Loading...
HomeMy WebLinkAbout02 - Mariners Mile Waterfont Walkway Study• CITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Study Session Item No. 2 March 23, 2004 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Lloyd Dalton, PE 949 -644 -3328 Idalton @city.newport- beach-.W.US SUBJECT: MARINERS MILE WATERFRONT WALKWAY FEASIBILITY STUDY RECOMMENDATION: Review the study results and provide staff direction on possible further actions regarding the walkway feasibility. • DISCUSSION: The FY 02 -03 budget contained an appropriation to retain a consultant to determine the feasibility of constructing a waterfront walkway along Mariners Mile from Newport Boulevard to the Balboa Bay Club. This Study has been completed by Cash & Associates Engineers and Architects (Cash), and it has been reviewed by the Harbor Commission. The summary of the Study and the Harbor Commission's comments are attached hereto. Copies of the complete Study are available in the Public Works Department for review. A major portion of Cash's work was to research property and business ownership along the waterfront and to schedule individual onsite meetings with business and property owners. In these meetings, Cash explained the components of the Study, disclosed ownership of easements within the parcels, and received verbal input concerning the project. Some owners agreed to follow up the meeting with their written comments, all of which are included in the appendix to the Study. In summary, the Study indicates that it is feasible to construct the walkway, although it would be a lengthy, controversial, and costly project. Many easements already exist along the waterfront for such a project and from Pacific Coast Highway (PCH) to the waterfront. Certain of these easements may need to be widened or renegotiated in order to be used for the proposed project, while other easements would need to be purchased • or voluntarily dedicated to make the project viable. SUBJECT: Mariners Mile WalerHent Walkway Feasibility Study March 23, 2004 Pape 2 Many privatelyowned buildings and structures along the waterfront would need to be • modified or strengthened in order to build t .kway. The Appendix of the-Study r.. includes photographs of each parcel aloWthe:Waterfront and estimated coi*-to buy land and construct the walkway within or adjacA to each parcel. Today, most Mariners Mile dock installations extend into the Bay to the maximum legal limit, as defined by a federally- established ' pierhead line'. If a waterfront walkway was to be built along Mariners Mile, the 10t foot space needed to construct the walkway could be provided by relocating or removing some of the boat docks. Removing the docks would be very costly, since the City would need10 compensate their owners for their permanent loss of dock space. Removing Id also be counterproductive to the City's renown as an enclave for pleasure and fierrcial boating facilities. There is no space to relocate docks within the Mariners Mile waterfront. However, the docks could be moved further into the bay, but then most of them would cross over the pierhead line. To mitigate this, Staff could request the federal govemment to reestablish the pierhead tine further out into the bay. This would allow the existing docks to be simply moved outward, thus eliminating the need to compensate dock owners for permanent loss of slip space. Obtaining federal permits and approvals needed to reestablish the pierhead line would be a lengthy, tedious, and costly exercise. The Summary of the Study cites that it would take approximately 18 to 39 months and cost about $150,000.00 to $500,000.00 to produce • the environmental detail and assessments required to accomplish this task. The time and cost relates to the extent of pierhead extension requested and the number and type of studies required to justify the extension. Certain Mariners Mile business and property owners would also seek compensation from the City for devaluation of property value due to impeded access to docks, obstruction of views, or other physical impairment caused by the walkway. This is the case where the proposed walkway would interfere with views from a restaurant, impede use of boat launching facilities, etc. During the Harbor Commission meeting, several comments were made relating to providing more analysis regarding the physical and economic benefits and investigating complimentary issues such as pedestrian circulation and parking in the Mariners Mile area. The project would undoubtedly attract more visitors to the Mariners Mile area; accordingly, the project must be coupled with the need to provide additional public parking and pedestrian access to the walkway. It was suggested that it may be feasible to build a public parking garage on the inland side of PCH and a pedestrian bridge over PCH to facilitate public access from the parking garage to the walkway. These concepts were not included in the scope of work for the walkway feasibility study. is SUBJECT: Mariners We Waterfront Wakway FeasUlty Study March 23, 2004 Pape 3 • If the City Council desires to move forward with the project, staff recommends that the City Council direct staff to begin obtaining the approvals and permits needed to extend the pierhead line into the turning basin so as to avoid displacing dock space. In addition, the City Council may wish to direct staff to Investigate the pedestrian circulation and parking issues throughout the Mariners Mile business area including the feasibility of building a public parking garage on the inland side of PCH and a pedestrian bridge over PCH to join the walkway. 0 • If staff determines that consultant services are needed to accomplish the City Council's direction, staff will request the City Council to approve a budget amendment to provide for such services at a later date. Environmental Review: Not applicable at this time. Funding Availabil'dv: Not applicable at this time. Prepared I. s . L!Mign Engineer Attachments: Study Summary Harbor Commission Comments Submitted by: e en G. Badum Public Works Director Mariner's Mite Waterfront Walkway City of Newport Beach, Public Works u Mariner's Mile Waterfront Walkway Feasibility Study (C -3548) City of Newport Beach Public Works Department INTRODUCTION The following report is a collaborative effort between individuals representing the City Council, City of Newport Beach Public Works, individual property owners along the study area, Paragon Partners Ltd. providing the land and water value study, and Cash & Associates, to assess the feasibility of constructing a walkway along the waterfront area know as Mariner's Mile. Mariner's Mile is composed of 24 separate parcels, representing 19 separate ownerships. Among the predominantly private ownership of this strip of land is one ownership by the State of California (Orange Coast College) and one non - profit organization ownership (Boy Scouts of America). • The concept of a waterfront walkway along Mariner's Mile has been of interest to various community leaders over the last 20 years. The California Coastal Commission has requested the City of Newport Beach to investigate the potential for this walkway for several years, as providing public access to the water's edge is a primary charter of the Commission. The Mariner's Mile Walkway is a controversial proposal, as it would traverse through predominantly private property that currently encompasses various uses ranging from commercial to residential. For the purposes of this report, reference to the "Design Team" refers to Cash & Associates, led by Mr. Randy H. Mason, and Paragon Partners Ltd., led by Mr. Charles Wadell, Jr. Meetings with City Council members Mr. Tod Ridgeway (Mayor) and Mr. Don Webb, along with Mr. Lloyd Dalton of Public Works were held to understand the nature of the proposed walkway as well as obtain an understanding of existing easements and conditions. is CASH & ASSOCIATES 1 Manner's Mile Waterfront W City of Newport Works Department • A. CITY AND DESIGN TEAM GOALS The Goals provided to Cash & Associates by the City of Newport Beach for this project were simple: Assess the technical feasibility as well as the associated project build -out costs for a continuous walkway along Mariners Mile waterfront. The purpose of this walkway are stated as follows: There are currently few opportunities for either citizens of Newport Beach or outside tourists to have access to the water's edge. This is particularly true along one of Newport Beach's noteworthy spots; Mariners Mlle. Other major waterfront cities in the United States have created waterfront boardwalks along city coastlines that have become destination points and fostered local business success and growth. The City of Los Angeles is currently embarking on an ambitious waterfront enhancement program in San Pedro and Wilmington to bring new life to a tired waterfront. The City of Long Beach has embarked on a major campaign to upgrade the waterfront with the recent Queensway Bay project, aquarium and commerciaUresidential developments along the downtown Long Beach waterfront. The Lido Village boardwalk in Newport Beach is also an example of a public walkway along the waterfront that attracts public use and enhances local business. it is envisioned that a new continuous boardwalk along the waterfront of Mariners Mile will rejuvenate the area, providing access for adjacent and City-wide residents • as well as tourists, promoting local business establishments and creating a positive atmosphere, now and in the future. The City of Newport Beach recognizes that this project possesses both technical as well as property use and ownership challenges. The City believes that the potential benefits of this walkway are worth pursuing, but require this feasibility study to