HomeMy WebLinkAboutCaptial Improvement Program 2014A
40
a
al
a
V S
C94F00.N�P
City of Newport Beach
CAPITAL IMPROVEMENT PROGRAM
Fiscal Year 2013 -14
�I
V
IT 0
CITY COUNCIL
Mayor Keith D. Curry
Mayor Pro Tem Rush N. Hill, II
Council Member Michael E. Henn
Council Member Tony Petros
Council Member Leslie J. Daigle
Council Member Nancy Gardner
Council Member Edward D. Selich
CITY MANAGER
David A. Kiff
PUBLIC WORKS DIRECTOR
Dave Webb
CAPITAL IMPROVEMENT PROGRAM
The City of Newport Beach Capital Improvement Program (CIP) serves as a plan for the provision of public improvements,
special projects, on -going maintenance programs, and the implementation of the City's master plans. Projects in the CIP include
improvements and major maintenance on arterial highways, local streets, and alleys; storm drain and water quality
improvements; harbor, bay, pier, and beach improvements; park and facility improvements; water and wastewater system
improvements; transportation safety and traffic signal improvements; and planning programs and studies.
The adopted FY 2013 -14 CIP budget consists of over $36 million in new appropriations and more than $34 million in rebudgeted
funds to be carried forward from the current fiscal year for a total proposed budget of $70,160,354. Major funding initiatives
include neighborhood revitalization projects, park improvements, road and pavement rehabilitations, and water quality and
environmental improvements. Significant work continues this fiscal year on major facilities projects such as Marina Park, Sunset
Ridge Park, and rehabilitation of the Lifeguard Headquarters.
Projects are organized by primary function or benefit into
one of the following categories: Facilities; Streets and
Drainage; Traffic; Parks, Harbors and Beaches; Water
Quality and Environmental; Water; Wastewater; and
Miscellaneous. Given the current fiscal climate, the
development of the proposed CIP was limited to meeting
Council priorities and master plan requirements. Essential
projects were prioritized and summarized by available
funds and were presented to the City Council for
consideration at several public meetings prior to approval.
Funding of capital projects is derived from multiple funding
sources as shown in the chart to the right.
FY 13114 CIP Funding Sources
Highlights of the adopted CIP budget for FY 2013 -14 are presented by category as follows:
Facilities
Projects organized under Facilities include construction, rehabilitation and repair of City buildings and facilities. Major projects
within this category exceed $11.4 million and include:
• Civic Center Closeout and Reuse Planning of City Property ($7,990,704)
• Lifeguard Headquarters Rehabilitation ($1,384,000)
• Big Canyon Reservoir Auxiliary Maintenance Yard ($750,000)
• San Miguel Park Restroom Replacement ($500,000)
• Central Library and Police Facility HVAC Refurbishment ($474,950)
• Corona del Mar Fire Station No. 5 Rebuild Design ($250,000)
• Newport Coast Community Center Stage Remodel ($100,000)
Streets and Drainage
Projects organized under Streets and Drainage include construction, rehabilitation and repair of City roads, alleys, medians,
bridges, sidewalks, streetlights, slopes and tide structures. Projects within this category approximate $18.6 million and major
highlights include:
• Street and alley construction and rehabilitation, including: 15th Street and Balboa Boulevard Reconstruction, Bay
Avenue Pavement Rehabilitation, Bayside Drive Area Pavement Rehabilitation, Campus Drive and San Joaquin Hills
Road Arterial Street Overlay, Dover Drive Westcliff Drive Pavement Rehabilitation, Jamboree Road Improvements,
Major Arterial Streets Repair Program, Newport Boulevard 32nd Street Modification, and Residential Street Overlay
Program ($11,888,150)
• Balboa Boulevard Landscaping and other streetscape and landscaping enhancements ($2,743,505)
• Park Avenue Bridge Over Grand Canal Replacement ($1,605,500)
• Storm drain improvements ($672,600)
• Streetlight replacement program ($645,000)
• Slurry seal program ($595,000)
• Sidewalk, curb and gutter and ADA improvements ($450,000)
Traffic
Projects organized under Traffic include traffic signal system maintenance and improvements, neighborhood traffic management,
pedestrian improvements and signage. Projects within this category exceed $3.5 million and major highlights include:
• East Coast Highway Signal Rehabilitation ($1,500,000)
• Traffic signal modernization ($1,129,595)
• Traffic signal rehabilitation, equipment maintenance and modeling ($388,580)
• Bayside Cove Public Walkway ($204,600)
• Eastbluff Bike Lane ($182,788)
• Traffic signage, striping, and parking lot improvements ($173,000)
Parks, Harbors and Beaches
Projects organized under Parks, Harbors and Beaches include improvements or repairs to the City's parks, harbors, docks,
wharfs, piers and beaches. Projects within this category exceed $27.7 million and major highlights include:
• Park improvements — Sunset Ridge Park, Sunset View Park, Marina Park, Back Bay View Park, and Pocket Parks
($24,509,930)
• Pier improvements — Harbor Piers Maintenance and Ocean Piers Maintenance ($1,000,000)
• Harbor and tidelands improvements — Balboa Marina Public Dock, Balboa Yacht Basin Mooring Support Services,
Eelgrass Surveys, Bay Beach Sand Management and Minor Dredging, Bulkhead Repairs and Sealing, Newport
Harbor Dredging Permit, Mooring Field Realignment, Tidegate Retrofit, Vessel Waste Pumpout Station Replacement
($2,256,000)
Water Quality and Environmental
Projects organized under Water Quality and Environmental include studies, improvements and programs that benefit the City's
natural resources. Projects within this category exceed $4.9 million and major highlights include:
• Santa Ana Delhi Regional Project ($1,700,000)
• Big Canyon Wash Restoration ($1,575,000)
• Storm Drain Interceptors ($1,380,623)
• Newport Coast ASBS Protection Program, Runoff Reduction and environmental restoration ($224,000)
Water and Wastewater
Projects listed as Water and Wastewater improvements are funded from respective service charges and are used for the
rehabilitation and expansion of these services. Projects in these categories approximate $3.1 million and major highlights include:
• Newport Boulevard water main improvements ($500,000)
• Water Main Master Plan Program ($1,000,000)
• Pump Station and Well Site VFD Improvements ($1,233,780)
• Saint James Road Sewer Relocation ($228,000)
• Water Main Cathodic Protection Program ($150,000)
• Miscellaneous studies and diversion improvements ($153,885)
• Sewer Pipeline Point Repairs ($100,000)
Miscellaneous
Projects organized under Miscellaneous are ones that do not fit into any other category and include capital purchases and
special projects. Projects within these categories exceed $317,000 and major highlights include:
• SCE Rule 20A Credit ($142,400)
• Santa Ana Heights Utility Undergrounding ($153,758)
• Arts and Culture Master Plan ($100,000)
• Local Coastal Program Implementation Plan ($75,000)
• Doryman Fleet facility improvements ($50,000)
Conclusion
The City continues to undertake an ambitious and wide - ranging capital improvement program. The projects, both significant and
diverse, serve all areas of the City. It is the City's policy to appropriate sufficient funds for all projects scheduled during the
coming budget year. Many of the projects require multiple year terms to complete them. In such cases, only the current phase
identified to be completed during FY 2013 -14 is budgeted and appropriated. Subsequent phases of a project and projects
requiring more time or funding are reconsidered at the appropriate time. Our project delivery team of engineers, support staff
and consultants are tasked with managing more complex workloads while maintaining high quality standards. Creative project
management solutions and alternative delivery methods continue to play a key role in our future success.
iv
ly_T011 4 111 29
City of Newport Beach
Capital Improvement Program
Adopted FY2013 -2014
TABLE OF CONTENTS
Big Canyon Reservoir Auxiliary Maintenance Yard 1
Central Library HVAC Refurbishment 2
City Hall Interim Use Plan
3
Civic Center and Park
4
Fire Station No. 5 Rebuild Design
5
Lifeguard Headquarters Rehabilitation
6
Master Facilities Plan - Planning
7
Newport Coast Community Center Stage Remodel
8
Police Facility HVAC Repair /Replacement
9
San Miquel Park Restroom and Picnic Structure Replacement
10
F91:7��6y�I�9�7�7:7 ►6rI IH�
15th Street and Balboa Boulevard Reconstruction 11
15th Street and Monrovia Avenue
12
Balboa Boulevard Landscaping 13
Bav Avenue Pavement Rehabilitation 14
Bayside Drive Area Pavement Rehabilitation 15
Bristol Street South Landscape Improvements 16
Campus Drive San Joaauin Hills Road Arterial Street Overlav 17
Concrete Street Pavement Reconstruction 18
Corona del Mar Entry Improvements 19
Dover Drive Westcliff Drive Pavement Rehabilitation 20
Jamboree Road Improvements - MacArthur to Campus 21
Major Arterial Streets Repair Program 22
Newport Boulevard 32nd Street Modification 23
Old Newport Boulevard Streetscape 24
Old Newport Boulevard West Coast Highway Modifications 25
Park Avenue Bridge Over Grand Canal Replacement 26
Residential Street Overlav Proaram 27
TOC -1
Fy/: 7��1. 1►�N�777_�►6rL[HxK�Idlll�rlp��]
TRAFFIC
Sidewalk, Curb and Gutter Replacement and ADA I
Slurry Seal Proqram
28
29
Storm Drain System Repairs and Sliplining 30
Streetliaht Replacement Proaram 31
West Coast Highway Landscapinq 32
Cove Public Walkwav 33
Bonita Canyon Sports Park Parking Improvements 34
Citywide Street Signage, Striping and Marking 35
East Coast Highway Signal Rehabilitation 37
Traffic Signal Equipment Enhancement Program 38
Traffic Signal Modernization 39
Traffic Signal Rehabilitation Program 40
Transportation Model Maintenance 41
PARKS, HARBORS AND BEACHES
Back Bay View Park Enhancements 42
Balboa Marina Public Dock 43
Balboa Yacht Basin Mooring Support Services Improvements 44
Bay Beach Sand Management and Minor Dredging 45
Eelqrass Survev 46
Lower Harbor Dredging
48
Marina Park
49
Mooring Field Realignment
50
Newport Harbor Dredging Permit - RGP54
51
Ocean Piers Maintenance
52
Pocket Park
53
Seawall and Bulkhead Modifications
54
Sunset Ridge Park
55
Sunset View Park
56
Tidegate Retrofit and Upgrades
57
Vessel Waste Pumpout Station Replacement
58
TOC -2
WATER QUALITY AND ENVIRONMENTAL
WATER
Big Canyon Wash Restoration
Buck Gully Canvon Stabilization and Restoration
MWDOC Rebate Project
Newoort Coast ASBS Protection
m
Santa Ana Delhi Regional Project 63
Sediment Removal at Bia Canvon Wash 64
Storm Drain Interceptors - Tier 1 65
Storm Drain Interceptors - Tier 11 66
Boulevard Water Main Rehabilitation 67
Pump Station and Well Site VFD Improvements 68
Water Main Cathodic Protection Proqram 69
Water Main Master Plan
WASTEWATER
Big Canyon / Port Streets Sewer Diversion Improvements 71
Saint James Road Sewer Relocation 72
Sewer Pipeline Point Repairs and Lining 73
Wastewater Master Plan Rate Studv 74
MISCELLANEOUS
Arts and Culture Master Plan 75
Doryman Fleet Facility Structural Rehabilitation 76
Local Coastal Program Plan 77
Santa Ana Heights Utility Undergrounding 78
SCE Rule 20A Credit 79
TOC -3
fi
I FOR
City of Newport Beach
Capital Improvement Program
Adopted FY2013 -2014
ALPHABETICAL INDEX
Project Page
15th Street Balboa Boulevard Reconstruction
15 Street and Monrovia Avenue Landscape Improvements
Arts and Culture Master Plan
Back Bay View Park Enhancements
Balboa Boulevard Landscaping
Balboa Marina Public Dock
11
12
75
42
13
43
Balboa Yacht Basin Mooring Support Services Improv.
