RECOMMENDATION
To accept the renovation plan for Grant Howald Park and direct staff to finalize plans and
specifications for the project.
DISCUSSION
The Grant Howald Athletic Field renovation is funded in FY 1998/99 as a Capital Improvement
Project at $300,000. This project was originally planned in 1990 and then deferred when
funding was not available. It provides for rehabilitation of the softball /football /soccer field.
• This heavily utilized facility was built over 20 years ago, and is in need of turf, and irrigation
replacements. The work will consist of upgrading or replacing the existing sport field
elements. In addition the field lighting system is inadequate and needs to be upgraded to
improve field lighting and to incorporate "state of the art' glare control. The limited size of
the location does not allow for redesign or added amenities. Benefits of the project include:
A new backstop
A dugout area
A variable height retaining wall along the north side of the field to reduce slope
erosion and improve park appearance
An enhanced park entry from 5t' Avenue.
Staff has coordinated the project with the Public Works and General Services Departments
and has retained Hirsch & Associates, Landscape Architects, for the design of the park
renovation.
Staff and the architect will present the preliminary plan, along with a light intensity survey, at
the Commission meeting. If the Commission approves .the plan, staff will finalize the contract
documents to bid the project. The City Council would then award the contract and
construction would begin in April with completion scheduled for June 1999. A turf
maintenance period would continue through August to prepare the field for use in September
1999.
Attachments
•
16 �-
J
�Cityof Newport Beach
OMMUNITY SERVICES
0
•
September 25, 1998
1' 0. BOX 1768, 3300 NEW'POR'T BLVD
NEWPORT BEACH, CA 92658.8915
Re: Grant Howald Park Athletic Field Renovation Project
Dear Grant Howald'Park Neighbor,
PHONE 714.644.3151
FAX 714- 644.3'155
The City of Newport Beach is planning to renovate the Grant Howald Park Athletic Field in the
Spring of 1999. The preliminary site plans will be reviewed at a public hearing during the
Parks, Beaches & Recreation Commission meeting, Tuesday, October 6, 7pm, City Council
Chambers, 3300 Newport Boulevard.
The goal of this project is to enhance the existing athletic facilities, including a "state of the
art" glare control field lighting system. A list of general renovation features is attached.
Please call me, at 644 -3151, if you have any questions.
Sincerely, }
Steve Hunt
Senior Recreation Manager
Attachment
/ DS
FROM : HIRSCH +ASSOCIATES INCORPORATED PHONE NO.
r$Ch
E /lssotiates Iqc.
L%NOSCAPGANCNMCTUOE
PAF1KPI.WNING 6 DESIGN
PAW2UMANAGiMW
7144471849 Sep. 25 1998 09:46RM P2
Install new state of,the art sports •fieldlighting to increase fieldlight levels and decrease
off -site spill light levels.
* Fine grade sports field to obtain uniform playing surface.
* Install new turf and•irrigation system on sports fields.
* Install new variable heighi concrete block retaining wall. This wall will reduce slope erosion,,
increase, sports field play, area and improve park.appearance.
* NVew slopevlantingto reduce slop erosion and improve park appearance.
Install new'backstop and dugouts at primary field.
* Improve park entry from 5th Avenue; eliminate rock cobble and erosion, fine grade and plant
with shrubs /seasonal color, install new park entry sign.
* Install' ground cover in dirt area adjacent to West'parldog •lot. ,
* Install vinyl- coated chain link to match new fencing at backstop on primary field.