Loading...
HomeMy WebLinkAbout06 - San Miguel ParkTO: FROM PREPARED BY: PHONE: TITLE: ABSTRACT: CITY OF NEWPORT BEACH City Council Staff Report September 23, 2014 Agenda Item No. 6 HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL David A. Webb, Public Works Director- (949) 644 -3330, dawebb @newportbeachca.gov Fong Tse, Assistant City Engineer (949) 644 -3321 San Miguel Park Restroom Building and Picnic Structure Replacement Project - Completion and Acceptance of Contract No. 5541 (CAP14 -0005) At your regular April 22, 2014 meeting, City Council awarded the San Miguel Park Restroom Building and Picnic Structure Replacement Project Contract No. 5541 to Big Ben Construction, Inc. for a total contract amount of $303,271.00. The work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and c) Release the Faithful Performance Bond one year after this Council acceptance. FUNDING REQUIREMENTS: Excluding the new shade structures, concrete picnic tables and trash receptacles that were purchased separately, funds for the construction contract were expended from the following account: Account Number Account Description General Fund 7015- C1002044 Amount $283,057.66 DISCUSSION: Overall Contract Cost /Time Summary Awarded Final Cost at Contingency Actual % Due to % Due to Contract Amount Completion Allowance Contract Directed Unforeseen Change Change Change $303,271.00 $290,517.86 10% or less (4.21%) (7.94 %) 3.73% Actual Time Allowed Contract Time (days) 50 -8 42 The contract has now been satisfactorily completed. A summary of the contract cost is as follows: Original bid amount: $ 303,271.00 Actual cost of bid items constructed: $ 279,220.40 Total change orders: $ 11,297.46 Final contract cost: $ 290,517.86 Prior to this project, the former 25+ year old modular restroom building in San Miguel Park had deteriorated to a point of becoming unsightly and required frequent maintenance and repairs. Additionally, the overhead timber shade structure over the picnic area was removed due to its deteriorated condition. The San Miguel Park Restroom and Picnic Structure Replacement Project has now been completed to the satisfaction of the Public Works Department. The contract improvements installed by Big Ben, Inc. at the park site included a prefabricated masonry restroom building, new retaining walls, integrally colored concrete pavement with a diamond -cut pattern, reconstructed concrete sidewalks connecting the existing parking lot and the picnic area, new concrete access ramps, and a freshened parking lot with new pavement striping and markings. The contractor also installed a new shade structure ($46,118.65), concrete picnic benches and trash receptacles ($8,009.28) that were purchased separately by the City to expedite work completion. In addition, two existing barbeque grills were replaced with new units provided by the Municipal Operations Department to further enhance the park aesthetics and function. The final construction contract cost was 4.21 percent below the original contract amount due to changed field conditions as well as some value engineering. Two contract change orders were executed to resolve unexpected field conditions including a collapsed sewer lateral line that serves the new restroom building; unmarked electrical conduits and wirings that interfered with the work; incorrectly sized circuit breakers; additional retaining wall backfill that was needed to protect several existing mature trees in place (which screen the restroom building from the residents above); and an extra height concrete retaining curb needed to retain future landscaping irrigation or storm runoff onsite. A summary of the project schedule is as follows: Estimated Completion Date per 2013 Baseline Schedule 8/26/2014 Project Awarded for Construction 4/22/2014 Contract Completion Date Per Notice To Proceed 8/26/2014 Actual Substantial Construction Completion Date 8/14/2014 ENVIRONMENTAL REVIEW: The Project was determined to be exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15302 (Replacement or Reconstruction) of the CEQA Guidelines. This Exemption covers the replacement or reconstruction of existing structure and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaces. M NOTICING: This agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENTS: Description Attachment A - Location Mao M ATTACHMENT A SAN MIGUEL PARK -O� J� r �v Cn ICJ _ a N.T.S. SAN MIGUEL PARK CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT LOCATION MAP C -5541 09/23/14 ME,