Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout10 - Traffic Signal Modernization - Econolite Control Products.pdfCITY OF NEWPORT BEACH
CITY COUNCIL STAFF REPORT
0
COUNCIL AGENDA
K 10
Agenda Item No. 1a
February 26, 2008
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: Public Works Department
Antony Brine
949 -644 -3329 or tbrine@city.newport-beach.Ga.us
SUBJECT: Traffic Signal Modernization - Approval of Purchase Contract with
Econolite Control Products, Inc.
RECOMMENDATION:
Approve a Purchase Contract with Econolite Control Products, Inc. of Anaheim,
California, for purchase,' installation, maintenance and repair services of the icons
Advanced Traffic Management System, at a not to exceed price of $584,610 and
authorize the:Mayor and City Clerk to execute the Agreement.
DISCUSSION:
Staff has been working together with Econolite Control Products, Inc. to outline the
equipment needed to replace and modernize the City's existing traffic signal control
system. The Traffic Signal Modernization project is a multi - phased program to install a
new and upgraded City -wide traffic signal management system that utilizes current and
future technology. The planned City -wide project includes eight separate phased
projects to replace aging and technologically outdated traffic signal control equipment at
all 112 signalized intersections in the City. The overall initial Phase 1 Traffic Signal
Modernization project includes the following tasks:
1) Replacement of the existing master traffic signal computer controller at City Hall
with new hardware and software. The new Advanced Traffic Management
System is a product of Econolite under the registered product name icons.
2) Replacement of existing traffic signal controller equipment at 22 intersections
along MacArthur Boulevard, Coast Highway, Avocado Avenue, and San Miguel
Drive in Corona del Mar. The new controllers will be compatible with the icons
system.
3) Construction of new fiber or Ethernet based communication links between the
traffic signals and City Hall.
Traffic Signal Modernization — Approval of Purchase Contract With Econolite Control Products, Inc.
February 26, 2008
Page 2
4) Installation of video cameras at the intersections of Coast Highway at MacArthur
Boulevard and San Miguel Drive at MacArthur Boulevard.
5) Improvements to the existing Traffic Management Center at City Hall to add new
video television screens to monitor traffic at the intersections listed above.
During the initial design, staff completed a selection process to determine the best
qualified vendor for the traffic signal controller hardware and software. Staff interviewed
each vendor and completed an extensive evaluation of the products and services of
seven different manufacturers and suppliers of traffic control equipment. Staff reviewed
each firm's qualifications, past experience on similar projects, and availability before
selecting Econolite as the best qualified firm to provide the hardware and software for
our City -wide Traffic Signal Modernization project. Upon selection, staff negotiated with
Econolite to provide the necessary equipment and services for a fee of $584,610.
Econolite has completed traffic signal control services competently and professionally
on similar projects for other local agencies in Southern California.
Entering into this Purchase Contract with Econolite is a key component of the overall
Phase 1 Traffic Signal Modernization project, and includes the completion of the above
listed tasks 1 and 2. Tasks 3, 4, and 5 will be completed .under a separate construction
contract.
The scope of services to be provided by Econolite includes the following work items:
A) Provision and installation of field equipment including; replacement of 22
controllers (with a provision of two additional spares), two cabinet replacements,
and one new cabinet installation.
B) Provision, configuration and installation of the new icons Advanced Traffic
Management System master computer including hardware and software. The
icons system provides coordination and enhanced operation capabilities, and the
software is capable of being expanded to traffic signals throughout the City in
future phases.
C) Software integration including testing the system components, preparing the
system graphics including the initial 22 intersection displays.
D) Provision of servers, computers, and laptops to operate the system from the Traffic
Management Center (TMC) at City Hall.
E) Provision and installation of communications equipment including modems and
switches.
F) Provision of two video cameras and a CCTV license to serve up to 10 cameras.
Traffic Signal Modernization — Approval of Purchase Contract with Ecorrolite Control Products, Inc.
February 26, 2008
Page 3
G) Provision of a software package referred to as Synchro, which allows the traffic
engineering staff to design or improve upon traffic signal timing.
H)' Training for staff including instruction on system hardware and software, system
operation, and system administration.
Environmental Review:
Categorically Exempt under Chapter 3, Article 19, Section 15301, Class 1 (c) of the
Title 14 California Code of Regulations. This exemption covers maintenance, repair,
and upgrades of existing traffic signal facilities.
Funding Availabilitv:
There are sufficient funds available in the following accounts for the project:
Account Description
Measure M Competitive
Measure M Turnback
Transportation and Circulation -
Signal System Improvement
Transportation and Circulation -
Traff d Signal Coordination
Prepared by:
Antony :Brine
L-31
City Traffic Engi eer
Attachment: Purchase Contract
Account Number
Amount
7284- C5200852
$ 301,808
7281- C5200852
$ 200,000
7261- C5200852
$ 49,400
7261- C5200699 $ 33,402
Submitted
Total: $ 584,610
3gum
Director
CONTRACT WITH ECONOLITE CONTROL PRODUCTS, INC.
FOR PURCHASE, INSTALLATION, MAINTENANCE
AND REPAIR SERVICES OF icons@ ADVANCED TRAFFIC MANAGEMENT
SYSTEM
THIS CONTRACT is made and entered into as of this W day of February, 2008, by
and between the CITY OF NEWPORT BEACH, a Municipal Corporation and Charter
City ( "City "), and ECONOLITE CONTROL PRODUCTS, INC., a California corporation
whose principal place of business is 3360 E. La Palma Ave., Anaheim, CA 92806,
(" Contractor"), and is made with reference to the following:
RECITALS
A. City is a municipal corporation duly organized and validly existing under the laws
of the State of California with the power to cant' on its business as it is now
being conducted under the statutes of the State of California and the Charter of
City.
B. City is planning to perform Phase One of its Traffic Signal Modernization project
( "Project "), which will provide advanced traffic management at 22 intersections
within the City.
C. City desires to purchase necessary software and equipment from Contractor, to
engage Contrpplor to install all necessary equipment and software, to provide
advanced traffic; management at 22 intersections within the City, and to configure
tMat'system to r' automating capability for up to 150 intersections at a later
date:: City also "wishes to.engage. Contractorto provide training to City staff:who
wilt" be mvooed in operation of the icons® Advanced Traffic Management
System (All.such software and equipment purchases, installation, and training
shall 'be hereinafter referred to as "Project "). Contractor has agreed to perform
the Project over a 120 day period, commencing upon receiving Notice to
Proceed.
D. The Icons@ Advanced Traffic Management System shall provide coordination and
enhanced operation at 22 traffic signals for Phase One of the Traffic Signal
Modernization Project and which is capable of being expanded to traffic signals
throughout the City in future project phases if agreed to by City and Contractor.
Additionally, the Icons@ Advanced Traffic Management System will provide
advanced traffic signal observation and response from City Hail through an
interface with closed circuit television cameras (CCTV) and direct communication
with individual intersections, creating centralized control for the connected
intersections as. needed from the Traffic Division of the City's Public Works
Department.
E. Contractor has examined the location of all proposed work, carefully reviewed
and evaluated the specifications set forth by the City for the Project, is familiar
with all conditions relevant to the performance of services and has committed to
perform all work required for the price specified in this Agreement.
F. Contractor is a manufacturer and supplier of traffic control equipment, advanced
traffic management systems and traffic controller firmware.
G. Contractor, alone and in partnership with others, has developed proprietary
software systems, including the communication and control system registered as
"icons."
NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as
follows:
1. SCOPE OF WORK
Contractor shall provide all tangible items and perform all the services described
in the Scope of Work attached hereto as Exhibit A and incorporated herein by
this reference. As a material inducement to the City entering into this
Agreement, Contractor represents and warrants that Contractor is a provider of
first class work and services and Contractor is experienced in performing the
work and services contemplated herein and, in light of such status and
experience, Contractor covenants that it shall follow the highest professional
standards in performing the work and services required hereunder and that all
materials will be of good quality. For purposes of this Agreement, the phrase
"highest .professional standards" shall mean those standards of practice
recognized by one or more first -class firms performing similar work under similar
circumstances.
Contractor shall perform everything required to be performed, and shall provide
andsfumish all tlie:labor, materials, necessary tools, expendable equipment and all
utility and- transportation services necessary for the Project.
In consideration of the payment of the Purchase Price and subject to all the
terms and conditions hereof, Contractor shall:
(a) Sell to City, and install, the software, hardware, devices,
connections and equipment (hereinafter referred to as "the
System ") listed and set forth in the Scope of Work attached hereto
as Schedule A and incorporated in full by this reference.
(b) Supply to City under license the software components of the
icons® system, described in detail in Schedule A, including any
necessary licensed software products and related materials.
(c) Supply to City and install all software and hardware required to
operate the Synchro® Interface Module and CCTV Module.
(d) Provide the testing and training services as set forth in Exhibit A.
2. TIME OF PERFORMANCE
Time is of the essence in the performance of services under this Agreement and
Contractor shall complete the Project installation, implementation and
2
acceptance testing within the time set forth in Exhibit A. The failure by
Contractor to meet this schedule may result in termination of this Agreement by
City as outlined in Section 16.
2.1 Force Maieur
The time period(s) specified in Exhibit A for performance of services rendered
pursuant to this Agreement shall be extended because of any delays due to
unforeseeable causes beyond the control and without the fault or negligence of
Contractor, including but not restricted to acts of God or of the public enemy,
unusually severe weather, fires, earthquakes, floods, epidemics, quarantine
restrictions, riots, strikes, freight embargoes, wars, and/or acts of any
governmental agency, including the City, if Contractor shall within ten (10) days
of the commencement of such delay notify City in writing of the cause of the
delay. City shall ascertain the facts and extent of delay, and extend the time for
performing the services for the period of the enforced delay when and if in the
judgment of the City such delay is justified. City's determination shall be final
and conclusive upon the parties to this Agreement. In no event shall Contractor
be entitled to recover damages against City for any delay in performance of this
Agreement, however caused, Contractor's sole remedy being extension of the
Agreement pursuant to this Section.
2.2 Term
Unless earlierterminated in accordance with Section 17 of this Agreement, this
Agreement shall continue in full force and effect until completion of the services
agreed to tierein.
3. COMPENSATION
As full compensation for the performance and completion of the Project as
required by the Scope of Work, City shall pay to Contractor and Contractor accepts
as the full Purchase Price the sum of Five Hundred Eighty -Four Thousand Six
Hundred Sixty -Nine Dollars and 12/1.0.0 ($584,669.12). Contractor shall not
receive any additional compensation unless approved in advance by the City in
writing. The City shall make monthly progress payments for labor as the Project
work proceeds based on the fee schedule set forth in Exhibit A. Payment for
software, hardware and equipment shall become due upon shipment to and
receipt of such software, hardware and equipment to City. City shall pay
Contractor ninety percent (90 %) of each approved invoice amount no later than
thirty (30) days after approval of an invoice by City staff. The remaining ten
percent (10 %) of each approved invoice shall be paid by City upon Final System
Acceptance, as defined in Subsection 6.1 of this Agreement.
A. All shipping and insurance costs to and from the installation sites are
included in the purchase price of the Project, as listed in Exhibit A. All
payments to shipping. agents and for insurance fees shall be made directly by
Contractor and the City shall make no payments to any firm conceming the
shipment, installation, and delivery of hardware which is not a part of this
Agreement and for which exact payments are not described. Contractor shall
be responsible for all arrangements for the shipment of software, hardware and
equipment to the City, and /or movement of the hardware to the prepared site y
within the City. Contractor shall also be responsible for removal of all debris
and packing materials from the City site resulting from the installation of the
equipment, hardware and software.
B. Contractor shall provide City with a minimum 14 days notice of its dates of
installation to enable the City to prepare the installation sites for the Hardware
in accordance with the instructions of Contractor. The City shall complete site
preparation prior to the date of installation of the hardware, and the site shall
thereafter be available for inspection and approval. All costs and expenses
related to the site preparation shall be at the sole expense of City. Contractor
will provide staff for complete on -site training of City personnel as set forth in
Exhibit A.
C. Payments shall be made in accordance with this Section and the schedule
set forth in Exhibit A.
D. Extra Work - Contractor shall not receive any compensation for Extra Work
without the prior written authorization of the City. As used herein, "Extra Work"
means any work that is determined by the City to be necessary for the.proper
completion of the Project, but which is not included in the Purchase Price as
specified in Exhibit A, and which parties did not reasonably anticipate would be
necessary. Compensation for any authorized Extra Work shall be paid in
accordance with the hourly rates set forth in Exhibit A.
4. ADM IN1STRATI.ON
This Agreement will be administered by the Public Works Department. Anthony
Brine shall be the'Project Administrator and shall have the authority to act for
City under this Agreement.
5. TYPE AND INSTALLATION OF MATERIALSISTANDARD OF CARE
5.1 Contractor shall use only the standard materials described in Exhibit A in
performing services under this Agreement. Any deviation from the
materials described in Exhibit A shall not be installed unless approved in
advance by the City Project Administrator.
5.2 All of the services shall be performed by Contractor or under Contractor's
supervision. Contractor represents that it possesses the personnel
required to perform the services required by this Agreement, and that it
will perform all services in a manner commensurate with community
professional standards. All services shall be performed by qualified and
experienced personnel who are not employed by City, nor have any
contractual relationship with City.
6. ACCEPTANCE TESTING AND ACCEPTANCE
6.1 "Final System Acceptance" shall mean the latest of the dates on which (a)
all phases of the system have been used in live onsite operations for a
:!
period of at least seven (7) continuous days without significant error
following successful completion of the seven (7) day System Acceptance
Test described below; and (b) all remaining punch list items have been
addressed and completed.
6.2 Acceptance Test Plan
Contractor shall follow the System Acceptance Test Plan (hereinafter
"ATP ") developed in consultation with the City containing Acceptance
Criteria that establishes test procedures and test criteria, for evaluating
system capabilities, functions, and features along with a problem reporting
method for use in the system testing. The ATP is attached hereto as
Exhibit B.
6.3 Acceptance of Hardware
Upon completion of the installation of the hardware, Contractor will notify
City that such hardware, as described in Exhibit A, has successfully been
installed. Hardware shall not be deemed to have been accepted by City
until Final System Acceptance.
6.4 System Acceptance Test
Once all phases of the project have commenced simultaneous live
operations, a seven (7) day period of acceptance testing for the entire
systo -n including all interfaces and deliverables provided under this
Agreement, shall begin. System Acceptance Testing. shall occur in a live
environment. Any significant error or deviations from the ATP, or the
error,.: deviation or failure of any part or component of the System not
manufactured but provided by Contractor, shall be reported to City, and
Contractor shall provide in writing an action plan for resolution of such
error, deviation or failure within two (2) working days. The System
Acceptance Test shall be deemed completed upon completion of a
continuous seven (7) day period during which no material failure to meet
the criteria set forth in the ATP or significant errors remain unresolved to
the satisfaction of the City. System Acceptance Test shall not be
unreasonably delayed due to actions of City or its agents, contractors or
subcontractors not.retained by or through Contractor.
6.5 Failure
A. Failure Prior to Final System Acceptance. Upon any failure of the
System Acceptance Test, Contractor shall have an additional
seven (7) days in which make necessary equipment repairs,
replacements and /or software fixes without additional cost to City,
after which the System Acceptance Test shall be repeated without
additional cost to City. If more than seven (7) days are reasonably
required to make the aforementioned repairs, replacements or
software fixes, Contractor shall provide a written action. plan that
includes a timeline for resolution based on the scope of work
involved, and City may authorize a longer repair or resolution
5
period in writing. Failure of the System to meet or exceed a
second System Acceptance Test, or failure to provide seven (7)
days of continuous live operation without significant errors after any
additional System Acceptance Test, shall constitute a failure to
successfully complete Contractor's obligations under this
Agreement and Contractor shall be considered in default of a
material obligation. City shall be entitled to a refund of the full
amount of the fees paid for Contractor's services. City shall also
be entitled to full refund on any software, hardware and other
System components purchased pursuant to this Agreement that is
deemed unusable by the City. Any removal of the system will be at
Contractor's sole cost and expense.
B. Failure After Final System Acceptance. Contractor and City agree
that upon system failure, time is of the essence for necessary
system equipment repairs or replacements, and time is of the
essence for addressing any software defects which cause failures
classified as Severity Level One and Severity Level Two, below.
Upon any failure of the System or its hardware or software
components, the Warranty provisions of Exhibit A and Section 26
of this Agreement shall apply. During the warranty period, if
hardware or equipment purchase under this Agreement from
Contractor shall fail, Contractor shall repair or replace the hardware
or equipment within seven (7) working days for all but Severity
Level One failures. In the event of a Severity Level One hardware
or. "uipment .failure, repair and replacement shall occur within 24
hours of notification of such failure to Contractor by City. If the
failure is due to a software defect or failure, the timelines for
Contractor response and defect resolution below shall apply:
1. Severity Level One (Critical): Failure that causes an
intersection to be in flash or dark, or failure of safety features
such as emergency vehicle preemption or railroad
preemption. In the event of a Severity Level One failure,
Contractor response shall be immediate, and Contractor
shall provide a fix, solution or workaround within 24 hours of
notification of such failure to Contractor by City.
2. Severity Level Two (High): Failure or bug in system that
results in degradation of traffic signal control and
communication system function to a moderate to serious
degree under normal or reasonable operating conditions.
Severity Level Two failures shall include but are not limited
to failure or severe degradation of coordination between
intersections, communication between the central system at
City Hall and the field elements, and the ability to upload and
download data to the ability demonstrated as part of the
ATP. In the ' event of a Severity Level Two failure,
Contractor shall respond with a written plan of action to
address the failure within five (5) business days of
notification by City. Contractor shall provide a fix or solution
6
for any Level Two failure within no later than forty -five (45)
calendar days of notification of failure by City.
3. Severity Level Three (Moderate to Low): Failure or bug in
system that creates aesthetic or user preference issues,
unrelated to the operation of the system. Severity Level
Three issues shall be addressed through regular system
upgrade releases on an as- needed basis.