assess the issues and costs before making final judgement. The City of Newport Beach requested a non - biased assessment of the issues and an independent evaluation of this plan by Cash & Associates. To this end, the City of Newport Beach has neither guided the study, nor attended the various meetings between the Consultant and the individual property owners, so as not to influence the nature of the discussions and study development. The Goals of the Design Team included assessing potential options for the proposed walkway including landside and waterside solutions assessing technical and safety issues, accommodating ADA access and compliance, and proposing pathways that minimize cost and disruption to existing uses. The City of Newport Beach desired a wide boardwalk, in the range of 8 to 10 feet wide if possible. As noted later in the study, some areas along the pathway cannot attain these widths without major construction and are proposed to be narrower, due to existing site constraints and associated costs and impacts to widen these walkways. • Due to project study funding limitations, it was not the intent to exhaust every project alternative and assess each and every project cost associated with the proposed walkway. The intent of CASH & ASSOCIATES 2 Manners Mile Waterfront Walkway Feasibility Study (C -3548) City of Newport Beach, Public Works Department this study is to determine techr" feasibility and "ordeW- magnitude" costs associated • with the project, and to determine the desire of the City and-community to continue their interest in this project. Therefore, the detailed cost estimates in the rear portion of this report have been broadly bracketed, to account for the conceptual level of this study and the wide range of potential impacts on the cost of this project. It is important to note that the architectural theme and treatment of the walkway, including material selections, railings, seating, lighting and landscaping, although all very critical factors to the planning, design, and a successful development, was not the focus of this study and would be subject of future study, planning and detailed costing, when deemed appropriate. For the purposes of providing a comprehensive construction cost estimate, generalized unit costing for the architectural treatment of the walkway for the items noted above have been included in the construction cost estimates in this report. B. EXECUTIVE SUMMARY A walkway along the Mariner's Mile waterfront is technically feasible. Special technical challenges exist along several of the properties, in particular the various boat yards, but solutions exist for each property. In order to provide this walkway as a continuous pathway along the waterfront, the route traverses over both existing landside and waterside spaces. Some pathways utilize existing parking lot areas and building corridors, while other potential routes occupy water space currently occupied by floating docks and boats. Property owners were contacted and the project issues discussed. There was a wide range of • responses voiced regarding the merits of this project. Some owners perceived a public or commercial benefit resulting from the proposed walkway, while others did not. All property owners had specific concerns about various aspects of the walkway, regardless of their position for or against the project. These issues and concerns are included in the body of this report. Refer to the Appendix of this report for formal communications from property owners willing to express their opinions in writing. These letters and/or written communications were provided upon request of the Design Team for inclusion in this report. Based on the proposed pathways noted in this report, the estimated 1" quarter 2004 construction cost for this project is between $3,000,000 and $5,000,000. "Soft" costs associated with design and project contingency could range between $750,000 and $1,250,000. Land acquisition associated with this project could add between $2,500,000 to $4,000,000. Costs associated with obtaining approval to extend the pierhead line beyond current limits could range between $150,000 to $500,000, depending on the environmental detail and assessments required, and take between 18 to 39 months to complete. These estimates assume that the majority of lost water space can be recreated by extending the pierhead line further into the channel, thus not impacting water space revenue over the long- term. If the Federal pierhead line cannot be relocated to mitigate lost water space caused by the walkway layout, a cost range of between $1,000,000 to $3,000,000 may become an additional project factor. - • CASH 8 ASSOCIATES 3 Manner's Mile Waterfront Walkway Feasibility Study (G3548) City of Newport Beach, Public Works Department •Other potential project cost impacts may include business interruptions, severance damages, temporary construction period impacts, and other potential related costs and damages were not a focus of this report, but should be investigated further, if this project proceeds. Conversely, potential benefits of the walkway that may include extinguishment of public easements that could revert back to the individual property ownerships, as well as potentially enhanced business environments, were not factored into this study. Based on our understanding of the funding for this project, it is not the intent of the City of Newport Beach to have the impacted private property owners along the Mariner's Mile alignment pay for the improvements associated with this walkway. Funding would be generated through various public mechanisms and possibly augmented by private contribution. C. STUDY PROCEDURE AND WORK PLAN The procedure for this study was as follows: 1. Meet with City officials to determine project goals and discuss project challenges. 2. Determine property ownership. A formal title report process was not part of the project scope; therefore, ownership listings were obtained through various City inquiries and field discussions with property managers and owners. • 3. Project Notification to Property Owners: Several notifications were sent to property owners and managers regarding the nature of the study, and scheduling meetings with each property owner and/or representative to discuss the specifics of each property. 4. Aerial photographs, field surveying/dimensioning and still photographs were utilized to establish a baseline for the various layouts and options. 5. Pathway concepts were developed for each property. In some cases, two to three alternative concepts were developed for consideration, due to special issues and challenges. 6. Meetings were scheduled with each property owner and/or property manager. Program goals and pathway concepts were presented, and comments were received from each property representative. A letter was requested from. each property owner stating support or opposition, as well as any specific issues or concerns that represented the owner's specific circumstance. 7. Conceptual Walkway Development Plans were revised based on further development and information obtained at these meetings. 8. Construction cost estimates were prepared for each site. Land/water acquisition • costs were also evaluated and quantified by initiating a study of recent property sales. Other potential project costs have been listed in this report, but have not been quantified and would be subject to further study in a subsequent project phase. CASH & ASSOCIATES 4 Manners Mile Waterfront lid 9. This report was assembled from all the communications, studies and documents • developed during the course of this study. D. WALKWAY DEVELOPMENT PLANS The existing, proposed and alternative conceptual development plans for each parcel are provided in Section 1 of the Appendix. An aerial photograph of the walkway extent has been provided in Fig. is that follows, with various easements and Federal bulkhead and pierhead limit lines noted. The Mariner's Mile project has been divided into six (6) "zones", as presented in Fig. I b that follows, and in Section 1 of the Appendix. There is no special significance to the organization of the six zones other than for purposes of presentation and consolidation, to clearly illustrate the properties at a reasonable drawing scale. Each parcel along the pathway is illustrated in Section 1 noting both the existing conditions as well as the proposed walkway plans. Figs. 2a & 2b that follow, identify the limits of this study. is CJ CASH & ASSOCIATES 5 Jr T - „'t ' � r� t1 :S .,. , "`. Y v �, . ' Y.P. �J. -•. � `� �'`� ` \'r��, - _ i %E� � ,. i �: .. ) qr ' =pY `�. .. ...... �.'i —cr .. . . . _ i %E� � ,. i �: .. ) qr ' =pY `�. . }'Iljj,, ��. ��R i ., -_r !�F � �..- � . � � i a.^ i .. �.. :x #.+ 9: > c . i; ;� -- is .