HomeMy WebLinkAbout2.0 - Harbor Day School - PA2013-212CITY OF NEWPORT BEACH
PLANNING COMMISSION STAFF REPORT
April 3, 2014 Meeting
Agenda Item 2
SUBJECT: Harbor Day School - (PA2013 -212)
3300 & 3443 Pacific View Drive
Conditional Use Permit No. UP2013 -024
APPLICANT: BKF Engineers on behalf of Harbor Day School
PLANNER: Rosalinh Ung, Associate Planner
(949) 644 -3208, rung @newportbeachca.gov
PROJECT SUMMARY
A Use Permit to allow Harbor Day School (HDS) to increase the school enrollment by
72 students, from 408 to 480; make improvements to the school's existing parking lot;
and improve a portion of the Big Canyon Revervoir site located at 3300 Pacific View
Drive for use as an off -site parking lot for traffic queuing and special event parking.
There is no increase in building square footage proposed and the additional students
will be accommodated within the existing school campus.
Applicable conditions of approval from Use Permit No. 1546 and its previous
amendments will be carried forward and included in the attached draft resolution for
approval; and Use Permit No. 2013 -024 will supersede the previous approvals.
RECOMMENDATION
1) Conduct a public hearing; and
2) Adopt Resolution No. _ approving Conditional Use Permit No. UP2013 -024
(Attachment No. PC 1).
1
Harbor Day School
April 3, 2014
Page 2
LOCATION
VICINITY MAP
ZONING
CURRENT USE
ON -SITE
PI 0.35 FAR
PI 0.35 FAR
Private School
NORTH
HDS's Proposed Off -Site
PF
City's Reservoir
Parking Lot (Existing Contractor
New Contractor Yard
Yard)
Single-unit residential dwellin s
EAST
PI
/
Pacific View Memorial Park
WEST
RM -20 DU /AC
RM
Multiple - family residential
development
/
HDS's Parkinq Lot
'
jll
Subject Property
I
^
AdUWL_.*A
LI
?"ti a
f
GENERAL PLAN
ZONING
P,
LOCATION
GENERAL PLAN
ZONING
CURRENT USE
ON -SITE
PI 0.35 FAR
PI 0.35 FAR
Private School
NORTH
PF
PF
City's Reservoir
SOUTH
RS -D
R -1 -6,000
Single-unit residential dwellin s
EAST
PI
PI
Pacific View Memorial Park
WEST
RM -20 DU /AC
RM
Multiple - family residential
development
2
Harbor Day School
April 3, 2014
Page 3
Project Setting
HDS is located on the south side of Pacific View Drive and west of Marguerite Avenue
and is surrounded by the Big Canyon Reservoir to the north, Pacific View Memorial
Park to the east, single - family residences to the south across San Joaquin Hills Road,
and the Bayview Apartments to the west. It is approximately six (6) acres in size and is
currently improved with a private school with multiple buildings, playgrounds, a track
field, and a parking lot located to the front of the property.
The proposed off -site parking lot is currently improved with a contractor yard at the Big
Canyon Reservoir.
Project Description
HDS is proposing to increase the school enrollment by 72 students, from 408 to 480
with no physical improvement or expansion to the existing school campus, or additional
faculty proposed.
HDS also proposes to make changes to the school's drop -off and pick -up activities by
making improvements to the school's existing parking lot and using a portion of the
City's reservoir site located on the north side of Pacific View Drive for traffic queuing
during the school's normal hours. The new queuing lot will also be used for special
event parking during after school hours and on weekends.
The proposed increase in school enrollment and the addition of an off -site parking lot
require an amendment to Use Permit No. 1546, pursuant to Section 20.54.070.0
(Changes Approved by Original Review Authority) of the Zoning Code. A use permit is
also required for the proposed off -site parking lot, pursuant to City Zoning Code Section
20.40.100 (Off -Site Parking).
Improvements to School's Parking Lot
The existing parking lot is designed with a pick -up and drop -off pattern consisting of a
right turn into the parking lot at the westerly driveway, and a left turn exiting at the
easterly driveway onto Pacific View Drive. The physical improvements to the school
parking lot would be restriping the parking lot, modifying existing landscape areas,
reconstructing the existing walkway, and relocating the existing free - standing sign to a
nearby location. In addition to the proposed improvements, the existing parking lot will
be re- oriented to provide a one -way traffic flow pattern where vehicles will be entering at
the easterly driveway and exiting at the westerly driveway. The drive aisle will be
widened to allow for a three -lane pick -up and drop -off configuration. This proposed
arrangement will allow approximately 24 vehicles to queue up in the on -site parking lot
while maintaining the required 36 parking spaces for full -time faculty.
3
Harbor Day School
April 3, 2014
Page 4
Improvements to City's Reservoir Site
If the City approves a proposed lease agreement with HDS, HDS proposes to convert
an existing contractor yard at the Big Canyon Reservoir to an off -site parking lot and
vehicle queuing area. The 30,100- square -foot area proposed to be leased to HDS will
be designed to accommodate up to 68 vehicles for queuing and 60 spaces for special
event parking. HDS will be responsible for all costs associated with the improvements
made to the City's property including the relocation of the existing City's contractor yard
to an area immediately east of the current site on the City's reservoir site. HDS will also
be responsible for the maintenance and upkeep of the off -site parking lot. No overnight
parking will be allowed. The improvements to the proposed leased area and new
contractor yard would include a new driveway approach, access gates and security
walls; removal and replacement of landscaping and trees; relocation of an existing fire
hydrant and installation of necessary utilities, storm water runoff and treatment facilities.
No new lighting is proposed on the off -site parking lot as there is sufficient lighting
provided from the street light poles along Pacific View Drive.
A condition precedent to development on the City's reservoir property will be the
approval of a lease between the City and HDS.
Background
Harbor Day School is a private school with classes from kindergarten to 8th grade and
was established in 1971 by Use Permit No. 1546. Since that time, several amendments
were made to allow the expansion of the facility. The latest amendment was approved
in 1999 and included a General Plan Amendment to increase the development limit
from 0.30 to 0.35 floor area ratio (FAR), or from 85,646 to 99,708 square feet. The
amendment has also allowed the construction of a 12,750- square -foot gymnasium. A
list of Use Permit amendments and all conditions of approval for the existing facility is
attached as Attachment No. PC 2.
A proposed increase in development limit for the school's future expansion is currently
under consideration as part of an amendment to the Land Use Element of the City's
General Plan. The amendment process does not entitle the school to these expansions,
as additional discretionary permits would be required.
