Loading...
HomeMy WebLinkAboutItem 3 - Proposed Dock and Pier Configuration - 109 Bayside PlaceCITY OF °� mz NEWPORT BEACH C9CF00.NP Harbor Commission Staff Report TO: HARBOR COMMISSION FROM: Public Works Department Chris Miller, Harbor Manager 949 - 644 -3043, cmiller @newportbeachca.gov PREPARED BY: Shannon Levin, Harbor Analyst 949 - 644 -3041, Shannon @newportbeachca.gov Agenda Item No. 3 July 21, 2014 TITLE: Proposed Dock and Pier Configuration, 109 Bayside Place ABSTRACT: The applicant proposes to remove and replace the existing dock and pier at 109 Bayside Place. According to Council Policy H -1 and Newport Beach Municipal Code Section 17.35.020(F), special permits shall be approved by Harbor Commission. RECOMMENDATION: 1. Approve the proposed dock and pier configuration; 2. Approve the proposed dock and pier configuration with special conditions; 3. Deny the proposed dock and pier configuration. FUNDING REQUIREMENTS: There are no funding requirements. DISCUSSION: The applicant proposes to remove the existing dock and pier structure at 109 Bayside Drive and replace it with a nearly identical configuration. Council Policy H -1, also called the Harbor Permit Policy, requires permit approval from Harbor Commission for permits at this Bulkhead Station. This property is located in Carnation Cove where property lines converge on one another and piers are built further out into the water due to depth (Attachment A). The proposed project includes: Seven pairs of steel piles supporting the pier to be removed and replaced with seven single piles; Existing pier to be replaced like for like; Four existing steel piles supporting pier platform to be removed and replaced like for like; Existing 18' gangway to be relocated and replaced with a 24' gangway; and a new 25' U -shape floating dock to replace the existing float like for like (Attachment B). Due to the convergence of property lines the area in which to construct a pier is limited so that the proposed structure is within the 5' setback. The northern edge of the float is within 5' of the property line. The southern side of the float is proposed to encroach approximately four feet (4) over the property line of 107 Bayside Place. According to Newport Beach Municipal Code Section 17.35.020 (B)(1) all piers and slips for Proposed Dock and Pier Configuration 109 Bayside Place July 21, 2014 Page 2 residential properties shall be set back a minimum of five feet from the prolongation of the property line. The existing configuration was built with the same setback and encroachment anomalies as the proposed configuration. NBMC 17.35.020(F)(4) requires Harbor Commission approval of a new permit where existing piers and floats encroach in front of abutting upland property owned by others when any destruction of the pier and float in which over sixty (60) percent of the replacement value of the pier and float has been destroyed. Typically these kinds of inconsistencies with encroachment and setback requirements would not be tolerated but may be approved by Harbor Commission in consideration of the special conditions due to the location within Carnation Cove. Special consideration should be given where conditions exist such as when property lines are not approximately perpendicular to the Bulkhead Line or curves or angles exist in the Bulkhead Line exist, NBMC 17.35.020(B)(3)(a),(b). The applicant has sought support of the neighbors on either side of the subject property who may be affected by the setback and encroachment issues, 107 and 111 Bayside Place. Both neighbors have issued a letter of support for the proposed project (Attachment C). ENVIRONMENTAL REVIEW: Staff recommends the Harbor Commission find this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301, Class 1, (Existing Facilities) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: This agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the Harbor Commission considers this item). Submitted by: Shannon Levin Harbor Analyst Attachments: A. Vicinity Map B. Drawing of Proposed Configuration C. Letters of Support ATTACHMENT A n,ro, Plrwmcm< MI•- »•a•'a' w.i¢ I[Lx.m.u¢ e. pupj n a ry)srm w[ta[xr nav • xm lq rv(�oiva n•al +wu. w m�M ow v xvtaarms v 6 Irl spec w+ r. t1 rc�lxW I nxxxry i-----� QI O)N�a are • NEWPORT BAY FOR Al ATTACHMENT B March 26, 2014 Re: 109 Bayside Place Corona del Mar, CA 92625 Harbor Commission, I have reviewed the attached document that includes replacing the existing wood pier, platform, floating dock, gangway and piles and approve the drawings. 111 Bayside Place Corona del Mar, FA 92625 28 May 2014 Re: Moss Pier Replacement 109 Bayside Place Corona del Mar, CA 92625 Harbor Commission, I have reviewed the attached document, "Replacing the Existing Wood Pier, Platform, Floating Dock Gangway and Piles" dated 05/02/2013, provided to us by Mr. Jay Moss. I have no objections to the proposed dock, as long as the floating dock serving 109 will remain or be replaced in substantially its present location, in accordance with the Judgment in Orange County Superior Court Case Number 144942 dated July 18, 1967. Sincerely, 4� N N w anet McDonald 107 Bayside Place Corona del Mar, CA 92625