Loading...
HomeMy WebLinkAboutSS2 - Balboa Village Project• October 10, 2000 STUDY SESSION AGENDA ITEM NO. ss2 TO: Mayor and Members of the City Council FROM: Public Works Department SUBJECT: REVIEW HARDSCAPE PATTERNS AND MATERIALS FOR THE BALBOA VILLAGE PROJECT RECOMMENDATIONS: Discuss options on which materials and patterns are to be used for the proposed streets and sidewalks and provide guidance on what Council desires. 2. Discuss options on maintenance of the streetscape and provide guidance on what Council desires. INTRODUCTION • At the February 22, 2000, City Council meeting, Staff was directed to solicit proposals for professional services to design pedestrian and streetscape improvements for the Balboa Village area. The Balboa Village project will include the pier parking lot, the pier plaza, street improvements, Peninsula Park, Washington Street Restroom, and Ocean Front. (See the attached Council Memo). On May 23, 2000, Council authorized the City to execute an Agreement with Psomas to provide pre- design, design, and construction services for the Balboa Village Improvement Project for a fee of $493,131. The scope of work includes: • Pedestrian and streetscape improvements • An odor assessment at Washington Street and Bay Avenue • Design of water, sewer, streetlight, and storm drain improvements Several other projects will be underway concurrently with the Village Plan including: 1. Forming an Underground Utilities Assessment District. 2. Re- designing the Washington Street and Balboa Pier restrooms. 3. Designing the landmark tower at the corner of Balboa Boulevard and Palm Avenue. 4. Performing a human health risk assessment for the methane and hydrogen sulfide emissions at Washington Street and Bay Avenue. 5. Preparing a negative declaration for the project. E SUBJECT: REVIEW HARDSCAPE PATTERNS AND MATERIALS FOR THE BALBOA VILLAGE PROJECT October 10, 2000 Page 2 The proposed Village Plan improvements would be constructed in two phases: • Phase I — FY 2001 -2002 Construction of the Balboa Pier Parking Lot improvements, Pier Plaza improvements, Main Street connection to the A Street Parking Lot, Balboa Boulevard improvements, and storm drain facilities in Washington Street. Phase II — FY 2002 -2003 and FY 2003 -2004 Construction of the Balboa Village streetscape improvements from Ocean Front to Edgewater Avenue. Note: A Phase III is conceptually planned to construct improvements along Edgewater Avenue. PROJECT STATUS The site plan for the proposed sidewalk and street widths has been reviewed and approved by the Public Works, Fire, Marine, and Police Departments. Based on this site plan, Psomas is preparing drawings for the new streets and City -owned utilities. Seventy -five percent complete drawings are expected to be submitted to the City in October 2000. Planning is ongoing for the selection of hardscape materials (sidewalks and roadways), patterns, and colors. Based upon staff research, concrete with integral color and lithocrete (concrete with granite or glass aggregates bonded to the surface) appear to be materials that will provide durability, good wearing surfaces, and an enhanced appearance to the hardscape. With regard to pavement patterns, preliminary design development drawings have been • prepared by Psomas showing the use of different patterns for each street. The drawings have been presented at meetings with the Balboa Merchants and Owners Association (BMOA) and the Promote Revitalization of our Peninsula (PROP) Committee. In general, there has been a positive response to the proposed patterns and the use of a distinct pattern on each street. However, some members of the BMOA and the PROP felt it would be beneficial to use only one pattern to unify the entire village. Following a site walk on September 12th, detailed design development drawings are now in preparation showing proposed locations for trees, street lights, street furniture, and pavement patterns. These design development drawings will be circulated for comments during October. Several meetings have been held with BMOA and representatives of the Peninsula Point