44
Bay Avenue Pavement Rehabilitation
14
Bay Beach Sand Management and Minor Dredging
45
Bayside Cove Public Walkway
33
Bayside Drive Area Pavement Rehabilitation
15
Big Canyon / Port Streets Sewer Diversion Improvements
71
Big Canyon Reservoir Auxiliary Maintenance Yard
1
Big Canyon Wash Restoration
59
Bonita Canyon Sports Park Parking Improvements
34
Bristol Street South Median Landscaping
16
Buck Gully Canyon Stabilization and Restoration
60
Campus Dr San Joaquin Hills Rd Arterial Street Overlay
17
Central Library HVAC Refurbishment
2
City Hall Interim Use Plan
3
Citywide Street Signage, Striping and Marking
35
Alpha -1
Civic Center and Park
4
Concrete Street Pavement Reconstruction
18
Corona del Mar Entry Improvements
19
Doryman Fleet Facility Structural Rehabilitation
76
Dover Dr Westcliff Dr Pavement Rehabilitation
20
Eastbluff Bike Lane
36
East Coast Highway Signal Rehabilitation
37
Eelgrass Survey
46
Fire Station No. 5 Rebuild Design
5
Harbor Piers Maintenance
47
Jamboree Road Improvements - MacArthur to Campus
21
Lifeguard Headquarters Rehabilitation
6
Local Coastal Program Plan Implementation
77
Lower Harbor Dredging
48
Major Arterial Streets Repair Program
22
Marina Park
49
Master Facilities Plan Planning Efforts
7
Mooring Field Realignment
50
MWDOC Rebate Project
61
Newport Boulevard 32nd Street Modification
23
Newport Boulevard Water Main Rehabilitation
67
Newport Coast ASBS Protection Program
62
Newport Coast Community Center Stage Remodel
8
Newport Harbor Dredging Permit - RGP54
51
Ocean Piers Maintenance
52
Old Newport Boulevard Streetscaoe
24
Alpha -2
Old Newport Boulevard West Coast Highway Modifications 25
Park Avenue Bridge Over Grand Canal Replacement 26
Pocket Park 53
Police Facility HVAC Repair /Replacement 9
Pump Station and Well Site VFD Improvements 68
Residential Street Overlay Program 27
Saint James Road Sewer Relocation 72
San Miguel Park Restroom and Picnic Structure Replacement 10
Santa Ana Delhi Regional Project 63
Santa Ana Heights Utility Undergrounding 78
SCE Rule 20A Credits Purchase 79
Seawall and Bulkhead Modifications 54
Sediment Removal at Big Canyon Wash
64
Sewer Pipeline Point Repairs and Lining
73
Sidewalk, Curb and Gutter Replacement and ADA Improvements
28
Slurry Seal Program
29
Storm Drain Interceptors - Tier 1
65
Storm Drain Interceptors - Tier 11
66
Storm Drain System Repairs and Sliplining
30
Streelight Replacement Program
31
Sunset Ridge Park
55
Sunset View Park
56
Tidegate Retrofit and Upgrades 57
Traffic Signal Equipment Enhancement Program 38
Traffic Signal Modernization 39
Traffic Sianal Rehabilitation Proaram 40
Alpha -3
Transportation Model Maintenance 41
Vessel Waste Pumpout Station Replacement
58
Wastewater Master Plan Rate Study
74
Water Main Cathodic Protection Program
69
Water Main Master Plan Program
70
West Coast Hiahwav Landscaoina
32
Alpha -4
Project Listing by Category
Facilities
Page
Fund
Project
Title
1
7402
C1002039
Big Canyon Reservoir Auxiliary Maintenance Yard
2
7271
C1002021
Central Library HVAC Refurbishment
3
7011
C1002040
City Hall Interim Use Plan
4
7410
C1002009
Civic Center and Park
4
7410
C1002030
Civic Center and Park
4
7410
C1002033
Civic Center and Park
4
7410
C1002035
Civic Center and Park
4
7410
C1002041
Civic Center and Park
5
7404
C1002042
Fire Station No. 5 Rebuild Design
6
7414
C1002037
Lifeguard Headquarters Rehabilitation
7
7415
C1002038
Master Facilities Plan -- Planning
8
7011
C1002043
Newport Coast Community Center Stage Remodel
9
7480
C1002014
Police Facility HVAC Repair /Replacement
10
7015
C1002044
San Miguel Park Restroom and Picnic Structure Replacement
$1,652,080
$0
$1,652,080
Total Facilities
Streets and Drainage
Page
Fund
Project
Title
11
7181
C2002068
15th Street and Balboa Boulevard Reconstruction
12
7013
C2002069
15th Street and Monrovia Avenue Landscape Improvements
13
7013
C2002063
Balboa Boulevard Landscaping
14
7181
C2002044
Bay Avenue Pavement Rehabilitation
14
7521
C2002044
Bay Avenue Pavement Rehabilitation
14
7541
C2002044
Bay Avenue Pavement Rehabilitation
15
7181
C2002061
Bayside Drive Area Pavement Rehabilitation
15
7251
C2002061
Bayside Drive Area Pavement Rehabilitation
15
7521
C2002061
Bayside Drive Area Pavement Rehabilitation
15
7541
C2002061
Bayside Drive Area Pavement Rehabilitation
Category-1
Rebudget
Budget
Total
$0
$750,000
$750,000
$324,950
$0
$324,950
$78,395
$0
$78,395
$677,764
$0
$677,764
$5,956,318
$0
$5,956,318
$4,153
$0
$4,153
$967,379
$0
$967,379
$119,094
$0
$119,094
$0
$250,000
$250,000
$84,000
$1,300,000
$1,384,000
$187,601
$0
$187,601
$0
$100,000
$100,000
$0
$150,000
$150,000
$0
$500,000
$500,000
$8,399,654
$3,050,000
$11,449,654
Rebudget
Budget
Total
$0
$300,000
$300,000
$0
$120,000
$120,000
$0
$1,899,205
$1,899,205
$1,652,080
$0
$1,652,080
$15,000
$0
$15,000
$10,000
$0
$10,000
$1,380,500
$0
$1,380,500
$0
$132,000
$132,000
$57,200
$0
$57,200
$58,000
$0
$58,000
Streets and Drainage
Page
Fund
Project
Title
16
7013
C2002064
Bristol Street South Landscape Improvements
17
7282
C2002070
Campus Dr San Joaquin Hills Rd Arterial Street Overlay
17
7521
C2002070
Campus Dr San Joaquin Hills Rd Arterial Street Overlay
17
7541
C2002070
Campus Dr San Joaquin Hills Rd Arterial Street Overlay
18
7282
C2002017
Concrete Street Pavement Reconstruction
18
7521
C2002017
Concrete Street Pavement Reconstruction
18
7541
C2002017
Concrete Street Pavement Reconstruction
19
7013
C2002065
Corona del Mar Entry Improvements
19
7251
C2002065
Corona del Mar Entry Improvements
20
7181
C2002018
Dover Dr Westcliff Dr Pavement Rehabilitation
21
7181
C2002062
Jamboree Road Improvements - MacArthur to Campus
21
7541
C2002062
Jamboree Road Improvements - MacArthur to Campus
22
7282
C2002047
Major Arterial Streets Repair Program
23
7181
C2002048
Newport Boulevard 32nd Street Modification
23
7284
C2002048
Newport Boulevard 32nd Street Modification
24
7013
C2002066
Old Newport Boulevard Streetscape
25
7013
C2002060
Old Newport Boulevard West Coast Highway Modifications
25
7284
C2002060
Old Newport Boulevard West Coast Highway Modifications
26
7251
C2002067
Park Avenue Bridge Over Grand Canal Replacement
27
7181
C2001012
Residential Street Overlay Program
27
7521
C2001012
Residential Street Overlay Program
27
7541
C2001012
Residential Street Overlay Program
28
7013
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
29
7013
C2001011
Slurry Seal Program
30
7012
C2502014
Storm Drain System Repairs and Sliplining
31
7013
C2201000
Streetlight Replacement Program
32
7013
C2002071
West Coast Highway Landscaping
Total Streets and Drainage
Category-2
Rebudget
Budget
Total
$125,000
$375,000
$500,000
$0
$1,088,600
$1,088,600
$0
$6,400
$6,400
$0
$5,000
$5,000
$0
$986,600
$986,600
$0
$8,400
$8,400
$0
$5,000
$5,000
$24,300
$0
$24,300
$0
$50,000
$50,000
$0
$200,000
$200,000
$500,000
$146,500
$646,500
$0
$3,500
$3,500
$0
$350,000
$350,000
$60,870
$1,000,000
$1,060,870
$0
$2,962,500
$2,962,500
$50,000
$0
$50,000
$90,000
$0
$90,000
$270,000
$0
$270,000
$30,500
$1,575,000
$1,605,500
$0
$571,500
$571,500
$0
$20,000
$20,000
$0
$8,500
$8,500
$50,000
$400,000
$450,000
$0
$595,000
$595,000
$672,600
$0
$672,600
$0
$645,000
$645,000
$0
$100,000
$100,000
$5,046,050
$13,553,705
$18,599,755
Traffic
Page
Fund
Project
Title
Rebudget
Budget
Total
33
7014
C3002020
Bayside Cove Public Walkway
$4,600
$0
$4,600
33
7251
C3002020
Bayside Cove Public Walkway
$0
$200,000
$200,000
34
7015
C4002010
Bonita Canyon Sports Park Parking Improvements
$0
$50,000
$50,000
35
7013
C3002016
Citywide Street Signage, Striping and Marking
$47,000
$76,000
$123,000
36
7013
C3002021
Eastbluff Bike Lane
$35,500
$0
$35,500
36
7251
C3002021
Eastbluff Bike Lane
$147,288
$0
$147,288
37
7254
C3002019
East Coast Highway Signal Rehabilitation
$300,000
$1,200,000
$1,500,000
38
7013
C3001008
Traffic Signal Equipment Enhancement Program
$69,580
$0
$69,580
39
7181
C3002018
Traffic Signal Modernization: Phase 6
$456,900
$0
$456,900
39
7261
C3002018
Traffic Signal Modernization: Phase 6
$280,000
$0
$280,000
39
7284
C3002018
Traffic Signal Modernization: Phase 6
$92,695
$0
$92,695
39
7261
C3002023
Traffic Signal Modernization: Phase 8
$0
$300,000
$300,000
40
7013
C3001007
Traffic Signal Rehabilitation Program
$44,000
$0
$44,000
40
7181
C3001007
Traffic Signal Rehabilitation Program
$0
$150,000
$150,000
41
7013
C3001003
Transportation Model Maintenance
$125,000
$0
$125,000
Total Traffic
$1,602,563
$1,976,000
$3,578,563
Parks, Harbors and Beaches
Page
Fund
Project
Title
Rebudget
Budget
Total
42
7015
C4002013
Back Bay View Park Enhancements
$0
$350,000
$350,000
43
7231
C4402009
Balboa Marina Public Dock
$125,000
$0
$125,000
44
7231
C4402006
Balboa Yacht Basin Mooring Support Services Improvements
$25,000
$0
$25,000
45
7231
C4801003
Bay Beach Sand Management and Minor Dredging
$250,000
$100,000
$350,000
46
7231
C4402015
Eelgrass Survey
$0
$25,000
$25,000
47
7231
C4401002
Harbor Piers Maintenance
$0
$400,000
$400,000
48
7241
C4402003
Lower Harbor Dredging
$300,000
$0
$300,000
49
7411
C4002002
Marina Park
$5,100,930
$10,000,000
$15,100,930
50
7231
C4402013
Mooring Field Realignment
$25,000
$75,000
$100,000
51
7231
C4401001
Newport Harbor Dredging Permit - RGP54
$45,000
$356,000
$401,000
Category-3
Parks, Harbors and Beaches
Page
Fund
Project
Title
52
7231
C4801001
Ocean Piers Maintenance
53
7015
C4002011
Pocket Park
54
7231
C4402007
Seawall and Bulkhead Modifications
55
7412
C5100515
Sunset Ridge Park
56
7015
C4002012
Sunset View Park
56
7251
C4002012
Sunset View Park
57
7231
C2502009
Tidegate Retrofit and Upgrades
58
7231
C4402014
Vessel Waste Pumpout Station Replacement
58
7251
C4402014
Vessel Waste Pumpout Station Replacement
65
7012
C2502010
Total Parks, Harbors and Beaches
Water Quality and Environmental
Page
Fund
Project
Title
59
7014
C5002004
Big Canyon Wash Restoration
59
7251
C5002004
Big Canyon Wash Restoration
60
7014
C5002002
Buck Gully Canyon Stabilization and Restoration
61
7255
C5100968
MW DOC Rebate Project
62
7014
C5002006
Newport Coast ASBS Protection Program
62
7251
C5002006
Newport Coast ASBS Protection Program
62
7255
C5002006
Newport Coast ASBS Protection Program
63
7251
C5002019
Santa Ana Delhi Regional Project
64
7014
C5002020
Sediment Removal at Big Canyon Wash
65
7012
C2502010
Storm Drain Interceptors - Tier 1
65
7284
C2502010
Storm Drain Interceptors - Tier 1
66
7012
C2502015
Storm Drain Interceptors - Tier II
66
7284
C2502015
Storm Drain Interceptors - Tier II
$9,000
$0
$1,700,000
Total Water Quality and Environmental
Category-4
Rebudget
Budget
Total
$0
$600,000
$600,000
$0
$90,000
$90,000
$280,000
$0
$280,000
$8,769,000
$0
$8,769,000
$0
$50,000
$50,000
$0
$150,000
$150,000
$540,000
$100,000
$640,000
$5,000
$0
$5,000
$5,000
$0
$5,000
$15,469,930
$12,296,000
$27,765,930
Rebudget
Budget
Total
$75,000
$0
$75,000
$1,500,000
$0
$1,500,000
$30,000
$0
$30,000
$70,000
$0
$70,000
$0
$32,000
$32,000
$0
$8,000
$8,000
$9,000
$0
$9,000
$0
$1,700,000
$1,700,000
$0
$75,000
$75,000
$105,042
$20,510
$125,552
$286,771
$0
$286,771
$0
$241,490
$241,490
$208,480
$518,330
$726,810
$2,284,293
$2,595,330
$4,879,623
Water
Page
Fund
Project
Title
Rebudget
Budget
Total
67
7511
C6002014
Newport Boulevard Water Main Rehabilitation
$0
$500,000
$500,000
68
7251
C6002013
Pump Station and Well Site VFD Improvements
$0
$253,786
$253,786
68
7523
C6002013
Pump Station and Well Site VFD Improvements
$330,000
$650,000
$980,000
69
7511
C6002012
Water Main Cathodic Protection Program
$150,000
$0
$150,000
70
7511
C6001000
Water Main Master Plan Program
$0
$1,000,000
$1,000,000
Miscellaneous
Total Water
$480,000
$2,403,786
$2,883,786
Wastewater
Page
Fund
Project
Title
Rebudget
Budget
Total
71
7541
C7002004
Big Canyon / Port Streets Sewer Diversion Improvements
$103,885
$0
$103,885
72
7541
C7002005
Saint James Road Sewer Relocation
$228,000
$0
$228,000
73
7541
C7001002
Sewer Pipeline Point Repairs and Lining
$0
$100,000
$100,000
74
7541
C5600934
Wastewater Master Plan Rate Study
$50,000
$0
$50,000
Total Wastewater
$381,885
$100,000
$481,885
Miscellaneous
Page
Fund
Project
Title
Rebudget
Budget
Total
75
7425
C8002036
Arts and Culture Master Plan
$0
$100,000
$100,000
76
7231
C8002035
Doryman Fleet Facility Structural Rehabilitation
$0
$50,000
$50,000
77
7014
C8002031
Local Coastal Program Plan
$75,000
$0
$75,000
78
7459
C5100879
Santa Ana Heights Utility Undergrounding
$153,758
$0
$153,758
79
7014
C8002022
SCE Rule 20A Credit
$142,400
$0
$142,400
Total Miscellaneous
$371,158
$150,000
$521,158
Totalfor All Categories
$34,035,533
$36,124,821
$70,160,354
Category-5
fi
I FOR
Project Listing by Funding Source
Page Fund General Fund
7011 Facilities
3 C1002040 City Hall Interim Use Plan
8 C1002043 Newport Coast Community Center Stage Remodel
Category Rebudget
Facilities $78,395
Facilities $0
Total Facilities $78,395
Budget
$0
$100,000
Total
$78,395
$100,000
$178,395
Funding -1
7012
Drainage
65
C2502010
Storm Drain Interceptors - Tier I
Wtr Qual /Environ
$105,042
$20,510
$125,552
66
C2502015
Storm Drain Interceptors - Tier II
Wtr Qual /Environ
$0
$241,490
$241,490
30
C2502014