7. RESPONSIBILITY FOR DAMAGES OR INJURY
7.1 City and all officers, employees and representatives thereof shall not be
responsible in any manner for any loss or damage to any of the materials
or other things used or employed in performing the Project or for injury to
or death of any person as a result of Contractor's performance of the
services required hereunder; or for damage to property from any cause
arising from the performance of the Project by Contractor, or its
subcon contractors, or its workers, or anyone employed by either of them.
7.2 Contractor shall be responsible for any liability imposed by law and for
injuries to or death of any person or damage to property resulting from
defects, obstructions or from any cause arising from Contractor's work on
the Project, or the work of any subcontractor or supplier selected by the
Contractor.
7.3 Co666".or; shall. indemnify, hold harmless, and defend City, its officers
aFltl arnpioyees -from and against: (1) any and all loss, damages, liability,
clarrns, allegations of `liability, suits, costs and expenses for damages of
anIymature whatsoever, including, but not limited to, bodily injury, death,
personal injury, property damage, or any other claims arising from any
and all acts or omissions of Contractor, its employees, agents or
subcontractors in the performance of services or work conducted or
performed pursuant to this Agreement; (2) use of improper materials in
performing this Project including, without limitation, defects in
workmanship or materials and /or design defects; and /or (3) any and all
claims asserted by Contractor's subconcontractors or suppliers on the
Project, and shall include reasonable attorneys' fees and all other costs
incurred in defending any such claim. Contractor's liability in this
Subsection shall be limited to the maximum amount of its insurance
coverage for claims arising out non - negligent and non - intentional acts
performed under this Agreement. Contractor shall not be held responsible
for consequential or special damages, or claims made to City for such
consequential or special damages. Nothing herein shall require
Contractor to indemnify City from the sole negligence or willful misconduct
of City, its officers or employees.
Intellectual Property Indemnity - Contractor shall defend, indemnify and
hold City, its agents, officers, representatives, employees and City
Council, boards and commissions harmless from any proceeding brought
against City for any intentional or unintentional violation of the intellectual
7
property rights of any third party with respect to equipment and software
deliverables purchased in this Agreement. This indemnification shall
include, but is not limited to, infringement of any United States' letters
patent, trademark, or copyright infringement, including costs, contained in
Contractor's deliverables provided under this Agreement.
The City agrees to keep confidential all material and documentation
relating to the Software and any modification thereto, to the extent that
such materials are not subject to disclosure under the California Public
Records Act or Freedom of Information Act. The City will not make
available or distribute any program code or description associated with the
icons® System in any form whatsoever to third parties, without the prior
written approval of Contractor.
7.4 Contractor shall perform all Project work in a manner to minimize public
inconvenience and possible hazard, to restore other work areas to their
original condition and former usefulness as soon as possible, and to protect
public and private property. Contractor shall perform work as specified in
Exhibit A to limit impacts to traffic during the system installation period.
Contractor shall be liable for any private or public property damaged during
the performance of the Project work.
7.5 Contractor shall provide traffic control and access in accordance with
Section 7 -10 of the State Standard Specifications and the latest edition of
the Work Area Traffic Control Handbook (WATCH), as published by
Building News; Inc.
If necessary; traffic control plans for field work will be provided by City, or
with two weeks :prior written notice, by Contractor. Traffic control services
provided by Contractor shall be considered Extra Work, and will be billed
to the City separately from monthly progress payments.
At the request of the City, the Contractor shall submit to the Engineer a
traffic control plan and detour plan for each street and sidewalk within the
project area. The Contractor shall be responsible for processing and
obtaining approval of a traffic control plan from the City's Traffic Engineer.
The Contractor shall adhere to the conditions of the traffic control plan.
Traffic control plans shall be prepared, signed, and sealed by a California
licensed Civil Engineer or Traffic Engineer, as directed by the City Traffic
Engineer, and conform to the provisions of the WORK AREA TRAFFIC
CONTROL HANDBOOK (W.A.T.C.H), Latest Edition.
Traffic control and detours shall at a minimum meet the following
requirements:
A. Emergency vehicle access shall be maintained at all times.
B. The locations and wordings of all barricades, signs, delineators,
lights, warning devices, parking restrictions, and any other
required details shall ensure that all pedestrian and vehicular
N
traffic will be handled in a safe manner with a minimum of
inconvenience to the public.
C. All advanced warning sign installations shall be refiectorized
and/or lighted.
Traffic signal system shutdown or planned "red flash" shall be limited to 4-
hour periods between the hours of 9:00 AM and 3:00 PM on weekdays
(Monday through Thursday), except as authorized by the Engineer.
"STOP AHEAD" and "STOP" signs shall be furnished by the contractor and
shall conform to the provisions in Section 12 -3.06, "Construction Area
Signs,' of the State Standard Specifications except that the base material
for the signs shall not be plywood. Two "STOP AHEAD" signs and two
"STOP" signs shall be placed for each direction of traffic. Locations of the
signs shall be per the WATCH manual.
7.6 Nothing in this section shall be construed as authorizing any award of
attorney's fees in any action to enforce the terms of this Agreement, except
to the extent provided in Section 7.3 above.
7.7 The rights and obligations set forth in this Section shall survive the
termination of this Agreement.
8. INDEPENDENT CONTRACTOR
City has :retained Contractor as an independent contractor and neither
Contractor nor its employees, nor any of its subcontractors, are to be considered
employees -of the City. The manner and means of conducting the work are
under the control of Contractor, except to the extent they are limited by statute,
rule or regulation and the express terms of this Agreement. No civil service
status or other right of employment shall accrue to Contractor or its employees.
9. COOPERATION
Contractor agrees to work closely and cooperate fully with City's designated
Project Administrator and any other agencies that may have jurisdiction or
interest in the work to be performed. City agrees to cooperate with the
Contractor on the Project.
10. INSURANCE
Without limiting Contractor's indemnification of City, and prior to commencement
of work, Contractor shall obtain, provide and maintain at its own expense during
the term of this Agreement, a policy or policies of liability insurance of the type
and amounts described below and in a form satisfactory to City.
A. Certificates of Insurance. Contractor shall provide certificates of
insurance with original endorsements to City as evidence of the insurance
coverage required herein. Insurance certificates must be approved by
N
City's Risk Manager prior to commencement of performance or issuance
of any permit or performance of any work. Current certification of
insurance shall be kept on file with City at all times during the term of this
Agreement.
B. Signature. A person authorized by the insurer to bind coverage on its
behalf shall sign certification of all required policies.
C. Acceptable Insurers. All insurance policies shall be issued by an
insurance company currently authorized by the Insurance Commissioner
to transact business of insurance in the State of California, with an
assigned policyholders' Rating of A (or higher) and Financial Size
Category Class VII (or larger) in accordance with the latest edition of
Best's Key Rating Guide, unless otherwise approved by the City's Risk
Manager.
D. Coverage Requirements.
L Workers' Compensation Coverage. Contractor shall maintain
Workers' Compensation Insurance and Employer's Liability
Insurance for his or her employees in accordance with the laws of
the State of California. In addition, Contractor shall require each
subcontractor to similarly maintain Workers' Compensation
Insurance and Employer's Liability Insurance in accordance with
the laws of the State of California for all of the subcontractor's
employees. Any notice of cancellation or non - renewal of all
Workers' Compensation policies must be received by City at least
thirty (30) calendar days (10 calendar days written notice of non -
paymen# of premium) prior to such change. The insurer shall agree
to waive all rights of subrogation against City, its officers, agents,
employees and volunteers for losses arising from work performed
by Contractor for City.
ii. General Liabilitv Coverage. Contractor shall maintain commercial
general liability insurance in an amount not less than two million
dollars ($2,000,000) per occurrence for bodily injury, personal
injury, and .property damage, including without limitation,
contractual liability. If commercial general liability insurance or
other form with a general aggregate limit is used, either the general
aggregate limit shall apply separately to the work to be performed
under this Agreement, or the general aggregate limit shall be at
least twice the required occurrence limit.
iii. Automobile Liability Coverage. Contractor shall maintain
automobile insurance covering bodily injury and property damage
for all activities of the Contractor arising out of or in connection with
work to be performed under this Agreement, including coverage for
any owned, hired, non -owned or rented vehicles, in an amount not
less than one million dollars ($1,000,000) combined single limit for
each occurrence.
10
iiii. Excess Liability Coverage. Contractor shall maintain insurance
covering excess liability in the amount of nine million dollars
($9,000,000) for all activities of the Contractor arising out of or in
connection with work to be performed under this Agreement.
E. Endorsements. Each general liability and automobile liability insurance
policy shall be endorsed with the following specific language:
L The City, its elected or appointed officers, officials, employees,
agents and volunteers are to be covered as additional insureds
with respect to liability arising out of work performed by or on behalf
of the Contractor.
ii. This policy shall be considered primary insurance as respects to
City, its elected or appointed officers, officials, employees, agents
and volunteers as respects to all claims, losses, or liability arising
directly or indirectly from the Contractor's operations or services
provided to City. Any insurance maintained by City, including any
self- insured retention City may have, shall be considered excess
insurance only and not contributory with the insurance provided
hereunder.
iii. This insurance shall act for each insured and additional insured as
though a separate policy had been written for each, except with
respect to the limits of liability of the insuring company.
iv. The insurer waives all rights of subrogation against City, its elected
or appointed officers, officials, employees, agents and volunteers.
V. Any failure to- comply with reporting provisions of the policies shall
not affect coverage provided to City, its elected or appointed
officers, officials, employees, agents or volunteers.
vi. The insurance provided by this policy shall not be suspended,
voided, canceled, or reduced in coverage or in limits, by either
party except after thirty (30) calendar days (10 calendar days
written notice of non - payment of premium) written notice has been
received by City.
F. Timely /Notice of Claims. Contractor shall give City prompt and timely
notice of claim made or suit instituted arising out of or resulting from
Contractor's performance under this Contract.
G. Additional Insurance. Contractor shall also procure and maintain, at its
own cost and expense, any additional kinds of insurance, which in its own
judgment may be necessary for its proper protection and prosecution of
the work.
11. BONDING
11
Contractor shall obtain, provide and maintain at its own expense during the term
of this Contract: a Labor and Materials Payment Bond in the amount of one
hundred percent (100 %) of the total amount to be paid Contractor as set forth in
this Agreement and in the form attached hereto as Exhibit B which is
incorporated herein by this reference; and a Faithful Performance Bond in the
amount of one hundred percent (100 %) of the total amount to be paid Contractor
as set forth in this Agreement in the form attached hereto as Exhibits C which is
incorporated herein by this reference.
The Labor and Materials Payment Bond and Faithful Performance Bond shall be
issued by an insurance organization or surety (1) currently authorized by the
Insurance Commissioner to transact business of insurance in the State of
California, (2) listed as an acceptable surety in the latest revision of the Federal
Register Circular 570, and (3) assigned a Policyholders' Rating A (or higher) and
Financial Size Category Class VII (or larger) in accordance with the latest edition of
Best's Key Rating Guide: Property- Casualty.
The Contractor shall deliver, concurrently with execution of this Agreement, the
Labor and Materials Payment Bond and Faithful Performance Bond, a certified
copy of the "Certificate of Authority" of the Insurer or Surety issued by the
Insurance Commissioner, which authorizes the Insurer or Surety to transact
surety insurance in the Sate of California.
12. PREVAILING WAGES
Purswant to tfre applicable provisions of the Labor Code of the State of California,
not' less thahl.he general prevailing rate of per diem wages including legal holidays
and. overtrm inn. rk for each craft or type of workman needed to execute the work
contemplated :under the Agreement shall be paid to all workmen employed on the
work to be. done according to the Agreement by the Contractor and any
subcontractor. In accordance with the California Labor Code (Sections 1770 at
seq.), the Director of Industrial Relations has ascertained the general prevailing
rate of per diem wages in the locality in which the work is to be performed for each
craft, classification, or type of workman or mechanic needed to execute the
Agreement. A copy of said determination is available by calling the prevailing
wage hotline number (415) 703 -4774, and requesting one from the Department of
Industrial Relations. The Contractor is required to obtain the wage determinations
from the Department of Industrial Relations and post at the job site the prevailing
rate or per diem wages. It shall be the obligation of the Contractor or any
subcontractor under him/her to comply with all State of California labor laws, rules
and regulations and the parties agree_ that the City shall not be liable for any
violation thereof.
13. SUBCONTRACTING
City and Contractor agree that subcontractors may be used to complete the work
outlined in the Scope of Services provided the Contractor obtains City approval
in writing prior to the subcontractor performing any work. Contractor shall be
fully responsible to City for all acts and omissions of the subcontractors. Nothing
in this Contract shall create any contractual relationship between City and
subcontractor nor shall it create any obligation on the part of City to pay or to see
12
to the payment of any monies due to any such subcontractor other than as
otherwise required by law.
14. WITHHOLDINGS
City may withhold payment to Contractor of any disputed sums until satisfaction
of the dispute with respect to such payment. Such withholding shall not be
deemed to constitute a failure to pay according to the terms of this Contract.
Contractor shall not discontinue work as a result of such withholding. Contractor
shall have an immediate right to appeal to the City Manager or his /her designee
with respect to such disputed sums. Contractor shall be entitled to receive
interest on any withheld sums at the rate of return that City earned on its
investments during the time period, from the date of withholding of any amounts
found to have been improperly withheld.
15. CONFLICTS OF INTEREST
The Contractor or its employees may be subject to the provisions of the
California Political Reform Act of 1974 (the "Act "), which (1) requires such
persons to disclose any financial interest that may foreseeably be materially
affected by the work performed under this Contract, and (2) prohibits such
persons from making, or participating in making, decisions that will foreseeably
financially affect such interest.
If sutjJeot to,the Act,.; Contractor shall conform to all requirements of the Act.
Faalta"rb 1ti A1 psq constitutes a material breach and is grounds for immediate
teti ihatioh of this Contract by City. Contractor shall indemnify and hold
herM - 9`s City for any and all claims for damages resulting from Contractors
V161kion of:this Section.
16. NOTICES
All notices, demands, requests or approvals to be given under the terms of this
Agreement shall be given in writing, to City by Contractor and conclusively shall
be deemed served when delivered personally, or on the third business day after
the deposit thereof in the United States mail, postage prepaid, first -class mail,
addressed as hereinafter provided. All notices, demands, requests or approvals
from Contractor to City shall be addressed to City at:
Attn: Anthony Brine
Public Works Department
City of Newport Beach
3300 Newport Blvd.
Newport Beach, CA 92660
Phone: 949 - 644 -3329
Fax: 949 -644 -3318
All notices, demands, requests or approvals from City to Contractor shall be
addressed to Contractor at:
Attention: Jason Hann
13
Econolite Control Products, Inc.
3360 E. La Palma Ave.
Anaheim, CA 92806
Phone: (719) 471 -9866 ext. 380
Fax: (719) 471 -9063
17. TERMINATION
Termination With Cause - In the event that either party fails or refuses to perform
any of the provisions of this Agreement at the time and in the manner required,
that party shall be deemed in default in the performance of this Agreement. If
such default is not cured within a period of five (5) calendar days, or if more than
five (5) calendar days are reasonably required to cure the default and the
defaulting party fails to give adequate assurance of due performance within five
(5) calendar days after receipt of written notice of default, specifying the nature
of such default and the steps necessary to cure such default, the non - defaulting
party may terminate the Agreement forthwith by giving to the defaulting party
written notice thereof.
Termination Without Cause - Notwithstanding the above provisions, City shall
have the right, at its sole discretion and without cause, of terminating this
Agreement at any time by giving seven (7) calendar days prior written notice to
Contractor. In the event of termination under this Section, City shall pay
Contractor " for services satisfactorily performed and costs incurred in the
peaFvrniance of such 'services up to the effective date of termination for which
Contractor has not previously been paid. In the event of termination under this
Section Cityishall, also pay Contractor for all software, hardware, and equipment
d City site under this Agreement that City deems usable.
18. COMPLIANCE WITH ALL LAWS
Contractor shall at its own cost and expense comply with all statutes, ordinances,
regulations and requirements of all governmental entities, including federal, state,
county or municipal, whether now in force or hereinafter enacted.
19. WAIVER
A waiver by City of any term, covenant, or condition in the Agreement shall not
be deemed to be a waiver of any subsequent breach of the same or any other
term, covenant or condition.
20. INTEGRATED AGREEMENT
This Agreement represents the full and complete understanding of every kind or
nature whatsoever between the parties hereto, and all preliminary negotiations
and agreements of whatsoever kind or nature are merged herein. No verbal
Agreement or implied covenant shall be held to vary the provisions herein.
21. CONFLICTS OR INCONSISTENCIES
NC!
In the event there are any conflicts or inconsistencies between this Agreement
and the Scope of Services or product warranties, including Software and
Hardware warranties contained in the Scope of Services or delivered to City after
execution of this Agreement, the terms of this Agreement shall govern.
22. AMENDMENTS
This Agreement may be modified or amended only by a written document
executed by both Contractor and City and .approved as to form by the City
Attorney.
23. EFFECT OF CONTRACTOR'S EXECUTION
Execution of this Agreement by Contractor is a representation that Contractor
has visited the Project Site, has become familiar with the local conditions under
which the work is to be performed, and has taken into consideration these
factors in submitting its Project Proposal and Scope of Work.
24. CONTROLLING LAW AND VENUE
The laws of the State of California shall govern this Agreement and all matters
relating to it and any action brought relating to this Agreement shall be
adjudicated in a court of competent jurisdiction in the County of Orange.
25 INTEFiFRETA'F,ION .
The.'terms of.this•Agreement shall be construed in accordance with the meaning
of the language used and shall not be construed for or against either party by
reason of the authorship of the Agreement or any other rule of construction
which might otherwise apply.
26. WARRANTY
Contractor warrants to City that all software and equipment to be delivered
hereunder will be free from defects in material or workmanship and will be of the
kind and quality designated or specified by Contractor in Exhibit A. The warranty
shall apply only to defects appearing within one year from the date of Final
System Acceptance of Project by City for software products, two years from the
date of Final System Acceptance by City for hardware products not
manufactured by the Contractor, and two years from the date of Final System
Acceptance by City for hardware products manufactured by Contractor. If
Contractor installs the equipment and software, or supplies technical directions
of installation by contract, the warranty period shall run from the date of Final
System Acceptance by City, provided same is not unreasonably delayed by City.
