in terms of ease of relocation, the structures can be seasonal, temporary or for a more permanent use. Commercial, Recreation and Entertainment: Establishments providing participant or spectator recreation or entertainment, either indoors or outdoors, for a fee or admission charge. Illustrative examples of these uses include: arcades or electronic games centers having three or more coin - operated game machines bowling alleys billiard parlors cinemas ice/roller skating rinks live entertainment pool rooms tennis/racquetball courts theaters Cultural Institutions: Public or private institutions that display or preserve objects of community, or cultural interest in one or more of the arts or sciences. North Newport Center Planned Community Development Plan 27 1118107 Land Uses, Development Standards & Procedures Section V. Definitions Department Store: A store selling a wide variety of goods or services arranged in several departments. Day Care: Non - medical care and supervision of children or adults on a less than 24 hour basis, including nursery schools, preschools, and day care centers. Day Spas: Establishments that specialize in the full complement of body care including, but not limited to, body wraps, facials, pedicures, make -up, hairstyling, nutrition, exercise, water treatments and massage which is open primarily during normal daytime business hours and without provisions for overnight accommodations. Eating and Drinking Establishments: Establishments engaged in serving prepared food or beverages for consumption on or off the premises. Bars and Cocktail Lounges: Establishments engaged in selling or serving alcoholic beverages for consumption on the premises or establishments having any of the following characteristics: Licensed as a "public premises" by the California Department of Alcoholic Beverage Control. Provides an area for serving alcoholic beverages that is operated during hours not corresponding to regular meal service hours. Food products sold or served incidentally to the sale or service of alcoholic beverages shall not be deemed as constituting regular food service. Entry Marker Sign: Sign used to provide information on activities and events, as well as advertise stores and shops within a shopping center. Eye Level: The height of 5 feet measured from grade. Freestanding Commercial: Any building with a commercial use which is separated from other commercial uses by parking and/or streets. Internal Pedestrian Street: Any walkway, path, plaza, arcade or corridor, either covered or open to the sky, which is primarily for use by people on foot and is not adjacent to the frontage road or common parking areas. Major Building: A mall building over 50,000 square feet. Major Tenant: A store or restaurant having a minimum of 10,000 square feet of floor space, which is located within or between other commercial buildings. Mall Building: Retail buildings where stores front a pedestrian walkway, which may be enclosed or open. Medical Retail: Sales of medical goods or services that are retail oriented. Illustrative examples of these uses include: - eye exam, eyeglass /contact lens sales - skin treatments - body scanning - dental enhancement treatments Minor Use Permit: Use permit issued by the Planning Director. North Newport Center Planned Community Development Plan 28 1718107 Land Uses. Development Standards & Procedures Section V. Definitions Monument Sign: Any sign that is supported by its own structure and is not part of or attached to any building. Parking Structure: Structures containing more than one story principally dedicated to parking. Parking structures may contain accessory, ancillary and resident support uses. Periphery Building: Building located along the ring of Fashion Island adjacent to Newport Center Drive. Personal Improvement: Includes those services that are personal and that promote the health and well -being of an individual. Personal Services: Establishments that provide recurring services of a personal nature. Illustrative examples of these uses include: - barber and beauty shops - clothing rental shops - dry cleaning pick up store with limited equipment - dry cleaning with no on -site equipment - home electronics and small appliance repair - postal services - locksmiths - self - service laundries - shoe repair shops - tailors and seamstresses - tanning salons - printing & duplicating - travel agencies/services - nail salon Podium Level:A superposed terrace conforming to a building's plan, a continuous pedestal; a level of vertical segregation linking separate areas. Primary Tenant: The largest tenant of a building. Project Identification Sign: A free - standing (single or double faced) monument sign containing the project name. Regional Commercial Gross Floor Area: Refer to Section II.B.1 above. Residential: An area within a structure on a parcel that contains separate or independent living facilities for one or more persons, with area or equipment for sleeping, sanitation or food preparation. Resident Support Uses: Uses within residential developments and residential parking structures designed, oriented, and intended to primarily serve building occupants. This includes uses such as dry cleaners, coffee vendors, and sundry shops. Such uses must be consistent with the pertinent regulations in Table 1. North Newport Center Planned Community Development Plan 29 rUSro7 Land Uses, Development Standards & Procedures Section V. Definitions Retail Sales: Stores and shops which sell various lines of merchandise for profit. This includes the sales of non - durable and durable goods to customers. Illustrative examples of these stores and lines of merchandise include: - antiques - appliances - artists supplies - automotive accessories (no installation) - animal sales and services - bakeries - bicycles - books - cameras and photographic supplies - carpeting and floor covering - clothing and accessories - convenience markets /stores - department stores - drug and discount stores - dry goods - electronic equipment (including automotive installation) - food and beverages - gift shops - handcrafted items - hardware - hobby materials - jewelry - real estate information center - luggage and leather goods - medical supplies and equipment - musical instruments, parts and accessories - office supplies - paint and wallpaper - pharmacies - shoe stores - specialty shops - sporting goods and equipment - supermarkets - tobacco - toys and games Secondary Tenant: A small tenant; not the primary tenant of an office building. Sign: Any media, including their structure and component parts which are used or intended to be used out -of -doors to communicate information to the public. Sign Area: The area enclosed by a rectangle drawn around the working, numbers or images composing the sign. Sign Face: The physical plane and /or surface upon which the working or images are applied. North Newport Center Planned Community Development Plan 30 11/8/07 Land Uses, Development Standards & Procedures Sign Letter: The individual symbols of the alphabet used in forming the words of a message. Shopping Center Identification Sign: A monument sign identifying a shopping center. Tenant Sign: Any permanent sign of an establishment that+ is located on or attached to the storefront elevation, a covered walkway, or an awning for the purpose of communicating the name of the tenant. Temporary Sign: Any sign, banner, pennant, valance, or advertising display constructed of cloth, canvas, plywood, light fabric, cardboard, wallboard or other light materials, with or without frames, intended to be displayed for a limited period of time. Theater Sign: Any permanent sign used to communicate tolthe public the name of a theater and the show(s) or movie(s) that are offered. Vehicle Entry: Any intersection points along the public riot -of -way that provide access for automobiles. Visitor Accommodations: Establishments offering lodging rooms, including bed and breakfasts, inns, hotel, and motels. Incidental support facilities are included within these uses. Wind Sign: A series of similar banners or objects of plastic or other light material more than 2 inches in diameter which are fastened together at intervals: by wire, rope, cord, string or by any other means, designed to move and attract attention upon being subjected to pressure by wind or breeze. North Newport Center Planned Community Development Plan 31 1118/07 Land Uses, Development Standards & Procedures Appendix — Design Regulations NORTH NEWPORT CENTER DESIGN REGULATIONS North Newport Center Design Regulations [1/8/07 Land Uses, Development Standards & Procedures Appendix — Design Regulations I. Introduction .......................................................................................................... ............................... 1 A. Purpose of Design Regulations .......................................................................... ..............................1 B. Newport Center Design Framework ................................................................... ..............................1 C. North Newport Center ........................................................................................ ..............................4 Il. Design Regulations ............................................................................................... ..............................7 Usingthese Regulations .............................................................................................. ............................... 7 A. Building Location and Massing ......................................................................... ..............................7 1. Site Planning Elements ............................................................................ ..............................7 2. Building Envelope ................................................................................... ..............................9 3. Building Character and Style ................................................................... ..............................9 4. Building Materials and Colors ................................................................ .............................11 5. Parking Structures ................................................................................... .............................11 B. Landscape .......................................................................................................... .............................12 1. Overall Landscape ................................................................................... .............................12 2. Perimeter and Street Landscape .............................................................. .............................13 3. Parking Lot Landscape ............................................................................ .............................14 4. Internal Landscape .................................................................................. .............................15 C. Circulation ......................................................................................................... .............................15 1. Streets and Pedestrian Activity ............................................................... .............................15 2. Service and Emergency ........................................................................... .............................19 3. Parking Lots ............................................................................................ .............................20 D. Orientation and Identity .................................................................................... .............................21 1. Gateways and Entrances ......................................................................... .............................21 2. View Corridors ........................................................................................ .............................22 3. Landmarks ............................................................................................... .............................23 4. Signage .................................................................................................... .............................24 5. Lighting ................................................................................................... .............................25 North Newport Center Design Regulations 1118/07 I..A I. Introduction A. Purpose of Design Regulations The Design Regulations expand upon the regulations set forth in the Planned Community Development Plan. The Design Regulations are intended to be used for reference by the City of Newport Beach as part of the plan review process. It is recognized that North Newport Center will be built and redeveloped over time and that not all regulations may be achieved nor are applicable for any given project. All new commercial and residential development shall be subject to the North Newport Center Design Regulations. Review for compliance of projects under this section shall occur through the plan review process, as defined in the Development Plan, prior to building permit issuance. B. Newport Center Design Framework Newport Center is a 600 -acre master planned area. Development within Newport Center began in the 1960s and generally has followed the following guiding principles: I. Strong physical urban design framework which provides structure and character yet allows flexibility Z. Synergistic mix of land uses, market driven to insure economic vitality 3. Balanced and dispersed auto access 4. Organized in "blocks" and districts to break down scale and provide identity 5. Pedestrian Orientation 6. Building massing that responds to topography, with taller buildings located along San Joaquin Hills Road 7. Unifying architectural and landscape character North Newport Center Design Regulations 11/8/07 Land Uses, Development Standards & Procedures Appendix — Design Regulations Early Newport Center Planning Diagrams and Sketches (circa 1960) The design regulations provide standards that govern future development so that, to the extent feasible, the initial design framework is carried forward and the design and development policies from the Land Use Element of the General Plan are implemented. North Navvon Center Design Regulatans 11007 Land Uses, Development Standards & Procedures Appendix — Design Regulations General Plan Policies Newport Center The following policies from the Land Use Element are for Newport Center as a whole. Development within North Newport Center should contribute toward the policies whenever possible. • Development Scale: Reinforce the original design concept for Newport Center by concentrating the greatest building mass and height in the northeasterly section along San Joaquin Hills Road, where the natural topography is highest and progressively scaling down building mass and height to follow the lower elevations toward the southwesterly edge along East Coast Highway. • Urban Form: Encourage that some new development be located and designed to orient to the inner side of Newport Center Drive, establishing physical and visual continuity that diminishes the dominance of surface parking lots and encourages pedestrian activity. • Pedestrian Connectivity and Amenity: Encourage that pedestrian access and uses within the district be improved with additional walkways and streetscape amenities concurrent with the development of expanded and new uses. • Fashion Island Architecture and Streetscape: Encourage that new development in Fashion Island complement and be of equivalent or higher design quality than existing buildings. Reinforce the existing promenades by encouraging retail expansion that enhances the storefront visibility to the promenades and provides an enjoyable retail and pedestrian experience. Additionally, new buildings shall be located on axes connecting Newport Center Drive with existing building to provide visual and physical connectivity with adjoining uses, where practical. Mixed -Use District and Neighborhood The following policies from the Land Use Element are City -wide in orientation. Development within North Newport Center should contribute toward the policies whenever possible. Mixed -Use Buildings: Require that Mixed -Use buildings be designed to convey a high level of architectural and landscape quality and ensure compatibility among their uses in consideration of the following principles: - Design and incorporation of building materials and features to avoid conflicts among uses, such as noise, vibration, lighting, odors, and similar impacts - Visual and physical integration of residential and non - residential uses - Architectural treatment of building elevation and modulation of their massing - Separate and well- defined entries for residential units and non - residential businesses - Design of parking areas and facilities for architectural consistency and integration among uses - Incorporation of extensive landscape appropriate to its location; urbanized streetscapes, for example, would require less landscape along the street North Newport Center Design Regulations 1118/07 Land uses. Development standards 6 Procedwes Appendx — Doslgn Regubtiom frontages but integrate landscape into interior courtyards and common open spaces dfixed -Use Building Location and Size of Non- Resldentfat Uses Require that 100 percent of the ground floor street frontage of Mixed -Use buildings be occupied by retail and other compatible non - residential uses, unless specified otherwise by policies for a district or condor. Parcels buegratbng Reridentlat and Non - Residential Uses: Require that properties developed with a mix of residential and non - residential uses be designed to achieve high levels of architectural quality in accordance with policies related to the character and quality of multi - family residential and the architecture and site design of commercial districts, be planned to assure compatibility among the uses, and provide adequate circulation and parting. Residential uses should be seamlessly integrated with non - residential uses through architecture, pedestrian walkways, and landscape. They should not be completely isolated by walls or other design elements. Dlstricts Guegraring Residential and Non- Residential Uses: Require that sufficient acreage be developed for an individual use located in a district containing a mix of residential and non - residential uses to prevent fragmentation and assure each use's viability, quality, and compatibility with adjoining uses. Aerial of Newport Center — 2007 C. North Newport Center North Newport Center consists of properties on the higher elevations of Newport Center between San Joaquin Hills Road and the Newport Center ring road (Blocks 500 and 600 and San Joaquin Plaza), as well as the core of Newport Center, Fashion Island. North Newport Center Design Regulations 1118107 Land Uses, Development Standards & Procedures Appendix — Design Regulations To the northeast is San Joaquin Hills Road, a wide boulevard on the ridge that forms the upper edge of Newport Center. To the south and southeast are office buildings, movie theaters, restaurants, service retail, the Newport Transportation Center, the Newport Beach Central Library, and Corona del Mar Plaza, a community retail center. Adjacent uses within Newport Center are office buildings, an apartment community, a resort hotel, art museum, police station, fire station, auto dealership, service station, and the Newport Beach County Club. North Newport Center is a mixed -use district that features an open -air regional shopping center, Fashion Island; a resort hotel; and a variety of office buildings that help form the skyline of Newport Beach; connected by a network of tree -lined streets and sidewalks, within a master planned environment featuring a consistent landscape. North Newport Center Design Regulations 1118/07 Land Uses, Development Standards & Procedures Appendix —Design Regulations IL Design Regulations Using these Regulations These regulations are intended to be used in conjunction with other applicable codes, documents, and ordinances to assess compliance of proposed projects. Each category of regulations begins with the intent, which describes the overall character that is envisioned and what objectives are necessary to attain the desired effect. A. Building Location and Massing Intent The intent of the building massing and location standards is to ensure that new development has an appropriate scale, is related to its use and location, and is properly integrated with adjoining land uses and features. 1. Site Planning Elements a. New commercial and residential buildings should respect the existing urban form, which generally consists of buildings that are organized orthogonally to create pedestrian - friendly courtyards and promenades that visually link the buildings into clusters, as seen in the diagrams below. Pedestrian promenade at Fashion Island Pedestrian courtyard at 550 Newport Center Dnve Building interface at San Joaquin Plaza North Newport Center Design Regulations 7 1118107 Land Uses. Development Standards & Procedures Appendix— Design Regulations b. In Mixed -Use sub -areas, the development of a complex of buildings is preferable to a single large structure because the varied massing provides visual interest and a human scale. Additionally, the spaces created between the various buildings provide opportunities for pedestrian plazas, courtyards and other outdoor gathering areas. C. New buildings should be oriented to and have features which reinforce and enhance the existing pedestrian experience. Mixed -Use sub -areas should emphasize pedestrian orientation by utilizing features such as plazas, courtyards, interior walkways, trellises, seating, fountains and other similar elements. d. New retail buildings should be located to enhance tenant visibility and identity, while maintaining compatible relationships with adjacent structures and street frontages. e. New buildings should be arranged to provide convenient access to entrances and efficient on -site circulation for vehicles and pedestrians. Projects should develop a comprehensive open space network that uses plazas and other open space elements to connect uses. Open space areas and the paths that link them should facilitate the integration of adjacent land uses on the site. New buildings with a strong street presence are encouraged in Fashion Island. g. Residential development shall provide common outdoor open space areas for residents. These areas should be configured and designed so as to address privacy for residential uses while also providing linkages to the public open space components of the project. h. Planning and developing shared facilities such as driveways, parking areas, pedestrian plazas and walkways, with adjoining properties, including those outside of the North Newport Center Development Plan, is strongly encouraged. Example of resident open space North Newport Center Design Regulations 11/8/07 Land Uses, Development Standards & Procedures Appendix — Design Regulations 2. Building Envelope a. New buildings should respect the existing development scale, which generally consists of high -rise buildings (10+ stories) clustered along San Joaquin Hills Road at the highest point in Newport Center. Mid -rise office buildings (5 -10 stories), low -rise office buildings, and retail development are generally located at lower elevations. 3. Building Character and Style a. The character and style of new buildings located in Fashion Island should be compatible with the classically inspired architecture of the existing buildings in Fashion Island. The character and style of new commercial and residential buildings located in the mixed -use sub -areas should be compatible with the existing contemporary architecture or the classically inspired architecture of the existing buildings. b. New buildings within Fashion Island should continue and enhance the existing pedestrian experience by promoting storefront visibility. C. New buildings should reflect a timeless architecture with straightforward geometry, a unified composition, the expression of floor levels and structure, and solid parapets. Trendy, short- lived, idiosyncratic architectural styles are not appropriate; although retail storefronts may reflect the design theme of the merchant. d. The top of all roof - mounted equipment and communications devices should be below the building parapet or equipment screens in a manner that hides them from the street. e. Ground level equipment, refuse collection areas, storage tanks and infrastructure equipment should be screened from public right -of -ways views with dense landscaping and/or walls of materials and finishes compatible with adjacent buildings. f. Above grade equipment, including backflow preventers at domestic water meters, irrigation controllers, and cable television pedestals should not be visible from public right -of -ways, when feasible. g. Chain link fencing is not allowed, except to screen construction areas. h. Avoid long, continuous blank walls, by incorporating a variety of materials and design treatments and/or modulating and articulating elevations to promote visual interest. North Newport Center Design Regulations 1118/07 --tot m 7,4 1 "1 1 e.l. I i �dffi.� via IA- Land Uses, Development Standards & Procedures Appendix — Design Regulations 4. Building Materials and Colors a. Colors, materials, and finishes should be coordinated on all exterior elevations to achieve continuity of design. Stripes and patterns are not appropriate; although retail storefronts may reflect the design theme of the merchant. b. Clay tile, concrete tile, metal, and fabric are acceptable materials for low- and mid - rise roofs. C. Stone, metal, exterior plaster, exterior insulated finishing systems (EIFS), brick, concrete, wood, and glass are acceptable materials for building walls. d. Stone, metal, exterior plaster, exterior insulated finishing systems (EIFS), brick, concrete, wood, and glass are acceptable materials for railings. e. Service door and mechanical screen colors should be the same as, or compatible to, the adjacent wall colors. Example of appropriate retail finishes 5. Parking Structures a. The architecture of new parking structures should be compatible, complementary, and secondary to principal buildings. b. The design of new parking structures in Fashion Island shall incorporate elements (including landscaping) to soften their visual impact. C. New parking structures in Fashion Island shall be located and designed in a manner that is compatible with the existing pedestrian scale and open feeling of Newport Center Drive. d. Simple, regular forms are encouraged. e. Views of parked vehicles should be screened. f. The visual appearance of sloping floors should be minimized. g. Interiors should be designed to promote a safe vehicular and pedestrian experience. It. Vehicular entries for non - residential parking structures should be obvious and inviting. North Newport Center Design Regulations 11 1118107 Land Uses, Development Standards & Procedures Appendix — Design Regulations Vehicular entries to exclusively residential structures should be incorporated into the structure so as to minimize the street presence of the parking structure entrance and to avoid interrupting the continuity of the street facing building elevations. rectangular form and vines to soften visual impact B. Landscape Intent demonstrating rectangular form and varied landscape to soften visual impact The intent of the landscape standards is to ensure that new commercial and residential development preserves and enhances the existing landscape character of North Newport Center. 1. Overall Landscape a. New development should promote an evergreen plant palette that is appropriate in the Mediterranean climate of Southern California. Plant materials should be of a native or drought - tolerant species where appropriate and provide variety, while being consistent with the existing landscape pattern and architectural design of the building. b. Landscape and site design will incorporate Best Management Practices (BMPs) to address low -flow runoff and storm water runoff. Landscaped areas within the project will be provided and used to treat runoff from impervious surfaces and roof drains prior to being discharged into the storm drain system. C. The landscape palette should consist of two distinct groups of plant materials: • Accent planting, including palms, cypress, and color accents • Background planting, including evergreen canopy trees and shrubs d. The overall landscape should be dominated by background planting with accent planting in key areas corresponding to the land use and development intensity. North Newport Center Design Regulations 12 1118107 Land Uses, Development Standards & Procedures Appendix — Design Regulations e. Planting should be organized in layers of plant size and variety such as flowering, cascading, or climbing plants. Contrasts in color and texture should be used to enhance the layering of plants. complementing the building form 2. Perimeter and Street Landscape a. The landscape on the perimeter of sub -areas and along streets of new commercial and residential development should complement the street tree pattern, enhance the pedestrian experience, screen parked vehicles, and soften the view of parking structures. b. Existing trees along public streets should be preserved, and new trees should be installed to fill in gaps. C. Evergreen hedges should be used to screen the lower portions of parked cars. d. Evergreen planting should be used to screen parking structures. North Newport Center Design Regulations 13 1118/07 Land Uses, Development Standards & Procedures Appendix — Design Regulations San Nicolas landscape showing screening of parked cars San Joaquin Hills Road landscape 3. Parking Lot Landscape Landscape adjacent to 888 San Clemente parking structure a. New surface parking lots should have evergreen canopy trees to provide shade. b. A uniform evergreen tree type should be used for parking lot fields, with a different uniform evergreen tree type used to highlight the major parking aisles. C. Evergreen hedges should be used to screen parked cars. North Newport Center Design Regulations 14 11!8!07 standards & screen parked cars 4. Internal Landscape a. New courtyards and promenades should continue the existing pedestrian experience by promoting visual continuity, shade and an evergreen landscape. b. Trees should be installed to shade appropriate walkways and cause an interesting and varied pedestrian experience. pedestrian experience C. Circulation visual continuity Intent The intent of the circulation criteria is to ensure that new commercial and residential development enhances existing circulation patterns by maintaining existing, upgrading existing and providing new street and walkway connections. I. Streets and Pedestrian Activity a. New development should preserve and enhance the existing attractive street scene, promote safe and convenient driving practices, and encourage street level pedestrian activity. 15 North Newport Center Design Regulations 1118107 Land Uses, Development Standards & Procedures Appendix — Design Regulations b. All buildings should be publicly accessible via a path or walkway from a public sidewalk. C. The crescent walk linking Block 500 and Block 600 along Newport Center Drive and pedestrian connections to /in Fashion Island should be preserved and enhanced where feasible. Connections from the crescent walk into courtyards, plazas, and other gathering areas in Block 500 and Block 600 should be provided where possible. d. Each sub -area should demonstrate an internal pedestrian network of walks and paseos that connect to the larger Newport Center pedestrian system. e. Strong pedestrian connectivity, reinforced by protected walkways and landscaping, should occur between Newport Center Drive and the retail core of Fashion Island. f. Amenities such as benches, plazas and other pedestrian- oriented facilities should be provided at pedestrian destinations. g. To promote the vitality of the street scene, pedestrian bridges and tunnels which remove pedestrians from the street level are not allowed. h. New benches, street trees, directional signs, trash receptacles, and exterior lighting are encouraged in the public right -of -ways to reinforce pedestrian activity. i. Enhanced paving in crosswalks to highlight pedestrian pathways is allowed if it is compatible with the character of the existing development. Center Drive to Fashion Island Example of pedestrian amenities Example of pedestrian connectivity to the street (between 500 and 550 Newport Center Drive) Example of the crescent walk design framework North Newport Center Design Regulations 16 11!6/07 F'W� 1 d i t ii e qq � t— vJ1 1V} (� �� 94 {i 1 ti i�Y, a p ��" ��� ` ,� ,I �Cr ^��(�L•c9 n J����J d; ..:, 2. Service and Emergency a New commercial and residential development should promote efficient circulation for service and emergency vehicles. b• Major loadin areas to g docks should is located away frail front doors and from separate service traffic from other traffic. m residential C. from bays should be interference with pedestrian and vehics minimize their visual ular flows prominence and any d• Turf -block may be Y used in landscape areas where fire access is necessary. e. Truncated domes should be a contrasting color, other than coordinated with the paving material unless otherwise required b be standards. Yellow, and should by federal or state North Newport Center Design R 11!8!07 9 Regulations ig Land Uses, Development Standards & Procedures Appendix — Design Regulations 3. Parking Lots a. Parking areas should not create a separation between adjacent land uses and buildings. b. Parking lots at new development should promote efficient circulation for vehicles and pedestrians. C. Convenient, well marked and attractive pedestrian access should be provided from parking lots to buildings. d. The use of permeable surfaces is encouraged. r � Pedestrian entrance from surface parking at 680 Newport Center Drive demonstrating flow from parking to building Well-defined pedesman walkway in 500 1550 Newport Center Drive parking lot Drive into Fashion Island at San Nicolas North Newport Center Design Regulations 20 11/8/07 Land Uses, Development Standards & Procedures Appendix— Design Regulations A Orientation and Identity Intent The intent of the standards for orientation, identity, and safety is to ensure that new commercial and residential development promotes wayfinding for residents and visitors, strengthens North Newport Center's sense of place, and produces a safe environment. 1. Gateways and Entrances a. New development should respect existing entries and, if entry modifications are required, should integrate with the existing vehicular and pedestrian circulation system. b. Key landscape elements at the "landscape corners" should be retained. San Joaquin Hills Road and MacArthur San Joaquin Hills Road and Santa North Newport Center Design Regulations 21 11/8/07 1i •PI . " I -p T I - ----------- IIY 'j, 3. 11 Land Uses, Landmarks •tioned and designed to serve 3 As appropriate, major new development may be Posi as a landmark within North Newport Center. Landmark elements may be included in building design to distinguish individual c_A: -- 23 North Newport Center Design Regulations 11 8107 Land Uses, Development Standards & Procedures Appendix — Design Regulations 4. Signage a. New development should have signs that promote identity and wayfinding. b. Signs should be designed to clearly communicate their messages. C. Signs should be designed to complement the architecture and landscape. d. Identification signs should be designed to convey the image of the project or business. e. Wayfinding signs should be unified within each sub -area. f Simplicity and legibility are encouraged. g. Ample blank space around sign copy is encouraged. It. Animated signs visible from public streets are not allowed unless otherwise permitted by the Municipal Code. Signs may be internally - illuminated, halo-illuminated, externally- illuminated, or non - illuminated. Business identification sign Directional sign Temporary signs mounted on construction fence North Newport Center Design Regulations 24 tt/sro7 Land Uses, Development Standards & Procedures Appendix — Design Regulations 5. Lighting a. The exterior lighting at new commercial and residential development should be compatible with and enhance the existing lighting of the sub -area. b. Light fixtures at walkways and parking lots should be coordinated in height, color, and style. C. Light fixtures should not cast off -site glare. d. Building walls may be illuminated by downlights and uplights; light sources should not be visible from public view. e. Tops of buildings may be highlighted with bands of light. f. Utilitarian light fixtures, such as floodlights and wallpacks, may only be used in service areas. g. Low sodium lighting is not allowed. h. ATM lighting shall conform to state code without causing offsite glare, such as through the use of bollards, tree lights, pole lights, and soffit lights, rather than floodlights and wallpacks. i. in pedestrian areas such as courtyards, plazas, and walkways, lighting fixtures should be pedestrian scale. Appropriate light bollard at Block 600 North Newport Center Design Regulations 25 11/8/07 n u 0 EXHIBIT 11 0 0 SAN JOAQUIN PLAZA (formerly Civic Plaza) PLANNED COMMUNITY DISTRICT REGULATIONS u Amendment No. 455 Ordinance No. 1649 December 22, 1975 Amendment No Resolution 2007 n u 0 TABLE OF CONTENTS Amendments.................................................. ............................... Page 4 Introduction................................................................................... SECTION I ............................... STATISTICAL ANALYSIS ...... ............................... Page 5 LAND USE PLAN ....... ............................... Page 6 SECTION II GENERAL NOTES .................. ............................... Page 7 SECTION III CIVIC, CULTURAL, BUSINESS AND PROFESSIONAL OFFICES ......................... Page 8 Sub - Section A Intent ........................................... ............................... Page 8 Page 8 Sub - Section B Permitted Uses ............................ ............................... Sub-Section C Building Location ....................... ............................... Page 8 Sub - Section D Building Height .......................... ............................... Page 8 Sub - Section E Parking ........................................ ............................... Sub - Section F Landscaping ................................ ............................... Page 9 Sub - Section G Loading Areas ............................ ............................... Page 9 Sub - Section H Refuse Collection Areas ............ ............................... • Sub- Section I Telephone and Electrical Service ............................•• Page 90 Sub - Section J Signs ........................................... ............................... Fienre 1 San Joaquin Plaza Planned Community Area ..................... Page 49 0 0 PLANNED COMMUNITY DISTRICT REGULATIONS For San Joaquin Plaza Ordinance No. 1649, adopted by the City of Newport Beach on December 22, 1975 (Amendment No. 455) Amendment No. 1 March 12, 1979 P.C. Amendment No. 527; Resolution No. 9517 Amendment No. 2 November 23, 1987 P.C. Amendment No. 653; Resolution No. 87 -164 Amendment No. 3 January 13, 1992 P.C. Amendment No. 729; Resolution No. 92 -5 Amendment No. 4 April 27, 1992 P.C. Amendment No. 755; Resolution No. 92 -33 Amendment No. 5 October 9, 1995 P.C. Amendment No. 825, Resolution No. 95 -115 Amendment No. 6 March 22, 2005 Code Amendment No. 2004 -013; Resolution No. 1656 Ordinance 2005 -3 Amendment No. 7 2007 P.C. Amendment No. . Resolution No. 3 0 LI -_3- MTRODUCTION The San Joaquin Plaza Planned Community District C-19 for the City of Newport Beach is apart of the Newport Center Development in conformance with the Newport Beach General Plan, ivltieh W—ember 1973. a The subject property is located in the northwestern area of Newport Center. It is Aasem to -bats leaquin Hills Read en die n hounded by Santa Cruz Drive on the cast, and -San Clemente Drives on the south.easand -Santa Barbara Drive toes the west.seirtlr, and aSurroundiny uses include an existing police station fire station, automobile ageAeydealershin and service station onto the west .and offices uses to the north. The purpose of this RG4Plarmed Community) "PC" District is to provide a method whereby property may be classified and developed for commercial activity, professional and business offices. The specifications of this district are intended to provide flexibility in both the land use and development standards for the planned building groups. El 0 LJ --3-- SECTION L STATISTICAL ANALYSIS San Joaquin Plaza I. Proiect Are a Net Acreage' 2.9224.42 2. Percentage of Site Coverage (Site Plan) a. Building Footprint 15 -20% b. Parking Area 45 -50% C. Landscape 35-40% 3. Square Foota2es of Uses 81lisec 337�261 Sq. F4= Art Museum 30,000 Sq. Ft. The shaded area in Figure I shows the San Joaauin Plaza Planned Communitv area. I Net Acreage Site area within the existing property lines. '-' c_Wm.-. 1 1991 e.:.,.;ng square feetage eAle -.,ble is 250,111 (Land Use at,.ment „c .t,e City e fA1a,.,. ei4l3ea.6 Uesolutio.. No OD 1001 Oeteber 24 1988) 5 0 i 0 --3- San Joaquin Plaza i E I* San Joaquin Hills Rd e 0 v 0 ■ San Joaquin Planned Community Figure I — San Joaquin Plaza Planned Community --3-- 0 SECTION IL GENERAL NOTES 1. Water within the Planned Community area will be furnished by the City of Newport Beach. 2. Sewage disposal facilities within the Planned Community will be provided by Orange County Sanitation District No. 5. 3. The subject property is within the City of Newport Beach. The Developer will provide the necessary flood protection facilities under the jurisdiction of the City of Newport Beach. 4. Grading and erosion control provisions shall be carried out on all areas of the Planned Community in a manner meeting the approval of the Director of Planning. 5. Except as otherwise stated in this Ordinance, the requirements of the Newport Beach Zoning Code shall apply. The contents of this supplemental text notwithstanding, no construction shall be proposed within the boundaries of this Planned Community District except that which shall comply with all provisions of Newport Beach's Uniform Building Code and the various mechanical codes related thereto. • 6. Parking lot lighting shall be subject to the review and approval of the Director of Planning. Parking lot lighting shall be designed in a manner so as to minimize impacts on adjacent residential areas. 7. All mechanical appurtenances on building roof tops and utility vaults shall be screened from street level view in a manner meeting the approval of the Director of Planning. 8. Prior to the issuance of grading permits, the site shall be examined to determine the existence and extent of archaeological and paleontological resources in accordance with adopted City polices. 9. In the event that any non -office facility was to be eliminated from the project, the eliminated facility would be replaced with the equivalent amount of office space. 10. That a pedestrian and bicycle trail system be reviewed and approved by the Director of Planning. • SECTION M CIVIC, CULTURAL, BUSINESS AND PROFESSIONAL OFFICES A. Intent The intent of this district is to permit the location of a combination of civic, cultural, business and professional office uses, and support commercial activities engaged in the sale of products to the general public. B. Permitted Uses The following shall be pemritted: Retail sales and service of a convenience nature. 2. Administrative and professional offices. Restaurants, bars and theater/nightclubs. Subject to Use Permit. 4. Institutional, financial and governmental facilities. 0 5. Civic, cultural, commercial recreational and recreational facilities. 6. Parking lots, structures and facilities. C. Building Location All buildings shall be located in substantial conformmoe with the approved site plan. D. Building Height All buildings and appurtenant structures shall be limited to a maximum height of sixty -five (65) feet. E. Parking Adequate off -street parking shall be provided to accommodate all parking needs for the site. The intent is to eliminate the need for any on -street parking. Required off - street parking shall be provided on the site of the use served, or on a common parking area in accordance with the off - sheet parking requirements of City of Newport Beach Planning and Zoning Ordinance. • Parking for the museum shall be based on 3.5 spaces /1,000 square feet of gross floor area. 0 F. Landscaoine Detailed landscaping and irrigation plans, prepared by a licensed landscape architect, licensed landscaping contractor, or architect shall be reviewed by the Director of Parks, Beaches and Recreation. All landscaping referred to in this section shall be maintained in a neat and orderly fashion. 1. Screening Areas used for parking shall be screened from view or have the view interrupted by landscaping, and/or fencing from access streets, and adjacent properties. Plant materials used for screening purposes shall consist of lineal or grouped masses of shrubs and/or trees. 2. Landscavine- Vehicle Separation All landscaped areas shall be separated from adjacent vehicular areas by a wall or curb, at least six (6) inches higher than the adjacent vehicular area. • 3. Parking Areas Trees, equal in number to one (1) per each five (5) parking stalls shall be provided in the parking area. G. Loading Areas Street side loading shall be allowed providing the loading dock is screened from view from adjacent streets. H. Refuse Collection Areas All outdoor refuse collection areas shall be visually screened from access streets, and adjacent property. Said screening shall form a complete opaque screen. 2. No refuse collection area shall be permitted between a frontage street and the building line. L Teleuhone and Electrical Service All "on site" electrical lines (excluding transmission lines) and telephone lines shall be • placed underground. Transformer or terminal equipment shall be visually screened from view from streets and adjacent properties. 10 0 J. sus Building Address Sign Building address numerals shall be a maximum of two (2) feet in height and shall be consistent with the building identification signing. Building address number shall face the street (and/or pedestrian walkways in the case of necessity), and be located on the building so that they are visible from adjacent frontage roads and designated parking areas. 2. Project/Building Identification Sign Project and/or building identification signs are permitted at major entry access drives from adjacent frontage streets, and adjacent to project intersection corners provided that they comply with the City of Newport Beach sight distance requirement 110 -L. The identification signage is permitted in the form of a free- standing (single or double faced) monument sign. The sign copy shall be restricted to the project or building name and street address. Individual letter heights shall not exceed eighteen • (18) inches. The monument sign shall be limited to 5 feet in height and 12 feet in width as depicted on the attached sign drawings. 3. Project/Tenant Identification Signs Project/tenant identification signs are permitted at major entry access drives from adjacent frontage streets, provided that they comply with the City of Newport Beach sight distance requirement 110-L• The project/tenant identification signage is permitted in the form of a free standing (single or double faced) monument sign and may contain the project identification and a maximum of two tenant names. The tenant selection will be determined by the property owner or their designated management company. The tenant name shall not exceed 5 % inches in height and the monument sign shall be limited to 6 feet in height and 12 feet in width as depicted on the attached sign drawings. 4. Tenant Identification Signs Tenant identification signs are permitted and are divided into two (2) categories: Primary Tenant Secondary Tenant Tenant identification signs are to be wall- mounted graphics, consisting of individually fabricated letters. Box or "can" signs are not permitted. The maximum number of primary tenant signs permitted on any one building elevation is two (2). 11 M Each secondary tenant shall be limited to one (1) identification sign. The maximum letter height of a primary tenant sign shall not exceed twenty -four (24) inches. The maximum letter height of a secondary tenant sign shall not exceed sixteen (16) inches. Sign copy shall be restricted to identification of the person, firm, company or corporation operating the use conducted on the site. 5. General Sign Standards a. Signs (to include all those visible from the exterior of any building) may be lighted but no sign or any other contrivance shall be devised or constructed so as to rotate, gyrate, blink or move in any animated fashion. 6. Temporary Signs The following guidelines are intended to produce a consistent sign design for temporary signs within Newport Center. All temporary signs require the approvals of the City of Newport Beach and The Leine Company. Temporary signs are to identify the future site, project or facility under development on individual project sites. Information on this sign is limited to: - For Sale, For Lease, Future Home of, Building/Project Name, etc. - Type or Name of Development - Type and Area of Space Available - Major Tenant or Developer - Financial Institution - General Contractor - Architect - Leasing Agent - Occupancy Date - Phone Number - Irvine Company or Irvine Company Project Name and Logo Location: One temporary sign is permitted on site for each frontage street. These signs may be single or double -faced and parallel or perpendicular to the roadway. Design: All temporary signs are to be built in substantial conformance to The Irvine Company corporate design standards as shown on the following page. 12 0 lJ 0 am Longevity: Signs can exist from the time of lease or sale of the parcel until construction and/or leasing of the facility is complete. 13 0 Ll • s a l"Il IL 14 i 0 0 m a w m F W IL ��l<11111 all ,E-- -- 15 w� W W y d 8 s (� nmrwca � 0 �6M 1' . 0 il! go .n • --4j BQ 2'ra k 0 0 Son Joaquin. Plaza 17 GSM " 1 0 E • EXHIBIT 12 • i BLOCK 500 PLANNED COMMUNITY DISTRICT REGULATIONS • Adopted August 28,1995 Ordinance No. 95 -32 Amendment No. 827 Amendment No. .Resolution 2007 • 0 n LJ 49 TABLE OF CONTENTS INTRODUCTION SECTION I Statistical Analysis Page 4 SECTION II General Notes Page 5 SECTION III Definitions Page 7 SECTION W Business, Professional and Commercial Standards Page 8 LIST OF FIGURES FIGURE 1 Land Use Designations Page 2 1] LJ • i.rI: 0 . The Block 500 Planned Community District for the City of Newport Beach is a part of the Newport Center Development, and has been developed in accordance with the Newport Beach General Plan. The purpose of this PC (Planned Community) District is to provide a method whereby property may be classified and developed for commercial activity, professional and business offices. The specifications of this district are intended to provide land use and development standards supportive of the development contained herein while insuring compliance with the intent of all applicable regulatory codes. Whenever the regulations contained herein conflict with the regulations of the Newport Beach Municipal Code, the regulations contained herein shall take precedence. The Municipal Code shall regulate this development when such regulations are not provided within these district regulations. All development within the Planned Community District boundaries shall comply with all provisions of the Uniform Building Code and various mechanical codes related thereto. 0 �, San Joaquin �p Hills Rd CI�N r ii - 0 SECTION L STATISTICAL.ANALYSIS • • Block 500 1. Project Area Net Acreage 494.37 2. Percentage of Site Coverage a. Building Footprint 20% maximum b. Landscape 30% minimum 3. Maximum building floor area will not exceed ' ° 122942 square feet. 4. The square footage of individual building sites is subject to adjustment as long as the limitations on total development are not violated. Any adjustment in the square footages for each building site shall be reviewed and approved by the Planning Director. 91 • SECTION EL GENERAL NOTES FOR NEW CONSTRUCTION L J 1. Grading within the Planned Community area will be permitted upon securing of a grading permit 2. Water within the Planned Community area will be furnished by the City of Newport Beach. 3. Sewage disposal facilities within the Planned Community will be provided by the City of Newport Beach and Orange County Sanitation District No. 5. 4. The subject property is within the City of Newport Beach. The Developer will provide the necessary flood protection facilities under the jurisdiction of the City of Newport Beach. 5. Erosion control provisions- shall be carried out during construction activities on all areas of the Planned Community in a manner meeting the approval of the Director of Planning. 6. Except as otherwise stated in this Ordinance, the requirements of the Newport Beach Zoning Code shall apply. The contents of this text notwithstanding, no construction shall be proposed within the boundaries of this Planned Community District except that which shall comply with all provisions of Newport Beach's Uniform Building Code and the various mechanical codes related thereto. 7. Parking lot lighting for new construction shall be subject to the review'and approval of the Planning Director. Parking lot lighting shall be designed in a manner so as to minimize impacts on adjacent residential areas. 8. All mechanical appurtenances on building roof tops and utility vaults shall be screened from street level view in a manner meeting the approval of the Planning Department. 9. Prior to the issuance of new grading permits the site shall be examined to determine the existence and extent of archaeological and paleontological resources in accordance with City Council Policies K -4 and K -5. 10. Prior to issuance of new grading pen-nits the on -site parking, vehicular circulation and pedestrian circulation systems shall be reviewed and approved by the City Traffic Engineer. 4 11. The intersection at new private streets and drives shall be designed to provide sight distance as specified in drawing No. STD- 110 -L of the City Public Works design criteria unless otherwise approved by the City Traffic Engineer. Slopes landscape, walls and other obstructions shall be considered in the sight distance requirements. Landscaping within the sight line shall not exceed thirty inches in height. The sight distance requirement may be modified at non - critical locations, subject to approval of the City Traffic Engineer. J 0 SECTION M. DEFUSTMONS Advertising Surface of a Sien The total area of the face of the sign struct =, excluding supports. Area of Elevation Total height and length of a building as projected to a vertical plane. Setbacks from Street Comers Setbacks from street comers shall be established as that point of intersection of the required setback lines from access streets, prolonged to point of intersection. n ►,J 0 • 1 SECTION IV. BUSINESS, PROFESSIONAL AND COMMERCIAL A. Intent The intent of this district is to permit the location of a combination of business and professional office uses, and light general commercial activities engaged in the sale of products to the general public. B. Permitted Uses Permitted uses shall be as speeified e _ the n nc Distfiet _ mss,.._.,.- 2033 include offices, light general commercial and medical/dental offices. . C. Buildine Location All buildings shall be located within the boundaries of the district and in compliance with sight distance as established in City Standard Drawing No. 1 10 -L. D. Building Hei¢ht Ail buildings and appurtenant structures shall be limited to a maximum height of 375 feet. • E. Parkin L J Adequate off - street parking shall be provided to accommodate all parking needs for the site. Required off - street parking shall be provided within the Block 500 P.C. District area, unless otherwise approved by the P. C. through an off -site parking agreement: General office use: I space per 375 square feet of net floor area Medical office use: 1 space per 250 square feet of gross floor area Otherpermitteduses: As set forth in ce... en 20 3n n3c c the Newport Beach Municipal Code. Future conversion of general office floor area to medical office shall be contingent on the provision of the above required parking. 7 F. Landscaping All landscaping referred to in this section shall be maintained in a neat and orderly fashion. 1. Screening Areas used for parking shall be screened from view or have the view interrupted by landscaping, and/or fencing from access streets, and adjacent properties. Plant materials used for screening purposes shall consist of lineal or grouped masses of shrubs and/or trees. 2. Parking Areas Trees, equal in number to.one (1) per each five (5) parking stalls shall be provided in the parking area. G. Loading Areas Street side loading shall be allowed providing the loading dock is screened from view from adjacent streets. • H. Storage Areas I* All outdoor storage shall be visually screened from access streets, and adjacent property. Said screening shall form a complete opaque screen. 2. No storage shall be pemutted between a frontage street and the building line. I. Refuse Collection Areas 1. All outdoor refuse collection areas shall be visually screened from access streets, and adjacent property. Said screening shall form a complete opaque screen. 2. No refuse collection area shall be permitted between a frontage street and the building line. 3. Screen areas shall not interfere with the required sight distance per City Standard Drawing No. 110 -L. 3 0 J. Telephone and Electrical Service All "on site" electrical lines (excluding transmission lines) and telephone lines shall be placed underground. Transformer, terminal equipment, detector checks and fire service facilities shall be visually screened from view from streets and adjacent properties, and shall meet the requirements of City Standard Drawing No. 110 -L. K. Signs General Sign Standards All permanent and temporary signs must be consistent with the provisions of these regulations or be approved by the City of Newport Beach and The Irvine Company. Signs must consist of individual fabricated letters; or routed -out letters in an opaque background. Enclosed sign, box or "can" signs are not acceptable on buildings. Signs, including all signs visible from the exterior of any building, may be lighted, but no sign or any other contrivance shall be devised or constructed so as to rotate, gyrate, blink, or move in any animated fashion. — °reje t ida r r-atien s g is maybe Ieeated a� ene or mare ef4he €eliewing lesain MIN 3. Building Identification Signs Building identification signs may only be located at the ground floor level of 567 San Nicholas Drive; 18 inches max. logo/letter height; 2 locations maximum W 4. Tenant Identification Signs The following types of tenant identification sign are permitted: standing MR ...., a ; a ; i g Two (2) free- standing monument signs at the Avocado entry to Block 500: one (1) sign for 1601 Avocado and one (1) sign for 1605 Avocado. The signs must match in design, materials, colors, and position relative the street and entry drive; 4 feet max. height; 5 feet max. length; 8 inches max. logo/letter height g. Signs on buildings, restricted as follows: 567 San Nicholas Drive No tenant signs are permitted on the building Low -rise single- tenant buildings and low -rise buildings with exterior • doors used by more than one tenant Max. one (1) sign per major tenant per building elevation, up to a maximum of two (2) major tenant signs per building, but not located at the same 10 • building comer; 24 inches max. letter/logo height; 30 feet max length; (at 2161 San Joaquin Hills Road, 28 inches max. letter/logo height) Max one (1) sign per minor tenant per building elevation, up to a maximum of two (2) signs per building, but not located at the same building comer, 12 inches max. letter/logo height; 15 feet max length Multi-tenant low -rise buildings with exterior doors for the exclusive use of individual tenants Major tenant: max. two (2) signs per building: max. one (1) sign facing perimeter of Block 500, 24 inches max letter/logo height, 20 feet max. length; and max. one (1) sign facing the parking lot, 12 inches max. letter/logo height, 15 feet max. length Minor tenants: max. one (1) sign per tenant per building elevation, up to a maximum of two (2) signs per tenant; 12 inches max. letter/logo height; 15 feet max length Sign copy shall be restricted to identification of the person, firm, company, or corporation operating the use conducted on the site. The free standing fne.,...„ _« J I Santa Rese Drive-San Joaquin Hills Read may inelude names ef tefiams and r....wen is Tenant signage exceeding the above standards shall be uses at • limited to the interior of buildings located within a common entryway or lobby area. Building Address Signs Building address signs may be located at one or more of the following locations: On a free- standing monument sign at 1601 Avocado Avenue; 8 inches, max. number height On a free- standing monument sign at 1605 Avocado Avenue; 8 inches, max. number height On a building; 24 inches, max. number height Primary building address numbers shall be visible from the street (and/or pedestrian walkways in the case of necessity), and be located on the building so that they are • visible from adjacent frontage roads and designated parking areasp�� buildings µ«. 5`0n and 550 ,,T,,....,, -. Gen. _- n -:..,. .,Neh have then, addF.s 0 • nufflbers a„ she eubes elaiig Ne_ eft Gent-of „f . Secondary address signs may be located where logical for on -site orientation. All address signs shall have a consistent color, design, and material for any given building. A single letter style is recommended. 6. Other Signs Advisory signs are permitted in the parking lot; 48 inches, max. height. 7. Temporary Signs The following guidelines are intended to produce consistent sign design for temporary signs within Newport Center. Temporary signs are to identify a future site or project; or a facility under development or offered for lease. Information on this sign is limited to: For Sale, For Lease, Future Home of, Building/Project Name, etc. Type of Name of Development Type and Area of Space Available Major Tenant or Developer Financial Institution General Contractor Architect Leasing Agent Occupancy Date Phone Number Irvine Company or Irvine Company Project Name and Logo Maximum number: One (1) temporary sign is permitted on a site for each frontage street, up to two (2) signs per building, but not at the same corner of the building. Type: Single- or double -faced ground signs or wall signs. Location: If ground signs, they may be parallel or perpendicular to the roadway. If wall signs, they must be located below the sill of second floor windows. Design: Rectangular shape. Rigid, permanent material; not fabric. Mounting technique: Flush with building: entirely on glass or entirely on a wall surface; not overlapping glass or wall surface. Required color•. White copy on colored background; or colored copy on white background; or a combination of the above. 12 0 • Longevity: Signs may exist from the time of lease or sale of the parcel until the construction and/or leasing of the facility is complete. 13 n 0 14 n U n U EXHIBIT 13 0 MIIm �wm .O LO V d 0 6� U d a L1 �j V ocn�%, U 4 n rce * r 2 CL� m r � t \ m NEWPORT m / E P� 0. v n \ ro wb OZ y U g F = 3 J � 0 all CL _ So g g �1pp1jj $ g Ito } i a V Elie a a n TZ 3�avg"r N Jyg� 9 ff gS 0 EXHIBIT 14 I* 0 0 EXHIBIT 15 I U m< nn eew .vas i 6 O taua� edw g 3 la at nv avw d N W q yyM a! � N_ i r :N _ o Vi � a U CI R 4 3 H �Ti €$l LL LU t = d TY e lAk � � ) k wv J a � "�L� i �jpl" h 6 >� a � s � z a = r p a 3$ p cn Pm' }P_zxnF U U Q c[ ar a op , n a} A cc £EP��i sE IL a -8t is 3 3qz q� 000JO1C pp i E i $ € 2 u 'Y gpy ta Oc f� f al OUR Iz NO d n U • EXHIBIT 16 0 • RECORDING REQUESTED BY AND WHEN RECORDED RETURN TO: City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92663 -3884 Attn: City Clerk (Space Above This Line Is for Recorder's Use Only) This Agreement is recorded at the request and for the benefit of the City of Newport Beach and is exempt from the payment of a recording fee pursuant to Government Code §§ 6103 and 27383. • ZONING IMPLEMENTATION AND PUBLIC BENEFIT AGREEMENT • between CITY OF NEWPORT BEACH, and THE IRVINE COMPANY LLC CONCERNING PROPERTIES LOCATED IN NORTH NEWPORT CENTER (BLOCK 600 AND PORTIONS OF FASHION ISLAND, BLOCK 500, AND SAN JOAQUIN PLAZA) 859M v.5 I l/9N7 • U • TABLE OF CONTENTS RECITALS...... AGREEMENT.. Page ... 1 ....... ............................... 4 1. Definitions ............................................................... ............................... 1.1 " AHIP" ........................................................ ............................... 1.2 "Bonita Canyon Development Agreement" ............................... 1.3 "CEQA" ...................................................... ............................... 1.4 "CIOSA" ..................................................... ............................... 1.5 "City Council" ................................... ............................... 1.6 "Design Regulations" ........................ ............................... 1.7 "Development Fees" ......................... ............................... 1.8 "Development Plan " .......................... ............................... 1.9 "Development Regulations" ............. ............................... 1.10 "Effective Date" ................................ ............................... 1.11 "Fair Share Traffic Contribution Ordinance " ................... 1.12 "Fair Share Traffic Fees" .................. ............................... 1.13 "First Building Permit" .................... ............................... 1.14 "First Residential Building Permit" .. ............................... 1.15 "General Plan" ................................... ............................... 1.16 "Initial Fee Increase" ......................... ............................... 1.17 "Initial Park Fee" ............................... ............................... 1.18 "Initial Public Benefit Fee" ............... ............................... 1.19 "Initiative Condition" ........................ ............................... 1.20 " Mortgage" ........................................ ............................... 1.21 "Mortgagee" ...................................... ............................... 1.22 "Operative Date" ............................... ............................... 1.23 "Option Agreement" ......................... ............................... 1.24 "Option Period" ................................ ............................... 1.25 "Option Site" .................................... ............................... 1.26 "Park Fees" ........................................ ............................... 1.27 "Parking Structure" ........................... ............................... 1.28 "Parking Structure Provisions" ........ ............................... 1.29 "Parking Structure Site" ................... ............................... 1.30 "Party" or " Parties" .......................... ............................... 1.31 "Per Unit Park Fees" ........................ ............................... 1.32 " Project" ........................................... ............................... 1.33 " Property ........................................... ............................... 1.34 "Public Benefit Fee" ......................... ............................... 1.35 " Term" .............................................. ............................... 1.36 "Traffic Phasing Ordinance" ............ ............................... 1.37 "Transfer of Development Rights" .. ............................... -i- ............................. 4 ............................. 4 ............................. 4 ............................. 4 ............................. 4 ........ ............................... 4 ........ ............................... 4 ........ ............................... 4 ........ ............................... 4 ........ ............................... 5 ........ ............................... 5 ........ ............................... 5 ........ ............................... 5 ........ ............................... 5 ........ ............................... 5 ........ ............................... 5 ........ ............................... 5 ........ ............................... 6 ........ ............................... 6 ........ ............................... 6 ........ ............................... 6 ........ ............................... 6 ........ ............................... 6 ........ ............................... 6 ........ ............................... 6 ........ ............................... 6 ........ ............................... 6 ........ ............................... 6 ........ ............................... 6 ........ ............................... 7 ........ ............................... 7 ........ ............................... 7 ........ ............................... 7 ........ ............................... 7 ........ ............................... 7 ........ ............................... 7 ........ ............................... 7 ........ ............................... 7 2. General Plan Consistency, Zoning Implementation, and Extinguishment of Any of • Landowner's Remaining Development Rights Under the CIOSA and Bonita Canyon Development Agreement ........................................................ ............................... 7 3. Affordable Housing Obligation ............................................................ ............................... 7 4. Public Benefits ..................................................................................... ............................... 8 4.1 In -Lieu Park Fees for Renovation of Oasis Senior Center and for Park Uses.......................................................................................... ............................... 8 4.2 Public Benefit Fee .................................................................... ............................... 8 4.3 Fair Share Traffic Fees ............................................................. ............................... 9 4.4 Circulation Enhancements to Public Right of Way ................. ............................... 9 4.5 Dedication of Public Right of Way North of San Miguel Drive Between MacArthur Boulevard and Avocado Avenue ......................... ............................... 10 4.6 Conditional Open Space Dedication ...................................... ............................... 11 4.7 Maintenance of CIOSA Pre -Paid Transportation Fund ......... ............................... 11 4.8 City's Option to Purchase New City Hall Site; Parking Structure ........................ 11 4.9 Retrofit Sprinkler Systems ..................................................... ............................... 14 4.10 Cooperation of Landowner if City Hall Constructed on Property North of Library.................................................................................... ............................... 15 5. Fees ..................................................................................................... ............................... 15 5.1 Fees Applicable to Property ................................................... ............................... 15 5.2 Permitted Increases in Development Fees Applicable to Property ....................... 16 • 6. Development of Property ................................................................... ............................... 16 6.1 Applicable Regulations .......................................................... ............................... 16 6.2 Landowner's Vested Rights ................................................... ............................... 17 6.3 Project Components ................................................................. .............................18 6.4 Police Power ........................................................................... ............................... 18 6.5 Time -Share Developments ..................................................... ............................... 19 6.6 Available Use in Newport Center Block 500 for City Hall Building ...................19 6.7 Available Use in Newport Center Block 500 if City Does Not Develop a CityHall on the Option Site ................................................... ............................... 19 6.8 Effect of Agreement on Applications for Land Use Approvals ............................ 20 6.9 Mello -Roos Community Facilities District .............................. .............................20 6.10 No Conflicting Enactments ...................................................... .............................20 6.11 Benefits to Landowner ............................................................. .............................21 6.12 Tentative Subdivision Maps ................................................... ............................... 21 6.13 Compliance with California Government Code Section 65897.5(c) on WaterSupply ............................................................................ .............................21 6.14 Cancellation of CIOSA and Bonita Canyon Development Agreement ................ 21 6.15 No Payments Due from City .................................................. ............................... 21 7. Compliance with Traffic Phasing Ordinance ..................................... ............................... 22 7.1 7.2 Scope of Traffic Study ........................................................... ............................... Sufficiency of Traffic Study ................................................... ............................... 22 22 • 7.3 Circulation Improvements ........................................................ .............................22 _ii- • r1 U 8. Reservations of Authority .................................................................. ............................... 22 8.1 Procedural Regulations .......................................................... ............................... 22 8.2 Consistent Future City Regulations ........................................ ............................... 23 8.3 Overriding Federal and State Laws and Regulations ............. ............................... 23 8.4 Public Health and Safety ........................................................ ............................... 23 8.5 Uniform Building Standards .................................................. ............................... 23 9. Utility Capacity .................................................................................... .............................24 10. Project as Private Undertaking ........................................................... ............................... 24 11. Effective Date and Operative Date of Agreement; Term ................... ............................... 24 12. Amendment or Cancellation of Agreement ....................................... ............................... 25 13. Enforcement ........................... ............................... 14. Periodic Review.of Compliance ......... ............................... 25 .. 26 15. Events of Default ................................................................................ ............................... 26 15.1 Default by Landowner ............................................................ ............................... 26 15.2 Default by City ....................................................................... ............................... 26 15.3 Specific Performance and Damages Remedies ...................... ............................... 27 15.4 Limited Recovery of Legal Expenses by Prevailing Party in Any Action............ 27 16. Cooperation .......................................................................................... .............................27 17. Force Majeure .......... 18. Indemnity ............................................................................ ............................... 19. Third Party Legal Challenge ............................................... ............................... 20. Mortgagee Rights ................................................................ ............................... 20.1 Encumbrances on Property ...................................... ............................... 20.2 Mortgagee Protection .............................................. ............................... 20.3 Mortgagee Not Obligated ........................................ ............................... 20.4 Notice of Default to Mortgagee; Right of Mortgagee to Cure ............... 21. Transfers and Assignment s ........................................... ............................... 21.1 Right to Assign .................................................. ............................... 21.2 Agreement Binding on Successors and Assigns .............................. 22. Estoppel Certificate ....................................................... ............................... 23. Further Actions and Instruments ................................... ............................... • 24. Notices .......................................................................... ............................... 25. Rules of Construction and Miscellaneous Terms ......... ............................... -iii- .............. 27 .............. 27 .............. 28 .............. 28 .............. 28 .............. 28 .............. 28 .............. 28 .............. 29 .............. 29 .............. 29 .............. 30 .............. 30 .............. 30 .............. 31 26. 27 25.1 Rules of Construction ............................................................. ............................... 31 • 25.2 Time Is of the Essence ........................................................... ............................... 31 25.3 Waiver ...................................................................................... .............................31 25.4 Counterparts ............................................................................. .............................31 25.5 Entire Agreement ................................................................... ............................... 31 25.6 Severability ............................................................................... .............................31 25.7 Construction ........................................................................... ............................... 31 25.8 Constructive Notice and Acceptance ..................................... ............................... 32 25.9 No Third Party Beneficiaries .................................................. ............................... 32 25.10 Applicable Law and Venue .................................................... ............................... 32 25.11 Non - Liability of City Officers and Employees ...................... ............................... 32 25.12 Section Headings .................................................................... ............................... 32 25.13 Incorporation of Recitals and Exhibits ................................... ............................... 32 Authorityto Execute .......................................................................... ............................... 33 Recordation........................................................................................ ............................... 33 -iv- C 1 • ZONING IMPLEMENTATION AND PUBLIC BENEFIT AGREEMENT (Pursuant to California Government Code sections 65864- 65869.5) This ZONING IMPLEMENTATION AND PUBLIC BENEFIT AGREEMENT (the "Agreement') is entered into on December _, 2007, by and between: (1) CITY OF NEWPORT BEACH ( "City "), and (2) THE IRVINE COMPANY LLC ("Landowner"). City and Landowner are sometimes collectively referred to in this Agreement as the "Parties" and individually as a "Party." RECITALS A. Landowner is the owner of the parcels of real property (collectively, the "Property ") that are described in the legal description attached hereto as Exhibit A and depicted on the site map attached hereto as Exhibit B. The Property is under City's jurisdiction and is located in North Newport Center. The Property consists of the following sub -areas: portions of Newport Center Block 500, Newport Center Block 600, portions of San Joaquin Plaza, and portions of Fashion island. No part of the Property is located in the coastal zone. B. On September 14, 1992, the City Council of the City of Newport Beach ( "City Council ") adopted Ordinance No. 92 -35, through which City and Landowner entered into the Circulation Improvement and Open Space Agreement pertaining to twelve (12) parcels of real property located in City, including the four parcels owned by Landowner in North Newport Center that • comprise the Property subject to this Agreement. City subsequently adopted the Amendment to the Circulation Improvement and Open Space Agreement dated May 12, 1996. The original Circulation Improvement and Open Space Agreement and the May 12, 1996 Amendment are collectively referred to herein as the " CIOSA." C. Under the CIOSA, Landowner: (1) committed to road improvements adjacent to proposed projects, made an interest -free loan to City, and pre -paid required fair share road improvement fees that City used as matching funds when obtaining outside transportation funding; and (2) committed to dedicating more public open space than required for the twelve (12) parcels under the City of Newport Beach General Plan and the City of Newport Beach Park Dedication Ordinance, as detailed in Exhibit C. D. The CIOSA provided Landowner with certain building entitlements with respect to the properties addressed therein. Landowner has not utilized all of the building entitlements provided by the CIOSA, including the building entitlements for Newport Center Block 600, as detailed in Exhibit C. E. Although Landowner did not utilize all of the building entitlements provided by the CIOSA, it fulfilled all the public benefits listed in Recital C as if it had done so. . F. On November 10, 1997, the City Council adopted Ordinance 97 -77, through which City and Landowner entered into the Bonita Canyon Annexation and Development Agreement pertaining to the Bonita Canyon property (the "Bonita Canyon Development Agreement "). 4- Approximately concurrent to adoption of Ordinance 97 -77, the Bonita Canyon property was e detached from the City of Irvine and annexed by City. G. Under the Bonita Canyon Development Agreement, Landowner: (1) constructed roads and other circulation improvements designed for the capacity of a larger project that had previously been approved by the City of Irvine; (2) sold some of the land that it agreed not to develop to City for open space purposes and cooperated in the formation of a community facilities district to provide funding to City for improvement of the park site between Ford Road and Bonita Canyon Road; and (3) made park dedications. H. The Bonita Canyon Development Agreement provided Landowner with certain building entitlements with respect to the properties addressed therein, which entitlements were to be implemented through a Planned Community Development Plan. Landowner has not utilized all of the building entitlements provided by the applicable development plan, as detailed in Exhibit C. I. Although Landowner did not utilize all of the building entitlements provided by the Bonita Canyon Development Agreement, it fulfilled all the public benefits listed in Recital G as if it had done so. J. This Agreement effectuates General Plan policies and goals by extinguishing • Landowner's remaining building entitlements under the CIOSA and the Bonita Canyon Development Agreement. This Agreement provides for the rescission and cancellation of the Landowner's remaining rights and obligations under the CIOSA and the Bonita Canyon Development Agreement on the Operative Date (collectively, the "Cancellation "). K. The Cancellation eliminates conflicts that exist among the CIOSA, the Bonita Canyon Development Agreement, and the General Plan. The Cancellation, together with this Agreement, also ensures that zoning implementation and utilization of the building entitlements applicable to the Property are consistent with the General Plan's standards for land use, housing, circulation, open space, noise, safety, and conservation, and with the General Plan's goals of improving and providing transportation infrastructure, parks, public services, open space, water resources, and environmental resources. Notably, existing utility capacity, circulation infrastructure, and other public services, together with the circulation improvements referenced in this Agreement, support development consistent with the Development Regulations. L. As detailed in Section 4 below, Landowner has agreed to provide public benefits as consideration for this Agreement, including the following: in -lieu park fees in advance of the time that the fees otherwise would be due to provide for matching funds for the renovation of the Oasis Senior Center and to provide funds for other qualified park uses, development fees to fund construction of a new City Hall building or other municipal use, circulation enhancements, a conditional dedication of a public right of way as specified in Section 4.6, and the conditional • dedication to City of an open space parcel within Newport Center. Landowner has also agreed to grant City an option to acquire a site in Newport Center Block 500 for the purpose of constructing a new City Hall building. -2- • M. On March 13, 2007, the City Council adopted Ordinance No. 2007 -6, entitled "Ordinance Amending Chapter 15.45 of City of Newport Beach Municipal Code Regarding Development Agreements" (the "Development Agreement Ordinance "). This Agreement is consistent with the Development Agreement Ordinance, which requires a development agreement for certain types of projects, including: (1) projects that include development of 50 or more residential units, and (2) projects that include new non - residential development in Newport Center. N. This Agreement is consistent with the City of Newport Beach General Plan Policy LU 6.14.8, which applies to Newport Center and requires the execution of development agreements for residential projects and mixed -use development projects with a residential component. O. This Agreement is consistent with provisions of state law (California Government Code sections 65864- 65869.5) and local law (City of Newport Beach Municipal Code chapter 15.45) that authorize binding agreements that: (1) encourage investment in, and commitment to, comprehensive planning and public facilities financing; (2) strengthen the public planning process and encourage private implementation of the local general plan; (3) provide certainty in the approval of projects in order to avoid waste of time and resources; and (4) reduce the economic costs of development by providing assurance to property owners that they may proceed with projects consistent with existing policies, rules, and regulations. P. The Parties intend that, concurrently with their approval of this Agreement, the Parties will approve and execute a separate Affordable Housing Implementation Plan ("AHIP') for the Property, in the form attached hereto as Exhibit D, that reflects the terms of this Agreement • regarding Landowner's affordable housing requirements. The Parties intend that Landowner's performance under the AHIP will satisfy Landowner's obligations for the Property under the City of Newport Beach General Plan Housing Program 2.2.1. The Parties intend that the AHIP and this Agreement shall be interdependent and neither shall be effective unless each is approved and the Operative Date occurs. The adopted AHIP may be amended by the mutual consent of the Parties without requiring an amendment to this Agreement. Q. In recognition of the significant public benefits that this Agreement provides, the City Council has found that this Agreement: • (1) is consistent with the City of Newport Beach General Plan as of the date of this Agreement; (2) is in the best interests of the health, safety, and general welfare of City, its residents, and the public; (3) is entered into pursuant to, and constitutes a present exercise of, City's police power; (4) is consistent and has been approved consistent with the Final Environmental Impact Report for the City of Newport Beach General Plan 2006 Update (State Clearinghouse No. 200601 1 1 19) and the North Newport Center Addendum to EIR for General Plan 2006 Update (State Clearinghouse No. 2006011119), both of which analyze the environmental effects of the proposed development of the Project on the Property; and -3- (5) is consistent and has been approved consistent with provisions of California • Government Code section 65867 and City of Newport Beach Municipal Code chapter 15.45. R. On November 15, 2007, City's Planning Commission held a public hearing on this Agreement, made findings and determinations with respect to this Agreement, and recommended to the City Council that the City Council approve this Agreement. S. On November 27, 2007, the City Council also held a public hearing on this Agreement, considered the Planning Commission's recommendations. On December 18, 2007, pursuant to the applicable state law (California Government Code sections 65864- 65869.5) and local law (City of Newport Beach Municipal Code chapter 15.45), the City Council adopted its Ordinance No. finding this Agreement consistent with the City of Newport Beach General Plan and approving this Agreement. AGREEMENT NOW, THEREFORE, City and Landowner agree as follows: 1. Definitions. The following terms when used in this Agreement shall have the meanings set forth below: 1.1 "AHIP" shall mean the Affordable Housing Implementation Plan that is attached hereto as Exhibit D, which has been approved and executed by Landowner and is being • considered for approval by the City Council of City concurrently with its consideration of this Agreement. 1.2 "Bonita Canvon Development Agreement" shall have the meaning ascribed in Recital F of this Agreement. 1.3 "CEOA "shall mean the California Environmental Quality Act (California Public Resources Code sections 21000 - 21177). 1.4 "CIOSA" shall have the meaning ascribed in Recital B of this Agreement. 1.5 "City Council" shall mean the governing body of City. 1.6 "Design Regulations" shall mean the North Newport Center Design Regulations, that are being approved by the City Council of City concurrently with its approval of this Agreement. 1.7 "Development Fees" shall have the meaning ascribed in Section 5.1 of this Agreement. 1.8 "Development Plan" shall mean the North Newport Center Planned Community Development Plan that is being approved by the City Council of City concurrently with its approval of this Agreement. • !! • 1.9 "Development Regulations" shall mean the following regulations that are in effect as of the Effective Date (notwithstanding that some of the regulations do not become operative until the Operative Date): the General Plan; the Development Plan; the Design Regulations; the AHIP; the Transfer of Development Rights; and, to the extent not expressly superseded by the Development Plan or this Agreement, all other land use and subdivision regulations governing the permitted uses, density and intensity of use, design, improvement and construction standards and specifications, procedures for obtaining required City permits and approvals for development, payment of Development Fees, and similar matters that may apply to development of the Project on the Property during the Term of this Agreement that are set forth in Title 15 of the Municipal Code (buildings and construction), Title 19 of the Municipal Code (subdivisions), and Title 20 of the Municipal Code (planning and zoning), but specifically excluding all other sections of the Municipal Code including Title 5 of the Municipal Code (business licenses and regulations). 1.10 "Effective Date" shall mean the thirty -first (31s`) day following the date the City Council adopts the ordinance approving this Agreement or such other date that the ordinance becomes effective by applicable law. 1.11 "Fair Share Traffic Contribution Ordinance" shall mean City's Fair Share Traffic Contribution Ordinance, codified in Chapter 15.38 of City's Municipal Code, together with resolutions implementing said ordinance. • 1.12 "Fair Share Traffic Fees" shall have the meaning ascribed in Section 4.3 of this Agreement. 1.13 "First Building Permit" ermit" shall mean the building permit that is first issued for either (i) the Parking Structure; or (ii) residential, office, or hotel development on any portion of the Property located in Newport Center Block 500, Newport Center Block 600, or San Joaquin Plaza, provided the building permit is for new development that did not exist as of the Operative Date of this Agreement on the property for which the permit is being issued and not for the renovation, repair, or improvement of an existing building that does not increase the building's square footage. 1.14 "First Residential Building Permit" emit" shall mean the first building permit issued for residential development in any portion of the Property located in Newport Center Block 500, Newport Center Block 600, or San Joaquin Plaza, provided the building permit is for new development and not for the renovation, repair, or improvement of an existing residential unit that does not increase the unit's square footage. 1.15 "General Plan" shall mean City's 2006 General Plan adopted by the City Council on July 25, 2006, by Resolution No. 2006 -76. The Land Use Plan of the Land Use Element of the General Plan was approved by City voters in a general election on November 7, 2006. 1.16 "Initial Fee Increase" shall have the meaning ascribed in Section 4.3 of this • Agreement. -5- 1.17 "Initial Park Fee" shall mean the portion of the Park Fees that is to be paid by • Landowner to City upon the issuance of the First Residential Building Permit for any portion of the Property located in Newport Center Block 500, Newport Center Block 600, or San Joaquin Plaza, as more fully explained in Section 4.1 of this Agreement. 1.18 `Initial Public Benefit Fee" shall mean the portion of the Public Benefit Fee that is to be paid by Landowner to City upon the issuance of the First Building Permit for any portion of the Property located in Newport Center Block 500, Newport Center Block 600, or San Joaquin Plaza, as more fully explained in Section 4.2 of this Agreement. 1.19 "Initiative Condition" shall have the meaning ascribed in Section 4.8 of this Agreement. 1.20 "Mortgage" shall mean a mortgage, deed of trust, sale and leaseback arrangement, or any other form of conveyance in which the Property, or a part or interest in the Property, is pledged as security and contracted for in good faith and for fair value. 1.21 "Mortgagee" shall mean the holder of a beneficial interest under a Mortgage or any successor or assignee of the Mortgagee. 1.22 "Operative Date" shall mean the date upon which all of the conditions precedent to the commencement of the Term are satisfied, as set forth in Section 11 of this Agreement. 1.23 "Option Agreement" shall mean that certain Option Agreement in the form • substantially the same as that attached hereto as Exhibit F to be entered into by City and Landowner for Landowner to grant to City an option to acquire the Option Site, as more fully explained in Section 4.8.1. 1.24 "Option Period" shall mean the period of time during which City may exercise the option to acquire the Option Site, as more fully explained in Section 4.8.1 of this Agreement. 1.25 "Option Site" shall mean that certain real property that will be the subject of the Option Agreement and that is defined in Section 4.8.1. 1.26 "Park Fees" shall collectively refer to the Initial Park Fee and the Per Unit Park Fees, payable in accordance with Section 4.1. 1.27 "Parking Structure' shall mean the multilevel parking structure to be developed on the Parking Structure Site in the event City exercises its option to acquire the Option Site. 1.28 "Parking Structure Provisions" shall mean the right and obligations of the Parties with respect to the construction and operation of the Parking Structure, as more fully explained in Section 4.8.2 of this Agreement. 11 C.'E • 1.29 "Parking Structure Site" shall mean that certain real property located adjacent to the Option Site and depicted on Exhibit E attached hereto, as further described in Section 4.8. 1.30 "Party" or "Parties" shall mean either City or Landowner or both, as determined by the context. 1.31 "Per Unit Park Fees" shall mean the portion of the Park Fees that are to be paid by Landowner to City upon the issuance of residential building permits for development of any portion of the Property located within Newport Center Block 500, Newport Center Block 600, or San Joaquin Plaza, as more fully explained in Section 4.1 of this Agreement. 1.32 "Proiect" shall mean all on -site and off -site improvements (including new development and replacement development for existing buildings that may be demolished) that Landowner is authorized and/or required to construct with respect to each parcel of the Property, as provided in this Agreement and the Development Regulations. 1.33 "Property" is described in Exhibit A and depicted on Exhibit B 1.34 "Public Benefit Fee" shall have the meaning ascribed in Section 4.2 of this Agreement. • 1.35 "Term" shall have the meaning ascribed in Section 11 of this Agreement. 1.36 "Traffic Phasing Ordinance" shall mean City's Traffic Phasing Ordinance, codified in Chapter 15.40 of City's Municipal Code and including Appendix A to Chapter 15.40, together with any resolutions implementing said ordinance. 1.37 "Transfer of Development Rights" shall mean the resolution approving the transfer to Newport Center Block 500 of development rights for development of approximately 277,161 square feet currently assigned to Newport Center Block 600 (of which up to 72,000 square feet may be utilized by City for the City Hall building to be situated on the Option Site if City exercises the Option), that the City Council is considering for approval concurrently with its approval of this Agreement. 2. General Plan Consistency, Zoning Implementation, and Extinguishment of Any of Landowner's Remaining Development Rights Under the CIOSA and Bonita Canyon Development Agreement. This Agreement and the Development Regulations applicable to the Property will cause City's zoning and other land use regulations for the Property to be consistent with the General Plan. Although development already completed under the CIOSA and the Bonita Canyon Development Agreement remains vested as a conforming use, the CIOSA and the Bonita Canyon Development Agreement provided for vested development rights that Landowner has not yet used and that are inconsistent with the General Plan. The Cancellation of those agreements on the Operative Date will eliminate this inconsistency. • 3. Affordable Housing Obligation. The Parties agree that Landowner's compliance with the AHIP constitutes satisfaction of any obligation of Landowner to City under the City of Newport -7- Beach General Plan Housing Program 2.2.1 with respect to the development of the Property • pursuant to and during the Term of this Agreement. This Agreement does not authorize Landowner to transfer any affordable housing credits to any property that is outside the Property. 4. Public Benefits. 4.1 In -Lieu Park Fees for Renovation of Oasis Senior Center and for Park Uses. Landowner agrees to process subdivision maps for any residential development to be developed in Newport Center Block 500, Newport Center Block 600, and San Joaquin Plaza. Landowner also agrees to pay to City the Initial Park Fee and the Per Unif Park Fees as set forth in this Section 4.1 (collectively, the "Park Fees "), regardless of whether a subdivision map is approved for any or all of the residential units. Prior to and as a condition to City's issuance of the First Residential Building Permit, but in no event earlier than the Operative Date, Landowner shall pay to City the sum of $3,733,333.33 (which is 1/3 of the total Park Fees to be paid to City under this Agreement) ( "Initial Park Fee"). In addition to the foregoing, and notwithstanding any other provision set forth in this Section, if, on the date that City awards a contract for renovation of the Oasis Senior Center, the total sum of both the Initial Park Fee and the Per Unit Park Fees paid by Landowner to City to the date of award is less than the sum of $5,600,000 (the amount of the matching challenge grant referred to below), then within five (5) days after City's award of the contract, Landowner shall pay to City the difference ( "Park Fee Advancement'). Landowner's payment of the Initial Park Fee and Park Fee Advancment • shall entitle Landowner to a credit against payment of the Per Unit Park Fees for the fast 215 residential units to be developed on the Property. Prior to and as a condition to City's issuance of the 216"' building permit and thereafter each subsequent building permit for residential development on any portion of the Property located in Newport Center Block 500, Newport Center Block 600, or San Joaquin Plaza, Landowner shall pay to City the sum of $26,046.51 per unit ( "Per Unit Park Fees "), subject to adjustment of said Per Unit Park Fee in accordance with Section 5.2. In the event City has received sufficient Park Fees from Landowner prior to the award of the contract for the renovation of the Oasis Senior Center, City shall earmark up to $5,600,000 (which is one -half of the total Park Fees to be paid to City, without taking into consideration future adjustments to the Park Fee provided for in Section 5.2) as a matching challenge grant to apply toward contributions to the renovation of the Oasis Senior Center. City shall apply any Park Fees not spent by City on the renovation of the Oasis Senior Center to any park use as determined by City. Landowner acknowledges that the actual amount of funds raised through the matching challenge may be less than $5,600,000 and that the amount rose shall not affect the amount of Park Fees payable by Landowner to City. 4.2 Public Benefit Fee. Landowner shall pay to City the sum of $27,090,000 as set • forth in this Section 4.2 ( "Public Benefit Fee "). Prior to and as a condition to the issuance of the First Building Permit, Landowner shall pay to City the sum of 0 • $13,545,000, which is one -half of the Public Benefit Fee ( "Initial Public Benefit Fee "). The balance of the Public Benefit Fee shall be paid to City upon the issuance of building permits for the 430 residential units authorized for development within the Property. The amount payable by Landowner to City for each such residential unit shall be the sum of $31,500. City shall use the Public Benefit Fee for any of the following expenses: the design, engineering and construction of a new City Hall building anywhere within City, the costs to acquire the Option Site if City exercises the option under the Option Agreement, City's pro rata share of the costs to design and construct the Parking Structure if City builds a City Hall on the Option Site, and any other municipal purpose as determined by City. 4.3 Fair Share Traffic Fees. Landowner acknowledges that the Property is subject to City's Fair Share Traffic Contribution Ordinance, which requires the payment of certain fair share traffic fees for development ( "Fair Share Traffic Fees "). Landowner further acknowledges that City is in the process of considering updates and amendments to its Traffic Contribution Ordinance and its Fair Share Traffic Fees and that as a result of such updates and amendments the Fair Share Traffic Fee charged by City may be increased (the `Initial Fee Increase ") and Landowner agrees that the Property shall be subject to the modified Fair Share Traffic Contribution Ordinance including the increased fees payable pursuant to the Initial Fee Increase, provided that (i) these fees are generally applicable to all substantially similar new development within City on the same basis that they are • applicable to the Property, or (ii) if City elects to impose Fair Share Traffic Fees on a zone by zone basis, these fees are generally applicable to all substantially similar new development within the zone within which the Property is located on the same basis that they are applicable to the Property. Landowner's responsibility to pay any increases made to the Fair Share Traffic Fees after the Initial Fee Increase shall, however, be limited by percentage increases in the California Department of Transportation Construction Index from and after the date that the Initial Fee Increase becomes effective to the date the applicable adjustment is made, as more fully explained in Section 5.2. Nothing herein is intended to preclude Landowner from satisfying its obligation to pay Fair Share Traffic Fees through in -lieu contributions, subject to and in accordance with the Fair Share Traffic Contribution Ordinance and any modifications thereto, which Landowner acknowledges requires the approval of City's Planning Commission. The improvements and dedication to be made under this Agreement shall not be eligible for consideration as an in lieu contribution under the Traffic Contribution Ordinance. City acknowledges that the Fair Share Traffic Fees cover all fair share traffic fees associated with development of the Property, and that during the Term of this Agreement, City shall not require additional fair share traffic fees associated with development of the Property other than the Fair Share Traffic Fees described in this Agreement. 4.4 Circulation Enhancements to Public Right of Way. Landowner shall coordinate with the City on the design and development of the following circulation improvements, which shall be subject to approval by City, including appropriate environmental review. • Landowner and City shall exercise diligent efforts to agree upon the exact timing during the sixty (60) month period following the issuance of the First Building Permit (but M specifically excluding the building permit for the Parking Structure), that Landowner will 40 construct the individual Circulation Enhancements. (1) widening of Avocado Avenue between San Miguel Drive and San Nicolas Drive; (2) enhancement of San Miguel Drive between MacArthur Boulevard and Avocado Avenue; (3) installation of traffic signal at the intersection of Newport Center Drive and San Nicolas Drive; (4) installation of traffic signal at the intersection of Newport Center Drive and Center Drive; and(5) other improvements mutually agreed upon by City's Director of Public Works and Landowner. Landowner's commitment to undertake the circulation enhancements to the public right of way described in this Section are in addition to Landowner's obligation to pay Fair Share Traffic Fees under the Fair Share Traffic Contribution Ordinance, and to any actions Landowner takes to improve access to private property in Newport Center. Landowner's commitment to undertake the circulation enhancements to the public right of way described in this Section are in addition to Landowner's obligation to pay Fair Share Traffic Fees under the Fair Share Traffic Contribution Ordinance and to any • actions Landowner takes to improve access to private property in Newport Center. 4.5 Dedication of Public Right of Way North of San Miguel Drive Between MacArthur Boulevard and Avocado Avenue. Landowner shall dedicate to City a public right of way necessary for circulation improvements on the north side of San Miguel Drive between MacArthur Boulevard and Avocado Avenue at such time as City provides a specific design for the necessary circulation improvements for this public right of way. Landowner shall convey the public right of way to City (through the recordation of a grant deed) free and clear of all recorded and unrecorded monetary liens, any delinquent property taxes or assessments, and all tenancies, lessees, occupants, licensees, and all possessory rights of any kind or nature. In addition, upon the conveyance, there shall not be any violation of any law, rule, or regulation affecting the public right of way or its use, including any environmental law or regulation, and Landowner shall be responsible for causing said condition to be satisfied. Landowner shall have the right, to the extent necessary and subject to obtaining an encroachment agreement from City, to install, maintain, repair, and replace a Newport Center entry sign at a location mutually acceptable to City and Landowner. Landowner's dedication of the public right of way described in this Section is in addition to Landowner's obligation to pay Fair Share Traffic Fees under the Fair Share Traffic Contribution Ordinance, to mitigate traffic impacts under the Traffic Phasing Ordinance (City of Newport Beach Municipal Code chapter 15.40, including Appendix A • to chapter 15.40), and to any actions Landowner takes to improve access to private property in Newport Center. -10- • 4.6 Conditional Open Space Dedication. If City determines it will construct a City Hall at the current Orange County Transportation Authority site in Newport Center Block 500 or on the property located on the east side of Avocado Avenue, north of the Central Library, Landowner shall within thirty (30) days after City notifies Landowner that City has made that determination, dedicate to City (through the recordation of a grant deed) the open space parcel in Newport Center comprised of approximately 3.18 acres of land area, bounded on the north by the Orange County Transportation Authority site, the east by MacArthur Boulevard, the south by San Miguel Drive, and the west by Avocado Avenue ( "Open Space Parcel "). Landowner shall convey the Open Space Parcel to City free and clear of all recorded and unrecorded monetary liens, any delinquent property taxes or assessments, and all tenancies, lessees, occupants, licensees, and all possessory rights of any kind or nature. In addition, upon the conveyance, there shall not be any violation of any law, rule, or regulation affecting the Open Space Parcel or its use, including any environmental law or regulation, and Landowner shall be responsible for causing said condition to be satisfied. Landowner shall, at its sole cost and expense, cause a title company selected by City to issue to City an owner's policy of title insurance for the Open Space Parcel with liability in an amount reasonably determined by City (but not exceeding the fair market value of the Open Space Parcel) showing fee title to the Open Space Parcel vested in City, free and clear of the liens, rights, and encumbrances referred to above. If the Open Space Parcel is dedicated to City, Landowner shall have the right, to the extent necessary and subject to obtaining an encroachment agreement from City, to install, maintain, repair, and replace a Newport Center entry sign at a location mutually acceptable to City and Landowner. • 4.7 Maintenance of CIOSA Pre -Paid Transportation Fund. The Cancellation referred to in Section 6.14 terminates the Parties' remaining rights and obligations under the CIOSA, including any obligation of City to repay Landowner for funds that Landowner provided pursuant to the CIOSA. In connection therewith, Landowner agrees that City may retain any balance of pre -paid transportation funds City may be holding as a result of unused CIOSA mitigation. In the event any payments on the loan are due between the Effective Date and the Operative Date, such payments shall be suspended and shall not be required to be made unless the Operative Date does not occur and this Agreement terminates pursuant to Section 11. City may use any such remaining balance of prepaid transportation funds for transportation improvements in accordance with the Protocol Agreement for the Circulation Improvement and Open Space Agreement dated December 11, 1995, and the Protocol Agreement Memorandum dated December 11, 2001. 4.8 City's Option to Purchase New City Hall Site; Parking Structure. 4.8.1 Option to Purchase Option Site. No later than ten (10) days after the Effective Date, Landowner and City shall enter into the Option Agreement, which provides for Landowner to grant to City an option to acquire the Option Site for the sum of One Hundred Forty -Five Dollars ($145.00) per square foot of net land area for the purpose of constructing a new City Hall building thereon. The Option Site is not yet subdivided. For purposes of this Agreement, until such time as the exact boundaries of • the Option Site are established, the term "Option Site" shall be deemed to mean that certain real property consisting of approximately 46,175 square feet legally described in Exhibit E ( "Legal Parcel "), plus any contiguous property adjacent to the Legal Parcel. City shall have the right to establish the boundaries of the Option Site within the land • area described in the preceding sentence provided that the Option Site shall not exceed 54,000 square feet of net land area as further explained in the Option Agreement. Once the boundaries of the Option Site are established by City, the term "Option Site" shall be deemed to refer to the land located with the boundaries of the established Option Site. The term of the option to be granted by Landowner to City under the Option Agreement (the "Option Period ") will commence on the date of the Option Agreement and will expire on the earliest of the following dates: (i) the date that is four (4) years after the Operative Date; (ii) upon City's termination of the Option Agreement by delivery of written notice of termination to Landowner, which notice City shall have the right to deliver at any time during the Option Period prior to City's exercise of the Option; or the date City's electorate approves and City implements an initiative restricting the location of a new City Hall building to a site outside of Newport Center Block 500, with such initiative to be deemed implemented upon the issuance of a certificate of occupancy for a City Hall building at that site; or (iv) if this Agreement does not become operative in accordance with the terms set forth in Section 11 and this Agreement is terminated in accordance with the second to last paragraph of Section 11, then on the date of termination. As more fully explained in the Option Agreement, City's right to exercise the option is subject to the Operative Date occurring and to City awarding a contract for the construction of a new City Hall on the Option Site. If City exercises the option during the Option Period and acquires the Option Site, this Agreement shall terminate as to the Option Site and shall be removed as an encumbrance upon title to the Option Site upon City's acquisition thereof. City agrees that the required parking ratio for a City Hall building developed on the Option Site shall be a minimum of 4.17 spaces per 1,000 square feet of building improvements. 