SUBJECT: Parks and Trees Divisions Activities Report
Park Division Activities
1. Staff continued coordinating the construction of the Bonita Canyon Sports Park with
the Public Works Department although construction work has been limited due to the
financial difficulties of the general contractor at this time.
2. Additional California native plants were installed on the slope adjacent to Fernleaf
Avenue. The seasonal dieback of the existing natives left the slope unattractive at times
and complaints were received from the public. The additional perennial native plants
will allow for year round foliage.
3. Three Commission approved donation benches were installed, one at Cliff Drive Park
• and along West Ocean Front sidewalk of the Peninsula at 8`t' and 10"' Streets.
Additionally, four Commission approved donation trees were installed, at Grant
Howald, Old School and Cliff Drive Parks.
4. The Phase II Walkway Replacement Project at Eastbluff Park began in mid - December.
This project provides for the removal of deteriorated asphalt walkways and replacement
with concrete.
5. The fields at Arroyo Park were renovated due to wear at this site. The work included
deep tine aerification, fertilization, seeding and top dressing.
Upcoming Activities for January
1. The planting of replacement shrubs and ground covers will continue Citywide.
2. Staff will continue to monitor the Arches Mitigation Site in the Big Canyon area.
3. Staff will continue coordinating the annual control of rodents with contract services.
Tree Division Activities
• During the month of December 937 trees were trimmed, 34 trees were planted and 6
emergency calls were responded to regarding trees. The Urban Forester received 43 tree
maintenance requests.
CAWIND0W8\Desktop\PBRDm2001Dft Am
1. The City tree- trimming contractor, West Coast Arborists, has nearly concluded the
. annual tree trimming of selected tree species throughout the City in anticipation of the
winter storms. There has been no significant damage by City tree in recent storms
because of this trimming.
•
•
2. The Urban Forester coordinated the Citywide Sidewalk Replacement Program with the
Concrete Maintenance Supervisor and a Public Works Inspector. This work involved
the Urban Forester inspecting City street trees as related to sidewalk repairs.
3. The attached Tree Activity Report summarizes requests and field activities that were
performed during the past several months.
re ctfixlly,
Marcelmo omeli
Parks and Trees Maintenance Superintendent
Attachments: (A) Tree Activity Report 2001
CAWMDOWS\Desktop\PBRDm2001Dft .doe
o
cD CD
a..
N
7
d
d
C
Cu
CD
d
C
CD
N
0
Ul
0
CD
0
A
n
U
Em
N
N
N
0
a
0
0
v' "J- C
C
� o
CD co
r\ H.
(p
0
Q CD
a
o
�s
CD
C
d
CD C
a �
Oh
CD
W
CCD
C.
(D
a m CD
C
CD
wD
CD
� o
C
h
CD
CD
d
C
1 `
z
r
�I
7H
a
H
O
O
N
N
O
O
O
O
N
O
O
O
O
O
O
O
N
O
O
O
O
O
N
O
O
O
N
O
N
O
w
C,
w
-P�
N
C�
CT
rn
O
N
o
0
0
0
0
0
0
0
0
0
0
0
0
C
� o
CD co
r\ H.
(p
0
Q CD
a
o
�s
CD
C
d
CD C
a �
Oh
CD
W
CCD
C.
(D
a m CD
C
CD
wD
CD
� o
C
h
CD
CD
d
C
1 `
z
r
�I
7H
a
H