Loading...
HomeMy WebLinkAbout09 - CdM Street RehabilitationCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 9 December 9, 2008 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Peter Tauscher /Junior Engineer 949 - 644 -3316 or ptauscher @city.newport - beach.ca.us SUBJECT: CORONA DEL MAR STREET REHABILITATION PROJECT— PHASE 1 — AWARD OF CONTRACT NO. 3963 Recommendations: 1. Approve the project plans and specifications. 2. Award Contract No. 3963 to R.J. Noble Company for the Total Bid Price of $1,514,045.00, and authorize the Mayor and the City Clerk to execute the contract. 3. Establish an amount of $150,955.00 (approximately 10 %) to cover the cost of unforeseen work. Discussion: At 9:00 a.m. on November 18, 2008, the City Clerk opened and read the following bids for this project: TOTAL BID AMOUNT $1,514,045.00 $1,547,547.00 $1,562,505.00 *$1,573,500.00 $1,644,902.00 **$1,719,702.00 $1,779,090.00 As -bid amount is $1,565,000.00 As -bid amount is $1,723,717.00 The low total bid amount is 9.2 percent above the $1,385,000 Engineer's Estimate. Staff confirmed with other local agencies that the low bid unit costs are consistent with the prices paid by other agencies. The low bidder, R.J. Noble Company, possesses a BIDDER Low R.J. Noble Company 2 All American Asphalt 3 Sequel Contractors, Inc 4 Elite Bobcat Service 5 Alliance Streetworks, Inc 6 Excel Paving Company 7 Hardy & Harper, Inc TOTAL BID AMOUNT $1,514,045.00 $1,547,547.00 $1,562,505.00 *$1,573,500.00 $1,644,902.00 **$1,719,702.00 $1,779,090.00 As -bid amount is $1,565,000.00 As -bid amount is $1,723,717.00 The low total bid amount is 9.2 percent above the $1,385,000 Engineer's Estimate. Staff confirmed with other local agencies that the low bid unit costs are consistent with the prices paid by other agencies. The low bidder, R.J. Noble Company, possesses a Corona Del Mar Street Rehabilitation Project — Phase 1 — Award of Contract No. 3963 December 9, 2008 Page 2 California State Contractors License Classification "A" as required by the project specifications. A check of R.J. Noble Company's references indicates they have satisfactorily completed similar projects for the City and other municipalities. The majority of the work lies within residential streets bounded by Larkspur Avenue and Dahlia Avenue between East Coast Highway and Bayside Drive. Portions of Granville Drive, Bayside Drive and Dove Street will also be rehabilitated. The project includes: • cold milling of existing asphalt pavement, and overlaying the existing pavement sections with asphalt concrete and a Glasgrid reinforcing layer; • removal and reconstruction of street sections, curb and gutter, sidewalk, driveway approaches, cross gutters and curb access ramps; • adjusting junction structures, manhole, water valves and other structures to grade; and • replacing traffic signal detector loops, pavement striping, markings, and markers. An amount of $7,425.00 will be reimbursed to the City by the Orange County Sanitation District (OCSD) for the adjustment of their eleven sewer manholes to new finished grade along Bayside Drive. Pursuant to the Contract Specifications, the Contractor will have 90 consecutive working days to complete the work. Environmental Review: The project is Categorically Exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 of the CEQA Implementing Guidelines. This exemption covers the repair, maintenance and minor alteration of existing public facilities with negligible expansion. Public Notice: The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. Prior to starting work, two City prepared notices will be distributed by the Contractor to residents and businesses within the project vicinity. The first notice will be distributed ten days before work in the area and the second notice 48 hours prior to starting work in the area. Geotechnical. Material Testing, and Survey Services: In addition to the contract costs, approximately $30,000 in geotechnical and material testing services will be needed for this project and will be performed under the on -call professional services agreement with Harrington Geotechnical Engineering. Corona Del Mar Street Rehabilitation Project — Phase 1 — Award of Contract No. 3963 December 9, 2008 Page 3 Funding Availability: There are sufficient funds available in the following accounts for the project: Account Description Prop 1B (CDM Street Rehabilitation) Gas Tax (Dove Street Rehabilitation) Gas Tax (Bayside Drive Rehabilitation) Measure M Turnback (CDM Street Rehabilitation) Proposed uses are as follows: Vendor R.J. Noble Company R.J. Noble Company Harrington Geotechnical Various Prepared by: Peter Tauscher Junior Engineer Attachments: Project Location Map Account Number 7185- C2002004 7181- C2002006 7181- C2002002 7281- C2002004 Amount $ 1,354,500.00 $ 97,000.00 $ 211,000.00 $ 37,500.00 Total: $ 1,700,000.00 Purpose Construction Contract Construction Contingency Materials Testing Printing and Incidentals Total Submitted by: Amount $ 1,514,045.00 $ 150,955.00 $ 30,000.00 $ 5,000.00 $ 1,700,000.00 fn G. Badum Works Director PROJECT LOCATION MAP. WT M sou