Association to discuss future tree planting on Main Street. Although discussions and additional research are underway to find a canopy tree suited to the Peninsula environment, new street trees that have been suggested for Main Street include the Queen Palm and the Hong Kong Orchid. The street trees designated for Balboa Boulevard, Palm Street and Washington Street are the Queen Palm, Mexican Fan Palm, and King Palm respectively. At this time, no change is anticipated for these designations. Two types of streetlights are being considered: the City's standard concrete pole with acorn luminaire or an aluminum pole streetlight that is also being considered in Corona del Mar. Several meetings are anticipated with City staff, the light vendor, and the Business and Community Associations. • SUBJECT: REVIEW HARDSCAPE PATTERNS AND MATERIALS FOR THE BALBOA VILLAGE PROJECT October 10, 2000 Page 3 • TOTAL PROJECT COST Psomas has prepared a preliminary cost estimate. The following table compares this preliminary cost estimate with the conceptual costs submitted with the February 22, 2000 Council Memo. Table 1: Cost Estimate Comparison Task Description Phase I Engineering Design, Environmental Documents, Permits Pier Parking Lot Pier Plaza & Lot A connecting driveway Balboa Boulevard ' Construction Services 16% Contingency Conceptual Preliminary Cost Estimate Cost Estimate * February 22, 2000 September 27, 2000 Will 1 •f I 380,000 Total Phase I Cost $2,900,000 $3,070,000 Phase II Property Acquisition 350,000 320,000 • Ocean Front to S/O Balboa Boulevard 1,150,000 1,460,000 N/O Balboa Blvd. to Edgewater (includes landmark tower) 2,080,000 1,070,000 Peninsula Park improvements 80,000 220,000 Construction Services 440,000 370,000 16% Contingency — 490,000 Total Phase II Cost $4,100,000 $3,930,000 Total Project Cost $7,500,000 $7,500,000 ' Each task includes a 25 percent contingency. " Each construction item includes 6 percent for mobilization & traffic control. *" Includes Washington Street restroom, odor remediation & storm drain system. Costs for Peninsula Park are based on a "detailed concept" drawing. The preliminary cost estimate assumes that lithocrete (with granite or glass) and colored concrete will be used extensively on the project - including all sidewalks and street pavement on Main Street, Washington Street, and Palm Street, as well as Ocean Front and the pier plaza. These pavements do have a cost premium. As a comparison, here are approximate costs per square foot for various types of pavement: Standard AC (4 ") $1.00 •Rubberized AC $1.50 Stamped /colored AC $4.00 - $4.50 SUBJECT: REVIEW HARDSCAPE PATTERNS AND MATERIALS FOR THE BALBOA VILLAGE PROJECT October 10, 2000 Page 4 Standard concrete $4.00 - $5.00 • Colored concrete (PCC) $6.00 - $7.00 Colored PCC, sandblast, sawcut $8.00 - $11.00 Stamped concrete $7.00 - $10.00 Pavers on aggregate $9.00- $10.00 Pavers on AC or PCC $20.00 Wausau Tile (2 -1/2 ") $5.00 Lithocrete w/ granite (4 ") $10.00 - $13.00 Lithocrete w/ glass (20% -100 %) $12.00 - $18.00 Costs for sewer and water improvements are included in a different budget. Estimates for future unfunded Phase III improvements along Edgewater Avenue are not included in this budget. The cost of the underground utility assessment district is not considered in the estimate for the Village Plan. The City may wish to share these costs. PAVEMENT CLEANING COSTS The colored concrete and lithocrete will be sealed and will therefore be resistant to staining. However, periodic power washing will be required to keep the pavement free of gum, oil and • coffee stains. Based on conversations with the cities of Huntington Beach, Long Beach, and Santa Monica, cleaning schedules of their enhanced pavement areas during the summer range from daily to semi - weekly to weekly. During low season, cleaning occurs much less frequently. The City of Huntington Beach's annual cost to clean its 50,000 square foot pier plaza area is $22,000 with twice -a -week cleaning. The City of Huntington Beach has installed a clarifier to capture the power cleaning water. Approximately 130,000 