HomeMy WebLinkAbout95-61 - Adding Chapter 15.10 of the Newport Beach Municipal Code to Adopt the Newport Beach Grading CodeORDINANCE NO. 95-61
AN ORDINANCE OF THE CITY OF NEWPORT BEACH ADDING CHAPTER
15.10 OF THE NEWPORT BEACH MUNICIPAL CODE TO ADOPT THE
NEWPORT BEACH GRADING CODE
The City Council of the City of Newport Beach DOES ORDAIN as
• follows:
Chapter 15.10 of the Newport Beach Municipal Code is adopted to
read:
Chapter 15.10
EXCAVATION AND GRADING CODE
Sections:
15.10.010. Purpose.
15.10.020. Administration.
15.10.030. Exempt Work.
15.10.040. Hazard Abatement
15.10.050. Definitions.
15.10.060. GradingPermit requirements
15.10.065 Drainage Permits.
15.10.070. Fees
15.10.080. Bonds.
• 15.10.090. Cuts.
15.10.100. Fills.
15.10.110. Setbacks.
15.10.120. Drainage and Terracing.
15.10.130. Erosion Control.
15.10.140 Grading Inspection
15.10.150. Notification of Completion.
15.10.160. Alternate Methods
15.10.170. Denial of Permit
15.10.180. Placing Excavated Material.
15.10.190. Denuding Natural Ground Cover.
Section 15.10.010. Purpose. The purpose of this section is to safeguard
life, limb, property and the public welfare by regulating grading, drainage and
hillside construction on private property and for similar improvement proposed by
private interests on City right -of -way where regulations are not otherwise
exercised.
• The Building Official shall formulate such rules, procedures, and
interpretations as may be necessary to administer this section. Such rules,
procedures, and interpretations shall be referred to as the "City of Newport Beach
Grading Manual' or the "Grading Manual ". Any amendments to the Grading
Manual shall be specifically adopted as necessary by the Building Official.
I
In the event of any conflict between said grading manual and this chapter,
the provisions of this section shall govern. The provisions of the Grading Manual
shall, to the extent that they are made conditions of any permit by the Building
Official, be binding on the permittee.
Section 15.10.020. Administration. This section sets forth rules and
• regulations to control excavation, grading, drainage conditions, erosion control,
earthwork construction including fills and embankments, and the use of earth
material as a structural component; establishes the administrative procedure for
issuance of permits; and provides for the approval of plans and inspection of
grading construction and drainage control.
Section 15.10.030. Exempt Work. No person shall do any grading without
first having obtained a Grading Permit from the Building Official except for the
following:
1. An excavation below finish grade for basements and footings of a
building, retaining wall or other structure authorized by a valid
Building Permit. This shall not exempt any fill made with the
material from such excavation, nor exempt any excavation which is
• unsupported or unstable after the completion of such structure, nor
shall it exempt any condition resulting from the construction of such
structure which requires grading or construction of drainage
improvements to provide a safe and stable structure which does not
create adverse conditions on other properties, either public or private.
2. Cemetery graves.
3. Refuse disposal sites covered by other regulations.
4. Excavations for wells or tunnels or utilities under the jurisdiction of
other agencies. This shall not exempt any fill made from such
excavations on private property unless preemptive regulations have
been established by law.
5. Mining and quarrying together with necessary stockpiling, processing
• and other activities where established and provided such operations do
not significantly affect the lateral or vertical support, or significantly
increase the stresses in or pressure upon any adjacent or continuous
property.
6. Exploratory excavations under the direction of soils engineers or
engineering geologists.
3
r�
•
7. An excavation which (a) is less than 2 ft. in depth; or (b) does not
create a cut slope greater than 5 ft. in height and steeper than two
horizontal to one vertical; and (c) is less than 50 cubic yards on one site
and does not create an adverse erosion, drainage, groundwater, or
slope condition requiring remedial work covered by this regulations.
8. Unless preempted by other regulations, fill which does not exceed 50
cubic yards on any one site which is not part of a regular maintenance
procedure and which;
(a) Is placed on natural undisturbed terrain with a slope flatter
than 5 horizontal to 1 vertical; or
(b) Less than 3 ft. in depth not intended to support structures
provided:
(i) No fill which may create an adverse slope, erosion,
drainage, groundwater or structural condition shall be
placed without a Grading Permit;
(ii) No person shall construction, reconstruct, alter, repair or
install any structure in any natural drainage channel
water course without a Grading Permit;
(iii) Road or parking lot paving work shall be performed
under permit, unless waived by the Building Official, or
when performed as part of maintenance work.
Exceptions listed above shall not be interpreted as exempting future
construction on a site from code compliance due to an exempted nonconforming
condition nor shall any exception be construed as exempting an adverse condition
from being corrected in accordance with the procedures, nor shall it be construed as
exempting any requirement for grading as a flood plane management requirement.
Whenever the Building Official determines that; (a) construction of any
device or structure has resulted or may result in adverse drainage, groundwater, or
slope conditions; or (b) existing drainage conditions have resulted or may result in
adverse erosion conditions, he /she may require a Drainage Permit to be obtained
and corrective work accomplished.