�. � ^" 4 �� < { ` Z �° 1 _ }j ew j -jam' 1 (t '� _ ! � �Yk _ :�f, y4 , 5 __ i u _ _ j, �a - i ` +ry 41.x. :'�.0 - ff$xa, l �. S.S _ a O� Z �i N� p2 N ,Iql �I zm) N 3� z� x 3 e0' L z0 � U U. Z W W Z O N Q g J 9 `1 e s R V Mariners Mile Waterfront Walkway Feasibility Study (C -3548) City of Newport Beach, public Works Department •It should be noted that the Walkway Development plans are not based on discussions with the City of Newport Beach and would be subject to their ultimate review and approval, as well as other governing agencies. Based on Design Team's experience with similar projects and a knowledge of agency concerns, the proposed plans are consistent with accepted policies and it would be expected that local, state and federal approvals could be obtained. In addition, all concepts, alternatives, and options for this walkway are the brainchild of the Design Team, and should not assume that individual property owners or City officials necessarily agree with or sanction all of the concepts represented in these Walkway Development plans. . The California Coastal Commission has been contacted, and the general concept of this public walkway expressed. Based on these discussions, the California Coastal Commission is in support of this plan, and will review the project in greater detail once it is formally submitted. Existing pedestrian pathway easements, either horizontal (parallel to the waterfront) or vertical (perpendicular to the waterfront connecting to Coast Highway), property, federal pierhead and bulkhead lines are noted on the Walkway Development plans in this report. All easements and various legal lines must be verified once full Title Reports are authorized. Various "Walkway Types" are noted in the following Fig 3, representing various cross - sectional details and concepts for the public walkway. A detailed condition survey of the existing seawalls, owned by individual property owners, was not an element of the scope of work for this project. Based on age and the brief observations made during our site walks, most seawalls will • require structural rehabilitation and/or replacement in the coming years and could experience damage during a major localized seismic event. Based on uncertainties regarding seawall condition, we have selected "Type I" from Fig 3 as the over - the -water walkway. This walkway type does not rely on support offered by the existing seawalls. All project costing is based on the Type I walkway, where the walkway route is over the water. E Fagade Improvements: The introduction of this new pedestrian walkway along the waterfront will expose the public to portions of existing properties that previously were not subject to public view. Improvements would be necessary to rear and side yard areas, screening of utilities and trash enclosures and improvements to wall finishes, landscaping, etc, to provide a durable and aesthetic walkway. CASH & ASSOCIATES 10 a: n i k e 1 i; n 4 n i 0 • r� Mariner's Mile Waterfront Walkway Feasibility Study (C -3548) City of Newport Beach, Public Works Department 0 ZONE 1 The east edge of the Newport Blvd Bridge over the Newport Blvd Channel defines the westerly boundary limits of the Mariners Mile study area. Zone 1 is composed of the multi -story 3333 Coast Highway commercial building, marina and parking lot, owned by Golden Shores. This property already has both vertical and horizontal easements established from previous capital project improvements. The majority of boardwalk along this waterfront in this zone is 10 feet wide, with isolated locations narrowing to 5 feet wide due to the installations of the Harbormaster office and a gangway approach ramp. In general, the existing walkway width appears adequate. Site improvements to support the walkway project would include relocating a stair and an ADA chair lift alongside the multi -story building, and providing a cantilevered sidewalk extending over the adjacent property line along the Villa Nova Restaurant. General upgrades to pavement, sidewalks, railings, lighting and landscaping would also be part of the overall plan. ZONE 2 Zone 2 includes Villa Nova Restaurant, The Towers, and Mariners Mile commercial building. Villa Nova Restaurant: The pathway across this property is planned to run over the water, as the building is located over the water's edge on piles. A 6 to 8 foot wider pile - supported walkway is proposed to connect from the 3333 Coast Highway property to the adjacent The • Towers interface. This pathway would impact the existing docks and gangway access, resulting in a loss of slip rental, unless pierhead lines.can be relocated channelward. The Villa Nova ownership requested this planned walkway not be located directly against the existing building frontage and include a clearance space, providing a more comfortable atmosphere for restaurant patrons. It was also requested to lower the walking path, if possible, so as not to limit views of customers seated and dining in the restaurant. The Towers: The pathway across this property is proposed to be located through and beneath the waterside Tower. It is proposed that the pathway be supported from the existing concrete pile -cap girders spanning the Tower support columns and supporting the floors above. The additional weight of the walkway is considered negligible in comparison to the weight currently being supported by the foundation of the building, but this would need to be verified by a structural engineer at a later date. The pathway would impact the existing docks resulting in a loss of berthing area, unless pierhead lines can be relocated channelward. The walkway width is proposed to be between 6 to 8 feet wide. Mariner's Mile Building: The building already has a waterfront walkway easement that serves only this parcel. This walkway is located approximately 3' -6° below the top of seawall. At high • tides, the walking surface is below the harbor water level, and the seawall is required to prevent water from flooding the office space of the first floor. CASH 6 ASSOCIATES 12 Manners Mile Waterfront Public Works Department Utilizing the existing pathway and easement in any new proposal provides two challenges at the • two far ends of the property. In particular, if the existing easement were a part of the new walkway, it would be necessary to create a ramp over the existing bulkhead at the west end of the property and ramp down to the existing walkway easement. Obtaining headroom beneath the overhang for this route would require great expense and would alter the building and support of upper floors. A similar challenge exists on the east end of the property. Due to these conditions, an independent walkway located channelward from the seawall is proposed. This walkway is proposed to be 6 to 8 feet wide. Due to the approximate 3.5 to 4.0 foot elevation differential between these two parallel walkways, we would not suggest a lateral connection, thus making both walkways independent from one another. This over- the -water pathway will impact the existing docks resulting in a loss of slip rental, unless the pierhead line can be relocated channelward. Zone 3 includes The Waterfront commercial building, the Chart House and related office building, Billy's Restaurant, the Rusty Pelican Restaurant, and Larson's Shipyard and related office buildings. Pathway widths are suggested to be between 6 to 8 feet, unless noted otherwise. The WaterFront: The Waterfront commercial building currently has an approximate 10 foot • pedestrian walkway across the frontage of the property, and little other work is deemed necessary. An ADA- compliant ramp is required to replace the existing stair interface, between The Waterfront and building to the east that includes the Chart House restaurant. Chart House: The Chart House Restaurant property also has an existing walkway that requires cosmetic upgrade. This walkway narrows in spots to a little over 5 feet in width, due to columns that support the upper floors and roof. Widening this walkway beyond it's current width would require relocation of the marina, and would still include restrictions at the columns that support the upper floor and root. Due to these conditions, we are not suggesting a widening of this walkway. Billy's: Billy's Restaurant has an existing walkway approximately 7 feet in width, that requires some remedial concrete repair. At the interface between Billy's and the Rusty Pelican, a new ADA ramp will be required to accommodate the change in elevation between these two properties. Rusty Pelican: An elevated over - the -water walkway is required, and is suggested to be incorporated as part of the existing structure and deck within the alignment of the proposed walkway. This proposed walkway could be incorporated with the tenant's desire to create a narrow patio area with outdoor seating. The existing deck requires structural upgrade and is currently used as a platform for washing the frontage windows. The existing gangway leading • down to the docks must be relocated, and this proposal would result in a loss of water space to the marina, if the pierhead line can not be moved channelward. GASH & ASSOCIATES 13 Manner's Mile Waterfront Walkway FeaslbiW Study (C -3548) City of Newport Beach, Public Works Department •A major challenge associated with this property is the boat yard to the east. The waterfront walkway proposal at this interface will require a bridge. Many different types of bridges could be designed for this site, but a hydraulic lift bridge hinged on the Rusty Pelican side of the water space property is currently being represented in this report as a feasible concept. There appears to be sufficient water and land space between the restaurant and the property line to develop all foundations and hydraulic equipment necessary for a bridge or this type. • • Bridge operation would be controlled by Larson Shipyard personnel, with appropriate pedestrian safety gates, electronic signage, and secondary landside access to bypass the bridge path, when the bridge is up and the public desires to pass. Similar pedestrian bridges exist along the waterfront in other locations in the United States and can become another point of interest for the public. An architectural theme for this bridge should be developed and incorporated into the design. Fig. 4 illustrates the basic concept of this hydraulic bridge, for reference. Larson's Shipyard: The bridge from the Rusty Pelican site would terminate at a new pile - supported girder along the face of the piled- supported office building. An existing walking deck (8 to 9 feet in width) is in place along the waterfront of this office building and is being proposed to be the continuation of the Mariner's Mile pathway. Along the eastern face of the office building, a new