Loading...
HomeMy WebLinkAboutNewport Lexus (PA2004-153)CITY OF NEWPORT BEACH PLANNING COMMISSION STAFF REPORT Agenda Item 5 April 21, 2005 TO: Honorable Chairman and Members of the Planning Commission FROM: David Lepo, Contract Planner 949 - 553 -1427, dlepo @hogleireland.com SUBJECT: Draft Final Environmental Impact Report (SCH 2004081004), General Plan Amendment No. 2004 -004, Planned Community Text Amendment No. 2004 -003, Use Permit No. 2004 -026, Modification Permit No. 2005 -0303, Traffic Study No. 2004 -003 for Newport Lexus Automobile Dealership (PA 2004 -153) LOCATION: 3901, 3931, 3961 MacArthur Boulevard 848, 888 Dove Street APPLICANT: . Wilson Automotive Group RECOMMENDATION: Review the draft Final Environmental Impact Report (EIR), General Plan Amendment (GPA), Planned Community (PC) Text Amendment, Use Permit (UP), Modification Permit, and Traffic Study, receive public comments, and recommend that City Council certify the Final EIR and approve the GPA, the PC Text Amendment, the UP, the Modification Permit, and the Traffic Study for the Newport Lexus automobile dealership. DISCUSSION: Background Wilson Automotive Group submitted an application for a General Plan Amendment, a Planned Community Text Amendment, a Use Permit, a Modification Permit, and a Traffic Study for construction of a 130,000 square -foot Newport Lexus automobile dealership on an 8.05 acre parcel on the westerly Newport Lexus April 21, 2005 Page 2 of 21 side of MacArthur Boulevard at Jamboree Road. Existing improvements that include an Avis rental car storage facility and three office buildings whose tenants include Platt College would be demolished. The Planning Commission reviewed and commented on conceptual plans for the dealership at a Study Session on December 9, 2004. The proposed dealership has been revised in response to Planning Commission comments and consistent with the Reduced Impact Alternative identified in the Draft EIR as the Environmentally Superior Alternative. Current plans also reflect revisions necessitated by cost considerations and include redesigned building facades, a net reduction in the building area to 114,485 square feet, and a reduction in the service and parking structure from four stories with rooftop parking to two stories plus roof -top parking. A Draft Environmental Impact Report (EIR) was prepared for the project consistent with California Environmental Quality Act (CEQA) Guidelines and circulated for public review on November 29, 2004. The 45 -day public review period ended on January 12, 2005. Responses to comments on the Draft EIR received during public review have been prepared. The Draft EIR and the responses to comments together comprise the draft Final EIR included for Planning Commission consideration. Proiect Description Automobile Showroom and Parts and Service Structures The 8.05 -acre project site is proposed to be developed with a 114,485 square - foot automobile dealership. The dealership facility consists of a 42,142 square - foot showroom building and a 72,343 square -foot service department integrated within a two -story parking structure. The automobile showroom is comprised of a 31,518 square -foot first level that includes automobile display, a service customer lounge, coffee bar, wine bar, and sales offices. An automobile service reception and work write -up area are located in the southerly portion of the showroom building. Business offices are located on a 10,624 square -foot mezzanine. The two -story service building includes approximately 80 service stalls, a parts counter and parts storage on the first level. Up to 412 spaces on the second and rooftop levels of this building are provided for new vehicle and loaner car storage. An additional 185 spaces are indicated on the rooftop for employee parking. A car wash for new and used car preparation and for vehicles being serviced at the dealership adjoins the south wall of the auto service facility. A service customer driveway from Dove Street and customer vehicle queuing lanes are situated between the service building and the showroom building. A canopy above the customer queuing lanes connects the two buildings. M Newport Lens Ap0121, 2005 Page 3 of 21 The height of the showroom building is 31'— 6" to the top of the parapet and 40' — 9" to the ridge of the hip roof above the main customer entrance. The two -story service facility and parking structure is 34'— 7" to the top of the parapet. A "logo" tower at the northeasterly corner of the service building extends to a height of 56' —10 ". The applicant has indicated that an additional level may be added to the service parking facility in the future, extending the height of that structure to up to 50 feet. This addition to the service and parking structure would be accompanied by an increase in the height of the logo tower to up to 75 feet. Height limits in the PC Text are revised to accommodate this expansion. The showroom and service buildings comply with PC Text minimum building setbacks of thirty (30) from MacArthur and from Jamboree. No portion of the showroom building is nearer than 100' to the Jamboree or MacArthur frontages. The southwesterly corner of the showroom projects approximately one foot into the required 30 -foot Dove Street setback (See Modification Permit, below). A setback of approximately 63' is provided between the curvilinear first -level wall of the parking structure and Jamboree. Upper levels of the structure are approximately 90' from the Jamboree right -of -way. A minimum side yard at interior lot lines of 10 feet is required by the PC Text and exceeded at the south building line where a distance of 20 feet separates the service facility/parking structure from the adjacent commercial property. A side yard at the northerly property line where the outdoor automobile display area abuts the parking lot on the adjoining property is proposed to be 6 feet (See Modification Pen-nit, below). Minimum landscaped front yards of 30 feet are required by the PC Text at both the MacArthur and Jamboree ( "Special Landscaped Streets") frontages. The landscaped front yard shown on the project plans along MacArthur, measured from right -of -way line, varies from 18' at the fountain to 25'— 10 W at the outdoor automobile display area adjacent to the service building, to 26' near the Jamboree /MacArthur intersection, and to a maximum of 52' — 6" at the south property line (See Modification Permit, below). Future right -of -way dedication for planned widening of Jamboree Road would reduce the depth of the yard at the automobile display area near the service building to 19'— 5 % " as shown on the plans accompanying this report. A minimum 30 -foot landscaped yard is provided at Jamboree Road and at MacArthur Boulevard and a minimum 10 -foot deep landscaped yard is shown along Dove Street, consistent with the PC Text. Eight (8), circular automobile display pads are proposed and will encroach into the required landscaped yards (See Modification Permit, below). 3 Newport Lexus April 21, 2005 Page 4 of 21 The location of the showroom building has been adjusted from previous proposals but still encroaches approximately two (2) feet into the required 30 -foot yard adjacent to Dove Street. A 10 -foot high screening wall and tire and fluid storage areas are proposed in the required minimum 30 -foot yard between the service building and Dove Street (See Modification Permit, below). The service building itself is approximately 55' from the Dove Street frontage. On -Site Circulation and Parking A vehicle entrance to the new car display lot and the showroom facility is proposed from MacArthur Boulevard approximately 320 feet south of Bowsprit Drive. A traffic island in MacArthur limits this access to "right -in, right -out" only. A drive aisle extends from the MacArthur entrance through the new and pre- owned vehicle displays to the customer parking area (approximately 35 spaces) flanking the front doors to the showroom. The parts and service building, and the service write -up area at the back of the showroom, may also be reached from this entrance. Vehicle access is also provided at three locations from Dove Street on the westerly edge of the site: an automobile service customer entrance opposite Quail Street (service drive); an entrance to the new car display lot and showroom north of Quail Street; and a gated access at the southern end of the site used primarily for service department test drives and employee parking on the rooftop. The service drive from Quail Street includes three inbound and two outbound lanes. The three inbound lanes provide stacking for approximately 30 vehicles. These will accommodate incoming service customers and loaner vehicle returns. Stacking for approximately 20 vehicles is provided in two outbound lanes, primarily for customer vehicle and loaner vehicle pick -up. The location and configuration of the service drive were largely determined by the location of an easement for a storm drain and a water main beneath the driveway. The proposed configuration would allow the service department to continue functioning in the event that future repair or replacement of the water main or storm drains requires excavation of portions of the service drive. Architectural Features The conceptual architectural elevations for the Newport Lexus dealership balance strong, horizontal building planes with key vertical elements such as the building form at the main customer entrance. A curved, linear colonnade is set in front of and repeats the strong horizontal plane of the showroom fagade. Prominent building materials include large plate glass surfaces, stucco walls, and metal roofing compatible with the overall contemporary design theme. The conceptual landscape master plan includes king and queen palm trees in setbacks along street frontages. Setbacks will incorporate turf, ornamental Y Newport Lexus April 21, 2005 Page 5 of 21 shrubs, and seasonal plants for accent color. Retaining walls in the landscaped setbacks along MacArthur Boulevard and Jamboree Road provide a grade transition from the building site down to the public sidewalks. A fountain is proposed near the Jamboree Road frontage at the east end of the service drive. Areas of enhanced paving are included throughout the display lots. Signs for the proposed dealership include three -foot high, illuminated channel letters indicating "Newport Lexus" and a backlit Lexus logo are proposed for the uppermost corner of each of three showroom building walls visible from Jamboree Road, from MacArthur Boulevard, and from Dove Street, respectively. Similar signs are shown near the top of each of the three walls of the service facility /parking structure that are oriented toward Jamboree Road, MacArthur Boulevard, and Dove Street, respectively. An illuminated Lexus logo is proposed on each of the four sides of the tower at the northeast corner of the service facility. A detailed sign program will be submitted for staff review and a Modification Permit will be required as the PC Text allows wall signs on only two facades of a building. Four monument signs are indicated in landscaped setbacks: one at the MacArthur Boulevard frontage south of the main vehicle entrance; one at the MacArthur /Jamboree intersection; one at the Dove Street entrance to the new car display lot; and one at the entrance to the service facility. Directional signs are shown in the landscaped setback at the service drive entrance and at the new car display lot entrance from Dove Street. Sign regulations are included in the revised PC text to reflect the Planning Commission's Study Session response to the "sign layout" program included with this report. An exterior display and security lighting plan is