square feet of enhanced pavement is proposed for the Village Project. If it is assumed that the sidewalks, Ocean Front and the Pier Plaza are cleaned 24 times a year and the street and intersections are cleaned 12 times a year, the annual cost would be $75,000 assuming $0.03 per square foot. Additional research regarding pavement maintenance and options for reducing costs is continuing. PROJECT SCHEDULE We are presently on track to submit construction documents to the Coastal Commission in January of 2001, and begin construction in the fall of 2001. Staff is requesting direction from the City Council at this point on preferred pavement patterns and materials. Your input is needed to keep the project on schedule. A final decision on maintenance is not needed at this time, but Staff would benefit from Council input as we continue to explore this topic. • SUBJECT: REVIEW HARDSCAPE PATTERNS AND MATERIALS FOR THE BALBOA VILLAGE PROJECT October 10, 2000 Page 5 • Respectfully submitted, 4� "40(V� - 9AWWNI41V� Ae PUBLIC WORKS DEPARTMENT Don Webb, Director By: Robert Sleiii, P. E. Senior Civil Engineer Attachment: February 22, 2000, Council Memo on the Balboa Village • • February 22, 2000 • CITY COUNCIL AGENDA ITEM NO. TO: Mayor and Members of the City Council FROM: Public Works Department SUBJECT: PHASING AND ESTIMATES FOR THE BALBOA VILLAGE PEDESTRIAN AND STREETSCAPE IMPROVEMENT PLAN (VILLAGE PLAN) AND THE BALBOA PIER PARKING LOT IMPROVEMENTS RECOMMENDATIONS: A. Direct staff to solicit proposals for professional services to: 1. Proceed with the design of the Balboa Pier Parking Lot per the Village Plan and the Austin -Foust Associates concept plan. 2. Proceed with the design of Balboa Boulevard from A Street to Adams Street per the Village Plan and Public Works Design Criteria for streets and drainage. 3. Proceed with the design for the Village Plan pedestrian and streetscape • improvements. B. Direct staff to proceed with environmental clearances and permits. C. Direct staff to pursue forming a property owner - funded Underground Utility Assessment District. D. Direct staff as to the preferred option for the upgrade of Peninsula Park. DISCUSSION: Balboa Village Pedestrian and Streetscape Improvement Plan (Village Plan) The Village Plan was prepared by Planning and Urban Design Resources and presented to the City Council during the December 13, 1999, Study Session. Staff was directed to review the improvement plan, prepare a cost estimate, propose a funding plan, and prepare a project schedule. The Village Plan shows enhanced streetscape improvements for an area roughly bounded by Edgewater, Adams Street, Ocean Front and A Street. It includes improvements on Balboa Boulevard from Adams Street to A Street, as well as within a portion of Peninsula Park adjacent to Main Street. • SUBJECT: Phasing and Estimates for the Balboa Village Pedestrian and Streetscape Improvement Plan and Pier Parking Lot Redesign February 22, 2000 Page 2 • Coupled with the Village Plan is the proposed upgrade of the Balboa Pier Parking Lot per the concept plan prepared by Austin -Foust Associates. The parking lot concept plan was approved by the City Council in Study Session on October 25, 1999. This parking lot plan, in addition to the planned street and drainage improvements along Balboa Boulevard, will be combined with the Village Plan so they can be designed and environmentally cleared as one project. The combined design project will be submitted to the Coastal Commission in one application for overall approval. The construction can be phased as funding becomes available. The project is divided into 3 phases. Phase 1 would construct the Balboa Pier Parking Lot improvements, the Pier Plaza improvements, the Main Street connection to the A Street Parking Lot, and the Balboa Boulevard improvements. Phase 2 (which could be split into sub - phases depending on funding) would construct the Balboa Village streetscape improvements from Ocean Front to Edgewater. Phase 3 is a future project to construct improvements along Edgewater. The Village Plan also will require the acquisition of the 