Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Bayview Affordable Senior Housing (PA2002-246)
CITY OF NEWPORT BEACH PLANNING COMMISSION STAFF REPORT Agenda Item No. 4 February 20, 2003 TO: PLANNING COMMISSION FROM: William Cunningham, Contract Planner (949) 644 -3234 SUBJECT: Bayview Senior Affordable Housing Project, consisting of 150 units on approximately 5 acres. The Use Permit will establish the development standards under the provisions of the Bayview Landing Planned Community (PC -39) regulations, and will establish a height limit. The Site Plan Review will establish the grade of the site for the purposes of measuring building height. The Lot Line Adjustment will adjust the boundary between the site and the proposed park site to the south. A Mitigated Negative Declaration has been prepared for the project in accordance with the California Environmental Quality Act. (PA2002 -246) APPLICANT NAME: The Related Companies of California 18201 Von Karman Avenue, Suite 400 Irvine, CA 92612 ISSUE: Should the Planning Commission grant approval of the application request by The Related Companies to develop a 150 -unit senior affordable housing project? RECOMMENDATION: Hold a public hearing, adopt the Draft Mitigated Negative Declaration, and approve Use Permit No. 2003 -003, Site Plan Review No. 2003 -001 and Lot Line Adjustment No. 2003 -011, subject to the findings and conditions of approval within the attached resolution (Attachment No. 1). DISCUSSION: Background: The project site is located at the southwest corner of the intersection of Jamboree Road and Back Bay Drive. The site is currently vacant and has been altered in the past with Bayview Senior Affordable Housing February 20, 2003 Page 2 road alignments for Back Bay Drive and Jamboree Road. The site also has been used for the disposal of dredged materials from Upper Newport Bay. The project is being developed concurrently with a public passive view park located on the adjacent ten -acre parcel to the south. The Planning Commission's review is limited to the senior housing portion only and the Mitigated Negative Declaration, as it covers both projects. The park project has been reviewed and preliminarily approved by the Parks, Beaches and Recreation Commission, and is within the jurisdiction of the City Council. The Planning Commission heard a presentation and received public comments on the project at a workshop on January 23, 2003. The City Council will consider the project along with an agreement to provide financing from the City's affordable housing fund on February 25, 2003. The project will also require approval of a Coastal Development Permit by the Coastal Commission. It is anticipated that the Coastal Commission will consider the project at its April, 2003 meeting, provided that the Planning Commission approves the project and the City Council reaffirms that approval on February 25th. Project Description: The senior affordable housing consists of 150 units in three buildings. The project has 120 one - bedroom and 30 two- bedroom units. The one - bedroom unit is 583 square feet and the two - bedroom unit is 810 square feet. Both unit types have one bathroom, a kitchen and a balcony. A total of 180 uncovered parking spaces, including 8 handicapped spaces, will be provided: 150 spaces for tenants and 30 spaces for guests/employees. The three buildings are three stories in height, with two -story elements located at each end of the buildings. Total height of each building to the ridge of the roof is 35 feet; height to midpoint of each roof is 32.5 feet. These heights are measured from the finished pad elevations. offices and a recreation/community center consisting of lounge, exercise room and computer room will be located in Building No. 1 (center building). An outdoor pool, patio and BBQ area will be provided adjacent to the recreation room and located between Building Nos. 1 and 3. The project will include ornamental landscaping and site lighting along pedestrian walkways and in the parking lot. All of the 150 units will be affordable, with 30 of the units at 50% of Area Median Income (AMI), and 120 units at 60% AMI. In addition, all 150 units will be age restricted with the residents being 55 years or older. As noted above, the project is being developed concurrently with the adjacent passive park site. Grading for both the senior housing and park projects will consist of approximately 75,500 cubic yards of cut and fill, with a majority of the cut occurring on the park site, and with the housing site receiving a portion of the fill (see detailed discussion that follows under "Grading"). An objective in developing the park portion of the site is to lower the grade in the southwest portion of the park in order to improve Bayview Senior Affordable Housing February 20, 2003 Page 3 public views of Back Bay from Coast Highway. Of the total graded earth, approximately 25,000 cubic yards are excess and will be exported from the site. A detention basin has been incorporated into the design, located at the northwest comer of the site adjacent to Back Bay Drive and the Newport Dunes entry drive. The basin is designed to retain storm waters from both the park site and senior housing site, improve water quality, and to prevent sheet flow onto Back Bay Drive. The detention basin is included in the land being included as part of the park site, and will not be a portion of the senior affordable housing site. Bayview Senior Affordable Housing February 20, 2003 Page 4 Surrounding land uses are: • Hyatt Newporter Hotel and Resort to the north across Back Bay Drive • Villa Point Condominiums to the east across Jamboree Road • Vacant (passive park site) and Promontory Point apartments to the south across Coast Highway • Newport Dunes parking lot, RV parking and lagoon to the west. Analysis: General Plan - The Land Use Element of the Newport Beach General Plan designates the site as Retail and Service Commercial. However, the General Plan for the Bayview Landing site provides as follows: "The lower level of the site which is on the corner of Jamboree Road and Back Bay Drive is designated for Retail and Service Commercial land use, and is allocated 10,000 sq. ft. for restaurant use, or 40,000 sq. ft. for athletic club use, excluding parking. Use of the site for affordable senior citizen housing facilities is also permitted as an optional land use (instead of restaurant or athletic club)..." As an incentive to develop the site for senior citizen housing, the Land Use Element also provides: "7f the site is used for senior citizen housing, 30, 000 sq. ft. of general retail use may be transferred to Newport Center..." No dwelling units are included in the Land Use Element summary table for Statistical Area K1. However, 200 units of "miscellaneous residential' uses are included within the City wide Growth Projections table that are intended to be for development of affordable housing. The Land Use Element further states that the site may be developed with the senior affordable housing option `only if the Coastal Development Permit findings demonstrate that adequate visitor serving uses exist in the Newport Beach coastal zone consistent with the recreational and visitor serving commercial policies of the Coastal Act." This language was required by the Coastal Commission. Included in the draft Resolution (Attachment No. 1) is a finding, including supportive documentation, consistent with the foregoing requirement. Land Use Element Policy "D" states: "The siting of new buildings and structures shall be controlled and regulated to insure, to the extent practical, the preservation of public Bayview Senior Affordable Housing February 20, 2003 Page 5 views, the preservation of unique natural resources, and to minimize the alteration of natural land forms along bluffs and cliffs." Even though the project being considered by the Planning Commission is limited to the senior affordable housing site, and does not include the park site, as explained above, the park site and the housing site are being graded and developed concurrently. The hillside to the south of the housing will be re- graded and will result in a 2:1 slope, and the southwestem portion of the park site will be re- graded to improve public views from Coast Highway. The areas being graded are highly altered and are not natural landforms or bluffs. However, the natural bluff located along the western portion of the park boundary has been preserved in its natural condition. With respect to the senior affordable housing site, a view analysis and computerized photographic simulations were undertaken in order to assess the impact on public views. The siting of the buildings, particularly Building No. 2 (the building closest to the park site) was done in a manner so as not to impede views from Coast Highway or the park. In addition, in order to meet the policies and objectives of the housing element, the project was designed to provide 150 affordable units. In order to meet that objective, the project could either be developed with the three 3 -story buildings, or a lower single building that would result in greater building mass. The three- building design provides more optimal public view opportunities by allowing view corridors between buildings that would not otherwise be possible. As discussed in the Mitigated Negative Declaration, public views from Jamboree Road of Upper Newport Bay are minimal. While views from that location of the project site itself will be substantially changed, given the competing policies of the Housing Element, the intent of Policy "D" has been met "to the extent practical." Based upon the foregoing, staff believes that the project is consistent with the General Plan. Zoning - Both the park site and the senior affordable housing site are designated Bayview Landing Planned Community (PC -39). PC -39 further designates the upper 10- acre parcel for "Open Space/Park" use and the lower 5 -acre parcel for "Restaurant/Health Club /Senior Residential" use. The Statistical Analysis of the PC Text provides that if the senior residential alternative is implemented, the site could be developed with 120 units. Under the provisions of the City Housing Element, if affordable units are developed, a 25% density bonus is applied. Therefore, the site qualifies for a density bonus of 30 dwelling units (120 X .25 = 30) for a total of 150 units. The following discussion items cover the specific issues related to the project design: a. Development Standards - In addition to the provisions within PC -39 allowing for senior housing, Section IV of the Bayview Landing PC Text provides for flexibility in the design for the use. Under that section, the design standards are to be determined "at a later date... subject to review and approval by the City of Newport Beach." The mechanism for the establishment of specific development standards is Bayview Senior Affordable Housing February 20, 2003 Page 6 through the processing of a Use Permit. Even though specific site development standards were not specified in PC -39, staff compared the proposed project with the development standards of the Multiple- Family Residential (MFR) District standards: Area 21 Front" 20 ft. 20 ft. Side 4 ft. 12 ft/97 ft. Rear 10 ft. 16 ft. FAR 1.75 0.7 Distance Between 10 ft. 40 ft. /82 ft. Buildings 'Back Bay Drive frontage used as front property line. The project as proposed exceeds the development standards of the MFR District, with the exception of building height and parking, which are discussed separately below. b. Parking - As noted above, no parking standard is contained within the Bayview Landing Planned Community text. The purpose of allowing specific standards, including parking to be developed as part of the project design, was the recognition that non - market rate seniors housing project would have unique parking demands, and that the Zoning Code parking ratio of 2.5 spaces per unit may not be appropriate for apartment complexes that are restricted to lower- income seniors. The applicant, The Related Companies, has developed other senior affordable apartment projects in the region in the past including Somerset Glen in the City of La Mirada (159 units/186 parking spaces), Vista Alicante in the City of La Mirada (98 units/95 parking spaces), The Village at Sierra in the City of Fontana (108 units/110 parking spaces), and Bowen Court in the City of Huntington Beach (20 units/29 parking spaces). The parking ratios for those developments range from .95 spaces per unit for the Vista Alicante project to 1.45 for the Bowen Court project. The applicant is proposing a total of 180 spaces (150 tenant and 30 guest spaces) for the Bayview project based on past operational characteristics and actual parking demand of other developments. The parking results in a ratio of 1.2 spaces per unit. In addition, the unit breakdown for the Bayview project is: 120 one - bedroom units and 30 two- bedroom units, resulting in a total of 180 bedrooms, for an overall per- bedroom parking ratio of 1.0. In analyzing the adequacy of the parking as proposed by the applicant, staff considered other communities that have adopted a specific parking standard for senior rental housing. A survey of various communities that have such a standard include the following: Bayview Senior Affordable Housing February 20, 2003 Page 7 Mountain View 0.35 space /unit Santa Clarita 0.5 space /unit San Mateo 0.25 space /unit San Francisco 0.2 space /unit Pasadena 0.5 space/unit Fremont 1.0 space /unit San Bernardino (city) 0.4 spacetunit Manhattan Beach 0.7 space /unit + 1 space /employee Carlsbad 0.5 space /unit + 2 spaces Of the foregoing, with the exception of San Bernardino, all of the standards were for senior rental projects and did not differentiate between market rate and non - market rate housing. Given that residents of an affordable housing project would be less inclined and/or less able to afford to own and operate their own automobiles, the parking demand in affordable senior housing projects would be lower than market rate projects. In summary, of the cities that have a specific senior housing parking standard, the ratios ranged between .2 to 1.0 spaces per unit, and are all below the parking proposed for the Bayview project. In addition to the foregoing, staff reviewed the parking issue with Mr. Joe Foust, the traffic engineer who prepared the traffic analysis for the project. Mr. Foust noted that his firm has recently completed a parking analysis of apartment complexes. In that study, he stated that field counts were undertaken for apartment projects located throughout Orange County. In addition, the study evaluated apartment complexes that were either market rate or luxury rentals. The study also considered the size of the units within the respective complexes with respect to number of bedrooms. The Austin -Foust study concluded that parking demand averaged 0.9 per bedroom for all of the apartment complexes evaluated, which were not age- restricted. In discussing this project with Mr. Foust, he noted that the fact that the project is restricted to seniors only and is affordable. The parking demand would likely be less than the 0.9 spaces per bedroom. He concluded that in his opinion, the 1.0 parking per bedroom proposed by The Related Companies will be adequate for the project. In summary, given the survey of other cities that have established a senior housing parking standard and the review and conclusions of the consulting traffic engineer, it is staff's opinion that the proposed parking standard of 12 spaces per dwelling unit is appropriate for the project. c. Traffic/Circulation - A traffic analysis was prepared for the Mitigated Negative Declaration. The analysis concludes that the project, including the park portion, will generate 600 average daily trips (ADT). Under the Circulation Improvement and Open Space Agreement (CIOSA), which is a committed project, the combined project site is entitled to construct a 10,000 square foot restaurant and park that Bayview Senior Affordable Housing February 20, 2003 Page 8 would have generated 669 ADTs. These trips are presently within the Newport Beach Traffic Analysis Model and the committed projects list maintained for the Traffic Phasing Ordinance (TPO). Since the senior housing project and park generates less traffic than the CIOSA entitlements, and no further analysis is required under the TPO. d. Grading - The grading for the project is proposed to be done concurrently with the development of the park site located adjacent and to the south. A total of approximately 75,500 cubic yards will be graded, with approximately 40,000 cubic yards of fill and 25,000 cubic yards of export from the site. At the time of the preparation of this staff report, it is anticipated that most of the export (approximately 20,000 cubic yards) will be to the Big Canyon Country Club to a site in the vicinity of the clubhouse, located on the north side of San Joaquin Hills Road between Jamboree Road and MacArthur Boulevard. The balance of the export (approximately 5,000 cubic yards) will be trucked to an alternate site to be determined. The export will require approximately 2,500 truck trips. The route to the Big Canyon Country Club will be from the project construction entrance on Back Bay Drive, north along Jamboree Road to San Joaquin Hills Road to the clubhouse entrance, a distance of approximately 1.5 miles. The Mitigated Negative Declaration concludes that the grading operations and the truck traffic associated with the soil export will result in short-term air quality impacts during construction, but that these impacts are less than significant. As noted in the analysis undertaken within the Mitigated Negative Declaration (MND), the truck traffic associated with the export of 25,000 cu. yds. of soil is temporary and will not be disruptive to traffic. However, staff is concerned that any truck traffic occurring during the summer season (Memorial Day through Labor Day weekends) could impact tourist and beach goers. Therefore, a condition has been included in the draft Resolution requiring that any truck traffic occurring during that period be limited to no more than ten trucks per day. In addition, the Mitigation Monitoring Program for the CIOSA EIR restricts grading during the Gnatcatcher mating season, which is from February f to July 31. A Mitigation Measure has been included in the MND requiring that an ornithologist be retained to determine if any native bird nests are located in the area and remedial actions are outlined if any nests are detected. Related to the grading issue is the loss of natural vegetation habitat. Approximately one - quarter acre of coastal sage scrub exists on areas proposed to be graded. This loss is proposed to be mitigated at a four to one ratio, resulting in one acre of coastal sage scrub beiU established on the adjacent park site. The question was raised at the January 23 workshop whether or not additional vegetation could be provided. The final designs of the park site are still being prepared and the issue is being considered to provide additional coastal sage scrub. Bayview Senior Affordable Housing February 20, 2003 Page 9 e. Establishment of Grade - The project site is highly disturbed, having been used for street alignments in the past and as a placement site for dredged materials from the Bay. Due to these unstable soil conditions and a need to provide site drainage, grading of the site will result in the site being raised by approximately 5 feet over the "natural grade." In addition, these constraints would make it impossible to construct a three -story building without a variance. Zoning Code Section 20.65.030(B) provides that, for the purposes of height, the grade shall be the unaltered natural grade. However, the Zoning Code also recognizes that measuring building height from the existing natural grade is not feasible. Section 20.65.030(B -3) provides that the Planning Commission may establish grade in cases where the natural grade is "unworkable." In order to establish grade at a different elevation than natural grade, the following mandatory findings are required: 1. That the proposed grade being requested by the applicant is reasonable and comparable with the grades of surrounding properties and that the establishment of such grade will not be detrimental to the health, safety, peace, morals, comfort and general welfare of persons residing or working in the neighborhood or be detrimental or injurious to property and improvements in the neighborhood or the general welfare of the City. 2. That the proposed grade and related development will not result in the loss of any public views and shall be consistent with the existing character of the neighborhood in which the project is located. 3. That the existing grade on the subject property is inappropriate and unworkable for the purposes of measuring height. 4. That the proposed grade being requested by the applicant is necessary for the preservation and enjoyment of substantial property rights of the applicant. The grading of the seniors housing site is dictated by two primary factors: structural requirements and drainage. The site is low and is characterized by very shallow groundwater, and bedrock located 25 to 30 below the surface. It was determined during preliminary geologic investigations that providing caissons to the bedrock would be prohibitive with respect to the project costs. In addition, it was determined that a minimum "utility zone" would need to be made between the finish floor elevations of the buildings and the groundwater table. The result of these structural requirements, as summarized in the Geologic Report (December 18, 2002, NMG Geotechnical, Inc.) is that the site will be graded into the hillside to the south, a 2:1 manufactured slope provided, and fill of approximately 5 feet will be provided in the lower northerly portion of the site. In addition, the lower fill portion of the site will require approximately 4 feet of surcharge soil (to be removed at a later date) and post tensioned building slabs for the two buildings located on the fill. The result of Bayview Senior Affordable Housing February 20, 2003 Page 10 the grading will be that the southern -most building (Building No. 2) will be located approximately 6 feet below the average existing grade, the center building (Building No. 1) will be approximately 5 feet above average existing grade, and the building closest to Back Bay Drive (Building No. 3) will be approximately 5 feet above average existing grade. The following table summarizes the three buildings in relation to the existing and proposed grade elevations: 1 21 ft. - 23 ft. 22 ft. 27 ft. 2 23 ft. - 74 ft. 35 ft. I 29 ft. 3 17 ft. - 21 ft. 20 ft. 1 25 ft. The Geotechnical report states that, optimally, the lower portion of the site should be raised approximately 10 feet over existing grade. However, in order to preserve views from the Villa Point units to the east, the report summarized that the minimum height of fill would need to be the 5 feet to avoid foundation problems or the need for caissons. The poor drainage conditions are also a driving factor in the design of the project and determination for raising the lower portion of the site by approximately 5 feet. The site is currently very low with a shallow water table. Both the park and housing portions drain to the northwest, and a detention basin is required to control storm water runoff and improve water quality. The engineering solution was to locate the detention basin at the northwest comer in the vicinity of Back Bay Drive and the entrance to Newport Dunes. The basin is required to be engineered to accept storm flows from a minimum 10 -year storm, and to maintain those waters on site. In order to provide flood protection from a 10 -year storm while avoiding the reliance on sump pumps, which can fail, it is necessary to raise the lower portion of the site, and provide drainage swales from the parking lot and around the buildings with a minimum of 2% slope. In order to meet these criteria, the Geotechnical report concludes that the minimum finished floor levels as proposed will be necessary. With respect to the mandatory findings, it is staff's opinion that the four findings can be made. 1. In comparing the proposed grade with surrounding properties, it is slightly higher than the Dunes located to the west. The grade of Back Bay Drive to the north is generally also lower, ranging from approximately 27 feet at the Jamboree Road intersection to about 15.5 feet at the western boundary of the project. The proposed new grade will result in the lower portions of the site being raised approximately five feet, with Building No. 3 (the building closes to Back Bay Drive) having a floor elevation of 25 feet. The proposed new grade, therefore, is comparable to the Bayview Senior Affordable Housing February 20, 2003 Page 11 existing grades along Back Bay Drive. With respect to the grades along Jamboree Road, the existing grades range from the 27 feet at the Back Bay intersection to approximately 60 feet at the projects northerly property line. The raising of the site by approximately 5 feet will have minimal visual impact when compared with the existing grades along Jamboree Road. The grades at the Hyatt Newporter, Villa Point and Sea Island are all higher than the proposed grade. Finally, the adjacent parcel to the south is the future park site. The park site will undergo grading on the western portion in order to improve public views. However, the finished grade of the portion of the park site adjacent to the project site will be approximately 49 feet above the finished grade of Building No. 2 (the building closest to the park site). In summary, it is staff's opinion that the modifications in the grade elevations on the project site reasonable when compared with the surrounding grades. 2. The grades as established will be similar to the surrounding neighborhood and will result in improved public views since the grades proposed in the park portion of the site are designed to improve views from Coast Highway. As noted in the Mitigated Negative Declaration, a goal of the park development is to improve the views of Upper Newport Bay from Coast Highway and the park. Building 2 is being lowered so that the top of roof is located below the grade of the park and Coast Highway and will result in no loss of public views from Coast Highway or the park. With respect to the views from Jamboree Road, also noted in the Mitigated Negative Declaration, is the lack of notable views from the Jamboree Road of Upper Newport Bay, although the project will substantially change the views of the site itself. 3. The existing grade, which has been highly modified in the past and is not a natural grade, is inappropriate and unworkable for the purposes of measuring building height. Staff considered the "useful height" that would remain if the existing grade were used to measure building height after the building pads are raised due to the soil and drainage conditions discussed previously. For example: the existing grades under Building No. 1 range from 21 to 23 feet. Subtracting the existing elevations from the proposed finished floor elevation of 27 feet, results in the finished floor being 4 to 6 feet higher than the existing grade, resulting in the "useful height" of Building 1 being 20 to 22 feet if the 26 -foot base height limitation is imposed (26 ft. less the 4 to 6 ft. grade differential), and a "useful height" of 29 to 31 ft. for a 35400t height limit (35 ft. less the 4 to 6 ft. grade differential). In the case of the 26 -foot height limit, the "useful height" of 20 to 22 ft. would preclude the construction of a two -story building, and in the case of the 35 -foot height limit, the "useful height of 29 to 31 ft. would preclude the construction of a three -story building. Extending the foregoing analysis to the other two buildings, the "useful height" for each building is summarized in the following table: Bayview Senior Affordable Housing February 20, 2003 Page 12 Extending the foregoing "useful height" analysis to Buildings 2 and 3 results in the same conclusion: two and three -story buildings cannot be constructed within the height limits respectively of 26 and 35 feet. Therefore, the existing grade elevations are unworkable for the purposes of measuring height in this case due to the need to raise the grade as the intent of the 26135 height limit is not supported. 