4.8.2 Parking Structure Provisions. If a new City Hall building is developed on the Option Site, the parking for the City Hall shall be located on the Parking Structure Site and Landowner and City shall perform and implement the provisions set forth in this Section 4.8.2 (collectively, the "Parking Structure Provisions "): (i) Landowner shall construct and operate a new multilevel parking structure on the Parking Structure Site ( "Parking Structure "). (ii) Landowner shall grant to City an exclusive easement, in recordable form, for exclusive use of 300 to 375 parking spaces for City Hall parking, without charge (except as otherwise provided herein), with the exact number of City parking spaces to be determined by City in its sole discretion, and provided that a minimum of 4.17 parking spaces per 1,000 square feet of building improvements on the Option Site shall be provided. Landowner shall designate the location of the required spaces within an area located within the first three floors of the Parking Structure at locations within the Parking Structure nearest to City Hall. The City's parking spaces shall be segregated from the rest of the parking though specific markings, signs, and/or barriers. City shall have the right to establish rules and regulations governing the use of its designated spaces. (iii) Landowner shall grant to City appropriate easements in the Parking Structure • and on the Parking Structure Site to enable City to access its parking spaces. -12- • (iv) City shall have the right to review and approve the plans and specifications for the Parking Structure (in its capacity as a regulatory agency and as a property owner) and the Parking Structure shall be constructed in accordance with the approved plans. So long as the Option Period has not otherwise expired, City shall have the right to approve the plans for the Parking Structure regardless of whether Landowner commences the design or construction of the Parking Structure before the option is exercised. (v) No later than ninety (90) days after City occupies the City Hall building on the Option Site, City shall pay a pro rata share of the costs to design and construct the Parking Structure, including costs of required utility relocation and costs for offsite improvements necessary to provide access to the Parking Structure, but not including any charge for the value of the land comprising the Parking Structure Site or any other charge or payment. City's pro rata share shall be based on the ratio that the number of City designated parking spaces bears to the total number of parking spaces in the Parking Structure. City shall have the right to review and approve the costs incurred by Landowner for which the Landowner seeks reimbursement for City's pro rata share. It is understood and agreed that City shall have no obligation to pay for any of the costs to construct, maintain, operate or repair the Parking Structure if City does not acquire the Option Site. (vi) For cost reference purposes, the design of the Parking Structure shall be substantially similar to the parking structure constructed in 2007 on the north side of Fashion Island ( "Fashion Island 2007 Parking Structure "), including the level of • landscaping, elevators, quality of materials used, design features, etc. (vii) Regardless of Landowner's timing for any development in the vicinity of the Property, Landowner shall commence and complete construction of the Parking Structure such that it is operational by the time construction of a new City Hall building at the Option Site is completed and ready for occupancy, and the Parties shall cooperate in keeping one another informed of their plans and construction schedules as needed to enable Landowner to satisfy such obligation. (viii) Landowner shall maintain and operate the Parking Structure and City shall pay a pro rata share of the maintenance and operation costs based on the ratio that the number of City designated parking spaces bears to the total number of parking spaces in the Parking Structure. (ix) Landowner shall establish a capital replacement reserve account for the improvement and repair of the Parking Structure. The amount of the capital replacement reserve shall be mutually determined by the Parties and shall be consistent with the capital replacement reserve maintained for the Fashion Island 2007 Parking Structure. The funds in the capital replacement reserve shall be placed in a separate account of Landowner and shall not be commingled with any other funds. City's contribution to the capital replacement reserve shall be based on the ratio that the number of City designated parking spaces bears to the total number of parking spaces in the Parking Structure. • Landowner shall fund or cause to be funded the balance of the capital replacement reserve. -13- (x) The obligations of Landowner and City with respect to the operation, • maintenance, repair, and replacement of the Parking Structure shall be evidenced by a recordable document that runs with the land and benefits and burdens all of the property owned by Landowner in Block 500 and the Option Site. (xi) Landowner shall, at its sole cost and expense, satisfy any parking obligations it may have to other property owners or parties that may be affected by the development of the Parking Structure on the Parking Structure Site, without creating a burden on City or City's rights to exclusive use of the City designated parking spaces within the Parking Structure and without any cost to City. (xii) The foregoing rights and obligations shall terminate upon the expiration or termination of City's option under the Option Agreement if City does not exercise the option. Although the rights and obligations of the Parties under the Parking Structure Provisions are intended to be final and binding, from and after the Effective Date, the Parties shall exercise diligent efforts to enter into agreements to implement, and set forth in greater detail, these Parking Structure Provisions. The foregoing agreements shall terminate in the event City does not exercise the option during the Option Period or the Option Agreement otherwise terminates prior to City's exercise of the option. 4.9 Retrofit Sprinkler Systems. No later than June 2008, Landowner shall retrofit the existing sprinkler systems in the Newport Center Drive parkways and medians to low flow technology with the following specifications: Control System (1) The control system shall monitor and adjust itself not less than daily, using either evapotranspiration rates for the Corona del Mar microclimate or soil moisture levels monitored at enough locations in the irrigation area as to cover each soil and slope type in Newport Center; (2) The control system shall self- monitor for broken lines or sprinkler heads so that the system shuts down in the event of a break; (3) The control system shall adjust to wind and rain conditions to limit or eliminate watering during windy times or rain events; and (4) The control system shall separate irrigation valves for hydrozones Sprinkler Heads: (1) The sprinkler heads shall eliminate overspray onto roads, sidewalks, and other hardscape either by using highly targeted heads that only water the plant material or by using a sprinkler -like wicking system; and (2) Suggested sprinkler heads; rotor heads drip /micro irrigation on all medians. • -14- Supervision: (1) The performance of the sprinkler systems shall be monitored daily; and (2) The soil shall be tested monthly to determine if it is adequate vs. saturated The specifications listed above will enhance water quality by reducing surface runoff into storm drains in Newport Center. 4.10 Cooperation of Landowner if City Hall Constructed on Property North of Library. If City elects to construct a new City Hall on the property located on the east side of Avocado Avenue, north of the Central Library, Landowner shall cooperate in good faith with City to implement any necessary land use regulations, including zoning amendments, and to release and terminate the use restrictions contained in the deed for the property to allow for and accommodate construction of a new City Hall on that site. 5. Fees. 5.1 Fees Applicable to Property. During the Term of this Agreement, the affordable housing fee assessable against the Property shall be as set forth in the AHIP and the Development Fees assessable against the Property shall be Park Fees, the Public Benefit Fee, and the Fair Share Traffic Fees, and City shall not levy or require any additional affordable housing fees or Development Fees for the development of the Property. City shall retain the right to assess such Development Fees as it may adopt, and whatever applicable rate City may adopt, to any development of the Property beyond the development of the Property authorized in the Development Plan and contemplated by this Agreement. As used herein, the term "Development Fees" shall mean the monetary exactions charged by City in connection with a development project for the purpose of defraying all or a portion of the cost of public facilities related to development of the project. The Parties acknowledge that the following fees, taxes, and charges do not constitute Development Fees and that nothing in this Agreement is intended or shall be construed to release Landowner from the obligation to pay such fees, taxes, and charges, including increases, if and when they become due: (1) City's normal fees for processing, environmental assessment and review, tentative tract and parcel map review, plan checking, site review and approval, administrative review, building permit, grading permit, inspection, and similar fees imposed to recover City's costs associated with processing, reviewing, and inspecting project applications, plans, and specifications; and (2) fees and charges levied by any other public agency, utility, district, or joint powers authority, regardless of whether City collects those fees and charges; and (3) community facility district special taxes or special district assessments or similar assessments, business license fees, bonds or other security required for public improvements, transient occupancy taxes, sales taxes, property taxes, • sewer lateral connection fees, water service connection fees, new water meter fees, and the Property Development Tax payable under Section 3.12 of City's Municipal Code. -15- This Agreement does not authorize Landowner to transfer any fees paid or fee credits to O any other property outside the Property that is the subject of this Agreement. Once the Term of this Agreement has ended, Landowner shall not receive any credit for future planned development of the Property based on the fees paid pursuant to this Agreement. 5.2 Permitted Increases in Development Fees Applicable to Property. During the Term of this Agreement, City shall not increase the amount of the Public Benefit Fee, nor shall City increase the amount of the Park Fees or the Fair Share Traffic Fees (the three Development Fees applicable to the Property after the Operative Date) except as set forth in Sections 4.1 and 4.3 and this Section. If Landowner sells any residential unit to a third party purchaser in other than a bulk sale of all of the units in a single residential building, then Landowner shall pay to the City at the time of such sale of an individual residential unit the then applicable Park Fee for construction of such unit, as may be in effect at that time within the City of Newport Beach, less a credit for the amount of any per unit Park Fee previously paid to City pursuant to Section 4.1 of this Agreement for such unit. Landowner's obligation to pay such fee upon individual sale under this Agreement shall be described in a memorandum and recorded against the title of each unit at the time that a subdivision map creating the condominium unit is recorded by Landowner, in a form acceptable to the City. Pursuant to Section 4.3, the Property shall be subject to increases in the Fair Share • Traffic Fee made pursuant to the Initial Fee Increase. As to any subsequent increases in Fair Share Traffic Fees, the Property shall be subject to the increases; provided, however, that in no event shall Landowner's Fair Share Traffic Fee be increased by an amount that exceeds the percentage increase in the California Department of Transportation Construction Index from the date the Initial Fee Increase becomes effective to the date the adjustment is made. If at any time the Engineering the California Department of Transportation Construction Index is discontinued or no longer available, City shall substitute an official index that is most nearly equivalent thereto. This Agreement does not vest Landowner against increases in any other fees other than Development Fees that are payable by Landowner, including without limitation the Property Development Tax referred to in subparagraph (3) of Section 5.1. 6. Development of Property. 6.1 Applicable Regulations. Other than as expressly set forth in this Agreement, during the Term of this Agreement, the terms and conditions of development applicable to the Property, including but not limited to the permitted uses, the density and intensity of use, and the maximum height, size, and location of proposed buildings, shall be those set forth in the Development Regulations and this Agreement. The permitted uses, density and intensity of development, and the maximum height, location, and size of proposed buildings permitted under the Development Regulations conform with the development studied and contemplated by the Final Environmental Impact Report for the • City of Newport Beach General Plan 2006 Update (State Clearinghouse No. 200601 1 1 19) and the North Newport Center Addendum to EIR for General Plan 2006 -16- • Update (State Clearinghouse No. 2006011119). During the Term of this Agreement, the Development Fees applicable to the Property, and increases in said fees, shall be as set forth in Sections 4.1, 4.2, 4.3, and 5.2. The affordable housing requirements applicable to the Property shall be as set forth in the AHIP. During the Term of this Agreement, City shall not prevent development of the Property that is in compliance with the Development Regulations, or require the Landowner to modify or redesign any building which complies with the Development Regulations, regardless of whether City exercises the option to acquire the Option Site. Landowner may apply to City for permits or approvals necessary to modify or amend the development specified in the Development Regulations, provided that the request does not propose an increase in the maximum density, intensity, height, or size of proposed structures, or a change in use that generates more peak hour traffic or more daily traffic and, in addition, Landowner may apply to City for approval of minor amendments to existing tentative tract maps, tentative parcel maps, or associated conditions of approval, consistent with City of Newport Beach Municipal Code section 19.12.090. This Agreement does not constitute a promise or commitment by City to approve any such permit or approval, or to approve the same with or without any particular requirements or conditions, and City's discretion with respect to such matters shall be the same as it would be in the absence of this Agreement. City acknowledges that the Development Regulations provide a process for the • transfer of development rights among parcels within the Property, consistent with City's General Plan Policy LU 6.14.3, and that if Landowner eliminates any of the existing uses on the Property which are set forth in Exhibit G and the associated development rights, Landowner shall retain the right to rebuild the use and development rights elsewhere on the Property or transfer the development rights among parcels within the Property, subject to and consistent with the Development Regulations and said policy. Notwithstanding any other provision in this Agreement to the contrary, if at any time during the Term of this Agreement, Landowner transfers a development right from a building or buildings anywhere within the Property to any other building within the Property, the building(s) from which the development right is transferred must be demolished and cleared or transformed into an authorized non - habitable use that does not count as development intensity under the General Plan before Landowner can obtain a certificate of occupancy for the new building(s). Nothing set forth herein is intended to prohibit or restrict the transfer of development rights elsewhere in Newport Center, consistent with and subject to City's normal rules and regulations. 6.2 Landowner's Vested Rights. During the Term of this Agreement, except to the extent City reserves its discretion as expressly set forth in this Agreement or in the applicable Development Regulations, Landowner shall have the vested right to exercise its discretion within the limits and constraints of the Development Regulations in designing any buildings, structures, streets, sidewalks, buildings, and development within the Property. City shall not exercise or require any design review approval for • Landowner's use of the Property unless expressly set forth in the Development Regulations. Landowner acknowledges that the Development Regulations provide for a design review process for the Property pursuant to which City has certain discretionary -17- authority. In connection therewith, Landowner acknowledges that nothing in this 40 Agreement is intended to override any review and approval requirements contained in the Development Regulations or to preclude City from the exercise of any discretionary authority it has under the Development Regulations. In addition to the foregoing, Landowner acknowledges and agrees that nothing herein is intended to vest Landowner with any environmental approvals that may be required in connection with the future development of the Property and Landowner must submit and process and obtain the approval of all documentation and information required to comply with the California Environmental Quality Act (California Public Resources Code § 21000 et seq.) with regard to any development of the Property. The Parties acknowledge that the environmental approvals for the improvements described in Section 6.3 are being processed concurrently with this Agreement. 6.3 Project Components. During the Term of this Agreement, subject to any approvals required under the Development Regulations, Landowner shall have a vested right to develop the following improvements on the Property: (1) 75,000 square feet in Fashion Island. This square footage will be available for uses, including hotel and retail, that are consistent with the Development Regulations. (2) 430 residential units in Newport Center Block 500, Newport Center Block 600, or San Joaquin Plaza; provided, however, that to the extent Landowner • desires to develop any of said residential units in Newport Center Block 500 or San Joaquin Plaza, it shall be required to comply with the Traffic Phasing Ordinance. (3) The transfer to Newport Center Block 500 of development rights for development of approximately 277,161 square feet currently assigned to Newport Center Block 600 and designated for office, hotel, and supporting retail uses, of which up to 72,000 square feet may be utilized by City for the City Hall building to be situated on the Option Site if City exercises the Option. Upon transfer to Newport Center Block 500, the development rights will be designated only for uses permitted under the Development Regulations and, to the extent City exercises the option to acquire the Option Site, for a City Hall on the Option Site. The foregoing development and/or transfer of development rights will occur in new or modified buildings that comply with the Development Regulations. Consistent with the City of Newport Beach General Plan Policy LU 6.14.3, the transfer of the foregoing development rights is consistent with the General Plan and will not result in any adverse traffic impacts. 6.4 Police Power. In all respects not provided for in this Agreement, City shall retain full rights to exercise its police power to regulate the development of the Property. Any uses or developments requiring a use permit, tentative tract map, or other discretionary 40 permit or approval in accordance with the Development Regulations shall require a permit or approval pursuant to this Agreement, and, notwithstanding any other provision M • set forth herein, this Agreement is not intended to vest Landowner's right to the issuance of such permit or approval nor to restrict City's exercise of discretion with respect thereto. Not by way of limitation of the foregoing, it is specifically understood that City reserves the right to amend, pursuant to procedures provided by law and this Agreement, City laws, rules, regulations, and policies applicable to the Property as to which Landowner's rights are not expressly vested and such amendment or amendments shall be binding on the Property except to the extent that the same conflict with the express provisions of this Agreement. 6.5 Time -Share Developments. If Landowner desires to establish time -share developments within the Property in the future, Landowner shall be required to comply with the City of Newport Beach Time -Share Developments Ordinance (City of Newport Beach Municipal Code chapter 20.84), including the requirement for a separate development agreement under the City of Newport Beach Municipal Code section 20.84.050. City retains its full discretion with respect to such matters, including without limitation, the imposition of an in -lieu of transient occupancy tax fee in accordance with section 20.84.050 of the Municipal Code, and nothing herein constitutes a promise or commitment by City to approve such use or enter into any such development agreement. 6.6 Available Use in Newport Center Block 500 for City Hall Building. If a new City Hall building is developed on the Option Site, the development intensity for the Property available to Landowner will not be reduced by more than 72,000 square feet, regardless of whether the size of the City Hall building exceeds 72,000 square feet. As of the date • of this Agreement, City intends that any new City Hall building constructed on the Option Site will contain approximately 72,000 square feet of building area; provided, however, that nothing in this Agreement shall be deemed to prohibit City from constructing a smaller City Hall building or from constructing a larger building so long as such building maintains the minimum parking ratio provided for in Section 4.8. If City acquires the Option Site, City shall be responsible for conducting a traffic analysis and providing traffic mitigation if required to comply with the Traffic Phasing Ordinance with respect to the construction of a City Hall building on the Option Site. City acknowledges and agreed that Landowner shall not be responsible for the payment of any fees for any development by City on the Option Site. 6.7 Available Use in Newvort Center Block 500 if Citv Does Not Develop a City Hall on the Option Site. If City does not exercise the option to acquire the Option Site during the Option Period, then the 72,000 square feet of development intensity available to Landowner that otherwise would have been utilized on the Option Site shall remain part of the development intensity designated for office use in Newport Center Block 500, to which Landowner has an exclusive vested right in accordance with this Agreement. In addition, if City acquires the Option Site and the City Hall building developed on the Option Site is less than 72,000 square feet, then the unused square footage remains part of the development intensity designated for office use in Newport Center Block 500 and to which Landowner has an exclusive vested right in accordance with this Agreement. If City does not exercise the option to acquire the Option Site during the Option Period, • then Landowner shall be responsible for conducting a traffic analysis and providing traffic mitigation with the Traffic Phasing Ordinance and paying applicable Fair Share -19- Traffic Fees with regard to the 72,000 square feet of development intensity referred to • herein. 6.8 Effect of Agreement on Applications for Land Use Approvals. In connection with any approval that City is required, permitted, or has the right to give relating to the Project, or otherwise under its ordinances, resolutions, and codes, including without limitation the approval of a tentative tract map under the Subdivision Map Act (California Government Code sections 66410- 66499.58), City shall not impose any condition or restriction that prevents Landowner from developing and subdividing the Property with the uses, density, intensity, maximum height, and size of proposed structures permitted by the Development Regulations. Subject to review for completeness, City shall accept for processing and shall timely review and act on all applications for further land use entitlement approvals with respect to the Project called for or required under this Agreement. Unless expressly required by the Subdivision Map Act, the Development Regulations, or overriding federal or state law, City in considering any proposed tentative tract map shall not require any decrease or increase in density, intensity, size, relocation, or setback of a proposed development or require any modification of the design of any buildings, condominiums, parcels, units, or other uses located in the proposed subdivision. 6.9 Mello -Roos Community Facilities District. Pursuant to the Mello -Roos Community Facilities Act of 1982 (California Government Code sections 53311- 53368.3), Landowner may petition the City Council to establish one or more community • facilities districts including some or all of the Property for the purpose of financing Landowner's obligations under this Agreement. City shall have the sole discretion to determine whether to establish a community facilities district, the improvements to be financed, and the method of financing these improvements. 6.10 No Conflicting Enactments. Except to the extent City reserves its discretion as expressly set forth in this Agreement, during the Term of this Agreement City shall not apply to the Project any ordinance, policy, rule, regulation, or other measure relating to development of the Project that is enacted or becomes effective after the Effective Date to the extent it conflicts with this Agreement. This Section shall not restrict City's ability to enact an ordinance, policy, rule, regulation, or other measure applicable to the Project pursuant to California Government Code section 65866 consistent with the procedures specified in Section 8. In Pardee Construction Co. v. City of Camarillo (1984) 37 Cal. 3d 465, the California Supreme Court held that a construction company was not exempt from a city's growth control ordinance even though City and construction company had entered into a consent judgment (tantamount to a contract under California law) establishing the company's vested rights to develop its property consistent with the zoning. The California Supreme Court reached this result because the consent judgment failed to address the timing of development. The Parties intend to avoid the result of the Pardee case by acknowledging and providing in this Agreement that Landowner shall have the vested right to develop the Property at the rate, timing, and sequencing that Landowner deems appropriate within the exercise of Landowner's sole subjective business judgment provided that such development occurs in accordance with this • Agreement and the Development Regulations, notwithstanding adoption by City's electorate of an initiative to the contrary after the Effective Date. No City moratorium or -20- • other similar limitation relating to the rate, timing, or sequencing of the development or construction of all or any part of the Project and whether enacted by initiative or another method, affecting subdivision maps, building permits, occupancy certificates, or other entitlement to use, shall apply to the Project to the extent such moratorium or other similar limitation restricts Landowner's vested rights in this Agreement or otherwise conflicts with the express provisions of this Agreement. 6.11 Benefits to Landowner. Landowner has expended and will continue to expend substantial amounts of time and money on the planning of the Project and construction of infrastructure for and in conjunction with the Project. Landowner represents and City acknowledges that Landowner would not make these expenditures without this Agreement, and that Landowner makes these expenditures in reliance upon this Agreement. A benefit to Landowner under this Agreement is the assurance that Landowner will preserve the right to develop the Property in accordance with the terms of this Agreement. City acknowledges that Landowner will be investing money and planning efforts in the Project in reliance on City's covenants and representations in this Agreement. City agrees that Landowner may reasonably and justifiably rely on City's covenants and representations in this Agreement and on the enforceability of this Agreement. 6.12 Tentative Subdivision Malls. City agrees that Landowner may file and process new and existing vesting tentative maps for the Property consistent with California Government Code sections 66498.1- 66498.9 and City of Newport Beach Municipal Code • chapter 19.20. Pursuant to the applicable provision of the California Subdivision Map Act (California Government Code section 66452.6(a)), any tentative subdivision map approved for the Property, whether designated a "vesting tentative map" or otherwise, shall be extended for the Term of this Agreement. 6.13 Compliance with California Government Code Section 65897.5(c) on Water Supply. Pursuant to California Government Code section 65897.5(c), the tentative map prepared for any subdivision of the Property shall comply with the provisions of California Government Code section 66473.7 relating to the availability of water supply, as enacted as of the Effective Date. 6.14 Cancellation of CIOSA and Bonita Canvon Development Agreement. Pursuant tc the ordinance adopted by the City Council approving this Agreement, the CIOSA and the Bonita Canyon Development Agreement shall automatically terminate on the Operative Date ( "Cancellation'). Within ten (10) days after the Operative Date, the Parties shall cooperate in executing and recording against the properties owned by Landowner that are encumbered by the CIOSA and the Bonita Canyon Development Agreement a written instrument memorializing the termination of said agreements in such form as to permit the agreements to be removed as encumbrances upon title. The Cancellation shall not affect the rights and obligations of any third parties under the CIOSA or the Bonita Canyon Development Agreement. • 6.15 No Payments Due from Citv. The Parties acknowledge that City is not required to make any reimbursement payments to Landowner and that no funding is otherwise due -21- from City to Landowner for improvements made by or at the direction of Landowner to • Back Bay View Park, located at Jamboree Road and Pacific Coast Highway. Compliance with Traffic Phasing Ordinance. 7.1 Scope of Traffic Study. The traffic study prepared in conjunction with this Agreement covers all development authorized by this Agreement (including new development and replacement development for existing buildings that may be demolished), with the exception of (i) construction of a City Hall building in Newport Center Block 500 if and to the extent that City is required to comply with the Traffic Phasing Ordinance if City exercises the option to acquire the Option Site and construct the City Hall building thereon, (ii) construction of any residential units in Newport Center Block 500 or San Joaquin Plaza, and (iii) the development by Landowner of 72,000 square feet of office space within Newport Center Block 500 (if City does not acquire the Option Site and the development rights to said site revert to Landowner, as provided herein). 7.2 Sufficiency of Traffic Study. City acknowledges that the traffic study for the Property prepared prior to the Effective Date satisfies the provisions of the Traffic Phasing Ordinance. Specifically, City acknowledges that the traffic study establishes that the project considered in the traffic study meets the requirements for a Comprehensive Phased Land Use Development and Circulation System Improvement Plan with all phases not anticipated to be complete within 60 months of project approval and subject to a development agreement that requires circulation improvements, as defined in City of • Newport Beach Municipal Code section 15.40.030(B)(2). With the exception of the need for traffic studies for the three items listed in Section 7. 1, City shall not require any additional traffic studies in conjunction with any application for approvals or permits necessary to construct development authorized by this Agreement as long as the application is consistent with the provisions of this Agreement and the relevant Development Regulations. 7.3 Circulation Improvements No later than the earlier of (i) the date City issues the certificate of occupancy for any new development under the First Building Permit (but specifically excluding the building permit for the Parking Structure), or (ii) that date that is sixty (60) months after the Operative Date, Landowner shall, in compliance with all City requirements, complete construction of a third eastbound left turn lane at the intersection of MacArthur Boulevard and San Joaquin Hills Road, to mitigate traffic impacts pursuant to the Traffic Phasing Ordinance. 8. Reservations of Authority. Notwithstanding any provisions set forth in this Agreement to the contrary, the laws, rules, regulations, and official policies set forth in this Section 8 shall apply to and govern the development of the Property. 8.1 Procedural Regulations. Procedural regulations relating to hearing bodies, petitions, applications, notices, findings, records, hearings, reports, recommendations, appeals, and any other matter of procedure, provided that they are adopted and applied • City -wide or to all other properties similarly situated in City. -22- • 8.2 Consistent Future City Regulations. City ordinances, resolutions, regulations, and official policies governing development and building which do not conflict with the Development Regulations, or with respect to such regulations that do conflict, where Landowner has consented in writing to the regulations. 8.3 Overriding Federal and State Laws and Regulations. Federal and state laws and regulations that override Landowner's vested rights set forth in this Agreement shall apply to the Property, together with any City ordinances, resolutions, regulations, and official policies that are necessary to enable City to comply with the overriding federal and state laws and regulations, provided that: (1) Landowner does not waive its right to challenge or contest the validity of any such federal, state, or local laws, regulations, or official policies; and (2) Upon the discovery of a federal or state law or regulation (or City ordinance, resolution, regulation, or official policy undertaken pursuant to those laws and regulations), that prevents or precludes compliance with any provision of this Agreement, City or Landowner shall provide the other Party with written notice of the state or federal law or regulation, provide a copy of the law or regulation, and a written statement of conflict(s) with the provisions of this Agreement. Promptly thereafter City and Landowner shall meet and confer in good faith in a reasonable attempt to determine whether a modification or suspension of this Agreement, in whole or in part, is necessary to comply with such federal or state • law or regulation. In such negotiations, City and Landowner agree to preserve the terms of this Agreement and the rights of Landowner as derived from this Agreement to the maximum feasible extent while resolving the conflict. City agrees to cooperate with Landowner at no cost to City in resolving the conflict in a manner which minimizes any financial impact of the conflict upon Landowner. City also agrees to process in a prompt manner Landowner's proposed changes to the Project and any of the Development Regulations as may be necessary to comply with such federal or state law; provided, however, that the approval of such changes by City shall be subject to the discretion of City, consistent with this Agreement. 8.4 Public Health and Safety. Any City ordinance, resolution, rule, regulation, program, or official policy, that is necessary to protect persons on the Property or in the immediate community from conditions dangerous to their health or safety shall apply to the Property, even though the application of the ordinance, resolution, rule regulation, program, or official policy would result in the impairment of Landowner's vested rights under this Agreement. 8.5 Uniform Building Standards. Existing and future building and building - related standards set forth in the uniform codes adopted and amended by City from time to time, including building, plumbing, mechanical, electrical, housing, swimming pool, and fire codes, and any modifications and amendments thereof. ' • 8.6 Public Works Improvements. To the extent Landowner constructs or installs public works or facilities, the City standards in effect for such public works or facilities at -23- the time of City's issuance of a permit, license, or other authorization for construction or • installation of same shall apply. 