HomeMy WebLinkAbout07 - C-3566 - Buck Gully Sewer Relocation-Siphon AbandonmentCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 7 December 17, 2002 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department M. Sinacori, P.E. 949 - 644 -3311 msinacori@city.newport-beach.ca.us SUBJECT: BUCK GULLY SEWER RELOCATION /SIPHON ABANDONMENT, CONTRACT NO 3566 — COMPLETION AND ACCEPTANCE RECOMMENDATIONS: 1. Accept the work. 2. Authorize the City Clerk to file a Notice of Completion. 3. Authorize the City Clerk to release the Labor and Materials bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 4. Release the Faithful Performance Bond 1 year after Council acceptance. DISCUSSION: On October 8, 2002, the City Council authorized the award of the Buck Gully Sewer Relocation /Siphon Abandonment contract to Albert W. Davies, Inc. The contract provided for the construction of a sewer line through 215, 219, and 223 Evening Canyon Road. The contract has now been completed to the satisfaction of the Public Works Department as well as the effected homeowners. A summary of the contract cost is as follows: Original bid amount: $87,810.00 Actual amount of bid items constructed: 87,810.00 Total amount of change orders: 8,273.19 Final contract cost: $96,083.19 One change order was issued for the project at a cost of $8,273.19. The final overall construction cost was 9.42 percent over the original bid amount. SUBJECT: BUCK GULLY SEWER RELOCATION /SIPHON ABANDONMENT, CONTRACT NO 3566 — COMPLETION AND ACCEPTANCE December 17, 2002 Page 2 The change order centered around the necessary re- alignment efforts to avoid interfering planter walls, footings, pools, and other private utilities and drain lines that were unknown during the design process. The alignment had to be completely re- thought in the field because of these interferences. The contractor was extremely fair with the extra work request. If the Contractor wasn't so cooperative,it could have had impacts to the new house construction at 219 Evening Canyon. Attached is a letter from the builder thanking the City for our efforts and a job well done. Funds for the project were expended in the following account: Description Wastewater Fund Account No. Amount 7531- C5600292 $96,083.19 The original scheduled completion date was November 13, 2002. All work was completed on November 15, 2002, the extended completion date. The time extension was granted in order to complete the added work with the change order. Environmental Review: (Not applicable) Prepared by: Cvtit� _ Michael J. Sinacori, P.E. c)V" Utilities Engineer Submitted by: G. Badum 'orks Director Attachment: November 25, 2002 letter from the Richard Crawford Company Fru The Richard F. Crawford Company t3uilcic l:5 OI fill(, 015unr1 I I(mu 5 DEC 4 2002 November 25, 2002 Mr. Mike Siaacori City of Newport Beach Public Works Department 3300 Newport Blvd. P.O. Box 1768 Newport Beach, CA 92658 -8915 Dear Mr. Sinacori: This letter is to inform you that installation of the new sewer line at 219 Evening Canyon is now complete and installed to our satisfaction. Your subcontractor Albert W. Davies Inc. has been very cooperative in allowing us to dig out and recompact the soil under the new line before installation. Thank you for your cooperation in expediting this work so that we can move forward with the construction of our project. We appreciate your help. Sincerely, THE RICHARD F. WFORD COMPANY i i Daniel J. M Project Superintendent \%(III u hl I Ii-I I M( so, it ()I I lik 1 !)2( 52(; 1714 -, 5 +_> -0004 I 714) .4,_.._ -__ 9