Storm Drain System Repairs and Sliplining
Streets /Drainage
$672,600
$0
$672,600
Total Drainage
$777,642
$262,000
$1,039,642
7013
Streets
12
C2002069
15th Street and Monrovia Avenue Landscape Improvements
Streets /Drainage
$0
$120,000
$120,000
13
C2002063
Balboa Boulevard Landscaping
Streets /Drainage
$0
$1,899,205
$1,899,205
16
C2002064
Bristol Street South Median Landscaping
Streets /Drainage
$125,000
$375,000
$500,000
35
C3002016
Citywide Street Signage, Striping and Marking
Traffic
$47,000
$76,000
$123,000
19
C2002065
Corona del Mar Entry Improvements
Streets /Drainage
$24,300
$0
$24,300
36
C3002021
Eastbluff Bike Lane
Traffic
$35,500
$0
$35,500
24
C2002066
Old Newport Boulevard Streetscape
Streets /Drainage
$50,000
$0
$50,000
25
C2002060
Old Newport Boulevard West Coast Highway Modifications
Streets /Drainage
$90,000
$0
$90,000
28
C2001009
Sidewalk, Curb and Gutter Repl. and ADA Improvements
Streets /Drainage
$50,000
$400,000
$450,000
29
C2001011
Slurry Seal Program
Streets /Drainage
$0
$595,000
$595,000
31
C2201000
Streetlight Replacement Program
Streets /Drainage
$0
$645,000
$645,000
38
C3001008
Traffic Signal Equipment Enhancement Program
Traffic
$69,580
$0
$69,580
40
C3001007
Traffic Signal Rehabilitation Program
Traffic
$44,000
$0
$44,000
41
C3001003
Transportation Model Maintenance
Traffic
$125,000
$0
$125,000
32
C2002071
West Coast Highway Landscaping
Streets /Drainage
$0
$100,000
$100,000
Total Streets
$660,380
$4,210,205
$4,870,585
Funding -1
Page
Fund
General Fund
Category
Rebudget
Budget
Total
7014
Miscellaneous
33
C3002020
Bayside Cove Public Walkway
Traffic
$4,600
$0
$4,600
59
C5002004
Big Canyon Wash Restoration
Wtr Qual /Environ
$75,000
$0
$75,000
60
C5002002
Buck Gully Canyon Stabilization and Restoration
Wtr Qual /Environ
$30,000
$0
$30,000
77
C8002031
Local Coastal Program Plan Implementation
Miscellaneous
$75,000
$0
$75,000
62
C5002006
Newport Coast ASBS Protection Program
Wtr Qual /Environ
$0
$32,000
$32,000
79
C8002022
SCE Rule 20A Credits Purchase
Miscellaneous
$142,400
$0
$142,400
64
C5002020
Sediment Removal at Big Canyon Wash
Wtr Qual /Environ
$0
$75,000
$75,000
39
C3002018
Traffic Signal Modernization: Phase 6
Total Miscellaneous
$327,000
$107,000
$434,000
40
7015
Parks
Traffic
$0
$150,000
$150,000
42
C4002013
Back Bay View Park Enhancements
Prks /Hrbrs /Bchs
$0
$350,000
$350,000
34
C4002010
Bonita Canyon Sports Park Parking Improvements
Traffic
$0
$50,000
$50,000
53
C4002011
Pocket Park
Prks /Hrbrs /Bchs
$0
$90,000
$90,000
10
C1002044
San Miguel Park Restroom and Picnic Structure Replacement
Facilities
$0
$500,000
$500,000
56
C4002012
Sunset View Park
Prks /Hrbrs /Bchs
$0
$50,000
$50,000
Total Parks
$0
$1,040,000
$1,040,000
Page
Fund
Gas Tax
Category
Rebudget
Budget
Total
7181
Gas Tax
11
C2002068
15th Street Balboa Boulevard Reconstruction
Streets /Drainage
$0
$300,000
$300,000
14
C2002044
Bay Avenue Pavement Rehabilitation
Streets /Drainage
$1,652,080
$0
$1,652,080
15
C2002061
Bayside Drive Area Pavement Rehabilitation
Streets /Drainage
$1,380,500
$0
$1,380,500
20
C2002018
Dover Dr Westcliff Dr Pavement Rehabilitation
Streets /Drainage
$0
$200,000
$200,000
21
C2002062
Jamboree Road Improvements -MacArthur to Campus
Streets /Drainage
$500,000
$146,500
$646,500
23
C2002048
Newport Boulevard 32nd Street Modification
Streets /Drainage
$60,870
$1,000,000
$1,060,870
27
C2001012
Residential Street Overlay Program
Streets /Drainage
$0
$571,500
$571,500
39
C3002018
Traffic Signal Modernization: Phase 6
Traffic
$456,900
$0
$456,900
40
C3001007
Traffic Signal Rehabilitation Program
Traffic
$0
$150,000
$150,000
Total Gas Tax
$4,050,350
$2,368,000
$6,418,350
Funding -2
Page Fund Tide and Submerged Lands
Category
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Total Tide and Submerged Lands
7241 Tide and Submerged Lands - Capital
48 C4402003 Lower Harbor Dredging Prks /Hrbrs /Bchs
Total Tide and Submerged Lands - Capital
Page
7231
Tide and Submerged Lands
43
C4402009
Balboa Marina Public Dock
44
C4402006
Balboa Yacht Basin Mooring Support Services Improvements
45
C4801003
Bay Beach Sand Management and Minor Dredging
76
C8002035
Doryman Fleet Facility Structural Rehabilitation
46
C4402015
Eelgrass Survey
47
C4401002
Harbor Piers Maintenance
50
C4402013
Mooring Field Realignment
51
C4401001
Newport Harbor Dredging Permit - RGP54
52
C4801001
Ocean Piers Maintenance
54
C4402007
Seawall and Bulkhead Modifications
57
C2502009
Tidegate Retrofit and Upgrades
58
C4402014
Vessel Waste Pumpout Station Replacement
Category
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Total Tide and Submerged Lands
7241 Tide and Submerged Lands - Capital
48 C4402003 Lower Harbor Dredging Prks /Hrbrs /Bchs
Total Tide and Submerged Lands - Capital
Page
Fund
Contributions
7251
Contributions
33
C3002020
Bayside Cove Public Walkway
15
C2002061
Bayside Drive Area Pavement Rehabilitation
59
C5002004
Big Canyon Wash Restoration
19
C2002065
Corona del Mar Entry Improvements
36
C3002021
Eastbluff Bike Lane
62
C5002006
Newport Coast ASBS Protection Program
26
C2002067
Park Avenue Bridge Over Grand Canal Replacement
68
C6002013
Pump Station and Well Site VFD Improvements
63
C5002019
Santa Ana Delhi Regional Project
56
C4002012
Sunset View Park
58
C4402014
Vessel Waste Pumoout Station Replacement
Category
Traffic
Streets /Drainage
Wtr Qual. /Environ
Streets /Drainage
Traffic
Wtr Qua]. /Environ
Streets /Drainage
Water
Wtr Qual. /Environ
Prks /Hrbrs /Bchs
Prks /Hrbrs /Bchs
Total Contributions
Funding -3
Rebudget
$125,000
$25,000
$250,000
$0
$0
$0
$25,000
$45,000
$0
$280,000
$540,000
$5,000
$1,295,000
$300,000
Rebudget
$0
$0
$1,500,000
$0
$147,288
$0
$30,500
$0
$0
$0
$1,682,788
Budget
$0
$0
$100,000
$50,000
$25,000
$400,000
$75,000
$356,000
$600,000
$0
$100,000
$0
$1,706,000
Total
$125,000
$25,000
$350,000
$50,000
$25,000
$400,000
$100,000
$401,000
$600,000
$280,000
$640,000
$5,000
$3,001,000
$0 $300,000
1T rte t tlr
Budget Total
$200,000
$132,000
$0
$50,000
$0
$8,000
$1,575,000
$253,786
$1,700,000
$150,000
$4,068,786
$200,000
$132,000
$1,500,000
$50,000
$147,288
$8,000
$1,605,500
$253,786
$1,700,000
$150,000
$5,751,574
Page
Fund
PCH Relinquishment
Category
Rebudget
Budget
Total
7254
Contributions
37
C3002019
East Coast Highway Signal Rehabilitation
Traffic
$300,000
$1,200,000
$1,500,000
18
C2002017
Concrete Street Pavement Reconstruction
Total PCH
$300,000
$1,200,000
$1,500,000
Page
Fund
Environmental Contributions
Category
Rebudget
Budget
Total
7255
Environmental Contributions
Total Measure M Fair Share
$0
$2,425,200
$2,425,200
61
C5100968
MWDOC Rebate Project
Wtr Qual /Environ
$70,000
$0
$70,000
62
C5002006
Newport Coast ASBS Protection Program
Wtr Qual /Environ
$9,000
$0
$9,000
Total Environmental Contributions
$79,000
$0
$79,000
Page Fund Transportation and Circulation Category Rebudget Budget Total
7261 Transportation and Circulation
39 C3002018 Traffic Signal Modernization: Phase 6 Traffic $280,000 $0 $280,000
39 C3002023 Traffic Signal Modernization: Phase 8 Traffic $0 $300,000 $300,000
Total Transportation and Circulation $280,000 $300,000 $580,000
Page Fund Building Excise Tax Category Rebudget Budget Total
7271 Building Excise Tax
2 C1002021 Central Library HVAC Refurbishment Facilities $324,950 $0 $324,950
Total Building Excise Tax $324,950 $0 $324,950
Page
Fund
Measure M
Category
Rebudget
Budget
Total
7282
Measure MFair Share
17
C2002070
Campus Dr San Joaquin Hills Rd Arterial Street Overlay
Streets /Drainage
$0
$1,088,600
$1,088,600
18
C2002017
Concrete Street Pavement Reconstruction
Streets /Drainage
$0
$986,600
$986,600
22
C2002047
Major Arterial Streets Repair Program
Streets /Drainage
so
$350,000
$350,000
Total Measure M Fair Share
$0
$2,425,200
$2,425,200
Funding -4
Page Fund Measure M
Category
Streets /Drainage
Streets /Drainage
Wtr Qual /Environ
Wtr Qual /Environ
Traffic
Total Measure M
Rebudget
$0
$270,000
$286,771
$208,480
$92,695
657,946
Budget
$2,962,500
$0
$0
$518,330
Total
$2,962,500
$270,000
$286,771
$726,810
Page
7284
Measure M Competitive
23
C2002048
Newport Boulevard 32nd Street Modification
25
C2002060
Old Newport Boulevard West Coast Highway Modifications
65
C2502010
Storm Drain Interceptors - Tier 1
62
C2502015
Storm Drain Interceptors - Tier II
39
C3002018
Traffic Signal Modernization: Phase 6
Category
Streets /Drainage
Streets /Drainage
Wtr Qual /Environ
Wtr Qual /Environ
Traffic
Total Measure M
Rebudget
$0
$270,000
$286,771
$208,480
$92,695
657,946
Budget
$2,962,500
$0
$0
$518,330
Total
$2,962,500
$270,000
$286,771
$726,810
Page
Fund
Major Facilities Master Plan
Category
Rebudget
Budget
Total
7402
Facilities Miscellaneous
1
C1002039
Big Canyon Reservoir Auxiliary Maintenance Yard
Facilities
$0
$750,000
$750,000
Total Facilities Miscellaneous
$0
$750,000
$750,000
7404
Fire Stations
5
C1002042
Fire Station No. 5 Rebuild Design
Facilities
$0
$250,000
$250,000
Total Fire Stations
$0
$250,000
$250,000
7410
Civic Center
4
C1002009
Civic Center and Park
Facilities
$677,764
$0
$677,764
4
C1002030
Civic Center and Park
Facilities
$5,956,318
$0
$5,956,318
4
C1002033
Civic Center and Park
Facilities
$4,153
$0
$4,153
4
C1002035
Civic Center and Park
Facilities
$967,379
$0
$967,379
4
C1002041
Civic Center and Park
Facilities
$119,094
$0
$119,094
Total Civic Center
$7,724,708
$0
$7,724,708
7411 Marina Park
49 C4002002 Marina Park
7412 Sunset Ridge Park
55 C5100515 Sunset Ridqe Park
Prks /Hrbrs /Bchs
Total Marina Park
Prks /Hrbrs /Bchs
Total Sunset Ridge Park
Funding -5
$5,100,930
$8,769,000
$10,000,000 $15,100,93(
$10,000,000 $15,100,930
$0 $8,769,000
Page Fund Major Facilities Master Plan
Category Rebudget Budget Total
7414 Lifeguard Headquarters
6 C1002037 Lifeguard Headquarters Rehabilitation Facilities $84,000 $1,300,000 $1,384,000
Total Lifeguard Headquarters $84,000 $1,300,000 $1,384,000
7415 Strategic Planning
7 C1002038 Master Facilities Plan Planning Efforts Facilities $187,601 $0 $187,601
Total Strategic Planning $187,601 $0 $187,601
Page Fund Public Art and Cultural Facilities Category Rebudget Budget Total
7425 Public Art and Cultural Facilities
75 C8002036 Arts and Culture Master Plan Miscellaneous $0 $100,000 $100,000
Total Public Art and Cultural Facilities $0 $100,000 $100,000
Page Fund Santa Ana Heights Category Rebudget Budget Total
7459 Santa Ana Heights Projects
78 C5100879 Santa Ana Heights Utility Undergrounding Miscellaneous $153,758 $0 $153,758
Total Santa Ana Heights Projects $153,758 $0 $153,758
Page Fund Facilities Maintenance
7480 Facilities Maintenance
Category
Rebudget Budget Total
9 C1002014 Police Facility HVAC Repair /Replacement Facilities $0 $150,000 $150,000
Total Facilities Maintenance $0 $150,000 $150,000
Funding -6
Page
Fund
Water Enterprise
Category
15
7511
Distribution and Piping
Water
67
C6002014
Newport Boulevard Water Main Rehabilitation
Water
69
C6002012
Water Main Cathodic Protection Program
Water
70
C6001000
Water Main Master Plan Program
Water
$15,000
$57,200
$0
Total Distribution and Piping
Page
Fund
Water Enterprise
Category
$8,400
7521
Distribution and Piping - Non Master Plan
$20,000
14
C2002044
Grade Adjustments: Bay Avenue Pavement Rehabilitation
Water
15
C2002061
Grade Adjustments: Bayside Drive Area Pavement Rehabilitatic
Water
17
C2002070
Grade Adjustments: Campus Dr SJH Rd Arterial Street Overlay
Water
18
C2002017
Grade Adjustments: Concrete Street Pavement Reconstruction
Water
27
C2002012
Grade Adjustments: Residential Street Overlay Program
Water
7523 Water Pumping and Operating
68 C6002013 Pump Station and Well Site VFD Ir
Total Distribution and Piping - Non Master Plan
Water
Total Pumping and Operating
Funding -7
Rebudget
Budget
Total
$0
$500,000
$500,000
$150,000
$0
$150,000
$0
$1,000,000
$1,000,000
$150,000
$1,500,000
$1,650,000
Rebudget
Budget
Total
$15,000
$0
$15,000
$57,200
$0
$57,200
$0
$6,400
$6,400
$0
$8,400
$8,400
$0
$20,000
$20,000
$72,200
$34,800
$107,000
$330,000
$650,000
$980,000
$330,000
$650,000
$980,000
Page Fund Wastewater Enterprise
14
15
71
17
18
21
27
72
73
74
Category
7541
Sewer Main Replacement
Total
C2002044
Grade Adjustments: Bay Avenue Pavement Rehabilitation
Streets /Drainage
C2002061
Grade Adjustments: Bayside Drive Area Pavement Rehabilitatic
Streets /Drainage
C7002004
Big Canyon Port Streets Sewer Diversion Improvements
Wastewater
C2002070
Grade Adjustments: Campus Dr SJH Rd Arterial Street Overlay
Streets /Drainage
C2002017
Grade Adjustments: Concrete Street Pavement Reconstruction
Streets /Drainage
C2002062
Grade Adjustments: Jamboree Road Improvements
Streets /Drainage
C2001012
Grade Adjustments: Residential Street Overlay Program
Streets /Drainage
C7002005
Saint James Road Sewer Relocation
Wastewater
C7001002
Sewer Pipeline Point Repairs and Lining
Wastewater
C5600934
Wastewater Master Plan Rate Study
Wastewater
Total for All Funds
Total Sewer Main Replacement
Funding -8
Rebudget
Budget
Total
$10,000
$0
$10,000
$58,000
$0
$58,000
$103,885
$0
$103,885
$0
$5,000
$5,000
$0
$5,000
$5,000
$0
$3,500
$3,500
$0
$8,500
$8,500
$228,000
$0
$228,000
$0
$100,000
$100,000