4. The existing grade on the lower portion of the site is required to be raised a minimum of approximately 5 feet in order to develop the site in an economically viable fashion within the context of the City's goal to provide a maximum number of affordable senior housing units, resulting in the preservation of the ability to develop the property. f. Building Height - The site is located within the 26/35 Foot Height Limitation Zone. Zoning Code Section 20.65.030 provides that the height for structures with a sloping roof is measured from the established grade (finished floor elevations) to the midpoint of the roof plane, and overall height (to roof ridgeline) five feet over that midpoint height. The applicant's original proposal included an overall building height of 40 feet, and height to the midpoint of the roofline at 35 feet. In response to comments made at the Planning Commission workshop meeting on January 23, the applicant revised his plans to maintain the overall building height at 35 feet, and height to midpoint of the roof at 32.5 feet. Under the provisions of the 26/35 Zone, building heights may exceed the 26 height limitation up to a maximum of 35 feet through the adoption of a use permit. Code Section 20.65.055 requires the following findings to be made to allow the height of the structure to exceed 26 feet: I. The increased building height would result in more pubic visual open space and views than is required by the basic height limit in any zone. Particular attention shall be given to the location of the structure on the lot, the percentage of ground cover, and the treatment of all setback and open areas. The applicant proposes to exceed the 26400t height limitation by 7.5 feet (32.5 feet at roof midpoint). The design of the project resulted in a three- building design rather Bayview Senior Affordable Housing February 20, 2003 Page 13 than a single building in order to decrease building mass and to improve views through the site from Jamboree Road. The buildings have been located with setbacks in excess of the typical MFR standards and the overall building coverage is relatively low at approximately 25 %. Therefore, in staff's opinion this finding can be made. 2. The increase building height would result in a more desirable architectural treatment of the building and a stronger and more appealing visual character of the area than is required by the basic height limit in any zone. The building design, in addition to the three - building concept discussed above, incorporates a pitched roof, and all mechanical equipment is proposed to be located and screened at ground level or incorporated into the roof structure of the buildings. Therefore, no mechanical or other equipment will be visible from either the surrounding public areas or from existing residences located at higher elevations around the project site. In addition, in staff's opinion, the three - building design is more appealing visually than a lower single - building with a larger building footprint in that the latter design would result in more building coverage and less open space, and views through the site between the buildings would be reduced or eliminated. Therefore, in staff's opinion this finding can also be made. 3. The increased building height would not result in undesirable or abrupt scale relationships being created between the structure and existing developments or public spaces. Particular attention shall be given to the total bulk of the structure including both horizontal and vertical dimensions. The project as proposed has a low lot coverage (25 %), increased setbacks (40 to 133 feet along Back Bay Drive, and 100 to 147 feet along Jamboree Road), and two - story elements have been designed into the ends of the buildings. These design features help mitigate any abrupt relationships between the proposed project and surrounding developed properties. As noted above, a design feature of the project was to provide the units in three buildings rather than a single building in order to provide open landscaped areas and in order to maximize views through and over the project. Building No. 2 has been designed so as to be below the ultimate level of the grade of the park site in order to optimize the public views from Coast Highway. From that vantage point, the tops of the buildings will not be seen, and the park is being graded so as to improve the public views to the Back Bay. The height limits of surrounding developments are: 32 feet for Villa Point and Sea Island and 26 feet for the Hyatt Newporter. These developments have been built to the maximum height allowed and all three of these developments are at higher elevations than the proposed project. Therefore, in staff's opinion this finding can be made. Bayview Senior Affordable Housing February 20, 2003 Page 14 4. The structure shall have no more floor area than could have been achieved without the use permit. There is no floor area limitation within the Bayview Landing Planned Community text or zoning regulations applicable to this project. Therefore, the increased height does not permit any additional floor area than would be achieved without the increased height. In summary, in staff's opinion the four mandatory findings can be made to allow the building height to be increased from 26 feet to 32.5 feet as requested by the applicant. g. Views - A view analysis was undertaken for the project in conjunction with the preparation of the Mitigated Negative Declaration. As part of the analysis, photographs were taken from various locations surrounding the site, and computer simulations prepared showing the site after completion of the proposed project. The seniors affordable housing project is being constructed in conjunction with development of the park site. A primary objective of the park development is to enhance public views looking northwest from the vicinity of Coast Highway towards Upper Newport Bay. Even though the northwesterly portion of the park site is being lowered by approximately 10 feet in order to improve the public views, the senior housing will be below the level of the park and will be virtually unseen by the traffic along Coast Highway. While the project will substantially change the views of traffic along Jamboree, there are currently very limited view opportunities from that vantage point due to the elevation of the roadway and the grade of the senior housing site. The most notable private views in the area are from the Villa Point condominiums located across Jamboree Road. The units in Villa Point that parallel Jamboree Road and that view the site are located above the project site (the units are stacked, and the lower level units have floor elevations that are approximately 35 feet higher than the top of the roof lines of the proposed senior housing project). The building design and siting has been done in a manner to optimize both the public and private views. As demonstrated by the computer simulations (photos taken at both the ground floor and second floor levels of Villa Point), the views of the water in Newport Dunes and Upper Newport Bay will be maintained -- the units in Villa Point will continue to have views of the Bay and beyond over the roofs of the project, and view corridors are maintained between the buildings. h. Lot Line Adjustment - The application includes a Lot Line Adjustment. Currently, the property is divided into the upper portion (approximately 10 acres) park site, and the lower portion (approximately 5 acres) senior affordable housing site. The lot line adjustment will move the boundary between the two parcels, but will not result in a Bayview Senior Affordable Housing February 20, 2003 Page 15 change in the net land area within each parcel and no new parcels will be created. Subdivision Code Section 19.76.030.13 requires the following findings to be made: 1. The project site described in the proposal consists of legal building sites, 2. Any land taken from one parcel will be added to an adjacent parcel and no additional parcels will result from the lot line adjustment; 3. The parcels proposed to be created by the lot line adjustment comply with all applicable zoning regulations and there will be no change in the land use, density or intensity on the property, and 4 The lot line adjustment, in and of itself, will not result in the need for additional improvements and/or facilities. The two existing lots are Parcel 1 and Parcel A of Parcel Map No. 95 -137, and meet minimum acreage requirements and are, therefore, legal building sites. As noted above, the lot line adjustment will not result in additional parcels or change in the net size of each parcel, and all of the zoning regulations, including minimum parcel size and configuration, will be maintained. Also, no street improvements or street dedications are required per the Circulation Element of the General Plan. Therefore, all of the four mandatory findings can be made. i. Architectural Design - The three buildings will be three stories in height with two - story elements at the ends of the buildings. The architecture is Mediterranean, with beige smooth - trowel stucco finish, and medium to dark brown eave fascia and metal railings. The roof is full -pitch and is dark reddish -brown tile. Wall articulation in the form of building pop -outs and balcony alcoves has been included in the design. In addition, the applicant had considered the potential of designing the site with a single building or two buildings, but decided on the three building site design. In staff's opinion, the three- building concept provides for a more optimal design in terms of adding building interest, landscaping around buildings, decrease in overall building mass, and provision of view corridors between the buildings. j. Landscaping - The landscaping for the senior affordable housing portion of the site is proposed to consist of trees, shrubs and ground covers in the open areas between the buildings, parking lots and around the perimeter of the site. Staff is concerned that some of the tree species (camphor, California pepper, sycamore and Canary Island pine) are tall- growing and have a wide canopy, which could interfere with both public and private views across the site in the future. Therefore, a condition has been included in the draft Resolution requiring that the final landscaping plan incorporate lower- growing tree species, or that the trees be trimmed and maintained so that they are below the height of the buildings. k. Site Lighting - A lighting plan and specifications for on -site lighting have not been submitted as part of the application. On -site security lighting, parking lot lighting and Bayview Senior Affordable Housing February 20, 2003 Page 16 minimal accent lighting will be provided. It is anticipated that lighting along walkways will consist of low level bollard type fixtures, and parking lot light fixtures as well as building- mounted fixtures will be installed with shields to direct light rays downward. A condition has been included in the draft Resolution requiring that final lighting plans, fixtures and other lighting details be submitted for review by staff, and that the lighting be designed in a manner so as to restrict light and glare from impacting surrounding properties and that the site not be excessively illuminated. Additionally, staff suggests limiting parking lot light standard to no higher than 20 feet and prohibition of "wallpack" lighting. I. Signage - A sign program has not been submitted as part of the application. However, site identification signage is anticipated, most likely in the form of wall signs that will be visible from Jamboree Road, as well as small directional signage for the office and guest parking and a monument sign at Back Bay Drive. A condition has been included in the draft Resolution requiring that any eventual signage be consistent with the Zoning Code sign regulations for multiple family residential uses. Environmental Review: Although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case due to specific mitigation measures and conditions of approvals associated with the approval of the project. The senior affordable housing project is being developed concurrently with the adjacent park site to the south since they are both related in terms of grading and storm drainage. Therefore, a Mitigated Negative Declaration (MND) has been prepared for both projects, which outlines the environmental analysis and the proposed mitigation measures related to aesthetics, biological and cultural resources, geological and soils, including grading impacts, hazards and hazardous materials, hydrology and water quality, noise, public services and utilities, and traffic. The Draft MND was published and made available for public comment in accordance with the California Environmental Quality Act. A Notice of the Availability of the Draft MND was sent to residents of the area, responsible agencies and those persons requesting copies of such notice. No comments have been received as of the drafting of this report. The comment period ends February 19, 2003. All comment letters received will be forwarded to the Commission for consideration. Public Notice: A public notice was originally prepared for the January 23, 2003 Planning Commission workshop to review this project. A public notice was also prepared in accordance with the Municipal Code and was made available approximately 30 days in advance of this Bayview Senior Affordable Housing February 20, 2003 Page 17 hearing. In addition, the notice included the mandatory 30 -day public review for the Mitigated Negative Declaration in accordance with the requirements of the California Environmental Quality Act, and the notice distributed and posted more than 30 days prior to this hearing. The notice was also published in the Daily Pilot, posted at the site and mailed to property owners and nearby homeowners associations as required by Section 20.91.030 of the Municipal Code. Conclusion: Staff believes that the findings for approval of the Use Permit, Site Plan Review and Lot Line Adjustment can be made subject to the conditions of approval and the Mitigation Monitoring Plan contained within the draft resolution. The land use is consistent with the General Plan and the Bayview Landing Planned Community. The project also assists in meeting affordable housing production goals as mandated by the latest Regional Housing Needs Assessment. Staff also believes that the mandatory findings can be made with respect to the establishment of grade and building height and those findings are included within the draft resolution. Finally, staff also believes that the proposed use is compatible with surrounding uses and will not prove detrimental to the area. Alternatives: The Planning Commission has the following alternative courses of action in addition to the recommended action, which is to approve the project subject to the draft conditions. 1. Further modify and approve the project - staff recommends this action if the Commission believes that additional alterations to the project are minor in nature and need not be re- evaluated by the Commission before project approval. 2. Deny the project - this option is recommended should the Commission be unable to make the required findings for project approval. If the Commission decides to proceed with this alternative, it would be appropriate for the Commission to offer findings for denial that will be included in the Resolution for Denial. Prepared by: oys �a✓ lU•G. William Cun6ingharb Contract Planner Submitted by: LyAlod Patricia L. Temple Planning Director Bayview Senior Affordable Housing February 20, 2003 Page 18 Attachments: 1. Draft Resolution for project approval including findings, conditions and mitigation monitoring program. 2. Mitigated Negative Declaration. 3. Applicant's explanation of technical site engineering constraints. 4. Traffic analysis report. 5. Project plans. 6. Lot line adjustment. The draft resolution with conditions was not complete as of the publication of the staff report. It will be transmitted to the Commission prior to the meeting as soon as available. ." d O m co t co N m d CL 0 C O O O O p7 11 11 ��tPf U to C ` a E c Y 2 co 1tl m L. sir W O C . m a N Ql 5 _ O W N Q G 1i 111 _ i if il; p ( O C U O O1 U 0.9 G G C 0 0O 'O p O a s 'aa 0--a-0 a ro v "O @ Q °' t (I c p_ c Q, w f' a al 0 a 0.: a o Q a a �"- m m 0 �s ° c o 0 0 QUA- - - o fm A O O ° U U i v c� r`c3a�o� it .(� m mn�a`s co mcc �c ni 0mg as m c c c - 61 rn m m c to c n c v: n m O a o o C. tp .0. m c p m O � a c Ci w ul o°m °mEc W mPso { =aO cwa� to rs fl A ?p iP Oi m m tx a 4 a QC .i.: cC UCm GOOy k C ' owmom Rf.aN . U . O C y V m m co ma m Z vi .� m da yWt yoE ®-0 ro CL cx 2'Y £ w 0 t o T fi -m ° mL` � ° � m 4 Co m CL 0-0 Qrn °N O O m oy°gym'ca°`� inmmoNa`ci o+ co c�O as Ifi. Ii 0 0 -O o m N X maa20am'c `m c o m m a 2' E f t-E - i�°a3a( X01 moaQmaonc�•14 �a°c = °c NcEa ic�°aroo4 °w jo'asm t ,< +G= t �°- 's. .Y •y .0 E wl E° U ca N m w m L m O m m CL t t 7 O ti C N .0 t O> ... C .E 4 o o_m� w V) g �c4 5 N mOhr -� 4 r EL/CL �k,%cj � .e£ &+f= ¥i,C, M:9 ) (��\ 2,«]§2-a_- f�I= §�.�» E %E 'a t))a �Eos:2aa,�£ =o o'? &,tb §\§], >o�e ;_� =�, =o� Cx ED —,c )i$$ #test- §J \) \fK \K 2 ® «`CIOa C:$,� Ee4D25 � ..z t,ae22o 0.0 mZ_!�a « /@£�#0ƒ tae © -�■ �\§±�a\£§ *aE§Q) c{ca 225\27- ca m e §27 @ #`& Cm@k2328 - @* ,�a� k %2%$�2° '3 = 3 @aa e /§kbCO 0��e=K 2 ]2� -a �m - {8 %«£e\/ 2�z §I - ;■. /mZm:m_mC: CE, a) -- §�# °``® °) ®�(j22ff® / ®�t /�k _�ttkf |) `2 &- -`k2k` (=282 k�` - -�- ■`S7mmab ~�2.fa -pmt ;�2)k = ©q ;Z.a zt& 2$r U 2ca:tQ ;02,1%nQ 6 ti \ )D \/ CL IL ƒ\ i2 �k,%cj � .e£ &+f= ¥i,C, M:9 ) (��\ 2,«]§2-a_- f�I= §�.�» E %E 'a t))a �Eos:2aa,�£ =o o'? &,tb §\§], >o�e ;_� =�, =o� Cx ED —,c )i$$ #test- §J \) \fK \K 2 ® «`CIOa C:$,� Ee4D25 � ..z t,ae22o 0.0 mZ_!�a « /@£�#0ƒ tae © -�■ �\§±�a\£§ *aE§Q) c{ca 225\27- ca m e §27 @ #`& Cm@k2328 - @* ,�a� k %2%$�2° '3 = 3 @aa e /§kbCO 0��e=K 2 ]2� -a �m - {8 %«£e\/ 2�z §I - ;■. /mZm:m_mC: CE, a) -- §�# °``® °) ®�(j22ff® / ®�t /�k _�ttkf |) `2 &- -`k2k` (=282 k�` - -�- ■`S7mmab ~�2.fa -pmt ;�2)k = ©q ;Z.a zt& 2$r U 2ca:tQ ;02,1%nQ 6 ti \ cd I IL �k,%cj � .e£ &+f= ¥i,C, M:9 ) (��\ 2,«]§2-a_- f�I= §�.�» E %E 'a t))a �Eos:2aa,�£ =o o'? &,tb §\§], >o�e ;_� =�, =o� Cx ED —,c )i$$ #test- §J \) \fK \K 2 ® «`CIOa C:$,� Ee4D25 � ..z t,ae22o 0.0 mZ_!�a « /@£�#0ƒ tae © -�■ �\§±�a\£§ *aE§Q) c{ca 225\27- ca m e §27 @ #`& Cm@k2328 - @* ,�a� k %2%$�2° '3 = 3 @aa e /§kbCO 0��e=K 2 ]2� -a �m - {8 %«£e\/ 2�z §I - ;■. /mZm:m_mC: CE, a) -- §�# °``® °) ®�(j22ff® / ®�t /�k _�ttkf |) `2 &- -`k2k` (=282 k�` - -�- ■`S7mmab ~�2.fa -pmt ;�2)k = ©q ;Z.a zt& 2$r U 2ca:tQ ;02,1%nQ 6 CL ) ��o , §;% (k) ° §f4 \ \) \\k! kye §a�E• @ ak)&f\ 28 { ° {§g! ca 44 T.) /t{ )teao # {4tu ca �\\ \ \ \\ . \\\ mkf i§ a \\2 (22\ $n\§ L6 Q) M t% ■ C :L m (a ! >f /kkkkk fet�7e \mot 0)— vi °^ stet §2222 ,am ca &o k Co ft�l22 \ak CL( \�k� }k� �k� *mx2L Z clm -0 �� \ §k\-0 \Qi$Ez \ §� °��r■ @±§ \ \ \ /Z8 a ®a t:0mo)+ z � X 40 k}� \ })\ CA EX �� \�\((j\\ 7)Gk�iq%E l\ \k)§ \ 3]§» } k\ CD »! (Le ca CL ) ��o , §;% (k) ° §f4 \ \) \\k! kye §a�E• @ ak)&f\ 28 { ° {§g! ca 44 T.) /t{ )teao # {4tu ca �\\ \ \ \\ . \\\ mkf i§ a \\2 (22\ $n\§ L6 Q) M t% ■ C :L m (a ! >f /kkkkk fet�7e \mot 0)— vi °^ stet §2222 ,am ca &o k Co ft�l22 \ak CL( \�k� }k� �k� *mx2L Z clm -0 �� \ §k\-0 \Qi$Ez \ §� °��r■ @±§ \ \ \ /Z8 a ®a t:0mo)+ z � X 40 k}� \ })\ CA EX �� \�\((j\\ 7)Gk�iq%E l\ \k)§ \ 3]§» } I; ITO It (1) N :-: tv,! r ; + U d a ° � �; � , at �:: C € �I7 CD m 1 t t ',i C m diff"EEii. pow - II 1i 4 €7; d ro �. Y m L U a win c a N DI Ri O) d ro m L U a 1 C rom V a W M L ro m d ro HER I. NO OON j ITS E of A I 1:.- Y Ypp Y v !Ile , 'r m m m ::- IL - a - a a gal its as u 0 0 0 a n CL a co IE ;i m 0 0 ro 0 E o 0 „ Y i g U U �N EAN r hHiiE ;y w ' r N -0 °m Cm �t � 0 WO. am ; °my i ° E o y �g! t t�Ea m Mm �c2 UCb"m 3 o aU L nC !99'7 d l 'i•� c ao cmm ts?, ot ai= _m �P: j � ;E cra) rnh� Z o a� o w Qya y E (n rna oanic� i y m dn��� roo'cm n�a tfi O n �� 3 navy ! j9 t 4 O Q m N 0 CL �n G t z (a ��• :. O b W m C y a mC w O =� m U OC y R C m �•N b N y c Q j a _y�cOdRf yy E .y�m0 C p �N ���CmQ1�4CG m`m$ ° N m: m aci t; ma0 m4 m �ro 3mc �a� m �`myycmw$bo4 KU .ycm :oymEEn CL �.V2•F ro� *-m O b CLm +E Lo b T CcmlUOS E ai 2 Ny O $' a a m fi n m m E a Rj I k \ CD co 2 ( \ƒ /� ``` ' «�E20 \' |© § ) 2� §� )� \kk() /k \{KK(\ `7-- 13 7 z � a /) \\ ©GS#t 'a e0f& coed lai /{f /t $Al"co k %{ &$Z) 03 m- a aE\ czZ3 )k�\fk 2a /\Aac� OR4 co )E �E \/2co ƒ2[2%/ /\2■ TL 2222)@ /1CLm% Q i/� +%`�I /$} § #2�m�Af&®g % \ {2 /2k }Ake \\ / m�o> a-` ©a §e2±i) >!%�2b�% 0,2 \ 22 \\�fe ® ®k(ta® ©mK {)§- -`��2 a\3aaaa2¥|\ \£s 2(n ,ca Q \-Mk \ t N iii} fi�3t 3E # ;:c 9,•Qi T� ttl C c 1 1 ..._�.a UW 0 i N N N a U' co T c m� co — yp_ ya M co m cm v Q o rn A, o - o 0 v r! d i�.om po orn y c =am a`0 ago Y U L V a 'O ;rte mQ °�- g'3jrnm y.c acOi ca y y c i N N G b E ti m.ym�E a ca c o° o Q ao° m b'OC4O mroE2 w` m C C O O C O ro � rn� E E g c r o c m (U m C 3 m C tm N C r-Q N c E m Macio�ait�i� >.Ec£iUa.cmi ?mg`�g U C L O U � C c% N FL 5 O 6 CL 0 a m r N w Rt U1 n,G 4 0 4`3°'uyicyo 0_0 (i a V ,i •L m 'Cl CO a N 4 y O z cu U h.0 o.o >oog goag4.cw Q+ mO33E g•g:g�o °$ �ac!iCZ 3U� o v C O U C. y C c O V Qc V h °ca~ m`rnrn wac �3 y w M °-o a ai 2 a .Q a Wa y W c y� m M c Q'� y N C a° :3gyro` -0U 3 U 13-S �••°� n Or O y 3 y a C cc C w U C a m m m° M aai to 0 E y Nm rnaaa y-z c C mroa'o�Q`oy� �Q� C y O y O ti Q d Ca p M .3. U g m Em 0 / \ - / $k / q & ;fit \) ) / « % { \ %k \ \ )g ()CM 0zt: @`\a tz_ & xCXE ))% — tc:�.\ m_% -Ta 13 —0 0 7 \�±\ .e- e- §�).. § «�2�) m co £(ZZ to £!# k2^ jc a rh �n - XME a7o�mm� ®��\a;tt��e�k §I \ ƒ\kkk �E;QL -0 f\)k2)xC: \ -.-■2| §)Q.Qca % " EZ° c ,222]2 «£227§\7£%« 2222!2 \ \a£te �k`22%#� £| \k \ / §\Z {]`0) \tf\ /0r% »\ ®k` \EkB &«k% \ §kk \ \k22#%{!�)() Q. -G as qC)Z eo�a- 2g27 {) \\{ 2 \k/$L06 QE Ea£k&k {� § at; §f (E 0 (� / /k\ CL ;2 buss \ - / $k / q & ;fit \) ) / « % { \ %k \ \ )g ()CM 0zt: @`\a tz_ & xCXE ))% — tc:�.\ m_% -Ta 13 —0 0 7 \�±\ .e- e- §�).. § «�2�) m co £(ZZ to £!# k2^ jc a rh �n - XME a7o�mm� ®��\a;tt��e�k §I \ ƒ\kkk �E;QL -0 f\)k2)xC: \ -.-■2| §)Q.Qca % " EZ° c ,222]2 «£227§\7£%« 2222!2 \ \a£te �k`22%#� £| \k \ / §\Z {]`0) \tf\ /0r% »\ ®k` \EkB &«k% \ §kk \ \k22#%{!�)() Q. -G as qC)Z eo�a- 2g27 {) \\{ 2 \k/$L06 QE Ea£k&k O \k §f (E 0 2 ƒ/ CL ) / ƒa%) \ - / $k / q & ;fit \) ) / « % { \ %k \ \ )g ()CM 0zt: @`\a tz_ & xCXE ))% — tc:�.\ m_% -Ta 13 —0 0 7 \�±\ .e- e- §�).. § «�2�) m co £(ZZ to £!# k2^ jc a rh �n - XME a7o�mm� ®��\a;tt��e�k §I \ ƒ\kkk �E;QL -0 f\)k2)xC: \ -.-■2| §)Q.Qca % " EZ° c ,222]2 «£227§\7£%« 2222!2 \ \a£te �k`22%#� £| \k \ / §\Z {]`0) \tf\ /0r% »\ ®k` \EkB &«k% \ §kk \ \k22#%{!�)() Q. -G as qC)Z eo�a- 2g27 {) \\{ 2 \k/$L06 QE Ea£k&k O \k 2 ƒ/ \ - / $k / q & ;fit \) ) / « % { \ %k \ \ )g ()CM 0zt: @`\a tz_ & xCXE ))% — tc:�.\ m_% -Ta 13 —0 0 7 \�±\ .e- e- §�).. § «�2�) m co £(ZZ to £!# k2^ jc a rh �n - XME a7o�mm� ®��\a;tt��e�k §I \ ƒ\kkk �E;QL -0 f\)k2)xC: \ -.-■2| §)Q.Qca % " EZ° c ,222]2 «£227§\7£%« 2222!2 \ \a£te �k`22%#� £| \k \ / §\Z {]`0) \tf\ /0r% »\ ®k` \EkB &«k% \ §kk \ \k22#%{!�)() Q. -G as qC)Z eo�a- 2g27 {) \\{ 2 \k/$L06 QE Ea£k&k � \ .oI { CL Cd b\� 2�0 `M t3) /off Q) .0 \/i \\\k �Mr $:M I)) \7 \� } \\ - �a »2+ k\ %f k�u s (\\ \2\ 4)0 lu Z0 i$® )k) �03k/ \k)k ��� ��(. �0 uk ;)t] \(�{ 22 »_ £ \{tE cx /t=) 22� <r 4� «a k`o � A ,umo §E« , \2& $ 2 �k §&[ { \�� \{ va `#0! � \ \( \i \§����@ —; — ~Ete \k ]}e�oa� moo§ §«�e &3««§ %k Z�72�`® e'�E2$2 � ¥¥ / ca OL =U, U c C O L: m�dc C W Y O c C O � ti Co 7 _ L t{Lf N C m U .FU. ,L 2 U U N Q c _Ta C N a r 01 N 6 p N N la ULU O O O m = c E m = c E m c E CL mCL ma N O) N p N M °v °v °a 0 m 0rn cw 0v+ a- ca am am a d d o U N C (a N a� m 0 CL CL m b .� LL U'ya� �m C m .1Da o `� 3 '2' o w m m�omAIm -0 mr G `wck.ZGm W ro G R m V 3.� ai U Q>,ro N-G ••'cJG m ro o 0 o m D o _o am o� m mo2°�E'yEyOi -0E;e ` m a ro c yba rz S 4 ro C m�o� >ycvaio gw m w rn�aa 30 v O N a N c 0 m O Q> O hN ro �3 m 4z C, IT m 0 -0 m m N Z03 t5) b1 N~ $j U uj D G c a a b C1 > G G o c 40 �w QU 4 O. c*m y� AGO O.m al m j,NC Uromtoro mG n:!= ccp m asotz,EEy� 'cooca LU 4o ro p,ca -it `a ca Co M~ O N G ry m N ro Q) C y ro ° m grnm�ym2omnw�' c O_ C. .r- 2 CL CL m N E �oro3a� U m N sm 4 ~ ai tp ro a Y N Cm C v pY b Ny o Rf� O N U Q> 00 .c o,Gmaaw ~ �~ U ro O U a Q),4- 7 o io CO gomaao 0 1l q� mU w aVi E� m.4 CL b C j o, a 0 b c `6 mo yL N m QD rn !S•$W 0 d 3 0 C N m c c N W U N = c E m ro � O. h Of °v Oro rn am c 0 t5 d CL N C m O O. m b t 6 c ym° C7 b yQ) 0 0 t C m m a m m m ����°go.�a`Q �bE%u NOQ 'Om Ob��Q yb•4 .° U O O j F- O.n 0 qN 38 q) A-4 in Os�o�;i -,mzs 0D g4cmio �aDO Ob3�NW c 0 L`o CL m C 0 N U C N N G N O) O O W a`m L Q Y � rn V 0 N N 0 N n.o� c 3 0 A=! cx r (a a (D 0 i m C3 a m 3 tm 3 ZJ o > o' . rn 0) m y °moo c row ? � �+-0-• N O ro y3ge y4o O D mq �S p N wm °qbc O O " m Q co m d g El-- W Q N O O O Q •Q N w€ O€ O r E 0 m ro o N C C C C m t6U O)m r= = ca cc c 7 C 3 Z m Q °. 0 N C C ��Ol• -0 miry m'"V -iry® aci yL"m (� k i V U m o ai CL "? m vj N O m D o W ° c C) c E o m rnQ) a c oAc .c C U r ro Q C N�•-.m mb m m m3gE..romy u b= m cCc m N m m•0 22 `« c m m m 8 -0 % m C G m 4 a, wz r� Vi a V g Z n• gram) g�mw°oac O a� CL §)2 )2( |2# ƒk§ kkkB \� L ( \k\ ,«k{ 2k: 42 4i AQ o)k/ $)2)\ )�6ivtE §)27fk\%� C) 2222R2tZ « 722;2 \( §�\ »� CLk /�G® a - em k) \k \$ &EZi «� -i|� �23�)t�(] \{ k£ta t3l Z \k }7702.— - t) \ C-0 r 14 §�k) /(k&## §Q)q) to 0) 2) AD, u a \-talb §t . :�fet\me {23 ;;aaao a k.- #« /m§ »t � \ \�) / &Ik �`2 /B t r {%Z 8 §§% § %&ak a){§, Za�3y 2 § \%: \ \ \( {a«E G[[$@ \3 ( | f $ U2 CL 2\/ \� 8E�� °�U�( ) /k / \\ /\( kd CL !/ ca . a .� )'do �k (k ( /k\ §l LL— c #a lu (k �' f2$�\{ \]ƒ\ \ / \§ kk?}( \2® ] %-2 ca 10 N- ¥ ^ ` �k10 (( \2k o <at ~ 22� \f2• §ao� k] ;kak --U) To d] %)] z2kE -Qij) I Attachment 2 Mitigated Negative Declaration �I I 1 1 1 ' INITIAL STUDY and ' MITIGATED NEGATIVE DECLARATION BAYVIEW SENIOR AFFORDABLE HOUSING AND PARK PROJECT. 1 1 JANUARY 21, 2003 11 1 Submitted to: City of Newport Beach 3300 Newport Boulevard f Newport Beach, CA 92658 -8915 Submitted by: Civic Solutions, Inc. ' 31726 Rancho Viejo Road, Suite 223 San Juan Capistrano, CA 92675 Contact: John Douglas, AICP Phone: 949.489.1442 CIVIC SOLUTIONS, INC. 1 1 0 NOTICE OF PUBLIC HEARING AND AVAILBEUTYOF NEGATIVEDECLARATION Baytiew Paris and Senior Housing Use Permit No. 2003 -003 Site Plan Review No. 2003 -001 (PA2002 -246) and Negative Declaration NOTICE IS HEREBY GIVEN that the Planning Comnnssion of the City of Newport Beads will hold a public hearing on thejoirrt application of Related Companies and City of Newport Beach, on behalf of The tIrvine Company, property owner, for Use Permit No. 2003 -003 and Site Plan Review No. 2003 -001 on property located at the northwest corner of Coast Highway and Jamboree Road The property is located ' in the Bayview Landing Planned Community (SP 39) District. Request to a develop a uassive park on the southerlv Dorlion of the site consisting of annroximatel ' ten acres, and to construct 150 affordable senior housing units on the northerly portion of the site consisting of approximately five acres The nark design includes a bike trail that will run through the site and connect to the existing trail at Newport Dunes, park benches habitat restoration areas tand ornamental landlsca >l inz The use permit application would authorize the use of the property for 'Landing Planned Community District Regulaitons. The Use Permit will also establish a maximum structure height of 35 feet as measured by the the Zoning Code. The Site Plan Review application will establish the grade of the site for the purposes of measuring structure height. The grade 'requested is approximately 4 to 5 feet above the existing grade of the lower poriton of the site nearest the intersection of Back Bay Drive and Jamboree Road ' NOTICE IS HERESY FURTHER GIVIN that a Mitigated Negative Declaration (MND) has been prepared by the City of Newport Beach in connection with the application noted above. The MND states that the 'subject project will not result in a significant effect on the environment, and any identified adverse environmental effects can be mitigated. It is the present intention of the City to accept the MND and supporting documents. This is not to be construed as either approval or denial by the City of the subject 'application The City encourages members of the general public to review and comment on this documentation. Copies of the Mitigated Negative Declaration and supportng documents are available for pubic review at the Planning Department, City of Newport Beads, 3300 Newport Boulevard, Newport ' Beach, California, 92658-8915,(949) 644 -3200. NOTICE IS HERESY FURTHER GIVIN that the public hearing will be held on the 20th day of February '2W, at the hour of 6:30 p.m. in the Council Chambers of the Newport Beach City Hall, 3300 Newport Boulevard, Newport Beach, California, at which timeandplace any and all persons interested may appear and be heard thereon. If you challenge this project in court, you maybe limited to raising only those issues you or someone else raised at the public, hearing described in this notice or in written correspondence delivered to the City at, or prior to, the pubic hearing. For information call (949) 644 -3200. Shant Agayanian, Secretary, Planning Commission, City of Newport Beach. ,�I TABLE OF CONTENTS A. PROJECT DESCRIPTION Page 3 B. ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED and DETERMINATION Page 8 C. ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED Page 9 D. REFERENCES Page 77 E. LIST OF PREPARERS and ORGANIZATIONS Page 78 AND PERSONS CONSULTED APPENDIX I. TRAFFIC STUDY Page 80 CIVIC SOLUTIONS. INC Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration ryj January 21, 2003 Page 2 ENVIRONMENTAL CHECKLIST A. PROJECT DESCRIPTION 1. PROJECT TITLE: Bayview Senior Affordable Housing and Park Project 2. LEAD AGENCY NAME AND ADDRESS: City of Newport Beach 3300 Newport Blvd. Newport Beach, CA 92663 3. CONTACT PERSON AND PHONE NUMBER: Daniel Trimble, Program Administrator City of Newport Beach Planning Department 949- 644 -3230 4. PROJECT LOCATION: The project site is bounded by Jamboree Road on the east, Coast Highway on the south, Backbay Drive on the north, and Newport Dunes on the west in the City of Newport Beach (See Exhibit 1, Vicinity Map) 5. PROJECT SPONSOR'S NAME AND ADDRESS: ' City of Newport Beach 3300 Newport Blvd. ' Newport Beach, CA 92663 6. GENERAL PLAN DESIGNATION: ' Recreational & Environmental Open Space and Retail & Service Commercial 7. ZONING: Bayview Landing Planned Community 8. PROJECT DESCRIPTION: The proposed project consists of site preparation, grading of approximately 75,500 cubic yards with approximately 25,000 cubic yards of export, development of a 10 -acre public view park and 150 -unit senior affordable housing project. The park will be located at the northwest corner of Coast MC SOWFIONS. INC . ' Bayview Senior Affordable Housing and Park Project Initial Study /Negative Dec a 9 January 21, 2003 Page Highway and Jamboree Road and is designed primarily for passive uses. The park design includes a bike trail that will run through the site and connect to the existing trail at Newport Dunes; park benches for viewing Upper Newport Bay; habitat restoration areas; ornamental landscaping, and possibly future bollard lighting along the bike trail. The Newport Senior Apartments (Lower Bayview Landing) will be located on the vacant lot at the southwest comer .of Jamboree Road and Back Bay. Drive adjacent to the proposed view park. The parcel is approximately 5 acres in size and will include 150 senior apartments. The project will contain all affordable units with 20% of the units at 50% of Area Median Income (AM]) and 80% of the units at 60% AMI, all of which will be restricted to tenants aged 55 and older. The apartments will consist of 1 and 2 bedroom units, with all upper -floor units accessible by elevator. Approximately 80% of the units will be one - bedroom and 20% of the units will be two- bedroom. Included in the total will be an on -site manager's unit. The units will be located within three buildings, which are three - stories in height. The project will meet all local, State, and Federal regulations governing persons with mobility disabilities. The project also includes parking facilities with approximately 180 spaces, driveways and exterior security lighting. Vehicular access to the project will be controlled by a guard gate. A community center will house administrative functions, social programs, and recreational activities. A pool, sundeck and barbecue areas will also be included adjacent to the community center. Plans and specifications for the development of the passive view park must be approved by the Newport Beach Parks and Recreation Commission and the City Council. Use Permit and Site Plan Review applications for the development of the 150 senior apartments must be approved by the Newport Beach Planning Commission. The Use Permit application would authorize the use of the property for senior affordable housing and establish site development standards pursuant to the Bayview Landing Planned Community District Regulations. The Use Permit will also establish a maximum structure height of 35 feet as measured by the Zoning Code. The Site Plan Review application will establish the grade of the site for the purposes of measuring structure height. The grade requested is approximately 4 -5 feet above the existing grade of the lower portion of the site (approximately 5 acres) nearest the intersection of Back Bay Drive and Jamboree Road. CIVIC SOLUTIONS, INC. Bayview Senior Affordable Housing and Park Project Initial Study/Negative Declaration January 21, 2003 Page 4 F L L �icir���y IWI� Exhibit 1- VICINITY MAP N CIVIC SOLUTIONS, INC Bayview Senior Affordable Housing and Park Project January 21, 2003 Initial Study/Negative Declaration Page 5 The project Site Plan is shown in Exhibit 2. It is anticipated that project construction will occur during a 2-year period from mid -2003 to mid -2005. 