DISCUSSION
Analysis
General Plan
The HDS property has the General Plan Land Use designation of PI (Private
Institutions) which allows privately -owned facilities that serve the public, including
4
Harbor Day School
April 3, 2014
Page 5
places for religious assembly, private schools, health care, cultural institutions,
museums, yacht clubs, congregate homes, and comparable facilities. The HDS property
has an FAR of 0.35. The proposed use permit amendment is consistent with the
General Plan Land Use designation in that the proposed project will not change the
development limit as it does not include new construction or introducing a new use to
the subject property.
The proposed off -site parking lot to be developed on the City's property has the General
Plan Land Use designation of PF (Public Facilities) which is intended to provide public
facilities, including public schools, cultural institutions, government facilities, community
centers, public hospitals and public facilities. The proposed off -site parking lot is
consistent with the General Plan Land Use designation in that it is an ancillary use to
the existing City's reservoir.
Zoning Code
The HDS property is zoned PI (Private Institutions) with an FAR of 0.35 which allowed
private schools with the approval of a use permit. As mentioned above, Use Permit No.
1546 has been approved and amended several times throughout the years in order to
accommodate the operation and physical expansion of the facility. Most recently, the
1999 Amendment served to accommodate the development of a new gymnasium and
contains a condition limiting the number of enrolled students to 408 (Condition #3),
which HDS is now seeking to amend.
The proposed off -site parking area is owned by the City and is located on part of the Big
Canyon Reservoir property and zoned PF (Public Facility), which allows public facilities.
The proposed off -site parking lot is an ancillary use to the City's reservoir; however, a
Use Permit is required for HDS's use of the City property, pursuant to City Zoning Code
Section 20.40.100 (Off -Site Parking).
Concerns raised during prior amendments to Use Permit No. 1546 were the parking
demand generated by the school, traffic circulation, especially student drop -off and pick-
up arrangements, and student population. To mitigate these concerns, previous
amendments included conditions requiring one parking space for each full -time
employee, limited student enrollment, and required faculty to direct morning and
afternoon pick -up and drop -off activities.
Implementation of these requirements has been effective in controlling traffic issues
during pick -up and drop -off times. To our knowledge, there have been no recent
complaints or problems with regard to the current circulation, traffic or parking; however,
Pacific View Drive is heavily used and is very active during the morning drop -off and
afternoon pick -up of students.
0
Harbor Day School
April 3, 2014
Page 6
Increase in Student Enrollment and Parkina Demand
With regard to the proposed increase in student enrollment, HDS states that the existing
school facility has the physical classroom capacity to absorb the proposed increase of
72 students. The Zoning Code does not provide a parking requirement for school uses,
but requires the parking requirement to be established through the use permit
procedure. Previous amendments to Use Permit No. 1546 have required parking based
on the number of full -time employees serving the school, since the facility serves only
non - driving age students, from kindergarten to 8th grade. The school's parking lot
currently has 36 parking spaces. Since current amendment does not include an
increase in the faculty /employees, the faculty parking demand will not change.
Traffic Circulation Improvements and Off -Site Parking
The current pick -up /drop -off activity is being conducted in the school's existing parking
lot with school staff assisting in directing traffic during the peak times. Additionally, HDS
has a morning drop -off and afternoon pick -up area located at the back of the school
campus, on San Joaquin Hills Road, pursuant to an encroachment agreement approved
by the City Council in 1993. HDS expressed a desire to keep this arrangement for
convenience and necessary purposes.
To facilitate the afternoon traffic flow, which tends to be the most intense, and to
accommodate the proposed increase in enrollment, HDS is proposing a new queuing
arrangement which consists of four -lane vehicle stacking at the off -site parking lot with
staff members stationed at strategic locations to direct vehicles to enter into the school's
parking lot in a three -lane configuration for student pick -up. This arrangement will
eliminate vehicles queuing on Pacific View Drive. Currently, HDS has 12 staff members
opening doors and directing traffic on the HDS property. HDS is proposing to have 16
staff members direct traffic on both the HDS and City properties. No traffic control will
be allowed on Pacific View Drive. The City Traffic Engineer has reviewed and is
supportive of the proposed traffic queuing arrangement on the off -site parking lot and
school parking lot (Attachment No. PC 3).
HDS currently utilizes the Saint Michael's Church and United Methodist Church parking
lots for special event parking and HDS indicates that this existing arrangement will
remain in place. The proposed off -site parking area will provide 60 additional parking
spaces for special events and the off -site parking will not be used for routine HDS
parking or for parking of other potential uses.
Contractor Yard Relocation
The existing contractor yard on the City's property will be relocated to the east, at the
end of Pacific View Drive. A new security wall, gate, and drive approach will be
installed. Tree and landscape replacement and installation of necessary utilities and
0
Harbor Day School
April 3, 2014
Page 7
storm water runoff and treatment facilities are also proposed. No conflict is anticipated
between HDS's use and the City's use and operation of the reservoir property.
Summary
Staff believes that the findings necessary for project approval included in the Draft
Resolution and the project implementation as described will be adequately controlled
through the conditions of approval stated in the Use Permit.
The Use Permit application does not include the introduction of uses inconsistent with
the land use designation of the site. The increase in the school enrollment would not
result in additional parking demand for school faculty; however, the number of pick -ups
and drop -offs would increase. With the improvements to the school's existing parking lot
and utilization of the City's reservoir site as an off -site parking lot for traffic queuing and
special event parking, staff believes the additional vehicles due to the increase
enrollment will be accommodated and the existing queuing issues will be improved.
As a condition of approval, HDS will have to negotiate a lease agreement between the
City and HDS. Such an agreement is currently being negotiated and will require City
Council review and approval.
In recommending approval of this application, staff recommends that the conditions of
approval from Use Permit No. 1546, as amended, be consolidated so that the
applicable and relevant conditions are carried forward and incorporated into the Draft
Resolution. As recommended by staff, Use Permit No. 2013 -024 will supersede Use
Permit No. 1546 and all prior approvals.
Environmental Review
The project is categorically exempt under Sections 15311 — Class 11 (Accessory
Structures) and 15314 - Class 14 (Minor Additions to Schools), of the State CEQA
(California Environmental Quality Act) Guidelines.
Class 11 consists of construction, or replacement of minor structures accessory to
commercial, industrial, or institutional facilities, including small parking lots. The
proposed off -site parking lot and improvements made to the school's existing parking lot
have been appropriately considered under this CEQA Class Exemption.
