HomeMy WebLinkAbout2008-01-30_GP-LCP IC Agenda Meeting PacketAGENDA
AGENDA
General Plan/LCP Implementation Committee
January 30, 2008
3:30 p.m.
City Council Chambers
1. Approve Action Minutes from November 7, 2007 Meeting 3:30-3:35
Attachment No. 1
2. General Plan/LCP Implementation - Master Task List
Update From Staff and Committee Comments
Attachment No. 2 3:35-3:50
3. Zoning Code Rewrite — Project Schedule
Review schedule change and provide direction to staff
Attachment No. 3 3:50-4:05
4. Traffic Signal Synchronization
Review information provided by staff
Attachment No. 4 4:05-4:45
5. Items for Future Agenda 4:45- 4:50
6. Public Comments on non -agenda items 4:50-5:00
file:///FI/Apps/WEBDATAAntemet/P1nAgendasIGPlmplementationCommittee/ag01-30-08.htm (1 of 2) [10/29/2008 9:27:38 AM]
Attachment 1
CITY OF NEWPORT BEACH
GENERAL PLAN/LCP IMPLEMENTAION
COMMITTEE
DRAFT ACTION MINUTES
Action Minutes of the General Plan/LCP Implementation Committee held at the City Council
Chambers, City of Newport Beach, on Wednesday, November 7, 2007
Members Present:
X
Ed Selich, Mayor Pro Tem, Chairman
E
Steve Rosansk , Ma or
X
Leslie Daigle, Council Member
X
Barry Eaton, Planning Commissioner
X
Robert Hawkins, Planning Commissioner
X
Michael Toerge, Planning Commissioner
Advisory Group Members Present:
Staff Renresentativesc
X Sharon Wood, Assistant Cif' Manager
X David Le o, Planning Director
Robin Clauson, City Attorney
X James Campbell, Senior Planner
GreggRamirez, Senior Planner
E = Excused Absence
Committee Actions
1. Agenda Item No. 1 —Approval of minutes
Action: Committee approved the draft minutes.
Vote: Consensus
Mark Cross
X
Larry Frapwell
William Guidero
Ian Harrison
X
Brion Jeannette
X
Don Krotee
X
Todd Schooler
Kevin Weeda
Dennis Wood
Staff Renresentativesc
X Sharon Wood, Assistant Cif' Manager
X David Le o, Planning Director
Robin Clauson, City Attorney
X James Campbell, Senior Planner
GreggRamirez, Senior Planner
E = Excused Absence
Committee Actions
1. Agenda Item No. 1 —Approval of minutes
Action: Committee approved the draft minutes.
Vote: Consensus
2. Agenda Item No. 2 - General Plan/LCP Implementation - Master Task List
Action: The Committee was provided an update on the status of several items
on the master task list.
Vote: none
3. Agenda Item No. 3 - Zoning Code Rewrite — Alley Encroachments
Action: After a discussion of residential alley encroachments into the required
setbacks was conducted, the Committee directed staff to work with the
technical advisory committee, Public Works and General Services to identify
new regulations that improve alley circulation of without significantly changing
permitted encroachment regulations.
Vote: Consensus
4. Agenda Item No. 4 - Residential Parking — Spaces based on number of rooms
or size?
Action: The Committee directed staff to study the issue further
Vote: Consensus
5. Agenda Item No. 5 - Housing Elem(
Action: The Committee was
Housing Element.