included. Consistent with mitigation measures in the Draft EIR, exterior lighting standards are equipped with "sharp cut -off' fixtures to minimize outward and upward light spread. Draft EIR mitigation measures also include submittal of a photometric plan indicating fixture selection and illumination levels that minimize light and glare impacts on the surrounding area. Post - installation inspection by the City is also required to ensure that the site is not excessively illuminated and that lighting sources are properly shielded. Planning Commission Actions Draft Final Environmental Impact Report The Planning Commission will recommend to the City Council as to whether or not the draft Final EIR should be certified. The EIR identifies the range of potential environmental impacts that could result from construction and operation of the Lexus automobile dealership. The range of impacts analyzed was based on an Initial Study, included in the EIR, which concluded that no further analysis was needed in the areas of Biological Resources, Hazards and Hazardous 5 Newport Lexus April 21, 2005 Page 6 of 21 Materials, Mineral Resources, Public Services, Agricultural Resources, Cultural Resources, Noise, Recreation, Utilities /Service Systems, Geology /Soils, and Population/Housing. The "project' analyzed in the EIR is proposed development and operation of a 130,000 square -foot automobile dealership as initially proposed by the applicant. Potential impacts relating to Aesthetics /Land Use, HydrologyMater Quality, and Traffic were identified. With mitigation measures proposed in the EIR, all impacts would be mitigated to a less than significant level. Impacts and corresponding mitigation measures for the 130,000 square -foot "project" are paraphrased in the following: IMPACT Aesthefts/Land Use Potential incompatibility of project building mass and scale with existing buildings MITIGATION MEASURE Submit project plans to City for review to ensure consistency Potential light and glare on Use sharp cut -off fixtures with flat adjoining properties glass and internal and external shielding Fixture lenses parallel with finished grade; no fixtures tilted above 90- degree angle Lighting level design within IESNA recommended levels Lighting systems grouped into control zones for facility "open ", "closed" modes, and for security lighting mode with automatic clock and photocell controls Submit lighting and photometric plan for review by City Post - installation lighting inspection to ensure illumination is not excessive, sources are properly shielded In IMPACT Potential inconsistency with General Plan and Zoning Ordinance Potential inconsistency with Federal Aviation Administration (FAA) FAR Part 77 and with Airport Land Use Commission (ALUC) Airport Environs Land Use Plan Hydrology, Water Quality and Storm Water Violate any water quality standards or waste discharge requirements Degrade groundwater quality Cumulative impacts to surface water quality Transportation/Traffic Cause deterioration to an unacceptable Level of Service (CEQA) or cause an increase to Newport Lexus April 21, 2005 Page 7 of 21 MITIGATION MEASURE Submit application for Use Permit and for amendment of "Planned community Development Standards, Newport Place" Submit plans to the FAA and to ALUC Prior to grading permit, submit proof of Notice of Intent filing with State Water Resources Control Board and prepare a Storm Water Pollution Prevention Plan Have an approved Water Quality Management Plan prior to grading permit Have an approved Water Quality Management Plan prior to grading permit Prior to grading permit, submit proof of Notice of Intent filing with State Water Resources Control Board and prepare a Storm Water Pollution Prevention Plan Have an approved Water Quality Management Plan prior to grading permit Restripe westbound approach at Irvine Ave. and Mesa Drive to provide one left -turn lane, one 7 IMPACT ICU of 0.01 or more (TPO) Result in inadequate parking Result in hazards due to design feature Air Quality Violate air quality standards or contribute to air quality violation Newport Lens April 21, 2005 Page 8 of 21 MITIGATION MEASURE shared through /left lane, and one right -turn lane; signal modifications to implement split -phase operation on east -west approaches (TPO) Project shall comply with all City parking requirements Reduce curb radius of eastbound free right turn on Bowsprit Dr. to MacArthur Blvd. to 35 feet to slow turning traffic and increase distance between Bowsprit and project entrance. Cover trucks hauling loose materials or require at least two feet of freeboard Pave, water, or apply soil stabilizers on unpaved roads, parking and staging areas Sweep paved access roads, parking and staging areas with water sweepers Sweep streets with water sweepers if soil material is carried into adjacent public streets Hydroseed or apply stabilizers to inactive construction areas Enclose, cover, water, or apply soil binders to exposed stockpiles Limit traffic speeds on unpaved roads to 15 MPH Install sandbags or other erosion control measures to prevent silt run- IMPACT Newport Lexus April 21, 2005 Page 9 of 21 MITIGATION MEASURE off to public roadways during rainy season Replant vegetations in disturbed areas as quickly as possible Construction equipment shall be properly tuned and maintained Construction equipment shall be operated as to minimize exhaust emissions e.g. no idling in queues Stage construction to avoid emissions peaks and discontinue during second -stage smog alerts As required by CEQA, alternatives to the 130,000 square -foot Lexus dealership project were analyzed in the EIR. A smaller dealership facility and "no project" were evaluated as alternatives that would avoid or reduce the level of significance of environmental impacts. An alternative may be deemed environmentally superior to the project if the overall magnitude of impacts is determined to be less than that of the proposed project. The feasibility of an alternative, however, must be considered in light of the project proponent's objectives that are identified and set forth in the EIR as follow: • To better serve the existing Lexus customer base in Newport Beach; • To expand Lexus' market share in Orange County and the Newport Beach area; and • To construct a facility of high architectural quality, complementary to the Newport Beach image. Alternatives analyzed in the EIR, the relative overall magnitude of impacts of each, and the extent to which each meets project objectives are as follows: "No Proiect Alternative" This alternative assumes that no revisions are made to the existing General Plan and Planned Community texts, and that no new development occurs. The Avis rental car storage facility and office uses including Platt College would remain on the site. Analysis in the Draft EIR indicated that the No Project Alternative would not cause an increase in the amount of stormwater run -off. Water quality c Newport Lexus April 21, 2005 Page 10 of 21 impacts could be greater than those of the proposed project, however, because development of existing facilities on the site was not subject to Water Quality Management Plans and the attendant Best Management Practices that promote improvement in the quality of stormwater run -off. Air quality impacts resulting from new construction would be eliminated. Increases in peak hour trip generation would not occur. None of the project proponent's objectives, however, would be attained in this alternative. "Reduced Project Alternative" Redevelopment of the site with a Lexus dealership smaller than that of the project as originally proposed is reflected in the Reduced Project Alternative. The smaller dealership would include 117,000 square feet of building area rather than 130,000 square feet as in the EIR "project ". Qualitative analysis in the EIR shows that the Reduced Project Alternative would result in comparable Aesthetics /Land Use, Air Quality, and Hydrology and Water Quality impacts as the project. Quantitatively, the Reduced Project Alternative would generate 28 fewer vehicle trips in the morning peak hour and 34 fewer trips in the evening peak hour than the project originally proposed. This reduction in peak hour trips would reduce the traffic impact at the Jamboree /MacArthur intersection to a less than significant level. Transportation Phasing Ordinance impacts at the Irvine /Mesa intersection remain and the Reduced Project Alternative would require participation in funding of improvements at that intersection. The Reduced Project Alternative would allow the applicant to achieve project objectives of better serving the existing Lexus customer base in Newport Beach, of expanding Lexus' market share in Orange County and the Newport Beach area, and of constructing a facility of high architectural quality, complementary to the Newport Beach image. Although the No Project Alternative minimizes or avoids physical environmental impacts, this Alternative does not meet the applicant's project objectives. Furthermore, CEQA Guidelines require that the FEIR identify an alternative other than the No Project Alternative as the Environmentally Superior Alternative. The Reduced Project Alternative (117,000 square -foot dealership) is deemed to be the Environmentally Superior Alternative. At the time the Draft EIR was completed, the applicant revised plans for the Lexus dealership and reduced the building area to 117,000 square feet consistent with the Reduced Project/Environmentally Superior Alternative. The proposed dealership facility was subsequently reduced to approximately 114,485 square feet as shown in plans currently before the Planning Commission for consideration. For CEQA purposes, this project is substantially consistent with no Newport Lexus April 21, 2005 Page 11 of 21 the Reduced Project/Environmentally Superior Alternative and is expected to result in comparable impact levels. The resolution that includes the Planning Commission recommendation to City Council on the Final EIR incorporates "Findings and Facts in Support of Findings ". The Findings identify each potentially significant impact identified in the Final EIR and indicates the means by which each is to be avoided or reduced to a less than significant level. General Plan Amendment The eight (8) acre project site falls into two different land use designations in the General Plan: the northerly five (5) acres are "Administrative, Professional and Financial Commercial" and the southerly three (3) acres are "Retail and Service Commercial." Automobile dealerships are not allowed within areas designated "Administrative, Professional and Financial Commercial". Development of the Newport Lexus automobile dealership requires a General Plan Amendment to change the land use designation of the 5 -acre northerly portion of the site from "Administrative, Professional and Financial Commercial" to "Retail and Service Commercial," consistent with the current designation for the southerly 3 acres. Based on data for Statistical Area L4 (Airport Area) of the Land Use Element of the General Plan, total potential building area entitlement for the entire 8 -acre site is approximately 139,000 square feet. The General Plan Amendment will not increase the potential building area entitlement. An equivalent building area entitlement of 24,000 square feet, however, is added to the existing 115,000 square feet of entitlement and replaces an allowable "3.0 acres for auto center use" in the Statistical Area. The total potential building area entitlement in the proposed Land Use Element description includes the equivalent 24,000 square feet of entitlement for the 3 -acre southerly parcel, 115,000 square feet for the northerly 5 -acre parcel, and 89,530 square feet for the office building at the corner of MacArthur Blvd. and Dove St. which is not part of this project. The existing and proposed Land Use Element descriptions of the Lexus dealership site are as follow: Existing Land Use Element description Airport Area (Statistical Area L4) 2. Newport Place. Newport Place is bounded by Birch Street, MacArthur Boulevard, Jamboree Road and Bristol Street North. The area is identified as the Newport Place Planned Community. The areas described are not the same as those defined on the Planned Community Text map, but are a compilation of the area on a block -by -block basis, with more precise site Newport Lens April 21, 2005 Page 12 of 21 allocations made in the Planned Community Text. All development limits exclude parking. 