Class 14 consists of minor additions to schools within existing school grounds where the
addition does not increase original student capacity by more than 25% or ten
classrooms, whichever is less. The proposed increase in student enrollment would
qualify for this CEQA Exemption as HDS is requesting a cumulative increase of 22% in
student enrollment and no additional classrooms.
rW,
Harbor Day School
April 3, 2014
Page 8
Public Notice
Notice of this application was published in the Daily Pilot, mailed to all owners of
property within 300 feet of the boundaries of the school property and Big Canyon
Reservoir site (excluding intervening rights -of -way and waterways) and posted on the
subject property at least 10 days before the scheduled meeting, consistent with the
provisions of the Municipal Code. Additionally, the item appeared on the agenda for this
meeting, which was posted at City Hall and on the City website.
Prepared by: Submitted by:
(/;A"] rn-�Xw
o allnh Ung r n a Vvisnesifi, rlCP, Deputy Director
As ociate Planner
ATTACHMENTS
PC 1 Draft Resolution with Findings and Conditions
PC 2 Entitlement History and Conditions of Approval
PC 3 Carpool Proposal
PC 4 Project Plans
: 10/15/13
N
Attachment No. PC 1
Draft Resolution
I
INTENTIONALLY BLANK PAGE
10
RESOLUTION NO. ## ##
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF NEWPORT BEACH APPROVING CONDITIONAL USE
PERMIT NO. UP2013 -024 FOR HARBOR DAY SCHOOL
LOCATED AT 3443 PACIFIC VIEW DRIVE (PA2013 -212)
THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. An application was filed by Harbor Day School (HDS), with respect to property located at
3300 and 3443 Pacific View Drive, requesting approval of a Use Permit.
2. The applicant proposes to increase the school enrollment by 72 students, from 408 to
480; make improvements to the school's existing parking lot; and improve a portion of
the Big Canyon Reservoir located at 3300 Pacific View Drive for use as an off -site
parking lot for traffic queuing and special event parking. There is no increase in
building square footage proposed and the additional students will be accommodated
within the existing facility.
3. The school property is located within the PI (Private Institutions) Zoning District with a
floor area ratio (FAR) of 0.35 and the General Plan Land Use Element category is PI
(Private Institutions).
4. The proposed off -site parking lot at the Big Canyon Reservoir is located within the PF
(Public Facilities) Zoning District and the General Plan Land Use Element category is PF
(Public Facilities).
5. The subject properties are not located within the coastal zone.
6. A public hearing was held on April 3, 2014, in the Council Chambers at 100 Civic Center
Drive, Newport Beach. A notice of time, place and purpose of the meeting was given in
accordance with the Newport Beach Municipal Code. Evidence, both written and oral,
was presented to, and considered by, the Planning Commission at this meeting.
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
1. The project is categorically exempt under Sections 15311 — Class 11 (Accessory
Structures) and 15314 - Class 14 (Minor Additions to Schools), of the State CEQA
(California Environmental Quality Act) Guidelines.
a. Class 11 consists of construction, or replacement of minor structures accessory
to commercial, industrial, or institutional facilities, including small parking lots.
The proposed off -site parking lot and improvements made to the school's
existing parking lot have been appropriately considered under this CEQA Class
Exemption.
11
Planning Commission Resolution No. ####
Page 2 of 10
b. Class 14 consists of minor additions to schools within existing school grounds
where the addition does not increase original student capacity by more than
25% or ten classrooms, whichever is less. The proposed increase in student
enrollment would qualify for this CEQA Exemption as HDS is requesting a
cumulative increase of 22% in student enrollment and no additional classrooms.
SECTION 3. REQUIRED FINDINGS.
In accordance with Section 20.52.020.E of the Newport Beach Municipal Code, the following
findings and facts in support of the findings for a use permit are set forth:
Finding:
A. The use is consistent with the General Plan and any applicable specific plan.
Facts in Support of Finding:
1. The HDS property has the General Plan Land Use designation of PI (Private
Institutions) which allows privately -owned facilities that serve the public, including
places for religious assembly, private schools, health care, cultural institutions,
museums, yacht clubs, congregate homes, and comparable facilities. The HDS
property has an FAR of 0.35. The proposed use permit amendment is consistent with
the General Plan Land Use designation in that the proposed project will not change
the development limit as it does not include new construction or introducing a new use
to the subject property.
2. The proposed off -site parking lot to be developed on the City's property has the
General Plan Land Use designation of PF (Public Facilities) which is intended to
provide public facilities, including public schools, cultural institutions, government
facilities, community centers, public hospitals and public facilities. The proposed off -
site parking lot is consistent with the General Plan Land Use designation in that it is an
ancillary use to the existing City's reservoir.
3. The proposed improvements to the school's parking lot and the off -site parking are
ancillary and in support of the existing private school. There is no impact to the
existing use of the subject property or the City's Reservoir site as a result of the
proposed increase in the school enrollment.
Finding:
B. The use is allowed within the applicable zoning district and complies with all other applicable
provisions of this Zoning Code and the Municipal Code.
10 -15 -2013
12
Planning Commission Resolution No. ####
Paqe 3 of 10
Facts in Support of Finding:
1. The HDS property is zoned PI (Private Institutions) with an FAR of 0.35 which allows
private schools with the approval of a use permit. HDS is a private school with classes
from kindergarten to 8th grade and was established in 1971 by Use Permit No. 1546,
which has been amended several times throughout the years in order to accommodate
the operation and physical expansion of the facility. Most recently, the 1999
Amendment served to accommodate the development of a new gymnasium and
contains a condition limiting the number of enrolled students to 408, which HDS is now
seeking to increase.
2. The proposed off -site parking area is owned by the City and is located on part of the
Big Canyon Reservoir property and zoned PF (Public Facility), which allows public
facilities. The proposed off -site parking lot is an ancillary use to the City's reservoir;
however, a Use Permit is required for HDS's use of the City property, pursuant to City
Zoning Code Section 20.40.100 (Off -Site Parking).
3. According to the applicant, the existing school facility has the physical classroom
capacity to absorb the proposed increase of 78 students. The Zoning Code does not
provide a parking requirement for school uses, but requires the parking requirement to
be established through the use permit procedure. The previous amendments to Use
Permit No. 1546 have required parking based on the number of full -time employees
serving the school, since the facility serves only non - driving age students, from
kindergarten to 8th grade. The existing school's parking lot currently has 36 parking
spaces and a condition of approval reflects this number. The faculty parking demand
will not be increased or there would be additional parking required for the increased
number of non - driving age students.