pile- supported walkway is required over the water (6 to 8 feet in width), as the building is located on the seawall's edge. This walkway will eliminate dock space and will result in a loss of revenue, unless the pierhead line can be relocated channelward. CASH & ASSOCIATES 14 11 u y } 1 M" eo A Mariner's Mile Waterfront Walkway Feasibility Study (C -3548) City of Newport Beach, Public Works Department • ZONE Zone 4 includes the following facilities: Port Calypso/Marina Properties, Joe's Crab Shack Restaurant, Josh Slocums Restaurant, the Wig Shop /Residences, South Shore Yacht Club, Bayport Yacht, and the Hornblower Cruises office complex. Port Calypso/Marina Properties: The frontage along the walkway of the Port Calypso property is composed of a parking lot. Although a landside walkway is feasible, it would eliminate several parking spaces and is considered undesirable. Therefore, a short section of landside walkway, along with a pile- supported walkway over the water is proposed. The over - the -water walkway may impact the existing docks, and result in some loss of revenue, unless pierhead lines can be relocated channelward. Joe's Crab Shack: The Joe's Crab Shack Restaurant property has no existing access around the channelside face of the complex, since the building is located directly adjacent to the seawall. The west face of the building has a narrow walkway, steps and a platform that serves one exit doorway. A narrow 4 foot walkway exists on east side of the building and could be incorporated into the public walkway. Due to these conditions, a new 6 to 8 foot wide pile - supported walkway is proposed on the west and south faces of the building. This independent walkway will impact the dock system revenue, unless the pierhead line can be relocated channelward. . Josh Slocums: This restaurant is supported by an existing gravity seawall and no waterfront space exists for a walkway. A new 6 to 8 foot wide pile- supported walkway is proposed to be located adjacent to the existing seawall. This walkway may impact the existing docks, and result in some loss of revenue, unless pierhead lines can be relocated channelward. Wig Shop/ Rear Residences: It is proposed that the over - the -water walkway extend across this property, as well, so as not to interfere with the existing landside property open spaces. This walkway may impact the existing docks, and result in some loss of revenue, unless pierhead lines can be relocated channelward. South Shore Yacht Club: It is recommended that the new walkway return onto existing paved surfaces along the frontage of the South Shore Yacht Club. It is proposed that this walkway be approximately 6 foot wide. If the existing boat hoists are removed or relocated or the use of this property were to change, this walkway could be widened to 8 to 10 feet. Bayport Yacht: It is recommended that the new walkway continue on land behind the seawall, as is proposed for the South Shore Yacht Club. Slight impacts to the parking lot would be required for this orientation, but no loss in parking stalls is anticipated. Pedigree Marine Inc.: This property contains a boat yard and utilizes a travel lift. This represents a challenging condition for the public walkway and must be carefully planned and • managed. The proposed concept includes a series of fences and rolling gates that prevent the public from wandering outside of the pathway limits, and closes access to the public walkway during operations of the travel lift. Operation of the gates would be managed by boat yard personnel. Creating this walkway will reduce the current size of the maintenance yard and will CASH 8 ASSOCIATES 16 Mariners MYe Waterfront impact boat yard operations and revenue. Risks and liabilities relating to public and commercial • use of these common open spaces must be further discussed and reconciled. Homblower Cruises: The Homblower Cruise property has an existing walkway along the waterfront approximately 6 to 8 feet in width. A wall that divides the Homblower area with the adjacent property must be removed to create a continuous pathway. A stair that serves the second level of one of the buildings must be relocated to provide the proper width needed for the walkway. The relocation of this stairway may be problematic, due to City Planning Department requirements for view corridors and open space. ZONE 5 Zone 5 includes the following facilities: Windows By The Bay, Ardell and Duffy Boats. Windows By The Bay: This property currently has a waterfront walkway of approximately 7 feet in width, that meets the requirements of this project. A portion of the walkway extends beneath the overhang of the existing building. It is understood that potential plans for the redevelopment of this property may be in conflict with City desires of providing a public walkway across this property. Ardell Properties: This property currently has a waterfront walkway that meets the requirements of this project. At the south end of the property, the walkway must be built over the water in order to traverse around an existing building that is built over and beyond the • bulkhead. It is proposed that the block wall that divides the Ardell Property from the Duffy Boats site be removed to provide a continuous walkway. It is understood that potential plans for the redevelopment of this property may be in conflict with providing a public walkway across the property. Duffy Boats: This property is particularly challenging due to the heavy use of the landside operations that includes boat sales and boat maintenance, including frequent boat launches using a modified forklift. The maintenance yard is quite small and congested with boats staged for repair, and any land -based walkway would severely impact existing operations. The proposed concept presents an independent waterside walkway, with a new boat jib crane and hoist to launch and retrieve boats. Various risks and liabilities are associated with the common public and commercial use of this property, requiring additional discussion and dialog. Zone 6 includes the Boy Scout Base, and the Orange Coast College Sailing Base. Boy Scout Base: The Boy Scout Base facility is currently under reconstruction. A public walkway along the waterfront is a project component of the design, and a reduced copy of the site work plan is included in this report for reference. No additional work is necessary for this • property. CASH & ASSOCIATES 17 Mariner's Mile Waterfront Walkway of Newport Beach, Public Works Department •Orange Coast College Sailing Base: This facility currently has a waterfront walkway that . meets the requirements of this program. Some upgrading of the pavement finish would be required. Orange Coast College Sailing Base represents the westerly limit of the Mariners Mile route and study area, at which point the public is directed to the sidewalk along PCH to walk further southbound to a public lateral walkway through the Balboa Bay Club site and to the waterfront. E. PROJECT IMPACTS, ISSUES AND OBSTACLES All property owners were contacted as part of this program and meetings were coordinated on- site with most property owners and/or managers. Property owners not available to meet on -site were contacted by phone or e-mail, and comments were received. The following is a summary of the impacts, issues and comments received from the various owners along the proposed walkway, as well as those issues perceived by our Design Team. Refer to the Appendix section for letters received from various property owners that address specific project concerns in writing. GENERAL: Some owners supported the concept of a walkway, but generally had reservations about specific areas of concern. Some owners looked at the public walkway as an opportunity to enhance current operations and provide greater visibility. Some owners were very opposed to a public walkway and fell this was an invasion of their property rights and/or future • development plans. • Walkway Usage: A general skepticism was voiced that this walkway may be built at high expense with associated risks and property operational constraints, and public usage may not be as high as expected. Some owners compared this proposed walkway to the Lido Village public walkway in Newport Beach, where the pathway meanders along businesses and restaurants. Although there were perceived benefits to restaurant and yacht broker businesses, controlled access to floating docks was a concern of most respondents. • Parking: Parking was an issue with many of the property owners contacted. Increased public usage of the waterfront would require additional parking. People visiting the waterfront may spend more time on the waterfront, and thus parking durations would increase. • Loss of Water Space: Where the proposed walkway extends over the water, a loss of water space would occur and the dock revenue would be impacted. Property owners would expect long -term reimbursement of any lost revenue due to this condition. Federal Pierhead Line Extensions: Cash & Associates has investigated the possibility of extending the existing federal pierhead line as part of this project. Although only informal discussions have taken place to this point with Federal agencies, it is believed to be feasible • to extend the existing pierhead lines by some modest amount. Studies will be required regarding navigation and the planned channel width as well as the Federal dredging limits and conditions. If deemed appropriate by all agencies, the pierhead line could be extended channelward, thus providing the needed additional water space for Mariner's Mile berthing CASH & ASSOCIATES 18 Mariner's Mile Waterfront Walkway Feasibility Study (C -3548) City of Newport Beach, Public Works Department requirements. Pierhead line realignment will take