$449,885 $122,000 $571,885
$34,035,533 $36,124,821 $70,160,354
Project Fund Summary
Fund Funding Source
10 General Fund
7011
Facilities
7012
Drainage
7013
Streets
7014
Miscellaneous
7015
Parks
FY 2013 -2014 Adopted Budget
Rebudget
Budget
Total
$78,395
$100,000
$178,395
$777,642
$262,000
$1,039,642
$660,380
$4,210,205
$4,870,585
$327,000
$107,000
$434,000
$0
$1,040,000
$1,040,000
Total General Fund $1,843,417 $5,719,205 $7,562,622
180 Gas Tax
Rebudget
Budget
Total
7181
Gas Tax
$4,050,350
$2,368,000
$6,418,350
Total Gas Tax
$4,050,350
$2,368,000
$6,418,350
230 Tide and Submerged Lands
Rebudget
Total
Budget
7231
Tide and Submerged Lands
$1,295,000
$1,706,000
$3,001,000
7241
Tide and Submerged Lands
$300,000
$0
$300,000
Total Tide and Submerged Lands
$1,595,000
$1,706,000
$3,301,000
250 Contributions
Rebudget
Budget
Total
7251
Contributions
$1,682,788
$4,068,786
$5,751,574
7254
PCHRelinquishment
$300,000
$1,200,000
$1,500,000
7255
Environmental Contributions
$79,000
$0
$79,000
Total Contributions
$2,061,788
$5,268,786
$7,330,574
Summary-1
Fund Funding Source FY 2013 -2014
260 Transportation and Circulation
Rebudget
Budget
Total
7261 Transportation and Circulation
$280,000
$300,000
$580,000
Total Transportation and Circulation
$280,000
$300,000
$580,000
270 Building Excise Tax
Fire Stations
$0
Total
Rebudget
Budget
7271 Building Excise Tax
$324,950
$0
$324,950
Total Building Excise Tax
$324,950
$0
$324,950
280 Measure M Rebudget Budget Total
7282 Measure MFair Share $0 $2,425,200 $2,425,200
7284 Measure M Competitive $857,946 $3,480,830 $4,338,776
Total Measure M $857,946 $5,906,030 $6,763,976
Summary-2
Major Facilities Master Plan
Rebudget
Budget
Total
402
7402
Facilities Miscellaneous
$0
$750,000
$750,000
404
7404
Fire Stations
$0
$250,000
$250,000
410
7410
Civic Center
$7,724,708
$0
$7,724,708
411
7411
Marina Park
$5,100,930
$10,000,000
$15,100,930
412
7412
Sunset Ridge Park
$8,769,000
$0
$8,769,000
414
7414
Lifeguard Headquarters
$84,000
$1,300,000
$1,384,000
415
7415
Strategic Planning
$187,601
$0
$187,601
Total Major Facilities Master Plan
$21,866,239
$12,300,000
$34,166,239
Summary-2
Fund Funding Source FY 2013 -2014 Adopted Budget
Public Art and Cultural Facilities Rebudget Budget Total
425 7425 Public Art and Cultural Facilities $0 $100,000 $100,000
Total Public Art and Cultural Facilities $0 $100,000 $100,000
Santa Ana Heights Rebudget Budget Total
459 7459 Santa Ana Heights Projects $153,758 $0 $153,758
Total Santa Ana Heights $153,758 $0 $153,758
Facilities Maintenance Rebudget Budget Total
480 7480 Facilities Maintenance $0 $150,000 $150,000
Total Facilities Maintenance $0 $150,000 $150,000
500 Water Enterprise
Rebudget
Budget
Total
7511 Distribution and Piping
$150,000
$1,500,000
$1,650,000
7521 Distribution and Piping- Non - Master Plan
$72,200
$34,800
$107,000
7523 Pumping and Operating
$330,000
$650,000
$980,000
Total Water Enterprise
$552,200
$2,184,800
$2,737,000
530 Wastewater Enterprise Rebudget Budget Total
7541 Sewer Main Replacement $449,885 $122,000 $571,885
Total Wastewater Enterprise $449,885 $122,000 $571,885
Total for All CIP Projects $34,035,533
Summary-3
$36,124,821 $70,160,354
fi
I FOR
Facilities
Page
Fund
Project
Title
Rebudget
Budget
Total
1
7402
C1002039
Big Canyon Reservoir Auxiliary Maintenance Yard
$0
$750,000
$750,000
2
7271
C1002021
Central Library HVAC Refurbishment
$324,950
$0
$324,950
3
7011
C1002040
City Hall Interim Use Plan
$78,395
$0
$78,395
4
7410
C1002009
Civic Center and Park
$677,764
$0
$677,764
4
7410
C1002030
Civic Center and Park
$5,956,318
$0
$5,956,318
4
7410
C1002033
Civic Center and Park
$4,153
$0
$4,153
4
7410
C1002035
Civic Center and Park
$967,379
$0
$967,379
4
7410
C1002041
Civic Center and Park
$119,094
$0
$119,094
5
7404
C1002042
Fire Station No. 5 Rebuild Design
$0
$250,000
$250,000
6
7414
C1002037
Lifeguard Headquarters Rehabilitation
$84,000
$1,300,000
$1,384,000
7
7415
C1002038
Master Facilities Plan -- Planning
$187,601
$0
$187,601
8
7011
C1002043
Newport Coast Community Center Stage Remodel
$0
$100,000
$100,000
9
7460
C1002014
Police Facility HVAC Repair /Replacement
$0
$150,000
$150,000
10
7015
C1002044
San Miguel Park Restroom and Picnic Structure Replacement
$0
$500,000
$500,000
fi
I FOR
Big Canyon Reservoir Auxiliary Maintenance Yard
Category: Facilities
This project will construct a small 3,500 sf materials storage building and material storage area on the westerly most portion of the Big
Canyon Reservoir property. This limited facility provides field crews working in easterly and southerly portions of the City such as East
Bluff, Newport Coast or Corona del Mar a convenient location to obtain supplies not carried on their vehicles. City operations will realize
cost savings and reduced response times in its field operations. The new improvements will be designed and landscaped to fit into the
surrounding area.
Location:
Big Canyon Reservoir
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $750,000
Other $0
Total $750,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Major Facilities Master Plan
7402
C1002039
$0
$750,000
$0
$0
$0
$0
TOTAL
$0
$750,000
PROJECT TOTAL I $750,000
Central Library HVAC Refurbishment
Category: Facilities
The existing Central Library HVAC system was put into service in 1994. Only the main chiller has been replaced to date and the system
has received periodic maintenance and repairs. An examination confirmed that the existing HVAC system has deferred maintenance items
and components needing correction to function properly and to achieve optimal efficiency. A private consultant will be retained to audit the
existing system and prepare plans and specifications to replace existing control systems, fans, motors, pumps, ducting, and other
components. Repairs will be integrated with the new system to be installed in the expanded wing. Construction will be performed by a
private contractor.
Location:
Central Library, 1000 Avocado Avenue
FY 2013 -14
Design /Environmental $24,950
Right -of -Way, Land Acquisition $0
Construction $300,000
Other $0
Total $324,950
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Building Excise Tax
7271
C1002021
$324,950
$0
$0
$0
$0
$0
$0
$0
TOTAL
$324,950
$0
PROJECT TOTAL 1 $324,950
2
City Hall Interim Use Plan
Category: Facilities
This project continues decommissioning activities to close down and secure of the old City Hall site while the ultimate reuse of the property
is determined, developed and permitted. Decommissioning includes removing all furnishings and significant items, securing the existing
building in place, fencing off interior corridors between the various buildings, and shutting down certain utilities. The project converts
existing employee parking areas to public parking. Staff will also test the existing facility to identify possible areas of special concern such
as lead paint and asbestos.
Location:
City Hall, 3300 Newport Boulevard
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $78,395
Total $78,395
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7011
C1002040
$78,395
$0
$0
$0
$0
$0
$0
$0
TOTAL
$78,395
$0
PROJECT TOTAL 1 $78,395
3
Civic Center and Park
Category: Facilities
The Civic Center and Park Project includes a City Hall building, one of the City's largest parks, a 450 -space parking structure, and an
expansion of the Newport Beach Central Library. Construction was completed in April 2013. The carry-over funds will be used to complete
close -out expenses related to this project.
Location:
100 Civic Center Drive
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $5,956,318
Other $1,768,390
Total $7,724,708
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Civic Center - Other
7410
C1002009
$677,764
$0
Civic Center - Construction
7410
C1002030
$5,956,318
$0
Civic Center - FF &E
7410
C1002033
$4,153
$0
Civic Center - OCIP
7410
C1002035
$967,379
$0
Civic Center - IT /AV
7410
C1002041
$119,094
$0
TOTAL
$7,724,708
$0
PROJECT TOTAL 1 $7,724,708
4
Fire Station No. 5 Rebuild Design
Category: Facilities
The existing fire station was built fifty years ago to serve the Corona del Mar area. Since then, public safety staffing, equipment, and
apparatus required at this location have outgrown the building's capacity and the building does not meet the definition of an essential
facility. The design of a new station within the existing lot will have efficient space planning components to provide adequate space for staff
and equipment.
Location:
410 Marigold Avenue
FY 2013 -14
Design /Environmental $250,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $250,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Major Facilities Master Plan
7404
C1002042
$0
$250,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$250,000
PROJECT TOTAL 1 $250,000
5
Lifeguard Headquarters Rehabilitation
Category: Facilities
This project provides for the interior remodel of the lifeguard headquarters building. Existing work spaces, restrooms, showers and
computer equipment rooms are outdated. The project will provide functional work spaces for year round staff and the Junior Lifeguard
program. The existing lower level and garage will be reconfigured for more efficient use of space, storage, medical response and vehicles
parking. The building exterior will be mostly preserved to the extent allowable to maximize building functionality.
Location:
70 Newport Pier at McFadden Plaza
FY 2013 -14
Design /Environmental $84,000
Right -of -Way, Land Acquisition $0
Construction $1,300,000
Other $0
Total $1,384,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Major Facilities Master Plan
7414
C1002037
$84,000
$1,300,000
$0
$0
$0
$0
$0
$0
TOTAL
$84,0001
$1,300,000
PROJECT TOTAL 1 $1,384,000
2
Master Facilities Plan - Planning Efforts
Category: Facilities
This project provides for necessary studies and concept development needed to further refine the Major Facilities Financing Plan. It also
includes developing both interim and long term use plans for the old city hall site on Newport Boulevard. With the new Civic Center
constructed and occupied, long term concepts and plans for the prior city hall site and other other city properties need to be developed and
approved.
Location:
3300 Newport Boulevard and other City facility locations
FY 2013 -14
Design /Environmental $187,601
Right -of -Way, Land Acquisition $0
Construction $0
Other $C
Total $187,601
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Major Facilities Master Plan
7415
C1002038
$187,601
$0
$0
$0
$0
$0
$0
$0
TOTAL
$187,601
$0
PROJECT TOTAL 1 $187,601
7
Newport Coast Community Center Stage Remodel
Category: Facilities
Newport Coast Community Center stage area primarily has been used as a storage area since the center opened in 2007. The proposed
project converts the stage area to an enclosed room to be used year round for the Pre - school 101 and Pint Sized Campers programs.
Currently, these programs are held in the two front rooms of the center (Newport Ridge and Pelican Rooms.) These programs must be set
up and broken down daily to accommodate the 30 community and homeowners association meetings hosted monthly at Newport Coast
Community Center. This improvement will better the quality of youth curriculum and reduce staff time dedicated to preparing rooms each
day and will provide opportunities to use the Newport Ridge and Pelican rooms for new offerings for the community.
Location:
6401 San Joaquin Hills Road
FY 2013 -14
Design /Environmental $20,000
Right -of -Way, Land Acquisition $0
Construction $80,000
Other $0
Total $100,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7011
C1002043
$0
$100,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$100,000
PROJECT TOTAL 1 $100,000
0
Police Facility HVAC Repair /Replacement
Category: Facilities
The heating, ventilation and air conditioning (HVAC) units atop the Police Facility were installed twenty years ago. Due to their age and the
demanding operating environment, these units require substantial on -going maintenance and repairs. This project provides for an
inspection of the existing equipment to identify needed repairs and /or replacement of parts to keep future maintenance costs to a minimum.
Location:
870 Santa Barbara Drive
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $150,000
Other $0
Total $150,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Facilities Maintenance
7480
C1002014
$0
$150,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$150,000
PROJECT TOTAL 1 $150,000
9
San Miguel Park Restroom and Picnic Structure Replacement
Category: Facilities
The 25 plus year old modular restroom building is not user friendly and has surpassed its service life. The adjacent picnic area has been
modified in the past but still lacks features desirable by the community. This project will construct a new restroom facility, a new shade
structure to cover a large portion of the picnic area, new walking surfaces, and outdoor furniture. It is estimated these improvements will
reduce the park's operational costs and increase public use.
