HomeMy WebLinkAbout06 - Bayside Drive Storm Drain ImprovementsFebruary 13, 2001
CITY COUNCIL AGENDA
ITEM NO. 6
TO: Mayor and Members of the City Council
FROM: Public Works Department
SUBJECT: BAYSIDE DRIVE STORM DRAIN IMPROVEMENTS — AMENDMENT
NO. 2 TO PROFESSIONAL SERVICES AGREEMENT WITH DMc
ENGINEERING
RECOMMENDATIONS:
1. Approve Amendment No. 2 to the Professional Services Agreement with DMc
Engineering for $9,800.
2. Authorize the Mayor and the City Clerk to execute Amendment No. 2 to the
Agreement.
DISCUSSION:
On June 30, 1998, the City entered into an Agreement with DMc Engineering to
conduct a drainage assessment of three areas of the City that experienced flooding
during the 1997 -98 rainy season. One of the areas was on Bayside Drive near County
Road where a number of private properties were flooded. As a result of the
assessment, an Agreement was executed on May 12, 1999, to provide design services
for a new drainage system on Bayside Drive in addition to upgrading the existing
drainage system in Bayside Drive from County Road to Femleaf Avenue. Amendment
No. 1 to the Agreement was executed on July 27, 1999, to design additional drainage
facilities in an easement obtained from a property owner on Bayside Drive at County
Road.
As the final design plans were developed, staff felt the project could be expedited if all
improvements requiring Coastal Commission approval were separated from the rest of
the project and completed first. The plans requiring approval were submitted to the
Coastal Commission and a permit was obtained. Meanwhile the remaining design
plans were completed. A second set of drawings was needed to expedite the
construction of a storm drain in an easement adjacent to a home that was under
construction at Bayside Drive at County Road, and a third set of plans were completed
for the remaining improvements. This work was above the contracted scope of work.
Potholing was conducted to locate underground utilities prior to and during construction.
The utilities were found to be in a different location (vertically and /or horizontally) than
SUBJECT: Bayside Drive Storm Drain Improvements — Amendment No. 2 to Professional Services Agreement with DMc
Engineering
February 13. 2001
Page 2
shown by the utility markings in the field and therefore redesign of a number of facilities
was necessary to complete the drainage improvements.
All the drainage facilities were constructed and completed prior to this year's rains and
have been successful in conveying the Bayside Drive runoff.
The original contract amount for the design of the Bayside Drive drainage
improvements was $23,000. Amendement No. 1, which was for design of the storm
drain system within the easement, amounted to $7,060. The costs for the three
separate sets of plans, plus the pothole revisions were $9,800 (Amendment No. 2).
Therefore, the design costs for the $290,000 construction project were $39,860.
Funds are available in the Storm Drain Improvement Account No. 7012- C5100008 for
Amendment No. 2 ($9,800).
Respe bmitt ,
P BL WORKS DEPARTMENT
Don Webb, Director
``. a I
Bill ..
City Engineer
Attachment: Amendment No. 2
Location Map
/ Pv
rP� \
P
4 \
94
O�
NEWPORT
�N
LOCATION MAP
NOT TO SCALE
M -- PROJECT LOCATION
BAYSIDE DRIVE STORM DRAIN IMPROVEMENTS
C -3198
AMENDMENT NO. 2
TO
PROFESSIONAL SERVICES AGREEMENT WITH DMc ENGINEERING
FOR
BAYSIDE DRIVE AND CARNATION AVENUE STORM
DRAIN IMPROVEMENTS
THIS AMENDMENT No. 2 TO PROFESSIONAL SERVICES
AGREEMENT (hereinafter referred to as "Amendment No. 2 "), entered into this
day of 2001, by and between the City of Newport Beach, a Municipal
Corporation (hereinafter referred to as "City'), and DMc Engineering, whose address is
18 Technology Drive, Suite 100, Irvine, California, 92618, (hereinafter referred to as
"Consultant'), is made with reference to the following:
RECITALS
A. On June 30, 1998, and amended on July 27, 1999, the City and the
Consultant entered into an Agreement to provide for professional engineering services
for construction of drainage improvements on Bayside Drive and Carnation Avenue.
B. CITY and CONSULTANT mutually desire to amend the
AGREEMENT as provided herein.
