Loading...
HomeMy WebLinkAbout08A - CIP 1997-98 - GSn LJ n • ) q Agenda Item No. 8a January 7,1997 TO: Parks, Beaches and Recreation Commission FROM: General Services Director SUBJECT: Fiscal Year 1997 -1998 Capital Improvement Projects At the December 3,1996 meeting a preliminary list of projects were submitted to the Commission for review and comment. The finalized project list is being submitted for your review. Project PROTECTS and REQUESTS Catego Amount Park Facility Improvement Fund A $100,000 Backflow Replacement & Prevention Program A 7,500 Irvine Terrace Park Driveway A 30,000 Street Tree Reforestation (Phase 4) A 40,000 Eastbluff Park Walkway (Phase 2) A 60,000 Inspiration Point Handrail A 20,000 Bayside Drive Park Trimming A 10,000 Bonita Creek Parks Gypsum Injector A 10,000 Weed and Fire Abatement of Parks A 7,000 Root Pruning of Park Trees (Phase 1) A 5,000 Central Irrigation Computer System (Phase 1) A 45,000 Peninsula Park Irrigation and Field Renovation B 300,000 Newport Blvd. Median Improvements (Phase 2) B 100,000 Galaxy Park Walkway B 20,000 San Miguel Park Irrigation Renovation B 20,000 Bonita Creek Fence B 15,000 Irvine Blvd. Median Improvements (Phase 1) B 125,000 Bayside Drive Beautification (Phase 1) B 35,000 San Joaquin Median Improvements (Phase 1) C 50,000 Backflow Vandal Proof Covers (Phase 1) C 5,000 McFadden Median Redevelopment (Phase 1) C 90,000 Total $1,094,500 Very respectfully, David E. Niederhaus, Director General Services Department DEN /MGL /pw Attachments: Capital Improvement Project Description FY 97 -98 n u Capital Improvement Project Description FY 97 -98 Park Facility Improvement Fund - Projects for improvements of parks and facilities generated by City Departments, public, Commission and City Council, these projects include athletic fields. Backflow Replacement & Prevention Program - Project required by County Health Department Codes. Irvine Terrace Park Driveway - Remove existing deteriorating asphalt driveway and replace with pavers and landscaping Street Tree Reforestation (Phase 4) - Removal of problem trees City-wide in conjunction with Sidewalk Replacement Program. Eastbluff Park Walkway Improvements (Phase 2) - Replace existing deteriorated asphalt walkways with concrete walkways. Inspiration Point Handrail - Install a handrail for safety on walkway that leads to the beach. Several requests have been made by the public. • Bayside Drive Park - The Park boundary is in severe need of trimming and staff has received several complaints from the adjacent residents. There has not been any significant trimming of the area for several years. Many complaints have been made by the public regarding transients, vector habitats and, overgrown foliage. • 3� Bonita Creek Park Gypsum Injector - Provide for gypsum materials for improvement of Park per consultants recommendations. Weed and Fire Abatement of Park - Several sites exist that require the Fire Departments Weed Abatement Contractor to eradicate weeds for safety. Root Pruning of Park Trees (Phase 1) - Several locations have been identified by staff that have exposed roots and present a liability and tripping problem. Central Irrigation Computer System (Phase 1) - Study and engineering estimate to purchase and install a central irrigation computer system with radio link to satellite irrigation controllers. This will significantly improve irrigation water management at several sites. The project will be ,phased over several years and should pay for itself in water savings in 3 to 5 years. Peninsula Park Irrigation and Field Renovation - Replace existing irrigation system, regrade, and install new turf grass in the athletic field area. • Newport Boulevard Plant and Irrigation Improvements (Phase 2) - Install new irrigation system and additional planting on median currently irrigated by water truck. • • Vb Galaxy Park Walkway - Replace existing deteriorated asphalt walkways with concrete walkways. San Miguel Park Irrigation System Renovation - The irrigation system will be evaluated, redesigned, and renovated to provide efficient irrigation in the park. Bonita Creek Fence - Provide for a permanent barrier along ,the east side of 'the park for rodent control. Currently rabbits and squirrels are damaging the athletic fields. Irvine Blvd. Median Improvements (Phase 1) - Begin design work and construction on median that is major entry into City. More phases to continue in future years in conjunction with the City of Costa Mesa. Bayside Drive Beautification - First phase of design and construction at corner of Jamboree Road and Bayside Drive. More phases to continue between Jamboree Road and El Paseo Drive. Presentation of the .project at the October 1996 Commission meeting. San Joaquin Median Improvements (Phase 1) - Install concrete pavers in the median turn pockets for safety and maintenance. Backflow Vandal Proof Covers (Phase 1) - Covers to eliminate thefts and vandalism. McFadden Median Redevelopment (Phase 1) - Landscape and irrigation of interchange, a major entry to Peninsula.