Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
8/6/2011 - Agenda Packet (12)
General Services Department Activities Report - Ma 2011 This Month This Month Last Year Total To Date TTDLast Year Asphalt/Concrete Street Patching (Tons of Blacktop) 259 416 2,322 3,120 Sidewalk Repaired (sq. ft.) 4,670 3,600 36,747 45,790 Curb & Gutter Replacement (lin. ft.) 105 321 2,607 2,649 Sweeping, Beach Cleaning, Demo Materials (tons) 354 336 3,172 4,344 AsphaltiConcrete Recycled (tons) 332 508 2,848 3,724 Signs & Traffic Markings Signs Made 102 27 1,348 5,497 Signs Installed 192 155 1,968 2,093 Decals 10 18 506 2,526 Special Purpose Signs/Banners Made 5 85 468 610 Street Striping (lin. ft.) Added /Replaced 72 755 452,890 21,979 Pavement Markings (including reflective) 10 84 694 498 Parking Stalls 0 42 83 274 Curb Painting (Im. ft.) 1,191 1,950 14,470 73,418 Thermoplastic (Im. ft.) 609 0 32,001 14 Sign Posts Installed 25 15 202 244 Graffiti Graffiti Incidents Removed by Staff 18 17 226 166 Graffiti Incidents Removed by Contractor 70 1,077 524 2,281 Refuse Collection Residential (tons) 2,705 2,521 30,740 30,745 Liquid HazMat Incidents 16 12 277 206 E -Waste Incidents 9 14 159 203 U -Waste Incidents 18 7 146 118 Recyclables (tons) 1,128 1,106 12,859 13,016 Trees Trimmed by Staff 33 9 258 827 Trimmed by Contractor 1,907 1,561 10,925 10,386 Removed 1 29 135 125 Planted 0 13 78 114 Roots Pruned by Contractor 0 0 29 40 Roots Pruned by Staff 6 6 32 128 Automotive Repairs 199 262 2,681 3,067 Preventive Maintenance Completed 70 75 796 801 PM Labor Hours 178 193 1,933 1,789 Beach Maintenance Beach Area Refuse (tons) 99 86 1,113 1,110 Beach Debris (tons) 77 62 1,005 1,770 Sweeping/Storm Drain Gutter Miles Swept 3,247 4,109 39,516 47,531 Sweeping Debris (cubic yards) 398 485 5,333 5,683 Storm Drain Debris (cubic yards) 23 39 556 780