Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutSS2 - SR-55 Access Study1i
September 2008
m
OCTA
Improve mobility and reduce existing and future
congestion
Minimize environmental and traffic impacts
Manage regional traffic impacts to local streets
Consider existing and planned transit programs
such as bus rapid transit
Enhance system linkage and connectivity according
to local and regional plans
2
Stakeholder groups
Web site & online survey
E- newsletter
Direct mail piece
News media
Open houses (3)
3
Cut / Cover alternative
is preferred
No Build / Baseline
second most preferred
Signal synchronization
needs improvement
Cut - through traffic remains
a concern primarily on
weekends and during summer
Cost, funding & schedule
need refinement
ZI
O EXISTING
SR -55 /NEWPOR7 BLVD
- CITY STREET
IMPROVEMENTS
CITY LIMITS
EXISTING DICTA
BUS ROUTES
PROPOSED
BHT PONTES
COMPONENTS
El SR- SSMEWPORT BLVD IN EXISTING CONDITION.
Q A NB LANES ON NEWPORT BLVD FROM IITH ST TO 19TH ST.
3 SB LAWS ON NEWPORT BLVD FROM BROADWAY TO ITTH ST.
❑A ADD 4th SIT LANE ON NEWPORT BLVD FROM 19TH TO BROADWAY.
❑5 AN 58 RIGHT TERN LANE ON NEWPORT BLVD
AT ITTH ST.
©
IMPROVE ORANGE /17TH ST AND SANTA ANA /17TH ST
INTERSECTIONS.
QT IMPROVE MOBILITY TH1101HR1 17TH ST.
Q ENHANCE EXISTING BUS ROBES WITH BRT RONTES,
Evaluation Matrlx��
WeewLeneuMSW • • • � � •i
.01
>tGENO
SHOPS
SHIPS
0 PROPOSED FREEWAY
R/Y
NA
EXTENSION
PROPOSED STREET
I
11PROYEYENTS
r_ UJ PROPOSED RAMPS
— BASELINE
IMPRDVEMEMTS
-
CITY LIMITS
—
iEH16NE0 SR -55 FREENAl
EXISTING MIA
COMPOWNTS
TYPICAL SECTION A-A
BUS ROUTES
�i
nT To..
FREEWAY
REALfTRIAL
IMPACTS
PROPOSEp
TO THE EAST DF EXISTING NEWPORT BLVD I OM
TOI UN
INDUSTR1Al AVE AYE TO JUST SDIfIN OF BAY SL AS OEPIIESSEO FREEWAY. THREE I ME5
■ ReLOCA "ION Of BS RESIDENTIAL
DRY ROUTES
EACH DIRECTION.
UNITS AID 40 BUSINESSES
Q
PROVIDE STREET WERCROSSINGS.
. HUG+ PROJECT COST
]�
PROVIDE INTERCHANGES AT ITTH ST AND 18TH ST.
Evaluation JJmatrix MAY/ F�.
��iinWlT�PigI�RT
rej
1❑ ADD OIE SS LANE TO MAINTAIN A NB AND . PoTEN'ILL 1055 OF FREE" PARKING
SB LANES ON NEWPOIT BLVD AS CONVENTIONAL
HIGHWAY FROM 19TH ST TO 17TH ST.
© ADD BUS TURNOUTS. M ADDITIONAL RIGHT OF MAY REOUIRED
® MODIFY SIGNAL TIMING AT INTERSECTIONS.
CONSTRUCT PEDESTRIAN BRIDGE ACROSS NEWPGRT
BLVD AT BROADWAY ST.
x
n Matrix
Evaluatio
. S f Y//////
NORTA
B1M1[M MURORAN.,
7
PROPOS MER
IMPROVEMENTS
Br
BASELINE IMPROVEMENTS
-
PEDESTRIAN
BRPRIOPOSED
CITY LIMITS
EXISTING OCTA
BUS RCUTES
- - -
PROPOSED BAY RCUTES
A
PROPOSED SIGNAL TIMING
MGOIFICATIONS
iJ
EXISTING WS STOPS
1❑ ADD OIE SS LANE TO MAINTAIN A NB AND . PoTEN'ILL 1055 OF FREE" PARKING
SB LANES ON NEWPOIT BLVD AS CONVENTIONAL
HIGHWAY FROM 19TH ST TO 17TH ST.
© ADD BUS TURNOUTS. M ADDITIONAL RIGHT OF MAY REOUIRED
® MODIFY SIGNAL TIMING AT INTERSECTIONS.
CONSTRUCT PEDESTRIAN BRIDGE ACROSS NEWPGRT
BLVD AT BROADWAY ST.
x
n Matrix
Evaluatio
. S f Y//////
NORTA
B1M1[M MURORAN.,
7
PROPOSED STREET
!AFROVEWNTS
PROPOSED RAIFS
BASELINE
INPROVE1ENTS
PROPOSED
PEDESTRIAN
MIDGE
CITY LIMITS
EXISTING CCTA
WS ROUTES
PftCPCSED MT
POIJTES
S,4MPQFENT TYPICAL, SECTION A -A
S xPT � seuX
❑1 �uPRDVE NOS I.. TT TO 19Tx ST Ox TXE NEST SIDE OF NEWPORT BL Vp:
- ASS FREE RIGHT FRROW ISTNFSSTTTTOLII[NTTIIE-I BLVD B 5151ELOCATINc
- AM ED 119TH ST M TSR 55 FLYOVER.
