Loading...
HomeMy WebLinkAbout02 - GS Activity Report (10)42�WPO�T O B, • V CqU F00.N�P PB &R Commission Agenda Item No. January 10, 2002 SUBJECT: Parks and Trees Divisions Activities Report Park Division Activities 1. Staff continued coordinating the construction of the Bonita Canyon Sports Park with the Public Works Department although construction work has been limited due to the financial difficulties of the general contractor at this time. 2. Additional California native plants were installed on the slope adjacent to Fernleaf Avenue. The seasonal dieback of the existing natives left the slope unattractive at times and complaints were received from the public. The additional perennial native plants will allow for year round foliage. 3. Three Commission approved donation benches were installed, one at Cliff Drive Park • and along West Ocean Front sidewalk of the Peninsula at 8`t' and 10"' Streets. Additionally, four Commission approved donation trees were installed, at Grant Howald, Old School and Cliff Drive Parks. 4. The Phase II Walkway Replacement Project at Eastbluff Park began in mid - December. This project provides for the removal of deteriorated asphalt walkways and replacement with concrete. 5. The fields at Arroyo Park were renovated due to wear at this site. The work included deep tine aerification, fertilization, seeding and top dressing. Upcoming Activities for January 1. The planting of replacement shrubs and ground covers will continue Citywide. 2. Staff will continue to monitor the Arches Mitigation Site in the Big Canyon area. 3. Staff will continue coordinating the annual control of rodents with contract services. Tree Division Activities • During the month of December 937 trees were trimmed, 34 trees were planted and 6 emergency calls were responded to regarding trees. The Urban Forester received 43 tree maintenance requests. CAWIND0W8\Desktop\PBRDm2001Dft Am 1. The City tree- trimming contractor, West Coast Arborists, has nearly concluded the . annual tree trimming of selected tree species throughout the City in anticipation of the winter storms. There has been no significant damage by City tree in recent storms because of this trimming. • • 2. The Urban Forester coordinated the Citywide Sidewalk Replacement Program with the Concrete Maintenance Supervisor and a Public Works Inspector. This work involved the Urban Forester inspecting City street trees as related to sidewalk repairs. 3. The attached Tree Activity Report summarizes requests and field activities that were performed during the past several months. re ctfixlly, Marcelmo omeli Parks and Trees Maintenance Superintendent Attachments: (A) Tree Activity Report 2001 CAWMDOWS\Desktop\PBRDm2001Dft .doe o cD CD a.. N 7 d d C Cu CD d C CD N 0 Ul 0 CD 0 A n U Em N N N 0 a 0 0 v' "J- C C � o CD co r\ H. (p 0 Q CD a o �s CD C d CD C a � Oh CD W CCD C. (D a m CD C CD wD CD � o C h CD CD d C 1 ` z r �I 7H a H O O N N O O O O N O O O O O O O N O O O O O N O O O N O N O w C, w -P� N C� CT rn O N o 0 0 0 0 0 0 0 0 0 0 0 0 C � o CD co r\ H. (p 0 Q CD a o �s CD C d CD C a � Oh CD W CCD C. (D a m CD C CD wD CD � o C h CD CD d C 1 ` z r �I 7H a H