PB &R Commission Agenda
Item No. a'
October 5, 2004
TO: Parks, Beaches and Recreation Commission
FROM: Parks and Trees Maintenance Superintendent
SUBJECT: Parks and Trees Maintenance Divisions Activities Report
August and September Parks Maintenance Division Activities
1. Synthetic artificial turf grass was installed at the entrance to the new Building Department office
trailer at City Hall, as a small test site to evaluate future potential uses in the City.
2. Four Commission - approved donation benches were installed on the Newport Pier.
• 3. Parks Maintenance Division staff coordinated with the Recreation and Senior Services
Department relative to a Concert in the Park Event at Bob Henry and Peninsula Parks, two
nights of Shakespeare in the Park at Grant Howald Park, and the Sunday Fun Day Event held at
the Bonita Canyon Sports Park.
4. The four infields at the Bonita Canyon Sports Park were renovated in preparation for the
upcoming season. The improvements were funded by two Little League groups which use the
fields. The work consisted of fertilizing, overseeding and top - dressing, and was coordinated by
staff and the City parks maintenance contractor, TruGreen.
5. The planters at Newport Island Park were relandscaped with colorful plantings
Upcoming Activities for November
1. The planting of replacement shrubs and ground covers will continue Citywide.
2. Parks Maintenance Division staff will continue coordinating the control of rodents
with contract services.
Tree Division Activities
During the month of September, 945 trees were trimmed, no trees were removed as either claim
related or problem tree categories per the G -1 Policy, 18 trees were planted, and 13 emergency tree
calls were responded to. The Urban Forester received 168 tree maintenance requests.
In the month of August, 1320 trees were trimmed, 37 trees were removed as either claim related or
problem tree categories per the G -1 Policy, 8 trees were planted, and 11 emergency tree calls were
• responded to. The Urban Forester received 176 tree maintenance requests.
1. The City's tree trimming contractor, West Coast Arborists, is currently trimming trees
within the Corona Del Mar area.
2. The Urban Forester coordinated the Citywide Sidewalk Replacement Program with the
Concrete Maintenance Supervisor and a Public Works Department Inspector. This work
involved the Urban Forester inspecting City street trees as related to sidewalk repairs.
3. The attached Tree Activity Report summarizes requests and field activities performed
during the past month.
Beach Maintenance Activities
See attached General Services Department, Activities Report for July and August.
Parks and Trees Maintenance Superintendent
Attachments: (A) Tree Activity Report 2004- 2005
(B) General Services Department July and August Activities Report
•
n
u
•
• OfACH
r
g
0
A-
°O
a4, '
I,tta
6
9atg
o tt�o
�t9a�
Q4Q�.y
d' o x9t4,,,-
9
'O> C,4 P4 �
Q 144
va
F b U ,tag O
LO
�a,
O
Y
cC �sOo9
y t'b
W O
O�
CO
N
O
O
O
O
O
O
T
ro
m
co
N
O
O
O
O
O
O
O
T
O
O
O
O
O
O
CO
O
M
O
O
O
O
O
O
O
O
O
T
k
i[
.
c�a
H
A
."'
W
a�i
O
m
o
�
U
a)
a
O
m
O
�
w
0
E
0
O
E
0
H
N
>
O
E
(i
>
c
(D
W
>
O
E
(yD
LL
m
CO
a�
E
ol
>
C
C CD
(D
02
:°.
o
W1
dI
c6
>
E
s
a
•
T
a
U
0
O
O
N
O
O
N
1.
CC
U
w
x
F � 4
O C 3
� 1
� Q
W
z
O
z
4
d
d
d
N
z
m
o
s
H
QU C p
'
w
E U Q O
-gy
m p 2
�
C
ca
N N (n V
�
W
a
z
F
x
F � 4
O C 3
� 1
� Q
W
z
O
z
4
d
d
d
N
•
a
d
O
W
i
W
�Q
O
a
U
0
0
N
f
O
O
N
eet
U
..n
�I
x a
o
� Q
W
Z
O
Z
0
0
L
d
e
w
d
N
a�
Q
-o
z
000
O
J o
=
=
J
=
F
d
�r
o
m
a
°
@
a
X
'D C
J J
C =
O J
O
a
>
Q
0
O Li
Gr
CO Q
O Q Q
N N
@
p`
M
Cc O
=
'J "6
J "O "O C
C=
C C
L J J O �` U1
J _@
C� U)
Oi
O O co
-O m Q
C
J N
J
J J
Ol C C C L O fJl
J � 01
-� c
L L
X@@
O C L W
;.0
�, 0 U ?0 L �X C
y
C
O
O
(6 j ___
m
j@ m
y _� C
C C
O C C O 0) O O
C
C O O UI
>
�j 0 2
0' =
W 2 2 Q
Q Q
Z J J U J K >
Q U)
W
M
M 7 0—
O fl- (O
O r (O t`
O
O (D Cl O O W
O m N
M
co N O
O N M
O O O N
M O
M O N (O O M M
M M 7 M
n
M M N M
0 N --
(O M
0 (O
N V M Uf LO (O
(9 M M N
M (O W..