If Contractor - manufactured equipment delivered hereunder does not meet the
above warranty, and if City promptly notifies Contractor in writing, Contractor
shall thereupon correct any defect, including non - conformance with the
specifications, either (at its option) by repairing any defective or damaged parts
of the equipment, or by making available any necessary replacement parts,
15
delivered and installed without additional charge to City within seven (7) working
days, unless the failure is of Severity Level One, as defined by Section 6.5(B) of
this. Agreement. City will return the defective product to Contractor, at
Contractor's expense. Contractor shall repair or replace the defective item and
return it to City, shipping costs prepaid. Contractor shall perform any necessary
diagnostic work, software, hardware and equipment removal, repair,
replacement, certification, and installation at no cost to the City during the
warranty period, using Contractor's equipment. If icons@ software, or other
proprietary software products licensed by Contractor and delivered hereunder as
part of the System, do not meet the above warranty, the Contractor response
and resolution times specified in Section 6.5(B) of this Agreement shall apply.
The foregoing warranty is exclusive and in lieu of all other warranties, whether
written, oral, implied or statutory. Contractor does not warrant any equipment of
other manufacture designated by City.
Contractor shall supply to City in a timely manner any software revisions or
upgrades of the standard icons® software modules to correct "bugs" or
deficiencies, which would appear within one (1) year from the date of Final
System Acceptance of the standard icons® traffic management system.
27. MAINTENANCE
City reserves the right, but is not obligated to, enter a Maintenance Agreement
with-'Contractor for the System at any time during the warranty, period. If City
provides Contractor of notice of intent to enter a Maintenance Agreement upon
expira #ion of Contractor's one (1) year warranty within thirty (30) days of the
expiration of such warranty, City shall have the option to enter a five (5) year
Maintenance Agreement with Contractor for maintenance of the System at the
cost of $12,500 per year ( "the Maintenance Fee "). The Maintenance Agreement
shall take effect on the day the software warranty expires ( "Software Warranty
Expiration Date ".) If City exercises its option to enter the five -year Maintenance
Agreement, the annual fee of $12,500 shall be due each year on or before that
year's calendar date which corresponds to the day and month of the Software
Warranty Expiration Date.
If City does not exercise the option to enter the five year Maintenance
Agreement, Contractor's technical support and service provided beyond the
initial warranty periods shall be subject to applicable hourly support rates plus
travel and per diem cost at time support is provided.
28. REPRESENTATIONS
Non- infringement. ECONOLITE represents that to the best of its knowledge the
technology embodied in the products sold herein does not infringe upon a United
States patent or United States copyright in effect as of the Effective Date.
Authori . Each party represents as follows: (a) that it has full power and
authority to execute, deliver and perform its obligations under this Agreement; (b)
lur
that there are no actions, proceedings or investigations, pending or, to the best
of each party's knowledge, threatened against such party which may in any
manner whatsoever materially affect the enforceability of this Agreement or the
rights, duties and obligations of the parties hereunder; and (c) that the execution,
delivery and performance of this Agreement will not constitute a breach or
default under any agreement, law or court order under which such party is a
party or may be bound or affected by or which may affect the rights, duties and
obligations hereunder.
No Other Representations. Each party acknowledges and agrees that it is
relying on no representation of the other party except as expressly set forth
herein.
29. LICENSES
The Contractor grants to the City for exclusive use in the City a fully paid non-
exclusive, non- transferable icons® software license for (1) Communications
server, (1) File /Applications server, (1) Terminal services server and workstation
computers. The Communications Server license covers up to 250 intersections
operating from a single communications server computer (expandable beyond.
250 intersections with additional software licenses and hardware). The City shall
be entitled to:
a. use the licensed programs but only in machine - readable form on licensed
computers.
b. use:fle support material supplied but only as required to support the use
of tfie Licensed programs
c. make only as many back up copies of the Licensed programs in machine
readable form as required to support the use of the Licensed programs
on each computer. All back up copies must include the copyright notice
in the original form as it appears on the licensed programs.
The City may not copy, modify, adapt, merge, disassemble, decompile or
distribute the software, its documentation or create derivative works based upon
the software. None of the support material in human readable form included with
the Licensed programs may be copied in any way. The City may print any screen
the software will allow, however, no copyright notices may be removed from the
printing.
The Licensed programs and support material included with this Agreement are
confidential information that is the property of the Contractor. The Licensed
programs, program concepts, or any of the support materials shall not be made
available to any other party or organization without the written consent of the
Contractor.
Title to all intellectual property rights including patent, trademark, copyright and
trade secret rights and title to all ownership rights and all copies of and all media
17
bearing the Licensed programs, support materials and program concept shall
remain sole property of the Contractor.
30. CONFIDENTIAL INFORMATION.
Confidential Information. In the performance of this Agreement or in
contemplation thereof, the parties and their respective employees and agents
may have access to private or confidential information owned or controlled by the
other party and such information may contain proprietary details and disclosures.
All information and data identified in writing as proprietary or confidential by
either party ( "Confidential Information ") and so acquired by the other party or its
employees or agents under this Agreement or in contemplation thereof shall be
and shall remain the disclosing party's exclusive property. The recipient of
Confidential Information shall use all reasonable efforts (which in any event shall
not be less than the efforts the recipient takes to ensure the confidentiality of its
own proprietary and other confidential information) to keep, and have its
employees and agents keep, any and all Confidential Information confidential,
and shall not copy, or publish or disclose it to others, nor authorize its
employees, agents or anyone else to copy or disclose it to others, without the
disclosing party's written approval; nor shall the recipient make use of the
Confidential Information except for the purposes of executing its obligations
hereunder, and (except as provided for herein) shall return the Confidential
Information and data to the first party at its request. The City's duty to maintain
corifctentiality as;described hereunder shall be subject to the laws of the State of
California.
Excluded Information. The foregoing conditions will not apply to information or
data whieh;'.s, or which becomes generally known to the public by publication or
by any means other than a breach of duty on the part of the recipient hereunder,
is information previously known to the recipient, is information independently
developed by or for the recipient or is information generally released by the
owning party without restriction.
Right to Iniunctive Relief. Because of the unique nature of the Confidential
Information, the parties agree that each party may suffer irreparable harm in the
event that the other party fails to comply with any of its obligations under this
Article, and that monetary damages may be inadequate to compensate either
party for such breach. Accordingly, the parties agree that either party will, in
addition to any other remedies available to it at law or in equity, be entitled to
seek injunctive relief to enforce the terms of this Article.
31. SOFTWARE UPDATES AND ENHANCEMENTS
Software enhancements or new features added to icons through new system
development for other agencies, or as part of the Contractor's ongoing research
and development shall be offered to the City at a fixed, quoted price. The offer
shall remain firm for 90 days from the date of the offer.
32. ASSIGNMENT
ff.]
This Agreement shall not be assigned by any party, or any party substituted,
without prior written consent of the City and the Contractor.
33, . COUNTERPARTS
This Agreement may be executed in any number of counterparts, each of which
shall be deemed an original and all of which shall constitute one and the same
instrument.
34. OTHER MATTERS
Severability. In the event any of the provisions of this Agreement shall, for any
reason, be held void or unenforceable, the remaining provisions shall remain in
full effect and shall control.
Invalidity. Any provisions of this Agreement prohibited by the law of any state
shall, as to said state, be ineffective to the extent of such prohibition without
invalidating the remaining provisions of this Agreement.
Absence of Third Party BeneficiaM Rights. Except as otherwise provided in this
Agreement, no provision of this Agreement is intended, nor shall be interpreted,
to- provide or create any. third party beneficiary rights or any other rights of any
kind t�, any affiliate or subsidiary, and all provisions hereof shall be personal
soleiy'betweer the parties hereto.
. eos. Article and Section headings are included solely for convenience, are
ii.of to be considered a part of this Agreement nor are they intended to be full and
accurate descriptions of the contents thereof.
IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on
the day and year first written above..
APPROVED AS TO FORM:
By; ' Nom--_
Aaron C. Harp,
Assistant City Attorney
for the City of Newport Beach
ATTEST:
in
LaVonne Harkless,
19
CITY OF NEWPORT BEACH,
A Municipal Corporation
By:
Edward D. Selich, Mayor
for the City of Newport Beach
BE
City Clerk Title: Senior Vice President
By:
N e: Brian Maffin'
Title: Assistant Secretary
Attachments: Exhibit A - Scope of Services
Exhibit B — System Acceptance Test Plan
Exhibit C - Labor and Materials Payment Bond
Exhibit D - Faithful Performance Bond
20
EXHIBIT A: SCOPE OF SERVICES
City of Newport Beach
Traffic Signal System Upgrade Proposal
icons Advanced Traffic Management System
Proposal Prepared By-
ECONOLITE
Solutions that Move the Worldo
3360 E. La Palma Ave.
Anaheim, CA 92806
(714) 630 -3700
www.econolite.com
February 13, 2008
Table of Contents
1. Introduction ............................................................ ............................1 -1
Revision Date: February 13, 2008
This document contains information from Econolite that may be confidential. Except for personal use by the intended recipient, or as
expressly authorized by the sender, any person who receives this Information is prohibited from disclosing, copying, distributing, and /or
using it. if you have received this document in error, please immediately return it and all copies, and promptly notify the sender.
Summaryof Experience ........................................................................... ...............................
1 -1
Summaryof Capabilities .......................................................................... ..:............................
1 -1
OurMission .............................................................................................. ...............................
1 -1
OurPromise ............................................................................................. ...............................
1 -1
S.
Project Scope and Understanding ................... ...............................
2-1
GeneralScope ......................................................................................... ...............................
2 -1
CommunicationsScope ........................................................................... ...............................
2-4
Description of electrical and hardware requirements for the project ......... ...............................
2.5
System Intersection Layout .................................................................... ...............................
2 -10
SystemArchitecture ............................................................................... ...............................
2 -11
3.
Installation and Integration ................................... ............................3
-1
Overall System Integration ....................................................................... ...............................
3 -1
SoftwareIntegration ................................................................................. ...............................
3 -1
SoftwareTraining ..................................................................................... ...............................
3 -1
TrainingSchedule .................................................................................... ...............................
3 -2
Project Integration Schedule .................................................................... ...............................
3-4
4.
Integrated Closed Circuit Television (CCTV) Module Included
Option.................................. ............................... ......... ............................4 -1
S.
SynchroTm Module Included Option .................. ............................... 5 -1
B.
W,ar*renty and Support ...................................... ............................... 6 -1
Product :warrantyi: Certificate .................................................................... ...............................
6-1
SoftwareWarranty ..... ............................................................................... ...............................
6 -2
Servjceand Support .............................................................................. ...............................
6 -2
7.
Prvice $ umrni ............................. ... .................. ............................... 7 -1
GeneralProposal Summary ..................................................................... ...............................
7 -1
Clarifications............................................................................................ ...............................
7 -1
OverallPrice Summary ............................................................................ ...............................
7-2
Termsand Conditions .............................................................................. ...............................
7 -3
Revision Date: February 13, 2008
This document contains information from Econolite that may be confidential. Except for personal use by the intended recipient, or as
expressly authorized by the sender, any person who receives this Information is prohibited from disclosing, copying, distributing, and /or
using it. if you have received this document in error, please immediately return it and all copies, and promptly notify the sender.
1. Introduction
Econolite Control Products, Inc. (ECPI) is pleased to provide this proposal for the following equipment,
software and services to the City of Newport Beach in the deployment of a Traffic Control System (TCS)
installation.
Summary of Experience
Econolite is celebrating its 75'" year of involvement in developing traffic control equipment and systems.
Econolite is recognized as an industry leader in applying new technology to traffic control applications. In
particular, Econolite is a recognized leader in the development of advanced traffic controllers, distributed
arterial control systems, advanced transportation management systems and video vehicle detection systems.
Summary of Capabilities
Econolite combines extensive traffic industry experience together with software, hardware, and systems
engineering capabilities to provide the following products and services:
Traffic Control Products
• Actuated and Pre -timed controllers
• Arterial Masters
• Advance Transportation Management Systems
• Distributed Traffic Management Systems
• Communications Systems
Traffic Control Cabinet Assemblies
• AUTOSCOPE® Wide Area Video Vehicle Detection Systems
• Vehicle and Pedestrian Signals
Services
• Traffic Engineering, Planning and Analysis
• Hardware and Software Development
• Systems Integration and Test
• Needs Analysis
• Functional and Environmental Testing
Our Mission
Econolite is a customer focused provider of innovative solutions for the transportation management systems
market. We are committed to employing advanced technologies with the highest level of quality, service and
value to our family of employees, customers and suppliers through a process of continuous improvement.
Our Promise
Econolite promises leading -edge solutions with superior customer service, and delivers the highest quality
products built with integrity and pride.
Section - Introduction = ECONOLITE
City of Newport Beach sduaorvs r . M. m worvfl
Page 1 -1
a " Project Scope and Understanding
The following section is the scope of the project, as Econolite understands it.
General Scope
The following is a proposal to supply software, equipment and services required for the deployment of a
basic icons Advanced Traffic Management System (ATMS) to the City of Newport Beach for their new
Traffic Control System (TCS). We will provide the icons software, closed circuit television module and
SynchroT" module to be installed by Econolite on Econolite supplied computers provided to the city, which
meet the specifications set forth in the Servers, Computers and Auxiliary Equipment section of this
document. We will also provide all necessary controller and cabinet upgrades, communications equipment
and integration services as described later in this proposal.
With respect to this proposal, and according to the information provided by the City, they currently have 21
existing intersections operating under City control, which will be integrated into the initial phase of the
upgrade project. They will also be installing one new intersection onto the system, for a total of 22. The 22
intersections to be added to the icons system have been identified with the following type of controller types.
The intersections marked with an asterisk will be replaced with new cabinets.
Avocado & Corona Del Mar Plaza
820A
Avocado & Farallon Dr
820A
Avocado & San Miguel
820A
San :Miguel & San Joaquin
820A
MacArthur & San Miguel •
170 -type
MacArthur & San Joaquin Hills
170 -type
MacArthur & Bonita /Ford
820A
MacArthur & Vilaggio
820A
MacArthur & Bison
820A
Coast Hwy & Jamboree
170 -type
Coast Hwy & Irvine Terrace
170 -type
Coast Hwy & Newport Center
170 -type
Coast Hwy & Avocado
170 -type
Coast Hwy & MacArthur
170 -type
C oast Hwy & Goldenrod
170 -type
Coast Hwy & Iris Avenue
New
Coast Hwy & Marguerite
170 -type
Coast Hwy & Poppy
170 -type
Coast Hwy & Morning Canyon
170 -type
Coast Hwy & Cameo Shores
170 -type
Coast Hwy & Pelican Point
170 -type
Coast Hwy & Newport Coast Dr
170 -type
The new system will be a combination of TWP and FO, according to the drawing supplied by Iteris, and
included on page 2 -8 of this document. For this system upgrade, Econolite proposes to implement icons in
one phase, but configuring the system for a maximum of 150 intersections, adding any remaining
intersections onto the system over time.
Section — Project Equipment Requirements -
City of Newport Beach �>���ii� ®�,Q��
Page 2 -1 Solurbne Graz Mwe Use V blr
All controllers on this project will be replaced with Econolite ASC /3 NEMA controllers or 2070L controllers
loaded with ASC /3 -2070 software. Wdh respect to MacArthur @ San Miguel and Coast Hwy @ Goldenrod,
the whole cabinet will be replaced with Econolite TS -2 type 2 "O" cabinets. The new cabinet location, Coast
Hwy @ Iris Ave, will also be supplied with a TS -2 type 2 "O" cabinet. These NEMA cabinets are designed to
be placed directly on the mounting bolts of 332 or 336 cabinets. The following upgrades are proposed.
Traffic Signal System Upgrade Project
City of Newport Beach
Field Controller List and Intersection Equipment Configuration
IP / Ethernet Communications
Existing
Controller
Type
CCTV
Video
Location
Cabinet
Upgrade
Upgrade
Controller
Suggested
Upgrade
Int#
Intersection main/cross
Central Communications Equipment
none
1
Avocado & Corona Del Mar Plaza
other
Yes
ASC /3 -2100
2
Avocado & Farallon Dr
other
Yes
ASC/3 -2100
3
Avocado & San Miguel
other
Yes
ASC /3 -2100
4
San Miguel &;San Joaquin
170 -type
Yes
ASC/2070
5
Mt?hur� &San 6iT "uel- ..
other
Yes
°O" TS2 -2
Yes
ASC /3 -2100
6
,MacArthur &;San 3oa` ijin.Hills
170_ type
Yes
ASC2070
7
MrYrihur &:SoriitalFord
other
Yes
ASC /3 -2100
8
Iatrthur &17ilaggio.
other
Yes
ASC /3 -2100
9
•MacArthur.& 8istin
other
Yes
ASC /3 -2100
10
Coast Hwy .& Jamboree:
170 -type
Yes
ASC/2070
11
Coast Hwy &.tnrine Terrace
170 -type
Yes
ASC/2070
12
CoasWwy & Newport Center
170 -type
Yes
ASC /2070
Coast Hwy &Avocado
170 -type
Yes
ASC /2070
Coast Hwy & MacArthur
170 -type
Yes
Yes
ASC /2070
Coast Hwy & Goldenrod
170 -type
"O" TS2 -2
Yes
ASC /3 -2100
r
Coast Hwy & Iris Ave
NEW
"O" TS2 -2
NEW
ASC /3 -2100
Coast Hwy & Marguerite
170 -type
Yes
ASC/2070
Coast Hwy & Poppy
170 -type
Yes
ASC2070
Coast Hwy & Morning Canyon
170 -type
Yes
ASC/2070
20
Coast Hwy & Cameo Shores
170 -type
Yes
ASC/2070
21
Coast Hwy & Pelican Point
170 -type
Yes
ASC /2070
22
Coast Hwy & Newport Coast Dr
170 -type
Yes
ASC /2070
23
Spare Equipment
ASC12070 (1)
ASC13 -2100 1
Econolite is responsible for all field modifications, including installing communications equipment, replacing
Controllers, and modifying existing cabinets. Pricing includes three, new additional cabinets and installation.