time due to the required studies and • associated approvals, with estimates between 3 to 10 years to obtain ultimate approval, depending on the nature and extent of the pierhead line relocation. If extension of the pierhead line is desired, it is recommended that studies be commissioned by the City of Newport Beach as soon as possible, since Federal and County approvals can take several years to obtain. Cash & Associates is in the process of preparing a listing of potential requirements and effort duration for obtaining the permits. • Loss of Landside Property: The walkway proposals relate to a loss of property, unless easements already exist, and monetary reimbursement for this property is expected. Various types of property ownership exists along the waterfront of the Mariner's Mile strip. Some ownerships involve City and County Tidelands, others are owned by the State of California, while others are privately owned. For the purposes of this study, these varied ownership conditions are ignored, and not made part of the analysis. In addition, for the purposes of this study, it is assumed that land will be acquired from each property owner at market value. It should also be understood that establishing the market value of waterfront property is not an exact science and is subject to formal negotiations between the City of Newport Beach and the individual property owners. • Business Interruption/s: If disruption to existing uses or operations are involved as part of the development or during the construction process, several property owners voiced their concerns that some sort of reimbursement for this disruption be included in any settlement. is • Security and Safety: The security of property, both landside and waterside was a concern of many. Gates would be required with locking hardware to prevent the public from walking on the docks or into commercial property uses. Various owners inquired as to how the City would monitor and provide security for this walkway; i.e., guards and/or camera surveillance. Along buildings, a walkway buffer space was requested by restaurant owners, so seated restaurant patrons have a more comfortable dining experience. Lighting for the pathway was an issue of concern, as well. It was recommended that decorative pole- mounted lighting be provided and maintained by the City of Newport Beach. • Special Events: During the Christmas Boat Parade, several restaurant owners voiced a concern about the public congregating along the pathway, limiting the view of the parade by customers. A desire to "lower" the walkway and provide some separation between the walkway and the face of building, was expressed. • Noise: It was noted that a public walkway and related uses; i.e., patio dining, may impact residential concerns across the channel on Lido Isle, in regards to noise. It was generally felt that noise could be minimized by management of the space within acceptable levels. • Maintenance of Public Walkway: Many owners were concerned about the maintenance of the walkway. There is a perception that additional trash will be generated due to public • access to the water's edge, both landside and waterside. Property owners do not want this additional responsibility and cost associated with maintenance of the walkway. CASH & ASSOCIATES 19 Mariners Mile Waterfront Walkway Feasibility Study (C -3548) City of Newport Beach, Public Works Department • • Walkway Links: Links for public access to Lido Village and the Balboa Bay Club were voiced. It was felt that these links would insure a higher usage and success of the walkway. It was noted that a public access easement already exists across the frontage of the Balboa Bay Club. • Cost of Construction: Several property owners voiced a concern that the proposed walkway would be very expensive and wanted the City's assurance that they would not be the source of funding. In addition, costs associated with potential lighting of the walkway, including cost and location for transformers, utility trenches and distribution, maintenance, and pathway upkeep must be addressed. • Walkway Liabilities and Damage: It is anticipated that public access along existing properties will result in higher risks and exposure, as this relates to the potential of property damage, personal injury, fire and theft. Individual property insurance policies are expected to be impacted. In addition, during construction of any new walkway, damage could occur to existing structures, including the seawalls. These costs and risks are expected to be assumed by the City of Newport Beach or Others, and not the various property owners. • Public Restrooms: It was noted that a public walkway would require public restrooms. Property owners do not want existing building facilities to be used for public restrooms, due to the increased liabilities and maintenance costs. • • Severance Damages: Some owners voiced their concern that a public walkway would negatively impact the value, use and marketability of remaining property, resulting in severance damages. It is not within the scope of work for this Report to solve all specific issues or to address valid concerns Identified by the City of Newport Beach, Cash & Associates, and/or voiced by property owners. It is the Intent of this Report to present all issues of concern for assessment and discussion by the City of Newport Beach City Council, property owners, and the community. All of these issues can be addressed, If contracted to do so in the future. F. COST ASSESSMENTS The walkway cost estimate includes the following general elements, although not every parcel requires each item noted: 1. Pavement upgrades including new surfacing. 2. Building side yard beautification. 3. New waterside railings, gates and transition plates, where access to docks are required. • 4. New elevated walkway consisting of concrete piles and deck. CASH & ASSOCIATES 20 Manner's Mile Waterfront Walkway Feasibility Study (0-3548) City of Newpon Beach, Public Works Department 5. Standard walkway signage and special electronic signage coupled to boat • launching operations, where applicable. 6. Retrofitted stairs and ramps to meet ADA compliance requirements. 7. Relocation and extension of floating docks, where required, including guide piles. 8. Walkway fixtures such as benches, landscaping and lighting. 9. Lift bridge alongside the Rusty Pelican Restaurant. 10. New boat lift at Duffy's Electric Boat facility. Construction costing data is based on estimated prices for the 1� quarter, 2004. Costing has been presented in unit pricing terms; i.e., costs per square foot or linear foot, where appropriate. Costs for items such as walkway surfacing, landscaping, and architectural barrier railings can vary greatly depending on the nature of the design and materials selected. Based on the estimates prepared, and the uncertainties of the plan at this early stage, the project costing has been bracketed by providing a cost range, from 20% lower to 40% higher than the estimate sheets provided in the Appendix. The estimate for this project would be further refined at each subsequent stage of design, and as more guidance and detail is established. 1. Construction Cost Range: $3,000,000 and $5,000,000 • 2. Soft Costs (Design & Project Contingency): $ 750,000 and $1,250,000 3. Land Acquisition. $2,500,000 to $4,000,000 4. Pierhed line extension: $ 150,000 to $ 500,000 These estimates assume that the majority of lost water space can be recreated by extending the pierhead line further into the channel, thus not impacting property owner water space revenue over the long-term. If the Federal pierhead line cannot be relocated to mitigate lost water space caused by the walkway layout, water space purchases totaling $1,000,000 to $3,000,000 I may be needed. This project will require an environmental impact study and/or report. Environmental costs associated with EIR mitigation concerns have not been budgeted in the pricing above, as yet. Environmental concerns may include traffic, parking, noise abatement, inter -tidal mudflats environmental concerns, and channel navigation. As previously noted, other potential costs and damages are not made part of this evaluation. See the Appendix for the Market Value evaluation used for assessing property acquisition costs. • CASH & ASSOCIA TES 21 • L J • Mariner's Mile Waterfront Walkway Feasibility Study (C -3548) City of Newport Beach, Public Works Department Cash & Associates appreciates the opportunity to assist the City of Newport Beach with this exciting project. It is our hope that this report provides valuable information and enables the City of Newport Beach to objectively assess the potential issues and costs and make the appropriate decisions. We would also like to express our appreciation to all the property owners that took time to meet with us and express their opinions about this proposal. Cash & Associates is available to answer any questions or provide additional information and/or study, if so desired. Very truly yours, Randy H. Mason, P.E. President CASH & ASSOCIATES Engineering and Architecture CASH & ASSOCIATES 22 Date: March 12, 2004 Harbor Resources Division Memorandum To: Lloyd Dalton, Principal Civil Engineer, Public Works Department From: Tom Rossmiller, Manager Harbor Resources Department Subject: Comments on Mariners Mile Waterfront Walkway Feasibility Study Following is a compilation of comments from the Newport Beach Harbor Commission. I have paraphrased many of the comments in order to provide a more concise listing of their concerns. Also attached are the comments in their original format. The Feasibility Study should provide a more detailed definition of the goals and objectives of the proposed project such as: • Allow greater public access to the Waterfront