HomeMy WebLinkAbout251 - Construction of Water Distributing SystemRESOLUTION 10. 2 s
L-,RZSOLMION OF THE BOARD OF TRUSTEES OF
TH,i -CITY OF NEWPORT BEACH ADOPTING $PECI-
PIBATIONS NO. 34 FOR THE CONSTRUCTION OF
A WATER DISTRIBUTING SYSTEM FOR DWSTIO
SVPnT AND FIRE PROTECTION WITHIN THE SAID
CITY OF NEWPORT BEACH.
Be it resolved by the Board of Trustees of the:
City of Newport Beach that the following specifications to be
known as Specifications No. 34 for the construction of a water
distributing system for domestic supply and fire protection in
the City of Newport Beach be and the same are hereby adopted.
NOR[ TO BE DONE .
Under these specifications the contractor will be
required:
1. To excavate or fill in to such iz extent and
In such a manner as may be required by the plans, profiles and
cross sections in these specifications, the area in which the
improvement hereinafter provided for is to be constructed.
8. To furnish all materials as hereinafter pro -
Tided for and required for the construction and completion of
the improvement in.a000rdanos with the plane and specifications
and all labor, tools and equipment necessary for the perform -
ance of said work.
3. To day and install the pipe fittings, hydrants
and other appurtenances as hereinafter specified.
r l-
STANDARD OML
21 NSIONS:
All standard steel pipe shall be lap - welded and
conform to the following dimensions: -
6 inch nominal diameter pipe shall have an actual
external diameter of not less than 6.685 inches, a wall thick
nose of not. less than 0.88 of an inch and a weight of not lass
than 18.76 lbs. per lineal foot.
10 inch nominal diameter pipe shall have an actual
external diameter of not less than 10978 inches, a wall thick-
nose of not less than 0.366 of an inch and a weight of not less
than 40 lbs. per lineal foot.
ALz = ;
The steel for the plates in the mam facture of the
pipe must be of the beet quality.eoft steel and have a tensile
strength of not less than 551,000 lbs. per square inch, plates
must be ,free from lamination and surface defects.
COAT I N0:
All pipe shall be double dipped and coated inside
and outside with asphaltum or coal tar. The coating must be
- uniformly thick and must have absolute adhesion to the pipe. To
prevent a layer of. moisture beneath the coating, the mixture oust
.be applied on a perfectly dry surface. The pipe, before apply-
ing the coating, must be oleaned of rust and mill scales.
TRENQHIXO:
All pipe shall be laid in an open trench. The
minimum width of excavation for pipes and fittings shall not be
_a_
•
•
- :r,
_:,:-less than six' (Winches wider on both sides of pipes or
fiLLings, the excavation shall be made.a sufficlen die
taws below the depth indioated,;tiy the grade line on the pro-
file and shown by the grade atakes not by the engineer to a.l••
low for Lhickaoss of pipes or-fittings,, and of hubs. Should,
however, the trench be excavated to a. depth greater than that
herein above last mentioned the Contractor shall refill such
excess excavation with send. the Contractor shall beat all
Limes during the progress of the work keep the trenches and
excavations free from water until the baokfilling has been
completed.
All soft and spongy earth or material below sub-
grade not to exceed two (8) feet in depth, shall be removed by
the Contractor and replaoed with screened gravel which shall be
tamped until solid.
LAPIN PiPX:
After the trench has been brought to the proper
line and grade in the manner above specified, the pipe shall
be laid therein in the following manners-
Before any pipe is put into place the trench bottom
shall be prepared so that each pipe shall have a firm and uni-
foas bearing over its entire length. . All adjustment to line
and grade must be made by scraping away or filling in the earth
under thenbody of the pipe, and not by wedging or blocking up
the ends.
Mthe joints of all pipes shall be welded together
In a good and workmanlike manner, except that the ends of pipes
fitting into gate valves or to connections with fire hydrants,
shall be threaded and screwed into place.
_3_
•
•
.00
All joints and screw ends must be thoroughly
coated in the manner hersibefore described, and all pipe,
the coating of which may have been removed for any reason,
want be thoroughly coated before covering the pipe.