Section 15.10.040. Hazard Abatement. Whenever the Building Official
determines by inspection, from information made available to him/her, that any
existing drainage condition, excavation, fill, natural slope or subsurface condition
has become a hazard to life and limb, or endangers property or adversely affects the
safety, use or stability of a public way or any drainage channel, he /she shall make a
3
determination of the level of hazard and the owner of the property upon which the
drainage conditions, excavation, fill, natural slope or subsurface condition is
located, or other person or agent in control of said property, upon receipt of notice in
writing from the Building Official shall, within the period specified, correct such
conditions in accordance with the requirements and conditions set forth in such
• notice so as to eliminate the hazard and be in conformance of the hazards
abatement section of the Uniform Code for the Abatement of Dangerous Buildings,
as adopted by the City of Newport Beach.
Section 15.10.050. Definitions. For the purposes of this Chapter, the
definitions listed hereunder shall be construed as specified in this section.
APPROVAL shall mean a written, civil engineering or geological opinion
concerning the satisfactory progress and completion of the work.
AS- GRADED is the topographic surface at completion of grading.
BEDROCK is in -place of solid rock.
BENCH is a relatively level step excavated into earth material on which fill
is to be placed.
BORROW is earth material acquired from off -site location for use in grading
• on a site.
CIVIL ENGINEER shall mean a professional engineer in the branch of civil
engineering holding a valid certification of registration, issued by the State of
California.
CIVIL ENGINEERING shall mean the application of the knowledge of the
forces of nature, principles of mechanics and the properties of materials to the
evaluation, design and construction of civil works for the beneficial uses of
mankind.
CLEARING, BRUSHING AND GRUBBING shall mean the removal of
vegetation (grass, brush, trees and similar plant types or root systems) by
mechanical means.
COMPACTION is the densification of a fill by mechanical means.
• EARTH MATERIAL is any rock, natural soil or fill and/or any combination
thereof.
ENGINEERING GEOLOGIST shall mean a professional geologist registered
in the State of California as a geologist and certified by the State of California as a
geologist and certified by the State of California to practice engineering geology in
the field of civil works.
4
EROSION is the wearing away of the ground surface as a result of the
movement of wind, water and/or ice.
EXCAVATION is the mechanical removal of earth material.
FILL is a deposit of earth material placed by artificial means.
GRADE shall mean the vertical location of the ground surface.
• GRADING shall mean to bring an existing surface to a designed form by
cutting, filling and/or smoothing operations.
ROUGH GRADE is the stage at which the grade approximately conforms to
the approved plan.
FINISH GRADE is the final grade of the site which conforms to the approved
plan.
GRADING CONTRACTOR is a contractor licensed and regulated by the
State of California who specializes in grading work or is otherwise licensed to do
grading work.
KEY is designed and compacted fill placed in a trench excavated in earth
material beneath the toe of a proposed fill slope.
LANDSLIDE shall mean the downward and outward movement of soil, rock
• or fill or a combination thereof, or the resultant materials from such movement.
MASSIVE LANDSLIDE shall mean a landslide too large to be stabilized by
retaining methods or normal control methods.
PERMIT shall mean any permit issued pursuant to this Code, together with
the application for the same, the conditions upon which it was issued, together with
any plans, specifications, reports and approved modifications pertaining thereto.
PERMITTEE shall mean the owner or his authorized agent to whom a
Grading Permit is issued.
SEDIMENT is the material derived by erosion carried by an agent of erosion.
SITE is any lot or parcel of land or contiguous combination thereof, under the
same ownership, where grading is performed or permitted.
SLOPE is an inclined ground surface, the inclination of which is expressed as
• a ratio of horizontal distance to vertical distance.
SOIL is naturally occurring surficial deposits overlying bedrock.
SOIL ENGINEER is a civil engineer with training and experience in soil
mechanics who specializes in the practice of soils and foundation engineering.
SOIL ENGINEERING shall mean the application of the principles of soil
mechanics in the investigation, testing, evaluation and design of civil works
5
involving the use of earth materials and the evaluation, inspection, and testing of
the construction thereof.
TERRACE is a relatively level step constructed in the face of a grade slope
surface for drainage and maintenance purposes.
TRACT is a subdivision of land containing five (5) or more lots.
• Section 15.10.060. Grading Permit Requirements
(a) Permits Required. Except as exempted in Section 15.10.030 of this
Code, no person shall do any grading without first obtaining a permit from the
Building Official. A separate permit shall be required for each site and may cover
excavation, fills, and paving.
(b) Application. The provisions of Section 301(b), 302(a) of the
Administraive Code are applicable to grading and in addition to the application
shall state the estimated quantities of work involved. The work shall also conform
to the requirements of the flood plane management ordinance.
(c) Plans and Specifications. When required by the Building Official,
each application for a Grading Permit or Building Permit shall be accompanied by
two sets of plans and specifications, and supporting data consisting of soil
•engineering and engineering geology report, or other needed documents. The plans
and specifications shall be prepared and signed by a Civil Engineer when required
by the Building Official. Within the Newport Bay drainage catchment area, a
grading and erosion control plan is required unless waived in writing by the
Building Official.
(d) Information on Plans and in Specifications. Plans shall be drawn to
scale upon substantial paper or cloth and shall be of sufficient clarity to indicate the
nature and extent of the work proposed and show in detail that they will conform to
the provisions of this Code and all relevant laws, ordinances, rules, and regulations.
The first sheet of each set of plans shall give the location of the work and the name
and address of the owner, the person by whom they were prepared, and where
required, the name(s) and address(es) of professional person(s) or firm(s) related to
• the project.