Finding:
C. The design, location, size, and operating characteristics of the use are compatible with the
allowed uses in the vicinity.
Facts in Support of Findinq:
1. The proposed improvements to the existing school's parking lot and the addition of the
off -site parking lot to be used for traffic queuing and special event parking would result
in an improvement to the existing daily pick -up and drop -up activities associated with
the school and would improve rather than cause additional undue traffic impacts to the
local street system.
2. The proposed design and improvements to the school's parking lot and off - street
parking lot have been reviewed and approved by the Public Works and Municipal
Operations Departments to ensure that they would be functional and compatible with
the existing uses in the vicinity.
10 -15 -2013
2�
Planning Commission Resolution No. ####
Paqe 4 of 10
3. The proposed off -site parking lot does not abut sensitive uses and is designed to
accommodate additional vehicles attributable to the increased enrollment as well as
alleviate existing congestion on Pacific View Drive experienced under current
operations.
4. The existing contractor yard located at 3300 Pacific View Drive will be relocated to the
east of the existing site, at the end of Pacific View Drive. A new security wall, gate, and
drive approach will be installed. Tree and landscape replacement and installation of
necessary utilities, and storm water runoff and treatment facilities are also included in
this project. No conflict is anticipated between the existing school parking lot and the
proposed use of the reservoir property for traffic queuing and parking purposes.
Finding:
D. The site is physically suitable in terms of design, location, shape, size, operating
characteristics, and the provision of public and emergency vehicle (e.g., fire and medical)
access and public services and utilities.
Facts in Support of Finding:
1. HDS is a private school that was established in 1971 by Use Permit No. 1546. Since
that time, several amendments were made to accommodate the operation and
physical expansion of the facility. The proposed improvements to the existing school's
parking lot and the off -site parking lot have been reviewed by the Fire and Municipal
Operations Department to ensure adequate access for public and emergency vehicles.
Access to the City's reservoir will be maintained and accessible to City staff at all times.
Additionally, the City Traffic Engineer has reviewed and is supportive of the proposed
traffic queuing arrangement of the off -site parking lot and school parking lot. With the
proposed conditions of approval, no conflicts in traffic circulation or queuing problems are
anticipated and the current locations and design of the driveways can accommodate the
increased vehicle movements.
In accordance with Section 20.40.100.13 of the Newport Beach Municipal Code, the following
findings and facts in support of the findings for a use permit for an off -site parking lot are set
forth:
Finding:
A. The parking facility is located within a convenient distance to the use it is intended to serve.
Facts in Support of Finding:
1. The proposed off -site parking lot is located on the north side of Pacific View Drive,
immediately across from the school campus, and conveniently accessible to the
school. The proposed design and improvements to the off - street parking lot have been
reviewed and approved by the Public Works and Municipal Operations Departments to
10 -15 -2013
14
Planning Commission Resolution No. ####
Paqe 5 of 10
ensure that they would be functional and readily accessible for the queuing of vehicles
during the drop -off and pick -up times and parking for special events.
Finding:
B. On- street parking is not being counted towards meeting parking requirements.
Facts in Support of Finding:
1. On- street parking along Pacific View Drive is not being counted towards meeting
parking requirements for the existing school and the school's parking lot currently has
36 parking spaces as required by Use Permit No. 1546 and its previous amendments.
Finding:
C. Use of the parking facility will not create undue traffic hazards or impacts in the
surrounding area.
Facts in Support of Finding:
1. The off -site parking lot will be used as a vehicle queuing area in order to facilitate the
afternoon traffic flow, which tends to be the most intense, and to accommodate the
proposed increase in enrollment. The new queuing arrangement consists of four -lane
vehicle stacking with staff members stationed at strategic locations to direct vehicles to
enter into the school's parking lot in a three -lane configuration for student pick -up. This
arrangement will eliminate vehicles queuing on Pacific View Drive and thereby will not
create undue traffic hazards or impacts in the immediate area. The City Traffic
Engineer has reviewed and is supportive of the proposed traffic queuing arrangement
on the off -site parking lot.
Finding:
D. The parking facility will be permanently available, marked, and maintained for the use it is
intended to serve.
Facts in Support of Finding:
1. HDS is negotiating with the City for the use of a portion of Big Canyon Reservoir for
traffic queuing and special event parking. The 30,100— square -foot area proposed by
HDS for lease will be designed to accommodate up to 68 vehicles for queuing and 60
spaces for special event parking. HDS will be responsible for all costs associated with
the improvements made to the City's property. HDS will also responsible for the
maintenance and upkeep of the off -site parking lot.
10 -15 -2013
2J�
Planning Commission Resolution No. # # ##
Paqe 6 of 10
NOW, THEREFORE, BE IT RESOLVED:
1. The Planning Commission of the City of Newport Beach hereby approves UP2013 -024,
subject to the conditions set forth in Exhibit A, which is attached hereto and incorporated
by reference.
2. This resolution supersedes Use Permit No. 1546 and its amendments, which upon
vesting of the rights authorized by Use Permit No. 2013 -024, shall become null and
void.
3. This action shall become final and effective 14 days after the adoption of this
Resolution unless within such time an appeal is filed with the City Clerk in accordance
with the provisions of Title 20 (Planning and Zoning), of the Newport Beach Municipal
Code.
PASSED, APPROVED AND ADOPTED THIS 3rd DAY OF APRIL, 2014.
AYES:
NOES:
ABSTAIN:
ABSENT:
BY:
Bradley Hillgren, Chairman
Kory Kramer, Secretary
10 -15 -2013
10
Planning Commission Resolution No. ####
Paqe 7 of 10
EXHIBIT "A"
CONDITIONS OF APPROVAL
PLANNING
The development shall be in substantial conformance with the approved site plan,
stamped and dated with the date of this approval. (Except as modified by applicable
conditions of approval.)
2. The project is subject to all applicable City ordinances, policies, and standards, unless
specifically waived or modified by the conditions of approval.
3. Harbor Day School shall comply with all federal, state, and local laws. Material
violation of any of those laws in connection with the use may be cause for revocation
of this Use Permit.
4. This Use Permit may be modified or revoked by the Planning Commission should they
determine that the proposed uses or conditions under which it is being operated or
maintained is detrimental to the public health, welfare or materially injurious to property
or improvements in the vicinity or if the property is operated or maintained so as to
constitute a public nuisance.
5. Any change in operational characteristics, expansion in area, or other modification to
the approved plans, shall require an amendment to this Use Permit or the processing
of a new Use Permit.