BAOEIPILLING TBEZON:
a .. .3
After the pipe laid has been tested as herein-
after provided for, the trench shall be baokfilled with the
same material exoavated from the trench, and carefully packed
and.well raemed with proper tools under and around the body of
the pipe and fittings, as well as the fill over the top of the
pipe and fittings.
Surplus material not required in refilling the
trench shall be evenly and uniformly spread over the ground
adjacent to the trench.
TZOTING PIPE AND SITTINGS M LWAGl:
After the pipe has been laid it will be subjected
to a hydrostatic pressure test of.185.pounds per square inch,
hold for 3D minutes, during which time no portion of the pipe
or fittings skull laid shall show percolation.
SM17ICATIONS IM VALVE&
CASTINGS:
All iron castings shall be made from a superior
quality of iron, remelted in oupola or.air furnace, tough and
of even grain, and shall possess a tensile strength of 282,000
pounds per square Inch. The castings must be clean and per-
foot, without blow or sand holes or defects of any ]rind. Yo
plugging or stopping of holes will be allowed.
4 -.
s
s �► :
Specimen bars of the metal used each being
Inches long by 8 inches wide and 1 inch thick, shall:_.be made
without, charge as often as the engineer may direot:'and in de-
fault of definite instructions the contractor shall salt* and
Lest at least one bar from each heat or run:<of metal. The ire
when.plaoed -flat -wise upon supports 34 inches apart aAd; oaded
in the center, shall support a load of 3800 pouade and show a
defleotion"of not less than .36 of an inch before breaking; at
It preferred, tensile bars shall be made which will show a break -
ing point of not less than 88,000 pounds per square inch. Hare
Lo be oast as nearly as possible to the dimensions without finish-
ing, but corrections may be made by the engineer for variations
In width and thickness and the corrected result must conform to
above requirement.
HARiR� ��S lax:
Such valve.shall have the maker's name oast .upon it.
WROD®T IRON
All wrought iron.used shall be of the best quality
of refined iron, of a tensile strength of at least 45,000 pounds
Per square inch.
COMPOSITION METALS:
All composition metals to be of the best quality,
and, ezoept the *teas, to have a tensile strength of not less
than 30,000 pounds per square inch with.5 per cent elongation
In 8 diameters, and 5, per cent reduction of area at breaking point.
TAOR JOINT$:
All joints shall be faced true and smooth, so-as to
mats, with suitable gaskets, a perfectly watertight joint.
5 "
t
09
�Y
,. 71TTINCB AND INTERCHANGEABLE PARTSL
The fittings of all parts met'. be such as make`'
perfect joints and all parts of the valves of the same make
and the same also shall be interchangeable.
Valves to open an specified by the engineer.
BOLTS AND HOTEL.
All bolts and nuts in valves to be made from the
beet quality of double refined wrought iron or steel., heads,
juA s and threads to be standard sizes.
UNDB or VALVZS:
Valves shall be fully mounted with bronze or suit-
able nonoorrodibls metal, and be either of the double disc or
made up gate type with bronze or suitable nonoorrodi`ble metal
mounted wedging devices or have wedge shaped gates with double
faces and seats, designed to work equally well with pressure on
either side of the gate* T?js gates ( or disco ) shall.be of
oast iron with bronze or suitable noncorrodible metal faces.
These faces shall be maohined, dovetailed and driven into cor-
responding machined grooves in gates.(or discs) or.riveted on
with bronze or suitable noncorrodible metal rivets.
The seats for composition rings in body of valve
shall be turned and threaded before rings are screwed in,
SEAT AND GATE RINGS:
Both seat rings and gate (or disc) rings shall have
smooth nand true faces, and make a perfectly watertight joint.