9. Utility Capacity_. With respect to utility services provided by an entity other than City, in the event of a reduction of interruption of said service by the utility provider, City shall require no greater reduction in utility service to any parcel of the Property than the general provider of the service requires. Nothing in this Agreement limits City's ability to impose reasonable conditions on any future development or building permits or approvals that require Landowner to install utility lines and appurtenances servicing the Property. City shall not take any action to obstruct development on the Property on the basis of utility capacity, provided that City is not guaranteeing water supply or the Orange County Sanitation District's ability to provide wastewater treatment services for new development planned for the Property. If, as a result of City Action and after Landowner has paid the Initial Park Fee and/or Initial Public Benefit Fee to City, sufficient sewer and water hookups, water supplies, and sewage treatment capacity ( "Sewer and Water Service ") is not available to allow building permits and/or certificates of occupancy to be issued for construction or occupancy of the residential units authorized for development under this Agreement, City shall refund to Landowner the per unit fee ($26,046.51 and/or $63,000) for each such residential unit. As used herein, the term "City Action" shall mean affirmative action taken by City to reduce the Sewer and Water Service currently available, and shall not include any action or event that is outside City's control, including without limitation, any action taken or regulation adopted by any other governmental agency or City ordinances, resolutions, regulations, and official policies that are • necessary to enable City to comply with any overriding federal or state laws and regulations. The refunds referred to in this Section shall be made at the time Landowner is otherwise entitled to issuance of the building permit or certificate of occupancy, whichever is applicable, and City is not able to issue the permit because of the City Action taken. 10. Proiect as Private Undertaking. The development of the Project is a private undertaking. Neither Party is acting as the agent of the other in any respect, and each Party is an independent contracting entity with respect to the terms, covenants, and conditions contained in this Agreement. This Agreement forms no partnership, joint venture, or other association of any kind. The only relationship between the Parties is that of a government entity regulating the development of private property by the owner of the property. 11. Effective Date and Operative Date of Agreement; Term. This Agreement shall become effective on the thirty -first (31s`) day following the City Council's adoption of its ordinance approving this Agreement or such other date that the ordinance becomes effective by applicable law ( "Effective Date "). Notwithstanding the forgoing, this Agreement shall not become operative and neither Party shall have any rights or obligations hereunder, with the exception of the obligations in Section 4.8 to execute the Option Agreement and to negotiate the agreements to implement the Parking Structure Provisions, until the "Operative Date," which for purposes of this Agreement shall mean the latest of the following dates: (i) the date the AHIP becomes operative after approval or adoption by the City Council; (ii) the date the Development Plan becomes operative • after approval or adoption by the City Council; (iii) the date the Design Regulations become operative after approval or adoption by the City Council; (iv) the date the Transfer of -24- • Development Rights Resolution becomes operative after approval or adoption by the City Council; or (v) the date the time period for appealing or challenging this Agreement, the AHIP, the Development Plan, the Design Regulations, the Transfer of Development Rights Resolution, and the environmental documents approved by City in connection with all of said agreements and land use approvals has expired with no challenge having been timely filed or, if any such challenge is timely filed, the date such action is concluded and the validity of the agreement or regulation that was the subject of the challenge is upheld. The Parties shall have the right to make this Agreement become operative while litigation is pending upon mutual agreement of the Parties in writing in the sole and absolute discretion of each of them, in which case the date agreed upon by the Parties shall be the Operative Date. The Parties shall cooperate by executing in recordable form an appropriate memorandum providing notice of the occurrence of the Operative Date as soon as the Operative Date has occurred. The Parties acknowledge that the resolutions and ordinances adopting the AHIP, the Development Plan, the Design Regulations, and the Transfer of Development Rights provide that the foregoing plans and regulations do not become operative until the Operative Date of this Agreement. If this Agreement, the AHIP, the Development Plan, the Design Regulations or the Transfer of Development Rights are challenged and the applicable agreement or regulation is not upheld at the conclusion of the action, and the Operative Date has not otherwise occurred by mutual agreement by the parties in accordance with clause (v) of the fast sentence of the second paragraph of this Section 11, either Party not then in default may, by delivery of written notice to • the other Party, terminate this Agreement, in which event neither Party shall have any further rights or obligations hereunder, the AHIP, the Development Plan, the Design Regulations, and the Transfer of Development Rights shall be null and void, and the Parties shall execute and record against the Property a written instrument memorializing the termination of this Agreement in such form as to permit this Agreement to be removed as an encumbrance upon title to the Property. • The term of this Agreement ( "Term") shall commence on the Operative Date and shall continue thereafter until the earlier of the following: (i) the date that is twenty (20) years after the Effective Date; or (ii) the date this Agreement is terminated pursuant to Sections 12 or 15.1. 12. Amendment or Cancellation of Agreement. Other than modifications of this Agreement under Section 8.3, this Agreement may be amended or canceled in whole or in part only by mutual written and executed consent of the Parties in compliance with California Government Code section 65868 and City of Newport Beach Municipal Code section 15.45.060 or by unilateral termination by City in the event of an uncured default of Owner. 13. Enforcement. Unless amended or canceled as provided in Section 12, or modified or suspended pursuant to California Government Code section 65869.5, this Agreement is enforceable by either Party despite any change in any applicable general or specific plan, zoning, subdivision, or building regulation or other applicable ordinance or regulation adopted by City (including by City's electorate) that purports to apply to any or all of the Property. -25- 14. Periodic Review of Compliance. The Parties shall review this Agreement at least once • every 12 months from the Operative Date consistent with California Government Code sections 65865 and 65865.1 and City of Newport Beach Municipal Code section 15.45.070. At the reviews, Landowner shall demonstrate its good faith compliance with this Agreement and shall document the current status of its entitlement use and its provision of the public benefits referred to in Section 4 of this Agreement. Landowner also agrees to furnish evidence of good faith compliance as City may require in the reasonable exercise of its discretion and after reasonable notice to Landowner. 15. Events of Default. 15.1 Default by Landowner. Pursuant to California Government Code section 65865. 1, if City determines following a noticed public hearing and on the basis of substantial evidence that Landowner has not complied in good faith with Landowner's obligations pursuant to this Agreement, City shall by written notice to Landowner specify the manner in which Landowner has failed to comply and state the steps Landowner must take to bring itself into compliance. If Landowner does not commence all steps reasonably necessary to bring itself into compliance as required and diligently pursue steps to completion within 30 days after receipt of the written notice from City specifying the manner in which Landowner has failed to comply, then Landowner shall be deemed to be in default under the terms of this Agreement. City may then: (1) seek a modification of this Agreement, or (2) seek any other available remedies as provided in Section 15.3. . 15.2 Default by City. If City has not complied with any of its obligations and limitations under this Agreement, Landowner shall by written notice to City specify the manner in which City has failed to comply and state the steps necessary for City to bring itself into compliance. If City does not commence all steps reasonably necessary to bring itself into compliance as required and diligently pursue steps to completion within 30 days after receipt of the written notice from Landowner specifying the manner in which City has failed to comply, then City shall be deemed to be in default under the terms of this Agreement. City may then: (1) seek a modification of this Agreement, (2) terminate this Agreement, or (3) seek a specific performance or similar equitable remedy as provided in Section 15.3. Except as provided below, if City adopts or enforces any moratorium, de facto or de jure, or other similar limitation (whether relating to the rate, timing, or sequencing of the development or construction of all or any part of the Project and whether enacted by initiative or otherwise) affecting the processing or approval of subdivision maps, building permits, occupancy certificates, or other entitlement to use which is applied to the Project, then Landowner may immediately seek a modification of this Agreement, terminate this Agreement, or seek any other available remedy as provided in Section 15.3. City shall not be in default pursuant to this Section if: (1) It adopts a temporary City -wide moratorium on development due to its inability to supply sufficient water, sewer or other utilities to then - current customers as necessary to maintain minimum levels of health, safety, and sanitation; . -26- • (2) It is required to enforce a moratorium because of a law, rule, regulation, or plan identified in Section 8.3; or (3) The enactment of the moratorium or other limitation is the result of a court order. 15.3 Specific Performance and Damages Remedies. Due to the size, nature, and scope of the Project and the potential impracticality or impossibility of restoring the Property to its natural condition once implementation of this Agreement has begun, the Parties acknowledge that, except as provided in this Section and in Section 15.4, money damages and remedies at law generally are inadequate and that specific performance is appropriate for the enforcement of this Agreement. The remedy of specific performance or, in the alternative, a writ of mandate, shall be the sole and exclusive remedy available to either Party in the event of the default or alleged default by the other, with the exception that City shall be entitled to damages against Landowner for Landowner's breach or its obligations under Sections 18 or 19 of this Agreement. The limitations on the remedy of damages in this Agreement shall not prevent City from enforcing Landowner's monetary obligations hereunder. 15.4 Limited Recovery of Legal Expenses by Prevailing Party in Any Action. In any judicial proceeding, arbitration, or mediation (collectively, "Action") between the Parties that seeks to enforce the provisions of this Agreement, the prevailing Party shall recover all of its actual and reasonable costs and expenses, regardless of whether they would be recoverable under • California Code of Civil Procedure section 1033.5 or Civil Code section 1717 in the absence of this Agreement. These costs and expenses include expert witness fees, attorneys' fees, and costs of investigation and preparation before initiation of the Action. The right to recover these costs and expenses shall accrue upon initiation of the Action, regardless of whether the Action is prosecuted to a final judgment or decision. 16. Cooperation. Each Party covenants to take reasonable actions and execute all documents that may be necessary to achieve the purposes and objectives of this Agreement. 17. Force Maieure. Neither Party shall be deemed to be in default where failure or delay in performance of any of its obligations under this Agreement is caused, through no fault of the Party whose performance is prevented or delayed, by floods, earthquakes, other acts of God, fires, wars, riots or similar hostilities, strikes or other labor difficulties, state or federal regulations, or court actions. Except as specified above, nonperformance shall not be excused because of the act or omission of a third person. In no event shall the occurrence of an event of force majeure operate to extend the Term of this Agreement. 18. Indemnity. Landowner agrees to indemnify, defend, and hold harmless City, City's designee, and their respective elected and appointed councils, boards, commissions, officers, agents, and employees from all actions, suits, claims, liabilities, losses, damages, penalties, obligations, and expenses (including but not limited to attorneys' fees and costs) that may arise, directly or indirectly, from the acts, omissions, or operations of the Landowner or Landowner's • agents, contractors, subcontractors, agents, or employees pursuant to this Agreement. City shall have the right to select and retain counsel to defend any actions, and Landowner shall pay the -27- reasonable cost for this defense. The indemnity provisions in this Section shall survive • termination of this Agreement. 19. Third Party Legal Challenge. If a third party brings a legal action challenging the validity or enforceability of any provision of this Agreement or the Project approvals under the Development Regulations ( "Third Party Legal Challenge "), City shall defend the Third Party Legal Challenge, and Landowner shall be responsible for the reasonable legal expenses incurred by City in connection with the challenge. As long as Landowner is not in default under this Agreement, City shall not allow any default or judgment to be taken against it or compromise the defense of the action without Landowner's prior written approval. Landowner shall also have the right to settle a Third Party Legal Challenge, provided that nothing in this Agreement shall authorize Landowner to settle the Third Party Legal Challenge on terms that would constitute an amendment or modification of this Agreement or the AHIP, the Development Plan, the Design Regulations, or the Transfer of Development Rights Resolution unless City approves the amendment or modification consistent with applicable legal requirements. City reserves its full legislative discretion to make this approval. 20. Mortgagee Rights. 20.1 Encumbrances on Property. The Parties agree that this Agreement shall not prevent or limit Landowner in any manner from encumbering the Property, any part of the Property, or any improvements on the Property with any Mortgage securing financing with respect to the constriction, development, use, or operation of the Project. 20.2 Mortgagee Protection. This Agreement shall be superior and senior to the lien of • any Mortgage. Nevertheless, no breach of this Agreement shall defeat, render invalid, diminish, or impair the lien of any Mortgage made in good faith and for value. Any acquisition or acceptance of title or any right or interest in the Property or part of the Property by a Mortgagee (whether due to foreclosure, trustee's sale, deed in lieu of foreclosure, lease termination, or otherwise) shall be subject to all of the terms and conditions of this Agreement. Any Mortgagee who takes title to the Property or any part of the Property shall be entitled to the benefits arising under this Agreement. 20.3 Mortgagee Not Obligated. Notwithstanding the provisions of this Section, a Mortgagee will not have any obligation or duty under the terms of this Agreement to perform the obligations of Landowner or other affirmative covenants of Landowner, or to guarantee this performance except that: (1) The Mortgagee shall have no right to develop the Property under the Development Regulations without fully complying with the terms of this Agreement; and (2) To the extent that any covenant to be performed by Landowner is a condition to the performance of a covenant by City, that performance shall continue to be a condition precedent to City's performance. 20.4 Notice of Default to Mortgagee; Right of Mortgagee to Cure. Each Mortgagee • shall, upon written request to City, be entitled to receive written notice from City of: No • (1) The results of the periodic review of compliance specified in Section 14, and (2) Any default by Landowner of its obligations set forth in this Agreement. Each Mortgagee shall have a further right, but not an obligation, to cure the default within 10 days after receiving notice of monetary defaults and within 30 days after receiving notice of non - monetary defaults. If Mortgagee can only remedy or cure the default by obtaining possession of the Property, then Mortgagee shall have the right to seek to obtain possession with diligence and continuity through a receiver or otherwise, and to remedy or cure the default within 30 days after obtaining possession. Except in case of emergency or to protect the public health or safety, City may not exercise any of its judicial remedies set forth in this Agreement until expiration of the 30 -day period. But in the case of a default that cannot with diligence be remedied or cured within 30 days, the Mortgagee shall have additional time as is reasonably necessary to remedy or cure the default, provided Mortgagee promptly commences to cure the default within 30 days and diligently prosecutes the cure to completion. Landowner shall not be released from performing its obligations in Sections 3 and 4 of this Agreement in the event of a foreclosure by a Mortgagee. 21. Transfers and Assignments. 21.1 Right to Assign. Subject to the last sentence of this Section 21.1, Landowner shall have the right to sell, lease, transfer, or assign the Property in whole or in part to any • person, partnership, joint venture, firm, or corporation at any time during the Term of this Agreement without the consent of City, provided that no partial transfer shall violate the Subdivision Map Act (California Government Code sections 66410 - 66499.58). Upon the effective date of any such sale, lease, transfer or assignment of the Property, the transferor /assignor shall notify of the name and address of the transferee. Any assignment of this Agreement must be pursuant to a sale or transfer of the Property. Any sale or transfer of the Property shall include the assignment and assumption of the rights, duties, and obligations arising from this Agreement to the transferee with respect to that part of the Property transferred. Landowner shall no longer be obligated under this Agreement for the part of the Property that was sold or transferred if Landowner is not in default under this Agreement at the time of the sale or transfer. hi no event, however, shall Landowner be relieved from its obligations under this Agreement to pay the Public Benefit Fee, Park Fees, and Fair Share Traffic Fees or to fulfill its obligations under Sections 3 and 4 of this Agreement. Notwithstanding the foregoing, from and after the date of this Agreement, Landowner shall not have the right to sell, lease, transfer, or assign (i) the Option Site until the expiration of the Option Period without City having elected to exercise the option to acquire the Option Site, or (ii) the Parking Structure Site until the expiration of the Option Period without City having elected to exercise the option, or if City does exercise the Option, until the construction of the Parking Structure is complete and the Parking Structure is operational. 21.2 Agreement Binding on Successors and Assigns. The burdens of this Agreement • are binding upon, and the benefits of this Agreement inure to, all successors in interest of the Parties to this Agreement, and constitute covenants that run with the Property. In 61!2 order to provide continued notice, the Parties will record this Agreement and any • subsequent amendments to it. 22. Estoppel Certificate. At any time, either Party may deliver written notice to the other Party requesting that the Party certify in writing that, to the best of its knowledge: (1) this Agreement is in full force and effect and is binding on the Party; (2) this Agreement has not been amended or modified either orally or in writing. If this Agreement has been amended, the Party providing the certification shall identify the amendments; and (3) the requesting Party is not in default in the performance of its obligations under this Agreement. If the requesting Party is in default, the other Party must describe the nature and amount of the default. The requesting Party shall execute and return the certificate within 60 days following receipt. Any assignee of a Party's rights and obligations hereunder, as referred to in Section 22, and any Mortgagee, shall be entitled to rely on the certificate. 23. Further Actions and Instruments. Each Party shall cooperate with and provide reasonable assistance to the other Party to the extent consistent with and necessary to implement this Agreement. Upon the request of a Party at any time, the other Party shall promptly execute, with acknowledgement or affidavit if reasonably required, and file or record the required instruments • and writings and take any actions as may be reasonably necessary to implement this Agreement or to evidence or consummate the transactions contemplated by this Agreement. 24. Notices. Any notice or demand that shall be required or permitted by law or any provision of this Agreement shall be in writing. If the notice or demand will be served upon a Party, it either shall be personally delivered to the Party; deposited in the United States mail, certified, return receipt requested, and postage prepaid; or delivered by a reliable courier service that provides a receipt showing date and time of delivery with courier charges prepaid. The notice or demand shall be addressed as follows: TO CITY: City of Newport Beach 3300 Newport Boulevard Post Office Box 1768 Newport Beach, California 92663 -3884 Attn: City Manager With a copy to: City Attorney City of Newport Beach 3300 Newport Boulevard Post Office Box 1768 Newport Beach, California 92663 -3884 is -30- • TO LANDOWNER: The Irvine Company LLC 550 Newport Center Drive Newport Beach, California 92660 -0015 Attn: General Counsel With a copy to: Latham & Watkins LLP 600 West Broadway, Suite 1800 San Diego, California 92101 -3375 Attn: Christopher W. Garrett Either Party may change the address stated in this Section by notice to the other Party in the manner provided in this Section, and notices shall be addressed and submitted to the new address. Notice shall be deemed to be delivered upon the earlier of: (1) the date received or (2) three business days after deposit in the mail as provided above. 25. Rules of Construction and Miscellaneous Terms. 25.1 Rules of Construction. The singular includes the plural; the masculine and neuter include the feminine; "shall" is mandatory; "may" is permissive. 25.2 Time is of the Essence. Time is of the essence regarding each provision of this Agreement in which time is an element. • 25.3 Waiver. Failure by a Party to insist upon the strict performance of any of the provisions of this Agreement by the other Party, and failure by a Party to exercise its rights upon a default by the other Party, shall not constitute a waiver of that Party's right to demand strict compliance by the other Party in the future. 25.4 Counterparts. This Agreement may be executed in two or more counterparts, each of which shall be identical and may be introduced in evidence or used for any other purpose without any other counterpart, but all of which shall together constitute one and the same agreement. 25.5 Entire Agreement. This Agreement constitutes the entire agreement and supersedes all prior agreements and understandings, both written and oral, between the Parties with respect to the subject matter addressed in this Agreement. 25.6 Severability. if any provision of this Agreement or the application of the provision to any party or circumstances shall be held invalid or unenforceable to any extent, the remainder of this Agreement or the application of the provision to persons or circumstances other than those to whom it is held invalid or unenforceable shall not be affected. Each provision of this Agreement shall be valid and enforceable to the fullest extent permitted by law. 25.7 Construction. This Agreement has been drafted after extensive negotiation and • revision. Both City and Landowner are sophisticated parties who were represented by independent counsel throughout the negotiations. City and Landowner each agree and acknowledge that the terms of this Agreement are fair and reasonable, taking into account -31- their respective purposes, terms, and conditions. This Agreement shall therefore be • construed as a whole consistent with its fair meaning, and no principle or presumption of contract construction or interpretation shall be used to construe the whole or any part of this Agreement in favor of or against either Party. 25.8 Constructive Notice and Acceptance. Every person who now or later owns or acquires any right, title, or interest in any part of the Project or the Property is and shall be conclusively deemed to have consented and agreed to every provision of this Agreement. This Section applies regardless of whether the instrument by which the person acquires the interest references this Agreement. 25.9 No Third Party Beneficiaries. The only parties to this Agreement are City and Landowner. This Agreement does not involve any third party beneficiaries, and it is not intended and shall not be construed to benefit or be enforceable by any other person or entity. 25.10 Applicable Law and Venue. This Agreement shall be construed and enforced consistent with the internal laws of the State of California. Any action at law or in equity arising under this Agreement or brought by any Party for the purpose of enforcing, construing, or determining the validity of any provision of this Agreement shall be filed and tried in the Superior Court of the County of Orange, State of California, or the United States District Court for the Central District of California. The Parties waive all provisions of law providing for the removal or change of venue to any other court. 25.11 Non - Liability of City Officers and Emplovees. No official, officer, employee, • agent, or representative of City shall be personally liable to Landowner or its successors and assigns for any loss arising out of or connected with this Agreement or the Development Regulations. 25.12 Section Headings. All section headings and subheadings are inserted for convenience only and shall not affect construction or interpretation of this Agreement. 25.13 Incorporation of Recitals and Exhibits. Recitals A through S are incorporated into this Agreement by this reference. Exhibits A through G are attached to this Agreement and incorporated by this reference as follows: EXHIBIT DESIGNATION DESCRIPTION A Legal Description of Property B Depiction of the Property Development Status, Transportation Improvements and C Open Space Dedications Under the CIOSA and Bonita Canyon Development Agreements D Affordable Housing Implementation Plan -32- r1 U • • • EXHIBIT DESIGNATION DESCRIPTION E Location of Option Site and Associated Parking Structure F Option Agreement G Existing Development on Property 26. Authoritv to Execute. The persons executing this Agreement warrant and represent that they have the authority to execute this Agreement on behalf of the entity for which they are executing this Agreement. They further warrant and represent that they have the authority to bind their respective Party to the performance of its obligations under this Agreement. 27. Recordation. This Agreement and any amendment, modification, or cancellation to it shall be recorded in the Office of the County Recorder of the County of Orange, by City Clerk within the period required by California Government Code section 65868.5 and City of Newport Beach Municipal Code section 15.45.090. [SIGNATURE PAGE FOLLOWS] -33- SIGNATURE PAGE TO • ZONING IMPLEMENTATION AND PUBLIC BENEFIT SPACE AGREEMENT ATTEST: City Clerk APPROVED AS TO FORM: Robin Clauson City Attorney "LANDOWNER" THE IRVINE COMPANY LLC m m "CITY" -34- CITY OF NEWPORT BEACH • m Its: Mayor • • STATE OF CALIFORNIA COUNTY OF ORANGE On , before me, the undersigned, a Notary Public in and for said State, personally appeared and , personally known to me to be the persons whose names are subscribed to the within instrument and acknowledged to me that they executed the same in their authorized capacities and that by their signature on the instrument the persons, or the entity upon behalf of which the persons acted, executed the instrument. Witness my hand and official seal. Notary Public in and for said County and State STATE OF CALIFORNIA • COUNTY OF ORANGE On , before me, the undersigned, a Notary Public in and for said State, personally appeared and , personally known to me to be the persons whose names are subscribed to the within instrument and acknowledged to me that they executed the same in their authorized capacities and that by their signature on the instrument the persons, or the entity upon behalf of which the persons acted, executed the instrument. Witness my hand and official seal. Notary Public in and for said County and State 11 -35- EXMBIT A: • LEGAL DESCRIPTION OF PROPERTY Newport Center Block 500: PARCEL AP NO. 442-082-07: THOSE PORTIONS OF BLOCK 93 OF IRVINE'S SUBDIVISION, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP FILED IN BOOK 1, PAGE 88, OF MISCELLANEOUS RECORD MAPS IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY, DESCRIBED AS FOLLOWS: BEGINNING AT THE EASTERLY TERMINUS OF THAT CERTAIN COURSE IN THE NORTHERLY RIGHT -OF -WAY LINE OF SAN NICOLAS DRIVE SHOWN AS "SOUTH 800 14'38" EAST 91.45 "' ON MAP OF TRACT NO. 6015 FILED IN BOOK 239, PAGES 28 THROUGH 41 OF MISCELLANEOUS MAPS, IN THE OFFICE OF SAID COUNTY RECORDER; THENCE ALONG THE RIGHT -OF -WAY LINES OF SAID SAN NICOLAS DRIVE, NEWPORT CENTER DRIVE EAST AND SANTA ROSA DRIVE, AS SHOWN ON SAID MAP, THE FOLLOWING COURSES AND DISTANCES: NORTH 800 14'38" WEST 91.45 FEET TO THE BEGINNING OF A CURVE CONCAVE NORTHEASTERLY HAVING A RADIUS OF 25.00 FEET; NORTHWESTERLY 38.16 FEET ALONG SAID CURVE • THROUGH AN ANGLE OF 870 26'49" TO THE BEGINNING OF A REVERSE CURVE CONCAVE WESTERLY HAVING A RADIUS OF 1670.00 FEET; NORTHERLY 472.13 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 160 11' 54" TO THE BEGINNING OF A REVERSE CURVE CONCAVE SOUTHEASTERLY HAVING A RADIUS OF 25.00 FEET; NORTHEASTERLY 38.16 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 870 26'49"; NORTH 780 2706" EAST 69.97 FEET TO THE BEGINNING OF A CURVE CONCAVE NORTHWESTERLY HAVING A RADIUS OF 825.50 FEET; NORTHEASTERLY 195.27 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 130 33' 11" TO A POINT ON A NON - TANGENT CURVE CONCAVE SOUTHWESTERLY HAVING A RADIUS OF 25.00 FEET, A RADIAL TO SAID POINT BEARS NORTH 350 38' 46" EAST; THENCE SOUTHEASTERLY 4.81 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 110 01' 42" TO THE BEGINNING OF A REVERSE CURVE CONCAVE NORTHEASTERLY HAVING A RADIUS OF 161.00 FEET; THENCE SOUTHEASTERLY 91.20 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 320 27' 16" TO THE BEGINNING OF A REVERSE CURVE CONCAVE SOUTHWESTERLY HAVING A RADIUS OF 25.00 FEET; THENCE SOUTHERLY 32.67 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 740 53'02"; THENCE SOUTH 00 53'46" EAST 25.50 FEET TO THE BEGINNING OF A CURVE CONCAVE NORTHWESTERLY HAVING A RADIUS OF 2.00 FEET; THENCE SOUTHWESTERLY 3.14 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 900 00'00" TO THE BEGINNING OF A REVERSE CURVE CONCAVE SOUTHEASTERLY HAVING A RADIUS OF 2.00 FEET; THENCE SOUTHWESTERLY 3.14 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 900 0' 00' ; THENCE SOUTH • 00 53' 46" EAST 179.75 FEET TO THE BEGINNING OF A CURVE CONCAVE NORTHWESTERLY HAVING A RADIUS OF 10.00 FEET; THENCE SOUTHWESTERLY lie • 6.59 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 37'45'40"; THENCE SOUTH 36° 51' 54" WEST 9.49 FEET TO THE BEGINNING OF A CURVE CONCAVE SOUTHEASTERLY HAVING A RADIUS OF 10.00 FEET; THENCE SOUTHERLY 6.59 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 370 45'40"; THENCE SOUTH 0° 53'46" EAST 31.50 FEET; THENCE CONTINUING SOUTH 00 53'46" EAST 31.50 FEET TO THE BEGINNING OF A CURVE CONCAVE NORTHEASTERLY HAVING A RADIUS OF 10.00 FEET; THENCE SOUTHEASTERLY 6.59 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 370 45' 40'; THENCE SOUTH 380 39' 26" EAST 9.49 FEET TO THE BEGINNING OF A CURVE CONCAVE SOUTHWESTERLY HAVING A RADIUS OF 10.0 FEET; THENCE SOUTHERLY 6.59 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 370 45' 40' ; THENCE SOUTH 00 53'46" EAST 212.75 FEET TO THE BEGINNING OF A CURVE CONCAVE NORTHWESTERLY HAVING A RADIUS OF 25.00 FEET; THENCE SOUTHWESTERLY 24.40 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 550 55' 53" TO THE BEGINNING OF A REVERSE CONCAVE SOUTHEASTERLY HAVING A RADIUS OF 147.00 FEET; THENCE SOUTHWESTERLY 66.40 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 250 52'43" TO THE BEGINNING OF A REVERSE CURVE CONCAVE NORTHWESTERLY HAVING A RADIUS OF 25.00 FEET; THENCE SOUTHWESTERLY 9.78 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 220 24' 25" TO A POINT ON A NON - TANGENT CURVE CONCAVE SOUTHERLY HAVING A RADIUS OF 950.50 FEET AND THE NORTHERLY RIGHT -OF -WAY LINE OF SAID SAN NICOLAS DRIVE, A RADIAL TO SAID POINT BEARS NORTH 220 12' 47" EAST; THENCE WESTERLY 206.65 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 120 •27'25" TO THE POINT OF BEGINNING. PARCEL AP NO. 442- 082 -08: THOSE PORTIONS OF BLOCK 93 OF IRVINE'S SUBDIVISION, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP FILED IN BOOK 1, PAGE 88, OF MISCELLANEOUS RECORD MAPS IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY, DESCRIBED AS FOLLOWS: COMMENCING AT THE EASTERLY TERMINUS OF THAT CERTAIN COURSE IN THE SOUTHERLY RIGHT OF WAY LINE OF SANTA ROSA DRIVE SHOWN AS "NORTH 780 27' 06" EAST 69.97' " ON A MAP OF TRACT 6015 FILED IN BOOK 239, PAGES 28 THROUGH 41 OF MISCELLANEOUS MAPS IN THE OFFICE OF SAID COUNTY RECORDER, SAID EASTERLY TERMINUS BEING THE BEGINNING OF A CURVE CONCAVE NORTHWESTERLY HAVING A RADIUS OF 825.50 FEET; THENCE NORTHEASTERLY 195.27 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 130 33' 11" TO A POINT ON A NON - TANGENT CURVE CONCAVE SOUTHWESTERLY HAVING A RADIUS OF 25.00 FEET AND THE TRUE POINT OF BEGINNING, A RADIAL TO SAID POINT BEARS NORTH 350 38'46" EAST; THENCE SOUTHEASTERLY 4.81 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 110 01' 42" TO THE BEGINNING OF A REVERSE CURVE CONCAVE NORTHEASTERLY HAVING A RADIUS OF 161.00 FEET; THENCE SOUTHEASTERLY 91.20 FEET ALONG SAID CURVE THROUGH AN ANGLE • OF 320 27' 16" TO THE BEGINNING OF A REVERSE CURVE CONCAVE SOUTHWESTERLY HAVING A RADIUS OF 25.00 FEET; THENCE SOUTHERLY 32.67 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 740 53'02"; THENCE SOUTH 0° -2- 53' 46" EAST 25.50 FEET TO THE BEGINNING OF A CURVE CONCAVE • NORTHWESTERLY HAVING A RADIUS OF 2.00 FEET; THENCE SOUTHWESTERLY 3.14 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 900 00' 00" TO THE BEGINNING OF A REVERSE CURVE CONCAVE SOUTHEASTERLY HAVING A RADIUS OF 2.00 FEET; THENCE SOUTHWESTERLY 3.14 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 900 00' 00'; THENCE SOUTH 00 53' 46" EAST 179.75 FEET TO THE BEGINNING OF A CURVE CONCAVE NORTHWESTERLY HAVING A RADIUS OF 10.00 FEET; THENCE SOUTHWESTERLY 6.59 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 370 45' 40'; THENCE SOUTH 360 51' 54" WEST 9.49 FEET TO THE BEGINNING OF A CURVE CONCAVE SOUTHEASTERLY HAVING A RADIUS OF 10.00 FEET; THENCE SOUTHEASTERLY 6.59 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 370 45' 40' ; THENCE SOUTH 00 53'46" EAST 63.00 FEET TO THE BEGINNING OF A CURVE CONCAVE NORTHEASTERLY HAVING A RADIUS OF 10.00 FEET; THENCE SOUTHEASTERLY 6.59 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 370 45'40"; THENCE SOUTH 380 39'26" EAST 9.49 FEET TO THE BEGINNING OF A CURVE CONCAVE SOUTHWESTERLY HAVING A RADIUS OF 10.00 FEET; THENCE SOUTHERLY 6.59 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 370 45'40"; THENCE SOUTH 00 53' 46" EAST 212.75 FEET TO THE BEGINNING OF A CURVE CONCAVE NORTHWESTERLY HAVING A RADIUS OF 25.00 FEET; THENCE SOUTHWESTERLY 24.40 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 550 55' 53" TO THE BEGINNING OF A REVERSE CURVE CONCAVE SOUTHEASTERLY HAVING A RADIUS OF 147.00 FEET; THENCE SOUTHWESTERLY 66.40 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 250 52' 43" TO THE BEGINNING OF A • REVERSE CURVE CONCAVE NORTHWESTERLY HAVING A RADIUS OF 25.00 FEET; THENCE SOUTHWESTERLY 9.78 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 220 24' 25' TO A POINT ON A NON - TANGENT CURVE CONCAVE SOUTHERLY HAVING A RADIUS OF 950.50 FEET AND THE NORTHERLY RIGHT OF WAY LINE OF SAN NICOLAS DRIVE AS SHOWN ON SAID MAP OF TRACT 6015, A RADIAL TO SAID POINT BEARS NORTH 220 12' 47" EAST; THENCE SOUTHEASTERLY 55.46 FEET ALONG SAID CURVE AND SAID RIGHT OF WAY LINE THROUGH AN ANGLE OF 30 20'36" TO A POINT ON A NON - TANGENT CURVE CONCAVE EASTERLY HAVING A RADIUS OF 25.00 FEET; A RADIAL TO SAID POINT BEARS SOUTH 860 12'25" WEST; THENCE NORTHERLY 9.44 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 21° 3737" TO THE BEGINNING OF A COMPOUND CURVE CONCAVE SOUTHEASTERLY HAVING A RADIUS OF 95.00 FEET; THENCE NORTHEASTERLY 122.78 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 740 02' 54" TO THE BEGINNING OF A COMPOUND CURVE CONCAVE SOUTHWESTERLY HAVING A RADIUS OF 262.03 FEET; THENCE SOUTHEASTERLY 193.09 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 