Vote: none
a
an update on the status of updating the
Attachment 2
GENERAL PLAN IMPLEMENTATION TASKS
Interim Zoning Resolution (including ability to require development
agreements)
Staff, January 9, 2007 - Complete
2. Procedures to implement single- and two-family design policies
Staff, March 27, 2007 - Complete
3. Zoning Code and Specific Plan rewrite
Consultant, with staff input and review, July 2008
4. CLUP amendment
Staff, Consultants
■ Planning Commission recommendation on clarification of policies
re: coastal bluff development, October 18, 2007
• City Council re -approval to correct notice will include clarification of
policies re: coastal bluff development, November 13, 2007
• City Council approval of contract with advocacy firm (D.B. Neish,
Inc.), November 13, 2007
5. Housing Element certification by HCD
EIP and staff, TBD
• Comments on re -submittal received from HCD September 10 ,2007
■ Revised RHNA approved by SCAG July 12, 2007
6. Park Dedication Fee (Quimby Act)
Staff, April 10, 2007- Complete
7. ED Strategic Plan
Staff, ADE and EDC, July 10, 2007 - Complete
8. Fair Share Fee update
Consultants, TBD
■ Staff approval of contract for nexus study( Revenue & Cost
Specialists LLC),, October 31 2007
Ne�srs
My" daft rev�ewed,Jditity 1622008
teXus sfuc>y,conrpletionebruar 2a0$
9. Airport Area infrastructure study and fee(s)
ROMA and Fair Share Consultant, TBD
01/25/2008
10. Inclusionary Housing Ordinance and In -lieu fee
Consultant
Affordable Housing Task Force review of updated fee study,
November 13, 2007
Committee review of fee study and draft ordinance, TBD
11. Parking Requirements and Management
Staff, EDC,
■ RFP Issued October 12, 2007
12. LCP Implementation Plan
Staff, concurrent withArailing Zoning Code rewrite
13. City Council Ordinance on development agreements
Staff, February 27, 2007 — Complete
14. Traffic signal
15. PC rewrite/revisions
Property owners for maior ones, their schedule
Staff or consultant for smaller ones, with Zoning rewrite or second phase,
TBD
16. Banning Ranch Pre -Annexation and Development Agreement
City Council, staff and property owners, TBD
17. Harbor Area Management Plan
Consultants, staff and Harbor Commission, September 2008
18. Run-off and Pollution Reduction Plan
Coastal/Bay Water Quality Committee and staff, ongoing
19. Database refinements and maintenance
Staff, refinements TBD, maintenance ongoing
20. Fiscal Impact Model training
ADE and staff, March 29, 2007- Complete
21.Traffic Phasing Ordinance revision re: NBTAM
Staff, July 24, 2007- Complete
01/25/2008
22. Measure S Guidelines revision re: variable FAR
Staff, TBD
Lower Priority
• Municipal Code amendments re: property maintenance standards
■ Building Code amendments re: green buildings
EQAC Energy Subcommittee
■ Amend City Council Policies on historic, archaeo and paleo resources
• Funding and priority program for construction of noise barriers along
arterials
01/25/2008
Attachment 3
CITY OF NEWPORT BEACH
MEMORANDUM
TO: General Plan/LCP Implementation Committee
FROM: Gregg Ramirez, Senior Planner
DATE: January 25, 2008
RE: Zoning Code — Project Schedule
Staff and the consultants continue to work on the code re -write. At this point staff is
nearing completion of the review of the draft code provided by the consultants. The draft
addresses most of the 32 items list, and some others. The schedule differs from the last
in that it includes a second administrative draft for the review by senior staff. This revised
schedule tentatively has the Committee/public review draft scheduled to be available on
May 2, 2008. Committee meetings on the draft would commence the following week on
May 7, 2008. At this point staff believes these dates represent a good approximation of a
project timeline but the complexity of many portions of the project such as the new
mixed-use zones, possible elimination of some of the Specific Plans, new regulations
required for the LCP Implementation Plan and setback map may necessitate further
adjustments at a later date. Staff will keep the committee apprised of the progress at the
regularly scheduled meetings.
REVISED ZONING CODE SCHEDULE
January 30, 2008
Staff completes first review of first draft of Code and IP,
and transmits comments to consultants February 1, 2008
Staff work with TAC
Consultants complete second draft March 14, 2008
Key staff (Clauson, Wood, Lepo, Ramirez, Campbell)
complete review of second draft, and transmit
comments to consultants April 11, 2008
Public Review Draft distributed to Committee and
Public May 2, 2008
Committee Review May 7-28, 2008
Consultants complete PC Draft June 27, 2008
Planning Commission hearings begin July 17, 2008
Attachment 4
DATE: January 25, 2008
TO: General Plan/LCP Implementation Committee
FROM: Antony Brine, City Traffic Engineer
SUBJECT: TRAFFIC SIGNAL COMMUNICATION MASTER PLAN
The Master Plan covers the long-term strategy for traffic signal communication
and infrastructure improvements.