9. SURROUNDING LAND USES AND SETTING: The project site is surrounded by the Newport Dunes resort on the west, the Hyatt Newporter Hotel on the north, Villa Pointe condominium development across Jamboree Road to the east, and Promontory Point apartments across Coast Highway to the south. 10. OTHER PUBLIC AGENCIES WHOSE APPROVAL IS REQUIRED (e.g., permits, financing approval, or participation agreement): The actions and approvals required to implement the project, which are part of this analysis, include the following: Approval of a Coastal Development Permit by the California Coastal Commission Other agencies having review or permit authority over the project may be identified during the environmental review process. AMC CIVIC SOLUTIONS. INC. ....mar..-- ,...r..rwr,... Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration 3� January 21, 2003 Page 6 N rF.r r` m a a Aw d. tx v r � I 8� 3 G � � � 1 �TfTT1 I I •! - sx ®s i T _t 3 cri L4 Ill �gg�,F� �e� k�r s UdIIIIUIJI.f/ +Ili W y LLgg i i 99 1 ,�' �/ mod° yi+:.. •. i m ps' 2q B. ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact," as indicated by the checklist on the following pages. DETERMINATION: (To be completed by the Lead Agency) On the basis of this initial evaluation: ❑ I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared. ❑ I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared. ❑ I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required. ❑ I find that the proposed project MAY have a "potentially significant impact" or "potentially significant unless mitigated" impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is, required, but it must analyze only the effects that remain to be addressed. ❑ I find that although the proposed project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon a proposed project, nothing further is required. ry} 1117103 gn ture Patricia Temple Planning Director CIVIC SOLUTIONS. INC. Bayview Senior Affordable Housing and Park Project Initial Study/Negative Declaration ' January 21, 2003 Page 8 4I Aesthetics I Agricultural Resources I Air Quality Biological Resources Cultural Resources Geology / Soils Hazards & Hazardous Materials Hydrology I Water Quality Land Use I Planning Mineral Resources Noise I Population I Housing Public Services Recreation I Transportation/ Traffic Utilkies / Service S stems Mandato Findin s of S' canoe DETERMINATION: (To be completed by the Lead Agency) On the basis of this initial evaluation: ❑ I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared. ❑ I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared. ❑ I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required. ❑ I find that the proposed project MAY have a "potentially significant impact" or "potentially significant unless mitigated" impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is, required, but it must analyze only the effects that remain to be addressed. ❑ I find that although the proposed project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon a proposed project, nothing further is required. ry} 1117103 gn ture Patricia Temple Planning Director CIVIC SOLUTIONS. INC. Bayview Senior Affordable Housing and Park Project Initial Study/Negative Declaration ' January 21, 2003 Page 8 4I C. EVALUATION OF ENVIRONMENTAL_ IMPACTS A brief explanation is required for all answers except "No Impact" answers that are adequately supported by the information sources a lead agency cites in the parentheses following each question. A "No Impact" answer is adequately supported if the ' referenced information sources show that the impact simply does not apply to projects like the one involved (e.g., the project falls outside a fault rupture zone). A "No Impact" answer should be explained where it is based on project - specific factors, as well as ' general, standards (e.g., the project would not expose sensitive receptors to pollutants, based on a project - specific screening analysis). ' All answers must take account of the whole action involved, including off -site as well as on -site, cumulative as well as project - level, indirect as well as direct, and construction as well as operational impacts. ' Once the lead agency has determined that a particular physical impact may occur, then the checklist answers must indicate whether the impact is potentially significant, less ' than significant with mitigation, or less than significant. "Potentially Significant Impact" is appropriate if there is substantial evidence that an effect may be significant. If there are one or more "Potentially Significant Impact" entries when the determination is made, an EIR is required. "Negative Declaration: Less Than Significant With Mitigation Incorporated" applies where the incorporation of mitigation measures has reduced an effect from "Potentially Significant Impact" to a "Less Than Significant Impact ". The lead agency must describe the mitigation measures, and briefly explain how they reduce the effect to a less than significant level (mitigation measures from Section XVII, "Earlier Analyses ", may be ' cross - referenced). Earlier analyses may be used where, pursuant to the tiering, program EIR, or other ' CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D). Earlier analyses are discussed in Section XVII at the end of the checklist. In this case, a brief discussion should identify the following: ' a) Earlier Analysis Used. Identify and state where they are available for review. b) Impacts Adequately Addressed. Identify which effects from the above checklist ' were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis. 1 CIVIC SOLUTIONS. INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration a ' January 21, 2003 Page 9 C) Mitigation Measures. For effects that are °Less than Significant with Mitigation Measures Incorporated ", describe the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site - specific conditions for the project. Lead agencies are encouraged to incorporate into the checklist references to information sources for potential impacts (e.g., general plans, zoning ordinances). Reference to a previously prepared or outside document should, where appropriate, include a reference to the page or pages where the statement is substantiated. A source fist should be attached, and other sources used or individuals contacted should be cited in the discussion. Supporting Information Sources: A source list should be attached, and other sources used or individuals contacted should be cited in the discussion. This is only a suggested form, and lead agencies are free to use different formats; however, lead agencies should normally address the questions from this checklist that are relevant to a project's environmental effects in whatever format is selected. The explanation of each issue should identify: a) The significance criteria or threshold, if any used to evaluate each question; and b) The mitigation measure identified, if any, to reduce the impact to less than significant. SOLUTIONS. INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration AA January 21, 2003 Page 10 1 1 1 Issues a substantial adverse effect on Less Than Potentially Significant Less Than No Significant With Significant Impact Impact I Mitigation Impact X resources, including, but not limited to, trees, X rock outcroppings, and historic buildings within a state scenic highway? c) Substantially degrade the existing visual character or quality of the site and its X surroundings? d) Create a new source of substantial light or glare, which would adversely affect X day or nighttime views in the area? Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland X Mapping and Monitoring Program of the California Resources Agency, to non- agricultural use? b) Conflict with existing zoning for agricultural use, or a Williamson Act X contract? c) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of X Farmland, to non - agricultural use? a) Conflict with or obstruct implementation of the applicable air quality Ian? b) Violate any air quality standard or contribute substantially to an existing or ro'ected air quality violation? CIVIC SOLUTIONS, INC. X X Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration 5 January 21, 2003 Page 11 CIVIC SOLUTIONS. INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration January 21, 2003 Page 12 ' Less Than Issues Potentially Signfticant significant With Less Than significant No Impact Mitigation Impact Impact Incorporated C) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non - attainment under an applicable federal or state ambient air quality X standard (including releasing emissions, which exceed quantitative thresholds for ozone precursors)? d) Expose sensitive receptors to X substantial pollutant concentrations? e) Create objectionable odors affecting a substantial number of people? X a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species X in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional X plans, policies, regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? c) Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal X pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established X native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? CIVIC SOLUTIONS. INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration January 21, 2003 Page 12 ' 1 E) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? X f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional or state habitat conservation Ian? SOLUTIONS. INC. '' Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration Al January 21, 2003 Page 13 a) Cause a substantial adverse change in the significance of a historical resource as X defined in § 15064.5? b) Cause a substantial adverse change in the significance of an archaeological X resource Pursuant to § 15064.5? c) Directly or indirectly destroy a unique paleontological resource or site or unique X geologic feature? d) Disturb any human remains, including those interred outside of formal cemeteries? X a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involvi i) Rupture of a known earthquake fault, as delineated on the most recent Alquist- Priolo Earthquake Fault Zoning map, issued by the State Geologist for the area or based X on other substantial evidence of a known fault? Refer to Division of Mines and GeoWy Special Publication 42. ii) Strong seismic ground shaking? I X iii) Seismic - related ground failure, X including liquefaction? iv Landslides? X b) Result in substantial soil erosion or X the loss of topsoil? C) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and X potentially result in on- or off -site landslide, lateral spreading, subsidence, liquefaction or colla e? d) -Be located on expansive soil, as defined in Table 18 -1 -B of the Uniform X Building Code (1994), creating substantial risks to life or property? e) Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater? X SOLUTIONS, INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration V January 21, 2003 Page 14 a) Create a significant hazard to the public or the environment through the routine X transport, use or disposal of hazardous materials? b) Create a significant hazard to the public or the environment through reasonable foreseeable upset and accident conditions X involving the release of hazardous materials into the environment? c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, X substances, or waste within one - quarter mile of an existing or proposed school? d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government code X Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles or a public X airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? f) For a project within the vicinity of a private airstrip, would the project result in a X safety hazard for people residing or working in the project area? g) Impair implementation of or physically interfere with an adopted emergency X response plan or emergency evacuation Ian? h) Expose people or structures to a significant risk of loss, injury or death involving wildland fires, including where wildlands are adjacent to urbanized areas or X where residences are intermixed with wildlands? a) Violate any water quality standards or X waste discha e r uirements? SOLUTIONS. INC Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration q January 21, 2003 Page 15 SOLUTIONS, INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration h� ' January 21, 2003 Page 16 J Less Than Potentially . Significant Less Than No Issues Significant With Significant Impact Impact Mitigation Impact Into orated b) Substantially deplete groundwater supplies or interfere substantially with . groundwater recharge, such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level X (e.g., the production rate of pre - existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been ranted )? c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a X stream or river, in a manner which would result in substantial erosion or siltation on- or off -site? d) Substantially after the existing drainage pattern of the site or area, including through the alteration of the course of a X stream or river, or substantially increase the rate or amount of surface runoff in a manner,, which would result in flooding on- or off -site? e) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or X provide substantial additional sources of Iluted runoff? f) Otherwise substantially degrade water X quality? g) Place housing Within a 100 -year flood hazard area as mapped on a federal Flood X hazard Boundary of Flood Insurance Rate Map or other flood hazard delineation map? h) Place within 100 -year flood hazard area structures, which would impede or X redirect flood flows? 1) Expose people or structures to a significant risk of loss, injury or death X involving flooding, including flooding as a result of the failure of a levee or dam? D Inundation by seiche, tsunami, or mudflow? X SOLUTIONS, INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration h� ' January 21, 2003 Page 16 J 1 1 1 SOLUTIONS, INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration January 21, 2003 Page 17 J Less Than Potentially Significant Less Than . No Issues Significant With Significant impact Impact Mitigation Impact incorporated X a) Physically divide an established community? b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local X coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? C) Conflict with any applicable habitat conservation plan or natural community X conservation plan? a) Result in the loss of availability of a known mineral resource that would be a X value to the region and the residents of the State? b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, X specific plan or other land use plan? a) Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise X ordinance, or applicable standards of other a encies? b) Exposure of persons to or generation of excessive groundbome vibration or X roundborne noise levels? c) A substantial permanent increase in ambient noise levels in the project vicinity X above levels existing without the project? d) A substantial temporary or periodic increase in ambient noise levels in the project X vicinity above levels existing without the project? e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public X airport or public use airport, would the project expose people residing or working in the ro'ect area to excessive noise levels? SOLUTIONS, INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration January 21, 2003 Page 17 J f) For a project within the vicinity of a private airstrip, would the project expose people residing or working in the project area X to excessive noise levels? a) Induce substantial population growth in an area, either directly (for example, by proposing new homes and businesses) or X indirectly (for example, through extension of roads or other infrastructure)? b) Displace substantial numbers of existing housing, necessitating the X construction of replacement housing c) Displace substantial numbers of people, necessitating the construction of X replacement housing elsewhere? a) Fire protection? X b) Police protection? X c) Schools? X d) Parks? X e) Other public facilities? X a) Would the project increase the use of I existing neighborhood and regional parks or 1 other recreational facilities, such that X substantial physical deterioration of the b) Does the project include recreational facilities or require the construction or expansion of recreational facilities, which might have an adverse physical effect on the environment? X MC SOLUTIONS, INC Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration !� January 21, 2003 Page 18 I 11 L LJ 1 SOLUTIONS, INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration 55 ' January 21, 2003 Page 19 Less Than Potentially Significant Less Than No Issues Significant With Significant Impact Impact Mitigation Impact Inco orated a) Cause an increase in traffic, which is substantial in relation to the existing traffic load and capacity of the street system (i.e., result in a substantial increase in either the X number of vehicle trips, the volume to capacity ratio on roads, or congestion at intersections)? b) Exceed, either individually or cumulatively, a level of service standard established by the county congestion X management agency for designated roads or highways? C) Result in a change in air traffic patterns, including either an increase in traffic X levels or a change in location that results in substantial safety risks? d) Substantially increase hazards due to a design feature (e.g., sharp curves or X dangerous intersections) or incompatible uses (e.g,, farm equipment)? e) Result in inadequate emergency X access? f) Result in inadequate parking X capacity? g) Conflict with adopted policies, plans, or programs supporting alternative X transportation (e.g., bus turnouts, bicycle racks)? a) Exceed wastewater treatment requirements of the applicable Regional X Water Quality Control Board? b) Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the. X construction of which could cause significant environmental effects? c) Require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the X construction of which could Muse significant environmental effects? d) Have sufficient water supplies available to serve the project from existing X entitlements and resources or are new or expanded entitlements needed? SOLUTIONS, INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration 55 ' January 21, 2003 Page 19 SOLUTIONS. INC. Bayview Senior Affordable Housing and Park Project . Initial Study /Negative Declaration January 21, 2003 Page 20 Less Than Potentially Significant Less Than No Issues Significant With Significant Impact Impact Mitigation Impact Incorporated e) Result in a determination by the wastewater treatment provider, which serves or may serve the project that it has adequate X capacity to serve the project's projected demand in addition to the provider's existing commitments? f) Be served by a landfill with sufficient permitted capacity to accommodate the X ro'ect's solid waste disposal needs? g) Comply with federal, state, and local statutes and regulations related to solid X waste? a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self- sustaining X levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? b) Does the project have impacts that are individually limited, but cumulatively considerable? ( "Cumulatively considerable' means that the incremental effects of a project are considerable when viewed in X connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects.) c) Does the project have environmental effects, which will cause substantial adverse effects on human beings, either directly or X indirectly? SOLUTIONS. INC. Bayview Senior Affordable Housing and Park Project . Initial Study /Negative Declaration January 21, 2003 Page 20 ' There are currently no noteworthy view opportunities of Upper Newport Bay from ENVIRONMENTAL ANALYSIS ' This section provides the explanations and supporting analysis for the impact categories and questions contained in the previous checklist, and identifies mitigation measures ' where applicable. appearance of the site but would not block any public views of the bay (see Exhibits 5 ). I. AESTHETICS ' Would the project: a) Have a substantial adverse effect on a scenic vista? ' ' Less Than Significant Impact. Policies contained in the City's General Plan and the Coastal Act address impacts on public views. In order to assess the project's impact ' on scenic vistas, photos of existing views of the project site from several representative ' locations were taken and computer simulations were prepared showing how views would be altered if the project is built as proposed. The photo locations are shown in Exhibit 3. immediately east of the project site. The homes along Jamboree Road overlook the One of the primary objectives of the park component of the project is to enhance public views looking northwest across the park property from Coast Highway toward Upper 7b show representative views with the proposed project as seen from the first floor Newport Bay. The topography of the park site currently blocks most views of the bay in ' this direction. The proposed grading plan would lower the elevation of.the southerly portion of the park by up to 12 feet, creating substantial new public view opportunities of Road. These exhibits show that the proposed buildings would not have a substantial the bay for pedestrians, bicyclists and motorists. The senior housing project would be ' mostly hidden from view from Coast Highway due to the difference in grade between the upper and lower portions of the site. (see Exhibit 4). ' There are currently no noteworthy view opportunities of Upper Newport Bay from Jamboree Road due to the elevation of the roadway and the topography of the site. The senior affordable housing project would represent a substantial. change in the ' appearance of the site but would not block any public views of the bay (see Exhibits 5 ). The view looking eastward toward the project site and Newport Dunes from the western side of the bay is shown in Exhibits 6. The simulation shows that this view would not be ' significantly altered. Although City and Coastal Act policies only address public views, the analysis of visual ' impacts has also included private views from the Villa Pointe residential development immediately east of the project site. The homes along Jamboree Road overlook the project site and have views of Newport Dunes and Upper Newport Bay. Exhibits 7a and ' 7b show representative views with the proposed project as seen from the first floor balcony elevation of a unit near the midpoint of the project's frontage along Jamboree Road. These exhibits show that the proposed buildings would not have a substantial ' impact on bay views. 1 ' SOLUTIONS. INC _t11WCMC ...aw�y,MwFwwM(FMy1FFF.. / Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration /� 5 ' January 21, 2003 Page 21 The project would have a beneficial effect on public views and private bay views would not be significantly obstructed. There would be a temporary negative visual impact due to grading and construction activities but this is not considered significant. No mitigation measures are necessary. CMC SOLUTIONS. INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration January 21, 2003 Page 22 1 1 1 1 1 1 I, t I' i View Simulation Photo Locations *fir II: PHOTO LOCATIONS CIVIC SOLUTIOJNS,IN Aw Bayview Senior Affordable Housing and Park Project January 21, 2003 Initial Study/Negative Declaration `j 1 Page 23 ✓ O N M Q d p A m u T 9 y .p 'a a m A .q 7 u m 9 0 'O N a �l b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? Less Than Significant Impact. The primary scenic resource in the vicinity of the project site is Upper Newport Bay. There is also a coastal bluff along the southwestern border of the site adjacent to the Newport Dunes access road, which may be considered a scenic resource. The proposed grading plan would lower this bluff a maximum of 12 feet in order to enhance public views of Upper Newport Bay from Coast Highway (see Section. La. above). The bluff is visible mainly from Newport Dunes, a private recreation area, and public views would not be substantially impacted. There are no other scenic resources on the site. No mitigation measures are necessary. C) Substantially degrade the existing visual character or quality of the site and its surroundings? Less Than Significant Impact. See discussion under La and Lb, above. No mitigation measures are necessary. ' d) Create a new source of substantial light or glare, which would adversely affect day or nighttime views in the area? Less Than Significant Impact With Mitigation. Since the site is currently ' undeveloped, the proposed project would create a new source of light. Since the park project does not include any active recreational facilities, the only lighting to be installed may be low -level illuminated bollards. Exterior lighting at the senior housing ' development could cause glare and adversely affect nighttime views primarily from adjacent residential developments if not properly controlled. In order to minimize the potential for light spillage and glare, the following mitigation measures will be imposed ' on the project. Mitigation Measures ' MM 1 -f ' Lighting shall be in compliance with applicable standards of the Zoning Code. Exterior on -site lighting shall be shielded and confined within site boundaries. No direct rays or glare are permitted to shine onto public streets or adjacent sites or create a public nuisance. "Walpak" type fixtures are not permitted. Parking area lighting shall have zero cut -off fixtures and light standards shall not exceed 20 feet in height. ' MM 1 -2 The site shall not be excessively illuminated based on the luminance recommendations of the illuminating Engineering Society of North America, or, if in the opinion of the Planning Director, the illumination creates an unacceptable negative impact on surrounding land uses or environmental AMC Civic soLu rioNs, INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration January 21, 2003 Page 29 a final lighting plan for approval by the Planning Director prior to the issuance of a building permit. The Planning Director may order the dimming of light sources or other remediation upon finding that the site is excessively illuminated. These mitigation measures would reduce potential impacts to a level that is less than , significant. II. AGRICULTURE RESOURCES Would the project: 1 a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non- agricultural use? No Impact. No agricultural activities occur in the project vicinity. No mitigation measures are necessary. b) Conflict with existing zoning for agricultural use, or a Williamson Act , contract? No Impact. The site is not zoned for agriculture and there are no Williamson Act ' contracts in the vicinity. No mitigation measures are necessary. C) Involve other changes in the existing environment which, due to their ' location or nature, could result in conversion of farmland, to non - agricultural use? No Impact. The project would not involve any changes that could result in the , conversion of farmland. No mitigation measures are necessary. III. AIR QUALITY Where available, the significance criteria established by the applicable air quality management district or air pollution control district may be relied upon to make the following determinations. Would the project: a) Conflict with or obstruct implementation of the applicable air quality plan? No Im a . The project site is within the South Coast Air Basin (SCAB), which includes Orange County and the non -desert portions of Los Angeles, Riverside, and San Bernardino counties. Air quality conditions in the Basin are under the jurisdiction of the South Coast Air Quality Management District ( SCAQMD). The SCAQMD and the Southern CIV1C SOLUTIONS, INC. . �, Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration ' January 21, 2003 Page 30 I ' California Association of Governments (SCAG) are responsible for formulating and ' implementing an Air Quality Management Plan (AQMP) for the Basin. The current AQMP was approved in 1997. Implementation of the AQMP is based on a series of control measures that vary by source type, such as stationary or mobile, as well as by the pollutant targeted. Since the AQMP.is based on growth projections reflected in local ' general plans, only new or amended general plans, or projects that exceed the level of development contemplated in the general plan have the potential to conflict with the AQMP. The proposed park and senior housing project are consistent with the Newport Beach General Plan, therefore no conflict with the AQMP would occur. No mitigation ' measures are required. b) Violate any air quality standard or contribute substantially to an existing or ' projected air quality violation? ' Less Than Significant Impact. The project would result in short-term emissions during construction (e.g., dust, construction equipment exhaust) and long -term emissions due to traffic generated by the project after construction is completed. ' Emissions Standards. California and Federal Ambient Air Quality Standards are shown on Table III -1. In its CEQA Air Quality Handbook, the SCAQMD provides specific criteria for determining whether the potential air quality impacts of a project are significant. ' These thresholds are as follows: Thresholds of Significance for Construction Emissions ' a 75 pounds per day of ROC or 2.5 tons per quarter 100 pounds per day of NOx or 2.5 tons per quarter ' a 550 pounds per day of CO or 24.75 tons per quarter 150 pounds per day of PM10 or 6.75 tons per quarter a 150 pounds per day of sulfur oxides (SOx) or 6.75 tons per quarter ' Thresholds of Significance for Operational Emissions 55 pounds per day of ROC ' a 55 pounds per day of NOx a 550 pounds per day of CO ■ 150 pounds per day of PM10 ■ 150 pounds per day of SOx Localized Criteria Pollutants Concentration Standards • California State 1 -hour standard of 20.0 ppm ■ California State 8-hour standard of 9.0 ppm iProiect Emissions. Tables 6-1 and 6-3 of the AQMD CEQA Handbook provide guidance for determining whether a project could exceed these thresholds of significance. For CMC SOLUTIONS, INC. ... jBayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration rj ' January 21, 2003 Page 31 P i construction emissions, the threshold for a residential apartment project is 1.41 million square feet of gross floor area. The proposed project would contain approximately 1 130,000 square feet of gross floor area, therefore it is below the threshold of significance. The threshold for grading is 177 acres. The proposed park and housing project combined would require that approximately 15 acres be graded, therefore the 1 project is below the threshold of significance for grading activities. (See Table III -2) soLu,noNs, mc. 1 1 7 L I� L� F L L� 1 L L F- L Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration �P 1 January 21, 2003 Page 32 1 1 1 1 1 1 1 1 1 1 1 1 1 .1 i 1 1 i 1 i Sonata. I MHav I 25rP1n' I MClua,ma pb NH— I OAI PM (26 M✓?) I Ou CM1mv 9"hy r(AllAll rY. iF .