The plan shall include the following information:
(1) General vicinity of the proposed site;
(2) Property limits, permit area limits, accurate contours of existing
ground, details of terrain, and area drainage;
(3) Limiting dimensions, elevations or finish contours to be achieved by
the grading, and proposed drainage channels and related construction. In a flood
6
plane zone, information concerning habitable floor elevations and flood protection
designs shall be included;
(4) Detailed plans of all surface and subsurface drainage devices, walls,
cribbing, dams, and other protective devices to be construction with, or as a part of
the proposed work, together with a map showing the drainage area and the
• estimated runoff of the area served by any drains;
(5) Detailed plans for temporary (during construction) and/or permanent
sediment and pollution control facilities. The Building Official may require the
inclusion of pollutant traps on the plans and specifications to intercept pollutants
draining from the project.
(6) Detailed plans for temporary (during construction) and/or permanent
sediment and erosion control facilities;
(7) Location of any buildings or structures on the property where the work
is to be performed and the location of any buildings or structures or slopes on land
of adjacent owners which are within 15 ft. of the property or which may be affected
by the proposed grading operations;
(8) Any additional plans, drawings, calculations, environmental impact
•information, or other reports required by the Building Official. If the grading
project includes the movement of earth material to or from the site, the Building
Official may require a description of the haul route to be submitted for approval.
(e) Soil Engineering Report. The soil engineering report required by
Subsection (c) shall include data regarding the nature, distribution, strength
consolidation characteristics of existing soils, conclusions and recommendations for
grading procedures, and design criteria for corrective measures when necessary,
and opinions and recommendations covering adequacy of sites to be developed by
the proposed grading. These listings shall not be interpreted to prevent the
Building Official from requiring other information required to produce a safe and
stable condition.
Recommendations included in the report and approved by the Building
• Official shall be incorporated into the grading plans or specifications.
(f) Engineering Geology Report. The engineering geology report required
by Subsection (c) shall include an adequate description of the geology of the site,
including necessary maps and illustrations showing geographic distribution of the
features described related to the proposed development, conclusions, and
recommendations regarding the effect of geologic conditions on the proposed
development, and opinions and recommendations covering the adequacy of sites to
be developed by the proposed grading.
Recommendations included in the report and approved by the Building
Official shall be incorporated into the grading plans and specifications.
(g) Issuance. The provisions of Section 303 of the Administrative Code
• are applicable to Grading Permits. The Building Official may require that grading
operations and project designs be modified to provide for erosion control, including
erosion protection devices, if project completion will extend into the rainy season
(October 15th through May 15th) or if delays occur which incur weather - generated
problems. The plans shall list specific dates for completion of erosion control
measures, and further subject to the provisions of Section 15.10.170. In addition to
the time limitations as specified in Section 303(d) of the Uniform Administative
Code, every permit issued shall be valid for a period of one year from the date
thereof.
(h) Transport of Earth from or to the Project Site. All earth materials
which are moved on public roadways from or to the site of an earth grading
operation, the following requirements shall apply:
•(1) Either water or dust palliative, or both, must be applied for the
alleviation or prevention of excessive dust resulting from the loading or
transportation of earth from or to the project site on public roadways. The
permittee shall be responsible for maintaining public right -of -way used for hauling
purposes in a condition free of
(2) Loading and transportation of earth from or to the site are subject to
the requirements of Section 10.28.040 of the Newport Beach Municipal Code.
(3) Access road to the premises shall be only at points designated on the
approved grading plan.
(4) The last fifty (50) feet of the access road, as it approaches the
intersection with the public roadway, shall have a grade not to exceed three percent
(3 %). There must be a 300 ft. (three - hundred) clear, unobstructed sight distance to
•the intersection from both the public roadway and access road. If the three
hundred feet (300 ft.) sight distance cannot be obtained, the permittee shall post
flagmen as required for traffic safety.
(5) A stop sign conforming to the requirements of Section 21400 of the
California Vehicle Code shall be posted at the entrance of the access road to the
public roadway.
9
(6) An advance warning sign must be posted on the public roadway four -
hundred feet (400 ft.) on either side of an access intersection carrying the words
"truck crossing." The sign shall be a diamond shape, each side being thirty (30 in.)
in length, shall have a yellow background, and the letters thereon shall be placed
six feet (6 ft.) from the edge of the pavement and the base of the sign shall be five
• feet (5 ft.) above the pavement level. The advance warning sign shall be covered or
removed when the access intersection is not in use.
Section 15.10.065 Drainage Permits.
(a) Where the Building Official determines that existing or proposed
construction may alter or has altered drainage conditions so as to create an adverse
or dangerous condition, or where existing drainage conditions result in an adverse
or dangerous condition, he may require a drainage permit to be obtained for the
purpose of preventing or eliminating the adverse or dangerous conditions and
require corrective work to be accomplished.
(b) Application.
The application shall be the same form as the Grading Permit, and
shall state that the purpose is for drainage alterations.
• (c) Plans and Specifications.
Plans may be required accurately showing the existing conditions and
proposed alterations in sufficient detail to make a determination concerning the
conformance to this Code of the proposed alterations. Inspection only may be
required by the Building Official where the alterations are of a minor nature.
(d) Conditions.
In granting any permit under this Chapter, the Building Official may
attach such conditions thereto as may be reasonable and necessary to prevent
danger to public or private property or to prevent the operation from being
conducted in a manner hazardous to life or property or in a manner likely to create
any unnecessary nuisance.
