Loading...
HomeMy WebLinkAbout2014-02-04_8_Mtg 11 pres�,hHri tK -) Lana use tiemew Land Use Element Amendment Advisory Committee Meeting 11 February 4, 2014 Intersection Deficiencies GOSTrA MESA LEGEND:_ 0 = GENERAL PLAN BASELINE DEFICIENCY WITH EXISTING LANES l/ = GENERAL PLAN BASELINE DEFICIENCY WITH GENERAL PLAN LANES O= PROJECT IMPACTED INTERSECTION WITH EXISTING LANES = PROJECT IMPACTED INTERSECTION WITH GENERAL PLAN LANES TUSTIN IRVINE Deficient Intersection Summary INTERSECTION NS W' 2006 GENERAL PLAN GENERAL PLAN BASELINE GENERAL PLAN PROJECT EXISTING LANES% GP LANES EXISTING LANES GP LANES EXISTING LANES GP LANES AM PM AM PM AM PM AM PM AM PM AM PM . Superior Av. & Coast Hw. D C D C F C F C C F C . Riverside Av. & Coast Hw. E E C D F D C D E D C D . MacArthur BI. & Campus Dr. C F C D D E A B E E B B 11. Von Karman Av. & Campus Dr. C E B D C D B C C D B C 13. Jamboree Rd. & Campus Dr. E F D D C F C D C F C D 14. Jamboree Rd. & Birch SL E D D C A A A A B B A A 15. Campus Dr. & Bristol St. (N) E F C D B A C B A C 19. Irvine Av. & Mesa Dr. F F C D A B A 8 A B A B 0. Irvine Av. & University Dr. F F C C C A C C A C 9. MacArthur BI. & Jamboree Rd. E E 0 0 B 0 B 0 C D B D 2. Jamboree Rd. & Bristol St. S. E D ❑ C C B C B D B C B 9. MacArthur BI. & Ford Rd. /Bonita Canyon Dr. C E C 0 C C D C lE C D 0. MacArthur BL & San Joaquin Hills Rd. O F B ❑ B D A B B D A B 3. SR -73 NB Ramps & Bonita Cy,. Dr. F C D B G B C B B A B A ]. Goldenrod Av. & Coast Hw. E B E B C D C ❑ D D D D 9.MaMuerite Av. &Coast Hw. E E E E C C C C D C D C 6. Newport Blvd (W) & Coast Hw. D C D C 'F D F D nnrD D In addition to the deficient intersections mentioned above, 7 intersections with existing lanes and 2 with GP lanes in the City of Irvine experience deficient operations. =Since 2006, additional lanes at several intersections have been constructed, resulting acceptable Level of Service (LOS). Newport @ Hospital, MacArthur @ Jamboree, Jamboree @ Bristol St. South. Traffic Volume Trends ■ General Plan Project changes result in the redistribution of peak hour directional traffic movements that generally do not degrade roadway system performance. ■ Introducing Residential into mostly Business area causes redistribution of travel patterns. This results in decreases on some movements. Calculated LOS would not necessarily increase. ■ Residential trips: primarily outbound AM, inbound PM ■ Office trips: primarily inbound AM, outbound PM ■ Completion of previously recommended intersection improvements (2006 General Plan) leaves only two deficient intersections in Newport Beach (with /without proposed General Plan Land Use Element Amendment): • Superior Avenue @ Coast Highway • Newport Boulevard (West) @ Coast Highway h Traffic Volume Trends Example 441 opF F .. _ �0440 �y 54 k23 --sw LEGEND: 100 = AM PEAK HOUR BASELINE 100 = AM PEAK HOUR PROJECT 100 = AM PEAK HOUR CHANGE Public Comments ■ Adjourn to April 1, 2014 at 3:30 pm