�` 4U3. _ 'Pa PIYtIM� On June 20, 20(12, the Mr Resourtea Board approved staffs recormreMatlan to revise the PMtO annual average standard to 20 pglm3 and to stablish an annual average standard for PM2.5 of 12 pWm3. Those standards will take effect upon final approval by the Office of AdniMsbative Law, Nei, is expected In February 2003. Information regarding these revisions can be found et hCIpYMmwmb cagoWrmaercNeegsla td- reratdrs.hhn. California Air Retourees Board (119103) January 21, 2003 Page 33 I California Standards' Federal Slandard.2 Pogumnt AversOn9 Time W®MIMWM== Wrrcardradon' MoNod A Primary as Semndary r rct � Fx 'ly t�:. cp ty �� ulac5 -.rflu^s v Respirable 24H , mousy"'' G�tlifii ywrs�^ y nn imetrk« B.0 tows mda S[ on m A-.1 1e YSAP' mft O Pmlo) A�nvrion' I m PfAa' MMnw3b Mao IIOM t Roo 291bw No3nnyeb $ble8aabytl (y pyfa' Partieulata B.omaPriwuysuPavd a"'"01r t`T°° °OOaa klslmr lPfA26) Amery 12 oamraac« Hw uPP� Atalyab ArArmek MavP Pda ARnallPa n Sonata. I MHav I 25rP1n' I MClua,ma pb NH— I OAI PM (26 M✓?) I Ou CM1mv 9"hy r(AllAll rY. iF .�` 4U3. _ 'Pa PIYtIM� On June 20, 20(12, the Mr Resourtea Board approved staffs recormreMatlan to revise the PMtO annual average standard to 20 pglm3 and to stablish an annual average standard for PM2.5 of 12 pWm3. Those standards will take effect upon final approval by the Office of AdniMsbative Law, Nei, is expected In February 2003. Information regarding these revisions can be found et hCIpYMmwmb cagoWrmaercNeegsla td- reratdrs.hhn. California Air Retourees Board (119103) January 21, 2003 Page 33 I W®MIMWM== rct � Fx 'ly t�:. cp ty �� ulac5 -.rflu^s v 1 k�Grya G�tlifii 6p +F y tl� tW.'�u'�L4 I IIOM t „b+td�?IF.ii111�' �i n Sonata. I MHav I 25rP1n' I MClua,ma pb NH— I OAI PM (26 M✓?) I Ou CM1mv 9"hy r(AllAll rY. iF .�` 4U3. _ 'Pa PIYtIM� On June 20, 20(12, the Mr Resourtea Board approved staffs recormreMatlan to revise the PMtO annual average standard to 20 pglm3 and to stablish an annual average standard for PM2.5 of 12 pWm3. Those standards will take effect upon final approval by the Office of AdniMsbative Law, Nei, is expected In February 2003. Information regarding these revisions can be found et hCIpYMmwmb cagoWrmaercNeegsla td- reratdrs.hhn. California Air Retourees Board (119103) January 21, 2003 Page 33 I TABLE III -1 1. California standards for ozone, carbon monoxide (accept Lake Tdee), sulfur dioxide (1 and 24 hour), nitrogen dioxide, suspended particulate matter- -PM 10, PM2.5, and visibility seducing particles, are values that are out to be exceeded. All others ate not ro be equated or =evaded. California ambient as quality standards ere listed in the Table of Standards in Section 70200 of Title 17 of the CatiPomia Code of Regulations- 2. National standards (other than ozone, particulate matter, and those based on annual avenges or nnmnl arithmetic mean) aro not to be exeaded more than once a year. The move standard is atudaed when do fourth highest fight hmrconcetrstion Ina yeas averaged over d a years, is egnal to a lass than the standard. For PMI%the 24 hour standard is attained when 99 pacer of the daily Concentrations, avenged over mree years, ere equal to or less Woo the standard. For PMU 5, the 24 hmr standard is andned when 9g percent of the daily concentrations, averaged over three years, ere apal to a leas than the standard. Contact U.S. EPA for furder clarification and wren fedaat policies. .. .... . 3. Concentration expressed first is units-in which it was pmnmulgated. Equivalent units given in parentheses are baud upon a reference temperature of 25"C and a refaeoec pressure of 760 rot. Most measurements of air quality are to be corrected to a reference temperature of25°C and a w&maee pressure of 7601or; ppm in,dds table refers to ppm by vole mo, of mkmwla of pollutant pa mole of gar 4. Any equivalent procedure which can be shown to the satisfaction ofthe ARB to give apdvatmt twous at or acar the levd of the airquality standard may be usd. .... 5. National Primary Standards The levels of air quality necessary, with an adequate margin of safety to protect the public hearth 6. National Secondary Standards: The levels ofar quality noeasany to protect the public worm Horn any . known or anticipated adverse effects of a pollutant 7. Refaema method as described by the EPA. An - equivalent uodhod" ofineasumuat maybe used but must haven uomhsteat relationship to the reference method" and must be approved by the EPA. S. New fake! S-hour ozone and fine particulate matter standards were promulgated by U.S. EPA on July 15, 1997. Contact U.S. EPA for father clarification and currant federal policies. 9. The ARB has identified Mad and vinyl chloride as 4mdc sit Watsminsnt$ with nn threshold level of exposure An adverse health effects determined. Those actions allow for the implementation of control measures: at levels below the ambient concentrations spocif end for these pollutants. SOLUTIONS, INC. C] 1 1 I F �I i� 1 1 1 Chi Califormla Air Resources; Bawd pa". 1 Bayview Senior Affordable Housing and Park Project Initial Study/Negative Declaration January 21, 2003 Page 34 7 L 1 Table 111 -2 Screening Thresholds for Construction Emissions Bayview Landing Senior Housing and Viewpark Sc Ill -1 Proposed Project Land Use Threshold of Significance Characteristics Residential -A artments 1,410,000 s .ft. GFA 130,000 s .ft Grading 177.0 acres 15 acres total Source: AQMD, CEQA Par Quality Handbook, 1993 The screening threshold for operational emissions is 261 units for a residential apartment project. The project proposes 150 units, which is below the threshold. It is anticipated that the project would actually generate less emissions than a normal apartment development since low- income seniors have fewer cars and drive fewer miles than typical apartment residents. No screening threshold is provided for public parks, however it is highly unlikely that the park would generate traffic volumes that would cause the operational threshold to be exceeded. ' Project Design Features and Standard Conditions Sc Ill -1 in order to reduce construction related fugitive dust, SCAQMD Rule 403 will be implemented during construction. Rule 403 requires that fugitive dust be controlled with best available control measures so that the presence of such dust does not remain visible in the atmosphere beyond the property line of the emission source, implementation of these dust suppression techniques can reduce dust generation and PM10 by 50 to 75 percent. implementation of the ' following measures will reduce short -term fugitive dust impacts on nearby sensitive receptors. • Apply non -toxic chemical soil stabilizers according to manufacturers' ' specifications to all inactive construction areas (previously graded areas inactive for 10 days or more). ' ■ Water active sites at least two times daily. (Locations where grading is to occur will be thoroughly watered prior to earthmoving.) ' ■ All trucks hauling dirt, sand, soil, or other loose materials are to be covered, or should maintain at least two feet of freeboard in accordance with the requirements of California Vehicle Code Section 23114 ' (freeboard refers to the vertical distance between the top of the load and the top of the trailer walls). BlIff—CIVIC SOLUTIONS. INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration January 21, 2003 Page 35 • Pave construction access roads at least 100 feet onto the site from the main road. ■ Traffic speeds on all unpaved roads shall be limited to 15 mph or less. ■ Revegetate disturbed areas as quickly as possible. • All excavating and grading operations shall be suspended when wind speeds (as instantaneous gusts) exceed 25 mph. ■ All streets shall be swept once a day if visible soil materials are carried to adjacent streets: Water sweepers with reclaimed water are recommended.) • Install wheel washers where vehicles enter and exit unpaved roads onto paved roads, or wash trucks and any equipment leaving the site each trip. SC Ili -2 Plan specifications shall include a statement that the contractor shall attempt to reduce VOC emissions by 1) using precoated(natural colored building materials; 2) using water -based or low -VOC coating; and 3) coating transfer or spray equipment with high transfer efficiency, such as high- volume low- pressure (1-IVLP) spray method, or manual coatings application, such as paint brush, hand roller, trowel, spatula, dauber, rag, or sponge. The plan specifications shall be approved by the City Building Department. SC 111-3 In order to reduce operational energy usage and reduce energy production air emissions, the project is required to comply with Title 24 of the California Code of Regulations established by the California Energy Commission regarding energy conservation standards. With the standard conditions listed above, potential impacts would be less than significant. No mitigation measures are necessary. C) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non - attainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)? Less Than Significant Impact. See Section Ill.a, above. SOLUTIONS, INC Bayview Senior Affordable Housing and Park Project Initial Study/Negative Declaration January 21, 2003 Page 36 1),b LJ I 1 ' d) Expose sensitive receptors to substantial pollutant concentrations? Less Than Significant Impact. See Section Ill.a, above. e) Create objectionable odors affecting a substantial number of people? Less Than Significant Impact. Diesel- powered equipment used for excavation ' and construction could cause odors and emissions that may be offensive to sensitive receptors. There are some residences, both permanent and temporary (i.e., hotel and short-term rental accommodations) in the immediate vicinity the project area, therefore ' this construction activity would occur in close proximity to sensitive receptors. This would be a temporary impact and is not considered significant, therefore no mitigation is necessary. IV. BIOLOGICAL RESOURCES ' Would the project: ' a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? Less Than Significant Impact With Mitigation. The CIOSA EIR noted that the vegetation cover on the upper Bayview Landing site included an unquantified amount of "open; localized coastal sage scrub" and surveys at that time (1992) found one California gnatcatcher on the site. The EIR also noted that grading of the park site could. have a significant impact on the coastal sage scrub and gnatcatcher habitat. Mitigation measures were incorporated that would prohibit grading or stockpiling of soil above the 25 -foot contour in connection with development of the lower portion of the site, and required that all non - emergency grading shall occur between August 1 to January 31, which is outside the breeding season for gnatcatchers. In order to assess the biological impacts associated with the project as currently ' proposed, Keane Biological Consulting was retained to conduct a field survey of the site to determine current conditions, potential impacts and appropriate mitigation measures. The survey found that the site is primarily covered by non - native vegetation, and that only small, non- contiguous fragments (approximately _ acre total) of native coastal sage scrub are present. Directed surveys were conducted to determine whether any sensitive species such as the California gnatcatcher currently inhabits the site. The surveys found no indication that gnatcatchers or any other sensitive species are present. Mitigation ' measures would require that existing fragments of coastal sage scrub be replaced at a ratio of at least 4:1 as part of a habitat restoration program for the ., CIVIC SOLUTIONS. INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration 1' January 21, 2003 Page 37 Horticultural species included myoporum (Myoporum laetum), a few small olive trees (Olea europaea), a non - native yucca (Yucca sp.) and an unidentified horticultural tree and unidentified horticultural shrub. EMMM—CIVIC SOLUTIONS, INC. , Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration January 21, 2003 Page 38 ' park site, and that no grading shall occur while occupied nests of migratory birds are present. The key findings from the biological report are summarized below. The complete report is available for review at the City Planning Department. ' Survey Methodology The biological assessment included both a review of existing literature and a series of field surveys. General surveys to map plant communities and assess habitat quality were conducted during the morning hours of May 7, May 15, June 21 and July 12, 2001 to ascertain the existing biological resources of the project site and its surroundings. ' The surveys focused on identifying the presence and locations of plant communities, wildlife habitat and potential habitat for sensitive species. The survey also evaluated whether riparian (streambed) habitats were present on the site that may be subject to ' potential jurisdiction under Section 404 of the U.S. Clean Water Act and /or Section 1600 of the California Fish and Game Code. Plant and wildlife species observed during the surveys were recorded. The surveys included botanical observations by walking through ' the entire project site noting plant species present on and adjacent to the site. Plant nomenclature in this report is consistent with The Jepson Manual, Higher Plants of California (Hickman 1993). Plant species were identified, where possible, in the field; ' plants that were not immediately identifiable were collected for identification at a later date by local expert botanist Dave Bramlet. Wildlife observed during general and botanical surveys was noted, and more focused surveys were conducted for souther ' spikeweed (Hemizonia panyi ssp. Australis) and the California gnatcatcher (Polioptila califomica califomica), which are sensitive species that have the potential to occur on site. ' Vegetation The field survey found that the site supports a plant community referred to as "ruderal ", ' which means primarily non - native and invasive plant species, with little native vegetation. The predominant plant species were foxtail chess (Bromus madritensis ssp. rubens), brume (Bromus hordeaceus), wild oat (Avena sp.), barley (Hordeum spp.), ' tocalote (Centaurea melitensis), sweet fennel (Foeniculum vulgare), Mediterranean mustard (Hirschfeldia incana), Russian thistle (Salsola tragus), tree - tobacco (Nicotiana glauca), Australian saltbush (Atriplex semibaccata), telegraph weed (Heterotheca , grandlflora), common horseweed (Conyza canadensis), horehound (Marrubium vulgare), and Indian sweetclover (MeNotus indica). Also present were iceplant (Carpobrotus sp.), and, dominating as ground cover among the non - native grasses and Russian thistle on , the plateau, were small - flowered iceplant (Mesembryanthemum nodiflorum), crystal iceplant (Mesembryanthemum crystapinum), and dove weed (Eremocarpus sedgerus). A clump of wild rye (Elymus sp.) is present at where the site begins to narrow toward the ' west. Horticultural species included myoporum (Myoporum laetum), a few small olive trees (Olea europaea), a non - native yucca (Yucca sp.) and an unidentified horticultural tree and unidentified horticultural shrub. EMMM—CIVIC SOLUTIONS, INC. , Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration January 21, 2003 Page 38 F-7 I' 1 ' Native plant species were limited to sparse and scattered individuals of coastal sagebrush (Artemisia califomica), with no understory or other components typical of a coastal sage scrub plant community present. A clump of saitbush (Atriplex lentiformis) was present on a small hill at the base of the slope leading down from the plateau, and saltbush dominates the Newport Dunes slope adjacent to the site on the west. Other native plant species included common tarweed (Hemizonia fasciculata), heliotrope (Heliotropium curassavicum ssp. oculatum), and cudweed aster (Lessingia filaginifolia). Exhibit 8 shows the existing vegetation communities on the site. It is estimated that a total of — acre of coastal sage scrub vegetation is present, although these areas are non- contiguous and scattered throughout the southern portion of the site. F I L 1 I 11 [1 ' CIVIC SOUMONS, INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration 1 ' January 21, 2003 Page 39 v 1 flu �e�® a T"ill u O O I � C O Wildlife ' The site's disturbed condition, its location isolated from other areas of open space, and the predominance of ruderal vegetation, limits its potential to support wildlife species ' other than birds and other species well- adapted to human - disturbed habitats. Some native reptiles may still occur on this site surrounded by developed areas but would likely be limited to the side - blotched lizard (Uta stansburiana) and western fence lizard (Sceloporus occidentalis). The most common and numerous bird during the survey was house finch (Carpodacus mexicanus); also present were mourning dove (Zenaida macroura), Anna's hummingbird ' (Calypte anna), black phoebe (Sayomis nigricans), western kingbird (Tyrannus verticalis), Anna's Hummingbird (Calypte anna), American crow (Corvus brachyrhynchos), bushtit (Psaimparus minimus), Bullock's oriole (lcterus bullockir), California towhee (Pipilo crissalis), black- headed grosbeak (Pheucticus melanocephalus), Lazuli bunting (Passerina amoena), song sparrow (Melospiza melodia), American goldfinch (Carduelis Idstis), and house sparrow (Passer domesticus). ' Observed flying over the site during surveys were bam swallow (Petrochefrdon rustica) and northern rough- winged swallow (Stelgidopteryx senr*nnis) as well as species associated with Upper Newport Bay including Caspian tern (Sterna caspia) and great blue heron (Ardea herodias). Mammalian fauna on the site is also limited due to isolation of the site from open space ' areas and the site's disturbed condition. Several California ground squirrels (Spermophilus beecheyl) were observed on the site during all surveys; also expected to occur on the site are Botta's pocket gopher (Thomomys bottae), domestic cats (Felis domesticus), Virginia opossum (Didelphis virginiana), Norway rat (Rattus norvegicus), and house mouse (Mus musculus). ' Wildlife Dispersal Corridors A wildlife corridor is a large patch of habitat connecting two or more larger areas of ' habitat and is essentially free of physical barriers such as fences and developed areas. A functioning wildlife corridor allows for ease of movement between habitat patches. Canyon bottoms with a well- developed tree canopy often serve as wildlife corridors and offer food, shelter, and water, as well as ease of movement, depending upon the density of the understory. Because the project site is surrounded by developed areas, its ability to function as a wildlife disperal corridor is severely limited. ' Sensitive Species Species are typically offered recognition as sensitive because of declining or limited ' population sizes resulting, in most cases, from loss of habitat. Those listed as threatened or endangered by the federal or California Endangered Species Act are protected by those acts. Other categories for sensitive species that do not afford legal ' me soumoNs. INC. ' Bayview Senior Affordable Housing and Park Project Initial Study/Negative Declaration January 21, 2003 Page 41 11 protection are USFWS Category 1 candidates or CDFG Species of Special Concern; still other species are included on lists maintained by resource conservation organizations (California Native Plant Society [CNPS] or National Audubon Society [NAS]). Although these species are not protected as are those listed by Endangered Species Acts, measures to avoid or minimize impacts on these species are often considered during California Environmental Quality Act (CEQA) review. As discussed above, because the project site supports no native plant communities aside from scattered patches of coastal sage scrub vegetation, sensitive plant or wildlife species expected on the site are limited to those discussed below, aside from rare, brief visits by some sensitive bird species during migration. Southern spikeweed (Hemizonia parryi ssp. australis) is included on the California Native Plant Society's (CNPS) List 1B, a list of plants considered rare, threatened or endangered in California and other states. It occurs along estuary margins and the edges of vernal pools, as well as in semi - saline soils of disturbed areas, such as along some of the lower trails on the west side of Upper Newport Bay. Southern spikeweed has been extirpated (no longer exists) from many locations because of coastal development, and many existing populations are threatened by development and habitat degradation. Although the typical species of tarplant was found on the site during surveys, southern spikeweed was not observed during the June 21 or July 12 surveys, or during surveys conducted for other sensitive species. The second focused survey for this species on July 12 occurred following mowing of non - native grasses so that this species would not have been obscured by other vegetation. The coastal California gnatcatcher (Polioptera califomica) was listed by the USFWS as threatened in March 1993. In California, the majority of the population is located in Orange, San Diego and western Riverside counties. It is known to occur in the project vicinity on eastern slopes bordering Upper Newport Bay. Gnatcatchers are year -round residents and occur almost exclusively in coastal sage scrub. Although sparse patches of some coastal sage scrub plants occur on the project site, no habitat for Cafrfomia gnatcatchers is present on the project site, and gnatcatchem would not be expected to occur on the project site other than very rarely and temporarily. Nevertheless, focused surveys per USFWS protocol were conducted and no California gnatcatchers were seen or heard during any of the surveys. California horned lark (Eremophila atpestrls actia) is a year -round resident that generally occurs along the coast of California from Sonoma County southward. This species requires open fields and grasslands for foraging and nesting, and because such habitats are declining in southern California, it is a California Species of Special Concern. California homed larks may occasionally forage on the project site, although this ground - nesting species would likely not nest here due to the presence of feral cats and other predators. It was not seen or heard on the project site during general or focused surveys, which occurred during the same time period the biologist conducting the surveys heard them at locations other than the project site. SOLUTIONS. INC Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration U ' January 21, 2003 Page 42 ' Loggerhead shrike (Lanus ludovicianus) is an uncommon but widespread resident of southern California. This species typically occupies open habitats with scattered trees. Such habitats are becoming scarce in southern California; thus, Loggerhead Shrike is a ' California Species of Special Concern. Loggerhead shrikes may occur occasionally on the site but are unlikely to nest here; none were observed during any of the general or focused surveys. ' Pacific pocket mouse (Perognathus longimembris pacificus) is a small rodent with isolated populations occurring dose to the coast from Tijuana to El Segundo. According to mammalogist Steve Montgomery, who has conducted trapping studies for this species, it occurs in sandy soils in some ruderal habitats at Camp Pendleton Marine Base in San Diego County, although its favored habitat is coastal sage scrub. Because of the disturbed soils of the project site and its lack of preferred habitat, the potential for the site to support ' Pacific pocket mouse is very low; thus, trapping studies to document its absence on the project site were not considered warranted. Project impacts The majority of the site would be disturbed during grading and construction. Since there are no sensitive species on site, this would not be considered a significant impact. Site preparation activities would destroy approximately _ acre of coastal sagebrush. Although this does not represent high quality habitat, the City proposes a habitat restoration program that would replace the disturbed coastal sage at a minimum 4:1 ratio. The City of Newport Beach is also. a participant in the Natural Communities Conservation Planning (NCCP) Program for the Central and Coastal Subregion of Orange County. The project site is not part of the Reserve Area, therefore the proposed removal and replacement of coastal sage vegetation is permitted subject to consultation with the Resource Agencies. Project Design Features and Standard Conditions ' PDF IV -1 The landscaping plan for the park portion of the site shall include a habitat restoration component that provides a minimum of 1 acre of coastal sage scrub vegetation. Mitigation Measures MM /V-1 Prior to issuance of a grading permit, the proposed revegetation plan shall be submitted to the California Department of Fish and Game and the Nature Reserve of Orange County for review. CIVIC SOLUTIONS. INC Bayview Senior Affordable Housing and Park Project Initial Study/Negative Declaration �1 January 21, 2003 Page 43 MM IV -2 The City of Newport Beach shall retain the services of a qualified ornithologist to conduct a survey of the construction zone, if any of the phased construction , activities (grubbing, grading, tree trimming or removal) are to occur during the breeding season for native birds (approximately February 1 through July 31). The ornithological survey shall occur not more than two days prior to the initiation , of those construction activities. If the ornithologist detects any occupied nests of native birds within the construction zone, the City of Newport Beach will conspicuously flag off the area(s) supporting bird nests, providing a minimum ' buffer of 100 feet between the nest and limits of construction. The construction crew will be instructed to avoid any activities in this zone until the bird nest(s) is/are no longer occupied, per a subsequent survey by the qualified ornithologist. These requirements and mitigation measures would reduce potential impacts to a level that is less than significant. b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? Less Than Significant Impact. See Section Ma. above. C) Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? No Impact. There are no wetlands found on the site. See Section Ma. above. No mitigation is necessary. d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? No Impact. See Section Ma. above. No mitigation is necessary. e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? No Impact. There are no applicable ordinances or policies related to tree preservation. No mitigation measures are necessary. CIVIC SOLUTIONS. INC. ... �- n- �F� c� Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration (J� January 21, 2003 Page 44 ' f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? ' Less Than Significant Impact. A Natural Communities Conservation Planning /Habitat Conservation Plan for the Central /Coastal Orange County area was ' approved by the Orange County Board of Supervisors on April 16, 1996 and by the California Department of Fish and Game and the US Fish and Wildlife Service on July 17, 1996. The project site is included within the NCCP area but is not located within the Reserve Area. (The Reserve Area is considered critical habitat to be permanently ' maintained while coastal sage scrub vegetation outside the Reserve Area may be removed subject to replacement.) Orange County's NCCP Program is now administered by the Nature Reserve of Orange County, and the Executive Director has requested that ' it be notified when the Department of Fish and Game is consulted on the revegetation plan. Since the site is not within the Reserve Area, the Nature Reserve has no approval authority over the project. ' Project Design Features and Standard Conditions ' PDF -1V -2 Prior to issuance of a grading permit for any area containing coastal sage scrub ' vegetation, the City shall provide notification to the Nature Reserve of Orange County. No mitigation measures are required. V. CULTURAL RESOURCES ' The following discussion is based on the Phase I Cultural Resources Investigation of the Bavview Landing Project Area report prepared by McKena et al on July 5, 2001. A complete copy of that report is available for review at the City of Newport Beach Planning Department. ' Would the project: a) Cause a substantial adverse change in the significance of a historical ' resource as defined in §15064.5? No Im ac . The project area was occupied by Native Americans during ' prehistoric times. After the arrival of Europeans in the 1500s, the Spanish missions were established along the California coast. The project site was within the territory of Mission MC SOLUTIONS, INC. ' Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration January 21, 2003 Page 45 �1 San Juan Capistrano, which was established in 1775. Following the mission period the site became part of the Rancho San Joaquin land grant, which was later purchased by James Irvine. The Geotechnical report for the site (NMG Geotechnical, December 18, 2002) notes that in 1927, the earliest date for which photos are available, the site