June 9, 2010
�� r� nrrq
Harbor M n
Dredging —Upper Bay
Project on the home stretch
Currently finishing up the Unit 1 /III Basin by the Jamboree Bridge.
Will move to Unit 11 Basin in about 4 weeks for some clean up work.
Back to Unit 1 /III near Skimmer Island for some additional dredging if project
modification is approved (likely).
Complete by the end of the year.
Dredging — Lower Bay
Coordination with Corps is continuing for design and
construction.
We've narrowed our contaminated footprint to about
500,000 cubic yards.
Main priority is to take care of the contaminants first while
we have a disposal window at the Port of Long Beach.
Port of Long Beach
Applications have been released and are due by the end of the month
—Anchor will complete.
Recent meeting with POLB indicated that our chances are high that
they will accept our material. Being shovel ready will significantly
help our chances.
Farewell Colonel Magness
On June 8, 2010, Council Thank You!!
recognized Colonel Thomas
Magness for his tremendous
contribution in helping
Newport Beach achieve our
dredging goals.
Helped secure funds to
complete the Upper Bay project
and coordinated staff to
complete the job by in 2010.
Extremely helpful in making the
Lower Bay project a reality by
pushing for funding and project
authorization. Dedicated staff to
focus on project coordination
during these early stages.
A
re
Colonel will be reassigned on June 30 for a
one -year tour in Afghanistan.
Dredging —Rhine Channel
The Mitigated
Negative
Declaration will be
released to the
public
in a
few
days
for
the
30 -day
review
period.
About 120,000 cy
Dredge main channel of contaminants with some work under the
docks as well
Also include Marina Park contaminants (if possible), American Legion
(City owned property) and 15th Street public pier area.
It is imperative that this material goes to the POLB above all else. All
efforts are focused on making this happen.
Schedule is very tight, but we are planning to be shovel ready by
January 15, 2011, assuming the POLB is ready to accept material. If
the POLB is delayed, then that buys more time for the City.
Heavy planning in the next 6 months with Public Works' help.
Relocation of vessels in the Rhine
Staging area
Community outreach and coordination
Design
Rhine Wharf Project
Milestone: Design modification approved by Building
Request from Harbor Resources and public to deviate from
flotation, draft and freeboard standards. This important delay will
greatly improve the final outcome — well worth the effort and time.
Outcome:
18" freeboard for Dead Load
10" freeboard for Dead Load + Live Load
More user - friendly dock!
Anticipated installation date is September 1. Open to the public 2
weeks later.
/A�
G
DF inghy Dock Extensions Installed This Week!
Fernando St.
�.�
�� ' / 4&3i
am
Nid
ri4 �
I
U-
�.
I 1 10-
-.0opw—. .e,-too V6
Dinghy Dock Extension -Rules
Sign subcommittee has met as reported in April
Other comments sought from the MMPSC in May
Plan going forward:
Observe dock usage after they are installed this week.
More outreach to the end users on the dock.
Fine tune our existing ideas into a solid game plan that makes sense for
the harbor community.
Bring to HC in August, then Council after that.
BEACON BAY - �1sY
OFO
R
BALBOA ISLAND CHANNEL
BAY FRONT
SAY, RO _ - ' -- - N w BAY FRONT ALLEY N
I, OP , NT gL[EYN BAYPROMMTLY
4i Py. P4 Q F p �
P P r
Q. BAL BOA AVE r Q ? 9
< w c z u vA p0
pl<� < �^
z T( w m
^ � PAR AVE O
w �
P 2 m Pl1
J�
BAY FRONT ALLEYS < z I I B Y FRONT ALLEY S o
BAY< 'wT S – — 'y j — – -1 BAY FRONT S —
M �
NEWPORT CHANNEL
I
! ' i
f II ¢
A
,
Sea Lions
Updated the code relative to sea lions
Went from two notices and 17 days, to one 7 day notice
Adopted May 13, 2010
Reminders to mooring permittees before summer season
April 2010
Contracting with South Mooring Co. to conduct night time abatement
Seal Guard also �7
working in Newport Harbor 1Y 11111 7f
www.newportsealguard.com aon 1�V
T=
Distribute stickers to commercial businesses
Goal is by end of June 2010
Working with Harbor Patrol. This year they will use their water
cannons to shoo sea lions from boats and docks
T N G E C O ll
CCommunity Resources
0., CXmmu ',Y. Our rumor; v�en r.