6. A copy of the Resolution, including conditions of approval (Exhibit "A ") shall be
incorporated into the Building Division and field sets of plans prior to issuance of the
building permits.
7. Prior to the issuance of a building permit, the applicant shall pay any unpaid
administrative costs associated with the processing of this application to the Planning
Division.
8. Should the property be sold or otherwise come under different ownership, any future
owners or assignees shall be notified of the conditions of this approval by either the
current business owner, property owner or the leasing agent.
9. Construction activities shall comply with Section 10.28.040 of the Newport Beach
Municipal Code, which restricts hours of noise - generating construction activities to
between the hours of 7:00 a.m. and 6:30 p.m., Monday through Friday and 8:00 a.m.
and 6:00 p.m. on Saturday. Noise - generating construction activities are not allowed on
Sundays or Holidays.
10. A Special Events Permit is required for any event or promotional activity outside the
normal operational characteristics of the approved use, as conditioned, or that would
10 -15 -2013
17
Planning Commission Resolution No. ####
Paqe 8 of 10
attract large crowds or any other activities as specified in the Newport Beach Municipal
Code to require such permits.
11. To the fullest extent permitted by law, applicant shall indemnify, defend and hold
harmless City, its City Council, its boards and commissions, officials, officers, employees,
and agents from and against any and all claims, demands, obligations, damages,
actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and
expenses (including without limitation, attorney's fees, disbursements and court costs) of
every kind and nature whatsoever which may arise from or in any manner relate (directly
or indirectly) to City's approval of the Harbor Day School application including, but not
limited to, Use Permit No. 2013 -024. This indemnification shall include, but not be limited
to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other
expenses incurred in connection with such claim, action, causes of action, suit or
proceeding whether incurred by applicant, City, and /or the parties initiating or bringing
such proceeding. The applicant shall indemnify the City for all of City's costs, attorneys'
fees, and damages which City incurs in enforcing the indemnification provisions set forth
in this condition. The applicant shall pay to the City upon demand any amount owed to
the City pursuant to the indemnification requirements prescribed in this condition.
12. Prior to the issuance of building permit, the lease between HDS and the City for the
improvement and use of the off -site parking lot shall be recorded.
13. The number of students enrolled at the school shall not exceed 480 students at any
time.
14. One parking space for each full -time faculty member (36 spaces) shall be provided on-
site.
15. An adequate number of bicycle storage racks shall be provided at the school facility.
16. Special events including, but not limited to, theatrical presentations and athletic events
which involve the attendance of parents and visitors shall be permitted to occur
simultaneously in the auditorium and the new gymnasium but only within the
occupancy of the existing multipurpose room as determined by the Fire Department.
17. The existing gymnasium building shall be limited to a maximum overall height of 41
feet 6 inches.
18. Harbor Day School shall be responsible for the control of noise generated by the
subject facility. The use of outside loudspeakers, paging system or sound system shall
be included within this requirement. The noise generated by the proposed use shall
comply with the provisions of Chapter 10.26 of the Newport Beach Municipal Code.
Upon evidence that noise generated by the project exceeds the noise standards
established by Chapter 10.26 of the Municipal Code, the Community Development
Director may require that the applicant or successor retain a qualified engineer
specializing in noise /acoustics to monitor the sound generated by the use and to
develop a set of corrective measures necessary in order to ensure compliance.
10 -15 -2013
Wr
Planning Commission Resolution No. ####
Paqe 9 of 10
19. No outdoor loudspeaker or paging system shall be permitted in conjunction with the
gymnasium operation.
20. All outdoor storage and trash areas shall be screened from view from Pacific View
Drive and adjoining properties.
21. The use of the off -site parking lot shall be consistent with the terms and conditions
stated herein and included in the lease agreement.
22. Prior to the issuance of a building permit, the applicant shall submit a landscape and
irrigation plan prepared by a licensed landscape architect for the off -site parking lot.
These plans shall incorporate drought tolerant plantings and water efficient irrigation
practices, and the plans shall be approved by the Municipal Operations Department
and Planning Division.
23. All landscape materials and irrigation systems shall be maintained in accordance with
the approved landscape plan. All landscaped areas shall be maintained in a healthy
and growing condition and shall receive regular pruning, fertilizing, mowing and
trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation
systems shall be kept operable, including adjustments, replacements, repairs, and
cleaning as part of regular maintenance.
Building Division Conditions
24. Prior to issuance of grading permits, the applicant shall prepare and submit a Water
Quality Management Plan (WQMP) for the proposed project, subject to the approval of
the Building Division and Code and Water Quality Enforcement Division. The WQMP
shall provide appropriate Best Management Practices (BMPs) to ensure that no
violations of water quality standards or waste discharge requirements occur.
25. A list of "good housekeeping" practices will be incorporated into the long -term post -
construction operation of the site to minimize the likelihood that pollutants will be used,
stored or spilled on the site that could impair water quality. These may include frequent
parking area vacuum truck sweeping, removal of wastes or spills, limited use of
harmful fertilizers or pesticides, and the diversion of storm water away from potential
sources of pollution (e.g. trash receptacles and parking structures). The Stage 2
WQMP shall list and describe all structural and non - structural BMPs. In addition, the
WQMP must also identify the entity responsible for the long -term inspection,
maintenance, and funding for all structural (and if applicable Treatment Control) BMPs.
Public Works Conditions
26. The driveway to the new queuing area shall be a minimum of 24 feet wide and shall
align with the centerline of Marguerite Avenue. Modifications to the gated entry (i.e.
gate, drive aisle and wall) to the Big Canyon Reservoir Yard may be required upon
further review by the Municipal Operations Department and Public Works Department.
10 -15 -2013
19
Planning Commission Resolution No. ####
Paqe 10 of 10
27. The off -site parking lot driveway located at Marguerite Avenue and Pacific View Drive
shall be modified to comply with ADA requirements to ensure that an ADA pathway is
provided.
28. The damaged driveways along Pacific View Drive adjacent to Harbor Day School shall
be reconstructed and modified to comply with ADA pedestrian pathway requirements.
29. Student drop -off and pick -up procedures shall be subject to further review by the City
Traffic Engineer. Modifications to these procedures shall be reviewed and approved by
the Community Development Director and Traffic Engineer. Also, should problems
arise in the future with regard to these procedures, the applicant shall work directly
with the City Traffic Engineer to resolve said problems and concerns.
30. School staff shall only be allowed to direct queuing traffic within the off -site parking lot
and the schools parking lot. School staff shall not direct traffic within the public right -of-
way.