Location:
San Miguel Park - 1 Spyglass Hill Road
FY 2013 -14
Design /Environmental $80,000
Right -of -Way, Land Acquisition $0
Construction $420,000
Other $0
Total $500,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7015
C1002044
$0
$500,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$500,000
PROJECT TOTAL 1 $500,000
10
Streets and Drainage
Page
Fund
Project
Title
Rebudget
Budget
Total
11
7181
C2002068
15th Street and Balboa Boulevard Reconstruction
$0
$300,000
$300,000
12
7013
C2002069
15th Street and Monrovia Avenue Landscape Improvements
$0
$120,000
$120,000
13
7013
C2002063
Balboa Boulevard Landscaping
$0
$1,899,205
$1,899,205
14
7181
C2002044
Bay Avenue Pavement Rehabilitation
$1,652,080
$0
$1,652,080
14
7521
C2002044
Bay Avenue Pavement Rehabilitation
$15,000
$0
$15,000
14
7541
C2002044
Bay Avenue Pavement Rehabilitation
$10,000
$0
$10,000
15
7181
C2002061
Bayside Drive Area Pavement Rehabilitation
$1,380,500
$0
$1,380,500
15
7251
C2002061
Bayside Drive Area Pavement Rehabilitation
$0
$132,000
$132,000
15
7521
C2002061
Bayside Drive Area Pavement Rehabilitation
$57,200
$0
$57,200
15
7541
C2002061
Bayside Drive Area Pavement Rehabilitation
$58,000
$0
$58,000
16
7013
C2002064
Bristol Street South Landscape Improvements
$125,000
$375,000
$500,000
17
7282
C2002070
Campus Dr San Joaquin Hills Rd Arterial Street Overlay
$0
$1,088,600
$1,088,600
17
7521
C2002070
Campus Dr San Joaquin Hills Rd Arterial Street Overlay
$0
$6,400
$6,400
17
7541
C2002070
Campus Dr San Joaquin Hills Rd Arterial Street Overlay
$0
$5,000
$5,000
18
7282
C2002017
Concrete Street Pavement Reconstruction
$0
$986,600
$986,600
18
7521
C2002017
Concrete Street Pavement Reconstruction
$0
$8,400
$8,400
18
7541
C2002017
Concrete Street Pavement Reconstruction
$0
$5,000
$5,000
19
7013
C2002065
Corona del Mar Entry Improvements
$24,300
$0
$24,300
19
7251
C2002065
Corona del Mar Entry Improvements
$0
$50,000
$50,000
20
7181
C2002018
Dover Dr Westcliff Dr Pavement Rehabilitation
$0
$200,000
$200,000
21
7181
C2002062
Jamboree Road Improvements - MacArthur to Campus
$500,000
$146,500
$646,500
21
7541
C2002062
Jamboree Road Improvements - MacArthur to Campus
$0
$3,500
$3,500
22
7282
C2002047
Major Arterial Streets Repair Program
$0
$350,000
$350,000
23
7181
C2002048
Newport Boulevard 32nd Street Modification
$60,870
$1,000,000
$1,060,870
23
7284
C2002048
Newport Boulevard 32nd Street Modification
$0
$2,962,500
$2,962,500
Streets and Drainage
Page
Fund
Project
24
7013
C2002066
25
7013
C2002060
25
7284
C2002060
26
7251
C2002067
27
7181
C2001012
27
7521
C2001012
27
7541
C2001012
28
7013
C2001009
29
7013
C2001011
30
7012
C2502014
31
7013
C2201000
32
7013
C2002071
Title
Rebudget
Budget
Total
Old Newport Boulevard Streetsoape
$50,000
$0
$50,000
Old Newport Boulevard West Coast Highway Modifications
$90,000
$0
$90,000
Old Newport Boulevard West Coast Highway Modifications
$270,000
$0
$270,000
Park Avenue Bridge Over Grand Canal Replacement
$30,500
$1,575,000
$1,605,500
Residential Street Overlay Program
$0
$571,500
$571,500
Residential Street Overlay Program
$0
$20,000
$20,000
Residential Street Overlay Program
$0
$8,500
$8,500
Sidewalk, Curb and Gutter Repl. and ADA Improvements
$50,000
$400,000
$450,000
Slurry Seal Program
$0
$595,000
$595,000
Storm Drain System Repairs and Sliplining
$672,600
$0
$672,600
Streetlight Replacement Program
$0
$645,000
$645,000
West Coast Highway Landscaping
$0
$100,000
$100,000
15th Street and Balboa Boulevard Reconstruction
Category: Streets and Drainage
This project consists of design and permitting for the future reconstruction of 15th Street between Balboa Boulevard and West Oceanfront
street end. Plans and specifications will be prepared by various consultants. Construction costs will be budgeted and performed in another
fiscal year.
Location:
15th Street between Balboa Boulevard and West Oceanfront
FY 2013 -14
Design /Environmental $300,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $300,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002068
$0
$300,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$300,000
PROJECT TOTAL 1 $300,000
11
15th Street and Monrovia Avenue Landscape Improvements
Category: Streets and Drainage
This project provides for parkway landscaping and irrigation on the north side of 15th Street between Placentia Avenue and Monrovia
Avenue and on Monrovia Avenue from 15th Street to Production Way.
Location:
15th Street and Monrovia Avenue
FY 2013 -14
Design /Environmental $20,000
Right -of -Way, Land Acquisition $0
Construction $100,000
Other $0
Total $120,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002069
$0
$120,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$120,000
PROJECT TOTAL 1 $120,000
12
Balboa Boulevard Landscaping
Category: Streets and Drainage
This project provides for the installation of a new irrigation system and new landscaping along Balboa Boulevard between 22nd Street and
West Coast Highway. Preparation of design plans and specifications are underway. Construction will be performed by a private contractor.
Location:
Balboa Boulevard - 22nd Street to West Coast Highway
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,899,205
Other $0
Total $1,899,205
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002063
$0
$1,899,205
$0
$0
$0
$0
$0
$0
$0
$0
TOTAL
$0
$1,899,205
PROJECT TOTAL 1 $1,899,205
13
Bay Avenue Pavement Rehabilitation
Category: Streets and Drainage
This project involves removing and reconstructing deteriorated concrete pavement on Bay Avenue. Deteriorated concrete curb, gutter and
sidewalk will also be removed and reconstructed. Existing utilities will be adjusted to grade. Plans and specifications will be prepared by
staff. Construction will be performed by a private contractor.
Location:
Bay Avenue, 15th Street to 8th Street
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,677,080
Other $0
Total $1,677,080
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002044
$1,652,080
$0
Water Enterprise
7521
C2002044
$15,000
$0
Wastewater Enterprise
7541
C2002044
$10,000
$0
$0
$0
TOTAL
$1,677,080
$0
PROJECT TOTAL 1 $1,677,080
14
Bayside Drive Area Pavement Rehabilitation
Category: Streets and Drainage
This project involves grinding and overlaying the asphalt concrete pavement on Harbor Island Drive and Road, Bayside Drive and Avocado
Avenue. Deteriorated concrete curb, gutter and sidewalk will also be removed and reconstructed. Existing utilities will be adjusted to grade.
Plans and specifications will be prepared by staff. Construction will be performed by a private contractor. CalRecycle has awarded the City
a Rubberized Pavement Grant for this project.
Location:
Harbor Island Drive - Bayside Drive to east end, Harbor Island Road, Harbor Island Drive to south end, Bayside Drive, El Paseo Drive to
Marguerite Avenue, Avocado Avenue, East Coast Highway to San Nicolas Drive
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,627,700
Other $0
Total $1,627,700
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002061
$1,380,500
$0
Contributions
7251
C2002061
$0
$132,000
Water Enterprise
7521
C2002061
$57,200
$0
Wastewater Enterprise
7541
C2002061
$58,000
$0
TOTAL
$1,495,700
$132,000
PROJECT TOTAL 1 $1,627,700
15
Bristol Street South Median Landscaping
Category: Streets and Drainage
Plans and specifications to install a new irrigation system and landscaping at this location are currently shelf ready. Input for this project
was provided by the Citizens Advisory Panel and Council approved concept plan. Construction oversight services will be provided from the
project's consulting Landscape Architect. Construction will be performed by a private contractor. A specialty sign contractor will install a
new monument sign within the project work limits.
Location:
Bristol Street South - between Campus Drive and Jamboree Road
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $500,000
Other $0
Total $500,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002064
$125,000
$375,000
$0
$0
$0
$0
$0
$0
TOTAL
$125,000
$375,000
PROJECT TOTAL 1 $500,000
16
Campus Drive and San Joaquin Hills Road Arterial Street Overlay
Category: Streets and Drainage
This project involves grinding and overlaying Campus Drive and San Joaquin Hills Road with rubberized asphalt concrete. Deteriorated
concrete improvements will also be reconstructed. Existing utilities will be adjusted to grade. Plans and specificaitons will be prepared by a
private consultant. Construction will be performed by a private contractor.
Location:
Campus Drive from Bristol Street North to MacArthur Boulevard and San Joaquin Hills Road from Marguerite Avenue to Spyglass Hill Road
FY 2013 -14
Design /Environmental $200,000
Right -of -Way, Land Acquisition $0
Construction $900,000
Other $0
Total $1,100,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Measure M Fair Share
7282
C2002070
$0
$1,088,600
Water Enterprise
7521
C2002070
$0
$6,400
Wastewater Enterprise
7541
C2002070
$0
$5,000
$0
$0
TOTAL
$0
$1,100,000
PROJECT TOTAL 1 $1,100,000
17
Concrete Street Pavement Reconstruction
Category: Streets and Drainage
This project involves removing and reconstructing the concrete pavement on Bay Avenue, Anade Street, and Montero Street. Deteriorated
sidewalk and curb and gutter will also be reconstructed. Existing utilities will be adjusted to grade. Plans and specifications will be
prepared by staff. Construction will be performed by a private contractor. Design services for Ocean Boulevard and Marguerite Avenue
improvements will also begin under this project.
Location:
Bay Avenue from 8th Street to Palm Street, Anade Street and Montero Street from Bay Avenue to Edgewater Street, Ocean Boulevard from
Goldenrod Avenue to Marguerite Avenue, and Marguerite Avenute from Ocean Boulevard to East Coast Highway.
FY 2013 -14
Design /Environmental $50,000
Right -of -Way, Land Acquisition $0
Construction $950,000
Other $0
Total $1,000,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Measure M Fair Share
7282
C2002017
$0
$986,600
Water Enterprise
7521
C2002017
$0
$8,400
Wastewater Enterprise
7541
C2002017
$0
$5,000
$0
$0
TOTAL
$0
$1,000,000
PROJECT TOTAL 1 $1,000,000
18
Corona del Mar Entry Improvements
Category: Streets and Drainage
Corona del Mar Entry is one of five revitalization priority areas reviewed in 2011 -2012. A concept plan was prepared for a beautification
project along the south side of East Coast Highway from Avocado Avenue to Dahlia Avenue. This project relies on a partnership
contribution from the Corona del Mar Business Improvement District to begin improvements. Current estimates for construction of
improvements approximate $500,000. Additional funding will need to be identified to complete construction.
Location:
East Coast Highway at MacArthur Boulevard
FY 2013 -14
Design /Environmental $74,300
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $74,300
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002065
$24,300
$0
Contributions
7251
C2002065
$0
$50,000
$0
$0
$0
$0
TOTAL
$24,3001
$50,000
PROJECT TOTAL 1 $74,300
19
Dover Drive and Westcliff Drive Pavement Rehabilitation
Category: Streets and Drainage
This project involves development of engineering plans and bid packages for overlaying and /or reconstructing the asphalt pavement on
Dover Drive and Westcliff Drive. Replacement of deteriorated concrete improvements will also be reconstructed. Plans and specificaitons
will be prepared by a private consultant. Construction will be performed by a private contractor and may begin after the completion of the
Orange County Sanitation District Dover Drive Trunk Sewer Replacement project.
Location:
Dover Drive from West Coast Highway to Irvine Avenue and Westcliff Drive from Dover Drive to Irvine Avenue
FY 2013 -14
Design /Environmental $200,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $200,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002018
$0
$200,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$200,000
PROJECT TOTAL 1 $200,000
20
Jamboree Road Improvements - MacArthur Blvd to Campus Drive
Category: Streets and Drainage
This is a joint project with the City of Irvine and involves grinding and overlaying the asphalt pavement on Jamboree Road between
MacArthur Boulevard and Campus Drive. The City boundary is along the street centerline. The two cities entered into a cooperative
agreement to administer this project. Existing utilities will be adjusted to grade. Plans and specifications have been completed by a
consultant. Construction will be performed by a private contractor.
Location:
Jamboree Road from MacArthur Boulevard to Campus Drive
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $650,000
Other $0
Total $650,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002062
$500,000
$146,500
Wastewater Enterprise
7541
C2002062
$0
$3,500
$0
$0
$0
$0
TOTAL
$500,0001
$150,000
PROJECT TOTAL 1 $650,000
21
Major Arterial Streets Repair Program
Category: Streets and Drainage
This project involves isolated asphalt pavement repairs on several major arterials including Newport Coast Drive, Bonita Canyon Drive,
MacArthur Boulevard, San Joaquin Hills Road and Newport Boulevard. Plans and specifications will be prepared by staff. Construction will
be performed by a private contractor.
Location:
Isolated areas on Newport Coast Drive, Bonita Canyon Drive, MacArthur Boulevard, San Joaquin Hills Road and Newport Boulevard
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $350,000
Other $0
Total $350,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Measure M Fair Share
7282
C2002047
$0
$350,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$350,000
PROJECT TOTAL 1 $350,000
22
Newport Boulevard 32nd Street Modification
Category: Streets and Drainage
This project involves widening Newport Boulevard to accommodate one additional through lane from 30th Street to 32nd Street and one
additional southbound through lane from Via Lido to 32nd Street terminating as a right -turn only lane at 32nd Street. Staff was successful
in obtaining Measure M Competitve grants to fund the majority of the design efforts and recently submitted another grant application for the
right -of -way phase. Plans and specifications are currently being developed by a consultant. Construction will be performed by a private
contractor in a future fiscal year.
Location:
Newport Boulevard from Via Lido to 30th Street
FY 2013 -14
Design /Environmental $60,870
Right -of -Way, Land Acquisition $3,962,500
Construction $0
Other $0
Design /Environmental $4,023,370
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2002048
$60,870
$1,000,000
Measure M Competitive
7284
C2002048
$0
$2,962,500
$0
$0
$0
$0
TOTAL
$60,8701
$3,962,500
PROJECT TOTAL 1 $4,023,370
23
Old Newport Boulevard Streetscape
Category: Streets and Drainage
This project provides for the preparation of a concept plan to develop and provide for new and enhanced street parking and landscaping
along Old Newport Boulevard between Catalina Drive and 15th Street.