2 -9. NP Block J. Block J is bounded by Dove Street, Bowsprit Drive, MacArthur Boulevard, Jamboree Road and Bristol Street North. The site is designated for Administrative, Professional and Financial Commercial and Retail and Service Commercial land use. The site is allocated 204,530 sq. ft. plus 3.0 acres for auto center use. Proposed Land Use Element description Airport Area (Statistical Area 1-4) 2. Newport Place. Newport Place is bounded by Birch Street, MacArthur Boulevard, Jamboree Road and Bristol Street North. The area is identified as the Newport Place Planned Community. The areas described are not the same as those defined on the Planned Community Text map, but are a compilation of the area on a block -by -block basis, with more precise site allocations made in the Planned Community Text. All development limits exclude parking. 2 -9. NP Block J. Block J is bounded by Dove Street, Bowsprit Drive, MacArthur Boulevard, Jamboree Road and Bristol Street North. The site is designated for Administrative, Professional and Financial Commercial and Retail and Service Commercial land use. The site is allocated 228,530 sq. ft. Charter Section 423 Analysis Consistent with Section 423 of the City Charter of Newport Beach, Council Policy A -18 requires that proposed General Plan Amendments be reviewed to determine if voter approval is required. Voter approval is required for a General Plan Amendment if more than 100 peak hour trips will be generated, an additional 40,000 square feet of building area is proposed, or more than 100 dwelling units will be built. The proposed General Plan Amendment for the Newport Lexus project does not allow additional building area entitlement or include any dwelling units and voter approval is not required based on the respective Charter criteria. An analysis of peak hour trips, however, was prepared and is included as Exhibit 3. Consistent with Charter Section 423, the peak hour trip analysis for the General Plan Amendment includes trips generated by the proposed project plus 80% of the increase in trips associated with a previous General Plan Amendment in the same General Plan Statistical Area. This cumulative trip analysis shows that total AM peak hour trips would increase by 21.26 and total PM peak hour trips would increase by 31. is Newport Lens April 21, 2005 Page 13 of 21 Both are below the 100 peak hour trip threshold of City Council Policy A- 18. Voter approval, therefore, is not required for this General Plan Amendment. Planned Community Development Plan Amendment The entire project site is zoned "Planned Community" (PC). Development and use regulations for this PC area are established in the document entitled "Planned Community Development Standards Newport Place" (PC text). This document was first adopted in 1970 and has been amended numerous times since then. The PC text designates the southerly 3 acres for auto center uses and the northerly 5 acres for professional and business office uses. Amendment of the Newport Place Planned Community text would change the PC text designation for the entire project site to "General Commercial" to accommodate a broad range of retail sales and service uses including the proposed Lexus dealership. As in commercial zones elsewhere in Newport Beach, the revised PC text will require a Use Permit for automobile sales and service uses. Numerous clerical corrections will be made to the Planned Community Text. Substantive changes to accommodate the Lexus automobile dealership are as follows: STATISTICAL ANALYSIS, PART II., COMMERCIALIPROFESSIONAL & BUSINESS OFFICES, A. Building Sites, B. Building Area, C. Building Area, D. Parking, E. Landscaped — Open Space, F. Building Heights Site 3A, the 5.2 acre portion of the project site, is deleted from all subsections to reflect the change in designation of the 5.2 -acre site from "Commercial /Professional & Business Offices" to "General Commercial "; STATISTICAL ANALYSIS, PART II., AUTO CENTER AND GENERAL COMMERCIAL [8,9] PERMITTED USES, A. Auto Center Building Sites, B. General Commercial Building Sites, C. Building Area, D. Parking, E. Landscaping — Open Space, F. Building Height "AUTO CENTER" is deleted from the heading to reflect the change in designation of the 3.0 -acre portion of the project site to "General Commercial`; Subsection A, "Auto Center Building Sites ", is deleted to reflect the change in the designation of the 3.0 acre portion of the project site from "Auto Center" to "General Commercial" and the letter designations of succeeding paragraphs are changed accordingly; 13 Newport Lexus April 21, 2005 Page 14 of 21 "Site 7 ", representing the combined 5.2 -acre site and the 3.0 -acre site that comprise the 8.2 -acre project site, is added to the listing under General Commercial Building Sites and the cumulative acreage for that designation is changed accordingly; "Site 7 ", representing the combined 5.2 -acre site and the 3.0 -acre site that comprise the 8.2 -acre project site, is added to the listing under Building Area together with potential building area (141,120 sq. ft.) and site acreage (8.20) and the cumulative building areas and acreages are changed accordingly; "Site 7 ", representing the combined 5.2 -acre site and the 3.0 -acre site that comprise the 8.2 -acre project site, is added to the listing under Parking together with the respective number of parking spaces (357 cars) and parking area (2.98 acres) and the cumulative parking spaces and parking areas are changed accordingly; "Site 7 ", representing the combined 5.2 -acre site and the 3.0 -acre site that comprise the 8.2 -acre project site, is added to the listing under Landscaping — Open Space together with potential landscaped acreage and the cumulative landscaped acreages are changed accordingly; "Site 7 ", representing the combined 5.2 -acre site and the 3.0 -acre site that comprise the 8.2 -acre project site, is added under Building Height with a maximum permissible building height of fifty -five (55) feet except for vertical projections ( "Lexus logo" tower and stairwell) which may extend to seventy -five (75) feet. PART II., COMMERCIAL, Section 111., General Development Standards for Commercial, B., Signs, Ground Sign Maximum permissible height for an identification ground sign is increased from four (4) feet to six (6) feet. Land Use Plan Newport Place Planned Community The line separating the sites designated "Auto Center Site 1 B" and "Pro. & Bus. Office Site 3A" on the land use map is deleted. The designations of sites as "Auto Center Site 1B" and "Pro. & Bus. Office Site 31" are deleted and the resultant single site is designated "General Commercial Site 7 ". The "Area Summary" is revised by increasing "7.2 ac." corresponding to "Retail /General Commercial" to 15 ac. ", by reducing the acreage corresponding to "Office" from "70.0 ac." to "65.0 ac. ", and by deleting "Auto Center" and the corresponding "3.0 ac." to reflect the combining of the 5 -acre site "Pro. & Bus. Office Site 3A" with the 3 -acre "Auto Center ly Newport Lexus April 21, 2005 Page 15 of 21 Site 1B" into a single site that is designated as "General Commercial Site 7." Use Permit The revised "Planned Community Development Standards Newport Place" includes automobile sales and service as a use subject to approval of a Use Permit. The applicant also proposes to include a wine bar in the showroom which, pursuant to Chapter 20.89 of the City's Zoning Code, "Alcoholic Beverage Outlets ", is also subject to a Use Permit The Planning Commission will recommend to the City Council such action as deemed appropriate for the Use Permit request. Planning Commission review of the Use Permit request for the automobile dealership and the wine bar are required to ensure that the facility is designed, located, and operated in a manner compatible with nearby uses. A recommendation to the City Council to approve these uses requires that the Planning Commission make the following findings: That the proposed location for the automobile dealership is in accord with the objectives of the Zoning Code and the purposes of the district in which the proposed automobile dealership site is located; That the propose location of the automobile dealership and the proposed conditions under which it would be operated or maintained will be consistent with the General Plan and the purpose of the district in which the site is located; will not be detrimental to the public health, safety, peace, morals, comfort, or welfare of persons residing or working in or adjacent to the neighborhood of such use; and will not be detrimental to the properties or improvements in the vicinity or to the general welfare of the City; and That the proposed use will comply with the provisions of this code, including any specific condition required for the proposed use in the district in which it would be located. Use Permit— Automobile Dealership Compatibility of the proposed automobile dealership with nearby uses is a consideration in Use Permit approval. The proposed Lexus automobile dealership would be located adjacent to the rear wall of a retail commercial center that fronts on Bristol Street North and separated from office buildings that are located opposite the project site across Jamboree Road, MacArthur Boulevard, and Dove Street. The service and parking structure would be set back a greater distance from Jamboree Road and a comparable distance from Dove Street than the commercial center. Nearby office buildings are up to eight IS Newport Lexus April 21, 2005 Page 16 of 21 stories in height. The proposed dealership facility is substantially consistent in design, quality of materials, scale, and building volume with that of nearby structures. Vehicular access to the site is also a consideration in reviewing a request for a Use Permit. Based on a previous circulation study, vehicular access points to the project site were selected to provide safe ingress and egress. The main new vehicle customer entrance at MacArthur Boulevard was located 130 feet south of Bowsprit to avoid a conflict between vehicles entering MacArthur from Bowsprit and vehicles entering the dealership from MacArthur. The analysis included a recommendation that the curb radius of the traffic island that forms the eastbound free right turn from Bowsprit Drive to MacArthur Boulevard be reduced to 35 feet to slow turning traffic to further reduce conflict between traffic entering MacArthur from Bowsprit and traffic entering the dealership from MacArthur. This improvement is included as a condition of approval for the proposed project. A weaving analysis was conducted to determine if vehicles exiting the proposed dealership onto MacArthur Boulevard and crossing to the left -turn lanes to eastbound Jamboree could safely do so. An estimated 60 vehicles at peak hour were assumed to follow this route based on the originally proposed 130,000 square -foot facility. The weaving analysis showed that this volume of traffic