Section 15.10.070. Fees
• (a) Grading Plan Review Fees
Before accepting a set of plans and specifications for checking, the
Building Official shall collect a plan checking fee. Separate permits and fees shall
apply to retaining walls over three feet (3 ft.) in height and additional fees shall be
collected for pavement and drainage collection, stabilization and erosion protection
devices not exempted in accordance with this Code. There shall be no separate
charge for standard terrace drains, standard subdrains, temporary erosions or
9
sediment control devices or similar facilities. For excavation and fill on the same
site, the fee shall be based on the volume of the excavation or fill, whichever is
greater, and shall be as specified in Section 15.02.130 in Table 3 -G.
(A fee for each drainage permit shall be paid) Drainage Plan Review
Fees. The Building Official may charge a plan review fee if, in his opinion, the
• proposed drainage alterations are sufficient in extent to require more than field
inspection to ensure code conformance. Fees shall be assessed as specified in
Section 15.02.130 in Table 3 -G.
(c) Grading Permit Fees. The Grading Permit fees shall be based on the
volume of excavation or fill whichever is greater or on the estimated valuation of
retaining walls for which no separate permit is required combined with the
estimated valuation of any commercial or industrial paving, drainage collection,
stabilization and erosion control devices not exempted by this Code. The fee for each
Grading Permit shall be as specified in Section. 15.02.130 in Table 3 -H.
(d) Drainage Permit Fees. d to the Building Official. The fee shall be set
forth in Sction 15.02. 130 in Table 3 -H.
When drainage plans are required for a proposed structure, an additional fee
•for plan checking shall be paid at the time of submitting the application. Said plan
checking fee shall be equal to one -half (1/2) of the fee heretofore established in
section 15.02.130 in Table 3 -H.
Section 15.10.080. Bonds. The Building Official may require bonds in such
form and amounts as may be deemed necessary to assure that the work, if not
completed in accordance with the approved plans and specifications will be
corrected to eliminate hazardous conditions.
In lieu of a surety bond, the applicant may file a cash bond or instrument of
credit with the Building Official in an amount equal to that which would be
required in the surety bond.
Section 15.10.090. Cuts.
(a) General. Unless otherwise approved by the Building Official and
•recommended in the approved soil engineering and/or engineering geology report,
cuts shall conform to the provisions of this Section.
(b) Slope. The slope of cut surfaces shall be no steeper than is safe for the
intended use. Cut slopes shall be no steeper than two horizontal to one vertical
(2:1).
(c) Drainage and Terracing. Drainage and terracing shall be provided as
required by Section 15.10.120.
10
Section 15.10.100. Fills.
(a) General. Unless otherwise approved by the Building Official and
recommended in the approved soil engineering report, these provisions may be
waived for minor fills not intended to support structures, provided such fills are
protected against soil erosion in the Newport Bay drainage catchment area.
• EXCEPTIONS
(1) Fills excepted in Section 15.10.030 and where the Building
Official determines that compaction is not a necessary safety measure
to aid in preventing saturation, settlement, slipping, or erosion of the
fill.
(2) Where lower density and expansive types of soil exist, then
permission for lesser compaction may be granted by the Building
Official, upon showing of good cause under the conditions provided
herein.
(b) Fill Location. Fill slopes shall not be constructed on natural slopes
steeper than two horizontal to one vertical (2: 1).
(c) Preparation of Ground. The ground surface shall be prepared to
•receive fill by removing vegetation, noncomplying fill, topsoil and other unsuitable
materials, scarifying to provide a bond with the new fill, and, where slopes are
steeper than five (5) horizontal to one (1) vertical, and the height is greater than
five (5) feet, by bending into sound bedrock or other competent material as
determined by the soils engineer. The bench under the toe of a fill on a slope
steeper than five (5) horizontal to one (1) vertical shall be at least ten (10) feet wide.
The area beyond the toe of fill shall be sloped for sheet overflow or a paved drain
shall be provided.
Where fill is to be placed over a cut, the bench under the toe of fill shall be at
least ten (10) feet wide but the cut must be made before placing fill and approved by
the soils engineer and engineering geologist as a suitable foundation for fill.
Unsuitable soil is soil which, in the opinion of the Building Official, civil engineer,
•soils engineer, or geologist, is not competent to support other soil or fill, to support
structures, or to satisfactorily perform the other functions for which the soil is
intended.
The final report and approval by the soils engineer shall describe the limits
and extent of removal of unsuitable materials including a description of the criteria
used for determination of the suitable material.
11
(d) Fill Material Earth materials which have not more than minor
amounts of organic substances and have no rock or similar irreducible material
with a maximum dimension greater than 8 inches shall be used.
EXCEPTIONS:
The Building Official may permit placement of a larger rock when the soils
• engineer properly devises a method of placement, continuously inspects its
placement, and approves the fill stability. The following conditions shall also apply:
(1) Prior to the issuance of the Grading Permit, potential rock
disposal area(s) shall be delineated on the grading plan.
(2) Rock sizes greater than eight (8) inches in maximum dimension
shall be ten (10) feet more below grade, measured vertically.
(3) Rocks greater than eight (8) inches shall be placed so as to be
completely surrounded by fine grained soils; no nesting of rocks will be
permitted.