was in its natural condition except for the old Backbay Drive, which extended through the western portion of the property. Between 1931 and 1947 there was a single residence on the site, and by 1952 the house had been removed. In 1953 the original Jamboree Road was constructed with the alignment crossing the southeastern hillside area. Newport Dunes was constructed in the late 1950s and Backbay Drive was relocated to its current alignment. In 1958, the new Jamboree Road was graded to the current alignment and the old Backbay Drive and Jamboree Road alignments were abandoned. According to the Phase I Environmental Site Assessment (ENVIRON, 2001) the proposed park site was occupied by a gasoline service station from 1968 to 1984. Neither the site nor any of the previous structures are considered to be a historically sensitive resource. No mitigation measures are necessary. b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to § 15064.5? Less Than Sian cant Imoact With Mitigation. Previous surveys identified two potential archaeological sites on or adjacent to the proposed project: CA -ORA -1098 and CA- ORA -66. The site investigation conducted by McKenna et al. found only shell scatter at both of these sites, and no artifacts were seen. Since shell concentrations are common around Newport Bay, there is some doubt whether either of these sites represent anything other than naturally occurring shell accumulations. Project Design Features and Standard Conditions City Council Policy K -5 outlines the City's requirements with respect to archaeological resources. The following applicable policies and requirements were identified in the CIOSA EIR (p. 320): PDF V -1 A. A qualified archaeologist shall be present during pregrade meetings to inform the project sponsor and grading contractor of the results of any previous studies. In addition, an archaeologist shall be present during grading activities to inspect the underlying soil for cultural resources. !f significant cultural resources are uncovered, the archaeologist shall have the authority to stop or temporarily divert construction activities for a period of 48 hours to assess the significance of the find. CIVIC SOLUTIONS. INC. Bayview Senior Affordable Housing and Park Project initial Study /Negative Declaration January 21, 2003 Page 46 B. In the event that significant archaeological remains are uncovered during excavation and/or grading, all work shall stop in that area of subject property until an appropriate data recovery program can be developed and implemented. The cost of such a program shall be the responsibility of the project sponsor. C. Prior to issuance of any grading or demolition permits, the applicant shall waive the provisions of AB 952 related to the City of Newport Beach responsibilities for the mitigation of archaeological impacts in a manner acceptable to the City Attorney. Mitigation Measures The CIOSA EIR also contains the following mitigation measures that are applicable to the Bayview Landing site (p. 321): MM V -1 Prior to issuance of a grading permit, CA -ORA -1098 shall be surface collected and subjected to test excavations by a City- approved archaeolotist to determine site integrity, extent and significance. A report shall be prepared detailing all Findings and submitted to the Planning Department within 90 days of completing test excavations. MM V -2 Prior to grading for the new park, the project sponsor shall retain a City approved archaeologist to conduct a surface collection and subsurface test excavation of CA- ORA -66 to determine site extent integrity and significance. A report she# be prepared detailing all findings and submitted to the Planning Department within 90 days of completing test excavations. MM V -3 Prior to grading for the view park, the project sponsor shag retain a City approved archaeologist to place a test unit on top of the knoll on the Bayview Landing site in the area containing shell scatter, to determine if the shell is representative of a ' subsurface archaeological deposit. A report shall be prepared detailing all findings and submitted to the Planning Department within 90 days of completing the test excavation. These standard requirements and mitigation measures would reduce potential impacts to a level that is less than significant. IrI L�I' CIVIC SOLUTIONS. INC. ' Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration O J January 21, 2003 Page 47 C) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature? Less Than Significant Impact With Mitigation. The CIOSA EIR contains the following discussion of existing conditions related to paleontological resources on the Bayview Landing site: "Quatemary age terrace deposits are exposed in the Bay View Landing site. Fossils of both land and sea animals have been collected from these deposits at the Bay View Landing site. Fossils from the site include a horse jaw and several types of invertebrates. The widening of Jamboree Road destroyed this fossil site. Fossil shells were observed in two horizons in the terrace deposits in the road cut along Jamboree Road and as loose or float materials along the base of the cliffs facing the Newport Dunes Resort. No fossils were observed on the site during this study. "The Monterey Formation is exposed along the cliffs next to Newport Dunes, the north facing slope in the middle of the. site, and in the north end of road cut along Jamboree Road. In the past, fossil whale remains were found in similar exposures of the Monterey Formation on the cliff face along the western boundary of the nearby Newporter North site." (p. 327) The CIOSA EIR also states that high potential for the future discovery of significant fossils exists for the site and that grading operations would be expected to unearth fossils (p. 329). Project Design Features and Standard Conditions City Council Policy K-6 outlines the City's requirements with respect to paleontological resources. The following applicable policies and requirements were identified in the CIOSA EIR (pp. 329 -330): PDF V -2 A. A qualified paleontological monitor shall be retained by the landowner, developer, and/or project sponsor to attend pregrade meetings and perform inspections during development. The paleontologist shall be allowed to divert direct, or halt grading in a specific area to allow for salvage of exposed fossil materials. B. Paleontological resources within the coastal zone shall be investigated in accordance with acceptable scientific procedures and in compliance with any applicable requirements of the California Coastal Commission. Appropriate mitigation measures shall be adopted on a case -by -case basis in accordance with regular City policy CIVIC SOLUTIONS. INC. % Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration X V January 21, 2003 Page 48 Mitigation Measures The CIOSA EIR also contains the following mitigation measures that are applicable to the Bayview Landing site (p. 330): MM V -4 Prior to the issuance of grading permits, a collection plan shall be prepared and implemented by a City approved, qualified paleontological monitor for known exposed fossil localities on Bay View Landing, Newporter North, and Upper Castaways. Because of the small nature of some fossils present in these rock units, matrix samples shall be collected for processing through fine mesh screens. The collection plan shall be reviewed and approved by the Planning Department. MM V -5 Prior to the issuance of grading permits, the applicant shall make provisions for the preparation and curation of alt fossils possibly recovered from the sites during grading. This shag be done in a manner approved by the City's Planning Department. MM V -6 Prior to the issuance of grading permits, the applicant shall identify a repository approved by the City's Planning Department which shall receive all fossils collected from the sites. MM V -7 ' ' Cliff faces along Upper Newport Bay that have served as a reference section for micro- paleontological studies should be protected from alteration. if bluffs along Newport Bay need to be altered for bluff stabilization purposes, detailed measured sections and samples shall be made before and after alteration. Samples shall be prepared and analyzed as part of these efforts. The City of Newport Beach shall be responsible for retaining a qualified paleontologist to conduct the comparative study and sampling. A report shall be submitted to the Planning Department within 90 days. ' These standard requirements and mitigation measures would reduce potential impacts to a level that is less than significant. d) Disturb any human remains, including those interred outside of formal ' cemeteries? 1 ' HWO cMC sownom. INC- ...,��,i„y..,�r.�n,rr.. ' Bayview Senior Affordable Housing and Park Project Initial StudylNegative Declaration Q January 21, 2003 Page 49 U I Less Than Significant Impact With Mitigation. The analysis, standard ' requirements and mitigation measures described in Section V.b above would reduce potential impacts to a level that is less than significant. VI. GEOLOGY AND SOILS The following discussion is based on the Preliminary Geotechnical Investigation for the Newport Senior Lower Bavview Landing, December 18. 2001 prepared by NMG Geotechnical. A complete copy of the report is available for review at the City of Newport Beach Planning Department. Would the project: a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: i) Rupture of a known earthquake fault, as delineated on the most recent Alquist - Priolo Earthquake Fault Zoning map, issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42. Less Than Significant Impact With Mitigation. According to the geotechnical report, there are no known major or active earthquake faults mapped at the site, and the site is not located in an Alquist -Priolo zone. The closest major active fault is the Newport- Inglewood, located offshore approximately 2 miles south of the site. The CIOSA EIR noted that several minor faults are exposed in the bedrock of the bluff face, and one possible fault zone, obscured by heavy deposits, may show offset of the terrace/bedrock contact, which would suggest the fault, if present, could be potentially active (p. 275). Like many areas of Southern California, the site would experience groundshaking during a seismic event in the area. The following existing City requirements and mitigation measures identified in the CIOSA EIR are relevant to the proposed project: Project Design Features and Standard Conditions PDF VI -1 A. Prior to issuance of a grading permit, the applicant or successor in interest shall demonstrate to the City of !Newport SOLMONS. INC. Sayview Senior Affordable Housing and Park Project Initial Study/Negative Declaration January 21, 2003 Page 50 xkp 1 Beach Building Department that all facilities will be designed and constructed as specified in the City adopted version of the Uniform ' Building Code. B. Development of each site shall be subject to a grading permit to be approved by the Building and Planning Departments. The application for grading permit shall be accompanied by a grading plan and specifications and supporting data consisting of solid engineering and engineering geology reports or other reports required by the building official. ' H. That prior to the issuance of any building permits a specific soils and foundation study shall be prepared and approved by the Building Department. (pp. 283 -284) ' Mitigation Measures MM VI -t Buildings less than four stories in height shall be designed by a Structural Engineer in accordance with UBC Chapter 23 ' requirements for Seismic Zone 4. Non - critical structures shall be designed to withstand strong ground shaking that may accompany a maximum probable earthquake along the Newport - Inglewood ' Fault. Critical structures (i.e., hospitals, fire /police facilities, schools, etc.) shall be designed to withstand strong ground shaking associated with a maximum credible earthquake on the Newport- Inglewood Fault. Structural plans, including seismic design calculationsiparameters, shall be approved by the City Building Department prior to issuance of building permits. ' MM VI-2 In accordance with the Alquist -Priolo Special Studies Zone Act, a ' Registered Geologist shall further evaluate and make recommendations regarding the potential for ground surface rupture affecting proposed development on sites. where ' "Potentially Active Faults" have been identified (Bayview Landing and Freeway Reservation) or on any other sites where Potentially Active Faults are identified in the future. The study shall be t prepared to the satisfaction of the City Building Department and shall be prepared prior to approval of a tentative tract map or a grading permit whichever comes first. Grading and building plans ' shall reflect the recommendations of the study to the satisfaction of the Building Department. CMC SOLUTIONS. INC. Bayview Senior Affordable Housing and Park Project Initial StudylNegative Bedaration C� January 21, 2003 Page 51 These standard requirements and mitigation measures would reduce potential impacts to a level that is less than significant. Strong seismic ground shaking? Less Than Significant Impact With Mitigation. See item Vl.a.i, above. ill) Seismic - related ground failure, including liquefaction? Less Than Significant Impact. Liquefaction is a phenomenon in which earthquake - induced cyclic stresses generate excess pore water pressure in low density, saturated, sandy soils and soft silts below the water table. This causes a loss of shear strength and, in many cases, ground settlement. Liquefaction is generally thought to be a problem in earthquake -prone areas where conditions that promote liquefaction are present in the upper 50 feet of earth. The potential for surface damage due to liquefaction is dependent on the thickness of non - liquefiable surface cover. Soil tests performed by NMG Geotechnical found that the thickness of the non - liquefiable layer will be adequate to mitigate damage, and indicated a low potential for lateral spread (NMG, p. 10). No mitigation measures are necessary. IV) Landslides? Less Than Significant Impact With Mitigation. The project site contains slope areas, some of which show signs of previous landslides. The standard requirements and mitigation measures identified in Section Wa, above, will ensure that grading and construction will be done in a manner that reduces this potential impact to a level that is less than significant. No further mitigation is necessary. b) Result in substantial soil erosion or the loss of topsoil? Less Than Significant Impact With Mitigation. The CIOSA EIR discusses erosion potential of the site (p. 280). Soil erosion can occur naturally, and may be accelerated during grading and construction when vegetation cover is removed and bare soil is disturbed. The relevant standard requirements and mitigation measures identified in the EIR are as follows: Project Design Features and Standard Conditions r�UR M N E. An erosion, siltation and dust control plan shall be submitted prior to issuance of grading permits and be subject to the approval of the Building MKIM CMC SOLUTIONS, WC. Bayview Senior Affordable Housing and Park Project Initial Study/Negative Declaration p " January 21, 2003 Page 52 Department and a copy shall be forwarded to the California Regional Water Quality Control Board, Santa Ana Region. F. The velocity of concentrated runoff from each project site shall be evaluated and erosive velocities controlled as part of the project design. t. Prior to the issuance of any grading permit, the design engineer shall review and state that the discharge of surface runoff from the project will be performed in a manner to assure that increased peak flows from the project will not increase erosion immediately downstream of the system. This report shall be reviewed and approved by the Building Department and Public Works Department. J. Erosion control measures shall be done on any exposed slopes within 30 days after grading, or as approved by the City Grading Engineer. (p. 264) Mitigation Measures MM VI -3 Any necessary diversion devices, catchment devices, or velocity reducers shall be incorporated into the grading plan and approved by the City Grading Engineer prior to issuance of grading permits. Berns or other catchment devices shall be incorporated into the grading plans to divert sheet flow runoff away from areas which have been stripped of natural vegetation. Velocity reducers shall be incorporated into the design, especially where drainage devices exit to natural ground. MM VI-4 All fill slopes shall be property compacted during grading in conformance with the City Grading Code and verified by the project Geotechnical Consultant. Slopes shall be planted with vegetation upon completion of grading.. Conformance with this measure shall be verified by the City Grading Engineer prior to the issuance of occupancy permits. MM VI-5 Berms and brow ditches shall be constructed to the satisfaction and approval of the City Grading Engineer. Water shall not be allowed to drain over any manufactured slope face. Top -of -slope soil berms shall be incorporated into grading plans to prevent surface runoff from draining over future rill slopes. Brow ditches shall be incorporated into grading plans to divert surfrcial runoff from ungraded natural areas around future cut slopes. The design of berms and brow ditches shag be approved by the City Grading Engineer prior to issuance of grading permits. SOLUTIONS, INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration January 21, 2003 Page 53 MM V1 -6 Prior to the issuance of grading permits, appropriate artificial substances shall be recommended by the project landscape architect and approved by the City Grading Engineer'for use in reducing surface erosion until permanent landscaping is well established. Upon completion of grading, stripped areas shall be covered with artificial substances approved by the City Grading Engineer. These standard requirements and mitigation measures would reduce potential impacts to a level that is less than significant. C) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off -site landslide, lateral spreading, subsidence, liquefaction or collapse? Less Than Significant Impact With Mitigation. No structures are proposed for the park portion of the project. The lower (northern) portion of the site where the senior housing development is proposed is characterized by soil conditions that could be unsuitable for development in its present condition. To ensure that the ground can support foundations and buildings, it is anticipated that overexcavation and soil surcharge will be necessary in order to reduce potential settlement to acceptable levels. ( Overexcavation refers to the removal and replacement of soil to improve its stability. Surcharge refers to the temporary placement of additional fill on a building pad in order to compress the underlying soil, thereby improving its stability.) A surcharge depth of 4 to 8 feet is anticipated for a period of 3 to 6 months, after which the excess soil would be removed and exported. The standard requirements and mitigation measures described in Section We, above, will ensure that this process complies with applicable engineering standards and that potential impacts are reduced to a level that is less than significant. No additional mitigation measures are required. d) Be located on expansive soil, as defined in Table 18 -1 -B of the Uniform Building Code (1994), creating substantial risks to life or property? Less Than Significant Impact With Mitigation. Expansive soils are generally high in clay content. According to the NMG report, soils in the. project area vary in their expansion potential from very low to very high depending on the location. The standard requirements and mitigation measures described in Section We, above, will ensure that grading and site preparation complies with applicable engineering standards and that potential impacts are reduced to a level that is less than significant. No additional mitigation measures are required. SOLUTIONS. INC Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration WO O January 21, 2003 Page 54 ' e) Have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal systems where sewers are not available.for the disposal of waste water? ' No Impact. The project would not involve the use of septic tanks. All wastewater is proposed to be conveyed off -site via connections to the sanitary sewer system. No mitigation measures are necessary. VII: HAZARDS AND HAZARDOUS MATERIALS ' Would the project: a) Create a significant hazard to the public or the environment through the routine transport, use or disposal of hazardous materials? No Impact. No use, transport or disposal of hazardous materials is proposed in ' connection with the project. No mitigation measures are necessary. b) Create a significant hazard to the public or the environment through reasonable foreseeable upset and accident conditions involving the release of ' hazardous materials into the environment? Less Than Significant Impact. During construction, gasoline- and diesel - powered ' equipment would be used. in the event of an accident, gasoline or diesel fuel could be spilled. Standard construction contract provisions would require that the contractor follow site maintenance and spill cleanup procedures as described in the Standard ' Specifications for Public Works Construction (the "Greenbook "). No additional mitigation measures are necessary. C) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one - quarter mile of an existing or proposed school? ' No Impact. The project is not located within _ mile of a school. The nearest schools are Newport Harbor High School (approximately 1 mile west) and Corona del Mar High School (approximately 1.3 miles north). No mitigation measures are necessary. d) Be located on a site which is included on a list of hazardous materials sites ' compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? 1 �l IVIC SOLUTIONS. INC. ' Bayview Senior Affordable Housing and Park Project initial Study /Negative Declaration I January 21, 2003 Page 55 No Impact. The Phase I Environmental Site Assessment prepared by ENVIRON International Corporation indicated that the project site is not included on any list of hazardous materials sites (p.22). No mitigation measures are necessary. e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles or a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? No Impact. The project site is not located within 2 miles of an airport. The nearest airport (John Wayne) is approximately 3 miles north of the site. The project site is near the flight corridor of John Wayne Airport but is not within any hazard zone. No mitigation measures are necessary. f) For a project within the vicinity of a private airstrip, would the project result in a safety hazard for people residing or working in the project area? No Impact. There are no private airstrips within the project vicinity. No mitigation measures are necessary. g) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? Less Than Significant Impact With Mitigation. The proposed project would have no effect on any emergency response or emergency evacuation plan or procedures. Emergency evacuation routes could be affected during construction, however, due to temporary street or lane closures. The following mitigation measure would reduce this impact to a level that is less than significant. Mitigation Measures MM Vll -1 Prior to award of a construction contract or Issuance of a grading permit, a traffic control plan meeting the approval of the City Traffic Engineer shall be prepared. The plan shall specify what measures shall be taken to minimize travel disruptions and safety hazards, including safety of pedestrians and bicyclists, minimize inconveniences to residents and businesses, minimize the loss of parking, and. ensure adequate emergency access at all times. The plan shall include haul routes and restrictions for soil export, if required if soil export occurs during the peak summer period (Memorial Day through Labor Day) truck trips shall not exceed 10 during any one -hour period. The traffic control plan shall be incorporated into the contract specifications and shall be enforced by the construction inspector. SOLUTIONS. INC Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration q D/ January 21, 2003 Page 56 h) Expose people or structures to a significant risk of loss, injury or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? ' No Impact. The project site is surrounded by urban development, and no wildland interface exists. No mitigation measures are necessary. VIII. HYDROLOGY AND WATER QUALITY Would the project: a) Violate any water quality standards or waste discharge requirements? Less Than Sianificant Impact With Mitigation. The project site is located in a sensitive area adjacent to Upper Newport Bay, which is an ecological reserve. Contaminants such as oil and grease, fertilizers, pesticides, and animal waste typically accumulate on ground surfaces and are then washed into storm drains and waterways by irrigation or rainfall. Construction activities could also temporarily increase the amount of soil erosion and siltation in the bay. In order to reduce the level of contaminants leaving the property, the project has been designed to include a stormwater detention basin in the northwester portion of the site. The purpose of this detention basin is to hold the initial flush of stormwater, which typically contains the highest level of contaminants, so that these pollutants can be trapped and filtered as the water percolates into the ground. This project design feature would substantially reduce the amount of contaminants leaving the site. The CIOSA EIR includes the following standard requirements and mitigation measures to further reduce this potential impact: Standard Conditions Sc Vlll -1 A. Prior to issuance of any grading permit, an erosion, siltation and dust control plan shall be submitted and be subject to the approval of the Building Department and a copy shall be forwarded to the California Regional Water Quality Control Board, Santa Ana Region. B. Prior to the issuance of any grading permit, the design engineer shall review and state that the discharge of surface runoff from development of any site will be performed in a manner to assure that increased peak flows from the site will not increase erosion immediately downstream of the system. As part of this review, the velocity of concentrated runoff from the project shall be evaluated and erosive velocities controlled as part of the final project design. This report shall be reviewed by the Planning Department and approved by the Building Department. SOLUTIONS. INC Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration 3 January 21, 2003 Page 57 C. Erosion control measures contained in the erosion, siltation and dust control plan shag be implemented on any exposed slopes within 30 days after grading, or as otherwise directed by the City Grading Engineer. D. Any existing on -site drainage facilities shall be improved as required or updated concurrent with grading and development to the satisfaction of the Public Works and Building Departments. Improvement plans shall be approved by the Public Works Department prior to issuance of a grading permit. E. Any modification of existing on -site drainage systems or extensions of culverts for contributory drainage from surrounding areas shall be studied during project design. Necessary improvements shall be installed in conformance with local ordinances and accepted engineering practices and in a manner acceptable to the Public Works Department and Building Department. improvement plans shall be approved by the Public Works Department prior to issuance of a grading permit. (pp. 298 -299) Mitigation Measures MM Vlll -t Prior to the issuance of grading permits, the applicant shall incorporate the following erosion control methods into grading plans and operations to the satisfaction of the City Grading Engineer and Building Department. a. An approved material such as straw, wood chips, plastic or similar materials shall be used to stabilize graded areas prior to, revegetation or construction. b. Airborne and vehicle -borne sediment shall be controlled during construction by: the regular sprinkling of exposed soils, and the moistening of vehicle loads. c. An approved material such as nprap (a ground cover of large, loose, angular stones) shall be used to stabilize any slopes with seepage problems to protect the topsoils in areas of concentrated runoff. If During the period of construction activity, existing vegetation which wit be retained on site shall be protected from traffic by the use of fences. if appropriate, buffer strips or vegetative filter strips, such as tall stands of grass, can be used as an aHemative and/or supplementary method to protect against sediment buildup. MM Vlll -2 Prior to the issuance of grading permits, the project geotechnical consultant CIVIC SOLUTIONS. INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration January 21, 2003 Page 58 and/or civil engineer shall develop a plan for the diversion of stormwater away from any exposed slopes during grading and construction activities. The plan shall include the use of temporary right -of -way diversions (i.e., banns or swales) located at disturbed areas or graded right -of -ways. The plan will be approved by the City Engineer and Building Department and implemented during grading and construction activities. MM V/ll -3 The applicant shall provide a temporary gravel entrance located at every construction site entrance. The location of this entrance shall be incorporated ' into grading plans prior to the issuance of grading permits. To reduce or eliminate mud and sediment carried by vehicles or runoff onto public rights -of- way, the gravel shall cover the entire width of the entrance, and its length shall ' be no less than 50 feet The entrance plans shall be reviewed and approved by the City Engineer and Grading Engineer concurrent with review and approval of grading plans. MM Vlll -4 The applicant shall construct filter berms or other approved devise for the temporary gravel entrance. The berms shall consist of a ridge of gravel placed across graded right -of -ways to decrease and filter runoff levels while permitting construction traffic to continue. The location of berms shall be incorporated into grading plans prior to the issuance of grading permits. The plans shall be reviewed and approved by the City Grading Engineer. MM Vlll -5 During grading and construction the applicant shall provide a temporary sediment basin located at the point of greatest runoff from any construction area. The location of this basin shall be incorporated into grading plans. it shall consist of an embankment of compacted soils across a drainage.. The basin shall not be located in an area where its failure would lead to a loss of life or the loss of service of public utilities or roads. The plan shall be reviewed and approved by the city Grading Engineer. (pp. 299 -300) These project design features, standard conditions and mitigation measures would reduce this potential impact to a level that is less than significant. b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge, such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level (e.g., the production rate of pre- existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted)? SOLUMONS. [NQ Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration v4� January 21, 2003 Page 59 No Impact. The project would have no effect on groundwater supplies or recharge. Runoff from the project area currently flows into Upper Newport Bay or Newport Harbor via storm drains or surface drainage. No mitigation measures are necessary. C) Substantially alter the existing drainage pattern of the site or area, Including through the alteration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on- or offsite? No Impact. See Section Vlll.a. No stream courses are located on the site. No additional mitigation measures are necessary. d) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner, which would result in flooding on- or offsite? Less Than Significant Impact With Mitigation. No change in runoff would be expected from the park site. The senior housing development would be expected to cause an increase surface runoff due to an increase in impervious surfaces such as buildings and paved areas. As discussed in Section Vlll.a, above, the detention basin incorporated in the project design would substantially reduce the amount of runoff leaving the site. The following mitigation measure contained in the CIOSA EIR would further reduce the likelihood of flooding: Mitigation Measures MM V111 -6 Prior to issuance of a grading permit, the master plans of water, sewer and storm drain facilities shall be approved by the City Engineer. Any systems shown to be required by the review shall be the responsibility of the developer, unless otherwise provided for through an agreement with the property owner or serving agency. (p. 300) e) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? Less Than Significant Impact With Mitigation. See Sections Vlll.a and Vlll.d, above. No additional mitigation measures are necessary. f) Otherwise substantially degrade water quality? Less Than Significant Impact With Mitigation. See Sections Vlll.a and VIIIA, above. A gasoline service station was located on the park site from 1968 to 1984. During that time a gasoline release impacting groundwater occurred as a result of leaks from underground storage tanks. A remedial action plan was produced in 1995 and the SOIAMONS. INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration January 21, 2003 Page 60 Shell Oil Company has conducted remediation activities and is in the process of obtaining site closure from the Orange County Health Care Agency. No additional mitigation measures are necessary. g) Place housing within a 100 -year flood hazard area as mapped on a federal Flood Hazard Boundary of Flood Insurance Rate Map or other flood hazard delineation map No Impact. The site is not within a 100 -year flood hazard area. (CIOSA Elie p. 301) No mitigation measures are necessary. h) Place within a 100 -year flood hazard area structures, which would impede or redirect flood flows? No Impact. The site is not within a 100 -year flood hazard area. (CIOSA EIR p. 301) No mitigation measures are necessary. 