could safely merge with MacArthur Boulevard traffic and transition to the left -turn lanes in the distance provided between the dealership driveway and the MacArthur /Jamboree intersection. Subsequent reduction in the size of the proposed dealership to approximately 114,000 square feet and inclusion of three vehicle entrances to the site from Dove Street will further reduce the potential number of vehicles using this route. Noise emanating from the proposed dealership is a subject for review in the application for a Use Permit. Noise sources on the project site, including the car wash near the south end of the property, were considered in the Initial Study prepared for the project as required by CEQA. No sensitive noise receptors e.g. residences are located in the vicinity of the proposed dealership and the Initial Study found that the highest noise levels would result from construction of the dealership facility. The proposed dealership is subject to Mitigation Measure M -XIA that requires that construction activities be conducted in accordance with the City of Newport Beach noise standards and that the hours of construction be limited accordingly. The Initial Study indicates that operational noise sources would be less than significant with Mitigation Measure M -XI.2 requiring noise barriers to minimize operational noise impact consistent with the City's noise standards. A condition of Use Permit approval requires that a noise study be conducted to assure that noise levels at property lines nearest the service facility and car wash comply with the City's noise standards. il0 Newport Lexus April 21, 2005 Page 17 of 21 Nighttime lighting of the dealership site was considered for possible impacts on adjoining properties and rights -of -way as part of the EIR analysis. Although potential impacts were considered significant, implementation of Mitigation Measures M -3A.2 through M -3A.8 relating to lighting plans, fixture selection, and operational controls would minimize potential lighting and glare impacts and reduce them to a less than significant level. Based on review of land use and building compatibility, of traffic considerations, and of noise and light and glare impacts indicated, the Planning Commission may make findings for approval of a Use Permit for the automobile dealership and include them in a resolution recommending subsequent City Council approval. Use Permit —Wine Bar The applicant's proposal to include a wine bar in the new car showroom is subject to the findings required for a Use Permit as well as those of Chapter 20.89 of the Zoning Code, "Alcoholic Beverage Outlets ". A license from the California Department of Alcoholic Beverage Control would also be required. Recommendation of approval of the wine bar use is subject to Planning Commission consideration of the following: • Whether the use serves public convenience or necessity. • The crime rate in the reporting district and adjacent reporting districts as compared to other areas in the City. • The number of alcohol licenses per capita in the reporting district and in adjacent reporting district as compared to the county-wide average. • The numbers of alcohol - related calls for service, crimes or arrests in the reporting district and in adjacent reporting districts. • The proximity of the alcoholic beverage outlet to residential districts, day care centers, park and recreation facilities, places of religious assembly, and school. The applicant proposes to include the wine bar (Hospitality Room) in the dealership facility as an adjunct to the new vehicle sales and delivery process. Customers would be offered a glass of wine as vehicle purchase documents are prepared and the new vehicle is prepared for delivery. The City of Newport Beach Police Department is compiling the information relative to the crime rate in the area, the number of existing alcohol licenses, and the numbers of alcohol - related calls in the vicinity. This information will be II Newport Lexus April 21, 2005 Page 18 of 21 provided to the Planning Commission under separate cover prior to the public hearing. The nearest residential district is located in the Back Bay area three - tenths of a mile west of the site across Bristol Street and the 73 Toll Road. The nearest daycare center is located at Bristol and Birch, approximately 0.6 miles. Newport Christian School at 1000 Bison is approximately 1.5 miles south of the site. East Bluff Elementary is located at 2627 Vista Del Oro, approximately 1.5 miles to the southwest. No churches are located within a mile and a half of the subject property. Bonita Creek Park is located 0.6 miles to the south, Upper Newport Bay Regional Park is located 0.4 mile to the southwest, and the University of California —Irvine Nature Reserve is located 0.4 mile due east. After considering the proposed wine bar use, the information to be provided by the Newport Beach Police Department, and the proximity to other uses included for consideration under Chapter 20.89, the Planning Commission may incorporate this information and make findings for a Use Permit, indicated above, in a resolution recommending City Council approval. Conditions of approval may include the following: The applicant may serve a glass of beer or wine only upon request by a customer. 2. Only customers 21 years of age or older will be served. 3. A customer requesting a glass of beer or wine will be required to provide the dealership receptionist with his /her driver's license for verification that the customer is 21 years of age or older. 4. The receptionist will provide such customer with a voucher for a glass of beer or wine, shall note the time at which the voucher is provided, and shall retain customer's driver's license until the customer departs the dealership. 5. A salesperson will then pour a 6 -ounce serving of beer or wine and serve it to the customer. 6. No more than one 6 -ounce serving will be provided to any customer in any one -hour period and the receptionist shall ensure that no customer receives more than one 6 -ounce drink in any one -hour period. Modification Permit Zoning Code Chapter 20.93 authorizes granting of a Modification Permit whenever strict application of provisions of the Zoning Code "... would preclude a reasonable use of property not otherwise permissible under existing regulations... "Among the regulations subject to the Modification Permit process are those applicable to required building setbacks in front, side or rear yards. A Modification Permit may be approved upon findings that the proposed building is Newport Lens April 21, 2005 Page 19 of 21 would not be detrimental to the health, safety, peace, comfort and general welfare of persons residing or working in the neighborhood, would not be detrimental or injurious to property and improvements in the neighborhood or the general welfare of the City, and that the proposed modification is consistent with the legislative intent of the Zoning Code. Consistent with this process, the applicant is requesting a Modification Permit to allow encroachment of vehicle display areas at the Jamboree Road frontage into the required landscaped yard, to allow encroachment of eight (8), circular vehicle display pads into required landscaped yards at Jamboree Road, MacArthur Boulevard, and Dove Street, to allow encroachment of the dealership showroom into the required yard at Dove Street, to allow a site screening wall and tire and new and waste oil storage to encroach into the required yard opposite the service facility at the Dove Street frontage, and to allow reduction of the sideyard at the northerly property line from the required 10 feet to 6 feet. As indicated in the Project Description section of this report, minimum landscaped front yards of 30 feet are required by the PC Text at both the MacArthur and Jamboree (`Special Landscaped Streets ") frontages. The landscaped front yard shown on the project plans along MacArthur, measured from right -of -way line, varies from 18' at the fountain to 25'— 10'/a" at the outdoor automobile display area adjacent to the service building, to 26' near the Jamboree /MacArthur intersection, and to a maximum of 52' — 6" at the south property line. Future right -of -way dedication will reduce the depth of the front yard at the automobile display next to the service building to 19' 5' /z ". The southwesterly comer of the showroom building encroaches approximately one foot into the required 30' yard at Dove Street. A 10 -foot high screening wall is to be located 10 feet from the Dove Street property line within the required minimum 30 -foot yard. The wall is proposed to screen the service building, and tire and vehicle fluid storage areas proposed within the 30 -foot yard from Dove Street. As previously noted, easements for a water line and a storm drain bisect the proposed dealership site. The possible need for future repair or replacement of these lines by the City of Newport Beach requires that sufficient access be maintained and that no building or structure block this access. This access effectively precludes development on a 60 foot -wide portion of the site stretching from Jamboree Road to Dove Street. Compliance with minimum required building setbacks at each of the three streets abutting the site further limit the area available for development and the possible configuration of buildings. The site plan reflects the applicant's best effort to incorporate minimum required building areas for dealership functions consistent with the intent of the Zoning Code. j9 Newport Lexus April 21, 2005 Page 20 of 21 Traffic Study The Planning Commission will make a recommendation to City Council on the Traffic Study prepared according to Municipal Code Chapter 15.40, Traffic Phasing Ordinance (TPO). The TPO requires the Traffic Study as a basis for evaluating traffic impacts of the project, of identifying improvements needed to accommodate project traffic, and of ensuring that improvements are made or funded by the project proponent in a manner roughly proportional to the impacts of the project. A Traffic Study was conducted for the 130,000 square -foot dealership project and for the 117,000 square-foot Reduced Project Alternative (See draft Final EIR for TPO Analysis). The results of the Reduced Project Alternative TPO analysis approximate and marginally overestimate the traffic impacts of the smaller dealership now proposed by the applicant. Accordingly, the results of the Reduced Project Alternative TPO analysis are applicable and summarized here. Because the traffic impacts of the Reduced Project Alternative would be reduced from those of the 130,000 square -foot project, only intersections shown to be affected by the larger project were analyzed in the Reduced Project Alternative Traffic Study. Consistent with the TPO, project trips that would exceed one percent of peak hour vehicle movements on any intersection approach and would cause or make worse an unacceptable level of service at an impacted intersection represent a significant TPO impact. As indicated in Table 4 -1 of the FEIR, the only significant TPO impact would be at the intersection of Irvine Avenue and Mesa Drive where the evening peak hour ICU would increase from 0.98 to 0.99, thus worsening an unacceptable level of service. The TPO requires that the project proponent either complete improvements or participate in funding of improvements to the Irvine Avenue /Mesa Drive intersection commensurate with project impacts. Required improvements are set forth in FEIR Mitigation Measure M -3C.1: "To mitigate the TPO impact: Restripe the westbound approach at the intersection of Irvine Avenue and Mesa Drive to provide one left -turn lane, one shared through /left hand and one