Econolite is not responsible for any existing cabinet deficiencies or operational issues. A site survey has
been conducted, with all deficiencies and issues listed, and written mutual acceptance of the survey shall be
recorded prior to any work beginning.
The following modifications have already been identified and will be required on this project.
section Pio}ed Equipment Requirements W ECONOLITE
City of Newport Beadi
Page 2-2 so0.s u,ec nro.e v,e vvo
14
2010 ECL monitors by EDI
170 -type
7
MMU by EDI
NEMA
21
Wire in Door Open PB Switch
170 -type / NEMA
21
Wire in CMU /Cab FI PB Switch
170 -type / NEMA
12
Punch Down block
170 -type / NEMA
14
Red Monitoring panel
170 -type
4
242 DC isolator Isolation module
170 -type / NEMA
12
Load switches cubed with diagnostics
170 -type / NEMA
16
222 detectors
170 -type / NEMA
7
ASC /3 D cable and connector
NEMA
7
D Panel interface assembly
NEMA
1
New TS2 -2 "O" Cabinet assembly
NEMA
Including: MMU
ASC /3 -2100
Load switches
Detectors
Door Open / Flash Switches
Section - Project Equipment Requirements ZEECONOLITE
aty of Newport Beads
Page 2 -3
Communications Scope
Econolite has been providing advanced transportation management system solutions for 75 years. As
system functionality and technology advances, we have been able to embrace these advancements to
provide more efficient and cost effective systems. Many of the complexities and difficulties with system
deployment focus on communications infrastructure, communications medium and communication hardware
devices.. We have determined that many of these devices /technologies may or may not be compatible with
our systems and control hardware and may or may not be able to provide the correct capabilities to support
our systems communications needs. Econolite engineers have spent hundreds of hours qualifying specific
communications devices that will seamlessly integrate with our systems and control equipment.
In this proposal, Econolite proposes specific communications technology and devices based on our
evaluation relative to the proposed system requirements. As such, Econolite will take responsibility for the
implementation, compatibility, and operation of the communications. necessary for our systems as defined
within a given proposal. Agencies that choose to provide their own communications, have a third party do
so, or request Econolite to substitute devicesttechnology run the risk of encountering communications
problems with their system. Econolite requires the use of Econolite approved third party. communications
devices.
According to the requirements, the TCS file server and communications server are to be located at the City in
the IT equipment room. Econolite will provide the central computer equipment for the icons system,
compliant with the central hardware list supplied herein.
Econolite proposes supplying all ;communications equipment except for the interconnect wire or cabling and
patch'panels vVe'fuopose;the following:
'
• This projectconsisfs connecting all the new ASC /3 controllers 2070L (ASC/2070) controllers directly
to the Communications Server located at the City. using Ethernet communications. This Ethernet
connectii.n will be established by a combination of methods. The following three methods are
proposed'.
• Where twisted -pair copper is to remain, provide a high -speed Ethernet connection using IP-
over-TWP modem equipment.
• Where the above is not available or is to be upgraded, Econolite proposes to provide
Ethernet radios or fiber -optic modems (provided cabling exists) at each cabinet to provide a
high -speed Ethernet connection.
• Either type of communications can originate at the communications server location.
Conversion of any type of communications medium (IE. DSL to Radio / Radio to DSL) can be
made at any field location by adding a switch at the point where the conversion is required.
• Communications channels shall be set up in the ATMS so that no more than 8 controllers will exist on
a single channel. With Ethernet communications these channels can co -exist on a single switch port.
• Econolite will install the software, upgrade the field hardware, and install the fieWto- center
communications equipment, integrate 22 intersections into the proposed ATNIS system, and provide
systems training.
NOTES: it is very important that all communications interconnect used to communicate between the field
and the proposed TCS be dedicated to the icons ATMS and that the system communications will
not be affected by any other users.
Section — Project Equipment Requirements
City of Newport Beach HECONOUTE
Page 2-0 G.S. . a,acM. t ,. war4d•
The scope described above is based on information provided to Econolite to date. Any changes to
the scope of this project will require a new quotation. The City shall be responsible for testing all
the existing copper for proper connectivity and conductance. This scope is based on information
provided to Econolite. In the event that (a) alternate means of communications (IP radio / fiber -
optic) are desired, or (b) any cut, damaged, and/or otherwise unusable required TWP circuit
necessary for the proposed Ethernet communications system will be the responsibility of the City to
repair or replace. Any repair /replacement effectively delaying the project shall be added to the
proposed project schedule. The City shall not withhold payment for work performed for material on
hand due to unforeseen communications issues which are not directly related to Econolite
equipment or work.
This proposal reflects the design considerations proposed by the City's selected communications
consultant, as outlined on page 2 -8 of this document.
Description of electrical and hardware requirements for the project
Servers. Comouteis and Auxi //ary Eaulnment
In order to meet the requirements of the City of Newport Beach, the icons system requires one (1)
file /applications server, one (1) communications server, two (2) workstation computers, one (1) laptop
computers, and the central communications equipment as listed in the Hardware Equipment List included in
this proposal. Econolite will be providing the equipment and software as detailed in the included list.
The system hardware will be configured, software installed and tested in our Colorado Springs, CO
EngineenrLq facility An EcinoJitY systems engineer will assist the City's IT personnel in integrating the new
u»rrs �5#em LAI�1(yirorkst�Uorts anriservers only - field_communications wilt be kept separate) with the City's
LAN tfneeded: A11 uir(uatpnvate ne "twork corine`ctions. and wide area network connections to the new icons
neor are tFie domain +and responsibility of the City's ItAIS/IT personnel. Econolte can provide network
co: uraUon diagnostics or design assistance if required. to integrate the new icons network to the Citys
existing networkJ�y Econoljte engineers, at a rate of $175.00 per hour.
Should the City of Newport Beach chose to procure the computer equipment through other channels, the
City shall be responsible for the cost of shipping the equipment to and from the Econolite, Colorado Springs
facility.
Central Computer Equipment List- minimum requirements.
Section - Project Equipment Requirements 'OEIL'DliiOUTE
City of Newport Beach sox,aa� t ,3 nA� ttm Wm,P
Page 2 -5
1
Application/
File Server
PowerEdge 2950, Dual Core Intel® Xeon® 5130, 4MB Cache,
2.00GHz, 1333MHz FSB
1
Single Processor only
2GB 533MHz (4x512MB), Single Ranked DIMMs
Windows Server® 2003 R2, Standard Edition, Includes 5 CALs
1x6 Backplane for 3.5 -inch Hard Drives
PERC Srr, x6 Backplane, Integrated Controller Card
Integrated SAS /SATA RAIDS, P.ERC 5/1 Integrated
4 - 73GB SAS, 3.5 -inch, 15K RPM Hard Drive [Standard]
Riser with 3 -PCle -Slots
Rack Chassis w /Sliding RapidNersa Rails and Cable
Management Arm,Universal
Broadcom TCP /IP Offload Engine Not Enabled
PowerVault 100T, DAT72 Tape Backup, 36/72GB, w /Controller,
Internal
Section - Project Equipment Requirements 'OEIL'DliiOUTE
City of Newport Beach sox,aa� t ,3 nA� ttm Wm,P
Page 2 -5
Section — Project Equipment Requirements �E�:rO1VOL�'TE
City of Newport Beads
Page 2 -6 sw,aa,s V» M. the woras.
Section — Project Equipment Requirements M-ECONOUTE
City of Newport Beach Sk, � rli �e � VV4r1CF&
Page 2-7
DVDTM
Dell 24 inch UltraSharpT 2407FPW-HC Widescreen, adj stand,
VGAIDVI
USB Entry Quietkey, No Hot Keys
Deli USI3 2-Button Mechanical Mouse with Scroll
Quick Reference Guide
Resource CD - contains Diagnostics and Drivers
3 Year Economy Plan
CD-R/RW Software
3
30 Foot Cat 5 LAN Cable
3
Transient Protection Power Strip
3
4
Central
System
Equipment
UPS, 2200 -Watt
1
Cisco 24 port lGbps LAN Switch - Model 3560 - P/N WS-03560-
24PS-S
1
ServSwitch 4 Port KVM Switch
1
Accutime 2000 Time Synchronization Kit
1
Telephone Surge Prot. 4-port
1
17" SVGA Monitor
1
A . d", Rackmount Keyboard Drawer with built-in Touchpad
1 1
Cat .6 LAN-Cable
1
Wilk-
5
Central
Gomm
Equipment
Single, Bay System 90 Rack
1
Foundry FESX424HF (lGig-E Copper Port & 20 Ethernet Fiber
Ports)
1
6
Laptop
Latitude ATG D620, Intel Core 2 Duo T7200, 2.00GHz, 667Mhz4M
L2 Cache, Dual Core (222-7258)
1
Genuine WindowsO XP Professional, SP2, with media
NTFS File System for all Operating Systems
14.1 inch Wide Screen WXGA RGDLCD for Latitude ATG D620
(311-6939
Standard Touchpad
1.OGB, DDR2-667 SDRAM, 1 DIMM
8OGB Hard Drive, 9.5MM, 720ORPM
Dell Wireless 5700 (CDMA EVDO)Built-in Mobile Broadband
Mini-Card for Verizon Wirelessservice, Latitude (430-1489)
8X DVD+/-RWv4th Roxio, CreatorDell Edition Digital Media
andCyberlink Power DVD, for Latitude 120E (313-3883)
IntelO Integrated Graphics Media Accelerator 950
Internal English Keyboard
6 Cell Primary Battery
9OW A/C Adapter
Floppy Drive
Section — Project Equipment Requirements M-ECONOUTE
City of Newport Beach Sk, � rli �e � VV4r1CF&
Page 2-7
ttetn�tDevi"
.,r .: T.: Q t aom' xii
uany_ �
Quick Reference Guide
Targus Sports Backpack, fits up to 15.4 in.
3 Year Economy Plan
Freld Equipment
All NEMA controllers will be replaced with ASC/3 NTCIP Level 2 Ethernet capable controllers. The 170 -type
controller will be replaced with a 2070L controller, loaded with ASC/3 -2070 software.
According to the City's documentation the following controller upgrades are required:
13 Controller replacements to 2070L and ASC /3 -2070 for the existing 170 -type cabinets
6 Controller replacements to ASC /3 for the existing NEMA cabinets
2 Cabinet replacements w/ ASC/3 controllers
1 New Cabinet Installation (equipment only)
Communications between intersections will require the following equipment in order to provide adequate
connectivity from the City TMC to each of the intersections. Wherever TWP is listed under Cabinet
Interconnect, two pairs of the.existing copper will be reserved for the VDSL modems, which will replace FSK
communications. Any proposed Camera locations will utilize Fiber Optic interconnect. The required cabinet
equip ment,is defined in the, chart below:
Section — Project Equipment Requirements
City of Newport Beach GECONOLITE
Page 2.8 cw. aonv O. M she WortO
Communications Equipment
IP / Ethernet Communications
Existing
Controller
Type
Upgrade
Controller
Suggested
Upgrade
Controller
Comm
Modules
Ruggedcom
switch
Ethernet
cable
Intersection main /cross
RS900Lor
R5930L
A01041
Central Communications Equipment
none
Avocado & Corona Del Mar Plaza
other
Yes
ASC /3 -2100
Ethernet
1
1
Avocado & Farallon Dr
other
Yes
ASC /3 -2100
Ethernet
1
1
Avocado & San Miguel
other
Yes
ASC /3 -2100
Ethernet
1
1
San Miguel & San Joaquin
170 -type
Yes
ASC/2070
None
1
1
MacArthur & San Miguel
other
Yes
ASC /3 -2100
Ethernet
1
2
MacArthur & San Joaquin Hills
170 -type
Yes
ASC/2070
None
1
1
MacArthur & Bonita/Ford
other
Yes
ASC/3 -2100
Ethernet
1
1
MacArthur & Vilaggio
other
Yes
ASC /3 -2100
Ethernet
1
1
MacArthur & Bison
other
Yes
ASC13 -2100
Ethernet
1
1 ,
Coast Hwy & Jamboree
170 -type
Yes
ASC/2070
None
1
1
Coast Hwy & Irvine Terrace
170 -type
Yes
ASC/2070
None
1
1
Coast Hwy &Newport Center
170 -type
Yes
ASC/2070
None
1
1
Coast Hwy & Avocado
170 -type
Yes
ASC/2070
None
1
1
Coast Hwy & MacArthur
170 -type
Yes
ASC/2070
None
1
2
Coast Hwy:& ins 1A, ..
New
Yes
ASC /3.2100
Ethernet
1
1
;Coast Hwj ?&� Goldenrod
170 -type
Yes
ASC/3 -2100
Ethernet
1
1
"Coast F{wy?& drtarguente
170ype
Yes
ASC/2070
None
1
1
`:Coast Hwy %$Poppy ..
170 -type
Yes
ASC/2070
None
1
1
CoasfHwy! &filaming;Canyon
170 =type
Yes
ASC/20,70
None
1
1
Coast Ww,y & Carrieo.Shores
170 -type
Yes
ASC/2070
None
1
1
CodsNHwy:& Pelican Point
170 -type
Yes
ASC/2070
none
1
1
Coast Hwy $ Newport Coast Dr
170 -type
Yes
ASC/2070
none
1
1
Spare Equipment
None
none
Section — Project Equipment Requirements ECONOLIT6
2
Gty Newport Beach saw u�c n u,a
Page 2-9
System Intersection Layout
NAVfE00N BOnAOi��etrMdNAVEEO. oM"n FQ. Nays Feea.M -G—LW vi��✓�fver l9%]dl6
Section — Project Equipment Requirements EECONOUTE
City of Newport Beach w«4dd
Page 2 -10
System Architecture
Vol
L TNIBNWAY
aTrxAu
Etch, CA System CIM
�" MMbwwE
MErcr.a
• avocwOiw.CAamuR r9.w NOlEL �•iw,�is.ri
® .w
.x
.__....__ coA•T NwNw•r
-TM4 04ho ..87 -*06
YC
Nw Baaeh 5"V. ArshkaNUn- Phaaa1
FW 7.3
The foundry switch will be installed by Econolite, as long as we have access to the equipment rack at the
Library. Otherwise, the City's IT department will need to install the switch and make the necessary
connections.
Section - Proms Equipment Requkonents _ECONOLITE
Gty of Newport Beach -
PaW 2-11 SoRidms mac Mwe me Wor ds
3. "Installation and Integration
Overall System Integration
This Rem includes software license fees for three icons workstations (desktops and laptops), one traffic
applicationifile server and one communications server license. All items have a one year warranty. The
Communications Server license covers up to 250 intersections operating from a single communications
server computer (expandable beyond 250 intersections with additional software licenses and hardware).
The standard protocol for this system will be NTCIP. Econolite Control Products, Inc.'s systems engineering
team provides an extensive process for system installation, initialization, testing and acceptance. An
Econolite Project Manager, Jason Hann, will manage the new system from its earliest stages of contract
signing all the way to final acceptance.
Econolite will also supply one licensed copy of Econolite's Aries® Data Manager software, to be loaded on 1
computer and used to configure the ASC/3 controllers prior to deployment to the field. This software is
licensed for a single computer only, and allows the user to upload/download databases while directly
connected to the controller.
Software Integration
Factory performance testing is performed at the Econolite Colorado Springs, Colorado Facility. There, an
Eonolde team of engineers will assemble. the system hardware, install the software, test the system
` c4rlr�ponents (using,standard system west documents), prepare the system graphics for one (1) base map,
one.(1):area map and twenty two (22) standard inter§ection displays, and document the final system (aEl
hardvrare c onfigu�atlons) *he base: map and a(ea,map wiitbe developed from an appropriate map graphics
file supplied bq t1i� Crty bf:Newporf'eeach in'a file.fonnat compatible with the icons' graphic editor (6MP or
wMFj: After completion of the Econolite standard system performance tests, the system will be
disassembled, packed and shipped to the job site. A member of the Econolite system engineering team will
arrive on. site to unpack, reassemble and test the system. Performance testing of the system and the
interconnect infrastructure will be conducted by communication testing (upload / download / status checidrig).
to an initial twenty-two (22) 2070L or ASC/3 controllers. This proposal includes labor and expenses for one
week for installation and intersection integration. All communications channels should be tested, and any
cabinet installations should be completed by the City, prior to the arrival of system engineering. Any
additional time necessary to integrate the intersections will be billed separately at $175.00 per hour, plus
travel expenses.
Acceptance testing will consist of an operational demonstration to the customer of all major software
components using a standard system acceptance test developed by Econolite.
Software Training
System training will be scheduled after the system engineering team has the system functionally operational.
Our quote for this project includes one week of initial training, for up to 32 hours, on the icons® system. This
is the minimum amount of time required for the initial training and will include instruction on system hardware,
system operation, and system administration. The course outline is included at the end of this proposal.
Training will be conducted at Econolite's Anaheim facility for up to ten people. The training will be conducted
on four consecutive days.
Section - Instaltation and Integration Ell :il]NOLJTE
aty of Newport Beads
Page 3 -1 sowor� ` move v
Follow up training can be scheduled once the City has had a chance to use the system and become familiar
with tote, areas where they may benefit from additional instruction. Agendas and time frames can be
negotiated at anytime.
Training Schedule
Day 1:
Introduction to icons&, System Overview and Summary.
1.5 HRS.
This session will review the System Hardware, System Software, icons Traffic Management System
capabilities and features, and a brief tour of the Traffic Management System Workspace.
How to Log-On to Windows@ for both remote (Dial -Up) and local workstations, launching the ITMS Client
application, logging on to icons® accessing system graphics and an explanation of the workspace
components will be discussed.
Using the icons ®Advanced Traffic Management System. 6.5 HRS
This session will consist of a comprehensive review of the workstation software suite. During the class, each
menu item in the ITMS Client application will be reviewed. Each attendee will be afforded the opportunity to
use the system software to perform various tasks and operations.
D3ys2::.
Us hi. g,#lie.iennse system (continued from Day 1) 8.0 HRS
Day 3:
Using the icons® system (continued from Day 2) 4.0 HRS
Using the icons Graphic Editor. 4.0 HRS.
This session will cover the. use of the icons® Graphic Editor Software. During the class, attendees will be
walked through the various menu entries and features of the Graphic Editor package. Practical application of
the editor will be demonstrated by modifying one of the system graphics and creating a new graphic using
one of the template graphics supplied with the editor.