P
r v- r —
— .-
— — —
�
W
W
O
C4
Z
H
x a
o
� Q
W
Z
O
Z
0
0
L
d
e
w
d
N
•
GENERAL SERVICES DEPARTMENT ACTIVITIES REPORT
July-04
This This Month Total to Date Total to Date
Month Last Year Fiscal Year Last Fiscal Year
FIELD .MAif4.tENANCE.PIYI$ION
Street Patching: Tons of Blacktop
245
1 412
245
412
Misc. Cement (cu. ft.) Footings, Meter Posts, etc
189
0
189
0
Curbing (Lineal Feet)
636
26
636
26
Sidewalk (Square Feet) 4" Thick
1,580
5,368
1,580
5,368
Concrete (cu yds) Sidewalk & Curb Replacement
74
75
74
75
Sidewalk Grinding (Lineal Feet)
1,044
616
1,044
616
Trees Root Pruned by Staff
8
41
8
41
Sidewalks Ramped (Lineal Feet)
332
1 508
332
508
Sidewalks (sq ft) 4" thick Replaced by Contractor
0
0
0
0
Wheelchair Ramps Installed by Contractor
0
0
0
0
Curb & Gutter (lin ft) Replaced by Contractor
0
0
0
0
Trees Root Pruned by Contractor
0
-
0
Maintenance Debris (Tons)
Street Sweeping, Beach Cleaning, Demo
352
409
352
409
Asphalt & Concrete Recycled
279
285
279
285
Signs & Street Markings
Street Name Signs Added & Replaced
18
88
18
88
Traffic Signs Added & Replaced
192
238
192
238
Special Purpose Signs Installed
7
48
7
48
Beach Signs Installed
17
is
17
15
Street Striping (fin ft) Total Added & Replaced
1,192
311
1,192
311
Pavement Markings (Messages)
46
18
46
18
Parking Stalls
17
1 0
17
1 0
Curb Painting (Lineal Feet)
3,861
2,700
3,861
2,700
Reflective Pavement Markers (Included in Above)
0
0
0
0
Thermoplastic
195
33
195
33
Sign Posts Installed
51
77
51
77
Graffiti - Incidents Removed by Staff
556
349
556
349
14
Beach Maintenance
Beach Area Refuse (Tons)
179
1 127
179
127
Beach Debris (Tons)
100
197
100
197
Gutter Miles Swept (Large & Small Total)
5,132
5,615
5,132
5,615
Sweepings Picked Up (Cubic Yards)
554
713
554
713
Hand Sweepers (Cubic Yards)
50
75
so
75
Storm Drain Debris (Cubic Yards)
30
26
1 30
26
V-Ditch/Structures Crons)
0
-
0
Sign Shop
Traffic Signs
100
2
100
2
Street Name Signs
2
92
2
92
Regulatory Signs
375
2,134
375
2,134
Special Purpose Signs and Banners
142
67
142
67
Decals
1
68
1
68
Graffiti - Incidents Removed by Contractor
40
29
40
29
•
•
n
i. J
GENERAL SERVICES DEPARTMENT ACTIVITIES REPORT
July -04
This This Month Total to Date Total to Date
Month Last Year Fiscal Year Last Fiscal Year
Refuse Collection
Residential tons
3,558
1 3,851
3,558
3,851
Rec clables tons
1,108
1,180
1,108
1,180
Commercial
0
0
0
0
Special Pickup
0
0
0
0
Total Residential
3,558
3,851
3,558
3,851
Man Hourslron
1.16
1.05
1.16
1.05
Tons/Man Hour
0.87
0.96
0.87
0.96
Tons/Man Day
6.93
7.65
1 6.93
1 7.65
Total Miles Traveled
11,817
11,692
1 11,817
1 11,692
PACKER COMPARISONS - One Man
Man Hours/Ton
0.82
0.81
0.82
0.81
Tons/Man Hour
1.22
1.23
1.22
1.23
Tons/Man Da
9.76
9.87
9.87
Total Miles Traveled
6,370
6,235
6,370
6,235
PACKER COMPARISONS - Two Man
Man Hours/Ton
1.57
1.19
1.57
1.19
Tons /Man Hour
0.64
0.84
0.64
0.84
Total Miles Traveled 5,447 1 5,457 5,447 5,457
REFUSE TRANSFER - Transfer Trailer
Man Hours
576
601
5.5.7
501
Loads Hauled
155
166
155
166
Tons Hauled