1) Expose people or structures to a significant risk of loss, injury or death involving flooding, including flooding as a result of the failure of a levee or dam? ' No Impact. The project is not located in a flood hazard area, is not near a levee or dam and would not expose additional people or structures to flood hazards. (CIOSA EIR p. 293) No mitigation measures are necessary. J) Inundation by seiche, tsunami, or mudflow? No Impact. The site is not located in an area that is subject to seiche or tsunami. (CIOSA EIR p..293). No mitigation measures are necessary. IX. LAND USE AND PLANNING Would the project: a) Physically divide an established community? No Impact. The site is surrounded on all sides by developed land. The project would have no effect on the established community. No mitigation measures are necessary. b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? SOLUTIONS, rNG Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration January 21, 2003 Page 61 No Impact. The proposed project is consistent with the existing General Plan ' land use designation, zoning, and Local Coastal Program Land Use Plan. The General Plan and LCP /Land Use Plan designate the upper portion of the Bayview Landing site for Recreational and Environmental Open Spaceiview park and the lower portion for ' Retail and Service Commercial/restaurant or athletic club or senior citizen housing as an optional use [GPA 92- 2(C)]. The General Plan /LCP /LUP specifies that "The site may be developed with the Senior Affordable Housing option only if the Coastal Development Permit findings demonstrate that adequate visitor serving uses exist in the Newport ' Beach coastal zone consistent with the recreational and visitor serving comercial policies of the Coastal Act." — The project proposal is consistent with the Newport Beach General Plan and the policies of the California Coastal Act in that extensive visitor serving uses currently exist in the Newport Beach Coastal Zone in that there is a full -range of existing visitor serving areas and uses within the City including 276 acres .of public beaches, 220 acres of public parks, Newport Dunes Aquatic Park, the entire Newport Bay and Harbor, Upper Newport Bay Nature Preserve, Crystal Cove State Park and Beach, Balboa Fun Zone, Balboa Village, Marine Avenue, and 37 commercial areas within the Coastal Zone portion of the City. Those uses and areas provide a broad range of visitor services and facilities including: 14 hotels, motels and other similar lodging facilities offering 2,287 rooms within the Coastal Zone and 3,520 rooms citywide; restaurants and snack bars; camping and recreational vehicle accommodations; boat rentals; sports equipment sales and rentals; boat tours; amusement and recreational facilities; golf courses; yacht clubs; tours and cruises; and specialty and souvenir shops. The five acres represents only one percent of the total 497 acres of commercially -zoned property within the Coastal Zone. The development of the five acres for the proposed affordable senior housing site will not substantially detract from the extensive visitor serving facilities within the City, will not preempt establishment of additional facilities on other sites in the City, and will not inhibit the expansion of existing facilities. The project furthers the stated Coastal Act policy to "provide lower cost visitor and recreational facilities" in that the project includes development of a 10 -acre passive park that will provide enhanced public views of Upper Newport Bay and will provide a riding and hiking trail linkage. The portion of the project site consisting of the proposed 150 -unit affordable senior housing units is located on the lower portion of the site that is not a optimal location for visitor serving uses due to the location, size, topography and the proximity to other surrounding residential uses. No mitigation measures are necessary. c) Conflict with any applicable habitat conservation plan or natural community conservation plan? CIVIC SOLUTIONS. INC. ... «.mss...,- ...+............. (( Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration G U January 21, 2003 Page 62 ' Less Than Significant Impact. The site is located within the Central /Coastal Orange County NCCP area. The project's proposed habitat restoration component (see Section IV.f) is consistent with NCCP policies. No mitigation measures are necessary. ' X. MINERAL RESOURCES Would the project: a) Result in the loss of availability of a known mineral resource that would be ' a value to the region and the residents of the state? No Impact. There are no known mineral resources on the site. No mitigation measures are necessary. b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? No Impact. There are no locally important mineral resource recovery areas located in the project area. No mitigation measures are necessary. XI. NOISE Would the project result In: a) Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? Less Than Significant With Mitigation Incorporated. The additional traffic generated by the senior housing project would contribute to a long -term noise increase on roadways in the vicinity, but this increase would not be significant ( CIOSA EIR p.229). A short-term noise increase during construction would occur, however. The CIOSA EIR contains the following standard condition to address construction noise: Standard Conditions SCXI -i Pursuant to the City of Newport Beach Noise Ordinance Section 40.28.040, construction adjacent to existing residential development shall be limited to the CIVIC souiTIONS. INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration 1 January 21, 2003 Page 63 hours of 7:00 a.m. to 6:30 p.m. Monday through Friday and 8:00 a.m. through 6:00 p.m. on Saturday. Construction shall not be allowed outside of these hours Monday through Saturday and at any time on Sundays and federal holidays. Verification of this shall be provided to the City's Advance Planning Manager. 1p.233) Adherence to this requirement would reduce potential impacts from construction noise to a level that is less than significant. The proposed senior housing units would be located adjacent to Jamboree Road, a 6- lane major highway. Traffic noise from this roadway would impact residents of the project. The Noise Element of the General Plan contains Policy 4.1.2 requiring that noise mitigation be incorporated into new residential developments that are adjacent to major roads. The applicable noise standards are as follows (Table 2): Interior: 45 dB CNEL (with windows closed) 55 dB CNEL (with windows open) Exterior: 65 dB CNEL (private yards, patios or balconies) The CIOSA EIR contains the following standard City requirements and mitigation measures related to this issue: Standard Conditions SC Xi -1 Prior to issuance of building permits for each of the planned units, an acoustical engineering study shall be performed based on actual pad, property, roadway grades, building locations, and orientations to assure that the exterior building shells of each structure will be sufficient to reduce existing and future noise levels to an acceptable intensity. Mitigation Measures MM X1-1 The applicant shall ensure that all residential lots and dwellings are sound attenuated against present and projected noise, which shall be the sum of all noise impacting the project, so as not to exceed an exterior standard of 65 dB CNEL in outdoor living areas and an interior standard of 45 dB CNEL in all habitable rooms. Evidence shall be prepared under the supervision of a City certified acoustical consultant which demonstrates that these standards will be satisfied in a manner consistent with applicable zoning regulations shall be submitted as follows: SOLUTIONS, INC Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration 1 bb January 21, 2003 Page 64 1 A. Prior to the recordation of a final tract/parcel map or prior to the issuance of grading permits, at the sole discretion of the City, an Acoustical Analysis Report shall be submitted to the City's Advance Planning Manager for approval. ' The report shall describe in detail the exterior noise environment and preliminary mitigation measures. Acoustical design features to achieve interior noise standards may be included in the report in which case it may also satisfy "B" below. B. Prior to the issuance of any building permits, an acoustical analysis report describing the acoustical design features of the structures required to satisfy the ' exterior and interior noise standards shall be submitted to the Advance Planning Manager for approval along with satisfactory evidence which indicates that the sound attenuation measures specified in the approved acoustical report(s) have ' been incorporated into the design of the project. C. Prior to the issuance of any building permits, all freestanding acoustical ' barriers (if required) must be shown on the project plot plan illustrating height, location and construction in a manner meeting the approval of the City's Advance Planning manager. ' D. Prior to the issuance of any Certificates of Use and Occupancy, field testing in accordance with. Title 25 regulations may be required by the Planning Director to verify compliance with STC and iiC design standards. MM Xl -2 All freestanding acoustical barriers (if required) shall be a berm, wall or combination berm and wall. Walls shall not contain holes or gaps. Walls shall be constructed of materials suitable to meet sound attenuation standards. Final ' acoustical barrier heights and locations shall be determined when final grading plans are developed showing lot locations, house/building setbacks and precise pad elevations. ' These standard conditions and mitigation measures would reduce this potential impact to a level that is less than significant. ' b) Exposure of persons to or generation of excessive groundborne vibration or groundborne noise levels? ' Less Than Sionificant Imoact. A short-term increase in groundbome vibration and noise would be expected to occur during excavation and construction. Limitations on allowable hours of construction found in Standard Condition XI -1 would reduce this ' impact to a level that is less than significant. 1 ' CIVIC SOLUTIONS, INC ' Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration I b l January 21, 2003 Page 65 C) A substantial permanent increase in ambient noise levels in the project vicinity above levels existing without the project? No Impact. The project would not result in significant long -term noise impacts (CIOSA EIR p.229). No mitigation is necessary. d) A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project? Less Than Significant Impact. See Section XI.a, above. e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? Less Than Significant Impact. The site is located near the flight path from John Wayne Airport; therefore construction .workers, residents of the senior housing development, and park users would be subject to minor noise impacts due to aircraft overflight. These impacts are not considered significant, however, since the site is approximately 3.3 miles from John Wayne airport and is outside the 65 dB CNEL noise contour. No mitigation measures are necessary. f) For a project within the vicinity of a private airstrip, would the project expose people residing or working in the project area to excessive noise levels? No Impact. There are no private airstrips within the vicinity of the site. No mitigation measures are necessary. XII. POPULATION AND HOUSING Would the project: a) Induce substantial population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)? No Impact. The project would result in a population increase due to the construction of 150 senior apartments. This is not considered a significant impact since the project is consistent with the City's General Plan. No mitigation measures are necessary. SOLUTIONS. INC Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration `b1, January 21, 2003 Page 66 l ' b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere? ' No Impact. There is no existing housing that would be displaced by the proposed development. No mitigation measures are necessary. C) Displace substantial numbers of people, necessitating the construction of ' replacement housing elsewhere? No Impact. No people or existing housing would be displaced by the proposed ' development. No mitigation measures are necessary. ' XIII. PUBLIC SERVICES Would the project result in substantial adverse physical impacts associated with ' the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, ' response times or other performance objectives for any of these public services: a) Fire protection? ' Less Than Significant Impact. The proposed project would cause an incremental increase in demand for fire protection and paramedic service due to the construction of 150 senior apartments. An adequate level of service can be provided by existing Fire Department facilities and staff, therefore this is not considered a significant impact. No mitigation measures are necessary. 1111111 b) Police protection? Less Than Sianificant Impact With Mitigation. The proposed project would cause an incremental increase in demand for police protection due to the. construction of 150 senior apartments and a public park. An adequate level of service can be provided by existing Police Department facilities and staff, therefore this is not considered a significant impact. Traffic control during construction will be provided by the contractor in a manner meeting the approval of the City Traffic Engineer (see Mitigation Measure VII - 1). No additional mitigation measures are necessary. C) Schools? No Impact. The proposed project would have no effect on student generation or school operations since the housing project would be restricted to residents age 55 and over. No mitigation measures are necessary. SOLUTIONS. INC. Bayview Senior Affordable Housing and Park Project Initial Study/Negative Declaration] January 21, 2003 Page 67 b d) Parks? No Impact. The proposed project includes the construction of a public view park and would have no effect on the demand or usage of other parks or recreation facilities. No mitigation measures are necessary. e) Other public facilities? No Impact. The proposed project would have no effect on any other public facilities. No mitigation measures are necessary. XIV. RECREATION a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities, such that substantial physical deterioration of the facility would occur or be accelerated? No Impact. The proposed project includes the construction of a public view park but would not increase the use of parks or other recreation facilities. No mitigation measures are necessary. b) Does the project include recreational facilities or require the construction or expansion of recreational facilities, which might have an adverse physical effect on the environment? No Impact. See Section XIV.a, above XV. TRANSPORTATION/TRAFFIC The following discussion is based on a project -level traffic analysis prepared by Austin - Foust Associates. The full report is provided in Appendix II. Would the project: a) Cause an increase in traffic, which is substantial in relation to the existing traffic load and capacity of the street system (i.e., result in a substantial Increase in either the number of vehicle trips, the volume to capacity ratio on roads, or congestion at intersections)? Less Than Significant Impact. Appropriate trip generation rates for the proposed project were obtained from the Newport Beach Traffic Analysis Model (NBTAM). These rates were derived from Institute of Transportation Engineers trip rates for senior /elderly CIVIC SOLUTIONS. INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration January 21, 2003 Page 68 ,a housing. Table XV -1 summarizes the trip generation for the proposed project. As this table indicates, the proposed project will generate 600 trips daily. The project site is currently entitled with the original Circulation Improvement and Open Space Agreement (CIOSA) with 10,000 square feet of restaurant and a 10 -acre view park, which generates 669 average daily traffic (ADT). Since the proposed project generates less traffic than the entitled use, no further TPO analysis is required. Distribution of project- generated traffic was derived from observed travel patterns in the vicinity of the project site as well as from locations and levels of development in relation to the location of the proposed project. Project traffic is assumed to travel south along Jamboree Road with 25 percent assumed to travel west and 15 percent to travel east along Coast Highway. The remaining project traffic is assumed to travel north along Jamboree Road. Ten percent of the project's traffic is assumed to divert to Newport Center and five- percent to San Joaquin Hills Road east of the project site. Ten percent is assumed to travel east and ten percent west on the San Joaquin Hills Transportation Corridor (SR -73). Ten percent is assumed to continue north on Jamboree Road and five percent north on MacArthur Boulevard and five percent north on Von Karmen Avenue. The remaining five percent is assumed to travel north on University Drive north of the SR -73. Table XV -1 TRIP GENERATION SUMMARY AM PEAK HOUR PM PEAK HOUR LAND USE AMOUNT IN OUT TOTAL IN OUT TOTAL ADT Previously Approved Project nl TRIP GENERATION Restaurant 10 TSF 6 1 7 35 16 51 669 View Park 10 ACRE 4 0 0 0 4 0 0 Sub -Total 6 1 7 35 16 51 669 Proposed Project TRIP RATES Elderly Residential DU .10 .30 .40 .30 .10 .40 4.00 TRIP GENERATION Elderly Residential 150 DU 15 45 60 45 15 60 600 Difference 9 44 53 10 -1 9 -69 (proposedapproveM I'r= Newport Beach Circulation Improvement and Open Space Agreement Traffic Study, Reference 2 The City of Newport Beach identified 10 intersections for analysis to determine the impact of the proposed senior housing development. These intersections are: SOLUTIONS. ING ' Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration January 21, 2003 Page 69 Jt5 W. Coast Highway & Dover Drive E. Coast Highway & Bayside Drive E. Coast Highway & Jamboree Road E. Coast Highway & Avocado Avenue E. Coast Highway & MacArthur Boulevard Jamboree Road & Backbay Drive Jamboree Road & Island Lagoon Drive Jamboree Road & Santa Barbara Drive Jamboree Road & San Joaquin Hills Road Jamboree Road & Eastbluff Drive -Ford Drive As part of a CEQA based traffic impact analysis, an examination of existing, background and background -plus- project conditions is required. This CEQA analysis utilizes the City's TPO criteria for determining significant impacts. City Staff provided the 2002 peak hour volumes (existing) for study area intersections. An expected completion date of 2005 was assumed. The analysis year, 2006, is one year after the project is completed. An ambient growth rate of 1.0 percent per year was added to volumes along MacArthur Boulevard, Jamboree Road, and Coast Highway. Approved projects consist of project developments that have been approved but are not fully completed. Cumulative projects are known but not approved project developments that are reasonably expected to be completed or nearly completed at the same time as the proposed project. The peak hour volumes of all approved projects and cumulative projects, also provided by City Staff, were added to the peak hour volumes. The resulting volumes (background volumes) represent the projected peak hour volumes prior to the addition of project traffic. One - percent of the projected peak hour volumes of each approach of each intersection was compared with the peak hour distributed volumes from the proposed project. A summary of this comparison is shown in Table XV 2 (the one.peroent analysis sheets are included in Appendix II). If one - percent of the 2006 peak hour volumes of each approach were larger than the peak hour project volumes, no further analyses was performed. If project peak hour volumes were higher than one - percent of the projected peak hour volumes on any approach of any intersection, the intersection was analyzed using the intersection capacity utilization (ICU) method. Comparison of the one - percent of the peak hour volumes with the project peak hour volumes resulted in the following five intersections requiring additional analysis: E. Coast Highway & Jamboree Road Jamboree Road & San Joaquin Hills Road Jamboree Road & Island Lagoon Drive Jamboree Road & Santa Barbara Drive Jamboree Road & Backbay Drive SOLUTIONS. INC Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration I IN ' January 21, 2003 Page 70 ' TABLE XV -2 ' SUMMARY OF ONE PERCENT ANALYSIS AM PROJECT PEAK HOUR VOLUMES LESS THAN I% OF ' 2006 H INTERSECTION NB SB EB WB PEAK HOUR Vni I IMPS 1. W Coast Hwy & Dover 0 0 2 11 Yes ' 2. E Coast Hwy & Bayside 0 0 2 11 Yes 3. E Coast Hwy & 0 18 2 1 No Jamboree 4. E Coast Hwy & Avocado 0 0 7 1 Yes ' 5. E Coast Hwy & 0 0 7 1 Yes MacArthur 6. Jamboree & Backbay 4 5 44 0 No ' 7. Jamboree & Island 26 5 0 0 No Lagoon 8. Jamboree & Santa 26 4 0 1 No Barbara ' 9. Jamboree & San 22 4 0 0 No Joaquin Hills 10. Jamboree. & 20 4 0 0 Yes. Eastbluff/Ford ' PM PROJECT PEAK HOUR VOLUMES LESS THAN 1% OF 2006 INTERSECTION NB SB EB WB PEAK HOUR ' VOLUMES 1. W Coast Hwy & Dover 0 0 2 0 Yes 2. E Coast Hwy & Bayside 0 0 2 0 Yes ' 3. E Coast Hwy & 0 0 2 2 Yes Jamboree 4. E Coast Hwy & Avocado 0 0 0 2 Yes 5. E Coast Hwy & 0 0 0 2 Yes MacArthur 6. Jamboree & Backbay 4 6 -1 0 Yes 7. Jamboree & Island -1 6 0 0 Yes Lagoon ' 6. Jamboree & Santa 0 5 0 1 Yes Barbara 9. Jamboree & San 0 4 0 1 Yes Joaquin Hills 10. Jamboree & 0 4 0 0 Yes Eastbluff /Ford ' An ICU analysis was performed for these five intersections. Existing lane configurations were noted and a capacity of 1,600 vehicles per hour (VPH) per lane with no clearance factor and a .75 right- turn -on -red (RTOR) adjustment was utilized. Table XV -3 summarizes the resulting existing, background and background -plus- project ICU values ' for these intersections: CIVIC SOLUTIONS. INC •..r•U4Ww�,pYY�YYYI Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration ' January 21, 2003 Page 71 1� INTERSECTION TABLE XV -3 ICU ANALYSIS SUMMARY EXISTING BACKGROUND AM PM AM PM BACKGROUND+ PROJECT AM PM 3. E Coast Hwy & Jamboree .69 .74 1.00 1.06 1.00 1.06 6. Jamboree & Backbay .35 .47 .51 .58 .52. .59 7. Jamboree & Island Lagoon .33 .48 .49 .59 .50 .59 8. Jamboree & Santa Barbara .46 .58 .62 .68 .62 .68 9. Jamboree & San Joaquin Hills .49 .56 .70 .71 .70 .71 Level of service ranges:. 00 - .60 A .61 -.70B .71 -.80C .81 - .90 D .91 -1.00 E Above 1.00 F As Table XV -3 indicates, the proposed project would not cause a one - percent increase at any intersection that is at Level C or worse. No mitigation is required. b) Exceed, either individually or cumulatively, a level of service standard established by the county congestion management agency for designated roads or highways? Less Than Significant Impact. Please see Section Wa. The traffic analysis demonstrates that the project would not exceed any level of service standard. No mitigation is necessary. C) Result in a change in air traffic patterns, including either an Increase in traffic levels or a change In location that results in substantial safety risks? No Impact. The project would have no effect on air traffic patterns. No mitigation measures are necessary. L-CMC SOLUTIONS. INC Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration January 21, 2003 Page 72 lb d) Substantially Increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? Less Than Significant Impact With Mitigation. The following analysis is provided ' in the traffic study prepared for the project: The proposed 150 unit senior residential development will be served from a single ' entrance off of Bayside Drive except for a gated secondary emergency access for use by the police and fire department only. The project is forecast to generate a total of 60 peak hour trips — 45 out and 15 in, in the AM peak hour and 45 in and 15 out in the PM ' peak hour. Storage for eight to nine vehicles (210 feet t) is provided on the exit throat. Additionally, even more vehicles could be stored, but would block the visitor parking area. The available storage is more than adequate to accommodate the peak demand t of 45 vph, which is less than one vehicle per minute. Based on a worst case exit delay of two to three minutes, it is estimated that a maximum of two or three vehicles will ever be queued up waiting to leave compared to storage for roughly twice that many vehicles. ' Entering traffic will be controlled by a single gated entry. A typical and conservative storage requirement for vehicle storage in advance of a gate entry is one foot of storage for each unit served. With a total demand of 150 residential units, a typical storage of ' 150 feet would be required. This project has its entry gate located with over 300 feet from Backbay Drive. As a result, it is certain that entering traffic will never back up and interfere with thru traffic on Backbay Drive. ' The project's entry pattern also involves a traffic circle with a diameter of 80 feet. The main entrance (80' diameter) is adequate to serve all service and emergency vehicle ' access needs. The main entrance off Backbay Drive is offset from the Hyatt's gated access. However, ' this offset is such that there is no conflict between left - turning vehicles entering both sites simultaneously. Likewise, the main entrance utilizes curb returns to facilitate both entry and exit for right - turning vehicles. ' In summary, it is concluded that both the access and internal circulation for these 150 residential units are adequately designed to accommodate seniors driving characteristics and their vehicles. ' During construction the project could cause traffic safety problems as a result of lane closures or due to heavy truck traffic. It is estimated that site grading could require the ' export of up to 60,000 cubic yards of excess fill, which could result in a total of up to 6,000 truck trips. Mitigation Measure VII -1 would reduce this potential impact to a level that is less than significant ' e) Result in inadequate emergency access? 1 ' CIVIC SOLUTIONS. INC. .....