WEIGHT:
Valves without bypasses shall be approximately not
less than the following weights for the respective sizes:
6 4
}
40
il
VALVE STEM
STEI[8 - "valve stems shall be made of solid brass or oultabif
X;
noncorrodible astal, free from
defects, and shall have a ton-
sils strength of not lose than
45,000 pounds per square
inch. =_
3-inoh
67
poWAs:.:
4-inah ''
85
pounds
6-inoh
180
pounds
8-inch
055
pounds
10 -inch
400
pounds
10 -inch
500
pounds'
14 -inch
780
pounds
18 -inch
1890 pounds °,
VALVE STEM
STEI[8 - "valve stems shall be made of solid brass or oultabif
7-
noncorrodible astal, free from
defects, and shall have a ton-
sils strength of not lose than
45,000 pounds per square
inch. =_
THMDS - Threads on stone to
^:S
be_dquare, none or WS V, and
out in most perfect manner, so
as to work
true and
smooth and
In perfeot.lins throughout the
lift of the
valvee
SIZE OF STEMS - Valve stone at
the bottom
or bass of
the thread
shall not be 1666 than the following sizes
in diameter:
3-inch
valve
44/64
inch
4-inch
valve
55/64
inoh
5-inch
valve
55/64
Inch
6-inoh
valve
1
Inch
7-1noh
valve
1
Inch
8-inch
valve
1
Inch
9-Inch
valve 1
8/64
inch
10-Inch
valve 1
8/64
Inch
13-inch
valve 1
18/64
Inch
14-inch
valve 1
10/64
Inch
18 -inch
valve 1
08/64
Inch
7-
WaCB WJTs
Thy wrench nut on stem shall be 3 inches square with
arrow oast on showing direction which way valve is to turn to open .
All iron work, after being thoroughly cleaned, to
be painted throughout with asphaltum varnish, or.suitable paint,.
or dipped in suitable coating material, '
T aG:
Valves must be tested for lsitkage and distortion ae
follower On double disc or made up gate type, the body of the
valve shall be drilled and tapped with a hole for pipe and a'
removable plug inserted, through this hole an hydraulic pressure
of lay pounds per square inch shall be applied; the wedge shaped
gets type by an hydraulic pressure of 185 pounds per square inch
applied, first between one end and the gate, second between the
opposite and and the gate, and third in the bonnet with grate open.
L80U BANKS:
The materials excavated shall be laid compactly along
the side of the trench, and kept trimmed up so as to cause as lit-
tle inconvenience an possible -to the public travel. In case the
street is not wide enough to hold -the earth without stopping the
passageway on the sidewalk, the Contractor shall erect a board
fence and keep a passageway — six feet wide — open on said sidewalk.
lree access must be left to all fire hydrants and
watergates. .
M SUREM8NT8:
Pain pipes will be measured horizontally from center
to center of structure along the center line of the pipe service,
Including all specials.
CBANCM It DIAI"EH:
Any.ohange in, diameter of the water passage
through the hydrant must have easy curve, and all outlets
must have rounded corners of pod radius.
WATER HAM iER�;
Hydrants must be so designed, particularly as
regards the pitch of the thread of the opsrgting stem, that,
when properly operated a water hammer will not be caused which
will give an increased pressure to exceed the,working pressure,
when such pressure is over 60 pounds, nor increase the.pressure
more than 60 pounds when operated under lose working pressure
than 60 pounds*
s o Es HTn�N„�:
Valves when shut must remain reasonably tight-when
upper portion of barrel Is broken off.
CZ IOit ��i.
With a 5 -toot hydrant discharging 250 gallons per
minute, through each 2 -1/2 -inch outlet, the total friction loss
of the hydrant must not exceed 2 pounds for two -way, 3 pounds
for three- way,:and 4 pounds for four -way hydrants.
When requested, hydrants must be fitted with 2 lugs,
so that the leaded joint underground can be strapped.
MATERIAL
HYDRANT BODY: .
The hydrant body must be made of cast iron.
All castings shall be made from a superior quality
of iron, remelted in cupola or air furnace, tough and even grain,
and shall possess a tensile strength of 38,000 pounds per square
Inch. The casting suet be clean and perfect, without blow or-
sand holes, or defects of any kind. .Ho plugging or stopping of
holes will be allowed.
