Loading...
HomeMy WebLinkAboutItem 2 - Appeal for Dock Reconfiguration 411 Edgewater PlaceCITY OF NEWPORT BEACH HARBOR COMMISSION STAFF REPORT Agenda Item No. 2 August 11, 2010 TO: HARBOR COMMISSION FROM: Harbor Resources Division (City Manager's Office) Shannon Levin, (949) 644 -3041 shannon@newportbeachca.gov SUBJECT: Appeal for Dock Reconfiguration at 411 Edgewater Place ISSUE: Should the Harbor Commission allow the applicant to relocate an existing float and extend it beyond the Pierhead Line at 411 Edgewater Place? OPTIONS: The Harbor Commission may: Advise the Harbor Resources Manager to deny the proposal to add an extension to the existing float; or 2. Advise the Harbor Resources Manager to approve the application; or 3. Advise the Harbor Resources Manager to approve the application with modifications. BACKGROUND: At 411 Edgewater Place John Morally proposes to relocate an existing float, install three 14" piles, add a new 4' x 8' pier lobe supported by a 12" pile, and install a new 4' x 6' float to the existing dock beyond the Pierhead line (Attachment A). The proposed design reconfiguration meets the Harbor Design Criteria. However, the position of the structure is outside of the specification of the Council Policy H -1 for Bulkhead Station 112. H -1 Section D states, "U.S. Bulkhead Sta. 112 to No. 113. Piers will be permitted to extend out to the U.S. Pierhead Line. Commercial piers between A Street and Adams Street will be subject to special permits approved by the Harbor Commission." However, the pier currently extends past the Pierhead line, as permitted according to a reconfiguration in 1997. The neighboring pier structures are also positioned outside the Pierhead line (Attachment B). The Harbor Commission has the discretion to allow special permits for the commercial piers in this Bulkhead Station (Attachment C). The structures in this bulkhead station, both commercial and residential, extend beyond the pierhead line (Attachment C). 411 Edgewater Place —Dock Reconfiguration August 11, 2010 Paget After review of this application Harbor Resources staff acknowledges that this proposed reconfiguration does not meet the Council Policy criteria, yet the proposed structure is akin to those in Bulkhead Station 112. Therefore, Harbor Commission is asked to review the application and advise staff to approve the application. ENVIRONMENTAL REVIEW The Harbor Commission's approval of this item is categorically exempt from CEQA under section 15301, Class 1, Existing Facilities. "Class 1 consists of the operation, repair, maintenance, permitting, licensing, or minor alternation of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of use beyond that existing at the time of the lead agency's determination." PUBLIC NOTICE: This agenda item has been noticed according to the Ralph M Brown Act (72 hours in advance of the public meetings at which the Harbor Commission considers the item). Prepared by: Shannon Levin Harbor Resources Supervisor Attachment A: Proposed Configuration Attachment B: Aerial Photo of 411 Edgewater Place & Surrounding Area Attachment C: Aerial of Bulkhead Station 112, Existing Structures Attachment A I i~ _':`Y OF NEWPOPT - -- -- -- Proposed Configuration ;-- ;,Y- -- - —° - MT _,`' I MY .L. Or {r 'y -• a r i PFK)FILE V = 0. v IwIRY ns� — — . -- — �sr 3 -- inwmsrr, w.uuaox ScTr Fl.EWTIGN (I� IN F2A OW All -4.E - E1.eYliiIGF$ I)lT'I ON HEikl LCI}cA LOW nRl'..�. i r �„n sLec'llrn.� T Wt Pierhead Line i i �•v tda'� qa I pC iTi r44 'MA" IN NSW I I I NSw k'!Eti ws�l� � vewr yp I Z's3 4� PLAN V16N t" = U, Ilieslr•sr `�o ,�� p7( Iae ness E .�w' _rZ -r0 Attachment B Aerial of 411 Edgewater Existing Structure i Bulkhead Line v L fi°0 r n A a Pierhead Line i ..14L. Project Line J � r Attachment C Aerial of Bulkhead Station 112, Existing Structures 1 � Pierhead Line ul �s 4 1 Proiect Line 3 #� Y� a ��CJ M1 fJ S� a f -'Ik = _r