April 11, 2012
Harbor Resources
aka Po
4 �
C 6
F ~
Lower Bay Dredging - Status
Funding
Corps Memorandum of Agreement ( "MOA ") — Complete
City transferred $2.5 million to the Corps in March
Federal Funds ($4.4 million)
$2.4 M (existing) + $2.0 M (federal infusion)
County ( $6405000)
Port of Long Beach
New Disposal Deadline — June 30
Waiting for POLB execution.
Lower Bay Dredging — Status (cont.)
Schedule
Unsuitable ocean material (POLB): June 30
Suitable ocean material (LA -3): September
Dredge plan still being developed by R.E. Staite
Anticipated start date: April 25
Most likely start in Anchorage area and move along Via Lido
Soud.
Anchorage area to be significantly reduced in size
Some NHYC and "F" moorings to be relocated
South Mooring Company won the bid for mooring
relocation.
Outreach
Li Regular email updates with updated map
o Door hangers on houses
Li Personal communication through City
ae
4
k;�ilC � 1 + �� �` ,�•r` � �vs C` 1'� �lYh'!.�Iy �� '� � � fir: ..« �_ � �+ r „ �..r f n" ' ^ �.� ., , .
Xa
« ! • i � J.x �, in ;f � ��MI'�llY n � `. rpt{^A��
» (L
som
?lam ;:i�A; ,r. �, t : i \ ,.... / _. ..• . _
r V,
15
�•� mei•. h • •y,•f• ... �^�•''' �r � i- 6 � ftp. ' ..
t
Regional General Permit (RGP -54)
Permit Expired in October 2011
However, eelgrass surveys are prohibited between November —
February. Therefore, March 1 is when the permit effectively ended.
Sediment Chemistry Report completed March 5th.
Applications to the agencies are last hurdle
Coastal Commission has stated it would be relatively simple, and could
get approved by June (assuming application submitted by April 20)
Corps requires 120 days, but that could be shorter, maybe
Water Board — unknown at this time.
Wca Liuu Channel
HIiSaIC
V
15 '1, Street Bock -
Balboa Peninsula
Area approved for LA -3
m Proposed RGP -54 Boundary
Area with elevated Hg
RGP -54 areas excluded from interim extension
Dover Shores
e"
N unei.�i
W.,
Balhua
—
Yidlt
Balboa Island
�iJGll.
r/
s u •.��'ti9a
_ C X11
RGP -54 — Historical Use
For Dredging
2007 = 16
2008 = 16
2009 = 9
2010 = 7
2011 = 5
(Eelgrass is a factor in these low numbers.)
For Dock Construction
2007 -08 = 38
2009 = 3
2010 = 5
2011 = 0
(The Permit only allows for like- for -like reconstruction — most folks want to
change configuration. Permit does not help dock projects.)
RGP -54 (cont.)
Sediment testing for previous 5 year permit: $300,000
Sediment testing for current, proposed 2 year extension:
$125,000
Permit fee for the City: $1,640
Eelgrass
Eelgrass surveys are posted on the City's website in the
"Maps" section: http: / /www.newportbeachca.gov CGIS
Mapping" then "Interactive Maps ")
Nearshore survey data for 2004, 2007 & 2010
Deep channel survey data for 2004 & 2008
Newport Harbor Specific Eelgrass Plan
u Approved by NMFS
Li Approved by Water Board
Lj Coastal Commission is next
Updated California Eelgrass Management Plan
(NMFS sponsored)
ii Update to the current plan
L If Newport specific plan is adopted, then this won't have a
drastic effect
Several important proposed changes:
- Increased extent of eelgrass beds
Includes all eelgrass plus a 30' buffer area (even if there is no
eelgrass in that buffer area!)
Expanded definition of eelgrass bed
A single plant equals a bed
Bathymetric surveys required
Hydrodynamic surveys required for projects that may affect currents
�. Increased complexity of mitigation determinations
Updated California Eelgrass Management Plan
(NMFS sponsored)
Proposed plan available for review here:
http: / /www.gpo.gov /fdsys /pkq /FR- 2012 -03-
09/pdf/2012 -5811. pdf
Public comment period until May 8.
City is preparing a comment letter for the Mayor to sign
Mayor
Nancy Gardner
Mayor Pro Tern
Keith D Cunt'
Council Mr(nberg
Lirsicl Dm,k-
Michael F. Hmn
Rush N. Hill- It
SlevenI Illusionary
Edward D. Sellch
CITY OF NEWPORT BEACH
January 19. 2012
The I lonomble Comund G. Brown, Jz
State of California
Sum Capital
Sacrunento. CA 95814
OFFICE OF THE MAYOR
LrproWllwwuK ElwuNG.&mn. h.0 rm+
Jwa.o In :wJ
r.e.:
This stale's more than 3 million boafnv enlhui asLL must have a department with a Director ashow
Versus" focus u boating. Cal Boating has a compact organizational structure and administers boating
programs in a thnely end non- bumucmtic manner. Its smtmnry chamr is directly boating- related.