Location:
Old Newport Boulevard between Catalina Drive and 15th Street
FY 2013 -14
Design /Environmental $50,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Design /Environmental $50,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002066
$50,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$50,000
$0
PROJECT TOTAL 1 $50,000
24
Old Newport Boulevard West Coast Highway Modifications
Category: Streets and Drainage
This project involves widening the westbound side of West Coast Highway at Old Newport Boulevard to accommodate a third through lane,
a right turn pocket and a bike lane. Old Newport Boulevard will also be realigned to maximize the right turn pocket storage length and
improve roadway geometrics. Additional right -of -way from Caltrans will be required. Project funding includes a Measure M2 competitive
grant. The City is required to participate with a 25 percent funding match ($90,000) for the design of this project. Plans and specifications
will be prepared by a consultant. Construction will be performed by a private contractor.
Location:
Intersection of Old Newport Boulevard and West Coast Highway
FY 2013 -14
Design /Environmental $360,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Design /Environmental $360,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002060
$90,000
$0
Measure M Competitive
7284
C2002060
$270,000
$0
$0
$0
$0
$0
TOTAL
$360,000
$0
PROJECT TOTAL 1 $360,000
25
Park Avenue Bridge Over Grand Canal Replacement
Category: Streets and Drainage
This project provides for the replacement of the Little Balboa Island Bridge. Design alternatives to evaluate the best form for the
replacement bridge have been completed. Construction will be performed by a private contractor.
Location:
Balboa Island and Little Balboa Island
FY 2013 -14
Design /Environmental $30,500
Right -of -Way, Land Acquisition $0
Construction $1,575,000
Other $0
Design /Environmental $1,605,500
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Contributions
7251
C2002067
$30,500
$1,575,000
$0
$0
$0
$0
$0
$0
TOTAL
$30,5001
$1,575,000
PROJECT TOTAL 1 $1,605,500
26
Residential Street Overlay Program
Category: Streets and Drainage
This project involves grinding and overlaying various local streets with asphalt concrete. Deteriorated concrete improvements will also be
reconstructed. Existing utilities will be adjusted to grade. Plans and specifications will be prepared by staff. Construction will be performed
by a private contractor.
Location:
University Dr from Irvine Ave to east end; La Vida from University Dr to La Salud; Monrovia Ave from Newhall St to 16th St and from 15th St
to south end; 16th St from west end to Placentia Ave; Production PI from Monrovia Ave to Placentia Ave
FY 2013 -14
Design /Environmental $80,000
Right -of -Way, Land Acquisition $0
Construction $520,000
Other $0
Design /Environmental $600,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C2001012
$0
$571,500
Water Enterprise
7521
C2001012
$0
$20,000
Wastewater Enterprise
7541
C2001012
$0
$8,500
$0
$0
TOTAL
$0
$600,000
PROJECT TOTAL 1 $600,000
27
Sidewalk, Curb and Gutter Replacement and ADA Improvements
Category: Streets and Drainage
This project provides for the replacement of sidewalks, curbs, gutters, and cross gutters. Construction of curb access ramps to improve
pedestrian and wheelchair access in accordance with the Americans with Disabilities Act (ADA) is included. Plans and specifications will be
prepared by staff. Work will be performed by a private contractor.
Location:
Newport Heights and Lido Isle
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $450,000
Other $0
Total $450,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2001009
$50,000
$400,000
$0
$0
$0
$0
$0
$0
TOTAL
$50,0001
$400,000
PROJECT TOTAL 1 $450,000
In
Slurry Seal Program
Category: Streets and Drainage
This project involves slurry sealing residential streets inNewport Heights and Cliff Haven neighborhoods. Plans and specifications will be
prepared by staff. Construction will be performed by a private contractor.
Location:
Newport Heights and Cliff Haven neighborhoods
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $595,000
Other $0
Total $595,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2001011
$0
$595,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$595,000
PROJECT TOTAL 1 $595,000
29
Storm Drain System Repairs and Sliplining
Category: Streets and Drainage
The City owns and operates an extensive drainage system, including corrugated metal drainage pipes (CMP) built into roads and housing
tracts in the 1960s and earlier. Many CMPs have required unscheduled repairs in recent years. This project retains the services of a
private pipeline video inspection firm to assess the condition of existing CMPs. Staff will prepare the plans and specifications for a private
contractor to make proactive, nondestructive pipe sliplining repairs to maintain full use of the pipelines.
Location:
Citywide
Design /Environmental
Right -of -Way, Land Acquisition
Construction
Other
Total
FY 2013 -14
$0
$0
$672,600
$0
$672,600
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7012
C2502014
$672,600
$0
$0
$0
$0
$0
$0
$0
TOTAL
$672,600
$0
PROJECT TOTAL 1 $672,600
30
Streetlight Replacement Program
Category: Streets and Drainage
This project is a continuation of the City's 15 -year Streetlight Replacement Master Plan. This year's project includes: Circuit 75
(replacement of 91 lights in Westcliff — East Side Area) and Circuit 79 (replacement of 38 lights in Irvine Avenue area, Santiago to Santa
Isabel Avenue). Work includes replacing obsolete street lights, conduits, wires, pull boxes and service cabinets. The existing lights will be
replaced with energy efficient LED lamp fixtures.
Location:
Westcliff - East Side Area and Irvine Avenue Area from Santiago Drive to Santa Isabel Avenue
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $645,000
Other $0
Total $645,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2201000
$0
$645,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$645,000
PROJECT TOTAL 1 $645,000
31
West Coast Highway Landscaping
Category: Streets and Drainage
This project retains the design services of a landscape architect to start preparation of plans and specifications for improved landscaping
and irrigation along West Coast Highway between the Santa Ana River and Newport Boulevard, and the intersection of West Coast
Highway, Balboa Boulevard and Superior Avenue. A construction and maintenance agreement from Caltrans is required. Construction is
not part of this year's funding.
Location:
West Coast Highway between Santa Ana River and Newport Boulevard
FY 2013 -14
Design /Environmental $100,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $100,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C2002071
$0
$100,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$100,000
PROJECT TOTAL 1 $100,000
32
Traffic
Page
Fund
Project
Title
Rebudget
Budget
Total
33
7014
C3002020
Bayside Cove Public Walkway
$4,600
$0
$4,600
33
7251
C3002020
Bayside Cove Public Walkway
$0
$200,000
$200,000
34
7015
C4002010
Bonita Canyon Sports Park Parking Improvements
$0
$50,000
$50,000
35
7013
C3002016
Citywide Street Signage, Striping and Marking
$47,000
$76,000
$123,000
36
7013
C3002021
Eastbluff Bike Lane
$35,500
$0
$35,500
36
7251
C3002021
Eastbluff Bike Lane
$147,288
$0
$147,288
37
7254
C3002019
East Coast Highway Signal Rehabilitation
$300,000
$1,200,000
$1,500,000
38
7013
C3001008
Traffic Signal Equipment Enhancement Program
$69,580
$0
$69,580
39
7181
C3002018
Traffic Signal Modernization: Phase 6
$456,900
$0
$456,900
39
7261
C3002018
Traffic Signal Modernization: Phase 6
$280,000
$0
$280,000
39
7284
C3002018
Traffic Signal Modernization: Phase 6
$92,695
$0
$92,695
39
7261
C3002023
Traffic Signal Modernization: Phase 8
$0
$300,000
$300,000
40
7013
C3001007
Traffic Signal Rehabilitation Program
$44,000
$0
$44,000
40
7181
C3001007
Traffic Signal Rehabilitation Program
$0
$150,000
$150,000
41
7013
C3001003
Transportation Model Maintenance
$125,000
$0
$125,000
fi
I FOR
Bayside Cove Public Walkway
Category: Traffic
This project completes the link necessary to make the existing public walkway which runs along the waterside of Bayside Cove accessible
by the public. Efforts involve design and approvals towards the construction of a public walkway. Development Agreement No. DA 2007 -02
with the Irvine Company provides a contribution towards to the construction of the walkway.
Location:
Bayside Cove - Bayside Drive near Marine Avenue
FY 2013 -14
Design /Environmental $4,600
Right -of -Way, Land Acquisition $0
Construction $200,000
Other $0
Total $204,600
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C3002020
$4,600
$0
Contributions
7251
C3002020
$0
$200,000
$0
$0
$0
$0
TOTAL
$4,600
$200,000
PROJECT TOTAL 1 $204,600
33
Bonita Canyon Sports Park Parking Improvements
Category: Traffic
This project provides striping work along Ford Road to provide for additional parking spaces adjacent to the playing fields at Bonita Canyon
Sports Park. Plans and specifications will be prepared by staff.
Location:
1990 Ford Road west of Mesa View Drive
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $50,000
Other $0
Total $50,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7015
C4002010
$0
$50,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$50,000
PROJECT TOTAL 1 $50,000
34
Citywide Street Signage, Striping and Marking
Category: Traffic
This project completes various traffic signing, striping and pavement markings and other minor improvements to enhance traffic safety.
Plans will be prepared by staff. Work will be performed by a private contractor or City crews.
Location:
Citywide
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $123,000
Other $0
Total $123,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C3002016
$47,000
$76,000
$0
$0
$0
$0
$0
$0
TOTAL
$47,000
$76,000
PROJECT TOTAL 1 $123,000
35
Eastbluff Bike Lane
Category: Traffic
This project provides for design and construction to widen the south side of Eastbluff Drive between Jamboree Road and Mar Vista Drive by
five (5) feet to accommodate and continue an on- street bicycle lane on the south side of the street. The project was awarded grant funds
from OCTA. The design is being performed by a consultant and construction will be completed by a private contractor.
Location:
Eastbluff Drive between Jamboree Road and Mar Vista Drive
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $182,788
Other $0
Total $182,788
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C3002021
$35,500
$0
Contributions
7251
C3002021
$147,288
$0
$0
$0
$0
$0
TOTAL
$182,788
$0
PROJECT TOTAL 1 $182,788
.IZB
East Coast Highway Signal Rehabilitation
Category: Traffic
The project includes design of traffic signal rehabilitation work for the existing traffic signal equipment along East Coast Highway in Corona
del Mar. Work involves replacing hardware including control equipment, signal poles, and cabinets, and re- wiring of the intersections. Plans
and specifications will be prepared by a consultant. Construction will be performed by a private contractor.
Location:
East Coast Highway from Jamboree Road to Newport Coast Drive
FY 2013 -14
Design /Environmental $300,000
Right -of -Way, Land Acquisition $0
Construction $1,200,000
Other $0
Total $1,500,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
PCH Relinquishment
7254
C3002019
$300,000
$1,200,000
$0
$0
$0
$0
$0
$0
TOTAL
$300,0001
$1,200,000
PROJECT TOTAL 1 $1,500,000
37
Traffic Signal Equipment Enhancement Program
Category: Traffic
This project provides funding to replace worn out poles, cabinets and equipment on a proactive maintenance basis over and above basic
rehabilitation, repairs and maintenance. The goal of to extend the life of existing facilities without having to undergo major replacement and
to improve streetscape aesthetics where traffic signals exist.
Location:
Citywide
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $69,580
Total $69,580
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C3001008
$69,580
$0
$0
$0
$0
$0
$0
$0
TOTAL
$69,580
$0
PROJECT TOTAL 1 $69,580
IM
Traffic Signal Modernization: Phases 6 and 8
Category: Traffic
Traffic Signal Modernization is a multi -year, multi - phased program to update the City's traffic signal system. Staff applied for, and received
Competitive Measure M Grant funding from OCTA to complete Phase 6 of the City's traffic signal modernization program. Phase 6 includes
installation of new hardware, fiber optic cable upgrades and CCTV cameras to intersections along San Joaquin Hills Road and Newport
Coast Drive. Phase 8 is the final phase of the citywide improvement program. Phase 8 includes installation of modern traffic equipment to
intersections along San Miguel Drive, Ford Road and Bonita Canyon Drive.
Location:
Phase 6: San Joaquin Hills Road and Newport Coast Drive; and Phase 8: San Miguel Drive, Bonita Canyon Drive, and Ford Road
FY 2013 -14
Design /Environmental $300,000
Right -of -Way, Land Acquisition $0
Construction $829,595
Other $0
Total $1,129,595
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Gas Tax
7181
C3002018
$456,900
$0
Measure M Competitive
7284
C3002018
$92,695
$0
Transportation and Circulation
7261
C3002018
$280,000
$0
Transportation and Circulation
7261
C3002023
$0
$300,000
TOTAL
$829,595
$300,000
PROJECT TOTAL 1 $1,129,595
39
Traffic Signal Rehabilitation Program
Category: Traffic
This project provides for rehabilitation and maintenance of existing traffic signal equipment throughout the City. Work includes replacement
of hardware including control equipment, signal poles, cabinets, and re- wiring select traffic signals. Plans and specifications will be prepared
by a consultant and /or staff. Construction will be completed by a private contractor.
Location:
Citywide
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $194,000
Other $0
Total $194,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C3001007
$44,000
$0
Gas Tax
7181
C3001007
$0
$150,000
$0
$0
$0
$0
TOTAL
$44,000
$150,000
PROJECT TOTAL 1 $194,000
40
Transportation Model Maintenance
Category: Traffic
This project provides for the updating of the transportation model required by changes in land use and circulation within the City and
surrounding portions of Orange County. Modeling will be performed by a consultant with input from City staff.
Location:
Citywide
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $125,000
Total $125,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7013
C3001003
$125,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$125,000
$0
PROJECT TOTAL 1 $125,000
41
fi
I FOR
Parks, Harbors and Beaches
Page
Fund
Project
Title
Rebudget
Budget
Total
42
7015
C4002013
Back Bay View Park Enhancements
$0
$350,000
$350,000
43
7231
C4402009
Balboa Marina Public Dock
$125,000
$0
$125,000
44
7231
C4402006
Balboa Yacht Basin Mooring Support Services Improvements
$25,000
$0
$25,000
45
7231
C4801003
Bay Beach Sand Management and Minor Dredging
$250,000
$100,000
$350,000
46
7231
C4402015
Eelgrass Survey
$0
$25,000
$25,000
47
7231
C4401002
Harbor Piers Maintenance
$0
$400,000
$400,000
48
7241
C4402003
Lower Harbor Dredging
$300,000
$0
$300,000
49
7411
C4002002
Marina Park
$5,100,930
$10,000,000
$15,100,930
50
7231
C4402013
Mooring Field Realignment
$25,000
$75,000
$100,000
51
7231
C4401001
Newport Harbor Dredging Permit - RGP54
$45,000
$356,000
$401,000
52
7231
C4801001
Ocean Piers Maintenance
$0
$600,000
$600,000
53
7015
C4002011
Pocket Park
$0
$90,000
$90,000
54
7231
C4402007
Seawall and Bulkhead Modifications
$280,000
$0
$280,000
55
7412
C5100515
Sunset Ridge Park
$8,769,000
$0
$8,769,000
56
7015
C4002012
Sunset View Park
$0
$50,000
$50,000
56
7251
C4002012
Sunset View Park
$0
$150,000
$150,000
57
7231
C2502009
Tidegate Retrofit and Upgrades
$540,000
$100,000
$640,000
58
7231
C4402014
Vessel Waste Pumpout Station Replacement
$5,000
$0
$5,000
58
7251
C4402014
Vessel Waste Pumpout Station Replacement
$5,000
$0
$5,000
fi
I FOR
Back Bay View Park Enhancements
Category: Parks, Harbors and Beaches
This project provides additional landscape and new enhancements to the park such as a potential shade and viewing structure, perimeter
fencing, amenities for cyclists, improved signage and public art.