right -turn lane. In addition, necessary signal modifications will be made to implement split -phase signal operation on the east -west approaches." A Planning Commission recommendation for City Council approval of the Traffic Study as conforming with the requirements of the TPO is appropriate upon findings by the Planning Commission that: 1) A traffic study was prepared in compliance with the TPO; 2) Based on the evidence including the traffic study, construction of the project will be completed within sixty (60) months of approval; and Newport Lexus April 21, 2005 Page 21 of 21 3) The project including circulation improvements that the project proponent is required to fund will neither cause nor make worse an unsatisfactory level of traffic service at any intersection. The project proponent intends to complete construction within eighteen (18) months of project approval. As indicated above, the project proponent will be required to implement FOR Mitigation Measure M -3C.1 that will restore the ICU at the Irvine Ave/Mesa Drive intersection to an acceptable level. A Planning Commission recommendation of City Council approval of the project Traffic Study as conforming to the TPO is appropriate. CONCLUSION: After reviewing the project plans and elevations and the Final Environmental Impact Report (EIR), General Plan Amendment (GPA), Planned Community (PC) Text Amendment, Use Permit (UP), Modification Permit, and Traffic Study, and after receiving public comments, the Planning Commission may adopt a resolution recommending that City Council certify the Final EIR and approve the GPA, the PC Text Amendment, the UP, the Modification Permit, and the Traffic Study for the Newport Lexus automobile dealership. Prepared by: David Lepo Hogle - Ireland, Inc. Exhibits: 1. Plans and Elevations Submitted by: J VJ� ��°r Patricia Temp Planning Director 2. Final Environmental Impact Report 3. Charter Section 423 Analysis 4. Draft Resolution for project approval Oil lIl t, {' = AM I' I it II B�$ °O t I I tl� III a ----------- eo 6 lu �'1 i, i9 ii{ I. II W .J J .J #1 a g ICI .J Li CC III I III + // n u - -'. r, W n r. I � II /I r1l is u t a J S I � i$ o0o m m eo z 0o pp o I I o08 ki �eo � d O i3s b� x a e 3 a� lip ED kF- - - Yg [flat' IA LC------------- ------ WT D ZIA --- - ---- -- - -09 IX at------- IN i i J? Ya 2 If ail [cot LW CL W ffi O Ya 2 If ail [cot Exhibit 2 (See Exhibit EIR -1 and EIR -2 to Draft Resolution Exhibit 4) 3y Exhibit 3 Charter Section 423 Analysis NmponLew+x Charter Sa*" 423Aaalyls January 6, 2005 36 oa 8� oci � I I S Condition wish GPA Approval GPA 2001 -004. 80% 1;272 1.78 1.72 2.30 ! 2.20 Pryosed GPA 138,930 3.00 4.00 4109 ! 555.72 Total 140,202 419.09 1 557.92 I aisting General Plan - - - -- - -- -- - -- - -- -- - - t Auto Center Use 24,000 2.21 2.90 53.04 6710 Admin. Prof. Financial Commercial 114,930 3.00 4.00. 344.79 459.72 Total 138 "930 397.83 526:92 Change 1.,272 21261 31.00 January 6, 2005 36 EXHIBIT NO. 3 RESOLUTION NO. A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH RECOMMENDING THAT THE CITY COUNCIL CERTIFY THE NEWPORT LEXUS FINAL ENVIRONMENTAL IMPACT REPORT (SCH # 2004081004) AND APPROVE GENERAL PLAN AMENDMENT NO. 2004 -004, PLANNED COMMUNITY TEXT AMENDMENT NO. 2004 -003, USE PERMIT NO. 2004 -026, MODIFICATION PERMIT NO. 2005 -030, and TRAFFIC STUDY NO. 2004 -003 FOR PROPERTY LOCATED AT 848 & 888 DOVE STREET & 3901, 3931, & 2961 MACARTHUR BOULEVARD (PA 2004 -153). WHEREAS, an application was filed by Wilson Automotive Group for property identified as 848 & 888 Dove Street and 3901, 3931, & 3961 MacArthur Boulevard located at the southwesterly corner of the intersection of MacArthur Boulevard and Jamboree Road. The application requests approval of. a General Plan Amendment to change the land use designation from "Administrative, Professional and Financial Commercial' to "Retail and Service Commercial" for the 5 -acre northerly portion of the site and establish a maximum developable gross floor area of 139,000 square feet for the entire 8 -acre project site; an amendment to the Newport Place Planned Community Development Standards to change the designation of the 3 -acre southerly portion from "Auto Center Site" to "General Commercial" and combine the 3 -acre site and the 5 -acre site into a single site designated Site 7 and to revise use and development regulations in the Planned Community Text to allow construction of a 114,485 square -foot automobile dealership comprised of a 42,142 square -foot automobile showroom building and a 72,343 square -foot service department facility; a Use Permit as required by the Planned Community Text for an automobile dealership and for a wine bar pursuant to the Alcoholic Beverage Ordinance; a Modification Permit to allow encroachment of vehicle display areas into required landscaped yards, encroachment of eight (8) new vehicle display pads into required yards, encroachment of a screening wall and tire and fluid storage areas into a required yard, encroachment of the showroom building into a required yard, and a reduction in the required side yard at the northerly edge of the property; and, a Traffic Study pursuant to the Traffic Phasing Ordinance. WHEREAS, in accordance with California Environmental Quality Act (CEQA) requirements, a Notice of Preparation (NOP) was filed with the State Clearinghouse, which assigned State Clearinghouse No. 2004081004, indicating that an Environmental Impact Report would be prepared. WHEREAS, the NOP and an Initial Study were distributed to all responsible and trustee agencies and other interested parties for a 30 -day public review period commencing on August 2, 2004 and ending on September 1, 2004. WHEREAS, in accordance with CEQA requirements, a Notice of Completion (NOC) of a Draft Environmental Impact Report (DEIR) was filed with the State Clearinghouse. I IN City of Newport Beach Planning Commission Resolution No. _ Page 2 of 22 WHEREAS, the Draft EIR was distributed to agencies, interested organizations, and individuals by the City. The distribution list is available at the City of Newport Beach Planning Department. The Draft EIR dated November 2004 was distributed separately due to bulk and is hereby designated as EXHIBIT EIR -1 of this Resolution as if fully set forth herein. WHEREAS, a 45 -day public review period for the Draft EIR was established pursuant to State law, which commenced on November 29, 2004 and ended on January 12, 2005. WHEREAS, all comments received during the public review period for the Draft EIR were responded to in the Response to Comments document dated March 2005, distributed separately due to bulk and hereby designated as EXHIBIT EIR -2 of this Resolution as if fully set forth herein. The Planning Commission considered all comments and responses during its review of the Environmental Impact Report. WHEREAS, on April 21, 2005, the Planning Commission held a noticed public hearing at which time the draft Final Environmental Impact Report, comprised of the Draft Environmental Impact Report, a listing of persons and organizations that provided written comments on the Draft Environmental Impact Report during the public circulation period, a compilation of those comments, and responses to those comments, was considered. Notice of time, place and purpose of the public hearing was given in accordance with law and testimony was presented to and considered by the Planning Commission at the hearing. WHEREAS, the draft Final Environmental Impact Report identifies potential significant impacts to the environment and certain mitigation measures designed to reduce or avoid these impacts to a less than significant level. WHEREAS, as part of the development and implementation of the Newport Beach General Plan, the Land Use Element has been prepared which sets forth objectives, supporting policies and limitations for development in the City of Newport Beach and designates the general distribution and general location and extent of the uses of land and building intensities in a number of ways, including floor area limitations. WHEREAS, the General Plan provides for redevelopment of older or underutilized properties and preservation of property values through establishment of floor area limits allowing for modest growth based on trip generation characteristics of land uses to ensure that traffic does not exceed the level of service desired by the City. The proposed amendment of the Land Use Element (Exhibit A) changes the designation of a 5 -acre portion of the project site from Administrative, Professional and Financial Commercial to Retail and Service Commercial and does not result in an 39 City of Newport Beach Planning Commission Resolution No. _ Page 3 of 22 increase in the floor area limit established for the subject site and allows for redevelopment of the underutilized subject site and with required mitigation measures will not generate traffic in amounts that would result in an undesirable level of service in the circulation system as indicated in the traffic study prepared for this project. WHEREAS, consistent with Charter Section 423, Council Policy A -18 requires that proposed General Plan Amendments be reviewed to determine if voter approval is required. Voter approval is not required for the subject General Plan Amendment because it will not result in generation of more than 100 peak hour trips, will not increase allowable building area, and does not include any dwelling units. Peak hour trip analysis for the subject General Plan Amendment included trips generated by the proposed project plus 80% of the increase in trips associated with a previous General Plan Amendment in the same General Plan Statistical Area and indicated an increase of 21.26 AM peak hour trips and 31 PM peak hour trips. The project will be tracked as a prior amendment per Charter Section 423 and Council Policy A -18. WHEREAS, the Planned Community Development Standards Newport Place text with amendments proposed as part of this project (Exhibit C) designates the project site as General Commercial consistent with the proposed General Plan designation of Retail and Service Commercial. WHEREAS, the General Plan requires that the City maintain suitable and adequate standards for landscaping, sign control, site and building design, parking and other development standards to ensure that commercial projects are aesthetically pleasing and compatible with surrounding land uses. The City maintains and implements development standards through the Zoning Ordinance which enables adoption of Planned Community District Regulations, approval of Use Permits for certain uses, and approval of Modification Permits. The Planned Community Development Standards Newport Place includes permitted uses and uses permitted subject to a Use Permit, regulations that ensure that the size and scale of the building, the number of parking spaces provided, the building setbacks provided, the areas of landscaped yards, and the design and placement of signs result in a project that is aesthetically pleasing and compatible with surrounding land uses consistent with objectives of the Municipal Code. WHEREAS, the proposed project is subject to a Use Permit consistent with the Planned Community Development Standards Newport Place text with amendments proposed as part of this project. The location and design of the proposed use and facilities and the proposed conditions under which the use would be operated or maintained will be consistent with the General Plan and the purpose of the district in which the site is located; will not be detrimental to the public health, safety, peace, morals, comfort, or welfare of persons residing or working in or adjacent to the neighborhood of such use; and will not be detrimental to the properties or improvements in the vicinity or to the general welfare of the City for the following reasons: yo City of Newport Beach Planning Commission Resolution No. _ Page 4 of 22 1. All potentially significant environmental effects will either be avoided or reduced to a less than significant level through the implementation of mitigation measures as identified in the Final EIR for this project. 