TITLE: Marina Park �Project —Marina Basin Construction Including
Dredging, Bulkheads, Grading and Soil Remediation (Bid Package
2) — Award of Contract No. 3897 -B (CAP09 -0070)
ABSTRACT:
Staff has received bids for the second of four bid packages for the Marina Park Project —
"Marina Basin Construction Including Dredging, Bulkheads, Grading and Soil Remediation"
(Bid Package 2), and is requesting City Council approval to award the contract to Dutra
Construction Company, Inc.
RECOMMENDATIONS:
1. Approve the project drawings and specifications;
2. Award Contract No. 3897 -B (Marina Park Project — "Marina Basin Construction
Including Dredging, Bulkheads, Grading and Soil Remediation") to Dutra
Construction Company, Inc. ( Dutra) of San Rafael, California, for the total bid price of
$4,576,079.00 and authorize the Mayor and City Clerk to execute the contract; and
3. Establish a contingency of $457,607.00 (ten percent) to cover the cost of unforeseen
work.
FUNDING REQUIREMENTS:
The current adopted budget includes sufficient funds for this contract.
Account Description
Marina Park
Account Number
7411- C4002002
Amount
5,033,686.00
5,033,686.00
1 of4
Marina Park Project — Bid Package 2 — Award of Contract No. 3897 -B (CAP09 -0070)
December 10, 2013
Page 2
Proposed uses are as follows:
Vendor
Dutra Construction Company, Inc.
Dutra Construction Company, Inc.
Purpose
Construction Contract $
Construction Contingency $
Total: $
Amount
4,576,079.00
457,607.00
5,033,686.00
Staff recommends establishing a ten (10) percent contingency for unforeseen events
associated with the construction of a new marina basin.
DISCUSSION:
The Marina Park Project is divided into four general construction plan sets and bid
packages: (1) Site Demolition and Tree Relocation; (2) Marina Basin Construction; (3)
Community Center and Park; and (4) Docks. Contract No. 3897 -A - Site Demolition and
Tree Relocation was awarded by City Council on October 22, 2013 and is currently
underway. This contract, Contract No. 3897 -B, is to award the work related to Bid Package
2, which generally includes improving /stabilizing the underlying ground for the future
Community and Sailing Center buildings through the use of stone columns; installing the
marina bulkheads /groin walls with dead -man tie backs and pre- fabricated handrail; dredging
of the marina basin; and placing and grading of the dredged sand material on to target
beaches.
The low bidder, Dutra Construction Company, Inc., possesses a California State Contractors
License Classification "A" as required by the project specifications. A check of Dutra's and its
subcontractors' references indicates satisfactory completion of projects of comparable size
and scope. Dutra was the US Army Corps of Engineers' contractor for the recent lower
Newport Harbor Dredging project.
At 1:30 PM on November 19, 2013, the City Clerk opened and read the following bids for
the "Marina Park Project — Marina Basin Construction Including Dredging, Bulkheads,
Grading and Soil Remediation" Project:
BIDDER TOTAL BID AMOUNT
Low Dutra Construction Company, Inc. $4,576,079.00
2 Reyes Construction, Inc. $5,922,580.00
3 Connolly- Pacific Company $6,185,231.25
4 John S. Meek Company, Inc. $6,299,595.00'
"John S. Meek Company, Inc. submitted an incomplete bid proposal, rendering its bid non- responsive.
The low bid amount is approximately 14 percent more than the Engineer's Estimate of
$4,000,000. This discrepancy appears to reflect the recent upturn in the building
construction industry which is resulting in corresponding increases of labor and material cost
as well as affording higher profit levels.
2 of
Marina Park Project — Bid Package 2 — Award of Contract No. 3897 -B (CAP09 -0070)
December 10, 2013
Page 3
Pursuant to the contract specifications, the contractor will have 140 consecutive working
days to complete the Bid Package 2 construction work.
ENVIRONMENTAL REVIEW:
The Final Environmental Impact Report for the Marina Park Project was adopted by City
Council on May 11, 2010. No additional environmental clearances are required.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of the
meeting at which the City Council considers the item). The Notice Inviting Bids for this
project was advertised in the City's official publication and in construction industry
publications.
Submitted by:
David A. Webb
Public Works Director
Attachment: A. Location Map
3 of
NEWPORT CHANNEL
ROJECT LOCATIO
w
W. BALBpA
w BpULEVARD
W
OCEAN cl
FRONT WEST
A
a PACIFIC OCEAN
NTS
MARINA PARK - PACKAGE 2
MARINA BASIN CONSTRUCTION
LOCATION MAP
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
C- 3897 -B 1 12/10/13