Loading...
HomeMy WebLinkAbout2 - GS Activity ReportE SEW a�RT C'�4F0 R��P PB &R Commission Agenda Item No. a' October 5, 2004 TO: Parks, Beaches and Recreation Commission FROM: Parks and Trees Maintenance Superintendent SUBJECT: Parks and Trees Maintenance Divisions Activities Report August and September Parks Maintenance Division Activities 1. Synthetic artificial turf grass was installed at the entrance to the new Building Department office trailer at City Hall, as a small test site to evaluate future potential uses in the City. 2. Four Commission - approved donation benches were installed on the Newport Pier. • 3. Parks Maintenance Division staff coordinated with the Recreation and Senior Services Department relative to a Concert in the Park Event at Bob Henry and Peninsula Parks, two nights of Shakespeare in the Park at Grant Howald Park, and the Sunday Fun Day Event held at the Bonita Canyon Sports Park. 4. The four infields at the Bonita Canyon Sports Park were renovated in preparation for the upcoming season. The improvements were funded by two Little League groups which use the fields. The work consisted of fertilizing, overseeding and top - dressing, and was coordinated by staff and the City parks maintenance contractor, TruGreen. 5. The planters at Newport Island Park were relandscaped with colorful plantings Upcoming Activities for November 1. The planting of replacement shrubs and ground covers will continue Citywide. 2. Parks Maintenance Division staff will continue coordinating the control of rodents with contract services. Tree Division Activities During the month of September, 945 trees were trimmed, no trees were removed as either claim related or problem tree categories per the G -1 Policy, 18 trees were planted, and 13 emergency tree calls were responded to. The Urban Forester received 168 tree maintenance requests. In the month of August, 1320 trees were trimmed, 37 trees were removed as either claim related or problem tree categories per the G -1 Policy, 8 trees were planted, and 11 emergency tree calls were • responded to. The Urban Forester received 176 tree maintenance requests. 1. The City's tree trimming contractor, West Coast Arborists, is currently trimming trees within the Corona Del Mar area. 2. The Urban Forester coordinated the Citywide Sidewalk Replacement Program with the Concrete Maintenance Supervisor and a Public Works Department Inspector. This work involved the Urban Forester inspecting City street trees as related to sidewalk repairs. 3. The attached Tree Activity Report summarizes requests and field activities performed during the past month. Beach Maintenance Activities See attached General Services Department, Activities Report for July and August. Parks and Trees Maintenance Superintendent Attachments: (A) Tree Activity Report 2004- 2005 (B) General Services Department July and August Activities Report • n u • • OfACH r g 0 A- °O a4, ' I,tta 6 9atg o tt�o �t9a� Q4Q�.y d' o x9t4,,,- 9 'O> C,4 P4 � Q 144 va F b U ,tag O LO �a, O Y cC �sOo9 y t'b W O O� CO N O O O O O O T ro m co N O O O O O O O T O O O O O O CO O M O O O O O O O O O T k i[ . c�a H A ."' W a�i O m o � U a) a O m O � w 0 E 0 O E 0 H N > O E (i > c (D W > O E (yD LL m CO a� E ol > C C CD (D 02 :°. o W1 dI c6 > E s a • T a U 0 O O N O O N 1. CC U w x F � 4 O C 3 � 1 � Q W z O z 4 d d