3,175
3,306
3,175
3,306
Average Trailer Loads per Work Day
5.74
5.72
5.74
5.72
Average Tons per Work Day
117.60
114.00
117.60
114.00
Total Miles Traveled
5,599
5,749
5,599
5,749
Ll
LJ
•
GENERAL SERVICES DEPARTMENT ACTIVITIES REPORT
August-04
This This Month Total to Date Total to Date
Month Last Year Fiscal Year Last Fiscal Year
FIELD MA(f1'ENANCEiD4VlSt�l:i =113
Street Patching: Tons of Blacktop
376
433
621
845
Misc. Cement (cu. ft.) Footings, Meter Posts, etc
0
135
189
135
Curbing (Lineal Feet)
421
365
1,057
391
Sidewalk (Square Feet) 4" Thick
3,604
4,065
5,184
__.9,.433
Concrete (cu ds) Sidewalk & Curb Replacement
go
97
163
171
Sidewalk Grinding (Lineal Feet)
1,328
248
2,372
864
Trees Root Pruned by Staff
89 1
24
97
65
Sidewalks Ramped (Lineal Feet)
340 1
632
672
1,140
Sidewalks (sq ft) 4" thick Replaced by Contractor
0
0
0
0
Wheelchair Ramps installed by Contractor
0
0
0
0
Curb & Gutter (lin ft) Replaced by Contractor
0
0
0
0
Trees Root Pruned by Contractor
0
0 --J-O
0
Maintenance Debris (Tons)
Street Sweeping, Beach Cleaning, Demo
437
11 )15
789
4648
814
Asphalt & Concrete Recycled
559
3
838
Signs & Street Markings
---
Street Name Signs Added & Replaced
35
200
53
288
Traffic Signs Added & Replaced
184
137
376
375
Special Purpose Signs Installed
53
P23.558
25
60
73
Beach Signs Installed
6
19
23
34
Street Striping (lin ft) Total Added & Replaced
930
24,750
1,241
Pavement Markings (Messages)
r
65
56
111
74
Parking Stalls
0
26
17
26
Curb Painting (Lineal Feet)
1,059 1
10,211
4,920 _
12,911
Reflective Pavement Markers (included in Above)
loo
0
100
0
Thermoplastic
0
11,504
195
1,537
Sign Posts Installed
63
51
114
128
Graffiti - Incidents Removed by Staff
16
149
572
498
0,11p . ERAMN,51UP F 0
Beach Maintenance
Beach Area Refuse Crons)
196
180
375
307
Beach Debris Crons)
75
126
175
323
Gutter Miles Sweipt (Large & Small Total)
5,045
5,008
10,177
10,623
Sweepings Picked Up (Cubic Yards)
509
552
1,063
1, 265
__--
Hand Sweepers (Cubic Yards)
85
95
135
170
Storm Drain Debris (Cubic Yards)
74
33
1 104
1 59
V-Ditch/Structures (Tons)
o
o
Sign Shop
-
Traffic Signs
21
31
121
33
Street Name Signs
0
4
2
96
Regulatory Signs
4,345
0
4,720
2,134
Special Purpose Signs and Banners
5
32
147
99
Decals
406
457
407
525
Graffiti - Incidents Removed hw Contractor
39
15
79
44
•
GENERAL SERVICES DEPARTMENT ACTIVITIES REPORT
August -04
This This Month Total to Date Total to Date
Man Hours/Ton
0.82
0.82 1
0.63 1
0.74
Tons /Man Hour
1.22
1.21
1.22 1
1.11
Tons /Man Day
9.73
9.71
9.75
8.91
Total Miles Traveled
5,360
5,306
11,730
11,541
Man Hours/Ton 1 1.63 1 1.41 1 1.22 1 1.11 I
Tons/Man Hour
• Tons/Man Dav
0.71
4.90 1 5.66 1 5.01
Total Miles Traveled 4,543 1 5,513 1 9,99u I lu,wu
RFF11.4F TRCNSFFR _ Transfer Trailer
Man Hours
575
1 556
1,151
1,157
Loads Hauled
153
154
308
320
Tons Hauled
3,144
3,107
6,320
6,413
Average Trailer Loads per Work Day
5.67
5.92
5.70
5.82
Average Tons per Work Day
116.46
119.51
117.03
116.60
Total Miles Traveled
5,429
5,495
11,028
11,244