- mss.,+,- .........r+..... Bayview Senior Affordable Housing and Park Project Initial Study/Negative Declaration I �� ' January 21, 2003 Page 73 Less Than Significant Impact. See Section XV.d, above. Q Result in inadequate parking capacity? Less Than Significant With Mitigation Incorporated. Demand for additional parking would be created by residents of the senior housing project. A total of 180 parking spaces would be provided for the 150 apartment units. Although the City's typical parking requirement is 2 spaces per unit plus _ space per unit guest parking (or a total of 375 spaces) and the California Coastal Commission uses a standard of 2 spaces per residential unit, the proposed ratio of 1.2 spaces per unit is considered acceptable since the project contains small units (approximately 80% 1- bedroom and 20% 2- bedroom units) that would be restricted to seniors with low incomes. Studies from comparable projects have shown that a ratio of 1.2 spaces per unit is adequate. Reports supporting this finding are available for review at the City Planning Department. The demand for parking for the viewpark is expected to be minimal since the park would have no recreational amenities attract visitors. Most park users would be expected to arrive on foot or bicycle. On- street parking is available along Bayside Drive near the site for park users or as a staging area for bicyclists. Parking is also available for a modest fee at the Newport Dunes resort, which is immediately adjacent to the park on the west. Temporary demand for additional parking would be created by workers during construction. Mitigation Measure VII -1 would reduce this impact to a level that is less than significant. g) Conflict with adopted policies, plans, or programs supporting alternative transportation (e.g., bus turnouts, bicycle racks)? Less Than Significant With Mitigation Incorporated. The park project would include the extension of a bicycle trail, which would support alternative transportation goals. Potential disruption of bus travel and bicycle lanes could occur during construction, however. Mitigation Measure VII -1 would reduce this impact to a level that is less than significant. XVi. UTILITIES AND SERVICE SYSTEMS Would the project: a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board? SOLUTIONS, INC Bayview Senior Affordable Housing and Park Project Initial Study/hlegafrve Declaration January 21, 2003 Page 74 ' No Impact. No wastewater would be generated by the park. The senior housing project would generate typical wastewater flows with no unusual treatment requirements. No mitigation measures are necessary. b) Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? Less Than Significant Impact. The CIOSA EIR indicates that the project would not exceed the level of development assumed in current master plans, and no new 1 facilities would be required (p.350). No mitigation measures are necessary. C) Require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? Less Than Significant Impact With Mitigation. The developer of the senior housing project will be required to install new storm drainage facilities to serve the site (see Mitigation Measure VIII -6). This would reduce the potential impact to a level that is less than significant. No additional mitigation measures are necessary. d) Have sufficient water supplies available to serve the project from existing entitlements and resources, or are new or expanded entitlements needed? Less Than Significant Impact. The project would result in an incremental increase in demand for water, but adequate supplies and infrastructure are available to ' serve the site ( CIOSA EIR p.347 -348). No mitigation measures are necessary. e) Result in a determination by the wastewater treatment provider, which ' serves or may serve the project that it has adequate capacity to serve the project's projected demand in addition to the provider's existing commitments? Less Than Significant Impact. See Section XVi.b, above. No mitigation measures are necessary. f) Be served by a landfill with sufficient permitted capacity to accommodate the project's solid waste disposal needs? Less Than Significant Impact. Construction of the project would result in an incremental increase in solid waste generation. The CIOSA EIR indicates that the project would not adversely affect landfill or refuse collection capacity (p.352). No mitigation measures are necessary. g) Comply with federal, state, and local statutes and regulations related to solid waste? CIVIC SOLUTIONS. INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration January 21, 2003 Page 75 I Less Than Significant Impact. The project could generate solid waste during construction. Standard contract specifications requiring the contractor to dispose of waste in accordance with applicable statutes and regulations would reduce this impact to a level that is less than significant. No mitigation measures are necessary. MANDATORY FINDINGS OF SIGNIFICANCE a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self- sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? Less Than Significant With Mitigation Incorporated. The project has the potential to degrade the quality of the environment, but project design features, standard conditions, and mitigation measures would reduce these potential impacts to a level that is less than significant. b) Does the project have impacts that are individually limited, but cumulatively considerable? ( "Cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects.) Less Than Significant With Mitigation Incorporated. The project would contribute to short-term cumulative impacts in the areas of air quality, noise and traffic during the construction period. The project's contribution to these cumulative impacts would be substantially reduced by the standard conditions and mitigation measures, however, and the incremental impacts of the project would be so small that they would make only a de minimis contribution to the cumulative impacts caused by other projects. C) Does the project have environmental effects, which will cause substantial adverse effects on human beings, either directly or indirectly? Less Than Significant With Mitigation Incorporated. The project design features, standard conditions, and mitigation measures would substantially reduce the potential impacts of the project to a level that is less than significant. SOLUTIONS. INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration ' January 21, 2003 Page 76 D. REFERENCES Building News Publications, Standard Specifications for Public Works Construction. 1997 (the "Greenbook °) ' City of Newport Beach, Circulation Improvement and Open Space Agreement Final EIR, 1992 City of Newport Beach, Newport Beach General Plan. City of Newport Beach, Newport Beach Municipal Code. County of Orange, Central and Coastal NCCP Program Map. 1996 ' ENVIRON International Corporation, Phase I Site Assessment, Vacant Land, Southwest Corner of Back Bay Road and Jamboree Road. Newport Beach, California. December Keane Biological Consulting, Biological Resources Report, Bavview Landing Park. City of Newport Beach, California, October 29, 2001 ' McKenna et al., Phase I Cultural Resources Investigation of the Bavview Landing Project Area, Newport Beach, Orange County, California . July 5, 2001 Nature Reserve of Orange County, personal communication with Lyn McAfee, Executive Director, January 15, 2003. t NMG Geotechnical, Inc., Preliminary Investioation for the Newport Senior Lower Bavview Landing. City of Newport Beach, California. December 18, 2002 South Coast Air Quality Management District, CEQA Air Quality Handbook, 1993 ' CIVIC SOLUTIONS. INC. •.. r����.�llik! =YYMf Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration ■ January 21, 2003 Page 77 `� E. LIST OF PREPARERS Lead Agency: City of Newport Beach Steve Badum, P.E. Public Works Director Public Works Department Bill Patapoff, P.E. City Engineer Mike Sinacori, P.E. Principal Engineer Rich Edmonston, P.E. Manager, Transportation & Development Services City of Newport Beach Patricia Temple Planning Director Planning Department James Campbell Senior Planner Daniel Trimble Project Administrator Bill Cunningham Contract Planning Consultant City of Newport Beach Dennis Lockard Fire Marshall Fire Department City of Newport Beach Tim Newman Captain Police Department Environmental Consultant: Civic Solutions, Inc. John H. Douglas, AICP Director of Planning Projects Keane Biological Consulting Kathy Keane Principal Austin -Foust McKenna et al. Jeanette McKenna Principal ORGANIZATIONS AND PERSONS CONSULTED The Related Companies Gino Canod Project Manager Nature Reserve of Orange Lyn McAfee Executive Director County CIVIC SOLUTIONS, INC. ... �JNiq�rw�YrYY,rIYY.f Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration I January 21, 2003 Page 78 14 APPENDIX SOLUTIONS, INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration 1 `1 January 21, 2003 Page 79 APPENDIX I TRAFFIC STUDY SOLUTIONS. INC. Bayview Senior Affordable Housing and Park Project Initial Study /Negative Declaration I I January 21, 2003 Page 80 SENIOR HOUSING TRAFFIC PHASING ORDINANCE Traffic Analysis January 2003 4VII&TAN,, -r SENIOR HOUSING TRAFFIC PHASING ORDINANCE Traffic Analysis Prepared for: City of Newport Beach Prepared by: Austin -Foust Associates, Inc. 2020 North Tustin Avenue Santa Ana, California 92705 -7827 (714) 667 -0496 January 16, 2003 a3 SENIOR HOUSING TRAFFIC PHASING ORDINANCE TRAFFIC ANALYSIS PROJECT DESCRIPTION The proposed senior housing development on Jamboree Road near the Dunes in the City of Newport Beach consists of 150 dwelling units. The project site is located at the southwest corner of ' Jamboree Road and Backbay Drive. Figure 1 illustrates the location of the project, and Figure 2 illustrates the proposed site plan. Access to the proposed project will be provided from Backbay Drive. , TPO ANALYSIS AND TRIP GENERATION AND DISTRIBUTION ' Appropriate trip generation rates for the proposed project were obtained from the Newport Beach , Traffic Analysis Model (NBTAM). These rates were derived from Institute of Transportation Engineers trip rates for senior /elderly housing. Table 1 summarizes the trip generation for the proposed project. As , this table indicates, the proposed project will generate 600 trips daily. The project site is currently entitled with the original Circulation Improvement and Open Space Agreement (CIOSA) with 10,000 ' square feet of restaurant and a 10 -acre view park, which generates 669 average daily traffic (ADT). Since the proposed project generates less traffic than the entitled use, no further TPO analysis is required. , Distribution of project- generated traffic was derived from observed travel patterns in the vicinity of the project site as well as from locations and levels of development in relation to the location of the proposed project. The general trip distribution is illustrated in Figure 3. Project traffic is assumed to travel south along Jamboree Road with 25 percent assumed to travel west and 15 percent to travel east , along Coast Highway. The remaining project traffic is assumed to travel north along Jamboree Road. Ten percent of the project's traffic is assumed to divert to Newport Center and five - percent to San , Joaquin Hills Road east of the project site. Ten percent is assumed to travel east and ten percent west on the San Joaquin Hills Transportation Corridor (SR -73). Ten percent is assumed to continue north on , Jamboree Road and five percent north on MacArthur Boulevard and five percent north on Von Karman Avenue. The remaining five percent is assumed to travel north on University Drive north of the SR -73. , Figures 4 and 5 illustrate the project's AM and PM peak hour trips, respectively. \� Savior Housing Traffic Phasing lhdmaaca Austin -Foust Associates, Ina Traffic Analysis Traffic report 03 -01 -14A= 1 I 1 �J 11 1 1 1 1 1 a5 SenioriiaumgTB 2 1 Table I TRIP GENERATTON SUMMARY AM PEAK HOUR 'PM PEAK HOUR Proviowly Approved Project N TRIP GENERATION Restau t .IO TSF 6 1 7 35 16 51 669 View Park 10 ACRE 0 0 0 0 0 4 0 Sub -Total 6 1 7 35 16 51 669 Proposed Project TRIP RATES Elderly Residemial DU .10 .30 .40 .30 .10 .40 4.00 TRW GENERATION Elderly Residential 150 DU 15 45 60 45 15 60 600 Difference (proposed- approved) 9 44 53 10 -1 9 -69 ot= Newport Beach Circulation Improvement and Open Space Agemwnt Traffic Study, Refemdce 2 Senior Hming 7taf6c Phasing Traffic Analysis 1a1 senw Houft Traffio Phasing O TraM 5 PSgore 3 PROH=TRIPDMVIBtMON Austin- Foust AwdatM I= 91 I u a] I ! I I I I . I I .1 !I Senior HoumgTOftPhzsmg Ordinance TrdkAnabfsis Figure 4 PRojEcrAmPEAKHouR TURN vOIxWm 6 A..Iil'bM AdaM Lr- 17970boaAft Senior Housing Tcafhc Phasing Ordjm= T affieAutivis Figure S PROMcr PM PBAK HOUR TURN voLuuw 7 Austin- FoustAssoaates, Inc. 1707ffimm. g I 1 1 1 1 1 1 h 1 1 I 1 1 1 U 1 1 CEQA TRAFFIC IMPACTS The City of Newport Beach identified 10 intersections for analysis to determine the impact of the proposed senior housing development. These intersections are: W. Coast Highway & Dover Drive E. Coast Highway & Bayside Drive E. Coast Highway & Jamboree Road E. Coast Highway & Avocado Avenue E. Coast Highway & MacArthur Boulevard Jamboree Road & Backbay Drive Jamboree Road & Island Lagoon Drive Jamboree Road & Santa Barbara Drive Jamboree Road & San Joaquin Hills Road Jamboree Road & Eastbluff Drive -Ford Drive As part of a CEQA based traffic impact analysis, an examination of existing, background and background- plus - project conditions is required. This CEQA analysis utilizes the City's TPO criteria for determining significant impacts. City Staff provided the 2002 peak hour volumes (existing) for study area intersections. An expected completion date of 2005 was assumed. The analysis year, 2006, is one year after the project is completed. An ambient growth rate of 1.0 percent per year was added to volumes along MacArthur Boulevard, Jamboree Road, and Coast Highway. Approved projects consist of project developments that have been approved but are not fully completed. Cumulative projects are known but not approved project developments that are reasonably expected to be completed or nearly completed at the same time as the proposed project. The peak hour volumes of all approved projects and cumulative projects, also provided by City Staff, were added to the peak hour volumes. The resulting volumes (background volumes) represent the projected peak hour volumes prior to the addition of project traffic. A list of approved projects and cumulative projects is given in Table 2. Umm,am a 13� Table 2 APPROVED AND CUMULATIVE PROIECTS SUMMARY Balboa Bay Club Expansion 0% occupancy Fashion Island Expansion 36 %Occupancy Ternple Bat Yahm Expansion 0% occupancy Ford Redevektpmem 95% Occupancy CIOSA —Irvine Project 91 %Occupancy Newport Duns 0% Occupancy City of Irvine Development 0 % Occupancy Holtu Hotel 30% Occupancy Newport Center Block 600 0% Occupancy Cannery Lofts Village 0% occupancy Hoag Hospital Phase B 0%Occupancy St. Mark Presbyterian Church Our Lady Queen ofAogels Church Regent Newport Beach Resort Bonita Canyon -Bluffs Conunucial Cantu Mariam Church Exodus Coramuoiry Center and Tarbrrt V'TwA Expansion Newport Coal[ Newport Ridge Residential Project (SW comer of Bonita Cyn./Newport Coast) Senior Housing Traffic Phasing Ordinance 9 Austin-Foust Associates, Inc. Traffic Analysis Traffic report 03 -01- 14.doc ' One- percent of the projected peak hour volumes of each approach of each intersection was compared with the peak hour distributed volumes from the proposed project. A summary of this comparison is shown in Table 3 (the one - percent analysis sheets are included in the Appendix). ' If one - percent of the 2006 peak hour volumes of each approach were larger than the peak hour project volumes, no further analyses was performed. If project peak hour volumes were higher than one- ' percent of the projected peak hour volumes on any approach of any intersection, the intersection was analyzed using the intersection capacity utilization (ICU) method. Comparison of the one - percent of the peak hour volumes with the project peak hour volumes resulted in the following five intersections requiring additional analysis: E. Coast Highway & Jamboree Road Jamboree Road & Santa Barbara Drive ' Jamboree Road & Backbay Drive Jamboree Road & San Joaquin Hills Road Jamboree Road & Island Lagoon Drive An ICU analysis was performed for the above five intersections. Existing lane configurations were ' noted and a capacity of 1,600 vehicles per hour (VPH) per lane with no clearance factor and a .75 right - tum-on -red (RTOR) adjustment was utilized. The following table summarizes the resulting existing, ME background and background -plus- project ICU values for these intersections: LJ 1 I _J INTBRSF.Cn Nl AM ICU ANALYSIS SUMMARY EXISTING BACKGROUND PM AM PM BACKGROUND +PROJECT AM PM 3. E Cesar Hwy & Jamboree .69 .74 1.00 1.06 LOD 1.06 6. Jamboree & Ba&baY .35 .47 .51 .58 .52 .59 7. Jamboree & Islaod Lagoon .33 .48 .49 .59 .50 .59 8. Jamboree & Santa Barbara .46 .58 .62 .68 .62 .68 9. Jamboree & San Joaquin JBlls .49 .56 .70 .71 .70 .71 Level of service magm .00 - .60 A .61- .70 B .71- .80 C 81- .90D .91 -1.00 E Above 1.00 F As this table indicates, the proposed project does not cause a one - percent increase at any location and will have no significant impact on any study area intersections. 10 Traffic report Aw 33 swiw housing Traffic Phasing Ordinance 11 AaStm -Faust Associeles, Im. Traffic An*sb Traffic tgxwt 03 -01- 14.doc TRAFFIC ACCESS AND CIRCULATION The proposed 150 unit senior residential development will be served from a single entrance off of Bayside Drive except for a gated secondary emergency access for use by the police and fire department only. The project is forecast to generate a total of 60 peak hour trips - - 45 out and 15 in, in the AM peak hour and 45 in and 15 out in the PM peak hour. Storage for eight to nine vehicles (210 feet t) is provided on the exit throat. Additionally, even more vehicles could be stored, but would block the visitor parking area. The available storage is more than adequate to accommodate the peak demand of 45 vph, which is less than one vehicle per minute. Based on a worst case exit delay of two to three minutes, it is estimated that a maximum of two or three vehicles will ever be queued up waiting to leave compared to storage for roughly twice that many vehicles. Entering traffic will be controlled by a single gated entry. A typical and conservative storage requirement for vehicle storage in advance of a gate entry is one foot of storage for each unit served. With a total demand of 150 residential units, a typical storage of 150 feet would be required. This project has its entry gate located with over 300 feet from Backbay Drive. As a result, it is certain that entering traffic will never back up and interfere with thru traffic on Backbay Drive. The project's entry pattern also involves a traffic circle with a diameter of 80 feet. The main entrance (80' diameter) is adequate to serve all service and emergency vehicle access needs. The main entrance off Backbay Drive is offset from the Hyatt's gated access. However, this offset is such that there is no conflict between left - turning vehicles entering both sites simultaneously. Likewise, the main entrance utilizes curb returns to facilitate both entry and exit for right - turning vehicles. In summary, it is concluded that both the access and internal circulation for these 150 residential units are adequately designed to accommodate seniors driving characteristics and their vehicles. CONCLUSIONS The project site is currently CIOSA approved with 10,000 square feet of restaurant and a 10 -acre view park which generates 669 ADT. The currently proposed elderly housing project will generate only 600 ADT which is less than entitled and therefore does not require a more rigorous TPO analysis. ustin-Foxmt Associdw, tM 35 Traffic mpmt 03- 01-14.dw However, ten intersections in the vicinity were investigated, to determine if any significant impact occurred on the street system from a CEQA standpoint. An ICU analysis was performed on five intersections where traffic exceeded the criteria for a one percent analysis. However, the project does not cause any change in the resulting ICUs and it is concluded that no significant impact results. Finally, a review of access and on -site circulation reveals the plan is adequate to accommodate seniors and their unique driving characteristics. REFERENCES: 1. "Newport Beach Traffic Analysis Model (NBTAM), Traffic Model Data," Austin -Foust Associates, Inc., September 1996. 2. "Newport Beach Circulation Improvement and Open Space Agreement Traffic Study," Austin -Foust Associates, Inc., February 1992., 1 Senior Housing Traffic Phasing Ordinance 13 Austin -Foot Associd a, inc. I ' Traffic Analysis Traffic report 03 -01 -14Aoc Attachment 3 Applicant's explanation of technical site engineering constraints 131 Technical Discussion of Site Constraints related to Civil Engineering Project: Lower Bayview Senior Affordable Housing Southwest corner of Jamboree Road and Back Bay Drive Newport Beach, CA Date: January 30, 2003 Overview of Existing Drainage Patterns The existing site at the southwest corner of Jamboree Road and Bay Bay Drive is currently vacant and drains northerly to a primary low point within the site adjacent to the intersection of Bay Bay Drive and the primary entry road to Newport Dunes. In addition to this low point, there are two other small localized low points within the site where runoff currently ponds during the rainy season. These low points are located within areas where new buildings and improvements will be constructed. Drainage from adjacent city park site and protection of Lower Bayview from flooding The City of Newport Beach will be developing a passive park just to the south of Lower Bayview. While the park will be owned and maintained by the City, the park site will drain northerly toward the residential project. To protect the proposed structures and other improvements, portions of the site will need to be raised to achieve positive drainage around the buildings. Grading of Lower Bayview to achieve positive drainage The grading of Lower Bayview has been designed to require the least amount of earth fill while assuring that positive drainage away from the buildings will be achieved. In order to grade the level building pads, the existing localized low points within the site will need to be filled. Additional fill will be placed to raise the building structures: (I) above the potential 100 year flood level around the buildings, and (2) to provide positive drainage swales around the buildings. Drainage away from the structures will be a minimum of two percent. Drainage swales must flow at a minimum of two percent to an approved drainage inlet. These requirements have been achieved on the Conceptual Grading Plan, Detention Basin Drainage from Lower Bayview will be directed to the proposed detention basin shown on the plans. Drainage from the majority of the park site will also drain to the detention basin. Based on technical design criteria provided by the City, the size of the basin was determined through engineering calculations. The detention basin is required to meet current requirements of the City, County, State and Federal agencies. The purpose of the basin is two -fold: The basin will detain peak storm runoff flows such that runoff from the park site and housing site will be detained within the basin until such time as the "peak" of the storm has occurred. Hence, the basin will serve to mitigate any increased flow to the city j `. streets during the peak of the storm. Additionally, a portion of the runoff detained in the basin will percolate into the soil, and, thus, never leave the site at all. The basin will address the County of Orange, State of California, California Coastal Commission, and Federal EPA requirements which require filtration of initial storm runoff flows. By detaining the runoff for several hours, settlement will occur within the basin. When the runoff eventually drains from the basin, the quality of the runoff will be improved due to the fact that there has been time for potential pollutants to settle to the bottom of the basin. The detention basin will be landscaped and be an aesthetically pleasing landscape feature of the project. Grading and Utilities Sewer Another advantage of the site grading design is its relationship to underground utilities. The proposed sewer system will drain by gravity and connect to an exiting Orange County Sanitation District Trunk main in Back Bay Drive. Due to the high ground water table at this site, it is necessary to provide a sufficient " utility zone" between the groundwater table and the finished grade elevations. Excavating for utilities (storm drain ,sewer, water, etc.) below the groundwater table would cause caving of trenches and would be cost prohibitive. Storm Drain To provide positive flow of the proposed on -site storm drain system, the grades as shown on the Conceptual Grading Plan are necessary. The storm drain system must outlet into the detention basin. Traveling upstream from the basin at a minimum pipe slope, the storm drainpipes will have minimal earth cover over the pipe at the most upstream catch basin. If the building site were lowered, the pipes would rise "out of the ground" and the essential storm drain system would not be feasible. Grading and Export of Excess Material As currently designed, the earthwork quantities for the project indicate a significant amount of soil export from the site. To balance the cut and fill quantities, it would be advantageous to increase the elevation of the existing site by 10 or more feet. Because there are other factors which would not allow us to do this, the grading design is the minimum quantity (depth) of fill required to make the project feasible from a drainage and utility standpoint. The fill to be placed on the Lower Bayview site, however, will help reduce the amount of export which will need to be transported from the site via trucks over city streets. The California Coastal Commission and the citizens of Newport Beach and its neighboring communities will look favorably on the reduction in truck trips leaving the project site. `S 1 OPTIONAL ITEM Existing elevations within site verses proposed elevations within site The existing elevations within the Bayview Landing site range from elevation 15 to elevation 75. The proposed elevations will not change dramatically; the elevations will range from 17 to 75. Technical Discussion ofGeolechnical Findings The geotechnical consultant for this project (NMG Geotechnical, Inc.) has performed a preliminary geotechnical investigation to evaluate the existing subsurface conditions in order to determine the geotechnical constraints and provide preliminary remedial grading and design recommendations for the proposed development. The geotechnical report by NMG dated December 18, 2002 summarizes the findings and provides preliminary recommendations for the proposed site development. The primary geotechnical issues for the subject site are 1) the remedial grading and shallow groundwater conditions; 2) the settlement of underlying compressible materials as a result of fill and structural loading; and 4) the stability of the hillsides and graded slopes created by the design cuts. A summary of the geotechnical findings and the primary issues are provided below. The earth units underlying the lower area include uncertified fill overlying alluvium, with Monterey bedrock at a depth of 25 to 30 feet below the site. Elevations at the site vary from a low of approximately 16 feet (above mean sea level) in the northwest corner to a high of 30 feet in the southern portion of the site. The groundwater table underlying the site is shallow, on the order of 10 to 20 feet deep (elevation 7 to 12 feet above mean sea level). The groundwater is probably influenced by seasonal fluctuations. The earth units underlying the upper mesa area include approximately 15 feet of non - marine ten-ace deposits over 10 feet of marine terrace deposits, over bedrock of the Monterey Formation. The Monterey bedrock consists of diatomaceous siltstone. These materials are generally much denser than the earth units underlying the lower area. Groundwater is believed to be deeper below the mesa site, deeper than 70 feet. There are no known major or active faults located at the subject site; therefore, the potential for ground rupture is considered low. The subject site is not located within a Fault Rupture Hazards Zone as defined by the State's Alquist Priolo Act, but is located within a Seismic Hazard Zone as defined by the State's Seismic Hazard Mapping Act (Newport Beach Quadrangle). Based upon the current geotechnical studies at the site the potential for seismically induced liquefaction is considered very low. There is a mapped seismic hazard zone for "Earthquake Induced Landslides" along the hillside to the south of the subject site. 0 5 The recommended remedial removals will be shallow and limited by the existing shallow groundwater level. As a result, a temporary stockpile has been recommended to surcharge the lower area of the site and reduce the future settlement potential. The actual size (height and area) and the duration of the surcharge will depend on the actual design loading, construction schedule and settlement tolerances. As a result of the design cut into the existing hillside, one of the planned buildings will be underlain by bedrock and will not require surcharging. The proposed slopes created by the design cuts into the hillside are anticipated to be grossly stable however, a supplemental geotechnical investigation is currently in progress in order to provide remedial recommendations related to slope stability. Based on the anticipated design grading and recommended remedial measures a shallow foundation system is considered to be geotechnically acceptable. The proposed design finish grades will help reduce the impact of the shallow groundwater conditions and will provide a thicker fill cap for the building foundations. At this time, the building foundations are anticipated to be post - tensioned slabs to be designed based on low to medium expansion potential and differential settlement on the order of 1.0 inch over a 40 -foot span. Final foundation recommendations will be confirmed upon the completion of grading based on the evaluation of the final as- graded conditions. 