d N z m o s H QU C p ' w E U Q O -gy m p 2 � C ca N N (n V � W a z F x F � 4 O C 3 � 1 � Q W z O z 4 d d d N • a d O W i W �Q O a U 0 0 N f O O N eet U ..n �I x a o � Q W Z O Z 0 0 L d e w d N a� Q -o z 000 O J o = = J = F d �r o m a ° @ a X 'D C J J C = O J O a > Q 0 O Li Gr CO Q O Q Q N N @ p` M Cc O = 'J "6 J "O "O C C= C C L J J O �` U1 J _@ C� U) Oi O O co -O m Q C J N J J J Ol C C C L O fJl J � 01 -� c L L X@@ O C L W ;.0 �, 0 U ?0 L �X C y C O O (6 j ___ m j@ m y _� C C C O C C O 0) O O C C O O UI > �j 0 2 0' = W 2 2 Q Q Q Z J J U J K > Q U) W M M 7 0— O fl- (O O r (O t` O O (D Cl O O W O m N M co N O O N M O O O N M O M O N (O O M M M M 7 M n M M N M 0 N -- (O M 0 (O N V M Uf LO (O (9 M M N M (O W.. P r v- r — — .- — — — � W W O C4 Z H x a o � Q W Z O Z 0 0 L d e w d N • GENERAL SERVICES DEPARTMENT ACTIVITIES REPORT July-04 This This Month Total to Date Total to Date Month Last Year Fiscal Year Last Fiscal Year FIELD .MAif4.tENANCE.PIYI$ION Street Patching: Tons of Blacktop 245 1 412 245 412 Misc. Cement (cu. ft.) Footings, Meter Posts, etc 189 0 189 0 Curbing (Lineal Feet) 636 26 636 26 Sidewalk (Square Feet) 4" Thick 1,580 5,368 1,580 5,368 Concrete (cu yds) Sidewalk & Curb Replacement 74 75 74 75 Sidewalk Grinding (Lineal Feet) 1,044 616 1,044 616 Trees Root Pruned by Staff 8 41 8 41 Sidewalks Ramped (Lineal Feet) 332 1 508 332 508 Sidewalks (sq ft) 4" thick Replaced by Contractor 0 0 0 0 Wheelchair Ramps Installed by Contractor 0 0 0 0 Curb & Gutter (lin ft) Replaced by Contractor 0 0 0 0 Trees Root Pruned by Contractor 0 - 0 Maintenance Debris (Tons) Street Sweeping, Beach Cleaning, Demo 352 409 352 409 Asphalt & Concrete Recycled 279 285 279 285 Signs & Street Markings Street Name Signs Added & Replaced 18 88 18 88 Traffic Signs Added & Replaced 192 238 192 238 Special Purpose Signs Installed 7 48 7 48 Beach Signs Installed 17 is 17 15 Street Striping (fin ft) Total Added & Replaced 1,192 311 1,192 311 Pavement Markings (Messages) 46 18 46 18 Parking Stalls 17 1 0 17 1 0 Curb Painting (Lineal Feet) 3,861 2,700 3,861 2,700 Reflective Pavement Markers (Included in Above) 0 0 0 0 Thermoplastic 195 33 195 33 Sign Posts Installed 51 77 51 77 Graffiti - Incidents Removed by Staff 556 349 556 349 14 Beach Maintenance Beach Area Refuse (Tons) 179 1 127 179 127 Beach Debris (Tons) 100 197 100 197 Gutter Miles Swept (Large & Small Total) 5,132 5,615 5,132 5,615 Sweepings Picked Up (Cubic Yards) 554 713 554 713 Hand Sweepers (Cubic Yards) 50 75 so 75 Storm Drain Debris (Cubic Yards) 30 26 1 30 26 V-Ditch/Structures Crons) 0 - 0 Sign Shop Traffic Signs 100 2 100 2 Street Name Signs 2 92 2 92 Regulatory Signs 375 2,134 375 2,134 Special Purpose Signs and Banners 142 67 142 67 Decals 1 68 1 68 Graffiti - Incidents Removed by Contractor 40 29 40 29 • • n i. J GENERAL SERVICES DEPARTMENT ACTIVITIES REPORT July -04 This This Month Total to Date Total to Date Month Last Year Fiscal Year Last Fiscal Year Refuse Collection Residential tons 3,558 1 3,851 3,558 3,851 Rec clables tons 1,108 1,180 1,108 1,180 Commercial 0 0 0 0 Special Pickup 0 0 0 0 Total Residential 3,558 3,851 3,558 3,851 Man Hourslron 1.16 1.05 1.16 1.05 Tons/Man Hour 0.87 0.96 0.87 0.96 Tons/Man Day 6.93 7.65 1 6.93 1 7.65 Total Miles Traveled 11,817 11,692 1 11,817 1 11,692 PACKER COMPARISONS - One Man Man Hours/Ton 0.82 0.81 