(e) Compaction. All sills shall be compacted to a minimum of 90 percent of
maximum density as determined by ASTM D 1557 -70 or a more restrictive standard
if recommended in the approved soils engineering reports. Field density shall be
•determined as approved by the Building Official. The Building Official may
require tests of the compressibility and anticipated fill settlement characteristics
where more than 10 feet of fill is to be placed. The final report and approval by the
soils engineer shall contain the type of field testing performed. Each test shall be
identified, located, and the method of obtaining the in -place density shall be noted.
Sufficient maximum density determinations by test method ASTM D1557 -70
or other approved method, shall be performed during the grading operations to
verify the accuracy of the maximum density curves used by the soils engineer.
(f) Slope. The slope of fill surfaces shall be no steeper than is safe for the
intended use. Fill slopes shall be no steeper than two horizontal to one vertical.
EXCEPTION:
The Building Official may authorize a fill to be constructed with an exposed
•surface steeper than two horizontal to one vertical (2:1) when he fords: the
applicant has submitted a soil engineer's report recommending such steeper slope.
Such report shall include sufficient soil test data and other information to
substantiate slope stability and safety when saturated, and shall include an
evaluation of the creep characteristics of the soils and surficial stability.
12
(g) Drainage and Terracing. Drainage and terracing shall be provided
and the area above fill slopes and the surfaces of terraces shall be graded and paved
as required by Section 15.10.120.
(h) Utility Line BackfiR. All backfill in utility line trenches both
inside and outside of the building shall be compacted and tested in compliance with
• Subsection (e) of this section, and the soils engineer shall observe, test and render
an opinion to the Building Official as to whether this backfilling has been
satisfactorily accomplished. Alternate methods of filling and reduced compaction
requirements may be applied on certain projects when specified by the soils
engineer and approved by the Building Official.
EXCEPTION:
On single lot projects where no soils engineer was required during grading of
the site, the Building Official may waive tested compaction and allow the use of
approved material which is relatively self - compacting. This material and the
method of placement must be approved prior to backfilling, and trenches utilizing
this material must cross foundations at right angles or be located outside a one
horizontal to one vertical plane extending from the nearest point of the foundation
• to the bottom of the trench.
Section 15.10.110. Setbacks.
(a) General. The setbacks and other restrictions specified by this Section
are minimum and may be increased by the Building Official or by the
recommendation of a civil engineer, soils engineer or engineering geologist, if
necessary for safety and stability or to prevent damage of adjacent properties from
deposition, erosion, or to provide access for slope maintenance and drainage.
Retaining walls may be used to reduce the required setbacks when approved by the
Building Official. Where natural slopes are involved, setbacks shall be interpreted
to include a 2 :1 setback plane unless specifically contradicted in the approved
reports.
(b) Setbacks from Property Lines. The tops of cuts and toes of fill slopes
• shall be set back from the outer boundaries of the permit area, including slope
right -of -way and easements, in accordance with Figure No. 1 and Table D:
13
Under 5
• 5 -30
Over 30
•
•
rr
SETBACKS
H CM a b
TABLE 70 -D
(ffl 0
b
Under 5 0
S 30 H 1
1 7
Over 30 15
10
TO E
OF
PA* SLOPE
1 A
i
NATRUAL OR FINISH GRADE
FIGURE NO. 1
TOP
OF
SLOP
0 7
H/2 H/2
15 10
PA"
A TURAL
SLOPE
H " PA =PERMIT AREA
1. If the drainage is carried on this side in an unimproved earth swale,
the setback from the top of slope (or berm) to the face of the building or projection
thereof is T -0 ". This may be reduced to the tabular value if an improved drainage
device is used.
2. If the slope is flatter than five (5) horizontal to one (1) vertical, the
setback required is T -0 ".
3. The tabular valves may be enforced for natural slope conditions as
determined by the Building Official.
! —Y � H/? but need not exceed loft moxlmum
H/2 but need rot exceed
15 ft. moxlnunl
FIGURE NO. 2
14
Section 15.10.120. Drainage and Terracing.
(a) General Unless otherwise indicated on the approved grading plan,
drainage facilities and terracing shall conform to the provision of this Section.
(b) Terrace Terraces at least 6 ft. in width shall be established at not
• more than 30 -ft. vertical intervals to control surface drainage and debris. Suitable
access shall be provided to permit proper cleaning and maintenance.
Swales or ditches on terraces shall have a minimum gradient of six (6)
percent and must be paved with reinforced concrete not less than three (3) inches in
thickness or an approved equal paving. They shall have a minimum depth at the
deepest point of eighteen (18) inches and a minimum paved width of five (5) feet.
A single run of swale or ditch shall not collect runoff from a tributary area
exceeding 13,500 sq. ft. ( projected) without discharging into a down drain.
(c) Subsurface Drainage. Cut and fill slopes shall be provided with
subsurface drainage as necessary for stability. Unless waived by the Building
Official, all canyons shall be provided with subsurface drainage. Material and
methods used in subsurface drainage designs shall be approved by the Building
• Official.
(d) Disposal. All drainage facilities and grading shall be designed to carry
concentrated and surface sheet flow waters to the nearest practicable drainage way
approved by the Building Official and/or other appropriate jurisdiction as a safe
place to deposit such waters. All buried pipe shall be constructed of corrosion -
resistance material. If drainage facilities discharge onto natural ground, riprap or
conversion to sheet flow may be required. Building pads shall have a drainage
gradient of two percent (2 %) toward approved drainage facilities, unless waived by
the Building Official.
