HomeMy WebLinkAbout2014-03-12_Staff Presentationtewport 13eacn 131cycle
Proec.v
OIL-
4 WELOOM
/�
ITO BAL BOA
�1 I � � ISL.41 D
ONSULTINO
aster Piz
C)vprvip'
-
Agenda
• Project Overview
— Objectives
— Scope
— Schedule
• Group Discussion
— Existing Plans, Projects, and Studies
— Review of Draft Recommendations
• Wrap Up and Collect Resources
Pq
Project Purpose
Prepare a comprehensive,
citywide Bicycle Master Plan
.... to plan, design, and
construct cycling improvements
.... to create a comprehensive
bicycle network
.... with a sustainable
bicycle friendly policy,
education and outreach.
PW
r Current Bikeways Master Plan
Gry d
` 1
CITY of NEWPORT BEACH
GENERAL PLAN
Figure CE4
BIKEWAYS
MASTER PLAN
Legend
Class I-
Oirroed Pavad
Class II -
On -road SInpW Lane
Class III -
Sipneel Only
Class I Bikeway
Provides for bicycle travel on a paved right -of -way _
Ihcycle Mah
separated from any street or highway. —"
Includes sidewalk bikeways adjacent to street
Class II Bikeway
Provides a striped and stenciled lane for bicycle
I firyrlr 6uur
travel on a street or highway.
Claas III Bikeway
Provides for a shared use with motor vehicle traffic
hi yrle Route
and may be identified by signing.
Class IV Bikeway
Provides a dirt pathway designated for the use of bicycles
ffirycie 7-rail
and pedestrians completely separated from motor vehicle traffic.
CITY of NEWPORT BEACH
GENERAL PLAN
Figure CE4
BIKEWAYS
MASTER PLAN
Legend
Class I-
Oirroed Pavad
Class II -
On -road SInpW Lane
Class III -
Sipneel Only
Class Iv -
Off-mad Unpaved
3
o 0 1
nr
blue UtaraixnleacnvC
wm cwom
naztn rruwera Imraol
ose oi2aa
S a EIP
P1
Key Project Components
A. Policy Review and Vision
B. 5 E's Development
1. Engineering
2. Education
3. Encouragement
4. Enforcement
5. Evaluation
C. Public Participation
D. Implementation Strategy
E. Bicycle Master Plan
Key Components I
Policy Review and Vision
• Current governing
documents and standards
• Goals and policies
• Recommended changes
OW
Key Components �
5 E's: Engineering
• Field review
• Collision analysis
• Gap analysis
e
I L sw'cm
- F Ie
w e lw.day
•
e
I o <aeao.ew
•�
� �
Ij
I f
f
Air
I ws
,fI
I
I
F I
load ne �.-r` 2' �..
w
#f
e
I I
or
t
ear,
„>,.
i
IpYW UnleMIry of Prlxone Area Bicycle and Peeertryn Sway
Bikeway Gaps: University of Artona
�n..xae.r..re.re� �roerrrwerr
�wx .ww
Key Components I
5 E's: Engineering
• Bike counts
• User surveys
Time
period
starting:
male
Femde
Child
( older 73
Mid-
block
Crossing
Helmet
Sidewalk
Wrong
Way (m
street)
7:00 AM
7:15 AM
7:30 AM
7:45 AM
8:00 AM
8:15 AM
8:30 AM
8:45 AM
9:00 AM
Key Components I
5 E's: Engineering
• Baseline mapping
• Bicycle demand analysis
• Opportunities and
constraints
— Coast Highway
— Back Bay
— Constrained
Circulation System
Key Components �
5 E's: Engineering
• Recommended bikeways and support
facilities
• Wayfinding and signage plan
V
SurMard Spn �u�n Sqn
I
Al
IIPWNSIP
A
MI
Key Components �
5 E's: Programs
Education and marketing programs
— Bicycle network map
Encouragement
Enforcement
Evaluation and Planning
— Benchmarking tools
— Benefits analysis
Key Components I
Implementation Strategy
• Prioritization
and phasing
• Segment
cross - sections
• Cost estimates
• Funding strategies
• Design guidelines
PI
Key Components �
Bicycle Master Plan
• Comprehensive plan