There will be eight (8) phased projects associated with the completion of the
citywide traffic signal modernization project. New traffic signal control equipment
will be installed at all of the existing 112 signalized intersections in the city. We
are currently working on the first phase of the project, which includes the
installation of new signal controllers at 22 intersections along Coast Highway in
Corona del Mar, on MacArthur Boulevard, and on Avocado Avenue. The Phase 1
project also includes two new video cameras, installation of new fiber
communication lines, and the installation of a pedestrian traffic signal on Coast
Highway at Iris Avenue.
The existing traffic signal equipment was installed in the 1980's. This equipment
is outdated, and maintenance of this equipment is becoming cost prohibitive.
There are currently different traffic signal controller types (or models) used within
the city. When the city took over Coast Highway and MacArthur Boulevard from
the State, we inherited different types of control equipment. The different types of
equipment do not "communicate" with each other. When all of these projects are
complete, every signal in the city will have new equipment of the same type. This
will improve the coordination, and the operation of the traffic signals.
A copy of the Executive Summary of the Traffic Signal Communication Master
Plan is attached for your review.
8
a
EXECUTIVE SUMMARY
The City of Newport Beach initiated the Traffic Signal Communication Master Plan and Phase I
PS&E project that in part involved the development of the Traffic Signal Communications Master
Plan. The focus of the Traffic Signal Communications Master Plan was to develop a Master
Plan that meets the following goals:
1. Details a long-term communication and Intelligent Transportation Systems (ITS)
deployment strategy
2. Inventories the existing communication and transportation infrastructure to maximize
the use of existing resources when deploying future communication, traffic signal and
ITS deployments to maximize funding
3. Improves public safety and incident response times
4. Coordinates with City of Newport Beach Information Technology (IT) to address
communication hardware needs and requirements of the City's WAN
5. Provides the City with the tools to more efficiently and effectively manage the existing
transportation network
6. Provides communications operations and maintenance cost estimates
7. Develops detailed deployment cost estimates for the phased deployment of
communications and ITS strategies
8. Employs Systems Engineering Best Practices
9. Addresses requirement for Ethernet -based communications to support the traffic signal
system consisting of icons® central software and ASC/3 traffic signal controllers (NEMA
and 2070 based formats)
10. Details a transition plan from the VMS system to the icons® system for each phase of
the deployment
11. Supports the transmission of IP video and data from CCTV cameras
12. Addresses possible systems integration to support multi -jurisdictional coordination with
additional City departments including IT
13. Comply with and become part of the Regional ITS Architecture
14. Develop City standards for communication and ITS deployments
15. Address communication requirements for possible relocation of Newport Beach TMC, if
applicable
Three technical memorandums were completed to support the development of the Master Plan.
The first summarized the City's existing signal system and communications infrastructure. The
second highlighted the various alternatives that the City could choose to support future signal
system and communications expansion. The third provided specific recommendations for the
City to support the signal system and communication expansion goals and a deployment
strategy. Comments received on each of the three technical memorandums were used to
develop the City of Newport Beach's Traffic Signal Communications Master Plan.
The Master Plan is comprised of the following sections:
Section 1: Introductions: This section introduces the Traffic Sional Communication Master
Plan and Phase I PS&E project and the details of the Master Plan document.
Section 2: Existing Conditions: This section summarized the City's existing traffic signals
and operations systems. The section is divided into four main sections covering the existing
streets and highway network, traffic management system, communication system, and
operations maintenance.
Section 3: Stakeholder Identification & Coordination: This section discusses the major
stakeholders and partnering agencies for the Traffic Signal Communication Master Plan and
Phase I PS&E project. The partnering agencies are included in this report for future
coordination between agencies, for signal timing coordination, data sharing (i.e. CCTV
feeds), or future phase projects.
Section 4: ITS Strategies: This section discusses the numerous ITS strategies available to
the City to aid in improving transportation management in Newport Beach. This section
covers a wide array of ITS strategies to aid City staff in becoming more familiar with ITS.
Note that it is likely only some, not all, of the ITS strategies presented will be applicable to
Newport Beach.
Section 5: Needs Assessment & Solutions: This section discusses the specific needs of
the City based on the ITS deployment strategies. Based on the goals identified for the
project, this section determines the communication needs for the communications
infrastructure, transportation system management, traffic operations, ITS planning and
institutional opportunities, and level of service goals for traffic.