EXCEPTION:
The gradient from the building pad may be one percent (1 %) if all the
following conditions exist throughout the permit area:
• 1) No proposed fills are greater than 10 ft. in maximum
depth.
2) No proposed finish cut or fill slope faces have a vertical
height in excess of 10 ft.
3) No existing slope faces, which have a slope face steeper
than 10 horizontally to 1 vertically, have a vertical height
in excess of 10 ft.
15
•
(e) Commercial and Industrial Drainage Standards. Drainage
standards for industrial/commercial developments in non -hilly areas shall conform
to the following minimum standards:
A. Rough Grade
1. Earth at rough grade stage
B. Finished Grade:
1. Earth
2. Asphalt pavement (sheet flow)
3. Concrete drain in earth area
4. Concrete gutter in asphalt
paved area.
Minimum Gradient
0.5%
1.0%
1.0%
0.5%
0.2%
C. In parking lot design, access shall be provided to entrances and exits
for pedestrian traffic not affected by concentrated flow.
D. Penetration of landscape irrigation water under pavement shall be
mitigated through the design process.
Section 15.10.130. Erosion Control.
(a) Slopes. The faces of cut and fill slopes shall be prepared and maintained
to control against erosion. This control may consist of effective planting. The
protection for the slopes shall be installed as soon as practicable. The Building
Official may require planting and irrigation systems to be installed prior to rough
grade approval, and such systems shall be installed prior to final approval.
Slope irrigation for tracts may be required to be controlled by automatic
systems equipped with an override keyed to continuous soil moisture measurement
devices; other projects may be required to have such systems if adverse ground
water conditions exist which may be worsened by landscape irrigation where cut
slopes are not subject to erosion due to the erosion- resistant character of the
materials. Such protection may be omitted if specifically waived by the Building
Official. Planting materials and maintenance schedules shall be approved by the
Building Official. To assure that cuts and fill slopes will be effectively planted, the
preparation and planting should be designed by an experienced landscape planner.
Each bank should be planted upon its completion and all planting must be
maintained in growing condition for at least two years or until accepted by the
Building Official.
16
(b) Pads. Pads should be prepared and maintained to control erosion in
the same manner as required for slopes. The Building Official may waive the
requirement for planting on pads when construction has commenced within ten (10)
days of the completion of the grading.
(c) Other Devices. Where necessary, check dams, cribbing, riprap, or
• other devices or methods shall be employed to control erosion and provide safety.
Absence of specific measures on the plans shall be accompanied by a statement on
the plans by the Building Official that none are needed.
(d) Permanent desilting facilities may be required by the Building Official
where undue siltation of Newport Bay may result.
(e) Minimum size of temporary basins shall be established by the uniform
soil loss equation. If all weather cleanout capability in the basin is not provided,
greater capacity will be required.
(f) Both sheet flow and concentrated flow areas shall be considered in
design of erosion control system. In addition, sediment control shall include
provisions for both low flow volume as well as intense rainfall conditions.
(g) Erosion control shall be coordinated with sites contiguous to the
• permit area to achieve effective control.
Section 15.10.140. Grading Inspection
(a) General. All grading operations for which a permit is required shall be
subject to inspection by the Building Official. When required by the Building
Official, special inspection of grading operations and special testing shall be
performed in accordance with the provisions of Section 306 of the Administrative
Code and Subsection 15.10.140 (d) of this section. Erosion control devices shall be
installed, inspected, and approved by the Building Official prior to the rainy season
(October 15th through May 15th.)
(b) Grading Designation. Grading in commercial and industrial areas,
tracts, or potentially hazardous areas and all grading in excess of 5000 cubic yards
shall be performed in accordance with the approved grading plan prepared by a
•civil engineer, and shall be designated as "engineered grading." Grading involving
less than 5000 cubic yards shall be designated "regular grading" unless the
permittee, with the approval of the Building Official, chooses to have the grading
performed as "engineered grading". The Buildling Official may require a survey at
the completion of regular grading to ensure compliance with drainage
requirements.
17
(c) Engineered Grading Requirements. For engineered grading, it shall
be the responsibility of the civil engineer who prepares the approved grading plan
to incorporate all recommendations from the soil engineering and engineering
geology reports into the grading plan. He shall also be responsible for the
professional inspection and approval of the grading within his area of technical
• specialty. This responsibility shall include, but need not be limited to, inspection
and approval as to the establishment of line, grade, and drainage of the
development area. The civil engineer shall act as the coordinating agent in the
event the need arises for liaison between the other professionals, the contractor,
and the Building Official. The civil engineer shall also be responsible for the
preparation of revised plans and the submission of as- graded plans upon
completion of the work. The grading contractor shall submit, on a form prescribed
by the Building Official, a statement of compliance to said as- graded plan.
Soil engineering and engineering geology reports shall be required as
specified in Section 6. During grading all necessary reports, compaction data, soil
engineering, and engineering geology recommendations shall be submitted to the
civil engineer and the Building Official by the soil engineer and the engineering
• geologist.
The soil engineer's area of responsibility shall include, but need not be
limited to, the professional inspection and approval concerning the preparation of
ground to receive fills, testing for required compaction, stability of all finish slopes,
and the design of buttress fills, where required, incorporating the data supplied by
the engineering geologist.