31. The applicant shall be required to modify the internal reservoir circulation as directed
by the Municipal Operations Department.
32. The applicant shall effectively and efficiently control queuing of vehicles on -site to
ensure that this operation does not impact the Marguerite Avenue and Pacific View
Drive right -of -ways.
33. The existing fire hydrant located within the proposed queuing lane at the off -site
parking lot shall be relocated to Pacific View Drive at minimum of 5 feet from the new
driveway approach, per City Standard STD - 500 -L.
10 -15 -2013
20
Attachment No. PC 2
Entitlement History and Conditions
of Approval
21
INTENTIONALLY BLANK PAGE
22
Harbor Day School — Entitlement History & Conditions of Approval
GP Update 2006
• To increase the development limit from 0.30 to 0.35 FAR (from 85,646 to
99,708 sf.)
GPA #99 -1(E) — April 12, 1999
• To increase the development limit from 0.15 to 0.30 FAR (from 42,823 to
85,646 sf.)
Use Permit #1546 Amendment —March 18, 1999
To construct a 12,750 sf. gym including storage facility, weight and locker
rooms, & offices
• To allow the gym exceed the 32 -foot height limit
Conditions:
1. The development shall be in substantial conformance with the approved site
plan, floor plan and elevations, except as noted below.
2. All previous Conditions of Approval of Use Permit No. 1546 shall remain in effect,
except as noted below.
3. The number of students enrolled at the school shall not exceed 408 students at
any time.
4. One parking space for each full -time faculty member (36 spaces) shall be
provided on -site.
5. Special events including, but not limited to, theatrical presentations and athletic
events which involve the attendance of parents and visitors shall net be permitted
to occur simultaneously in the auditorium and the new gymnasium but only
within the occupancy of the existing multipurpose room as determined by
the Fire Department.
6. The approval of Use Permit No. 1546 Amended is subject to City Council's final
approval of GPA 97 -3 (D).
7. The new gymnasium building shall be limited to a maximum overall height of 40
feet 41 feet 6 inches.
8. The Headmaster of the school facility shall be responsible for the control of noise
generated by the subject facility. The use of outside loudspeakers, paging
system or sound system shall be included within this requirement. The noise
generated by the proposed use shall comply with the provisions of Chapter 10.26
of the Newport Beach Municipal Code. Upon evidence that noise generated by
23
the project exceeds the noise standards established by Chapter 20.26
(Community Noise Control) of the Municipal Code, the Planning Director may
require that the applicant or successor retain a qualified engineer specializing in
noise /acoustics to monitor the sound generated by the use and to develop a set
of corrective measures necessary in order to insure compliance.
9. The project shall be designed to eliminate light and glare onto adjacent
properties or uses. The plans shall be prepared and signed by a licensed
Electrical Engineer acceptable to the City. Prior to the issuance of any building
permit the applicant shall provide to the Planning Department, in conjunction with
the lighting system plan, lighting fixture product types and technical
specifications, including photometric information, to determine the extent of light
spillage or glare which can be anticipated. This information shall be made a part
of the building set of plans for issuance of the building permit. Prior to issuance of
the certificate of occupancy or final of building permits, the applicant shall
schedule an evening inspection by the Code Enforcement Division to confirm
control of light and glare specified by this condition of approval.
10. No outdoor loudspeaker or paging system shall be permitted in conjunction with
the gymnasium operation.
Standard Requirements:
1. The project shall comply with State Disabled Access requirements.
2. All signs shall conform to the provisions of Chapter 20.06 of the Municipal Code.
3. All improvements shall be constructed as required by Ordinance and the Public
Works Department.
4. Public improvements may be required of a developer per Section 20.80.060 of
the Municipal Code.
5. The proposed gymnasium facility and related structures shall conform to the
requirements of the Uniform Building Code.
6. The on -site parking, vehicular circulation and pedestrian circulation systems be
subject to furtherreview by the City Traffic Engineer.
7. The Planning Commission may add to or modify conditions of approval to this
Use Permit or recommend to the City Council the revocation of this Use Permit,
upon a determination that the operation which is the subject of this Use Permit,
causes injury, or is detrimental to the health, safety, peace, morals, comfort, or
general welfare of the community.
Harbor Day
December 2, 2013
Page 2
24
8. That this Use Permit shall expire unless exercised within 24 months from the
date of approval as specified in Section 20. 91.050A of the Newport Beach
Municipal Code.
Use Permit #1546 Amendment — March 21, 1996
• To construct a new 8,108 sf. building (2 art labs, pottery storage, wood
shop and machine area, a science lab, music room and restroom facilities)
• To remove of an existing 2,536 sf. building (art lab, wood shop & pottery
area)
• Additional 14 students and 5 faculty since 1990
Conditions:
1. That the proposed development shall in substantial conformance with the
approved site plan, floor plans and elevations, except as noted in the following
conditions of approval.
2. That all previous applicable conditions of approval of Use Permit No. 1546 and
subsequent amendments approved September 21, 1972, May 19, 1983 and
January 4, 1990 shall remain in effect.
3. That a minimum of one parking space shall be provided for each full -time
employee and faculty member (35 spaces plus 1 handicap space) and that the
on site parking spaces shall be available for use by the full -time teachers,
administrative faculty and employees at all times. That prior to issuance of
building permits, the final parking lot striping plan shall be approved by the City
Traffic Engineer.
4. That prior to issuance of building permits, the applicant shall provide information
to the City Traffic Engineer establishing the traffic and pedestrian circulation with
regard to student drop -off and pick -up. Also, should problems arise in the future
with regard to the student drop -off and pick -up, that the applicant shall work
directly with the City Traffic Engineer to resolve said problems and concerns.
5. That the proposed new structure shall be equipped with an automatic fire
sprinkler system and fire alarm system to the satisfaction of the Fire Department
and in accordance with Fire Code requirements.
6. That the Planning Commission may add to or modify conditions of approval to
this use permit, or recommend to the City Council the revocation of this use
permit, upon a determination that the operation which is the subject of this use
Harbor Day
December 2, 2013
Page 3
25
permit, causes injury, or is detrimental to the health, safety, peace, morals,
comfort, or general welfare of the community.
7. This use pennit shall expire unless exercised within 24 months from the date of
approval as specified in Section 20.80.090A of the Newport Beach Municipal
Code.
8. That prior to issuance of building permits, the applicant shall correct the signage
of the overhead sign located on San Joaquin Hills Road by replacing the
"SCHOOL XING" sign with a "SCHOOL" sign.