2. The proposed use and improvements are located adjacent to the rear wall of a retail commercial center and separated from office buildings by Jamboree Road, MacArthur Boulevard, and Dove Street such that appropriate separation of uses and buildings is provided. The proposed facility is substantially consistent in design, quality of materials, scale, and building volume with nearby structures. 3. Adequate vehicular access to the site can be provided from MacArthur Boulevard and from Dove Street as indicated in a circulation study and a weaving analysis prepared for the proposed project. Vehicular access points are situated as to provide safe ingress and egress to the site and conditions of approval include street improvements at MacArthur Boulevard and Bowsprit to further enhance safe vehicular movements near the site. 4. No noise sensitive receptors are located near the proposed facility. Potential impacts from construction and operational noise will be reduced to less than significant levels through FEIR Mitigation Measures M -XIA and M -XI 2 which limit hours of construction and require noise barriers and through a Use Permit condition requiring a noise study to assure that noise levels at property lines nearest the automobile service facility and car was are consistent with the City's noise standards. 5. Nighttime lighting of the dealerships will be subject to FEIR Mitigation Measures M -3A.2 through M -3A.8 relating to lighting plans, fixture selection, and operations controls that minimize potential lighting and glare impacts. 6. The proposed project includes on -site parking in excess of that required by the Planned Community Development Standards Newport Place. WHEREAS, a wine bar proposed in the new car showroom is subject to a Use Permit and to Chapter 20.89 of the Zoning Code, "Alcoholic Beverage Outlets." Consistent with Chapter 20.89, consideration was given to whether or not the use serves public convenience or necessity, to the crime rate in the reporting district and adjacent reporting districts as compared to other areas in the City, to the number of alcohol licenses per capita in the reporting district and in adjacent reporting districts as compared to the county -wide average, to the numbers of alcohol- related calls for service, crimes or arrest in the reporting district and in adjacent reporting districts, and to the proximity of the alcoholic beverage outlet to residential districts, day care centers, park and recreation facilities, places of religious assembly, and schools as indicated in the administrative record prepared for this project. The location and design of the proposed use and facilities and the proposed conditions under which the use would be operated or maintained will be consistent with the General Plan and the purpose of the yl City of Newport Beach Planning Commission Resolution No. _ Page 5 of 22 district in which the site is located; will not be detrimental to the public health, safety, peace, morals, comfort, or welfare of persons residing or working in or adjacent to the neighborhood of such use; and will not be detrimental to the properties or improvements in the vicinity or to the general welfare of the City because the Use Permit will include the following conditions: The applicant may serve a glass of beer or wine only upon request by a customer. 2. Only customers 21 years of age or older will be served. 3. A customer requesting a glass of beer or wine will be required to provide the dealership receptionist with his/her driver's license for verification that the customer is 21 years of age or older. 4. The receptionist will provide such customer with a voucher for a glass of beer or wine, shall note the time at which the voucher is provided, and shall retain customer's driver's license until the customer departs the dealership. 5. A salesperson will then pour a 6 -ounce serving of beer or wine and serve it to the customer. 6. No more than one 6 -ounce serving will be provided to any customer in any one - hour period and the receptionist shall ensure that no customer receives more than one 6 -ounce drink in any one -hour period. WHEREAS, a request for approval of a Modification Permit is included with this application because the landscaped front yard adjacent to Jamboree Road is proposed to be a minimum of 18 feet rather than 30 feet as required by the Planned Community Development Standards Newport Place (PC Text), because eight (8), circular automobile display pads are proposed in the landscaped yards at Jamboree Road, MacArthur Boulevard, and Dove Street, because the front yard between the showroom building and the Dove Street property line is proposed to be a minimum of 28 feet rather than 30 feet as required by the PC Text, because a 10 -foot high architectural screening wall and tire and vehicle fluid storage areas are proposed at a minimum of 10 feet from the Dove Street property line within the required 30 -foot front yard, and because the side yard at the northerly edge of the property is proposed to be 6 feet rather than 10 feet as required by the PC Text. Chapter 20.93 of the Zoning Code authorizes granting of a Modification Permit whenever strict application of provisions of the Zoning Code, including those applicable to landscaped yards and required building setbacks in front yards, would preclude a reasonable use of property. Because a 60 foot -wide easement for a water line and a storm drain bisect the proposed project site, the possible need for future repair or replacement of these lines by the City requires that sufficient access be maintained and that no building or structure be located across the easement. Compliance with minimum required front yards at each of three street frontages abutting the project site further restricts the area that may be developed with buildings. Approval 107 City of Newport Beach Planning Commission Resolution No. _ Page 6 of 22 of a Modification Permit to accommodate these project components would not be detrimental to the health, safety, peace, comfort and general welfare of persons residing or working in the neighborhood, would no be detrimental or injurious to property and improvements in the neighborhood or the general welfare of the City, and would be consistent with the legislative intent of the Zoning Code for the following reasons: 1. The landscaped yard adjacent to Jamboree Road has a variable depth ranging from 52'-6" to 18' from the existing right -of -way line results in landscaped yard area significantly greater in area than that which would result from incorporation of landscaped yard with a constant depth of 30 feet. No buildings will encroach into this landscaped yard thereby avoiding possible inappropriate building massing near lot lines. 2. The front yard at the automobile showroom is 28 feet at its narrowest point and 40 feet at the widest point which results in landscaped yard area significantly greater than that which would result from incorporation of a landscaped yard with a constant depth of 30 feet. 3. The 10 -foot high architectural screening wall at Dove Street provides a visual barrier between the street and the interior of the service building and screens the tire and fluid storage areas from view from Dove Street and the 10 -foot yard proposed shall be heavily landscaped to enhance the streetscape. 4. The proposed encroachments do not occur adjacent to any structures on another property but at rights -of -way or adjacent to parking areas that provide sufficient distance between the proposed buildings and those on other properties. 5. Increase in the sizes and numbers of plants provided at each front yard provide adequate visual relief and separation to compensate for reduction in minimum distances. WHEREAS, a Traffic Study was prepared under the direction and supervision of the City Transportation /Development Services Manager in accordance with the requirements of the Traffic Phasing Ordinance (TPO). The study found that the proposed project would result in a decrease in the level of service at the intersection of Irvine Avenue and Mesa Drive from "D" to "E ". Circulation improvements at the Irvine Avenue /Mesa Drive intersection that the applicant is required to make and /or fund, as a condition of project approval and pursuant to a reimbursement program or otherwise, will mitigate this decrease in level of service such that the project will neither cause nor make worse an unsatisfactory level of service. NOW, THEREFORE, BE IT RESOLVED: Section 1. The Planning Commission of the City of Newport Beach does hereby find that Environmental Impact Report (State Clearinghouse No. 2004081004) designated by reference as Exhibit EIR -1 of this Resolution has been prepared in U City of Newport Beach Planning Commission Resolution No. Page 7 of 22 compliance with the California Environmental Quality Act (CEQA) and the CEQA Guidelines. In addition, the Planning Commission finds that the EIR adequately analyzes project— related impacts, potential cumulative impacts, identifies feasible mitigation measures and discusses project alternatives, and that the Final EIR reflects the independent judgment of the Planning Commission. The Planning Commission hereby recommends that the City Council certify the Environmental Impact Report identified as State Clearinghouse No. 2004081004. Section 2. Based on the aforementioned findings, the Planning Commission hereby recommends that the City Council approve General Plan Amendment No. 2004 -004 as in Exhibit "A" and the revised General Plan Land Use Map depicted in Exhibit "B ", Planned Community Text Amendment No. 2004 -003 as in Exhibit "C" and the revised Newport Place Land Use Map as in Exhibit "D ", and Use Permit No. No. 2004 -026, Modification Permit No. 2005 -030, and Traffic Study No. 2004 -003 all subject to Conditions of Approval set forth in Exhibit "E ". ADOPTED THIS 21st DAY OF APRIL 2005. BY: Larry Tucker, Chairman M Jeffrey Cole, Secretary AYES: NOES: ABSENT: 9y City of Newport Beach Planning Commission Resolution No. _ Page 8 of 22 EIR -1 Draft Environmental Impact Report for Newport Lexus (SCH #2004081004) 45 City of Newport Beach Planning Commission Resolution No. _ Page 9 of 22 EIR -2 Responses to Comments on the Draft Environmental Impact Report for Newport Lexus (SCH #2004081004) Ell City of Newport Beach Planning Commission Resolution No. _ Page 10 of 22 Exhibit "A" The following text in the General Plan Land Use Element under Airport Area (Statistical Area L4) shall be revised from: 2 -9. NP Block J. Block J is bounded by Dove Street, Bowsprit Drive, MacArthur Boulevard, Jamboree Road and Bristol Street North. The site is designated for Administrative, Professional and Financial Commercial and Retail and Service Commercial land use. The site is allocated 204,530 sq. ft. plus 3.0 acres for auto center use. to read as follows: 2 -9. NP Block J. Block J is bounded by Dove Street, Bowsprit Drive, MacArthur Boulevard, Jamboree Road and Bristol Street North. The site is designated for Retail and Service Commercial and for Administrative, Professional and Financial Commercial land uses. The site is allocated 228,530 sq. ft. I/ City of Newport Beach Planning Commission Resolution No. _ Page 11 of 22 Exhibit "B" (To be provided under separate cover prior to public hearing) REVISED GENERAL PLAN