Section 6: Communications Analysis: This section discusses the communication needs
for the City based on existing conditions and the needs assessment and solutions presented
in the previous section. Based on the goals identified for the project, this section assesses
the various communication alternatives and recommendations.
Section 7: Deployment Strategies: This section provides a summary of the project
phases, including the phase limits and the number of intersections per phase. The section
also provides details for each phase including a list of intersections, limits of work,
communication upgrades, and devices to deploy.
Section 8: Proiect Costs: This section presents the cost estimates for each phase detailed
in Section 7.
Section 9: Traffic Management Center: This section presents various layouts that the City
can use as a guide for the future City Hall.
section 1o: gigabit Ethernet Backbone Communications: This section presents a
preliminary Gigabit Ethernet backbone network that could be implemented to provide a high -
bandwidth, redundant communications system for Newport Beach.
Section 11: Next Steps: This section presents a summary of this report and the
subsequent activities to finalize the Master Plan.
E 2 December
10
It
Deployment Strategy
The Master Plan provides an approach to deploy Ethernet -based communications, new traffic
signal controllers, and CCTV cameras by phase. For each phase, the Master Plan provides the
project limits, listing of signalized intersections, quantities of equipment (controllers, Ethernet
hardware, CCTV cameras), communication media (fiber, twisted pair, wireless), and
infrastructure (conduit, pull boxes) to install. Each phase also includes an itemized cost
estimate inclusive of design, construction, integration and signal timing costs, plus a escalation
factor corresponding to the number of years before a specific phase will be implemented. Upon
full deployment of the phases detailed in the Master Plan, all of the City's existing and future
signals, identified during the preparation of the Master Plan, will be supported by the City's
Ethernet -based communications system.
Gigabit Ethernet Communications System
The Master Plan details the deployment of an Ethernet -based communication system between
the signalized intersections (field elements) and the City -facilities listed below.
1. Central Library near Avocado Ave and 5. Fire Station 6 near Irvine Avenue and
Corporate Plaza Drive Westcliff Drive
2. NCCC near San Joaquin Hills Road and 6. General Services near Superior Avenue
Newport Coast Drive and 16`h Street
3. Police Department near Jamboree and 7. City hall near Newport Blvd. and 32nd
Santa Barbara Street
4. Fire Station 7 near Irvine Avenue and
University Drive
At each City -facility listed above, a high -bandwidth communication link will be implemented by
Newport Beach IT Department to the City Hall. At the time this report was written, the COX
Business Services agreement with the City established the following services for the City.
A DS3 (T3) communication link between City Hall and the Central Library offering 44 MB
of bandwidth.
Additional services to be provided with the agreement include a 10/1.7 Ethernet line
service (ELS) from the Police Department to City Hall. These communication links are
envisioned to replace the existing T1 connections.
The deployment of an Ethernet -based system supported by a DS3 leased line will provide the
City with a viable network and substantially more bandwidth that was offered by the T1 leased
lines, especially in the short term in support of the Phase 1 and Phase 2 projects. But it does
not provide much growth potential and limits traffic bandwidth availability over the long term as
the City expands into Phase 3 and beyond.
The Master Plan provides a long-term vision to deploy a Gigabit Ethernet communications
system to address the long-term needs for both Traffic and IT departments of Newport Beach.
The proposed Gigabit Ethernet network configuration could include both primary and secondary
Gigabit Ethernet microwave communication links. These links would provide redundant
communications between the Gigabit Ethernet fiber backbone and City Hall, via two field
connections to the fiber backbone. For the purposes of this discussion, the field Gigabit
Ethernet microwave links would be located at Central Library and Fire Station 7. The two
E3
0
It
4
wireless network paths, along with the deployment of fiber optic cable between the Central
Library and Fire Station 7, represents a redundant configuration of the fiber backbone to
achieve a 1 Gigabit wireless backbone to City Hall.