Use Permit #1546 Amendment — January 4, 1990
• To permit the construction of 3 new classrooms, expansion of 2 existing
classrooms, construction of a new storage room, expansion of an existing
storage room, and construction of various mechanical rooms.
Conditions:
1. That the proposed development shall be in substantial conformance with the
approved plot plan, floor plans, elevations and sections, except as noted below.
2. That all previous applicable conditions of approval of Use Permit No. 1546 and
subsequent amendments approved on September 21, 1972, and May 17, 1983
shall remain in effect.
3. That all outdoor storage and trash areas shall be screened from view from Pacific
View Drive and adjoining properties.
4. That a minimum of 29 standard size parking spaces and 1 handicapped parking
space shall be provided on -site. The required handicapped parking space shall
be used solely for handicapped self - parking and shall be identified by a
handicapped sign on a post and a handicapped sign on the pavement.
5. That all improvements be constructed as required by Ordinance and the Public
Works Department.
6. That arrangements be made with the Public Works Department in order to
guarantee satisfactory completion of the public improvements, if it is desired to
obtain a building permit prior to completion of the public improvements.
7. That the displaced and tree damaged portions of sidewalk be reconstructed and
the tree roots pruned along the Pacific View Drive frontage under encroachment
permit issued by the Public Works Department.
Harbor Day
December 2, 2013
Page 4
20
8. That the Planning Commission may add to or modify conditions of approval to
this Use Permit or recommend to the City Council the revocation of this Use
Permit upon a determination that the operation which is the subject of this Use
Permit, cause injury, or is detrimental to the health, safety, peace, morals,
comfort, or general welfare of the community.
9. That is Use Permit shall expire unless exercised within 24 months from the date
of approval as specified in Section 20.80.090A of the Newport Beach Municipal
Code.
Use Permit #1546 Amendment — May 19, 1983
• To construct additional administrative and office space and to include the
retention of two previously approved prefabricated buildings on a
permanent basis.
Conditions:
That the proposed development shall be in substantial conformance with the
approved plot plan, floor plan, and elevations.
2. That all applicable conditions of approval of Use Permit No. 1546 and 1546
(Amended) shall remain in effect.
3. That the prefabricated buildings shall be considered permanent structures.
Use Permit #1546 Amendment — September 21, 1972
• To permit temporary use of a relocatable building for locker room purposes
and maintenance and storage operation and to delay required landscaping
along San Joaquin Hills Road in the Edison Company easement.
Conditions:
1. That development of the relocatable building shall be according to the approved
plot plan, except for minor modifications approved by the Department of
Community Development.
2. That the relocatable building shall be in compliance with all requirements of the
Uniform Building Code.
3. This approval for the relocatable building shall for a three (3) year period. Any
extension of time beyond the three (3) year period shall be reviewed by the
Modifications Committee.
Harbor Day
December 2, 2013
Page 5
27
Use Permit #1546 —September 2, 1971
• Use Permit for a private school
Conditions:
1. The landscape plans, as submitted, be amended to provide for suitable ground
cover within the Southern California Edison Company easement adjacent to San
Joaquin Hills Road.
2. That an adequate number of bicycle storage racks be provided.
3. All illumination shall be shielded or directed so as to confine direct rays to the
subject property.
4. That a separate plan showing the details of the water service connection in
Pacific View Drive and the sewer lateral connection in San Joaquin Hills Road be
submitted to the Public Works Department for review and approval.
5. That parkway trees be planted along the Pacific View Drive frontage in
accordance with the requirements and specifications of the Parks, Beaches and
Recreation Department; that the standard street tree inspection fee of $3 per tree
be paid; and that a satisfactory parkway sprinkler system be installed.
6. That separate arrangements be made with the Parks, Beaches and Recreation
Department for the future planting of parkway trees and installation of a parkway
sprinkler system along the San Joaquin Hills Road frontage.
7. That a 20 -foot wide storm drain easement be dedicated to the City covering the
new 42 -inch R.C.P. storm drain that was constructed recently in conjunction with
the site grading.
8. That no trees or large shrubs be planted in the existing 15 -foot wide water
easement of the 20 -foot wide storm drain easement required in the previous
condition of approval.
9. That no surface and landscaping improvements be placed in the 15 -foot wide
water easement along the northeasterly edge of the site until the 16 -inch "Zone
IV" water main proposed for construction by the City in the near future has been
completed.
Harbor Day
December 2, 2013
Page 6
MAr
Attachment No. PC 3
Carpool Proposal
�9
INTENTIONALLY BLANK PAGE
so
March 10, 2014
Community Development Department
Planning Division
100 Civic Center Drive
Newport Beach, CA 92660
Harbor Day School Front Carpool Statistics and Proposal
Morning Front Carpool
Morning front carpool starts at 7:30 and end at B:OOam. During that time there is only a brief period, right
before 8:00, that there is some congestion around the intersection of Marguerite Ave. and Pacific View Drive.
Changing the entrance of front carpool to the east end of Pacific View Drive should relieve or eliminate any
congestion at this intersection.
Currently, 6 to 8 administrators and teachers open doors for students at front carpool. No additional teachers
are necessary for traffic control in the morning.
Afternoon Front Carpool:
Currently an average of 77 cars use the afternoon front carpool (see Front Carpool Statistics Oct 2012 -June
2013) from a period of time between 2:40 and 3:20. At its peak, just after 3 pm, approximately 60 cars will be
queued up waiting to pick up their child. These cars currently sit on Pacific View Drive in front of the apartments,
St. Michael's Church and all the way down to and sometimes in front of Lincoln Elementary and on Marguerite
Ave. down to the San Joaquin intersection.
The proposed carpool queuing area will accommodate all cars off the street, greatly improving traffic flow and
congestion during afternoon carpool.
Staffing for Afternoon Front Carpool:
Currently each of the seven grade levels has a teacher assigned to it and twelve teachers open doors and help
direct traffic. In the proposed plan, four more teachers would be added to the traffic control to help direct traffic
within the proposed carpool queuing area (See Front Carpool Staffing Map).
Front Carpool Procedures:
Three teachers and a Queuing Captain (orange dots on the Front Carpool Staffing Map) will be positioned in the
Carpool Queuing Area. Ten teachers and a Carpool Pickup Area Captain (red dots on the Front Carpool Staffing
Map) will be positioned in the Pickup Area. The Queuing Captain will be in communication with the Carpool Area
Captain via walkie- talkie to regulate the flow of cars. The Carpool Pickup Area Captain will use a handheld
Stop /Slow sign to control carpool. The Queuing captain will use a handheld flag to control which line of cars are
allowed to leave the Carpool Queuing Area.