Day 4:
System Administration:
Windows® Security
8.0 HRS.
(1.0 HR.)
This session will provide a general overview of the .Windows security system as well as creating and
removing user accounts to and from the system. Each attendee will have the opportunity to add or remove a
user account to / from the system.
The Windows® Event Logs (0.5 HR.)
r icons is a registered trademark of Econolite Control Products, Inc.
City of Newport Beach
Page 3 -2
9-ECONOL.ITE
Sdutlme that Move th. Yvid�
This session will cover both the System and Application Event Logs within Windows. Speck items
appearing, within the logs will be discussed and their relationship to system performance will be reviewed.
Database Backups
(0.5 HR.)
This session will review how the system backs -up the SOL Databases and the required operator actions.
Software Installation Procedures
(2.0 HRS.)
This session will review the procedures used to install the icons Traffic Management System Software on a
target computer. Additionally, general setup requirements for each "type" of computer will be reviewed.
The icons® Server software suite (2.0 HRS.)
This session will review the function of each component comprising the server software suite. Each INI file
used by an icons® component will be reviewed in detail. The NT Registry will also be reviewed for those
ITMS Services that use the registry to configure their operation.
This session will also cover the Administration menu. items associated with the ITMS Client application.
Adding and deleting users to and from the icons system and assigning user privileges will be reviewed.
Using the System Configuration editor to after the system Zone and Section layout will also be reviewed.
icons:System Cgnfigurptiori and Troubleshooting (2 HRS.)
This session Will- rewew th "e;systern hardware and cabling. General functions of each piece of equipment will
be covereii anti °the potential impact of equipment faults will be discussed. The LAN and TCP /IP portion of
the session will review the basic setup and configuration of the Local Area Network. General network
troubleshooting tools and•proeedures will be reviewed.
This session will also review the ITMS COMM TEST, NTCIP COMM TEST and COMM MANAGER WIN
SPY applications included with the Traffic Management System.
Section — Installation and Integration RECONOL[TE
6ty of Newport Beads
Page 3-3
Project Integration Schedule
Below is a schedule defining the project tasks and proposed timeline. Some tasks can run concurrently, but
the overall timeframe should be less than 120 days, after Econolite Control Products receives the notice to
proceed.
Section — Installation and Integration
Qty of Newport Beach soa,taans u,ac Wn .tt,e
Page 3 -4
Newport Beach, CA icons® Project
120 days
Notice to proceed
0 days
Field equipment installation
70 days
Communications equipment rocurement
4 wks
Controller t cabinet upgrades
4 wks
Field testing
1 Wk
icons installation
90 days
Procure equipment
4 wks
Receive main map and intersection graphics from City
2 wks
Generation of main map and 22 intersection displays
3 wks
Configure equipment in house
2 wks
Factory Acceptance test in house
1 wk
sh'. 1 rr�ent to. Project, site
1 wk
Irista ("'WOO-,'Intl
ration. on site
2 wks
Acae tance
bitin g (on site
1 wk
T.rajnin
1 wk
Section — Installation and Integration
Qty of Newport Beach soa,taans u,ac Wn .tt,e
Page 3 -4
4. Integrated Closed Circuit Television (CCTV)
Module Included Option
The optional icons CCTV -IP module consists of video servers (Broadware Media Server and Command
Server) and video server software packages that provide integrated system -wide distributed video and
camera management over local and wide area IP networks, and is licensed for up to 10 cameras. The
Media server purpose is to retrieve the video from the field, make the video available to icons. The
Command server is responsible for retrieving the video from the Media server and "pushing" to the wall
monitors. Additional cameras may be added by increasing the camera licenses. This module takes
advantage of the latest developments in streaming video technology and is based on an advanced
Interactive Media Server.
Video is encoded at the source using low cost digital encoders or IP cameras from vendors such as Axis,
VCS and Pelco. Most of these encoders offer the ability to set the image size, quality, and frame rate. The
Interactive Media Server then manages and distributes the encoded video allowing transmission of the video
to multiple viewing clients simultaneously. This license price covers up to 10 cameras or video streams and
the video server.
Access to the icons CCTV -IP module is controlled by privileges associated with operator IDs. All cameras
connected to the icons system are represented by objects on the system map. Using the CCTV -IP module,
system operators at the TMC or anywhere on the system's network can dick on a camera object on the
system base map and view video from that camera and control the camera position (pan, tilt, and zoom).
,con. workstation.
1W10UBaseta
Ssltch -.
Broadware
Vldeo Medla
Servor S
_ System
Network
RuggedCom Switch
Broadware
video
Command
Wall Monitors Server
snot Included in proposal) Feid Network
Video
Encoders ' t.
Analog
Cameras
Fixed cameras images, such as those from video detectors, can also be viewed.
At this time the icons CCTV -IP module supports Pelco and Cohu cameras together with video encoders from
Axis, VCS, and Pelco (PelcoNet).
This proposal includes all the equipment necessary to view video from icons or from wall monitors, but
DOES NOT include the wall monitor. themselves.
Section - Integrated Dosed Grcuit Television (CCTV) 3-ECONOLITE
Gty of Newport Beach S k, tdae tJlwe rf,a worsea
Page 4 -1
This proposal includes all equipment to install 2 camera locations onto the CCTV -IP module, as listed below.
CCTV Module
Item
Description
dt
Up to ten cameras
Central Equipment & Software
1
Broadware Media Server (EMS) w/ Software & 10 Camera License
1
Broadware Command Server (BCS) — includes 1 BCS Client License
1
Broadware BCS Client Licenses (1 required for each wall monitor)
3
2
icons CCTV License Fee
1
Field Equipment
3
Cameras - Pelco
Pelco SD435 -PG -E7 Spectra IV SE Color PTZ Dome Camera
Pendant Environmental, 35x Optical Zoom
2
Camera Power Supply, 1 output 4 amps, 120/240vAC
2
Pole mount adapter
2
4
Encoders
Axis single port video sever to be used with Media Server
2
Axis four port video server to be used with Media Server
0
Camera Interface Panel (ACIP -1)
0
Camera. Interface Panel (ACIP-4)
0
Cats Jumper Cable
2
Video wall equipment is not included in this price proposal.
Section — Integrated Closed Circuit Television (CCTV)
City of Newport Beach = �� ®� ®���((�
Page 4-2 sokrcions &h v Move the vv M v
SiynchroT^" Module Included Option
The icons system supports an optional interface to the SYNCHRO'" signal timing optimization software.
This interface provides the ability to transfer Econotite ASC /2 or ASC43 controller phase and coordination
data to/from SYNCHRO.
The icons SYNCHRO interface provides the ability to save controller phasing and timing data in the Universal
Traffic Data Format (UTDF). Once saved in this format, the data can be imported and opened in the
SYNCHRO application for off -line analysis and optimization.
The icons SYNCHRO interface also provides the ability to import SYNCHRO timing plan data saved in the
UTDF format into the native ASC12 orASC13 controller format for use within the system. After transfer to the
ASC/2 or ASC 13 controller database, the new timings can be downloaded to the local controller by the icons
operator.
The SYNCHRO interface is not part of the basic icons system and requires additional licensing. Pricing for
this module has been included as a separate line item.
Section — S'"d1° Interface RECONOLME
My of Newport Beach EoWoona chat Nb�e Ma wu#ia
Page 5-1
Warranty and Bupporl
Product Warranty Certificate
Below, is an example of the Warranty Certificate provided with every controller supplied by Econolite. This is
only a sample. Actual certificates will be provided upon delivery of equipment.
dera�n n Ration aminnsmwinivarn�wNw.rtxnwvwai a
OF
919
or
100 b*W MW MW9IbV PD&Me W EWWVA -mar WS"a pe
ww GeeulrAlca d omWan
MC. EoauJNeG6ntlW AIf1tl11CJP, NG
212: iYice
213 ogU7Aeim IMM 3 Suit 8
8l AVyus5�f8; 6lotiCYJ2UBM1
ECONOLITE PRODUCTS COVERED UNDER THIS WARRANTYINCLUDE:
ASC12S— ASC72M — CBD6000 — ATC2070— AUTCSCOPE PRODUCTS — MMU — CMU — BIU — 50K MODEM
W49RWA
Section - warranty certificate SEC ©NOLiTE
City of Newport Beach -
Page 6-1 Sa6filwre0. Howe thewviaa
Software Warranty
Econolite Control Products, Inc. ( Econo(ite) warrants the icons software components licensed to the original
purchasing agency (Purchaser) for a period of one (1) year from date of customer acceptance, 4 Econolite
installs the software or supplies technical direction or installation by contract. The warranty period shall run
from the completion of installation, provided same is not unreasonably delayed by the Purchaser. Econolite is
responsible for warranting the software in accordance to published icons specifications. Econolite is not
responsible for non - conformance caused by negligence, acts of God, or use of software in a manner not
originally intended.
If the software delivered hereunder does not meet the above warranty, and if the Purchaser promptly notifies
Econolite, Econolite shall thereupon correct any defect, including non - conformance with published icons
specifications, either (at our option) by correcting defective software or modifying the software to meet
specifications. The liability of Econolite under this warranty, for any loss or damage whether the claim is
based on contract or negligence, shall not in any case exceed the cost of correcting defects in the equipment
as herein provided and, upon the expiration of the warranty period, all such liability shall terminate. The
foregoing shall constitute the exclusive remedy of the Purchaser and the exclusive liability of Econolite.
THE EXPRESS WARRANTY SET FORTH IS A LIMITED WARRANTY AND IS THE ONLY WARRANTY
MADE BY ECONOLITE. ECONOLITE MAKES AND PURCHASER RECEIVES NO OTHER EXPRESS
WARRANTY AND NO IMPLIED WARRANTIES. ALL WARRANTIES OF MERCHANTABILITY AND
FITNESS 'FOR A PARTICULAR PURPOSE. ARE EXPRESSLY EXCLUDED. THE STATED EXPRESS
uxaNIY I£ ICJ LIEU OF ALL LIABILITIES OR OBLIGATIONS OF ECONOLITE FOR DAMAGES
A(illl OH1T OF "OR IN.•C:ONNECTION WITH THE SALE, DELIVERY, OPERATION OR USE OF THE
"R'r���+ari`antres set forth . herein shall'.be void ff the software has been (1) altered outside of Econolite's
fa3esf2) suf�eeted to misuse, negligence or operated in otherffian normal and proper use and service, or
(3} tts�talled or adjusted ;in a'manner not in accordance with Econolite's instructions. This warranty does not
extend:fo softvare• not developed by Econolite. Econolite has the sole right to determine whether or not an
item is covered under our warranty policy.
Service and Support
With keeping to our company promise, we will make every effort to provide quick and immediate service and
support for any problems or issues that the City may encounter. This may involve troubleshooting by
telephone, email or other communications methods (remote access), or may be handled by field visits by
technicians if we are unable to resolve the problem remotely.
For any trouble reports that are received after normal business hours, we will respond with a telephone call
and email confirmation from one of our technicians within one business day of receiving the message. If he is
unable to resolve the issue, a. visit will be scheduled. We cannot guarantee a time frame on the field
response; but we will make every effort to respond to any issue as quickly as possible.
secoon ` Warranty Certificate FECONOLITE
City of Newport Beath
Page 6-7 sm,d� that � the \Akx4c e
7. „ Price Summary
General Proposal Summary
The main proposal includes pricing for connecting 22 intersections either by Ethernet over copper or wireless
Ethernet to the icons system. The main also proposal includes the following:
• icons Central Traffic Management System
• SynchroTM Interface Module
• CCTV Module (10 camera license)
The computer hardware either provided by Econolite will include licenses for:
1 — File/Application Server
1 - Communication Server
2 — Workstations
1— Laptop
There are (2) proposed CCTV locations to be installed with necessary communications and camera
equipment for the optional CCTV module.
PLUM
r system lance includes supplying the software and services required for the deployment of a
vanced Traffp Management System to the City of Newport Beach. We will provide the icons
installed by Econolite engineers. We will also provide integrations services as described in this
proposal.
The Basic icons system will be supplied in one phase, which includes the base map, area map, 22
intersection displays, CCTV module and SynchroTm Module, as well all training and integration required to
set up, configure and begin operating the system.
AttachmentA — Acceptance Test nn
vac 7 _ .. EGONOUTE
Gty Newport Beach a m the Page 7 -1 9.k
Overall Price Summary
System Upgrade Price (22 Intersections) . ............................... ....................$492,500.00
Includes:
1. Basic irons system .................................................... ............................... $228,100.00
a. Computers (servers, workstations, laptops, etc.) ................. $38,400.00
b. Server/ Computer Configuration & Installation .................. $189,700.00
• 9016 Payable upon Delivery .......... ....................$205,290.00
• 10°% Payable upon Acceptance ....... .....................$22,810.00
2. Field Equipment (controller replacements and module upgrades) ... $201,228.00
24 Controller Replacements (including 2 spares) ................ $81,600.00
2 Cabinet Replacements ..................... ............................... $36,300.00
New Cabinet Installation (equipment only) ...................... $18,150.00
Field.Modification Equipment ..................... ..................... $65,178.00
90 %:Payable upon Delivery ........... ....................$181,105.20
10% Payable upon Acceptance ........ .....................$20,122.80
3. Communications Equipment (modems, switches, etc.) ............... „......$37,400.00
22 RuggedCom 900 series switches & Installation ..............$37,400.00
• 900% Payable upon Delivery ........... .....................$33,660.00
• 10°% Payable upon Acceptance ......... ......................$3,740.00
4. Field Modification/Communications Labor ..................... .....................$25,872.00
• 90°% Payable upon Delivery ........... .....................$23,284.80
• 10% Payable upon Acceptance ......... ......................$2,588.00
5. CCTV Module Price (10 Camera License) .... ............................... $45,900.00
Includes all equipment and Integration
Broadware video servers and all applicable licenses
Video and Communications Equipment for 2 Camera Locations
• 90°% Payable upon Delivery .......... .....................$41,310.00
• 10% Payable upon Acceptance ........ ......................$4,590.00
Attachment A — Acceptance Test �ECONOL�TE
Pty of Newport Beach GohA* � � M, � VV r�
Page 7 -2
6. Synchro® Interface Module ....... ............................... .....................$20,000.00
• 90% Payable upon Delivery ........ .....................$18,000.00
• 10% Payable upon Acceptance ..... ......................$2,000.00
Labor, Materials & Performance Bond ............. ............................... $8,639.54
• 100% Payable upon Issuance of Bond............ $8,639.54
Estimated Shipping .....................$2,767.50
Estimated Tax (7.75 %) .............$14,702.08
Total Proposal Price ................$584609.12
Terms and Conditions
• Payment terms net 30 days
• All shipments are FOB Anaheim, CA.
Attachment A- Acceptance Test 7-3 c � sECCiNOLITE
Page 7
City of Newport Beach SOL M� ow V br. •
Exhibit 8: Sample System Acceptance Test
RW
`"
lit} h
icons ATMS
System Acceptance Test Procedure
Newport Beach, California
Date of Performance:
Performed By:
Witnessed By:
B bwitmt B - Acceptance Test RECONOLITE
Qty of Newport Beads . ®W oV K„a the VA„,d„
Page
ASC/3 Controller Basic Setup and Configuration
ASC/3 Controller:
1. Set Coordinator Options [Main-4-'oordinator- -Dptions]:
a.
Set Interconnect Format to PLAN.
b.
Set Interconnect Source to NIC.
2. Set Port 3 parameters [Main-42'onfig- Port.3]:
a.
Set protocol to NTCIP.
b.
Set NTCIP Address (not "Telemetry Address').
c.
Set NTCIP Response Delay to 1.
d.
Set NTCIP Drop Out Time to 60.
e.
Set to full duplex.
f.
Set the data rate to 38400 BPS.
g.
Set the data, parity, stop bits to 8,N,1 (not 8,0,1).
h.
Enable the port.
iconsTmWorkstation Setup
1. Ensure the controller types is ASC/3 [AdminlConfiguration].
2.. Graphics for, the system will not be available until formatting of files is
Setup
Verify ITMSCOMM parameters in the ITMSCOMM.INI for the Field Communication
Circuits (Communications Server):
a. Protocol = NTCIP 2.
b. Primary Poll Message = NTCIP PRI.
c. Secondary Poll Message = NTCIP_SEC.
d. Primary Poll Period = 1.
e. Secondary Poll Period = 60.
f. Secondary Poll Mode = STAGGERED.
g. Transmit Overlap = NONE.
h. Soft Failure Count = 5.
i. Media Type = UDP.
j. Line Speed = 38400.
k. Line Bits = 8. .
1. Line Parity = NOPARITY.
m. Line Stop Bits = ONESTOPBIT.
n. Turnaround Delay = 0.
o. Write and Read timing parameters are set to values of 10, 30, 0, 0 and 100
respectively.
p. No Poll Read Total Timeout = 1000.
q. Controller Drops are correctly programmed for each channel.
r. Controllers are enabled and their respective Comm. Addresses are correct.
2. Verify ITMS RELAY parameters in the ITMSRELAY.INI (Communications Server 1
Exhibit 0 — Acceptance Test RECONOUTE
City of Newport Bead, ed.,aa,a U Ma a wee®
Page ii
a. All Controllers are assigned to NTCIP_ASC2B_RIA protocol profile.
b. [packet I ] consists of the following NTCIP objects:
i. PHS_GRN_I (phase 1 -8 green and yellow status).
ii. PED_I (phase 1 -8 walk and ped. clear status).
iii. unit flash
iv. coord _pat_ status
v. short _ alarm_ status
vi. asc — trans—status
vii. asc _preempt_status
viii. veh_detI
ix. veh_det__2
x. phs_ call _I
xi. phs_next_I
xii. pedcall_I
xiii. alarm _state _I
xiv. spec f _ mc_I
xv. spec _fanc.2
xvi. spec _fanc_3
xvii. spec _fanc_4
c. [packet2] consists of the following NTCIP objects:
i.::..unt. download request
& [ NTCIP -Primary is assigned to all controllers as packetl.
e. [ NTCIP Secondary_Polling_Message] is assigned to all controllers as packet2.
f. [ NTCIP Setup]:
is ` 'Retiy_C6unt = 3.
ii. .VOS_Period = 60.