NOW, THEREFORE, the parties hereto agree as follows:
1. Consultant has provided the services noted below relative to storm
drain improvements in Bayside Drive north and south of County
Road that were not part of the original agreement.
a. Prepare three separate sets of Improvement Plans. One for
Coastal submittal, another for Coastal Improvement final
drawings, and a third for non - Coastal improvements.
b. Analyze pothole data and revise trench drain, two storm
drain laterals, and roadway cross sections on the
construction plans.
C. Re- design the junction structure at County Road in order to
relocate it horizontally and vertically from existing utilities
and private property improvements.
d. Additional reprographic allowance for changes in the
Amendments to the Agreement.
2. Consultant shall be compensated for additional services performed
pursuant to this Agreement in the amount and manner set forth in
Exhibit "A ". The maximum fee for additional services shall not
exceed $9,800. The maximum amount of the Agreement as
awarded by Amendment No. 1 is $30,060. The total maximum
amount including Amendment Nos. 1 and 2 is $39,860.
3. The Term of this Agreement and Amendment Nos. 1 and 2 is
extended to June 30, 2001, unless terminated earlier as set forth
herein.
4. Except as expressly modified herein, all other provisions, terms,
and covenants set forth in AGREEMENT shall remain the same
and shall be in full force and effect.
IN WITNESS WHEREOF, the parties have caused this Amendment No. 2
to be executed on the day and year first written above.
APPROVED AS TO FORM:
By:
Robin Clauson
Assistant City Attorney
ATTEST:
0
LaVonne Harkless
City Clerk
CITY OF NEWPORT BEACH
A Municipal Corporation
By:
Mayor
DMc ENGINEERING
Consultant
LIM
Derek J. McGregor, P.E., P.L.S.
Principal
f: \users\pbw\shared \contracts \fy 00- 01\bayside drive storm drain improvements c-3198 \dmc engineering amend 2.doc
Exhibit A Summary
Addendum No. 3
Addendum No. 4
Addendum No. 5
Additional Miscellaneous
Duplicating And Printing Of
Three Versions Of Plans
$3,500
$3,940
$1,560
$9,800
ADDENDUM NO. 3
ENGINEERING SERVICES
BAYSIDE DRIVE/CARNATION AVENUE IMPROVEMENT PLANS
Below are the additional work items and associated fees included in this addendum:
A. Engineering Services
Prepare three (3) separate Storm Drain Improvement Plan Sets:
a) Coastal Submittal
b) Coastal Improvement Plans Set
c) Non- Coastal Improvement Plan Set
This work item was not included in our original scope of work for the above project. Therefore,
we request your approval of an additional fee of $3,000 plus a budget amount of $500 for the
cost of blueprints, computer plotting, reproductions and deliveries.
All terms and conditions of our original agreement shall apply to this addendum.
ADDENDUM NO. 4
ENGINEERING SERVICES
BAYSIDE DRIVE IMPROVEMENT PLANS
Below are the additional work items and associated fees included in this addendum:
A. En¢ineerine Services
Analyze recently provided pothole data relative to the final plans.
2. Compile the pothole data and revise the trench drain and two (2) storm drain
laterals accordingly.
Revise the plans and cross sections relative to the existing pavement sections
provided with the pothole data based on the above. This includes verification of
achieving the recently provided 4" AC over 10" AB minimal pavement section.
This also includes revising the specifications and quantities.
These work items were not included in our original scope of work for the above project.
Therefore, we request your approval of an additional fee of $3,740 plus a budget amount of
$200 for the cost of blueprints, computer plotting, reproductions and deliveries.
All terms and conditions of our original agreement shall apply to this addendum.
ADDENDUM NO. 5
ENGINEERING SERVICES
BAYSIDE DRIVE IMPROVEMENT PLANS
Below are the additional work items and associated fees included in this addendum:
A. Engineering Services
1. Re- design the storm drain juncture structure's horizontal and vertical location at
the intersection of Bayside Drive and County Road. This includes revisions to the
vertical and horizontal location. This is based on our field meeting on 10/2/00 and
subsequently provided fax on 10/4/00 along with City provided field survey data
on 10/5/00 and will be noted as Delta 2.
These work items were not included in our original scope of work for the above project. .
Therefore, we request your approval of an additional fee of $1,360 plus a budget amount of
$200 for the cost of blueprints, computer plotting, reproductions and deliveries.
All terms and conditions of our original agreement shall apply to this addendum