HomeMy WebLinkAboutManager's_Report (19)Manager's Re ort February 10, 2010 Harbor Resources �� � g • Skimmer Island is being reduced in size to increase the capacity of the Unit 1 /III basin • Excavators are also busy dredging the basin Skimmer Island L44 �v AA Dredging —Lower Newport Bay & Rhine Channel i Funding Appropriations requests have been submitted to Senators Feinstein and Boxer Testing The Corps has officially taken the lead with the project. We are busy working with the Corps and the DMMT to finalize our dredge plan for the clean material. Rhine Channel Anchor QEA is busy with the MND and EIR for this clean up effort that will occur with the Lower Bay project Several questions remain about the City's areas of responsibility Funding is also an issue Marina Park Progress Draft re- circulated EIR has a 45 -day public comment period (January 25 to March 10). Tentatively scheduled for certification by City Council on May 11, 2010. Staff recommendation for project approval (Phase 1, 2, or 3). Permits obtained for whichever phases Council approved. Construction drawings complete after agency permit approvals. Main Differences in EIR Phased approach considered (sandy lot vs. turf lot vs. full project) Wetlands determination Lifeguard Tower I Remwe Existing Block Wall New Concrete Walks to connect HC ParkingPoints to Beach Access Locations Existing Edge of Paving .:. I� Widen I atl I I I E o I 'e E MR ' 0 ! f FSemnCe Existing / Entry "in Balboa ealeoa aoulml;� Community Center � I Rabben /Herman ExisdngSteps at Beach Access- Remove Gates _,— New Lifeguard Tower Beach 11 v Existing Sol] to Remain e _+ i `` r Ak 4h RBstitpOldsbng Par�dhg In II taR e is • F 7T77 — FaAde Pedestrian Aimess F Provide Pedestnm, Acu. -5,7 h E>n � stn RnM. Existing Girl Scout ^ - Balboa Boulenard LIE Marina Park Phase 1 Plan 0 w 11 Ii I 2009 Lifeguard Tower ,�New tifeguardTovi Beach II I � Existing Steps at Beach Access - Remme Gates I• Remove Existing Block Wall Nev, Turf Area ® Additional Decomposed Gra iteTrails to connect Pedestrian Access Points to Beach Access Locations I. Existing Edge of Paving r"°^•'0o°" r ° "^ ' ' _ TJ - - g I� II �® �I e: flestnpe Existing ParhingInSWll Meters at all Stalls I ^� ati E nn xemww.m r n vA o rrc w+o RSw^ r � Polde e8 cc ss P e¢ J�an Acde� ,L {{ E ..a. F4, on ❑ Existing Balboa Exsting Tennis Courts , nmwe r•�w . , poxaEimyhom Community Existing BrOemllaNwd Center ' Girl Smut ^ X. � louse U ap I . , . . , , . , . nea+w ahbaeman •` BBIOOe Boulevard . , a .. a .. • �_ aa gg���t Marina Park Phase 2 Plan 'IF C1esiv TfI�E Aug. 18, 2009 ti L, - Rhine Wharf Repairs & Public Dock Wharf repair Start: February 1 Scheduled completion: March 22 Public Dock Start: January 22 Scheduled completion: May 18 a- Wt The Department of Boating and Waterways, the California Coastal Commission, the Santa Monica Bay Restoration Foundation in partnership with the City of Newport Beach and Project -Green Works US Coast Guard Auxiliary, Dana West Yacht Club and the Dana Point Yacht Club Presents DOCKWALKER TRAINING • Learn about boating practices that reduce water pollution • Get training on how to talk to boaters about clean boatinit practices This FREE workshop trains volunteers to become "Dockwalkers," who conduct face -to- face boater education about environmentally - sound boating practices. Receive free educational materials to distribute to boaters at marinas, boat launch ramps, boat shows, and special events. Boater Kit Where and When: Saturday, March 20 Dana West Yacht Club (24601 Dana Drive. Dana Point, CA. 92629) 10 a.m. - 12:15 p.m Optional Dockwalking Activity from 1:00 p.m. to 2:30 p.m. Direchons to trarrvng factlrty well be sent to you with a confirmation of your registration For information visit our website at MD lm coastal ca ocnlocbryccbnd, html Or contact Vivian Matuk at (415) 904 -6905, vmatuk0wastal ca aov YOU MUST REGISTER TO ATTEND.. Deadline for Regisbadon March 171h. 2010 6 Fundlnp o, asslsl— In D- kwalki,, Iralnlnp p,.Ithd py IM1esa prpanlzMlons YESI I WOULD LIKE TO BE A DOCKWALKER LOCATION: Dana West Yacht Club DATE: Saturday. March 20, 2010 NAME OF PARTICIPANT ORGANIZATION ADDRESS' PHONE. tuaRend. Pleaseretum this Ruth prorto to date of M&Muning. Dlredons to the lain Ing wll l be sent to you with a wnrnmatlon notice. Other Issues a ■ 8 Marker (near BYC mooring area) • Steel pile has been hit, creating a hazard • Responsibility of the Coast Guard • Coast Guard issued a "notice to mariners" for 30 days. • Issue was vetted with the harbor community at the January Yachtsman's luncheon. A red floating buoy is preferred to a pile. Carter Ford has been instrumental in helping to solve this problem. Coast Guard may easily solve problem because the pile removal costs are under $5,000. Coast Guard "Ship Shore Maintenance Record" has been submitted by the Coast Guard for removal. Other Issues Mooring administration RFP Still under consideration by Harbor Resources Public Dock Extension Project 15th, 19th and Fernando St. Bid packages will go out soon. Short turn around. Award contract March 9th Council meeting. Pull permits and begin work by April. Water Taxi Council considered the item February 9. Authorized the City to test market demand by incorporating the need in an upcoming questionnaire Did not authorize Summer 2010 program Other Issues OC Natural History Lecture Hosted by Harbor Resources — Marine Education and Protection — Back Bay Science Center, 7 -9 PM March 3 — Mammals in the Ocean April 7 — Sky Above Southern California May 5 — Rescuing Wild Animals June 2 — Native American Uses of Local Plants Harbor Patrol Bulkhead Project Where will the dredged material go? 2,000 cy of sandy material Agencies have deemed it "unsuitable" for beach disposal County will dispose elsewhere (landfill, cover etc...) F- Harbor Commission Vacancies La Tim Collins John Corrough Karen Rhyne Appointed 4/9/02 4/9/02 6/27/06 Re- Appointed 6/27/06 6/27/06 Term Expires 6/30/10 6/30/10 6/30/10 Harbor Commissioners may run two full 4 -year terms. * Commissioner Rhyne may be reappointed again. Next Meeting Wednesday, March 10 6:00 pm Suggested Meeting Dates for April April 7th (Fire Conference Room) or April 21St (Council Chambers) For More Information http://www.newportbeachca.gov/HarborResources Chris Miller, Harbor Resources Manager cmiller @newportbeachca.gov (949) 644 -3043 Shannon Levin, Harbor Resources Supervisor shannon@newportbeachca.gov (949) 644 -3041