While 1 understand the importance of finding savings during these difficult times, eliminating Cal Boating
would not help resolve the state's fiscal problems, and would jeopardize programs ead services which the
boating community has determined to be essential and is willing to finance.
1 urge you to withdraw your proposal to eliminate the Depermem of Boating and Waterways (Cal
Boating].
Sincerely,
Gnverma `�
Nancy Qwdsa
Mayor of Newport Bench
RE: Rlieiutwn of Depanmrm of Itnatin8 and N'vmn.ns UpryrsrJ
Dear Gmcmn Brazen
I strongly opixnc' ynur pmp.ml to dnmmcne the Dapartmertt of Beatmg and Marerwa)s
[Cal Baatmi and re u'nsmutc the department as a division within the Depammvp of
Parks and Rccreanao
Llmtinatinp Cal B.apug lu. alr.mdJ born suumll5 relccred bur ornos, ..h..i it wit,
proposed b5 G.n cnan Nte A Ii mr in IW2 and 1996. and a was t,mpoxd b. U—cmor
Arnold 3chwamri Mcr in 2W3 and 2oW The n assts Cal Muting must c,mncuc remain
luy as s pal F W%
at Banana Pmvidn Acroaau bility, 1'nmoannee and Iwadenbin rtpar it rng the
:nlloconn and use or ho ter -den. ed mxcs and fees. and the best use ot'these hinds tin
pmprmm that bereft rinsing
Eliminating Cal Beat a, al reline • $ mile General Fuad dollar I he rk.Pamnun
is Graded by roster fuel tin d lim, regrursbun Ices sad intend p mcrib in
infrastructure loans FGmmatmg the department could nor licit, rru,he the current budget
crisis
('al Bnatiae rnatn tors thnmgr Lan, and amn" of b.rarcr fm,d fir Mvtrnc
ndhumnn me tbmughom rim .Lrc thin err.ures Nsarn arc.. to mnmrwm s
City Ball • 3380 Newport Boulevard • Pusl Office Boa 1768
Newport Beach, California 92658.8915 • www newpodbeachca.gov
n: Members orthe Newport Beach City Council
The Honorable Darrell Steinberg, Senate President pro Tcrti
The Honomble Bob Huff, Senate Republican Leader
The Honorable John Pcrr . Assembly Speaker
The Honorable Connie Conway, Assembly Republican leader
Moorings — A Brief Summary
800 Off -Shore Moorings
400 On -Shore Moorings
Permit Fees
Raise mooring rates to 14% of moderate to low average slip rates over 5
years. Currently in year 2.
Off -Shore
$30.71
per foot,
per year
On -Shore
$15.35
per foot,
per year
Mooring may be transferred twice in 10 years (9 years to go)
After that, all moorings must be returned to the City to be given
to the wait list.
77 7
rI�
J
m
CITY OF NEWPORT BEACH 1 THE IRVINE COMPANY JOINT PROJECT
MAR
COMMERCIAL.
I
'N
0
Public Transient Dock and
Marina Expansion
CONCEPTUAL PLAN
BALBOA MARINA WEST
Balboa Yacht Basin -
Recycling Center
Many thanks to Len Bose for his excellent ideas to
improve the BYB with a recycling center.
Due to Fire Codes, it is not possible to incorporate into
the BYB.
We have improved our bilge pad and oil collection
center
Visitor Serving Dock
Will consider dedicating a side tie on C dock for
visitors after the LNB dredging project is complete.
F-
V
1m�
s.
\
�`�%
HANDBOOK FOR
CITY OF NEWPORT BEACH
BOARDS, COMMISSIONS,
AND COMMITTEES
- HARBOR COMMISSION -
Prepared by:
Office of the City Manager
Office of the City Attorney
Office of the City Clerk
April 2012
Other Issues
Tidelands Management Committee
Next meeting Wednesday, April 18, 4:00 PM @ OASIS
Citizens Advisory Panel Update — Capital Project Prioritization
Linda Isle Lagoon Dredging
Lower Bay Dredging Update
Harbor Commission Membership on the Citizens Advisory Panel
Li Agendas posted:
http: / /newportbeachca.gov /index.aspx ?page =1822
Next Meeting
May 9, 2012
6:00 PM
For More Information
http://www.newportbeachca.gov/HarborResources
Chris Miller, Harbor Resources Manager
❑ cmiller @newportbeachca.gov
❑ (949) 644 -3043
Shannon Levin, Harbor Resources Supervisor
❑ shannon @newportbeachca.gov
❑ (949) 644 -3041