The engineering geologist's area of responsibility shall include, but need not
be limited to, professional inspection and written approval of the adequacy of
natural ground for receiving fills, the stability of cut slopes with respect to
geological matters, and the need for subdrains or other ground water drainage
devices. He shall report his findings to the soils engineer and the civil engineer for
engineering analysis.
•The Building Official shall inspect the project at the various stages of the
work requiring certification and at any other time deemed necessary to determine
that adequate control is being exercised by the professional consultants.
(d) Regular Grading Requirements. The Building Official may require
inspection and testing by a qualified soil engineer.
18
The soil engineer's responsibility shall include, but need not be limited to,
approval concerning the inspection of cleared areas and benches to receive fill, and
the compaction of fills.
When the Building Official has cause to believe that geologic factors may be
involved, the grading operations will be required to conform to 'engineering grading'
• requirements.
(e) Notification of Noncompliance. If, in the course of fulfilling their
responsibility under this section, the civil engineer, the soil engineer, the
engineering geologist, or the test agency finds that the work is not being done in
conformance with this section or the approved grading plans, the discrepancies
shall be reported immediately in writing to the person in charge of the grading
work and to the Building Official. Recommendations for corrective measures, if
necessary, shall be submitted.
(f) Transfer of Responsibility for Approval. If the civil engineer, the soils
engineer, the engineering geologist, or the contractor are changed during the
grading, then work shall be stopped until:
(1) The owner submits a letter of notification verifying the change of the
•responsible professional, with a copy so noted, to be sent to the prior responsible
professional; and
(2) The new responsible professional submits in writing, that he assumes
all responsibility within his area of expertise as of a specified date. Also, he must
state he has reviewed all prior reports and/or plans (specified by date and title) and
work performed, or by the previous responsible person; concurs with the former
findings, conclusions, and recommendations, and is satisfied with the work
performed provides recommendations for the required remedial work necessary for
his acceptance. All exceptions must be justified.
(g) Site Inspection by the Building Official.
(1) Site Inspection and Pre - Inspection:
Prior to the approval of any building or grading plans and
•specifications, the Building Official may inspect the site to determine that the plans
and specifications are current and reflect existing conditions.
(2) Inspection of Excavation and FMs:
The permittee or his agent shall: notify the Building
Official when the grading operation is ready for each of the following
inspections:
19
(a) Pre - Grading Inspection. When the permittee is ready to begin
work, but not less than two (2) days before any grading or
brushing is started;
(b) Toe Inspection. After the natural ground or bedrock is exposed
and prepared to receive fill, but before fill is placed;
• (c) Excavation Inspection. After the excavation is started, but
before fill is placed;
(d) Fill Inspection. After the fill placement is started, but before
the vertical height of the fill exceeds ten (10) feet;
(e) Drainage Device Inspection. After forming of terrace drains, or
after placement of pipe in subdrains, but before any concrete or
filter material is placed;
(f) Rough Grading. When all rough grading has been completed.
This inspection may be called for at the completion of rough
grading without the necessity of the Building Official having
previously reviewed and approved the reports;
(p) Final. When all work, including installation of all drainage
• structures and other protective devices has been completed and
the as- graded plan, professional written approval, and the
required reports have been submitted.
(3) Revised Grading Plan: If the Building Official finds the soil or other
conditions not as stated in the application for a Grading Permit, he may refuse to
approve further work until approval is obtained for a revised grading plan which
will conform to the existing conditions.
(4) Other Inspections: The provisions of Section 304(e) of the
Administrative Code shall apply to all grading work being done without a permit
and whenever the Building Official determines that the work does not comply with
the terms of the permit or this code, or that the soils or other conditions are not as
stated on this permit, he may order the immediate cessation of all work thereunder,
• and such work shall cease until such corrections shall be complied with.
(5) Prior to the issuance of Building Permits for a graded site, the rough
grading shall be completed to the satisfaction of the responsible engineers,
engineering geologist, and the Building Official unless otherwise approved by the
Building Official.
(6) Whenever any work on which inspections are required is covered or
concealed by additional work without first having been inspected, the Building
20
Official shall require, by written notice, that such work be exposed for examination.
The work of exposing and recovering shall not entail or be subject to expense by the
City of Newport Beach, and shall be the sole expense of the Permittee.
(7) Authority to Stop Work: Whenever any building work or grading is
being done contrary to the provisions of this Code, the Building Official may order
• the work stopped by notice in writing, served on any persons engaged in the doing
or causing of such work to be done. Any such persons shall forthwith stop such
work until authorized by the Building Official to proceed with the work. The
Administrative Code provisions of Sections 201, 202 and 203 as amended, shall be
construed to apply to grading construction work.
Section 15.10.150. Notification of Completion.
(a) Final Reports. Upon completion of the rough grading work and at the
final completion of the work, the Building Official may require the following
reports, drawings, and supplements thereto.
(1) An as- graded grading plan prepared by the civil engineer,
including original ground surface elevations, lot drainage patterns and
locations, and elevations of all surface and sub - surface drainage
• facilities. He shall provide written approval that the work was done in
accordance with the final approved grading plans.
(2) A soil grading report prepared by the soils engineer, including
locations and elevations of field density tests, summaries of field and
laboratory tests and other substantiating data, and comments on any
changes made during grading and their effect on the recommendations
made in the soils engineering investigation report. He shall provide
written approval as the adequacy of the site for the intended use.