1PIC"M
Specimen bare of the metal used, each being 36
inches long, by 3 inches wide, and 1 inch thick, shall be made
without charges as often as the engineer may direct, and In-de-
fault of definite instructions, the contractor shall make and
teat at least one bar from each heat or run of metal. The bare
when placed flatwise upon supports 84 inches apart, and loaded
r
in the center, shall support a load:of 8300 pounds, and show a
deflection of not lose than 0935 of an inch, before breaking;
or, if preferred,> tensile bare shall be made which shall show a
breaking point of not lose than 88,000 pounds per square inch.
Bare.must be cast as nearly as possible to the dimensions without
finishing; but corrections any be made by the engineer for varia-
•
•
go..
r q
MCUOT
All wrought iron shall be of the bast quality of
refilled iron of a tensile strength of at least 45,000 pounds
_per square inch.
OQ_MP06ITION-METALS;
411 compdpition or other non - corrodible metals
used to be of the best quality, to have .a. tensile strength of
not lees than 53,000 pounds per equare inch, with a 5 per cent
reduction of area at breaking point..
HOSE NIPPLES AND U".
M MARL
Soso nipples must be of bronze or suitable non-
corrodible metal, either threaded with fine thread into the hy-
drants and securely pinned in place, or carefully looked and
caulked in place.
390 THAEAM
Home threads on all hydrants to be installed in any
given community must of necessity be interchangeable with those
already in service, but,.where practicable, threads should coa-
foau to the National Standard.
HMNT f-AT W. ATE.2,
MV
The seat must be made of bronze or suitable non-
corrodible metal, securely fastened in place.
Vim;
The valve must be faced with a yielding material,
w
• such as rubber or leather, except that, if of the gate types
&'bronze ring may be need: the valve must be designed so that
It can be easily removed for repairs without digging up the
hydrant.
MIIPP VALVE.
MIPS
A positively operating non- corrodible drip valve
must be provided and arranged sous to properly drain the hydrant
when the main valve is closed. The seat for the waste valves
which must be hastened in the hydrant seeurelys must be made of
non- corrodible material. All other patte of the drip mechanism
must be so designed as to be easily removed without digging up
the hydrant.
OPUARING PAS•
0 PBEiATL1�G THAS6D8s .
The operating threads of the hydrant must be so
arranged as to do away with the working of any iron or steel
parts against iron,, or steel. ]tither the operating screw or the
operating nut must be made of non- oorrodible metal, and suffi-
oient.?,strong to perform the work for which intended.
The stem must terminate at the top in a nut of
pentagonal shape, finished with slight. taper to 1 -1/8 -in0h from
point to flats except for hydrants to be installed where exist-
ing hydrants have different shape or size of rut, in which case
the additional hydrants suet have operating.nuts similar to the
old one for uniformity. The nut socket in the wrench must be
made without taper, so as to be reversible.
la -
• WFFING BOX AND GLAND.
UUMI BO
The stuffing "box and gland must be of bronze or
suitable non - corrodible metal, or bushed with bronze or suit;
able non- corrodible metal, when an iron or eteOi stem is used,
or when an iron operating atom nit passes through the stuffing
box. When packing nit 16 used, it must be made of bronze or
suitable non- corrodible metal. The bottom of the.boi and end
of the gland or packing aut.must be slightly beveled.
($.AND BOLA!
Gland bolts or stubs mast be at least 1/3 -in0h
Irk diameter. Bolts or etude may be either of bronze 'or euit-
able non - corrodible metal, iron or steel. The nits must always
be of bronze or suitable non- corrodible metal.
HYDRANT TOP.
T21P1
The hydrant top must be designed,so as to make the
hydrant as weather proof as possible,.and thus overcome the dan-
ger from water getting in and freezing around the stem. Provi-
aione must be pade for oiling, both for lubrication and to pro -
vent corrosion. A reasonably tight fit should be made around
the stems.
�E'PTE�iINCt
There must be Cast on top of the hydrant in ehar-
aeters raised 1/8 -inch, an arrow at least 8- 1/8- inohes long, and
the word "open" in letters 1/3 -inch high and 1/8 -inch in relief,
indicating direct -ion to turn to open the hydrant.