420 13' 18 "; THENCE SOUTH 450 53' 46" EAST 109.58 FEET TO THE BEGINNING OF A CURVE CONCAVE WESTERLY HAVING A RADIUS OF 25.00 FEET; THENCE SOUTHEASTERLY AND SOUTHWESTERLY 39.27 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 900 00'00"; THENCE SOUTH 440 06' 14" WEST 100.91 FEET TO THE BEGINNING OF A CURVE CONCAVE NORTHWESTERLY HAVING A RADIUS OF 25.00 FEET; THENCE SOUTHWESTERLY 12.72 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 290 09' 46 ", THENCE NON - TANGENT SOUTH 460 44' 00" • EAST 56.70 FEET TO A POINT OF A NON - TANGENT CURVE CONCAVE SOUTHEASTERLY HAVING A RADIUS OF 25.00 FEET, A RADIAL TO SAID POINT BEARS NORTH 760 44' 00" WEST; THENCE NORTHEASTERLY 13.45 FEET ALONG Egli • SAID CURVE THROUGH AN ANGLE OF 30° 50' 14 "; THENCE NORTH 44° 06' 14" EAST 99.45 FEET TO THE BEGINNING OF A CURVE CONCAVE SOUTHERLY HAVING A RADIUS OF 25.00 FEET; THENCE NORTHEASTERLY AND SOUTHEASTERLY 39.27 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 900 00'00"; THENCE SOUTH 450 53'46" EAST 15.01 FEET TO THE BEGINNING OF A CURVE CONCAVE NORTHERLY HAVING A RADIUS OF 40.00 FEET; THENCE SOUTHEASTERLY AND NORTHEASTERLY 62.83 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 900 00' 00'; THENCE NORTH 440 06' 14" EAST 289.00 FEET TO THE BEGINNING OF A CURVE CONCAVE WESTERLY HAVING A RADIUS OF 40.00 FEET; THENCE NORTHEASTERLY AND NORTHWESTERLY 62.83 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 900 00' 00'; THENCE NORTH 450 53'46" WEST 254.09 FEET TO THE BEGINNING OF A CURVE CONCAVE EASTERLY HAVING A RADIUS OF 25.00 FEET; THENCE NORTHWESTERLY AND NORTHEASTERLY 39.27 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 900 00' 00'; THENCE NORTH 440 06' 14" EAST 104.09 FEET TO THE BEGINNING OF A CURVE CONCAVE SOUTHEASTERLY HAVING A RADIUS OF 25.00 FEET; THENCE NORTHEASTERLY 13.00 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 290 474 1 " TO THE SOUTHWESTERLY RIGHT OF WAY LINE OF SAN JOAQUIN HILLS ROAD AS SHOWN ON SAID MAP OF TRACT 6015; THENCE NON - TANGENT NORTH 460 41' 16" WEST ALONG SAID RIGHT OF WAY LINE 48.72 FEET TO A POINT ON A NON - TANGENT CURVE IN THE BOUNDARY OF THAT CERTAIN PARCEL SHOWN ON A MAP FILED IN BOOK 13, PAGE 41 OF PARCEL MAPS IN THE OFFICE OF SAID COUNTY RECORDER, SAID CURVE BEING CONCAVE NORTHWESTERLY HAVING A RADIUS OF 25.00 FEET, A RADIAL TO SAID POINT • BEARS SOUTH 760 12'47" EAST; THENCE SOUTHWESTERLY 13.23 FEET ALONG SAID CURVE AND SAID BOUNDARY THROUGH AN ANGLE OF 300 19' 01 "; THENCE CONTINUING ALONG SAID BOUNDARY SOUTH 440 06'14" WEST 103.60 FEET TO THE BEGINNING OF A CURVE IN SAID BOUNDARY CONCAVE NORTHERLY HAVING A RADIUS OF 25.00 FEET; THENCE SOUTHWESTERLY AND NORTHWESTERLY 39.27 FEET ALONG SAID CURVE AND SAID BOUNDARY THROUGH AN ANGLE OF 900 00' 00'; THENCE NORTH 450 53' 46" WEST ALONG SAID BOUNDARY AND ITS NORTHWESTERLY PROLONGATION 190.00 FEET TO THE BEGINNING OF A CURVE CONCAVE NORTHEASTERLY HAVING A RADIUS OF 313.67 FEET; THENCE NORTHWESTERLY 111.43 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 200 21' 13" TO THE BEGINNING OF A REVERSE CURVE CONCAVE SOUTHWESTERLY HAVING A RADIUS OF 121.38 FEET; THENCE NORTHWESTERLY 108.34 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 510 08'21"; THENCE NORTH 760 40'54" WEST 100.00 FEET; THENCE NORTH 75° 36'41" WEST 53.00 FEET TO THE BEGINNING OF A NON - TANGENT CURVE CONCAVE NORTHEASTERLY HAVING A RADIUS OF 66.00 FEET; A RADIAL TO SAID POINT BEARS SOUTH 130 19' 06" WEST; THENCE NORTHWESTERLY 62.51 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 540 16' 02' TO THE BEGINNING OF A COMPOUND CURVE CONCAVE EASTERLY HAVING A RADIUS OF 25.00 FEET; THENCE NORTHWESTERLY 9.79 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 220 26'33" TO A POINT ON THE SOUTHEASTERLY RIGHT OF WAY LINE OF SAID SANTA ROSA DRIVE, SAID POINT BEGINNING ON A CURVE CONCAVE NORTHWESTERLY HAVING A RADIUS OF 825.50 FEET, A RADIAL TO • SAID POINT BEARS SOUTH 29° 13'23" EAST; THENCE SOUTHWESTERLY 59.38 FEET ALONG SAID CURVE AND SAID RIGHT OF WAY LINE THROUGH AN ANGLE OF 40 07' 18" TO THE TRUE POINT OF BEGINNING. ffm 0 PARCEL AP NO. 442-082-06: THOSE PORTIONS OF BLOCK 93 OF IRVINE'S SUBDIVISION, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP FILED IN BOOK 1, PAGE 88, OF MISCELLANEOUS RECORD MAPS IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY, DESCRIBED AS FOLLOWS: BEGINNING AT THE EASTERLY TERMINUS OF THAT CERTAIN COURSE IN THE NORTHERLY RIGHT OF WAY LINE OF SAN NICOLAS DRIVE SHOWN AS "SOUTH 800 14' 38" EAST 91.45' " ON A MAP OF TRACT 6015 FILED IN BOOK 239, PAGES 28 THROUGH 41 OF MISCELLANEOUS MAPS IN THE OFFICE OF SAID COUNTY RECORDER, SAID EASTERLY TERMINUS BEING THE BEGINNING OF A CURVE CONCAVE SOUTHWESTERLY HAVING A RADIUS OF 950.50 FEET; THENCE SOUTHEASTERLY 262.11 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 150 48' O1" TO A POINT ON A NON - TANGENT CURVE CONCAVE EASTERLY HAVING A RADIUS OF 25.00 FEET AND THE TRUE POINT OF BEGINNING, A RADIAL TO SAID POINT BEARS SOUTH 860 12' 25" WEST; THENCE NORTHERLY 9.44 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 210 37' 37" TO THE BEGINNING OF A COMPOUND CURVE CONCAVE SOUTHEASTERLY HAVING A RADIUS OF 95.00 FEET; THENCE NORTHEASTERLY 122.78 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 740 02' 54" TO THE BEGINNING OF A COMPOUND CURVE CONCAVE SOUTHWESTERLY HAVING A RADIUS OF 262.03 FEET; THENCE SOUTHEASTERLY • 193.09 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 420 13' 18 "; THENCE SOUTH 450 53'46" EAST 109.58 FEET TO THE BEGINNING OF A CURVE CONCAVE WESTERLY HAVING A RADIUS OF 25.00 FEET; THENCE SOUTHEASTERLY AND SOUTHWESTERLY 39.27 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 900 00' 00"; THENCE SOUTH 440 06' 14" WEST 100.91 FEET TO THE BEGINNING OF A CURVE CONCAVE NORTHWESTERLY HAVING A RADIUS OF 25.00 FEET; THENCE SOUTHWESTERLY 12.72 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 290 09' 46'; THENCE NON - TANGENT NORTH 460 44' 00" WEST 34.74 FEET TO THE BEGINNING OF A CURVE CONCAVE SOUTHWESTERLY HAVING A RADIUS OF 950.50 FEET AND BEING THE SOUTHEASTERLY CONTINUATION OF THE NORTHERLY RIGHT OF WAY LINE OF SAID SAN NICOLAS DRIVE; THENCE NORTHWESTERLY 293.80 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 170 42' 37" TO THE TRUE POINT OF BEGINNING. PARCEL AP NO. 442-082-01: THOSE PORTIONS OF BLOCK 93 OF IRVINE'S SUBDIVISION, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP FILED IN BOOK 1, PAGE 88, OF MISCELLANEOUS RECORD MAPS IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY, DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHWESTERLY TERMINUS OF THAT CERTAIN COURSE IN • THE SOUTHWESTERLY RIGHT OF WAY LINE OF SAN JOAQUIN HILLS ROAD SHOWN AS "SOUTH 460 14' 16" EAST 286.60 "` ON A MAP OF TRACT 6015 FILED IN BOOK 239, -5- • PAGES 28 THROUGH 41 OF MISCELLANEOUS MAPS IN THE OFFICE OF SAID COUNTY RECORDER; THENCE SOUTH 46° 14' 16" EAST 236.39 FEET ALONG SAID RIGHT OF WAY LINE AND ALONG THE BOUNDARY OF THAT CERTAIN PARCEL SHOWN ON A MAP FILED IN BOOK 13, PAGE 41 OF PARCEL MAPS IN THE OFFICE OF SAID COUNTY RECORDER TO A POINT ON A NON - TANGENT CURVE CONCAVE NORTHWESTERLY HAVING A RADIUS OF 25.00 FEET; A RADIAL TO SAID POINT BEARS SOUTH 760 12' 47" EAST; THENCE SOUTHWESTERLY 13.23 FEET ALONG SAID CURVE AND SAID BOUNDARY THROUGH AN ANGLE OF 300 19'01"; THENCE CONTINUING ALONG SAID BOUNDARY SOUTH 440 06' 14" WEST 103.60 FEET TO THE BEGINNING OF A CURVE IN SAID BOUNDARY CONCAVE NORTHERLY HAVING A RADIUS OF 25.00 FEET; THENCE SOUTHWESTERLY AND NORTHWESTERLY 39.27 FEET ALONG SAID CURVE AND SAID BOUNDARY THROUGH AN ANGLE OF 900 00'00" THENCE NORTH 450 53'46" WEST ALONG SAID BOUNDARY AND ITS NORTHWESTERLY PROLONGATION 190.00 FEET TO THE BEGINNING OF A CURVE CONCAVE NORTHEASTERLY HAVING A RADIUS OF 313.67 FEET; THENCE NORTHWESTERLY 111.43 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 200 21' 13" TO THE BEGINNING OF A REVERSE CURVE CONCAVE SOUTHWESTERLY HAVING A RADIUS OF 121.38 FEET; THENCE NORTHWESTERLY 108.34 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 510 08'21"; THENCE NORTH 760 40'54" WEST 100.00 FEET; THENCE NORTH 750 36'41" WEST 53.00 FEET TO THE BEGINNING OF A NON - TANGENT CURVE CONCAVE NORTHEASTERLY HAVING A RADIUS OF 66.00 FEET; A RADIAL TO SAID POINT • BEARS SOUTH 130 19' 06" WEST; THENCE NORTHWESTERLY 62.51 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 540 16' 02" TO THE BEGINNING OF A COMPOUND CURVE CONCAVE EASTERLY HAVING A RADIUS OF 25.00 FEET; THENCE NORTHWESTERLY 9.79 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 220 26' 33" TO A POINT ON THE SOUTHEASTERLY RIGHT OF WAY LINE OF SANTA ROSA DRIVE AS SHOWN ON THE MAP OF SAID TRACT 6015; SAID POINT BEING ON A CURVE CONCAVE NORTHWESTERLY HAVING A RADIUS OF 825.50 FEET; A RADIAL TO SAID POINT BEARS SOUTH 290 13' 23" EAST; THENCE NORTHEASTERLY 190.16 FEET ALONG SAID CURVE AND SAID RIGHT OF WAY LINE THROUGH AN ANGLE OF 130 11' 54 "; THENCE NORTH 470 37' 43" EAST 2.20 FEET CONTINUING ALONG SAID RIGHT OF WAY LINE TO THE BEGINNING OF A CURVE CONCAVE SOUTHERLY HAVING A RADIUS OF 25.00 FEET THENCE NORTHEASTERLY AND SOUTHEASTERLY 38.96 FEET ALONG SAID CURVE THROUGH AN ANGLE OF 890 17' 26" TO THE BEGINNING OF A REVERSE CURVE CONCAVE NORTHEASTERLY HAVING A RADIUS OF 6072.50 FEET AND THE SOUTHWESTERLY RIGHT OF WAY LINE OF SAID SAN JOAQUIN HILLS ROAD; THENCE SOUTHEASTERLY 329.29 FEET ALONG SAID CURVE AND SAID RIGHT OF WAY LINE THROUGH AN ANGLE OF 30 06'25" TO THE POINT OF BEGINNING. EXCEPTING THAT PORTION SHOWN ON A MAP FILED IN BOOK 13, PAGE 41, PARCEL MAPS, RECORDS OF SAID COUNTY. • PARCEL AP NO. 442-082-02: 0 PARCEL 1, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF • CALIFORNIA, AS PER MAP FILED IN BOOK 13, PAGE 41 OF PARCEL MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. PARCEL AP NO. 442-082-03: PARCEL 1, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP FILED IN BOOK 21, PAGE 18 OF PARCEL MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. PARCEL AP NO. 442-082-05: PARCEL 1, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP FILED IN BOOK 27, PAGE 43 OF PARCEL MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. PARCEL AP NO. 442-082-09: PARCEL 1, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP FILED IN BOOK 54, PAGE 23 OF PARCEL MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. PARCEL AP NO'S 442- 082 -11, 442-082-12,442-082-13 and 442- 082 -14: PARCELS 1 TO 4 OF PARCEL MAP NO. 84 -706, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP FILED IN BOOK 192, PAGES 1 AND 2 OF PARCEL MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY Newport Center Block 600: [Replace with legal descriptions] 442 -101 -09 442- 101 -19 442- 101 -11 442- 101 -20 442- 101 -13 442- 101 -21 442- 101 -14 442- 101 -22 -7- 11 • 0 • • 442- 101 -16 442- 101 -23 442- 101 -18 442- 101 -24 San Joaquin Plaza: [Replace with legal descriptions] 442- 261 -01 442- 261 -19 442- 261 -16 Fashion Island: [Replace with legal descriptions] 442- 021 -08 442- 021 -28 442- 021 -10 442- 021 -29 442- 021 -11 442- 021 -30 442- 021 -13 442- 021 -31 442- 021 -16 442- 021 -32 442- 021 -17 442 -021 -33 442- 021 -21 442- 021 -34 442- 021 -25 442- 021 -35 442- 021 -26 442- 021 -36 442- 021 -27 In • EXHIBIT C: DEVELOPMENT STATUS, TRANSPORTATION IMPROVEMENTS AND OPEN SPACE DEDICATIONS UNDER CIOSA AND THE BONITA CANYON DEVELOPMENT AGREEMENT 0 • CIOSA Open Space Dedication Requirement: Actual Open Space Conveyed/Offered: Completion. Status: 138.1 acres 146.0 acres 106% Transportation Improvements Total Program Expended or Amount Available for Required: Funding Requirement: Committed to Date: Future Projects: Frontage $5,220,360 $5,220,360 $0 Improvements Fair Share $1,398,428 $1,398,428 $0 Contribution Advancement $14,295,572 $12,191,740 $0 Total $21,014,360 $21,014,360 $0 Outside Funds Used $0 $30,108,183 to Complete CIOSA Improvements Total CIOSA Related Funding Expended $51,122,543 A- Approved Development: Completed Completion Status: 100% Development: 88% 1076 residential units 945 residential units 88% 94,000 office square feet 94,000 office square 100% feet 30,000 regional retail square feet 30,000 office square 100% feet 68 hotel units 0 hotel units 0% BONITA CANYON DEVELOPMENT AGREEMENT Park Dedication Requirement: Completion Status: Acquisition and improvement of Bonita Canyon Sports Park 100% Transportation Improvements Required: Completion Status: Dedication of required right of way and widening of Bonita Canyon Road, Bison Road, and MacArthur Boulevard 100% Approved Development: Completed Development: Completion Status: 1521 residential units 1339 residential 88% units 55,000 general commercial square feet 54,000 general 98% commercial square feet -2- 0 11 r1 U 0 • • Approved Development: Completed Completion Status: Development: 1076 residential units 945 residential units 88% 94,000 office square feet 94,000 office square 100% feet 30,000 regional retail square feet 30,000 office square 100% feet 68 hotel units 0 hotel units 0% -3- • EXHIBIT E: LOCATION OF OPTION SITE AND ASSOCIATED PARKING STRUCTURE [Insert legal description of parcel that will be included in option site and attach depiction of parcel and associated parking structure] Cl C, J 0 EXHIBIT G: EXISTING DEVELOPMENT ON PROPERTY • • As of Date of Approval of the City of Newport Beach General Plan 2006 Update (July 25, 2006) Sub -Area Existing Development Block 500 285,142 square feet of office and commercial development 952,673 square feet of office and commercial Block 600 development 295 hotel rooms San Joaquin Plaza 330,989 square feet of office and commercial development 1,331,268 square feet of regional retail development Fashion Island 1700 theater seats Within an area of 27,000 square feet. OPTION AGREEMENT This OPTION AGREEMENT ( "Agreement ") is entered into as of this _ day of December _, 2007, by and between THE IRVINE COMPANY LLC, a Delaware limited liability company, successor -in- interest to The Irvine Company, a Michigan corporation ( "Optionor "), and the CITY OF NEWPORT BEACH, a California municipal corporation ( "City "). RECITALS A. Optionor is the owner of that certain real property located in the City of Newport Beach, County of Orange, State of California, consisting of approximately 46,175 square feet of land area more particularly described in the legal description attached hereto as Exhibit "I" and depicted on the Site Map attached hereto as Exhibit "2 ", and the property adjacent to said property (collectively, the "Parcel "). B. Optionor and City desire to enter into this Agreement to provide for Optionor to grant to City and City to obtain from Optionor, upon the terms set forth in this Agreement, an option to purchase a portion of the Parcel not to exceed 54,000 square feet of net land area, the boundaries of which shall be established by City in accordance with this Agreement, together with all improvements thereon, all easements, licenses, and interests appurtenant thereto, and all development rights, governmental approvals, and land entitlements, owned or held by Optionor in connection with the Land (collectively, the "Property "). • C. City and Optionor are entering into this Agreement pursuant to Section 4.8.1 of that certain Zoning Implementation and Public Benefit Agreement between City and Optionor dated December 18, 2007 ( "Development Agreement "). AGREEMENT Based upon the foregoing Recitals, which are incorporated herein by this reference, and for good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged by both parties, Optionor and City agree as follows: 1. OPTION TO ACQUIRE. 1.1 Survey Legal Description of Land-, Compliance with Subdivision Map Act. City shall have the right to establish the boundaries of the Property within the Parcel provided that the Land shall not exceed 54,000 square feet of net land area (as defined in Section 2). Within sixty (60) days after the date of this Agreement, City shall notify Optionor of the land area that City has determined will comprise the Property through an exhibit depicting the Property boundaries and, within thirty (30) days thereafter, Optionor shall obtain and deliver to City a current survey of the Property ( "Survey ") prepared by a licensed civil engineer or registered surveyor in accordance with the current ALTA/ACSM standards, and shall be certified to City, Optionor, and First American Title Company ( "Title Company "). The Survey shall establish both the gross land area and net land area of the Property for purposes of confirming the Purchase Price • pursuant to Section 2 of this Agreement. As used herein, the term "net land area" shall mean the gross land area of the Property excluding any areas that have been dedicated to City for road or Error! Unknown document property nanx: Errorl Unknown doctmem property nnrna- Error! Unknown docmocnt Property name. Error! Unknown document property mmc -Error! Unknown docnmem property come. al JMV -1- sidewalk purposes (i.e., if the legal parcel in which the Property is situated includes the half • width of the abutting street). In addition, the Survey shall show a metes and bounds description of the Property, consistent with the description provided by City, and shall show all easements encumbering and easements appurtenant to the Property, visible or recorded, and roads and other means of physical and record ingress and egress to and from the Property. Within thirty (30) days after City's receipt of the Survey, City shall deliver written notice to Optionor approving or disapproving the same. In the event that City disapproves the Survey, said disapproval shall identify in detail any changes that are required to be made in order to obtain City's approval thereof and Optionor shall promptly make said changes, provided that the land area of the Land as described in the metes and bounds description shall be consistent with the land area depicted on the Site Map. Upon City's approval of the Survey, the term "Property" as used in this Agreement shall mean the land described in the approved metes and bounds description. City's approval of the Survey shall be for the purpose of establishing the metes and bounds description of the Property and the net land area for purposes of establishing the Purchase Price in accordance with Section 2, and shall not constitute City's approval of any easements or encumbrances on the Property. The parties acknowledge that the Property is not an existing "legal lot" under the Subdivision Map Act. Accordingly, promptly following the approval of the Survey, Optionor and City shall take such steps as may be appropriate to effect such lot line adjustments as reasonably may be proposed by Optionor or City to (a) establish and/or confirm that the Property, as described and approved per the Survey, thereafter shall consist exclusively of one or more legal lots under the Subdivision Map Act, and (b) establish and/or confirm that any • property adjoining the Land and retained by Optionor (any such property, the "Retained Property "), including any property that remains from a former legal lot after adjustments of boundary lines so as to establish the Property, thereafter shall consist exclusively of one or more legal lots under the Subdivision Map Act. At the request of Optionor and subject to any public review process, such steps may include any actions that reasonably may be required of City, at no cost to City, in order to establish or confirm that the Retained Property shall be in compliance with the Subdivision Map Act (e.g., the issuance by City of a certificate of compliance with respect to the Retained Property). The completion of the above described steps in accordance with applicable law sometimes is referred to herein as the "Subdivision Map Act Condition." Optionor acknowledges that minor boundary adjustments may need to be made to the existing rights -of -way within the vicinity of the Property in order to accommodate the creation of the Property as a separate parcel and the construction of a City Hall thereon, and Optionor shall, within thirty (30) days after written request by City, dedicate to City the rights -of -way necessary to accommodate said boundary adjustments. 1.2 Grant of Option. Optionor hereby grants to City an option to purchase the Property upon all of the terms, covenants, and conditions contained in this Agreement ( "Option ") and in the Escrow Instructions to be executed in accordance with Section 1.5 below. The Option created hereby shall be irrevocable by Optionor and shall be binding upon the successors and assigns of Optionor. Optionor's granting of the Option to City shall be in consideration of City's performance of its obligations set forth in that certain Zoning Implementation and Public Benefit Agreement between Optionor and City dated December 18, 2007 (the "Development • Agreement "), and City shall not be required to pay any option fee, or pay or provide any other Errorl Unknown document property namcdErrorl Uuknowo document property as - Error! Uuknown docmneat properly Dame• Error! Unlmuwn doemocnt property name Errorl Unknown document property mame- al 1/09/07 -2- • consideration or purchase price for the Option. Optionee hereby represents and warrants to Optionor that the Development Agreement has been duly executed and delivered by City, that all steps and approvals have been taken and obtained under applicable law in order for the Development Agreement to become effective and to become the binding obligation of City, and that the Development Agreement constitutes a valid and binding obligation of City, fully enforceable against City in accordance with its terms. 1.3 Option Period. The term of this Option ( "Option Period ") shall commence on the date of this Agreement and expire on the earliest of the following dates: (i) the date that is 48 months after the Operative Date; (ii) upon City's termination of this Agreement by delivery of written notice of termination to Optionor, which notice City shall have the right to deliver at any time during the Option Period prior to City's exercise of the Option; (iii) the date City's electorate approves and City implements an initiative restricting the location of a new City Hall building to a site outside of Newport Center Block 500, with such initiative to be deemed implemented upon the issuance of a certificate of occupancy for a City Hall building at that site; or (iv) if the Development Agreement does not become operative in accordance with the terms set forth in Section 11 of the Development Agreement and the Development Agreement is terminated in accordance with the second to last paragraph of Section 11, then on the date of such termination. 1.4 Conditions to Exercise of Option. City's right to exercise the Option shall be subject to the satisfaction of the following conditions: (i) the Operative Date under the Development Agreement shall have occurred, and (ii) City shall have awarded a contract for the • construction of a new City Hall on the Option Site. 1.5 Manner of Exercise of Option. In the event this Agreement has not earlier terminated pursuant to the provisions of Section 1.3 above, City shall have the right to exercise the Option during the Option Period by delivering to Optionor or Optionor's counsel written notice of City's election to acquire the Property, together with three (3) originals of the Agreement for Purchase and Sale of Real Property and Escrow Instructions in the form attached hereto as Exhibit "4" ( "Escrow Instructions "), with each original of said Escrow Instructions fully executed by City. Optionor shall thereupon promptly execute the Escrow Instructions, with Section 6 initialed in the space provided for the Seller's initials, and deliver, within seven (7) days after receipt thereof, one fully executed original to City and one fully executed original to First American Title Company at its offices located at 2 First American Way, Santa Ana, CA 92707 ( "Escrow Holder "), and shall retain one fully executed original for Optionor's records. Thereafter, Optionor and City shall cooperate in executing any additional and supplemental escrow instructions as may be required by the Escrow Holder to perform its duties with respect to the escrow, provided that in the event of any conflict between the form of Escrow Holder's standard escrow instructions and the Escrow Instructions, the Escrow Instructions shall govern. The date that the Escrow Instructions are executed and delivered by City to Optionor shall be the date inserted on the fast page of the Escrow Instructions as the date of the Opening of Escrow. The Close of Escrow shall occur within thirty (30) days following the exercise of the Option by City, as more particularly provided in the Escrow Instructions. • 1.6 Recordation of Memorandum. Within five (5) business days after the date the metes and bounds description of the Property is determined in accordance with Section 1.1 of Error! Unknown docomenl properly nameArror! Unknown document property Dame- - Error! Unknown document property name. Error! Un!mown document property wnm .Error! Unknown document property mime. a! 1109107 -3- this Agreement, Optionor shall execute and deliver to City a short form memorandum of this • Agreement ( "Memorandum ") in the form attached hereto as Exhibit "3 ". Upon receipt of the Memorandum from Optionor, City shall execute the Memorandum and cause it to be recorded in the Official Records of Orange County, California. 1.7 Document to Remove Cloud. This Agreement constitutes only an Option to purchase the Property, and although the Option granted hereby shall automatically terminate with respect to the Property unless exercised within the time and in accordance with the other provisions set forth herein, City agrees that upon termination or expiration of the Option Period or, if City timely exercises the Option but the Closing provided for in the Escrow Instructions does not occur for any reason other than an uncured material default by Optionor, City shall execute, acknowledge, and deliver to Optionor upon Optionor's request therefor, a quitclaim deed or such other document(s) required by a reputable title company to remove any cloud from Optionor's title to the Property that might arise as a result of the Option. 2. PURCHASE PRICE. In the event that City exercises the Option, the purchase price payable by City to Optionor for the Property shall be the sum of One Hundred Forty -Five Dollars ($145.00) per square foot of net land area ( "Purchase Price "). The net land area of the Property shall be determined by the Survey to be obtained by Optionor and approved by City pursuant to Section 1.1 of this Agreement. Within five (5) days after City's approval of the Survey as provided for in Section 1.1, City and Optionor each shall execute and deliver to the other a written instrument • confirming the net land area of the Property and the Purchase Price resulting therefrom. Prior to executing the Escrow Instructions, the parties shall insert the amount of the Purchase Price into the blank in Section 2.1 of the Escrow Instructions. If City exercises the Option, the Purchase Price shall be paid by City to Optionor at the Closing in accordance with the terms set forth in the Escrow Instructions. As used herein, the terms "Closing," "Close of Escrow" and "Closing Date" shall have the meaning ascribed in Section 3.1 of the Escrow Instructions. 3. INSPECTIONS AND REVIEW. 3.1 Delivery of Property Documents. Within five (5) days after the date of this Agreement, Optionor shall deliver to City all documents, reports, agreements or other items in its possession or control relating to the Property, including without limitation the following (collectively, the "Property Documents "): all information and documents relating to the condition of the soils, groundwater, subsurface improvements, including without limitation building foundations and underground utility lines, and subsurface physical and environmental conditions on and under the Property, including copies of all asbestos, lead -based paint, soils, seismic, geologic, drainage, toxic waste, engineering, environmental and similar type reports and surveys; all information and documents relating to the physical and environmental condition of the structures located on the Property; any survey of the Property; and all engineering reports and studies relating to the physical and environmental condition of the Property. During the Option Period, Optionor shall promptly deliver to City any additional Property Documents that Optionor comes to posses or control after the date of this Agreement. Optionor makes no representations as to the accuracy or completeness of such information or to any analyses based on such • information. Error! Unknown doruntenl property nameArrur! Unknown doeumenl property name.- Error! Unknown doeamxM properly name. Error! Unknown document property rmme- Error! Unknown docnmenl property name. al 1109107 4- • 3.2 Condition of Title. Prior to the date of this Agreement, City reviewed that certain preliminary title report dated 2007, issued by the Title Company under Order No. (`Title Report"). City agrees it shall accept title to the Property on the Close of Escrow subject to the following title exceptions (collectively, the "Approved Title Exceptions "): (i) the standard printed exceptions and exclusions contained in the form of the Title Policy commonly used by Title Company; (ii) the exceptions disclosed as items of the Title Report; (iii) the Grant Deed attached as Exhibit "B" to the Escrow Instructions; and (iv) any other exceptions to title that may be approved in writing by City in its sole and absolute discretion. If City exercises the Option to purchase the Property, Optionor shall be responsible for removing prior to the Close of Escrow all title exceptions that do not constitute Approved Title Exceptions. Without City's written consent, Optionor shall not allow any new title exceptions or defects to be created that will not be eliminated or removed by Optionor prior to the Closing (if City timely exercises the Option). 3.3 Right of Err . During the Option Period (and, if City timely exercises the Option, from that date until the Closing or the termination of the Escrow Instructions, whichever first occurs), City (either directly or through and City's employees, representatives, agents, engineers, consultants, contractors, and designees) shall have the right to enter onto the Property to make such independent investigations, inspections, tests, reviews, studies or surveys as City deems necessary or appropriate, including without limitation, any desired investigations of the site work, soil, subsurface soils, drainage, seismic and other geological and topographical matters, and location of any asbestos, toxic substances, hazardous materials or wastes, provided, however, that: (i) all of the foregoing inspections, investigations, tests, etc. shall be performed by • City at City's sole cost and expense; (ii) City shall not enter the Property for any such purposes unless it first has provided Optionor with evidence reasonably satisfactory to Optionor that City (and its employees, representatives, agents, engineers, consultants, contractors or designees, as the case may be) possess insurance reasonably appropriate in scope and coverage to protect against damages or losses that may be suffered in connection with such activities, and that Optionor has been made an additional insured with respect to such policies; (iii) City shall provide written notice to Optionor at least 48 hours prior to inspection and any on -site inspection must be conducted in the company of a representative of Optionor; (iv) with respect to any invasive inspections, City shall obtain the prior written approval of Optionor prior to conducting such inspections, investigations, tests, etc. which approval shall not be unreasonably withheld, conditioned or delayed; (v) City shall, in a timely manner, repair any and all damage to the Property caused by such inspections, investigations, tests, etc. and return the Property to its original condition prior to City's entry, unless such repair would be legally prohibited under any environmental or other applicable laws; (vi) City shall keep the Property free of all liens in connection with its inspection of the Property and shall cause all such liens to be removed immediately upon its being notified of same; and (vii) City shall not materially disrupt the ordinary course of Optionor's businesses and/or activities on the Property during any such inspections, investigations, tests, etc. (including without limitation parking of automobiles or any business or activities conducted by any tenants or other third parties on the Property with the permission of Optionor, although Optionor agrees that it shall cooperate reasonably with City (subject to any contractual limitations which may be binding upon Optionor) in order to permit City to undertake its desired inspections, inspections, tests, etc.). City shall indemnify, defend • and hold harmless Optionor from and against any and all damage, liability or expense arising from the entries of City, its agents, contractors, consultants, and employees upon the Property; Error! Unknown document property oameArror! Unknown documen property name: Error! Unknowo docmneot property narne. Error! Uoknoro document property name..Error! Unkrmwn document property name. a! U09/07 -5- provided, that the foregoing indemnity shall not apply to any damage, liability or expense arising • from or related to (a) the mere discovery of matters by City during its investigation of the Property, including any latent defects in or Hazardous Materials on or in the Property or any diminution in value of the Property as a result thereof, or (b) negligent or wrongful acts or omissions of the Optionor or its agents, representatives or employees. 4. REPRESENTATIONS AND WARRANTIES: CONDITION OF PROPERTY. 4.1 Optionor's Representations and Warranties. Optionor hereby makes the following representation and warranties as of the date hereof and acknowledges that the execution of this Agreement by City has been made and, if the Option is exercised, the acquisition by City of the Property will be made in material reliance by City on such covenants, representations and warranties: (a) Power, Consents. Optionor has the legal power, right and authority to enter into this Agreement and the instruments referenced herein, to perform its obligations hereunder and to consummate the transaction contemplated hereby, and all documents to be executed by Optionor hereunder, including the Escrow Instructions if City exercises the Option, are and at the time of Closing will be duly executed and delivered by Optionor, are and at the time of Closing will be legal, valid and binding obligations of Optionor enforceable against Optionor in accordance with their respective terms and do not and at the time of Closing will not violate any provision of any agreement or judicial order to which Optionor or the Property is subject. Optionor has obtained all necessary authorizations, approvals and consents to the execution and • delivery of this Agreement and the consummation of the transactions contemplated hereby. (b) No Litigation. Optionor has not received written notice of any pending or threatened claims, allegations, lawsuits or governmental investigations of any kind, whether for personal injury, property damage, property taxes or otherwise affecting or relating to the Property, nor to the actual knowledge of Optionor, any such action or proceeding pending or threatened. (c) Compliance with Laws. To Optionor's actual knowledge, the Property is not in violation of any applicable law, rule, statute, ordinance or regulation, and Optionor has not received any written notification from any applicable governmental authority having jurisdiction over the Property of any existing, past or potential violation of applicable law. (d) Hazardous Materials. Optionor has no actual knowledge, and has not received any written notice or communication from any governmental agency having jurisdiction over the Property notifying Optionor, of the presence of surface or subsurface zone Hazardous Materials in, on, under or adjacent to the Property or any portion thereof. The term "Hazardous Materials" shall mean (i) hazardous wastes, hazardous materials, hazardous substances, hazardous constituents, toxic substances or related materials, whether solids, liquids or gases, including, but not limited to, substances deemed as • "hazardous wastes," "hazardous materials," "hazardous substances," "toxic substances," Error! Unknown doctmem properly oame./Errorl Unknown document property name.