serving a range of cyclists
• Strategic positioning
for grant /funding
of near -term
improvements
• Bicycle Master Plan
Oversight Committee &
community review
Public Engagement Activities
0
0
0
Community Survey
— 421 Responses (Hard Copy & Digital)
Outreach Booths
— McFadden Plaza (August)
— Vista Point Park (October)
Open House
— Central Library (November)
Youth & Stakeholder
Workshops
— January
7
�I
Legend
Existing Bikeways
Off-Street Bike Path (Class 1)
awwwwo On- Street Bike Lane (Class II)
common Designated Bike Route (Class III)
Proposed Bikeways
..... Off - Street Bike Path (Class 1)
asses On- Street Bike Lane (Class II)
ones* Designated Bike Route (Class III)
moose Enhanced Bike Route (Bike Boulevard)
o a.s 1 2
L
1
oop
Draft Recommended Network
Newport Beach Bicycle 011511freetBike Path (Class 1)
On-Street Bike Lane (Class 11)
1l /\ Master Plan - Draft Network Designated Bike Route (Class 111)
I ± 1\\ \ r- 1M�BtMK� x,
U W11IBSi e
Jt
-- Cliff Nt.eri
Eusung RecomnxN,dahons
Off-Street Bike Path (Class 1) Bike Boulevard
On-Street Bike Law (Class lq - - -- (Enhanced Class 111)
Designated Bike Route (Class ill) - - -- yr
Pit pf / CB n W CANVOy
Iph o trn B Q 9
I
w rt_Be ch N.vpon Bean N2Wpa
�• Counvy Cob Center
•` \ \`�•• Vrq 4pdS�0 �p
a0rl
,• 3 del
-` EBAI BOA B1 VO "A:
_ YG
_ y Draft Network - Website
Paok V•w
m.m P.
••'� '
32nd V
IN w /�L� o
nfrom
•,w�• • `: B /La
•
Draft Network - Peninsula
Next Steps
• Bikeways Recommendations
— Website Comments: Due March 17
— Network Refinements with City staff
• Additional Outreach Events:
— April
27
at
West
Coast Highway /Orange St
— May
31
at
Vista
Point Park
• Draft Bicycle Master Plan
— Public review in June /July
— City Council Adoption in Fall
�a Y
alts
Questions ?
r�
1 No
do
.-A
; .1,
0
a Develop a conceptual streetscape plan, including
targeted improvements to bicycle and pedestrian
facilities.
Develop a coordinated public signage and
wayfinding sign program.
Revise the Design Guidelines, including modifying
the implementation process.
Commercial facade improvement program.
5. Targeted tenant attraction program.
MAR
APR
MAY
I JUN
I JUL
I AUG
SEP
FOCT
j NOV
I DEC
BICYCLE AND PEDESTRIAN IMPROVEMENTS
1. Presentation from Bicycle Master Plan (BMP) Oversight Committee
Consultant. Committee to review BMP and provide comments
A
COMMERCIAL FACADE IMPROVEMENT PROGRAM
1. Review facade improvement program types and components and
provide direction to staff
2. Review and approve program
A
TARGETED TENANT ATTRACTION PROGRAM
1. Review tenant attraction programs and provide direction to staff
2. Review and approve program
A
DESIGN GUIDELINES'
1. Review guidelines and provide direction to staff and consultant
2. Review and approve guidelines and implementation process
A
SPECIAL EVENTS INITIATIVE
1. Review and receive an update on special events
STREETSCAPE PLAN'
1. Provide initial direction to staff and consultant
2. Review plan and provide direction to staff and consultant
3. Review and approve plan
A
WAYFINDING PROGRAM'
1. Provide initial direction to staff and consultant
2. Review program and provide direction to staff and consultant
3. Review and approve program
A
IMPLEMENTATION OF REVITALIZATION STRATEGIES
1. Review by City Council of 2014 priorities
CC
2. Staff efforts for parking strategies
PC
CC