3000 square foot parcel on the southwest corner of Bay Avenue and Washington Street for parking. The Public Works Department reviewed the Village Plan traffic circulation concept and • believes the following changes will be necessary: 1. The Village Plan calls for widening the sidewalk on both sides of Balboa Boulevard from 6 (or 8) feet to 14 feet. The resulting 40 -foot street width (curb to curb) would yield 4 lanes, each 10 -feet wide requiring vehicles in the outside lanes to drive in the 2 -foot gutter. Both outside lanes will be widened 2 feet to provide for a 10 -foot driving lane width. This modification would still allow for 12 -foot wide sidewalks along Balboa Boulevard. 2. Proposed angle parking on Balboa Boulevard will have a severe impact on traffic flow and will need to be eliminated. The angle parking would reduce Balboa Boulevard to one lane westbound and vehicles waiting for someone to leave or motorists backing out of a stall would block all traffic exiting the peninsula. 3. Several parking spaces near A Street need to be deleted in order to ensure access to County Sanitation District facilities. 4. The plan proposes to eliminate two, well -used commercial loading zones on Bay Avenue. At least one loading area must be maintained or commercial vehicles will be forced to park in a traffic lane. 5. During the design phase when precise dimensions of parcels and streets have been • determined, adjustments in the plan will be made to conform to the City's design standards. SUBJECT: Phasing and Estimates for the Balboa Village Pedestrian and Streetscape Improvement Plan and Pier Parking Lot Redesign February 22, 2000 Page 3 With regard to an on -going odor problem at Bay Avenue at Washington Street, staff recommends that methane abatement measures be incorporated into the design of the streets. As an additional consideration, staff recommends that property owners be asked to participate in forming an Underground Utilities Assessment District to complete the upgrades in this neighborhood. The estimated cost of the assessment district is $1 million. The cost of the assessment district is not considered in the cost for the Village Plan. Total Project Cost A cost estimate was prepared for Phase 1 (Balboa Pier Parking Lot, Pier Plaza, connecting driveway to 'A' Street Parking Lot, and Balboa Boulevard) and Phase 2 (Balboa Village streetscape, excluding Edgewater). Costs for Phase 3 improvements along Edgewater are not included in the estimate. Quantities were estimated using the Balboa Village Improvement Plan prepared by Planning and Urban Design Resources and the Balboa Pier Parking Lot concept plan prepared by Austin -Foust Associates. • The approximate cost for construction and property acquisition is $5 million. This estimate contains construction items that may not have been included in previous cost estimates such as demolition and removal costs, paving on Balboa Boulevard, • irrigation, lighting conduit and conductors, methane abatement, and traffic signal modifications. This estimate also includes costs for property acquisition. The construction and property acquisition costs for Phases 1 and 2 are modified as shown in Table 1 to arrive at the Total Project Cost. Table 1: Total Project Costs Construction and Property Acquisition Costs Design engineering, permitting, environmental studies, and construction services (25% of construction costs) Total Project Cost without Contingency Contingency for unknown construction items that will be revealed during final design and construction (25% of construction costs). Total Project Cost with $5,000,000 $1,250,000 $6,250,000 $1,250,000 $7,500,000 • E SUBJECT: Phasing and Estimates for the Balboa Village Pedestrian and Streetscape Improvement Plan and Pier Parking Lot Redesign February 22, 2000 Page 4 The total project cost for Phases 1 and 2, including engineering design, construction services, property acquisition, and a 25% construction contingency, is estimated to be $7.5 million. Budget Requirements Table 2 shows the distribution of the costs for constructing the two phases of the Village Plan