Location:
East Coast Highway and Jamboree Road
FY 2013 -14
Design /Environmental $50,000
Right -of -Way, Land Acquisition $0
Construction $300,000
Other $0
Total $350,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7015
C4002013
$0
$350,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$350,000
PROJECT TOTAL 1 $350,000
42
Balboa Marina Public Dock
Category: Parks, Harbors and Beaches
This is a joint project between The Irvine Company, which is adding slips to its existing private marina at 201 E. Coast Highway, and the
City, which proposes to build a public dock at the same location on private property. This budget is for the entitlement process only (CEQA,
permitting, and studies.) The Irvine Company proposes to fund an estimated $680,000 towards this entitlement effort with the City funding
an additional $125,000.
Location:
201 E. Coast Highway
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $125,000
Total $125,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402009
$125,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$125,000
$0
PROJECT TOTAL 1 $125,000
43
Balboa Yacht Basin Mooring Support Services Improvements
Category: Parks, Harbors and Beaches
This project improves amenities for mooring permittees at the City owned Balboa Yacht Basin. New amenities consist of 1) providing
temporary, free slips for mooring permittees for access to service their boats for short periods of time (2 -3 hours); 2) providing two power
slip pedestals to be used with a credit card; 3) potential dinghy storage racks; and 4) potential dinghy dock located at the bulkhead between
docks D and E.
Location:
Balboa Yacht Basin
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $25,000
Other $0
Total $25,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402006
$25,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$25,000
$0
PROJECT TOTAL 1 $25,000
44
Bay Beach Sand Management and Minor Dredging
Category: Parks, Harbors and Beaches
This project consist of normal sand and sediment maintenance operations throughout the harbor's bay beaches and street ends.
Additionally, sand maintenance and dredging work within the Grand Canal and Semeniuk Slough will be undertaken.
Location:
Various bay beaches, Grand Canal and Semeniuk Slough
FY 2013 -14
Design /Environmental $50,000
Right -of -Way, Land Acquisition $0
Construction $300,000
Other $0
Total $350,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4801003
$250,000
$100,000
$0
$0
$0
$0
$0
$0
TOTAL
$250,0001
$100,000
PROJECT TOTAL 1 $350,000
45
Eelgrass Survey
Category: Parks, Harbors and Beaches
This project consists of taking surveys of eelgrass and conducting basic water quality analysis (light, salinity, temperature, dissolved
oxygen.) This project will help the City maintain accurate data on eelgrass distribution and quantity. Negotiations are underway with State
and local agencies for a Newport Beach specific eelgrass plan.
Location:
Deep channel areas
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $25,000
Total $25,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402015
$0
$25,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$25,000
PROJECT TOTAL 1 $25,000
46
Harbor Piers Maintenance
Category: Parks, Harbors and Beaches
This project provides for inspection and maintenance of city owned piers in Newport Harbor. Staff or a consultant will prepare construction
project plans and specifications based on reported recommendations for needed maintenance work.
Location:
Newport Harbor Piers
FY 2013 -14
Design /Environmental $50,000
Right -of -Way, Land Acquisition $0
Construction $350,000
Other $0
Total $400,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4401002
$0
$400,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$400,000
PROJECT TOTAL 1 $400,000
47
Lower Harbor Dredging
Category: Parks, Harbors and Beaches
Dredging of the entire lower Newport Bay was recently completed in cooperation with the Army Corps of Engineers. This project provides
for necessary sediment testing and documentation following major dredging activities.
Location:
Lower Newport Bay
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $300,000
Total $300,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7241
C4402003
$300,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$300,000
$0
PROJECT TOTAL 1 $300,000
M
Marina Park
Category: Parks, Harbors and Beaches
The Marina Park project proposes new visitor - serving marina facilities, an aquatics sports building, a community center and community
park. The California Coastal Commission approved the project in June 2012. The City is awaiting issuance of the Coastal Development
Permit from the Coastal Commission in order to proceed with the project. Construction mobilization and site preparation could begin by fall
2013.
Location:
West Balboa Boulevard between 15th and 19th Streets
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $15,100,930
Other $0
Total $15,100,930
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Major Facilities Master Plan
7411
C4002002
$5,100,930
$10,000,000
$0
$0
$0
$0
$0
$0
TOTAL
$5,100,930
$10,000,000
PROJECT TOTAL 1 $15,100,930
49
Mooring Field Realignment
Category: Parks, Harbors and Beaches
This project consists of realigning the City's mooring fields so that all vessels are situated inside their respective fields. Harbor Resources is
in the process of obtaining federal approval for realigning the mooring fields. This project will move the individual moorings into their newly
defined field.
Location:
Mooring areas throughout Newport Harbor
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $100,000
Total $100,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402013
$25,000
$75,000
$0
$0
$0
$0
$0
$0
TOTAL
$25,0001
$75,000
PROJECT TOTAL 1 $100,000
50
Newport Harbor Dredging Permit - RGP54
Category: Parks, Harbors and Beaches
The Regional General Permit 54 (RGP54) is a blanket dredging permit for Newport Harbor to meet regulations governed by the Army
Corps of Engineers, the California Coastal Commission and the Regional Water Quality Control Board. RGP54 is designed to simplify the
permit process for the local harbor community to perform minimal impact dredging activities. Significant tasks of the permit process is to
perform sediment testing and to negotiate permit conditions.
Location:
Newport Harbor
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $401,000
Total $401,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4401001
$45,000
$356,000
$0
$0
$0
$0
$0
$0
TOTAL
$45,0001
$356,000
PROJECT TOTAL 1 $401,000
51
Ocean Piers Maintenance
Category: Parks, Harbors and Beaches
This project provides for the bi- annual inspection and maintenance of the Newport Pier and Balboa Pier. The consultant prepared
inspection report will focus on the underside condition of both piers and will form the basis of the construction work. Staff will prepare the
construction project plans and specifications based on the Report recommendations to complete the needed maintenance work such as
crack sealing stringers and piles and replacing missing or broken timber members, corroded straps, and other identified deficiencies.
Location:
Newport Pier and Balboa Pier
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $550,000
Other $50,000
Total $600,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4801001
$0
$600,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$600,000
PROJECT TOTAL 1 $600,000
52
Pocket Park
Category: Parks, Harbors and Beaches
This project consists of completing pocket park improvements on the north side of East Coast Highway near the intersection of Jasmine
Avenue and Coast Highway (adjacent to Hobie Sports.) Park improvements include: grading, terraced walls and planting, irrigation,
concrete walkway, benches and possible public artwork.
Location:
Intersection of Jasmine Avenue and East Coast Highway (adjacent to Hobie Sports) in Corona del Mar.
FY 2013 -14
Design /Environmental $10,000
Right -of -Way, Land Acquisition $0
Construction $80,000
Other $0
Total $90,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7015
C4002011
$0
$90,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$90,000
PROJECT TOTAL 1 $90,000
53
Seawall and Bulkhead Modifications
Category: Parks, Harbors and Beaches
This project continues the consultant process of developing conceptual design and plans for the eventual replacement of the entire seawall
around both Balboa Islands. Design efforts will also include public outreach and concept approval, necessary CEQA review, technical
support and assistance with State Lands, California Coastal Commission, other regulatory reviews and permitting, final plan development,
and construction phasing. A couple of other city bulkhead walls may be reviewed. Necessary rehabilitations may be part of this budgeted
item.
Location:
Balboa Islands and various other locations (typically street ends) that have public walls needing rehabilitation
FY 2013 -14
Design /Environmental $280,000
Right -of -Way, Land Acquisition $0
Construction $0
Other $0
Total $280,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402007
$280,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$280,000
$0
PROJECT TOTAL 1 $280,000
54
Sunset Ridge Park
Category: Parks, Harbors and Beaches
The project provides a new park in West Newport with active and passive uses. When completed, Sunset Ridge Park will provide baseball
and soccer fields, restrooms and picnic facilities, flower gardens and coastal views. The project also includes the creation of several acres
of environmental habitat for endangered species. The California Coastal Commission approved a Coastal Development Permit in August
2012. Upon issuance of the permit from the Coastal Commission, the project can proceed with bidding for construction.
Location:
West Coast Highway and Superior Avenue
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $8,769,000
Other $0
Total $8,769,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Major Facilities Master Plan
7412
C5100515
$8,769,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$8,769,000
$0
PROJECT TOTAL 1 $8,769,000
55
Sunset View Park
Category: Parks, Harbors and Beaches
This project consists of completing park improvements on vacant property east side of Superior Avenue adjacent to Villa Balboa Community
Association. Park improvements include grading, groundcover and turf planting, irrigation installation, concrete walkway construction, and
bench and trash receptacle placement. Major funding for this project includes a contribution from Hoag Hospital.
Location:
East of Superior Avenue, south of Villa Balboa Community Association and northwest of Hoag Hospital cogeneration plant.
FY 2013 -14
Design /Environmental $50,000
Right -of -Way, Land Acquisition $0
Construction $150,000
Other $0
Total $200,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7015
C4002012
$0
$50,000
Contributions
7251
C4002012
$0
$150,000
$0
$0
$0
$0
TOTAL
$0
$200,000
PROJECT TOTAL 1 $200,000
56
Tidegate Retrofit and Upgrades
Category: Parks, Harbors and Beaches
This project provides for the installation of new tidegates and hardware to replace existing deteriorated and high maintenance units within
Balboa Peninsula and Balboa Island. Provisions for automated operations to reduce maintenance costs will be implemented to the extent
possible.
Location:
Balboa Island and Balboa Peninsula
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $640,000
Other $0
Total $640,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C2502009
$540,000
$100,000
$0
$0
$0
$0
$0
$0
TOTAL
$540,0001
$100,000
PROJECT TOTAL 1 $640,000
57
Vessel Waste Pumpout Station Replacement
Category: Parks, Harbors and Beaches
This project consists of replacing the harbor's five vessel waste pumpout stations which are aging and have exceeded their expected life
due to heavy usage by the public. The Department of Boating and Waterways provides grants to cover 75% of the cost of purchase and
installation. Majority funding for this project comes from a grant from the Department of Boating and Waterways.
Location:
Pumpout stations are located at Washington Street, Fernando Street, 15th Street, and the Balboa Yacht Basin
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $10,000
Total $10,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C4402014
$5,000
$0
Contributions
7251
C4402014
$5,000
$0
$0
$0
$0
$0
TOTAL
$10,000
$0
PROJECT TOTAL 1 $10,000
0
fi
I FOR
Water Quality and Environmental
Page
Fund
Project
Title
Rebudget
Budget
Total
59
7014
C5002004
Big Canyon Wash Restoration
$75,000
$0
$75,000
59
7251
C5002004
Big Canyon Wash Restoration
$1,500,000
$0
$1,500,000
60
7014
C5002002
Buck Gully Canyon Stabilization and Restoration
$30,000
$0
$30,000
61
7255
C5100968
MWDOC Rebate Project
$70,000
$0
$70,000
62
7014
C5002006
Newport Coast ASBS Protection Program
$0
$32,000
$32,000
62
7251
C5002006
Newport Coast ASBS Protection Program
$0
$8,000
$8,000
62
7255
C5002006
Newport Coast ASBS Protection Program
$9,000
$0
$9,000
63
7251
C5002019
Santa Ana Delhi Regional Project
$0
$1,700,000
$1,700,000
64
7014
C5002020
Sediment Removal at Big Canyon Wash
$0
$75,000
$75,000
65
7012
C2502010
Storm Drain Interceptors - Tier 1
$105,042
$20,510
$125,552
65
7284
C2502010
Storm Drain Interceptors - Tier 1
$286,771
$0
$286,771
66
7012
C2502015
Storm Drain Interceptors - Tier II
$0
$241,490
$241,490
66
7284
C2502015
Storm Drain Interceptors - Tier II
$208,480
$518,330
$726,810
fi
I FOR
Big Canyon Wash Restoration
Category: Water Quality and Environmental
This project is a continuation of a multi -phase plan to restore Big Canyon Wash area. This year's objectives begins invasive plant removal,
native plant restoration and trail creation west of Jamboree Road, and removal of selenium hot spots located in the Big Canyon Golf
Course. Major funding comes from a settlement agreement with the Irvine Company.
Location:
Big Canyon Golf Course and Big Canyon Restoration area West of Jamboree Road.
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,575,000
Other $0
Total $1,575,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C5002004
$75,000
$0
Contributions
7251
C5002004
$1,500,000
$0
$0
$0
$0
$0
TOTAL
$1,575,000
$0
PROJECT TOTAL 1 $1,575,000
59
Buck Gully Canyon Stabilization and Restoration
Category: Water Quality and Environmental
The Lower Buck Gully Restoration project, completed in August 2012, provided drop structures and weirs to stabilize erosion in Buck
Canyon and water improvement filters in Evening Canyon. These funds provide for continued monitoring and plant replacement during the
establishment phase of the project.
Location:
Lower Buck Gully
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $30,000
Total $30,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C5002002
$30,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$30,000
$0
PROJECT TOTAL 1 $30,000
m
MWDOC Rebate Project
Category: Water Quality and Environmental
The City's irrigation runoff reduction program in Newport Coast encourages property owners to install Smart irrigation controllers. These
controllers use weather information and site conditions to tailor watering schedules and run times automatically to conserve water and
reduce runoff from residential properties. Rebates received from Metropolitan Water District (MWDOC) are used to install Smart controllers
in the Newport Coast watershed area.
Location:
Newport Coast Watershed
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $70,000
Total $70,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Environmental Contributions
7255
C5100968
$70,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$70,000
$0
PROJECT TOTAL 1 $70,000
61
Newport Beach ASBS Protection Program
Category: Water Quality and Environmental
State Proposition 84 grant funds were awarded to the City to complete various water quality improvements in the Newport Coast and Big
Canyon watersheds and Areas of Special Biological Significance (ASBS). City funds and a contribution from MiOcean have been added to
the budget to provide match funding for the design and installation of interpretive signs on pathways leading down to the ASBS public areas
and to perform analyses of public and water chemistry impacts to the ASBS.