LAND USE MAP City of Newport Beach Planning Commission Resolution No. _ Page 12 of 22 Exhibit "C" The text of Planned Community Development Standards Newport Place is revised as follows (and all other provisions remain unchanged): STATISTICAL ANALYSIS, PART II., COMMERCIAUPROFESSIONAL $ BUSINESS OFFICES, A. Building Sites, B. Buildina Area, C. Building Area, D. Parking, E. Landscaped — Open Space, F. Building Heights Site 3A, the 5.2 acre portion of the project site, is deleted from all subsections to reflect the change in designation of the 5.2 -acre site from "Commercial/Professional & Business Offices" to "General Commercial; STATISTICAL ANALYSIS, PART II., AUTO CENTER AND GENERAL COMMERCIAL [8,9] PERMITTED USES, A. Auto Center Building Sites, B. General Commercial Building Sites, C. Building Area, D. Parkina, E. Landsca in —Open S"ace, F. Building Height "AUTO CENTER" is deleted from the heading to reflect the change in designation of the 3.0 -acre portion of the project site to "General Commercial "; Subsection A, "Auto Center Building Sites ", is deleted to reflect the change in the designation of the 3.0 acre portion of the project site from "Auto Center" to "General Commercial" and the letter designations of succeeding paragraphs are changed accordingly; "Site 7 ", representing the combined 5.2 -acre site and the 3.0 -acre site that comprise the 8.2 -acre project site, is added to the listing under General Commercial Building Sites and the cumulative acreage for that designation is changed accordingly; "Site 7 ", representing the combined 5.2 -acre site and the 3.0 -acre site that comprise the 8.2 -acre project site, is added to the listing under Building Area together with potential building area (141,120 sq. ft.) and site acreage (8.20) and the cumulative building areas and acreages are changed accordingly; "Site 7 ", representing the combined 5.2 -acre site and the 3.0 -acre site that comprise the 8.2 -acre project site, is added to the listing under Parking together with the respective number of parking spaces (357 cars) and parking area (2.98 acres) and the cumulative parking spaces and parking areas are changed accordingly; "Site 7 ", representing the combined 5.2 -acre site and the 3.0 -acre site that comprise the 8.2 -acre project site, is added to the listing under Landscaping — 49 City of Newport Beach Planning Commission Resolution No. _ Page 13 of 22 Open Space together with potential landscaped acreage and the cumulative landscaped acreages are changed accordingly; "Site 7 ", representing the combined 5.2 -acre site and the 3.0 -acre site that comprise the 8.2 -acre project site, is added under Building Height with a maximum permissible building height of fifty -five (55) feet except for vertical projections ( "Lexus logo' tower and stairwell) which may extend to seventy-five (75) feet. PART II., COMMERCIAL, Section 111., General Development Standards for Commercial, B., Signs, Ground Sign Maximum permissible height for an identification ground sign is increased from four (4) feet to six (6) feet. Land Use Plan Newport Place Planned Community The line separating the sites designated "Auto Center Site 1 B" and "Pro. & Bus. Office Site 3A" on the land use map is deleted. The designations of sites as "Auto Center Site 113" and "Pro. & Bus. Office Site 3A" are deleted and the resultant single site is designated "General Commercial Site 7 ". The "Area Summary" is revised by increasing 72 ac." corresponding to "Retail /General Commercial' to "15 ac. ", by reducing the acreage corresponding to "Office" from "70.0 ac." to "65.0 ac. ", and by deleting "Auto Center" and the corresponding "3.0 ac." to reflect the combining of the 5 -acre site "Pro. & Bus. Office Site 3A" with the 3 -acre "Auto Center Site 113" into a single site that is designated as "General Commercial Site 7." 50 City of Newport Beach Planning Commission Resolution No. _ Page 14 of 22 Exhibit I'D" Area Summary Intlu °tr °I 40.2 ac. 34,3 se. .......' �.. .......... .. .. Ratce RB1ai/Geneml Commemlal Y29ac .' Commarem9Rpabwant ^2.9 ac. ' CommertiaNiotat Motel 10.1 ac Service Sbibn 1:234. - Tobl 134.8 ee camm etN .. a 4:: '� Gxwrat GOmmwpal Bate 1 9Rs 5 .. Ganxal (:ommarclN \ 91a8 am ��. Pre 8 Dus. Olflp 9&a6 U• Industrial' ' ; ... n Pro. & 6us. oten Bfle] Ple. $ 0116. RsslauarA Stta 1 Office ''SiteS< Pm. Bi Due. % 'A tMUStl3al '. Office Sites 1:82 SK43A . ,o 'llfDee Sit09 " cvm .,,A01 &N 4 i9 .... r jti .. MmiWr181 �y, Q 3 =9 GMxal ComnMdal General ZAGS T Land Use '=.711 ' Plan Newport Plane Planned Community Gan.ro Cammarclal General jinant 34 8110-2 Revised bye:TB �"4= CommeMlal Date:78 D _ :� ,Y {.. SNa1 /S _.=� .... '. N REVISED NEWPORT PLACE MAP s� City of Newport Beach Planning Commission Resolution No. _ Page 15 of 22 Exhibit "E" CONDITIONS OF APPROVAL USE PERMIT NO. 2004 -026, TRAFFIC STUDY NO. 2004 -003 AND MODIFICATION PERMIT NO. 2005 -030 The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 2. The development shall be in substantial conformance with the approved site plans, floor plans, and elevations marked as Exhibit No. A to Planning Commission Staff Report for PA 2004 -153 dated April 21, 2005. 3. The service canopy shall provide minimum 15' — 0" vertical clearance over the water line and storm drain easement unless otherwise approved by the City. 4. This Use Permit may be modified or revoked by the City Council or Planning Commission should they determine that the proposed uses or conditions under which it is being operated or maintained is detrimental to the public health, welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance. S. The applicant is required to obtain all applicable permits from the City Building and Fire Departments. The construction plans must comply with the most recent, City- adopted version of the California Building Code. 6. Any change in operational characteristics, expansion in area, or other modification to the approved plans, shall require an amendment to this Use Permit or the processing of a new Use Permit. 7. The applicant shall comply with all federal, state, and local laws. Material violation of any of those laws in connection with the use may be cause for revocation of this Use Permit. 8. This approval was based on the particulars of the individual case and does not in and of itself or in combination with other approvals in the vicinity or Citywide constitute a precedent for future approvals or decisions. sa City of Newport Beach Planning Commission Resolution No. _ Page 16 of 22 9. Use Permit No. 2004 -026 shall expire unless exercised within 24 months from the date of approval as specked in Section 20.91.050 of the Newport Beach Municipal Code, unless an extension is otherwise granted. 10. Traffic Study No. 2004 -003 shall expire unless exercised within 24 months from the date of approval pursuant to Section 15.40.035 of the Newport Beach Municipal Code. This approval shall be deemed exercised by the issuance of a building permit to construct the proposed automobile dealership. 11. Pursuant to the Traffic Phasing Ordinance, construction of all proposed buildings shall be completed no more than 60 months from the date of final approval of Traffic Study No. 2004 -003. 12. Should this site be sold or otherwise come under different ownership or be operated by a different entity than the applicant, any future owners, assignees or operators shall be notified of the conditions of this approval by the current owner or leasing company. 13. The facility shall be designed to meet exiting and fire protection requirements as specified by the Uniform Building Code and shall be subject to review and approval by the Newport Beach Building Department and the Fire Department. 14. The proposed project shall conform to the requirements of the Uniform Building Code, any local amendments to the UBC, and State Disabled Access requirements, unless otherwise approved by the Building Department. 15. All work conducted within the public right -of -way shall be approved under an encroachment permit issued by the Public Works Department. 16. The operator of the facility shall be responsible for the control of noise generated by the subject facility. The noise generated by the proposed use shall comply with the provisions of Chapter 10.26 of the Newport Beach Municipal Code. 17. All mechanical equipment shall be screened from view of adjacent properties and adjacent public streets within the limits authorized by this permit, and shall be sound attenuated in accordance with Chapter 10.26 of the Newport Beach Municipal Code, Community Noise Control. 18. A sign plan shall be submitted for review for conformity with Planned Community Development Standards Newport Place and a Modification Permit, if required, applied for. The final location of the signs shall be reviewed by the City Traffic Engineer and shall conform to City Standard 110 -L to ensure that adequate sight distance is provided. 53 City of Newport Beach Planning Commission Resolution No. _ Page 17 of 22 19. Temporary signs shall be prohibited in the public right -of -way unless otherwise approved by the Public Works Department in conjunction with the issuance of an encroachment permit or encroachment agreement. 20. A Special Events Permit is required for any event or promotional activity outside the normal operational characteristics of the approved use, as conditioned, or that would attract large crowds, involve the sale of alcoholic beverages, include any form of on -site media broadcast, or any other activities as specified in the Newport Beach Municipal Code to require such permits. 21. Prior to the issuance of grading /building permits, Fair Share Traffic Fees shall be paid in accordance with Chapter 15.38 of the Newport Beach Municipal Code. 22. Prior to the issuance of grading /building permits, transportation corridor fees shall be paid in accordance with the TCA Major Thoroughfare and Bridge Fee Program. 23. Prior to the issuance of grading /building permits, the final design of all required off -site right of way improvements shall be reviewed and approved by the Public Works Department and Traffic Engineer. 24. Prior to the issuance of grading /building permits, the applicant shall prepare a construction phasing plan and construction delivery plan that includes routing of large vehicles. The plan shall include a haul route plan for review and approval of the Public Works Department. Said plan shall specify the routes to be traveled, times of travel, total number of trucks, number of trucks per hour, time of operation, and safety/congestion precautions (e.g., signage, flagmen). Large construction vehicles shall not be permitted to travel narrow streets and alleys as determined by the Public Works Department. Traffic control and transportation of equipment and materials shall be conducted in accordance with state and local requirements. 25. Prior to the issuance of a grading permit, a Stormwater Pollution Prevention Plan ( SWPPP) shall be prepared and approved by the City of Newport Beach as the local permitting agency in accordance with the requirements of the Regional Water Quality Control Board (RWQCB). The SWPPP shall include BMPs to eliminate and /or minimize stormwater pollution prior to, and during construction. The SWPPP shall require construction to occur in stages and stabilized prior to disturbing other areas and require the use of temporary diversion dikes and basins to trap sediment from run -off and allow clarification prior to discharge. 