1A Attachment 4 Traff ic Analysis Report \a� SENIOR HOUSING TRAFFIC PHASING ORDINANCE. ,a� SENIOR HOUSING TRAFFIC PHASING ORDINANCE Traffic Analysis Prepared for: City of Newport Beach Prepared by: Austin -Foust Associates, Inc. 2020 North Tustin Avenue Santa Ana, California 92705 -7827 (714) 667 -0496 January 14, 2003 SENIOR HOUSING TRAFFIC PHASING ORDINANCE TRAFFIC ANALYSIS PROJECT DESCRIPTION The proposed senior housing development on Jamboree Road near the Dunes in the City of Newport Beach consists of 150 dwelling units. The project site is located at the southwest comer of Jamboree Road and Backbay Drive. Figure 1 illustrates the location of the project, and Figure 2 illustrates the proposed site plan. Access to the proposed project will be provided from Backbay Drive. TPO ANALYSIS AND TRIP GENERATION AND DISTRIBUTION Appropriate trip generation rates for the proposed project were obtained from the Newport Beach ' Traffic Analysis Model (NBTAM). These rates were derived from Institute of Transportation Engineers trip rates for seniorlelderly housing. Table 1 summarizes the trip generation for the proposed project. As this table indicates, the proposed project will generate 600 trips daily. The project site is currently entitled with the original Circulation Improvement and Open Space Agreement (CIOSA) with 10,000 square feet of restaurant and a 10 -acre view park, which generates 669 average daily traffic (ADT). Since the proposed project generates less traffic than the entitled use, no further TPO analysis is required. Distribution of project - generated traffic was derived from observed travel patterns in the vicinity of the project site as well as from locations and levels of development in relation to the location of the proposed project. The general trip distribution is illustrated in Figure 3. Project traffic is assumed to travel south along Jamboree Road with 25 percent assumed to travel west and 15 percent to travel east along Coast Highway. The remaining project traffic is assumed to travel north along Jamboree Road. Ten percent of the project's traffic is assumed to divert to Newport Center and five - percent to San Joaquin Hills Road east of the project site. Ten percent is assumed to travel east and ten percent west on the San Joaquin Hills Transportation Corridor (SR -73). Ten percent is assumed to continue north on Jamboree Road and five percent north on MacArthur Boulevard and five percent north on Von Karman Avenue. The remaining five percent is assumed to travel north on University Drive north of the SR -73. Figures 4 and 5 illustrate the project's AM and PM peak hour trips, respectively. Senior Traffic C Ordinance 017070ta.doc 1 Figure 1 PROJECT VICINITY MAP Senior Housing Traffic Phasing Ordinance 2 Austin -Foust Associates, Inc. Traffic Analysis 1767Obase.dwg 1 Figure 2 PROPOSED PROJECT SITE PLAN Senior Housing Traffic Phasing Ordinance 3 Austin-Foust Associates, Inc. Traffic Analysis 17070hase.dwg 151 Table 1 TRIP GENERATION SUMMARY LAND USE AMOUNT IN AM PEAK HOUR OUT TOTAL IN PM PEAK HOUR OUT TOTAL ADT Previously Approved Project P) TRIP GENERATION Restaurant 10 TSF 6 1 7 35 16 51 669 View Park 10 ACRE 0 0 0 0 0 0 S Sub -Total 6 1 7 35 16 51 669 Proposed Project TRIP RATES Elderly Residential DU .10 .30 .40 .30 .10 .40 4.00 TRIP GENERATION Elderly Residential 150 DU 15 45 60 45 15 60 600 Difference (proposed- approved) 9 44 53 10 -1. 9 -69 ot= Newport Beach Circulation Improvemeat and Open Space Agreement Traffic Study, Reference 2 Senior Housing Traffic Phasing Ordinance 4 Austin -Foust Associates, Inc. Traffic Analysis 017070ta.doc Figure 3 ' PROJECT TRIP DISTRIBUTION i Senior Housing Traffic Phasing Ordinance 5 Austin -Foust Associates, Inc. Traf&cAnalysis 17070base.dwg Figure 4 PROJECT AM PEAK HOUR TURN VOLUMES Senior Housing Traffic Phasing Ordinance 6 Austin -Foust Associates, Inc. Traffic Analysis 17070base.dwg 1 1 Senior Housing Traffic Phasing Ordinance Traffic Analysis 7 Figure S PROJECT PM PEAK HOUR TURN VOLUMES Austin -Foust Associates,, Inc. 17070basedwg 1 CEQA TRAFFIC IMPACTS The City of Newport Beach identified 10 intersections for analysis to determine the impact of the proposed senior housing development. These intersections are: W. Coast Highway & Dover Drive E. Coast Highway & Bayside Drive E. Coast Highway & Jamboree Road E. Coast Highway & Avocado Avenue E. Coast Highway & MacArthur Boulevard Jamboree Road & Backbay Drive Jamboree Road & Island Lagoon Drive Jamboree Road & Santa Barbara Drive Jamboree Road & San Joaquin Hills Road Jamboree Road & Eastbluff Drive -Ford Drive As part of a CEQA based traffic impact analysis, an examination of existing, background and background - plus - project conditions is required. This CEQA analysis utilizes the City's TPO criteria for determining significant impacts. City Staff provided the 2002 peak hour volumes (existing) for study area intersections. An expected completion date of 2005 was assumed. The analysis year, 2006, is one year after the project is completed. An ambient growth rate of 1.0 percent per year was added to volumes along MacArthur Boulevard, Jamboree Road, and Coast Highway. Approved projects consist of project developments that have been approved but are not fully completed. Cumulative projects are known but not approved project developments that are reasonably expected to be completed or nearly completed at the same time as the proposed project. The peak hour volumes of all approved projects and cumulative projects, also provided by City Staff, were added to the peak hour volumes. The resulting volumes (background volumes) represent the projected peak hour volumes prior to the addition of project traffic. A list of approved projects and cumulative projects is given in Table 2. Senior Housing Traffic Phasing Ordinance 8 Ausbn -Foust Associates, Inc. ^ Traffic Analysis 017070ta.doc Table 2 APPROVED AND CUMULATIVE PROJECTS SUMMARY Balboa Bay Club Expansion 0% Occupancy Fashion Island Expansion 36 °A Occupancy Temple Bat Yabm Expansion 0% Occupancy Ford Redevelopment 9501. Occupancy CIOSA— Irvine Project 91% Occupancy Newport Dunes 0% Occupancy City of Irvine Development 0% Occupancy Holtze Hotel 30% Occupancy Newport Center Block 600 0% Occupancy Cannery Lofts Village 095 Occupancy Hoag Hospital Phase B 0°h Occupancy St Mark Presbyterian Church Our Lady Queen of Angels Church Regent Newport Beach Resort Bonita Canyon -Stuffs Conanercial Center Mariners Church Exodus Cormnunity Center and Tarbut V'Tomab Expansion Newport Coast Newport Ridge Residential Project (SW comer of Bonita Cyn./Newport Coast) Senior Housing Traffic Phasing Ordinance 9 Austin -Foust Associates, Inc. Traffic Analysis 017070ta.doc W I 1 1 1 1 0 1 1 1 1 L F l.. l 1 1 One- percent of the projected peak hour volumes of each approach of each intersection was compared with the peak hour distributed volumes from the proposed project. A summary of this comparison is shown in Table 3 (the one- percent analysis sheets are included in the Appendix). If one - percent of the 2006 peak hour volumes of each approach were larger than the peak hour project volumes, no further analyses was performed. If project peak hour volumes were higher than one- percent of the projected peak hour volumes on any approach of any intersection, the intersection was analyzed using the intersection capacity utilization (ICU) method. Comparison of the one - percent of the peak hour volumes with the project peak hour volumes resulted in the following five intersections requiring additional analysis: E. Coast Highway & Jamboree Road Jamboree Road & Backbay Drive Jamboree Road & Island Lagoon Drive Jamboree Road & Santa Barbara Drive Jamboree Road & San Joaquin Hills Road An ICU analysis was performed for the above five intersections. Existing lane configurations were noted and a capacity of 1,600 vehicles per hour (VPH) per lane with no clearance factor and a .75 right- turn-on-red (RTOR) adjustment was utilized. The following table summarizes the resulting existing, background and background -plus- project ICU values for these intersections: INTERSECTION AM ICU ANALYSIS SUMMARY EXISTING BACKGROUND PM AM PM BACKGROUND + PROJECT AM PM 3. E Coast Hwy & Jamboree .69 .74 1.00 1.06 1.00 1.06 6. Jamboree & Backbay .35 .47 .51 .58 .52 .59 7. Jamboree & Island Lagoon .33 .48 .49 .59 .50 .59 8. Jamboree & Santa Barbara .46 .58 .62 .68 .62 .68 9. Jamboree & San Joaquin Hills .49 .56 .70 .71 .70 .71 Level of service ranges: .00 - .60 A .61 - .70 B .71 - .80 C .81 - .90 D .91 -1.00 E Above 1.00 F As this table indicates, the proposed project does not cause a one - percent increase at any location and will have no significant impact on any study area intersections. Senior Housing Traffic Phasing Ordinance 10 Austin -Foust Associates, Inc. Traffic Analysis 017070ta.doc ` /� t INTERSECTION Table 3 SUMMARY OF ONE PERCENT ANALYSIS AM PROJECT PEAK HOUR VOLUMES NB SB EB WB LESS THAN 1% OF 2006 PEAK HOUR VOLUMES I. W Coast Hwy & Dover 0 0 2 11 Yes 2. E Coast Hwy & Bayside 0 0 2 11 Yes 3. E Coast Hwy & lamhoree 0 18 2 1 No 4. E Coast Hwy & Avocado 0 0 7 1 Yes 5. E Coast Hwy & MacArthur 0 0 7 1 Yes 6. Jamboree & Backbay 4 5 44 0 No 7. Jamboree & Island Lagoon 26 5 0 0 No 8. Jamboree & Santa Barbara 26 4 0 1 No 9. Jamboree & San Joaquin Hills 22 4 0 0 No 10. Jamboree & Eastbluff/Ford 20 4 0 0 Yes PM PROJECT PEAK HOUR VOLUMES LESS THAN 1% OF 2006 INTERSECTION NB SB EB WB PEAK HOUR VOLUMES 1. W Coast Hwy & Dover 0 0 2 0 Yes 2. E Coast Hwy & Bayside 0 0 2 0 Yes 3. E Coast Hwy & Jamboree 0 0 2 2 Yes 4. E Coast Hwy & Avocado 0 0 0 2 Yes S. ECoast Hwy & MacArthur 0 0 0 2 Yes 6. Jamboree & Backbay 4 6 -1 0 Yes 7. Jamboree & Island Lagoon -1 6 0 0 Yes 8. Jamboree & Santa Barbara 0 5 0 1 Yes 9. Jamboree & San Joaquin Hills 0 4 0 1 Yes 10. Jamboree & Eastblufi/Ford 0 4 0 0 Yes Senior Housing Traffic Phasing Ordinance 11 Austin -Foust Associates, Inc. Traffic Analysis 017070m.doc �/� ' TRAFFIC ACCESS AND CIRCULATION The proposed 150 unit senior residential development will be served from a single entrance off of Bayside Drive except for a gated secondary emergency access for use by the police and fire department only. The project is forecast to generate a total of 60 peak hour trips - - 45 out and 15 in, in the AM peak hour and 45 in and 15 out in the PM peak hour. Storage for eight to nine vehicles (210 feet t) is provided on the exit throat. Additionally, even more vehicles could be stored, but would block the visitor parking area. The available storage is more than adequate to accommodate the peak demand of 45 vph, which is less than one vehicle per minute. Based on a worst case exit delay of two to three minutes, it is estimated ' that a maximum of two or three vehicles will ever be queued up waiting to leave compared to storage for roughly twice that many vehicles. ' Entering traffic will be controlled by a single gated entry. A typical and conservative storage requirement for vehicle storage in advance of a gate entry is one foot of storage for each unit served. With a total demand of 150 residential units, a typical storage of 150 feet would be required. This project ' has its entry gate located with over 300 feet from Backbay Drive. As a result, it is certain that entering traffic will never back up and interfere with thru traffic on Backbay Drive. The project's entry pattern also involves a traffic circle with a diameter of 80 feet. The main entrance (80' diameter) is adequate to serve all service and emergency vehicle access needs. The main entrance off Backbay Drive is offset from the Hyatt's gated access. However, this offset is such that there is no conflict between left - tuming vehicles entering both sites simultaneously. Likewise, the main entrance utilizes curb returns to facilitate both entry and exit for right - turning ' vehicles. ' In summary, it is concluded that both the access and internal circulation for these 150 residential units are adequately designed to accommodate seniors driving characteristics and their vehicles. CONCLUSIONS 1 The project site is currently CIOSA approved with 10,000 square feet of restaurant and a 10 -acre ' view park which generates 669 ADT. The currently proposed elderly housing project will generate only 600 ADT which is less than entitled and therefore does not require a more rigorous TPO analysis. ' senior Housing Traffic Phasing Ordinance 12 Austin -Foust Associates, Inc. Traffic Analysis 017070ta.doc �1 � ' However, ten intersections in the vicinity were investigated to determine if any significant impact occurred on the street system from a CEQA standpoint. ' An ICU analysis was performed on five intersections where traffic exceeded the criteria for a one percent analysis. However, the project does not cause any change in the resulting ICUs and it is concluded that no significant impact results. Finally, a review of access and on -site circulation reveals the plan is adequate to accommodate seniors and their unique driving characteristics. 1 REFERENCES: 1 1. "Newport Beach Traffic Analysis Model (NBTAM), Traffic Model Data," Austin -Foust ' Associates, Inc., September 1996. 2. "Newport Beach Circulation Improvement and Open Space Agreement Traffic Study," ' Austin -Foust Associates, hic., February 1992. U U I 11 .1 ' Senior Housing Traffic Phasing Ordinance 13 Austin -Foust Associates, Ina Traffic Analysis 017070ta.dw \ APPENDIX ,I'\ i U 1 1 1 1 i 11 1 i 1 i 1 11 11 1 LEGEND XX • STUDY INTERSECTION Senior Housing Traffic Phasing Ordinance A -1 Traffic Analysis Figure A -1 TPO STUDY LOCATIONS Austin -Foust Associates, Inc 17070b=.dwg `� 1 I% Traffic Volume Analysis Intersection: 1. W. Coast Hwy /Dover Existing Traffic Volumes Based on Average Winter/Spr 2002 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1 % of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 147 0 0 0 147 1 0 Southbound 1452 0 16 97 1565 16 0. Eastbound 2362 94 115 405 2976 30 2 Westbound 2800 112 71 1151 4134 41 11 Project AM Traffic is estimated W be 1% or less of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be greater than 1 % of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 101 D 0 0 101 1 0 Southbound 1684 0 12 152 2048 20 0 Eastbound 1936 77 96 589 2698 27 2 Westbound 6405 256 102 552 7315 73 0 Project PM Traffic is estimated to be 1 % or less of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be greater than 1 % of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required, PROJECT: Senior Housing TPO FULL OCCUPANCY YEAR: 2006 'Y5 I% Traffic Volume Analysis Intersection: 2. E Coast Hwy/Dover- Bayside Dr E)dsting Traffic Volumes Based on Average Wlnter /Spr 2002 Peak 1 Hour Approved Cumulative E)dsting Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 425 0 2 0 427 4 0 Southbound 88 0 62 0 128 1 0 Eastbound 3022 121 104 505 3752 38 2 Westbound 1928 77 53 1151 3209 32 11 Project AM Traffic Is estimated to be 1 % or less of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be greater than 1 % of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 499 0 1 0 500 5 0 Southbound 56 0 100 0 156 2 0 Eastbound 2684 107 83 742 3616 36 2 Westbound 5463 219 72 551 6305 63 0 Project PM Traffic is estimated to be I% or less of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be greater than 1 % of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: Senior Housing TPO FULL OCCUPANCY YEAR: 2006 1�5 i i I % Traffic Volume Analysis Project AM Traffic is estimated to be 1 % or less of Projected AM Peak 1 Hour Traffic Volume. Intersection: 3. E Coast Hwy /Jamboree Rd Project AM Traffic is estimated to be greater than 1 % of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. Existing Traffic Volumes Based on Average Winter/Spr 2002 PM PEAK PERIOD Northbound 346 14 4 0 364 Peak 1 Hour Approved Cumulative 0 Southbound 2718 109 92 361 3280 33 0 Existing Regional Projects Projects Projected I% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 How Direction Volume Volume Volume Volume Volume Volume Volume AM PEAT( PERIOD Northbound 600 24 1 9 634 6 0 Southbound 1087 43 108 298 1536 15 18 Eastbound 3047 122 106 506 3781 38 2 Westbound 1363 55 45 1580 3043 30 1 Project AM Traffic is estimated to be 1 % or less of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be greater than 1 % of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 346 14 4 0 364 4 0 Southbound 2718 109 92 361 3280 33 0 Eastbound 2187 87 123 739 3136 31 2 Westbound 2625 105 64 671 3465 35 2 Project PM Traffic is estimated to be 1 %or less of Pmjeced PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be greater than 1 % of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: Senior Housing TPO FULL OCCUPANCY YEAR: 2006 /1 1� P L `I 1�� 1% Traffic Volume Analysis Intersection: 4. E Coast Hwy/Avocado Ave Existing Traffic Volumes teased on Average Wlmer/Spr 2002 Peak 1 Haw Approved Cumulative 5dsting Regional Projects Projects Projected 1 % of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour . Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 How Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 320 0 0 0 320 3 0 Southbound 169 0 0 0 169 2 0 ' Eastbound 2298 92 21 559 2970 30 7 Westbound 1617 65 32 1417 3161 32 1 Project AM Traffic is estimated to be 1 % or less of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to he greater than 1 % of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis Is required. PM PEAK PERIOD Northbound 348 0 0 0 348 3 0 Southbound 794 0 1 0 795 8 0 Eastbound 1706 68 35 796 2605 26 0 Westbound 1638 66 18 622 2344 23 2 Project PM Traffic is estimated to be I% or less of Projected PM Peak 1 Hour Traffic Volume. ' Project PM Traffic is estimated to be greater than 1 % of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: Senior Housing TPO FULL OCCUPANCY YEAR: 2006 `I 1�� 1 % Traffic Volume Analysis Intersection: 5. E Coast Hwy/MacArthur Blvd Existing Traffic Volumes Based on Average Winter/Spr 2002 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected I% of Projected Project Approach Peak 1 Four Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PFAX PERIOD Northbound 0 0 0 0 0 0 0 Southbound 912 36 . 16 204 1168 12 0 Eastbound 1712 68 32 1509 3321 33 7 Westbound 2043 82 28 480 2633 26 1 = =y Project AM Traffic is estimated to be 1 % or less of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be greater than 1 % of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 0 0 0 0 0 0 0 Southbound 2527 101 14 314 2956 30 0 Eastbound 1775 71 40 672 2558 26 0 Westbound 2769 111 16 734 3630 36 2 Project PM Traffic is estimated to be 1 % or less of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic Is estimated to be greater than 1 % of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis Is required. PROJECT: Senior Housing TPO FULL OCCUPANCY YEAR: 2606 1 °� �i 1 i 'i �r f i f i f f 1% Traffic; Volume Analysis Intersection: 6. Jamboree Rd /Back Bay Existing Traffic Volumes Based on Average W inter/Spr 2002 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected I% of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD . Northbound 1516 61 69 641 2287 23 4 Southbound 984 39 108 '298 1429 14 5 Easffiound 58 0 0 0 58 1 44 Westbound 47 0 0 0 47 0 0 Project AM Traffic is estimated to be 1% or less of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be greater than 1 % of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 1557 62 91 372 2082 21 4 Southbound 2029 81 92 360 2562 26 6 Eastbound 72 0 0 0 72 1 -1 Westbound 30 0 0 0 30 0 0 Project PM Traffic Is estimated to be 1 % or less of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be greater than 1 % of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: Senior Housing TPO FULL OCCUPANCY YEAR: 2006 1r 3 1 % Traffic Volume Analysis Intersection: 7. Jamboree Rd /Island Lagoon Existing Traffic Volumes Based on Average Winter/Spr 2002 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 1% of Projected Project Approach Peak 1 Hour Growth Peek 1 Hour Peak -I Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound 1532 61 61 641 2295 23 26 Southbound 994 40 109 298 1441 14 5 Eastbound 20 0 0 0 20 0 0 Westbound 23 0 0 0 23 0 0 Project AM Traffic is estimated to be 1% or less of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be greater than 1 % of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 1493 60 93 372 2018 20 -1 Southbound 2032 81 88 360 2561 26 6 Eastbound 73 0 0 0 73 1 0 Westbound 25 0 0 0 25 0 0 =_> Project PM Traffic is estimated to be 1 % or less of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be greater than 1 % of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: Senior Housing TPO FULL OCCUPANCY YEAR: 2006 i 1�5 I 1 I I i I I I I I I i i I °% Traffic Volume Analysis Intersection: B. Jamboree Rd[Santa Barbara 1955 Existing Traffic Volumes Based on Average Winter]Spr 2002 95 Peak 1 Hour Approved Cumulative . Edsting Regional Projects Projects Projected 1 %of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume 0 47 AM PEAT( PERIOD 0 Northbound 1529 61 61 641 2292 23 26 Southbound 1259 50 110 298 1717 17 4 Easthound 97 0 6 0 103 1 0 Westbound 125 0 5 0 130 1 1 Project AM Traffic is estimated to be 1 % or less of Projected AM Peak 1 Hour Traffic Volume. __> Project AM Traffic is estimated to be greater than 1 % of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required, PM PEAK PERIOD Northbound 1460 58 93 372 1983 20 0 Southbound 1955 78 95 360 2488 25 5 Eastbound 44 0 3 0 47 0 0 Westbound 858 0 5 0 863 9 1 Project PM Traffic is estimated to be 1 % or less of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be greater than 1% of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: Senior Housing TPO FULL OCCUPANCY YEAR: 2006 'G1 r i I% Traffic volume Analysis Westbound 98 0 12 114 224 2 0 Project AM Traffic is estimated to be 1 % or less of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be greater than 1 % of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. Northbound 1707 Intersection: 9. Jamboree Rd/San Joaquin PM PEAK PERIOD 96 372 2243 22 0 Southbound P)dsting Traffic Volumes Based on Average WintenSpr 2002 106 103 423 3282 33 Peak 1 Hour Approved Cumulative Existing Regional Projects Projects Projected 11% of Projected Project Approach Peak 1 Hour Growth Peak t Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume AM PEAK PERIOD Northbound . 1306 52 70 641 2069 21 22 Southbound 1631 65 119 439 2254 23 4 Easthound 377 0 0 0 377 4 0 Westbound 98 0 12 114 224 2 0 Project AM Traffic is estimated to be 1 % or less of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be greater than 1 % of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. Northbound 1707 68 PM PEAK PERIOD 96 372 2243 22 0 Southbound 2650 106 103 423 3282 33 4 Eastbound 157 0 5 0 162 2 0 Westbound 1049 0 50 81 1180 12 1 = => Project PM Traffic is estimated to be 1% or less of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic Is estimated to be greater than 1 % of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: Senior Housing TPO FULL OCCUPANCY YEAR: 2006 r 1 f lA1 I% Traffic Volume Analysis Eastbound 771 0 1 95 867 9 Intersection: 10. Jamboree Rd /Eastbluff -Ford Westbound 699 0 13 251 963 10 0 Project AM Traffic Is estimated to be 1 % or less of Projected AM Peak 1 Hour Traffic Volume. . Existing Traffic Volumes Based on Average Winter/Spr 2002 Project AM Traffic is estimated to be greater than 1 % of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. Peak 1 Hour Approved Cumulative PM PEAK PERIOD Existing Regional Projects Projects Projected 1 %of Projected Project Approach Peak 1 Hour Growth Peak 1 Hour Peak t Hour Peak 1 Hour Peak 1 Hour Peak 1 Hour Direction Volume Volume Volume Volume Volume Volume Volume Intersection Capacity Utilization (ICU) Analysis is required. AM PEAK PERIOD Northbound 2023 81 66 715 2885 29 20 Southbound 1559 62 124 346 2091 21 4 Eastbound 771 0 1 95 867 9 0 Westbound 699 0 13 251 963 10 0 Project AM Traffic Is estimated to be 1 % or less of Projected AM Peak 1 Hour Traffic Volume. Project AM Traffic is estimated to be greater than 1 % of Projected AM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PM PEAK PERIOD Northbound 2508 100 131 395 3134 31 g Southbound 2077 83 112 385 2657 27 4 Eastbound 492 0 2 118 612, 6 0 Westbound 328 0 10 137 475 5 0 Project PM Traffic Is estimated to be 1 % or less of Projected PM Peak 1 Hour Traffic Volume. Project PM Traffic is estimated to be greater than 1 % of Projected PM Peak 1 Hour Traffic Volume. Intersection Capacity Utilization (ICU) Analysis is required. PROJECT: Senior Housing TPO FULL OCCUPANCY YEAR: 2006 P\ i '1 1 3. H Coast Hwy & Jamboree Rd Existing TOTAL CAPACITY UTILIZATION .69 74 Backgroimd+Projed AN PE HOUR PH PR HOUR LANES CAPACITY VOL V/C VOL V/C Nu 1 1600 29 .02 27 .02 NBT 2 3200 483 .18* 259 .10* NBR 0 0 88 .19* 60 .11* SBL 1 1600 177 .11* 237 .15* SBT 2 3200 270 .08 626 .20 SBR f 3200 640 .10 1855 .23 EEL 3 4800 1047 .22* 682 .14* EBT 4 6400 1986 .31 1473 .24 EBR 0 0 14 .41 32 .35 WBL 2 3200 123 .04 254 .08 WBT 4 6400 1134 .18* 2241 .35* WBR f 6400 106 .35* 130 .45* TOTAL CAPACITY UTILIZATION .69 74 Backgroimd+Projed AN PR HOUR PH PE HOUR ROUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 29 .02 28 .02 NBT 2 3200 508 .19* 274 .11* NBR 0 0 88 88 62 62 SBL 1 1600 347 .21* 503 .31* SBT 2 3200 314 .10 738 .23 SBR f f 893 882 2039 2039 EBL 3 4800 1188 .25* 921 .19* EST 4 6400 2580 .41 2185 .35 EBR 0 0 15 15 32 32 WBL 2 3200 123 .04 257 .08 WBT 4 6400 2243 .35* 2852 .45* WBR f f 678 677 358 356 TOTAL CAPACITY UTILIZATION 1.00 1.06 Background AN PR HOUR PH PR ROUR LANES CAPACITY VOL V/C VOL V/C Nu 1 1600 29 .02 28 .02 NBT 2 _ 3200 508 .19* 274 .11* NBR 0 0 88 62 SBL 1 1600 340 .21* 503 .31* SBT 2 3200 314 .10 738 .23 SBR f 882 2039 EBL 3 4800 1186 .25* 919 .19* EBT 4 6400 2580 .41 2185 .35 EBR 0 0 15 32 WBL 2 3200 123 .04 257 .08 WBT 4 6400 2243 .35* 2852 .45* WBR f 677 356 TOTAL CAPACITY UTILIZATION 1.00 1.06 M 6. Jamboree Rd & Back Bay Dr Existing AN PK HOUR AN PK HOUR PH PK BOOR LANES LANES CAPACITY VOL V/C VOL V/C Nu 1 1600 35 .02 54 .03* HBT 3 4800 1472 .31* 1477 .31 NBR f 9 9 26 26 SBL SBL 1 1600 9 .01* 22 .01 SBT 3 4800 943 .20 1962 .41* SHR f 37 32 51 45 EBL EBL 0 0 30 32 33 EBT EBT 2 3200 0 .02* 0 .02* EBR 0 0 28 39 39 WBL WBL 0 0 13 (.01 )* 20 (.01 )* WET 3 4800 1 .00 2 .00 WBR 0 0 33 .02 8 .01 Background AN PK HOUR AN PK HOUR PH PK HOUR LANES LANES CAPACITY VOL V/C VOL V/C Nu 1 1600 35 .02 54 .03* NET 3 4800 2243 .47* 2002 .42 NBR f 9 9 26 26 SBL SBL 1 1600 9 .01* 22 .01 SET 3 4800 1388 .29 2495 .52* SBR f 37 32 51 45 EBL EBL 0 0 30 32 33 EBT EST 2 3200 0 .02* 0 .02* EBR 0 0 28 39 39 WBL WBL 0 0 13 (.01 )* 20 (.01)* WBT 3 4800 1 .00 2 .00 WBR 0 0 33 .02 8 .01 TOTAL CAPACITY UTILISATION .35 .47 TOTAL CAPACITY UTILIZATION Background ±Project AN PK HOUR PH PK DOUR LANES CAPACITY VOL V/C VOL V/C Nu 1 1600 39 .02 58 .04* NBT 3 4800 2243 .47* 2002 .42 NBR f 9 26 SBL 1 1600 9 .01* 22 .01 SBT 3 4800 1388 .29 2495 .52* SBR f 37 51 EBL 0 0 56 32 EBT 2 3200 0 .03* 0 .02* EBR 0 0 46 39 WBL 0 0 13 (.01)* 20 (.O1 }* WBT 3 4800 1 .00 2 .00 WBR 0 0 33 .02 8 .01 TOTAL CAPACITY UTILIZATION .52 .59 .51 .58 abt) 7. Jamboree Rd 6 Island Lagoon Dr Hxistin9 AH PK AN PK HOUR PH PK HOUR LANHS LAHHS CAPACITY VOL V/C VOL V/C NBL 1 1600 27 .02 37 .02* NBT 3 4800 1498 .31* 1431 .30 NBR 1 1600 7 .00 25 .02 SBL 1 1600 4 .00 23 .01 SBT 3 4800 971 .21 1957 .42* SBR 0 0 19 52 52 HBL HBL 1 1600 11 .01* 45 .03* HBT 1 1600 0 .01 0 .02 BBR 0 0 18 28 28 WBL WBL 0 0 14 15 15 WBT WBT 1 1600 0 .01* 0 .01* WBR f 9 9 10 10 TOTAL CAPACITY UTILISATION .33 .48 Baclalro &Projed AH PK HOUR PH PK HOUR HOUR LANHS CAPACITY VOL V/C VOL V/C NBL 1 1600 27 .02 37 .02* HBT 3 4800 2287 .48* 1955 .41 NBR 1 1600 7 .00 25 .02 SBL 1 1600 4 .00 23 .01 SBT 3 4800 1423 .30 2492 .53* SBR 0 0 19 19 52 52 HBL 1 1600 11 .01* 45 .03* HBT 1 1600 0 .01 0 .02 HBR 0 0 18 18 28 28 WBL 0 0 14 14 15 15 WBT 1 1600 0 .01* 0 .01* WBR f f 9 9 10 10 TOTAL CAPACITY UTILIZATION .50 .59 �i Background AH PK BOOR PH PK HOUR LANHS CAPACITY VOL V/C VOL V/C HBL 1 1600 27 .02 37 .02* HBT 3 4800 2261 .47* 1956 .41 DR 1 1600 7 .00 25 .02 SBL 1 1600 4 .00 23 .01 SBT 3 4800 1418 .30 2486 .53* SBR 0 0 19 52 HBL 1 1600 11 .01* 45 .03* MT 1 1600 0 .01 0 .02 HBR 0 0 18 28 WBL 0 0 14 15 WBT 1 1600 0 .01* 0 .01* WBR f 9 10 TOTAL CAPACITY UTILIZATION .49 .59 P1 i i 8. Jamboree Rd S Santa Barbara Dr Existing TOTAL CAPACITY UTILIZATION .46 .58 Badground+Project 446 WBT 2 3200 0 .02* AN PK HOUR PH PK HOUR 402 .25 LANES CAPACITY VOL V/C VOL V/C Nu 1 1600 3 .00 13 .01 NET 3 4800 1338 .28* 1372 .29* MEN 1 1600 188 .12 75 .05 SBL 2 3200 370 .12* 263 .08* SET 3 4800 887 .18 1665 .35 SBR 1 1600 2 .00 27 .02 EEL 1 1600 58 .04* 24 .02* EBT 1 1600 6 .02 5 .01 EBR 0 0 33 15 WBL 0 0 65 442 WBT 2 3200 0 .02* 15 .14* WBR 1 1600 60 .04 401 .25 Right Turn Adjustment WBR .05* Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION .46 .58 Badground+Project WBL 0 0 67 446 WBT 2 3200 0 .02* AN PK HOUR PH PK HOUR 402 .25 LANES CAPACITY VOL V/C VOL V/C HU 1 1600 3 .00 13 .01* NET 3 4800 2121 .44* 1893 .39 NBR 1 1600 194 .12 77 .05 SBL 2 3200 371 .12* 267 .08 SBT 3 4800 1347 .28 2193 .46* SBR 1 1600 3 .00 33 .02 EBL 1 1600 64 .04* 26 .02* EBT 1 1600 6 .02 6 .01 EBR 0 0 33 15 WBL 0 0 67 446 WBT 2 3200 0 .02* 16 .14* WBR 1 1600 64 .04 402 .25 Right Turn Adjustment WBR .05* Note: Assunes E/W Split Phasing V/C TOTAL CAPACITY UTILIZATION .62 .68 Background TOTAL CAPACITY UTILIZATION .62 .68 a6q AN PK HOUR PK PK HOUR LANES CAPACITY VOL V/C VOL V/C HBL 1 1600 3 .00 13 .01* NET 3 4800 2099 .44* 1893 .39 NBR 1 1600 190 .12 77 .05 SBL 2 3200 371 .12* 267 .08 SET 3 4800 1343 .28 2188 .46* SBR 1 1600 3 .00 33 .02 EBL 1 1600 64 .04* 26 .02* EBT 1 1600 6 .02 6 .01 EBR 0 0 33 15 WBL 0 0 66 445 WBT 2 3200 0 .02* 16 .14* WBR 1 1600 64 .04 402 .25 Right Turn Adjustment WBR .05* Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION .62 .68 a6q i I I 9. Jamboree Rd & San Joaquin Hills Rd Existing TOTAL CAPACITY UTILISATION .49 .56 Background +Project AN PE HOUR PH PR HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 28 .02 74 .05 NET 3 4800 1149 .24* 1540 .32* NBR 1 1600 129 .08 93 .06 SBL 2 3200 519 .16* 507 .16* SBT 3 4800 1071 .22 1943 .40 SBR 1 1600 41 .03 200 .13 EEL 0 0 276 91 EBT 3 4800 51 .07* 28 .03* EBR 0 0 50 .03 38 .02 WBL 0 0 69 205 WBT 3 4800 11 .02* 54 .05* WBR f 18 790 Note: Assumes E/W Split Phasing Assumes E/W Split Phasing TOTAL CAPACITY UTILISATION .49 .56 Background +Project TOTAL CAPACITY UTILISATION .70 .71 Background AK PE HOUR PH PR HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 28 .02 75 .05 NBT 3 4800 1893 .39* 2041 .43* NBR 1 1600 170 .11 127 .08 SBL 2 3200 699 .22* 621 .19* SBT 3 4800 1518 .32 2465 .51 SBR 1 1600 41 .03 200 .13 EBL 0 0 276 92 EBT 3 4800 51 .07* 32 .03* EBR 0 0 50 .03 38 .02 WBL 0 0 100 246 WBT 3 4800 11 .02* 54 .06* WBR f 113 881 Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILISATION .70 .71 Background TOTAL CAPACITY UTILISATION .70 .71 pj AN P& HOUR PH PE HOUR LAW CAPACITY VOL V/C VOL V/C HBL 1 1600 28 .02 75 .05 UBT 3 4800 1873 .39* 2041 .43* HER 1 1600 168 .11 127 .08 SBL 2 3200 699 .22* 621 .19* SST 3 4800 1514 .32 2461 .51 SBR 1 1600 41 .03 200 .13 HBL 0 0 276 92 EBT 3 480D 51 .07* 32 .03* EBR 0 0 50 .03 38 .02 WBL 0 0 100 245 WBT 3 4800 11 .02* 54 .06* WBR f 113 881 Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILISATION .70 .71 pj Attachment 5 Project plans �l� Attachment 6 Lot line adjustment a�5 w av w naaMM ww� -.md ew �aw4la�l TR om y .. g. �� 0 •sl � r il'tZF 1 t � {I'..: .. I. L 'N b0 A C 111 cz � � tin I I rr Kr W w Li It. X155 � of •i m � �' 1 � �tiy' � r ^ W KU N S UP um 'o lio ilk Q q p i ~ az �z �. ✓I \��rib ��i�r� m p t Hk 4 � I t 5,1 W //' I � �• Leo f 0 _ 1 I� t � • Y l 1 t a��