IIFROVE NCBIL "Y AT 17TH ST ON THE EST SIDE K NEFPORT BLVD1
SIGNIFICANT GCOETRIC IMPROVEMENTS AT NEINORT 11TT01
- PARTIAL WIDEN NNIIM ALONG SYPERIM AVE NAY BE REWIRED.
© CONSMCT PEDESTRIAN MIDGE ACNOSS 1EPPpIT BLVD AT BRCADMAY ST.
IMPACTS
■ VISIA&L BFACTS
.
alit L RIGHT OF WIT
AA
.
NODERATE PROJECT ODST
■
PCTEWIAL LOSS OF STREET PARSING
[valuation Matti: )))( //] {.)
00 1 Y41TIC1L TgY11 O • • • •
axA MM FL L
C PROF09E0 ELEVATED
FREEWAY
PROPOSED S-BEET
DAPROVENENTS
® BASELINE
IMPROVEMENTS
D PROPOSED RAAARS
CITY LIMITS
EXISTING OCTA
BITS ROUTES
—� —. PROPOSED
BRT ROUTES
YR-55
CONEPONENTS
Evaluation matrix
REEVAI
1
Y ER
OSVT
T BD L VA FRELVA1T9ETD H
TO IND Y.
®
COR NTR OL LEE ACCESS FREEBAT
OR NEEPOIT BVD.
0
SIDE STREET ACCESS FROM
MEW" XLXYATEP
NEEPoRT BLVD.
eYY USE, • • •
WB ❑M
E INTERCFANOE AT
EWIEVIK
� { { i 4 4 {
{ { T
1STH
19TH ST.
PMFING 6{
NE9 T BLVD
..R T BLVD
ELEVATE) SR -55 YREEVAY
TYPICAL SECTION A -A
IMPACTS
NIGH PROJECT CCS-
■CNNVIIRRQWENNTTALLT
SENSITIVE
ALATI
E
MOO
EIIYENSION
S>A� ED
1PROVELENIS
PROPOSED
RAMPS
Ii BASELINE
IMPROVEMENTS
CITY LIMITS
BUS
_ - -- T
PROPOSE
SR ES
COMPONENTS !valuation matrix
S2 1 NB SxOPS CJT AND COVED SP -SS FREEWAY • • ���
9 SWTWPOOIMDII9TO FROM Y.
PARKING
- ❑2 CONTROLLED ACCESS FREEWAY
LNOER NEWPORT BLVD. 0=100 A WYCWAY
NENNRT ALOYY K VOM • •
BLVD SB xB NEWPORT O❑ 510E STREET ACCESS FROM YSULOART •
1 ' I B VO NENPRT BLVD.
❑A PROVIDE INTERCHANGE AT
19TH S -.
SP-55 FREEWAY
TYPICAL SECTION A
wR �c uus
IMPACTS
■ HIGH PROJECT COST
10
System Linkage
Capacity & Transportation Demand
Compatibility with Legislation & Plans
Social Demands /Economic Development
s Modal Interrelationships
IN Project Enhancements /Safety
Feasibility /Implementation
is
Evaluation Matrix
O Q� OC
• • OQ'F y. \ QF . D ZC
Fully Moderately Fails to co op� o\� F6o� �m
Achieves Achieves Achieve x�i xo ov'o x011_ c�cgD xo
F pox o F �c oc
c
O0Ca
h �
NO BUILD /BASELINE
CURRENT FREEWAY PLAN
(EASTERLY FREEWAY
EXTENSION)
TRANSPORTATION
SYSTEM MANAGEMENT
VERTICAL TERMINAL O /� I /� • .
ENHANCEMENT I� I
FREEWAY ELEVATED
OVER NEWPORT 01 0: • •
BOULEVARD
CUT /COVER FREEWAY O ^ �, • •
ALONG NEWPORT
BOULEVARD
12
Alternative Newport Blvd. Study Area
No Build / Baseline 923 109050
Current Freeway Plan 684 ( -26 %)* 91248 ( -8 %)*
TSM 867 ( -6 %)* 99814 ( -2 %)*
Terminal Enhancement 879 ( -5 %)* 99651 (- 4 %)*
Elevated / Tunnel 701 ( -24 %)* 99435 ( -6 %)*
* Percent reduction in delay from No Build / Baseline Alternative
13
No Build / Baseline
Transportation Systems Management
Terminal Enhancement
Cut / Cover Tunnel
Future study alternatives may be hybrids using
most promising elements of screened
alternatives
Other Considerations
• Shuttle / Park & Ride to beach areas
• Avoid potential tunnel queuing at Industrial Way
• Conduct weekend / summer congestion analysis as
part of future study
14
Bored Tunnel Freeway
o Cost, water table, utilities
Reversible Lanes
o Relatively uniform weekday directional split
One -Way Couplets
o No closely spaced parallel streets
Parallel Routes
o Superior is beyond area of worst congestion
o Irvine Ave. has on- street residential
15
2030 Peak Period Volumes on PCH at the Santa Ana River
16
Alternative 1
Alternative 7
7 vs. 1
No Bridge
AM
10,500
107600
( +0.95
%)
PM
14,600
147600
( +0.0
%)
With Bridge
AM
89800
97200
( +4.55
%)
Vs. No Bridge
(- 16.19 %)
(-13.21%)
PM
127500
12,900
( +3.2
%)
Vs. No Bridge
(- 14.38 %)
(- 11.64 %)
16
OCTA Board — October 2008
Develop scope for next phase of study
(if approved by OCTA Board)
17