26. Prior to the issuance of a grading permit, the applicant shall prepare a Water Quality Management Plan (WQMP) specifically identifying the Best Management Practices (BMP's) that will be used on site to control predictable pollutant runoff. s9 City of Newport Beach Planning Commission Resolution No. _ Page 18 of 22 The plan shall identify the types of structural and non - structural measures to be used. The plan shall comply with the Orange County Drainage Area Management Plan (DAMP). Particular attention should be addressed to the appendix section "Best Management Practices for New Development." The WQMP shall clearly show the locations of structural BMP's, and assignment of long term maintenance responsibilities (which shall also be included in the Maintenance Agreement). The plan shall be prepared to the format shown in "Attachment C" of the DAMP title "Water Quality Management Plan Outline" and be subject to the approval of the City. 27. Prior to the issuance of a grading permit, the applicant shall provide proof of filing for an NOi with the SWRCB and prepare a project SWPPP that will describe the BMP's to be implemented during project construction. 28. Prior to the issuance of a building permit, the final design of all on -site parking, vehicular circulation and pedestrian circulation shall be subject to the approval of the Traffic Engineer. The location, number, and dimensions of the parking spaces shall be in substantial conformance with the approved site plan. 29. Prior to the issuance of a building permit, the trash enclosure design shall be approved by the Planning Department. The trash enclosure shall be enclosed by three walls, a self - closing, self - latching gate and shall have a decorative, solid roof for aesthetic and screening purposes. The design of the enclosure shall be integrated with the design of the other on -site buildings and structures. 30. Prior to the issuance of a building permit, the applicant shall submit a landscape and irrigation plan prepared by a licensed landscape architect. These plans shall incorporate drought tolerant plantings and water efficient irrigation practices, and the plans shall be approved by the Planning Department, General Services Department and Public Works Department. All planting areas shall be provided with a permanent underground automatic sprinkler irrigation system of a design suitable for the type and arrangement of the plant materials selected. The irrigation system shall be adjustable based upon either a signal from a satellite or an on -site moisture - sensor. Planting areas adjacent to vehicular activity shall be protected by a continuous concrete curb or similar permanent barrier. Landscaping shall be located so as not to impede vehicular sight distance to the satisfaction of the Traffic Engineer. 31. Prior to the issuance of a building permit, in accordance with the City of Newport Beach General Plan and Planned Community Standards for Newport Place, the applicant shall submit design plans to the City of Newport Beach for review to ensure consistency with the surrounding area and all conditions of approval. Z' City of Newport Beach Planning Commission Resolution No. _ Page 19 of 22 32. Prior to the issuance of a building permit, the applicant shall prepare a lighting plan and photometric study for approval by the Planning Director. The buildings and grounds shall not be excessively illuminated based on the luminance recommendations of the Illuminating Engineering Society of North America or based on the opinion of the Planning Director that the illumination creates an unacceptable negative impact on surrounding land uses or environmental resources. The Planning Director may order the dimming of light sources or other remediation upon finding that the site is excessively illuminated. The lighting plan shall include design features to minimize impacts of light and glare on the surrounding area as follows: a. All lighting fixtures shall be consistent with Illuminating Engineering Society of North America ( IESNA) "sharp cut -off' fixtures, and will be fitted with flat glass lenses and internal and external shielding. b. Exterior, on -site lighting shall be shielded and confined within site boundaries; no direct rays or glare are permitted to shine on public streets or adjacent sites or create a public nuisance. C. Light standards for parking areas shall not exceed twenty feet in height. d. All fixtures shall be parallel with the finished grade of the project site; no fixtures shall be tilted above a 90- degree angle. e. Lighting levels will be appropriately designed to fall within the IESNA recommendations for automobile dealerships. f. Site lighting systems and showroom lighting shall be grouped into control zones to allow for open, closing, and night lightisecurity lighting schemes. All control groups shall be controlled by an automatic lighting control system utilizing a time clock, photocell, and low voltage relays. g. Design and layout of the site shall take advantage of landscaping, on -site architectural massing, and off —site architectural massing to block light sources and reflection from cars. 33. Prior to issuance of a building permit, the applicant shall submit project plans to the FAA to be evaluated under the FAR Part 77 procedure and to the ALUC for a Determination of Consistency or Inconsistency with the JWA AELUP. 34. Prior to issuance of a building permit, applicant shall provide Letter of Closure from the County of Orange Health Care Agency for any leaking underground storage tank previously located on the site. 35. Prior the issuance of a building permit, the project shall be reviewed by the Building Department to verify compliance with the following requirements: W City of Newport Beach Planning Commission Resolution No. _ Page 20 of 22 a. Project design must comply with the 1997 Uniform Building Code (UBC) seismic design criteria. b. Structure setback must comply with either the 1997 Uniform Building Code (UBC) or the Orange County Grading Manual. C. Any imported soil for general grading shall have a Expansion Index of less than 60. d. Control site drainage. e. Design footing embedments to resist the effects of expansive soil. f. Maintain a proportionately high dead load component on foundations. g. Over- excavate and moisture soils condition below foundations, floor slabs and hardscape. h. Use of articulation and reinforcement of concrete slabs and footings. L Use of rigid foundation and floor slabs. 36. Prior to the issuance of a building permit, the project shall be reviewed by the Building Department to verify compliance with the following requirements: a. Provide fire sprinklers for all buildings; b. Provide Class I standpipes for parking structure in addition to fire sprinklers; C. Elevators shall be capable of accommodating a gurney in accordance with Chapter 20 of the California Building Code, 2001 Edition; d. Provide on -site hydrants; e. All gates to property shall be automatic and provided with opticom and knox key. 37. Prior to the issuance of a certificate of occupancy, the applicant shall schedule an inspection by the Code and Water Quality Enforcement Division to confirm that all landscaping materials and irrigation systems have been installed in accordance with the approved plans. 38. Prior to issuance of the certificate of occupancy or final of building permits, the applicant shall schedule an evening inspection by the Code and Water Quality Enforcement Division to confirm control of light and glare as specified in these conditions. 39. Prior to issuance of the certificate of occupancy, the applicant shall conduct a noise study and provide verification of the results of such study to the Planning Department to assure that noise levels at property lines nearest the service facility and car wash comply with the City's noise standards. 51) City of Newport Beach Planning Commission Resolution No. _ Page 21 of 22 40. Prior to issuance of the certificate of occupancy, to mitigate the TPO impact, restripe the westbound approach at the intersection of Irvine Avenue and Mesa Drive to provide one left turn lane, one shared throughtleft lane and one right -turn lane. In addition, necessary signal modifications will be made to implement split - phase signal operation on the east -west approaches. 41. Prior to issuance of a certificate of occupancy, applicant shall make the required improvements at the intersection of Bowsprit Drive and MacArthur Boulevard to reduce the curb radius of the eastbound free right turn on Bowsprit Drive to MacArthur Boulevard to approximately 35 feet to slow turning traffic and to increase the distance between Bowsprit Drive and the project entrance. 42. During construction of the proposed improvements: a. construction vehicles shall not block roadways on any roads adjacent to the project site or any of the roads leading to or from the project site; b. construction equipment will be properly maintained at an off -site location and includes proper tuning and timing of engines. Equipment maintenance records and equipment design specification data sheets shall be kept on -site during construction; C. all contractors will be advised not to idle construction equipment on site for more than ten minutes; on -site diesel fueled construction equipment will be fueled with aqueous diesel fuel; e. cover all trucks hauling soil, sand, and other loose materials, or require all trucks to maintain at least two feet of freeboard; f. pave, water (three times daily), or apply non -toxic soil stabilizers on all unpaved access roads, parking areas, and staging areas at construction sites; g. sweep all paved access roads, parking areas, and staging areas at construction sites daily with water sweepers; h. Sweep streets daily with water sweepers if visible soil material is carried onto adjacent public streets; hydroseed or apply non -toxic stabilizers to inactive construction areas; j. enclose, cover, water (twice daily), or apply non -toxic soil binders to exposed stockpiles (dirt, sand, etc.); City of Newport Beach Planning Commission Resolution No. _ Page 22 of 22 k. limit traffic speeds on unpaved roads to 15 miles per hour; 1. install sandbags or other erosion control measures to prevent silt runoff to public roadways during; M. replant vegetation in disturbed areas as quickly as possible; n. all construction equipment shall be properly tuned and maintained; o. contractors shall maintain and operate construction equipment so as to minimize exhaust emissions; P. trucks and vehicles in loading or unloading queues shall not idle; q. construction activities shall be staged and scheduled to avoid emissions peaks, and discontinued during second -stage smog alerts. 43. The applicant shall be responsible for the payment of all administrative costs identified by the Planning Department within 30 days of receiving a final notification of costs or prior to the issuance of a Building Permit. 44. The applicant shall ensure that the trash dumpsters and /or receptacles are maintained to control odors. This may include the provision of either fully self - contained dumpsters or periodic steam cleaning of the dumpsters, if deemed necessary by the Planning Department. Cleaning and maintenance of trash dumpsters shall be done in compliance with the provisions of Title 14, including all future amendments (including Water Quality related requirements). 45. All landscape materials and landscaped areas shall be installed and maintained in accordance with the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 46. All trash shall be stored within the building or within dumpsters stored in the trash enclosure (three walls and a gate) or otherwise be screened from view of neighboring properties, except when placed for pick -up by refuse collection agencies. The trash dumpsters shall have a top, which shall remain closed at all times, except when being loaded or while being collected by the refuse collection agency. 0