Loading...
HomeMy WebLinkAboutSt. Mark Presbyterian Church (PA2003-085) 2200 San Joaquin Hills RdCITY OF NEWPORT BEACH PLANNING COMMISSION STAFF REPORT Agenda Item No. 6 April 21, 2005 TO: PLANNING COMMISSION FROM: Planning Department Gregg B. Ramirez, Associate Planner (949) 644 -3230, gramirez &citv.newport- beach.ca.us SUBJECT: Saint Mark Presbyterian Church Use, Permit No. 2003 -015 (PA2003 -085) 2200 San Joaquin Hills Road Review for Substantial Conformance APPLICANT: Scott Bamard representing Saint Mark Presbyterian Church SUBJECT Review of proposed changes to the Saint Mark Presbyterian Church project for determination of substantial conformance with plans approved as part of Use Permit No. 2003 -015. RECOMMENDATION Review proposed changes and determine that they are in substantial conformance with the previously approved plans. DISCUSSION The Saint Mark Church project was approved by the City Council on October 12, 2004 following a favorable recommendation the Planning Commission. The applicant is currently preparing final plans and has approached the Planning Department with preliminary drawings that differ from what was approved. St. Mark is asking for a review of these changes and for a determination of substantial conformance prior to proceeding with full construction drawings. Following is a summary of the proposed changes. Raise the finished grade of Administration Building approximately 1 -foot. The building height will be lowered from 26 -feet above finished floor to 24 -feet above finished floor. Saint Mark Presbyterian Church April 21, 2005 Page 2 • Raise the finished grade of Fellowship Hall by 1 -foot and increase the main ridge of the building by 1 -foot, 1 -inch resulting in an approximate 2 foot increase in the height of the main ridge and 1 -foot for the tower. (28 -foot tower with a main ridge of 23 feet, 7 inches). • Raise the finished grade by 1 -foot for the main sanctuary. The building height from finished floor remains the same - 46 feet for the main sanctuary and 51 feet for the tower /cross. • Reduce the size of the main sanctuary that results in an increased setback from the northerly property line to approximately 23 feet from the approved 5 feet. • Switch the location of one of the preschool buildings with the pre - school administration building. • Raise the finished grade of the pre - school buildings and portions of the northerly campus 4 -feet. The pre - school buildings are 15 feet tall from finished floor. • Shift the location of the Nature Center Plaza and Amphitheater. The changes to the Nature Center Amphitheater and pre - school buildings will result in an increase of approximately .04 acres of coastal sage scrub removal. Of the 1.96 acres existing, 1.5 acres are to be removed under approved plan with an approximate additional .04 acres proposed to be removed for a total of 1.54 to be removed. • Reduced cut will result in changes to landscape berms along MacArthur and San Joaquin Hills Road. Berms will become slightly larger and taller. Additionally, the export of dirt will be reduced to approximately 25,000 cubic yards from the previously estimated 47,000 cubic yards. After a review of the preliminary drawings (Exhibit No. 1), staff believes that the changes are in substantial conformance with the approved plans. Additionally, a review of the certified EIR found that the proposed changes would not be significant enough to warrant recirculation of the EIR. Finally, all of the requested changes are in compliance with the Big Canyon Planned Community development regulations adopted with the approval of the church. Public Notice Public notice is not required for this type of review. Should the Planning Commission determine that the proposed changes are not in substantial conformance with the approved plan an application for an amendment to the approved use permit would be required and public hearing conducted. Prepared by: A, 1'�. y . Gregg B. amirez, Associate PlAnner Exhibits: Saint Mark Presbyterian Church April 21, 2005 Page 3 Submitted by: P� LAAA c Patricia L. Temple, Plan ing Director Plans Depicting Proposed Changes EXHIBIT NO. 1 Plans Depicting Proposed Changes 11 w :13 ��' .;.�,� <� a x .. _� v it MW I a � C .- :� + �, �,�. ti ��� � -- �� � .. _,, �. �� .. �,. .. , .. - - � ,, .� ._ •.�, i� Y �I !a � � r 6 1 � ` � G � .�, � �( ,irj' � .. � � +� . - -"" �' . • ': :. • ., . ... :: . �� h �� l � Fy I J `� `I `�U %�� � 1%; ���� 1 ( '��` �`' • � ��1 .. , • f :�_ � i / ,-- ■. ,� � � t � � � o� � � k � � � r. �,; � i, ,.;�,rirl ' �^ �_nirr, �_t�ii Si �i�Ni�;iL�` • ■ � 'is'� �� i ! /I L Q m W� m � mm \ r\ m I 1 �t i I i I Ov ID 0 tiff Lam' ti ZV��y i , �0 z , O � ' , i Iv m OD C� ti r r D m 0 CV r ti LL� �w 1 n = O O ' t _m G) w CD O t m W� m � mm \ r\ m I 1 �t i I i I Ov ID 0 tiff Lam' ti ZV��y i , �0 z , O � ' , i