oiRccnw N
C[COMMVx(ry RESWPCES
arPx oRNru
LCPXdW ANWoIRECIOR
At CAVE
RNRen wren
maECroR
OC EOMMVHT' SERVIRS
NleaaeRM
E
Oc.0 Vl0.. R5
xeux U
CWNiY LIBM0.INY
OC VValIC L1aMP1E5
k C
13002 Wo mmw Rule
vme. cR 92602
enola: 666.0 Aaxs
na: 310 - 6676511
May 13, 2010
CONSTRUCTION NOTICE
For
Lower Newport Harbor Bulkhead Replacement
1901 Bayside Drive
Comna Del Mar, CA
Dear Resident
The County of Orange has awarded a contract for construction of Lower Newport
Harbor Bulkhead Replacement at the Harbor Patrol Facility at 1901 Bayside Drive
The project involves replacing the deteriorated bulkhead wall, renovation of the
guest docks and dredging amund the guest docks.
Construction of this project is scheduled to begin in June 2010 and continue to
approximately March 2011.
OC Parks' role will be that of providing the necessary inspection and testing to
ensure that the contractor's work meets the requirements of the plans and
specifications, mid the requirements of the County of orange.
It is the agency's sincere desire to accomplish this project with a minimum of
inconvenience to the area's residents. Your cooperation is appreciated, and we
in turn will work closely with you and the contractor to reduce both the occurrence
and the duration of any unpleasant conditions.
Please recognize that construction sites can be dangerous to visitors. Special care
should be taken W keep children away from the construction activity at all times.
The construction may result in temporary traffic control for motorists, pedestrians
and bicyclists and may impact perking on Bayside Drive. Please drive slowly and
safely on Bayside Drive and use caution around and near the ermance to Harbor
Patrol parking lot.
OC Parks can be contacted at (949) 585 -6422 ifyou have questions or concerns
&bow construction related activities.
SSi inxcerrellly,,/µ{v( \n^`��,^(,t�
Sdett- Thomas, an4N eger
OC Parks Design
Other Issues
D Annual Sailing / Charter Coordination Meeting
Excellent gathering of charter companies and yacht clubs / sailing
organizations.
Message: Communication between boaters and race committees /
instructors
People agreed that this past year was successful with limited
problems
However, private boats were an issue when they charge through a
regatta or a start /finish line.
Harbor Resources has assisted by calling one party so they're aware.
❑ FOR MORE INFORMATION VISIT THE HARBOR RESOURCES WEBSITE
i
4
ti
Newport Harbor �
Racecourse Markers
COAST
/ YY MIf l
G � �
(' LIDO
ISLE
..\ ®OBI UYO �6YG,.
GO
AL80A ISLAND
;NryyC, ` \
I \/ I-
0 5 mph Speed Limit Buoy
0 Yellow Spar Buoy
0 Navigational Aide
— Typical Start/Finish
J�a.Yxf
Locations
_ J Mooring Areas
uuof
N
Wt
S
0 0.25 0.5
Miles
i
of
A — — m
v
Other Issues
8 Marker
On May 5, the Coast Guard hired
Shellmaker to remove the old,
damaged pile. (37.5' of pile was
pulled.)
The pile broke off beneath the
mud line so there was question
as to what was left. Total length
of pile unknown.
On May 19, the City hired
Shellmaker to dive the site and
inspect for hazards. No trace of
the old pile either at or below the
mud line depth of 16.5 ".
GPS coordinates were taken to
memorialize the exact location if
needed in the future.
u Marina Park
Other Issues
EIR was approved by Council on May 11.
Council approved a contract with Schmitz and Associates to submit
the permitting applications to the agencies.
Project planning is in progress.
Mooring Management
Council directed staff to proceed with contract negotiations with
Harbor Patrol.
County and City have agreed on the terms and Scope of Work.
Final contract will go to Council on June 22, then County Board shortly
after that.
Harbor Area Management Plan
Final version is on my desk for Council review and approval in July.
Next Meeting
Wednesday, July 14, 2010
6:00 pm
Council Chambers
For More Information
http://www.newportbeachca.gov/HarborResources
Chris Miller, Harbor Resources Manager
cmiller @newportbeachca.gov
(949) 644 -3043
Shannon Levin, Harbor Resources Supervisor
shannon@newportbeachca.gov
(949) 644 -3041