Master Plan
The City's existing traffic signal central system, the VMS -330, supports nearly half of the City's
signalized intersections. The remaining intersections communicate at the local level through
field masters. With the Traffic Signal Communications Master Plan and Phase I PS&E project,
Citywide upgrades of the existing traffic signal central system and the traffic signal controllers
have been initiated. This includes the following:
• Replacement of the existing VMS -330 system with an icons® system, by Econolite
IR
• Replacement of the existing traffic signal controllers with new controllers compatible with
icons®
• Deployment of new Ethernet -based communications
• Deployment of video surveillance system to monitor traffic operations
• Deployment of a temporary TMC at the existing City Hall and possible layouts for an
upgraded TMC at the new City Hall
Citywide improvements have been broken down into eight phases. Intersections were grouped
based on geographic locations and intersection similarities. Phases were prioritized based on
volumes and incident frequency rates provided by the City and discussed in the previous
sections. The limits of work and various improvements per phase are detailed in the subsequent
subsections.
Projects corresponding with each phase may include communications upgrades, traffic signal
14 controllers upgrades, CCN cameras and other ITS device deployments. Other proposed
improvements may include the installation of GPS clocks for synchronization purposes or the
retention of the phone drops at isolated locations, if no other cost-effective means of
It communications can be achieved. The proposed project phases and associated limits are
summarized below. The range of costs is based on the option to deploy a combination of
primary CCTV camera locations and optional secondary CCTV camera locations.
PHASE 1: 21 intersections at cost of $587,000 (excludes cost of icons®and TMC)
• Coast Hwy from Jamboree Rd to Newport Coast Dr
• Avocado Ave/ San Miguel Dr/ MacArthur Blvd from Coast Hwy to San Joaquin Hills Rd
• San Joaquin Hills Rd from MacArthur Blvd to San Miguel Dr
PHASE 2: 14 intersections at cost of $435,404 to $480,745
•Jamboree Rd from Coast Hwy to MacArthur Blvd
• Bison Ave from Jamboree Rd to MacArthur Blvd
PHASE 3: 20 intersections at cost of $696,554 to $711,554
• MacArthur Blvd from Jamboree Rd to Campus Dr
• Irvine Ave/ Campus Dr from Santa Isabel Ave to MacArthur Blvd
• Mesa Dr/ Birch St from Irvine Ave to Von Karman Ave
• Bristol St North
• Bristol St South
• Bayview PI / Bayview Cir
PHASE 4: 13 intersections at cost of $594,854 to $639,854
E4
14
4
IR
IR
• Superior Ave from Coast Hwy to Industrial Way
• Placentia Ave from Hospital Rd to 15`h St
• Irvine Ave from 17'h St / Westcliff Dr to Santiago Dr
• Dover Dr from Cliff Dr to Westcliff Dr
PHASE 5: 14 intersections at cost of $378,194 to $438,194
• Newport Center Dr from Coast Hwy to Newport Center Dr East/West
• Newport Center Dr East from Newport Center Dr to Newport Center Dr West
• Newport Center Dr West from Newport Center Dr to Newport Center Dr East
• Santa Barbara Dr from Jamboree Rd to Newport Center Dr West
• San Clemente Dr from San Joaquin Hills Rd to Newport Center Dr West
• San Joaquin Hills Rd from Jamboree. Rd to MacArthur Blvd
• San Joaquin Hills Rd from San Miguel Dr to Spyglass Hill Rd
PHASE 6: 13 intersections at cost of $637,266 to $682,266
• San Joaquin Hills Rd from Spyglass Hill Rd to Newport Coast Dr
• Newport Coast Dr from Sage Hill School to Coast Hwy
• Ridge Park Rd from San Joaquin Hills Rd to Newport Coast Dr
• Pelican Hill Rd South from Resort Entrance to Newport Coast Dr
PHASE 7: 10 intersections at cost of $237,741 to $297,741
• Balboa Blvd from Coast Hwy to Newport Blvd
• Newport Blvd from Finley Ave to Main St
PHASE 8: 10 intersections at cost of $803,257 to $833,257
• University Dr at La Vida — Baypoint Dr
• Ford Rd/ Bonita Canyon Dr from Jamboree Rd to Chambord
• San Miguel Dr from San Joaquin Hills Rd to Ford Rd
• Jamboree Rd/ Marine Ave at Bayside Dr
Future Newport Beach TMC
The Master Plan also provides a discussion on the needs for the planned Newport Beach Traffic
Management Center once the new Newport Beach City Hall is constructed. The details of the
new TMC are general and aim to provide the City with general criteria for the size and layout of
the TMC based on the City's anticipated needs. Once more information is provided as to the
area in the new City Hall allocated for the TMC, a specific floor plan can be developed.
E5
December2007