of Newport Harbor, thereby increasing the public's awareness of the harbors marine oriented activities; • Enhance the exposure of the public to the retail /marine elements of Mariners Mile, i.e. boat brokers and charter companies; • Create a friendlier waterfront atmosphere in Newport Beach. In addition to a public walkway, consider amenities such as provisions for public guest docks. The Feasibility Study should provide a listing of potential physical and economic benefits: • Improved occupancy of existing "dead" and underutilized commercial water frontages seen along some of this high value property; • Achieving the (underutilized) existing potential for outdoor waterfront dining at multiple levels of all of the waterfront restaurants; 0 is • • • Higher visibility for yacht sales, charter, brokerage and boat rentals through increased foot traffic and accessibility drawn by these and other uses; • Reduced lot -to -lot local car trips by residents and visitors to multiple uses along the waterfront, thus reducing overall local traffic on PCH in this congested area; • Additional fire and police access and visibility; • Use of the water area for portions of the walkway not achievable on land; • Use of the existing underutilized portions of waterfront walkway and access easements which were constructed in the past, but are "dead- ended "; • Creating links to the other side of PCH with bridges, walks, etc. • The Feasibility Study should also consider other factors: • Newport Beach already provides a tremendous opportunity for viewing the water and "going to the water's edge ". The study should recognize that this project is part of a larger effort to provide waterfront access to the extent feasible throughout the harbor; • A market study is needed to show the usage that the walkway will likely get, who the user group is and what the resultant • business gains and /or losses might be. o Accommodating the security needs and controlled access related to the boatyards and rental boat dry storage /launch by walk - arounds or other simple means where needed (avoid expensive bridges, etc.); • Meeting the overwhelming parking needs of the existing commercial and visitor - serving uses, as well as future walkway visitors through new parking structures and an overall parking plan; • Expanding the water area available for berthing reconfiguration to meet fire code, design standards, market demand, etc. by extending the pierhead line, or by granting exceptions for moving docks for reasons of fire safety, navigational safety and public access /ADA; • Encouraging renovation of waterfront uses to take advantage of the presence of a waterfront walkway, and to redesign to accommodate and create new security, views, and expanded sales /revenue areas; • Creation of a Mariners' Mile "sense of place" linked visually, economically, and physically to the water by a waterfront/to-the - water pedestrian network rather than as parallel car - oriented is commercial strips oriented to PCH; • Creation of expanded parking capacity/accessibility through the creative design and construction of at least two parking • structures on the inland side of PCH with planted /open space /viewing roof decks to serve as an attractive foreground view for the residences on the bluffs above, with commercial uses on the ground level; • Linkage of uses and parking areas on both sides of PCH by two or more pedestrian bridges crossing from the parking structures to the waterfront side of PCH, and serving as visual "gateways" defining Mariner's Mile; • Creation of a comprehensive docking facility reconfiguration master plan for the entire length of Mariners' Mile; • While initially appearing overwhelming, the cost estimates are appropriately /necessarily conservative and overstated at this point in the process, but they tend to so discourage the casual reader in that they artificially constrain further consideration of the idea; • To reduce potential costs a number of these areas could be served by a floating walkway rather than by adjustments to their existing structures or land areas. This would also reduce the visual blockage of concern to some restaurants, and provide a variety of experiences for people along the length of the walkway (above /adjacent to the water; on the water, etc.); • • This proposed project needs strong, articulate, continuing, patient and creative political sponsorship and leadership by the elected representatives; • The private sector, particularly the Mariners' Mile business groups and Chamber of Commerce need to weigh in constructively on the general concept of this project; • How the intent, results and future follow -on of this study are described, by whom and in what forums will determine if there is any future to this idea. is Ss2- DICK'S DOCK LLC 668 N. COAST Hwy. #193 LAGUNA BEACH, CA 92651 PHONE/ FAX: (949) 497 -2487 January 12, 2004 VIA DIRECT MESSENGER City Council City of Newport Beach 3300 Newport BI. Newport Beach, CA 92663 Re: Proposed Mariner's Mile bayside walkway Ladies and Gentlemen: Dick's Dock, LLC is the owner of the property on which the Rusty Pelican restaurant is located. We rent the land and building to Rusty Pelican restaurant. We also operate the marina on the bay side of the restaurant. As owner of the land and building and the marina, we have a keen interest learning how the proposed bayside walk will affect our interests. We expect that our marina tenants and the restaurant will have a similar interest and that you may hear from them also. We are writing to respond to your request for comments about the proposed bayside walkway. Although we understand the concept has been under discussion for many years, the idea is new to us. We and our neighbors have made inquiries seeking specific information about the project and have learned that there is little that is definite and few particulars are available to us. Therefore, it is difficult to give you completely focused comments. Nevertheless, we offer you our initial thoughts and questions in this letter. After we receive more information about the proposed project, we will doubtless have more thoughts and questions. This project appears to be somewhat analogous to the City seeking to build a new public pier at the beach. We are told that the City thinks a walkway would enhance "public access" to the bayside, and that is a good thing, just like a pier gives increased niihlin —A in n —.l 4L.;— TL - IL....... I:L_ _ :_ _1..: ........ ._i__�_�.._ DICK'S DOCK LLC City Council City of Newport Beach January 12, 2004 Page 2 who presently live and work along the bayside. And we want to know how the City plans to cope with and provide public services for all these new visitors. In general, we have questions and comments about impacts on the existing marina tenants and our tenant, the Rusty Pelican restaurant. We know that if there are adverse impacts on our marina tenants and our restaurant tenant, they will not be pleased. We also know that if there are adverse impacts on our tenants, those impacts will have a negative economic impact on Dick's Dock, LLC. We want to know how the City plans to reduce or prevent all of the negative impacts. 1. There are only a limited number of parking spaces on our property serving restaurant patrons and the people who visit their boats in the marina. There are no extra spaces for new visitors who wish to stop in and go for a stroll along the bayside. The City presently provides extensive parking facilities to serve visitors to its piers. If the City requires this walkway which will attract many people like a pier does, how will the City provide parking for these who are not restaurant patrons or marina tenants and visitors? 2. A concern unrelated to the City's obligation to provide parking for people that its new project attracts to the area is the problem the marina tenants and the restaurant operator will have in keeping those visitors from using parking spaces on their private property intended for marina tenants and restaurant patrons. What will the City do to prevent the adverse impacts of this parking problem? 3. An attraction like this will require services for the new visitors, such as restrooms, drinking fountains, trash containers, maintenance and cleanup. What will the City do to assure that there are adequate facilities, trash services, maintenance and cleanup so that adjacent residents and businesses are not burdened with this effort and expense? 4. Piers and beaches are closed at night, and are not available to the public after closing. However, the restaurants along the walkway remain open until early DICK'S DOCK LLC City Council City of Newport Beach January 12, 2004 Page 3 round - the -clock attraction? What will the City do to assure that the lighting and activities on the walkway do not disturb the peace and quiet of marina tenants? 5. During the holiday boat parade, this area fills with visitors to the restaurants who enjoy the parade. There is hardly sufficient parking to handle those patrons of the existing businesses. How will the City deal with the additional traffic congestion caused by the extra non - restaurant patron visitors who wish to view the parade from the walkway? How will the City provide parking for these extra visitors? 6. During the holiday boat parade, the partially completed walkway areas in front of the restaurants are currently used almost exclusively by restaurant patrons. Virtually no other visitors go there because they aren't attracted there, no completed walkway exists, and of course, no parking is available. There surely will be an influx of non - restaurant patrons if a walkway is completed. What will the city do to prevent these new visitors from clogging the walkway in front of restaurants so that restaurant patrons can't see the parade and will be discouraged from visiting the restaurants? 