All cars picking students up for afternoon carpool will pull into the Carpool Queuing Area. At 3pm the first 24
cars will be allowed to cross the street and form three lines of eight cars in the HDS Parking Lot Pickup Area. A
teacher calling names over a loud speaker will be positioned at the entrance of the Pickup Area (yellow dot on
Front Carpool Staffing Map). Seven teachers (blue dots on Front Carpool Staffing Map) will be assignment to
manage students waiting for their carpools. Teachers assigned to the Pickup Area (red dots) help open doors
31
and ensure all students get to into their cars and out of traffic before cars are allowed to move to exit the
parking lot. Once all 24 cars are loaded and all students clear of traffic, the Carpool Pickup Area Captain will let
the cars exit the HDS parking lot.
Once all of the cars have exited the parking lot, the Carpool Pickup Area Captain will alert the Queuing Captain
to let the next 24 cars exit the Carpool Queuing Area and form three lines of eight cars in the HDS Parking Lot
and Pickup Area.
Staff will be trained in the proposed procedure.
Security:
The current 6 foot high wall, which prohibits visual observation of this area from the street will be reduced to 2
feet, allowing for surveillance from the street. The proposal is to restrict access to this area with a bollard and
chain system. Existing street lamps already illuminate this area at night.
San Joaquin Hills Road Pick -up and Drop -off:
This proposal will not change the current pick -up and drop -off operations that take place on San Joaquin Hills
Road.
Sincerely,
Dr. Daniel R. Greenwood
Headmaster
Harbor Day School
Front Carpool Statistics Oct - June
33
Number
Wednesday, October 10, 12
71
Friday, March 29, 13
72
Thursday, October 11, 12
107
Wednesday, April 3, 13
82
Friday, October 12, 12
84
Monday, April 8, 13
80
Monday, October 15, 12
76
Tuesday, April 9, 13
84
Tuesday, October 16, 12
81
Wednesday, April 10, 13
82
Monday, October 22, 12
80
Monday, April 22, 13
74
Tuesday, October 23, 12
77
Tuesday, April 23, 13
87
Wednesday, October 24, 12
75
Wednesday, April 24, 13
80
Thursday, October 25, 12
81
Monday, April 29, 13
78
Friday, October 26, 12
81
Wednesday, May 1, 13
72
Thursday, December 13, 12
75
Thursday, May 2, 13
78
Friday, December 14, 12
80
Friday, May 3, 13
73
Monday, December 17, 12
71
Monday, May 6, 13
77
Tuesday, December 18, 12
78
Tuesday, May 7, 13
72
Monday, January 7, 13
83
Wednesday, May 8, 13
75
Tuesday, January 8, 13
76
Monday, May 13, 13
80
Wednesday, January 9, 13
84
Wednesday, May 15, 13
80
Thursday, January 10, 13
72
Thursday, May 16, 13
72
Wednesday, January 16, 13
70
Friday, May 17, 13
72
Thursday, January 17, 13
78
Monday, May 20, 13
77
Tuesday, January 22, 13
76
Tuesday, May 21, 13
79
Wednesday, January 23, 13
76
Wednesday, May 22, 13
72
Thursday, January 24, 13
82
Thursday, May 23, 13
79
Wednesday, February 6, 13
74
Tuesday, May 28, 13
79
Thursday, February 7, 13
77
Wednesday, May 29, 13
73
Monday, February 11, 13
68
Thursday, May 30, 13
70
Tuesday, February 12, 13
80
Monday, June 3, 13
79
Monday, February 25, 13
74
Tuesday, June 4, 13
82
Wednesday, February 27, 13
73
Wednesday, June 5, 13
73
Thursday, March 7, 13
72
Friday, June 7, 13
80
Monday, March 11, 13
83
Wednesday, March 13, 13
63
Ave
77
Thursday, March 14, 13
68
Tuesday, March 19, 13
82
Wednesday, March 20, 13
72
Thursday, March 21, 13
75
Friday, March 22, 13
75
Monday, March 25, 13
77
Thursday, March 28, 13
73
33
INTENTIONALLY BLANK PAGE
Attachment No. PC 4
Project Plans
35
INTENTIONALLY BLANK PAGE
YIWgJ 5 MD Natl38 lW.M a
�v Jl8 `� 31210 M31A 0131OVd £4b£ ' }
100HOS AVG 8086VH i s
NV"ld 9N63no
0
-t z 5 ca\
Q
U'
Y
\ 3 \
. w • va
\
Cr� H
La-
• S H
I
�I I�I�I Itll� ��
V I I I OJ ❑ ° I# � � � �.
U Cl
U U
itc __
_____________.
H z
LLLL
�ICil�l�l I�I' W 'a
Q o
z�I Irgrl I� U
E a I�I�I r
LL-
nI IDInI In d i
3
o
0
a
C) Ir�
z
0
ry w ��� �vs �� rirvnoer> xlx 3>NVnO {64£
X]r>B ln>G3x ��
aaq �M�-■� ® 3AI210 M31A N Jl011 n
MAA
Iy' 100HOs AVG 8088VH
0
62 ��
Sa`
0
a
a
R
x
®- .0 i
I I I sl �uu -9�
It
I I I�❑ I fil R a 8 IIeY� IlC I{{I�...I{{I II LI��Y
I I ,I{pp�J1 I
i�Y I I �pp19 I yy
_ �I PP LII �� r •��
a $
r1
a
n E
d 6;9i
sa��
�,Y �I
rwnOfnv'J "NmI Mw
bv381Y0dv.3x
3A180 M31A :)Ijlz)vd 90K
100HOS AVO 2f086VH
NV-ld ONISVHd 9Ninmo
'—
N
�
I I I I I
`� B
GG99pj
o
( I I I I
E B o
IIIII
=a9B=
a B�
i' 1 B�;•
� °;;� °;
_
'lase
!B,9B'�BI
oing
II II
-------------------
ill
IIIII
IIIII
IIIII.
IIIII
11111
IIII
IIII1
IIIII
IIIII
i
IIII
IIIII
IIIII`
98
� B�'•
I6 B
-
8
'I
_ =
,IIII
A�fl�,}}AppIA
I
IIIII
---- - - - - -- - - - - --
I II
- - - - - --
Y
IIIII
�
° 0
'A fl
it
ll
•..
1 1 1 1 1 i�
IIIII
IIIII
I
I I
e-••YY ��- IIR[.� ii�iiYflY��.T CC- ilwvwud/•'•0
39