Location:
Newport Coast and Big Canyon watersheds and adjacent Areas of Special Biological Significance, including pathways leading to Little
Corona Beach and Crystal Cove State Park.
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $49,000
Other $0
Total $49,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C5002006
$0
$32,000
Contributions
7251
C5002006
$0
$8,000
Environmental Contributions
7255
C5002006
$9,000
$0
$0
$0
TOTAL
$9,0001
$40,000
PROJECT TOTAL 1 $49,000
62
Santa Ana Delhi Regional Project
Category: Water Quality and Environmental
The City of Santa Ana is the lead agency for a diversion project on the Santa Ana Delhi Channel near Mesa Drive. This project diverts dry-
weather flows to a golf course lake or a sanitary sewer and proposes to eliminate bacteria, metals and other pollutant loads from entering
the bay. The cities of Newport Beach and Costa Mesa and the County of Orange are partners on this project.
Location:
Newport Beach Golf Course, 3100 Irvine Avenue
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,700,000
Other $0
Total $1,700,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
Contributions
7251
C5002019
$0
$1,700,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$1,700,000
PROJECT TOTAL 1 $1,700,000
63
Sediment Removal from Big Canyon Wash
Category: Water Quality and Environmental
This project is a continuation of a multi -phase project to remove selenium from the Big Canyon Wash area. The City will cooperate with Big
Canyon Country Club and Golf Course to remove sediment from Lake 4 located on the golf course property. Removal of the sediment will
reduce the amount of selenium released into the Big Canyon Wash and upper Newport Bay. The cost of sediment removal will be shared
between the City and country club.
Location:
Big Canyon Country Club, 1 Big Canyon Drive
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $75,000
Other $0
Total $75,000
FUNDING SOURCE
DIVISION NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C5002020
$0
$75,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$75,000
PROJECT TOTAL 1 $75,000
64
Storm Drain Interceptors - Tier I
Category: Water Quality and Environmental
OCTA (Measure M2 Tier I FY12/13 Water Quality Improvement Program) provides funds to clean urban and storm runoff associated with
our transportation corridors. Several locations have been identified where storm interceptors and trash skimmers can be installed to clean
water before it enters the bay or ocean. Tier I funding provides for the installation of continuous deflector separation (CDS) units on storm
drains and marina trash skimmers in the bay to capture trash, aromatic hydrocarbons, sediment and other constituents. Measure M2 Tier I
funds require a 25 percent match.
Location:
Various locations where storm drain discharge to the ocean or bay, including Balboa Coves, Pelican Point HOA, Dover Drive and Backbay
Drive near the Hyatt, and trash skimmers in Newport Bay.
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $412,323
Other $0
Total $412,323
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7012
C2502010
$105,042
$20,510
Measure M Competitive
7284
C2502010
$286,771
$0
$0
$0
$0
$0
TOTAL
$391,813
$20,510
PROJECT TOTAL 1 $412,323
65
Storm Drain Interceptors - Tier II
Category: Water Quality and Environmental
OCTA (Measure M2 Tier II FY13/14 Water Quality Improvement Program) provides funds to clean urban and storm runoff associated with
our transportation corridors. Two locations have been identified where storm interceptors could be installed to clean water before it enters
the bay or ocean. Tier II funding provides for the installation of continuous deflector separation (CDS) units on storm drains to capture
trash, aromatic hydrocarbons, sediment and other constituents. This Measure M2 project requires a 30 percent match.
Location:
Bayside Drive at Carnation Avenue and Goldenrod Avenue
FY 2013 -14
Design /Environmental $100,000
Right -of -Way, Land Acquisition $0
Construction $868,300
Other $0
Total $968,300
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7012
C2502015
$0
$241,490
Measure M Competitive
7284
C2502015
$208,480
$518,330
$0
$0
$0
$0
TOTAL
$208,4801
$759,820
PROJECT TOTAL 1 $968,300
0
Water
Page
Fund
Project
Title
Rebudget
Budget
Total
67
7511
C6002014
Newport Boulevard Water Main Rehabilitation
$0
$500,000
$500,000
68
7251
C6002013
Pump Station and Well Site VFD Improvements
$0
$253,786
$253,786
68
7523
C6002013
Pump Station and Well Site VFD Improvements
$330,000
$650,000
$980,000
69
7511
C6002012
Water Main Cathodic Protection Program
$150,000
$0
$150,000
70
7511
C6001000
Water Main Master Plan Program
$0
$1,000,000
$1,000,000
fi
I FOR
Newport Boulevard Water Main Rehabilitation
Category: Water
This project involves the rehabilitation of the 20 -inch and 16 -inch Transmission Main on Balboa Boulevard from 19th Street to the Channel
Bridge as identified in the Water Master Plan. Part of this project area is located within the Via Lido to 30th Street Newport Boulevard
Street Improvement project and lines in this section need to be rehabilitated prior to the start of the street improvements. Plans and
specifications will be prepared by staff and /or a consultant. Construction will be performed by a private contractor.
Location:
Newport Boulevard from Channel Bridge to 19th Street
FY 2013 -14
Design /Environmental $80,000
Right -of -Way, Land Acquisition $0
Construction $420,000
Other $0
Total $500,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7511
C6002014
$0
$500,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$500,000
PROJECT TOTAL 1 $500,000
67
Pump Station and Well Site VFD Improvements
Category: Water
The project removes and replaces existing electrical starters and motors at the Dolphin and Tamura Wells and 16th Street pump station
with new variable frequency drive starters and inverter motors. Water production efficiency is expected to be improved and electrical
consumption reduced by approximately 25 percent. The calculated payback period for the Dolphin and Tamura Wells is estimated to be
less than three years. Two pumps and VFDs will be installed at the 16th Street station with an estimated energy savings payback period of
six years. Design will be prepared by a consultant. Construction will be performed by a private contractor. Southern California Edison is
contributing to the cost of this project.
Location:
16th Street Utilities Yard and Fountain Valley Well Field
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,233,786
Other $0
Total $1,233,786
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7523
C6002013
$330,000
$650,000
Contributions
7251
C6002013
$0
$253,786
$0
$0
$0
$0
TOTAL
$330,000
$903,786
PROJECT TOTAL 1 $1,233,786
0
Water Main Cathodic Protection Program
Category: Water
This project involves the replacement of sacrificial anodes that were installed when the major transmission mains were built in the mid
1990s as part of the groundwater development system. Anodes were placed on these metal pipelines to minimize corrosion of the
pipelines and extend their useful life. A recent report has shown that the anodes have been depleted and that corrosion is now able to
impact the transmission mains. It is recommended that new anodes be installed throughout the various transmission main systems. Plans
and specifications will be prepared by consultant. Construction will be performed by a private contractor.
Location:
Various
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $150,000
Other $0
Total $150,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7511
C6002012
$150,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$150,000
$0
PROJECT TOTAL 1 $150,000
m
Water Main Master Plan Program
Category: Water
This project involves the removal and replacement of older cast iron water mains identified in the Water Master Plan. This year's project will
focus on pipelines near River Avenue between 41st and 44th Streets that have experienced breaks several times in the past few years.
Other mains in the Corona del Mar area will also be replaced upon completion of the Corona del Mar Transmission Main Project. Additional
smaller segments might also be replaced throughout different parts of the City as needed. Plans and specifications will be prepared by
staff. Construction will be performed by a private contractor.
Location:
Various
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $1,000,000
Other $0
Total $1,000,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Water Enterprise
7511
C6001000
$0
$1,000,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$1,000,000
PROJECT TOTAL 1 $1,000,000
70
Wastewater
Page
Fund
71
7541
72
7541
73
7541
74
7541
Project
Title
Rebudget
Budget
Total
C7002004
Big Canyon / Port Streets Sewer Diversion Improvements
$103,885
$0
$103,885
C7002005
Saint James Road Sewer Relocation
$228,000
$0
$228,000
C7001002
Sewer Pipeline Point Repairs and Lining
$0
$100,000
$100,000
C5600934
Wastewater Master Plan Rate Study
$50,000
$0
$50,000
SN
P
Big Canyon and Port Streets Sewer Diversion Improvements
Category: Wastewater
Two subdrains and an underdrain in the vicinity of Big Canyon Reservoir are suspected to have high concentrations of selenium. Low flow
diversions to the sewer of these sources will help reduce downstream impacts. Staff will design diversions at three points (Port Streets,
Yacht Streets, Reservoir) to the sanitary sewer.
Location:
San Miguel Drive and Newport Hill Drive East
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $103,885
Other $0
Total $103,885
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Wastewater Enterprise
7541
C7002004
$103,885
$0
$0
$0
$0
$0
$0
$0
TOTAL
$103,885
$0
PROJECT TOTAL 1 $103,885
71
Saint James Road Sewer Relocation
Category: Wastewater
This project relocates the sewer main behind homes along Saint James Road to a property below the hillside at 745 Dover Drive. Plans are
underway to construct a new medical office building at 745 Dover Drive. With the lot cleared, there is an opportunity to move the hillside
sewer to a more accessible location, which was recommended in a recently completed Master Plan. Plans will be prepared by staff and /or
a consultant. Construction will be performed by a private contractor.
Location:
St. James Road and 745 Dover Drive
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $228,000
Other $0
Total $228,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Wastewater Enterprise
7541
C7002005
$228,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$228,000
$0
PROJECT TOTAL 1 $228,000
72
Sewer Pipeline Point Repairs and Lining
Category: Wastewater
Wastewater Discharge Regulations require the City wastewater system to be inspected with cameras. Sewer line areas discovered to be
damaged, deteriorated or problematic are packaged into projects so repairs can be made. This program funds these ongoing repair
projects and priority projects identified in the Wastewater Master Plan. Plans and specifications will be prepared by staff. Construction will
be performed by a private contractor.
Location:
Citywide
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $100,000
Other $0
Total $100,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Wastewater Enterprise
7541
C7001002
$0
$100,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$100,000
PROJECT TOTAL 1 $100,000
73
Wastewater Master Plan Rate Study
Category: Wastewater
This project provides funding for a comprehensive Wastewater and Reclaimed Water Rate Study. Staff recently completed the Wastewater
Master Plan. The next step is to determine the necessary funding to construct recommended improvements and to review the City's rate
structure. Also, the reclaimed water system, constructed ten years ago by the Orange County Water District, will be studied to assess
current and potential future users for maximum use. Reclaimed water rates were set when the reclaimed water system was constructed.
The work also includes an analysis of those rates as part of wastewater rate structure review.
Location:
N/A
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $50,000
Total $50,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Wastewater Enterprise
7541
C5600934
$50,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$50,000
$0
PROJECT TOTAL 1 $50,000
74
fi
I FOR
Miscellaneous
Rebudget
Page
Fund
Project
75
7425
C8002036
76
7231
C8002035
77
7014
C8002031
78
7459
C5100879
79
7014
C8002022
Title
Rebudget
Budget
Total
Arts and Culture Master Plan
$0
$100,000
$100,000
Doryman Fleet Facility Structural Rehabilitation
$0
$50,000
$50,000
Local Coastal Program Plan
$75,000
$0
$75,000
Santa Ana Heights Utility Undergrounding
$153,758
$0
$153,758
SCE Rule 20A Credit
$142,400
$0
$142,400
fi
I FOR
Arts and Culture Master Plan
Category: Miscellaneous
A consultant will retained to create a master plan for arts and culture in Newport Beach. The plan will include a comprehensive review of
potential and existing facilities, development of collections, possible governance structures, and financial requirements to support plan
elements.
Location:
N/A
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $100,000
Total $100,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Arts Fund
7425
C8002036
$0
$100,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$100,000
PROJECT TOTAL 1 $100,000
75
Doryman Fleet Facility Structural Rehabilitation
Category: Miscellaneous
This project includes assessing and upgrading the electrical system and structurally strengthening the existing roof at the Doryman Fleet
facility located north of the Newport Pier. Work is strictly limited to the maintenance of the current facility.
Location:
Doryman Fleet Facility at McFadden Square
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $50,000
Other $0
Total $50,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Tide and Submerged Lands
7231
C8002035
$0
$50,000
$0
$0
$0
$0
$0
$0
TOTAL
$0
$50,000
PROJECT TOTAL 1 $50,000
76
Local Coastal Program Plan Implementation
Category: Miscellaneous
The City has a certified Coastal Land Use Plan (LUP), but has not yet developed its Implementation Plan (IP). Approximately 70 "Approval
in Concepts" are processed each year. A certified LCP eliminates the burden of obtaining coastal development permits from the Coastal
Commission, reducing time and expenses to develop in the community. Development of the implementation plan would require assistance
from an outside consultant to write the document, develop the CEQA documentation and conduct a public outreach program. Special
studies may also be required such as assessing alternative transportation (shuttles, off - Peninsula parking, etc.) and lower cost visitor
accommodations.
Location:
N/A
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $75,000
Total $75,000
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C8002031
$75,000
$0
$0
$0
$0
$0
$0
$0
TOTAL
$75,000
$0
PROJECT TOTAL 1 $75,000
77
Santa Ana Heights Utility Undergrounding
Category: Miscellaneous
Work is underway to underground utility facilities in Santa Ana Heights and rehabilitate the area's streets pursuant to City Council action on
October 11, 2005, and County Board of Supervisors action on March 27, 2007. This project provides for incidental expenses during the
construction phase of the project.
Location:
Santa Ana Heights
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $153,758
Other $0
Total $153,758
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
Santa Ana Heights
7459
C5100879
$153,758
$0
$0
$0
$0
$0
$0
$0
TOTAL
$153,758
$0
PROJECT TOTAL 1 $153,758
im
SCE Rule 20A Credits Purchase
Category: Miscellaneous
This provides funding for the purchase of SCE Rule 20A utility undergrounding funding credits from other agencies willing to sell their
surplus credits. Last fiscal year, the City was able to purchase surplus credit at a 50% discount from other cities in Orange County. Staff
expects to purchase additional Rule 20A credits this fiscal year with similar terms to advance the City's next Rule 20A priority projects. Rule
20A projects generally convert overhead utility facilities to underground where there is a benefit to the general public such as along a major
traffic corridor.
Location:
N/A
FY 2013 -14
Design /Environmental $0
Right -of -Way, Land Acquisition $0
Construction $0
Other $142,400
Total $142,400
FUNDING SOURCE
FUND NO.
PROJECT NO.
REBUDGET $
BUDGET $
General Fund
7014
C8002022
$142,400
$0
$0
$0
$0
$0
$0
$0
TOTAL
$142,400
$0
PROJECT TOTAL 1 $142,400
79
fi
I FOR
100 Civic Center Drives Newport Beach, CA 92660
(949) 644 -3123
www.NewportBeachCA.gov