3. Verify Detector Mapper parameters in the DM.INI (File Server):
a. Unit of Measurement = I (Feet)
b. Average Detection Zone Length = 6.5 (feet).
c. Average Vehicle Length = 16.5 (feet).
d. VOS Collection Period= 300 (seconds).
4. Verify Alarm parameters in the ALARM.INI (File Server).
a. CommPort = COM3.
Exhibit B —acceptance Test 9ECO W OUTE
City port
ty of New Beach
Page 01
Sauciane that Move the Waritle
Systems Acceptance Test Procedures
Task
-
- -- Pass /
Item
Action Result
Comments
Number
I I Fail
-
SOL SERVER AND DATABASE OPERATIONS
1.1
Verify that Microsoft SQL The software is installed.
Server 2005 has been
SQL Server
installed on the Traffic
software.
Application / File Server
computer.
1.1.1
Verify that the SQL Server
The log should show
software is running and
MSSQL Server
SQL Server
operating normally by
Application.
software.
examining the Application
Event Log.
1.1.2
Launch the SQL Server
The SQL Enterprise
Enterprise Manager utility
Manager Console Window
from the Start Menu I
opens.
SQL Server
Programs I Microsoft SQL
software.
Server I Enterprise
Manager option. Connect
to SQL.
1.1.3
Expand the 'Tree" view in
The graphic
the left windowpane to
representation of the
show the (Local)
computer contains a
SQL Server
(Windows NT) computer.
Green Right Arrow to
soft ware.
indicate that SQL Server
is running on the
computer.
1.2
Continue to expand the
The database tree shows
'Tree" in the left window
the databases.
SQL Databases.
for (Local) (Windows NT)
DATABASES.
1.3
Collapse the tree for the
The right window
Databases and expand
indicates Database
SQL Database
the tree for Management.
Maintenance Plan 1.
Maintenance
Select Database
Plans.
Maintenance Plans from
the Management tree.
Exhibit B — Acceptance Test gECONOLiTE
City of Newport Beads
sdEiorie Vut Move tha w«+ee
Page iv
Exhibit B - Acceptance Test
CKy of Newport Beach ;,BEECONCUTE
Page v Sokmo.,sd Mw�thaWbrids
Comments
1.3.1
Double click on
Information about
Maintenanceplanl in the
Maintenance plant
left window.
appears in the right
window.
SQL Database
The Maintenance Plan is
Maintenance
set to backup the
Plans.
databases.
Database Backups are
performed every Sunday
at 2:00 AM.
1.4
Close SQL Server
Enterprise Manager and
launch Windows Explorer.
The folder contains
Expand the tree to locate
backups of the selected
Database
the folder"CAPrograrn
databases
Backups.
FileMMicrosoft SQL
r veAMSSQL1\BACKUP
Mcbjis\7 and display. the
2
icons ITIVS SERVER SERVICES
INSTALLATION AND
OPERATION
2.1
Log on to the
The entry indicates that
Communication Server
the ITMS
computer and go to the
Communications service
Control Panel I
is set to Manual start type
ITMS
Administrative Tools
and that the service has
Communications
Services window.
started.
Service.
Scroll through the
services list and locate
the entry for ITMS
Communications.
2.1.1
Examine the Application
The event detail indicates
Event Log for and entry:
that the service started
ITMS
Source - ITMS, Category
successfully.
Communications
- Communications, Event
Service.
-150, and examine the
event detail.
Exhibit B - Acceptance Test
CKy of Newport Beach ;,BEECONCUTE
Page v Sokmo.,sd Mw�thaWbrids
Exhibit B— Acceptance Test NECONOLITE
City of Newport Beach Sokd� that More the WrWO
Page vi
N
4 W4,ya N!I
Fas
N "MIR
2.2
Go to the Control Panel
The entry indicates that
Administrative Tools I
the ITMS Time Broadcast
Services window on the
service is set to Manual
ITMS Time
Communication Server.
start type and that the
Broadcast
Scroll through the
service has started.
Service.
services list and locate
the entry for ITMS Time
Broadcast.
2.2.1
Examine the Application
Time has been
The broadcast interval
Event Log and locate the
successfully broadcast on
(frequency) may be
most recent entry,
all applicable channels.
determined by
Source: ITMS Time
examining the
ITMS Time
Broadcast; Category:
Broadcast Period key
Broadcast
Service; Event 300; and
value in the
Service.
open it.
Communication Server
computer Registry. The
minimum frequency
should be at once-per-
day(1440s)
2.2.2
Communication
Verify that the controllers
The Date and Time are
Channel 1
have the correct time and
correct.
controllers.
date.
2.2.3
Communication
Verify that the controllers
The Date and Time are
Channel 4
have the correct time and
correct.
controllers.
date.
2.2.4
Communication
Verify that the controllers
The Date and Time are
Channel 8
have the correct time and
correct.
controllers.
date.
2.2.5
Communication
Verify that the controllers
The Date and Time are
Channel 11
have the correct time and
correct.
controllers.
date.
Exhibit B— Acceptance Test NECONOLITE
City of Newport Beach Sokd� that More the WrWO
Page vi
E)ddtA B — Acceptance Test wEcor*iouTF-
City of Newport Beach the Woride
Page! vii
�M= 41
0
MHz Vlm
r CoMME I
t: W
2.3
Go to the Control Panel
The entry indicates that
Administrative Tools f
the ITMS Relay service is
Services window on the
set to Manual start type
ITMS Relay
Communication Server
and that the service has
Service.
CONSCS.
started.
Scroll through the
services list and locate
the entry for ITMS Relay.
2.4
Log on to the File Server
The entry indicates that
ICONSFS computer and
the ITMS Event Channel
go to the Control Panel
service is set to Manual
Administrative Tools
start type and that the
ITMS Event
Services window.
service has started.
Channel Service.
Scroll through the
services list and locate
the entry for ITMS Event
-Channel.
2.5
Goto the Control Panel
The entry Indicates that
Adminis6five Tools I
the I I TIVIS Event Log
Services—window on the
Monitor service is set to
File Server ICONSFS
Manual start type and that
ITMS Event Log
computer.
the service has started.
Monitor Service.
Scroll through the
services list and locate
the entry for ITMS Event
Log Monitor service.
2.6
Go to the Control Panel
The entry Indicates that
Administrative Tools I
the ITMS Event Logger
Services window on the
service is set to Manual
ITMS Event
File Server.
start type and that the
Logger Service.
Scroll through the
service has started..
services list and locate
the entry for ITMS Event
Logger service.
E)ddtA B — Acceptance Test wEcor*iouTF-
City of Newport Beach the Woride
Page! vii
�Cas
Fin-,
F�
Comt�'
Resin
i NOmtY
ra r '
, +�,�r . ��. .
a ,
2.7
Go to the Control Panel
The entry indicates that
Administrative Tools I
the ITMS Traffic Control
Services window on the
service is set to Manual
ITMS Traffic
File Server.
start type and that the
Control Service.
Scroll through the
service has started.
services list and locale
the entry for ITMS Traffic
Control service.
2.8
Go to the Control Panel
The entry indicates that
Administrative Tools I
the ITMS Remote Upload
Services window on the
/ Download service is set
ITMS Remote
File Server.
to start automatically and
Upload /
Scroll through the
that the service has
Download
services list and locale
started.
Service.
the entry for ITMS
Remote Upload/
,R*Ioad service.
` 2:g
Go to the Control Panel
The entry indicates that
Administrative Tools
the ITMS Detector
Services window on the
Mapper service is set to
ITMS Detector
File Server.
Manual start type and that
Mapper Service.
Scroll through the
the service has started.
services list and locate
the entry for ITMS
Detector Mapper service.
2.10
Go to the Control Panel
The entry indicates that
Administrative Tools I
the ITMS AlarmAct
Services window on the
service is set to Manual
ITMS Alarm
File Server.
start type and that the
Service.
Scroll through the
service has started.
services list and locate
the entry for ITMS
AlarmAct service.
F)hW B — Acceptance Test RECONOUTE
City of Newport Beach
sw,pcx,s Chat Nbre the V Vorb®
Page viii
Exhibit 6 - Acceptance Test M-r=CdN0LHr=
City of Newport Beach
Page ix
IN
2.10.1
Go to the Control Panel
The entry Indicates that
Administrative Tools I
the ITMS Traffic Control
Services window on the
service is set to Manual
ITMS Event
File Server.
start type and that the
Mapper Service.
Scroll through the
service has started.
services list and locate
the entry for ITMS Event
Mapper service.
2.10.2
Go to the Control Panel The entry Indicates that
Administrative Tools I the ITMS Traffic Control
Services window on the service is set to Manual
ITMS Time Drift
File Server. start type and that the
Service.
Scroll through the service has started.
services list and locate
the entry for ITMS Time
bv*service-
3
VVORKS-) ATION 1,41 CONFIGURATION AND OPERATION
fthe comlulter. 71ia computer boots
Outer
normally to Windows,&
Workstation.
3.1.1
Log-on to the computer
The Windom Desktop
Computer Log-
with a valid user name
appears.
On.
and password.
3.2
Using the PING
The PCONSCS computer
command, ping ICONSCS
replies to the ping
computer
command.
LAN Connection.
The ICONSFS computer
ICONSFS computer
replies to the ping
command.
3.3
Launch the icons Graphic
The Program launches
Editor program from either
without error.
the Start Menu I Programs
Software
1Icons I Icons Graphics
Installation
Editor entry or the desktop
The program shuts down
Verification.
shortcut.
correctly.
Close the program.
Exhibit 6 - Acceptance Test M-r=CdN0LHr=
City of Newport Beach
Page ix
Task;, e -NOW
Pas
'r•4v
:�-Num
tc?
rdltem
.,,
3.3.1
Launch the icons ITMS
The Program launches
Client program from either
without error.
Software
the Start Menu I Programs
Installation
I Icons I ICONS entry or
Verification.
the desktop shortcut.
The program shuts down
correctly.
Close the program.
4
icons GRAPHIC
•- FUNCTIONALITY
4.1
Launch the icons Graphic
The program starts
Editor program from either
without error and the
the Start Menu I Programs
Graphic Editor workspace
Program Start
Icons ( Icons Graphics
window opens.
Editor entry or the desktop
shortcut.
4.2
Click on File I Open.
An Open File window
appears.
.:
Move .to. the C:%Program
A graphic opens with a
File] Open
Fles%Eooholite%GSJGEID
Blue background
Function.
atalGraphicsl folder and
containing the word
select the NEW.ILX file.
'Label" at a 45- degree
Click on Open to open the
angle.
file.
4.3
Library File
Click on the Library Menu
A window opens to select
Function.
item.
the Library file to open.
4.3.1
Browse to C: \Program
A new window opens
FileslEconolitelGS_IGEID
containing the graphic
Library File
ata%Libl the folders and
selected.
Function.
select WARNINGS.ILX.
Click on the Open button.
4.3.2
Click on and 'drag -and-
The graphic is
Note: depending on the
drop" the graphic from the
successfully placed in the
original scale of the
library window into the
new window.
library graphic, it may
Library File
main graphic window.
be necessary to use the
Function.
Home View button to
observe the graphic in
the New drawing.
Exhibit B - Acceptance Test -MECIEMOUTE
City of Newport Beach a� rnom �
Page x
a
" We
g Agk il
4.3.3
Editor Group
Open the IGE intersection
The file successfully
Operation.
graphic for the test signal.
opens.
4.4
Click on the Edit Select
Selection boxes appear
Editor Group
All function.
around every object in the
Operation.
drawing.
4.4.1
Click on the Edit
Selection boxes appear
Editor Group
Ungroup function.
around each object in the
Operation.
drawing
4.5
Click on an object that is
A single selection box
Note: use the Home
part of the graphic.
appears around a single
View Tool Button to re-
object in the graphic.
size the display and
Editor Group
repeat this step as
Operation.
many times as
necessary to place the
graphic where desired.
4.5.1
Graphic
Double-click on any part
The Graphic Attributes
Attributes.
of the,graphlc,
box opens.
4.6
Change the'Layer for the
The Attributes window
Note: refer to the kwb�
Graphic
graphic to Layer 2 and
closes.
Graphic Editor Manuel
.Attributes.
click OK
for a list of the valid Icon
Data Types.
4.7
Click on File I Layers to
The window opens
open the Layer properties
showing the individual
Layering
window.
layers On/Off and
Functions.
Selectability settings.
Verify that Layer 2 is not
selectable.
4.7.1
Double-dick on the same
The Window will not open
Layering
object to open the Graphic
and selection marks are
Functions.
Attributes window.
not visible on the graphic.
Exhibit 6 — Acceptance Test
City of Newport Beach HEIC:10NOUTE
Page xi SoluU to Mum the WC,4d&
Exhibit 6 - Acoeptance Test
City of Newport Beach EFCONOUTE
Pagexii Sk=o dec Nlwe the WCr1CM
q
rem
,-,.uomme
4.7.2
Click the setting for Layer
Selection marks appear
2 Selectability, and then
on the graphic and the
double-dick on any part of
Graphic Attributes window
the graphic display to
opens.
Layering
open the Graphic
Functions.
Attributes window.
Close the Graphics
Attributes window.
4.8
Click Off the Layer
The Graphic disappears
Note: insure that "sig" is
Visibility setting for Layer
from the screen.
lower case and that
Layering
2.
there are no spaces
Functions.
between "sig" and the
number.
4.9
Click the Layer 2 Visibility
The graphic appears on
setting back On and click
the screen.
the Seledability setting
Lpypn'ng
'Off.
The Layer Attributes
Functions.
window closes.
Close the Layer Attributes
window.
4.10
Click on File I Save or
The graphic is saved to
File I Save
click the Tool Bar button
disk.
Function.
to save the graphic.
4.10.1
File I Close
Click on File I Close to
The IGE Workspace
Function.
close the Graphic File.
clears.
5.1
Winclows@
iconsGUI
FUNCTIONALITY
WiMows@operating
Visual inspection.
Software
normally
5.1.1
Double click on the
kons'" Client program is
WindowsQD
iconsrm shortcut on the
launched.
Software
Desktop.
5.1.2
The konsrU startup
screen appears with
ibonsrmStartup
Visual inspection.
progress baron the
bottom.
Exhibit 6 - Acoeptance Test
City of Newport Beach EFCONOUTE
Pagexii Sk=o dec Nlwe the WCr1CM
Oty of Newport
Page xili
EECONOUTE
SOLD ttat im a t*1 Vftrqdo
ontO �X-
Ewie'---IWYRWW-� L N
Re Lilt
t
ZIA
5-1.3
The konsGUI appears
kmw7uStartup
Visual inspection
with the Main System Map
displayed.
5.1.4
Confirmation of
kansTm logo at upper-right
Communications
Visual inspection.
comer shows scrolling
with User
icons.
Interface
5.1.5
The workspace screen
(with only the He menu
selection available)
Sign On
Visual inspection.
appears when the iconsm
Client is successfully
launched.
5.1.6
Click once on File menu
A dropdown File menu
Sign On
item on Menu Bar.
appears.
5.1.7
Click once on Sign On.
A Sign On screen
Sign On
appears.
5A.8
Typeavalid user name
and- password into the
All items on the menu
Sign On
appropriate spaces and
selections become
click once on the 'OK'
available.
I
button.
5.2
The map is correctly
displayed and covers the
entire system area.
Main System
Visual inspection.
Objects (arrows) are
Map
displayed on the map for
each Signal that is part of
the system.
5.2.1
Point at each object on
The pop-up text box
the map and verify that a
contains the correct ID
Main System
text box appears with the
Number and Description
Map
Object ID Number and
for each object.
Description for each item.
Verify that the map arrows
Main System
are changing color (Green
Visual inspection.
Map Display
and Red) for each signal
operating on the system.
Oty of Newport
Page xili
EECONOUTE
SOLD ttat im a t*1 Vftrqdo
i
.rte
.�^�4�:
B
[om"°i;nts�
Wry ei�°
5.2.1.2
The phase indications are
Verify correct Green and
correct.
Intersection
Red phase indications for
The Timing tab display
Graphics
each active phase as the
indicates the correct
controller cycles.
current pattern.
5.2.1.3
Intersection
Close the intersection
The graphic closes.
Graphics
graphic for the Controller.
5.2.1.4
Double -click on the Main
The Intersection Graphic
Map Arrow for Signal #20.
opens.
Verify that the graphic
The graphic correctly
correctly depicts the
depicts the intersection.
Intersection
actual intersection layout.
The graphic indications
Graphics
Verify that the graphic
appear correct for the
indicates the expected
current intersection
operation of the
operation.
intersection controller.
5:2:1.5
Double click on the Main
The Intersection Graphic
Map Arrow. for Signet #30
opens.
Verify that the graphic
The graphic correctly
correctly depicts the
depicts the intersection.
Intersection
actual intersection layout.
The graphic indications
Graphics
Verify that the graphic
appear correct for the
indicates the expected
current intersection
operation of the
operation.
intersection controller.
5.2.1.6
Double-dick on the Main
The Intersection Graphic
Map Arrow for Signal #40.
opens.
Verify that the graphic
The graphic correctly
correctly depicts the
depicts the intersection.
Intersection
actual intersection layout.
The graphic indications
Graphics
Verify that the graphic
appear correct for the
indicates the expected
current intersection
-
operation of the
operation.
intersection controller.
l
aty of
Page xlv
9-ECONOLITE
S� rx>ac � d vvorvam
Exubit 8 — Acoeptance Test MECONOUTE
Oty of Newport Beach
Page xv
MA
KI
5.2.1.7
Double-click on the Main
The Intersection Graphic
Map Arrow for Signal #50.
opens.
Verify that the graphic
The graphic correctly
correctly depicts the
depicts the intersection.
Intersection
actual intersection layout
The graphic indications
Graphics
Verify that the graphic
appear correct for the
indicates the expected
current intersection
operation of the
operation.
intersection controller.
5.2.1.8
Double-click on the Main
The Intersection Graphic
Map Arrow for Signal #60.
opens.
Verify that the graphic
The graphic correctly
correctly depicts the
depicts the intersection.
Intersection
actual intersection layout.