(3) A geologic grading report prepared by the engineering geologist,
including a final description of the geology of the site, including any
new information disclosed during the grading, and the effect of same
on recommendations incorporated in the approved grading plan. He
• shall provide written approval as the adequacy of the site for the
intended use as affected by geologic factors.
(B) Notification of Completion. The permittee or his agent shall notify the
Building Official when the grading operation is ready for final inspection. Final
approval shall not be given until all work, including installation of all drainage
facilities and their protective devices and all erosion control measures have been
completed in accordance with the final approved grading plan and the required
21
reports have been submitted. The permittee or his agent shall also furnish
evidence to the Building Official that all slopes, debris basins or other erosion
control devices will be maintained. Temporary devices shall be removed prior to
completion.
Section 15.10.160. Alternate Methods The provisions of this section are not
intended to prevent the use of any material or method of construction not
specifically prescribed, provided any such alternate has been approved pursuant to
this section.
The Building Official may approve any such alternate provided he finds that
the proposed design is satisfactory and complies with the provisions of this section
and that the material, method, or work offered is for the purpose intended at least
the equivalent of that prescribed in this section in quality, strength, effectiveness,
and safety.
The Building Official shall require that sufficient evidence or proof be
submitted to substantiate any claims that may be made regarding its use.
Whenever there is insufficient evidence of compliance with the provisions of
this section or evidence that any material or any construction does not conform to
•the requirements of this Code, or in order to substantiate claims for alternate
material or methods of construction, the Building Official may require tests by an
approved agency as proof of compliance to be made at the expense of the owner or
his agent.
Test methods shall be as specified by this section for the material in question.
If there are not appropriate test methods specified in this section, the Building
Official shall approve the test procedure. Copies of the results of all such tests shall
be retained for a period of not less than two (2) years after the acceptance of the
grading.
Section 15.10.170. Denial of Permit
(a) Hazardous grading. The Building Official shall not issue a permit in
any case where he finds that the work as proposed by the applicant is liable to
•constitute a hazard to the public welfare, endanger life or any private property,
result in the deposition of debris on any public way, interfere with any existing
drainage course, or cause any excess siltation in any natural river, stream,
drainage course, or in Newport Bay.
(b) Geological or Flood Hazard. If, in the opinion of the Building Official,
the land area for which grading is proposed is subject to geological or flood hazards
to the extent that no reasonable amount of corrective work can eliminate or
22
sufficiently reduce the hazard to human life or property, the Grading Permit and
the Building Permits for habitable structures shall be denied.
(c) Environmental Effect, Mitigation. The Building Official may require
plans and specifications to be modified in order to mitigate anticipated adverse
environmental effects at proposed grading projects and he may, under
circumstances where significant adverse effects of a proposed grading project
cannot be mitigated, deny the issuance of a grading permit. When a categorical
exemption is not appropriate for a site of proposed grading work, the City shall
cause to be prepared an initial study, which shall be submitted to the Building
Official. If the initial study shows that no significant adverse environmental effects
will result from the project, a negative declaration may be issued. The Building
Official shall cause the site to be posted and the members of the City Council
notified regarding the issuance of the negative declaration. Appeal of the Building
Official's determination to issue a negative declaration shall be set forth in the
State EIR Guidelines, Title 14, Section 15000 et seq., California Administrative
Code. The Building Official may charge a fee to a permit applicant for the
preparation and processing of environmental documentation.
. Section 15.10.180. Placing Excavated Material.
(a) Unauthorized Dumping Prohibited. No person shall dump, move, or
place any earth, sand, gravel, rock, stone, construction debris, or other excavated
material so as to cause the same to be deposited upon or to roll, flow, or wash upon
or over any public place or way, or upon or over the premises of another without the
express consent of the owner of each such premises so affected. Such consent shall
be in writing and in a form acceptable to the Building Official.
(b) Removal of Misplaced Material. When, unauthorized dumping
described in (a) occurs, the person responsible for the dumping, or the permittee,
shall remove the material within forty -eight (48) hours. In case of non - compliance,
the Building Director may order removal, and the cost of such removal shall be paid
to the City by the person who failed to remove the material, or by the permittee.
•Section 15.10.190. Denuding Natural Ground Cover. Except for a written
order of the Fire Marshal, no person shall denude and destroy the natural cover of
any watershed except for the immediate use of the denuded area for construction or
reconstruction purposes.
SECTION 2. That if any section, subsection, sentence, clause or phrase of
this ordinance is, for any reason, held to be invalid or unconstitutional, such
decision shall not affect the validity or constitutionality of the remaining portions of
23
this ordinance. The City Council hereby declares that it would have passed this
ordinance, and each section, subsection, clause or phrase hereof, irrespective of the
fact that any one or more sections, subsections, sentences, clauses and phrases be
declared unconstitutional.
SECTION 3. This Ordinance shall be published once in the official
• newspaper of the City and the same shall be effective 30 days after the date of its
adoption.
This Ordinance was introduced at a regular meeting of the City Council of
the City of Newport Beach held on the 13th day of November 1995, and
was adopted on the 27th day of November 1995, by the following vote to wit:
AYES, COUNCIL MEMBERS
GIDM, EDWARDS, DEBAY, HEDGES,
COX, O'NEIL, WATT
• NOES, COUNCIL MEMBERS
NONE
•
ABSENT COUNCIL MEMBERS
NONE
MAYOR
ATTEST:
/may
City Clerk
.R
24