- Error! Unknowo document property name. Error! Unknown docment property name..Errorl Unknown document property name. a11/09/07 -6- • "pollutants," "contaminants," "radioactive materials," or other similar designations in, or otherwise subject to regulation under, the Comprehensive Environmental Response, Compensation and Liability Act of 1980, as amended ( "CERCLA "), 42 U.S.C. § 9601 et seq.; the Toxic Substance Control Act ("TSCA "), 15 U.S.C. § 2601 et seq.; the Hazardous Materials Transportation Act, 49 U.S.C. § 1802; the Resource Conservation and Recovery Act ("RCRA "), 42 U.S.C. § 9601, et seq.; the Clean Water Act ("CWA "), 33 U.S.C. § 1251 et seq.; the Safe Drinking Water Act, 42 U.S.C. § 300 et seq.; the Clean Air Act ( "CAA "), 42 U.S.C. § 7401 et seq.; the Hazardous Waste Control Law, California Health and Safety Code § 25025 et seq., the Carpenter- Presley - Tanner Hazardous Substance Account Act, California Health and Safety Code, Division 20, Chapter 6.8, the Hazardous Materials Release Response Plans and Inventory Act, California Health and Safety Code, Division 20, Chapter 6.95, The Underground Storage of Hazardous Substances Act, California Health and Safety Code, Division 20, Chapter 6.7, the Porter - Cologne Act, California Water Code § 13050 et seq. and in any permits, licenses, approvals, plans, rules, regulations or ordinances adopted, or other criteria and guidelines promulgated pursuant to the preceding laws or other similar federal, state or local laws, regulations, rules or ordinances now or hereafter in effect relating to environmental matters (collectively, "Environmental Laws "); including without limitation (A) petroleum, (B) refined petroleum products, (C) waste oil, (D) waste aviation or motor vehicle fuel, (E) asbestos, or (F) lead -based paint. (e) Rights of Third Parties. Optionor has not entered into any lease or other agreement for possession or sale with any person or entity, except City, pursuant to which • such person or entity has any interest or future right or interest to occupancy, possession or use of all or any portion of the Property, except for those agreements listed on Exhibit "4" or any other agreements that may be listed in the Title Report, all of which City is encouraged to review in accordance with the provisions of this Agreement. (f) Bankruptcy. Optionor has not, and as of the Closing if City exercises the Option, Optionor shall not have (i) made a general assignment for the benefit of creditors, (ii) filed any voluntary petition in bankruptcy or suffered the filing of any involuntary petition by Optionor's creditors, (iii) suffered the appointment of a receiver to take possession of all, or substantially all, of Optionor's assets, which remains pending as of such time, (iv) suffered the attachment or other judicial seizure of all, or substantially all, of Optionor's assets, which remains pending as of such time, (v) admitted in writing its inability to pay its debts as they come due, or (vi) made an offer of settlement, extension or composition to its creditors generally. For purposes of this Agreement, whenever any representation, warranty, certification or other statement of Optionor is stated to be made to the "knowledge," "best knowledge," or "actual knowledge" of Optionor or any of its agents or representatives, such statement shall be deemed to refer to, and to be strictly limited and confined to, the present actual knowledge of (specify Irvine Company points of contact] of Optionor, and without any obligation on the part of such person to undertake any further investigation or inquiry (including without limitation any investigation or inquiry into files or into the content or effect of applicable laws). In no event • shall such individuals have any personal liability on account of such knowledge or their designation for purposes of this paragraph. If Optionor becomes aware of any act or Eme. Unknown documem properly onmeArror! Unknown documml property n Error! Unknown docmceat property nome. Error! Unknown docmnem property omoe..Error! Unknown document property name. at 11DW07 -7- circumstance which would materially change or render materially incorrect, in whole or in part, • any representation or warranty made by Optionor under this Agreement, whether as of the date given or any time thereafter through the Closing Date and whether or not such representation or warranty was based upon Optionor's actual knowledge and/or belief as of a certain date, Optionor shall immediately deliver written notice of such changed fact or circumstance to City. 4.2 Survival. All representations and warranties contained in Section 4.1 shall be true and correct on the date hereof, and Optionor's liability for misrepresentation of or breach of warranty, representation or covenant, wherever contained in this Agreement, shall survive the execution and delivery of this Agreement and the Closing for a period of twelve (12) months from the Closing Date, and thereafter Optionor shall have no liability with respect thereto; and provided further, however, Optionor shall have no liability whatsoever to City with respect to a breach of any of the representations and warranties herein contained if City obtains knowledge of a fact or circumstance the existence of which would constitute a breach of Optionor's representations and warranties hereunder prior to the Closing Date and City proceeds to Closing, in which event each representation or warranty shall be deemed automatically amended to conform with the knowledge of City as of the Closing Date, and Optionor shall have no liability whatsoever for such previously inaccurate representation or warranty. For the purposes hereof, City shall be deemed to have knowledge of any fact or circumstance set forth in any environmental assessment, soils, geological, physical condition or other report received by City prior to Closing, and the representations and warranties herein contained shall be deemed automatically modified to the extent information contained in any environmental assessment, soils, geological, physical condition or other report received by City prior to Closing is • inconsistent with the matters covered herein. 4.3 Disclaimer of Further Representations or Warranties; AS -IS Sale. If City elects to exercise the Option to acquire the Property, City acknowledges it will have had an adequate opportunity to inspect the Property, and all aspects thereof, and to investigate its physical characteristics and conditions and all other matters related or relevant to such property, including, without limitation, City's ability to develop same. Upon the Close of Escrow, and except as otherwise expressly provided in this Agreement, City shall be deemed to have waived any and all objections to the condition of the Property and to have accepted the Property in its present "AS -IS," "WHERE -IS" condition. 5. OPTIONOR'S COVENANTS DURING OPTION PERIOD. During the Option Period (and, if City timely exercises the Option, from that date until the Closing), (i) Optionor shall not further encumber or place any further liens or encumbrances on the Property, including, but not limited to, covenants, conditions, restrictions, easements, liens, leases, tenancies, or other possessory interests without the prior written consent of City which consent may be withheld by City in its sole discretion; provided, however, that City agrees that City's consent shall not be required, and Optionor shall have the right to proceed with, any such encumbrances which by their terms shall terminate at or before the Closing (and provided further that to the extent any such encumbrances cause any material damage to the Property, Optionor shall repair such damage at or before the Closing); (ii) Optionor shall not take any affirmative action to cause physical damage to the Property, and shall not place or authorize to • be deposited, stored, or placed on, in, or under any portion of the Property any Hazardous Error! Uulmown document property nerneArror! Unknown document property name: Error! Unknown doeumem property name. Error! Unknown document property mtoe..E ror! Unknown document property =me. a11109N7 -8- • Materials other than in strict compliance with applicable federal, state, and local environmental laws and as may be appropriate and necessary to maintain and repair the Property (e.g., the use of minor amounts of pesticides to control weeds); and (iii) Optionor shall not take or permit to be taken any actions constituting waste of the Property and shall maintain or cause to be maintained the Property in substantially the same condition as exists on the date of this Agreement and, except in the ordinary course of business, Optionor shall not make any alterations to the Property. 6. DESIGN AND CONSTRUCTION OF CITY HALL. In the event City exercises the option and acquires the Option Site, all construction by City on the Option Site shall be completed at no cost to Optionor and shall be performed in a manner reasonably tailored to minimize the disruption of the operation of neighboring properties. With respect to the City Hall improvements to be constructed by City on the Property if City exercises the Option, City agrees (i) prior to the award of any design contract for the proposed improvements, Optionor shall have thirty (30) days to review and comment on the proposed improvements and design plan, and (ii) after the design plans have been completed and prior to soliciting public bids for such improvements, Optionor shall have sixty (60) days' to review and comment on City's designed improvements or any significant changes thereto. Upon receipt of Optionor's comments, City shall give reasonable consideration to any suggestions provided by Optionor regarding the proposed improvements; provided, however, City is not required under this Agreement to implement any suggestions made by Optionor. • 7. LIKE -KIND EXCHANGE. Notwithstanding anything to the contrary in this Agreement, City acknowledges and agrees that Optionor shall have the right at Closing, in lieu of receiving the Purchase Price for the sale of the Property, to exchange the Property (the "Tax -Free Exchange ") in a transaction intended to qualify as a tax -free exchange under Section 1031 of the Internal Revenue Code of 1986, as amended from time to time, and any regulations, rulings and guidance issued by the Internal Revenue Service (collectively, the "Code "). If Optionor elects to effect a Tax -Free Exchange pursuant to this Section, Optionor shall provide written notice to City prior to Closing, in which case Optionor shall enter into an exchange agreement and other exchange documents with a "qualified intermediary" (as defined in Treas. Reg. § 1. 103 1 (k)- I (g)(4) of the Code) (the "Exchange Party "), pursuant to which Optionor shall assign all of its right, title and interest under this Agreement to the Exchange Party. City shall execute and deliver such documents as may be required to complete the transactions contemplated by the Tax -Free Exchange which are in form and substance reasonably acceptable to City, and otherwise cooperate with Optionor in all reasonable respects to effect the Tax -Free Exchange. City agrees that if Optionor elects to effect a Tax -Free Exchange pursuant to this Section, at Closing, City shall pay the Purchase Price to the Exchange Party and direct Escrow Agent to disburse the Purchase Price to the Exchange Party. Notwithstanding the foregoing, (i) the Tax -Free Exchange shall not diminish City's rights, nor increase City's liabilities or obligations, under this Agreement, nor delay the Closing; (ii) Optionor shall pay for all fees, costs and expenses in connection with the Tax -Free Exchange; (iii) ) the purchase and sale of the Property shall not be conditioned upon the • consummation of the 1031 exchange; (iv) in no event shall Optionor be relieved from liability under the Agreement or the Escrow Instructions to be executed in connection herewith including, Error! Unknown document property nameArror! Unknown document property name.- Error! Unknown document property came. Error! UAW" docwtem property oame..Error! Unknown docmment property ro a all M9107 -9- without limitation, with respect to representations and warranties of Optionor to City under this • Agreement and its exhibits; (v) the consummation of the 1031 exchanges shall be at no liability, risk, fee or expense to the City; and (vi) the Optionor shall protect, indemnify, defend and hold City free and harmless from all losses, costs, claims, liabilities, lawsuits, demands and damages, including any attorneys' fees and expenses, incurred in connection therewith. 8. MISCELLANEOUS. 8.1 Attorney's Fees. If either party commences an action against the other to enforce any of the terms of this Agreement or because of the breach by either party of any of the terms of this Agreement, the losing party shall pay to the prevailing party its expert witness fees and its reasonable attorneys' fees, costs and expenses incurred in connection with the prosecution or defense of such action, including appeal of and/or enforcement of a judgment. 8.2 Notices. All notices required to be delivered under this Agreement to the other party must be in writing and shall be effective (i) when personally delivered by the other party or messenger or courier thereof; (ii) three (3) business days after deposit in the United States mail, registered or certified; (iii) twenty -four (24) hours after deposit before the daily deadline time with a reputable overnight courier or service; or (iv) upon receipt of a telecopy or fax transmission, provided a hard copy of such transmission shall be thereafter delivered in one of the methods described in the foregoing (i) through (iii); in each case postage fully prepaid and addressed to the respective parties as set forth below or to such other address and to such other persons as the parties may hereafter designate by written notice to the other parties hereto. Notices delivered after 5:00 PM on a business day shall not be deemed to have been delivered • until the following business day. As used herein, business days shall exclude weekends and state and federal holidays. The parties' respective addresses for notices are as set forth below, (with such addresses subject to change from time to time if a notice of change of address is delivered in accordance with the notice provisions set forth herein: To Optionor: The Irvine Company LLC 550 Newport Center Drive Newport Beach, CA 92660 -0015 Attn: General Counsel Facsimile: (949) 760 -0896 Copy to: Latham & Watkins LLP 600 West Broadway, Suite 1800 San Diego, CA 92101 -3375 Attn: Christopher W. Garrett Facsimile: (619) 696 -7419 To City: City of Newport Beach 3300 Newport Boulevard Post Office Box 1768 Newport Beach, CA 92663 -3884 Attn: City Manager • Facsimile: f 1 Error! Unknown docwnent property nam Arrorl Unknown document properly Dame-- Errorl Uolmowa document Property name. Error! Unknown docent property ^°,,,,..Error! Unknown docomem property Dame all/OV -10-- • Copy to: City of Newport Beach 3300 Newport Boulevard Post Office Box 1768 Newport Beach, CA 92663 -3884 Attn: City Attorney Facsimile: (949) 644 -3139 8.3 Assignment. Neither party shall, whether voluntarily, involuntarily, or by operation of law, assign all or any part of this Agreement or any rights hereunder without the other party's written approval, which approval may be withheld in the other party's sole and absolute discretion; except that City many assign its rights to another governmental entity solely for financing purposes. Also, City may specify a nominee to whom title will be conveyed on the Closing Date if the Option is exercised. hi connection with any assignment, any assignee shall execute all documents reasonably necessary to assume all of the obligations imposed under this Agreement as if the assignee were the original party to this Agreement. 8.4 Time of the Essence. Time is of the essence with respect to each of the terms, covenants, and conditions of this Agreement. 8.5 Binding on Heirs. Subject to the limitations set forth in Section 6.3 above, this Agreement shall be binding upon and inure to the benefit of the successors and assigns of the respective parties hereto. • 8.6 Entire Agreement. With the exception of the Zoning Implementation and Public Benefit Agreement, and the Escrow Instructions if the Option is exercised by City, this Agreement contains the entire agreement of the parties hereto with respect to the matters covered hereby, and all negotiations and agreements, statements or promises between the parties hereto or their agents with respect to this transaction are merged in this Agreement, which alone expresses the parties' rights and obligations. No other prior agreements or understandings not contained or incorporated herein shall be binding or valid against either of the parties hereto. 8.7 Modification. Any amendments or modifications to this Agreement must be in writing and executed by both parties to this Agreement. 8.8 Waivers. No delay or omission by either party hereto in exercising any right or power accruing upon the compliance or failure of performance by the other party hereto under the provisions of this Agreement shall impair any such right or power or be construed to be a waiver thereof. A waiver by either party hereto of a breach of any of the covenants, conditions or agreements hereof to be performed by the party shall not be construed as a waiver of any succeeding breach of the same or other covenants, agreements, restrictions or conditions thereof. 8.9 Interpretation; Governing, Law; Forum. This Agreement shall be construed according to its fair meaning and as if prepared by both parties hereto. Title and captions are for convenience only and shall not constitute a portion of this Agreement. As used in this Agreement, masculine, feminine or neuter gender and the singular or plural number shall each be • deemed to include the others wherever and whenever the context so dictates. This Agreement shall be construed in accordance with the internal laws of the State of California in effect at the Error! Unknown due®ent property nemeArror! Unknown doe ®ent property name. - Error! Unknown document property name. Error! Uokoowa document property oame..Etrorl Unknown document property nine. al 110W -11- time of the execution of this Agreement without regard to conflict of law principles. Venue and • jurisdiction of any action arising out of this Agreement shall exclusively be in any state or federal court sitting in the County of Orange, State of California. 8.10 Severability. If any term, provision, condition or covenant of this Agreement or the application thereof to any party or circumstances shall, to any extent, be held invalid or unenforceable, the remainder of this instrument, or the application of such term, provision, condition or covenant to persons or circumstances other than those as to whom or which it is held invalid or unenforceable, shall not be affected thereby, and each term and provision of this Agreement shall be valid and enforceable to the fullest extent permitted by law. 8.11 Authority to Execute. Each individual executing this Agreement on behalf of a party hereto warrants that (i) such party is duly organized and existing, (ii) he or she is duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) the entering into this Agreement does not violate any provision of any other agreement to which said party is bound. 8.12 Execution in Counterpart. This Agreement may be executed in several counterparts, and all so executed shall constitute one agreement binding on all parties hereto, notwithstanding that all parties are not signatories to the original or the same counterpart. [signature page follows] • r1 L_J Error! Unknown doerm ent property name./Errorl Unknown document property ueme.- Errorl Udmown document property uame- Error! Unknown document property ®me_Errorl Unknown document property mme- at IM107 -12- • IN WITNESS WHEREOF, the parties hereto have executed this Option Agreement as of the day and year first above written. L� 11 "OPTIONOR" THE IRVINE COMPANY LLC, a Delaware limited liability company By: Its: By: Its: "CITY" CITY OF NEWPORT BEACH, a California municipal corporation Its: ATTEST: City Clerk APPROVED AS TO FORM: City Attorney Errorl Unknown document property mmeJError! Unknown document property name.- Errorl Unknown document property came. Error! Unknown document property mme..Error! Unknown document property acme. al1WM -13- EXHIBIT "1" TO OPTION AGREEMENT • LEGAL DESCRIPTION OF LEGAL LOT INCLUDED WITHIN PARCEL [to be inserted] • • Errorl Uabmwa domalrot property came mr!Unknown document properly verve.- Errorl Uaknowo docuaeat property maime. Error! Uuknowo donmreat property avm .Error! Ualmowv document property oeae- al 1109/07 ' 1' EXHIBIT "2" TO OPTION AGREEMENT • SITE MAP • Error! Unkmwo document property mmeAmr! Unknown document property Dame.- Error! Unknown document property name. Error! Unknown document property mma.Error! Unknown document property Dame. at 110W [Attached] EXHIBIT "3" TO OPTION AGREEMENT MEMORANDUM OF OPTION AGREEMENT RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO: City of Newport Beach 3300 Newport Boulevard Post Office Box 1768 Newport Beach, CA 92663 -3884 Attn: City Clerk (Space Above For Recorder's Use) Exempt from the payment of a recording fee pursuant to Government Code Section 27383. MEMORANDUM OF OPTION AGREEMENT • By this MEMORANDUM OF OPTION AGREEMENT ( "Memorandum ") entered into as of the _ day of , 2008, THE IRVINE COMPANY LLC, a Delaware limited • liability company ( "Optionor "), and the CITY OF NEWPORT BEACH, a California municipal corporation ( "City "), the parties hereby agree as follows: 1. Optionor has granted to City an option (the "Option ") to acquire, that real property located in the City of Newport Beach, County of Orange, State of California, more particularly described in the legal description attached hereto as Exhibit "A" ( "Property "), in accordance with and subject to the terms and conditions set forth in that certain unrecorded Option Agreement dated December _, 2007 ( "Option Agreement "). The terms and provisions of the Option Agreement are incorporated herein by this reference as if fully set forth below. Capitalized terms utilized in this Memorandum which are not expressly defined herein shall have the meaning given to them in the Option Agreement. 2. The Option to purchase shall terminate, to the extent not exercised, on the date set forth in the aforesaid Option Agreement and shall otherwise be subject to the terms and conditions contained therein. In any event, this Memorandum shall terminate no later than 3. This Memorandum is intended only to memorialize the existence of the Option Agreement and does not constitute an amendment or modification thereof In the event of any inconsistency between this Memorandum and the terms and conditions set forth in the Option Agreement, the Option Agreement shall prevail and control. (signature page follows] • Error! Unknown docmoem property nameA ror! Unknown document property Dame. -Errorl Unknown document properly name. Error! Unkoowa docuoent properly nome..Error! Unknown docrmenl property ®ore. at IM9/07 -1- • IN WITNESS WHEREOF, Optionor and City have entered into this Agreement as of the date set forth above. LJ • "OPTIONOR" THE IRVINE COMPANY LLC, a Delaware limited liability company By: Its: By: Its: "CITY" CITY OF NEWPORT BEACH, a California municipal corporation Its: ATTEST: City Clerk APPROVED AS TO FORM: City Attorney Error! Unknown document property mameJErrmrl Unknown document property mane- Error! Unknown document property Dame. Error! Unknown document property neme..Error! Unknown document property mama a[ 1/09/07 -2- STATE OF CALIFORNIA ) ) ss. COUNTY OF ORANGE ) On before me, Notary Public, personally appeared personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) is /are subscribed to the within instrument and acknowledged to me that he /she/they executed the same in his/her /their authorized capacity(ies), and that by his/her /their signature(s) on the instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument. Witness my hand and official seal. Notary Public [SEAL] STATE OF CALIFORNIA ) ) ss. COUNTY OF ORANGE ) On before me, Notary Public, personally appeared personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) is /are subscribed to the within instrument and acknowledged to me that he /she/they executed the same in his/her /their authorized capacity(ies), and that by his/her /their signature(s) on the instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument. Witness my hand and official seal. Notary Public [SEAL] Error! UWmowo document property nameJErrmrl Unkmowm dmcamemt property mane.- Error! Unknown documeet properly name Error! Unlmowo document property oame.Errorl Unknown doeumeutproperty name. al 1109/07 -3- • F— -I LJ r1 U STATE OF CALIFORNIA • ) ss. COUNTY OF ORANGE ) On before me, Notary Public, • • personally appeared personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) is /are subscribed to the within instrument and acknowledged to me that he/she /they executed the same in his/her /their authorized capacity(ies), and that by his/her /their signature(s) on the instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument. Witness my hand and official seal. Notary Public [SEAL] Errorl Uokoown docmneol property nameArror! Unkc o docmnent property natm -Error! Unknown doe meat Property name. Errorl Unknowo docmoenl property name..Ertor! UAW" document property Dame. al U09107 -4- EXHIBrr "A" TO MEMORANDUM • LEGAL DESCRIPTION OF PROPERTY That certain real property located in the City of Newport Beach, County of Orange, State of California, described as follows: [to be inserted] • C� Error! Unknown document property namedErrur! Unknown doeuoust property name.- Error! Unknown dueumem property mmne. Error! Unknown document property name-Error! Unknown document property Dame. at UOW -1- EXHIBIT "4" TO OPTION AGREEMENT is AGREEMENT FOR PURCHASE AND SALE OF REAL PROPERTY AND ESCROW INSTRUCTIONS Escrow No. Date of Opening of Escrow: To: First American Title Company ( "Escrow Holder ") 2 First American Way Santa Ana, CA 92707 Attention: Escrow Officer Telephone: This AGREEMENT FOR PURCHASE AND SALE OF REAL PROPERTY AND ESCROW INSTRUCTIONS ( "Agreement ") is made this day of by and between THE IRVINE COMPANY LLC, a Delaware limited liability company ( "Seller"), and the CITY OF NEWPORT BEACH, a California municipal corporation ( "Buyer"). RECITALS: A. Seller is the owner of that certain real property comprised of approximately 53,000 square feet of land area, located in the City of Newport Beach, County of Orange, State • of California, more particularly described in Exhibit "A" attached hereto ( "Property "). B. Seller and Buyer previously executed that certain Option Agreement dated December _, 2007. All of the terms, conditions, provisions and covenants of the Option Agreement are incorporated in this Agreement by reference as though written out at length herein and the Option Agreement and this Agreement shall be deemed to constitute a single instrument or document. Capitalized terms used herein and not otherwise defined shall have the same meaning as set forth in the Option Agreement. C. By its execution of this Agreement, Buyer has exercised its option to purchase the Property. NOW, THEREFORE, the parties hereto agree as follows: 1. Purchase and Sale of Property. Subject to all of the terms, conditions, and provisions of this Agreement, and for the consideration herein set forth, Seller agrees to convey the Property to Buyer and Buyer agrees to purchase the Property from Seller. 2. Purchase Price. 2.1 Amount of Purchase Price. The purchase price which Seller agrees to accept and Buyer agrees to pay for the Property is , and shall not be subject to any escalation or increase for any reason. The Purchase Price is all- inclusive of • Seller's interest in the Property and the rights and obligations which exist or may arise out of the acquisition of the Property, as more fully explained in Section 6 of this Agreement. Error! Un!mown document property nameJError! Unknown document property name. -Errors Unknowo document properly name. Error! Unknown document property nama.Error! Unknown document property Hama al 1/09/07 -1- 2.2 Payment of Purchase Price. On the Closing Date, Buyer shall deposit with • Escrow Holder in "good funds" payable to Seller a sum equal to the Purchase Price. The term "good funds" shall mean a wire transfer of funds, cashier's or certified check drawn on or issued by the offices of a financial institution located in the State of California, or cash. 3. Escrow 3.1 Opening of Escrow; Closing Date. Pursuant to Section 1.5 of the Option Agreement, the Escrow shall be deemed opened on the date that Buyer executed and delivered this Agreement to Seller and that date shall be inserted on the first page of this Agreement as the date of the Opening of Escrow. Escrow shall close on or before the date that is thirty (30) days after the Opening of Escrow ( "Closing Date "). The terms the "Close of Escrow," and/or the "Closing" as used herein shall mean the date Seller's Grant Deed is filed for record by the Escrow Holder in the Office of the County Recorder of Orange County, California. 3.2 Escrow Instructions. This Agreement, together with any standard instructions of Escrow Holder, shall constitute the joint escrow instructions of Seller and Buyer to Escrow Holder as well as an agreement between Seller and Buyer. In the event of any conflict between the provisions of this Agreement and Escrow Holder's standard instructions, this Agreement shall prevail. 3.3. Deliveries by Seller. On or before 1:00 p.m. on the business day preceding the Closing Date, Seller shall will deposit with Escrow Holder the following: (a) an executed and acknowledged grant deed conveying fee title to the Property to Buyer in the form • attached hereto as Exhibit `B" ( "Grant Deed "); (b) a certificate of non - foreign status and California Franchise Tax Board Form 597, each executed by Seller and prepared by Escrow Holder; and (c) such funds and other items and instruments, executed and acknowledged if appropriate, as may be reasonably necessary in order for the Escrow Holder to comply with this Agreement. 3.4 Deliveries by Buyer. On or before 1:00 p.m. on the business day preceding the Closing Date, Buyer shall deposit with Escrow Holder the following: (a) a Preliminary Change of Ownership Statement completed in the manner required in Orange County; and (b) all additional funds and/or documents, executed and acknowledged (if appropriate) which are reasonably necessary to comply with the terms of this Agreement, other than the Purchase Price. On the Closing Date and provided Escrow Holder has received all closing documents and is in a position to close the Escrow, Buyer shall deliver the Purchase Price to Escrow Holder. 3.5 Closing, Recording and Disbursements. On the Closing Date, and provided all of the conditions to closing set forth in Sections 4.1 and 4.2 of this Agreement have been satisfied or waived in writing by the appropriate party, Escrow Holder shall take the following actions: (a) Recording. Escrow Holder shall insert the Purchase Price in the blank in Section 4.1 of the Grant Deed and thereafter cause the Grant Deed to be • recorded in the Official Records of Orange County, California. Error! Unknown document property nem iError! Unknown document properly name.- Error! Unknown doeoment property name. Error! Unknown docent property name..Errorl Unknown document property neme-al 1109/07 -2- • (b) Disbursement of Purchase Price. Escrow Holder shall disburse the Purchase Price to Seller after deducting therefrom the escrow and closing costs and prorations chargeable to Seller under Sections 3.7 and 3.8 of this Agreement. (c) Title Policy. Escrow Holder shall deliver to Buyer the Title Policy referred to in Section 4.2(b) of this Agreement. (d) Delivery of Documents. Escrow Holder shall deliver to the parties conformed copies of the Grant Deed and any other documents (or copies thereof) deposited by the parties with Escrow Holder pursuant to this Agreement. The original of the Grant Deed shall be returned to Buyer after recordation. 3.6 Possession. Seller shall deliver the Property to Buyer at the Close of Escrow, free and clear of all tenancies, lessees, occupants, licensees, and all possessory rights of any kind or nature. 3.7 Pavment of Costs. The premium for the Title Policy attributable to CLTA standard owners coverage shall be paid by Seller. Buyer shall pay for any additional title coverage requested by Buyer, including the difference between a CLTA standard owner's policy and an ALTA extended owner's policy, and any endorsements required by Buyer. Seller shall pay all documentary transfer taxes payable in connection with the recordation of the Grant Deed. The escrow fee of Escrow Holder shall be shared equally by Seller and Buyer; provided, however, if the Close of Escrow has not occurred by the Closing Date by reason of a default • hereunder, the defaulting party shall bear all Escrow cancellation charges. All other costs and expenses of Escrow not specifically allocated in this Agreement shall be allocated between Buyer and Seller in accordance with customary practice in the county in which the Property is located. 3.8 Real Property Taxes. Buyer is a public entity and is not required to pay property taxes. Seller shall cause all property taxes and assessments as of Closing to be paid when due. Seller may apply for a refund for any portion of taxes and assessments paid by Seller and allocated to any period after the Closing Date, in accordance with the applicable provisions of the Revenue and Taxation Code. 3.9 IRS Reporting Responsibilities. Any returns, statements or reports required to be filed under Section 6045(e) of the Internal Revenue Code of 1986 (or any similar reports required by state or local law) relating to the Property shall be filed by Escrow Holder. In no event shall this Agreement be construed so as to require that such returns, reports or statements be filed by Seller or Seller's counsel or Buyer or Buyer's counsel. Escrow Holder shall provide evidence to Seller and Buyer of its compliance with the provisions of this Section 3.9. 4. Conditions Precedent to Close of Escrow. 4.1 Conditions to Seller's Obligations. Seller's obligations to convey the Property and close the Escrow shall be subject to the satisfaction or written waiver by Seller of • each of the following conditions precedent: Error! Unknown doenment properly nameArrorl Unknown doeoment property name. - Error! Unlmown document properly Dame. Error! Unkno" docmnent property noore..Error! Unknown -3- document property name. al 1/09,U7 (a) Escrow Holder holds and will deliver to Seller the instruments and • funds accruing to Seller pursuant to this Agreement; and (c) Buyer is not in default of any term or condition of this Agreement or the Option Agreement. 4.2 Conditions to Buyer's Obligations. Buyer's obligation to purchase the Property and close the Escrow shall be subject to the satisfaction or written waiver by Buyer of each of the following conditions precedent: (a) Escrow Holder holds and will deliver to Buyer the instruments and funds, if any, accruing to Buyer pursuant to this Agreement; (b) First American Title Company is irrevocably committed to issue to Buyer a CLTA standard, or at Buyer's election, an ALTA extended coverage owner's policy of insurance, with liability in the amount of the Purchase Price, showing fee title to the Property vested in Buyer, subject only to the Approved Title Exceptions referred to in Section 3.2 of the Option Agreement ( "Title Policy "); and (c) all representations and warranties made by Seller in this Agreement and the Option Agreement are true and correct as of the Closing as thought made at that time, and Seller is not in default of any term or condition of this Agreement or the Option Agreement. (d) Buyer shall have approved, subject to acquisition of the Property, • the award of a construction contract for construction of the City Hall of the City of Newport Beach. 4.3 Satisfaction of Conditions. Where satisfaction of any of the foregoing conditions requires action by Seller or Buyer, each party shall use its diligent efforts, in good faith, and at its own cost, to satisfy such condition. 4.4 Termination. In the event each of the conditions set forth in Section 4.1 is not fulfilled on the Closing Date or waived by Seller, Seller may, at its election, terminate this Agreement and the Escrow opened hereunder. In the event that the conditions set forth in Section 4.2 are not fulfilled on the Closing Date or waived by Buyer, Buyer may, at its election, terminate this Agreement and the Escrow opened hereunder. Notwithstanding the foregoing, if Escrow is not in a position to close due to a party's failure to deposit into Escrow any documents or funds required to close Escrow, the non - defaulting party shall have the right to terminate this Agreement without first having given the defaulting party notice of the default and seven (7) days to cure the default, with the understanding that it is the parties' desire that this Agreement not terminate as a result of a technicality such as a party's inadvertent failure to timely make a deposit into Escrow. In the event this Agreement is terminated, all documents delivered by Seller to Buyer or Escrow Holder shall be returned immediately to Seller and all documents and funds delivered by Buyer to Seller or Escrow Holder shall be returned immediately to Buyer. Nothing in this Section 4.4 shall be construed as releasing any party from liability for any default of its obligations hereunder or breach of its representations and warranties under this Agreement • or the Option Agreement occurring prior to the termination of this Agreement and/or the Escrow. Error! Unlmown docmrent properly name. /Error! Unknown document properly rmme.•Error! Unknown document properly name. Error! Unknown document property name..Error! Unknown document property Hume. al 1109/017 -4- • 5. Property Purchased "AS -IS ". Buyer hereby confirms and acknowledges that, except for Seller's express representations and warranties set forth in this Agreement or the Option Agreement (or in any other agreement expressly incorporated into the Option Agreement), it is acquiring the Property in "AS -IS," "WHERE -IS" condition, "WITH ALL FAULTS," and without representation or warranty of any kind from Seller, as more particularly provided for in the Option Agreement. Further, Seller shall have no liability whatsoever to Buyer with respect to a breach of any of the representations and warranties set forth in this Agreement or the Option Agreement if Buyer obtains actual knowledge of a fact or circumstance the existence of which would constitute a breach of Seller's representations and warranties hereunder prior to the Closing Date and Buyer proceeds to Closing, in which event each representation or warranty shall be deemed automatically amended to conform with the knowledge of Buyer as of the Closing Date, and Seller shall have no liability whatsoever for such previously inaccurate representation or warranty. For the purposes hereof, Buyer shall be deemed to have actual knowledge of any fact or circumstance set forth in any environmental assessment, soils, geological, physical condition or other report received by Buyer prior to Closing, and the representations and warranties herein contained shall be deemed automatically modified to the extent information contained in any environmental assessment, soils, geological, physical condition or other report received by Buyer prior to Closing is inconsistent with the matters covered herein. 