over the 4 -year time period estimated to complete the project. Table 2: Budget Requirements Task Description Engineering Design, Environmental Documents, Permits Phase 1 Pier Parking Lot Pier Plaza Lot A connecting driveway Balboa Boulevard Construction Services Total Phase 1 Cost Phase 2 Property Acquisition Oceanfront to S/o Balboa Blvd. N/o Balboa Blvd. to Edgewater Peninsula Park improvements Construction Services Total Phase 2 Cost Total Project Cost Task Cost' Recommended Budget per Fiscal Year 1999 -00 2000 -01 2001 -02 2002 -03 $500,000 $500,000 $790,000 120,000 50,000 1,630,000 310,000 $2,900,000 $350,000 1,150, 000 2,080,000 80,000 440,000 $4,100,000 $7,500,000 $500,000 Task cost includes a 25 percent contingency. $790,000 $120,000 $50,000 $1,630,000 $310,000 $350,000 $1,150,000 $440,000 2003 -04 $2,080,000 $80,000 $0 $2,900,000 $1,940,000 $2,160,000 The current budget provides off - street parking funds and CDBG funds totaling $600,000 for the Balboa Pier parking lot and peninsula revitalization. $500,000 of this budgeted amount will be used for the preparation of the engineering design documents, environmental documents, and permit applications. The design would be prepared for both phases of the project at the same time. Design would begin in spring 2000. The design, environmental clearances, and permitting would be completed by July 2001. SUBJECT: Phasing and Estimates for the Balboa Village Pedestrian and Streetscape Improvement Plan and Pier Parking Lot Redesign February 22, 2000 Page 5 Construction would begin on Phase 1 in FY01 -02 at an estimated cost of $2,900,000. • Phase 2 construction costs are approximately $4,100,000. Table 2 shows the funding for Phase 2 split over two fiscal years beginning in FY02 -03. The proposed improvements within Peninsula Park include upgrading the pavilion gazebo to a bandstand and providing uplighting on the existing palms. The cost for these improvements, as shown in Table 2, is $80,000. Another option envisions a more extensive refurbishment of the park to include a grass area around the bandstand for outdoor seating, relocation of the flight monument, new irrigation system, new landscaping, and new hardscape. While additional conceptual design is required to define costs, a rough estimate of cost ranges from $250,000 to $350,000. Maintenance Costs The cost for providing an enhanced level of landscape maintenance within the business district, including frequent pruning, daily litter removal, maintenance of 'color' areas, and weekly adjustment of the irrigation, is approximately $1,200 per month. While additional review is required, it appears that the pavement and sidewalk enhancements will require increased routine maintenance to keep the surfaces clean. The cost per day for a steam cleaning crew and pollutant disposal is approximately $1,000. At 1 day per month the cost would be approximately $12,000 per year. Funding Sources • As outlined in the December 13, 1999, staff report to the Mayor and City Council, the additional project costs can be partially funded from the Community Development Block Grant (CDBG), the Off - Street Parking Fund, and the Neighborhood Enhancement Reserve Fund as follows: 1. The City may borrow against future CDBG allocations for approximately $2,000,000. 2. The Off - Street Parking Fund has a FY 1998 -1999 balance of $690,000, of which $430,000 is committed to the Balboa Pier Parking Lot. 3. The Neighborhood Enhancement Reserve Fund has a FY 1998 -1999 balance of $479,000, with anticipated annual receipts of approximately $240,000. 