The graphic indications
Graphics
Verify that the graphic
appear correct for the
indicates the expected
current intersection
operation of the
operation.
intersection controller.
5.2.1.9
Double -click on the Main
The Intersection Graphic
Map Arrow for Signal #70.
opens.
Verify that the graphic
The graphic correctly
correctly depicts the
depicts the intersection.
Intersection
actual intersection layout.
The graphic indications
Graphics
Verify that the graphic
appear correct for the
Indicates the expected
current intersection
operation of the
operation.
intersection controller.
5.2.1.10
Double-click on the Main
The Intersection Graphic
Map Arrow for Signal #80.
opens.
Verify that the graphic
The graphic correctly
correctly depicts the
depicts the intersection.
Intersection
actual intersection layout
The graphic indications
Graphics
Verify that the graphic
appear correct for the
indicates the expected
current intersection
operation of the
operation.
intersection controller.
Exubit 8 — Acoeptance Test MECONOUTE
Oty of Newport Beach
Page xv
Exhibit 8 — Acceptance Test RECONOUTE
City of Newport Beach Sk�. � M� � NAAXkl*
Page xvi
Double-click on the Main
The Intersection Graphic
Map Arrow for Signal #90.
opens.
Verify that the graphic
The graphic correctly
correctly depicts the
depicts the intersection.
Intersection
actual intersection layout.
The graphic indications
Graphics
Verify that the graphic
appear correct for the
indicates the expected
current intersection
operation of the
operation.
intersection controller.
5.3
System Status
Select Monitor I System
A System Status window
Report
Status.
is displayed.
5.3.1
Verify that all the
The display is correct.
controllers are shown with
System Status
the corresponding
Report
patterns that are active for
each controller in the
status 'column.
Use 'Filtairs' to generate
Various reports are able to
System Status
various system status
be generated.
Report
reports.
5.111.2
System Status
Click once on the Print
The system status report
Report
button.
preview appears
5.3.2
Click on the print icon in
A print dialog box appears
the tool bar
5.3.3
If asystem printer is
Select the range of pages
correctly connected to the
to be printed & number of
workstation, the System
copies. Click OK
Status Report will be
printed.
5.3.4,
Communication
Select Monitor I Comm
A Comm Status window is
Status Report
Status.
displayed.
5.3.4.1
Verify that all controllers
are shown with the
Communication
corresponding
The display is correct
Status Report
communication status in
the status column.
Exhibit 8 — Acceptance Test RECONOUTE
City of Newport Beach Sk�. � M� � NAAXkl*
Page xvi
s RQS ,
T
. ...... .....
Ile,
5.3.42
Use'Filters'to generate
Various reports are able to
Communication
various communications
be generated.
Status Report
status reports.
5.3.5
An Event Log window
Event Log
Select Monitor I Event
appears for all objects
Reports
Log.
connected to the system.
5.3-5.1
Event Log
Use 'Filters' to generate
Various reports are able to
Reports
various event log reports.
be generated.
5.3.5.2
The Signal Phase Data
Event Log
Select the Signal Phase
log appears for the signals
Reports
Data log and Apply Filter.
programmed in the
ITMSEventLogger INI file.
5.3.5.3
Event Log
Use'Fitters'to generate
Various reports are able to
Reports
various event log reports.
be generated.
5.4
Controller
The ASC/2 Database
Select Params I DB
Database
Editor window appears.
Editor.
Functions .
5A.1
�i
Controller
A window appears with
Select Communication I
Database
the intersection names.
Upload From Controller.
Functions
5.4.1.1
A window showing upload
progress from the Central
Database appears and
closes followed by a
Controller
Highlight Intersection
window showing upload
Database
SIG#20 and click on
progress from the
Functions
"Load".
Controller. A window
containing 8 tabs of
controller parameters
appears when the upload
is complete.
5.4.1.2
Click on each tab and
Controller
sub-tab and verify each
Control and database
Database
parameter Is the same as
parameters are identical.
Functions
in the controller.
Exhibit 0 — Acceptance Test ErmONOLITE
Oty of Newport Beach
Page xvii
Item'
sm
t I
5.4.1.3
A window showing the
Controller
Select File I Store
Save progress appears
Database
Controller in Database,
and closes after
Functions
click "Yes" to save.
completion.
5.4.1.4
Select Utilities l Compare
Controller
Controller, and make a
Observe the changes are
Database
few changes on to the
highlighted in yellow.
Functions
parameters on the right
side.
5.4.1.5
Controller
Select Utilities l Restore
Observe all highlighted
Database
Database Data, click
parameter values are
Functions
'Yes" to restore.
reset to original values.
5.4.1.6
Controller
In the Controller tab,
Phase 2 Minimum Green
Database
change Phase.2 Minimum
Time is set to 30.
Functions
Green Time to 30.
5.4.1.7
Select Communication I
A window showing
Controller.
Download to Controller,
download progress
D'ataba'se
click 'Yee to begin
appears and closes after
F unction6
download.
completion.
5.4.1.8
Controller
On the ASCf2, press
Verify Phase 2 Minimum
Database
[Main Menu) 9 [2.
Green Time is 30.
Functions
Controller] -) [1.Timing].
5.4.1.9
Observe Phase 2
Controller
Select Utilities l Restore
Minimum Green Time
Database
Database Data, click
parameter value is reset to
Functions
"Yes' to restore.
its original value.
5.4.1.10
Select Communication i
A window showing
Controller
Download to Controller,
download progress
Database
click "Yes" to begin
appears and closes after
Functions
download.
completion.
5.4.2
Upload the controller
The database Is uploaded.
database from Signal #20.
The database appears to
Review the database and
be valid for this signal.
Controller
verify its validity.
The database is
Database Upload
Save the uploaded
successfully saved.
database to the Central
Database.
B ibits— Acceptance Test gECONOLITE
City of Newport Beath sducone u»c More rM woNaQ
Page xvftl
(Z f
k �
tem sPfk A4Yo �� �. fxe$ult
mP. ntilyk'
sr�`' 2". !.4 % C -{S l Il' x J t 5 F
'�
fhTF s.rr4
>♦.c�zrd�`�`.:': -r ,
l,.
5.42.1
Upload the controller
The database is uploaded.
database from Signal #30.
The database appears to
Review the database and
be valid for'this signal.
Controller
verify its validity.
The database. is
Database Upload
Save the uploaded
successfully saved.
database to the Central
Database.
5A.2.2
Upload the controller
The database is uploaded.
database from Signal #40.
The database appears to
Review the database and
be valid for this signal.
Controller
verify its validity.
The database is
Database Upload
Save the uploaded
successfully saved.
database to the Central
Database.
5.4.2.3
Upload the controller
The database is uploaded.
database from Signal #50.
The database appears to
Review the database and
be valid for this signal.
Controller
verify. its validity.
The database is
Database Upload
1
Save the uploaded
successfully saved.
database to the Central
Database.
5A.2.A
Upload the controller
The database is uploaded.
database from Signal #60.
The database appears to
Review the database and
be valid for this signal.
Controller
verify its validity.
The database is
Database Upload
Save the uploaded
successfully saved.
database to the Central
Database.
5.4.2.5
Upload the controller
The database is uploaded.
database from Signal #70.
The database appears to
Review the database and
be valid for this signal.
Controller
'
verify its validity.
The database is
Database Upload
Save the uploaded
successfully saved.
database to the Central
Database.
Exhibit H— Acceptance Test RECONOUTE
City of Newport Beady = a ac Mr tt a vv&. &
Page rdx
IMP
gigg
It
4 TK,--7-
4V esq W,K
it
5.4.2.6
Upload the controller
The database is uploaded.
database from Signal #80.
The database appears to
Review the database and
be valid for this signal.
Controller
i
I verify its validity.
The database is
Database Upload
Save the uploaded
successfully saved.
database to the Central
Database.
5.4.2.7
Upload the controller
The database is uploaded.
database from Signal #90.
The database appears to
Review the database and
be valid for this signal.
Controller
verify its validity.
The database is
Database Upload
Save the uploaded
successfully saved.
database to the Central
Database.
5.5
Traffic Control
Select Control I Manual
The Manual Assignment
Functions
Assignment.
GUI window opens.
5.5.1
Manuel
Observe the Assignment
Click on 'Add Entry".
Assignment
Settings Box Appears
5.5.1.1
Manual
Click on the "Entity"
Observe a dropdown
Assignment
d6bpdown menu button.
menu appears.
5.5.1.2
Manual
Observe it is added to the
Select SIG#20.
Assignment
Entity Box.
5.5.1.3
Manual
Click on the 'Action"
Observe a dropdown
Assignment
dropdown menu button.
menu appears.
5.5.1.4
Manual
Observe PAT: is entered
Select "PAT:"
Assignment
in the Action window.
5.5.1.5
Manual
Enter "3" from the
Observe PAT".3 is entered.
Assignment
keyboard.
5.5.1.6
Click on the "Start Date"
Manual
and 'Start Time" windows
Observe the current time
Assignment
to set the current time and
and date.
date.
5.5.1.7
Select the Duration Radio
Manual.
Button and use the
Observe 15 is entered.
Assignment
vertical scroll bars and set
"Duration" to 15 minutes.
Exhibits - Acceptance Test RECONOUTE
City of Newport Beach sok� 0� Kll� � Wor"s
Page)0(
It .. rf
esUft�
_'��
Mytitber
a
Fart
? S
yr
ar
L-
5.5.1.8
Observe this action
returns back to the
Manual
Click on "OK".
Manual Assignment
Assignment
Window with the newly
created entry.
5.5.1.9
Manual
The Manual Assignment
Click on 'Close'
Assignment
Window Closes
5.5.1.10
A window opens showing
Active
Select Control I Active
the current Active
Configuration
Config.
Commands for the
Display
system.
5.5.1.11
Active
Observe the manual plan
The box shows the
Configuration
in the "Active Manual
Manual Plan just entered.
Display
Override command" box.
5.5.1.12
Active
The display returns to the
Click on OK to dose the
Configuration
tbomworkspace.
display.
Display ,
5:5:1.13
Manual
Click. on Monitor ( System
Observe SIG#20 is
Assignment
.Status:
running on PAT:3.
5.5.1.14
Manual
CIiEk Close to close the
The System Status
Assignment
System Status display.
window closes.
5.5.1.15
Observe that a TOO
Select Setup I TOD
Schedule GUI opens to
TOD Schedule
Schedule.
enter TOD schedule
parameters.
5.5.1.16
Click once on Add in the
Observe that an Enter
TOD Schedule dialog box.
Description dialog box
TOD Schedule
opens to check an Active
box and request a
description.
5.5.1.17
Check the Active box and
Observe that this
enter a description
information is displayed in
TOD Schedule
"Schedule 1" and dick on
the upper left hand side
OK.
comer of the TOD
Schedule dialog, box.
Ediibt B - Acceptance Test FECONOUTE
City of Newport Beach
Page xxi Duda a i acMo etl avva da
�r
two --I . N
Item
q i�Y yyu' F+T
Aotiott� ¢
Y.KJ� {..
esu-
lk� f4'SS
M.
$21yS �µ�� Al"',
xComments
N m6ef
a
2r 'fit �r:
Fail
��'
"ri
a
5.5.1.18
Observe that a new row
Click once on Insert Row
appears in the main grid
TOO Schedule
or Append Row in the
to enter time- of-day
TOD Schedule dialog box.
command data.
5.5.1.19
Observe a dropdown
Click once in the "Entity"
TOO Schedule
menu appears with a list
box.
of System Entities.
5.5.1.20
Observe SIG20 is entered
Select Signal #20 (Test
m the "Entity" box and its
TOD Schedule
Controller) from the drop-
description appears in the
down menu.
"Entity Description" box.
5.5.1.21
Observe a dropdown
Click once on the "Action"
TOD Schedule
menu appears with a list
box.
of functions.
5.5.1.22
Observe PAT: is displayed
TOD Schedule
Select "PAT: "— pattern.
in the Action box.
5:5.123
Click. on 'PAT:" in the
Observe "PAT:2" is
Action box. From the
entered.
TOD Schedule
keyboard, enter a pattern
number, PAT:2.
5.5.1.24
Click on the START TIME
Check the time.
box. Set the startup time
TOD Schedule
for PAT:2. as the current
time.
5.5.125
Click on the days of the
Observe a °d° in the
TOD Schedule
week for PAT:2 to take
selected box.
effect including today.
5.5.1.26
Click on the STOP TIME
Check the time.
box. Set the stop time for
TOD Schedule
PAT: 2 for 15 minutes
later.
5.5.1.27
Click on "Apply", then
The TOD Schedule GUI is
TOD Schedule
"OK".
closed.
5.5.1.28
Select Control I Active
Observe the TOD Plan #
TOD Schedule
Config.
is listed.
5.5.129
The Active Configuration
TOD Schedule
Click on "OK".
window closes.
Exhibit B— Acceptance Test M.EGONOLITE
City of Newport Beach �y,ay Mp„a y,e �,ya.We
Page xxil
ff
Almon
Fail
5.5-1.30
Click on Monitor System
Observe SIG#20 is
TOD Schedule
Status-
running PAT:2.
5.5.1.31
The System Status
TOD Schedule
Click on "OK".
window closes.
5.5.1.32
Click on Setup TOD
Observe TOD Schedule
TOD Schedule
Schedule.
window appears.
5.5.1.33
Observe that data entry
Click once inside one or
rows in the main grid of
more boxes within the
the TOD Schedule dialog
TOD Schedule
Filter section of the TOD
box appearldisappear
Schedule dialog box.
based on selectlon/cle-
selection of entity boxes.
5.5.1.34
Observe that an Enter
Description dialog box
Click once on Modify in
opens to display
TOD Schedule
the TOD Schedule dialog
previously saved
box
Information under number
`TOD: 1'.
5.5.1.35
Observe that the modified
information is displayed in
Modify information as
TOD Schedule
the upper left hand side
desired and click on OK.
comer of the TOD
Schedule dialog box.
5.5.1.36
Click once on Apply then
Observe that this action
TOD Schedule
OK in the TOD Schedule
closes the TOD Schedule
dialog box
dialog box.
5.5.2
Observe that a Holiday
Holiday
Select Setup I Holiday
Assignment GUI window
Assignment
Assignment
opens.
5.5.2.1
Observe that an Enter
Click once on Add in the
Description dialog box
Holiday
Holiday Assignment dialog
opens to check an Active
Assignment
box
box'and request a
description.
Exhibit 6 - Acceptance Test ;5ECONOUTE
City or Newport Beach M the WoNds
Page xxiil
t
fl
N
gp-
U4 m
gi
W-1
M ag- -
N
PRi >,
5.5.2.2
Observe that this
Check the Active box and
information is displayed in
Holiday
enter description "Holiday
the upper left hand side
Assignment
1" and click on OK.
corner of the Holiday
Assignment dialog box.
5.5.2.3
Click once on Insert Row
Observe that a Select
Holiday
or Append Row in the
Year dialog box opens to
Assignment
Holiday Assignment dialog
request a year.
box,
5.5.2.4
Enter 2006 and click on
Observe that the year
OK.
calendar appears in the
Holiday
Holiday Assignment dialog
Assignment
box and a new row
appears in the Year grid
indicating year
5.5.2.5
Click once on holiday
Observe that the toggled
Holiday
dates in the calendar,
on holiday dates are
Assignment
select today's date.
selected.
5.5.2.6
A:TbD plan must be setup
Holiday
before a holiday can take
A TOD Schedule Is set up.
Assignment
effect.
5.5.2.7
Select Control I Active
Holiday
Observe the TOD Plan is
Configuration, and dick
Assignment
selected.
,or.
5.5.2.8
Observe the current
Holiday
Select Monitor I System
pattern for SIG#20 is the
Assignment
status.
holiday pattern.
5.5.2.9
Holiday
The System Status
Click 'Or.
Assignment
window is closed.
5.5.2.10
Holiday
Select Setup I Holiday
The Holiday window
Assignment
Assignment.
opens.
5.5.2.11
Observe that the affected
Click once on Delete Row
Holiday
row in the Year grid and
in the Holiday Assignment
Assignment
the corresponding
dialog box.
calendar are deleted.
Exhibit B — Acoeptance Test 3-F-CONOUTE
aty of Newport Beach Gkd. tf» rotas the Wbride
Page xxiv
M
ffi&bt 8 — AmeptanoR Test. EkicoNoLmE
City of Newport Beach
Page xxv
5.5.212
Click once on Apply then
Observe that this action
Holiday
Cancel, or click once on
closes the Holiday
Assignment
OK in the Holiday
Assignment dialog box.
Assignment dialog box.
5.5.3
Observe that an Action
Select Setup I Action Set
Set Editor dialog box
Action Set Editor
Editor.
opens to enter action set
parameters.
5.5.3.1
Observe that an Enter
Click once on Add in the
Description dialog box
Action Set Editor
Action Set Editor dialog
opens to check a Master
box.
box and request a number
and description.
5.5.3.2
Observe that this
Check the Master box and
information is displayed in
enter number "I" and
Action Set Editor
the upper left hand side
description "Test Set 1'
comer of the Action Set
and click on OK
Editor dialog box
5.5.3.3
Click once on Insert Row
Observe that a now row
or Append Row In the
appears in the list view
Action Set Editor
Action Set Editor dialog
grid to enter action set
box.
command data.
5.5.3.4
CAick once on the Entity,
Observe that actions
Entity Description, or
entered into the list view
Action Set Editor
Action cell to open a tree
grid will also appear next
view box for selection of
to the affected entities in
an entity or action.
the tree view grid.
5.5.3.5
I
Observe a dropdown
Click once in the 'Entit y*
Action Set Editor
I
menu appears with a list
box.
of System Entities.
5.5.3.6
Observe SIG20 is entered
Select Signal 920 from the
in the 'Entity* box and its
Action set Editor
drop-down menu.
description appears in the
"Entity Description" box.
5.5.3.7
Observe a dro pdown
Click once in the "Action*
Action Set Editor
menu appears with a list
box.
of functions.
ffi&bt 8 — AmeptanoR Test. EkicoNoLmE
City of Newport Beach
Page xxv
ExhibitB — AcceptanceTest �ECONOLITE
City of Newport Beach
Page xxW sok c ms vhae Mn the w«id®
s Item
d Acho Resul "¢
'Comments `7
r r
Sys
5.5.3.8
Observe Flash is
Action Set Editor
Select "FLASH ".
displayed in the Action
box.