6. Relocation; Release. Seller acknowledges and agrees that a portion of the Purchase Price represents Buyer's payment to Seller for Seller's relocation from the Property. Buyer's payment to Seller of said amount shall constitute full and complete satisfaction of any is obligation Buyer may have for providing relocation assistance to Seller and paying its relocation costs required to comply with all applicable federal, state and local laws, rules and regulations arising out of, based upon, or relating to, relocation assistance or benefits owing under Government Code § 7260 et seq., Title 25 of the California Code of Regulations, Section 6000 et seq., or under any other federal, state or local relocation statutes, regulations or guidelines, including but not limited to, any such regulations or guidelines of Buyer. Seller, for itself and for its agents, successors, assigns, and all entities related to any of the foregoing, and on behalf of all persons claiming any interest in the Property or this Agreement fully releases, acquits and discharges the Buyer and its officers, officials, members, directors, employees, attorneys, accountants, other professionals, insurers, and agents, and all entities, boards, commissions, and bodies related to any of them (all of the foregoing, collectively, the "Released Parties "), from all rights, claims, demands, actions or causes of action that Seller, or any of them, has or may have against the Released Parties arising out of or related to Buyer's acquisition of the Property or the displacement of Seller from the Property, including, but not limited to all of Seller's property rights and interests in the Property, and including but not limited to relocation benefits and assistance, all leasehold interests and rights of tenancy or occupancy, all improvements, all improvements pertaining to the realty, furniture, fixture, and equipment, business goodwill, lost income (past or future), failure to locate a suitable replacement location, lost rental income or sublease or license income, severance damages, pre- condemnation damages, if any, economic or consequential damages, professional consultant fees, attorney's fees and costs, expert witness fees and costs, interest , all other costs, and any • and all compensable interests, and/or damages, and/or claims, of any kind and nature, claimed or Error! Unknown document property oame/Error! Uuknowo document property name -Error! Unknown document properly name Errorl Unknown docmment property nan e.- Error! Unknown document property oa.ne. al 110M -5- to be claimed, suffered or to be suffered, by Seller, and any of them, by reason of Buyer's • acquisition of the Property or Seller's displacement from the Property. Seller, on behalf of itself and its agents, successors, assigns, and all entities related to any of the foregoing, and on behalf of all persons claiming any interest in the Property or this Agreement, and as owner, principal, director, partner, shareholder, agent, or representative of any business, enterprise, or venture, expressly waive any and all rights under Section 1542 of the Civil Code of the State of California, or any other federal or state statutory rights or rules, or principles of common law or equity, or those of any jurisdiction, government, or political subdivision thereof, similar to Section 1542 (hereinafter referred to as a "Similar Provision "). Thus, Seller and each of them, and any business, enterprise, or venture in which it is involved, may not invoke the benefits of Section 1542 or any Similar Provision in order to prosecute or assert in any manner claims released hereunder. Section 1542 provides as follows: "A GENERAL RELEASE DOES NOT EXTEND TO CLAIMS WHICH THE CREDITOR DOES NOT KNOW OR SUSPECT TO EXIST IN HIS FAVOR AT THE TIME OF EXECUTING THE RELEASE, WHICH, IF KNOWN BY HIM, MUST HAVE MATERIALLY, AFFECTED HIS SETTLEMENT WITH THE DEBTOR." Seller's Initials: In the event any occupants or lessees of the Property shall be entitled to relocation • assistance, Seller shall have the sole and exclusive responsibility for providing relocation assistance and paying all relocation costs required to comply with all applicable federal and state laws, rules, and regulations. Seller shall indemnify, defend, and hold Buyer and the Buyer harmless from and against any claims, liabilities, damages, or losses made against it by tenants or occupants of the Property, including without limitation claims for relocation assistance and inverse condemnation. 7. Miscellaneous. 7.1 Attorney's Fees. If either party commences an action against the other to enforce any of the terms of this Agreement or because of the breach by either party of any of the terms of this Agreement, the losing party shall pay to the prevailing party its expert witness fees and its reasonable attorneys' fees, costs and expenses incurred in connection with the prosecution or defense of such action, including appeal of and/or enforcement of a judgment. 7.2 Notices. All notices required to be delivered under this Agreement to the other party must be in writing and shall be effective (i) when personally delivered by the other party or messenger or courier thereof; (ii) three (3) business days after deposit in the United States mail, registered or certified; (iii) twenty -four (24) hours after deposit before the daily deadline time with a reputable overnight courier or service; or (iv) upon receipt of a telecopy or fax transmission, provided a hard copy of such transmission shall be thereafter delivered in one of the methods described in the foregoing (i) through (iii); in each case postage fully prepaid and • addressed to the respective parties as set forth below or to such other address and to such other Errorl Unlmowo document property numeArrorl Unknown document property oume.•Error! Udmown docent property name. Error! Unknown document property oeme.Ermrl Unlmown document property onme. x11/09/07 -6- • persons as the parties may hereafter designate by written notice to the other parties hereto. Notices delivered after 5:00 PM on a business day shall not be deemed to have been delivered until the following business day. As used herein, business days shall exclude weekends and state and federal holidays. The parties' respective addresses for notices are as set forth below, (with such addresses subject to change from time to time if a notice of change of address is delivered in accordance with the notice provisions set forth herein: • To Seller: The Irvine Company LLC 550 Newport Center Drive Newport Beach, CA 92660 -0015 Attn: General Counsel Facsimile: (949) 760 -0896 Copy to: Latham & Watkins LLP 600 West Broadway, Suite 1800 San Diego, CA 92101 -3375 Attn: Christopher W. Garrett Facsimile: (619) 696 -7419 To Buyer: City of Newport Beach 3300 Newport Boulevard Post Office Box 1768 Newport Beach, CA 92663 -3884 Attn: City Manager Facsimile: f Copy to: City of Newport Beach 3300 Newport Boulevard Post Office Box 1768 Newport Beach, CA 92663 -3884 Attn: City Attorney Facsimile: (949) 644 -3139 7.3 Assignment. Neither party shall, whether voluntarily, involuntarily, or by operation of law, assign all or any part of this Agreement or any rights hereunder without the other party's written approval, which approval may be withheld in the other party's sole and absolute discretion, except that Buyer many assign its rights to another governmental entity solely for financing purposes. Also, Buyer may specify a nominee to whom title will be conveyed on the Closing Date. In connection with any assignment, any assignee shall execute all documents reasonably necessary to assume all of the obligations imposed under this Agreement as if the assignee were the original party to this Agreement. 7.4 Time of the Essence. Time is of the essence with respect to each of the terms, covenants, and conditions of this Agreement. Errorl Unknown docoment property nameJErrorl Unknown document property name. -Error! Unknown document property onne. Errorl Unknown document property name..Error! Unknown document piny omane. at I109M -7- 7.5 Binding on Heirs. Subject to the limitations set forth in Section 7.3 above, this Agreement shall be binding upon and inure to the benefit of the successors and assigns of the • respective parties hereto. 7.6 Entire Agreement. With the exception of the Development Agreement and the Option Agreement, this Agreement contains the entire agreement of the parties hereto with respect to the matters covered hereby, and all negotiations and agreements, statements or promises between the parties hereto or their agents with respect to this transaction are merged in this Agreement, which alone expresses the parties' rights and obligations. No other prior agreements or understandings not contained or incorporated herein shall be binding or valid against either of the parties hereto. 7.7 Modification. Any amendments or modifications to this Agreement must be in writing and executed by both parties to this Agreement. 7.8 Waivers. No delay or omission by either party hereto in exercising any right or power accruing upon the compliance or failure of performance by the other party hereto under the provisions of this Agreement shall impair any such right or power or be construed to be a waiver thereof. A waiver by either party hereto of a breach of any of the covenants, conditions or agreements hereof to be performed by the party shall not be construed as a waiver of any succeeding breach of the same or other covenants, agreements, restrictions or conditions thereof 7.9 Interpretation; Governing Law; Forum. This Agreement shall be • construed according to its fair meaning and as if prepared by both parties hereto. Title and captions are for convenience only and shall not constitute a portion of this Agreement. As used in this Agreement, masculine, feminine or neuter gender and the singular or plural number shall each be deemed to include the others wherever and whenever the context so dictates. This Agreement shall be construed in accordance with the internal laws of the State of California in effect at the time of the execution of this Agreement without regard to conflict of law principles. Venue and jurisdiction of any action arising out of this Agreement shall exclusively be in any state or federal court sitting in the County of Orange, State of Califomia. 7.10 Severability. If any term, provision, condition or covenant of this Agreement or the application thereof to any party or circumstances shall, to any extent, be held invalid or unenforceable, the remainder of this instrument, or the application of such term, provision, condition or covenant to persons or circumstances other than those as to whom or which it is held invalid or unenforceable, shall not be affected thereby, and each term and provision of this Agreement shall be valid and enforceable to the fullest extent permitted by law. 7.11 No Merger. Subject to Section 4.2 of the Option Agreement, the provisions of this Purchase Agreement and the Option Agreement shall survive the Close of Escrow and shall not be merged with the Grant Deed. 7.12 Broker Commissions. Seller and Buyer each represent and warrant to the other that it has not engaged any broker or finder in this transaction and that no broker or finder is entitled to any commission or finder's fee in with this transaction as a result of its • connection Error! Unknown docu tent property nameArror! Unknown document property mm• .Error! Unlmown document Property nome. Error! Unknown document property name..Errorl Unlmorvn document Property Dame. at 1109107 -8- CJ LI actions or agreement, and Seller and Buyer shall indemnify, defend and hold harmless each other from any claim to any such commission or fee resulting from any action or agreement of or by the indemnifying party. 7.13 Authority to Execute. Each individual executing this Agreement on behalf of a party hereto warrants that (i) such party is duly organized and existing, (ii) he or she is duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) the entering into this Agreement does not violate any provision of any other agreement to which said party is bound. 7.14 Execution in Counterpart. This Agreement may be executed in several counterparts, and all so executed shall constitute one agreement binding on all parties hereto, notwithstanding that all parties are not signatories to the original or the same counterpart. [signature page follows] Error! Unknown document property name/Error! Unknown document property name- Error! Unknown document property name. Error! Unknown document property oame-.Error! Unknown doeameut property name. al IM/07 -9- IN WITNESS WHEREOF, the parties hereto have executed this Agreement of Purchase i and Sale of Real Property and Escrow Instructions as of the date first above written. "SELLER" THE IRVINE COMPANY LLC, a Delaware limited liability company By: Its: By: Its: "BUYER" CITY OF NEWPORT BEACH, a California municipal corporation By: is Its: ATTEST: City Clerk APPROVED AS TO FORM: City Attorney • Error! Unknown document property oamedError! Uukaown docmocnt property omoe-- Error! Uolmown docomem property name• Error! Unknown doe000ent property noun-Error! Udmown doeomem property m al 009107 -1�' EXHIBIT "A" TO ESCROW INSTRUCTIONS • LEGAL DESCRIPTION OF PROPERTY • U That certain real property located in the City of Newport Beach, County of Orange, State of California, described as follows: Error! Unknown document property mmeJEmr! Unknown document property nameArrorl Unknown document property name. Error! Unknown document property nome..Errorl Unknown document property name. al IM9107 [to be inserted] EXHIBIT `B" TO ESCROW INSTRUCTIONS • GRANT DEED City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92663 Attn: City Clerk (Space Above For Recorder's Use) The undersigned grantor(s) declare(s) that this transaction is This document is being recorded for the benefit exempt from the payment of a documentary transfer tax of the City of Newport Beach and is exempt pursuant to Revenue and Taxation Code Section 11922. from payment of a recordation fee pursuant to Government Code Section 27383. GRANT DEED FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, THE IRVINE COMPANY LLC, a Delaware limited liability company, successor -in- interest to The Irvine Company, a Michigan corporation ( "Grantor"), hereby grants to the CITY OF NEWPORT BEACH, a California municipal corporation ( "Grantee "), that certain real property located in the City of Newport Beach, County of Orange, State of California, described in the legal description attached hereto as Exhibit "1" and incorporated herein by this reference (the . "Property "), subject to: (A) all exceptions of record; and (B) reserving to Grantor, for the benefit of the owner (the "Benefited Party ") of fee title to the real property comprised of one legal parcel described in Exhibit "2" (the "Benefited Property"), the rights set forth in this Section (B). In the event the Benefited Party is comprised of more than one person or entity, Grantee shall be entitled to rely on the actions and statements of any such person or entity as binding the Benefited Party. 1. Use Restrictions. Grantee, as owner of the Property, hereby agrees for the benefit of the Benefited Party as follows with respect to specific uses of the Property. For a period of twenty -five (25) years following the recordation of this Deed, unless otherwise agreed by Benefited Party: (i) the Property may not be used for any purpose other than a City Hall and other civic uses including without limitation uses which are reasonably ancillary to, and customary in connection with, the operation of a City Hall and are not unreasonably disruptive to the use of the Benefited Property; (ii) the Property shall be the primary seat of government for the City of Newport Beach and shall contain the chambers of the City Council and the primary offices of the Mayor, the City Councilmembers and the City Manager. City will not develop or use the Property for any other use or purpose during the twenty -five (25) year period following the recordation of this Deed. The foregoing is a use restriction and not an operating covenant. 2. In accepting this Deed, Grantee hereby agrees to all of the rights and obligations • described above in this Deed. The terms and conditions of Deed shall create equitable servitudes Error! Unknown doctmeut property name./Error! Unknown document properly tame.- Error! Unknown document property tame. Error! Unlmowa document property name..Error! Uolmown document Property name. al 1!09/07 4- . upon the Property; shall bind the owners of the Property (and each person or entity having any interest therein); and shall run with the land. The benefits provide to Grantor (and any Benefited Party) under this Deed shall run with the land. [This provision will include the concept that Grantor shall have a right to repurchase in the event of breach of the terms and conditions of Deed, but that if Grantor decides not to repurchase, the use restriction preventing Grantee from selling property is removed.] (C) MISCELLANEOUS; 3. Attorney's Fees. If either party commences an action against the other to enforce any of the terms of this Deed or because of the breach by either party of any of the terms of this Deed, the losing party shall pay to the prevailing party its expert witness fees and its reasonable attorneys' fees, costs and expenses incurred in connection with the prosecution or defense of such action, including appeal of and/or enforcement of a judgment. 4. Notices. All notices required to be delivered under this Deed to the other party must be in writing and shall be effective (i) when personally delivered by the other party or messenger or courier thereof; (ii) three (3) business days after deposit in the United States mail, registered or certified; (iii) twenty -four (24) hours after deposit before the daily deadline time with a reputable overnight courier or service; or (iv) upon receipt of a telecopy or fax transmission, provided a hard copy of such transmission shall be thereafter delivered in one of the methods described in the foregoing (i) through (iii); in each case postage fully prepaid and addressed to the respective parties as set forth below or to such other address and to such other . persons as the parties may hereafter designate by written notice to the other parties hereto. Notices delivered after 5:00 PM on a business day shall not be deemed to have been delivered until the following business day. As used herein, business days shall exclude weekends and state and federal holidays. The parties' respective addresses for notices are as set forth below, (with such addresses subject to change from time to time if a notice of change of address is delivered in accordance with the notice provisions set forth herein: To Grantor: The Irvine Company LLC 550 Newport Center Drive Newport Beach, CA 92660 -0015 Attn: General Counsel Facsimile: (949) 760 -0896 Copy to: Latham & Watkins LLP 600 West Broadway, Suite 1800 San Diego, CA 92101 -3375 Attn: Christopher W. Garrett Facsimile: (619) 696 -7419 Error! Unknown document property nameArror! Unknown document property onme.- Error! Unknown doca neat Properly name. Error! Unknown document property oame..Error! Unknown document properly name. &11/09/07 -2- To Grantee: City of Newport Beach • 3300 Newport Boulevard Post Office Box 1768 Newport Beach, CA 92663 -3884 Attn: City Manager Facsimile: ( 1 Copy to: City of Newport Beach 3300 Newport Boulevard Post Office Box 1768 Newport Beach, CA 92663 -3884 Attn: City Attorney Facsimile: (949) 644 -3139 5. Time of the Essence. Time is of the essence with respect to each of the terms, covenants, and conditions of this Deed. 6. Binding on Heirs. Subject to the limitations set forth in Section 3 above, this Deed shall be binding upon and inure to the benefit of the successors and assigns of the respective parties hereto. 7. Entire Agreement. With the exception of the Development Agreement, the Option Agreement, and the Agreement for Purchase and Sale of Real Property and Escrow Instructions • between Grantor and Grantee dated this Deed contains the entire agreement of the parties hereto with respect to the matters covered hereby. No other prior agreements or understandings not contained or incorporated herein shall be binding or valid against either of the parties hereto with respect to the subject matter set forth herein. 8. Modification. Any amendments or modifications to this Deed must be in writing and executed by both Grantee and Benefited Party. 9. Waivers. No delay or omission by either party hereto in exercising any right or power accruing upon the compliance or failure of performance by the other party hereto under the provisions of this Deed shall impair any such right or power or be construed to be a waiver thereof. A waiver by either party hereto of a breach of any of the covenants, conditions or agreements hereof to be performed by the party shall not be construed as a waiver of any succeeding breach of the same or other covenants, agreements, restrictions or conditions thereof. 10. Interpretation, Governing Law; Forum. This Deed shall be construed according to its fair meaning and as if prepared by both parties hereto. Title and captions are for convenience only and shall not constitute a portion of this Deed. As used in this Deed, masculine, feminine or neuter gender and the singular or plural number shall each be deemed to include the others wherever and whenever the context so dictates. This Deed shall be construed in accordance with the internal laws of the State of California in effect at the time of the execution of this Deed without regard to conflict of law principles. Venue and jurisdiction of any action arising out of • this Deed shall exclusively be in any state or federal court sitting in the County of Orange, State of California. Errorl Unknown document property mateArrorl Unknown document property noo a Errorl Unknown document property uame. Error! Unlmown doc®eot property omne..Error! Uuk,mwo doc,ment property name. al IMM7 -3- • 11. Severability. If any term, provision, condition or covenant of this Deed or the application thereof to any party or circumstances shall, to any extent, be held invalid or unenforceable, the remainder of this instrument, or the application of such term, provision, condition or covenant to persons or circumstances other than those as to whom or which it is held invalid or unenforceable, shall not be affected thereby, and each term and provision of this Deed shall be valid and enforceable to the fullest extent permitted by law. is • 12. Authority to Execute. Each individual executing this Deed on behalf of a party hereto warrants that (i) such party is duly organized and existing, (ii) he or she is duly authorized to execute and deliver this Deed on behalf of said party, (iii) by so executing this Deed, such party is formally bound to the provisions of this Deed, and (iv) the entering into this Deed does not violate any provision of any other agreement to which said party is bound. 13. Execution in Counterpart. This Deed may be executed in several counterparts, and all so executed shall constitute one agreement binding on all parties hereto, notwithstanding that all parties are not signatories to the original or the same counterpart. Dated THE IRVINE COMPANY LLC, a Delaware limited liability company LE UR Error! Unknown doctonent property name./Error! Unknown doeoment property name. Error! Unknown doc,ment property name. Error! Unknown dacmnent property norm.Error! Unknown document property name. al 1/09U7 -4- STATE OF CALIFORNIA ) ) ss COUNTY OF ORANGE ) On , before me, , Notary Public, personally appeared personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her /their authorized capacity(ies), and that by his/her /their signature(s) on the instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument. Witness my hand and official seal. Notary Public [SEAL] STATE OF CALIFORNIA ) ) ss COUNTY OF ORANGE ) On before me, Notary Public, personally appeared personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her /their authorized capacity(ies), and that by his/her /their signature(s) on the instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument. Witness my hand and official seal. Notary Public [SEAL] Error! Unknown document property nameJ&mr! Unknuwa document property Dame.- Error! Unknown document property name. Error! Unlmown document property name..Error! Unlmown document property name. at 1109M7 -5- is is is • CERTIFICATE OF ACCEPTANCE This to certify that the interest in real property conveyed by the foregoing Grant Deed, from The Irvine Company LLC to the City of Newport Beach is hereby accepted by the undersigned officer of the City of Newport Beach, on behalf of the City of Newport Beach, pursuant to authority conferred by Resolution No. of the City Council of the City of Newport Beach adopted on and the grantee consents to the recordation thereof by its undersigned duly authorized officer. • r1 U CITY OF NEWPORT BEACH, a California municipal corporation M Dated: ATTEST: City Clerk STATE OF CALIFORNIA ) ) ss COUNTY OF ORANGE ) On before me, , Notary Public, personally appeared , personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he /she/they executed the same in his/her/their authorized capacity(ies), and that by his/her /their signature(s) on the instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument. Witness my hand and official seal. Notary Public [SEAL] Error! Unknown document property namedError! Unknown document property name.- Error! Unknown document properly name• Error! Unknown document property name..Errorl Unknown document property name. al 1/09M7 -6- EXHIBIT "1" TO GRANT DEED • LEGAL DESCRH'TION OF PROPERTY That certain real property located in the City of Newport Beach, County of Orange, State of California legally described as follows: [to be inserted] • Errorl Unknown document property mmeJErrorl Unknown document property mme.- Error! Untmown document Papery Damn. Error! Untmowo document property mn a . Eeror! Unknown document Property Dame. an/0997 -7- • CJ EXHIBIT 17 Cl NORTH NEWPORT CENTER PLANNED COMMUNITY AFFORDABLE HOUSING IMPLEMENTATION PLAN Prepared For: The City of Newport Beach November 2007 Contents I. Executive Summary ........................................................................................ ..............................1 Background.................................................................................................... ............................... l H. Affordable Housing Plan ................................................................................ ..............................3 ProposedPlan ................................................................................................. ..............................3 Timing............................................... ............................... I ............................ ............................... 3 Number of Affordable Units/Income Levels .................................................. ..............................5 Conclusion...................................................................................................... ..............................5 III. Consistency with Housing Element ................................................................ ..............................6 IV. Amendments to the AMP ............................................................................... ..............................7 V. Authority ......................................................................................................... ..............................7 Figures Exhibit 1 - North Newport Center Planned Community .. ............................... Exhibit 2 - Child Time Center and The Bays Apartment Complex Locations North Newport Center Planned Community i Affordable Housing Implementation Plan 2 4 I. Executive Summary The North Newport Center Planned Community (Planned Community) approval by the City of Newport Beach includes a Planned Community Development Plan that implements the goals and policies of the City's General Plan. The Planned Community, as shown on Exhibit 1, consists of four sub -areas within North Newport Center, a regional center comprised of major retail, professional office, entertainment, recreation, hotel and residential development. Block 500, Block 600 and San Joaquin Plaza are designated in the General Plan as MU -H3, a designation which allows for a mixed -use area combining commercial, office, entertainment and residential uses. The Planned Community Development Plan for North Newport Center allows construction of 430 residential units in these blocks, and affordable housing units must be provided in accordance with City Housing Element. This Affordable Housing Implementation Plan (AHIP) outlines how the required affordable housing will be provided. Background The City's Housing Element includes a goal that 15% of all new housing units in the City be affordable to very low, low and moderate income households. The Housing Element identifies moderate income households as those with annual incomes between 80% and 120% of the county median household income. Low income households are those with annual incomes between 51% and 80% of the county median household income. Very low income households are those with annual incomes of 50% or less of the County median household income. Projects with more than 50 units are required to prepare an AHIP that specifies how the development will meet the City's affordable housing goal. The Southern California Association of Governments (SCAG) prepares the state - mandated Regional Housing Needs Assessment (RHNA). The RHNA quantifies the need for housing within each jurisdiction during specified planning periods. The City's General Plan Housing Element must include its "fair share" regional housing needs allocation for all income groups which must be updated periodically. The most recently published SCAG RHNA identifies the City allocation as follows: • Total allocation between 1/1/06 and 6/30/14 —1,784 • Very low income allocation — 22% (392 units) • Low income allocation —18% (321 units) • Moderate income allocation — 20.3% (362 units) North Newport Center Planned Community Affordable Housing Implementation Plan ti an" �quin . yNVcauz� IaLa _...,.A community II. Affordable Housing Plan Proposed Plan The City's General Plan Housing Element allows for sale or for rent options in order to meet the obligation for affordable housing units. In addition, affordable housing may be provided off -site, with City approval. Consistent with these Housing Element provisions, this Affordable Housing Implementation Plan includes the following options. Locations of the sites are included on Exhibit 2. A. New Construction The Irvine Company is the owner of a 0.75 -acre parcel of land located at the former Child Time Center near the intersection of San Joaquin Hills Road and San Miguel Avenue. The site is in a residential area and could accommodate up to 14 two- or three - bedroom multi - family units with a density bonus for affordable housing. The Irvine Company may construct 14 housing units on this site to be offered for sale or for rent. If this option is selected, The Irvine Company will record a legal deed restriction on the property which insures the units will meet the affordability requirements for a period of at least 30 years. The annualized rents chargeable for occupancy of the Affordable Units shall not exceed thirty percent (30 %) of the amount of Very Low, Low or Moderate Income. The sales price of affordable for sale units shall not exceed three times the income limits. B. Covenants on Existing Units The Irvine Company owns The Bays, an apartment complex consisting of three buildings known as Baywood, Bayview and Bayport, which is shown on Exhibit 2. Rental costs for the required number of affordable housing units located in The Bays complex and income limits of tenants will be restricted for a period of 30 years with a recorded document. The Irvine Company will determine which apartments are best suited to meet the obligation. The City will inspect the apartments to ensure compliance with relevant codes, proper maintenance and adequate common areas for any rental units designated to meet the affordable housing requirement. The Irvine Company will agree to make improvements, if necessary, to ensure viable housing for the 30 year period. The annualized rents chargeable for occupancy of the Affordable Units shall not exceed thirty percent (30 %) of the Very Low, Low or Moderate Income limits. Timing The affordable housing units required under this AHIP will be provided incrementally. The affordable units shall be phased as follows: Certificate of use and occupancy for 100' market rate unit / one -third of required units Certificate of use and occupancy for 200th market rate unit / one -third of required units Certificate of use and occupancy for 300' market rate unit / one -third of required units North Newport Center Planned Community Affordable Housing Implementation Plan Exhibit 2 - Child Time Center and The Bays Apartment Complex Locations North Newport Center Planned Community Affordable Housing Implementation Plan 4., C� Ford/td. 8 °gym n. `� • s' ".: �' Harbor View •5v e 4^",',0. •� l�� b@' d ID y Fashlon Island u 40 I C CP4'd� "•� ♦ 1 Pdc ` Co O 9 d C d 4w tlfww� MuG6 �� The Bays Apartment Complex Child Time Center Exhibit 2 - Child Time Center and The Bays Apartment Complex Locations North Newport Center Planned Community Affordable Housing Implementation Plan Number of Affordable Units /Income Levels The requirement for affordable housing shall be based on income categories. The Irvine Company will provide either very low, low or moderate income housing, or a combination of income categories, using the percentages shown in the table below. INCOME CATEGORY PERCENTAGE REQURED TOTAL AMOUNT Very Low 10% 43 units Low 15% 65 units Moderate 20% 86 units Implementation Affordable housing agreements shall be executed and recorded at each phase identified above for any units constructed on the Child Time site and for designated affordable units in The Bays apartment complex prior to the point where a certificate of use and occupancy is issued for the related market rate units. In order to meet the minimum eligibility requirements, the units must be rented to households qualifying as very low, low or moderate income households. In addition, the City will have the ability to inspect the designated Bays apartrnents. Such inspection shall be focused on ensuring compliance with relevant codes, proper maintenance and the provision of adequate common areas for any existing rental units designated to meet the affordable housing requirement. The Irvine Company shall cooperate with the City and its agents in monitoring the units for compliance as outlined herein. Conclusion Implementation of this AHIP will result in the availability of affordable housing units as identified above within the City of Newport Beach in accordance with the City's Housing Element. North Newport Center Planned Community Affordable Housing Implementation Plan M. Consistency with Housing Element The City of Newport Beach adopted a General Plan in 2006. A Housing Element was included in the General Plan in accordance with State law. The Housing Element identifies goals and programs for the provision of affordable housing in the City. The AHIP is intended to meet the specific goals of the Housing Element as follows: Policy H2.1 Encourage preservation of existing and provision of new housing affordable to very low, low and moderate income households. Program 2.1.2 Take all feasible actions, through use of development agreements, expedited development review and expedited processing of grading, building and other development permits, to ensure expedient construction and occupancy for projects approved with low and moderate income housing requirements. The AHIP supports the City's requirement for the provision of affordable housing for all new development with more than 50 residential units. The Irvine Company has prepared a Development Agreement in accordance with this Policy/Program. Policy H2.2 Encourage the housing development industry to respond to housing needs of the community and to the demand for housing as perceived by the industry, with the intent of achieving the Regional Housing Needs Assessment construction goals within five years. Program 2.2.1 Require a proportion of affordable housing in new residential developments or levy an in -lieu fee. The City's goal over the five-year planning period is for an average of 15 percent of all new housing units to be affordable to very low, low and moderate - income households. The City shall either (a) require the payment of an in -lieu fee, or (b) require the preparation of an Affordable Housing Implementation Plan (AHIP) that specifies how the development will meet the City's affordable housing goal, depending on the following criteria for project size: 1. Projects of 50 or fewer units shall have the option of preparing an AHIP or paying the in -lieu fee. 2. Projects where more than 50 units are proposed shall be required to prepare an AHIP. Implementation of this program will occur in conjunction with City approval of any residential discretionary permits or Tentative Tract Maps. To insure compliance with the 15 percent affordability requirements, the City will include conditions in the approval of discretionary permits and Tentative Tract Maps to require on -going monitoring of those projects. Program 2.2.4 All required affordable units shall have restrictions to maintain their affordability for a minimum of 30 years. As described in Section H, the affordable housing provided per the AHIP will meet the Housing Element requirement for the total affordable units required. The units will be deed restricted to North Newport Center Planned Community Affordable Housing Implementation Plan remain affordable for a period of 30 years. In addition, the developer will provide periodic reports in the form required by the City. The provision of the affordable housing units will assist the City in meeting the RHNA construction goals. In conclusion, the AHIP is consistent with the relevant goals and programs in the City's 2006 General Plan Housing Element. IV. Amendments to the AHIP This AHIP may be amended with the approval of the City Council. No modification of the General Plan requirement for affordable units is allowed, unless the requirement is reduced through an amendment to the General Plan prior to implementation of development. V. Authority The AHIP has been adopted by the City of Newport Beach per Resolution No. day of , 200_ . North Newport Center Planned Community Affordable Housing Implementation Plan on the