7. Completing the walkway improvements and connecting its various parts will require extensive new construction, remodeling, removal and relocation of bulkheads, walls, marina facilities, code compliance such as ADA, and other dislocations and improvements. Are we correct in assuming that, since this project is required by the City, the City will pay for this work and accept the liabilities associated with it? If the City won't pay for this, who will? If the City will pay for this, where will the money come from? 8. We suspect we have touched on only a few of the impacts that will result from completing a walkway along the bay. There are probably many more impacts that we have not thought about, but which must be considered. A project of this magnitude surely requires a complete environmental impact report so all of those affected can understand the physical, environmental, economic and other DICK'S DOCK LLC City Council City of Newport Beach January 12, 2004 Page 4 We appreciate the opportunity to begin discussions about the proposed walkway. We will have more questions and comments as we obtain answers to the questions in this letter and as we gain more understanding of the proposal. Dick's Dock, LLC i � Y i� By. David VVinckler, Owner & Manager cc: Homer Bludau, City Manager Lloyd Dalton, PE — Public Works Dept. Randy Mason, Project Manager — Cash & Associates v _ I a'f, rr fin. I �. Pelican 3 Mariner's Mi Waterfront Wall Feasibility Sty (C3548) City of Newport BI 1 R s, Mariner's Mi Waterfront Wall Feasibility Sty (C3548) City of Newport 6i Goals • Technical Feasibility • Potential Hard &Soft Costs • Property Owner Response • Project Challenges Executive Summary • Walkway is Technically Feasible • Property Owner Resistance /Support • Project Cost Estimate — Construction Cost: 3.0 to 5.0 mil dirs — Land Acquistition: 2.5 to 4.0 mil dirs — Soft Costs /Conting: .75 to 1.25 mil dirs — Water Acquisition: 1.0 to 3.0 mil dirs Total Range: 7.25 to 13.25 mil dirs Development Comi3on • Pavement upgrade • Building /Sideyard Beautification • Railings and gates • Land & Waterside walkways • Landscaping, Benches, Signage • Pole- mounted area lighting • Stairs and ramps • Dock relocations • Lift Bridge & Equipment Stud Limitations • Title Reports • Soft cost analysis: bus, interrupt, severance damages • Elevation surveys of walking path • Coastal Commission Input EASEMENT OVERVIEW PROPOSED MARINER'S MILE WATERFRONT WALKI NEWPORT BEACH ARDELL YACHT SALES BAYPORT JOSH PORT CALYPSO & MARINA PROPERTIES RIII.Y'S THE DUFFY'S WINDOWS PEDIGREE SOUTH SNORE; WIG SHOP & ACES GRAB ARSONS BY THE BAY —' MARINE, INC YACHT CLUB ' RESIDENTIAL SHACK SHIPYARD FCA Cash & Associates :I.STY PELICAN GI6 HOi -GUANO Mn & GATES BRIDGING TOE PLATE Ex1ETING PILE SUPPORTED / - 4ElWALL., WILLAMPP CMC RS vue RELOCATED GANGWAYS, MERE REQUIRED 11IIII` TYPE I (OVER- THE - WATER) GUARD RAIL CANTILEVERED MISTING SEAWALL F� REPLACE TIE N003, IF NECESSARY `— ENGAGE 3-1.1. -`VIII FREINFORCING INTO NEW CONCRETE CAP vA A�.4� ✓` l• TYPE III (OVER- THE - WATER) F CA Cash & Associates E ISTINY SEAWALL -GUANO RAIL TYPE II (OVER- THE - WATER) . -OYANO MIL MEN REQUIR ED BALING, WHEN EOYINE P MISTING 11 SEAWALL CAP TYPE IV (LAND -BASED ALONG SEAWALL) WALKWAY TYPES ZONE ZONES j BULKHM LINE ZONE %EfHMME ZONE3 ZOP � •.r,+e :,i�?• +�I��t •'�-1I jai t•�= L e ��.[ yr "i ��. i�l i.��1�1�i4 i � � �. � •r�fi /. Y � a F 1 t' i �._ j' '" �� s�illlj'{I'l�„ • � �� ___� n 1 �• ^ i �• _�, Ill I- '•1,1:1x � M, WALKWAY ZONE IDENTIFICATION 0 rl `� > r 9' Ex MARINA ,OFFICE P P�KEP . EX. PP - PEDESTRIAN EASEMENT C; WRf OF,. t ARIfW" M MILE i i _ 1 1� � 1 Q Z( LEGEND EXIS ACC PRO EAST PRO EASI EXIS REL( REW SHIF PEDESTRIAN E EASEMENT \ KHEP�� \N EXISTING EXIST. 6 DOCK - PLANTER ._ , EXISTING SEAWALL { ✓ /.. STAIR &CHAIRLIFf 5 GS. • 70 BE RELOCATED / f 1 1 G�� X0 3 4 oR�S EXISTING GOLDEN SHORES l F �. RELOCATI & CHAIRLI EXISTING EXISTING DOCK } SEAWALL -, \ CANTILEVERED WALKWAY y>,\ GC\ o. PROPOS Lz-GEND N O ; EXISTING PUBLIC AC( PROPOSED PUBLIC A PROPOSED WALKWA' EXISTING BUILDING RELOCATE GANGWA` SHIFTED FLOATING D s PaF:r -� ' .�a� .S'S'A!''" ".....T!• - ;•�t�•..� ,.._... .., GS2 t,s .. j�Ci; G.,My�4.•.r, j e � �,�a GS4 GS5 GS6 14 I .,k a GS8 f - +.iiet.7 GS9 win I map Man mmw- man j p I S12 Cn� 11 vy ZONE 6 ZONES f BULMEAD LINE ZONE 4 /- PIERSEM LINE ILIJ 9iT L I L ZONE 3 WALKWAY ZONE IDENTIFICATION � J �QY . QIERHEAD LINE 4 f_� 1 C zc MARINER'S \�4. \ MILE_ ENE. NO�1P. I S 313 LEGEND: ', _ '��" � 1 •; j! /,. EXISTII ACCES 1 PROPC EASEM PROPC EASEM - v= EXISTII RELOC G REWOf SHIFTE PIERHEAD ONE EX. FLOATING DOCKS EX. LANDING FOR `DOORWAY X. PILES EX, \GANGWAY– EXISTING,, -SEAWALL o- EXISTING SEAWALL EXISTING VILLA NOVA -1. PIERHEAD UME anir kpv DOCK AN I jo RE20RIENTED GMGWAY- PROPO'Q LEGEND EXISTING PUBLIC AC( PROPOSED PUBLIC A PROPOSED PUBLIC A EXISTING BUILDING R� RELOCATE GANGWA' SHIFTED FLOATING D I 50 goo t. goo ej I JOB wa aft"llft FLOATING DOCKS + \ \ \ \ _ PIERNEAD \ - . �c- \ gU� % ELEVATED \ TOWER -EX BLDG PLATFORM `� RE- ORIENTED BLDG. - \ i COLUMNS'. �\ SYSTEM l `GANGWAYS i (TYP) ON BLDG OHARBC R_ - a PILE CAP -t- a, (. WATERS . \/• c /' I GANGWAY - ,1 I CAP IlE ,1 ? _ ... ,';' r 4 F: A X. _ E �� � 9U, FAD "NE- GIRDERS GANGWAY •'+� } ��'` PLATFORM EX GANGWAY I 0 EX. PUBLIC ACCESS + 11 :EASEMENT (3-6- BELOW EX LANDING \1 "'• ITOPOFSEAWALU ." \� 'i "h `.; FOR DOORWAY .`'t EXISTING SEAWALL , + - EXISTING SEAWALL c w EXISTING PROPOE. LEGEND: ... EXISTING PUBLIC ACC PROPOSED PUBLIC AC PROPOSED PUBLIC AC EXISTING BUILDING THE TOWERS RELOCATE GANGWAY "- '- - -- SHIFTED FLOATING D( TT9' -i , �- r.' idJ10 0 p� TT12 I Ar Arm I EX. GANGA•AY•E)LCIDw- L . STAIRS: O`-CK A$O {A ST �';� II Ill A•' . IL }1 1� 1 EXISTING MARINER'S MILE SHFTEDFLOAnNG I DOCKS B PILES r swPTEO .! I GANGWAY L (• � M MARINER'S Ml' — wtOCATEO 3101 1 STAIR 0� 'I WIWE PROPO: LEGEND EX FLOATING EXISTING PUBLIC DOCKS EXISTING PROPOSED PUBLIC % SEAWALL — ;. EX. GANGWAY –.. \ 1 \' EXISTING BUILDING �i RELOCATE GANGW SHIFTED FLOATING EX PEOESTR" EASEMENT (F0 I BELOW TOP OF SEAWALL) ` MILE \ Mp,R1NER'S 1� 1 EXISTING MARINER'S MILE SHFTEDFLOAnNG I DOCKS B PILES r swPTEO .! I GANGWAY L (• � M MARINER'S Ml' — wtOCATEO 3101 1 STAIR 0� 'I WIWE PROPO: LEGEND ® EXISTING PUBLIC PROPOSED PUBLIC FROPOSED PUBLIC EXISTING BUILDING �i RELOCATE GANGW SHIFTED FLOATING A LA MM5 z r R =�- MM &• Ab INE v- a: KIM I t, A 15 oft", ol AOI'�. A I ZONE 6 ZONE 5 ZONE 4 rBUL. INE (-PIER MLINE 4 p ZONE 3 L-wln WALKWAY ZONE IDENTIFICATION COAST HWY i Z( LEGEND -�- EXIST ACCE PROP EASE PROP EASE EXIST RELO REM SHIFT rEa"E_ n `W—. - _ - �;1� WSJ.. ,A4 �_.:.,iY�',?'le%• - _� ✓.'. ., ' Vgl AM I.._ . .. I THE �. WATERFRONT , i K LARSON'S 2901 R_D, RUSTY SHIPYA_ CHART -- 2701 -2729 + P 2735 N BILLY'S HOUSE j j 2751 i 2801 1 COAST HWY i Z( LEGEND -�- EXIST ACCE PROP EASE PROP EASE EXIST RELO REM SHIFT EXISTING THE WATERFRONT PROVIDE NEW RAMI EXISTING rpEmSTRAN EX I EASEMENT EX I I I I FLOATING I I EWING I GANGVYAY: DOCKS SEAWALL. '-EX. STAIR EX ME PEDESTRIAN EASEMENT- WATERFRONT 29.01 EXISTING THE WATERFRONT I. THE WATERFF 2901 PROPO! LEGEND EXISTING PUBLIC A PROPOSED PUBLIC PROPOSED PUBLIC EXISTING BUILDING ISM RELOCATE GANGVI SHIFTED FLOATING PROVIDE NEW RAMI I. I. THE WATERFF 2901 PROPO! LEGEND EXISTING PUBLIC A PROPOSED PUBLIC PROPOSED PUBLIC EXISTING BUILDING ISM RELOCATE GANGVI SHIFTED FLOATING ri TW3 pp Aw I FLOATING EXISTING DOCKS - SEAVYALL- - -r - — BUINHFnD I WE EX. STAIR EX. H — ^ ! EX. GANGW e I ;, ,. 1 PEDESTRIAN (EASEMENT w! I CHARTHOUSE al I i 1 BILLY'S I 2801 I 0 It ~ w 1 EXISTING CHARTHOUSE P ROPO LEGEND; N • % /'• EXISTING PUBLIC PROPOSED PUBLIC PROPOSED PUBLIC EXISTING BUILDINC RELOCATE GANGV SHIFTED FLOATIN( LBuvMF DLINE f L •I I %{ ,I ^i ya•tta 1J /t UPGRADE CHARTF PAVING - -• I ' 281 I aI L-IL 'S - 1 P ROPO LEGEND; N • % /'• EXISTING PUBLIC PROPOSED PUBLIC PROPOSED PUBLIC EXISTING BUILDINC RELOCATE GANGV SHIFTED FLOATIN( MIT!, or 'lid MtTL EV;, CH4 in r. i or . -_- -_� •, •'F {� 1, - - _ • FLOATING L— DOCKS I- - . BULKHEAD LINE_._ % GANGWAY EXISTING I SEAWALL - -• - I i � I EX. PEDESTRIAN PEDESTRIAN ` 1 I` EASEMENT CV I 1 I� I BILLY'S wl Z --- w Cn � ' 2751 0I ° W' s Cn � U Y I EXISTING BILLY'S L_ -_EX / GANGWAY I I1 I I _ I PROVIDE EX. (' .01 NEW I PEDE RAMP EASE 1 i 2751 LU wf• / CD j :• D v' PROPO ® LEGEND N 'i /%• tXISTING PUBLIC ACC' PROPOSED PUBLIC AC PROPOSED PUBLIC AC EXISTING BUILDING RELOCATE GANGWA SHIFTED FLOATING C B6. lA 9'N 7 rill -dOW Imp 61 I 'I OA7NG DOCKS.. L. • - - - �_�x•. 1 +' GANGWAY! ' \ , I EXISTING DECK DECK "IC -. I_ (INCOMPLETE) RUSTY PELICAN II I II I EX. RAILS —% �1 I 1 bm I =1 aI LARSON'S- SHIPYARD 2701;2729 2735 f �I EX. PEDESTRIAN — w✓ I m EASEMENT p� IL J Y EXISTING RUSTY PELICAN �.'f ^� �i .cam `•I .I PROVIDE BRIDGE REBUILD EX (DRAW HOW SWING. TELESCOPIC. LIM-7 DECK —� J I s+ EX. RAILS J, 1 ,1 LARSON'S_ SHIPYARD 2701_2729 I 1 ym mil �I aI I , i RUSTY PI 273 PROPO; ® EGEND: EXISTING PUBLIC PROPOSED PUBLIC PROPOSED PUBLIC EXISTING BUILDIN( RELOCATE GANGV SHIFTED FLOATIN( 1 RP2 . • A.. 1 p cl.d� w :xl _ „).'.M•. -� - '52...1, ) 1 . i r"D rg : �h4 I Boa e 1p p71 .•.�d I • ;,....a LS IF� IEX— caNGI3A� —� ..- FXISTING DFCKI jo I � I 1 II- •- .��I�r'I�{ v� I t - J 71� EX. RAILS .L. - -- II I — I EX. SEAWALL —'/ I I ".•. � I ._ I I I z I ff 1j EX. BOAT II II I REPAIR YAF�D SHAMROCK I �I I CARSON'S 2633 I SHIPYARD �. 