February 10, 2010
Harbor Resources
�� � g
• Skimmer Island is being reduced in size to increase the capacity of the Unit 1 /III
basin
• Excavators are also busy dredging the basin
Skimmer Island
L44
�v
AA
Dredging —Lower Newport Bay &
Rhine Channel
i Funding
Appropriations requests have been submitted to Senators
Feinstein and Boxer
Testing
The Corps has officially taken the lead with the project. We
are busy working with the Corps and the DMMT to finalize our
dredge plan for the clean material.
Rhine Channel
Anchor QEA is busy with the MND and EIR for this clean up
effort that will occur with the Lower Bay project
Several questions remain about the City's areas of
responsibility
Funding is also an issue
Marina Park Progress
Draft re- circulated EIR has a 45 -day public comment period
(January 25 to March 10).
Tentatively scheduled for certification by City Council on May 11,
2010. Staff recommendation for project approval (Phase 1, 2, or 3).
Permits obtained for whichever phases Council approved.
Construction drawings complete after agency permit approvals.
Main Differences in EIR
Phased approach considered (sandy lot vs. turf lot vs. full project)
Wetlands determination
Lifeguard Tower
I
Remwe Existing Block Wall
New Concrete Walks
to connect HC ParkingPoints
to Beach Access Locations
Existing Edge of Paving
.:. I� Widen I atl I I I E o I 'e
E MR
' 0 ! f FSemnCe
Existing /
Entry "in
Balboa
ealeoa aoulml;� Community
Center �
I
Rabben /Herman
ExisdngSteps at Beach Access- Remove Gates
_,— New Lifeguard Tower
Beach
11
v
Existing Sol] to Remain e
_+ i `` r Ak 4h
RBstitpOldsbng Par�dhg In II taR e is • F 7T77
— FaAde Pedestrian Aimess
F Provide Pedestnm, Acu. -5,7
h
E>n � stn
RnM.
Existing
Girl Scout ^ -
Balboa Boulenard
LIE
Marina Park Phase 1 Plan
0 w 11 Ii
I
2009
Lifeguard Tower ,�New tifeguardTovi
Beach
II I � Existing Steps at Beach Access - Remme Gates
I•
Remove Existing Block Wall
Nev, Turf Area ® Additional Decomposed Gra iteTrails
to connect Pedestrian Access Points
to Beach Access Locations
I.
Existing Edge of Paving r"°^•'0o°" r ° "^ ' '
_ TJ - - g
I� II
�® �I e: flestnpe Existing ParhingInSWll Meters at all Stalls
I ^� ati E
nn xemww.m r n
vA o rrc w+o RSw^ r � Polde e8 cc ss P e¢ J�an Acde� ,L {{
E ..a.
F4,
on ❑
Existing
Balboa Exsting Tennis Courts ,
nmwe r•�w .
,
poxaEimyhom Community Existing
BrOemllaNwd Center '
Girl Smut ^ X.
�
louse U
ap
I
. , . . , , . , . nea+w ahbaeman •` BBIOOe Boulevard . , a .. a .. • �_
aa gg���t Marina Park Phase 2 Plan
'IF
C1esiv TfI�E Aug. 18, 2009
ti
L, -
Rhine Wharf Repairs
& Public Dock
Wharf repair
Start: February 1
Scheduled completion: March 22
Public Dock
Start: January 22
Scheduled completion:
May 18
a-
Wt
The Department of Boating and Waterways, the California Coastal Commission, the Santa Monica
Bay Restoration Foundation in partnership with the City of Newport Beach and Project -Green Works
US Coast Guard Auxiliary, Dana West Yacht Club and the Dana Point Yacht Club
Presents
DOCKWALKER TRAINING
• Learn about boating practices that reduce water pollution
• Get training on how to talk to boaters about clean
boatinit practices
This FREE workshop trains volunteers to
become "Dockwalkers," who conduct face -to-
face boater education about environmentally -
sound boating practices.
Receive free educational materials to
distribute to boaters at marinas, boat launch
ramps, boat shows, and special events.
Boater Kit
Where and When:
Saturday, March 20
Dana West Yacht Club (24601 Dana Drive. Dana Point, CA. 92629)
10 a.m. - 12:15 p.m
Optional Dockwalking Activity from 1:00 p.m. to 2:30 p.m.
Direchons to trarrvng factlrty well be sent to you with a confirmation of your registration
For information visit our website at MD lm coastal ca ocnlocbryccbnd, html
Or contact Vivian Matuk at (415) 904 -6905, vmatuk0wastal ca aov
YOU MUST REGISTER TO ATTEND.. Deadline for Regisbadon March 171h. 2010
6
Fundlnp o, asslsl— In D- kwalki,, Iralnlnp p,.Ithd py IM1esa prpanlzMlons
YESI I WOULD LIKE TO BE A DOCKWALKER
LOCATION: Dana West Yacht Club DATE: Saturday. March 20, 2010
NAME OF PARTICIPANT
ORGANIZATION
ADDRESS'
PHONE.
tuaRend. Pleaseretum this Ruth prorto to date of M&Muning. Dlredons to the lain Ing wll l be sent
to you with a wnrnmatlon notice.
Other Issues
a
■ 8 Marker (near BYC mooring area)
• Steel pile has been hit, creating a hazard
• Responsibility of the Coast Guard
• Coast Guard issued a "notice to mariners" for 30 days.
• Issue was vetted with the harbor community at the January
Yachtsman's luncheon. A red floating buoy is preferred to a
pile.
Carter Ford has been instrumental in helping to solve this
problem.
Coast Guard may easily solve problem because the pile
removal costs are under $5,000.
Coast Guard "Ship Shore Maintenance Record" has been
submitted by the Coast Guard for removal.
Other Issues
Mooring administration RFP
Still under consideration by Harbor Resources
Public Dock Extension Project
15th, 19th and Fernando St.
Bid packages will go out soon. Short turn around.
Award contract March 9th Council meeting.
Pull permits and begin work by April.
Water Taxi
Council considered the item February 9.
Authorized the City to test market demand by incorporating the
need in an upcoming questionnaire
Did not authorize Summer 2010 program
Other Issues
OC Natural History Lecture
Hosted by
Harbor
Resources —
Marine
Education and
Protection
—
Back
Bay Science
Center,
7 -9
PM
March 3 — Mammals in the Ocean
April 7 — Sky Above Southern California
May 5 — Rescuing Wild Animals
June 2 — Native American Uses of Local Plants
Harbor Patrol Bulkhead Project
Where will the dredged material go?
2,000 cy of sandy material
Agencies have deemed it "unsuitable" for beach disposal
County will dispose elsewhere (landfill, cover etc...)
F- Harbor Commission Vacancies
La Tim Collins
John Corrough
Karen Rhyne
Appointed
4/9/02
4/9/02
6/27/06
Re- Appointed
6/27/06
6/27/06
Term Expires
6/30/10
6/30/10
6/30/10
Harbor Commissioners may run two full 4 -year terms.
* Commissioner Rhyne may be reappointed again.
Next Meeting
Wednesday, March 10
6:00 pm
Suggested Meeting Dates for April
April 7th
(Fire Conference Room)
or
April 21St
(Council Chambers)
For More Information
http://www.newportbeachca.gov/HarborResources
Chris Miller, Harbor Resources Manager
cmiller @newportbeachca.gov
(949) 644 -3043
Shannon Levin, Harbor Resources Supervisor
shannon@newportbeachca.gov
(949) 644 -3041