Loading...
HomeMy WebLinkAboutV-8 - Grant Howald Athletic Field Renovation• (Item V -8) October 6, 1998 COMMUNITY SERVICES DEPARTMENT Arts & Cultural - Library - Recreation - Seniors To: Parks, Beaches and Recreation Commission From: Steve Hunt, Senior Recreation Manager Re: Grant Howald Athletic Field Renovation RECOMMENDATION To accept the renovation plan for Grant Howald Park and direct staff to finalize plans and specifications for the project. DISCUSSION The Grant Howald Athletic Field renovation is funded in FY 1998/99 as a Capital Improvement Project at $300,000. This project was originally planned in 1990 and then deferred when funding was not available. It provides for rehabilitation of the softball /football /soccer field. • This heavily utilized facility was built over 20 years ago, and is in need of turf, and irrigation replacements. The work will consist of upgrading or replacing the existing sport field elements. In addition the field lighting system is inadequate and needs to be upgraded to improve field lighting and to incorporate "state of the art' glare control. The limited size of the location does not allow for redesign or added amenities. Benefits of the project include: A new backstop A dugout area A variable height retaining wall along the north side of the field to reduce slope erosion and improve park appearance An enhanced park entry from 5t' Avenue. Staff has coordinated the project with the Public Works and General Services Departments and has retained Hirsch & Associates, Landscape Architects, for the design of the park renovation. Staff and the architect will present the preliminary plan, along with a light intensity survey, at the Commission meeting. If the Commission approves .the plan, staff will finalize the contract documents to bid the project. The City Council would then award the contract and construction would begin in April with completion scheduled for June 1999. A turf maintenance period would continue through August to prepare the field for use in September 1999. Attachments • 16 �- J �Cityof Newport Beach OMMUNITY SERVICES 0 • September 25, 1998 1' 0. BOX 1768, 3300 NEW'POR'T BLVD NEWPORT BEACH, CA 92658.8915 Re: Grant Howald Park Athletic Field Renovation Project Dear Grant Howald'Park Neighbor, PHONE 714.644.3151 FAX 714- 644.3'155 The City of Newport Beach is planning to renovate the Grant Howald Park Athletic Field in the Spring of 1999. The preliminary site plans will be reviewed at a public hearing during the Parks, Beaches & Recreation Commission meeting, Tuesday, October 6, 7pm, City Council Chambers, 3300 Newport Boulevard. The goal of this project is to enhance the existing athletic facilities, including a "state of the art" glare control field lighting system. A list of general renovation features is attached. Please call me, at 644 -3151, if you have any questions. Sincerely, } Steve Hunt Senior Recreation Manager Attachment / DS FROM : HIRSCH +ASSOCIATES INCORPORATED PHONE NO. r$Ch E /lssotiates Iqc. L%NOSCAPGANCNMCTUOE PAF1KPI.WNING 6 DESIGN PAW2UMANAGiMW 7144471849 Sep. 25 1998 09:46RM P2 Install new state of,the art sports •fieldlighting to increase fieldlight levels and decrease off -site spill light levels. * Fine grade sports field to obtain uniform playing surface. * Install new turf and•irrigation system on sports fields. * Install new variable heighi concrete block retaining wall. This wall will reduce slope erosion,, increase, sports field play, area and improve park.appearance. * NVew slopevlantingto reduce slop erosion and improve park appearance. Install new'backstop and dugouts at primary field. * Improve park entry from 5th Avenue; eliminate rock cobble and erosion, fine grade and plant with shrubs /seasonal color, install new park entry sign. * Install' ground cover in dirt area adjacent to West'parldog •lot. , * Install vinyl- coated chain link to match new fencing at backstop on primary field. Sw�S WEET CtOMMONWFn. Tr. nm .+ue. eurt•o raw.�..uu.rnTnti, W. irr... .w uuuu.i LID. NO. 1710 \J •