4. It is anticipated that $700,000 in Gas Tax funds will be available in FY 2001 -2002 for roadway related improvements. • SUBJECT: Phasing and Estimates for the Balboa Village Pedestrian and Streetscape Improvement Plan and Pier Parking Lot Redesign February 22, 2000 Page 6 • Table 3 indicates funding sources for the project. Table 3: Funding Sources 1999 -00 2000 -01 2001 -02 2002 -03 2003 -04 Total Engineering Design & Environmental Documents Neighborhood Enhancement $250,000 Off Street Parking $250,000 Phase 1 - Balboa Blvd, Pier Parking Lot, Pier Plaza, A St. Parking Lot Driveway CDBG - Section 108 Loan $300,000 Off - Street Parking $690,000 Neighborhood Enhancement $460,000 Gas Tax $700,000 Parking Revenue Bond $750,000 Total Phase 1 $500,000 $0 $2,900,000 • Phase 2 - Property Acquisition, Village Streetscape, Peninsula Park CDBG - Section 108 Loan $1,700,000 Neighborhood Enhancement $240,000 $240,000 Parking Revenue Bond $1,920,000 General Fund $0 Total Phase 2 $1,940,000 $2,160,000 Total $500,000 0 $2,900,000 $1,940,000 $2,160,000 $7,500,000 Parking Revenue Bond In order to implement all of the Village Plan within 4 years, the City Council may wish to consider the use of revenue bonds or a similar financing tool to fund a portion of the project costs. In the past, the City has utilized new or increased revenues from a project to pay for the bonds. While the meters for the full length of the Peninsula generate approximately $1 million annually, including the $240,000 that is directed to the Neighborhood Enhancement Reserve, this project will result in minimal additional revenue due to the small number of meters being added. Should the City Council • decide to use meter revenues to repay bonds, other General fund projects will need to be adjusted to offset the repayments. If $2.67 million were raised through the issuance SUBJECT: Phasing and Estimates for the Balboa Village Pedestrian and Streetscape Improvement Plan and Pier Parking Lot Redesign February 22, 2000 Page 7 of a revenue bond at 7.5 %, the semi - annual payments would be approximately • $150,000 for 15 years. After FY 2003 -2004, the Neighborhood Enhancement Reserve Fund could be reused to payoff the bond rather than the general fund. This would obligate Neighborhood Enchancement funds generated from the entire peninsula to one area of improvement for 15 years. Proiect Schedule Assuming the City Council approves initiation of the project and then authorizes design contracts in April 2000, construction could begin on Phase 1 by fall 2001. A conceptual schedule is shown as an attachment. The schedule is based on the following: 1. Environmental Clearance A 4 -month period to hire an environmental professional, prepare the environmental documents, a 30 -day public review period and final approval on a mitigated negative declaration. This will be done concurrently with the design. 2. Design Engineering A 9 -month period, concurrent with the Environmental Clearances procurement, to hire a civil engineering firm and prepare the design drawings and specifications. 3.. Coastal Commission Permit A 6 -month period after completion of the design is expected for the application to be agendized for Coastal Commission hearing and approval. The Coastal • Commission requires signed plans prior to starting the review process. Respectfully submitted, PUBLIC WORKS DEPARTMENT Don Webb, Director A Robert Stein Senior Civil Engineer Attachments: Conceptual Schedule Preliminary Assessment District Estimate Exhibit Sharon Wood Assistant City Manager f:\users\pbw\ shared\ council \fy99- 00 \february- 22\balboa village.doc • 3 -:8 2 ??a :3: 4 745ci::2 .I_ Ankoar, Inc. (ReseerCh Offices) 301 Hospital Road, Su/h 327 Newport Beach, CA 92003 USA (714) 031 -4327 (rake) 000 OCT 10 P'1 :39 (714) 031 -2030 (fax) hNp./Mww allhear. arm (14brld Wfde Wob site) AIIHear®AIIHear.cum (e -mail) Of:-I-- :;TY CLEF?( O;i ), L-:Z1 C ' *X'i To Members of the Newport Beach City Council: EDAfTERAGENDA PRINTED" Fax 544 -3039 110 _ kO _ O Mrs House and I understand that at the meeting of City Council the removal of the Flcus trees an Main Street in Balboa will be discussed. It Is our understanding that they will be replaced with palm trees. We wish to express our strong opposition to the removal of these trees. Main Street Is an Ideal walking street with ample beach parking. The present trees lend a relaxed and pleasant feeling to the street. Do not change this atmosphere by placing austere palm trees that have no unique distinction. My wife had planned on attending the meeting but has had to be hospitalized, so we are sending this Fax. Slncerel June and William House