0.82 0.81 Tons/Man Hour 1.22 1.23 1.22 1.23 Tons/Man Da 9.76 9.87 9.87 Total Miles Traveled 6,370 6,235 6,370 6,235 PACKER COMPARISONS - Two Man Man Hours/Ton 1.57 1.19 1.57 1.19 Tons /Man Hour 0.64 0.84 0.64 0.84 Total Miles Traveled 5,447 1 5,457 5,447 5,457 REFUSE TRANSFER - Transfer Trailer Man Hours 576 601 5.5.7 501 Loads Hauled 155 166 155 166 Tons Hauled 3,175 3,306 3,175 3,306 Average Trailer Loads per Work Day 5.74 5.72 5.74 5.72 Average Tons per Work Day 117.60 114.00 117.60 114.00 Total Miles Traveled 5,599 5,749 5,599 5,749 Ll LJ • GENERAL SERVICES DEPARTMENT ACTIVITIES REPORT August-04 This This Month Total to Date Total to Date Month Last Year Fiscal Year Last Fiscal Year FIELD MA(f1'ENANCEiD4VlSt�l:i =113 Street Patching: Tons of Blacktop 376 433 621 845 Misc. Cement (cu. ft.) Footings, Meter Posts, etc 0 135 189 135 Curbing (Lineal Feet) 421 365 1,057 391 Sidewalk (Square Feet) 4" Thick 3,604 4,065 5,184 __.9,.433 Concrete (cu ds) Sidewalk & Curb Replacement go 97 163 171 Sidewalk Grinding (Lineal Feet) 1,328 248 2,372 864 Trees Root Pruned by Staff 89 1 24 97 65 Sidewalks Ramped (Lineal Feet) 340 1 632 672 1,140 Sidewalks (sq ft) 4" thick Replaced by Contractor 0 0 0 0 Wheelchair Ramps installed by Contractor 0 0 0 0 Curb & Gutter (lin ft) Replaced by Contractor 0 0 0 0 Trees Root Pruned by Contractor 0 0 --J-O 0 Maintenance Debris (Tons) Street Sweeping, Beach Cleaning, Demo 437 11 )15 789 4648 814 Asphalt & Concrete Recycled 559 3 838 Signs & Street Markings --- Street Name Signs Added & Replaced 35 200 53 288 Traffic Signs Added & Replaced 184 137 376 375 Special Purpose Signs Installed 53 P23.558 25 60 73 Beach Signs Installed 6 19 23 34 Street Striping (lin ft) Total Added & Replaced 930 24,750 1,241 Pavement Markings (Messages) r 65 56 111 74 Parking Stalls 0 26 17 26 Curb Painting (Lineal Feet) 1,059 1 10,211 4,920 _ 12,911 Reflective Pavement Markers (included in Above) loo 0 100 0 Thermoplastic 0 11,504 195 1,537 Sign Posts Installed 63 51 114 128 Graffiti - Incidents Removed by Staff 16 149 572 498 0,11p . ERAMN,51UP F 0 Beach Maintenance Beach Area Refuse Crons) 196 180 375 307 Beach Debris Crons) 75 126 175 323 Gutter Miles Sweipt (Large & Small Total) 5,045 5,008 10,177 10,623 Sweepings Picked Up (Cubic Yards) 509 552 1,063 1, 265 __-- Hand Sweepers (Cubic Yards) 85 95 135 170 Storm Drain Debris (Cubic Yards) 74 33 1 104 1 59 V-Ditch/Structures (Tons) o o Sign Shop - Traffic Signs 21 31 121 33 Street Name Signs 0 4 2 96 Regulatory Signs 4,345 0 4,720 2,134 Special Purpose Signs and Banners 5 32 147 99 Decals 406 457 407 525 Graffiti - Incidents Removed hw Contractor 39 15 79 44 • GENERAL SERVICES DEPARTMENT ACTIVITIES REPORT August -04 This This Month Total to Date Total to Date Man Hours/Ton 0.82 0.82 1 0.63 1 0.74 Tons /Man Hour 1.22 1.21 1.22 1 1.11 Tons /Man Day 9.73 9.71 9.75 8.91 Total Miles Traveled 5,360 5,306 11,730 11,541 Man Hours/Ton 1 1.63 1 1.41 1 1.22 1 1.11 I Tons/Man Hour • Tons/Man Dav 0.71 4.90 1 5.66 1 5.01 Total Miles Traveled 4,543 1 5,513 1 9,99u I lu,wu RFF11.4F TRCNSFFR _ Transfer Trailer Man Hours 575 1 556 1,151 1,157 Loads Hauled 153 154 308 320 Tons Hauled 3,144 3,107 6,320 6,413 Average Trailer Loads per Work Day 5.67 5.92 5.70 5.82 Average Tons per Work Day 116.46 119.51 117.03 116.60 Total Miles Traveled 5,429 5,495 11,028 11,244