- 13 =
.. =V"
s
Hose caps must be provided for all out ete, and
dust be securely chained to the barrel with a chain eonstfeneted
of material not lose than 1/8 inch in diameter.
9AP MD.
The hose cap nut must be of the same siss and shape
as the top or operating nut.
wABIiER I8 CA.Pi
When requested by the purchaser, a leather, rubber
or lead washer must be provided in the hose cap, get in a groove
to prevent its falling out when the cap is removed.
YAK. -•
Gs
The hydrant must be marked with the name or parti-
cular mark of the manufacturer. All letters and figures oust be
oast on the hydrant barrel above the ground line.
?Z J G.
Hydrants assembled, shall be tested by hydraulic
pressure to .goo pounds per square inch, .before leaving the fao-
tory. The test must be mader.ith the valve open in order to
test the whole barrel for porosity, and strength of hydrant
body.. A second test must be made with valve shut, in order to
test the strength and tightness of the valve.
•-
14
SOUND BTAEb"t8:
Whenever the pipe Is built in any ungraded street,
the trench shall be refilled to the original surface of the
street; provided, however, that there shall not be lose than
three'(3) feet of earth over the -pipe; and, provid.ed furtker
that where a till is required on which to construct the pipe,
the fill shall be made of good, sound earth, built up: in layers
not more than one (1) foot thiok, and the layers thorbughly com-
pacted by rolling or tamping;
There the trenehee do not supply sufficient mater-
ial of the proper quality for making the fill., the. Contractor
•hall supply the deficiency.
RE AATIOF OF S@iFACE OVER__rjm.
In all public streets, alleys or other public
Places* and in pipe rigbte- of-way, the surface over and ad-
jaeent to the sides of the trenches shall, after being back-
filled and prepared as specified in these specifications be
restored by the Contractor without delay Ina workmanlike man -
nor with the same class of materials and constructed in the
same manner as the euriacing or paving.that was in place be-
fore the construction of the pipes was commenced.
r.._
as><EI�►L, �a�cENT s,
�roRa.
The contractor shall, for the price bid; furnish
all the materials to e"oute the work in every respect in a
thorough and worlmanlike manner, in accordanos with the playa,
:and specifications and to the satisfaction of the Street
Superintendent.
UTWAALS AND B11M.
All materials must be of specified quality and
fully equal tot he samples, when samples are required. The
Contractor shall furnish to the Engineer for test, whenever
called for and free.of charge, samples of all materials pro -
posed to be used in the work. Rejected material must be im-
mediately removed from the work by the Contractor.
Any overseer, superintendent, laborer or other
person employed by the Contractor on the work, who shall per-
form work in a manner contrary to these specifications, shall
be discharged immediately and such person shall not again be
employed on the work.
EXAMINATION Or amp,
Bidders must examine and judge for themselves as
to the.location of the proposed work, and the nature of the
excavation to be made and the work to be done.
-
16
-
- -opt for the lines, levels or measurements for the work in
their proper places until authorized to remove them by the
Engineer, and any expense incurred in replacing said stakes
which the Contractor or his subordinates may lave failed to
preserve shall be borne by the Contractor.
PLANS AND _SPOIFICATIONS.
The Contractor shall keep uponihe work a copy of
the plans and specificatione, and access thereto shall at all
times be accorded the Engineer or Inspector.
INSLZOT ORS,
The Contractor shall prosecute work only in the
presence of an Engineer or Inspector, appointed by the Street
Superintendent, and any work done in the absence of said Zn-
gineer or Inspector will be subject to rejection. The Coax-
tractor shall furnish the Engineer and Inspector reasonable
facilities for obtaining such-Information.as may be necessary
to give them lull information at. all times respecting the pro-
gross and manner of the work and the character of the materials .
..17�
;i -
�ESaTaTlo�ar ��p�s.
The Contractor shall not disturb any monussnts o .?:
stakes found on the line of'improvements, until ordered by
Engineer; and he shall bear the expense of resetting anq ib" "nit =
Bents or stakes which may be disturbed without orderv*
B VIIIG OBBTRUCTT3018.
The Contractor shall. remove all trees, stones,';::::°
debris and other obstructions that may be encountered In' Ling
said improvements.