5.5.3.9
Enter a description in the
The description is
Action Set Editor
Description box.
accepted.
5.5.3.10
Observe a "d" in the EN
The "check mark" is there.
[Action Set Editor
box.
5.5.3.11
Click on "Apply", then
The Entity box is dosed.
Action Set Editor
OK".
5.5.3.12
Click once on Cancel or
Observe that this action
Action Set Editor
OK in the Action Set
doses the Action Set
Editor dialog box
Editor dialog box.
5.5.3.13
Create a Manual
The command is created.
Command to implement
Action Set Editor
(Action) SET: 1 with
duration of 5 minutes.
5.5.3.14
- -
Observe the current
Select Monitor System
Action Set Editor
" .
pattern for SIG#20 is the
Status.
Flash pattern.
5.5.3.15
The System Status
Action Set Editor
Click "OK".
window is closed.
5.5.3.16
Select Setup I Action Set
The Action Set is deleted.
Editor.
Delete the Test Action set
by selecting and deleting
Action Set Editor
each row In the grid
display and then deleting
the SET: 1 from the upper
left hand comer box.
5.5.3.17
Close the Action Set
The window closes.
Action Set Editor
Editor window.
5.5.4
Verify that the System
The schedule is correct.
TOD Schedule is correct
System TOD
and has no extra or
Schedule
modified steps remaining
from testing.
ExhibitB — AcceptanceTest �ECONOLITE
City of Newport Beach
Page xxW sok c ms vhae Mn the w«id®
!t Action Result
t Cora eiLs�
.=;WWita
5.5.5
Verify that the System
The schedule is correct.
Holiday Schedule is
System Holiday
correct for the current year
Schedule
and has no extra or
modified dates remaining
from testing.
5.5.6
Verify that the Traffic
The data is correct.
System Traffic
Responsive Plan data is
Responsive
correct and has no extra
Plans
or modified steps / plans
remaining from testing.
5.5.71
Verify that the Action Set
The data Is correct.
Plan data is correct and
System Action
has no extra or modified
Set Plans
steps / plans remaining
from testing.
5.5.8 -
The Alarm Individuals
window appears with a
display box and buttons
Alarm Individual
Select Setup Alarms and
for:
Info
Paging { Individual Info.
. Add
Edit
Delete
Close
5.5.8.1
The Add individual
Add Button
Click on the Add button.
window appears.
5.5.8.2
Enter valid information for
Click OK to add the new
the selected "test
individual.
individual". Note: the
The display returns to the
Add Individual
individual must be a valid
Alarm Individuals display
system user and must not
and the new individual is
be associated with any
listed.
other paging operations.
5.5.8.3
The Edit individual
window appears.
Edit Button
Click on the Edit button.
The window appears
identical to the Add
Individual window.
e- Acceptance Test �ECdN— 6UTE
City of Newport Beach
Page)oMl
VOW.
U
_P
Or
P
. .. ....
5.5.8.4
The display returns to the
Change one or more
Alarm Individuals window.
Edit Individual
entries for the individual
The changed entries are
and Glick on OK
displayed.
5.5.8.5
The display returns to the
Close Button
Click on the Close button.
iconsworkspace.
5.5.9
The Alarm Group window
appears with the following
action buttons:
Select Setup I Alarms and
Add
Alarm Group Info
Paging I Group Info.
Edit
• Delete
• Define
• Close
5.5.9.1
The Add Group name
Add Button
Click on the Add button.
window opens.
56.921 1
1. 11'', .1
Enter a "New Alarm Group
The display returns to the
1
Add.GrAoUp
'
� 1. 1 11 :
i" -ior 6 new alarm group
Alarm Group window and
Name
1,
and click OK
the new group is listed.
5.5;9.3
The Edit Group window
Edit Button
Click on the Edit button.
appears.
5.5.9.4
The display returns to the
Change the Group Name
Alarm Group window and
Edit Group Name
"New Alarm Group 2' and
1
the group name is
click 0 K.
changed to the new value.
5.5.9.5
The Define Group: "New
Define Button
Click on the Define button.
Alarm Group 2"window
opens.
5.5.9.6
Select "Member of Group"
New members are added
members and "Not
to the group and old
Member of Group"
members are deleted from
Define Group
members and using the
the group.
Add and Remove buttons,
redefine the group
membership.
The display returns to the
Define Group
Click on OK
I
Alarm Groups window.
Uhibit 8 — Acceptance Test
City of Newport Beach W-ECONOLITE
Page xcAli 80%jtkw� W m Mw the WorlicM
bftbft B — AmWonce Test NECONOLITE
Oty of Newport Beach
S.KAA� d. NAo e t . Vv. idO
Page x)dx
Result
The display returns to the
Close Button
Click on the Close button.
icons workspace.
5.5.10
Select Setup I Alarms and
The Alarms window
Alarm Triggers
Paging I Alarm Triggers.
opens.
5.510.1
ADD a new Alarm Trigger.
The display returns to the
Entity ID: SIG#20
Alarms window.
Trigger Event:
A new Alarm Trigger is
Device_Communication—C
listed for the defined
eased
event.
Trigger After: 1
Alarm Triggers
occurrence
Within: 1 minute
Notify: (select individual
performing this test)
Type: Heads Up
Enable: Checked
dick:on OK
5.5.16.2
A Heads Up notification is
Disconnect the test
displayed on the
controller's
SIG # 20
workstation for signal 1,
communication.
Device Communications
Ceased.
5.5.10.3
EDIT the Alarm Trigger
The display returns to the
and change the:
Alarms window.
Alarm Triggers
Type: Pager
The Alarm Trigger
Enable: Checked
definition has changed to
Click on OK.
Pager.
5.5.10.4
Disconnect the test
A Pager notification is
controllers
sent to the seleded
SIG # 20
communication.
individual.
5.5.10.5
Use the Fitter options to
Triggered Events are
Alarm Triggers
create various lists of the
displayed based on filter
lists of the Trigger Events.
options
5.5.10.6
DELETE the Alarm
The Trigger Event is
Alarm Triggers
Trigger created for this
removed from the display.
test-
bftbft B — AmWonce Test NECONOLITE
Oty of Newport Beach
S.KAA� d. NAo e t . Vv. idO
Page x)dx
��Task -r
� �'`�"� �,
lter L 0� °
R�
;� ,� Cortime�Ya''.
5.5.10.7
CLOSE the Alarms
The display returns to the
Alarm Triggers
window.
icons workspace.
5.5.11
Alarm Log
Select Monitor I Alarm
An Alarm Log window
Reports
Log.
appears.
5.5.11.1
Verify that the log contains
The log contains the
Alarm Log
entries for the alarm
events.
Reports
triggers previously
created.
5.5.11.2
Alarm Log
Use'Flters'to generate
Various reports can be
Reports
various alarm log displays.
generated.
5.5.12
Observe that the following
choices appear on the
Alert Menu
Click once on Alert on the
dropdown menu:
Group
Menu Bar.
• Page Group
• Page Individual
5.5.12.1
The Page Group window
appears with a Select
Page Group
Select Alert I Page Group
Group box, Message box,
and buttons for Send,
Properties, and Close.
5.5.12.2
Click once on a valid
The selection is
Page Group
Group in the Select Group
highlighted.
box.
5.5.12.3
Click on the Properties
The Group Properties
button.
window appears listing the
individuals assigned to the
Properties Button
group.
Close the Group
Properties window.
5.5.12.4
Enter a short test
The test message is
Page Group
message in the Message
. displayed.
box.
5.5.12.5
The page is sent to all
Send Button
Click on the Send button.
individuals in the Group.
5.5.12.6
The display returns to the
Close Button
1
Click on the Close button.
ravnsworkspace.
Exhibit B — Acceptuxe Test �ECONOLITE .
City of Newport Beads
Page root soR,Grx� mes nno��e the vvo-+es
r
-0,
I'M
-21
WE,
5-5.13
The Page Individual
window appears with a
Select Alert Page
Select Individual box,
Page Individual
Individual
Message box, and buttons
for Send, Properties, and
Close.
5.5.13.1
Click once on a valid
The selection is
Page Individual
Individual in the Select
highlighted.
Individual box.
5.5.13.2
Click on the Properties
The Individual Properties
button.
window appears listing the
individuals' properties.
Properties Button
Close the Individual
Properties window.
5.5.13.3
Enter a short test
The test message is
Page,lriclividual
message in the Message
displayed.
b, ex.
5.513.4
The page is sent to the
Send Button
Click on the Send button.
selected Individual.
5.5.13.5 5
The display returns to %a
Close Button
Click on the Close button.
iconsworkspace.
5.6
Select Admin I Security
Observe that the User
Security
Users.
Profiles window appears.
5.6.1
Click once on 'Adcr in the
Observe that the User
Security
User Profiles window.
Setup dialog box window
appears.
5.6.1.1
Enter a new user name:
Observe that a now User
Security
'a4)00r and rAlck on
Properties window
appears.
5.6.12
Enter a password:
Observe that the
Security
.at CW&.
password Is encrypted.
5.6.1.3
The User Setup dialog
Security
Click OK
box closes and a new
user has been created.
Exhibit 6 – Acceptance Test ;5F N
Oty of Newport Beach — -CO13LITE
Page xxxi
A
Action
Gen
AM ON
IMP
��iFIRRui 1,1`ox P
in
5.6.1.4
A"check mark" appears in
Click on the Select All
the Enabled column for
Security
button.
every menu item listed in
the Permissions tab.
5.6.1.5
Toggle on/off different
Menu option permissions
Security
security options, for the
can be enabled/disabled
user (a4D00�.
as desired.
5.6.1.6
Click on the Group
The Group Assignment
Assignment Tab
window shows which
Security
Add and Remove
groups the user is
associations to different
associated and not
groups as desired
associated with.
5.6.1.7
Click "OK" in the User
Observe that the User
Security
Profiles window
Profiles window is closed.
5.6.1.8
Observe that the User
Select Admin I Security
Profiles window appears
Security
Users
and user atpGOI is listed
in the window.
Select user "atpWf' and
Observe that the user
Security
click 'Delete" in the User
.
(a*700 � is deleted.
Profiles window.
5.6.1.10
Click once on "OK" in the
Observe that the User
Security
User Profiles window.
Profiles window is closed.
5.6.2
Observe that the System
System
Select Adrnin
Configuration window
Configuration
Configuration
appears.
5.6.2.1
Expand the "Tree" view of
The programmed
the System in the left
configuration is correct per
System
window and verify proper
the icons Zone / Section
Configuration
programming of the
Assignment Worksheets
System Configuration.
completed by the client.
5.6.2.2
Use the scroll bar in the
The entity is selected and
upper right window box to
its attributes are displayed
System
locate Signal #20 (Test
in the General Settings
Configuration
Controller). Click once on
window box.
the entry for SIG#20.
I
Exhibit s - Acceptance Test W-ECONOUTE
aty of Newport Beach
Page xxxil Gkidone that Move tt Wcwdm
Exhibit 0 — Acceptance Test 3-ECONOLITE
Oty of Newport Beach souciom "t WIMM tr,e wrens
Page xxxiii
5.6.2.3
A System Configuration —
Traffic Signal Edit window
opens. The Entity Type,
System
Click once on the Edit
Entity Number. Parent
Configuration
button.
Type and Parent Number
attributes are 'grayed out"
and all other attributes are
editable.
5.6.2.4
System
Click once on either OK or
The Traffic Signal Edit box
Configuration
Cancel.
closes.
5.6.2.5
Click once on the Close
The window doses and
System
button to close the System
the display returns to
Configuration
Configuration Editor
icons workspace.
window.
5.6.2.6
Click on the File Menu.
Current users is logged off
System Log 0
Click on Log off.
of icons.
5.B.2'1
'Click on the X box in the
Icons closes.
icons: shut down
J.upper right comer to close
down icons.
Exhibit 0 — Acceptance Test 3-ECONOLITE
Oty of Newport Beach souciom "t WIMM tr,e wrens
Page xxxiii
CITY OF NEWPORT BEACH
11 1 LABOR AND MATERIALS PAYMENT BOND
WHEREAS, the City of Newport Beach, State of California, has awarded to
hereinafter designated as the "Principal," a contract for the
, located at in the City of
in strict conformity with the Contract on file with the office of the City
Clerk of the City of Newport Beach, which is incorporated herein by this reference.
WHEREAS, Principal has executed or is about to execute the Contract and the
terms thereof require the furnishing of a bond, providing that if Principal or any of
Principal's subcontractors, shall fail to pay for any materials, provisions, or other supplies
used in, upon, for, or about the performance of the work agreed to be done, or for any
work or labor done thereon of any kind, the Surety on this bond will pay the same to the
extent hereinafter set forth.
NOW, THEREFORE, We the undersigned Principal, and,
duly authorized to
transact business under the laws of the State of California, as Surety, (referred to
herein as "Surety ") are held firmly bound unto the City of Newport Beach, in the sum of
(INSERT CONTRACT DOLLAR AMOUNT) lawful money of the United States of
America', 'saitl sum= ;beingreoual to 100% of the estimated amount payable by the City of
NewportBoach under the.`terrns of the Contract; for which payment well and truly to be
made, we ` -bind ourselves, our heirs, executors and administrators, successors, or
assigns, jointly andseverall.y, firmly by these present.
THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal or the
Principal's subcontractors, fail to pay for any materials, provisions, or other supplies,
implements or machinery used in, upon, for, or about the performance of the work
contracted to be done, or for any other work or labor thereon of any kind, or for amounts
due under the Unemployment Insurance Code with respect to such work or labor, or for
any amounts required to be deducted, withheld and paid over to the Employment
Development Department from the wages of employees of the Principal and
subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with
respect to such work and labor, then the Surety will pay for the same, in an amount not
exceeding the sum specified in this Bond, and also, in case suit is brought to enforce the
obligations of this Bond, a reasonable attorney's fee, to be fixed by the Court as required
by the provisions of Section 3250 of the Civil Code of the State of California.
The Bond shall inure to the benefit of any and all persons, companies, and
corporations entitled to file claims under Section 3181 of the California Civil Code so as to
give a right of action to them or their assigns in any suit brought upon this Bond, as
required by and in accordance with the provisions of Sections 3247 et. seq. of the Civil
Code of the State of California.
And Surety, for value received, hereby stipulates and agrees that no change,
extension of time, alterations or additions to the terms of the Contract or to the work to be
performed thereunder shall in any wise affect its obligations on this Bond, and it does
hereby waive notice of any such change, extension of time, alterations or additions to the
terms of the Contract or to the work or to the specifications.
In the event that any principal above named executed this Bond as an individual, it
is agreed that the death of any such principal shall not exonerate the Surety from its
obligations under this Bond.
IN WITNESS WHEREOF, this instrument has been duly executed by the above
named Principal and Surety, on the day of
2008.
Name of Contractor (Principal)
Name of Surety
Address of Surety
Telephone
Authorized Signature/Title
Authorized Agent Signature
Print Name and Title
NOTARY ACKNOWLEDGMENTS OF CONTRACTOR AND SURETY MUST BE
ATTACHED
CITY OF NEWPORT BEACH
BOND NO.
FAITHFUL PERFORMANCE BOND
The premium charges on this Bond is $
being at the rate of $
price.
thousand of the Contract
WHEREAS, the City of Newport Beach, State of California, has awarded to
hereinafter designated as the "Principal," a contract for the
, located at in the City of
in strict conformity with the Contract on file with the office of the City
Clerk of the City of Newport Beach, which is incorporated herein by this reference.
WHEREAS, Principal has executed or is about to execute the Contract and the
terms thereof require the furnishing of a Bond for the faithful performance of the Contract.
NOW, THEREFORE, we, the Principal, and
duly authorized to transact business under the laws of the State of
Califomia as Surety (hereinafter "Surety"), are held and firmly bound unto the City of
Newport Beach, in the sum of (INSERT CONTRACT DOLLAR AMOUNT) lawful money of
the' Umted States of'America ;. said sum-being equal to 100% of the estimated amount of
the r✓ontret to bepaid'to<,the City ;of Newport Beach, its successors, and assigns; for
which payment well 'and truly to be made, we bind ourselves, our heirs, executors and
adrninrstrators, successors; or assigns, jointly and severally, firmly by these present.
THE ,CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal, or the
Principal's heirs, executors; administrators, successors, or assigns, fail to abide by, and
well and truly keep and perform any or all the work, covenants, conditions, and
agreements in the Contract Documents and any alteration thereof made as therein
provided on its part, to be kept and performed at the time and in the manner therein
specified, and in all respects according to its true intent and meaning, or fails to
indemnify, defend, and save harmless the City of Newport Beach, its officers, employees
and agents, as therein stipulated, then, Surety will faithfully perform the same, in an
amount not exceeding the sum specified in this Bond; otherwise this obligation shall
become null and void.
As a part of the obligation secured hereby, and in addition to the face amount
specified in this Performance Bond, there shall be included costs and reasonable
expenses and fees, including reasonable attorneys fees, incurred by the City, only in the
event the City is required to bring an action in law or equity against Surety to enforce the
obligations of this Bond.
Surety, for value received, stipulates and agrees that no change, extension of
time, alterations or additions to the terms of the Contract or to the work to be performed
thereunder shall in any way affect its obligations on this Bond, and it does hereby waive
notice of any such change, extension of time, alterations or additions of the Contract or to
the work or to the specifications.
This Faithful Performance Bond shall be extended and maintained by the Principal
in full force and effect for one (1) year following the date of formal acceptance of the
Project by the City.
In the event that the Principal executed this bond as an individual, it is agreed that
the death of any such Principal shall not exonerate the Surety from its obligations under
this Bond.
IN WITNESS WHEREOF, this instrument has been duly executed by the Principal
and Surety above named, on the day of 2008.
Name of Contractor (Principal)
Name of Surety
Address of Surety
Telephone
Authorized Signature/Title
Authorized Agent Signature
Print Name and Title
NOTARY ACKNOWLEDGMENTS OF CONTRACTOR AND SURETY MUST BE
ATTACHED