27( 1 -2729 I I L EXISTING LARSON'S SHIPYARD b,J UPGRADE EXISTING DI 1 3 PROV •1I r � PILF SUPPORTED / I WALKWAY rIrc ai I SHAMROCK 2633 r -. I I � I I -�J I: I. i. I •HOP TELE: DRAY I I LARK SHIPY) 2701 -2 PROPQ ® LEGEND: EXISTING PUBLIC PROPOSED PUBLIC PROPOSED PUBLIC FXISTING BUILDIN( RELOCATE GANGV SHIFTED FLOATIN( xM -lf 0' 61uuR0 ------ 3Wf.. - ------------ -xc5 axwnn. SIQl LM1API @.WE PUA "IIAI9N . ... ... ... LS2 -i LS3, Is i 7; LS7 LS9 9g n.'ip,om 41' m Gn A ZONE 6 ZONE 5 /- 6u.KHE Unc ZONE 4 �.riewaEao uue I � I ZONE 3 WALKWAY ZONE IDENTIFICATION EXISTING PEDESTRIAN E.ASEMENT I 11 iL PIERHEAD LINE 0 is —ji I-- PL -4,I CX;S­NG CLY40 PPEDESTRIAN -ISO 1'T�jl ji EASEMENT 4, JOE'S i(SHAMROCK) i. BAYPORT A FOR _26D__ 1 (YACHT SHOP! CRAB YACHT L�LA�K HORN- 2507 JOSH! BLOWER , 2 1 -637 2607 2 IJ 2601 A CQNST_tlWY ZC LEGEND: EXIST11 ACCEcl PROPC EASEN PROK EASEIV EXISTI RELOC REWO SHIM E EXISING X DECK OArgw.AYS EMrM DOCKS - i �JOIw S CRAB I SHACK M LARSON'S AREA SHIPYARD 2607 P.C.M.C. �ROCK 2633 1. - J EXISTING. PORT CALYPSO M_ ARINA PROPERTIES (SHAMROCK MRQ CK PROM LEGE-N.D. EXISTING PUBLIC A( PROPOSED PUBLIC PROPOSED PUBLIC EXISTING BUILDING RELOCATEGANGVV SHIFTED FLOATING DOCK & PLES I PrEF*f-Q LM Stif T ED DOCK C.V4GWAY JOE'S GRAB SHACK -PILL SUPPURTE 2607 u{ WALKWAY P.C.M.C: SHAM PROM LEGE-N.D. EXISTING PUBLIC A( PROPOSED PUBLIC PROPOSED PUBLIC EXISTING BUILDING RELOCATEGANGVV SHIFTED FLOATING ii�,�pp-�� :mss' .�.- • �'�, L'�r;,�'° 1 ;, ' . �•� Aft _ ;-77 1 C Julml I All K { •; T }I Y 1 FIT ( r• / • JOE'S CRAB SHACK ® LEGEND: EXISTING PU PROPOSE01 PROPOSEDI EXISTING BL _ RELOCATU SHIFTED 00 - - - SHIFTED .. FLGATiNGDOCK, .I - PIER"EAD LINE 6 PILES i � I EXISTING F DOCKS.__: .• ._ i BULKHEAD '•� BLLKHEAD,LI ' -.) _, EXISTING SEAWALI - it EXISTING „ .' ' .t SEAWALL Ff�•. • - _ .L -- •- EXIST. _ PLANTER -- - I:•' I� EXISTING I �_ IWGRADE EX. PILE SUPPI !' GANGWAY T -1 i EXIST, LANDING® .I ; .� j`q WA KwAr WALKWAY WALKWAY .'1- =? -i • DOOR (ELEVATED) -' L_ I L -EXISTING JOE'S CRAB `'i JOE'S CRA SHACK I SHACK �I �. 2607 �I '� l _ �` 2607 EXISTING PROPU JOE'S CRAB SHACK ® LEGEND: EXISTING PU PROPOSE01 PROPOSEDI EXISTING BL _ RELOCATU SHIFTED 00 i� E JC3 ..�+` . �, , NO IN I . 041 r. •.: : � .Ire:; •4 : ' .:: es.: r ;pj ;• 'T r r` � � .•. �..i � ?:.; • e �:+.I ..:'Gtr. . �. may •• .�Tp ... .. •.ii ..•iA � I e I JC7 . - - ,N , Of I ' DOLK6�lE5 - -�� r -I I I I I I I i i I I, I I i I I I j I kn5•INL I`I ''� • ♦sue 'f.° � • �y� � - _ •! {YrQ Iii _ I ` . '+ I AI{RwAl 111 \�•II' I I I EXIST. J i ; t -i4 260 I `� ail ... - / I \ . - .— - _ _-• _ JOE 5 CRAJ1SHA(',H .I . . _ _ Lz - SEAW I-� 1 JOSH EXISTING SLOCUMS 2601 EXISTING JOSH SLOCUMS - s�srEO�noArr.c DOLK6�lE5 - -�� r -I r� 'I•: I ' i I I I I I � I I I I I`I r iNIG'EO � i 1 C\ AI{RwAl 111 I, JOS! EXIST. SLOCL t -i4 260 PROPU ® EGENO EXISTING PUBLIC ACC PROPOSED PUBLIC A( PROPOSED PUBLIC A( EXISTING BUILDING — RELOCATE GANGWA) SHIFTED FLOATING D ... i+Mii •�. •r .. ;.K < nrWiYt w*•. h ��.....! - � Ir I ., I S,,�CRggSti i i ... i+Mii •�. •r .. ;.K < nrWiYt w*•. h ��.....! - � Ir I JS6 a.. JS5 a q K4 • , <r I o',tgHEAD LINE_ � � i r ' I I � I , I I I ' i I EXISTING •I . DOCK- -. I BULKHEADLINE - "I 1 I, i I II EXISTING J; I _ 1 I GANGWAY EXISTING SEAWALL' I � -EXISTING HOIST �S�QCi 1LN� SOUTHSHORE WIG SHOP I'• Z�J I J gW 25471 EXISTING SHIFTED DOCK &PILES - PIERMEAD LIN° _ ` I I i 'I I I I I I I I I - I I I � i BULKHEAD LINE' _ I ,.I f / Nr �II PILE O j SUPPORTED WALKWAY .' EXISTING 1 I '-'i SEAWALL .1 ISOUTHSHORE i WIG SHOP 2S0 I c 2547,- 0 WIG SHOP /RESIDENTIAL PROM" LEGEND: EXISTING PUBLIC ACC PROPOSED PUBLIC Al PROPOSED PUBLIC Al EXISTING BUILDING _ RELOCATE GANGWA' SHIFTED FLOATING C fih I T1111 111F 1 14" I r1r. ',- F-1 - -- I / ! EXISTING i- - EXISTING SEAWALL-- i EXISTING SEAWALL ! DOCKS I } !L Olt U, �I, - I L �I EXISTING I C "___II �T- _•L i PI GANGWAY - I N I� f (PROPOSED EXISTING , I I PEDESTRIAN HOISTS L- EASEMENT ON LAND - I i' Iz II:. IIIJ i_ - Iz ! BAYPORT I I 7 SOUTH S' , YAH z I UB _•_ '. - I IBAYPOR. YACHT L. . • .: ( YACHTYAHT -- I II 2521-2537 II " 2521 -2 'L l._ EXISTING PROPOE EGEND ® EXISTING PUBLIC AC PROPOSED PUBLIC F PROPOSED PUBLIC f SOUTH SHORE YACHT CLUB EXISTING BUILDING GANGWA RELOCATE _ .._...._......._._.... - -.... - -._. -- .... ...._- . - -.__ SHIFTED FLOATING I t< .v s ASIM N!.Nirl �66f�ii r - ' W . 1`'�' "�.`• to .;7"" _ �__ ,alts` �r F'_ERSEAD •:Yf r, _ .. r• ` . . r' I PROPOSED PUBLIC AC PROPOSED PUBLIC AC I 1 = ,EXIST'NGI r (EXIST j "DOCKS TRAVEL I .L!FT I 'EXISTING , I 1 RAILS N i I SEAWALL EmSoNu 1 'BULKHEAD I INE 1 STAIRWAY - 'I . .. •�,; iT1 ,_ I J T 1 LIFT L I EXISTING T ,AII I HORN- YARD— 1 IL y -' - E%ISTING� S' BLOWER PEDIGREE FENCE 1 2429 i MARINE INC. it fX S *ING EXISTING PEDESTRIAN PEDESTRIAN FASENENT EASEMENT i I ill BAYPORT j j l YACHT I _ I 2507. I.. I - - -I-- 51DEVIA,K , ------ '—" —�- - PROPERTY LINE (-f)AS-. IIWY EXISTING BAYPORT YACHT_ , PEDIGREE MARINE, INC. HORNBLOWER i I ' I I !I 1 I Ii { �ULKFIEAQ SIN§ i i :I I I ELECT i c` PROVIDE I IGNA s t I " ,DENq WALL I ` PROVIDE i SLIDING RELOCATED GATE —� sTAUS,V�r -� _ PEDIGREE i MARINE IN jHORN BLOWER i 2429_ „I ExISrNG I I'I PEOESaIArJ� '. I EASENENTI'4]. ! i PATH ---I SOEWA,K _ COAST W.Y PROPO; I EGFND'. EXISTING PUBLIC ACC', ® PROPOSED PUBLIC AC PROPOSED PUBLIC AC EXISTING BUILDING RELOCATE GANGWAY SHIFTED FLOATING D( U.0 too I LJJ 1�. • �\ "Waft art MI• -, T#7t', —�_' A "aw 0 po *44 1' MR, will NI Cl t's HB4 No CK ZONE 6 ZONE 5 BVLR11EPp LINE _!o ;l ZONE4 ZONE3 WALKWAY ZONE IDENTIFICATION r". COAST HWY zc LEGEND EXISTII ACCEf PROPC EASEN PROPC EASEN EXISTI _ RELOC REWO SHIFrl LXiSTING -- XISTING RROPOSED ECSMG GANGWAY- OOCKS_. WALKWAY GANGWAY ,1r. - "i . .. j. - Ezlsrrc / DUFFYS OVER nLno Lx-. ; 200 HARBOR I ViA.L % WATERS Y THE - B ARDELL BAY - _ -_ 2077-2201 I 2241 r". COAST HWY zc LEGEND EXISTII ACCEf PROPC EASEN PROPC EASEN EXISTI _ RELOC REWO SHIFrl , I I j FXISTING EXISTING ! LXISTING GANGWAY I I I GANGWAY DOCKS PIFRfic AD PINE _. ti I I I • ;� — EXISTING I - SEAWALL BULKHEAD II,NE .. _ - -.- I r �E 7C. i —. - •. _ r -^� . ZPROPOSED BUILDING OVER j PEDESTRIAN / HARBOR WATERS EASEMENT / '� I WINDOWS EXISTING w Iw ON AND --j WINDOWS DJ :z - BY THE BAY PEDESTRIANz- EASEMENT - -- ��; ¢ BY THE BAY is 2241 -- rcI o a'I 10 2241 o ` — L PROPERTY LINE � PROPERTY LI COAST HWY i COAST HWY I _ - EXISTING PROPOE. LEGEND: ® EXISTING PUBLIC ACCE PROPOSED PUBLIC ACC i PROPOSED PUBLIC ACC WINDOWS BY THE BAY EXISTING UILDING RELOCATEGANNGWAYC -_ . - - - - SHIFTED FLOATING D m %VAW WB4 I a, I-,i3,-,, wadi. J Arz �k. - P, ZCI WB7 Ail EXISTING ARDELL YACHT SALES 1 i = _ pIERHEAD LINE �l _ I I i I PII F SUPPORTED PROPOSED it ! li WALKWAY EASEMENT • — EkST. DOCKS— - - — I I E7(IS'T. GANGWAYS - 7- -L- .. -- LL- n ��.�� •- E %IST. SEAWALL ^'I . � I i I � .. — ��' � I• Y I QI - 20_ m _ �! ,w PROP,— 5-I LL ! J ARDELL o 2077 -2201 I z EXISTING ARDELL YACHT SALES 1 i = _ PROPU LECEND: -;�i!• EXISTING PUBLIC ACCE PROPOSED PUBLIC ACI PROPOSED PUBLIC AG EXISTING BUILDING — RELOCATE GANGWAY SHIFTED FLOATING DO �l PII F SUPPORTED PROPOSED WALKWAY EASEMENT I LL- AF 20_ --pl PROP,— PROPU LECEND: -;�i!• EXISTING PUBLIC ACCE PROPOSED PUBLIC ACI PROPOSED PUBLIC AG EXISTING BUILDING — RELOCATE GANGWAY SHIFTED FLOATING DO alb •,.,w \;v i i AY3 . f • • � � N ! ir. AY4 I 4'i nil. 1 ri PIERHEAD LINE_. I I EXISTING ' DOCKS ! II I i i li • i I I I I � 1 I 'EXISTING ------ - -- GANGWAY EXISTING ,_ EXISTING SEAWALL r GANGWAY; :•' I BULKHEAD LINE , IF— EX I FORKLIFT/ ! " Fes- LAUNCH T a DUFFY'S o� a' 2001 ARDELL a DUFFY'S SHIFTED FLOATING DOCK & PILES PIER4CAD UNE _I ICII _ h i SHIFTED I EXISTING GANGWAYS PILE SUPPORTED WALKWAY - I — SLIDING GATES —J cn BOAT HOIST F-i I Ol p J > cn } p ZI w W a I r F DUFFY'S 2001 PROPO: ® LEGEND EXISTING PUBLIC AC( PROPOSED PUBLIC A PROPOSED PUBLIC A EXISTING BUILDING — RELOCATE GANGWA` SHIFTED FLOATING 13 it r . r , v MW � � A ZONE 6 r c. 11 n ZONE 5 ,6 LKIJE LIME -A - 1z _7 ZONE4 ZONE3 11 170761 WALKWAY ZONE IDENTIFICATION EXISTING EXISTING EXISTING SEAWALL DOCKS -. GANGWAYS -� �i, ., r _ .. ._ _. /. FN0 OF I' WALKWAY OC_C I B-BAY �.- JOINSALBOA BAY BAY CLUB - CLUB I COAST HWY PROPOSED WALKWAY , PIERHEAD LINE. _ �L_f3U4iHEA0 LLINE_.. BOY 'SCOUTS (UNDER CONSTRUCTION) zc LEGEND EXISTIf ACCES PROPC EASEM PROPC EASEM EXISTI? - RELOC RE WOf SHIFTE piq JL BOY SCOUTS (RECENTLY DUFFY'S occ RECONSTRUCTED) 25il 1 toot COAST HWY. EXISTING BOY SCOUTS FLQA S OCC 7 ROWING BLDG A�7 -COAST H W Y RECENTLY RECON LEGEND EXISTING PUBLIC ACCE PROPOSED PUBLIC AC( PROPOSED PUBLIC ACC EXISTING BUILDING RELOCATE GANGWAY SHIFTED FLOATING 00, P l 7wl- wi a i EXISTING EXISTING SEAWALL DOCKS - .. I 1 I I I EXISTING GANGWAYS PIERHEAD LINE , - I �y ij..k _ "i. I BULKHEAD LIN r J{ I EXISTING I - - BOY SCOUTS I - - -6 ��� 1 '� -- -� (RECENTLY -��RFCONSTRUGTED ' -" - -y END Or O`G` \ l� - 1801 BALBOA PAY CLUB JOIN COIN TO APTS BALBOA occ I: i BALBOABAY I. __- 1801_ '>xt CLUB — BALBOA BAY CLUB --- LIMITS OF MARINER'S APTS MILE STUDY AREA - j COAST HAY I EXISTING O ORANGE COAST COLLEGE PROPOS LEGEND %i. EXISTING PUBLIC ACCEI PROPOSED PUBLIC ACC PROPOSED PUBLIC ACC EXISTING BUILDING — RELOCATE GANGWAY C SHIFTED FLOATING DOC I ' -" - -y END Or O`G` WALKWAY 1801 BALBOA PAY CLUB JOIN COIN TO APTS BALBOA BAY IX UB PROPERTY UNE _ _ TO PUBLIC ACCESS AT COASTI DRIVEWAY ENTRANCE Of - - BALBOA BAY CLUB --- LIMITS OF MARINER'S MILE STUDY AREA - O ORANGE COAST COLLEGE PROPOS LEGEND %i. EXISTING PUBLIC ACCEI PROPOSED PUBLIC ACC PROPOSED PUBLIC ACC EXISTING BUILDING — RELOCATE GANGWAY C SHIFTED FLOATING DOC lye °''� ,..1. � � • �1f�A1` � i �. OT 11 'Will !x. l ' •r• 1 'sue -C,✓ �•�' ' � !!'n _ ;;,:. 1 .1 1 Imaacts, Issues, ObstZ • Walkway Useage • Parking • Lost Waterspace • Lost Landside property: Parking or Commercial use • Business Interruptions • View Blockage • Noise • Maintenance and support utilities • Walkway Links Impacts, Issues, Obstcon • High Perceived Development Cost • Walkway Liabilities and Property Damage • Seawall Stability Risk • Public Restrooms • Severance Damages • EIR /EIS Mariner's Mil Waterfront Wall Feasibility Stu (C3548) City of Newport BE