Q�SHAVl.,NG OITY ORDIiANCB$a
The Contractor shall observe all the ordiaa_aees of
the City of Newport Beach in relation to the obstruction of
streets, keeping open passageways and protecting the same where
they are exposed or dangerous to.travel.
r; +
The Contractor shall take all necessary measures
to protect the work and prevent accidents during.00nstruction.
He shall maintain and provide all necessary barriers, guards,
temporary bridges,.watchmen and lights.
PUBLIC UTILITISS.
move
In oars it should be necessary to mmmmsa .the property
of any owner of a public utility or franchise, such owner will,
upon proper application by-the Contractor, be notified by the
Street Superintendent, to move such property within a specified
reasonable time, and the Contractor shall not interfere with
-u-
r J,
u
said property until after the expiration of the time specified.
The right is reserved to the owners of public utilities
and franchises to,enter upon t1*.,Atreet for the purpose of ,asking
repairs or changes of their property that say be made necessary
by the work. the City shall also have the privilege of entering
upon the street .for the purpose of repairing culverts or star*
drains.
LOSS OR DAMAGE*
All loss or dosage arising from any unfOressn'obstruotiou
or difficulties, either natural or artificial, which may be en-
countered in the prosecution of the work, or from any action of
the elements, or from any act or omission not authorised by these
specifications, on the part of the Contractor, or any agent or
person saployed by his, shall be sustained by the Contractor.
EMOTIVE WORK.
No work which may be defective in its conettuotion or
deficient in any of the requirements of these specifications will
be considered as accepted in consequence of the failure of any
Officer of the City or Inspector connected with the work, to point
out &aid defeat or deficiency during construction, and the Con-
tractor shall correct any imperfect work, whenever discovered,
before the final acceptance of the work.
PROTECTION OF WORK AND QZANING UP.
The Contractor shall oars for all work until final oos-
pletion and acceptance. $e shall remove all surplus material and
rubbish from the work after its completion and before he make ap-
Y
rXNAL INSPECTION.
-
'..* - 3
The Contractor shall notify the Street Superintendent
when he desires a final inspection of the work, when the latter
will, as soon as poseible,.make the necessary examination, and..
if the work is f*vAd in compliance with these speci float Ion& the
street superintendent will furnish the Contraotor with a oertifi-
oats to that effect.
A MABLE VARIATION.
When in these specifications a maximum or minimum,
either in size, psroentage or thickness, or relating to quality
or character or other matter, is allowed or prescribed, the work
shall be accepted as in compliance therewith, if within such maxi-
mue or minimun so allowed thereby.
DEPINITIONO.
Whenever the word RQity" is used in these specifica-
tions it refers to the City of Newport Beach, California.
whenever the word "Contractor* is used in these specific
stions, it refers to the party or parties of the second part in
the agreement for the construction of the work herein specified*
Whenever the words "Superintendent" or "Engineer" are
used in these specifications, they refer respectively to the
eStrest Superintendent• or "City Engineer" of the City of Newport
Beach, or their authorized agents or inspectors.
The City Clerk shall certify to the passage of this
Resolution and shall cause the same to be entered in the book of
Resolutions and a Minute of the passage thereof in the Rsoord of
the Board of Trustees of the meeting at which it was'paesed.
20
.i:
5
Ilk
•
Passed
approved this /O/ day of Jam. 1ST•
and
a dent of the Board of lruetese.
Attest:
-�.
City Clerk.
STATE OF CALIlORNIA,
COUNTY OF ORANOZ,
8S
OITY OF NEWPORT BEACH
I,����
City Clerk of
the City of Newport
Beach, do hereby certify that the foregoing
Resolution, being Resolution No. 2 S�, was adopted by the Board
of Trustees of said
City, signed by the President of said Board,
and attested by the
City Cler all at aai#esBrra$ regular mest-
ing thereof, held on the '" day of .Se e , aa, and that
the same was adopted by the following rots, to —wits
AYES: Trustees,
/��°
NOESt Trustees,
Trustees,
ABSENT:
City Clerk of the City of Newport Beach.
— al —